Loading...
HomeMy WebLinkAboutContract 44489, ! � ; .: �, ,1 CITY OF FORT WORTH, TEXAS STANDARD AGREEMENT FOR ENGINEERING RELATED DESIGN SERVICES This AGREEMENT is between the City of Fort Worth, a Texas home-rule municipality (the "CITY"), and CMJ engineering, Inc., authorized to do business in Texas (the "ENGINEER"), for a PROJECT generally described as: Provide Construction Materials Testing Services for the new Fire and Police Training Center (new Public Safety Training Center) in Fort Worth. Article I Scope of Services A. Scope of Services is set forth in Attachment A. Article II Compensation A. The ENGINEER'S compensation ($321,855.00) is set forth in Attachment A. Article III Terms of Payment Payments to the ENGINEER will be made as follows: A. Invoice and Payment (1) The Engineer shall provide the City sufficient documentation, including but not limited to meeting the requirements set forth in Attachment A to this AGREEMENT, to reasonably substantiate the invoices. (2) The ENGINEER will issue monthly invoices for all work performed under this AGREEMENT. Invoices are due and payable within 30 days of receipt. (3) Upon completion of services enumerated in Article I, the final payment of any balance will be due within 30 days of receipt of the final invoice. (4) In the event of a disputed or contested billing, only that portion so contested will be withheld from payment, and the undisputed portion will be paid. The CITY will exercise reasonableness in contesting an bill � ortion thereof. No interest will accrue on any contest portion of the bI'_II� until ra���� �Q,��: ��� £��G r.,vr `��� M "t� `����� �l'���5 �. � � � 9fl ���FY 411� ��� i �• q A Construction Materials Testing Services for Public Safety Training Center (May 2013) CMJ Engineering, Inc. 16 ����IVE� MAY 3 U ZU13 mutually resolved. (5) If the CITY fails to make payment in full to ENGINEER for billings contested in good faith within 60 days of the amount due, the ENGINEER may, after giving 7 days' written notice to CITY, suspend services under this AGREEMENT until paid in full. In the event of suspension of services, the ENGINEER shall have no liability to CITY for delays or damages caused the CITY because of such suspension of services. Article IV Obligations of the Engineer Amendments to Article IV, if any, are included in Attachment B. A. General The ENGINEER will serve as the CITY'S professional engineering representative under this Agreement, providing professional engineering consultation and advice and furnishing customary services incidental thereto. B. Standard of Care The standard of care applicable to the ENGINEER'S services will be the degree of skill and diligence normally employed in the State of Texas by professional engineers or consultants perForming the same or similar services at the time such services are performed. C. Subsurface Investigations (1) The ENGINEER shall advise the CITY with regard to the necessity for subcontract work such as special surveys, tests, test borings, or other subsurface investigations in connection with design and engineering work to be performed hereunder. The ENGINEER shall also advise the CITY concerning the results of same. Such surveys, tests, and investigations shall be furnished by the CITY, unless otherwise specified in Attachment A. (2) In soils, foundation, groundwater, and other subsurface investigations, the actual characteristics may vary significantly befinreen successive test points and sample intervals and at locations other than where observations, exploration, and investigations have been made. Because of the inherent uncertainties in subsurface evaluations, changed or unanticipated underground conditions may occur that could affect the total PROJECT cost and/or execution. These Construction Materials Testing Services for Public Safety Training Center (May 2013) CMJ Engineering, Inc. Page 2 of 16 conditions and cost/execution effects are not the responsibility of the ENGINEER. � E. Preparation of Engineering Drawings The ENGINEER will provide to the CITY the original drawings of all plans in ink on reproducible Mylar sheets and electronic files in .pdf format, or as otherwise approved by CITY, which shall become the property of the CITY. CITY may use such drawings in any manner it desires; provided, however, that the ENGINEER shall not be liable for the use of such drawings for any project other than the PROJECT described herein. Engineer's Personnel at Construction Site (1) The presence or duties of the ENGINEER'S personnel at a construction site, whether as on-site representatives or otherwise, do not make the ENGINEER or its personnel in any way responsible for those duties that belong to the CITY and/or the CITY'S construction contractors or other entities, and do not relieve the construction contractors or any other entity of their obligations, duties, and responsibilities, including, but not limited to, all construction methods, means, techniques, sequences, and procedures necessary for coordinating and completing all portions of the construction work in accordance with the Contract Documents and any health or safety precautions required by such construction work. The ENGINEER and its personnel have no authority to exercise any control over any construction contractor or other entity or their employees in connection with their work or any health or safety precautions. (2) Except to the extent of specific site visits expressly detailed and set forth in Attachment A, the ENGINEER or its personnel shall have no obligation or responsibility to visit the construction site to become familiar with the progress or quality of the completed work on the PROJECT or to determine, in general, if the work on the PROJECT is being performed in a manner indicating that the PROJECT, when completed, will be in accordance with the Contract Documents; nor shall anything in the Contract Documents or the agreement between CITY and ENGINEER be construed as requiring ENGINEER to make exhaustive or continuous on-site inspections to discover latent defects in the work or otherwise check the quality or quantity of the work on the PROJECT. If the ENGINEER makes on-site observation(s) of a deviation from the Contract Documents, the ENGINEER shall inform the CITY. (3) When professional certification of performance or characteristics of materials, systems or equipment is reasonably required to perform the services set forth in the Scope of Services, the ENGINEER shall be entitled Construction Materials Testing Services for Public Safety Training Center (May 2013) Page 3 of 16 CMJ Engineering, Inc. to rely upon such certification to establish materials, systems or equipment and performance criteria to be required in the Contract Documents. F. Opinions of Probable Cost, Financial Considerations, and Schedules (1) The ENGINEER shall provide opinions of probable costs based on the current available information at the time of preparation, in accordance with Attachment A. (2) In providing opinions of cost, financial analyses, economic feasibility projections, and schedules for the PROJECT, the ENGINEER has no control over cost or price of labor and materials; unknown or latent conditions of existing equipment or structures that may affect operation or maintenance costs; competitive bidding procedures and market conditions; time or quality of performance by third parties; quality, type, management, or direction of operating personnel; and other economic and operational factors that may materially affect the ultimate PROJECT cost or schedule. Therefore, the ENGINEER makes no warranty that the CITY'S actu�l PROJECT costs, financial aspects, economic feasibility, or schedules will not vary from the ENGINEER'S opinions, analyses, projections, or estimates. G. Construction Progress Payments Recommendations by the ENGINEER to the CITY for periodic construction progress payments to the construction contractor will be based on the ENGINEER'S knowledge, information, and belief from selective sampling and observation that the work has progressed to the point indicated. Such recommendations do not represent that continuous or detailed examinations have been made by the ENGINEER to ascertain that the construction contractor has completed the work in exact accordance with the Contract Documents; that the final work will be acceptable in all respects; that the ENGINEER has made an examination to ascertain how or for what purpose the construction contractor has used the moneys paid; that title to any of the work, materials, or equipment has passed to the CITY free and clear of liens, claims, security interests, or encumbrances; or that there are not other matters at issue between the CITY and the construction contractor that affect the amount that should be paid. H. Record Drawings Record drawings, if required, will be prepared, in part, on the basis of information compiled and furnished by others, and may not always represent the exact location, type of various components, or exact manner in which the PROJECT was finally constructed. The ENGINEER is not responsible for Construction Materials Testing Services for Public Safety Training Center (May 2013) Page 4 of 16 CMJ Engineering, Inc. any errors or omissions in the information from others that is incorporated into the record drawings. I. Small Business Enterprise (SBE) Participation This paragraph is waived for this agreement. J. Right to Audit (1) ENGINEER agrees that the CITY shall, until the expiration of five (5) years after final payment under this contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers and records of the ENGINEER involving transactions relating to this contract. ENGINEER agrees that the CITY shall have access during normal working hours to all necessary ENGINEER facilities and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this section. The CITY shall give ENGINEER rsasonable advance notice of intended audits. (2) ENGINEER further agrees to include in all its subcontractor agreements hereunder a provision to the effect that the subcontractor agrees that the CITY shall, until the expiration of five (5) years after final payment under the subcontract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers and records of such subcontractor, involving transactions to the subcontract, and further, that the CITY shall have access during normal working hours to all subcontractor facilities, and shall be provided adequate and appropriate work space, in order to conduct audits in compliance with the provisions of this article together with subsection (3) hereof. CITY shall give subcontractor reasonable advance notice of intended audits. (3) ENGINEER and subcontractor agree to photocopy such documents as may be requested by the CITY. The CITY agrees to reimburse ENGINEER for the cost of copies at the rate published in the Texas Administrative Code in effect as of the time copying is perFormed. K. Insurance (1) ENGINEER'S INSURANCE a. Commercial General Liability — the ENGINEER shall maintain commercial general liability (CGL) and, if necessary, commercial umbrella insurance with a limit of not less than $1,000,000.00 per each occurrence with a $2,000,000.00 aggregate. If such Commercial General Liability insurance contains a general aggregate limit, it shall apply separately to this PROJECT or location. Construction Materials Testing Services for Public Safety Training Center (May 2013) Page 5 of 16 CMJ Engineering, Inc. The CITY shall be included as an insured under the CGL, using ISO additional insured endorsement or a substitute providing equivalent coverage, and under the commercial umbrella, if any. This insurance shall apply as primary insurance with respect to any other insurance or self-insurance programs afforded to the CITY. The Commercial General Liability insurance policy shall have no exclusions by endorsements that would alter or nullify: premises/operations, products/completed operations, contractual, personal injury, or advertizing injury, which are normally contained within the policy, unless the CITY approves such exclusions in writing. ii. ENGINEER waives all rights against the CITY and its agents, officers, directors and employees for recovery of damages to the extent these damages are covered by the commercial general liability or commercial umbrella liability insurance maintained in accordance with this agreement. b. Business Auto - the ENGINEER shall maintain business auto liability and, if necessary, commercial umbrella liability insurance with a limit of not less than $1,000,000 each accident. Such insurance shall cover liability arising out of "any auto", including owned, hired, and non-owned autos, when said vehicle is used in the course of the PROJECT. If the engineer owns no vehicles, coverage for hired or non-owned is acceptable. ENGINEER waives all rights against the CITY and its agents, officers, directors and employees for recovery of damages to the extent these damages are covered by the business auto liability or commercial umbrella liability insurance obtained by ENGINEER pursuant to this agreement or under any applicable auto physical damage coverage. c. Workers' Compensation - ENGINEER shall maintain workers compensation and employers liability insurance and, if necessary, commercial umbrella liability insurance with a limit of not less than $100,000.00 each accident for bodily injury by accident or $100,000.00 each employee for bodily injury by disease, with $500,000.00 policy limit. ENGINEER waives all rights against the CITY and its agents, officers, directors and employees for recovery of damages to the extent these damages are covered by workers compensation and employer's liability or commercial umbrella insurance obtained by ENGINEER pursuant to this agreement. Construction Materials Testing Services for Public Safety Training Center (May 2013) Page 6 of 16 CMJ Engineering, Inc. d. Professional Liability — the ENGINEER shall maintain professional liability, a claims-made policy, with a minimum of $1,000,000.00 per claim and aggregate. The policy shall contain a retroactive date prior to the date of the contract or the first date of services to be perFormed, whichever is earlier. Coverage shall be maintained for a period of 5 years following the completion of the contract. An annual certificate of insurance specifically referencing this project shall be submitted to the CITY for each year following completion of the contract. (2) GENERAL INSURANCE REQUIREMENTS a. Certificates of insurance evidencing that the ENGINEER has obtained all required insurance shall be delivered to the CITY prior to ENGINEER proceeding with the PROJECT. b. Applicable policies shall be endorsed to name the CITY an Additional Insured thereon, as its interests may appear. The term CITY shall include its employees, officers, officials, agents, and volunteers as respects the contracted services. c. Certificate(s) of insurance shall document that insurance coverage specified in this agreement are provided under applicable policies documented thereon. d. Any failure on part of the CITY to requesl required insurance documentation shall not constitute a waiver of the insurance requirements. e. A minimum of thirty (30) days notice of cancellation or material change in coverage shall be provided to the CITY. A ten (10) days notice shall be acceptable in the event of non-payment of premium. Such terms shall be endorsed onto ENGINEER'S insurance policies. Notice shall be sent to the respective Department Director (by name), City of Fort Worth, 1000 Throckmorton, Fort Wortn, Texas 76102. f. Insurers for all policies must be authorized to do business in the State of Texas and have a minimum rating of A:V or greater, in the current A.M. Best Key Rating Guide or have reasonably equivalent financial strength and solvency to the satisfaction of Risk Management. g. Any deductible or self insured retention in excess of $25,000.00 that would change or alter the requirements herein is subject to approval by the CITY in writing, if coverage is not provided on a first-dollar basis. The CITY, at it sole discretion, may consent to alternative coverage maintained through insurance pools or risk retention groups. Dedicated financial resources or letters of credit may also be acceptable to the Construction Materials Testing Services for Public Safety Training Center (May 2013) Page 7 of 16 CMJ Engineering, Inc. CITY. h. Applicable policies shall each be endorsed with a waiver of subrogation in favor of the CITY as respects the PROJECT. The CITY shall be entitled, upon its request and without incurring expense, to review the ENGINEER'S insurance policies including endorsements thereto and, at the CITY'S discretion; the ENGINEER may be required to provide proof of insurance premium payments. j. Lines of coverage, other claims-made basis, shall prior to the date of the insurance shall state both claims-made. than Professional Liability, underwritten on contain a retroactive date coincident with contractual agreement. The certificate the retroactive date and that the coverage � or of is k. Coverages, whether written on an occurrence or claims-made basis, shall be maintained without interruption nor restrictive modification or changes from date of commencement of the PROJECT until final payment and termination of any coverage required to be maintained after final payments. The CITY shall not be responsible for the direct payment of any insurance premiums required by this agreement. L. M. m. Subcontractors to/of the ENGINEER shall be required by the ENGINEER to maintain the same or reasonably equivalent insurance coverage as required for the ENGINEER. When sub subcontractors maintain insurance coverage, ENGINEER shall provide CITY with documentation thereof on a certificate of insurance. Independent Engineer The ENGINEER agrees to perform all services as an indepencient ENGINEER and not as a subcontractor, agent, or employee of the CITY. Disclosure The ENGINEER acknowledges to the CITY that it has made full disclosure in writing of any existing conflicts of interest or potential conflicts of interest, including personal financial interest, direct or indirect, in property abutting the proposed PROJECT and business relationships with abutting property cities. The ENGINEER further acknowledges that it will make disclosure in writing of any conflicts of interest that develop subsequent to the signing of this contract and prior to final payment under the contract. Construction Materials Testing Services for Public Safety Training Center (May 2013) Page 8 of 16 CMJ Engineering, Inc. N. Asbestos or Hazardous Substances (1) If asbestos or hazardous substances in any form are encountered or suspected, the ENGINEER will stop its own work in the affected portions of the PROJECT to permit testing and evaluation. (2) If asbestos or other hazardous substances are suspected, the CITY may request the ENGINEER to assist in obtaining the services of a qualified subcontractor to manage the remediation activities of the PROJECT. O. Permitting Authorities - Design Changes If permitting authorities require design changes so as to comply with published design criteria and/or current engineering practice standards which the ENGINEER should have been aware of at the time this Agreement was executed, the ENGINEER shall revise plans and specifications, as required, at its own cost and expense. However, if design changes are required due to the changes in the permitting authorities' published design criteria and/or practice standards criteria which are published after the date of this Agreement which the ENGINEER could not have been reasonably aware of, the ENGINEER shall notify the CITY of such changes and an adjustment in compensation will be made through an amendment to this AGREEMENT. P. Schedule ENGINEER shall manage the PROJECT in accordance with the schedule developed per Attachment A to this AGREEMENT. Article V Obligations of the City Amendments to Article V, if any, are included in Attachment B. A. City-Furnished Data ENGINEER may rely upon the accuracy, timeliness, and completeness of the information provided by the CITY. B. Access to Facilities and Property The CITY will make its facilities accessible to the ENGINEER as required for the ENGINEER'S perFormance of its services. The CITY will perform, at no cost to the ENGINEER, such tests of equipment, machinery, pipelines, and Construction Materials Testing Services for Public Safety Training Center (May 2013) CMJ Engineering, Inc. Page 9 of 16 other components of the CITY'S facilities as may be required in connection with the ENGINEER'S services. The CITY will be responsible for all acts of the CITY'S personnel. C. Advertisements, Permits, and Access Unless otherwise agreed to in the Scope of Services, the CITY will obtain, arrange, and pay for all advertisements for bids; permits and licenses required by local, state, or federal authorities; and land, easements, rights- of-way, and access necessary for the ENGINEER'S services or PROJECT construction. D. Timely Review The CITY will examine the ENGINEER'S studies, reports, sketches, drawings, specifications, proposals, and other documents; obtain advice of an attorney, insurance counselor, accountant, auditor, bond and financial advisors, and other consultants as the CITY deems appropriate; and render in writing decisions required by the CITY in a timely manner in accordance with the project schedule prepared in accordance with Attachment A. E. Prompt Notice The CITY will give prompt written notice to the ENGINEER whenever CITY observes or becomes aware of any development that affects the scope or timing of the ENGINEER'S services or of any defect in the work of the ENGINEER or construction contractors. F. Asbestos or Hazardous Substances Release. (1) CITY acknowledges ENGINEER will perform part of the work at CITY'S facilities that may contain hazardous materials, including asbestos containing materials, or conditions, and that ENGINEER had no prior role in the generation, treatment, storage, or disposition of such materials. In consideration of the associated risks that may give rise to claims by third parties or employees of City, City hereby releases ENGINEER from any damage or liability related to the presence of such materials. (2) The release required above shall not apply in the event the discharge, release or escape of hazardous substances, contaminants, or asbestos is a result of ENGINEER'S negligence or if ENGINEER brings such hazardous substance, contaminant or asbestos onto the project. G. Contractor Indemnification and Claims Construction Materials Testing Services for Public Safety Training Center (May 2013) Page 10 of 16 CMJ Engineering, Inc. The CITY agrees to include in all construction contracts the provisions of Article IV.E. regarding the ENGINEER'S Personnel at Construction Site, and provisions providing contractor indemnification of the CITY and the ENGINEER for contractor's negligence. H. Contractor Claims and Third-Party Beneficiaries (1) The CITY agrees to include the following clause in all contracts with construction contractors and equipment or materials suppliers: "Contractors, subcontractors and equipment and materials suppliers on the PROJECT, or their sureties, shall maintain no direct action against the ENGINEER, its officers, employees, and subcontractors, for any claim arising out of, in connection with, or resulting from the engineering services perFormed. Only the CITY will be the beneficiary of any undertaking by the ENGINEER." (2) This AGREEMENT gives no rights or benefits to anyone other than the CITY and the ENGINEER and there are no third-party beneficiaries. (3) The CITY will include in each agreement it enters into with any other entity or person regarding the PROJECT a provision that such entity or person shall have no third-party beneficiary rights under this Agreement. (4) Nothing contained in this section V.H. shall be construed as a waiver of any right the CITY has to bring a claim against ENGINEER. I. City's Insurance (1) The CITY may maintain property insurance on certain pre-existing structures associated with the PROJECT. (2) The CITY will ensure that Builders Risk/Installation insurance is maintained at the replacement cost value of the PROJECT. The CITY may provide ENGINEER a copy of the policy or documentation of such on a certificate of insurance. (3) The CITY will specify that the Builders Risk/Installation insurance shall be comprehensive in coverage appropriate to the PROJECT risks. J. Litigation Assistance The Scope of Services does not include costs of the ENGINEER for required or requested assistance to support, prepare, document, bring, defend, or assist in litigation undertaken or defended by the CITY. In the event CITY Construction Materials Testing Services for Public Safety Training Center (May 2013) Page 11 of 16 CMJ Engineering, Inc. requests such services of the ENGINEER, this AGREEMENT shall be amended or a separate agreement will be negotiated between the parties. K. Changes The CITY may make or approve changes within the general Scope of Services in this AGREEMENT. If such changes affect the ENGINEER'S cost of or time required for perFormance of the services, an equitable adjustment will be made through an amendment to this AGREEMENT with appropriate CITY approval. Article VI General Legal Provisions Amendments to Article VI, if any, are included in Attachment B. A. Authorization to Proceed ENGINEER shall be authorized to proceed with this AGREEMENT upon receipt of a written Notice to Proceed from the CITY. B. Reuse of Project Documents All designs, drawings, specifications, documents, and other work products of the ENGINEER, whether in hard copy or in electronic form, are instruments of service for this PROJECT, whether the PROJECT is completed or not. Reuse, change, or alteration by the CITY or by others acting through or on behalf of the CITY of any such instruments of service without the written permission of the ENGINEER will be at the CITY's sole risk. The CITY shall own the final designs, drawings, specifications and documents. C. Force Majeure The ENGINEER is not responsible for damages or delay in performance caused by acts of God, strikes, lockouts, accidents, or other events beyond the control of the ENGINEER that prevent ENGINEER's performance of its obligations hereunder. D. Termination (1) This AGREEMENT may be terminated only by the City for convenience on 30 days' written notice. This AGREEMENT may be terminated by either the CITY or the ENGINEER for cause if either party fails substantially to perForm through no fault of the other and does not commence correction of such nonperformance with in 5 days of written Construction Materials Testing Services for Public Safety Training Center (May 2013) Page 12 of 16 CMJ Engineering, Inc. notice and diligently complete the correction thereafter. (2) If this AGREEMENT is terminated for the convenience of the City, the ENGINEER will be paid for termination expenses as follows: a.) Cost of reproduction of partial or complete studies, plans, specifications or other forms of ENGINEER'S work product; b.) Out-of-pocket expenses for purchasing electronic data files and other data storage supplies or services; c:) The time requirements for the ENGINEER'S personnel to document the work underway at the time of the CITY'S termination for convenience so that the work effort is suitable for long time storage. E. F. G. � (3) Prior to proceeding with termination services, the ENGINEER will submit to the CITY an itemized statement of all termination expenses. The CITY'S approval will be obtained in writing prior to proceeding with termination services. Suspension, Delay, or Interruption to Work The CITY may suspend, delay, or interrupt the services of the ENGINEER for the convenience of the CITY. In the event of such suspension, delay, or interruption, an equitable adjustment in the PROJECT'S schedule, commitment and cost of the ENGINEER'S personnel and subcontractors, and ENGINEER'S compensation will be made. Indemnification In accordance with Texas Local Government Code Se ENGINEER shall indemnify, hold harmless, and defend liability for any damage caused by or resulting from an intentional tort, intellectual property infringement, or subcontractor or supplier committed by the ENGINEE agent, consultant under contract, or another entity ENGINEER exercises control. Assignment ction 271.904, the the CITY against act of negligence, failure to pay a R or ENGINEER'S over which the Neither party shall assign all or any part of this AGREEMENT without the prior written consent of the other party. Interpretation Construction Materials Testing Services for Public Safety Training Center (May 2013) Page 13 of 16 CMJ Engineering, Inc. Limitations on liability and indemnities in this AGREEMENT are business understandings between the parties and shall apply to all the different theories of recovery, including breach of contract or warranty, tort including negligence, strict or statutory liability, or any other cause of action, except for willful misconduct or gross negligence for limitations of liability and sole negligence for indemnification. Parties mean the CITY and the ENGINEER, and tneir officers, employees, agents, and subcontractors. I. Jurisdiction The law of the State of Texas shall govern the validity of this AGREEMENT, its interpretation and perFormance, and any other claims related to it. The venue for any litigation related to this AGREEMENT shall be Tarrant County, Texas. J. Severability and Survival If any of the provisions contained in this AGREEMENT are held for any reason to be invalid, illegal, or unenforceable in any respect, such invalidity, illegality, or unenforceability will not affect any other provision, and this AGREEMENT shall be construed as if such invalid, illegal, or unenforceable provision had never been contained herein. Articles V.F., VI.B., VI.D., VI.F., VI.H., and VI.I. shall survive termination of this AGREEMENT for any cause. K. Observe and Comply ENGINEER shall at all times observe and comply with all federal and State laws and regulations and with all City ordinances and regulations which in any way affect this AGREEMENT and the work hereunder, and shall observe and comply with all orders, laws ordinances and regulations which may exist or may be enacted later by governing bodies having jurisdiction or authority for such enactment. No plea of misunderstanding or ignorance thereof shall be considered. ENGINEER agrees to defend, indemnify and hold harmless CITY and all of its officers, agents and employees from and against all claims or liability arising out of the violation of any such order, law, ordinance, or regulation, whether it be by itself or its employees. Article VII Attachments, Schedules, and Signatures This AGREEMENT, including its attachments and schedules, constitutes the entire AGREEMENT, supersedes all prior written or oral understandings, and may only be changed by a written amendment executed by both parties. The following attachments and schedules are hereby made a part of this AGREEMENT: Construction Materials Testing Services for Public Safety Training Center (May 2013) Page 14 of 16 CMJ Engineering, Inc. Attachment A- Scope of Services, Compensation, and Schedule Attachment B- Amendments to Standard Agreement for Engineering Services Executed and effective this the ��day of , 20 (� � ATTEST: �_,y �� CITY OF FORT WORTH: By: '� ..-. �//i i�, _ �,�.�� - City Secretary 0 APPROVED AS TO FORM AN By: r t,��t < Gr.c l.d,l /'�f �- 1'�- v�� ����� �•-�1�614- m'� c h z 11.� K.� R- �, ,� Assistant City Attorney M&C No.: G26219 M&C Date: Mav 7, 2013 'AL RECOMMENDED: By: �� � h Dougla . Wiersig, PE Directo ransportation ar Public Works Department EN By: Principal Construction Materials Testing Services for Public Safety Training Center (May 2013) CMJ Engineering, Inc. rnando Costa sistant City Manager _ � i _ (. � r� , •� !'� i F�} �'-�'"� � i;1� �j�/`!. ..e' of 16 ATTACHMENT A- SCOPE OF SERVICES, COMPENSATION, SCHEDULE Refer to the attached CMJ Engineering, Inc. letter dated March 14, 2013, subject: Cost Estimate, Construction Materials Testing Services for Fire and Police Training Center, Fort Worth, Texas. If any conflict arises between the Attachments/Exhibits and the Agreement, the terms of the Agreement shall control. ATTACHMENT B- AMENDMENTS TO AGREEMENT NONE Construction Materials Testing Services for Public Safety Training Center (May 2013) Page 16 of 16 CMJ Engineering, Inc. � b ,�, ` � _ - _ �, _ E � _ y _��;_ 7636 Pebble Drive Foxt Worth, Texas 7G1I8 wwsv cmjengr.co�n Cost Estimate No,:13-047C March 14, 2013 City of Fort Worth Transportation � Public Works Attn: Jack Durham, Construction Superintendent 1000 Throckmorton Street Fort Worfh, TX 76102 email: jack.durham@fortworthtexas.gov COST ESTIMATE GONSTRUCTION MATERIALS TESTING SERVICES FOR FIRE AND POLICE TRAINWG CENTER FORT WORT�i, TEXAS Dear Mr. Durham, We are pleased to submit this proposal for providing construction materials engineering services on the above referenced prajec4. �cope of Work Our scope of service is based on our conversation regarding the subrnitted project testing quantities, testing needs and our experience on simi(ar projects. We propose to serve this project on a call out, as needed basis. Earthwork Laboratory testing of existing subgrade, fill, backfill and stabiliz�d pavement subgrade materials; in-place moisture/density testing of same. In-place sieve analysis of stabilized pavement subgrade, Drilled Piers Full time excavation observaiion, reinforcing steel insp�ction and concrefe testing and inspection. Cast-In-Place Concrete Pre�concrete placement reinforcing steel inspection, Orrsite placement inspection to include slump, fiemp�raiure, entrained air confent and molding of test cylind�r�. curing and testing of cylinders. Structural Steel On-site visual inspection and testing Welding Inspector, on-site ultrasonic Desfructive festing technician. and testing Laboratory of field welded and bolted connections by AWS Certified testing of fufl-penetration welds by ANSI Certified Non- -- �� --- — CMJ ENGINEERING, INC. City of Fort Worth Transportation & Public Worl<s Fire and Police Training Center Fort Worth, TX Page 2 Cost Estimate No. 13-047C March 14, 2013 Proiect Budqet Based upon our understanding of your needs, we have taken the submitted testing quantities and extrapolated a reasonable distribufion of the same with adjustments to the number of proctors and lime series. All fees for services perFormed which do not appear on the budget atfachment will be based on the city's standard fee schedule. The final charges wili be a function of the total services performed. No additional tests or inspections have been included for work failing fo meet project specifications. All charges for laboratory services are F.O.B. our laboratory. Invoices wiii be submitted for these services on a monthly basis. These will be due and payable upon receipt. Closin CMJ Engineering, Inc. appreciates the opportunity fo submit this proposal. Respectfully, CMT ENGINEERING, INC. R. Carl Lee, S.E,T. Executive Vice President ' • • •'�� - � ; ._, ,. _ ' � _ � � � - . - : :� •��1 • •. ..• " � � �-- :•• �' � • • Cost Estimate No, 13-047C March 14, 2013 � � � • � - . . - , �. : a ,� �� - �� . • � � - � _ � �'; �arthwork pH Lime Series (Eades and Grim Method) Moisiure/Densify Relafions (ASTM D698) Liquid & Plasfic Limit (ASTM D4318-B) Liquid & Plasfic Limits - Additive Material Sampling Technician (Min. 3 hours/trip) Earthwork Technician (First 1.5 hours) Earthwork Technician (Additional Hours) Vehicle Trip Charge Estimated Total for Earthwork Services: Pier Inspection Engineering Technician for Pier Inspections Vehicle Trip Charge Concrete Inspeciion Concrete Test Cylinders (ASTM C31/39) Concrete Technician (Min. 3 hours/trip) Concrete Technician Overtime Vehicle Trip Charge Esiimafed Total for Concrete inspection Services: Structural Sieel Observation Structural Steel Inspection by CWI (Min. 4 hours/trip) Vehicle Trip Charge Estimated Tofal for Structurai Steel Services: Estimated Total for Above Testing and Inspection Services: � 3 12 8 4 15 237 1900 237 2000 1900 950 235 160 20 $ 32,000.00 $ 76,000.00 $ 54,150.00 $ 8,225.00 $ 170,375.00 hour $ 10,400.00 trip $ 700.00 $ 11,100.00 $ 321,855.00 Note: Overtime rates of 1,5 times the regular hourly rate wiil be charged for hours worked over eight (8) hours per day. All fab and field services performed on Saturday or Sunday, will be billed at 1.5 times the regular rate. Ail services performed on recognized holidays will be billed at 1.5 times ihe regular rafe. � . 210.00 150.00 50.00 55.00 42. 00 165.00 47.00 35.00 � 50.00 35.00 __ � _ each each each each hour hour each trip hour trip $ 630.00 $ 1,800.00 $ 400.00 $ 220.00 $ 630.00 $ 39,105.00 $ 89,300.00 $ 8,295.00 $ 140,380.00 $ 16.00 each $ 40.OQ hour $ 57.00 each $ 35.OQ trip $ 65.00 $ 35.00 City of Fort Worth, Texas Mayor and Council Communication ' COUNCIL ACTION; ; Approved on 5/7/2013 DATE: Tuesday, May 07, 2013 LOG NAME: 06PSTC MATERIALS TESTING CONTRACT REFERENCE NO.: **C-26219 SUBJECT: Authorize Execution of an Engineering Agreement with CMJ Engineering, Inc., in the Amount of $321,855.00 for Materials Testing Associated with the New Public Safety Training Center and Provide for Contingencies for a Totai Project Cost in the Amount of $350,000.00 (COUNCIL DISTRICT 9) RECOMMENDATION: It is recommended that the City Council authorize the execution of an engineering Agreement with CMJ Engineering, Inc., in the amount of $321,855.00 for materials testing associated with the new Public Safety Training Center. DISCUSSION: State law requires that the City provide for materials testing on a design-build project such as this. Site demolition and earthwork are underway at the Public Safety Training Center project. This Mayor and Council Communication will provide for materials testing throughout the duration of the construction on an as needed/on call basis. Funding for this materials testing contract comes from the previously appropriated project budget amount (M&C C-25798). The Design-Builder consents to this action. Staff will be working with the design-build team to coordinate materials testing. CMJ Engineering, Inc., is one of the City's annual-contract geotechnical and construction material testing firms and was selected for this project in part due to its prior service to the City. Additional funds in the amount of $28,145.00 are being reserved for contingencies for a total project cost in the amount of $350,000.00. M/WBE Office: A waiver for SBE subcontracting requirements was requested by the Transportation and Public Works Department and approved by the M/WBE Office because the purchase of goods or services from source(s) where subcontracting or supplier opportunities are negligible. The project is physically located in COUNCIL DISTRICT 9 but will serve Fort Worth residents in ALL COUNCIL DISTRICTS. FISCAL INFORMATION / CERTIFICATION: The Financial Management Services Director certifies that funds are available in the current capital budget, as appropriated, of the Public Safety Training Facility Fund. FUND CENTERS: TO Fund/Account/Centers FROM Fund/Account/Centers C236 531060 069070198730 $350,000.00 Logname: 06PSTC MATERIALS TESTING CONTRACT Page 1 of 2 CERTIFICATIONS: Submitted for Citv Manaqer's Office by: Originatinq Department Head: Additional Information Contact: Fernando Costa (6122) Randle Harwood (6101) Mark Rauscher (2446) ATTACHMENTS 1. PNfO Public Safety Train Ctr MWBE CMJ Mat Test Waiver 21 Mar13.pdf (CFW Internal) Logname: 06PSTC MATERIALS TESTING CONTRACT Page 2 of 2