HomeMy WebLinkAboutContract 44676-A1-- -�
,�,;` ; ; �," i i�' �
ANFLNDMENT No . 1
WHEREAS, the
Associates, Inc.,
Contract No. 44676,
the 23rd day of July,
WHEREAS, the
following project:
TO CITY SECRETARY CONTRACT No
City of Fort Worth
(ENGINEER) made and
(the CONTRACT) which
2013 in the amount of
44676
(CITY) and Kimley-Horn ana
entered into City Secretary
as authorized M&C #C-26358 on
$ 422,850.00; and
CONTRACT involves engineering services for the
Caylor 5 Million Gallon Ground Storage Tank; and
WHEREAS, it has become necessary to execute Amendment No. 1 to the
CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement,
which amends the CONTRACT:
I�
Article I of the CONTRACT is amended to include the additional
engineering services specified in a proposal dated July 30, 2014, a copy
of which is attached hereto and incorporated herein. The cost to City
for the additional design services to be performed by Engineer totals
$143,200.00. (See Attached Funding Breakdown Sheet, Page -3-)
��
.
:�
�
—
.
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $566,050.00.
3.
All other provisions of the Contract, which are not
amended herein, shall remain in full force and effect.
EXECUTED and EFFECTIVE as of the date last writt
below.
City of Fort Worth
Professional Services Agreement Amendment Template
PMO Offlcial Release 8/1/2012
Page 1 of 3
expressly
• • •
t� � � s � �. � i.�i. �' ;�
"• T ", r t' �` '�• � '�' r� ;. .
3 �
r
� ;" � � . ,
,
APPROVED:
City of Fort Worth
Fernando Costa
Assistant City Manager
DATE: /� �/4
r��a
I�
Andrew T. Cronberg, �F. E.
Interim Director, Water Department
APPROVED AS TO FORM AND LEGALITY:
ATTEST:
Mary'J:"
City Sec
��
ary
� �� ��
���00000�a������
�
�o � `��
� � ��
� o�
�° ge
� o
�.�goo ov�
,��,�`��� 26 o G �L'UOO�
��'�� � v
• a_� "ti�
City of Fort Worth
Professional Se�vices Agreement Amendment Template
PMO Official Release 8/1/2012
Page 2 of 3
ENGINEER
Kimley-Horn and Associates,Inc.
�� �._-- / ' �- -
Gl enn A. Ga ry, P. E.
Senior Vice President
DATE : � - ��� I �
M&C:
Date:
C-2G�F�
�`` 7 ` 1 `/
!� '' : � =. . �. • �
r t
`r �' :.'
a.
Douglas W. Black
Assistant City Attorney
i � :• _ ��
Ci�y Secretary Y�To e 44 67 6
Amendment No. 1
Department Fund-Account-Center Amount
Water P265 531200 601180211130 $143,200.00
Total: $143,200.00
City of Fort Worth
Professional Services Agreement Amendment Template
PMO Official Release 8/1/2012
Page 3 of 3
'� �orn
�'�ai� J-� -� '� '` � ��
July 30, 2014
Ms. Farida Goderya, Ph.D., P.E.
Project Manager
Gity 4f Foi i Worth Watei� Department
1000 ihrockmorton
Foit Worth, TX 7601?
��: �ity of �ot� V�Jorth� �aylar 51VIG �racrnd Siarae�e iank
�rej�ct Nc�. P26?-607'1 S(3219?30/Ci�y Seer�er�ry Con�roc�'��X6�6
�lmenr�rner�� n 1-Adc�iiiorral �ervices — Property.�cquisifion, f�l�2fing, and C�r`f �iEe ��or�i7
INafer Design .
6CH� N6, 069098/99
Dear Farida:
As pari of the Site Evaluation report for this project, it was recommended by Kimley-Horn for the City
to purchase an adjacent site for construction of the 5 MG Ground Storage Tank (GSi). Subsequently,
this site was purchased by the City. This change from the original design intent of the project has
required additional services that were not included as part of aur Original Confract, These services
have been related to property acquisition and platting associated with the purchased site, as well as
off-site drainage design required to convey the overflow runoff from both the proposed and existing
tank sites. These services are further described below.
Propertv Acquisition
� The original scope of services assumed that ihe GST would be placed within the existing City
� property and stated that Propeity Acquisition would be considered Additional Services. Due to the
City's decision to acquire the additional site, Kimley-Horn performed services including meeting with
and coordinating with the property owners, determining site layout requirements to size the site and
performing preliminary grading analysis. In addition, Kimfey-Horn subcontracted surveying services to
Gorrondona & Associates, lnc. for preparation of the boundary and topographical survey needed to
appraise and finalize purchase of the property.
The additional amount requested for these services is $15,800.
(SBEFee: $7,000)
Plafiinp, Zoninq, and Gradinq Permit
Since the City purchased additional property which subsequently subdivided the adjacent property,
platting of fhe remainder tract and re-platting fhe acquired property to become part of the existing
Caylor Addition piat was required. The original scope of services stated that platting services would
be considered Additional Services. In addition to platting, additional services were required to
incorporate the newly acquired site into the Urban Forestry, iSWM requirements for approval of the
I�irf.�r��•j.i,,§,1��=�,.1?7,a� I .
_--_ "" "_ ". ___-� .
.FG f .
��, ii f;..ii � I� ���� i�) I�'� �� �� ���i i
f�•9rs. �arida Goderya, Ph. t7., P. E., July 3�; 201 �, Page '�
Grading Permit. Urban Forestry requirements include preparation of a Pai� I(existing) and Part 2
(proposed) si�e plan and canopy calculations to deiermine tree coverage in accordance with fhe City's
Tree Ordinance. In addition to the proposed site, the remainder site was required to be included in
the Conceptual a�id Preliminary iSWM checldisi applicafion for i�eview. Coordination is also required
to prepare an application for a Zoning Special Exception to present to the Zoning Board or
Adjustments for consideration.
The additional amount requested ior these services is $36,3�0.
(SBE Fee: $6,000)
�ff-Site Stormwaker �esiqn, �iddincl, and Construction Phas� Service�
The original contract did not include services associated with preparing Construction documents for
off-site stormwater improvements. During conceptual design for the GST, the City decided that due to
the proximity of development within the vicinify of the GST, not only ihe site drainage, but also the
pofential overFlow runoff should be conveyed through a storm drainage system. As part of the
conceptual design submittal, Kimley-Horn evaluated storm drainage altematives and projected
construction costs associated with each alternative.
Upon review of these alternatives with the City, it was dete��inined that approximately 3,000 linear feet
of 30 to 36-inch storm drain should be designed to oufflow to an existing drainage channel in a
downstream development. It is anticipated that these contract documents will consist oP 15 total plan
sheets (5 plan and profile) and specifications. These services will be performed in accordance with
Tasks 3(Preliminary Design) and 4(Final Design) of the Atfachment "A" Scope for Engineering
Design Related Services for Storm Water Improvements Projects as located on the City's Buzzsaw
sife.
� Additional Bid Phase services will be p�rformed to incorp�rate bidding th� storm drainage
improvements fogether with fhe GST plans and specifications as one project. These services will
require development of additional Division 01 General Requiremenfs, Division 33 Specifications, as
well as a Unit Price Bid Form for the storrnwater portion of the project, These services will be
performed in accordance with the terms described in TasK 5 of the Original Contract.
Addifional Construction Phase Services will be performed associated with the stormwater
construction related to Site Visits, Clarifications, Shop Drawings, Final Walk I hrough, and Record
Drawings in accordance with Taslc 6— Construction Phase Services of the Ori�inal Contract. i hese
services will include review of up to ten (10) shop drawings, response to up to three (3) r�quests for
information, and up to three (3) site visits during construction.
� I�� ,�'ttils;tir-lot�:l�'si1C_VI(fi I
The additional amount ��equested for these services is $9�,'i00.
(SBE Fee: $23, 000)
' _ =i
,i �; :� �7
�;.�:"� f�`t i A���� �1
�I`'_�� � ���:- �;f ��'� �'
:,
ll�lis. rarida Grderya, 1'I�.D., P.E.. July 3CJ; ���=i, F'aye 3
A iee summary of the s�ivices explained above is shown on ihe following table. Also included is a
10°/o i�arkup for the additional subconsultar�r services performed by Gorrondona &/�ssociates, Inc
{GAI) and V&A Engineering.
iask E�imley�Hd�n ��� F�� `�ofal �'ee
�e�
PropertyAcquisition $5,800 $7,000 �15,g00
Platting, Zoning, and Grading �30,300 $6,000 �36,300
Permit
Off-Site Stormwater Design �68,100 �23,000 $91,100
Amendrnent No. 9 TOTAL $107,200 $36,000 �143,200
Original Contraci '�otal
�evise�i �ontract Total
$4�2,SS0
$566,050
A partion of th�se services will he performed by SBE subconsultants. Our SBE participation
percentage for this project is 25.0%.
We appreciate the opportunity to be of continued service to the City. Please contact us if we need to
provide any further information.
Very truly yours,
KIMLEY-HORN AND ASSOCIATES, INC.
Texas Registration No, F-928
, !..- — "� _� �
Glenn A. Gary, P.E.
Senior Vice President
J RT/jrt
U1F7WFPO1lDatalP�ojectlFT1N Utiliti=_s10 61 01 811 31PPPlAmendmenl#1�OraftllAmendl Addsvcrequ2st_Fnal_Revislon2.Doc
�� �l,k� [�p �
, I:�t r��� .�(!j�ir.�_c%7Se' 1. !t IIA�Yi�i"���Itll iM`�-� �I�( �1—'h'1a 1�E�if i, f3�.�ni'7� l�Il-:rlK.-,:Sk �~ ��Iy d'��'� ��i �{_����2�'�,�
— '_ ' — 12� �i -..�•�'- -�
.,
� �oo
F�- .-�i m m
� � �
0
c a
`�° o o `y
1-a- O O� O N
p � I� l� nl �D
� F- �n �n K y
�
�
w m
o � o 0
� � � m .
m m <n .n
m iy
a I (I+?I �
�,) v
> �
N O
O �
"� a
o �
Z �
c 1O
w
E o 0 0 �
c c � � co
� � v^i v�i `i
E o N
« a �
N �
`o � N .-�
� � a m o >
r v � ` � �
I�i Im0 z L ry ��"
p O�, X E U' �
.T+ N U W 3
(J a �
C
7
O
�
C7 �
� U
N
O
>
R
U
�
W
� � M O
C X �v�Tt�R
O W
S
?
d
Y p 0 O O
.n O O V
J � N lm0
� i/T [/T
�E
`w v�
a o.
m�
c �
v o0
m—
c7°�
�
c v �
o c ai
- m �
�� � E
6 '
Q �O O
> h
� � N
� Y �
d
p � �a
n. n. O
����� Kimley-Horn
r�__ � _r�.-� • and Associates, Inc.
� --- �
Project Workplan Budget
Client: Fort Worth
Project: Caylor - Amendment #1
KHA No. 061018119
PM: Jeni Tatum
Task No.ITask Name
710 GAI-Bounary/Topo Survey
711 GAI-Platting
712 GAI-Off-Site Storm Drain S
715 Blackstone En4ineerinp
Labor:
Expenses:
OTAL:
CJ
0
- Church Site
100,400
42,800
143,200
Fee Type: CP
Expense Mult: 1.10
Allocation: 0.0%
�
—�
—�
� ' �
Cost
2,400
7, 000
6, 000
16,800
3.800
:�I�l
�udget �umnnary
Date: Jul 2, 2014
«` Fix. Mult.
�" - Schedule:
Mult
lier
1.10
1.10
1.10
1.10
1.10
Subtotal
$ 2,700
$ 7,700
$ 6,600
$ 18,500
$ 4,200
$ 39,700
Page 2 of 7
\\FTWFP01\Data\ProjectlFTW_Utilities\061018119\PPP�Amendment#1\Draft1\Workplan-Caylor-Amendment#1.xlsm Printed:7/2/2014,10:1GAM
City of Fort Worth, Texas
Mayor and Council Communication
COUNCIL ACTION: Approved on 9/9/2014
DATE: Tuesday, September 09, 2014 REFERENCE NO.: **C-26963
LOG NAME: 60CAYLOR GST DESIGN ENG AMENDI—KHA
SUB.TECT:
Authorize Execution of Amendment No. 1 to City Secretary Contract No. 44676 with Kimley—Horn and
Associates, Inc., in the Amount of $143,200.00 for the Design of the Caylar 5 Million Gallon Ground Storage
Tank, Thereby Increasing the Total Contract Cost to $566,050.00 (COUNCIL DISTRICT 7)
RECOMMENDATION:
It is recommended that the City Council authorize execution of Amendment No. 1 to City Secretary Contract
No. 44676 with Kimley—Horn and Associates, Inc., in the amount of $143,200.00 for the design of the
Caylor 5 million gallon ground storage tanlc, thereby increasing the contract cost to $566,050.00.
�Y�lil�
On July 23, 2013, (M&C C-26358), the City Council authorized the execution of an Engineering Agreement
with Kimley—Horn and Associates, Inc., in the amount of $422,850.00, for the design of the Caylor 5 Million
Gallon (MG) Ground Storage Tanlc (GST).
Amendment No. 1 will cover additional design engineering items requued for the completion of the project
documents. During the site evaluation, it was determined that the purchase of an adjacent site will be the cost
effective option for the proposed second tanlc. Also, the Fort Worth Water Department decided that due to the
proximity of existing residential development within the vicinity of the GST, the site drainage as well as the
potential overflow runoff needs to be conveyed through an appropriate storm drainage system. This change
from the original design intent required additional services including property acquisition, platting, off—site
drainage design to convey the overflow from both the proposed and existing tanlc sites, as well as additional
survey and associated minor design improvements.
M/WBE Office — Kimley—Horn and Associates, Inc., agrees to maintain its initial SBE commitment of 25
percent that it made on the original Agreement and extend and maintain that same SBE commitment of 25
percent to this Amendment No. 1. Therefore, Kimley—Horn and Associates, Inc., remains in compliance with
the City's BDE Ordinance and attests to its commitment by its signature on the Acceptance of Previous SBE
Commitment form executed by an authorized representative of its company.
This project serves the entire City and is located in COUNCIL DISTRICT 7, Mapsco 234 B-1.
FISCAL INFORMATION:
The Financial Management Services Director certifies that funds are available in the current capital budget,
as appropriated, of the Water Capital Projects Fund.
FUND CENTERS:
TO FundlAccountlCenters FROM FundlAccount/Centers