HomeMy WebLinkAboutContract 55324FORT WORTH .. ,,,.,. ..
PROJECT MANUAL
FOR
THE CONSTRUCTION OF
WATER AND SANITARY SEWER
REHABILITATION CONTRACT 101
Betsy Price
Mayor
City Project No. 02722
Chris Harder, P.E.
David Cooke
City Manager
Director, Water Department
William Johnson
Director , Transportation and Public Works Department
Prepared for
The City of Fort Worth
Water Department
Septem her 2020
SHIELD
Shield Engineering Group, PLLC
1600 W. 7th Street Suite 200
Fort Worth, TX 76102
817.810.0696
OFFICIAL "'
CITYSECR
FT. WORTH,
}
�
�
�
� ���� ����#+i^j
f
1
1
�
I
7
i
� ��� ��F��t�V�r��t�
y -�
F
�
I. _.........._........_...._._._______.._____-___._,__._.._......___._.___._____-- - - - - - _._.._......
1
Standard Construction Specification
� Documents
�
�
�
r
�
,
�
�
�
�
f
{
lldopted Septembcr 2011
4
4
oa ao oa
STANDARD CONSTRlICT10N SP];CI]�ICATIQN ])OCEJNt�,N'T5
Pagc 1 uffi
sECTio�v ao 00 00
TABLE OF CONTENTS
llivision 00 - General Conditions
Last Revised
00 QS i0 Ma or ancf Council Cammunication 071Q1/2411
OQ OS 15 Addenda 0714 i/2Q ] 1
00 1 l i 3 Ia�vitation to Bidders 03/09/2020
00 21 13 Instructions to Bidders d3/09/2020
00 3l 15 Cn ineer Pro'ect Schedule 07/20/201.8
00 32 I 5 Construction Pro'ect Schedtiile �7/20/2018
00 35 13 Conflict of Llterest Statement 02/24/2020
p0 4 i QQ Bid Form 03/09/2020
p0 42 43 Pro osal Form Unit Price 01/2Q12012
00 43 13 Bid Bond 09/11/2017
00 43 37 Vendor Cam liance to State Law Nonresident Bidder 0612 7/20 1 1
00 �}5 11 �3idders Pre ualificatinns 07/01/201 l
00 45 12 Pre ualification Stat�anent 07/01/201 1
00 45 13 Badder Pre ualification A lica#ion Q3/09/2020
00 45 26 Contractor Com liance with Workers' Corn ensation Law 07/p 1/2p 1 I
00 45 40 Minorit Business Enter rise Goal 06/09/201 S
00 45 41 S�nall Business Enter rise Goal 06/09/2015
00 52 43 A reement 09/06/2019
OQ 61 l 3 Perfar�raance Bond 07/41/241 I
�0 61 ].4 Pa ment I3ond 07/01/2011
00 G1 19 Maintenance Bond 07/01/201 1
00 bl 25 Certificate of Iiisurance 07/01/2011
00 72 00 Gcnerai Conditions 03/09/2020
00 73 00 Su lementar Conditioz�s 0310912Q20
Division 01 - General Re uiremenYs Last Revised
Ol 1 I 04 SuYmna of Work 12/20/2012
O1 25 40 Substitution Pracedures 07/Ol /20 ] 1
Ol 31 19 Precanstructian Meetin 08/17/2012
O1 3] 20 Pro'ect Meetin s 07/01/20l 1
01 32 16 Construction Pro ress Schedule 0710 1120 1 1
Ol 32 33 Preconstruction Video 0710 1/20 1 1
Ol 33 00 Submittals 1 212 0/20 1 2
O] 35 13 S ecialPz-o�ectPraced�res f212Q12012
01 45 23 Testin and Ins ection Services 03/09/2020
Oi 50 00 Tein arai Facilitfes and Cor►trols 07/01/201 ]
OI SS 2b Street Use Permit and Modifications to Traffic Control Q7/O1/201 i
O 1 S7 13 Stozzn Watei� YoElution Pre�entian Plan 07/01/2011
O 1 5$ i 3 Tezax orar Pro' ect Si na e 07/01 /2011
O1 b0 00 Product Re uirements a3/09/2020
O1 66 QO Product Stora e and Handlin Re uire�nenis 07/01/2Q] 1
Ol 70 00 Mobilization and Remobilization 11/22/2016
O1 71 23 Constrtiction Stakin and Surve 02/14/2018
Ol 74 23 Cleanii� 07/01/2011
C["I�Y OF FORT WOR'FH Waterand Sanitary Scwcr Rchabilitalion Contr�ict LDl
51�ANDAAD CQNSTRUCTION SPFCIfICA'110N DOCUMENTS CPN D2722
Revised Marcli 9, 2020
�
�
�
f
i
i
�
s
�
k
�
�
�
�
5
�
f
�
,
l
4
1
�
�
I
f
�
xj
2
4
I
i
00 0o ao
STANDARD CONSTRi1CT90N SPF.CiFICATION DOCUMP,I�ITS
Page 2 af 6
O1 77 19 Closeout Re uirements 07/O1/2011
Ol 78 23 O eration and Maintenance Data 12/20/20 i2
Ql 7& 39 Pro'ect Record Doctunents Q7/O1/201 1
Technical Speci�cations which have kseen moditied by the Engineer specifically for ti►is
Pro.ject; hard capies are included in the Project's Co��tract Docu�nents
Ol 35 13 Special Pro�ect Pracedures
D2 41 14 Utility Removal/Abandonment
33 I2 1D Water Services 1-inch and 2-inch
Technical S�eci�cations listed below are included for this Project by re%rence and can be
viewcd/downloaded from the City's website at:
http://fortworthtexa s.gov/ipwlcontractars/
or
hftps://a pps.fortwort�texas.�ov/Pro �eciResaur•ces/
Date
llivision 02 - �xistin Conditions Modi�ed
02 41 13 Selective Site Demolition
02 41 14 Utilit Removal/Abandonment
02 41 15 Paving Re�noval
D�visio� Q3 - Concrete
llivision 26 - �lectrical
Divisio�► 31 - Earthworlc
31 1 Q 00 Site Cleariaa
'21 72 1k TT,,..I���;�;a.] �...�.,<.�i�;..,.,
�r.�rry
'2 1�� ��
'21�r�rvv L'',-.'�i�
31 25 00 Erosian and Sediment Cnntroa
-z i �� � � o_oonn �a�ie+�s
�i z�nn
��-.-oo
D�vision 32 - Exterior im rovements
32 Q I I 7 Pea-rna��ent As halt Pavir
32 O 1 1 S Tem orar As halt Pavi:
32 O1 29 Concre#e Favin� Renair
CC1�Y OF FOR'f WOR"fH Water and Sanitary Sewer Reltiabilitalion Contract 141
S'fANDARll CONS'fRUCTION SPECIFICATION DOCUMENiS CPN 02722
Revised Maroh 9, 2U20
00 0o ao
STANDARD CONS"��1tUCTION SPEC[P1CA'1'lON DOCLJML'NT$
1'age 3 ofG
32 I 1 23 Flexible Base Courses
32 1 1 29 Lime Treated Base Caurses
32 11 33 Cement `1"reated Base Courses
32 1 l 37 Li �icf Treated Soil Stabilizer
32 12 16 As halt �'avin
2 7 1 7 '7'2
�z-rs
32 13 13 Concrete Pavit�
32 13 20 Conca�ete Sidewalks, Dri�ewa s anci Balrier Free Ram s
32 ] 3 73 Cancrete Pavin 7oint Sea]ants
'2'1 3 A 1 �
�v
32 I6 13 Cac�creEe Curb and Gutters and Valle Guttcrs
32 17 23 Yavemei�t Markin s
32 ] 7 25 Curb Addi•ess Paintiil
Z��� 2�� r�t,.,;,, t:�,.�,,,,... ..._a c,.+,.,.
�� �7LL�r� �a „!! l��ro
��_-n �_�L`� �zr,,,,a ��o�,.�� .,n,a r�.,+„�
'2��-�zr� y��+ ;,-, Ul�no l''.,,�..«o+., i7.,+.,;.,;.,.. }ll.,ll.-
32 91 14 To soi] �lacement and Finishin of Parkwa s
32 92 13 H dro-Mulchin , Seedira , and Soddin
2��� :'���:; ��,�,�� ch;:a�
Division 33 - UtiIities
CTFY OC' F'Oft'1' WORTH Walcr and SaniTary Sewer Rehabilitalion Contract 101
STANI]ARD CONSTRi1CTTON SPECIFICAT[ON DOCUMEN7�5 CPN 02722
Re�iscci March 9, 2020
4
M
i
E
,
�
i
M
s
,
i
i
i
f
i
f
F
�
,
1
;
�
�
1
�
t
i
�
f
�
f
�� Q� 00
STANDARD CONST'i�UC'I70N SI'liC1FiCA"I'ION DOCUMENTS
1'age 4 of 6
33 l 1 l 1 Ductile iran �'i#tin s
33 11 t 2 Pol �in I Chloride PVC Pressure Pi e
2'2 1 Y 1 '2
�ra � �
33 11 14 Buried Stee2 Pi e and Fittin s
33 12 ] 0 Water Services 1-inch to 2-inch
33 12 I 1 Lar e Water Meters
�z�o �z��.�i:�.,+ co.,.oa r_.,+o �r.,it.,,
� �_�-'�T
33 12 25 Connection to �xistEn Water Mains
33 12 30 Cambinatiazl Air Valve Assemhlies for Potable Water S ste�ns
33 i 2 40 Fi��e H drai�ts
33 12 50 ll�ater Sam le Stations
�� i� rn
��
33 31 ] 2 Cured in Place Pi e(C1PP
z ���
Z'2 23 1C
��
33 31 20 Pol vin 1 Chloride (PVC) Gravity Sai�itary Sewer Pi e
a,.t„� :,.t rHt„�:,a,, in�rr� rt,...,,,� n..,,s;i„ r�..,,,,,., c„�;.,.�,, o,,..,,,..
Zz��T
22 '2 7 '�'7
22 � ] ')'2
��
33 31 50 Sanitar Sewer Service Connectioi�s and Service Line
�� � i �n
��
33 39 10 Cast-in-Place Concrete Manholes
33 39 20 Precast Concrete Ma��holes
�z�
�-3-3�-4-8 �xr„�ro.,..,fio,- n,,,,o..� ��,�.,,t,o.. nx! n rt
33 39 60 E ox Liners for Sanitar Sewer Shuctures
� �a n�-T:-To
2Z A 7 3 1
�--mT
�� � I 1'1
�-�-rra
�
'2'S � F !1 !
��
Z'2�z Tr�,��.+� ,
33 49 10 Cast-in-Place Manholes and Junction Boxes
�� nn �n
�o
� n�a
CCfY OF FOR'f WOA'1'H W:rter ancE Sanitary Sewer Reha6ilitation Conlract 101
STANI]AKll CONS'1RUC'I�ION SPECIFICATION DOCUMENTS CPN 02722
Revised Nfaroh 9, 2020
�
00 OD 00
STANllARD CC}NSTRUCTIOi�! 51'ECIFICATION DOCUM�.N"d�S
Page 5 of 6
A��endix
�� 4.-91 ��� �,,,;*, „�-r .,,,,�5
t��"1':11� i�"flAcr�T7T[12aTTiGIf�'ILI�'Gl
GC-6.O6.D Minority and Women Owned Business Etiterprise Comp[iance
GC-6.07 Wage Rates
�� C.99 �'e�� u: ,a � r»-���������
GC-b.24 Nondiscrimination
GR-U 1 60 00 �'rod�ct Requi.reznenis
FND OF SCCTION
C[TY OP FORT WORTFI Water and Sanitary Scwer Rehabilitation Contract l0l
S"1�ANDARD CONSTRUC'1'i0N SPECiFICATiON llOCUMENTS CPA! 02722
Itevised March 9, 2020
Cf�y Q� �QPf IAIQit�l,
��y����,d
QAi�: 01/'[2121
�BXaS
.; '_ :. i ' •
M8�C FiLE NUM��R: M&C 21-DQ�6
L4G �IAM�: 60SSRC1Q1-CIRCL.�C
SUBJ�Ci
(CD 9) Authorize �xecufion of a Contract wifh Wilfiarn J. Schulfz, fnc, dba Gircle C ConsfCuction Campany, ir� fhe Arnount of $3,015,177.50, for the
Sanitary Sewer Rehabilitation, Contract 101 Project, Adopt Appropriation Ordi�ances, and Amend the FY2021-2025 Capitaf Irnprovement
PrQgram
RECOMMENDATfO�l:
!t is recommended fhat ihe City CounciL
�. Authorize execuiio� of a contract with William J. Schulfz, fnc. dba Cirde C Construction Company, in the amount of $3,01 �,9 77.50, for the
Sanifary 5ewer Rehabilifafion, Contract 9Q� praject;
2. Adopi the attached appropriation ordinance increasing receipts and appropriations in the Water and 5ewer Capital Projec#s Fund in the
amount of $3,126,555.OD, transferred from available f�nds wifhin the Water and Sewer Fund, for the Sanitary Sewer Rehabilffafian, Confract
90T project;
3. Adop# the attached appropriatian ordinance adjusting receipts and appropriations in the Genera! Capital Projects Fund by decreasing
receipts and a�propriations in the Contract 5treet Maintenance programmable project (Cify Project No. Pa0020) in amount af �417,68Q.QQ
and increasirtg receipts and appropriations in the Sanitary 5ewer Rehabilitation, Con#ract 10� project (City Project No. Cb2722) 6y the
same amount; and
4. Amend fhe FY2029-2025 Capital lmprovemenf Program.
QiSCUSS101V:
This Mayor and Council Communication (M&C) is to autharize a constr�cfion con#ract for fhe replacement of deteriarafed water and sanitary sewer
mains an the fo]iawing streefs:
Stree# F'rom To
Winfon Terrace E. Park Hilf Drive Winton Terrace W.
Winton T�rrace W. Park Nill Drive Wintan T'errace �.
Additionally, asphali pa�err�ent rehabilifation will be conducted on alf sfreets subsequent ta the water and sanitary sewer main replacement. The
Water Depa�tmer�t's share of this contract is $2,679,152.50 and ff�e Trensportation and Transporiafion & P�blic Works QepartmenYs share of the
coniract is $338,025.00.
The project was advertised for bids on �cfober 1, 2D20, and Ockober 8, 2020, in the Fort Worth Star-Telagram. On Navember 19, 2020, t�e
followir�g �ids were recei�ed:
In addifion to the contract amounf, $361,496.40 (Water: $1�7,993.00; 5ewer: $15�,9�51.00; Paving: $48,052.OD) is required for project
management, rnaterial testing and inspecfion, and $167,a61.5Q {Wa#er: $66,683.50; Sewer: $67,295.00; Paving: $33,603.OQ) is pro�ided for
projec# contingencies.
The sanitary sewer compor�ant of fhis project is Part af the Wa#er DeparfinenYs Sanitary Sewer Overflow Initiati�e Program.
This project will ha�a na impact on the Trans�orfatian & Public Works' or the Water Department's operafing budgets when compleied.
The General Capital funding was included in th� 2021-2025 Capital Improvernent Prograrn for project P0002Q. In order to administratively track
the spending of all funding sources in one project, appropriation ordinances are needed to mo�e appropriations from the programmable proj�ct to
#he jointEy funded s#atic project. �hEs action wifl amend the 2021-2Q25 Capitaf Impro�ement Program as approved in connection with Ordinance
24446-09-202Q.
Appropriations for the Sanitary Sewer Ref�abi[itation, Contract 101 project are as depicted below:
Fund Exrsfing Additionaf Pro�ect Total*
Appropriations Appropriafions
Water & Sewer' Capifaf $OAO $3,926,555.pp $3,126,555.00
Prajects Fund 56002
Ger�eral Capital
Projects �und 3D100 $0.00 $417,68D.00 $417,680.D�
Pro�ect Total $0.00 $3,544,235.00 $3,544,235.00
*Numbers rounded for preseniatian pttrposes.
MIWBE O�'�IC�: William J. Sch�Itz, lnc, dba Circ�e C ConstrucEion Company, is in compliance with the City's BDE Ordinance by dacumenting
good faith effort. William J. Sci�uftz, fnc. dba Circle C Construction Company identified several subcontracting and suppl�er opporfunities. However,
fhe firms contracted in the areas identified did r�ot respand or did not submif tl�e lawest 6ids. T[�e City's MBE goal on this project is 92 percent.
The pro�ect is Eocated in COUNCIL DISTRICT 9.
FISCAL I�IFORMATIOhI 1 GERTIFIGATIOPI:
The !]irector of Finance certif[es that funds are avaiiabla in #he current aperating budgei of the Water & Sewer Fund and the Contract 5treet
Maintenance program�nable projeci within the Generaf Capital Projecfs Fund, and upon approvaf of the abo�e recommendafions and adoptian of
the a#tached appropriation ordinances, funds will be a�ailable in fhe W&S Capital Projects Fund and the General CaPitai Projects Fund for the
SaniSewer Reha6 Contract 109 project to support the abo�e recomm�ndations and ex�cufion ofi the confrac#. f'rior to any expenditure being
incurred, the Wafer and Transportation & Public Works Repartments have the respoRsibility of verifying the avaiiabili#y of funds.
Submifted for City Manager's Office�: Dana Burghdaff 8Q18
Originating �usiness Unit Head: Chris Harder 6020
AddEtional Information Contact: Chris Underwood 2629
N N iV N N F-+ N N
Gl U'� Ul [n Cli lfl [IT Ul
O O O O O O C7 C7
O O O O O O O O
iV N N N N N N N
0 0 0 0 o a o 0
rn m m m o� rn rn ai
0 0 0 0 0 0 0 0
A A �P �P �P � � �
w w w w w w w w
O C7 O O O O O O
l7� ln ll� [I1 [fl N lfi �A
F-` I--' W�P �P -P i--' ln
0 0 0 0 0 0 o ai
I--• W [f� !-� O O F' O
O [Il O O I--` F--` O O
7-+ d O F-` O fl F-' F-`
n n n n n n n n
O O'O O � O O O
V V V V �f V V V
N FN.r N N N N N N
n�n�n�nlnln�n�n
0 0 0 0 0 0 0�
V� A A O L� O O O
1p 1 lD i�D ��D � Co l0 ��D
t� 1 to I in I cfl cQ �n �n co
W W N N N N
W W [n [n V� Cn
� b O Q O O
O O O 4 O O
O O N F-� N N
N N V� m OQi
0 0 0 0 0 0
A A �A O .�p O
W W W N W N
Y F-' O O O 4
A � �P U'k A (n
l0 l0 l0 LO 1p [p
F-' I--' (Jl LJl � Ul
4 a Q1 Q1 61 Q1
F-• F+ O O O O
� QO O O C7 �
n � n n
�N O �N N
N N N N
h.f O N N
a
o � o 0
N � F-` I--�
D
a °r.° o 0
�OI� ��D� 1lO
W W W W N N N N
UJ U�1 U_1 �..�1 [�l LJl Vi iPl
� H F-�-� � O O O O
O O� O N N ��N
0 0 0 0 0 0 0 0
0 0 0 o a o a o
A A A A � � � ?
W W W W W W W W
Y F--` F-� [--+ O Q O O
� � � �
w N cn v+
O O Q� Q1
O O 4 O
O O Fj I--'
n-unv nc� n�
p o p o 0 0 0 0
V O V 4 J v �l �f
N O N O N N N N
N NIFN-� INI ��0� I!-',�F-`
te+ I tn i/� �111� ry I V� t/� �!4 in
!u � IF' a '.-' F�'-' F�'-' F' I� '.Jy vx • [--' I--' 1-' I-'
{!1 �[h 'i/1 v4 W� u, � tn =, v+� cn �r `�' :. ��E. u, w cn u�
Oo I-� N�+'* T L-� � F..e [n F. T ln tI3 (n ln F-� — F-` r I rn U] [rl LI7
W W V ffi �u V V �J 00 00 V V �I � J +! _.I �0 00 V V
ia io io a rn iv .n co c�. �o io , a� ati a, rn rn co io
in w cn c� o, �. ,� N , t., 07 m a� r F+ ��,� rQ rn w w N�-+
p� CO [O ;a W h� Ib 1p � O OWl O�i �a CO I�+ r, �? �.'+ Q7 01 tO lD
O O O C� 41� � {s O O O 4'? C� � O O O O
O O O �7 O � C"� ,�'„ O s ._ a V O O � O Cr _'"J" _- . O Q O O
a
a
�
�
�
n
O
W
�
�
r
�
c�
�
C
H
a
m
W 1-� i�7 N i�+ N F' N N
ail u1 u. w W W [Il iJ� Ul l/Y 1.71 Ul 1f3
r? G C7 � O O Q7 6} Q7 Q] Ol O1 01
Y �-�+ I--' H!--' a O O O O O O
�7 �"1" � r� O O O O O O O O O
O O O O O � N N N N h7 N N
c7 �1 O CJ O C7 O O O � O O O
�x.1 R.r lya � N i� �! �l �I V V V V
b Q 47 4 O O O O O Q O O O
� � � � � � � � � � � � �
l4 wl LV W W W W W W W W W W
h' h} �" H Y H" O O O O O O O
VI Vl u+ U� VI VE Ul Ui [J1 lTl (fl V1 �P
W f. W w V V F-` W W V V F-` l�
N `--+ W F-' � � W 1-' W i� � H ln
G O O O � O O b O [7 O O a]
U+ �-` Ur r O a I1 W tn Q C] Y O
Sh O CJ O Y 1--' O [n 4 h� Y O O
d I-' � i" O O F-` O O O d I--' F-�
rl f 1 fi Fl (7 Cl n n n n n n (i
4 fl 1=i Q O O O O d C? O O O
I,� h� h.r F-J N N N N N N N N N
kl w �I.I V V V V V �I V V V
� � � F.� N N N N N N N hf N
+� N �i
� � 4 C� Q O p 4 O d O O p
h� #-� r� N N F-+ I-+ F-+ Y I-' F-` I-'
� � �A � V V V �! V V V
(76 � (a1 6� W 00 W W CO W 00 00 00
vx � n.r,� o o u, �� o 0 0 0
i!1 yC i.[.1 W �p LQ CO lD CO i0 lO l0 l0
iR �4 Lf, �P LD [D lD lD [O LD lO lD lD
�.P hf, i0 �P lo tD l0 l0 Co Co lD LO lo
�{l 4] SO �A lfl cD �D � �LJ �4 �O �A �9
G
� �
�
F-. �
�p v. V'+ Fry W W 00 � iV 61 -P N O1
it' w V h W � �P P Oo V [n Oo W
i� Ol 'Lw V O1 J l3 N N Da N a1
V 10 {.D 8A � Q lD W O1 �A �O 07 W
W 17'� W Ln W � F-` IV �P SJ'k O �P Ol
S? U �+ � C7 � O b O O O O O
O
i
�
,
E
i
�
r
�
r
F
�
�
�
�
1
�
5
,
�
i
2
,
r
�
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
1(
17
18
19
20
21
22
23
00 os �o - i
Page l of 1
SECTION 00 O5 10
MAYOA AND COUNCIL COMMUNICATION (M&C)
END OF SECTION
CITY OF I'ORT WORTH Waterand Sanitary Se+vcr Rchabilitation Contract E01
STANDARD CONSTRUC"l70N S]'EC[1-7CA'I'ION DOCIJMENTS CPN 02722
Revised July l, 20l ]
S
t1Q0535-1
Page 1 ot I
c���r o� �o�� �vo�i�x
w�T�;� D�=�A�T���
�NC�I�tE�`i�TN� SER'VIC�S DI`�I��i)N
A�IIEI�UM NC?. �
WA'.i'�R ��iYY) S1�N�TA�Y ��iVER.
R��)CA�i�I�'A�'�d�� �(�I�1'I'RA�fi �(9�
(�'i'�'�' �.'I:�:�1,�'�` N�< C}2722
�ZF:L�ASL llA`[']{: �7ctnbe�• 2t�, Zfl20
�71� .R�GEiF'T DA`I'E: f)ctobe�' 29, 2i�2a
T�T£ORM�'3.'It�N TD J3zDLi��S:
T.�e 5��e���c�tions and Cantt�aat Documents for #he �bove met�t�c�nec3 p�•ojeet ��c reviseti a�ad an�et�ded as �a�lows:
L�n 1:h� �NV"I`�'ATI[lN TE� )3IDIiir,'�; 7Jze firsE paragraph s�aeci��s t1�aC sealed bfc�s "will be xec��ved
�y t�e Czty of �o��i �a�-th Yurchasrr�g �f�ce until x:3t? 1'.M�. CST, T�i��•sda� i)et�ber 2�, 2��0 and
hids wi1l be �pen�d �ubliciy and. reari aloud at ;L:t�O Y.tvi. C�`�' i�� t�te Cou�icil Chambers."
1'�e IN���i'A�ICI�'�'� �3I�3T3Ekd� s,hs,�� be �:V��.�� iz� that sealed bids "vsrili .be received by ilae
City c����rt �nrth �'urc�asia� O�e� �t�� L•3t3 P.IVI. C�T, 'd`izu�-s.riay Il��3ve���e1• J�2, ZOZ�i an� blc�s
wili be c�penec� �u�a�ieiy arxd. re�c€ �lc�i��l at 2;Qfl �'.��. CST ir� t�e GounciT Charnber�."
�lease ��knawl�c�ge reccipt oft�ae �cidendu�n rra xhe bicl �ro��osai $nd an t�e c�utsic�e nftt�e sealed envel�pe.
I��i£;E:[P �' AC�QWI,£?I�GED:
�
! �����.� �.
�
CHRIS ITA:�t.�:3�R, I'.�.
I3II2�:C�'OR, WLI�'EIZU�P�R�'M��
���� � ��� �
�
�o�y s��x���, �.�.
Assisfane Di��ectc�z-,
V41�ter be�sarht�e��f C�pitaf 3�elivery
C;ITY C1I� Pfl1tT W(JR7"H iYATL'iit AI�t17 SAtvli'AItY SE1��:R
STEs.NT3A'�T3 C�NST'K[JC;'tIC?N 51?E�IfiC;A:Pi01�€ bOCt3R�iF<.3�T� R1:E3�31i.TAF1OI�CON772AC'?` (tiI
Revise�i Juiy 1, 2UI3 C;ity Project �Fo. Q2722
�
F
�
1
L
4
�
F
i
�
k
,
k
h
�
�
�
[
e
4
k
�
r
:
��a��s-�
�fl�� � of z
V.�J_ -�.. �� �V�� �r./1��,-L�
VY .iy.�,�� ��-./A .��1��.�.f�i�.��
�1�I�Cr'���2.1NCi �1=;�.'t�;�C�"� D:�I�IO�T
.�1 � Dp?,��d�TN� I`��, 2
���'����� �t#��M'C'.�� �1�V4'��Itt
� ��+�.�.����� ��{ )�r�'�.�� �Q�.
�,��� ��a�e��..�' ���. �����
tt�IsE�i�'� DI�T}i: N�V�171I)er CT, 2�2�
Oit�G�td��.. �3.i17 R�;GEIPT D�1`I'E: <}ctol�e�° 29, �(320
RZ,�TS�I3 B7D U�'ENINC� I�E17`�: 2�Ic�vem�er {9, 2d2D
I�T'l°��.li��`�TC)N "I'CU �f3]I7�RS:
i'i�ns�iective �33cic�e€• are l�eret�y in�ormett �at tlie hiel o�7esti��� ctat� %�r tlte pr�ajec.t has b�e�� cT�ae��ecl to
NUYedFll�ei' [�y L07{p.
I'leasc� neknourled�e �•eceipt c�f the �dcie�d.t�� in the �it4 p�•opasal at�d nn Pk�e c���isit�e afthe sea�ecl �nvetc�pe.
At..L:L�-il t ri`,�51 V v s'✓ 1,..3_';lI�7.�%JJ.
�.!- � ��c�. .______..,
���� ������y �.�.
��R��T��., WATE�.ii��'t1�.T��FT
�y'�,--� . __-...........
���y s��t�t���, ��.�.
ttssi4i�€�x i 3ireeft�l',
�Vater �.����artme�iC Ca�zi�l Ueli�ery
F
CI�I'Y Ol' i�Y3C?`I" l�pTt'fT-�
`3"t'Ai�7J.�si2t} Ct32�7S't'12t_7C�E'1CJN S}'�t'I1=ICA"�'i�N I)�C€7�S�:h3TS
Revi5esl 7i�ly ?, ?til T
Wti'1`EIt,41VI� SI�?dI']"�ii2'Y SEIVI:[t
R�IIt1.3�]G'T'ATf(5i+1 C(7te"P'i2.rLCT IOt
Ci[y Prt�je�t �i�. �27?2
i
r
Ci�r� �#� ���i �c���w�
�a���� ��������t��-
. '�� �_�.:� ;._�.�� �.:,� .�, .�,.
� �, �
�� �
��E� �. -� rtva�er
k�ni� � — �artai�r�r 5ev�rer
tJ�#� � - l�awirtg
��i:c�ett�#um (�� 3 is��tet$: tktcs��e�k�er �:CT, �t?��
�ir� �:�c�ip� �a��: E�cru�m.ber i�, �Ei�dl
Tf��s I�d.dendu�n ��rrr�s p�ri tif th� S�ecif.i�atic�ns ar�ri Gcar�fr�c# Dgcur�ae�€�s ar�c� madi€ies the
rr�iginal �pe�ific�tic�r�s ar�d C��t�rac# Dc�c�rn�r�ts. gic�ders sh�t11 acEtn�wf�:dr�e rec�ipi �f ihis
Add�rt�3u�t ir� #he spac� provicfed belov�r �nr1 ackr�av+�t�dg.� r�c�ipt on the c�ut�r �rt�elap� in yc�ur
#�rd. Faiture �a �ck�€�wle�fg� r�c�:i�st oithis �ddendurn ���id s�bj�ct th� b►dder ia disqci�fifiGa#ion.
'I he Specifie�#i�ans ane� �antract L�c�currrenis fc�r �i#y Proj�ct No. (�Zt2� ar� her�by r�viser� iay
ii�i� Adc�e�rdum l��. 3�s fo!lo�nrs:
�. � �c€�ic��ic�rt� S�cti�r� �1� �� �0 � `�'a�I� o# �anten�s � a#�a���t� ���r��n ��ef �c� ��
R���.1��Ea fn i% �rat�ret�r
�. ��ecificat���s ��cti�n [��1 �� �3 � EE���r€�c#i�ar�s �a Bids���� — ��e,�. � 6 af �� ���c��d
��r�ir� ��ae� �c� b� R�P�A��13 tc� �arrc:cf f�ae Adrle��da �'�Ider av�bsit�_
�_ ���t�csrt� 4E� �'# d'til --- ��s� �crrrn -- ���ach�si ��r�i� a�id �a �� ���L�t��� ir� �ks �ra�ir��y.
�. �pecificat"rc�rr� ��c��c�� €�'� �� �� �- �p�ci�� �roj�c� �rc��c�r��re� -- a#t�e�e� l��;r�in ar��
�c� i�e i���LA�E[� �r� it� er�tir���.
�. ��e�i�ca�io�t� �ec�iar� 33 �t� �� — ��#�r 5e�ric�� 'f-i�ch fo ��ir�c� —at��ch�ci h�rei�
��c� �t� �� ���3E� �r� th� Spec€fi��.�i�an� �+� in�ru�e Uevi�.fi�n�.
6. C��sir�ctirars �'F�n ��� sh��ts A�, �, �,. ��J ��a, `1�, �98, 'i�� 2�, 2�, 2�� ��, 2�i a��� ��
a�i�c��d h�reir� ��� �� �a� 1��Pl.A��� in ��a�tr ��s�ir��.
�Iarificaiion;
� l�t Ir��ati�ar�� �hat �he prc�p.erfy line conflic#s �ith an exis#ing struci�re, ci�ano�t lids rnay
k�� p�ac�d in f�� srefe�nraitt i�lITF1 TH� APPR�VAL of the Praj�cf Manager. Cleanc�crt lids
ir� �i�� sic�e�+aiic rnusi b�: cast iro��.
� P�rrr��nen� asphalt re�a�r shali ��ve 2N Asph��t !'av�r��r7t Type D�s��: r�visioF-� sheet
��}.
Th€� Addendu�n No_ � fartr�s part a� fh� ���cific�tions and Gantrac� C3c�cum�nts for the �b�ue
re�ere;r�c�� �ro}ec� and rr�o�fifies the origir��l Pr���ct Niant��( � Cc��rir�c� dcsc�tm�nt� a� sas�te.
Ackno�rl�d��: y�ur r���ip� �f Add�:ndum No_ � by cp�.npfefing tf7e rec{U�sted inf�rr��tion �t �hc�
follo�in� I�c�ti�r�s:
('I) ir� t�� sp�� pravir��ct ir� Sec�f�n �C} �#i DD, Bid Fc�rm, i'�ge �€�f �, and
(2) indicate E€� up��r c�se 1eft�rs r�r� t�e ��t��rl� c�f yc�ur sealed bid �nv���p�
���
�-� Add�noum No. 3
Vltater & �a:ni�ary 5esnrer i?et�abifitatic�r� C�nt�-act
CP� t)J7�2
x��lr��4f�� tiIV�J`i.isI4�LJ�YY�f..�LJLJ�eJ i-i£.ILl�liil✓aJ�tYi !t#CJ. .7�r
(nciude a�igned capy of �dd��€dur� E�o. � in t�� s��l�d bid �r�v�l�pE at the t�r�,� of bic� ��brniii�l.
��ifur� t� a��r��v�4ed�e r�ceipt a� �1dd�ndu€� Ptla.� ��icsw could c�u�� t�e subj�ci bidd�r ta ta�
cot��id��ed "�3��R�SPONSII#L", ��sui�in� i� rf�squaiifica�iran.
�ci�ferrdc�rr� �f�. 3
����lE'T �CKE�OVSIL��c;��:
�y; �''�� ��.�-��
����.i.i���. C.� �'r-t /i' G- �G�rli%.I�� -�---- -
�0�
�t-�
��rist�}�l��r N�rder, �'. �.
Directc�r, V1Ia��r fl�p�r�g„u�t
By:__. . _ �_ � �' '
rony Si�ola(a, �'.f�.
A��is��nf f�irect�ar, �Uaf�r L�e�s�rtrr;�n�
Adc3p.ndu� �Ic�. 3
U�tat�r & :5a[�i�ary Sew�r Rehab��itatica�� Ct�ntr�rt
CF'�! (i�7�2
E
�
�
�
�
�
�
�
}
F
I
���lY� ��iJ�� L ],V �. YlL 1 �rld
"���,�"..f�.�". ��,��.': �tiYP.3:1x�3BY � �3y ����
a�:r�rn��. stn �r�:����� ����; o�:�����- z�, zc�zo
Id�VCSE�i BII� flPEN.�te� I3�`I`I;: hTo�e�nber 19, 2[720
oo�>�s-1
A�e�ofi
t'�II'O�M�'�'I�N 71� I3Ti£)I?ER�:
I'r�s�+ective Ft�d�€��� a.re her�by �rsf'ra�ncd ihat the tsrr�e of �on�p[c�t�c�r� c�n E1t� � i t�(l P rd Fc�z-z� shal) be �•evisecl
ic� 4ZEi ci�ays aftet• the da�e �vhe� �he Canh•z�ct Tim� e€�mn�eT�ces to �•u3� �a� pt•c�virlecf in Yara�E-��h 7.�3 Ce;�teral
4�t���cJiYifa��s.
�'�ease �c��nes�v)�cl�� t•ec�ipf af ��e Actde�durr� i�t t�e birt ��rt�pt�sa! ai�cI a�t itie c�u.ts�cle of #he sealcc� eu�'e��pe.
ftEC;�;i�`i" ,�Ci��Tt3WL.�I3CiEI1_
I
� �._..�-{��'-'��
G
�
j
-�
�
C:EiL� i 4�f A�L7JT�,1�, I'.�;.
T3�RE(;'I`C):R, W/�'f�lt L?�:.��tt�'iM�,N"['
��r� __� .---
`�O?2y�u��3CtID�a., .�_�,
As�isfant �iz•ea�ni�>
�1Tater I?�pasi��ient E.a�itai U�Iive�-�l
Ci�TY C3T� I°OKT �rVCJla'ITz
S �Ah113AI�ll f;C3?�i�"fRU[:i'It�i� Sl'�C(�IC�IT[C71,; Ta�CLiiv3��'C'S
l2.uvised J�t[q 1, ?Ui ]
�� �y� �� ���� ���. r�
1�1�`C��:R 1��?PA�'�'.11�E�i'C'
�i�Tt�1NEE�'� ��'RVICLS �3�'Sr.�STC�N
� �.w��.�4'��i� lY�. �
;�`�1'�cp,Rs7.2.e.lE'�...c�AA'[� i7Z-§.����.Itt.l( �LYi'ir2�
�5�.7's.k.�..�����i���Fl� �F.�#'E��.�€.�� ��A
W�TERJ��vi? 5�L"�li7�A1Z'Y ��Vl'�:R
It�HA�33L,TA7'iON GOI I`i�fth�� i [3i
C:ity1'roJeGi ifo. U2732
i
0011 ]3
1NVITATION TO BIDDERS
Page l of 3
SECTION OQ 11 13
INVITATION TO BIDD�RS
RECEIPT OF BIDS
��ie l�� ��3e L���1�J��J I:flt:,`F�ill��' {��L;I.3C"i�� I]4+ li�e. �'i3y' 0���'Oif �VL11jF1 �l1il L1R�lI ��1� l`,�i7c'.d'�#`,Ck�'}'
{��L"�:Jp�tsic�,,. ;�s �me�nctc<l. is fescr�yde,J, sealed bids for the construetion of Water & Sanita�y Sewer
RehaUilitation Contract 101, CPN 02722, ("Project") will be received �y #he City of Fort Worth
Purc�7asing Oifice unti] 1:30 P.M. CST, Thursday, 4ctober 29, 2020 as fuither desc�•ibed below:
City of Fort Worth
Purchasing Division
200 Texas Sti'eet
Fo��t Worth, Texas 76IO2
E�i�� �vill k�r �cc�cG�cc�� h��:
�_ s.l� UI{iii :n t��e adi�ress above,
.�.. E�}' L`41111IC:, I'CiI�".7� flf I1:13i{� �E:}J;��r.r�� ti�ni�� �t;3fw I��itl t�u 1'ft�rssf�ys n�,fy ;�i �k7� 4t�a�tf� �.'�i�41
Ln�,l3v „i����y� i�l���l Iut.atec� ,�t ?tfiF I i%:9ti �R�CC��. J�i}a�� ���i711I1. TCli3$ ��] I�v, }I FfLll'Cf}�SII]�
1)c���{f��a�t'��� '�I�� f I� ����w��n �+�i I I�i� {�v�i��l�ale l�r cll;{:L;}�I ��SC �11{� :ifLil �Fi'{}1�it�i.:l Ciflle, s[,���ti�sed
re.�:eiC�l, ��t'
� II� Ihc� l}icirier desir�s �tx s,��5rr�il [fye 1,ic� aFil .� {��}� s�r [iitie �stl�er Ili�r� IF�e slesi�:e��ie�
-I'E�ur�cf3y. �IMc I>s{[�Et�r ��iii;;l won[ac� �fi� P�rrha;�ng L���a�ru��u��i �l+�ri�a� r�nrFTr,l �t�„rkiGy�
�143LIC5 �}� ���-��}'7.��{1�r I[1 f11;shS� ;��� sa��ss,�nin���i�l icr me�:l � i�.iet•����in� tl�F,�ri�����e���
.��t�}E�}ve� n� tExe �nutl� Tni� �.��E3i�y o�r C;t,� I�,�lI Icr�.;�t�>d:�� ?IMf� "fr,xa�s ,�ir�z,a, Fort;.'d�rl��,
�'cr:r�; ifFI3�� 44fltl'� 1aa*. �11i��5� �ti1�I I}P f'CC�`l'r�[� �li]LI IIICLcIl�til� 51,��nE,c�.l r,�s a�k�is�c.
]3ids will be opened publicty and read aloud at 2:00 PM CST in �h� (_'ity i=��,a�n��il C'IiaittL�ers �rr;:f
C+r�u�cJcsst �hfs�t�t�la liv�� wlreFy�rk :�e�d CI{i24� PUL3�SL` �el�visiutt xvJ�i�.i� �.aii lx;.��c:���eci ��I
�Rt;�:l�farsks�u� �h�Q�:is,b �x� �titi�i•� _ "f'k�e �e�era� 4��wl�lic �v�i� n{,� €�e �Ilo�verJ ir� tl7e � i�v �'�ru�sL.i1
C'�1�siii'�Cr�
1�� r����ilii��i_ iii lic�ii �rl tl�livct�n�� ��{,�n;;l�te�E ;��I3L l�rse�ii� liar R]�s; �,�c����.1 �c, [�I[' PIfCC�F,�wIT14' � illlt�t,
1��cfiE�f�s �liall e-�tr�i] II�:c;�ii7��l�t�si Alfil=_ ti�riatw [r� kl�ii= C;ik} �'ru��.ct lv�4����;�r iru k,��rr t�u�ri "�:lMf1
��.a�t, on [I�e �et4s�c! C'i�y k�t�s�n�as da�� a�ntir �fie. I�i�l n{�e��i�,�;.t'�x�r�, e,�cl<«iVe ��Ctl��e �ii�i c,pti�tiir��
d���;
GCN�RAL D�SCRT�'TION OF WORK
The major work will consist of tl�e (approximate) following:
Water:
4,600 LF 8" DIP Water
30 CY Water Line Grot�ting
175 SY Block Sod Placement
49 EA I" Water Service
14 EA 1.5" Water Service
1Q EA 2" Water Service
Sanitary Sewer:
2,900 LF 8" Sewer PVC �ipe
300 LF 8" PVC Sewer Pipe w/ CSS 13ackfIl
900 LF S" DI Sewei� Pipe w/ Protecto 401 Coating
20a FL I" DI Sewer Pipe w/ Protecto 441 Coating, CSS Backfil]
80 LF 10" D2 Sewer Pipe W/ Protecto 401 Caating
85 LF S" DP Sewer Pipe W/ Protecta 401 Coating By Other Than Opei1 Cut
CITY OF FpRT WORTH Water and Sanitary Sewer Rehabi[itation Conlract I O1
STAAIDARD CO�ISTRUCTION SPECfFICAT[ON DOCUMT;NT CPN 02722
Tein�orarily Rcviscd Apri] 6, 2020 due to COV[D19 Emergcncy
DO l 1 l3
]TiVITATION TO 13IDllE1LS
Page 2 af 3
920 LF G" Sewer CIPP
25 EA 4' Manhole
4 EA 4' Shallow Manhole
2 VF 4' Extra Depth Manhale
30 EA Concrete Collar
30 CY Sanitaiy Lia�e Gz�outing
Pavement:
I,000 T.,F 6" Curb and Gutter
2,500 S�� G" Concrete Driveway
2,633 SF 4" Concrete Sidewallc
10,000 L,F 4' Wide Asphalt Pavczncz�t Repair, Residentia]
PR�QUALIFICAT[ON
'The improvements included in tk�is pr•oject musc be performed by a contractor wha is pre-
qualified by the City at the time oP bid opeili3�g. The procedures for qualification and pre-
qualification arc outlined in the Sectian 00 23 ] 3— INSTRUCTIONS TO F3IDDERS.
DOCi1MENT EXAMINATION ANll PROCUREMENTS
The Biddir�g and Contz-act Documents may be examEned or obtained on-line by visiting the Cit�
of F'ort Wnrth's Purchasing Division website �t 1�ttp:Uwww.fort��orthtexas.�ov/puz�chasin�/ and
clicking o�� ti�e link to thc advez-tised project folders on #he City's electronic document
management and collaboration system site. The Contract Docun�ents may be downloaded,
viewed, and printed by interested confractors and/or suppliers.
Bid Docurr�ent Package
l�tt sJ/daes.b360.autoc�esk.co�n/s��ares/Q£e3e81.5-152i=4ec€f-�3fe-IOfd8G65i4ac
Addenda Foldei•
htips:ll dacs.b360. autodesk, com/shares�4 efa�G2d-S 82c-4d90-b429-fb(}79et�9b203
Copies of the Bidding and Contract Documents may be pu��chased fro�n Shield Engineering
Group, PLLC office which is located at:
1600 W. 7th Street Suite 200
�'ort Worth, TX 76012
'�'he cost of Bidding and Contract Docuinents is:
Set af Bidd�z�g a�id Coniract Documents with full size drawings: $74.00
Set of Bidding and Contract Documents with laalf size (if available) drawings: �40.00
PR�B1D CONFEREI�CE
A prebid conference may be held as dise�assed in Section p0 2] 13 - INSTRUCT'IONS TO
BIDDERS at ihe following date, and time via .� ti4�u�� t�r�Yic[tE�t�.in� ssE�},Ji4:i�is�n;
DATE: Thw•sday Oct�ober 15, 2020
T�M�: 9:00 �1M. 3] 1 W Tenth St, Fort Wat•th. TX 76IO2
II�.� �a��l��c[ r.c�i�lerr'ncc� �vill hs= IlC1CI 4J7EIkl� VI� K7 xveb cna7f�a�i;n�.i�,� ����aCic�ticar�, io�vi[;�tiia��.� st�il] l��
f�lti�f'I�ILI�L'i� L�91'I;LIIy I(� 1I]il�c' 4��i�i} �j:1�C' ti11�711�15lt{� �"�}{�}I"[..afi`i}jl$ �31� i��tci e:� in 1,17e �}enj4.cR tn tl7e Ci[y
k'�i�jetiL �'��e�t���r:���c�r'��G-lisc L?��i�ii i=,ir�;i�tc't�o�, �C�MF� �7rrwcni.�ricm tiven ar �17c �rc:bi[� c��tit'cr�'r��,�
:io:r.i :sny t��o�siir+ns anil u�r�w��r� E�i��,vitJ��i t�� tl7e ��rrkFiJ L"llll�i3'CfLi:C 441�I I�� i��u�rl ��s ��n l+ciJenclurn
�,,t Iltt �:�ll fcti' i�jclw,
CTfY OF FOR1' WOCZ"f]i W,iter and 5auitary Sewer Rehabiiitatfon Contract ] 01
STANDAftD CONS'fRUCT]OI�[ SPEC[F[CATiQN DpCUMP.NT CPN 02722
Temporarily Revised April 6, 2020 due to COVID 19 Emergency
aa>> >3
INVI"IA'170N TO BIDDERS
Page 3 of 3
C�'t� ��rch�il ct�iiiisrea�c� i� n{�I liei��� ]rc1�E, �srus}�ecti��•v E,itlti��s cair� c•�E1z�[I c�ii�};[ica��� t�r c�e�2�«��ais In
11CCOi'CC3J1�� 4i'IE�I �,�CCk{YII C] LFf� 1I11'. IiiS[rlii=ilx�115 [D L�I�.ICIt;�'S ft'fCFI'.33C�L� gl�}V�.1�J i�fC �rrc�,acct
n};t��.i�erls� �si �1�� w-n7ail adiCrs;ss�.s I���c�l Ix.lnw_ E=r�,flf�i;il ��sic:;�ic�r�s tik�ill s��9tice as "q�ieslions i�ti
}vriti�7�" ��r�i II7+� r�c�uire��1�I1R l{} IC}]"17i11II� !I]i�ll C�klE51JOR5 ES SIIS#lCl1l�L'cC. It'Et[;f.�tiS:i�'Y,
Addei�d� +,vill �Se isstir.d �5uts�iCiFU �4F �flC frGsir��c�ic�ns fo [�id�lers.
CITY'S RTGHT TO ACCEPT OR REJECT BIDS
City reserves the right to waive it•regularities and to accept or reject bids.
AWARD
City wili award a contract to the Bidder presenting the Iawest price, qualifcations aEid
competencies considered.
INQUIRIES
Ali ii�quiries ��elative to this procurement should be addressed ta the following:
Attn: J. Chris Underwood, City of Fart Worth Water Department Design Services
Email: John.Underwood a fortworthtexas.gov
Phone: (817) 392-2926
ANDIOR
Atin: Craig Barnes, FE, Shi�ld �ngineerii7g Graup, PLJ.0
Email: craig.barnes@segp]lc.com
Phone: 8 ] 7.8I 0.069G
F;�P#�F����7�! �F �[���i.[�ST.ti'!'
�I c, �i���.�rc liici�lc�rs:�re ke�+l si�+ �s� daie af:��E}� ktC4Y �llfirnifullt}ii �,111�3�`f1R Ct� �li�w �,rnj�c� ���� �17e
(=OViC.}I �} ��oi{�'���i�'y c���luR�[�1is�i�. s�� ��anersif�d. �s i� u�;�1' �'�I�t� Co I:oi� �trt����t. I,i�cicr;� r�rc
�t�c������t4�r,l ic} ca�ail Tj'�E,e�ssia�s� trr la�tc�c,r in �Ititi �,��c�c��ire3n�n! [�s [h� C'rk}� �r�r�c.c�t �1��:.E�ra�;er ancl
:aG� I��.�sF�n i=n�i�icc�r -�he� f�inr.�l �hu��fEi in�lt��� rEEr EaiEf�Ec�r�� �.ar������nv n�tor�t. c�r�n��i�'� j'�I'S�ki3, C�1�C
�FIUI�Ii�kIP1�4 s',l113tl� �iLIf�3'�w4 KIY{� I}Il�bil�' niirn��.r, �!I Aif�lenc}a �.��il Ix disti il}u��tl tlir�f�.�lv isr a��{rs�
wki�� E�s�ve �x�,ress�,i illl ifYt41't5E lll 1lli Ifi'i}L'I.II'{'Ff1tIll ;��k�i will �ilsc� i��. �,{�s{c.tf in Ehe CityT,.�l� f��s�rt
l�l+����f�'; �7��rek�:i�i��� w[:I��il� u! htip://#ortwo��thtexas.gov/purchasing/
PLAN HOLDERS
To ensure you are kept up ta date of any new i»formatior� per•tinent to this project such as when
an addenda is issued, download the Plan Holder Registi�ation form to your computer, complete
and email it ta ttae City Project Manager or the l�� �oktr� F��3�*i n��t�r.
The City Project Manager a.nd desigE� E��gineer are respoiisible to upload the Plans Holder
Registration form to the Plan Hofders folder in BIM360.
Mail your completed Plan Holder Registration form to those listed in INQUIRIES above.
ADVERTIS�M�NT DATES
October l, 2020
October 8, 2020
FND OI' SECT�ON
CITY OP FORT WOIt'I�H W1+ater and Sanitary Scwcr Rehabilitation Coni�act l01
STANDARi� CONS7RUC"I�ION SPEC1PiCATlON llOCUMENT CPN a2722
Teinporarily Revised April 6, 2020 due lo COVIU] 9 Emergency
00 l ] ] 3
TT�IVITATION TO 1�Tt�1)L:kS
Page4 of4
END OF SECTION
C[TY OP FORT WOATH � Water and Sai�iLary Sewcr Rd�abiiitation Contrict iDJ
STANDARD COT�ISTRUCTION SYEC[F1CA'1'lON IIOCUMEN'C CPN D2722
Temporarily Rcviscd Aprl E,, 2020 due to CdV1D ] 9 Emergency
Page 1 of l0
SECTION 00 21 13
�rrsrirucrro�vs -ro BIDDExs
l. Defined Terms
l.l. Ter�ms used ii� these INSTRUCTTONS TO BIDDGRS, wi�ic� are defined in Section 00
72 00 - GENEIZAL CONDITIONS.
1.2. Cei�tai�l additional terms used in these INSTRUCTIONS TO BIDDERS have the
meanings indicated below which are a�plicable to bath the sing�Elar and plural thereof.
1.2. l. Bidder: Any persoi3, firm, partnership, company, associaiion, or coz�poration actin�
directly through a duly authorized representative, sub�nitting a bid for performing
the work coi�templated uiider tl�e Contract Documea�ts.
1.2.2. Nonresident Bidcler: Any pez-son, �a�m, partnership, company, association, or
corporatio�l acting directly through a dufy author•ized represeniative, submitting a
bid for performing the worlc cozite�x�plated under the Contract Documents whose
principa] place of b��siiiess is not i�� the State of Texas.
I.23. Successful Bidder: The lowest responsible ai7d responsive Bidder to whom City
(on the basis of City's evaluatian as hereinafter pi�ovided} rnakes an award.
2. Copies of Bidding Documents
2. l.. Neztliez� City nor Engineer shall ass��me any responsibility for errors or
misinterpretations resulting from the Biclders use of incoinplete sets of l3idding
Docuzn ei�ts.
2.2. City a��d E��giraeez� in anakang copies of �3iddin� Documents a�ailable do so only fnr #he
purpose of obtaining l3ids for• the Work and do not authorize or confer a license or ga�ant
far any otl�er use.
3. �'requali�cation of Bidders (Prime Coniractors and Subcontractors)
3.1. All Bidders and their s��hcontractors are required to be preq�EaEified for the wori< types
requiring prequalification at C11e time of bidding. Bids received from cantz�actaz�s who aa�e
not pt•equalified shall not be opened and, even if inadverte��tly opened, shall not be
considered. Prequa.lification require�r�ent work types at�d documentation are availabfe
hy accessing alt rcquired files through the City's websiYe at:
hti�s://a�lps.fc�rtwc�rthfexas.�ov/YroiectResou rces/
3.1. ]. Paving — Requiremcnts docu�nent located at�;
hltps://a.�ps.fortworthtexas.gov/ProjectReso�rces/ResourcesP/02%20-
%20Construction%20Docu�r�e��ts/Coc�tractor%20Prequaliiicatioi�/11' W%20Paving
%20Coi�iractor%20Pre ualification%20Pro rain/PRC UALiF.�CATION%20RE
UIR�,MENTS%20POR%20PAV iNG%2(}CUNTRACTORS.pdf
CITY f?F FQRT WpRTH Water ancE Sanitary Sewer Rehabilitation ContracE l01
S'1'ANDAKll CONSTAUCTlON SPECIFICATION DOCUMENT CPN D2722
1'empordrily Revised April 24, 2U20 due to COViDl9 Emergency
Pagc 2 uf 10
3.12. Roadway and C'edestria» I ighti��g —Requirements document located at;
https :ll a�s.fort�uor�htex as. gov/Pro}ectReso urceslRes o urces P/02%20 -
°/420Co ilstructi on%20Docuane��#s/Contractor%20Prequa� �ficati on/TP W%20Roadwa
_y%ZOa��d%20Pedestrian%20Li�htin °�/o20Prec�ualifcation%20Prograin/STREE'�'%
20LIGHT°/a20PREQUl1L%20REOMNT'S.pdf
3.l .3. Water and Sanitary Sewer — Requirements document Eocated at;
littps://a�ps.fo��worthtexas. ro� v/PY•ojectResotu�ceslResourcesP/02%20-
%20Co�7structioil%20DacLimez�tslContractor%2�Pre ualircation/Water°/o20and°/o2
OSanitary%20Sewer%20C���tractor°/o2QPrequal ification%20Progra,m/W SS%2Q��_c
q ual%20req�i[re�nents,pdf
3.2. Each Bidder, uniess currently prequaliiled, must submit ta City at least seven (7)
calendar days prinr to Bid opening, the documentation identified in Section 00 45 i 1,
BIDDEAS PR�QIJALiFICATIONS.
3.2.1.Subinissioi� of and/or questions related ta prequalificatian should be addressed to
the City contact as pro�ided in Para�rap� 6.1.
3.2.2.'I`�.���i's��._��l�.1' Pf�f��El�)�Jft1=ti ��L•�E_ I�S-� C�]V�L�.��k ,� Fi:{iti���wC����r
�,r�t�u,,l;r-��.,�as,�f Eos,� �r���:f��G {I�irrr�k� rl�e �iR��e �ria4� 3��here if V]llls� 4J73E�'�'t.���}� i}l'i�t;i'
is :rr 431ucr f I�.t:�rtil. �itnc, li�c:fl€�) ari,J larr _��J cJ:iy� �r�s� II�{ �.xE�rr,�iic�ir atif 13��
�i��tii,�t�fE�.�� �o-r��4��� ���ill, ilrx f�i��r[Ge,� rx��rudi�:rn c�{ite -� ��y �€a�• �i�rd i��c!�ti!]s_ will �tnt �.r�
�sur��a���lic�J]}� �i�t��a::ji��E lit��ii lt;�viir�; ��it I�IL�LjL`F�ti �7l{� il�lE'ix't!, F1 Ric��ler :n il�i�
�i[��,�t�crr� ���itl 37, vc• iR� Iriri ����c�}eci ;�nd r¢acl :�lund ae�d wif! �re allr���red 5��u�i�a:;��
�fa�s �c�t�s: s�l� l�4iso�tess a� ���7e 'iU' t��}� j t�� ��al,i��it :� Ci}]iSII�L�L' �}I�!'(�Li;i1� I ic;�tacrn
f�ares,�,,l ��,�ck���e. ��{i�l��r� �c� �i�otcl}, ;��b��il. 47i' i11Y�17i1E5#5� il� �Il II1CL11iiF?iL'�iC Ik1l'I{r��c_
wif� rei�dcr E��e �3i�der'S E�iti t�ni7•rs'rE�c�i��lve. �t'1�7� F�r4't�ii�rlili�,«it�n r4>>�kti;wl
�J«c�u3tc;a��s s��a�w tFt�: Fiicici�r 2�� �l;p,X+ nL31-4�i1klII�C{�_ C�k� �]Ei� �4'J�1 �]S; 1'Undci��.�J ��u�t-
r�s�onsive..� 13i�fcicr u�ay EEc�� usc �l�is �xc�F��ac�,� �c� �eeh 2i �}r4�ct��.,lif��:31a4sn w1�1��s
���`:it�hr I�tif�il Ili�ii xva��cl� xv,�s ir, },lacc cr���];e dHie o�-ex���r��ilu�t. r'1 C3i�1�c� u�EE� sc.eks
t� 4ekcr�.�se iEs �rct�ualef�c�ai€a>�o st:�tuk i�r�E�� fi�!lu�V �h� li.itlifitm�t� tiii�,�fllit:a]lr�vi�3v
�I����_^ws,
3.3. '�"he City reseives the right to z�equire any pre-c�ualified contractar who is the apparent
low bidder(s) for a prajcct to submit such additional inforination as the City, in its sole
discretion may rec�uiz�e, includin� but not li�nited to manpower and equipment records,
ififormation about lcey personne] to be assigned to the project, and construction schedule,
to assist the Ciiy in evaluating and assessing the ahility of the apparent low 6idder(s) to
deliver a quality product and successfully complete projecis ror the amaunt hid within
the stipulated time frame. Based upon the City's assessment of the submitted
info�•mation, a recammendation �-egardiz�g the award of a contract wil] be made to the
City CounciL Failure to submit the additional information, if requested, nnay be grounds
for eejecting the a�parent low bidder as non-responsi�e. Affected contrac#ors will be
notified in writing of a recomfnendation to the City Cauncil.
3.4. Iz� adciition to prequalificatinn, additional requirernents for qualification may be required
within variaus sections of the Coniract Docume3�ts.
C1TY OF FORT WORT[] Water and 5a��ilary Scwcr Rehabilit�ition Contract lUl
STANpARll CONS'fRl1CT[ON SPECiFICATTON nOCUMENI' CPN 02722
Tempurarily Cte�ised April 24, 2020 due to CQVIDI9 rmergency
Pagc 3 of ]0
�4.
3.5. Special qualifications required for this project include the folfowing:
Examination of Sidding anc� Contract Documents, Oiher Related Data, and Site
4.1. Before subinitting a Bid, each Bidder shall:
4. I. I. Examine and carefi�lly study the Contract Doc�aments and other related data
identified in the Bidding Documents {including "technical data" referred to in
Pat�agraph 4.2. below). No inforrnation given by Ciiy or any representative of the
City other than that contained ir� the Cnntract Documents and officially
promulgated addenda thereto, shall be bindi»g upon the City.
4.1.2. Visit the site to become familiar with and satisfy Bidder as to the general, loca] and
site condi#ions that may affect cost, progress, p�i�ormance or furnishing of the
Work.
4.1.3. Consider federal, state and local Laws and Regulations that may affect cost,
progress, performance or furnishi�ig of the Worlc.
4. I.4. Study a1L• (i) reports of explorations and tests of subsurface conditions at or
contiguous to the Site and all drawings of physical conditions relating to existing
surface ar subsurface structures at tl�e Site (except Underground Faci�ities) that
have been identified in t�e Contract Docuixients as containing reliable "t�clv�ical
data" and {ii) reports and drawings of Hazardous Environmental Cor�ditions, if any,
at the Site that have bee�� identi�ed in the Co��tract Docuzxzents as cozataia�ing
reliable °technical data."
► 4.1.5. Be advised that the Contract Documents on file with the City shall eonstitl�te all oP
° the infarmation which thE City will furnish. All additional info�-matian and data
which the City will supply a$e�• promulgation af the formal Contract Doct�ments
� shall be iss�Eed in the far�x� of w��itteaa addenda and shall become part of the Contract
�� Documents just as though such addenda �vere actuaIly written i��to the original
ContracE Docume��ts. No infonnation given by the City o#l�er than that contained in
s the Contract Docurnents and of�iciafly prornulgated addenda thereto, shall be
•; bznding upon the City.
4.1.6. Perform independent research, in�estigatEons, tests, borii�gs, and such other means
as may bc necessary to gain a complete knowledge of the conditions which will be
encountea�ed durir►g the construction of tl�e project. On request, City may provide
ea.ch Bidder access to the site to conduct sE�ch examir�ations, investi�ations,
explorations, tests and studies as each Bidder deems necessary for submission of a
Bid. Bidder must fill all holes and elean up and restore the site to its f4rmer
conditions upon completion of such explorations, investigations, tests and studies.
CITY OF FORT WORTII
S"I AhiDARll CONS7IZUC"i [ON 5YECIFICA"1�lON DOCUMENT
Temporarily Revised April 24, 2020 due to COVIDI9 Emergencg
Watcrand Sanft�ry Scwcritchabi]]laGon Contract !Ol
CPN 02722
Page 4 of 10
4.1.7. Deterir�ine the difiic�lties o#�the Work and all attending circumstances affecting the
cosi of doing the Work, timc required for its conlpletion, and obtain a]] information
required to inake a proposai. Bidders shall i�ely exclusively and sole]y upon their
own estimates, investigation, research, tests, explorations, and other data which are
necessary for full and complete i»forznation upon which the proposa] is to be based.
It is unders#oad that tl3e submission of a proposal is prima-facie evidence that the
Bidder has �nade the investigatian, examinatinns and #ests herein required. Claims
fnr additio»al compensafion due to variatio��s between conditions actually
er�cauntered in construction and as indicated in the Cont�-act Documents wili not be
allowed.
4.1.8. Promptly notify City af a[i confliets, errors, dmbiguities or discrepancies in or
between ihe Contract Documents and such othe�� reiated documents. 'I'he Contractar
shaEl not ta[ce advantage of any gross enror az� omission in the Contract Documents,
and the City shall E�e pert•mitted to make such corrections ar interpretatior►s as �ay
be deemed necessary far fulfillment af the intent of the Contract Documents.
4.2. Reference is made to Section 00 73 00 — Supplementary Conditions far identification
of:
4.2.1. those reports of explarations aild tcsts of subsurPace conditions at or contiguous to
the site which ha�e l�een utilized Uy City in preparation of the Contract Documents.
The ]ogs of Soi] Boriiigs, if any, on the plans are for general infarination only.
Neither the City nor tlae Engineer guarantee that the data shown is representative of
conditio3�s which actualiy exist.
4.2.2. those drawings of physical conditions in or relating to existing surface and
subsurface stnictures (except Underground Facilities) which are at ar contiguo�s to
the site that Ezave been utilized by City in preparatini� af the Contract Dacuments.
4.2.3. copies af such reports aczd drawings will be ir�ade availabie by City to any Bidder
an request, Tlaose reports and dz�awings inay not be part of the Contract
Dacuine»ts, but the °lechnical data" contained therein upon which Bidder is entitied
to rely as provided in Paragraph 4.{?2. of the Genera! Conditions has been identified
aiid established in 1'aragraph SC 4.{}2 ofthe Supple�nentary Conditions. Bidder is
responsible for any interpretatio�� or conclusion drawn from any °technical data" or
aiiy other data, interpretations, opinians or information.
C[TY OF FORT WORTFI Waterand Sanitary Sewer 2ehabilitatiun Co�klract 101
STANT�Altll CONS'1�AUCT[()N SPEC[F[CATiON DOCUMI?AIT CPh! 02722
'3'empararily Re�ised April 24, 2020 due #o COVIE�19 i:mergency
Page 5 p1� 10
4.3. The submission of a Bid will constftute an incont�-overiibie representation by Bidder (i)
that Bidder has coixaplied with every requirement of tl�is Paragraph 4, (ii} that witi�aut
exception ti�e Bid is premised upon performing azad f�anislvng the Work required by tl�e
Contract Documents az�d applyin� the specific �neans, methods, techniques, sequences or
procedures of construction (if any) that ir�ay he s�awn or indicated or expressly req��ired
by the Contract Documents, (iiE) that Bidder has given City written notice of a�l
conflicts, errors, a�nbiguities and discrepancies in the Contract Documents and the
wriiten resolutioz�s thereof by City are acceptable to Bidder, and when said co���7icts,
etc., ha�e not been �•esolved through the ir�terpretations by City as described in
Paragraph 6., and {iv) that the Contract Documents are generaily sufficient to indicaie
and convey understanding of all tenns and conditions for performing and furnishing the
Work.
4.4. The provisaons ofthis Paragraph 4, i��c�usive, do nat a�ply to Asbestos, Palychlori��ated
bipt�enyls (PCBs), Petroleuzn, Hazai�dous Waste or Radioactive Material covered by
Paragrapl� 4.Ob. of the Ge»eral Conditions, unless s�ecifically identi�ed in the Contrac#
Docui�ients.
5. AvailabEiity of Lands for Work, Etc.
5.1. The ]ands upon which ti�e Work is to be performed, rig�ts-of-way and easements far
access tlaereto a��d other ]ands designated far use by Cont��actor in performing the Wnrk
a�•e identified in the Contract Dacuinents. A]I additional lands and access thereto
required %r temporary constniction facilities, cor�str��ctzon equipment or strn•age of
materials and equipment to be inco3porated in the Work are to be obtained and paid for
by Contractor. Easements for permanent structures or perrr�anent changes in existing
facilities a�•e to be obtained and paid for by City unless otherwise provided in tl�e
Contract Documents.
5.2. Outstanding right-of-way, easernents, ai�d/ar per�nits to be acquired by the City are Iisted
in Paragraph SC 4A1 oftkae Suppleine��ta�y Conditions. In ihe er�ent the necessa�y righi-
of way, easements, and/or permits are not obtai��ed, the Ci#y reserves the right to cancel
the award of coi�tract at a�1y time before tlle Bidder begins any canstruction woi�k on the
project.
5.3. T�ie Bidder shal] be prepared to commencc construction without al� executed right-af
way, easements, and/or pei�inits, a��d shall subinit a schedule to the City of haw
construc#ion will proceed in the athea� areas of the project that do not require permits
and/or easeme��ts.
6. Ynterpretations an�d Addenda
CiTY OF FORT WORTH Waler and Sanit:iry Sewer Rehahililation Coniract i01
STANDARIJ CONSTRIJCTION SPECIt1CAT[ON DOCIJM];1V"1' CPN 02722
Tempur:�rily Revised Aprl 24, 2�20 due to COVIDI9 Gmcrgc�icy
['age Fi of l0
6.1. All c�uestions about the meaning or intent of the Bidding Documents are to be directed to Ciry in writi�lg
on or before 2 p.m., the Monday priar to ii�e Bid openang. Questions received a��er this day �nay nat be
responded to. Interpretatians or clarificatians considered necessary by Ciry in response to such
questions will be issued by Addenda delivered to a11 parties recorded by City as having recei�ed the
Bidding Docuinents. Only questions answered by formal written Addenda will be bi�iding. Ot�al and
other inter�retations or clari�cations will be without legal effect.
Address questians ta:
City af Fart Warth
200 Texas Streei
Fort Worth, TX 76102
Attn: J. Clu•is Underwaod, City of Fort WorEh
k'ax: 817.392.2559
�mail: John.Underwaad@fartworthtexas.gov
Phone: 817.392.2629
Water Degartme�t Design Serviccs
6.2. Adc�er►da inay also be issued to modify the Bidding Docuinents as deemec� advisable by
City.
6.3. flddenda or clarifications may Ue posted via the City's electronic document �nanagement
and callaboration systezn at lattps://docs.b360.az�tadesk.coin/shares4efa4C�2c�-882c-4d9U-
b429-fb079eU9b203
6.4. A prebid canference may be held at the time and place indicated in the Advertisement or
INViTATION TO BIDDERS. Representatives of City will be preser�t to discuss thc
Project. Bidders are encouraged to attend and participate in the conference. City wil]
t�-ansmit to a�l prospecti�ve Bidders of record such Addenda as City considers neccssary
in respoz�se to quesfions arising at the conference. Ora] statements may nat be r•elied
upon and wiil i�at ve binding or legally effective.
7. Sid Security
7.1. Each Bid �nust �e accompanied hy Bid Bond iaaade payable ta City in a�7 amount oF five
(5) percent of Bidder's maximum Bid price on form attached, issued Uy a surety meeting
the requirements af Paragraphs S.O I af thc General Conditio�is.
72. The Bid Bond of all BicEders wili be retained unti] the conditions of the No#icc of Award
have been satisfied. If tl�e Successful Bicider fails to execute and deliver the compiete
Agreement within 10 days after the Notice of Award, Ci#y 3nay consider Bidder to be in
default, rescind the Notice of Award, and the Bid Bond of that B�cider wil� be foefeited.
Such forfeiture shal] be City's exclusive remedy if Bidder defauits. The Bid Bond of a[l
other [3idders whom City believes ta have a z�easonable chance aP receivin� the award
will be retained by City untit final contract execution.
Cl"I�Y OF FORT WORI I[ Water �nd Sanitary Sewer Rehabilitatian Contract 101
STANllAKI} CONS'iRUC'I10N SPECIFICA310N DOCUM�hlT CPN f12722
"femporarily Revised April 24, 2020 due ta CQVIDI9 �mergcncy
1'age 7 of ]0
S. Contract Titraes
The number of days within which, ar the dates by which, Milestoiles a�•e to be achieved i��
accordance with the General Requirements and the Work is to be completed and ready for
Pina] Acceptancc is set forth in the A�-eement or incorporated therein by rcference to the
attached Bid Foaxn.
9. Liquidated Damages
Provisions f'or liquidated damages are set for-lh i�� the Agreement.
10. Substitirte and "Or��qua[" Items
Tl�e ConCract, if awarded, will 6e on the basis of �natea�ials and equipment descrihed in #he
BicEding Documents without considez�ation of possible substitute or "or-eqi�al" items.
Wf�enever it is indicated or specrf ed in the Bidding Documents thaE a"substitute" or "or-
equa�" item of materiat or eyuipment may be furnished or used by Contractor if acceptable to
City, application for s��eh accepta��ce will not be considered by City un#il after tl�e Effective
Date of the Agreeinent. Tl�e procedure for submission of any such application by Cof�tractor
and consideration by City is set forth in Paragraphs 6.OSA., 6.OSB. and 6.OSC. of #he General
Conditions and is su�plemented in Section O 1 25 00 of the General Requirements.
11. Subcontractars, Suppliers and Others
I 1. i. In accordance with the City's Business Di�ersity Enterprise Ordii7ance No. 20020-
] 2-201 1(as amendec!), the City has goals for the participation of minority business
and/or s�nall business enterprises in City contracts. A copy of the Ordinance can be
obtained fro�n the Office of the City Sec��etary. The Bidder shall su�mit tt�e MT3E and
SBE Utilizatioz� Form, SUbcontractor/Supplier Utilizatian Form, Prim.e Contractor
Wai�er Form and/or Good Faith Effort Foa��n with documentation a�ld/or Joint
Ver�ture For�n as appropriate. The Forms including docurr�entatio�� znust be received
by the City no later than 2:00 P.M. CST, on the second business day after the bic�
o�aening date. The Bidder shal] obtain a receipt from the City as evidence the
documentation was r•eceived. Failure to comply shal] render the bid as non-
res�onsive.
11.2. No Contractor shall be requir�d to employ any S��bcontractor, St�pplier, other person
o�• oiganization against who�n Contractor has reasonable objection.
12. Bici Form
12.1. The Bid For•m is included with t��e Bidding DocEuneE�ts; additional copies may be
obtained froin the City.
12.2. All blanks on the Bid Foim must be completed by printing in ink and the Bid Form
sigi�ed in ink. Erasures oi- atteratians sl�all be initialed in ink by tl�e peison signing
the Bici Form. A Bid price shall he indicated for each Bid item, alternative, az�d unit
price item listec! therein. In the case of optioi�a) alternatives, the words "No Bid,"
"No Change," or "Not Applical�le" may 6e eritered. Bidder shall statE tlie prices,
written in inlc in both words and ��u�a�e�-als, for which the Bidder proposes to do the
woz�k contemplated or fEn•nish materials required. AI7 prices shall be written legibly.
ln case of cEiscrepancy between price iz� written words and the price in written
nuinerals, thc price in written words shall govern.
ciTv or eoKr waRri�
SFANDARD CONSTRUG"1�lON SPECiFICAT[OAI �OCUMEN'f
'I�emporarily Revised April 24, 2U20 due to COVIDI9 Gmergency
W:iter ancE Sai�itary Sewer RehabilrtaE]on Contract 101
CPN D2722
Pagc R af I 0
12.3. Bids by corporatioias shall be executed in the corporate name by the president or a
vice-president or othej• corparate off cer accompanied by evidence nf autl�ority to
si�;n. T}ae corporate seai shal� be affixed. The corporate address and state of
incorporation shall be s�awn below the signature.
12.4. Bids by partnerships shal[ be executed in the partnership nanae a�id signed 6y a
partner, whose title �nust appear under the signature accompanied by evidence of
authority to sign. The official address of the paz-tnea�ship shall be shown below the
signature.
125. Bids by limited liability companies shall be executed in tl�e na�ne of the firen by a
member and acco�npanied by evidence of authority to sign. The state of formation of
the firm and the officia! address of the firm shall be shown.
12.0
12.7
[ 2.8
12.9
Bids by indivicivals shall show tF►e Bidder's na�ne and official address.
Bids by joint ventures shall be executed by each joint �er►ture in the manner indicated
on the Bid FoeRn. The official address ofthe joint ve��ture shal� be shown.
All naines shall be typed or }�rinted in ink below the sigYiaturc.
The B id shall cantain ara ackc�owledgement of receipt of all Addenda, the numbers of
which shail be f�iiled in on the Bid Forrn.
12.10. Pos#al and e-mail addresses and telephane number for cominunications regarding ihe
Bid shall be shown.
12.1 I. Evidence of authority ta conduct business as a NoiiresEdent Bidder in the state of
Texas shall be provided in accorda3�ce with Section 00 43 37 — Vendor Coinpliance
to State Law Non Resident Bidder.
13. S�hmission of Bids
Bids sl�all be stibmitted on the prescri�ed Bid Form, provided with the Bidding Documents,
at the tiine and place indicated in the Advertisemeiit or INVITATION TO �3TDDERS,
adds•essed to Purchasing Manager of the City, azad shall be enclosed in an apaque sealed
envelope, marked with the City Project Number, Project title, the narne and address of
Bidder, and acco►npanied by the Bid security and other required documents. If the Bid is sent
through the mail ar other deli�ery syste3n, the sealed envelope shall be e��ctosed in a sepat�ate
envelope with tl�e ilotation "BID FNCLOSED" on the face af it.
14. 1Vlodification� and WithdrawaI of Bids
14.1. Bids addressed ta the Purchasing Manager and filcd with the Purchasing Of�ce
cannot be withdrawn �rior ta the time set £oz- bid opening. A request for wiihdrawal
inust be made in writing by an appropriate document duly execLited i�� the manner
tl7at a Bid must be executed and delivered to the place where Bids are to be submitted
at any time prior to the opening of Bids. After all Bids not reyuested for withdrawal
are opened and publicty read aloud, the �ids for which a withdrawal request has been
pz�operly filed inay, at tl�e option af the City, be 3�etut�ned unopened.
CITY OF FC?RT WORTH
S'fANDAItD CC)T�STl2I1CT']OT�I SPT-;CiPiCATI01�! 170CLfM�,NT
7 emporarily Revised ilprf] 24, 2020 duc lo COV[ll I 9 Emergency
Water and Sanitary 5cwcr Rchabilitalion Cuntract l0i
CPN Q2722
Page 9 of 10
14.2. Bidders may modify their Bid by electronic communication at any time p��ior to the
time set %r the closing of Bid receipt.
15. Open�ng af I3ids
Bids will be opened and read aloud publicly at the ptace where Bids are to be subrnitted. 1�n
abstract of the amounts of the base Bids and majoz� alternates (if ai�y) will be macEe available
to Biddcrs ai�er the opening ofBids.
I6. Bids to Remain Subject to Acceptance
All Bads will remain subject to acceptance far the time period specified for Notice of Award
and execution and detivery of a complete Agreement by Successful Bidder. City inay, at
City's sofe discretion, release any Bid and nuilify the Bid security prior to that date.
17. Eva�uation of Bids and Arvard of Contract
17.1. City reserves fihe right to reject any or all Bids, including without limitation the rights
ro reject any or all nonconforming, nonresponsive, unbalanccd or conditional BicEs
and to reject tlle Bid oPany Bidder if City believes that it would not be in the best
interest of the Project to make an award to that Bidder, whether because the Bid is
nat respoi�sive or the Bidder is unaualified or of doubtful #inancia] abili#y or fails to
meet any other pertinent standard or criteria established by City. City also reserves
the right to wai�e infot•malities not involving price, contract iime or ciianges in the
Work with thc Successfu] Bidder. Discrepancies between the multiplicatiar� of units
of Wark and unit prices will be resalved in favor of the unit prices. Discrepancies
between the indicated s�un of any column of figures and the carrect sum thereof wili
be resolved in favor of the correct sum. Discrepancies between words and fgures
will be resolved in favor of the words.
17. ].1. Any or all bids will be t�ejected if City has reason to believe that collusion exists
among the Bidders, Bidder is an interested party to any li#igation against City,
City or Bidder may have a claim against the other or be engaged in litigation,
Bidder is in arrears on any exisfing contract oz� has defaulted on a prcvious
co��tract, }3idder ]�as pe��formed a prior contract in an unsatisfactory �anner, or
Bidder has ui�completed work whic�a in the judginent of the City will prevent ar
hinder ti�e prampt complelion of additionai worlc if awarded.
17.2. City may consider the qualifications and experience of Subcontraetors, Suppliers, and
ath.er persons and organizations proposed for those portions of t��e Work as to which
the identiry of Subcontractors, Supplicrs, and otl�er persons and arganizatinns must
be submiited as pmvided in the Contract Documents or upon #he request of the City.
City also may consider the operating costs, maintenance requi��ements, performance
data and g�Earantces of major items of �naterials and equipment proposed for
incorporatzan in ihe Work when such data is required to be submi#ted prior to the
Notice of Award.
173. City may conduct such investigations as City deems iiecessary to assist in the
evaluation of any Bid and to establish the responszbility, qualifications, and financiai
ability of 73idders, proposed Subcontractors, Supplie►•s and othez- persons a��d
organizatrons to perform and fuinish the Work in accordance with the Contract
Dacuments to City's satisfactzo�� within the prescribed time.
crTv or- F�ox i- woaT� 1
STANDARD CONS'fRUC7'ION SPECiFiCATION DOCIJMENT
7'empnrarlfy Rovised Aprii 24, 2020 due lo COVTD] 9 Emergertcy
WaterandSanitary5ewerAehabi]itaGonContract ]01
CPi�I 02722
Page LO of 70
17.4. Cantractor sl�al] pe��fonn with his own organization, work of a value rtot ]ess than
35% of tE�e value embraced on the ConLract, unless otherwise approved by the City.
17.5. If the Contract is ta be awarded, it will be awarcfed ta lowest responsible and
responsive Biddez� whose e�aluatiozi by City indicates that the award wi]] be in the
best interests of the City.
17.6. Pursuant to '1'exas Government Code Chapter 2252.Q01, the City will not award
contract to a Nonresident Bidder unless the Nanresident Bidder's Uid is lower than
the lowest bid submitted by a responsible Texas Bidder by the same amount t�aat a
Texas resident Uidder would [�e required to unde�•bid a Nonresident Bidder to obtain a
comparable contraet in the state in which the nonresident's principal place of
business is ioca�ed.
17.7. A contract is not awarded until fo1•ma[ City Ca�ncil authorizatian. [f the Contract is
to be awarded, City will award the Contract within 90 days after the clay of the Bid
opening unless exte��ded i�i writing. Na other act of City or others will constitute
acceptaitice o£a Bid. Upon the coi�tractor awarci a Notice of Award wiil be issued by
the City.
17.7.1. The cantractor is required to fill out and sign thc Ccrtificate of lnteresfed
Parties Form 1.295 a�id t�e forzn� must be snbmitted to the Yrojcct Manager
before the contracf will be presented to the City Council. The form can be
obtaiaaed at I�ttps://www.e�hics.state.tx.us/clata/forms11295/1295.�df
17.8. F'ailure or refusa] to comply with the requirements �nay result irti rejection of Bid.
IS. S�gningofAgrecment
18.1. When City issues a Notice of Award tn the 5uccessful Bidd�r, it will be accompanied
by the required nuinber of unsigiled counterparts of the Agreenraent. Within 14 days
thereaFter Contractor sha]] sign and del iver the f•equired nuinber of counterparts of ti�e
Agreement to City with the rec���ired Boilds, Certificates of Jnsurance, anti all other
required docunlentation.
18.2.
l 8.3
Failure to execute a duly awarded contact may subject the Contractor to penalties.
City shall thereafter deliver one fully signecf caunterpart to Contractar.
ENll OF S�CTION
CfTY OP PORT WORTH
51�ftNDARD CON51'RUCTION SP1;CIPICAT[ON T30CLFM�3�lT
Temporarily Revised Apnl 24, 2020 duc to COV1D19 T:mergcncy
Water and Sanit�ry Sewer ReUabilitation Conlract 101
CPN 02722
003] ]5-0
CNGIAIEHR PROI�CT SCH�.DULE
P�gc 7 of 7 0
SECTION 00 31 15
ENGINEER PROJECT SCHEDULE
T'ART I - GENERAL
11 SUMMA.RY
A. Section Includes:
1. General rcquireinents fos- the preparation, sub�nittai, updating, status reporting and
inanagement of the Engineer's Praject Schedule
B. Deviations fro�n this City of Fort Worth Standaz-d S�ecification
1. None.
C. Related Specificalion Seetions include, but are not necessarily li�nited to:
1. Division 1— General Requiren�ents
D. Purpose
The City of Fort WortY� (City) is com�nitted to delivering quality, cost-effective
infrastructure to its citizens in a timely manner. A key tool to acliieve this purpose is a
properly structured schedule with accurate updates. This suppo�'ts effective �nonitoring
of progress and is input to critical decision making by the project mana�er thz-oughout
the lifc of the pro�ect. Data fi-am the updated project sched�ate is utilized in status
repo��tan�; to various levels of the City organization and the citizenry.
This docuax►ent compleinents the City's Standard l�greement to guide the Engineer in
preparing and subinitting acceptable schedules for use by tlie City rn project delivery.
The expectation is tl�e perfortnance of the work follows the accepted schedule and
adheres to the cantractual time�ine.
The Engineer will designa.te a qualified representative (Project ScheduIer) responsible
for developing and updating the sc�►edule and preparing sEa.tus reporting as required by
the City.
1.2 PRICE AND PAYMENT PRQCEDURES
A. Measurement and Payinent
1. Wo�•k associated with this Ttem is considered pait ofi`pz-ofessional services and
Engineer will be compensated in accordance with the schedule off•ates.
2. Non-compIrance with this specification is grounds fo�- Ciry to withhold pay�nentoF
the �ngineer's invoices until Engineer achieves said compliance.
1.3 REFERENCES
A. Project Schedules
Each pi•aject zs repz•esented by the City's master project schedule that encompasses tl�e
entire scope of activities envisioned by the City to properly deiiver the work. When the
City cont�acts with an Engineer to perfoim en�;ineering and design services, the
Engineer will develop and maintai�a a schedule for their scope of work in align�nent
CiTY OF FpRT WORTH Walcr and Sani[a�y 5ewer Reha6ilitalion
STANDARD SPECIFiCATION Contract 101 CPN 02722
Revised IULY 20, 2018
00 31 15 - 0
1:NGTNTF.R PROIT:CT SCH�:DULE
Pagc 2 of 10
with the City's schedule requirements as defined herein. The data and info��nation of
each such schedule wil] be leveraged and become integral in the master project
sci�edule as deemed appropriate by the City's Project Control Specialist and appro�ed
by the City's Project Manager.
Master Pra�ect Schedule
The tnaster pt�oject schedule is a holistic representation of the scheduled acCi�ities
and anilestozies for the total project and be Critical Path Method (CPM) based. The
City's 1'ro�ect Manager is accountable for oversight of Ehe devetap�nent and
maintaiz�ing a inaster projeck schedule for each project. When the City coniracts for
the design andlor construction of the p�•oject, the inaster �roject schedulc wzl�
incozpo�•ate elemeiits of fhe Design and Const�•uction schedules as decmed
appropriate by the CiCy's Project Control Specialist. The assigned City Project
Conri•ol Specialist creates and maintains the master project schedule in P6 (Ciry's
scheduling software}.
Sngineer's Schedule
The Engineez- is respansible for de�eIoping and maintaining a schedule for the scope
of their contractual requiresnents. The Engineer will issue an iilitial scheduie fot•
review and acceptance by the City's P�•oject Conn-ol Specialist and the City's Project
Manager, as a baseline schedule for Engineei's scope of woz-�. Engineer will issue
cu�xezit, accurate updates of their schedule (Progress Schcdule} to the City at the end
of each inonth tlu-oughout the life of their wa3�k.
B. Schedule Tie�-s
The Ci�y has a port£alio of projects that vary widely in size, cnmptexity and content
t-ec�uiring different scheduling to effeciively deli�er each project. '['he City uses a
"tiered" approach to align the proper schedule wiil� the critet-i1 for each �roject. The
City's Project Manager deiennines the appropriate schec�ule tier for each project, and
includes that designation and the associated requirements in the Engineer's scopc of
work. The followin� is a suinmary of the "tiers".
1. Tier 1: Small Size and Shoi� Duration Yroject (design not required)
The City develops and inaintains a Master Project Schedule Pot� the p�-oject. No
schedule submittal is required from �ngineer. City's Project Control Specialast
acqu.ires any necessary schedule status data or infnr�nation througE� discussions with
the respeciive pai•ty on an as-needed basis.
Tier 2: Sm111 Sizc and Shart to Mediuin Duration Project
The City develops and maintains a Master Pi�oject Schedule for the pr-ojcct. 1�he
Engineer identifies "start" and "��ish" milestone dates on key elemenls of eheir work
as agreed with the City's Praject Manager at Che kickoff' of their wor�C effort. The
Engineer issues to tl�e City, updates to the "start" and "fnish" dates £or such
milestones at the end of each inonth thraughout the life of`their work on tl�e project.
3. Tier 3: Medium and Large �ize and/or Complex Pro.jects Regardless of Duratian
The City de�elops and zxzaiiitains a Master Project Schedule £or the �roject. '1'he
�ngineer develops a BaseIine Schedule and maintains the schedule of their respective
scope of wor[c on the pt-ojcct at a level of detail (gene�-ally Level 3) and in alignmeiit
CITY OF FORT WORTH Water and Sanitary Sewer Rehahililation
STANDARD SPI:CIPICATION Contract I{] 1('PN p2722
Revised ,RJ[�Y 2p, 2pt 8
003i IS-0
ENG1N�.�R PRO]ECT SCHr17ULE
Page 3 n[' ] 0
with the WBS structure in Section 1.4.I-T as agreed by the Project Manager. The
Engineer issues to the City, updates of thezr respective schedule {Progress Schedule)
at the end of each month throughoui the life of their work on the project.
C. Schedule Types
Project delivery for the City utilizes two types of schedules as noCed below. '�he City
de�elops and maintains a Master Project Schedule as a"baseline" schedule and issue
inonthly updates to tk�e City Project Manager (end of each inonth) as a"pa'ogress"
schedule. The Engineer prepares and submits each schedule type l�sted below to fulfill
their cantractual requirements.
Baseline 5chedule
The Engineer devclops and submiis to the Gity an initial schedule fat� iheir work in
alignment with this specification. Once reviewed and accepted by the City, it
becomes the "Baseline" schedule and is the basis against whicE� alI progress is
measu�-ed. 7'he Uaseline schedule wilI be updated when there is a cha�ige or addilion
to the scope of work iinpact7ing tl�e duration of the work, and only after receipt of a
duly autl�orized amendtnent issued by the City. In the event �rogress is significa�tly
behind schedule, the City's 1'roject Manager may authorize the updaiing of the
schedule io faciIitate a mot-e p�-actical evaluation of progress. An example o£ a
$aseline Schedule is provided in Specification �0 31 15.1 Engineer Project
Schedule — Baseline Example.
2. Progress Schedule
The Engineer updates iheir schedule at the end of each month to represent the
progress achieved in the work which izacludes any impacl ii�om authorized changes
in the work. The updated schedule must accurateiy reflect the cun-ent status of khe
wark at that point in time and is referred to as the "Progress Schedule". The City's
Project Manager and Project Control Specialist reviews and accepts eacli progress
schedule. In the event a progress schedule is deemed not acceptable, the
unacceptable isst�es are identified by the City wiihin 5 working days and the
�.ngineer must provide an accepta�le progt•ess schcdule within 5 working days after
receipt ofi�on-acceptance notification. An exampie o�a Progress Schedule is
�rovided in Specifcation 04 31 15.2 �nginee� Project Schedule -- Progress
Ex a�a�ple.
1.4 CITY S'1'ANDAR.D SCHEDULL R.EQUIREMENTS
`I'he following is an ove�view of the ineChodology for developing and maintaining a
schedule fo�• delivery of a project.
A. Schedule k'rarz�ework
The schedule will be based on the deiined scopc of worlc and follow the (Critical Path
Methodology) CPM inethod. The �ngineer's schedule wilI align with the reyuireinents of
this specifica.Cion and be resource lnurlerl to reflect their plan for executio��. �veraIl
schedule duration will align with the contractual require�nents For the �-espective scope oF
work and be reflected in City's Masfer Peoject Schedule. The Pi-oject Nunr�ber and Name
of the Project is required on each schedule aizd must match the City's project data..
C1TY OF FOK"1' WQRTi{ Waterand Sanitary Sewer Rehabilitation
STAMJARll SPECIFICAT[OiV Contract ] pl CPN 02722
Rcvised .iULY 20, 2018
UQ3l 15-0
�:NGIN��.R 1'ROJECT SCI{EDIILE
Page 4 af ] 0
B. 5chedule File Natne
All schedules submitted to the City for a project will have a tte name that begins wzth the
City's project nutriber followed by the name of the�rnject followed by Gaseline {if a
baseline scl�edule) or the ycar and montli (if a pj•ogress schedule), as shawn below.
a Baseline Schedu�c �ile Name
Forinat: City Project Nulnber_1'raject Name_Baseline
Example; � 0137G_North Montgo�neiy Sh•eet HM1�C_BaseIine
• Progress 5chedule File Name
Format: Ci[y Ptrojeet Nuinber_1'roject Name YYYY-MM
Example: 101376 Na�th Montgarz�ery Street 1-IMAC_2018_O1
s Project Schedule Progress Narrativc Fale Naane
Format: City �roject Nuir�ber Project Name_PN_�'YYY-MM
Exatnple: l 01376_Naz-th Mantgamery Streei HM�C_PN 201 S_O1
C. Schedule Templates
`I'hc �ngineer will utilize the rele�ant sections from the City's templates providcd zn the
City's docu�nent Enaiiageinent system as the basis Por creating their res�ective project
schedule. Specifically, the Engineer's sc�edule wi11 align witk� the layout of the "Design"
and "ROW & Easement" and "utility" sections. The teinplates are identified by type of
pro.ject as noted below.
� Arterials
� Aviation
o Neigh6ot•haod Streets
� Sidewallcs (Eater)
o Quiet Zones {later)
• St�•eet Lights (later)
s intersection lanproveinents (fater)
• Par-ks
a Stoi7n water
• Street Maintenance
� Traffic
� Water
D. Schedule Calendar
The City's sta��daz-d caiendar for schedule developmeni purpnses is based on a 5-day
workweck ai7d accounts for the City's eight sLandard holidays (New Years, Martin I�uther
King, Mez��arial, Iiidependence, Labor, Thanksgiving, day a{�er Thanksgiving,
Chrishnas). The Engineer witE establish a schedule calendar as part of ihe schecEufe
developtnent process and providc to the Project Control Specialist as part af the basis ior
their schedule. Vaeiations between the Ciry's caleiidar and the �ngineer's calendar inusl
Ue resolved prior lo the City's acceptance of their Baseline project schedule.
E. WBS & Milesto�e Staiidards for Schedule Development
1'he scope of work to be accoin�lished by the Engineet- is represezated in the schedule in
the foz-n� af a Work Breakdown St�-ucture (WBS}. The WI3S is the basis for the
Cl'1'Y OF FORT WORT[[ Water and Sanitary Sewer RehaE�ililation
S'1�ANf]A]ZD SPE(.IF[CATION ("antract 10] CPN02722
Re�ised 1tJLY 20, 201 A
ao3E is-o
ENGINEER PRO.1rCT SCHEI]ULE
Page 5 of ] 0
developanent of the schedule activities and shall be imbedded and depicted in the
schedule.
Tl�e following is a summary of the stan dards to be followed in preparing and maintaining
a schedule for project delivety.
1. Engineer is �•equit�ecE to utilize the Ciiy's WBS structure and respective praject type
templaie for "Design", "ROW & Ease�nents" and "Utilities" as shown in Section
I.4.H below. AcEditional activities inay be added to Levels 1- 4 to accorraz�r�odate the
needs of the arganization executing the work.
2. Engineer is �•equired to adhere to thc City's Standard Milestones as shown in Section
1.4.I below. Enginccr wiil include additional milestones representing intea�nediate
deliverables as rec�uired to accurately reflect ihe work.
F. Sclledule Activities
�lctivities are the discreic elements of work that make up the schedule. They will be
organized under t1�e umbrella of the WBS. Activity descriptions shouId adequately
describe the activity, and in some cases the extent of the activity. All activities are
logica�ly �ied with a predecessor and a successo�•_ The only exception to this s-ule is for
"projeet start" and "project finish" milestones.
The activity duration is based on the physica� afnount of work to be perfonxked for the
stated activity, with a maximum duration of 20 working days. If the work for any one
activity exceeds 20 days, break that activity down incrementally to acl�ieve this duration
constraint. Any exception to this rec�uires rer�ierx� and acceptance by the City's Project
Contt•ol Specialist.
G. Ainend�nent
When az� A.��endment is issued by the City, the impact is incorporated into the previously
accepted baseline schedule as an update, to same to clearly sliow iinpact to the project
tzzneline. The �ngineer submits this updated baseline schedule to the City for review aaid
acceptance as described in Sectian 1.5 below. Updated baseline schedules adhere to the
followiug:
]. fizne extensions associated with approved contract modificaEions are limited ta the
actual amount of tiine the project activit�es are anticipated to be delayed, unless
otherwise approved by ihe Program Manager.
2. The updated baseline schedule is suhrnitted by the Engineer within ten workdays
after receipt of the Amendment.
The changes in logic or dueations approved by the City a�•e used to analyze thc impact
of the change ar►d is included in the �nendinent. The cading foa- a new acfivity(s)
added to the scheduie due to the Ainendment includes Ehe Ainendment n�unber in the
Activity ID. Use as many activities as needed to accui•ately show the work of the
Ainendment. Revisions to the baseline schedule are not effective untiI accepted by
the City.
H. City's Work B��eakdawn Structure
GTY OF T'OItT WORTH Water and Sanita�y Scwcr Reliabititation
STANDARD SPrCiPICATION Conti�act 10] CPI+l D2722
CLe��iscd 7iJLY 20, 2U ] S
0031 ]5-0
ENU[IVEER PR0IECT SCEIEDULE
Page 6 of 10
WBS Code WBS Name
XXXXXX Praject Name
XXXXXX.30 Design
XXXXXX30.10 Design E.ngineer Agrecment
XXXXXX.30.20 Conceptual Design (34%}
XXXXXX.30.30 Preliiiiinary Design (60%)
XXXXXX.3Q.40 Final Design
XXXXXX.3�.50 Enviranmental
XXXXXX.30.60 T'ermits
XXXXXX.30.60.10 Per�izits - Identificatinn
XXXXXX.30.60.20 Pei-�nits - Review/Approve
XXXXXX.r�Q ROW & Easements
XXXXXX.40.10 ROW Nc�otiations
XXXXXX.4020 Candemnation
XXXXXX.70 Utiliiy Relocation
XXXXXX.70.10 Utility Relocation Co-ordination
XXXXXX.SO Construction
XXXXXX $0.81 Bid and Award
XXXXXX.80.83 Constructian Execution
LX.$0.85 Jzzs�cctio�
LX.80.86 J�andscaping
XXXXXX.90 Closeout
XXXXXX.90.10 Construction Contract Close-out
XXXXXX.90.40 Design Contract Closeout
I. City's �tandard Milestones
The foffowing inilestnne activities (i.e., iinportant events on a project �hat mark critical
points in titne) are of particular inte�-est to the City and tnust be reflected in the project
schedule for afl phases of work.
Activify ID
Design
�o�a
304Q
3100
3120
3150
3160
3170
3220
3250
32G0
3310
crr� or c�ox�i' wox�'�
STANI7ARIll 51'LC1T']CA"]70N
Revised JULY 20, 201 S
Activitv Nanie
Award Dcsi�n Agz-eeznez�t
Issue Nolice To Pi-oceed - Design Engineer
Design Kick-off Meeting
Submit Conceptual P�ans to Utilities, ROW, Trafiic, Parks, Storm Water,
Water & Sewer
Peer Review Mee#ing/Design Re�iew meeting {technica[)
Conduct Design Public Meeting #1 (required}
Conceptual Design Complete
Submit Preliminary Plans and Specitcations ta Utilities, ROW, Traf�c,
Parks, Stonn Water, Water & Sewer
Conduct Desigjt Public Meeting #2 (�-equi�-ed)
Preliiiiinaiy Desigii Complete
Sub�nit Final Design to Utilities, ROW, Traffic, Parks, Skorm Waler,
Water & Sewer
Waterand Sanitary Sewer Rehahililation
Contract 10] CPN 02722
0031 15-0
�NGINEER PR0IECT SC�ILI�ULE
Page 7 n I� ] 0
3330 Canduct Desig� Public Meeting #3 {if required}
3360 Final Design Complete
ROW & Easements
40�0 Right of Way �tart
4230 Righc of Way Coinplete
Utility Relocation
7000 Utilities Sta�•t
7I20 Utilities Cleared/Coinplete
Constructron
Sid atxd Award
81 10 Start Advertisez�nent
S I 50 Conduct Bid Opening
8240 Award Construction Contract
Canstr►�ctron Execution
8330 Conduct Construction Public Meeting #4 Pre-Construction
835Q Construction Start
8370 Substantial Completion
8540 Construction Completian
9130 Notice of Conipletion/Green Sheet
9150 Construction Cnntract Closed
9420 Design Contract Closed
1.5 SUBMITTALS
A. Schedule Suhmittal & Review
The City's Project Managcr is responsible Po►• reviews aild acceptance ofthe Ez�gineer's
schedule. The City's Project Control Specialist is respolisible fnr ensuring aligmnent of
the �ngineei's baseli�ae and prog�•ess schedules with the Master Project Schedule as
support to the City's Project Manager. The City reviews and accepts or rejects the
schedule wiihin ten wo�krlays of Engineer's subinittal.
1. Schcdule Format
The Engineer will subinit each schedule in two electronic tonns, one in native file
fonnat (.xer, .xml, .mpx} and the second in a pdf fonnac, in the City's docmnent
management system in the locatian tEedicated for this pucpase and identified by the
Project Manager. In the event the Engineer does not use Priinavea•a P6 or MS Project
for scheduling pwposes, the schedule inforination must be subiriitted in .xCs or .xlsx
fo�7nat in cornpliance with the sample layout (See Speci�cakion 60 31 15.1 Engineer
Project Schedule Baseline Example), including activity predecessors, successors, and
totaI float.
_� 2. Iizitial & Baseline Schedule
The Engineer will develap theia• schedule for their scope of work and s►�bmit their
� initial scheduIe in electronic form (in t�ie iiie fa�7nats noted ahove}, in the City's
, document management systczn in the location dedicatcd for this piupose within ten
� workrlays of tlze 1Vntice nf�ward.
The City's Froject Manager and Pi•oject Control Specialist review this initial schedule
to dete�•mine aEignment with the City's Master Project Schedule, including format &
CI'1'Y OF FORT WpRTH Water and Sanitary Scwcr ReUabilita€ion
S"1'ANDAi2D SPL•CIPICAT[ON Cunh'acl I0] Cl'N 02722
Revised JULY 20, 2018
00 3� �s -a
�:NGINEER PRf)]ECT SCHF..DUT.T
Page 8 of l0
WBS structure. Followi�g the Cify's review, feedback is provided to the En�ineer for
their use in finalizing their initiai schedule aud issuing {witl2in, five work�lays) their
Baselzne Schedule for final review and acceptance hy the City.
3. 1'rogress Schedule
The Engineer will update and issue their pi•oject schedule (1'ro�;ress Schedule) hy the
last day �f each month throughout the ]ife c�f their work on the pro.ject. The Progeess
Schedule is submitted in elect�•onic form as noted above, iz� the City's doc�unent
manageznent system in the location dedicated for this puipose.
The City's Project Control team reviews each Progress Schedu[e fot- data and
information that suppart the assessinent of the update to the schedule. In ihe event
data or infot�natian is missing or incomplete, khe Project Controls 5pecialist
coinmuuicates direct[y with the Engineer's scheduler for providing saine. The
Engineer re-submits the corrected Progress Schedule within 5 wa�krlays, fo�lawing the
submittal peacess noted above. The City's Praject Manager and Projcct Control
Specialist eeview the Engineer's progress schedule for acce�tance and to nlonitar
perfonnance and progress.
The following Iist of items are required to ensure proper slatus information is contained in
flle Progress Schedule (See Specification 00 31 15.2 Engineet- Project Schec�uie Progress
Exatnple}.
� Baseline Sta�rt date
� Baseline �inish Date
� °/a Coxnplete
� Float
� Acti�ity Logic (dependeneies)
� Critical Path
o Activities added or deleted
• �xpected Finish date
s Variance to lhe Baseliree �'inish Date
B. Manthly Engineer Status Repart
The Engirieer submits a written status report (referred to as a pragress narrati�e} at the
end of each inonkh to accompany the Progress Schedule suUmittal, using the standard
forrr►at pz•avided in Specificakioi� 00 31 153 Engineer Project 5chedu[e Progress
f�arrative. The content of the Montk�ly �,ngineer Status Report should be concise and
complete Eo:
� Re�ect the cun-cnt status of the work for the i•eparting peric�d (including actual
acti�ities started and/or campleted during the repo�ting �eriod)
� �:xplain variances from the baseline an critical path ackivities
o �xplain any potentzal schedule conflicts or delays
o Describe t•ecovety plans where appropriate
o Provide a sunnmary forecask of the work to be achicved in the next repoi•tingpei-iod.
C. 5ubmittal Process
s Schedules and Monthly Engineer Status Reports aee submitted 'an Buzzsaw following
ihe steps outlined in Specification 00 32 15.4 Engineer Project Schedule Submittal
Process.
C1TY OF FORT WORTH Water and Sanitary Scwcr Rehabilitation
STf1NDARD SPP.CiPTCATION Contract ] Ol Cl'N 02722
Revised JUI.Y 20, 2018
}
i
i
{
�
�
�
�
!
i
r
i
i
f
�
�
�
�
0031 15-0
�NCiINEER PRO]�CT SCHEDi1LE
Pagc 9 of 10
� Once the project has been completed and Final AccepCance has been issued by ihe
City, no furthex- progress scliedules or montl�Iy status repoits are a-equired from the
Engineer.
1.6 ACTION SUBM�TTALS/INFORMATIONAL SUSMITTALS [NOT USEDj
I.7 CLOS�OUT SUBMITTALS (NOT LTSED]
1.8 MAINT�NANCE MATERIAL SUBMITTALS [NOT iISED)
1.9 QUALITY ASsi]I2.ANC�
A. 'Tl�e person prepaein� and revising the Engine�r's Project ScheduEe s�all be experienced
in the preparation of schedules af similar corr��lexity.
B. Schedule and supparting docurnents addt•essed in this Specification shall be prepa�•ed,
updated and re�vised to accurately reflect the pez•foi7nance of the Engineer's scope of
work.
C. The Engineer is responsihle for the quality of all subanittals in this section meetingthe
standard of care foi• the construction industry for siinilarprojects.
1.1p ll�LIVERY, STORAGE, AND HANDLING �NOT USED]
1.11 FIELD [SITE] CONDITION� [NOT USED]
1.12 WARRANTY [NOT USED]
113 ATTACHMLNTS
5pec 00 3l 15.1 Engineer Project 5chedule Baseline Exam�le
�pec 00 31 l 52 Eilgii�eer Pt-aject Schedule P�•ogress Exair�ple
Spec 00 3l � 5.3 Engineer� Project Schedule Progress Narrative
Spec 00 31 15.4 �ngineer Project Schedule Submittal Process
PART Z - PRODUCTS [NOT USED]
PART 3 - EXECUTION [NOT US�D]
END OP SLCTION
ciTv or- r-ox�r waa�r� 1
STAtVDARD S]'ECl�']CAT[ON
Reviscd 7i1LY 20, 261 S
l�Jater and Sanitary Sewcr Rchabititaliov
Cnntract 1 O1 CP3V Q2722
i
(
003115-0
�.NG2NL:LR 1'RO.i�CT SCHEDULH
Pagc 10 of 10
Revision Log
I}ATII NAME SUMMARY OF CHANGE
July 20, 2018 1v1. Jarrell l�stial fssue
CI1'Y OF FORT WORTF[ Water and Sanitary Sewer Reltabilitation
S'I�ANL]AIZD SPECIFICAT]ON Contracl 101 C'PN 02722
Revised .iULY 20, 2018
003215-0
CONSTRUC'1'ION f'ROGRESS SCHI3DU)�li
Page 1 0l']0
S�CTiON 00 32 15
CONSTRUCTTON PROJ�CT SCHEDULE
PART 1 - GL+'NERAL
1.1 SUMMARY
A. Section Includes:
1. General requi�-e�nents for the preparation, submittal, updating, status reporting and
management af the Construction Praject Schedule
}3. Deviations fi•nin this City of Fort Wot�h Standard Specification
1. Noa�e.
C. Related Speciiication Seciions include, but are not nccessarily limited to:
1. Division U--� Bidding Requirements, Contract Fo�xaas and Conditions of the Contract
2. Division � — General Requireinents
D. Puipose
The City of Port Woith (City) is cominitted to deiivez•ing quaIity, cost-efFective
infrashucture to iis citizens in a tiinely manner. A key tool to achieve this purpose is a
praperly structut�ed schedule with accurate updates. This siipports effective monitoring
of progress and is input to critical decision making by tlie project manage�� th�•onghout
the life of the pr�aject. Data from the upda.ted project schedule is utilized in status
reporting to various levels of the City organization and the citizem•y,
This Docuinent coinplements the City's Standard Agreeinent to guide the canstruction
contractor (Contr�actor) in preparing and submitting acceptable schedules for use Uy the
City in project deliveiy. The e��ectatio�i is the performance of the wark follows the
accepied scl�edule and adhere to tiie cont�-actuai tiz�neline.
The Contractor will designate a quaIilied repx-esentative (Project Scheduler) responsible
for developing and updating the schedule and preparing status reporting as required t�y
the City.
�.2 PRICE ANI) PAYMENT PROCE�IURES
A. Measur�ement and Payme�it
1. Work associated with this Ite�n is considered subsidiary to the various items 6id.
No separate payinent will be allowed for this Item.
2. Non-compliance with tliis specification is g�-aunds far City to withhold payment of
Ehe Contractor's invoices until Conhactor aehieves said comp�iance.
1.3 RL+'�{�RENCES
A. Project Schedulcs
Each project is representecf by City's master p�•ojeci schedule that encoinpasses the
entire scope of activities envisioned Uy the City to properly deliver the wot•k. When the
Ciiy contracts with a Contractor to perloi�n construction of the Wo�-k, the Coniractor
CITY O�' FOR7� WdR7'H Water and Sanitary Seiver Rciiabilitation
STAM]f11Lll $PEGFICATION Contract l0i CPN 02722
Rcvised JlILY 2a, 2018
oo�zis-o
CC}NSTRUCTiQN PROGRP.55 SCHEDULE
Pagc 2 of 10
will develop and maintain a scheduIe for their sca�e of woz-k in aligrunent wrth the
City's standat•d schedulc requirernents as defined heeein. 'l�he data and infonnation of'
each such schcdule will be leveraged and becazne integral iii tl�e master project
scheduEe as dcemed a�propriate by the City's 1'roject Contral Specialist ancE approved
by the City's Yroject Manager.
Master Peoject Schedule
The �naster pz•aject schedule is a holist�c represeiltation af the scheduled activities
and milestones for the total �roject and be Crikical Path Methad (CPM} based. The
City's Project Manager is accountaUle for oversight of the develop�ncnt and
msintaining a master �roject schedule for each project. When the City contracts for
the design andlor cansteuction of the project, the inastei- project schedule will
incorporate eleinents of the Desi�n and Construction schedules as dcemed
appropriate hy the City's Project Control Specialist. "['he assigned City Project
Contral S�ecialist creates and inaintains the master pro,ject schedule in Pb (City's
scheduling saftware).
Construction Schedule
The Contractor is responsible for dcveloping and rnaintaining a schedulc for the
sco�e of the Cantractor's contractual requireinenis. The Cantractor will issue an
initial schedule for rcview and acceptance by the City's Project ControI 5pecialist
and the Ciiy's Project Manager as a baseline schedule fa�• Contx-actor's scope af
work. Contractor will issue cuz�rent, accurate updates of kheir schedule (Progress
Schedule) ta the City at the end of each month theaughaut the life of therr work.
B. Schedule Tiers
The City has a portfolio ofprojects that vary widely in size, complexity and content
requiring different schcduling to effecti�ely deliver each project. The City uses a
"tiered" approach to ali�n the proper schedule with the criteria for each project. The
City's Project Managei- detcnnines the appropriate schedule tier foz- each �roject, and
includes that designation and the associated requit•einents in the Contractor's scope of
work. The fallowing is a surr�nary of the "tie�•s".
1. Tier 1: Srnall Size and Short Duration Project (design not required)
The City de�elops and �naintains a Master Pt�oject Schedule for the pro.ject. No
schedule submittal is required from Contractor. Czty's Project Control Specialist
acqnires any necessary schedule status data ar infarmation through discuss�ans with
the respective party on an as-needed basis.
2. Tier 2: Smrtll Size and Short to Medium Dueation I'roject
7'he Gity develops and maintains a Master Project Schedule foi- the project. The
Contractor identifies "sta�t" and "fiilish" milestone dates an key eiements of their
woek as agreed with the City's Project Managet• at the kic�Coff of their worI� effort.
The Conti•actox- issues to the City, updates to the "start" a�id "iinish" dates for such
milestones at tE�e ciid of each manth throughout the life of their work an the project.
3. Tier 3: Medium and T�ar�e Size and/or Cornplex Projects Regardless of Du�•akion
The City develops and inaintains a Masker Project Schedule for the project. Tl�e
Contractor develops a Baseline Schedule and inaintains the schedule of their
respective scope of work oil the project at a level of detail (generally Le�el 3} and in
CITY DF FORT WQRTH Water and Sanitary Sewer Rehabililation
STANDARD SPl?CIFICAI�TON Contract l0i CPN 02722
Re�isec� .TULY 2Q, 2a 18
0032 ]5-0
CONS"1'RUC']']ON ]'1tOGRESS SCI IEDUL�
1'age 3 of [ 0
aligmnent with the WBS structure in Sectian 1.4.H as agi•eed by the Project Manager.
The Cont�acior issues to the Gity, updates of their ��espective schedule (Progr�ss
Schedule) at the end of each inonth th�-oughout the li�`e of their work on tlze project.
C. Schedule Types
Project delivery for the City utilizes two types of schedules as nated below. The City
develops and maintains a Master Project Scheduie as a"baseline" schedule and issue
monthly updates to the City Froject Manager (end of each monch) as a"progress"
schedule. The Conh-actor prepar-es arad sui�inits each schedule type tn fulfi]] their
contractual requireinents.
Baseline �cheduIe
The Contractor deve7ops and sub�x�its to the City, an initial schedule for tt►eir scope
of work in aligmnent with this specificaiion, Once reviewed and accepted by the
City, it becomes Che "Baseline" schedt�le and is the b�tsis against which all progress
is ineasured. The baseline schedule wili be updated when there is a chai�ge or
addition ta the scope of work impacting the duration of the work, and only after
receipt of a duly autY►orized change order issued by the City. In the event progress is
significantly behind schedule, the City's Project Maiiage�• inay authorize an update
to the baseiine schec�ule to facilitate a mare practical evaluation of progress. An
exa�nple of a Baseline Schedule is provided in Spccification 00 32 IS.I
Construction 1'roject Scl�ec�ule Base[inc Example.
2. Progress Schedule
`1'he Contra.ctor updaLes their schedule at the end of each mo�th to represent the
pro�ress achieved in the work which includes any impact froz�r� authorized changes
in the work. The updated schedule tnust accurately reflect the cunent status of the
work at that pnint tn time and is refer�•ed to as the "Progress ScheduIe". The City's
Pi•oject Manager and �'roject Control Specialist reviews and accepts each pragress
schedule. In the event a progress schedule is deer��cd not acceptable, the
unacceptable issues are identified by the City within 5 working days and the
Cont�•acior must provide an acce�tab[e pa-ogress schedule within 5 working days
after receipt o�non-acceptance notification. An example of a Pragress Schedule is
provided in Specification 00 32 15.2 Const�uction Project Schedule Progress
�xample.
1.9 CITY STANDARD SC�ICDULE REQUIR�MENTS
The following is an oveiview of the methodology for developing ancf �naintaining a
schedule for delivery of a project.
--�� A. Scheduie Framework
Tl1e schedule will be based on tlie defined scope of work and foliow the (Gx-itical Path
Melhodology} CPM method. The Contz-actor's scheduie will a[ign with the requirements
� of this speci�cation and will be cost loa�lerl to �-eflect their plan foa- executioii. OveraIl
schedule duiation will align with t�e contractuaI requirements for the respective scope of
woz-k and Ue refIected in City's Master Project Sckzedule. The Project Number and Name
. of the Project is required on each schedule and musC match the City's project data.
B. Schedule File Naine
C[TY OF PORT WORTH Water and Saaitary Sewer Rchabilitation
STA.tVDARD SPT',CIFICATION Co�ttract 703 CPN 02722
Revised IULY 20, 2al 8
0�32i5-U
COTISTRUCT1pN PROGRrSS 5C1i�f]ULE
Pagc A of 10
All schedules subinitted to the City for a project will have a file name fihat begins vvith the
Gity's project numher followed by the nume of the project followed by haseline {if a
bsseline schedule} ar the year anrl manth (if a progress schedule), as shown below.
� Baseline Schedule File Name
Format: City Project Number Project Natne Baseline
Example: l O1376_North Montgomery Street HMAC_Baseline
s Progress Schedule File Name
Forinat: City Project Number Project Name_YYYY-MM
Example: 141376 North Montgomery �treekHMAC_2Q18_Ol
e Project Schedule Progress Nai�ative File N1�ne
l�onnat: Cify Project Nutnber Project Na3ne PN YYYY-MM
Exaznple: 1U1376_North Montgomeiy StreetlIMAC_PN_201$_O1
C. Schedule Templates
The Contr-actor will utilize the rele�ant sectaons from the City's teinplates provided in the
City's document tnanagement syste3n as the basis far creating their respeciive project
schedule. Specifically, the Contractoi's schedu�e will align with the layout af the
Constz-uction sectioii. The templates a3�e identified by type of pro,fect as noted below.
� Arterials
� A�iation
e Neighborhood StE•eets
� Sidewalks {laCer)
s Quiet Zones (later)
s Stree� Lights {later)
s Interseciion Improveir�ents (later)
� ]'arks
� Storm water
� Street Maintenance
� Trafifc
0 Water
D. Schedulc Calendar
The City's siandard calendar far schedule development purposes is based on a 5-day
worlcweek and accaunts far the City's eight standard holidays (New Years, Martin Luther
King, Meinot•ial, Indeper►dcnce, Labor, Thanksgiving, day after Thanksgi�ing,
Christmas). '1'he Contracior will establish a schedule calendar as part of the schedule
developinent process and provide to the Project Control Specialist as part of tl7e basis for-
their scl�edule. Variations between the City's calendar atld the Contractor's calendar
yr�ust be resol�ed prior to the City's acceptance of their Baseline project scl3edule.
E. WBS & Milestone Standards for Schedule De�elopinent
The scope of work ta be accomplished by the Contrac[or is represented in the schedule in
the fonn of a Work Breakdown Structure (WBS). The WBS is the basis for the
dcvelopment of the scnedule activities and sha31 be unbedded and depicted in the
schedule.
Cl"fY OF FORT WORTI I Water and Sanitary Sewer Rehahilitation
51'ANllA1tD SPECIF[CATiON Contract 101 CPN 02722
itevised JULY 20, 2018
00 32 15 - 0
CONSTRUCTION PROGRESS SCl-3EDULE
Page 5 of 10
The following is a summary of the stanc�ards to be followed in preparing and �naintaining
a schedule far px-oject deliveiy.
Contractor is required to utilize the City's WBS structure and respective project type
template for "Construction" as shown in Section I.4.H below. Adclitional activities
may be added to Levels l-� io accommodate the needs of khe organization executing
the work. Specifically the Contractor� will add activities under WB5 XXXXXX.80.83
"Construction Execution" that deIineates the activities associated with the various
coinponents oF the work.
2. Cont�actos• is required to adhere to the City's Standard Milestones as shown in
Section 1.4.I below. Contractor will include additional milestones re�resenting
intennediate deliverables as requit�ed to accurately f•eflect their scope ofwork.
F. Schedule �ctivities
Activities are the discrete eleinents af woa-1� that inake up the scheduIe. Tl�ey will be
organized undet• the uznbrella of the WBS. Activity descriptinns should adequately
describe the aclivity, and in so�ne cases the extent of the activity. A�1 activities are
logically tied with a predecessor and a successor. The only exce�tion to this rule is foi-
"pr•ojecE start" and "project tnish" rnilestones.
,The activity duration is based on the physical aznou�t of wor�k to be perfonned for ihe
stated a.ctivity, with a maxiinuin duration of 20 working days. If tk�e worIc for any one
activity exceeds 20 days, break that activity down incr�ementally to achieve this duraiion
constraint. Any exception to this requires review and acceptance by the City's Project
CoYltrol Specialist.
G. Change Ordef•s
When a Change Order is issued by the City, the impact is ancoaporated into the previously
accep[ed �aselinc schediile as an update, to clearly show impact to the projecl timeline.
The Cantracior submits this updated baseline schedufe to the City for t•eview and
acceptance as cEescribed in 5ection 1.5 below. Upda#ed haselinc schedules adhere to tl�e
following:
1. Tiine extensions associated with approved contract inodi�ications are liinited to the
actual ainount of tiine the p�-oject activities are ar►ticipated to be delayed, unless
otherwise approved �y the 1'rograin Marfager.
2. `fhe re-baselined schedule is submitted by the Contractor withira ten workdays aFter
the date of receipt of the approved Change Order.
f 3. The changes in logic or du�•ations approved by the City are used to aaiaiyze tlie impact
__� of the change and is included in the Chan�e Order. The coding foi- a new activity(s)
added ta the scheduie for the Change Order includes the Change Order number in the
� Activity ID. Use as many activities as needed to accurately show the work of tY�c
� Change O�-der. Revisions lo the baseline schedule aee not effective until accepted by
� the City.
H. City's Worfc Breakdown St�•ucture
C1TY OF FORT WQRTH 1Nater and Sanitaiy Sewer ltehabililaLipn
STANllA1tD SPECIPICATION Contract ]0! CPN 02722
Re��ised JULY 20, 2p] 8
b03215-0
CONSTRLIC'1'lON ['1tOGlt}'SS SCHEDULE
Page 6 of l0
WB5 C�de WSS Namc
XXXXX.X Project Name
XXXXXX.30 Design
XXXXXX.30. ] 0 Design Coiitractor 1-�greeinent
XXXXXX30.20 Conceptual Design (30%}
XXXXXX.30.30 Preliininary Design {60%)
XXXXXX.30.40 Final Design
XXXXXX.30.50 �n�ironmental
XXXXXX30.60 Pei-�nits
XXXXXX.30.b0.10 I'errz�its - Identification
XXXXXX.30.G0.20 Permits - Review/Approve
XXXXXX.4D ROW & Easements
XXXXXX.40.10 ROW Negotiations
XXXXXX.44.20 Condcmnatioil
XXXXXX.70 Utility Relocafion
XXXXXX.70.10 Utility lZelocafion Co-ordinatian
XXXXXX.80 Construc�ion
XXXXXX.86.81 Bid and Award
XXXXXX.80.83 Consh-uction Execution
LX.80. S 5 Inspection
LX.80.86 Landscaping
XXXXXX.90 Closeout
XXXXXX.90.1 Q Constz-uction Coiitract Close-out
XXXXXX.90.40 Design Conti-act Closuc•e
T. City's Standard Milestones
The following milestone �ctivities (i.e., important events on a project that mark ceitical
points in time} are oi' particulax- interest to the City and inust be reflected in the penject
schedule for all phases af wor[c.
Activitv ID
llcsign
3p20
3040
31p0
3120
3150
31b�
317Q
3220
3250
32b0
ciTv or roRT wax���
STANDARn SPT'CIFICA'1'lON
Rc;viscd NI.Y 20, 201 S
Activi�v Name
Award Design l�greement
Issue Notice To Pr-oceed - Design Engineer
Desi�z� Kick-off Meeting
Submit Concc�tual PIans ta Eltilities, ROW, Traffic, Pa�-ks, Stor�n Water,
Water & Sewe►-
Peer Review Meeting/Design Review meeting (tecl►nacal}
Conduct Design �'ublic Meeting #1 (required)
Conceptual Design Campieke
5ubmit Preliininary �'lans and Specifications to Utilities, ROW, Teaffic,
Parks, Sfonn Water, Water & Sewet•
Conduct Design Public Meeting {F2 (i•equired)
Preli�xa�na�y Design Coinplete
Water and Sanitary Sewer Rehabilitation
Contracc i01 CPN02722
D03215-D
CQNSTRUC"1'ION PROGiLESS SCHEDULE
Page 7 of ] 0
3310 Submit P'inal Design to Utilities, ROW, Traffic, Parks, �torm Water,
Watez� & Sewer
3330 Conduct Design Public Meeting #3 (if required)
33G0 Final Design Compleie
ROW & EasemenEs
4000 Right of Way Start
4230 Right of Way Complete
Utility Relocation
7004 Utilit�es Start
7f20 UtilitiesCleared/Complete
ConstrucEio�i
Bid and Award
8110 Stairt Adveitiseanent
& 150 Conduct Bid Opening
8240 Award Construction Contract
Canstruction Execution
8330 Conduct Constt�uction Public Meeting #4 Pre-Construcfion
8350 Consti•uctian Start
8370 Substantial Completion
&540 Construction Co�npletion
9130 Notice of Completion/Green Sheet
9150 Construction Contract Closed
9420 Design Contract Closed
1S �UBMITTALS
A. Schedule Sub3nittal & Rcvicw
The City's P�•oject Manager is respoi�sible for reviews and acceptance of the Contractor's
schedule. The City's Project Confrol Specialist is responsible for ensuring aligmnent of
the Contractor's baseline and progress schedules vvith the Master Project Schedule as
suppart to the City's Project Manager. The City reviews and accepts or rejects the
schedule witlzrn terz wnrkrlays of Cont�•actor's subinrttal.
Schedule Fox-�nat
The Contracto�• will sub�nit each schedule in two elect�onic forms, one in na.tive i`ile
fonnat (.xer, .xn:l, .nipx) and the second in a pdf foi-�nat, in the City's document
inanageinent system in the location dedicated fof• this piupose and identified by the
Project Manager. In the event the Contractor does not use Prirnavera P6 or MS
Pt•oject fpr schedulin�; purposes, the schedule infonnation must be subxnitted in .xlsor
.xlsx format in campliance with the sample layout (See Specification 00 32 115.1
Conscr�etior► Project Schedule Baseline Example), including activity predccessoa-s,
successo�-s and tota! float.
2. Initial & $aseline Schedule
Thc Cont�•actoa• will develop their schedule for their scope of work and subrnit their•
initial schedule in electf•onic form (in t�e file foimats nated abave), in the City's
document �xzanagement system in the location dedicated for this purpose within ten
rvo�krlays of tlie Notice of Award.
CITY Q�' PQRT WORTH Water and Sanitary 5e�ver Rehabiiitation
S`�'AM7ARD SPP.CTPTCATION Contract 101 CPN 02722
Revised 7IJI.Y 2D, 243 S
U03215-0
COl�ISTRUCTION 1'ROGRESS SCEIEI3ULE
Page S of 10
Thc City's Praject Manager and Project ControI Specialist re�iew this initial schedule
ta detennine aligncnent wit15 the City's Master Project �chedule, including foiri7at &
WBS st�-uctu��e. �'ollowing the City's review, feedback is pt•avided to the Contractor
for their use in rnalizin�; thcir initial schedule and issuing (wit/zir� five workdays) their
Baseline Schedule for final review and accepiance by the City.
3. Pro�;ress Scliedule
The Contractor will update and issue their project schedule (Progress Schedule) 6y the
lust day of each ntonth throughout the life af their work on the project. The Progt•ess
5chedule is subzx►itted in electronic foi�m as nated abovc, in the City's document
�nanagemcnt systein in the location dedicated for this purpose.
The City's Project Control team re�iews each Progress Schedule £or data and
infonnation that suppart the assessment of the update to the schcdule. Tn the event
data a�- iniormation is �nissing or incoinplete, the Project Cor�t�-ols Specialist
communicates directly with the Caniractor's scheduler for providing same. The
Conteaetor re-subinits the correctecf Progress Schedufe within 5 workdays, following
the subanittal �z-ocess iioted above. The Cily's Project Manager and Praject Contra!
Specialist review the Contractor's prog�•ess schedu[e for acceptance and to monitor
performance a��d progress.
The fol9owing list of ztems are t�equir•ed [o ensut�e pt�oper status infonnation is
contained in the Progress 5chedule.
� Baseline StarC date
� Baseline Finish Dafe
� °/a Cpmpiete
v Float
o Activify Lo�ic (dependencies)
� Criticall'ath
s Activities added ar deleted
� E.xpected Baseline Finish date
s Va��iance to the Baseline �inish Date
B. Monthly Constr-uction Status Report
The Coniractor subinits a written status eeport (rcfen•ed to as a progress narrative) at the
end of each inonth to acco�npany the Progress Schedule submittaI, using the s#andard
£ormat �rovided in Specif ca[inn 00 32 15.3 Construction Project Schedule Progress
Narrative. The content of the Constructian Project ScheduIe P�-ogress Narrative should
be concise and coinplete to:
0 lZeffect the cun-ent status of the work for the reporting period (including actual
activities started and/or completed during the eepacting period)
� }�xplain variances fi-om Lhe baseline oz� critical path activities
� Explain any potential schecluEe confIicts or delays
v Describe reco�ery plaz�s where appropriate
• Provide a sum�na�y forecast of the work to be achievcd in the next repartingpe�-ind.
C. Submittal Process
Cl'1'Y OF FURT WOR-['II Water and SaniFary Sewer Reliahilitatiun
S'1'ANDARDSPEf'IFICAT[ON ContracL 1Ql CPN02722
Revised .IULY 20, 20l ft
,
i
003215-0
COI+ISTREICTiO7�I PROGRrSS SCffEDULE
Pagc 9 of l0
�
�
I
S
i
�
i
��
�t
i
�.
?
� Schedules and Monthly Canstz-uction Status Repoits are submitted in Buzzsaw
following the steps outiined in Specification 00 32 15.4 Consh-uction Project
Schedule Submittal Process.
� Once the project has been compleied and Final Acceptance has been issued by the
City, no further progress schedules or construclion status reports are reqnired fi•o�n
ihe Cantractor.
1.6 ACTION SUSMITTALS/INFORMATIONAL SUBMITTAL� �NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTL+'NANCE MATERIAL SUBMITTALS jNOT USED]
1.9 QUALITY ASSURANCE
A. The person preparing and revising tl�e Contractar's Project Schedule shall be
experienced in tiie preparalion of sclzedules of similat• camplexity.
B. Schedule and su�porting docu�nents addressed in this Specification shall be prepai•ed,
updated and revised to accnrately reflect the perfo��nance af the Contractor's scope of
work.
C. 'I'hc Contractar is res�onsible for the quality of all submittals in this section meeting the
standard of care for the const�uction industry for sirnilarprojects.
1.10 DELIVERY, STORAGE, AND �TANDLING [NOT USEll]
1.Ii RIELD �S�TE] CONDITIONS [NOT USEDj
1.12 WARRANTY �NOT USED�
1.13 ATTACHMENTS
Spec 00 32 15.1 Construction Project Schedule Baseline Exainple
Spec 40 32 15.2 Constructian Project 5chedule Probress Exainple
Spec 00 32 15.3 Constructioz� Project Schedule 1'3�ogress Nanative
Spec DO 32 15.4 Constt�uction 1'roject Schedule Submittai Process
PART 2 - PR011UCTS [NOT US��)�
PART 3 - EXECUTION [NOT USED]
�ND OF SECTYON
i
f
Cl'1'Y OF FORT WpRT�I
S'1'ANDARD SPECIPICATION
Re�ised JULY 20, 2018
Watcr and Sa��ilary Sewer Rehahilitation
Coniract ]Ol CPN p2722
I
ao 3z �s-a
CONSTRUCTION PRQGRr55 SCHiDUi.P.
Page LO uC 10
Revisiou Log
DATE NAM� SUIVIMARY OF CHANG�
July 20, 2018 M. Jarrell Initial Issue
CT"fY OF FORT WORT[[ Water and Sanitary Sewer Rehabilitation
S'1'ANDA1tD SPEC;IF[CATION Contract ]O1 CPI�! 0272?
Revised JULY 2{], 20] S
�
.�
4
OD32 35.] -0
CONS7�RUCTION PROGRESS SC[1EDiJLE — BASELINE EXAMPL�
Page I of 5
� SECTION 00 32 I S.l
CONSTEtUCTION PRO.iECT SCHEDULE — BASELINE FXAMPI.,E
PART1- GENERAL
�.
The fo��awing is an exarz�ple of a Contractor's pi�oject schedule tl�at illustrates the data and
expectation for schedule content depicting the baseline for the project. 1'his ve�•sion of the
' schedule is ��efen�ed to as a"baseline" schedule. This example is intended to �rovide
guidance for the Contraclor when deve�oping and sulamitting a baseline sehedule. See CFW
Specification 00 32 15 Construction Project Schedule for details and requirements ��egarding
the Conti�actor's project schedule.
�
C17�Y OF FOR"i� WORTIf Water and Sanitary Sewer Rel�a6ifitation
STANDARD COiVSTRUCTiON SPrCIPTCATI01�! DOCUM�NTS Co�ivact lQl CPN V2722
ktevised JULY 20, 2018
'
r
!�
1
!
i
�
i
�
�
4�
E
�
�
k
�
4
i
�
�
�
�
00 32 15.2 - D
CO%1STRUCTION PItOGRGSS SCHTnUI,T — PROGRCSS EXAMI'LE
Page 2 of 4
�
� �
� �
� o
� �
� Q�
� �
u: 0.
c
�
[i.,
�
�
�
�
CC
l�' m
sy! �
� �� �
� i�
�' h
� � �
� `�R�Y
I' C
.� iL
bn'
�
•� G
�
�. .�
dl
S'
�
�
s_
J_� i��E '4•° _ ��_� .z�'� . ����`��
.. ? �a-��
�I[ ii�---- I t
� �.�..
�� �
n r. n o i� n o� ��� n .���'n n . y.... t�
�s ;2 � � .�' '-7 � �Fs � K, 4: �� Yr iY i� F
�i? 1;•- ' ii � .� �, � n i; .� � .� � � �i � � i "„ uii c� b � i
� �� iiRYl �,saF:�Fl•.k�:Fl��.n,.Ff'� ��,�h`]'"'�{�7(�{y ��•ti a �, 1
� µ � r ' � � �r , q , ��' i � � � � � t� � if i� '" � � �� � �
�f* � � '�F � �i l * ���� � � � '� � � �i�.� r� ii
��' � 'a T %i c � �� `� i� `-4 k�; i� , ,i � i - - . . �v ��i . � «� � �; f� J: � M -
� � �� � �s i� � _' � ili _ .} .� .� u w .. 4 ^' �_ i4 u v _ �: �. �i� _ +.. � � � � _' �. •i 4! ��:
�—.�,��y,—�- i`^sj;v::'.1'.�;;,�;���" ry�� `�::�,�;L�ry���ti Y��"
r� 3 iY l i 3
� ' �, Y� � � ;i ? 4 � � �� � }; �� ! ��.�' � � ,� - � � � K � � � � � T � c �
�J yi r'c� ,- '�' o 0 0 0 1� :: I,l P: ly _. I�, :'y . � ~ n., FI � F�` '.k
O ,� ._ n .� � .� .. �i, i�� .� i. .� � m _; ,,;y i.� .� .n '� w _�
f;� i� � {� �. �I £� € �� rr ii i� ' i }i ri }� � �r i'� , <r �i �i Lr i�l ii � � il � �I ii ii �� � �ii
' f. J� i � J�. y 4 /y `1
� � ���. � �. fl �4 'i � � "I L� � '� � � � li �L �i % � ��� � K �� L i� � � � L ii i7i {� � ��
� � I m i1' �i .4 ' :I ii �� � i ' f+ �i � � � ih r1 �' � i � I i �} ++ w� � � i + y'�
_� _� �_� � � -� ' " ; "� '�� " • �, �, -� •� ., m ., ., �, ., „ �, .p � � � ., .. ,,, �
„�i;�� �i-itf - =� k� }� r."'.�.r � ��c ',jt. � �'irit,�'�..�� ����:; � � ii�i
r � � � �H �� 8� d I,i, ra c� � J �
�i' }' � � �� { � # � � � � � � � � . � � � � � � � � � , 5 •k � � 4 � S � �
„ , „ '; «. S ��I ,. 'd ;w „ rk l; '� ;� :�I . 6, #J 6� r � ;,� , ;� ;� �' : �� � M � �:
�; ;�: '< <:��'� „�;�'}:�� fi���. ,:� �ao�'„r� ���
_. _. _ , . .;, �
+„', �� �� C] �Y �� i 4 �4 {. ,�, ":�.2� �. �� .����, `6 i�.ti ,� '� � �_.t� y, ��� yy � ��� w .o � y�y � a � 'a a u5
a� _ P �� � � IM R�' -�. i�, n� x� �S3:F r �, Q� '�, ��� .. �n f: ,�j 'n ua k� ro� �. ii ^ w r
i �I �I �II
�
�
�
�
O "".'
� �
� �
� �
�
� �'
� �
�y �i
�y
N �
o c�
� �
; a� a�a
� �
� �
V�'I
�
r
�
b
�
�
� �
�� �
�
�� � i � � �
� , I
r i I �,
� � . ���
� .� � , , ���
� � � 1 � � ���
� � �
a
.,
�T Ls �� f�
� K '� � � �, ? i � ' 8 � 1G sYj +$ #' �
•F � - � ` ` i� � :
� � � � � e c � �L' 1 ; �: q r� {�f i - u � t� :�i � Ch
L}(�I ■ i' ii' � s...
L,.1 C s � li y� � ' <. , �'Vi � � `� L.i'1 { , � C
� �' � t + tr � , � � !1 =' q'; s; �j.�:` F � t. k.F i �'� � � �. � !� � �' ..a,' � �
{ � � � r�+ :`i s ��i � �� �� � ;. a °'� i_ ' s� � � ` i � � C�
� � �; `,� �� �� ; e., mei� �' �1'P � �
� d � � � �s_ r Y� � � �i . - r` � I. � ''I r� ���.?��C' i i� � � i'-•�� � '� fi f� .ii � � � i� �! � i- 1�� � �r��[+ s�.�
� c� _�' � „„., r. �r,,r ��,_,},� ry'� _ S: v �' � i? � � := "� � .`°'�- � �
� �` � - n � � k? FI S�! 9 � `�' �� �k f�;? h � � . ��i � . '�, �� � � � a� � � � � il � 's�.�' l.�t
�r ��.Uo ��{ - � •�
a ? � %� ; � � a ; i :i +n � r
I�— —, k �' � � I
crev or r•ox�r woxr�
S7'ANDAIZll CON5"1RlJCTION SPECIFECATION DOCUMTNTS
Rcvised lU[�Y 20, 2018
Water anQ Sanitary Sewer RchabflflaUun
Coniract l Ol CPN 02722
�
0032 [5,2-0
CONSTRUCTION PROGRI:55 SCHT'llULE — PIZOGRESS EXAMPLE
1'age 3 of 4
w
�
f�a �
� �
"� �
�i
� �
_: �
�
�
[Y
�
�
�
�.�
�
�
(Y}
.�
�
�
Q}
}
.� �
� �
� L:
�
�r
F
� �
� �
� �
� fl
� "`!
,��.... ..,��,� ,..„,,,v�N„�„t�„ , „ ,�w��ti.. , .
------�- -r- � �
-- - --+---
""""""i"" F�
�� �
—•-------�--- F�
------- C--+
----�-- C�
�. � �'I (J •i4 : a _�
si I�:ln io i8 In i[ '. ti• a cr u s- � a o c- r., ., � rm e. .m , �., � n r. r� v� .� �, �„ r- ';�:��
!; � w w. w-� m�n ,r r� a w w�. �n .�� a� �� �.. .�� �� �� an �., �, � . �� �� �r u� ��� r� cn :' t. �� ,i,"��,:
c� f�• �;i � � .i �� � � �� ra � � {� fi F �S� sl %1 F i� � j � � i! il ='- +1 � �,�" €1 ?}�':s � �
.� � � i.i ii p i � � � ��� � � F i. �f h f, � �r j � ' � is J S � �y. �� -T .
�� F� � n �ti sv r: + :� ; � '� � ., il; �„., .� , , - �x � �'I ' �4 . . r � ,�� i', �.��
e� !ryn co � w � .n •n n m a+ ai -..p� -
S� {a k� N�3 �pg � �'y �� u�� � "�' � �� �i �'� `� �L �� r�� �f "'f e%' +Y .'�.. i�i k� i�l 4i `9 � '� :ry'
�� �g`?�i tl� �1 � r�,�j���aiti �'�F�.�':�' ��� �� � � � � y �- _ �:
�3 �. �si�L"a � L- I.'.9 l�i �3 �- ��lil+' „a,�� -FI _ 71:5:� ii+l� � �'�..�..§,
- �� n`+ my m .�� r� � m m} rn i� � r � v m�
C� i� U Ei � l�] ;ti fi 1�� �Y �'� �f h� tti �� ty i'. i;�` �`i � �_ fl i. �I ii f� N it C� fil�
F � � � i� � Y "� � � e' � �, �� M �.' t. � : ,' �`� �'�; � ,ti�.'�c � z �'
i r� � � 4 f _ Y } � u 1 �5 7' ;1� �' i � � ��,
'i� :'i �.�is � �'�ti � i ��, ..�i�,,,. � �i ...� .:1 ..� . . ,F ar�;
" �a ro �+ epa ., �q� � •'� w � ��� .� .- �; �- ��� �� a ^ �p u� �. m ,. ms �n, � m .o �, ��.
��f�y� fti L9 �Cfs �['V h' I '�I � Y Y'♦ /� 'E"' �� L 1J_ ,� f� - i tJ �L i.i y I �� w1 I'1 .L {{� st ,� �''
V ' � � � f�5 � � ;7 �� ' S. �� !i I7 � Lft JI � J� !1 � ,�y � � � � � �J ; '� �`' �
� � ,^I :i l� f; ='I � _, �_ . i� �: �� � ?' ;7i '!„.
`L� . � a �`i ei n �: i.i ,� . � � . . � . � + +i i i � �, � �
�' � n�� e o�o � ii.cr � �'t. .��i . ii ' z i� �.�:
� ,., , vs �j �3 �:l _ . .. �� t 'r° ��yry „ ._ „ .,� , „
� � � ��� m r� � � �' � '��' ' � 5 tY Stl � ' - - M � �
- +J iii �n �j Ef � n i� �� �� �'Jy m � � �. � !� _ n i i ` � � :m .� - � � �i � n � i� � � is
I �
s¢ x �
�S _, �
� � � A i! L �,
�'S } J��T � ��c
� � I' y � I € 'II � ,�.��� �.
+� � -�+ �� _ } r �� r i :� � �� _' I� +I
� i' �_ � � .` � � ^ � ' 7 � " � I; i
i ro 6. ��'I ii� � � r i� � � L�� � ri �.
��
��' 'i yycc � 'l � � �, �. Fi � � j � � � � II a � i Y
� R }� .} � � � � i�$ i' L '�j', '� - ' � iL l F k j
� Ei�s � r�'i � n" '�' �n�? ��.� R� }= �• �.i � ��
I � p � � �i
[ � � � � r � ;i � .� I, o �I� � � � � �.� j�' � .5 � �.JI � �
�" � t� � � � � � �� � '.9 '1 $' ��t � i� f' i i �' g � � � i c` � : p �°� .z 'f ..`- }
� � y} � � � � i� �'s n�j , • n [� n •� z� , Y r
I � �# � � � ' � � „i �R � �:s d "? '� �, :I ., ,'x J. � � � � � � �, , ,. .,..0 ,
� *� � . u � ia ;i u . u ��
�
i°Yi
�
V
�
u�
.� �
4 �
W �
�° W
� �
re� r�
� �
� �
�� ��
� �
� �
�
A
�
�
�
�
� �
� � �
��
f[5 �'
� � �
���� 5,:r u
O � i
�' � �
�
�
� C
� �
� .
_� � �
`U � �
� �
,�
iCs y�j
�Y � 4J
� � �
CT"�Y OF FOR"I� WORTII Watcr und Sanitan' Sewer Rel�abilitation
S"I�ANDARD CONSTRUCTION SPECIFICAT[OAI 1]OCUMEN"I�S Contract ] 01 CPN 02722
Rcvised JULY 20, 2U18
40 32 15.2 - 0
CONSTRUCf10N 1'ROGI�,SS SC]IEDULE — PROGRESS CXAMPi.T:
Page 4 of 4
END OF SECTION
Revision Log
DATE NAME SUMMARY OF CHA1vGE
7uly 20, 2018 M. Jarrcll ]nitia3 Issue
CITY 0�' 1^OR"1' WOIt"i�H Water and Sanitaiy Sewer Rehabilitation
S"1ANDARD CONSTRUCT[OT�I SPl?CIF]CATION DOCUMEN'I'S Canu�act 10] CY�T 02722
Revised ]ULY Z0, 2U18
f
i
i
OD 32 15.3 - 0
— I'ROGRESS NARRATNr
Page 7 0# 1
s�ccTroN ao 3z �s.�
CONSTRUCTION PROJECT SCHEDULE PROGRESS Nf1RRATIV�
�
1
i
t
i
Reporttng Periad; Date Issued:
Project Name: Company Name:
City Praject No: Engineer's Project No:
City Project Manager: Engineer's Project Manager:
A. List of activities accomplis�ed in the reporti�g period.
1. (insert #ext hereJ
2. (insert text here)
3. {insert text here)
4. (insert text here)
5. (insert text here)
6. (insert text herej
� B. List af activities to be accomplished in the next repor�ing period
1. (insert text hereJ
� 2. (insert text i�erej
3. {insert text here}
4. (insert text here}
z 5. (inser# text here)
� 6. [insert text here)
C. List any potential delays and pror►ide mi#igation actions
� 1. (insert text here)
2. (ins�rt text herej
3. (insert text here)
� D. List any actual deiays and pro�ide recovery actions
� 1. (insert text here)
r 2. {insert text here)
� 3. (insert text here}
�
f
City of Fort Worth, Texas
Construction Project Schedule Narrative Report for CFW Projects
TPW Officiai Release Date: 7.20.2D18
Page 1 pf 1
Q0 32 15.A - 0
COAISTKUC"flON 1'ROUf�,SS SCHEDULE — SIJBMIT�I'AL PROC]iS5
Page I of' 7
S�CTION 00 32 15.4
CONSTRUCTION YR03ECT SCHEDUL� — SUBMITTAL PROCESS
PART 1 - GEN�I2AL
The follawin� information prnvides the process steps for the Conti•actol• to follow for
sub�nitting a projeet baseline or pro�ress scE�edule foi� a capital project to !he City of �'ort
Worth. See CI'W Specificatinn 00 32 15 Canstructioii Project Schedezle for details and
require�neilts regarding the Contz�actor's proj ect schedule.
If you are not a registered CFW B«zzsaw user, please email or cantact:
Pred Griffin, Buzzsaw Admiz�.isti�ator
City of Fort W orth
Pred.Ciriffin@fartwo��l�gov.org
S ] 7-392-88fi8
Usic�g your registe�'ec� username and password !og mto ihe City's Buzzsaw Site
llCtps :ll pro j ect poi ��t.b�a zzs aw. com/c 1 i ent/f oc-twortll�ov
, �
._ i ,.�
— .—.�
.•
�:z �
Navi�ate ta your Praject Folder. Verify that your Praject ID and Project Name are
consistent w�th Project Foider Name.
Navigate to ihe Schedule Directory under your Pt�oject Folder. `T�11e 00701-Flaxseed
Drai��age improvements project is used for illust�-ation.
C1TY OP k�OR"l VdOR"CH Watcr und 5�nilary 5ewer Rehabiliiation
S7�ANDARD CONSTRIJCT[d�I SPT:CIP�CA'f101V DOCUMENTS Contract l91 CPN 02722
Rcvised JU�,Y 20, 2018
�
i
0032 35.4-0
CUNS'1-RUCTiON PTLOGI2E:S5 SCHEDULE — SUBN[ITTAL P1tOCESS
Page 2 of 7
I
r
�
S
�
��i,
l
l
G
I
i
�
(
l
I
r:. �r.r . u,..+. •Jt4
,a ti� ,w-. r�
� -•.i �p r�cwmr��,
�L�h_'ra. # . �. ' .I..yl .
�. � �1A71-Flaxseedilraa>ac�e7�'�:-� [ h I
��y � - _] �dForms �
f � � �d 0.e,cf]m1S25
� " e L43tshU[$oR
;te�� CO!k�.1�EH1�5
.. i v� Carsiracfer
; ti',I � �Q��n��
. , . � � � .-.� Ger�ral CenhactFT�a�ment<_ ard S
� JampxErn�a:rings
� � .�J vuh&c meepnes
�� - �A�iProperry
..i . .�.. ' 1}�,-.h:
- !Y';] UhY�ti`s
fi�s
ti � _+_� 90775-lhbanV�aayesCentralC:vsh_ �
ye
"J 's . i. � 00705 -11r6an l�dgC efnha� C�5T2f !
�
f' S /
�
" �'
��
�I
�' +�} ?�
LS � si Wt �.;,s nj � � �� -
. :.7.I:_ , �" �ulJuu . i'� .� ..�:.
' � 4�hi. J..�.� �.ti. I�u �
etltkesSnde%.xis FretlGF4i�ft 1d�.SEi9 l�93'�'d6a1[tNd'fSV...
.+-�� 9fl7t75 -1}r6an �ifag�s SE Ck:sic I'ri� �
;+„ � 99A1n-7lrhsnF:�ag�sSEC�IS:E+Py�i
,t � ��7�-Sd'tI�fY52'Po2iR2f1dFiCr.15s.
+�_ � Q0755 -MesqiaSes7d 26�4 CIP Yex 1:
.+:.� 00766 -OalsRoad -&ym:i3ti¢i io � r �
_+; � �778 -LeboY. Cllanr�
;+: � �'7038b -�-�e Ge£9c &SYc�na" :u�
�+: � G0783 -Gr�burY Raad -!<Ita:lesa �• F
_ n. ._ .n_..� ._a...�a r-,�_ ..
S F� a
, �;�:::,.. , �..,,i,; .. I}tn`3i�: ShTI� = S'{nv'.i'Suh45iYn�i ]�d
i�W
7
'1`wo files witi be uploaded For each sf�bmittal. A native schedule file forzxaat either
Primavera .xer or M5 Project .rr�pp and a PDF versian of the scheclule will be uploaded
Verify that the file name contains the S-digit Project ID, Project Name, aiid Submittal Date
and fo]laws t}ae standard naming cotzvention. Tnitial schedule subznittal wi11 be ]al�eled as
`Baseline' for example:
0074 � -FlaxseedDz�ainageImprovements-Baseline
Schedule su�mittal updates will be labeled with Schedule Submittal Date `YYYY MM' for
exaniple:
00701-FlaxseedDrainagelmprovements-2009_O 1
Expand or select the Schedules fo2der and add both the natzve file and PDP file #o t�e
directoiy.
Frorn the Taolbar Se�ect i—iArl�l Documer�t
CI'lY OF FORT WORTH
STANDARD CONSTkUC'110N SPECIFICATION I�OCIIMEN'iS
Revised JULY 2Q 2018
[Water and Sanoldiy Sei�er Rehabilitation
Cmi[ract 10l CPN 02722
�
i
003215.4-0
C(7NSTRl1CT[ON PROGRF.SS SCHP.BUI.T: — SU13M1'1'7�AL YROCESS
Pagc 3 of 7
fi'c FYI 5*f:. ����. .- ,
I ,} J �ao = � .�k' a3 � '.t 7.S _r�+� ;:J ' � C3' ' �'] `
F„u.� i �3 �t���KK
_ �� �:'.� �� —
•�a:r_��r � noie � .�:'� �� � �'LE}.���.�.�'��,.�F�drteia
� � Af 1�'nk ��J-w���. - --- -i�ik.,.:.,'.,..,. �
� l :���U:-R�x�e[iFhana9eIrnprovzr�4a�n fa�e .wll�4 � i'.�TS??
� �ohier '_1��Far�nc -�Ir.'.hflr�ji�i4..h FredGriHin 16,��� WffiunsaN'
'_ _l �d Res€�es
'. � .. � �_ � C�v isuc�un
, . � Ca�s�4tants
' _� C . tra[tw
'�_ _J CaTesPo�denoe
' �i . � ... 4 � c�� Can:raet�nc:xnenisand Spe�
+: :;,,,,,J P�9Je�f C�"d5;iP1¢
"i ... I��:�-_I�.Ir�
�� ,..,,..Rea��Ft�x+��l�
,;� ` .- �� �� .�*�
_ . - �schem�lesinae�r.� �
� � , � } uiirtiee
� t'� aox.,s -u�a-� ������.�,o-zi cb,ss�r:�x �
... � f� no�us-ud��ss��c�a�lc�.scw�
� QR7�6-ilr6an�'�jesSEtlus�rBerryi�.
1 I � t� i70705 - Lk6a�'v'Sfages SEC3usta Ne.� ta
..��� � f� �07�!] -Sani:arr Semr7 Rd�a� Canlrari L'�
. . ' � iiCf755-MesrNite-R�71]Q4C?SYear I I �_
- �y] @373S-Ui�cRaad-Bryanl7rv"�:MGrar3�
il�f ��'j ��-i.Eba'h'[hatvld
— � • F� a�37&5-s.�mner�3�eek&svcamxesa�o� „
� � I ' } { }
i r�nl
Select Browse and gn to the ]ocation af the files on yaur desktop.
Select �pen
�� -----�� _ � ,'i'-'s�.
� Ll'.���an_rtr.nlabxHlmMRa+ir:iwet�l=YAumakcxd�zo[4e�iTeq.,�iopt�xt4!
ck��, ��.�t... � ,..
hurumrMf
hvad.Cw�ie��� F�Yftriit Fietn�{rc� F�rif_T�� _
%NW [nw�
rLekykui
I��t,... �Ltl fle:➢Ucp - �4 ;.:.i-
�'�i, iaiuwo�u �,"�F�n¢jezf��8ana�rA�o 7
�i � �'�rr'r+m�Pr �f�#aamotesPisy�r
�hFl.tnn iy�ni.��rmzltla_c 5a�=�..,ti+i:�.r
� �I�` +'J h�W�� hn��yi ii-inles::.uaa� � r.x�4 .ya�v,' x.
t-�e� 1'.�rnS`�ir'�.1s :��-.�yt:."�-'a
_ �� �� � 6r„z�ara2fl0'a ,1�i{x+¢.^-r�EdlFia
f4+tlq+ ,�-;�i�._L� s�l� ta�r,m5x.rfFPExam5un7.3
r '�ree � 1 n��.od ,;�� e�.. � ur;.N i, .._ r
� �„�i_.. =.�i�� �. iti: _ � ii.r_� r.r[w�=.�f
44r—.+nw�. -�F�oPholt�smar�€d�gress�. ���_r.�!:befrag:�eszter
r.�,HPPhahr�a�f�reiner �fn�5uiindRe�order
�a,.���' Soiu�3 Cei�t� �l J�f : ee5au�idRecorde�.exe
'�� �N153�i1��51i'I ��Ia��rT":.'-'�I.
r�{.��w �. izin:: ::��k;{.l �
�in]io8�L551rV':r.i�_,14L1f3:id2'311�EB06� ��IIM}IMLii[]
#. } { } '
�
I'lrre'..,cn F�e�-. II ,•I r.l�e,
�itis�
f.r_-� rqr I.V Fi=: '. _ I ��-ro I
The file will appear in the B��zzsaw Add to Project — Select Documents window
Select Next.
C1TY OF FORT WORTH Water and Sanitary Sewer RehaUililalion
STANDARl7 COtQS'1'RUC"170N SPEC[FICATION DOClJNfT'NTS Coniract 101 CP%T p2722
Revised .T[]LY 2Q, 20) $
e
`
i
1
1
�
�
}
�
f
�
�
�
�
i
�
�
1
�
4
i
[
� -�
V032 i5.9-0
CONS"lRUC7�ION PROGRHSS SCHTiDU1.Ti —SUBMi"1"fAL PROCLSS
Page 4 of 7
Do not select Finish at this iiine.
��i�
u�,�.��t�
+4rya� i� r�m.n�r,t
SvuJ Thu.d
W�LK2iII�YI
�
I � �.�irri�:����.����ih�14�7RiFW4ie7��r��1„ebake YYx1ca�o5auNF��C�c.vx.r.r.IRet�vei [�nma4,
[� �-�.����. i .
F�r�k.n� 1 FMeLra`�i I Flndf.. � 5¢r
I.'KGGik�1�FI2r=erd0:�i7n.7r'�r4rr,or�rt'll�_�?44v'd��.1f1 _-Ylkti+�ml=:+rJ._. 11Jr'.. ��_'.1:1
f I_
�
��� • J F� � c�� � �.7� I
You will be placed into the Attach CoEnn�ent window to enter a recoa-d i��to the Project
Schedule Submittal Log.
Enter the Project ID-Project Name-Submittal i» the Suhject Line.
Type Submittal and Compa��y Name iR�to the Comment window along with Contact Narzae
and Co�tact Phane Number.
Sefect Ne�.
� _i �JL7ealratwi�iiraiLllx�ICw.a�iMn�kv.r5hhr��i{,Lmxxlln�lJ�sxonMemfaiieihrr.7siitl.
1�K deR h nphanal
' '�P1�.�Ooam�ents t �m.�y++�+Ilhi.wWAhriMr.i
��iAltedi [omn�ent I + I= _ �k _} I U� ki{I I� � � y I '= I fa� I I ��
_ �`
,�;rr,F��4� r���.�.�1� I'J41N3-f�ax�edDra�aage€enprotiements-tiaseline
�qhf�p9nn
5asel�se Schechke ��bm"siYal ,rrrnn'Goirq?any N�ne'
Cwata�t Mame
�Cairiact RFrone
Or
+Jpdat� Selsedute Su6nntia? frrza `Company PFame E� •nark�rfc+rmcdvp ta lanusry 31, Zp�9
L'6fi�dCt �VSffl2
t onia�t Phone�
� I
I� Em I r+a.l - � -r+_�—I �.��I � Ilr.b
c�ry or rox�r woiz�rH
STANllARD CONSTRUCTION SPCCIFICATlON DOCUMGN"1'S
Reviscd IULY 20, 2018
Water and Sanitary Scwer Rehabilitation
Conu-au IQl CPN 02722
I
�
0032 ]5.4-0
CONSTRi)CT[O7�I PROGRrSS SCH�:DL)L� — SUBMCl"l�AL PROCESS
Pag� 5 of 7
You will be placed into tl�e Send Email Nati�ication window.
Select To and the Select Recipients window will appear with a list of Pro}ect Contacts.
Select the Pro�ect Manager as the To Recipient and the Project Controls Group as #he Copy
Recipient.
, � , . -�=1 _
_I I—ltwl+w�sr�hW�w+ii�+ii4...i�r�rll...��.�-r...c+Ni���T� 1�i..,-uii�—�.M
•�1 �.�.,+�
P..M_'��iN .I
��•i"`_„ I � 1 i#R t 1+ I * I
,..:�_."' " �.
�� I
h,. I
„ , � t.—.�...
, +�+,��.. � ,. - i � �.�yl�
�1
��
_v rtm1 �{qr �
?�s8k�r'Sesv'�
_w Ber�y=L
C 11lmL[L�
r�, , �,
�+r�ii � t-JTl�t.r��i M1� f I` I
� .r_:.���i__Gr_.J�...ic�..-I,,,,,,:x��4 '_'.... _ ,_ � �y�i:.,,
°; s :,
��mY �e. . . f�e�.., .
nx W,.. l'1 .. hlt... i]f... �Iv,..
5 1'E��]dM.�. tj.. T.,, x ]P-«-.. !`�ro....
I V3u �ar-._ Y1u Y._. Y.'��.. yS... pin.,.
{ i�[kMx... M F]�. -0JS...
V'�c4ha... � K� CF.�� 3f:i.-.
v,_
WS�. Lt... Y•... vKx... rm.... r.C.
�. .��� :y... C... Cr,.._ <ya... oe...
. 'Jt�. G... #m... fbn... Ycr... . I .�il�..�
i�. � ���.. �
:+,.-Ax e., s°�.., �,,. cr_.. rei... uo...
v�Fl=.., F... PSI Ak1...
v,..
1nt1iF'�... Y... I'�... M1ln... Fre... fh... I
ro �._.
� ih r n,.. �. G... ;/.... I
� F... 4.�. .. Pr... .lt.. .. .
�
54 � � � ..,.,,.... J
� 1�F " � 3.-. . �� 1fJ... 3��r 1
�����_ _'__.�.-�.._.._ i �— C —L_r.,� I — . . I
Select the Paste Cr�mment btitton to copy the Comment into the body of tl�e en�ail
Select Finish.
CiTY OP PORT WOR"1'H Water and Sanitary Scwcr Rehabititation
STANDARD CONSTR[JCTIOId SPPCTPiCAT[O�'] T�OCUMEN'I5 C,anlrad 10] CPI�! U2722
Rcvised JUT Y 20, 20L8
oa 32 i s.a - o
CO]VS"1�RUCTION PROGR[;SS SCHIiDl1LE —SUBM�TTAL PRpCIiSS
Page 6 of 7
,.� ;+�iSc�.la��a�ron��r.f�'Ulr.ryPW�xi�n�MP�"4�cnutHxnewr.rup•J�alydfie:'F.ssU�soCmti
-�2 DPcawnents
� afict�niicrnl 1
hlltiTiiS��imeni I I-••I�•-I �� f i� � I
�} 5end Fmu J jo... I Fred Grif�ir� -
r1DLiFlce tion
�{.,. I Praject Cr�ntro9s Team
kkY,� I —
�44j�[I� �OQJf33�lcxseed�ratn��f I����a'nvements-Sase��e
�ase9^3� Shcei�ale 5ufx�Etta1 from'C:m-apanyiVame'. —
�
� :ontaci i+]ame
C�#act Phone
or
JpdaieScheckde S�mittal iram'Comparyy Plame' €or rrork per€osmed up tn ]a�y 3i, 20�y
�
'--- ' �ontaclName
�� ?yontac3Phaae
.?�7�G I i Gnr_n_I __ �en."I I -W:r �
The schedule file is up�oaded to the directory. An emai� is sent to the City's Project
Ma��ager and Project Control Specialist.
k� 4yl '.rr. low Il�li
�� � �_ . -� �r K._� �t' f, x r� :x 7x _,x wl �iJ V �s' i t'J -
�- -' � � im,v�.�sov . � - - -
_� :,� -- i �' �i � i� .' F.Ibi:. .. . '� ,—�—
�. ���'tm�oi-n-..-..�ImWaer�.��e,v�. :. i,r.._ .as.� ' ee.sa�lrmrasa. excne�... i•4rr.l _
. ��:drYxms :Jkmewesamex.xos rretls�3tic x,zka�ua�
W� •'_j&dRepartse& '.�J�.�....., _ R:Obef,Ei... 34.24G %£€2Rk� 1_'.:Y-• �1��
- - I . ...-I mnswcam
� �J cceax,etmns
r � �;� CanIIacNr
Y� .Jcirr�por�c
, � �Ger�+'slCvnaaclEanar.ci���`rc15o.�
_ - JRn1Ea0rswl�xis
� � "J R4&�t^eetex�s
�� � � m�erty
... . . � � .� : tii[�r
;� oe�atr����.,:�s=r:nrm: ••�
';. ;��srt�dksa,�.�
!t'� � ����
,. : � come-u�,a,oa�cE.�..��:�_,,;
, � u��es-�,�,ai�ce�v���._w,
�, , � �ome-u�t�,�m�e:sea;�c�s,.,,K
� -..� �;as-��,:�z,es�ckut�,� _�ry
' �* � b3737-Szoei}�y5e;.�-fte`:uhC�bo¢i5
:+��� ���55-r�esq.u;eRdlorycryvyear �¢t
'I.xlj :+ � p��ag-�hRo��&Yan[Ira�nf: �++�/.
L I � .� p}T'e -€e6ox<hs�nsl ,.
� � i
�
Upload the PDP file using the same guideline.
EN� OF SECTION
Cl"l�Y OF FOAT WORTH Water and Saniiary ScWcr itchabilila[ion
STANDARD CONS7'RUC'f101�i SPECIPiCAT10N ]JOCUMEN7�S CUniracl l0E CPN U2722
Aevised ]ULY 20, 2018
no 3z � s.4 - a
COI�IS'fItUC"1'iON PROCiitESS Si:[ ]EDIJLE — Si313iv1ITTAL PROC�;SS
Page 7 of 7
Revision Lag
AA`I'E NAM� SUMIVIARY OF CHAI�'GE
.Tuly 20, 2078 M. Jan�ell Ii�itial Issiie
CITY OP PORT WOR'I�H Water and Sanftary Scwcr Rchabilication
STANI3ARD CONSI RUCT[4N SPl'CIPICA"170N ll[�CUMENTS Contract l01 CPN 02722
Revfscd .Ii11.Y 20, 2018
1
i
�
i
I
k
�
�
t
i
0[4 35 13
BIl7 FClf:t�f
Page 1 nf 1
�E� 1 IC3�f f$�3 35 '�3
Cflt�[�'LI�T OF fNT�REST STATEMENT
E�ch bidder, �ifferor or respondertt {h�rein�ft�r referred ta �s "You"} t� � C'ity af �'ori Wart� prae�remen�
may #�� requic�d to c6rr��a�ete a Canflict �f Ir�t�resf Questionr�aire {tY�e att�che€! �tQ Fc�rr�} �ndlar � E.ocal
GQvernment CJfficer �onfliets C�isclosur� Stat��ent (the attact�etf CtS �orm} �ur��a�rt io state law. You
�re urged fa consuft u�ifh cbunsel regarding the a�pli�abi�ity �f thes� f�nrms fn yaur corr�p�r�y.
Th� refereneed forrrts may b� dn+nrnfoaded frQrn the (inks prc�vided b�l��c. �
l
�`
�
i
�
�
�
4
'
i
�
4
i
�
❑
❑
�
❑
��'°
�
GiC� �orr� do�s rtat �pplY
�IQ F�r� is �n �t� with City �ecr�tary
�IC� Forrn is b�inc� prouid�d tr� th� Gi#y 5ecret�ry
G!S Fc�rrr� does �oi apph'
�!� �arm is �n ��le with �ity Secr�i�ry
Ci� �orrr� is beQng prQvi�ed to th� Gity S�cr�tary
����'33��:
Vili((iarn J Schult� Inc d�a �ircle G�or�stn.�ction
PQ 8ox 40�28
Fort Wcarth; Texas 76�40
By: Teresa Skelly
�ignafure: /._.�.�.� -�'" ..
_ ��
Titl�: Pr�sic#en
..r � .
�
�
,
CiTY �F Ft3RT Y�IdRTH
Si�A�lf3ARi7 C�NSTF2UGT10N SPECi�fCRTl�N i7QCU11�t�NT3
� Form Fteuised 20179909
1
co������ o� ��v i ����� �u�s�'�o�v�vA��E ���� �1C�
For r►endor doing business with local governmental entity
This questiannaire retlects changes made to the law by H.B. 23, 84th Leg., Regular Session. OFFICEUSEONLY
This questionnaire is being liied in accordance with Chap#er 176, local Government Code, by a vendar who pate Received
has a business relationship as defined by Section 176.001{1-a} wiih a local governmental entiry and the
vendor meets requiremenls u�der Section 176.OQfi(aj.
By law this questionnaire must be filed wit� the records administrator of the local governmental entity not laier
than the 7th business day aiter the date the vendor becomes aware o( facis ihat require the statement to be
filed. See Secfion 176.OD&(a-1}, Local Government Code.
A vendor commits an offense if the vendor knowingly violates Section 176.006, Locaf Govemment Code. An
offense under this section is a misdemeanor.
1 Name of vendor who has a business relationship with local governmental entity.
2
❑ Check this box if you are filing a� update to a previously filed yuestionnaire. (The law requires that you �ile an updated
compfeted questionnaire with the appropriate fifing authority nof later #�an the 7th business day after the date on which
you became aware that the originally filed questionnaire was incQmple#e or inaccurate.)
3 Name of locat government officer about whom the in#armation is being disclosed.
Name of Of#icer
4 Describe each empioyment or other business relationship with the local go�ernrnent oiiicer, or a family member of the
officer, as descrihed by Section 176.OU3(a)(2)(A). A�so describe any family relafionship with ihe local government nfficer.
Complete subparts A and B for each empiayment or business relationship descri6ed. A3tach additionaf pages to this Forrn
CIQ as necessary.
A. Is the local governrrient officer or a famify member of the officer receiving or likely to receive taxable income,
other than investment income, from the vendor?
� Yes � Na
B. fs the vendor receiving or likely to receive taxable income, other than investment incorr�e, froin or at the direc�ion
of the local government officer or a family member of the offFcer AND the taxable income is not received from the
local governmental entity?
� Yes � No
� describe each employment or business relationship ihai the �endor named in Section 1 maintains with a corporation or
oiher business entity with respect to which #he locaf governmeni officer ser�es as an officer or director, or holds an
ownership interes# of one percent or more.
6
❑ Gheck this box if the vendor has given the local government officer or a family merrEber of the oificer one or more gifts
as described in 5ection 176.a03(a)(2J(B), excluding gifts described in Section 176.fl03(a-1).
7
Signature of vendor doing business with Ihe govemmenta! eniity Date
Form provided byTexas Ethics Commission www.ethics.state.tx.us Ftevised 1f/3D/2015
CONFLICT OF 1NT�REST QU�STIONIVAItl��
For vendar doing b�si�ess with locai go�ernmental er�ti#y
Acomplete copy of Chapfer 7 76 of the Loca] Governmeni Code may be found at http://www.statutes.legis.state.tx.us/
Docs/LG/htm/LG.176.htm. For easy reference, below are some of the section5 cited on this form.
Local Go�ernment Cocle � 176.00i(_1-a): "Business refatipn5�ip" means a connection between two or more parties
based pn commercial activity of one of the parties. The terr� does not include a connection based on:
(A) a transaciion that is subject to rate or fee reg�a�ation by a federal, state, or focal governmental entity or an
agency af a federal, state, or local governmental entity;
(8} a transaction conducted at a price and subject to terms available to the public; or
(C) a purchase or lease of goods or services from a person that is charterecE by a state or federal agency and
thaf is subjec# ta regular examination by, and reporting to, that agency.
Locai Government Code § 178.003la)(2)(A) and (B):
(a) A iocal government officer shall file a conflicts disclosure statement with respect to a vendor if:
���
(2) the vendor:
(A) has an employment or other business relationship with the local gavernment officer or a
family member af the officer that results in the officer or family member receiving #axable
incame, other than i�vestment income, that exceeds $2,540 during fhe 12-month periqd
preceding the date that th�e officer becomes aware that
(i} a contract between the local governmental entity and vendor has been execufed,
or
{ii) the local governmental entity is considering entering into a cantract with the
vendor;
(B) has given to the local government officer or a family member of the officer one or more giffs
#hat have an aggregate value of more tnan $� 00 in the i2-month period preceding the date the
officer becomes aware that:
(i) a contract between the local governmental entify and vendor has been executed; or
(ii) the local governmental entity is considering entering into a contract with the vendor.
Lacal Go�ernment Cpde § 176.006(a} anc! (a-1)
(a) Avendor shall file a completed conflicf of interest questionnaire if the vendor has a business relationship
with a local governmental entity and:
(1) has an employment or other business relationship with a local government officer of that locai
governmental entity, or a famiiy member of the officer, describec! by Section 176.043(a)(2)(A);
(2) has given a local government officer oi that local go�ernmentaf enfity, or a famify member of the
of#icer, ane or rnore gifts with the aggregate value specified by Section 176.OQ3{a)(2}(B), excluding any
gift described by Section 17fi.�03(a-i ); or
(3) has a#arnily reiat�onship with a local gpvernment officer ofi #hat loca! governmental entity.
(a-1) The completed conflici of interest questionnaire must be filed with the apprppriate records administrator
not later than the seventh business day after the later of:
(1) the date that the vendor:
(A) begins discussions ar negotiations to enter into a contract with the local governmental
entiiy; or
(B) submi#s to the iocal governmentaf entity an application, response to a request for propasals
or bids, correspondence, or another writing related to a potential contract with the local
governmental entity; or
(2) the date the vendor becomes aware:
(A) of an empioyment or other business relationship with a local government ofificer, or a
family member of the officer, described by Subsection (a);
(B) ihat fhe vendor has given one or mor� gifis described by Subsection (a); or
(C) of a family reiationship with a local government officer.
Form provicie8 by 7exas Ethics Commission www.ethics.state.tx.us Revised 1f/3012Q15
�oce�� �ov����n��v � o��i��� �o�nn CI�
CO�IFLICiS DI�CLOSI�R� S�eo►��M�IVi
(Insiructions far campleting and filing this form are provided on the n�xt page.)
'ihis questionnaire reffects changes made to the law by H.B. 23, 84th Leg., Regular Session. OFFICE US� �NL.Y
This is the notice to #he apprapria#e local governmen#al entity that the following loca!
government officer has become aware of facts that require the afficer to file this statement �ate ReCeived
in accordance with Chapter 17fi, Laca! Go�ernment Code.
y Name of Loca! Government Officer
2 Office Held
3 Name of vendor described by Sections 176.001(7} and 176.OQ3(a), Local Go�ernment Code
4 Description of the nature and extent of each empioymeni ar other bt�siness relalionship and each family relationship
with vendor named in iterrr 3.
5 List gifts accepted by the focaf go�ernment officer and any family member, if aggregaie value of the giffs accepied
from vendor named in item 3 exceeds $100 during the 12-month period described by Section 176.Oa3(a)(2)(B).
Date Gift Accepted Descriptian of Giit
Date Giff Accepted Descrip#ion of Gift
Date Gift Accepted Description of Gift
(attach additional forms as necessary}
s AFFIbAV17
I swear under penelly of perjury that the above stalement is #rue and correct. I acknowledge
that the disclasure applies to each lamily member {as defined by Section 176.pp1(2), Local
GovernmenF Code) oi fhis local government officer. I afso acknowfedge that this statement
covers the 12-month period described by Section 176.003(a){2}(6}, Local Government Code.
Signature of Local Gavernment Offcer
AFFIX NOTARY STAMP / SEAL ABOVE
Sworn to and subscribed before me, by the said , this the day
of , 20 , to cer�ify which, witness my hand and seal oi office.
Signalure of officer administering oath Printed name ot olticer administering oath Title of afficer a[iministering oath
Farm provided by Texas Ethics Gorr�mission www.etnics.slale.tx.us Revised 11/30/2pi5
LOCAL (aOVERNNi�Ni QFFICI�Ft CONFLlCTS DISCLOSU�� SY�1Y�Ni1�NT
Section 176.003 of the Lacaf Government Code requires certain local government officers to file this form. A"IocaE
government officer" is defined as a rnember af the governing body of a lacal governmental entity; a directar, superintendent,
administrator, president, or other person designated as the executive officer of a local go�ernmenta! entify; or an agent of
a local go�ernmenfal entity who exercises discretion in the planning, recornmending, seleciing, or contracting of a vendar.
This form is required to be #iled with the recards administrator of the locaf �overnmental entity not later than 5 p.m. on fhe
seventh business day afier the date on which the officer becomes aware of the facts that require the filing of this statement.
A local governmer�t officer commits an offense if the officer knowingiy vialates Section i 76.003, I�oca! Government Cade.
An offense under this section is a misdameanor.
Refer ta chapter 176 of the Local Government Code for cietailed infqrmation regarding the requirement ta file this form.
ENST�iUCTIONS FQR COMPLETING THIS FORM
The follpwing num6ers correspond to fhe num6ered boxes on fhe other side.
1. �lame of Local Governmenf Officer. Enter the name qf the iocal government oificer filing this staternent.
2. Office Held. Enter the name of the office held by the local government afiicer filing this statement.
3. Name of vendor described by 5ections 176.001(7) and '176.003(a), Local Government Code. Ente�r the name of
the vendor descr�bed by Section 17fi.001(7), Lacaf Government Code, if the vendor: a) has an employment ar other
business relationship with the focal government officer or a family member of the officer as described by Sectian
176.003(a)(2)(A}, Local Government Code; b) has given to the local government officer or a family member of the officer
one or more gifts as described by Section 176.003(a}(2}(B), Lacal Government Code; or c) has a family relationship wiih
the local gov�rnrnent officer as defined by Section 176.001(2-a), Locaf Government Code.
�. Description of the na#ure and ex#ent of each employment or other business relationship and each fam�ly
relationship with vendor named in item 3. Describe the nature and exient of the empfoymenf or ofher business
relationship the vendor has with the focal government officer or a family member of the pfficer as described by 5ection
176.003(a)(2)(A), �ocal Government Cocle, and each family reEationship the vencEor has with the local government oificer
as defined by Section � 76.001(2-a), Lacal Government Code.
5. List gifts accepted, if #he aggregata value af the gifts accepted from vendor named in i#em 3 exceeds $900.
�i5t gifts accepted during fhe 12-month period (described by Sectio� i 76.003(a)(2J(B), Local Gavernment Cocfe) by the
local government officer or family member of the officer from the �endor named in item 3 fhat in the aggregate exceed $100
in value.
6. Affidavit. Signature of local government officer.
Local Government Code S 176.007(2-a): "Family relationship" means a relafionship between a person and another
person within the third degree by consanguinity or the second degree by affinity, as thase terms are defin�d by Subchapter
B, Chapter 573, Government Code.
LocaE Government Code § 176_003(a)(2)(A):
(a) A lacal government officer shall fiie a conflicts disclosure statement with respect to a vendor if:
*�*
(2} the vendor:
{A) has an employment or other business relationship with the local gpvernment offic�r or a
family member of the officer that results in the afficer or family mernber receiving taxabfe income,
oih�r than investment income, that exceeds $2,500 during the 12-month period preceding the
date that the officer becomes aware that:
(i} a contract between the loca! governmental entity and vendor has been executed; or
(iij the local governmental entity is consicEering entering into a contract with the vendor.
Form provided by Texas Ethics Commission www.etnics.staie.tx.us Revised 11/30/2015
0� 41 (Kl
BEC3 FpRh9
Page 1 ut 4
S�Ci'#C11+1 i10 41 Otl
�i� �o�n�
iQ: Th� Purchasirtc� Nlanager
r.la. �he I'urchasing Division
1(3DC3 Thrac�ma�#on Stree#
Ciry of Fart Vl�arth; Texas 761Ci2
F�F2:
Cify I�roj�cfi iVo..
UnitslSeetians:
�hlaier and �ani#ary �Ewar Rehabiiit�tion �ar�t€�c# 101
C{�N 02i�2
Unif 9: 1tV�#er Imprpvernents
l�nit 2: Sanftary 5ewer Impr4v�ments
Unit 3: Paving ftn�ruvemenis
4. �nter lnYn Agreem�nt
The und�r�ign�d Bidder pro�os�s ar�d agrees, if #his Bici is accepted, ta enter infa an ,�greemenf with City in the form
inclutled in the �idding C�ocurner�ts ta pe�foccn antf f�rnish ai! Vllork as speci�ed or indicaied in the Canfract �3ocumeMs for
the Bid Pri�e ar,d wittair� the Cor3tract Tirne ir�dicated in this Bi.cE and in accardance wlth the oi�er f�rrns and ce,nditions of tiie
Contraef Docurrrents.
2. BiC71��R Aaknowtedgern�nts and Gertifiaation
2.9_ In subrrtitfing fhis Bid, Birider accepfs s!1 of #h� #erms and condi#ions of the tNVlTATt�N i0 BI[)pERS and
tNSTRUGTfC31V� TO ��DC)��tS, including wit3�nut limita#iQn those dealing wifh the di5�osition of Bid 8ond.
2.2. �idder is aware af atl ec�sts !c� pravide tF�e r�r�uired i�surance, wili �lr� sa �ereding ennfract a�nrard, and wiEl prnvide
a vaiid ins�r�nce certificate rt�eefing �!I reqt�i�em�nts wifhin 14 r#ays of t�o#ifc�tiart of av�ard.
2.3, �idder ce�fiifi�s that fhis �3id is genuin� and naf made in #he inferest nf nr an behaff ai any und]scla�ed ir�dividual
or ent�fy ar�d is r�ot sui�tr�[fied in canforn�ity with any colkusive agreement or rules of any group, associati�n,
arganizatic�n, Oi C[?iE7AC�flOf1.
2_�. Bideter has r�ot directfy or indirsctly induced nr �oliaiked any other Bidder to subrni# a falsa t�r si�am Bid.
2.5. Bidder has naf snlieifecf or ir�duced any ir��ividual or �ntity ta refrain irr�m bidding.
2.6_ �idd�r bas no# enr�aged in c�rru{�.t, fraud�lenf, collusiue, ar cnprciue practices in competing for fhe Confract. For
#he purposes of #his Paragr�pF�.:
a. "corrupt prsctice" means fhe affering, �iving, rec�iving, or snliniting of any thing of va(ue iik�ly ia
influence fhe acfion of a public official i€� #he biddir�� process.
b. °fraudulent pracfice" rnearts aR ir�tentional mfsrepresentati�� ofi facts mad� (a) fo influenee fh�
bi�td€ng proeess to ftte detriment af Cily (b} ta estabtish f3icf prices at �rtificial n�n-c�mpetitive levels,
or (e) lo deprive City of the a�nQfifs oi free anci open comp�tifian.
e. "collusive practice" r�aans a scherne or arrang�rr€enf beiween twn or more Sidders; wifh ar withauf
ihe knowfecfge of G.ity, a purpose of v�hich is #o ss#abfish Bid prices at arti�eiaf, non-comp�fitive levels.
ct. "coercive praciice" meaR� harrnir�g or threatet�ing tca harm, directly or indire�tly, persons tar their
prQperty #a i€�€i�er�ce t�eir participa#iori in the bidding proaess or afi�ct the cx�cuiion c�f ih� Gantracf.
cr1'� of� ���c��t•r Gvt��t't-r�
STf3NI�ftiZL3 CF?b€S'i°R[J(:3IL7AF S�ECfPICt�I'T(3N i30(�'[3AiI:�'TS GVatcr :uF�l 3a�uiary Sewer 3Zchafiil�4atian G�n[�'aat 16�
Pc>rrn ftat�ised 2(�15U�21 C�'AT U2722
4Q 4i 00
Bla FORM
Page 2 of 3
3. Prequalification
The Bidder acknowledges that the fallowing work iypes must be performed only by prequalified contraclors and
subcontractors:
a. Augur Boring - 24-inch diam�ter casing and less
b. Water Distribution, Development, 8-inch diarrseter and smaller
c. Sewer Bypass Pumping, 18-inches and sma4ler
d. CC1V, 12-i�ches and smaller
e. SewerClPP, 12-inches ancf smaller
f. Sewer Collection System, Development, 12-inches and smaller
g. Sewer Cleaning, 8-inches and smaller
h. Asphalt Paving Consfruction/Reconstruction (LESS THAN 15,000 square yards)
i. Concrete Paving Construction/Reconstruction (LESS THAN 15,�00 square yards)
4. Time of Completion
4.1. The Work will be complete for Final Acceptance wifhin 420 days after the daie when fhe
the Contract Tme commences to run as pro�ided in Paragraph 2A3 of the General Conditions.
4.Z. Bidder accepts t�e provisions of the Agreement as to liquidated damages in the event of failure fo complete the
Work {andlor achievement of Milestones} within the times specified in ihe Agreement.
5. Attached to this Bid
The following documents are attached to and made a part of this Bid:
a. This Bid Form, Secfion 00 41 00
b. Required Bid Bond, 5ection 00 43 13 issued by a surety meeting the requirements of Paragraph 5.01
of ihe General Conditions.
c. Proposal Form, Section 00 42 43
d. Vendor Compliance to 5tate Law Non Resident Bidd�r, 5ect�on QD 43 37
e. MWBE Forms (optional af time of bid)
f. Prequalification Statement, Section 40 45 12
g. Gonflict af Interesf Affida�it, Section 00 35 13
*If necessary, CIQ or C15 forms are to be provided directly to City 5ecretary
h. Any additionai documents thai may be required by Section 12 of the Instructions to Bidders
6. 7otal Bid Amount
6.1. Bidder will complete the Wark in accordance with the Contract Documents for the following t�id amount. In the
space pro�ided below, please enter the toiai bid amo�nt for this project. Oniy this figure will be read publicly by
ti�e City at fhe bid opening.
6.2. Ii is understood and agreed by fhe Bidder in signing this prpposal that the total bid amount entered below is
subject #o �eriflcation and/or modification by multiplying the unif bid prices for each pay item by the respecti�e
estimated quantities shown in this proposal and then totaling all of the extended amounts.
C[TY QF FORT WORTH
S"L'ANDARD CONSTRlJCT10N SPF,C]F1CA1'lOIV llOCUMLIV"CS Waler and Sanitniy Scwcr Kchabi]itation Coittract l0l
Form Re�ised 2Q I 5082 ] CPN 02722
�
c
�
�
�
k
�
i
�
1jt71i i: ����f
i�nit 2: Saniiary 5ewer
ilnit 3: Paving
iafal Bid
1'his Bid is subrnittecf on 'i 1/19f2D2 by th� entiiy �amed bet�svv.
Resp�ctfufiy sub
sy. '� �1'°°'�.:s``-�
(�ignat��:j ..._._.._
. �
eresa 5iceifv
rin#ed Name}
Tit€e: Presider�t
Corrtp�ny: fnC dEaa Circf� C Canstructiqn
Adritess: �'O Box 40328
F'art Worth, Texas 76fi�Ci
of I�tcr�rp�rafion: iexes
�maiE°
Phone: 8'f 7-293-fi 863
�r�e� o� ��c�r�on�
E'I"1'Y E�I� �'Olt"1' VGC3R1fi
5'I'ANl]itL�73 C'C71>3S7"T21JC37C3?� Sl'L:E;tf�IGATIQNI?DCIJMEN`�S
Form Rcvised 20150821
����� � �� � �
4��
� �ra�Y� �',� d, c' C'J
����
����,a��.�o
��:s� ,��� � fj
C�rrpor�fe ��aE:
GU 4i UO
�Fi� FpRM
Pag� 4 of 4
6Yaier ant� Sanilary Sevver Rr.hal�ilrtaficap Co�ntract 7 f11
C3'l3 027�?
r
�
i
}
suaa43
IIiDYROYOSAL
.Page.l aYa
� S��TlQE�t UQ.d2.A3
� PROP�S,4L FaRIV�
ii`aterand Ssal[FsstySe�er iiehabI€iistlnn C�ntracl_70[
f.iNl'�' ����'� 81�1 BI[�der'� �4F�#�t't���#�f�
i
,
,�;������ �������,
E3idlist Spzeificacion if�itof i3id
I[emNo. Descxiptioo SeciionNa Mcaseuc Quantily tJniiTrice i3id.Value
�
4
� ...... 1 wil'I.ULS'1 t!" L[�' ii9l�i 33 i i 7l! LE` .,FiiUU ..�,8_5'..I]U ,'�3Y1 FU[ltf.�ii
_ . ..._.._....�_.._...._... .._..,..____.,._.__ ,. _' ' _ ___�""' '. _ . _ ................. .... _ ...., . ....,. . . _........ _ _. .......... ._._...... _ �,... _ ._
z s�i�.a��� a•w��-�;�e 33113U,� �� �a
y _ __ , ..... __ _ _ _�._ . .. . . . , i9 92 $6,j U0 $5.1€�Q.GO
�. _.�_
� 3 3312.3UO2 4 Gate Va1ve 33 i2 2fl EA 4
_ . � _ ...
_ ..�„w,�_�� _.. w....._ , �. ;� 2aa.no „ �a ann:oo
� �� ___ � _.s�.�__
_ . �. ._. . . _
� _ ._ 33i�3W3 8 C� V�ve _.._.. � � ..� . __ . _ ._. � _ 33 i2 �[i . _ FA - - - _ _.9 .. ..�.1,4047 0Ei _ . , �12,BOO.ifO
_ _ ... _
5 331�l,0UDt Ch�ka Fron Water �tianSS wtJl2�sdaSnt .. _ __. 33 91 it T�N ._._ 3 .�5,500 0D �16,500:U0
_-�.�, ...w . . .
6 fS24ir'l302 Fi�.[nnve6 Watesllah�e �24114. _ .__.� . _ _ _..�_� _ ___�._���..� �,1�$�O:t�Q
. _ . __ _.__ _ _ _ ._
i 7 �241,12i64"-92'Water�R�andaa�meniPiu�q �_..... . _ __� _,Ei24]'E� , r �JS _ ._fi, $°��,�}.DO_. _�3�UEIO:Ui!
�. �........ _. V � ..� .. _ �. � ,-
, 8 33i�_flUO3 Fire rant
� _ �'� ... _ . .. _ 3312 dR EA 4 '0, d.8Uf1_F)11 $99;20[i.C�t1
� � n U2A1 r 951ti 5alvage Fire ��iysh�nt .. .._.... , .. _ �2 4i iA _ FJ� .. . _ 4 . .. �6U0 ;t#i _ . .._$2,4U0_0€l
� iu .�312�Oi I7 Con�s:cUat ta �lislin� 4�12" VYaEer Mair� _ 33 92 25 �A 5 $2,5UiI.00 �'I2 5�€3:{iD
M1 li 31i2 2iT03 1' 1R(ater Serv%e 3312 70 Eh $9 $4,�2(ijI U�3 �$5a $9U 0�
. f �..�.� . . . . .._. � .
�� _._ . . �-
� I 1'� ss �c ,h�13f i"VY',rh.r �;avu� Metor Reconn�cDtx3 331210 Ef1 98 $30� [3F1 .. �1A 7Eit1(t0
_ .._,__ . _. ._.� _ _
T3 �s�ituue 1`i'�iva+rWa�r'�r�'�+tr� Re�Cai7on 33i2T4 LE 150 �25U(iD $375fTUU0
la �1'7,t: e�tas I 1 t:''N�Fcx Sennce 33 7Z iil �4 i4 $7�5(li� Oi! $29 �fl0 nFi
� . . _ _ _-_ __ y
� � i� ,'t�3�'1�3,s �. 4'4;a�e� �,,,n,17S�ster ServEoe Rc�tor.ai"wrr ^ . . . . . "' 33 t210 E� .tn _ _S � � -ry �7�7� 00 Q'�
. .. �.. _ 3?
� �u ss��.�cui � waceraenn[f�,h�ier Recon�u:�elitar� 33'1210 �1 _ iQ �40fi.t14 �4;OD0.UQ
- - _ . . _._ _ .... .. . _._ ..�.__.._ ___. _.._._ � _ _.._ _ __ ,. . _ _. _. . __. . _ . � .. - .. _ .____.._ _�� __ _. ..___ _ _ _ __ _
i 9 �999.(}pU� Rec�uu� F�rshng S' WaierM�Lo-e �n Eyc�sdng Vau1#� �9_J� S9 V�;q �—._._
, . . �Z;5��DU $25p0_QU
...� _. .e, .� _,V. .. . , .
70 33fl5.01(i3 F�air�+6cr��raho» � �ttng EJE�lifies _ . . �.� �� _ , _ _ ,.. �.� _ _ .� ... 7 .. $1_,fi00 (16 ._ _ �"f VQO:,(lp
_ ..�� _
� }_z 33(�i_{3Qf}3 $" WaterCr�e Lrnr�erwu� - _ . 33 �5 72 EA .. . . 8 ._ $S;S[F6.00 $44 40Q,Oi�
. m. _ � . _ . ., __. - - . _ -- -
2? 3209_i�i12 5 UffidelL.�9�a1t P'v�ttt R��ratr RP�nEia1 - 32 09 77 LF . 5s{7�
.. �5.5_.[t(i $339,Uti�l i3�
� �<s 32�a r 42(11 Asp�u�lt 1�rmtRmpair�Yn?+�d De�r�ed Width, Reside�al . - '32 oi i7 SY 4[16 $35 fia ffi4� ao�:On
"l� u"# 7 Dlit V11a{e€ Lirle Groui�� D2 4i 44 GY _3f} .$25t} �CJ 5DO.tTO
. . .. Y. _
26 i all ti7{�i r rrn�fl S�tetY _. ._ . 33 Q5 9{} LF Q$UA , �7 UU � fiiHl.Cl€I
- � � _ �«, ,��, K� c.�a�t� c.��e � s�- ��tso3 _ � . nz �� -� � �� soa V V �a �ii �3 �.oa
� J7 . 32Y6 ikYlii 6 C'.cmczei�l.l�rb �d f8" 6uttec�match e:cisiinc�) {-`�15t►) 32 i6'F3 �� 500 �9D �i] $2Q UtIQ.Qp
�n i��A9 p4Q'1 Rert�av� Goncaete LDrlve.wray (s�lsi!� - - Q� 4i 15 _ �� ._ . __i2�J _ _ �7.Oi1 38 75DmmQ0
- _, _ _ _ � — . . ._, . _
7.s 3;Z43.�t �'i` C,anct'etc: I] `rlYi �"ay {a�fitS#!} 32 33211 SF 1.25[E $17 a0 $27 875 OQ
� �su i324i 9q�aC2eYr�t�V� C�[e V�y C`trfier' (5tll�j _ � _. . Q2 d't iS _. SY. _ . _.� _�� _� _ m____�7 5(i ��1'�2 50
37 79 �& Q3�1 9 ConclfalErr�Gtrtter 17es3denUgi (5t31�} 32 43 2(1 5Y �5 $85 00 ____ $3�,275 DO
� . ... ._�.._. _, _.__._ _�._. ._ � �_ _ __ �__ __ _
� ;si n� : 15U8 ? rrk#r Suriace Mfi ' 5�15� i�2 �F� 15 SY 4[i(ifl , $3 UU $i2,d]tlQ,i10
_ __-_.,._.,..__�.�..._ � _.. _ e . . , „ _._._ _ . __ _ .__..,
33 I!241 �Gf�u 6uftiil51N7r�g��)15Uj _ ___.r .._�.� _� _.� __ .�._._ _.__. _ 0241 �5 CF 25
.. . _.. _ _�, .. - ..... _ . .. .. .� UQ . ..._ _. �75Q_�{i
34 ?�;? 7? }� ��nrh +4�ha1# f'av�rr�ni �t Type "L' �5nt5@� 32 i2 96 51' 4f�(i(1 _ �iSAQ �sa,aao.00
3a ;9;!:;�.r1ni' fuL�nr =P�I;�isimert�l,iuwHwr{:+.�I�ar{hUf5U] _ 33flS13 FA 8 $150�Ud $t2,�[}Q�U
� -. . - -- � � .
..----
3[i �3(F:�.ii111 v�f � r'�:14ef�tvri„;:;S�iWiG7«ir(�f,ri(!J d"id5i4 EA 9 �ZQ�Oa $�30ffU�
� 3P :�-;L�`(�I�iti Ai..'�II�fK'r.E;h�uaL��„ts,•��ru�;cserar.+��ra s.�n`� �a Ls 1 �.3�00 _�3,5f3[DD(E
__�___. . . . _ . , __. __._.
' � 3(t .3.liss.�;lk`I h1lxxll�lieowAd�usUFl��u.L�� w��leel.lernr�{5�50� s:sdJ51d F_A 'f �U4.�D �3ft0.06
1 39 :','�Il.!:f1L11 [.11.9Tfi[�1EP'..^.i'�klAll[I�T�.Nl++O� .�1�13��1 � . �- . -<�_......� ...... . .... ...........
I -' -' - . _.... ;S25UQ11 _ . $1250_ti0
au ;lrai.t►t�'s P�Oxi t5t�l5f!} _3t �i ;y c�.v 3 25 n�} �7S.�f1f1
� � . 1 __ _ .. -� ... .
•1�7 3'r.!?3.{litliiJY�ckSod:'lixx�SieF�t,:�{}f3U} it,"l.L3 � 5'r' I(5 $1549�_ $1B25n0U
4z 's�i?..s n1v, 5�r1PPF� �� rr� �i aFno Ls � � s`s,SniF.i�r1 _$3SUR.QfI
M1s :Lni'wi.�3lFii � s'm��p? ,� 1'�`dieF 7c'Tlfioes YT G�+ si� 5� ? $50.Oi]� llfl $Sfl 40(I.OQ
. +m _.__ _
4a [I I .'a UUui d:an=lnxllnn �uaic'rr� frl 7i ;�3 � ! S # � �B 5[if� :YJ .�, g.500.�0
� u�€ � � u�ce� r�s-nuue �u -$
� � . 46 ��47� (H14i Ttai�,te C�ho1 e . ... ._ .. _. _ . - _� . - _ . ., �39 71 93 � MO �. l _- 3� --, T3 �f1U.i}R�--- �� St10 UEI
E
}
crr�ror�cuzama�'re�
S7AhU.'�A€) C ONS1R'.]i77iTSY SPECiEICAT,bu i1cn,5lau�s'PS
Fruaitte5`fsM�7VS2pf2p
t4al�aW saa.'ta+Fseivert�mbiLk�lswi.C�mlca:! 10i
p'IJ312"22
�
'
�
�
�
�
Ul�[Y Fl���� ���
�
g�i��s
� itemNu.
.-� _-. - ._-.. _.-
00 42 E3
E37n P3tQP455R7,
Pace Z ar3
SECTlDA[ Ub 42 A3
PROP09AL FOF�iVI
Wster aa�E SanIW ry R.exerTtehsbll[iedqn Cnntt�N 14f
�e�c�e�=s A���i����n
�������
T7csctiotion
�z��5r����
Specific�ti�un � TJnil�af � 13ic3 J Clnl[k�ic<s � itid Val�e
u4�ioi�P#o_ bAzawce �ut.ii[i�v� C:
i :s�33.a'F7� d' <<am,a F'��!. . .,_.. ... , . _ _. .. _ . _ _ .. . �33't'! 1U.33 �!" � 3Ci80 �
. . . _ .. ...._..�. ....,.... . _ _ _ . . .. . .......... .
} ?. 9ss:;7.-4ijs� A" Si,wr_r l�i�x, i:sS fl�ck{�t! �331t 90. 33 i� � 44 S
- ........... .... . .
{ .f 333i.431Ja�.�ie-�c.�rrer'r'ipevvt�r�iec[oqui� . ... �s3ii1G il- TQ65 �82.
` 9 3331.4120 8 C]Ip Se�r Pipe wf Protecto 4(t7 �Oatitm�. �S3 BackfiH 331� 1 t1 EF �" A6 - -
_�. _ .� � _ � _ ...
:..... _ _., _
- -�i$5.
: � 333'! 42[12 10 Sewe.rP�pe CSS �3aekiikE . , . __ _. 33 91 ili,,33 . LF - - -�� �j�p.
.& 333t.42U5 8 o1P SewerPi WI Fmter,io 4171 Coa " 33 91 30, 33
t�e trn9 8y�(3� iha� Open Cu€ EF 4[3
�� . _ .. _ ---- -_ _ _. . .. - .._... . ... �....� .. .. 3i t2y3339 �450.
.. _ ._. _ .�.
7 3337.290i fi" CfPP 3339 72 l,f- - 92�
� S 9999,flCiD3 Sgg_��►?�r� ___---_ _ _____ . _ _ ... _._.._. . . _�.� ._._.... � � _.. , .. 9�? 99 98 _ _ LF �tlil _._ .
� 3339.74Qi 4"ivfanhol� , ,. . 3339'i0 33 ER 25
Qi� 3�3�.9(�i13 4`F.xtraDepthManhole 33391q.33 VF 78 `
_ _ . . . �. .�. �
.� __
11 �s�s�17tif1: d'i7n�.ii9attFr�7lc 333910 33 EA _ �
. _ _ ��. . .,.... .___
� iL ,3is�.rtOat ,M1' ;h��Ifr�wR�aAlEtQfe 33391p 3.3 EA _.# .
� 73 �5_ii713 Tcetx� WaterSiu#7s _ ._ . - 33�1i�5 y� EA 3
. . - - - - . . .. - - . _
_ 14_ 33(35�0'[ 72 Con<x�te 4;odlar __, �_ __. 33 Q517 .. FA 3(k .
_.�, -' � ..__��.._.____.a_._ .__....._. . . .. . �. _�._.._�, _ � _ ._. ,
i5 330i.btfll ARaa�ttn�,: Vecwum Testin� 33 U9 3t7 C{1 32
.. �. .._ _. - -
, 7ti 3339 0€1€ii �xy Ms��twie E�Eter - 33 3J 60 VF &€1
� _. _. .. -- . � . , � � .
t7 024i 22D9 E�emave4 r�^�-Manhnle 024i 1� ER S
._. .�._ _ __ __ � . _ _
,a oa�i s�o� n�� r��,� . 02 a� -r� r-:a _ s--
19 999_4t�tiild i�lan}roleCesneSrafw��l�3lRiqg Frame &Cc3ver �37125 LS ,� 1
2(3 33C1� iii94 RAanhmle I�st�u'i��ie'-� Ada�arwfl'�over_ __ � ._. . 33 �514 �A 2__�
�.M _....____._.�_ .... .. _
' _ 29 3333�37�9 4" Sew�ServiCe 3� 3^� SE1 EJS 37 _�
� 22 333i 3iQ3 4 S�verSenn�e O�ser Itxan D n Cut 2222 Wi�t�n i'r�m�c.e 33 8-15fl EA
� �` _ � . � __., „ .. � .� 7 �3
j 2"� _ 3337 31U5 4 PrrvaEe 5cw�r Semce 33 34 �� � �p
� _. , . _.m_e._ . _ . �_.
��I 333� '�7A4 Seivece Rerctr,tatP.riu��t P�e Lanec (u�r�._ enci oisefvice clearo-nut� 33 31 23 F_A , t5
.._ _ . _ _ �_�,__� .. . , , _ _ _ _ . . __ __.._�v �.. _ .._
. .
�zi 33,�1_iZE}i 5�rwis�lt�instats�t(]NLY,PipeE�ner _ _ _�^''.3�.,�_�...._ _!�! _ _.._.�
� . _______ . �...
F6 U'41.21U7 4' S�rerl4handonmen2 PI . _ - _ , . .._ U2 47 14 . _ . .� . . � �
.._ _ . _ _ _,.
�..
` es` u��17.21[12 B" �r Ai��drmm�t i'luq� ___ _ _ ____.._. --- � __ O� �i 74 ER _ .. __�_ � _ �:
. _ . _._,�..�. .�. _._� _� . _ .._. _.. ._... ..___ .. __...._.�.
, 2$ n1dl.'1.1U3 ti�5�r.r�rAba�nmenEPlc�- - _ ^ . .... Ui41 �4 . .., EA . !. __ $..
,,...._ _......_, ... _... . .. - -
19 V;�43?i1t11 �anrtaryi.incG�t�utir� _. . �. - Q24414 CY 33
. ___ __. .. .__ _._ . _ . . . _ _.,.. _
30 99t79 �4ti5 C4tt€fcf.11u�uc3n Eiox - _ 33 391U. -. �.
� 33392U. � 3 . ._ �E
3f , 3305 �ti13 E�lQralt�EX�vahun of �xr�tert� Ltiilft�es �_ W. 33 Q5 30 ER 5 $:
... �.. �iar� _ �_. -. ._ .._,, 33[l731__ ' .� ., .62UU -.
� �z �a3 uE►sr� �,�cc�ry .
. 33_ _ 3301.(}0€12 Post-CC�V ins�rcx,;&or� 33 Ut 33 �L� 53tl{I
___._.__ . �W_ _�_. _ _ � _...,.... .,__�_____.�___.__.__...
� .. 33�;07(k9 Treix:h,Saf�1y __�.._ _ ��__.___�.�___P. __..__. _ ..______.�_�_._ _ 330S7tl __�F _ '�2Q� __.___ _
. .. _.__.
� _. �s _. 3zn�.nst�,s w�a�n���Re�f ���.. . _... . . . �oi �7 _. _�r azan �._
; 86 32(71.U2f]i AsP1�aft Pvmi F2ep�u' BeVflrtd i3eSr�d 1t+Ctdth, Residentiaf 32 (!4 '!7 SY 4Ut1
� 37 32'[3.Ci467 &' Gnrm.r�i�* tTrivevaay, Exposedl�e�ats _. __ 32 i32U � g� _�- ��� .... _.y
. ._ W:.� _.�_. _ ....-_�._.,,�_.. . . . .... . _._
36 0249 73{S(i idemave Gonc�ie Ctui� & Gutier{5�(50)__. �......_ _ _______ D2 A1 'E5 LF SpLI
_ 3� 3216 OIE€9 6 Caaraefe CUrb and ?�S' L3ta�tee {malr� �tislir'c�t (5W501 � 3216 ] 3 Lf 50(}
� � .,. _ _. �. _ __ _ . .
_ 4R 0241 U4n7 i2emoye ('yorxxete tJrisrewa,y �5015A� . 02 A� i5 SF 12�
di 3293Cf4Q1 6 Curta_ete[imt[rvs�.Y.(�iif�lOJ._ ._ _ .. . 32132f1 SF 425D
42 U241.16t30 Buit t�Crlh �Ol.�i _ _ . . _. __... . ._ _ _ . _ . � .a _
,.�,...,. • --- �-- ---_�_(.._.._ . � __ �_..____.. .. _.. _ ... ... ... . _ � � �24t t5 _ . _�__ . _ _ 25
d3 Ei241:75f36 _2 �ch S�rrfac,c �iir�:i`.�Ot, -`dii_ _ �.._ _. ,(12 d�1_ 15 _ ry SY 4t1i3i] .
_ _. �._ ....
l 44 32]2.63(Y1 2-ir�li /Ls�al[ Paverr�n! Type "�' {�f}I`n4�) 3212.16 5Y 4Rf3R _
_ __ .._ _
� d5 ,. 33f75 a��7_ Akanl�te�lr3j��ret Al1�ru�wlC.a31ari50i�Y) ._. 331k5 i3 ,., EA. ..__ g _ Si�
� 4f _ 32t7 5At?9 Ctub /1ddr�ss I'air�rtg ��150) _. __. � � �. _ ._._ _.� � . . .. 32_17 25 �1, 3 �
47 � 32�4�Oiil� �!`opsaiE (5�)SA.i , , , _ � � 32 9i 19 CY 3 ;
� . _ ..,,.. e _. � . _ _� _ _� _
d8 _ 329"L.Oi00 Slor�; SaJ Pf�emer�i (51)15Ui _ _ _ � . _._ . 32 9213 _. _. __ SY _ __ 375 . .�.___ W
..__ _ .
� 49 3t25 0109 5WC'C'P ' 1 a�re 37 2S �0 1 S 9 $��I
� _� _ � ._, -�
-
$a _ 0#71 �tiU7 Consixa�s:�on Staic� _ . , .� _ . _ .. at 7'! 23 . !� _ f $5 I
. _ _ _- _. ��s
_ . tl171.€�iQ2lls-I3iaifiSuryey ... _ . , __ 01 77,23 LS 7 _.. ....�5,1
52 3A%1_0�? TraWfiT'ic{:c�rtlrof ._._,- ._ .� 3471'f3 tuSQ 3.. $3„
.
53 9999_[H3i�i_BewEr Cc�nsBur�nnAllovxince - Q7 7i 23 LS i $9D.t
�
h crrvoFtoirtwaax�z
� STAi�iDnRDcoM57RV�"iieb:cPe=C!i�3CA7iFiNI�OC[!.5".F�'18
kc� Rcviszd�C73AiZC
SvattUaed S.mrts:yScuc�Rch+,b.�7it�.�'i.ica�actl0i
cerra..ex
W V e
�7
$77
__._�. ..
�3D�UII �. _...
Co33 43
B]UP7tUPas,v.
Page] of7
SEGTfON !30 d2 �
PROPOS?;L �ORA7f
n'sTer and RanlWry.Sewer kehab111tatfon Cunttace .7.JII
�19� 8 �li��� Lii�
�i����'s Ap�1i��tio�
su�Ma� �r srds:
SEl�td't�l Ulif#'1: i1VA�F
Sui�tota! UerEt 2: 5anitary Sev�rer
s�,sss,�ss
$1,345,$9.0
Sutitatai Llnit 3: Pa.wtng 5336,t}25
._.......... �tlfA� F3IiI 1i�ftF�¢{, Se.:l�&:V �'sEW�F, 8i10E P8V211'1�11C RC�OiiS�i4GTlflt1 R2I1&ISIIf#3�iAi] � �$ 0'jJ�" �7�
crs'r t�� r-o�cr wuxxn
Slexi99AR� L'S1NSitcuCY[oN.�.v�I±C�'1 cn21U1�1 noCFt?.7FTrIs
E�n n��a xmzn�za
Wasr a� �Ai.WtYS��rr4cAabili�aliv� GmAxi 101
ctvca;za
��� � � .-���.....,._..__�
B C3 [� �� I� G� tJ le� �.�i����
M�r�cHA��S E3c�,`�[n�� CoMI'A� t�lC7TUAL) P.O. I3ox 1�498, D�S !v[(7[NES, Ic�Wn 5Q3Q�-349$
t't-1oEVEr ($Qa) bi$-8171 Fi�C: (5�.5) Z43�3SS4
Bif� ����
���L�� �1�l��C
Bancf No. N!�
Kt�OW ALL P�RS��S �Y 7H�S� Pf2ESENT�:
7hat WilIiam J. Scltuttz. I��c. cil�a Circle C Co�3strucfion Cam an P. O. 13�ax 4Q328, Fort Vlorth, `I'X 7614.�
�hereinaffer caEled fhe Principal) as Principa[, and the M:erchants �3nr�c�i�z� Con�pany (M��tuai)
(hereinafier called SuretY}, as Surety, ar� held and f€rrr�€y bot�nd to Ci#y of �'ort i�'orth. 1U0� `f'f�rae�rriar�oz� �treet,
�ort �s7artla, Texas i61 �}2
(hereinaft�r call�d fh� �biig�ej 'sn t�e fu11 and �ust sum aF ( 5% �FGreatest l�inount Bid }
P.ive: I'er Cent af (ireatesi Ax���unt Bici [�alla�'s
gQoef and lav�rfuf i'�oney of the iJni#�d Stafes of Att't�r'rc�, to fhe payment �f whi�h surr� af rnr�ney we11 and truly to be
mad�, il�e Principa.l and �ur�ty bind #hemselves, th�ir heira, executc�rs, administr�tors, s�cc�ssors and assigns, jninify
and s��eraEfy, frrrtly by th�s� presents.
S{gned �ttd datec€ thi� 19t� riay of _ Naveznb�;r 2�2(3
TH� CC?h(QETEON OF THlS ��L1�A�'IC)N 15 SUCFl, thai, if the C�bligee sf��il make any awar� #a kh� �'rinsipaf f.c�r
Cvnstrt�ctit�n nf'►Nater and. �anit�ry �e�ver Rehabilifia�ian Ce�n�ract 101
�ity �'rajec� l�c�. Q27Zy
�ccorc�ing io �he terrns af ihe propeasal c,r iaid mad� by t#�e Princi�al tkrerefor�, and the F�rincip�! shall du�y rnak� and
enter inio a con#ra�# with fh� t�bligee in �ccordan�e w�it�i fhe t�rms af s�icf proposai or bid and �ward, and shali �iv�
bor�rf far ttie fai#hfu! p�r€ormance thereaf vv�� t�t� Mercha;�ts Bondin� Compaq�y_.(�fuival� , a5 �u�ety, ai� with
ra#her 5urety or 5ureiies approved by t[�e Ubiigee; or if the Principal shafl, irt case af failure to dn sa, p�y tc� the Qbiig�;e
th� damages which the Obligee may s�ffar by reason of suc.h faiiure, n�t �xceeding fhe penalty af this kaond, fh�n this
ab(igatiora shall bs null and �raid; cath�rwis� if shalt be �nd r�r��in in full forc� and effect_
[N T�ST(MONY WH�R�Q�, the Pr�ncipal ar�d Surety 3�av� caused these pres�nts tp be duly sign�rf and �eated.
Wtr�ess:
Wih��ss as io Su��ety:
��SA �..a...-._ _.
.�
� •' � 1 "�- `i :,�.� �� �,�`.�-�,.
.� .r-.- - _1�—�--- �-- �"„"
� .)n��n A Mzller ` ��
�illiarn .i, 5cl�ultz, iiae. db� Circie C CQnst�•�rcfion C�mpany
Prin�ipal ��.
�y �-�'E.�r�,�a� �, w _
T�resa 5. Sk�ily, Yresident
�eral�an[� o � ag Co�npany (�,�ntc�al}
��� � ��-
� heryl A. Ki s, I-�[tarr►ey-in-��'act
CflN 0333 (21i5j
..�� � �.'�.���.��.��� �
�i���� �� �����..��''�.
��Vil�� �� e� i �'� �2���
Kna�,vRil #'ersorrs By T€3ese F'resents, thaf MERCNANTS BONDIlZiG GQN[PAIVY {PAU7UAL} and �riEfiCHANTS NATIOPJAC Bi?N[31NG, 1�[G.,
6oth heing carparafions oF the $taie of lo4va (herein colfect�vefy cal(ed the "�ampanies"'j do hereby mak2, eonstitute and appoi7iE, indiv3cSualty�,
.John A Mi11er; .iohn R StockEun; 5heryl R Kiut€s
[neir true and lawfuf AttorneY(Sj-ir�-�act #o sign its name as surejr(ie5) and to ex�:cute, seal er�d ackrtowi�dge any anci ail bartds, undetlakirrgs,
contr�r,t5 a�d other wriiter� fnstrtft�ients iri Ehe nature iherec�f, an behalf pt tt3e Companies in tlieir business of gUaranieei�g 9he fideiity
of �ersorss. 9uaranteeing th�: performar�ce qf catatr�cts and executing oa guaranieeing [aar�tJs and undertakings required ar pertnitt�d in a1�y
aeiions or {sraceedings a€Inwed by law.
T€�is pc�vrer-flf-kti�rney is g€ar[t�d and is signed and saalarl by iacsit�tlle undsr and by aushori(y nf t13s follnwitsg By-.Laws adopt�d by the Soard
oi f5irec(ors aF NPefctaants �3an[€ing Coinpany (1�1utk�at) at� Aprii 2.3, 2017 and artlBnded August 14, 20]5 �nd adupi�:t1 by ttte Ba�rd of �frecf�rs
of �ulercl�anYsN�tionai Bond'€ng, Inc., an Octc�ber 16, 2095.
"ihe t'resident, Seere�.ary, Treasuter, or any Assist�ni Treasur�r r�r any Assistani SeEr�tary ar any Vice PreGident shaff bave pt�ree artd ac�thorigy
to appoint Afiameys-in-Fact, anci t� �utf�orize them to ex�cu€� an 6ehslC of the Campany, �nd atiach tiie 5eaf of the Gatnpany thereto, bpnds and
un�eRakinqs, secognizances, contracfs crf irid�mnity and Qiher wri#Ings oh)igatorY in fhe natura ihereaP.,,
"The signature pi any aufi�orized o�cer and the seal af the Company mey be aifixett iry far,simile vr efec€ronia �rarisrt�ission tu any Paur�r oi REtarney
ur Ceriification thereuf authorizi�ig t€�s execution and cleiivery of any bond. under€aking, r�cognizance, or .ntt3er auretysh9� o3�ligaiions o! tha
Cc�mpany, ant) such siyrrature stt�l seai when 5q u5ed shafi haue the sarr�e force and eH�ct as ihaugtt menual[y fixed"
fn cnnnectian with r��l7galions i�� faaor af the Florida l�epattmsnt of iransportetion only, if ls agreet# th;�t the power and sut hoi�ty herQby given to 1�3e
Attamey-it�-Fact it�.cludes an.y and all canser�!s for the refeast� �t re#�ined percenEages sndlor fnal estirnate5 oE3 engineeHr3�} and consiruction
con�racts re�a�ired t�y th� Siate v€ �[arida Departmerit a1 I'rarssporl�tion, tt is fully �r�d�rstoad tliai cnnsenting #� the Sk�te nf�lorida f3e�aartment
pf Transjsariation making payrneni of the FnaE sstitr€ate la the GontraGtor andlor iis assignee, si��i� not retieve this 5€aFely cprnpany of any csf
its ezbligatiorts und�riYs bn�td.
fn connectipn with obfigatiorss in favor of ihe {Centucky €]epartrnenf df HiqFnva�rs only, ii is agreed lhai tns power and auihor€ty hereby given
io ihe Aftarhey-i�t-Fact Lannot be modi�ed ar reuoksd unless prior tivritten p�l-sonai nptice of sucf� inteni has been giVen to Yfte Comntissfoner-
t]eparYment o[ Nighways af Ihe Cnrnmonwea)fh of KenEucky at Eeast Lhirty j3(]) days priar ta Ihe modificatian e�r revosaiion,
1n WitneSs 5/Vhareaf, the CDrnpanies �iave caused fhis in5iruinenf ta i�e si�ned and sealed this 41th d�y pt �eutuaty , 2p2p
i1L [ip
�9Ci{� s� fA�i F�.#ka..., ,� •
'aes����Yf�A/ ��+,i � i�� 1�� �� ��+
{ • �:.y.�.y �� 4
� � : ���'�h',�� � : : � • � .4��'t9.��•.,�'Aa, r���c�a�r�rs �o�o�a� �a.�upswx t�u�u�.:�
;� r C► >'':.� aa °'�� c,•a '�.i,�� a Nf�RCt4,0.NT t�ATt(3NAL sCthd�ilNG.11Vc.
;�;� "d.. ��.�� Y.�?='� -:�- �': ; _
:�i� � �:�' p:�° �
��. 2��.� ���±4 a,��,• ��;��� .�.�� B'/ cW��
�r,��� �: '���;. �-
��
+,�s�r.,�..•��q�.y m*��..,�i.�..-:•�;�� President
S7ATEOFa01is�A �t�=•�maax.•"+'e '�eeoear
COUNTY C?F (�kLLAB s5.
t3n th�s 19th day af �ebruary 2�2C1 , 6eiore m� ap�eaeed Lar.ry Tayl�rr, to �e personally knojnrn, who being 6y rrie r�itly swnrn
did say that he is President of �r1ERCHANTS B�iViIINC CC7MPAN`l (MUTIJAL� and MER�HAN75 �IRTIONAE $t7�lqING, [NG.; and .that #he
se«�I� �ftixecl ir� ;1ie fore�oinc� insTrumertt are lf3e Cqrpora'[e 5ea)5 pf tiie Cpm�anies; and that IhE said instrum�nt was signed and sealed in hehafi
o€ lhe Companie�s hy auEhprity af their respective Boards of C7irectars.
,�P�"�� s' ���.LY P�A��3�! ,
� o n � � � �ammission Number 7�0576 � �-��"�.d
�y �mm�ssion E�ir�s � ��-�-C.
b ��,P � Jar�u�ry OT, 2D23
- Nata�r Public
(�x�irakan ai notary's carrrmissit�n
does not ir3uefidate this insirument)
I, UVi3fiam LVarner. Jr., Secretar}r uF hs1ERC!-tAIV7S St]NDI�16 COMPAh3Y (MiJTUALj a�d f��RCJ-tR#YiS NRTIG�IAL SQN�iNG, tlti€G., da t�reby
certify iheE fE�e ahQue and toregt�inc� is a.frue anr3 c.orrect copy af fhe PqW��-OF-Ai�TORtd�Y executed by said �o€npaniss, which is s€ill in ful[
force and e(tect ar� has rta[ 6een amend�;d or revoked.
In lnlitr€ess Whereo€, i hav
PC3A ��118 (1f2�)
e hereuntrs sei my hand and ai�ixed the seal a€ fi3e Cnmpani�s on this i9th day of Navember, 202(i.
.s�serr
������-76�'3I'+> ��i1R� ie�.pR
�: ���.�� ;� ,� * ± •���. .. .. . �� R
a 69 .� . � • @,..:�j����;,,$',?��,°�
°,. �� i'�.'�•: axr,�,: � .4:«r.�d
:�:�' _p� �,;Ci; ��.,._;� -�- r'�': .
. �� �:,�'. �- �:
����y: �f383 : �a; ►'pc : i9$3 � �ti
rK� .M ik��'�Y� 6��9
��r•'.•r • ��b 4� il�SY..f�r ` �N
P����`..�..•��y� 4 .0���`.� l.�f• , •�[��oP
_.J j�
'+�46sY kFi9HfiA� •�C � � �'� R
������ -
��crePary
�
��4�..�� �� �. �` � �`�
������� �������:�
��CrtC.l-tntJTS B(��r)[�TG C�lnit�n�tY (�,tU7'[1AE,) � 4�LrtC11ls:�Ts I�ATtc�1�,��, k3E�nt7lfi=t:,, r�vC.
P-C7. �iC3x 1�4�38 • C7£5 �rif3#IVE;S. IC.)iNA 5�3€?G-3�f98 - (RO(31 �i7$-81 t ( ° (.�15i ��3-_S�S54 TA?:
����a�� s��� �lI ��a���� ��i- c �cj�� �� ��is ��r�� �cre
Me�•c�aa.��ts �3ondi�� Ca����arz�r {M��h��:I)1 Mex�ch;��rrs �,��[i€��al Bonding, 7��c.
l'.t7. }3a� 1�49�
�es �aines, toi��a 5{�;�6-3�9$
f �
(S15} Z���f� 1'�I
($�t)j 678-€� 171
Ph}rsical Acidr�ss: C7{�0 �Vestc����n Par�cwa�r, ���st Des l���tnes, Io��a SCi26fi
suP ooi3 -rx (2/� �}
fl0 43 37
VEN�OR GOMPLIANCE TO STATE LAW
Page 9 of 1
SECTIOI� 00 43 37
V�NDOR COMPLIANCE TO STATE LAW NON RESIDENT BIDDER
7exas Government Code CF�apter 2252 was adop#ed for the award of contracts to nonresident bidders. This law
provides that, in order to be awarded a contract as low bidd�r, nonresident bidders (out-of-state contractors
whose corporate offices or principal place of business are ou#side tF�e 5tata of Texas) bid projects for construction,
improvements, supplies or services in Texas at an amount lower than the lowest Texas resident bidder by the
same amount that a Texas resident bidder would be required to underbid a nonresident bidder in order to obtain a
comparable contract in the State which #he nonresidenYs principal pface of business is lacated.
The appropriate blanks in 5ection A must be fillad auf by all nonresident bidders in order for your bid to meef
specificafions. The failure of nonresident bidders to do so wil! automatically disqualify fhaf hRdder. Resident bidders
must check the box in Section B.
A. f�lonresident bidders in the Sta#e of �t�t;� Frrrr�� �a;� :il�nlc , o�r pri�cipal place of business,
are rec�uired to be "�� I IEri e percent lower than resident bidders by State Law. A capy of the
statute is attached.
NonresicEent bidders in the 5tate of �r�r� �4?rF3 s�r Hl�inl�: , our principal place of business,
are not required to underbid residen# bidders.
B. 7he principal place of business of oyr company or our parent company or majority owner is
in the 5tate of Texas. �
BiD4ER:
t.si��I'd.e� ��ci3a��� �c
Company Name I-lere
Crr�/r C`Ger�s%� c�ien
.��
�e�,pa�, y
By: Printed Name Here
Address Here �� �BX 9�G.��� ��rp �
Address Fiere or Space (5ignature)
City, 5tate Zip Cade Here,t�� �%,f �,y��- �S�ra .
Title: Title Here��,f��n�
Date: /� ��-� 42 �
�ND OF SECT�ON
CITY OF FORT WQftTH
STAN�ARD CONSTRUCTION SPECIFICATION DOCIJMENT5 Water and Sanitary Sewer Rehabilifation Contract 901
�orm Revised 2011 p627 CPN 02722
�
Page 1 of 3
1 SECTYON 00 95 11
2 BIDDERS PREQUALIFICATIONS
4 1. Sumtti�ry. AII contractors are required ta be prequaIified by the City prior to submitting
5 bids. To be eligzble to bid the contractor must submit Section 00 45 12, Prequalitcation
6 Statement for the work rype(s) listed with theix• Bid. Any contractor or subcont�•actor who is
7 not prequali�ed for the work type(s) listed rnust subinit Section 00 45 13, Bidder
S Pt•equalification flpplicatian in accoz-dance with the requirements below.
9
10 The prcquaiiiication process will establish a bid limit based on a technical evaluation and
i I fnancial analysis of the contt�actor. The infonnation musC be subinitted seven (7) days prior
12 to the date of the opening of bids. Foa- example, a contractor wishing to submit bids on
13 projects to be opened on the 7th of 1\pril musc file the infoa-mation by the 31st day of March
14 in order to bid on these projects. In order to expedite and facilitaie the approval af a Bidder's
15 Prec�ualification Application, the following �nusC accainpany t�e submission.
1C a. 1l co�nplece set of audited or reviewed financial statements.
1'7 (1) Classified Balance Sheet
18 {2) I�acojne Statement
19 (3) State�nent of Cash Flaws
20 (4) Statez�rient of Retained Eat�nin�s
21 (5) Notcs to the Pinancia.l SCatements, if any
22 U. A cei-tited copy of the fi1-�n's organizatinnal doeuments (Corporate Charter, Articles
23 of incarporation,llrticles af Oi�ganization, Certificate of Porrnation, LLC
24 Re�;ulatioaas, Certificate of Limited Pa�-�ncrship Agreement}.
25 c. A eoinpleted Bidder Prequali�ication Application.
26 (1) iThe firm's Texas Taxpayer Tdentification Nufnber as issued by the "Cexas
27 Com�h-oller of Public Accounts. To obtain a Texas Taxpayer ldentification
28 nu�nUe�• �isit the Texas Coinptroller of Public Accounts online at the
29 following web address www.window.state.tx.us/taxpe�•init/ and fiil out tlze
30 application to apply for your Texas tax ID.
31 {2) The frm's e-zz�ai� address and fax number.
32 (3) The fii7n's DUNS number as issued by Dun & Bradstreet. This number
33 is used by the City for required reporting on Federal Aid projects. The DLTNS
34 1�uinber may be obtained at www.dnb.com.
35 d. Resuines reflecting the construction experience of the principles of the finn for finns
36 submitting their initial preyualification. These resuanes should inchide the size and
37 scope of the work pet•fon�ned.
38 e. Ofher� infot�mation as requested by the City.
39
40 2. Prequaliiication Requirements
41 a. Financial Statenient.s. Financial state;inent submission must be provided in
42 accordance with the follawing:
43 (�) The City requires thaE the original Financial Statement ar a certified copy
44 be subinitted rpr epnsidea-ation.
CITYOP FORT WOR'fH Waterand Sanilary Sewer Reha6iiitalion Contract 10]
STEINDARD CONS7R�1C7'lON SI'ECIFICATIpN DOCUM�N"CS CPN 02722
Reviscd hily !, 2Ull
_2
I'age 2 of 3
7 (2) Tn be satisfactory, the finaucia� siateinents must be audited or re�iewed
2 by an independent, certified pubiic accnunting firm registcred and in
3 good standing in any state. Curt•ent Texas statues also require that
4 accaunting finns perfor�ning audits or reviews or� business entities within
5 thc State of Texas be properly licensed or x-cgistered with the Texas State
6 Board of Public Accountancy.
7 {3} 'T'he accounting finn should s�ate in the audit report or review whether
S the canh�actor is an individual, coiporation, or limited liability coz��pany.
9 {4) Pinancia3 Statements n�ust be presented in U.S. cEollars at the curt-ent rate
10 of exchange of the Balance Sheet date.
11 (5} The City will not c-ecagnzze any certified public accountant as
12 independent who is not, in fact, independent.
13 (6} The accountant's opinion on the financial statements of the contracting
14 company should state �iat the audit or review has been conducted in
] 5 accordaz�ce wit�i auditing standards gerieratly accepted in the United
16 States of America. This inust be stated in the accountin� �rxn's opinion.
17 It should: {1) express an unqualified apinion, nr (2) express a qualified
18 opinion on the stateir�ents taken as a whole.
19 (7) `�'he City reseives the righi to require a ncw statement at any time.
20 (8) 1'he iinancial stateinent must be peepared as o�the last day of any month,
2i not znore fhaii one year old and must he an filc with the City 16 months
22 thereafter, in accordance witl� Pa�•agraph 1.
23 {9) TYte City will detern7ine a contractor's bidding capacity for the }�urposes
24 of awarding contracts. Biddin� capacity is cietertnined by mulliplying thc
25 positive net working capital (working capital= cuiYent assets — current
26 liabilities) 6y a iactor af l p. Qnly those statements reflecting a}�ositi�e
27 net working capital pnsition will be considered satisfactoiy for
28 prequalification pux-�oscs.
29 (10) In the case ihat a hiddiiig date falls within the tiine a new Iinancial
30 stateinent is 6eing prepared, the previous statement shall be updated with
31 proper verificatinn.
32 b. Bidder Prequalification Elpplication. A Bidder 1'requalificakion lLpplication must be
33 subinitted alang with audited or reviewed financial stateinents �y firins wishing to be
34 eligible to k�id on aEl classes of const3ructian and mainfenance prnjects. Ineoinplete
35 Applications will be rejected.
36 (1} In thase schedules where there is nothing to i•epot-t, the notation of
37 "None" or "NIA" should be inserted.
38
39
40
41
42
43
44
45
{2) A miniinum of five (5} eeferences of relaked wark must be provided.
{3) Sub�nission of an equipment schedulc which indicates equipmen! under
the control of the Contractor and which is related to the iype of wo�•Ec for
wl�ich the Cantactot- is seeking prequalificatian. The schedule inust
ineEude t}�e inanufacturer, inadel and general cominon descrzption of
each picce of equipment. 116breviations or rneans of describing
equipment oiher than provided abo�e will not be accepted.
4b 3. Eligibility to Bid
47 a. The City shall bc the sole judge as ta a cont�aclnr's prequalificatioi7.
48 b. The City may reject, suspend, or modify any preqLialification �or failure by tl�e
49 contractar ta demonst�-ate acceptable financial ability ot� pe��f'orniance.
CiTY OF POR'1' W03t'1'H Water and Sanitary Sewer Rehavilitation Contract l01
STAT�iI]AR� COI+iS"1'KUC7'lOR! SPECIFICATiOT�I DOCi3M�:N"1'S CPN 02722
Revised ]uly l, 201 I
�
�
i
r
� �
�
2
3
4
� 5
l
'. 6
7
� �
�
9
�
I
�
f
i
�
i
�
!
�
f
i
i
_�
i
I
-3
Pagc 3 of 3
c. The City will issue a letter as to the status of thc p�-cqualification approval.
d. If a cant�•actor has a valid prequali�ication ]eiiez-, the contracto�- will he clzgible to bid
the prequalified work types untiI the expiration da#e stated in the letter.
END OF SECTION
C1TY OF FORT WQRTH Water ai�d S�nita�y Sewcr Rchabilitafion Contract 10�
STANl3�1RD CONS"fRUCTION SP�CII=ICATION llOCUMEN'1"5 CPN 02722
Revised luly [, 20] 1
a
�
E
�
�
o� as �z
g�� �o�tn�
Fage 'i oi 9
������� �� �� ��
PR�QUALiF1CATl0�3 STAT��v1�l�T
�ach E�idcter for � City procurement is req�ired t� caEt'►pl�ie the information i�elc�w by id�ntifyir�g the pr�q��lifi�d
cgntractors anrilor su6contract�rs w��m #hey in€�r�d tc� utiliz� for the major wc��k type(s} iist�cf_
[U�ajor 1�Iork 'Ty�e Gor��ra�tarlSub�s�tracfc�r Cc�mpany �ta�e Prequalificati�n
�xpiratiort €�ate
Asphalt F'auing
ConstructionlRee€�nstructio� Texa� Bii 4f3DI�C�2i
(LE�S iHAN 1�,000 square
yardsj
Sewer Bypass Pur�tping, 18- Circf� C Cons#ru�tiart 4I3Q12021
in�h�s �r�d srr�alfer
lt�fafer �isiributian,
Li�veiopm�rtt, S-inch diarr�e#er Circi� G Ctrnstru�tiort �/3q12429
and srr�af[er
Sevit�r CiP�', `i2�inches and fnsituform 41301�€�27
srn�Iter
The und�rsigned hereby certifiies th�t t�e c�niraciors andlor subc�ntractors described in fhe table �bove ar�
curr�r�ily pr�r�ualifi�d fc�r #he wc�rk tyrpes li�ted.
8����R:
William �1 S�hu(tz !nc dba Citcl� C Gonstruckion
PO 8nx 403�8
�art Wc�rtt�, Texas 7694C3
IBy: Teres k�lly
:
�-� � ��!�-���:v,���
�— _ __ �
(5ignat )
- -- __— __
Ti�le: �resident
[�ate; /'/ - / /�'-� r�2 �
�
�
f
C1TY qF F0�2T WORTH
S'iRNDFiRD CONSTRUCTIf)N SPECIFICf9T103V QOCiJM�NTS
Form Revisetl 20't20120
��a t�� S�Ci'to�r
Wafer ar�d Sani3ary ��wer Rehs6ilitation Cnntrat;i 'FOt
CAN f�2722
�
,
:
r
s
,
w
t
�
i
�
1
.
�
�
!
�
�
,
i
S
�
r
�
i
�
�������T��
s�ccT�oN ao as �3
BTDDER PREQUALIFICATION A1'PLICATION
Date of Balance Sheet
Naine under which you wish to qualily
Post Office Box
Street Address {required}
1 ele�l�oile
City
City
Fax
Mark only one:
Individual
Limited Partnership
Genera] Partnership
Corporation
Limited Liability Company
State
State
Email
Zip Code
Zip Code
Texas `I'axpayer ldentification No.
l�ederal Employers Identifcation No.
I7LTNS No. (if app�icable)
MAIL THIS QUES7'IONAIRB ALONG WTTH FINANCIAL STATEMENTS TO:
CITY OF FORT WORTH T�XAS
200 T�XAS STRE�'I,
FOR'1� W ORTH, TEXAS 76 102-63 1 1
AND MARK THE ENVBLOPE: `BIDDER PREQU�II.IFICATTON Ai'PLICATION"
r
r
00 45 13
BIIJll�it PREQUAL1tICA'T10N APPL[CATION
Page 2 of' 8
F3USIR�SS CLASSIFICATION
The fo]]owing should be completed in ordcr that we may properly classify your firm:
(Check the b]ock(s) which are a�plicable — Block 3 is to be lefC b[anlc if Black 1 and/or B�ack 2 is
checked}
� Has fewe�� than 104 employees
andlor
� Has tess t9�an $6,00O,OOQ.40 in aimual gross receipts
OR
� Does not meet the crite�-aa �or being ciesignated a srnalE business as provided in Section
2006.001 of the Texas Goverrnnent Code.
'�'he classification of your iirm as a small or ]ar�e business is not a�actor in determining eligibility to
become prequalified.
MAJOR WORK CAT�GORr�S
Water Department
Au�;ur Boriizg - 24-incl� diameter casing and ]ess
Augur I3orin� - Greater than 24-inci� diameter casi��g and greater
Tunneling — 36-Inches — 60 —inches, and 350 Li� or ]ess
Tlinneling - 3C-Inches — 60 —inches, and greatez� t�an 350 LP
Tunneling — 66" and greater, 350 LF and greater
Tunneiing — 66" and greater, 350 LF or Less
Cathodic Pratection
Water Distz�ibution, Development, 8-inch diameter and smailer
Water Distz�ibution, Urban and Renewal, 8-inch diameter and smaller
Water Distribution, Develapment, 12-inch dia�xactcr and smaller
Water Distribution, Urban and Renewal, I2-inch diameter and smaller
Water Transmission, Developrrient, 24-inchcs and smailer
Water Transmission, Urban/Re�lewal, 24-i��ches and smaller
Water "I'ransznission, Developineni, 42-inches and smaEler
Water T3-ansmissioz�, UrbanJRenewal, 42-inches and smaller
Water T�-ansanissaon, De�elopment, All Sizes
Water Transmission, Urban/Renewal, A.1] Sizes
Sewer Bypass Pu�nping, 18-inches and sma[ler
Scwer Bypass Pucnping, 1$-inches — 3G-inches
Sewer Bypass Pumpi�ig �}2-inches and larger
CCTV, S-inches and smal[er
CCTV, 12-inches and s�naller
CCTV, 18-incl�es and smailer
CCTV, 24-inches and smaller
CCTV, 42-inches and sn7aller
CCTV, 48-ii�ches and smalle��
C1TY OF FOCiT WORTI I Walcr and Sanilary Sewer ]Zehabilitatinn Contract l01
STA%IDARD COI�ISTRUC3�103V SI'ECI}1CA'1'lON llOCUMEN'fS CPN Q2722
Re�ised March 9, 202Q
DO 45 l 3
BID�ER ['REQUALIFICATION APPI.iCATION
Page 3 of 8
MA.�OR WORK CATEGORIES, CONTINU�D
Sewer CIPP, 12-i��ches and smaller
Sewer CIPP, 24-inches and smaller
Sewer CIPP, 42-inches and smaller
Sewer CIPP, AlI Sizes
Sewer Collection 5ystem, De�elopmenf, 8-inches and sinaller
Sewer Co�lection System, Urban/Renewal, 8-inches a��d smaller
Sewe►• Collection System, Development, I2-inches and smaller
5ewe�• Collection System, Ux�ban/Renewal, 12-inches and smaller
Sewer Interceptors, Development, 24-inches and smalle��
Sewer Interceptors, Urban/Renewal, 24-incl�es and smallez�
Sewer Interceptors, Deve]opment, �2-inches and sinaller
Sewer Intercepfors, Urban/Renewal, �42-inches and smailer
Sewer Interceptors, Development, 48-inches and smaller
Sewer Interceptors, Urban/Renewal, 48-inches and smaller
Sewer Pipe Enlargernent 12-inches ai�d sinaller
Sewer Pipe Enlargement 24-inches and sma�lei�
Sewe�� Pipe Enlargement, All Sizes
Sewer Cleaning , 24-inches and smaller
Sewer Cleaning , �2-inches and smaller
Sewer Cleaning , All Sizes
Sewer Cleaning, 8-inches and smaller
Sewer Cleaning, 12-inches and smaller
Sewe�� Siphans 12-inches or ]ess
Sewer Sipl�ons 24-inches or less
Sewer Siphons 42-inches or less
U Sewer Siphons All Sizes
Transportation �ublic Wor[�s
X Aspi�alt Paving Construction/Reconstr�etion {LESS THAN 15,004 square yards)
Aspl�alt �'aving Construction/Reconstruction (15,000 sqLiare yards and GREATER)
Asphalt Pavi�g Heavy Maintenance (UNDER $ I,000,000)
Asphalt Pavin� Heavy Maintenance {$1,000,000 and OVER)
X Co��ct•ete Paving Constructian/Recozlst�liction (LESS THAN 15,OQ0 square yards)
Concrete Paving Consh•uction/Reconstruction (15,000 square yards and GREATCR)
Roadway and Pedestrian Lightiug
�
CITY OF FORT WORTII Water aiid Sauitary Sewer Rehabililaliun Coi�tract ] Ol
SFANdARD CONSTRUCTIOIV Sl'ECIFICAT[C31V DOCUNEI;NTS CPN 02722
Revised March 9_ 2020
OU 45 l3
BIDDECi PRT'QUA�.iC'iCAT10N Al'1'LICATION
1'age 4 af 8
List et�uipment you do not own but whicl� is available by a�enting
D�,SCRIPTION OF EQUIPMENI' NAME AND DETAILED ADDRESS OF OWNER
2. How many years has yaur orga�ization been in business as a genera] contractar undcr your present
name?
List pre�ious business names:
3. How many years of experience in constructio�� work has your o�•ganization
had:
(a) As a C,enera] Contractar: (b} As a Sub-Contractor:
*What projects has your o�•ganization colnpleted in Texas and elsewhez-e?
CLASS LOCATIQN NAME AND DETAlLED
CONTRACT OF DATE CITY-COUNTY- ADDRESS OF OFFiCIAJ., T�
AMOUN`1' WORK COMPLETED STAT� WHOM YOU REF�R
*Tf requalifying on[y show work perPormed since ]ast statemenf.
S.I lave you ever failed to complete any work awarded to you?_
lf so, where and wl�y?
6.Has any officer or owner ofyour organization ever be�n an offlcer of another arganization that i�iled ta
cornple#e a contract? _ _
If sa, state the ��ame af the indi�idual, other organization and reason.
7.I�as any officer or owner nf you�• organization e�er failed to complete a contraci executed in his/her
name?
If so, state tl�e name of the individual, i�ame of owner and reason.
C[TY OF PORT WORTH Water and Sanilary Sc��rcr Rehabilitation Cnntract 101
STANDARD CONS7RUC1"ION 5PEG1PiCA"�'[ON �dCUMEN'fS CPN D2722
Revised March 9, 2020
00 45 13
BIDll�;A PRE;QUALIFIC ATION APPi.iCA'1�lON
Page S of 8
8. In what otl�er lines of business are you financially ii�terested?
9. Have you ever perfor�ned any work for the City?,
If so, when and to whom do you refer?
I0. State names and detailed addresses ofall producers from wl�om you have purchased principal
materials during the last three years.
NAME OI' FIRM OR COMPANY DETAILED ADDR�SS
I 1. Give the names of any affiliates or relatives cuz-a�ently debaired by the City. Indicate your relationshi�
to tltis persoll oe fir�n.
12. What is the construetion experier�ce o� the principal individua�s in your organization?
PTZ�SENT MAGNTTUDE
PQSITION OR Y�ARS OF AND TYPE OF IN WHAT
NAME OFFICE EXPCRIGNCF. WORT� CAPACITY
13. If any owi7er, officer, directar, or stockhalder of your firm is a�3 emp�oyee af the City, or shares the
sazne household witl� a City employee, please list thc naine of the Ci#y emp]oyee and the relationsi�ip. In
addition, list any City e��ployee who is the spouse, child, or parent of an ow��er, of�cer, stockY�older, or
director who does not live in the sarr►e househald but who receives care and assistance fi�om that person as
a direet rest�lt af a documenled medical conditio��. `l�his includes fostez� childzen or those related by
adoption or marriage.
CITY OF FORT WOitTH Water and Sanita�y Sc�ucr Rchabilitation Contract ]Ol
5"1�ANDAl2D CONSTKUC'170N Si'ECIFICATTpN DOCEJMENI�S Ci'N 02722
Revised March 9, 202D
00 45 l3
SIDDL•R PREiQUAL]PTCATION Ak'I'],1CA710IV
1'�ige 6 af 8
CORI'ORATION BLOCK PARTNERSHIP BLOCK
If a cor�oratian: If a partnership:
Date of Incorporation State of Organization
CharterlFile No. Date c�f nrganization
President Is partnership general, limited, or registered ]imited
liabiiity partnership?
Vice Presidents
1�'ile No. (if Li�nited
Partnership)
GeneraE Partners/O�fficers
Secreta�y Limited Partners {if applicable)
Treasurer
LFMITED LIABILiTY COMPANY BLQCK
[f a cor�oration:
Sta#e of Incorporation
Date af organization
rile No. Individuals authorized to sign far Partnership
Officers or Managers {with titles, if any}
Except k'or limited partners, the individuals listed 'r�� thc blocks above are presumed to have full
signature authority f'or your firm unless otherrvise ad�ised. Should you wish to grant signature
auth�ority for additianal individuals, please attach a certified copy of the cor�orate resoIut�on,
carporatc minutes, partnership ag�•eennent, powcr of attorney or other iegal documentation which
grants this authc�rity.
Cl"1�Y OF F�AT WORTII Water and Sanitary Sewer RehabilitaUon Conlrad 1 O1
STANDARD COAISTRUCT[�N 51'ECIFICAIION DOClJME�7T5 CYI�I 02722
Revised March �, 2020
00 45 ] 3
I3IDll�;R PI2EQUALIFlCATIO]V APPLiCATION
Page 7 nf� 8
14. �quipment
$
1'OTAL
BALANCESHEET
ITEM QUANTITY ITEM D�SCRIPTION VALUE
1
2
3
4
5
fi
7
8
9
]0
11
12
13
14
15
16
17
18
]9
20
21
22
23
24
25
26
27
28
29
3p
Various-
TOTAL
��rn�iar types oi equipment may be luenped togeiher. lf your t]rin has �nore than 30 types of equEpment,
you may show these 30 types and show #he remainder as "various". The City, by allowing you to shaw
only 30 types of equipinent, reserves the right to reGuest a cornplete, detailed aist of all your equipmcnt.
The equipa-�ent list is a representation of equipment under the contro] of tl�e tirrn and which is related to
the type oP work far which the firm is seeking qualification. In the description include, the manufact�irea�,
model, and general common description of each.
CI7�Y OF PORT WORTH Water and Sanitary 5cwer Rehabilitatfnn Conlrac[ ] Ol
STAt�1DARD CO1V5'17tUCT[ON SPtiCIPICA'f10N DOCUML-.NTS CPN �2722
Revised March 9, 2020
(}0 45 l3
BIDDECt PREQUALIF[CATiON APPT.TCATION
Pagc 8 oi8
13TllDER PREQFJALIFICATION AFF�DAVTT
STATE OF
COUNTY OF
The undersigned hereby declares that the foregair�g is a true statement of the financia[ condition of the
e��tity herein �rst nained, as of the date herein first gi�en; that this statement is for the express purpase of
inducing the party to whom it is submitted to award the submitter a cantract; and that the accountant who
prepared the balance sl�cct accompanying this report as wetl as any depository, vendor or any other
agency herein named is herehy authorized to su�ply each �arty witl� any informaiion, whiie t1�is statement
is in force, necessary io verify said statement.
__ __ , being duly sworn, deposes and says that
he/she 3S the of , the entity
�m..--- —_._.....__�....-- --
desc��ibed i�� and which executed the foregoing statement that helshe is fazxazliaa� witli the books of the said
entity showing its �inancial condition; that the foregaing tinancia] statetncnt taken fi•oin the books of the
said entity as of the date thereof aild that the answers to the questions of the foregoing Bidder
Prequalificatio� Applicatzon are coi�rect and true as of the date nf this affida�it.
Firm Name:
Signature:
Sworn to before me this
day of ,
Nntary PuUlic
Nota�y Public must not bc an officer, directc}r, or stockholder or relative thereo%
C17'Y OF FORT WORTI[ Water and Sauitary Setiver Rehabilitation Contc�act i01
STANDARD CpNSTRUCTiON 5T'ECIFICA"1 [ON DOCUMEN7�S CPN 02722
Revised March J, 2020
004526-1
CONTRACTOR COMPLIANCE WITH WQRKER'S COMPEI�ISATION LAW
Page 1 of 1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
l9
20
21
22
23
24
25
26
27
28
29
30
3I
32
33
34
35
36
37
38
39
40
41
Cya
SECTION 00 45 �6
CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW
Pursuant to Texas Labor Code Section 406A96(a), as amended, Contractor certifies that it
provides worker's compensation insurance coverage for all of its �mployees employed on City
Project No. Water and Sanztary Sewer Rehabilitation Contract 1pl CPN Q2722. Contractor
further certifies that, pursuant to Texas Labor Code, �ection 406.096(b), as amended, it will
provide to City its subcontractor's certificates of compliance wzth worker's compensation
coverage.
CONTRACTOR:
William J Schultz Inc dba
Circle C Construction Company
BY� �fJ'Ll �c��-r/�
Company (Flease Print}
��
/�� .(�OX �/432$ Signature: /�o� �!° ��
Address
��f �p� �.�y, /�x4s._ Title: ��.��• r��R�' -
Gity/State/Zip (Please Print)
a,,,x�„n,,,,
�,.°.��R'� p�e� MlCHEi.� S LANiCFO�tD
a,,"-� ��
THE STATE OF TEXAS § ;�� �"� N°�Y�'ubiic
= • • w£ STATE QF 7EXAS
��?rE aF tE+�`�� ��Y 1D ,'4` 1 i 7594�.g
COLJNTY OF TARRANT § �""'• •�" �", � "�' c0rt�. �. o�ra�r r, 2oa.a
BEFORE ME, the undersigned authority, on this day personally appeared
�2,r�� G'j , ktaown to me to i�e �he persan whose name is
subscribed to the fore oin instrume$t, and acknowledged to me that he/she executed the same as
the act and deed o�y�.,S���n � for the purposes and
consideration therein expressed and in the capacity therein stated.
GIVEN UNDER MY HAND AND SEAL OF OFFICE this .�Z D� day o.f
,, � -- ._ , 20�
� ' ��� ' _
Notary Public in and for the State Texas
END OF SECTIQT+i
CFTY OF FdRT WORTH
STAIVBARD CONSTRUCTION SPECIF[CATIQN DOCUMENTS
Revised JUIy 1, 20ll
-r t
i
�
�
I
�
�
�
�
r
{
,
�
�
�
;
�
i
J
�
1
i
i
,
i
F
�
f
1
.-�
�
i
�
SECTION UO 45 26
CONTRACTOR COMPLIANCE WITH WORKER'S COM�'�.NSATION LAW
Pursuani to 'I'�xas Labor Code Section 40G.a96(a), as amended, Contractar ccrtifies that it provides
warker's conapensation insurance coverage for all of its employees einployed on City Project No. 101476.
Contt•actor further ceriiiies that, pursuant to Texas Labor Code, Section 44b.496(b}, as ainended, it will
provicie to City its subcont�actor's cet-ti�cates of compliance with worker's co�npensation coverage.
CONTRA.CTOR:
Company
Address
Cityl State/Zip
By:
{PIease PrinY}
Signature:
Title:
(Please Print)
THE STATE OF TEXAS §
COUNTY OF TARRANT §
BEFOR� ME, the undetsigned authority, on this day persoilally appea�•ed
, known to me to be the person whose name is subscri�ed to
the foregoing instru3nent, and acknowledged to zne that he/she executed thc same as ihe act and deed of
for tl�e purposes and consideration therein expressed ancf in
the capacity theretn stated.
GIV�N LTNDER MY HAND 11ND SEAL OF OkkICE this day of
, 20 .
Notaiy PubIic in and for thc State of Texas
END Ol+ SECTION
CITY OF PQRT WQRTH Water and Sanitary 5ewer Rehahilitation Contract 101
S'I'ANDARD CONSTRUCTION SFECIFICATION DOCUMEN'fS CPN 02722
Reviscd duly l, 241 l
�
0045A0-1
Minnrity Busincss T-:nterprise Specilications
Page 1 of2
1
2
3
4
5
6
S
9
10
11
12
73
14
15
16
l7
18
19
20
21
22
23
24
25
26
27
2S
29
30
31
32
33
34
35
SECTION 00 45 40
7_Ja_MP()RARY R�VI�ION 4lb/2�20 {C�?VI_ D-!4)
Minority Business �nte�prise Specil�]catians
APPi IC_ATInN n�' P(IT.TCY
If the total dollaf- value of the contract is greater than $50,000, then a MBE subcontracting goai is
applicable.
NOLI_CY STATEMI+',NT
It 1S the policy of the City of Fort Worth to ensure the full and equitable participation by Minority
Business Enterprises (MBE) in the procuren�ent of all goods and services. f�II requirements and
r�egulatioi�s stated in the City's current Business Diversity Enterprise Ordinan:ce apply to thisbid.
MBE PRO.TE�T (YOAI,�
The City`s MBE goal on this project is � 2% of the total bid value of the
contraet (Base Gid applies to Parlis and Cnrta�muniiy Services).
Notc: I€ both MB� �SBE subcaniracting goals are established for this project, then an Offeror
must submit boih a MBI: Utilization Farm an�d a SBE Utilizatian Form to be deemed responsive.
PLIAN E'1' BID PEC FI
On City contracts $SQ,400 0�• more where a MBE subcoi�tracting gaal is applied, Offerois are c-equired to
caznply with lhe intcnt of the City's Business Diversity EnCet�pt-ise Ordinance by one of the fo�Iowing:
1. Meet or exceed the above stated MBE goal through MRE subcontractittg participation, or
2. Meet or exceed Yhe above stated MBE goal ihrough MBE .�oint Venture participatiot�, or
3. Good Faith Ef%rt documentafron, or;
4. Prime Warver documentaEion,
SUBMI7"TAL OF REQUIR�D DOCUMENTATTON
The applicable docuinenfs must be received by the assigned City of Fort Wo�tlz Project Managei• or
Department Designee, within the following times alIocated, in oi•der fo�- the entire bid tn be coi�sidered
responszve to the specifications. The Oiferot• sha�l �MAIL the M$E documentation to tlie assigtaed City
of Fort Worth Project Manager or Depari;r►ent vesignee. A faxed copy wzl� not be accepted.
1. Subcontractor Util�zation Form, i# received no later tE�an 2:00 p.m., oi; the seco�ad City business
goal is met or exceeded: day afte�• the bid ape�ing date, exclusive of ti�e bid opening
date.
2. Good T�ith �ffort and received no later than 2:00 p.rn., on tk�e second City business
�ubcontractor Uiilization rorm, if day after the i�id opening dale, exclusive of the bid opening
artici ation is less than stated oal: date.
3. Good Faith Effo�-t and received na latet- than 2:00 p.i�., on the second City business
Subcontractar Utiiizxtion Form, if no day after the hid opening date, excl�sive of the bid opening
MBE artici ation: date.
4. Prime Contractor Waiver l�orm, received no later than 2:00 p.in., on the second City husiness
if you will perform ali day after the bid openin�; date, exclusive of the bid opening
contractin /su lier work: date.
CITY OP POR'I� 1NOR"fH Water and Sanitary Sewer RehaUilitalian Cantract l Ol
STAiVDARd CONSTRUCTION SYEC[FICATEON DOClIMEN7'S CPt�I p2722
Tcmporarily Revised Apri] G, 2020 due to COViDI 9 Lmergency
aoasao-z
Minorily Business Enterprisc Specifications
Pagc 2 of 2
5. Joint Venture Form, if goal is met reccived no later than 2:00 p.m., on the second City busii�ess
or exceeded. day after the bid opening date, exclusive of the bid openin�;
date.
2 I FAILiTIiE TO COMPLY WI"['H T'�3� CITY'S 13USINES5 DIVERSITY ENTERPRISE ORDINANCE
3 WIL,L REST_)L'�' I�T TI3E BID BEING CONSIDFRED N�N-R�SONSIVE TO SPECik'ICATIONS.
� FAILUR� TO SYJBMIT TH� R�QUIIt�D M13E DOCUMEI�TATION WILL RESUI.T IN "I'HE SJD
B�ING CONSID�R�D NON-RESYONSIVE. A SECOND FAILURE WII.I. �t�.SULT 11V THE OFI'�ROR
S BEING DISQUAL�IT�D FOR A�'ER10D �F ON� YEAR. TIIR�E FAILURES iN A FIVE YF,AR
PER�OD V4'ILL RESUL'I' IN A DISQUALIFICAITON PERT011 OF THREE YEARS.
�
7 flny Questions, Please Coutact The BDE Office at {817} 392-2�674.
8 END OF SECTION
ia
�
C3TY OP i=OR'1' WOR7'E] Water and Sanitary Sewer Rehabilitation ConUact 101
S"1'AIVDARD C(}AISTRLICTIpN $1'�;CiNICA"f[ON D(7Cl1idIENT�S ��pN �27ZZ
7'emporarily Revised Apri] 6, 2fl20 due to COV[D I) Emcrgency
-!
A�r�ement
Page ! of5
s�e��onr aa �z ��
2 At'rlt�M�NT �
3 �'gil5 AG�1E�Ii�IEli1T, a�.�tharized on ���^y., _9s made by nnd between the Cify of �arth
4 Wort�i, a Taxas homa r�le anunicip�tlity, a�ting by a�d �i�trough tts du.ly at2thora�ed City Manager,
S ("Cif}'"}, artd _1Nilliam J._Sohulfz,_.Inc. dba Circfe C Const�uc,ction Gom at� -• _: _-�. .�_-:..�,
6 all��[Ol'1ZCc� f� [�fl �3i1§ii�C55 Ii2 TeXAS, �cfing by zlnd Ehrou�h its du�y authori�ed represe�2tati�e,
7 �uC.'ORtC2C�01•"�.
s �:ity+anr! Con#ractox, in enr�sicfen�tiot� afthemi�hia� cavenantshereinai�er set�'a�h, agreeas fai�ovvs:
Articte 1. WOR.K
10 Contractor s�iall compiete atI Wnrk as sper.ified or inciicaYed in #he Contract Documei�is for the
12 Praject it�entified he�'eiq.
I2 Articie 2. PROJECT
13 The p�-oject far �vhich the Wa��C w�d�r the Gonfi�act I7ocumet�ts ��ay he the whole or on�y a par� i�
1� ge�xeraily described Rs fo3lowrs:
15 Waierand SaniEary Sevrer Rahabili#afion Confract iE?i �
. _._ . � ._.--�--�--�--:-�_..�......__�,. ,,,.... .-�,..,.._„� -. r—._-�,--,;�---�� -- _�, _-�__.
�__ ....
i6 CPN,92722.,.- ::. � ...... .......:. _
�7 Artiele 3. C4NTE2A.C'�' PR�CE �... . . . . ..
18 City ag"rees tt� pay Cc�nnaata3' #'ar pe�'ormance n�the Warlc in accarcfance w�th the Coaatract
�9 f]acuments an amou�z� in cU�renl funds, of,;fhr�e,Mi[lion...�f#e�Thvusand, One _]7ollars
20 ($� . . *�.Q75,�78�fl.p* -��s. Nundred Seveiity�Eight anci�Na/70�
2i
zz
23
2�#
25
,�rtici� �b. CU�i'iItAC'I' T1��I�
4.1 F'ina! Acceptence.
The Work wi�l be Gorr�ptete for Final Aaceptance wiihin 420 days a#�er tl�e �3ate �,+he�� the
Cantract Time comnnences ta runs qs provided in Paragraph 2.03 v�the General Conrlitians,
�1us any exte��sian ihereaf altoured i� accardanae wifh A.tticle J 2 o�the Genera( Canditiot2s.
26 �.2 .Liqufdated Damages
z7 Con#racte�r recogn�zes that time is nf t�re e.ssence for completion of Milesto�es, if any, and
z8 to achieve Fina1 Acce�tance of the Wo�'k and City will suffer �r�anaxal loss if the j'Vork is
z9 r�ot completed vvltlii�� the time(s} sp�ci�ed in Paragraph 4.1 abo�e. The Contractor alsa
34 reco�izes ihe delays, expe��se and dif#icuIties- invotved in �raving in a le�al �aroaeacling,
31 the actual lass su�ered by #]�c Ci#y i�' [he Work is npt con7plet�d �rt tirne. Accc�rdingly,
32 irtsfead of requiring any suci� proof, Coniractor agrees il�at as liquidated da�nages for delay
33 (but not as a pena�ty), Contractor shali pay City. Six hundr.ed thu�v=Dollars [$630.Qfl} for
34 each day thaE expzres a�er the time speci�ed in paragl'ap� 4.1 �ar �istal Accepfance �1n�il
35 the City issues the Final Lef#eraf Ar,ceptanae. �
36 Article �. CQ�I�'Rl��T AUCCTM�]YT�
3� 5.] CQNTENTS.
38 A„T%tc Cnntzact Do�unnents which compri�e the entire �greement l�eiwecn City and
39 Contraotor concerning ihe Work eonsist of the faIlowii�g:
40 1. ?'his Agreement.
�� 2. A�tachrnen�s ta tkus Agreernent:
CITX OF �1fT 1�OR.TF�f Vlater and 3as�if�ry 5ewcr 2iehAbilitation Cantr.�ct i Ol
SFA%IUA1iC3 CONSTRUCTTQN SPBCFFICATIUt�' DOCUMEN"t� CP�I 02722
ltavi�ecf I1.15.l7
�z
43
44
45
46
47
48
49
S (�
5!
SZ
53
S4
55
56
57
58
59
s�
6l
62
53
6�i
CS
66
67
68
89
70
71
72
73
74
75
7S
77
7x
79
ga
81
3.
4.
5,
�.
'�.
8.
4.
_2
� Agreemant
page 2 of S
�, $Id �OCm
1) Proposat �ntrn
2) Vendor Coinplianee to State L�.F� Nan-l2�sident I�idde�•
, 3) Pret�uaii�catian �taiewe�t .
�) State and Fedezal documents (pro1ectspec�ifrc�J
b, Current Prevailing Wage Rat� Tahfe
c, inst�rarlce ACOI�7 Form(s�
d. Payment Bond
e. Per.forms�nee Sond
f, Niaintenartce BQna
g. Power of AtEorney for tize Bonds
h, Woricer's Cam�ensation�davit
i. MBE andlar SBE Utilizat�an Fo�'m
General Conditinns_
5upp�emeneary Conditions.
Specifications speCificslly mar3� a pa�•1 afihe Contract Docunnenss by attachment or,
if ��t akYaGhed, as incprparated by x�fere�ce and described in th� Table af C4ntents
af fhe Project's C4��tracE Docuinents.
�7rawings.
Add.e�ada.
poGumentafian silbmitted by Contracto�� �rior to No#ice nfAward.
The fnllowing w1�ieI� may be delivered or issued a'fter t��e Effective pate af tiae
A.greemen# and, if issued, becorne an ineorporated part of the Con#ract Docziraei3ts:
a. NotiCetnPxoceed.
b. Fieid Orders,
c. �hange Orders.
d. Lat[er Ui'�inai Accepfance.
.�.rticl� 6. Ii�ib�R'l�1lCi�'ICl�7'�U7V
�i.1 Cn��ractn�' cavet�ants and agrees to indemnify, hold har`mless and d��e�d, at it� own
expe�se, f�e ¢ity, i#s o�cers, servani� and empl�y�es, from and against any and al�
claims �risit�� opt af, ar aliegec� to arise out af, the wnrk and service� to he performed
�y the conf�•��tor, iis o��c�f�s, agenCs, em�Ioyees, 5�2ElC0Itff 8CL0�'8, lieenses ar invitees
�nder t�s cantract..�his-indexir�ni�reatxon_n�roxisi�n..�s_�txcci�cal�:�'=fnt�nded #o ��t3er.a.��
This e�zdernn's�-p�o"v.is2on isin#eniied ta incfude, withar�t'Txmi�aiion, indeannii� for eosfs;
exp�a�ses and 1e�a1 fecs incurrer� �y the city in defendiug against such clafms �nd c�uses
of a�#io��s.
C1TY O�FORT WORT�I 4laEcr and San9fary SetvarRehatiiiiTaEion Contract lUI
STANJIAIib CDNSTRT3C7Iq:�i SPi:C;lFJCATlON DpCUMER'7'S GPN 02722
ReviseQ 11.T5.17
�
-�
A�.�,���,�r
�eg�:, o�s
82
S3
��
85
�s
$7
88
89
9(3
91
G,� Can#r�c�nr co�vens��€�s a�td ags•ee� to ine�emni�y aa�d hold hsrtialess, �t ii� oEvn e�per€se,
#i�e c#i�r, €t� o�cee�, serva�� and ern�glpyees, fror,� anc� against �ny and at! loss, clarnag�
Qr r�eatx€��tin►� vf p�•operty of th� cifyi flt'I511�� Ali#' D�� OP il��CgE� �O r3t-�S8 U[i� it�, t�� wor�
and services fo be pci�foi�ne� by f�e contractor, ifs of�ice��s, ��ents, etnpFoya�,
suf�cnnt�•pciors, licensees u�'inv�te�s under this contract . This it�d.emnf�cation .��ovisfc��
- � - - -- - . .. ___..-r�.�..__:.. _:_ .......
�rticle �. I�][ISCEL,��[�U�
9z 7. � Terms.
g; Terms used in this Agreemeii# which �zi'e defined in t�E'ticle 1 of Ehe Generp! Cot�ditions w11!
94 �ave t�e meai�in�s indicater� in the CSen�ra! Cor�d�tians.
9� 7.2 Assi�r�z�ent' of Cont►-act.
96 Ti�is Agreement, incJudiitg all of �he �ontract l�oeurrtet�is may r�at be assi�ned �y tlta
97 Car�trac#or withor�t the adv�nced ex�ress written consent of th� City.
98 7.3 5uccessors and Assi� s.
99 City and Coni�•acto�� e�ch lr�E�ds itseif, its pa��fners; suec�ssoi.s, nssi�ns at�d tegal
!�U repr�:s�ntatsv�s to the nt�icr �ar�y her�to, tn respect to �1! eavenants, a��eemc;n#s and
701 qbligaiinns c�ntai�ed �ntheContraciDoculnenfs.
1U2 7.� Severabaltty. �
103 A.ny �rvvisia�� or part oi the C:ontract Dacurr�ents held fo h�, un,r.o��stit��tios�al, voicl or
1Q4 .unen%rc�a�le b3� a courk af cornpeterat jurisdieiion sh��t be tieemec� stric�:an, aixc� all
t05 rsmaining provisions shaEl coniinue to ba vaiid aE�d binding upon CJTY and
1(]b CON'IRACT�R.
I07 7.S Goverr�ing Law and Ventie_
i Q8 This Agree►nent, incti�din� a�I of ihe Contract Documents is perfor.�rxable in ihe State of
�O9 Texas. V�n��e s$a[i be Tat��ant Cou�ty, Texas, or Ehe Unifec� �tufes I�is�rict Caurt. fo�� the
�]0 Na1`the�'i Dis#rict oi Texas, �ot-f Vi�ort�i �?tvision.
t 1� 7.G Auti�ority to Sign.
1�2
zT3
lI4
I1S
IIb
I17
178
I19
I2�
I�I
122
I23
i24
Can#raetor staaI! attaah e.vic�e�ce o� �uthoz•ity to sign Agreement ii signed hy sa�neane ather
t}�t� the duly �ut�orizec2 s�gn�tc�ry af t�e Canh•a.ctar.
7.7 Prohibifion �z► Can#�acts i�Vit[i Campanias l3�ycoE�ing istaet. .
CaratY�Ctar acknowiedges �I►at itt szecbrdance u'ith Ch�.pter lZ?0 c�f the Tex�s Govern�ten€
Co�le, tl�e City ss �rohibit�d �•orn erttering inta a cantract with a eompa�zy fc�r goods flr
services �nless the contract cantains �. vv�-itten verifc�tiofi frc�m the corn�arty fhat it: (1)
does r�ot bnycott Israei; anci (2) will not boycott Isra�l during ihe tann of ti�e confract.
Tlie rer�zs "baycatt isra��" and "cvrnpany" shaE! have tha meani��s ascrzbed to t3�ase texn�s
in Sectzon 848.�101 0� ��ie Tex�s Gnver[unetit Code. Iiy si�niiig iftis cotttr�ct, Co�rlr acto,�
certifie.� Plar�t C'o�iruc�ot�'s signrtttcre ��avides �vriftert v8rtficatirirr i� the CYfy thr�t
Cv"�trr�cior: �l� rl�es �ipf boyCatP.�,s�r�e#; �12f� �2� 1t'III FiDt 110VCOtl i5tYtEI fillY�F1�111e i�fFfi f1�
tl�� con�raca.
CFI'i' OF PdRT l�'ORTkt 1i�aternnd 5anit,lry Se�vzr Reha6iiitation CunEraet IQi
S1'AI"�BAItD CONSTRi1CTI0z1 SA�C�JCetTlf)l�i �7UC'CiM6NTS CPi�T�02722
Revis�d 11.15.17
-�
Agreemen#
Pageq oCS
125
]2� 7.# InamigrationNationali#yA.ct.
127 Contractor sl�a11 veri:Fy ti�e identity and err�ploymeni eligibility of its employees �vho per,{brm
128 �vork under this Ag�•eement, inciuding coznpleting the Emplayrnent Eligibility Veriiiea�ic�n
129 Farm [I-9). Upon requ�st by_Ciiy, C�nfractor shall pro�Yc�e Cit�� w�th c�pies aiall I-9 fa�rzns
13o and suppo�`�ing eligibllity dacume��tation for each ernpioyee wha perfarn�s �vork under this
13 � Agreernent. Contractor shall adhare to a�i �ederal aiid State �aws as we�l as establish
132 Appropriate procedures ar�d aon#ro�s so that no serUices u�iJt be perfonned by any �on.1a•actor
]33 employee w�o is nai tega�ly eli,gible to ��r�arm such services. �OAtT�G�'OR Sl�[ALL
13� �IVDElil�iViF�'�l CIT'4� A.ND �OLD �A'� �ARii'�L��� �`I�tO�+i �1+1Y PEI�IAL�'F�S,
T 3S LIAISYLITI��, QR LO�SES IIUE TO '�4Ll�i�O�CS OF '�i'HX� �Ak�1,�RAP� �Y
l36 C��TTI�ACTOR, +CU�[TiRA.CTOR'� �l'+�I'g.4�KE��, �UBCON�C7[`C?]4,�,
137 AGEIVTS, QR LICEI>I��ES. L'ity, z�pan wiiiten riotice to Go��tractor, s�atl have #he right
13S to immediat�Zy terrnrr�ate this Agreerr�en[ for viol�tions of fhis prot=.ision by Con��acfol_
139
14Q 7.9 Na Third-�'ai�ty �ene�iciar,i�s.
l�l This A��eement gives nn rights or b�nefits #o anyone atl�ez� than the City and ti�e Cor►t►•�ctor
342 �►id there are no tE�ird-pariy benef�Citt�e.a.
].43
l44 7_ 10 No Cause c�f Action Against �,ngin�er.
1�4� Cc�ntracfor, ifs sub�oniractors and equipment and materials supplicrs on the �'RaJ�CT or tl�eir
1�4G sureties, shatl maintai�l na dir�ct action against flae Engineer, its o�ficers, cmgloyees, and
i4:7 subconfractors, fnr any ciain� arising aut of, in connection uTitt�, oR� resul[ing fron� ihe enginecrir��
l4S service� perfo�ned. Onty the City wiE! ae tha beneficiary nf any undertaking by the Engineer.
149 The presenee or duties of tt�e Engineer's personneI at a const�uction site, whether as an-site
�5Q repiesentati�es or otlte�'w+ise, dn z�oi make tiie Eng7ineer or its personna] in any way
i5� responsible for thase duiies ihat belong to th� City andior tT�e �ity's construotian cor�traetors
I52 or oi�er entities, and do apt xeiieve #he constructiv�i cot�iractors nr any other ent�ty pf #heir
153 abligatians, du#ies, and responsibilities, includia�g, but not lim;ited fa, all const�uction
�54 methods, means, tech�iques, sequences, aud pracedures necessary for coof�dinati�g and
] 55 completin,g ai� portions af it�e construction woxlt in accordarice with the Contract Docutrien�s
156 . and any ��ealth or safety precautians requit•ed by sueh caz�str�action work. The Engineer and
7S7 its personnel have nv authot�ity to exercise any cantrol o�ei any eons[ruEtian c:an�ractor ar
IS8 ather entity or fheir empivyees in corutection vvith tliei�� work or any hea�th or safeiy
i59 precautions.
l6Q
161
162
SIGNAI`U]i� �AGE TO �'OLT,�W
G[7'Y Ot� P�RT luaRTH SVntes e�nd Senitary Sewer Re}rabilitation Conhaat 1�1
57�At4DAltll CpN57�tUGTIDA' SP�CIF'lCATZON AOCUk1�f+li'S CPN 02ry2?
Revised i 1. i 5,17
-3
Agreement
Fage 5 aC5
163 IN WITNESS WI3ERI�OF, City and Contractor have each executed thi s A�eeinen� io ba effecti�e
iG4 as of the date su�scri�iec� by the City's desi�nated Assistant City 11�fanager ("Ei%c#ive �)afs"}.
I63
16G
167
1G$
169
17�
171
i72
173
174
Contt'actnx�
Wilfiam J. Schultz, Inc. dba
Circfe C Construafion Company
�X.:s�...�,. _ �_. .. -„_...�
� (Sign�ttui�e)
��.
"COre�� 5. Ss__]Sell�_-�. - - -
,��,_ ::�.--- - - -- -
{.Pr9nted Nama)u� -�
Title: Presidenf
Address: P. O. Box 4D328
City/�tate/zip: ��rE Worth, TX 7614D
- -�--�.._�,... _ -n..,:_. -
Date..�:_ _.- - _: .._ �_� . _.. ..
crr�r a� rox� wour�
STAtVpARl7 CONSi7.tilCTTpN Sp�CIFlCATIb�+T ll�CUl4IENTS
lieYised lI.[5.E7
City of�'ox�t Wortt�
PQna Bur�hda�F
BY-�..-�_T _- - - - - -- -
l�aiaaMBurg�fi�iit'� :- �.��=�-
Assistant City Ivla:nagcr
�• -
b�fE Feb 15, 2421 -,
Aite��., .�� `
City Se r� y
{Seai)
; `.
�,� .
M&C _',:� t °�
. .. . ��_ _ .__ .-.—.
Date: �.�����_-�,:�_ -- _
�'���m 1295 Na.�;.^ ._-�� .
Cont�act Complianca Manager:
By signit�g, i acicnowledge that � am the �erson
xesponsible #'ar #!ie monitoring anc!
admilaistt'at[an afth#s contract inc�urli��g
ensuring ail pe��fbrmance and repartirig
�ec�uire�nents. t '�..�
r� �
J. hnstop�ietUn�er►v,00d ` ' :�, . � _�-
Project Manager, Water Department
Appzaved as fo Fnt�zt� and I.egslity:
�I
DQu�1as W_ Biactc
Sr. Assistant City Atrozney
A�'PROVAL RECUMMENDED:
����� �la,r7�
Cliris'�2iri�ei-,1��:.� ��.� _ �- .-.
DI�tTGTOR,
Water l�epartmant
Ydater and Sanitary Se�ver Rehahilitation Gpntraa��91 -���-
PR! 02722
�� ',`.... �.t .
� �� f '` ' F �r �d 5
._,-�.�„---,t, � �.y . � '-.h `..::
_ _ �" . 6`^`. � ti,,� ~ ..
j - , — .:, � FJ �� � �Y;``��v
� „ ,
������
_,., � � �e������� d
��g � �A�� ���� ��
t�51 f3-1
Pa�c 1 of x
0
f
a
2
,�
�
5
b
7
8
9
�0
��
�2
13
�A
]S
I�
'['�l� S'�`AT� C)F+ TE�1�
�.*��TTY U-�' TAI�R�N't"
801V� NO. TXCB1331'E
��C�ION 00 6l 13
P'ER.�C3RMANCE �QI��I3
§
� �OW Ai�I, I3� THE�E PIt���WTS:
§
T�at we, WilEiam .i._Sc.huttz,nlnc. dba_Circte C, Cons.truc:tior� Com�xany _, knawn as
"�'rinc�pai" herein and Merchants Banding �orra�a��Mutuai.�.rv..p..__� __.,�_.., acnrporaEe
s��rety(sureiies, if nr�vre than pne} d�ly af�t�arizec� to do business in the St�fe ofTexas, k�sc�w� as
"Suret�" herein (�vhetiter ane or more), are hetd and frmly �our,d Unta the City of Fa�-t �'orth, a
munieipal corporatian created puisuant to the l�w� of Texas, ]�nown as "C�t�" hercin, ir� the per�al
sum of, Three Million, Fif€een Thnusand, One Hundred SeveMY [,ioIlars
- - - .�._..,� «,__m�.._��__ ..__.�.�,._,,.ti�..... _..��......, .�._....,
Eight and Nol'f 00*�����*�X'*�kAYeFrt'fi:FifT*kiF F�F�Yi**it***Yr*fiirR#**Rfi*
��___� .�3,,��15 '[ 76 _�0 ._�.._....), taw#ui mvn�y �f t�3e UniTed Siates, to be paid in %ort'UVarti�,
i's�rant C�n��nty, TexaS for the payrnent of whsc� sesm vireil antI �rs�ly tcs be rn�de, we bind
vurselves, our heirs, e�ecutars, adrninistratars, successo�•s and assi�ns,�cainify and sever�]iY,
�rrnly hy these preser►ts_
[ 7 �7VH���S, the Yrincip�t t�as entered into a certain written �ontr�ct �it� t�e City
i s� awar�ieci t�e 1� ____ day a�Q'�--..- 20 2�, �vhich +Contract is hereby refer�ed to and
l� made a part here�f for aiI purposes as if fi�lly set fv�tt� herein, to f�mish ail materia�s, ec�ui�rneztt
r� labor and ather accessories defined by law, in �he p�osecution of th� 't�V�rk, incl►�ding any Chan�e
�i Orde�rs9 as pravided Tnr ir� said Wafer and Sanitary Sewer Rehabi[itation Contract 1�9, GPN €12722
2� 1�I0�, T�II�R.�FCIRE, the cond�tic�� of this o6ligation is such th� ift�e said Principal
23 shaIl faithful(y pe�'farrr� iY ob�igations under the Contract and s3��f in ail respe�ts duly �d
2� faitfifi�liy perform the Worl�, inciuding Cl�a�ig� Qrders, a�der the Contract, accotding to the p�ans,
25 SpeCiflCati�nS, and COC1traCt C�OC[�merikS ���fei�l Ye�eE'� t[3, �nd as well during any period af
2S extension of tl�e Contrac� that may be grantcd on rh� parfi �f the �ity, then this oi�ligafion shall be
27 anci become auli at�d void, otherwise 4o r�main in full fr�ree and effeci.
28
�9
30
k'A[�VIDEU T13R�JER,, tfaal if any Ieu�ai actian be �led �nti��S I�and, ven�xe shali iie in
Tarrattt Cot�nty, T��s €�r ti�e United States I�istrict Court fQr t1�e Y*IarEherr� Districf of TexaS, ForE
�+Vorth I3ivision.
C17'Y OF' FORT WOILTi-T LVatetsnd Sanitary5ewer Re}��bifitation Coniract ��[
S�'ANUAXD COA15T1tUCiIO�I SPECIFICATIOi�' �OCUb4�NTS CPF+f €Y�722
RcvisAad July I, 241 i
GO 61 13 - 2
�
2
3
Ps�e 2 nf 2
Tftis bc�nd is made and execrated in complianc� wiEh fhe pravisians of Chapier 2253 of the
Texas Governmcnt C�cfe, as ama�ci�, and al! liabitities az� this �and shalI b� deterrriined in
accordance with the provisions of s$id statue.
4 iPqT WITNESS WH�REOF, the �'rincipal and the Surety have SIGI�IEED and �EALED
5 this instr�ment by duiy au#horized age�ts and afFicers an t�is th� __� �� day af
6 20 2�.
?
8
9
10
��
12
!3
i4
15
16
I7
1&
19
?�
21
22
23
24
ZS
26
27
28
29
30
31
32
33
34
35
3G
37
38
39
4U
4!
+12
43
44
as
��
ATTEST:
�. .1 � �. ' �
(Princ�pa� j 5ecretary Michele S. La n�
Witttess afi tn Principal
�-� - -
`--;�'�"�s �, . ~`�"`. ;;,< �•i - �—
- -f v ..
Witness �s �a Surery John A. Mifier
PR[NCIPAL:
V1liiliarn.J� Schuliz, Inc. dba . .
�..W ��v�.. �
�ircte_G Cor�stru ion Co . an.
� �.� � �.l.�i� •O� �.�7 �
5ignatu�•e - m -.
ieresa S�Skeliy �� _
Narr�e �nd �`ilie P
I,dc�ress• P. O. B�x 4Q3�8
--Fo�t ►Na�kk�, TX 76'14U m��
SUI�`i'Y,
-- �.. .
__.�.,�:a,�...,.�
Merchan#s in� Com an Mutua[
, -_ , ,
BY: . .
Signature � -
Sheryi A �Clutts, Attome�-in�Fact
Name and Title �4f��.
Address: �7QQ West�.��r� Rark+nrax
VV�sx_I?ss MQin�s^ IR �Q2�&-77�4
Te3�phone Number: 1-8D0-fi78-8171 ,�
*Note: If signeci by an officer of fihe Surety Crsmpaz�y, there m�st be on file a certified extract
from the !�-iaws showing that this perspn has autk�ority tcs sigs� such abIigation. If
Surety's physic;a.i add�ess is different frdm its mailing address, f�oth rr��st be provic�ed.
The date of the l�and shail r�at b� prior to the date t�e Contract is awarded.
CZI'Y OF FOCL7' WORTH Water and Sanitary Sewer Liehal�i�itatioa Conlract 101
STANDARD CO�ISTItUCIT�2V SPECffICA3TQN DOCi1MEf�"i'5 CPi� t}2722
RevisodJuiy 1, 2Q1.1
C-0 6! !4- t
Page P of2
0
�
2
3
4
s
6
7
8
9
1Q
I1
'�TE S'�ATE OF'T�XA,S
CQUNTY �J� TA�tRt41V�'
BOIVD I�lE3. TXC61331 i
��cTTon� oo s�. ��
PAY1i�ENT BON37
§
� ��raw ��.�, ��r ��s� �RE�Ex�s:
�
Thai wep Willfam J_ Schuitz, inc dba Circle C Cnnsfruction Com�any �a knovs�'r� a.s
•`Principal" h�rein, and �Aerch�nts 8onding.Campany.(M�atua�� - - - -. - - - . - - , �
corporate surety (sureti�s), duiy aut�c�rized tr, do busit�ess in the S�.te t�f Texas, !�nown as "Surety„
}��re�n {vuh�fi�r a��e or �are), are heid and �rmiy baur►d unto if�� City of �ort Warth, a rnunicipat
corp►�ratio�x cr�ated pi�rsuar�t to ti�e 1aw§ af the State af'�'ex�s, knor�n as "GiEy" hsrein, in ttre penai
12 siam of �hree Million, Fifteen Thousand, G�ne H€�ndred Seye�-Etght and Na/I�Q�lars
i3 (� _*3 Q15•T78_00*�.���, lavwfuf mc�ttey of the Unite�l States, ta be paict in Fr�rt Worth,
14 Tarrant County, Texas, %!' #ii6 �3�jrSIL811� Of Wi11GI'i Stli72 WE�i �ilC� iil�I)+ � iE?8f�C, ��ve bin� aurseives,
I5 �ur heirs, executars, ad�ninisiratoxs, successoz� and �ssigns, jai.ntl,� a�td severa�Ey, f.ir�r►ly by t�ese
16 presen�s:
17 VPHEItEAS, Principal laas entered intn a certais� written Contract with City, awarded the
18 �� day of ��. ... _.m. �, 2� Z�, �hich C�ntract is �areb}� referred tfl and made
I9 a part hereaf for all purlwses as if �liy set farth herein, to fn�nist� all tnateriais, aquipm�nt, lahc�r
20 and o#her accessori�s as defned by Iaw, in i�e prosecu#'roz� o�'#t�� Wt�rk as provi�ect fur in sai€�
21 Contr�aet and d�signated as Water and Sanitary 5ewer Rehabi[ifation Co�trac# 10'1, CPN 02722
x� �a��, 'I'HE��'(}RE, �� c€�rmr•rt��€ o� ��s a.s�.t���o�i �� ���� t�$� ��'
23 �riztca�al shall pay a]! rzaoniss owing to any (and a�l} pay�teent �ond benefciat� (a.s de�ined in
24 Chapter 2253 of the 7exas Gnvernm�ni Cade, as amended) in ihe prasecution of the '��'orlc u�lder
25 the Conteaci, t��en this �bli�a�Q:n shatl be and become null at�d void; ot�e�►uise to refna�n in fu)i
26 ft�rce and ef�'ect.
23
28
29
30
�'}�s bond is rnade and executed in compiianee wi�h t�� provis��ns of Cha�ster 2253 of the
Texas �nvemm�nt Code, as atnended, and aII liabilifies an th.is bond shail be d�ierntined in
accordar�c.e with t�e provisions af s�ic� statute.
CITY OH FORT W�R'I'H Water�nc� Sar�iCaty SeSver Rehabiiitaeian Contract i01
STANT�IARD C�i�fSTRUCTIi7id SPECIi'iCATIL3Y ��CLiMENi'S CPN OZ722
itevised Ju1y 1, 2di 7
00 h1 14- 2
P�ge 2 of2
0
1 IN WITN�5S �HERFQF, ihe Principa! and Siirety I�av�e each SIC'iNED and S�ALED
2 t�is i.nstru�ent by dut� a�thorized agenis and offcers c�n thi5 �1'ie ._ day of
3 �'���rtl.# `., 2�?�_,.�._.
i
�
S�;.f2�Ti�:
5
6
7
8
9
20
1]
A TTEST:
� 4e�'14�� � ",�-�.ri _�
(�'i�incipal) Sa;cre#.�r;� Michete �. L kford
WiMess as ta Principal _�...._ ..........._ �..._..�
_ _ �.. _ . — . — T�—.� .�_e_
Mercharlts o n�am�an Mui�al.
ATTEST: SY.
_ . ��_..���
Si �ture -
(�ur�tyj Secr�.
Sheryi R. Kiutts, Attarney-in-Fact
Name �nd Tf#le
� - , Adcfrass: 6700 Wesfovicr� �'�arkway_ �
r � �,��_..� _ �West_D�S Md3n�s !A 50266-7754
Witness as ft� .�5urety John A. M e�l� - -� - . - - - �� .�.__._.._
���CX�i�{-s.
Wifliam J. 5chultrl Enc. dba .- ,�.
,Circle C Ccas�strur�tiqn Company
�'
�Yr . ���. � ��_
Signature �
T:s�e�a �5�etl��i�nt..,��_`
Na3'tie antl Tit1e
Address: P. �ox 4Q328,,�„,,__._.._...�.,�_�.,a.
Forf Wol'fh, TX 78144
Telephone Nur�bet': _1-80Q-678-817i
Nate: If signed by atz of�c�r aFthe 5 i.rrety, ihere must be on �f� a�ertifeci extract �'rorn ti3e 6y3aws
shawing lhat this pers�n h�s auihori�y to sign suct� �bliga�ion. If 8urety's p�ysi�i adci�`ess js
di�erent frorn ics ma�li�g �ddress, bot� �nust be pro�aided.
T'he ctate af the ban� shaii not be prior to the date the �ontraet is awarded_
END iD� SEC�'ii?N
Cl'tY (3F F�I�7 WORTII WaEe.r a��d Sanztary Sawer R.ehabiiitatian ConYraCt f i11
S7�ANDAIiUCQNiS'Tk7L.�CTID�d SPECT�fCR71OND(7CtihiEN'FS CPi� D2722
Revised]uiy f,2Uil
fl06i J9-1
PagE I q�3
BQN� NO. TXCS133'i 1
SECTIQC� Otl 61 19
MA�i�T�NANCE B�7ND
�
0
3
4
5
6
7
$
9
�A
lI
T2
13
14
l5
i6
��
Ti�E ST�1.7f`� (3� TEXt�.S �
§ ��flvl� A�,L ��' T�3[�.sl� P1t�5EImtTS:
CfJUl�1'TY �)� TARR�NT §
i'�at we� Wi�liam .J._Schult�, inc, dk�a Circfe C Consfruction CompanY... _.-_.........__ �notivn as
"Fr�ncipai'� hsre9n anci Merchants Boncting Cos�pan� {Mutuai�_�_�_, a corpnrate surety
(sure�ies, if more th�r� one} duly autisorized to c�o business in the State of Texas, ktiovrn as
••Surety" herein (whether one or r►iare), axe ��elc� and firmiy bQc�nd ur�to the City �f �'art Worth, a
mi�nicipa! eo oratio�� created pursuant tn tf�e la�vs ofth.e St�ie ofi'exas, knnx�n as "Cft},,, herein,
�hree Miliio�, Fiifeen ihousand, One Hunctred
in ihe siun of��p�y-�aghi_and Ial.aLaQQ�"�"'...�,__�_�__.*"�"'"`.�'"""*"""'.�._.�.__. I?ollars
{� _ �3,��►5.1?8���* ..�.�.._...�,}, Iawful mQney of the Uniteri States, to be paid �n Fort Wortta,
"�'arrant County, 7'exa.s, for paymen# of wt�ich sum weil ar�d �ruty be rnade unta the Ci�y and its
suecessors, we bind o�rsei�es, our �teirs, executars, ad��i�ist�ators, sizccessars an� assigns, �oiritly
and severa�ly, fi�'miy b}+ t�ese �resents.
IS WHEREAS, the �'rincipal has ent�red into a certain wri�ten contt�a.ct wit�t the City a�s�ard�d
i9 the -�� _ day of ,�,� ._.�. , 2Q 2�, whtch Coniract is hareby
�. .._ , ..�... _. �
20 �°efe�red ic� and a r�ade part hereof for aIl pur�oses as if fully s�t forth herein, tv f�rnish �ll
21 m�teriats, equipment labe�r and other �ccessories as de�nad by law, in the prosacutic�n af the
22 �ork, inaluding any Work rest�ting f�`o�n a duly authnri��d Chat�e C3rder (CollectiveIy herein,
23 the "tiVork") xs provided fvr in sai� con[ract and c�esignated as Water and Sanilary Sewer Rehabiliiation
24 Contracf 1D9, CPN a2722 ; and
25
2G WHE�aAS, Principai bin�s itseifta use suct� �naterials and to sc� cvt�strucrthe Wor� in
�7 accordance with tha p�ans, speci�ica�ions and �ontract Doeurizents that the Work is an�4 wii�
z8 reznain free �rom defects ir� rnateriais ar workmanship for and duri�ag th� period of twr► i2) y�ars
Z9 after the date af Final Acceptance af the ��caz�k by the Cit� ("Maintena�ice Period"); and
30
3I
32
33
34
WHE�2EAS, Princigai bincls itself'tc� repair or rccons*ruct the Wprk in vv�tale or in �art
upan receiving nv#ice from the City of the need therefor at any trtrne within fhe CVi�antenance
Period.
CITY UF FOR"!' L�'DRTH Water anti 5anitary 5ewer Rehabilitation Contract ] pt
STItiNDARI7 CY3t33TiiiJCTi0a�1 SPEC1.FiCAI'!ON Dt3E:[711qEIVTS CPN 02722
RevEsed .Tuly 1, 2Qa 1
C
D(1G! 19-?
,
�
0
�
2
3
4
S
G
7
8
9
t�
11
l2
13
l4
1S
IG
�7
I8
19
Pag� 2 of 3
N�O�V THEREF�REy �Il� CDi7C�1�14I1 O�tI'Ji$ DUIl�1�1�11 1S SUG� L}lSt t�PiII1C1�3H� S�$.��
rerr�edy any defective Vi7ork, f4r whi�h timely natice was provided by City, to a corngle#ion
satisfactory ta the City, then this obtigati�nn shall became nuli and void; otherwr�se to re�ain in
fuEI fotce and effec#.
PRQ�IDED, H�JW�;VE�t., if Principal shall fail so io repa�r or reeonstn.ict any timely
nat�ced aefective �Vark, it is a�reed that ihe Ciiy may cause any and ali such defeciive Work to
be repa�red andi�r recanstructed with aIi assaciated costs t�ereof �ein� borne b}r the Principail and
the 5urety under this Mainteclance bond; and
�RClV�AE� k'L'RTH]E�i,, that if any legal antion be filed on this Boi�d, vent�e shall Iie in
Tarrant Co�nty, Texas ar tY�e [Inited St�tes Disirict Co�art fnr th� Nnrthern District nf Texas, Fort
1�forth Division; and
PRQ�IDED F�JRTHER, tha� tk�is obiigation ��all be continuous zr� na#ure a�d
s�eeessive recoveries may be �ad het�on for suceessive bre�ches.
C]'1'YaF �'DR7' WORI'�i Watettand Sanitary ServerRehabifitatiqn Gontmct IUZ
STAh3f}AI�) COnS1'ItUC7'IQIY SYEC1FiCA"3'!ON DE7CiJivlEiViS CYN U2722
Rcvised Iuly 1, 2d] 1
QO 61 19- 3
Pa�e 3 oP3
1 IN �VXT�E�S W�3[EREC}�a the Principa.I an€d the Surety have each SIGNED anc! SEA�ED this
2 i trurnent by duiy autho�zed agents and o�rieers an #his the ��_„_,�. day af
3 zo�.
�
6
7
$
9
]0
].1
12
13
14
i5
15
17
18
19
2Q
2I
22
23
24
25
z�
z�
zx
29
30
�r
32
33
34
35
36
37
38
39
4Q
41
AT'I"F�"[':
�������
(Priz�cipatj Secretary Miche[e S. ar�kfo��
Witness as to Yrincipai
117'"CES"�':
PRINCTPAi:
Williatn J 5chuifz._Inc. db�, ,,,_ _ _.
. . _. ___ ._
Circie [; t�anstruct�fln �ompany _ _��. �
- � .
$Y; T -�.�:� W:�. '
Si��ature
�
.�eresa ��.5ks[1v _ . _ �-----�. u�__. �
�WIV�me anc� T;tle
A�3dress: P_ O_ Bax 40328
_. .. �.�.��
_Fort.Wo�th, TX.. 7�.144 _ ,.
SUR�TY:
- :.-.�.��.-----�---
Merchan#s�� �i�g:t�a.m�an „,���#} .
i —
E#Y: . .
: _..
�nature
Sheryi A. Kluits Atis�mev-in_ �set _
fvame and 7'iii�
�.� Address: w:67�0 V4lesto+ecr� Par,�way�,,,,�„�.
(�urety) Secretary � - < � �Itest Des Ntoines, �+� �02F$-7754
� t _� -" - � � _-�_ . - --.-.
� '�r�_:..~.......Yr + J ���`"�`""~
_�.�� � _,._� ., �-_ _ ...._
Witness as to �urety John A. ($�iiler Telephone 7�t�smber: �-8(l0-fi.7$,-, 17� 1 .
�Note: If signed ��� an o�eer nf che Surety Campxny, t�tere mus� be an �le a certifed extraci
from the by-laws showing that this p�rson has autharity ta sign such obligation, If
Surety's physiGai �ddress is di�'f'erent .fron� its mailin� addres�, t�oth must be provided.
The date of the band shall nat be prior to the date the Contract is awarded.
C1TY OF FDRT WaRTH Water a�d 5anitary Sawer Reha6iiitation Contract ]01
STANLIA�Iai) CQNS7'RUC77t7iV SP�C[FTCATI()N �C)CTJME�TTS CPN 0,2722
Revise,d Ju1y 3, 2011
�� ���� ���
� C� i`�T �3 I � � � � L�. �'� 1����
P��i'dl�h� �F �1ii0��l�Y
KnowAll Persons By These Presants, that MERCHANTS BONDING COMPANY (MUTUAL} and MERCHANTS NATfONAL BqNDING, INC.,
both baing corporalions of the State of �owa (herein collectively cafied the "Companies") do hereby make, constilute and appoint, individually,
John A Miller; John R 5tockton; Sheryl A Klutis
fheir true and lawful A��orney(s)-in-Fact, t0 sign its name as surety(ies) and �o execute, seal and acknowledge any and all bonds, undertakings,
contracts and othar written instruments in the natura thereof, on behaff of the Companies in their business of guaranteeing the fideliiy
of persons, guaranteeing the performance of contracts and executing or guaranTeeing bonds and undertakings required or permitted in any
actions or proceedings allowed by law.
This Power-of-Attomey is granted and is signed and sealed hy facsimile under and by authority of tF�e following By-Laws adopted by the Soard
of Directors of Merchants Bonding Company {Mutual) on April 23, 2011 and amended August 14, 2D15 antl adopted by the Board of Diractors
of MarchantsNational Banding, Inc., on October 16, 2015.
"The President, Secretary, Treasurer, ar any Assistant Treasurer or any Assistant Secretary or any Vice President shall have power and authoriiy
to appoint Attorneys-in-Fad, and to authorize tham to execute on behalf of the Company, and attach the seal of the Company thereto, bonds and
undertakings, recognizances, contracts of indemnity and otherwritings obligatory in the nature thereof."
"The signature of any authorized officer and the seal of Ihe Company may be affixed 6y facsimile or electronic transmission lo any Power of Attorney
or Certification thereof authorizing the execution and deiivery of any bond, undertaking, recognizance, or other suretyship obligations of fhe
Company, and such signature and seal when so used shall have the same torce and effect as though manually fixad."
In connection with obligations in favor o# IF�e Florida Department of Transporfation only, it is agreed that the power and aut hority hereby given to the
Attorney-in-Fact indudes any and a�l consents for the release of retained percentages andlor final estimates on engineering and construclion
contracts required by the SEate of Florida Deparlment of Transportation. It is fully understond that consenli ng to the State of Florida Department
of Transporlalion making payment of the final estimate to the Cantractor andlor its assignee, shall nol relieve this surety company o[ any of
its obligatians under ics hond.
In connection with obligations in favor of the Kentucky Department of Highways only, it is agreed that the power and authority hereby given
to Ihe Attorney-in-Fact cannot be modified or revoked unlass prior written personal notice of such intent has heen given lo the Commissioner-
Department oi Highways of the Commonweal�h of Kentucky at least thirty (30) days prior to fhe modification or revncation.
In Witness 1lVhereof, the Companies nave caused this insirument to be signed and sealed Ihis 9'fth day of Fehruary , 2020 .
���xu��e�r� M��"���e
,•'`�,.�1DNA�'•�.: .• �tiG �p •.
�����1'���R ''�O F ,`�CS�"�+�P�!$�'�9�; MERCHANTS BQNDING GOMPANY {MUTUAI.)
`�-'O
`� : � �J'�� �4 � . � 'P�.�,�, MERCHANT NATIONAL 60NDING, INC.
:_' 20Q3 �=�' :'���� ��33 ��c; ay
.�' �� : <� `�v. ��
�;d' •= � • . �a�. .�C�.
. �,�dj; ,,' � ',: rJ��; .'.��Y,., � ,. •�`�+R� President
SYATE OF IpWA ���'��...�as*a* • � � a � � � •
COUNTY OF DALLAS ss.
Qn this 11ih day of February 2020 , before me appeared Larry Tayior, to me personally known, who being 6y me duly sworn
did say that he is President of MERCHANTS BONDfNG COMPANY (MUTUAL) and NfERCNANTS NATIONAL BONDING, INC.; and ihat the
seals a�xed to the foregoing instrument are the Corporate Seals of the Companies; and thaf the said instrumenf was signed and sealed in behalf
of the Companies by authority of their respeclive Boards of Directors.
,�PRiA� s R�LLY MASON � .
o p Commission Number750576 � �/V��,,�p��1
x ° ° ° ° �' My Cammission Expires
* ,o �. * January 07, 2023
Notary P�blic
(�xpiration of notary's commissipn
does not in�alidata this instrument)
I, William Warner, Jr., Secretary of MERCHANTS 60NQING COMPANY (MUTUAL) and MERCHANTS NATIONAL BDNdING, ING., do hereby
certi(y that fhe above and foregoing is a true and correct copy of the PDWER-OF-ATTORNEY executed by said Companies, which is still in full
force and �ffect and has noE been amendad or revoked.
In Witness Whereof, E ha�e f�ereunto set my hand and affixed the seal af the Companies on this ,� day o'�
��1���l�lf • � � � � �!
•'' �ON ''• .• ��, � •,
••• p,`� „ A� '•• • p1 t� .
. .� . � •, • � - r%l,a •,
� � • oR��R,q -o ►�o, o�����.��' ��
,!� 'G �'�:�v: ;� 'G .� ,�t:
��:� dp� p;t9� .M»;�' -o- �;...,:
R�' 2403 ;�� * 6'� 1933 ,•' �, Secretary
;c� � . . ��. . �.
%�.��i •. ... ��� � �+'d�'yr' �r ' ,�`�'�`'.
�oaoa�s ��i2o� '•��...�;,.,.••• •�....,.
S� ����
�
�ERCHA.�TS
BONDII�IG COMPANY,M
MEfLCHAN`I�5 [30NDlNG COMPANY (MUTl1Al.1 • MPRCFlANTS NATIQ�IAL Fi0�1171NCi, [NC:.
I'.(�. QOX 14495 � DES MO[NGS, fOWA 5D"30G-3498 •($00) G78-8171 �(51.51 293 3854 1�/1X
Please send all notices of claim on th�� bond to:
Merchants Bonding Company (M��tu�tl) / Mef•chants National Bonding, Inc.
P.O. f3oY I �1498
Des Moines, [owa 50306-3498
(515} 243-$171
{800) G78-S I 7 I
Phys�ca! Address: 67p0 Westow�t Parkway, West Des Moii�es, iowa 50266
SUP 0073 iX (2115)
Policy #CPP1 b0051064 COMME�2CfAL GENERA� LIABILITY
CGl. 0$4 (10 13)
TH1S ENDORSEMENT CHANGES THE POLICY. PL�ASE READ IT CAREFULLY.
A��I�I�YVe4L I�1SUR�� �— �V611VER�, L�SS��� �� ��NT�ACiOitS �
�U � �i�'iiATl� STAiU� �Ib�IV G��QUI�ED I� GON��h�l1CTI�N
A{3R�E�If��Y �lliH ��U -- O�I��IN� �P��4TIONS A�1�
�I��DIJCTS�C��II���i�� OP�R�ZIOP�S
This endorserr�ent modifies insurance provided under ihe foilowing:
COMMERCIAL GENERA� L.IABILi7Y COVERAGE �ORM
SCH��U�� (OPiIO�d.�Lj
Name of e4dditional Insurec! Peesons or Organizations
(As required by written conirac# or agreement per Paragraph A. beiow.)
�ocations of Covered O erations
(As per the wriften contract or agreernent, provided fhe location is wi#hin the "coverage territor}�'.)
(Information required to comPiete this Schetlule, if not shown above, will be shown in the Declarations.)
A. Section II — Wha Is a1n fnsured is amended to include as an additional insured:
9. Any persan or organizafion for whom you are performing operations when you and such person or
organization have agreed in writing in a contract or agreement in effect during the kerm of ihis policy that
such person or organization be added as an additionaf insured on your poficy; and
2. Any other person or organization you are required ko add as an addikianal insured under the contract or
agreement described in Paragraph 1. above; and
3. The particular person or organization, ifi any, scheduled above.
5uch person(s) or organization(s) is an additional insured o�ly with respect to liabiliky for "bodily injury",
"property tfamage" or "personal and advertising injury" occurring after the execukion of the contract or
agreement described in Paragraph 9. above and caused, in whoie or in part, by:
1. Your acts oT omissions; or
2. The acts or omissions of those acfing on your behalf in the performance of your ongoing operations for
the additionaf insured; or
3. Your work" performed for the additional insured and included in the "products-completed operations
hazard" if such coverage is specificalEy required in the written contract or a�reement.
CGL 084 (10 93) Includes copyrighted materia! of the Insurance 5ervices Offices, Inc. with its permission. Page 1 of 3
Copyright 2013 FCCI Insurance Group.
COMMERCIAL GENEF2AL LIABILITY
CGL 084 (90 13)
However, the insurance afforded to such additiana! insured(s) descrEbed above:
�. Only applies to the extent permitted by faw;
2. Wil! not be broader than that which you are required by the contract or agreement to provide for such
additional insured;
3. Will not be broader than t�at which is affarded to you under this policy; and
4. NotF�ing herein shafl extend fhe term of this policy.
B. The insurance pro�ided to the additional insured does not appEy to "bodily injury", "property damage" or
"personal and advertising ir�jury" arisir�g out of the rendering of, or the failure to render, any professional
architectural, engineeri�g or surveying serrrices, including:
9. The preparing, approving, or failing to prepare or appro�e, rr�aps, shop drawings, opinions, reports,
su+veys, field orders, change orders or drawings and specifications; or
2. Supervisory, inspeckion, architectural or engineering acti�ities.
C. This insurance is excess over any other valid and collectible insurance available to the additivnaf insured
wF�ether on a primary, excess, contingent or any other basis; unless the written contract or agreement
requires that this insurance be primary and non-contributory, in which case this insurance wiil be primary and
non-contributory relative #o insura�ce on which the additional insured is a Narned Insured.
D. With respect to the insurance afforded to these additional insureds, the fallowing is added to Section II! —
Rimits of Insurance:
The most we will pay on behalf af the additionaf insured is the amount of insurance:
1. Required by the contract or agreement described in Paragraph A.9.; or
2. Available �nder the applicable Limits of Insurance shown in #he Declarations;
whiche�er is less.
This endarsement shall not increase the applicable Limits of Insurance shown in the Declarations.
E. Section IV — Commerciai Ceneral L.iability Canditions is amer�ded as follows:
The Duties In The Event of Occurrence, OfFense, Claim or Suik condition is amended to add the foffowing
additionaf conditior�s applicable to the additional insured:
An additiona! insured under this endorserrzent must as soon as prac#icable:
1. Give us writfen notice of an "occurrence" or an ofFense which may result in a claim or "suii" under this
insurance, and of any clafm or "suit" that does result;
2. Send us copies of all legal papers received in connection with tF�e claim or "suit", cooperafe with us in the
investigation or settlement of the claim or defense against the "suiY', and otherwise comply with alf policy
conditions; and
3. Tender the defense and indemnity of any clairri or "suit" to any pro�ider of other insurance which would
cover the addi#ional insured for a loss we cover under this endorsement and agree #o make availabie all
such other insurance. However, this condition does not affect Paragraph C. above.
CGL a84 (10 13) lncludes copyrighted materiai of th� ir�surance Services Officas, Inc. with its permission. Page 2 of 3
Copyright 2013 FCCI Insurance Group.
COMMERCIAL GENERAL LIA8ILITY
CGL 08�4 (TO 13)
We have no duty to defend or indemnify an addi#ional insured under this endorsement until we receive from
fhe additional insured written notice of a claim or "suit".
F. This endorsement cfoes not apply to any additional insured or projecf that is specifically identified in any other
additiona! insured endorsement attached to the Commercial General Liability Coverage Form.
CGL 084 (10 93) lncludes copyrighted material of the Insurance Services Offices, Inc. w�th its permission. Page 3 of 3
Copyright 2013 FCCI Insurance Group.
Policy #C��100051064
rl��� �H�ICE CO�Iih��,CT��S �IA�I�I� �YVDORS��fI�IVi
iABLI� O�' CO�li�MiS
DESCI21�iiON
P�4G�
AdditionalInsured Coverage ...................................................................................................................................... 9
BailBonds ................................................................................................................................................................... 9
BlanketWaiver of Subrogation ................................................................................................................................. 14
BodilyInjury and Property Damage ........................................................................................................................... 1
Care, Custody or Control ............................................................................................................................................ 3
ContractorsErrors and Omissions ....-�-�--�--�--� ............................................................................................................ 6
Contractual Liability (Personaf & Advertising In1urY) --�--� ....................................:....................................................... 2
�lectronic Data Liability ...............................�--............................................................................................................ 1
GeneralLiability Conditions ...................................................................................................................................... 13
IncidentalMalpractice......--�--�--�-� ................................................................................................................................ 9
fnsurecl........................................................................................................................................................................ 9
Limited Product Wifhdrawal Expense ........................................................................................................................ 3
Lirni#s of Insurance ...........-�--�--�--� ............................................................................................................................. 11
Lossof Earnings ......................................................................................................................................................... 9
LastKey Caverage ..................................................................................................................................................... 8
Newly Formed or Acquired Drganizations .......--�-�-�--�-� ..................................�--�--�..............................--�--................ 11
Non-Owned Watercraft ...............................�--�-�.......................................................................................................... 1
Property Damage Liability — Borrowed �quipment .................................................................................................... 9
TenanYs Property and Premises Rented To You ...................................................................................................... 8
VoluntaryProperty Damage ...................�--�--................................................................................---�.......................... 2
Policy #CPP100051064 COMMERCIAL GENERAL LIABILITY
CGL 0$8 (01 15)
THIS EN�ORSEMENT CNANGES THE POLICY. PLEAS� READ IT CAREFULLY.
FI�ST CN�OI�� ��YViRao►CiORS �Ie4�I�lYY �fVl���t�E�IENY
This endorserrfent modifies insurance pro�ided under ihe folfowing:
C�MMERCIAL GENERAL LIABILITY COVERAGE FORM
NOTE: The following are additions, replacements and amendments to the Comrnercial General Liability Coverage
Form, and will apply unless excluded by separate endorsement(s} to the Commercial General Liabilify Coverage Form.
Yhe COM�'49�12ClA�. G��l�RA� LIA�ILI�Y C04�RAG� FORI4'� is amended as follows:
S�CilOid I� COV�RAC�S, CO�J�RAC� A. �ODILY IRlJURY APdD �ZOP�R�1( L�Ai1PfAG� is amended as follows:
1. �xtended "Property �amage"
Exclusion 2.a., Expected or Intended Injury, Es replaced with the following:
a. "Bodily injury" or "property damage" expected or intended from the standpoinf of the insured. This
exclusion does not apply ta "bodily injury" or "property damage" resulting from the use of reasonable
force fo protect persons or property.
�. �don�owned Vllatercraft
Exclusion 2.g. (2j (a) is replaced with the following:
(a) Less than 51 feet long; and
3. F�roperty Damage �,iability — �arrowed Equipment
The following is added to Exclusion 2.j. (4}:
Paragraph (4) of this exclusion does not apply to "property damage" io borrowed equipment while at a
jobsite and not being used io perForm aperations. The most we will pay for "property damage" to any one
borrowed equipment item under tF�is coverage is $25,000 per "occurrence". The insurance afforded under
this provision is excess over any other �alid and collectible property insurance (including deductibie)
avaifable to the insured, whefher primary, excess, contingent or on any other basis.
�4. Limited �lectronic �ata �iahiiity
Exclusion 2.p. is replaced with the following:
p. Electronic Data
Damages arising out of the loss of, loss of use of, damage to, corruption of, inability io access, or
inability to manipulate "electronic data" thaf does not result from physical injury to tangible property.
The most we will pay under Coverage A for "property damage" because of aff loss of "electronic data"
arising out of any one "occurrence" is $1D,000.
We have no duty to investigate or defend claims or "suits" covered by fhis Limited Electronic Data Liability
coverage.
The following definitian is added to S�CTION V— DEFINIiIONS of the Coverage Form:
"Electronic data" means information, facis or programs stored as or on, created or used on, or transmitted
to or from computer software (including systems and applications software), hard or floppy disks, CD-
ROMS, tapes, drives, cells, daia processing devices or any other media which are used with electronically
controlled equipment.
CGL 488 (01 9 5) Includes copyrighted material of the Insurance Services Office, Inc., with its permission. Page 1 of 14
Copyright 2015 FCCI lnsurance Group
COMMERCIAI. GEIVERA� LIABILITY
CGL 088 (01 '15)
�or purposes of this �imited �fectronic Data Riability coverage, the definition of "Property Damage" in
SEC i 10�! V—��'�I�ITlONS of the Coverage Form is replaced by the following:
97. "Property da�nage" means:
a. Physical injury to tangible property, incfuding all resulting loss of use of thaf property. All such loss
of use shafl be cleemed to occur at the time of the physical injury that caused it;
b. �oss of use of tangible property that is r�ot physically injured. All such loss of use shall be deemed
to occur at the #ime of the "occurrence° that caused it;
c. Loss of, foss of use of, damage to, corruption of, inability to access, or inability to properly
manipulate "electronic data", resulting from physicaf injury to iangible properiy. Afl such loss of
"electronic data" shall be deemed io occur at the #ime of the `bccurrence" that caused it.
F'or purposes of tF�is insurance, "elec#ronic data" is not iangible property.
S�CYION I— COV�i7AC�S, COV�l2�G� B. ��RSOPdA� A�d� �►�V�itTISINC I�dJU�Y �I��I�IiY is arr�ended
as follows:
Paragraph 2.e. Exclusions — the Contractual Liability �xclusion is deleted.
S�CYION I— COVERAC�S, the followit�g coverages are added:
COV�IZA('sE D. VO�UId��RY PIiO��R i Y�AAPIAG�
1. Insuring Agreement
We will pay, at your requesk, for "property damage" caused by an "occurrence", #o property of otF�ers
caused by you, or while in your possession, arising out of your business operations. The amount we will
pay for damages is described in SECTION III LIMITS OF INSURANCE.
�. �xclusions
TF�is insurance does not apply to:
"f'roperty Damage" fo:
a. Property at premises owned, rented, leased or occupi�d by you;
b. Property while in transit;
c. Property owned by, renied to, leased to, loaned to, borrowed by, or used by you;
d. Premises you sell, give away, or abandon, if the "prop�rty damage" arises out of any part of those
prerriises;
e. Property caused by or arising out of ihe "products-completed operations hazardn;
f. Motor vehicles;
g. "Your product" arising out of it or any part of it, or
h. "Your work" arising out of it or any part of it.
3. Deductible
We will not pay for foss in any one "occurrence" until the amouni of loss exceeds $250. We will then pay
the amount of loss in excess of $250 up to the appiicabfe limit of insurance.
4. Cost �actor
In khe event of a covered loss, you shall, if requested by us, replace the damaged property or furnish the
labnr and materials necessary for repairs thereto at your actual cost, excfuding profit or overhead
charges.
CGL 088 (D1 15) Includes copyrighted ma#erial of the Insurance Services OfFice, Inc., wifh its permission. Page 2 of 14
Copyright 2015 FCCi Insurance Group
COMMEF2CIAL GEEVERAL LIABILlTY
CGL 088 (Q1 15)
The insurance afForded under COVERAGE D is excess over any other valid and collectible property or iniand
marine insurance {including the deductible applicable to the property or infand marine coverage) availabie to
you whether primary, excess, contingent or any other basis.
Co�erage D covers unintentiona! damage or clestruction, but does not cover disappearance, theft, or loss of
use.
The insurance under COVERAGE D does not apply if a loss is paid under COV�RAGE E.
COV��AG� E. CAR�, CUS�O�Y Olt COM i RO[.
1. Insuring Agreement
We wifl pay those sums that the insured becorrtes legally obligated to pay as damages because of
"property ciamage" caused by an "occurrence", to property of others while in your care, custody, or control
or property of others as to whicl� you are exercising physical conkrol if the "property damage" arises out of
yaur business operations. The arnount we wiil pay for damages is described in SECTION !II LIMITS OF
INSEJRANCE.
2. �xclusions
7his insurance does not apply to:
"Property Damage" to:
a. Proper#y at premises owned, ren#ed, leased or occupied by you;
b. Property while in transit;
c. Premises you sell, give away, or abandon, if ihe "property damage" arises out of any part of those
premises;
d. Property caused by or arising out of the "producfs-completed operations hazard",
e. Motor vehicles;
f. "Your producY' arising out of it or any part of it; or
g. "Your work" arising out of it or any part of it.
3. Deductihle
We will not pay for loss in any ane "occurrence" until the amount of loss exceeds $2�0. We wiii then pay
the amoUnt of loss in excess of $250 up to the applicable limit of insurance.
�. Cost Factor
In the event of a covered loss, you shall, if requesied by us, replace the damaged property or furnish the
labor and maferials necessary for repairs there#o at your actual cost, excluding profif or overhead
charges.
The insurance afforded under COVERAGE E is excess over any o#her valid and coAectible property or inland
marine insurance {including th� deducfible applicable to the property or inland marine coverage) available ta
you whether primary, excess, contingent or any other basis.
The insurance under COV�RAGE E does not apply if a loss is paid under COVERAGE D.
COV�ItA[9� F. LIN11Y�� F�LQO�UCi IIIfIiHDRAHIIA� �XP�fdSE
1. fnsuring Agreement
a. If you are a"seller", we will reimburse you for "procluct withclrawaf expenses" associated with "your
product" incurr�d because of a"product withdrawal" to which this insurance applies.
7he amount of such reimbursement is limited as described in S�CTION III - LIMITS OF
1NSURANCE. No other obligation or liability to pay sums or perForm acts or services is covered.
CGL 088 (01 15} Includes copyrighted material of fhe Insurance Services Office, Inc., with its permission. Page 3 of 14
Copyright 2015 FCCI Ins�rance Group
COMM�RCfAL G�NERAL LIABILITY
CGL 088 (01 95)
a. This insurance applies to a"procluct withdrawal" only if the "product withdrawal" is initiated in fhe
"coverage territory" during the policy period because:
(� ) You determine that the "product withdrawal" is necessary; or
(2) An authorized government entity has ordered you to conduci a"product withdrawal".
c. We will reimburse only those "product withdrawal expenses" which are incurred and reported to us
with�n one y�ar of the date the "product witF�drawal" was initiated.
d. The initiafion of a"product withdrawal" will be deemed to have been made only at the earliest of the
following timas:
(1) When you have announced, in any manner, to the general public, your vendors or to your
employees (other than those employees directly involved in making the determination) your
decision to conduct a"product withdrawal" This applies regardless of whe#her the determination
to conduct a"product withdrawal" is made by you or is requested by a third party;
(2) When you received, eifher orafly or in writing, notification of an order from an authorized
government entity to conduct a"producf withdrawal; or
(3) When a third party has initiated a"product withdrawal" and you communicate agreement with the
"product wiihdrawal", or you announce #o the general public, your vendors or to ynur employees
(other than those empfoyees clirectly involved in making the determination) your decision to
pariicipate in tF�e "product wifhdrawal", whichever comes first.
e. "Product withdrawal expenses" incurred to withdraw "your products" which con#ain:
(9 ) The same "defect" will be deemed to have arisen out of the same "product wiihdrawal' ; or
(2) A difFerent "defecY' will be deemed to have arisen out of a separate "product withdrawal" if newfy
determined ar orclered in accordance with paragraph 1.b of this coverage.
2. Excfusions
This insurance does not apply to "product withdrawaf" expenses" arising out of:
a. Any "product withdrawal" initiatec! due to:
(1) 7he failure of "your praducts" to accomplish their intended purpose, including any breach of
warranty of fitness, w�ether written or implied. This exclusion cloes not apply if such failure has
caused or is reasonably expected to cause "bodily injury" or physical damage to tangible
properfy.
(2) Copyright, patent, trade secra# or trademark infringements;
(3) Transformation of a cF�emical nature, deterioration or decomposition of "your product", except if it
is caused by:
(a) An errar in manufacfuring, design, processing or transportation of "your product'; or
(b) "Product tampering".
(4) �xpiration of the designated shelf life of "your product".
b. A"product withdrawal", iniiiatec! because of a"defect" in "your product" known to exist by the Named
Insured or the Named Insured's "executive officers", prior to the inception date of this Coverage Par�
or prior to the time "your proclucY' leaves your contral or possession.
c. Recall of any specific products for which "bodily injury" or "property damage" is excluded under
Coverage A- Bodily Injury And I'roperty Damage Liability by endorsement.
d. Recall of "your products" which have been banned from fhe market by an authorized government
entity prior to the policy p�riod.
e. The defense of a claim or "suit" against you for "product withdrawa! expenses".
CG� 088 (01 15) fncludes copyrighted material of the Insurance Services Office, Inc., with its permission. Page 4 of 14
Copyright 2015 FCCI insurance Croup
COMMERCfAL GENER/1L LIABIL.ITY
CGL 088 (01 9 5)
3. For the purposes of the insurance afforded under COVERAGE F, the following is added to 2. Duties In
The Event Of Occurrence, Offense, Claim Or 5uit Condition under SECTION IV — COMMERCIA�.
GENERAL LiABI�lTY CONDiTlONS:
e. Duties fn The Event Of A"Defecf" Or A"Product Withdrawal"
(1) You �nust see #o it fhat we are notified as saon as practicabfe of any actual, suspected or
#hreatened "defect" in "your produets", or any governmental in�estigation, that may result in a
"product withdrawal". Ta the extent possible, notice shaufd include:
(a) How, when and where the "defecY' was discovered;
(b) The names and addresses of any injur�d persons and witnesses; and
(c) The nature, location and circumstances of any injury or damage arising out of use or
consumption of "your product".
(2} Ifi a"product withdrawal" is initia#ed, you rttust:
(a} Immediately record the specifics of the "product withdrawal" and the date it was inikiated;
(b) Send us wriiten notice of the "product wiihdrawal" as soon as practicabie; and
(c) Not release, consign, ship or distribute by any other methad, any product, or like or similar
products, with an acfual, suspected or threatened defect.
(3) You anr� any other invol�ed insured m�st:
(a) Immeclia#ely send us copies of pertinant correspondence received in connection wiih the
"product withdrawa!";
(b) Authorize us to obtain records and other information; and
(c) Cooperate with us in aur investigation of the "product withdrawal".
4. For the purposes of this Coverage F, the following definitions are added t� fhe �efinitions Section:
a. "DefecY' means a defect, deficiency or inadeq�acy that creates a dangerous condition.
b. "Producf tampering" is an act of infentional alteration of "your prodt�ct" which may cause or has
caused "bodily injury" or physicai injury to tangible properiy.
When "praduct #ampering" is known, suspected or threatened, a"product withdrawal" wiil noi be
limited to those bafches of "your product" which are fcnown or suspected to have been tampered with.
c. "Product withdrawal" means the recall or withdrawal of "your praducts", or products which confain
"your products", from the mari�et or from use, by any other person or organization, beca�ase of a
known or suspected "defecY' in "your product", or a knawn ar suspected "product tampering", which
has caused or is reasanably expected to cause "bodily injury" or physical injury io tangibfe proper#y.
d. "Product withdrawal expenses" means those reasonable and necessary extra expenses, listed below
paid and directly related to a"product withdrawal":
(1) Costs ofi not+fication;
(2} Costs of stationery, envelapes, production of annauncements and posfage or facsimiles;
{3) Costs of overtime paid to your regular non-saiaried employees and costs incurred by your
employees, including costs of transportation and accommodations;
(4) Costs of computer #ime;
(5} Costs of hiring indepenclent contractors and other temporary employees;
(6) Costs of transpor#ation, shipping or packaging;
(7) Costs of wareF�ouse or starage spac�; or
CGL O88 {01 15) InclUdes copyrighted material of the Insurance Services Office, Inc., with its permission. Aage 5 of 14
Copyright 2015 FCC( Insurance Group
COMMERCIAL GENERAL LfABILITY
CGL 08$ {01 15)
(8} Costs of proper disposal of "your products", or products that contain "your products", that canno#
be reused, noi exc�eding your purchase price or your cost fo produce the products; but "product
withdrawal expenses" does not include costs of the replacement, repair or redesign of "your
product", or the costs of regaini�g your market share, goodwill, tevenue or profit.
e. "Seffer" means a person or organizatian that manufactures, se!!s or distributes goods or products.
"Seller" does no# include a"coniractor" as defined elsewhere in this endorsement.
The insurance under COV�FZAGE F does not apply if a ioss is paic! under COVERAGE G.
C�VERA�� G. CONT�,CiORS �FtRORS o4�� OCHIISSIONS
1. Insuring ,�greement
If you are a"contractor", we will pay tF�ose sums that you become legally obligated to pay as damages
because of "property damage" to "your produc#", "your woTk" or "impaired property", due fo faulty
workmanship, material or design, or producis including consequential loss, to which this insurance
applies. The damages must have resulted from yaur negligent act, error ar omission while acting in your
business capacity as a coniractor or subcontractor ar from a defect in material or a product sold or
installed by you while actirtg in ihis capacity. The amount we will pay for damages is described in
SECTION Ili �IMITS OF INSURANCE.
We have no duty to inves#igate or defend claims or "suits" covered by this Contractors Errors or
Omissions coverage.
This coverage applies only if the "property damage" occurs in the "coverage territory�' during the policy
period.
This coverage does not apply to additional insureds, if any.
Supplementary Payments — Coverage A and B do not apply to Caverage G. Con#ractors Errors and
Omissions.
2. �xclusions
TF�is insurance does not apply to:
a. `Bodily injury" or "personal and advertising injury".
b. Liability or penalties arising from a delay or failure to compfete a contraci or project, or to complete a
contract ar project on time.
c. Liability b�cause of an error or omission:
(1) fn tF�e preparation of estimates or job costs;
(2) Where cost estimates are exceeded;
(3) In the preparation of estimates of profit or return on capital;
(4) In advising or failure to ad�ise on financing of the work or project; or
{5) In ad�ising or failing to advise on any legal wark, title checks, form of insurance or suretyship.
d. Any liabiliry which arfses out of any acfual or alleged infringement of copyright or trademark or irade dress
or patent, unfair competition or piracy, or theft or wrongful taking of concepts ar intellectual property.
e. Any iiability for damages:
(1) From the intentional dishonest, fraudulent, malicious or criminal acts of the Named Insured, or by
any partner, member of a limited liability company, or executi�e officer, or at the direction of any
of #hem; or
{2) Which is in fac# expecfed or infended by the insured, even if the injury or damage is of a different
degree or type fhan actually expected or intended.
CGL 088 (01 15) Includes copyrighted material of the Insurance Services OfFice, Inc., with its permission. Page 6 of 14
Copyright 2015 FCCI Insurance Group
COMMERCIAL GENERAL 1.IABILITY
CGL Q$$ (d1 15)
f. Any iiability arising out of manufacturer's warranties or guara�tees whether express or implied.
g. Any liability arising from "property damage" to proper�ty owned by, rented or leased to the insured.
h. Any liability incurred or "property damage" which occurs, in whole or in part, before you ha�e
comple#ed "your work." "Your woric" will be deemed completed at the earliesi of the foilowing times:
(1) When all of the work called far in your contract or work order has been completed;
{2) When al! the work to be done at the job site has been cornpleted if your contract calls for work at
more than one job site; or
(3) When that part of the work done at a job site has been put to its intended use by any person or
organizatian other than another contractor or subcontractor workRng on the same project.
Woric that may need service or maintenance, correction, repair or replacement, but which is ofherwise
complete, will be treated as complete.
i. Any fiability arising from "property damage" to products thai are still in your physical possession.
j. Any liability arising out of fhe renclering of or failure to render any professional services by you or on
your behalf, but onfy with respect to eiiher or both of the following operations:
(1) Providing engineering, architectural or surveying services to others; and
(2) Pr4viding or hiring independent professionafs to provide engineering, architectural or surveying
services in connection with construction work you perForm.
Professionai services include the preparing, appraving or failing to prepare or approve, maps, shop
drawings, opinions, reports, surveys, field orders, change orders, ar drawings and specifica#ions.
Professional services also include supervisary or inspection activities performed as part of any related
architectural or engineering aciivities.
But, professional services do not include services within constructian means, methods, techniques,
sequences and procedures employed by you in connection with construction work you perForm.
k. Your loss of prafit or expec#ed profit and any liability arising therefrom.
I. "Property damag�" to property other than "your product," "your work" or "impaired property."
m. Any liability arising from claims ar "suits" where the right of action against the insured has been
relinquished or waived.
n. Any liabiliiy for "property damage" to "your work" if #he damaged work or the work out of which the
damage arises was pe�Formed an your behalf by a subcontractor.
o. Any liability arising from the substitution of a material or product f4r or�e specified on blueprints, work
orders, contracts or engineering specificatior�s unless there has been written authorization, or unless
the blueprints, work orders, cantracts or engineering specifications were written by you, and you have
authorized the changes.
p. Liafaility of others assumed by the irtsured �nder any confract or agreement, w�ether oral or in writing.
This exclusion does not apply to liabifity for damages tha# the ir�sured would have in the absence of
the contract or agreement.
3. �or the purposes of Cor►erage G, the following definition is added to the �efinitions sectior�:
a. "Contracior" means a person or organization engaged in activities of building, clearing, filing,
excavating or improvement in the size, use or appearance of any structure or land. "Contractor" does
not include a"seller" as defined elsewhere in this endorsement.
4. Deductible
We will no# pay for loss in any one "occurrence" until the amount of loss exceeds $250. The iimits of
insurance wili not be reduced by the applicakion of the deductible amount.
CGL 088 (01 '!5) Includes copyrighted material of the Insurance Services Office, Inc., with its permission. Page 7 of 14
Copyright 2015 FCCI fnsurance Group
COMMERCIAL GENlERAL LiABILITY
CGL 088 (01 15)
We may pay any part or all of the deductible amount to effect se#tlement of any claim or "suiY', and upon
notification of the action taken, you shall promptly reimburse us for such part of the deductible amount as
I�as been paid by us.
5. Cost �actor
In the event of a covered loss, you shall, if requested by us, replace the damaged prope�ty or furnisF� the
labor and materials necessary for repairs thereto at your actual cost, excluding profit or overFiead
charges.
The insurance under COVERAGE G does not apply if a loss is paid under COVERAGE F.
COV�R�G� I-I. �OSY K�Y CO!lEI2AC�
1. Insuring Ageeement
We wi!! pay those sums, subject to the limits of liability described in S�CTION I!I LIMI7S OF INSURANCE
in this endorsement and the deductibie shown below, tha# you become legally obligated to pay as
damages caused by an "occurrence" and due to the loss or mysterious disappearance of keys entrusted
to or in the care, custody or control of you or your "employeesn or anyone acting on your behalf. The
damages covered by this endarsement are limitec! to the:
a. Actual cost of the keys;
b. Cost to adjust locks io accept new keys; or
c. Cost of new locks, if required, incfudir�g the cost of installation.
2. �xclusions
7his insurance does not apply to:
a. Keys owned by any insured, empioyees of any insured, or anyone acting on behaif of any insured;
b. Any resulting loss of use; or
c. Any of the following acts by any insured, employees of any insured, or anyone aciing on behalf of any
insured:
1) Misappropriation;
2) Conceafinent;
3} Conversion;
4) Fraud; or
6) Dishonesty.
3. Deductible
We will not pay for loss in any ane "occurrence" untif the amouni ofi loss exceeds $1,000. The limits of
insurance will not be reduced by the application of the deductible amount.
We may pay any part or all of the deductible amounf to effect settlernent of any claim or "suit" and, upon
notification of the action taken, you shall promptly reimburse us for such part of the deductible amount as
has been paid by us.
�Xl��ND�� COV�Ft�CE FOR ��MP�idi'S �1tO��R�1( AR�� �REMIS�S ���di�ID i0 YOlJ
The first paragraph after subparagraph (6) in Excfusion j., Damage to Property is amended to read as follows:
Paragraphs (1), (3) and (�1) of this exclusion do not apply to "property damage" (other than damage by fire)
to premises, including the cont�nts of such premises, rented to you. A separate limit of insurance applies
to Damage To Premises Rented i'o You as described in Section III — Limits Of Insurance.
CGL 0$8 (01 15) Includes copyrighted material of the Insurance Services Office, (nc., with its permission. Page 8 of 1�4
Copyright 2p15 FCCi Insurar�ce Group
COMMERCIAL GENERAI. LIABILITY
CGL 088 (07 15)
S�C714M I� COV�RAG�S, SUL°�LENf�R�YA�Y �.�Yo1Pl�NTS -- CO!l��AG� A and � is amended as follows:
All references ta SUPPLEMENTARY PAYM�NTS -- COVERAGES A and B are amended to SUPPLEMENTARY
PAYMENTS — COVERAGES A, 8, p, E, G, anc! M.
9. Cost of �ail �onds
Paragraph 1.b. is replaced with the following:
b. Up to $2,500 for cost of bail boncls required because of accidents or traffic law violaiions arising oui of the use
of any vehicle to which the Bodily Injury Liability Coverage appfies. We do not have io furnish these bonds.
2. Loss of �arnings
F'aragraph 9.d. is replaced wiih the foflowing:
d. Alf reasonable expenses incurred by the insured at our request to assis# us in the investigation or defense
of the claim or "suit", including actual loss of earnings up to $500 a day because of fime off from work.
S�CTIOid !I — WHO IS Af� IMSUF��D is amended as follows:
7. fncidental Malpractice
Paragraph 2.a.(1)(d} is replaced with the following:
(d} Arising out of his or her providing or failing ta provide professional health care services. However, this
exclusion does not apply to a nurse, emergency medical technician or paramedic employed by you to
provide medical services, unless:
(i) You are engaged in the occupation or business of providing or offering medical, surgical, dental, x-ray
or n�rsing services, treatment, advice or instruction; or
(ii) The "employee" has another insurance that would also cover cfaims arising under this provision,
whether the other insurance is primary, excess, contingent or on any other basis.
2. �roadened Wha Is �►n Insured
The fiollowing are added to Paragraph 2.:
Subsidiaries
e. Your subsidiari�s if:
{1) They are legally ir�corporated entities; and
(2) You own more ihan 5D% of the voting stock in such subsidiaries as of the effective date of this policy.
If such subsidiaries are not shown in the Deciarations, you must report them to us within 980 days of
the inception of your original policy.
�dditional Insureds
f. Any person ar organization described in paragraphs g. through k. below whom you are required ta add as
an additional insured on this policy under a written contract or agreement in effect during the terrrt ot this
policy, provided th� written contract or agreement was executed prior to ihe "bodily injury", "property
damage" or "personal and advertising injury" for which ihe additional insured seeks caverage.
However, the insurance afforded to such additional insured(s):
(1) Only applies to the extent permitted by law;
(2} Will not be broader than that which you are required by the contract or agreement to provide for such
additional insur�d;
{3) Will not be broader than tha# which is afforded to you under this policy;
(4) Is subject to the condiiions described in paragraphs g. through k. below; and
(5} Nothing herein shall extend the term of #his policy.
CGL 088 (01 15) Includes capyrighted material o{ the lnsurance Services Office, Inc., with its permission. Page 9 of 14
Copyright 20'15 FCCI insurance Group
COMMERCIAL GENERAL LIABII.ITY
CGL 088 (01 15)
g. �wner, Lessor or Manager of Premises
If the additional insured is an owner, lessor or manager of premises, such person or organiza#ion shall f�e
covered only with respect to liabifity arising out of ihe ownership, rt�aintenance or use of that part of any
premEses leased to you and subject to the following additional exclusions:
(1) Any `bccurrence" that takes place after you cease to occupy fhose premEses; or
(2) Structural alteratians, new construction or derr�olition operations perFormed by or on behalf of such
person or organization.
F�. State or Governmental Agency ar Subdivisian or Political Subdivision — Permits or Authoriza#ior►s
If the additional insured is the sta#e or any politicaf subdivision, the staie or political subdivision shall be
co�ered only with respect to operations performed by you or on your behalf for which the state or political
subdivision has issued a permit ar au#horization. This insurance does not app�y to:
{1) "Bodily injury", "property damage", or "personal and advertising injury" arising out of operations
perFormed for the federal government, state ar municipality; or
(2) 'Bodily injury" or "property damage" included within the "products-completed operations hazard".
i. Lessor of Leased Equipment
If the additional insured is a lessor of leased equipment, such lessor shall be covered only with respect to
liability for "bodily injury", "properfy damage" or "persona! and advertising injury" caused, in whofe or in
part, by your maintenance, operation or use of equipment leased to you by such person(s) or
organization(s). With respect to the insurance afforded to these adclitional insureds, this insurance does
nat apply to any "occurrence" which takes place after the equipment fease expires.
j. Mor�gagee, Assignee, or Receiver
If the additiona! Insured is a mortgagee, assignee, or receiver of premises, such rnortgagee, assignee or
receiver of premises is an additional insured only with respect to their liability as mortgagee, assignee, or
receiver and arising out of the ownership, maintenance, or use of the premises by you. This insurance
does not apply to struciural afterations, new construction and demolition operations performed by or for
thati person or organization.
k. Vendor
If the additional insured is a vendor, such vendor is an additional insured only with respect to "bodily
injury" or "property damage" caused by "your products" which are distributed ar soid in the regular course
ot the vendor's business, subject to the following additional exciusior�s:
(1) 7he insurance afforded io the vendor does noi apply to:
(a) "Bodily injury" or "property damage" for which the �endor is obligated ta pay damages by reasor�
of the assumption of liability in a contract or agreement. This exclusion does not apply to liabili#y
for damages that ti�e vendor would have in absence of the contract or agreement. _
(b) Any express warranty unauthorized by you;
(c) Any physical or chemfcal change in "your produci" made intentionally by the vendor;
(d) Repackaging, unless unpacked solely for the purpose of inspection, demonstration, testing, or the
substitution of parts under instructions from the manufacturer, and then r�packaged in the original
container;
{e) Any failure to make such inspections, adjustments, tests or servicing as the vendor has agreed
to make or normally unclertakes to make in the usual course of business, in connection with the
distribution or sale of the products;
(f) Demonstration, installation, servicing or repair operations, except such operations performed at
the vendor's premises in connection with the sale of the producf;
CGL 088 (09 15} Includes copyrighted material of the lnsurance Services Office, lnc., with its permission. Page TO of 14
Copyrighf 20'15 FCCI fnsurance Group
COMMERCfAL GEN�RAL LIABILITY
CGL Q88 (01 15)
{g) Products which, after distribufion or sale by you, have been labeled or reiabeled or used as a
container, part or ingredient of any other thing or substance by or for the vendor; or
(h) "Badily injury" or "property damage" arising out of ihe sole negligence of the vendor for its own
acts or omissions or those of its own acts or omissions or those of its employees or anyone else
acting on its behalf. However, this exclusion does not apply to:
The exceptions contained in Subparagraphs d. or f.; or
Such inspections, adjustments, tests ar servicing as the vendor has agreed to make or
normally undertakes to make in the usual course of business, in connection with the
clistribution or sale of the products.
(2) This insurance does not apply fa any insured person or organization, from whom you have acquired such
products, or any ingr�dier�t, part or container, entering into, accompanying or containing such products.
3. Newly �ormed or Acquired Organizatians
Paragraph 3. is amended as foflows:
a. Coverage under this provision is afforded until ihe end of the policy period.
d. Coverage A does not appfy to producf recafl expense arising out of any withdrawal or recali #hat occurrad
b�fore you acquired or formed the organization.
S�CiION III —�Il1AI�S Or IidSURANC� is amencled as follows:
9. �aragraph �. is replaced with the t'ollawir�g:
2. The General Aggregate L.imii is the most we wilf pay for th� sum of:
a. Medical expenses ur�der Coverage C;
b. Damages under Coverage A, except damages because of "bodily injury" or "property damage"
included in the "producis-completed operations hazard";
c. Damages under Coverage B;
d. Volun#ary "property damage" payments under Coverage D;
e. Care, Custody or Control damages under Coverage E.; and
Lost Key Coverage under Coverage H.
2. �aragraph 5. is replaced wiih the follawing:
5. Subject to Paragraph 2. or 3. above, whichever applies, fhe Each Occurrence l.imit is the most we will
pay for the sum of:
a. �amages under Coverage A;
b. Medical exp�nses under Coverage C;
c. Voluntary "property damage" payments under Coverage D;
d. Care, Custody or Control damages under Coverage E;
e. �imited Product Withdrawal Expense under Coverage F;
f. Contractors Errors and Omissions under Coverage G.; and,
g. Lost Key Coverage Wnder Coverage H.
because of all "bodily injury" and "property damage" arising out of any one "occurrence".
3. Paragraph 6. is replaced with the fallowing:
6. 5ubject to Paragraph 5. above the Damage To Premises Rented �'o You Limit is the most we will pay
under Coverage A for damages because of "property damage" io any one premises, while rented to you,
CGL 088 (01 15) Includes copyrighted material of the fnsurance Services QfFice, Inc., with its permission. F'age 11 of 14
Copyright 2015 FCCI lnsurance Group
COMM�RCiAL GENERAL LIABlL17Y
CGL 088 (01 15)
or in the case of damage by fire or explosion, while rented to you or temporarily occupied by you with
permission of the owner.
The Damage ta Premises Rented to You Limit is the higher of the Each Occurrence Limii shown in the
Declarations or the amoun# shown in the Declarations as �amage To Premises Renfed To You Limit.
�. �aragraph '7. is replaced with tf�e folfowing:
7. Subject to Paragraph 5. above, ihe higher of $10,000 or ihe Medical Expense Limit shown in the
Declarations is the mosi we wil! pay under Coverage C for all medical expenses because of "bodily injur�'
sustained by any one person.
�. �aragraph �, is added as follows:
8. Subject to Paragraph 5. above, the most we will pay under Coverage D. Voluntary Property Damage for
loss arising out of any one "occurrence" is $1,600. The most we will pay in any o�e-policy period,
regardless of the number of claims made or suits brought, is $3,000.
6. Paragraph 9. is added as follows:
9. Subject to Paragraph 5. above, the rrtost we wiil pay under Coverage E. Care, Custody or Conirol for
"properiy damage" arising out of any one "occurrence" is $'I,000. The most we wiI! pay in any one-policy
period, regardless of the number of claims made or suits bro�ght, is $5,OQ0.
7. �aragraph 10. is added as follows:
10. 5ubject ta Paragraph 5. above, the most we will pay under Coverage F. Limited Prodt�ct Withdrawal
Expense for "produc# withdrawal expenses" in any one-policy period, regardless of the number ofi
insurecls, "product withdrawals" initiated or number of "your products" withdrawn is $9 a,000.
8. �aragraph 11. is added as follows:
11. Subject to Paragraph 5. above, the mos# we will pay under Coverage G. Contractors Errors and
Omissions for damage in any one-poiicy period, regardless of the number of insureds, claims ar "suits"
brought, or persons or orga�izations making clairn or bringing "suits" is $10,000.
For errors in contract or job specifications or in recommendations of products or materials to be used, this
pol�cy will not pay for additional costs of products and maierials to be used ihat waufd not ha�e been
incurred had the correct recommendations or specifications been made.
9. L�aragraph 1�. is added as follows:
12. Subject to Paragraph 5. above, the most we will pay under Coverage H., Lost Key Coverage for damages
arising ou# of any one occurrence is $50,000.
70. �aragraph 13. is added as follows:
13. The General Aggregate Limit applies separately to:
a. Each of your projects away from premises owned by or rented to you; or
b. Each "location" owned by or ren#ed to you.
"�ocation" as used in this paragraph means premises involving the same or connecting lots, or premises
whose connection is interrupted only by a street, roadway, waterway or right-ofi-way of a railroad.
11. L�aragraph 44. is added as follows:
14. With respect to the insurance afforded to any additional insured provided coverage under this
endorsement:
If coverage provided to the additional insured is required by a contract or agreement, the most we will pay
on behalf of the additional insured is the amount of insurance:
a. Required by the contract or agreement; or
CGL Q88 (01 15) fncludes copyrighted material of fhe Insurance Services Offiice, Inc., with its permission. Page 12 of 44
Copyright 2015 FCCI Insurance Group
COMMERCIAL GENERAL LIABILlTY
CGL. 088 (01 15)
b. Available under #he applicable Limits of Insurance shown in the Declarations;
whichever is less.
This endorsement shall not increase the applicabfe Limits of lnsurance shown in the DeclaratiQns.
S�CiIORJ IV — CONIC��RCIAL CEINERAL LIAI�I�liY CO�f�IiIQNS is amended as follows:
4. Subparagraph 2.a. of Duiies Fn �he �vent Of Occurrence, Offense, Claim, or 5uit is replaced with fhe
fOIIOWll1�:
a. You must see to it that we are notified as soon as practicable of an "occurrence" or an offense which may
result in a claim. This requirement applies only when fhe "occurrence" or offense is known to the
foilowing:
(1) An individual who is tl�e sole owner;
(2) A partner, if you are a partnership or joint venture;
(3) An "executive officer" or insurance manager, if you are a corporation;
(4) A manager, if you are a limited liability company;
(5) A person or organization having proper temporary custody of your property if you die;
(6) The legal representafive of yau if you die; or
(7) A person (other than an "employee") or an arganization while acting as your real estate manager.
To the �xtent possible, notice should include:
(1) How, when and where the "occurrence" or offense took place;
(2) The names and addresses of any injured p�rsons and witnesses; and
(3) The nature and iocation of any injury or damage arising out of the "occurrence" or offense.
�. The folfowing is added to Subparagraph 2.b. of �uties !n ihe �vent Of Occurrence, Offense, Cfaim, or
5uit:
The requirement in 2.b.applies only when the "occurrence" or offense is known to the following:
(1) An individual who is the sole owner;
(2} A partner or insurance manager, if you are a par#nership orjoint veniure;
(3) An "executive ofFicer" or insurance manager, if you are a corporation;
(4) A manager or insurance rr�anager, if you are a limited liability company;
(5} Your officials, trustees, baard members or insurance manager, it you ar� a not-for-profit organization;
(6) A person or organization having proper temporary cus#ody of your property if you die;
(7) 7he legal representati�e of you if you die; or
(8) A person {other than an "employee") or an organization while acting as your real estate manager.
3. The fallowing is added to paragraph �. of Duties in the �vent of Occurrence, Offense, Claim ar Suit:
e. �f you report an "occurrence" to your workers compensatior� carrier that develops into a liability claim for
which coverage is pro�ided by fhe Coverage Form, failure to report such an "occurrertce" to us at the time
of the "occurrence" shall not be deemed a viola#ion of paragraphs a., b., and c. above. Nowever, you
shall give written notice of this "occurrence" to us as soon as you become aware that this "occurrence"
may be a liability claim rather than a workers campensation claim.
4. �aragraph 6. is replaced wi#h the following:
6. Representations
CG� Q88 (01 15) Includes copyrigh#ed ma#erial of the Insurance 5ervices Office, Inc., with its perrr�ission. Page 13 of 14
Copyright 20'!5 FCCI Insurance Group
COMMERCIAL GENERAL LIABILITY
CGL Q88 (01 15)
By accepting this policy, you agree:
a. 7he statements in the Declarations are accura#e and camplete;
b. Those statements are based upon representations you made to us; and
c. We have issued this policy in reliance upon your representations.
Any error or omission in the description of, or failure to completely describe or disclose any premises,
operations or products intended to be covered by the Coverage Form wif! not invalidate or affect coverage
for thase premises, operations ar products, provided such error or omission or failure to completely
describe or disclose premises, operatians or products was not intentional.
You must report such error or omission to us as soon as practicable after its discovery. However, this
provision does not affect our right to colleci addi#iona! premium charges or exercise our right of
cancellation or nonrenewal.
5, ihe fallowing is add�d to paragraph �. iransfer Of Rights Of Recovery Against Others �o Els;
Flowever, we waiv� any right of recovery we may have because of payments we make far injury or
damage arising out of your ongoing operations or "your work" included in the "products-completed
operations hazard" under the following condi#ions:
a) Only when you have agreed in writing to waive such rights of recovery in a contract or agreement;
b) Only as to the personJeniity as to whom you are required by the contract to waive rights of recovery;
and
c) Or�ly if the contract or agreement is in eff�ct during the term of this policy, and was executed by you
prior to ihe lass.
6. �aragraph 10. is added as follows:
10. Liberalization
If we revise this Coverage Form to provide more coverage withou# additional premium charge, your
policy will autorr�atically provide the additionaf co�erage as of the clay the revision is effective in the
applicable state(s).
CGL 488 (01 95) lncludes copyrighted material of the Insurance Services Office, Inc., with its permission. Page 14 of 14
Copyright 2015 FCCI Insurance Group
Policy #CAA10005IU65
COMMERClAL AEJTO
CA1105$ (05 19)
THIS ENDORSEM�NT CHANGES THE POLECY. PLEASE READ li CAREFULLY.
�11JT0 �IRSY �HOICE COV�I�A�� ENDOR���l�Ni
This endQrsement modifies insurance pra�ided under the following:
BUSlNESS AUTO COVERAGE FQRM
NOTE: The follovving are additions, repl�cemen#s and amendments to the Business Auto Coverage Form, and
wilE apply unless excluded by separafe endorsement(s) ta the Business Auta Co�erage Form.
With respect to coverages provided by this endorsement, the provisions of the Business Auto Co�erage Form
apply unless modified by ihis endorsement.
The Business Auto Coverage Form is amended as follows:
S��TION II � CUVI�4��� A�1TOS �!�►�fLI�Y COVI�Ii,�GE is amended as fallows:
�++. Paragraph 1. lNho Is An Insured ir� section o4. Goverage is amended by the addition af the folfowing:
d. Any legally incorporated subsidiary af yours in which you own more than 50% of the voting stock on the
effective date of this coverage form. Hawever, "insured" does not include any subsidiary that is an
"insured" under any other fiability policy ar would be an "insured" uoder such a policy but far ifs
termination or the exhaustion at its limi#s of insurance. In order for such subsidiaries to be considered
insured under this polfcy, you must natify us of sueh subsidiaries within 60 days of policy effective date.
e. Any arganization you newly acquire or form during fhe policy period, o#her than a partnership or joint
venture, and aver which yau mairttain soie ownership or a majori#y interest. Hawever, coverage under
this provision:
(7) naes not apply if the organization you acquire or form is an "insured" under anoth�r liability poliey
ar would be an "insured" under such a policy but for its terminatiort or the exhaus#ion of its fimits of
insurance;
(�j boss not appfy to "bodiEy irtjury" or "property damage" thai occurred befare you acquired or forrrted
fhe organizatian; and
(3� is afforded only for the ficst 90 days after you acquire or form the organization or unfil the end of the
policy period, whichever comes first.
fi. Any person or organization wha is req�ired under a written contract or agreement between you and that
person or organization, that is signed and executed by yau before the "bodily injur�' or "property
damage" occurs and that is in effect during the poficy period, to be named as an additional i�sured is
an "insured" for Liabiliiy Coverage, but only for damages to which this insurance applies and only fo the
exient that persan or organiza#ian guai�fies as an "insured" under the Who !s An Insured provision
contained in Section !I.
g. Any "�mployee" of yours using:
(7) a covered "auto" you do not own, hire or borrow, or a cavered "auto" �ot owned by an "employee"
or a member of his or her household, while performing duties related to the canduct of your
business or your personal affairs; or
{�) an "auto" hired ar rented under a contract ar agreement in that "employee's" name, witf� your
perrrtission, wl�ife performing duties related fo fhe eonduct of your busir�ess. HQwe�er, yo�ar
"empioyee" daes not qualify as an insured under this paragraph {2) whife using a covered "auto"
rented from you or fram any member of ihe "employee's" househoEd
CAU D58 (Q5 19) Includes copyrighted material of the Insurance Sarvices O�ce, Inc., with its permission. Page 'I of 4
Copyrigh# 201 S FCCI Insurance Group.
COMMERCIAL AUTO
CAEJ �58 (05 '! 9)
h. Your members, if you are a limifed liability company, while using a covered "auto" you do not own, hire
or borrow, whife performing duties related ta the conduct of your busfness or your personaf afFairs.
�. Paragraphs (�) and (�) under section 2. Coderage �ensions, a. Suppfementapy Paymenfs are deleted
and replaced by the fiollowing:
(2) Up to $3,OOU for cast ot bail bonds (including b�nds for related traffic viola#ions} required because of an
"acc�dent" we co�er. We do not have to f�rnish these bonds.
(4) Alf reasonable expenses incurred by the "insured" soiely at our request, including actual lass of
earnings up to $500 a day because of iime off from waric.
C. Paragraph �. under section �. �xcfusions is deleted and replaced by the foliowing:
6. Felloav �m�toyee
"Bodily injury" to:
a, Any feliow "empioyee" of the "insured" arising out of and in the cflurse af a fellow "empfayee's"
employment or while performing duties related ta the conduct of your business. However, this
exclusion daes not apply ta your "employees" that are officers or managers if fhe "bodiiy injury"
results from the use of a covered "auto" you own, hire or barrow. Coverage is excess o�er any other
collectible insurance; or
B. The spouse, child, parent, broth�r or sister of that fellaw "employee" as a consequer�ce of Paragraph
a. abave.
S�Ci101d III —�HYSICA� DAAAAGE COV��2A�� is amended as fallows:
A. Paragraph �1. Coverage �xtensions under sectifln �4. Coverage is deleted and replaced by #he follQwing:
4. Coderage �xiensfons
a. Transportation �xpenses
We wiil pay up to $50 per day ta a totaf maximum af $1,500 for femporary transportation expense incurred
by you due ia covered loss to any co�ered auto. We will pay only for #hose covered "autas" for which you
carry either Comprehensive or Specified Causes Qf L.oss Coverage. We wil! pay for temporary
transportation expenses incurred during the period beginning 24 hours after a lass attd ending, regarclless
of fhe policy's expiration, when the cover�d "auto" is returned to use ar we pay for its "loss".
b. �oss o� Use Expenses
For Hired Auto Physical Damage, w� wili pay expenses for which an "insured" becomes IegalEy
responsible to pay for loss of use ofi a �ehicle rented or hired without a driver undar a written rentaf
coniract o� agreerrEent. We will pay for loss of use expenses if caused by:
(9) Other than coflision only if #he Decfaratians indicate fhat Comprehensive Co�erage is provided for
hired "autos';
(�) Specifi�d Causes of Loss only if the Declarations indicate that Specified Causes of l.oss Coverage
is provided for hired "autos"; or
(3) Collision only if the Declarations indicate that Collision Coverage is provided for hired "autos".
However, the mast we will pay for any expens�s for loss of use to any one vehicfe is $75 per day, to a
total maximum of $1,500.
�. The following is adc�ec! to paragraph �. Co�eFage �xtensions under section A. Coverage:
c. L�ire �epartment Service Chaege
When a frre depariment is called to save or protecf a covered "auto", its equipment, its contents, or
occupanfs fram a co�ered cause of loss, we wifl pay up to $1,0�0 for your liability for fire department
service charges assumed by contractor or agreement priaT to loss.
No deductib[e appfies #o this additional coverage.
CAU 058 (0519) fncludes copyrigh#ed material of the Insurance Services Office, Inc., with its permission. Page 2 of 4
CopyrigF�t 2018 FCCI Ittsurance Group.
COMMER�IAL AUTD
CAL! 058 (Q519)
d. �uto LoanlLease Cap �overage
The following provisions apply:
{7) If a long term leased "auto", under an originaf lease agreement, is a covered "auta" under this
coverage form and the lessor af the covered "auto" is narned as an additional insured under fhis
policy, in the e�ent of a#okal loss to the leased co�ered "autd', we will pay any ur��aid amount
due an the lease, less ihe amour�t paid under the Physical Damage Coverage Sec#ian af the
poficy; and less any:
{a) Overdue lease or loan payments inciuding penalties, interest, or other charges resulting from
overdue payments at the time of the "lass";
(b) Financial penalties imposed und�r a fease for excessive use, abnormal wear and tear or high
mileage;
{c) Security deposits nof refunded by the lessor;
(d) Casts for extended warranties, Credit Life Insurance, Health Accident or Disability Insurance
purchased with the Ioan or iease; and
{e) Carry-over balances from pre�ious laans or leases.
(2) If an owned "auto" is a covered "auto" under this coverage form and the loss payee of the
covered "auto" is named a�oss payee under this policy, in the event of a tata! loss to the covered
"auto", we will pay any unpaid amount due on the loan, less the amount paid under #he Physical
�amage Coverage Seckion of the poficy; and less arny;
(a) Q�erdue loan paymenis at the time of the "loss' ;
(h) Casts far axtended warranties, Credit Life Insurance, Fl�alth Accident or Disability Insurance
purchased with the loan; and
(c) Carry-aver balan�es from previous loans.
C. Paragraph 3, under section �. �xc�usions is defeted ancE replaced by the fallowing:
3. We wil! not pay for "loss" due and confined to:
a. Wear and tear, freezing, mechanical or electrica! breakdown
b. Blowouts, punctures or ather road damage to tires
This exclusion does not apply to such "loss" resulting from the total theft vf a co�ered "auto".
Mowever, this excfusion does not include the discharge of an airbag in a covered "auto" you own that
inflates due to a cause other than a cause of "loss" set forth in Paragraphs A.`i.� and �►.1.c.but only:
a. ff that "auto" is a coverecE "auto" for Comprehensive Coverage under this policy;
b. The airbags are not co�ered under any warranty; and
c. The airbags were not intentionalfy inflated
We wifl pay up io a maximum of $1,000 for any one "loss".
D. Seciion �, �eductible is deleted and replaced by the follawing:
�. Deduc4ibfe
For each covered "auto", our obligation to pay far, repair, return or replace damaged ar stolen property
will be reduced by the app(icable deductible shown in the Declarations subjeci to the foliowing:
Any Comprehensive Coverage deductible shown in the Declarations does not appiy ta:
�1) "Loss" caused by fire or lightn�ng; and
(2) "Loss" arising out of theft of your v�hicle if your vehicle is equipped wiih an acfive GPS tracking syst�m.
GAU 058 (05 19) Includes copyrighfed material of the Insurance Services Offiee, Inc., with iks permission. Page 3 of 4
Capyright 2018 FCCI Insurance Group.
COMMERCIAL AUTO
CAl! 058 (05 19)
(3) Glass clamage if repaired rather than replaced.
�EC i l�fd !d —��JSIME�S AU�O GO�d�ITIpMS is amended as foflows:
A. The following is added to paragraph a. under section �. �ass �onditians, �. bu�ies in the �veni of
Accident, Claim, �uit or Loss:
ihis duty applies when the "accident", claim, "suit" or "loss" is firsf known #o:
(a) You, if you are an indi�idual;
{by A partner, if you are a partnership;
(cj An execu#ive officer or insurance manager, if you are a c�rporation; or
(d) A member ar manager, if you are a limiked liability company.
I�. Conditian 5. Trans�er og Ftights of �ecovee� a�ainst Oihers to �Js under sectian A. �oss Conditions is
deleted and replaced by the faflawing:
5. iransfer of �ights af Recabery against Others to Us
I# a person or organization ta or for whom we make paymenk under this caverage fiorm has rights to
recovar damages from another, those rights are transferred #o us. That person or organization rr�ust do
everything necessary io secure our rights and must do nothing afker "accident° or "lass" to impair them.
However, if ihe insured has waived rights to recover through a written con#ract, ar if your work was
cammenced under a letter of intent or work order, subject #o a subsequertt reduction in wrifing of such a
waiver wit� customers whose cusforriary contracts require a waiver, we wai�e any right of recovery we
may have under this co�erage farm.
C. The following is addeci to Condition �. �oncealment, l'4'iisrepresen#ation oe �raud under section �. General
Gonditians:
However, if you unintentiona�ly fai! fo dfsclose any hazards at #he inception of your palicy, we will not deny
coverage under this caverage form because of such faif�re. This provisio� does not affect our right ta
collect additional premium or exercise our right o# cancellation or non-renewal.
D. Paragraph b. o� Condition �. Other lnsuPance under section �. General Conditions is deleted and replaced
by #he follawing:
b. For Hired Auto Physica! Damage Co�erage, the following are deemed to be covered "autos" you own;
('i j Any covered "auto" you lease, hire, rent or borrow; and
(�) Any covered "auto" hired or rented by your "employee" under a contract in #hat individual
"err�ployee's" name, with yaur permission, while perfarming du#ies related to the conducf af your
busir�ess. Howe►rer, any "auta" that is leased, hired, rented or borrowed with a driver is not a
covered "auto", nor is any "auto" you hire fram any of yaur "employees", partners (if you are a
par#nership}, members (if you are a limited liability company), ar members of their households.
CAU 058 (05 19) Includes copyrighted maferial of the lnsurance Services Office, Inc., with its permission. Page 4 of 4
Cepyright 2018 FCCI Insurance Group.
Policy #CAA700a51065 COMMERCIAL AUTOMOBILE
CAU 082 (09 15}
THIS ENDORSEMENT CHANGES THE POLICY. PLEAS� READ fT CAREFULLY.
�U���i�►TIC I��URED - �IJSI�I��S ,�lJTO PO�ICY
PRI�A�3�(I�IO�I���N��I�U71�C �IV�i�N �IEQUIR�� �Y �ONiRA�Y
This endorseme�t modifies insurance provided under the following:
BUSIN�SS AUTO CDVERAGE FORM
This endorsernent is subject to #he terms, conditions, exclusions and any other pravisions of the BU5lNESS
AUTO COVERAGE FORM or any endorsement attached thereto unless changes or additions are indicated
below.
For the purpose of this endorsement, Section II.A.1. Who Is An Insured is amended by adding the fallowing:
1. Any person or organization when you and such person have agreed in writing in a contract signed and
executed by you prior to the loss for which coverage is sought, that such person or organization be added
as an "insured" on your auto policy. Such person ar organization shall be an "insured" to the extent your
negligent actions or omissions impose liabilify on such "insured" without fault on its part.
2. This insurance is prfmary and non-contributory to other fiability coverages of the person or organization
being added to this policy as an "insured" when so required in a written contract or agreement that is
executed prior to the loss for which coverage is sougF�t.
CAU 082 (0'I 15) lncludes copyrighted rnaterial of the Insurance Services OfFice, Inc., with its permission. Page 1 of 1
Copyright 2015 FCCI Insurance Group.
�
�
���
WORK�RS' COMPEA3SAY'iON IiV5f1RANCE
WO�a(��S" COAPI��NS�►�IAN AN�
�IIiIP�OY�RS RIABILI�'Y �O�ICY
11V� 4� A3 04 �
Insured copy
�r��s ��i�r�� o� o�� �r�HT ro ��cov�� ��o� o����� ���o�s�m���
This endorserrtent appfies only to the insurance provided by the policy beca�se Texas is shown in item 3.A. of the
Information Page.
We have the right to recover our payments from anyone liable for an injury co�ered by this poiicy. We wiff not enfarce our
right against the person or organizatian named in tF�e Schedule, but this waiver applies only with respect ta bodily inj�ry
arising out of the operations described in th� schedule where you are required by a written contract to obiain this waiver
from us.
7his endorsement shall not operate directly or indirectly to benefit anyone not named in the Schedule.
Tl�e premium for this endorsement is shown in the Schedule.
Schedul�
1. ( ) Specific Waiver
Name of person or organization
{X) Blanket Waiver
Any person or organization for whom the Named lnsured has agreed by written contract to furnish this waiver.
2. Operations: AI! 7exas operations
3. Premium:
The premium charge for this endorsement shall be 2.U0 percent af the premium developed on payroll ir� connecfion
with wnrk perFormed for the above person(s) or arganization(s) arising nut of the operations descrRbed.
4. Advance Premium: Included, see lnformation Page
This endorsement changes the policy to which it is attached effective on the inception date of the policy unless a different dafe is indicated below.
(The following "attaching clause" need be completed only when this endorsement is issued subsequent fo preparaiion of tf�e policy.)
This endorsement, effective on 8112120 at 12:01 a.m. standard time, forms a part of:
Policy no. ODa20S9085 of Texas Mutual Insurance Company effective on 8J12124
Issued to: WILLIAM J SCHULTZ IfVC
DBA: CIRCLE C CONSTRUCTION COMPANY
This is not a bill
NCCI Carrier Code: 29939
PO Box 12058, Austin, TX 78791-2058
1 of 1 texasmut�al.cam �(800) 859-5995 J Fax (800) 359-065Q
�r �d ""` �,
AuEhorized representative
8l91120
WC 42 03 04 B
�
�
�
�
�
i
�
�
�
�
f
�
�
�
�
�
�
�
1
2
3
4
5
6
7
8
9
IO
11
12
13
14
15
lt
17
18
19
20
21
22
23
OD 6] 25 - 1
CER1'IFICATE OF INSURANCE
Page ! of 1
SECTION 00 61 ZS
CERTIFICATE O�' TNSURI�NCE
END OF SECTION
C[TY OP PORT WOR'1'}I Wa1er and SaniFa�y Sewer Rehabi�itatinn Conlract l01
STt1NDARl� COt�IS"CRUCrIO�f SPL-C[PICATNON llOCUMEtVTS CPTI 02722
Reviscd 7uly I, 2fl � 1
i
I
I
STAl�TDARD GE�TERAL COI�DIT�01lTS
OF THE CONSTRUCTIOI�i COI�TTRACT
c�TY oe r•oxi' wox-rx
STRNDAKD COAlS'I'RUC"TION $PrCI�'ICA']'ION DQCUMEtVTS
Rcvisian: tebn�uy2, Z�! 6
STANDARD GENERAL CONDITIONS OF THE
CONSTRUCTION CONTRACT
TABLE OF CONTENTS
Page
Article 1 —De�initions and Terminology ..........................................................................................................1
T.OI Defined Terms ............................................................................................................................... l
1.02 Terminalogy ......................................................................................
............................................ b
Article2— Preliminary Matters ......................................................................................................................... 7
2.01 Copies of Documents .................................................................................................................... 7
2.02 Commencen�ent of Contract Time; Notice to Proceed ................................................................ 7
2.03 Starting the Worlc .......................................................................................................................... S
2.04 Before Starting Construction ..............................................................................
.......................... 8
2.05 Preconstructian Conference .......................................................................................................... 8
2.06 Public Meeting ............................................................................................... 8
2.07 lnitial Acceptance of Sck�edu�es .................................................................................................... 8
Article 3— Cnntract Documents: Intent, f�z�rzending, Reuse .........................
3 . 01 Int ent . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.02 Reference Standards ........................................................�--........
3.03 Reporting and Resolving Discrepancies ....................................
3.04 Amending and Supplernenting Contracl Documents ................
3.05 Re��se of Docur�aents ..................................................................
3.Ob Electranic Data ...........................................................................
......................
......................
......................
......................
......................
. . . .... . ..... ...... . ..
.. ..... . ..... . ..... . . .
........................ 8
........................ $
........................ 9
........................ 9
......................1.0
......................10
......................11
Article 4-- Availability of Lands; Subsurface and Physical Conditions; Hazardous Environmental
Conditions; Reference Points ........................................................................................................... l 1
4.01 n�ailability of Lands .................................................................................................................. ll
4.02 Subsurface and Fhysical Conditions ..........................................................................................12
4.U3 Differing �ubsurface or Physical Conditians .............................................................................12
4.Q4 Underground Facilities ...............................................................................................................13
4.05 Reference Paui#s .........................................................................................................................14
4.Q6 Hazardous Environrnental Condition at Site ..............................................................................14
Article 5— Bonds and Insurance ...................................................................
5.01 Licetased Sureties and Insurers .................................................
5.02 Performance, Paymenf, and Maintenance Bonds .....................
5.03 Certificates of Insurance ...........................................................
5.04 Contractor's InsUrance ..............................................................
5.05 �lcceptance of Bonds and Insurance; Option to Replace.........
Article 6 — Contractor's Respozasibilities ..........................
6.01 Supervision and Superintendence .................
.............................................. Ib
..............................................1G
..............................................16
..............................................16
..............................................18
..............................................19
......................................................................19
......................................................................19
�rrY or roxr wox�r�
S'I�AAIDARD CONS'1'RiJC'f[ON SPECIFICAT[ON DOCUtv1ENTS
Revision: Felm�y 2, 201 fi
�
�
ti
�
�
�
f
l
�
r
k
,
f
6.02 Labor; Warki��gHours .............. 2p
..................................................................
b.Q3 Services, Materials, and Equipnient .....................
...................................................................... 20
6.04 Project Schedule ..........................................................................................................................21
6.05 Substitutes and "Or-Equals" ....................................................................................................... 2 i
6.06 Concerning Subcantractors, Suppliers, and Others ....................................................................24
6.07 Wage Rates ..................................................................................................................................25
6.08 Patent Fees and Royalties ...........................................................................................................26
6.09 Permits and Utilities ....................................................................................................................27
b.10 Laws and Regulations ................................................................................................................. 27
6.11 Taxes .........................................................
.................................................................................. 28
6.12 Use of Site and Ofiher Areas ....................................................................................................... 28
6.13 Record Documents ......................................................................................................................29
6.14 Safety and Protection .................................................................................................................. 29
6.15 Safety Representalive .................................................................................................................. 30
6.16 Hazaxd Communication Programs ............................................................................................. 30
6.17 Emergencies and/or Rectification ............................................................................................... 30
6.18 Submittals ....................................................................................................................................31
G.19 Continuing the Woz'I� ................................................................................................................... 32
620 Coniractor's General Warranty and Guarantee ..........................................................................32
621 Yndemnification .........................................................................................................................33
6.22 Delegation of Professional Design Services .............................................................................. 3A
6.23 Right to Audit .............................................................................. ........34
........................................
624 NQndiscrir�ix�ation .......................................................................................................................35
i Artic�e 7- Other Worlc at �lie Site ........................
........................................................................................... 35
,
� 7.Qi Related Work at Site ...............................................................................................35
7.02 Coordination ................................................................................................................................36
ArticIe 8 - City's Responsibilities ...................
.............................................................................
8.OI Cammunicatio�is to Cantracfor .................................................................................
8.02 Furnish Data ..............................................................................................................
8.03 Pay When Due ..........................................................................................................
&.04 Lands and Easements; Reports and Tests .................................................................
8.05 Change Orders ................................................. .
............... 36
............... 36
............... 36
............... 36
, .............. 3 6
. ..........................................................................36
8.00 Inspections, Tests, and Approvals ..............................................................................................36
8.07 Limitations on City's Responsibilities .......................................................................................37
8.08 Undisclosed Hazardous Environmental Condition ....................................................................37
8.09 Compliatace with Safety Program ...............................................................................................37
Article 9- City's Observation Status During Consfruction ........................................................................... 37
9.01 City's Project Manager .. ... ....................................................................................................... 37
9.02 Visits to Site ................................................................................................................................37
9.03 Authorized Variations in Worlc ..................................................................................................38
9.04 Rejectiug Defective Work ..........................................................................................................38
9.05 Determinations for Work Performed ..........................................................................................38
9.06 Decisions on Requirements of Contract Documents and �cceptability of Worlc ..................... 38
C]'fY OF FpR7' WOKTH
S"1'AIVDr�RD CONSIRUC170N SPECI�iCAT10N llOCIJMENTS
Revision: Fe6�uary2, 2{] � 6
Article 10 - Changes in ilie Work; Claims; Extra Work ................................................................................ 3 S
10.01 Aukhorized Changes in the Worlc ...............................................................................................38
1Q.02 Uiiauthorized Changes in ihe Work .................................................................................. ..39
1 Q.03 Exec�tion of Change Orders ....................................................................................................... 39
10.04 Extra Work .................................................................................................................................. 3 9
10.05 Notificatian to Sureky ................................................................................... . . .........39
. . ..................
10.06 Contract Ciai�ns Process ............................................................................................................. 40
ArEicle 11 - Cost of the Worl�; Allowances; Unit Price Work; Plans Quantity Measurement ......................41
11.01 Cost ofthe Work .........................................................................................................................41
11.02 Allowances ..................................................................................................................................43
11.Q3 Unit Price Worlc ..........................................................................................................................4�
11.04 Plans Quantity Measurement ......................................................................................................45
llrticle 12 - Change of Contract Price; Change of Contract Time .................................................................4b
12.01 Change of Contract Price ............................................................................................................46
12.Q2 Change of Contract T��e ............................................................................................................47
i2.03 Delays ..........................................................................................................................................47
Article 13 - Tests ancE Inspections; Con-ection, Removal or Acceptance of Defective Worlc ......................48
13.0 i Notice of Defects ........................................................................................................................48
13.02 Access to Worlc ........................................................................................................................... 48
13.03 Tests and Inspections ..................................................................................................................48
13.04 Uncovex�i�g Worlc ........................................................................................................................49
13.05 City May Stop the Work ........................................................................................... ..........49
13.06 Carrection ar Removal of Defective Work ................................................................................50
13.07 Correction Period ........................................................................................................................50
13.08 Accepiance of De�ecCive Worlc ................................................................................................... 51
13.09 Citiy May Cor�'eet Defective Wark ............................................................................................. 51
l�t'ticle 14 - Payments to Contractor and Complction .................................................................................... 52
14.01 Schedule of Values ...................................................................................................................... 52
14.02 Progress Payments ...................................................................................................................... 52
14.03 Contractor's �Varranty of Tille ................................................................................................... 54
14.04 Partial Utili�ation ........................................................................................................................55
14.05 Finallnspection ...........................................................................................................................55
14.06 Final Acceptance .........................................................................................................................55
14.Q7 �'inal Payment ..............................................................................................................................56
14.48 Final Completion Delaycd and Partial Retainage Release ........................................................ 56
14.09 Waiver of Claims ........................................................................................................................ 57
Arkicle 15 - Suspension of Worlc and Termination ........................................................................................ 57
15.01 City May �uspend Work ............................................................................................................. 57
15.02 City May Terr�iinate fo�� Cause ................................................................................................... 58
15.03 City May Terminate Far Convenier�ce ....................................................................................... 60
Article 16 - Dispute Resolution .....................................
l 6.01 Methods and Procedures ............................
...................................................................... b 1
...................................................................... 61
crry or �o�zT woRT� �
S7'ANDfUtD CONSTCtlJ{"F[ON SPECiPiCAT[QI+F T}OCUNIT'�I"I�S
Revision: Pc�iu�y2, 2016
�
�
�
�
�
�
i
1
�
}
Article17 -- Miscellaneous ....................................................................................................
17.01 Giving Notice ....................................................................................................
17.02 Co�nputarion ofTimes ......................................................................................
17.03 Gtiitnulative Remedies .......................................................................................
17.04 Survival of Obligations .....................................................................................
17.05 Heac�ings ............................................................................................................
CI"I'Y i?F FORT WORTII
5"fANDt\RD CONSTRUCI70N SPEC�IFICflT10N DOCUMEAITS
Revision: Pebnaaiy2, 2016
.......................... 62
.......................... 62
.......................... 62
.......................... 62
.......................... 63
.......................... 63
_�
007200-1
GENERAL CQNDITIONS
Page 1 of 63
.ARTICLE 1 � DEFINITIONS AND TERMINOLOGY
1.01 Defined Terrvis
A. Wherever used in these Genez'al Conditions or in o�er Contract Documents, the terms listed belaw
ha�e the meanings indicated which are a�plicaUle to both the singular and plural thereof; and
words denoiing gender shall include the masculir�e, feminine and neuter. �aid tcrms are genez'ally
capitalizecf or written in italics, bui not al sx�ays. When used in a cantext consistent with th�
definition af a listed-de�ned tet'm, tl�e tentn shall have a meaning as de�ned below whether
capitalized ar itaiicized or otherwise. In addition to terins specifically defined, terms with initial
capital letters in the Contract Documents include references to identified articics and paragraphs,
and the titles of other documents or forms.
l. Addendcr Written or graphic instrumenCs issued prior to tlze opening of Bids which clanfy,
correct, or change the Biddiulg Requirements or the proposed Contract Documents.
2. �greerne�zt—The wrzlteza i�sttu�xaent which is evidence of the agreement between City and
Contractor covering the Work.
A�rplicat�ion .fr�r Payment The fnrm acceptable to Cily wl7ich is to be �sed by Contractor
during tl�e course of the WorIc in reques#ing progress or final payments and which is to be
accompanied by such supporting documentation as is rec�uzred by the Contract Documents.
4. Asbestos---��1ny material that contauis more than one perccnt asbestas and is �xiable or is
releasing asbestos fibers into the air above current action levels established by the United Staies
Occupational Safety and Health Administration.
5. Awcirr� — Authorization by the City Council foi- the City to enter inio an Agreement.
Bid—The affcr or proposal of a Bidde�' submitted oi1 the prescribed form setting forth the
prices for the Worlc to be performed.
7. Biclder—�Tl�e iz�dividual or entiiy who submits a Bid directly to City.
S, Bidding Doculnents The Bidding Requirements and the proposed Contract Documents
{including all Addenda).
Bidding Requirerrlents—The ad�ertisement or Iuvitation to Bid, Instructions to Bidders, Bid
security of acceptable form, if any, and the Bid Fornrx with ax�y supplements.
10. Business D�ry — A business day is defined. as a day tt�at the Citiy conductis nor�nal business,
generally Monday through Prfday, except for federal or state holidays observed by the City.
11. Buzzscaw — City's on-]ii�e, eIectx'onic dacument management �nd collaboration system.
12. Calenr�ar 1]ciy — A day consisting of 24 houx�s r�aeasured froin midnight to the next midnight.
crrr or� r�oxr woaT>>
S'1'ANf3ARL} CONSTRI)CTION SPECiPiCAT]ON TJpCiJM1?F�ITS
Re�isipn: rc�m�y2, 2� 16
O[} 72 00 - E
GEiV�RAL CONDfT101VS
Pagc 2 of 63
13. Chcange Order A document, which is prepared and approved by the City, which is si�ned
by Contz'aetor and City and authorizes an additian, deietion, or revision in t�ae Work or an
adjust�nent in the Contract Frice or the Contract Time, issued on or after Che Effecfiive Date
of ihe Agreement.
14. City— The City of Fort Wot'th, Texas, a home-iule municipaI corparation, authorized and
chartered under the Texas State Statutes, acting by its governing body through its City
Manager, his designee, or agents autharized under lus behalf, each of which is required by
Charter to perform specific duties witlz responsibility for final enfoz'cetnent of the contracts
involving the City of Fort Worth is by Charter vested in the CiCy Manager and is the entity
with whom Contractox has entcred into ihe Agreement and for whom the Work is to be
performed.
15. City Attorney -- The officially appointed CiCy Attoiney of the City of Fort Worih, Texas, or
his duly authorized representative.
16. City Council - The duly elected and qualified governing body of the City of Fort Worth,
Texas.
17. City Manc�ger — The officially appointed and authorized City Manager of the City of Fort
� Worth, Texas, or his duly au�liorized representative.
18. Cnntract Clairn A demand or assertion by Ciry or Contxactor seeking an adjushnent of
Contract Price or Contract Time, or both, or ather t'elief with �-espect to the terms of the
Contract. A demand for money or services by a tl�ird pariy is not a Contract Claun.
19. Cont�-cact—The eniire and integrated writtie�a dacument between the City and Contractor
concenung the Work. The Contt'act contains the Agreement and all Coniract Documents and
supersedes prior negotiations, representations, or agreements, whether wriiten or oral.
2fl. Contract Documents Those items so designated in the Agreexnent. All items listed in the
Agreement are Contracti Documents. Approved Submitlals, other Coniractor su6�nittals, and
the reports and drawzngs of su�surface and physical conditions are not Contract Docuzx�ei�ts.
21. Cor�tract Price—The moneys payable by City to Contractor for completion oC ihe Work in
accordance with thE Contract Documenls as stated in the Agreement {subject io tlie provisions
of Paragraph 11.03 in the case of Unit P�ice Worlc}.
22. Caratract Time The ntunbcr of days or the c3ates stated in the Agreeinent to: {i} achieve
Milestones, if any and (ii) coznplete the Work so tilat it is ready for Final Acceptance.
23. Contractor—The ind.ividual ar entity with whom City has entered into the Agreeinent.
24. Cost of the Work—See Paragraph 11.01 of these General Conditions for definition.
cn-7r ar rox•r wo�zTl �
STANDARI7 CONSTRUCI'ION SP�C]FICATION DpCUMEN"fS
Rcvision: Febnwy2, 2016
00 72 04 - l
GENERAL. CONDITIONS
Page 3 of fi3
25. Damage Clcrin2s — A deinand for maney or services arising from the Projecf or Site froin a
third party, City or Contractor exclusive of a Contract Claim.
26. Day or day — A c�ay, �nless otherwise defined, shall mean a Calendar Day.
27. Di�ectnr nf Aviation — The officially appointed Directar of the Aviation Department of fhe
City af Fort Worth, Texas, or his duly appointed representati�e, assistant, ar ageiits.
28. Direcior of Parks and Conz�nunit.y Ser�vices — The ofiicially appointed Director of the Farks
and Community Seivices Department of the City of Fort Worth, Texas, or his duly appointed
representative, assistax�t, or agents.
29. Director of Planning and Development — The afficially appointed Director of the Pl�nning
and Development Depariment of the City of Fort Worth, Texas, or his duly appointed
representative, assistant, or agents.
30. Director of Trc�nsportation Pi�blic Wo�ks — The ofiicially appointed Director of t�e
Transportation PuUlic Warks Departinent of the City of Fort Worth, Texas, or his duly
appointed representative, assistant, or agents.
31. Directar of Wr�ter Departrnent — The officially appoix�ted Directox- o�f t�e Water Departineiit
aC lJae City of Fart Worth, Texas, ar his duly appointed representative, assistant, or �gents.
32. DYawings� --That parE of the Cantract Daeuments prepared or approved by Engineer which
graplucally shows the scope, extent, and character of the Work to bc perfornzed by Contractor.
Submittals are nat Drawings as so defined.
33. Eff�ctive Dc�te of the Agreernent----The date indicated in the Agreement on which it becames
effective, but if no such date is indicated, it means the date on which the Agreement is signed
and delivered by the last of the two parties to sign az�d deliver.
34. Fngineer—The licensed professional engineer or engineering fir�n registered in the State of
Texas performing professianal services �or tk�e City.
35. Extra Work — Additional work made necessary by changes ar alterations of the Contract
Documents or of quantities or for other reasons for which no prices are provided in the Contract
Documents. Extra wark shall be part ofthe Work.
36. Field Opder -- E1 written order issued by City which requires changes in the Work but which
daes not involve a change ix� the Contract Pxice, Contxact Time, or the intent of the Engineer.
Field Orders are paid from �'ield Order Allowances incorporated inta the Contract by fuiided
work type at the time of award.
. 37. Final Acceptcrnce — The writken notice gi�en by the City ta the Contractor that the Worlc
specified in tlie Contract Documents has been completed to the satisfaction of the City.
crrY or� ��oxr woirrri
S'1'ANllARD CONSTRUC'TION SPEC[FICAT[QN DOCUivfENT$
Revision: rcjh�i�y2, 2016
ao�zoa-�
GENERAL COfVDITIONS
Page 4 of 63
3$. Fi��al Il�spection — Inspection carried nut by t}�e City to ven#y that the Contractor has
coznpleted the Work, and each and every part or appuz�tenance thereof, fully, entuely, and in
conformance with fhe Contract Documenls.
39. Genercal Requiremerats—Sections of Division 1 of the Contract Documents.
40. Hazcxrdous Environmentr�l Condition The presence at the Site of Asbestos, PCBs,
Petroleum, Hazardous Waste, Radioactive Material, ar other ma.teri�ls in suck� quantities or
circumstances t�at may present a substantial danger to persons or propea'ty exposed thereto.
41. I-Iazarr�ous Wasie—Hazardous waste is defined as any solid waste lzsled as hazardous or
possesses one or more hazardous characteristics as defined in i.l�e federal waste regulations,
as amended from time ta time.
42. Laws c��xcl Izegulations�—Any and all applicable laws, rules, regulations, ordinances, codes,
and orders of any and all gavernmental bodies, agencies, authorities, and courts having
jurisdiciion.
� 43. Liens—Charges, security in�tierests, or encumbrances upon Project funds, rea� property, or
personal pro�erty.
�
� 44. Mc�jor It�ni —,f1xz Itein of work included in the Contract Documenis lhat has a total cosl equal
to or greater than 5% of the original Contract Price ox $25,000 whichever is less.
�45. Milestone—A principal cvent specified in the Contract Docut�ents reIating to an intermediate
Contract Time prior to Final Acceptance of the V�orl�.
46. Noiice of flward The written notice by City to tI�e SuccessfuI Bidder stating that upon
timely comp�iance by die Success�ul Bidder with the conditions precedent lisied therein, City
will sign and deIiver tihe Agreement.
47. Notice to Proceecl—A wriiten �aoiice given by City to Cantractor fixing the datie on which the
Contract Time will commence to run and on which Contractor sha�� siart to perform the Worlc
specified in Contracl Documents.
48. PC13s Polychlorinated biphenyls.
49. Petrolear�n Petroleum, including crude oil or any fi•actioz� tl�ereof which is liquid at standard
conditions o£ teinperature and pressure {60 degrees Fahrenheit and 14.7 pounds pe�- square
inch absolute}, such as oil, petroleum, f�el oil, oil sludge, oil refuse, gasaiine, Icerosene, and
oil mixed r�itl� other non-Hazardous Waste and crude oils.
50. Plc�r�,s — See defmition of Drawings.
C1TY OF FORT WORTH
57�ANDARD CONSTRUCTION SPECIFICATIpN DOCUMEN"1 S
Revision: Febivaty2, 2016
00 �z oo - f
GENERAL CONDETIONS
1'age 5 oC 63
5 J. Project Schedzcle A schedule, pre�ared and nlaintained by Contractor, in aecordanee wiCh
the General Requireinents, describing the sequence and duration of the activitics comprising
the Contractor's plan to accomplish �e Wark within the Contract Time.
52. Project The Work to be performed under the Contract Documents.
53. Project Manager The authorized representative of the City vvho wi11 be assigned to the
Site.
54. Public Meeti�zg — An �nnounced meeting conducted by ihe City to facilitate public
participation and to assist f�ae public in gaining an informed view of the Project.
55. I2adiaactive Mater�ial�--Sau:rce, special nuclear, or byproduct material as defined by the
Atomic Ene:rgy Act of 1954 {42 USC Section 2011 et seq.) as amended fi-om time to time.
5G. Re�clar Worl�i��g Flours — Hours beginning at 7:00 a.m. and ending at 6:00 p.m., Mo�iday
thru Friday (excluding legal holidays).
S7. Sa�ples Physical ex�mples of materials, equipment, or workm�nship that are
represcntative oF some portion of �e Work and which establish the sta�adaz'ds by wluch such
portion of the Work wiIl be judged.
58. Schedule of Submil,tals—A schedule, prepared a�d z�n.aintained by Cont�-actor, of required
submitt�ls and the tiirne recluirements to support sclieduled performance of related construction
activities.
59. Schedule of Tlc�liGes A schedule, prepared and maintained Uy Contrac#or, allocating portions
of the Contract Price Eo various partions of the Work and used as the basis for reviewing
Contractor's Ap�lications for Payment.
60. Site L�nds or areas indicated in the Contract Docun�ents as being fuz-nzshed by City upon
which the Worlc is to be per�ormed, including rights-of=v✓ay, pe;r:mits, and easements far access
thereta, and such othe;r lands furnished by City which are designated for the use of Coirtractor.
61. S�ecificr�tions Tla�t paxt of tl�e Contract Dacuments consisting of written rec�uirements for
materials, equipment, systems, standards and workmanship as applied to the Woz'k, a.tzd certain
adminish-ati�e requirerrients and procedural matters applicable tibereto. Specificaiions may �c
speciiically made a part of the Contract Documents by attachment or, if not attached, may be
incorporated by reference as indicated in the Tab1e of Contents (Division 00 00 00) of each
Proj ect.
62. Suhcorct�c�ctor---An individual or ent�ty h�ving a direct contiract with Contractor or witii any
ather Subcontractar for the performance of a part of the Worlc at the Site.
C1TY OF FQRT WpRTH
STANDnRD CONSTRUCTION Sk'�:C1t1CA'r[OAI DOCUMENT$
Rc�isian: Pebn�y2, 2Q l6
007260-1
G�IVERAL CONDITIQNS
Page 6 of 63
63. Su6mittals—All drawings, diagrams, illustratians, schedules, and other data or information
which are specifically prepa:red or assemblcd by or for Contractor and submitted by Contractor
to illust�aie some portion of the Work.
64. Successficl Bidcler—The Bidder submitting the lowest and most responsz�ve Bid to whom City
makes an Award.
65. Sitperintendent — The representative of the Contractox who is availabi� at aIl times and able
to receive instructions from the City and to act for the Contractor.
66. ,5'uppleme�ztary Conclitions—That part o;f the Contract Documents which amends or
supplemer�ts these General Canditions.
67. Suppli�r �1 manufacturer, fabricator, suppiier, distributor, materialman, or vendor having a
direct contraci with Cantractor or with any Subcontractor to furnish z�aaterials or equipment
to be incorporated in the Work by Contractor or Subcantractor.
� 68. Un�lergrou�acl Facilities All underground pipelines, conduits, ducts, cab�es, wues,
manholes, vaults, tanks, tunnels, or other such faciliCies or attachments, and any encase�nents
conta2ning such facilities, includ �n.g but not Iimited to, those that conv�y e�ectricity, gases,
� steam, liquid petraleum products, teIephone or other co�nmunicatio�s, cable television,
—� water, wastewater, storm water, other liquids or chemicals, or traf�c or flther control systems.
69. Unii Price Work—See Paragraph 11.03 of these General Conditions for definition.
70. Weekend Worlcing Hou�s — Hours beginning at 9:00 a.m. and endiz�g at 5:00 p.m., Saturday,
Sunday or legal holiday, as approved in advance by tk�e Ciiy.
7L Worlc—The entiz'e construction or tl�e various separat�ly identz�able parts thereof required to
be provided under the Coi�tract Doc�nents. Woxlc iticludes and is the result of performing ot
providin� all lahor, services, and docu;mentation necessary to produce such co�astruciion
including any Change Oxde� �r Field Order, and furnishing, instalIing, and incorporating all
inaterials and. eq�ipxa-ient into such construction, all as required by the Coniract Documents.
72. Wo�-ki�zg Day — A warking day is defined as a day, not i�cluding Saturdays, Sundays, or IegaI
holidays aut�iorized by tl�e City for contract purposes, in which weather or other conditions
�iot under the control of the Contractioz' will permit thc performance of $ie princzpal unit of
worlc underway far a conCinuous period of not Iess than 7 hours between 7 a.m. and 6 p.m.
1.02 Ternziizology
A. The words and terms discussed in Paragraph 1.02.B through E are not defined btzi, when used in
the Bidding Requiretnents or Contract Documents, have tt�e indicated meaning.
B. I�atent, of Cerlaii� TeJ ms or Adjectives:
C17'Y OF FORT WORTH
S'1'ANDIIRD CON$TRUCTION SPECIFICATIOiV DOCLJMT:NTS
Revisioii: Pebcua�y2, 2016
00 72 0a l
GENERAL CONDITiQf�lS
1'age 7 of b3
1. The Contract Documents include tlae tierr�s "as allowed," "as approved," "as ordered," "as
directed" or terms of like effect or iniaporC to authoz'ize an exercise of jud�nent by City. In
additian, the adjectives "reasonable," "suitable," "acceptable," "proper," "satisfactory," or
adjectives of like effect or impart are used to describe an action ar determination of City as to
the Wark. It is intended that such exercise of professianal jud�ment, actian, ar deternaizaati.on
will be solely to e�valuate, in general, the Work for compliance with the information in tlie
Conlz'act Documents and with the design concept of the Project as a functioning whole as
shown or indicated in the Cantract Dacu�nents {unless there is a specific statement indicating
otherwise).
C. Defective:
1. The word "defective," wheii modifying tf�e word "Work," refers to Woz'lc that is
unsatisfactory, faulty, ar deficient i�a tk�at zt:
a. does not conform to the Contract Documents; pr
b. does not meet the requireinents of any �pplicable inspectian, refe�'ence standard, test, or
approval referred to in the Contract Dacu�xaenls; ot'
c. has bcen dan�aged prior tio City's written acceptance.
D. Furnish, Irzstall, Perf�lrm, Pravicle:
1. The word "k'uxnish" or the word "Install" or the ward "Perform" or the word "Provide" or
the word "Supply," ar any combination or simiiar directive or usage thereof, shall mean
furnishin� anc� incorporating in the Worl� inclucfing all necessary labor, materials, ec�uipx�rzent,
and everytliing necessary to perform the Worlc indicaled, ut�less specifically Iimited in the
context uscd.
E. Unless stated otherwise in the Contract Docuznents, wards or phrases that have a weIi-known
technical or co�stx'�rction indust�y or trade meaning are used in ihe Coniract Documents in
accordaiice with such recagnized meaning.
ARTYCLE 2 — PRELIMINARY MATTERS
2.01 Cnpies of Documents
City shall fiirnish to Contractor one (1) original executed copy and one {1) electranic copy of the
Contract Docuinents, and fc�ur {4) additional copies of tk�e Drawings. Additianal copies will be
fiiri�ished upan request at the cost of reproduction.
2.02 Comrrzencement of Contract Time; Notice to Proceecl
The Contract Tiine will commence to run on the clay indicated in the Notice ta Proceed. A Notice to
Proceed may be given at any time wittiin 14 days aftiet' Y1ae Effective Date of ihe Agreement.
CITY Ok= FOIt"1' WOR'1'H
5"I�ANllARD CO]VS"C[tUCT[03V SPL-CIPICATiOhI 1�OCUMT:IJTS
Itevision: Fehivary2, 201 G
ao�2ao- i
GENERAL CONDITlOIVS
Page 8 of C3
2.03 Sta�ting the Worl�
Cozztractor shall start ta perforni the Wor�c on the dat� when the Conta'act Time commences to run.
No Work shall be done at the 5ite prior to liae date on which the Contract Time co�nmences to run.
2.04 Befnre Stc�rting Constructior�
Baseli�ie ,Schedules: Submit in accordance with the Contract Dacuments, and prior to starting the
Work.
2.OS Preconst�uctian ConfereYzce
Befor� any Worlc at f.he Site is siarted, the Contractar shall attend a Preconstruction Con%rence as
specified in the Contract Dacumenis.
2.06 Pzablic Meetirxg
Contractor may i�ot mobilize any equipment, rnatexials or resources to the Site prior to Contractor
attending the Public Meeting as scheduIed by tlze City.
2.07 Iraitial Acceptance of�'cl2edules
No progress payment shall be made to Contractor unCzl acceptable sciiedules are sub�nitted to City in
accordance with the Schedule Speci�catian as provided in the Contract Documents.
ARTICLE 3— CONTRACT DOCLTN�NTS: INTENT, AMENDING, REUSE
3.0� InteJzt
A. The Canfract Documents are complcmentary; what is required by one is as binding as if required
by a11.
B. Tt is the inlent of the Contract Docuxx�ents to describe a functionally coinplete project (or part
thereof} to be constructed ir� accordance with the Contract Documents. Any labor, documentaiion,
services, materials, or equipment filiat reasonably rnay be z�fe.rred from the Contract Documen#s
or from prevailing cusfom ar trade usage as bei�g required to produce the indicated result wiil be
providec� whether or not specifically called f'or, at no additional cost to City.
C. Clari�calions and interpretations o� Che Contract Documents shall be issued by City.
D. The Specificanons may vary in forin, format and sryle. Some S�ecification sections noay be written
in varying degrees of streamlined or declarative style and some sections may be relatively
narratiive by compa�ison. Omission of sucli words and phrases as "the Cantractor shal�," "in
conformity witl�," "as shown," or "as specified" are intentional in strearnlined sections.
Omilted words and phrases shal� be supplied by inference. Similar types of provisions rnay appear
in various parts of a section or articles witl�in a part depending on t�e �ornnat of the
CITY OF FORT WORTH
STAAIDARD CONS1'12UC1'lON SPECIF[CATiON 1]OCUMEN"I�S
Rcvision: h'ebmary2, 2016
on �z oo - �
GENERAL CONDITIONS
I'age 9 of 63
section. The Contractor shall not take advantage of any variation of form, forinat or style in
making Contract Claims.
E. The cross rcferencing of specification sections under the subparagraph heading "Related
Sectians include but are nat necessar�ly lit�aatied to:" and elsewhere within each Speciiication
section zs pz'a�vided as an aid and convenience to the Contracfior. The Contractar shall not rely on
the cross referencing pro�ided and shall be responsible to coordinate the entire Work under the
Contract Documents and pravide a complete Project whetihex oz n.ot the cross referencing is
pravided in each section ar whether or nat the cross referencing is complete.
3.02 IZeferenee Staric�arcl.s
n. Standards, Specificatians, Codes, La�vs, and Regulations
1. Reference to standards, specifications, manuals, ar codes of any iechnical society, organization,
or association, or to Laws or Regulations, whether such reference be spec�fic or by implication,
shall rnea� t1�e standard, specification, manual, code, or Laws or Regulations in effect at the
time of opening of Bids {or on the Effective Date of the Agreement if there were no Bids],
except as may be otherwise speci�ically stated in the Contract Docunnents.
No pro�ision of any such standard, speci�catioza, mat�.ual, or code, or �ny instniction o£ a
Supplier, shall be effect�ve to chaa�ge the duties or respansibilities of City, Contractor, ar any
o� tik�eix' subcont�-actors, consultants, agents, or employees, from those set forth in the Co��tract
Documents. No such provision or instruction shall be effective to assign to City, ox' any af its
afficers, directars, members, partners, ernployees, agents, consultiantis, or subcontrac�ors, any
duty or authority to supervise ax dzz'ecf the performance of the Work or any duty or authority
to underlal�e x'esponsibility inconsistent with the provisions of the Contract Documents.
3.03 Reparti�zg a��.c1 Resolving Disc�^epancies
A. l2eparting Discreparrcies;
Contructo�'s Review of Contract Dacument.s Before Starting Work: Before undertak�ng each
part of the Woz'1�, Contractor shall carefully study and compare the Contract Documents and
checic and verify pertinent figures therein against all applicable field measurerne�tis and
conditions. Contractor shail promptly report in writiz�g tio City any conflict, error, ambiguity,
or discrepancy which Contracta�' discovers, or has actual lrnowlcdge of and sl�all obtain a
written interpxetiation or clarification from Ciry before proceeding with any Work affected
thereby.
2. Cnntracto�'s Review of Contract. Documents During Perf'oYlnca�zce of Work: If, during the
performance of the Work, Contractor discavers any conflict, error, am�iguity, or discrepancy
wit.�in the Contract Dacun�ex�ts, or between the Contract Documents and (a) any applicable
Lar� or Regulation ,(b) any standard, specification, manual, or code, or (c} any instruction of
any Supplier, then Contractar shall promptly report it to Ciry in writing. Contraetaz' shall not
praceed with the Warlc affected thereby (except in an emergency as z'equired by Par�gr�ph
C]TY OF FORT WORTH
S'TAAIDARD CQ1�I5TRUCCION SYECIF]CA`110N BOCUMENTS
Rcvision: Pebivary2, 2016
00720Q-1
GEN�RAL CONDITIONS
Page ] 0 of 63
6.17.A} ut�til an amenc�ment or suppleirient ta the Contract Documcnts has been issued by
one of the methods indicated in �arag�aph 3.04.
3. Contractor shall not be liabte to City for failure to repo��t any conflict, error, ambig►aity, or
discrepancy in the Contract Documents unless Contractor had actual know�edge thereof.
B. Resolving Disc�eparacies:
1. Except as may be othcrwise speci�cally stated in the Contract Documents, the provisions of
the Contract Documents shall take }�recedence in resolving any conflict, error, an�biguity, ox
c�iscrepancy between the provisions of fhe Contract Documents and the provisiozas of any
standard, specification, manual, or the inshuction of any Supplier (vv�e��er or nat specifica�ly
inco�porated by re�ez'e�ce in the Con#ract Documents).
2. In case of discrepancics, fgured dixa�ensiox�s shalI govem over scaied dimensions, Plans shaIl
gavern over Specifications, Supplementary Conditions shall govern over General Conditions
ajr�d Specifications, and quantities shown on the Plans sha11 govern ovcr those shovv� in the
proposal.
3.04 Amer�cliTzg alad Supplernent.irzg Contract Documer�t,s
.A.. The Contract Documents may be amended to provide for additions, d�letions, and xevisions in
t�ie Work or to modify the �erins and conditions thereof by a Change Ordex'.
B. The �-ec�uirements of the Contract Documents may be supplemented, ax�.d :rninor variations and
deviations in the Worlc not involving a change in Cox�tracti P:rice or Contract Time, may be
autharized, by one o� more of the following ways:
1. A Field Order;
2. City's review af a Submittal (subject to the provisions of I'ara�raph 6.18.C); or
3. City's written �nterpretation or clarification.
3.05 Rez�se ofDocicrneTzt.s
A. Contractor and a�iy Subcontracto�� or Supp�ier s�all not:
� 1. have or acquire any title to or ownership rights in any of tl�e Drawings, Specifications, or
—� other documents (or copies of aiiy thereo fl prepared by or bearing the seal of Engineer,
including electronic media editions; or
i 2. z'euse any such Drawings, Specifications, other documents, or copies thereof on extez�szons of
� the 1'roject or any other praject without written consent of City and specil�ic written verification
or adaptation by Engineer.
cr� or �-oxr wo��rH
STANUA[Z� CONS"IRIJCf[OIY SPECiFiCATiOiV DOCUMPI+]TS
Itevision: Febn�uy2,2016
00 72 00 - 1
GENERAL CONDITIONS
1'age 1 I o1�63
B. The prohibitions of this Paragraph 3.05 will survive final payment, or terinination af the
Contraci. Nolhing herein shall preclude Contractor from retaining copies of the Contz'act
DocumenEs for record purposes.
3.06 Electroiaic Dat.a
A. Unless otherwise stated in the Supplementary Conditioi�s, the data furnished by City ar Engineer
to Contractor, or by Contz�actor ta City or Engineer, tliat may be relied upo� are limited to the
printed copies included in the Contract Documents {also Icnawn as hard copies} and other
Specifications referenced and located on the CzCy's Buzzsaw site. Files in electronic media format
of text, data, graphics, or other types are furnished only for the convenience of the recei�ing party.
Any conclusian or infot'matian obtained or deri�ed from such electronic �zles will be �t the user's
sole rislt. If there is a discrepancy bet�veen the electronic files and the hard copies, the hard copics
govern.
B. Wlaen transferring documen#s in electronic �aedia format, the transFerring pariy makes no
represenfations as to long term cor�npaiibility, usabiliiy, or readability of documents resulting from
the use of sof'tware application pacicages, operaling systems, or computer haz'dware diffenng fro�n
those used by the data's creator.
ARTICLE 4-- AVArLABILITY OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS;
HAZARDOUS ENVIRONMENTAL COND�TI�NS; REFERENCE POINTS
4.01 Availability �fLczrrds
A. City slaall furnish the Site. City shall notify Contractiox af any encumbrances or restrictions not of
general application but specifically relateci to use af ihe Site with which Contractor must catnply
in performing the Work. City will obtain in a tiinely manner and pay for easeznents for permanent
structures or permat�ent changes in existiitg facilities.
The City has obtained or anticipates acquisi�ion of and/or access to right-o#=way, and/or
eascments. Any outstanding righE-of-way and/or easennents are anticipated to be acquired in
accordance with the schedule set forth in the Supplementary Conditions. The Project 5chedule
submitted by the Cotatractor in accordance with tlie Contract Docume�ats trzust consider any
outstanding right�of-way, and/or easements.
2. The City has or anticipates removing ancUar relocating utilities, and obstructians to the Site.
Any outstanding remo�a� or relocatiot� of utilities or obstructions is anticipated in accordax�ce
with the schedule set forth in the Supplexnentary Conditions. The Project Schedule suhmitted
by tlie Contractor in accardance with the Contract Dacuments nlust consider any outstanding
utilities or abstructions to be removed, adjusted, azacl/az' relocated by others.
B. Upon reasonab�e written request, City shall furnish Contiractor with a current statement of record
legal title and legal description of the lands upan w]aich the Wark is to be performed.
crr� or roxi� wo�zT>>
STAN]�AKll CONSTRUCT[Q1�I SP1iC1F1CA7701�! DOC'UMFNTS
Re�ision: Fetmiary2, 2p1 G
00 �z oa - i
GEN�RAL COiVDITIOfVS
Page 12 uf G3
C. Contractor shall provide for all additional lands and access thereto that may be requi:red for
� construc#ion facilities ar storage of mate�7als and equipment.
�
4.02 Suhsurf��� �nd Pl�ysic�t Conc�itio,zs
�
�
; A. Report.s and Drawings: The Supplementary Conditions identify:
� 1. those reports known to City of explorations and tests of subsurface conditions at or
� contiguous to the Site; and
� 2. those drawuigs lcnown to City of physical conditions relating to existing surface or
� subsurface shuctures at the Site (�xcept Llnderground k'aciliiies).
B. Limited Reliance by Ca�itructoY on Technical Datcc Authorized: Contractor may rely upon the
; accuracy af the "technic�tl data" contained in such reparts and drawings, but such reports and
} drawings are not Contract Doctaments. Such "technical data" is identified in the Supplementaiy
Conditions. Contractor may not malce any Contract Claim against City, or any of their o��cexs,
' directors members artners em lo ces a ents consultants or subco�tz'actors witl� res ect ta:
� � ,P � P Y � � � , P
l. the completcness of such 1•eports and dxawi�gs far Contractar's purposes, including, but not
� limiied to, any aspectis of the means, methods, techniques, sequences, and procedures of
f construction io be empinyed by Contr-actor, and safety precautions and programs incident
thereto; or
2. other data, interpretations, opinions, and information contained in such reports or shawn or
indicafiec� in such drawings; or
3. any Contractor interpretation of ar conclusion cirawn from any "t�chnical data" or any suc13
other data, interpretatians, opinions, or i�.for�r�atzo:n.
4.03 Diffe� irag �'ubsurface or Physical Conditions
A. IVotice: If Contractor believes tl�at any subsurface or physical condition that is uncovered oz
revealed either:
i. is of such a nature as to establish that any "teel�aieal data" on which Contractor is entitled to
� rely as provxded in Paxagrapl�. 4.02 is materially inaccurate; or
2, is o� sucla a�tature as Co require a change in the Contract Dacuments; or
3. dif�ea's ��aterially fro� that shawn or i�idicated in the Contract Docutnents; or
4, is of at� unusual naCu:re, and differs materially from canditions ardinarily encountered and
� generally recognized as inherent in worlc of the character provided for in the Cantract
� Documents;
1
�
f
I C1TY OF FOltl' WOR"fH
STAhT[JAH17 CdAIS'1�RUC'110N SPECIFIC.A110N llOCUMEN`TS
' Aevision: Febn�uy2, 20 ] 6
ao �z oo - �
GENERAL CONDI710NS
Page 13 of 63
then Co�atxactar shall, promptly after becoming aware thereof and befare further disturbing the
subsUrCace ox physical canditions or performing any Worlc in connecrian therewith {except in an
emergency as required by Paragraph fi. ] 7.A), notify City in writing about such condition.
B. Possible Price and Time Acljustments
Contractor shall not be entitled to any adjusttneiit ui #he Cantract Price or Contract Ttnae if
1. Cantz�actor knew of the existence of such conditions at the �ime Contractor mad.e a final
cammitment to City with respect to Contract Price and Contract Time by ti�e submission of a
Bid or becoming bound under a negotiatecl contract; or
2. the existence of such conditian couId reasonably have been discovered or revealed as a result
of the examinatio� of the Contract Docu�nents or the Site; oj-
3. Contractor failed to give tl�e written notice as required by Paragraph 4.03.A.
4.04 U�zdergYouncl Facilitr'es
!1. Shown or Indieated: The information and data sl�own or indicated in the Contract Documeiits
with respect to exisiing Ui�dergx'ound Facilities at or contiguous to the �ite is based on inforination
and data funiished to City or Engineer by the owiiers of such Underground Facilities,
including City, or by ot3�ers. Unless it is atherwise expressly provided in ihe 5upplementary
Canditions:
1. Ciry and Engineer sha11 not be responsible for the accuracy ar cotnpleteness of any such
infornlation or dala pt'ovided by others; and
2. the cost of alI of the following will be ixacluded ixi the Contract Price, and Contractor shall
have full responsibility for:
a. reviewing and checking all such itzformation and data;
b. locating all Undergrout�d Facilities shown or indicatcd in the Cantract Documents;
c. coordination and adjustment of the Work with the owners of suc� Underground
Facilities, including Ciry, dunng construction; and
d. the safety �nd pratection of all such Underground F�cilities and repairing any damage
thcreto resulting froin the Work.
B. Not Shown or Inclicated:
1. If an Underground Facility which conflicts with the Work is uncovered ox' :revealed �t or
contiguous to the Site which was not shown or indicated, ot' noti s�awn or indicated with
reasonable accuracy in the Co�tract Documents, Contractor shall, promptly after becoining
aware thereof a�d before fi�rtlier cfisturbing canditions affected thereby or perforini�ig any
C[TY QF PQRT WOR7�I�
STnNIIARD CONSTRUCf10N 51'EC[F[CATION DOCtIML-NTS
Revision: Febniary2,2UlG
00 �2 aa - �
GENERAL CONi71TION5
Page 14 of 63
Work in connection therewitli {except in an emergency as required by Paragraph 6.17.A),
identify the owner of such Underground k'acility and give noiice to that owner and ta City.
City will review the discovered U�derground Facility and determine the exteni, if a��y, ta
which a change nrzay be ree�nued in the Confiract Documents to re�ect and document the
cons�quences of the existence or location of the Undergroun�d Facility. Contractor shall be
responsible for the safety and protectiion of such discovered Underground Facility.
2. If City concludes that a change in thc Contz'a.et Documents is required, a Change Order may
be issued to reflect and docur�aent such consequences.
Verification of existing utilit�es, st�-uclures, �id service lines shalI include notif�catio� af all
utility companies a minimuz� of 48 hours in advance of construction including exploratory
exeavatzon if necessary.
4.05 Reference Paints
A. Cily sha11 provide engineez'ing surveys to establish reference points for co;nstruction, which in
City's judgrz�e;nt are necessary to enable Contractor to proceed wit1� the Work. City will provide
construction staices or other cUstomary method of �narl�ing to establish line ai�d grades for roadway
and utility construction, centerlines an�d benchmarks for bridgework. Contractor shall protect and
preserve the established z'eference points and property monuments, and slaall malce no changes or
relocations. Conti;ractor shali report to City whenever any reference point or properry monument is
lost or destroyed or requires relocation because of necessary changes in grades or locaiions. The
City shall be responsible for the replaceiment or relocation of reference poinis oz' properiy
monuments not care�essly or willfully aestroyed by the Contractar. The Coniractor shall notify
City in advance aild with s�fficient time to avoid delays.
B. Whenever, in the opiaion of i�ie City, any reference point or nr�o�utn.ent has been carelessly or
willfu�ly destroyed, d2sturbed, ar removed by the Co�atractor or any of his em}�loyees, the fiill cost
for replacing such points plus 25% wili �e charged against the Contractor, and the full amount will
be dedUcted from payment due tk�.e Contractor.
4.fl6 Hazc�rc�ous Environmental Condition c�t Site
A. Report.s aJzr�Drawings: Tlie Supplementary Conditions ideulify those reports and drawings lrnown
to City relating to Hazardous E�vironmental Conditions that have bcen identified at the Site.
B. Limited 1Zeliance by Cantrc�ctoY on Tech��ical Datcr Authorized: ContracCor may rely upon the
accuracy of thc "teclu�ical data" contained in such reports and d:rawings, but such reports and
drawings are not Contract Documents. Suck� "technical data" is identified in the Supplexxzentary
Conditions. Contractor may not make any Contract Claim against City, ar any of theu officers,
directors, members, pa;rtners, employees, agents, consultants, or subcontractors with respect to:
the coinpleteness of suc11 reparts and drawings for Contractor's p�t'poses, including, but not
limited to, any aspects of the means, methods, techniques, sequences and procedures of
crry oF roR�r wo�r�
57'AIVDARD CONSTRUCfION SPECIF[CATION DOCUMENTS
Revision: Febivary2, 2016
oo�zaa-�
GENERAL CONDITfONS
Page I 5 of 63
construcrion to be employed by Contractor and safety precautions and programs incideni
thereto; or
2. otil�ex data, ulterpretations, opinions and information contained in such reports or shown ar
indicated in such drawings; or
3. any Contractor interpretation af or conclusion drawn from any "technicaf data" or any such
o#her data, interpretations, opinions or iza�orz�aatio�.
C. Contractor shall not be responsible for any Hazardous Environrnental Coi�ditzon uncovered or
revealed at the Szfe which was not shown or indicated in Drawings or Specifications or identi�ed
ix� tl�e Contz-act Documents to be within the scope of the Work. Contractor shall be responsible for
a Hazardous Environmental Condition created with any materials brought to tihe Site by
Contractor, Subcantractors, Supplxers, ox a�ayone else for' w�oin Contractor is responsible.
D. If Contractor encounters a Hazardous Environmental Condition or if Contractor or anyone for
whorn Cantractor is responsible creates a Hazardaus Environmental Condition, Contractor shall
im.n�ediaCely: (i) seeure or otherwise isolate such condition; {ii} sto� all Work in connection with
such condition and in any area affected thereby {except in an emergency as required by Paragr'aph
6.17.A); aiid (iii} notify City {and prornptly thereafter con�rna such notice iza writing). City may
consider the necessity io retain a qualified expert ta e�aluate such condiiian ar take corrective
action, if ai1y.
E. Contractor sk�aIl not be required to resume Work in connection with such condition or in any
affected area until after City has obtained any required permits related #hereto and delivered written
notice to Contractar: (i} specifying t1�at such condition and any affected area is ot' has been
rendered suitable for lhe resux�aption of Wark; or (ii) specifying any special canditions under which
such Work rnay be resumed.
�. If after receipt of such written notice Cont;ractor does nat agree to resume such Work t�ased on a
reasanable belief it is �nsafe, or does not agree io resume such Worl< under such special conditioiis,
then Ciry may order the portion o£ the Work that is in tlie area affected by such conditian to be
deleted from the Work. City may have such deleted pot'tion of the Wox� performed by City's own
forces oi- otk�ers.
G. To the_firllest exient permitted l�y Laws ancl Regulations, Cont�c�ctor shc�ll inclemrciry ar�d hold
harrnless Cit.y,.from a»d agai�2st all cic�ims, costs, losses, and damages (includirzg but not limited
to all fees and charge.s of engineers, c�rchitecta�, c�ttorl�eys, ancl ot.her prafessior�als and c�ll court
or arhitratiorc or other dispz�te resolutiorz costs} arising ozrt �f or yelati�2g to ca HuzarcJous
Environrr2ental Condition creuted by Contractor or by anyone for whom Co��.tractnr is respo�2sible.
Nothiizg i�z this Pccragra�h 4.06.G shall obligate Contraetor to inr�emrzify uny individaGccl or entity
frnnz cand cagcainst the consequenees of that inelividual's or entity',s o�n negligenee.
H. The px'ovisions of Paragraphs 4.02, 4.03, and 4.04 do not apply to a Hazardous Envu-oi�nental
Condition uncovered or revealed at the Site.
�� �'�t or roxr wox rH
51'ANllA1Zll CONSTRUCI'ION SPEC[F[CATipi�I DOCL]Nt1:NT5
Reuision: Felm�y2,2016
oo�zoo-i
GENERAL COiV�ITfONS
1'age ! G ol' 63
ARTICLE 5— SONDS AND INSi]RANCE
5.01 Licensecl Silreties a�icl hzsurers
All bonds an.d insurance required by the Contract Documents to be purchased and maintained by
Contractor shall be ohtained from surety or insurance companies that are duly licensed or authorized
in the State of Texas to issue bonds or insurance policies for the limits and coverages so requued.
Sucl� surety and insuxance companies shall also meet such additional requireme�ts and qualifications
as may be provided in the Supplementary Conditions.
5.02 Perfornzm�ce, Payme�zt, and Maintenance Bonds
A. Contractor shall fur�ish perfonnancE and payment bonds, in accordance r�iCl� Texas Government
Code Chapter 2253 or successor statute, ea.ch in an ax�ount equal to the Contract Price as
security for the faithful performance and pay�ment of all of Contractor's o�ligations under the
Contract Documents.
B. Cantractor shall furnish maintenance bo�nds in an amount equai to the Contract Price as secuz'iiy
to protect the City against any defects in any portion of the Work described in the Contract
Docu►a�eaats. Maintenance bonds sl�all remain in effect fot two (2) years after the date of Final
[1.cceptance by the City.
C, All bonds sl�all be in the form prescribed by the Contz'act Documents exccpt as pravided otherwise
by Laws or Regulations, and shall �e executed by such sureties as are named in the list o f
"Companies Holding Cerii�cates of Authority as Acceptable �ureties on Federal Bonds and as
Accepta6le Reinst�ring Campanies" as publisl�ed in Circular 57p {amended) by the Finar�cial
Management Service, Surety Bond Branch, U.S. Depariznent of thE Treasury. All bonds signed. by
an agent or attorney-in-fact must be accotxzpanied by a sealed and dated power of attorney vvk�ich
shall show that it is effective on Che daie t�ie agent or attotney-in-fact si�med each bond.
D. Tf the surety on any bond furnished by Contractor is declared banktz�pt or becomes rnsolvent or its
right to do business is tez't�ninated in ihe Siate oi Texas or it ceases to meet Che x'equirements of
Paragraph 5.02.C, Contractor shall promptly notify City and shall, within 30 days after the event
giving aise to s�ch notification, provide anol�.er bond and stu-ety, both of which shall compIy vvith
tlie requirements af Paragxaphs 5.01 arid 5.02.C.
5.03 Cer�tificates of Ir2surance
Contractor shall deliver to City, with copies tio each additional insured and loss payee identif�ed ir� the
Suppleinentary Conditions, certificates of insurance (and ot.�ier evidence of iy�surance requested by
City or any other additionaI insured} which Contractar is rec�uiz'ed to purchase and maintain.
1. Thc certi�caie of insurance shall document the City, and all identified entities named in the
Supplement�y Conditions as "Additional Insured" oz� all liability policies.
c�TY or �oii�r wox�r�
sTnNna,x� corrs riz�c�rloN s�r:cmrcarroN vo�uMENTs
Rcvisian: Fetntiary2, 20 ] G
00�200- i
GENERAL CONDITIONS
Page 17 of 63
2. The Contz'actor's general liability insurance sl�all include a, "per project" or "per locatian",
endorsez�ne�t, which shall be identified in the certificate of insurance provided to the City.
3. The certificate shall be signed by an agent au�liorized to bind coveragc on behalf oFthe insured,
be complete in its entirety, and show complete insurance carrier names as listed in the cun'et�t
A.M. Best Property & Casualty Guide
4. The insurers far alI policies must bc licensed and/or appro�ved to do business in the State of
Texas. Except for warkers' compensation, all insurers must ha�e a minimum rating of �-:
V[I in lhe cur'rent A. M. Best Key Rating Guide or have reasonably equivalent financial
strengt� and solvency to the satisfacfian of Risk Maiiagement. If the rating is belovv tk�,at
required, written approval of City is rec�uired.
5. All applicable policies shall include a Waiver of Sub:rogatio� (Rights af Recovery} in favor
af the City. �n addition, the Contractoz' agrees io wai�e all rights of subrogation against the
Engineer (if applicable), and each additional insured identified in the Supplementary
Conditions
6. Failure of the City to den�and such ceriii�tcates or other evideiice of full compliance witl� the
insurance requirements or failure of the City tn ideniify a deficiency Croxn evidence that is
provided shall iiot be construed as a waivet' of Coz�tx'actor's obligation to maintain such iines
of insurance coverage.
7. If insurance policies a�'e nol wx'itten for specified coverage limits, an Umbrella ar Excess
LiabiJity insuraiice for any differences is required. Excess Liability sha11 follow form of the
primary co�erage.
8. Unless otherwise stated, all required insurance shall be written on ihe "occurrence basis". If
coverage is underwritten on a claims-made basis, the retroaciive date shall be coincident with
or prior to the date of the effectiee date of tl�e agx'een�.ent and the certificate of insurance shall
state that the cor�erage is c�aims-inade and the retroactive date. The insurance coverage shall
be naai�atained for the dur�tion of the Cantract and for three (3) years following Final
Acceptance pro�ided under the Contract Documenis or for the warxat�ty period, whichever is
Ionger. An annual certi�cate of insurance submitted to the City shali e�idence such
in.stu'axlce co�erage.
9, Policies shall have no exclusions by endorsemenfs, which, neither nuilify or amend, the
required lines of coverage, nor decrease the li�nits of s�id covera.ge unless suck� e�adoxsements
are approved ni writing by the City. Jn the event a Contract has been bid or executed and the
exclusions ax'e deterinuled to be unacceptable or the City desires additional insurance coverage,
and the City desires the contractor/engineer to obtain such coverage, the contract price shall
be adjusted by the cost of the premium for such additioz�al cov ez-age plus 10°/o.
10. Any self-insured reteiltion (SIR), in excess of $25,000.(}a, affecting :required insurance
coverage sllall be approved liy the City in regards tio asset value and stockholders' equity. In
C]'1'Y OF FORT WORTH
STANDARD CONSTRUCTION SPECI�7CA'I�[OAi f]OCUMENTS
Rcvisiun: Fdnuaty 2, 2015
00 �2 ao - i
GEfVERAL CQlVDI7fOfVS
Page 18 of 63
lieu of trac�itional insurance, alternative c�verage maintained through insurance pools or risk
retention groups, must also be appz'oved by City.
11. Any deductible in excess of $S,p00.00, for ar�y policy that does not provide coverage on a
first-dollar basis, must be acceptable to and approved hy the City.
I2. City, at its sale discretion�, reserves the ri�ht to review the insurance requirements and to
r�ake reasonable adjustments to insurance coverage's and their limits when deemed necessary
and prudent by the City based upon changes in statuto�y law, court decision or the claims
history of the industty as well as of tk�e contracting pariy to the City. The City shall be required
to provide priar notice o� 90 days, and the insurance adjuslments shall be i�corporated into Yhe
Work by Chazzge Order.
13. Cily sl�a�l be entitled, upon written request and without expense, to xeceive copies of palicies
and e�idorsemcnts thereto and may make any reasonable requests for deletion or revision or
modifications oi particuIar poIicy terms, conditions, limitatians, or exclusions necessary to
conform the policy and ei�dorse�x�ents to the requirements of the Contract. Deletions, revisions,
or modi�catia�is shall not be rec�uired where policy provisions are established by law or
regulations binding upon eit�er party ar the underwriter on any such policies.
14. City shall not be responsible for the direct payment of insuz'ance premium costs for
Contractor's insurance.
5.04 Contrccctor's Iiisurance
A. Workers Compensation a��d Ernplayers' Iiability. Contractor shalI purc�ase and inaintain such
insurance coverage with limits consiste�f �vith statutory benefits outlined in the Texas Warkers'
Compensation Act (Texas Labor Code, Ch. 406, as amenaed}, and minimum limits for Employe��s'
Liability as is appropriai e Car the Work being perfotmed and as will provide protection frozn claims
sel fo�th below whic�� may arise out of or result from Contractor's performance of the Work and
Contractor's other obligations under the Contract Docuta�en.ts, whether it is to be per%rmed by
Contractor, any Subcontractar or Supplier, ar by anyone directly or indirectly employed by a.ny of
them to perfoxm a�y of the Work, or by anyone for whose acts any af them z�r�ay be liab�e:
i. claims undex worlcers' compensation, disability benefits, and other sinazlar employee bene�t
acts;
2. claims for daaxzages because of bodily injury, occupational sickness or disease, or death of
Contractor's empioyees.
B. Co�nmercic�l Gelae�al Lic�bility. Coverage shall include but not be limited to covering liability
(bodily injury or praperty damage} aris�ig from: premises/operations, independent contractors,
products/completed opez'ations, personal injury, and Iiabflity under an insur�d cozatz'act. Insurance
shall be provided on an occurrence basis, and as comprehensive as tlle current Insurance Services
Office (TSO) policy. This insurance shall apply as pz'innary insurance with respect to any otEier
c �Tv or roRT woaTx
STf�NDt1RQ CONSTRUCTIdN SP�;CINICATIOI+f DOCUtvILNTS
itevision: Febivaty2, 2U16
oo�zoo-i
GENERAL CONDITIONS
Page 19 of 63
insurance or self-instu-ance prag�'ams afforded to the Ciry. The Cominercial Generai Liability
policy, shall have no exc�usions by endorsements that would alter of nullify premises/operations,
produets/co�npleted opez'ations, contractua�, personal injury, or advertising injury, which at'e
noz'tnally contained with the policy, ui�less the City approves such exclusions it� writuig.
�ox' construcfion projccts ihat present a substaiitial com��cted operation exposure, the City may
require the contractor to maintain conlpletied operations cover�ge for a minimum af no Iess than
three (3) years following the co�pletion of the project (if identified in the Supplementary
Conditions).
C. �Iutornobile Liability. A commercial busir�ess auto policy shall provide co�erage on "any auto",
defined as autos owned, hired a�.d non-owned and pravide indemnity for claims �or damages
because bodily injury or death of any person and or property dalaaage arising out of the work,
maintenance ar use of any motor vehicle hy ihe Contz'actioz', any Subcontr�ctar or �upplier, or by
anyone directly or ir�directly crnployed by axzy of them to perform any of the Work, or by anyone
for whose acts any o f tk�exn nnay be liable.
D. Rc�ilroad Protective Liability. .If any of the worlc or any warranty warl< is within the limits of
raiIroad right-of-way, the ContracEor shall comply with #he requirements identified in the
Supplementary Conditions.
E. Notificatirin of'Policy Curzcellatiorz: Contractor shall i�nrnediately notify City upon cancellafiion
or other loss of insurance co�erage. Contractor shall stap work until replaeement insurance has
been procured. There shall be no time cred�t far days not woriced �ursuant ta this sectian.
5.05 Acceptance of Bonds and Insurc�nce; Option to Replace
If City has any objection to the coverage affarded by oz' other provisions of thc bonds or insurance
required to be purch�sed and maintained by tlae Contractor in accardance with llrticle 5 on the basis
of non-confornlance with the Contract Documents, the City shali so notify the Contractat' ix� writing
within 10 Busi.ness Days a$er receipt of the certificates {or ather evidence requested). Contractor shall
pra�ide to the City such additional information in respect of insuxance provided as the City may
reasanably reqe�est. lf Cantracta r does nat purchase or maintain all o£ the bonds and insurance rec�uired
by the Contraci Documents, the City shall notify tl�e Contractor in writing of such failuz'e prior ta the
start of the Work, ar of such failure to inaintain prior to any chazage u1 the required caverage.
ARTTCLE 6 — CONTRACTOR'S RESPONS�BTL�TIES
6.01 Supervisinn c��xcl Su�erinte�zdenee
A. Contractor shall supervise, inspect, and direct the Work cotnpetently and efficiently, de�ating
such attention thereto and applying such sldlls and expertise as may be necessary to perform the
Work in accordance with the Contract Documents. Contractor sha11 be salely responsible for tk�e
means, methods, tecluaiques, sequences, and procedures of coilstruction.
CITY OC' FORT WOR'17-1
STAIV�)ACtL7 COI�lS"CRUC'TIOIV SPECiTTCATiON DOCUM�:N'1'S
Re�ision: Feixuary2, 2016
OU 72 00 i
GENERAL GONDfT10NS
Page 2p of G3
B. At all times during the progress of the Wark, Contractar shall assign a competent, English-
speaking, Superintendent wha shall not be replacec� rx�ithaut written notice to City. The
Superintendent wiil be Contractor's representative at the Site and shall have authority ta act on
behalf of Contractar. All communication given to or received from the Superintendent shali be
binding on Contractor.
C. Contractor sha11 notify the City 241iours prior to moving areas dux'ing the sequence of construction.
6.02 Labol ; Working I-Iours
A. Contractor s�all provide competent, suitably qualified personnel to perform canstruction as
required by the Contract Documents. Contractor shall at all times maintain good discipline and
order at the Site.
B. Except as otherwise rcq�xired far the safety ar protection of �ersons or the WarI� ar property at
the Sife or adjacent thereto, and except as otherwise stated in the Contraci Docurnents, a11 Work
at the Site shall be performed during Regular Working Hours. Contractior will not petmit the
per�o,rxnance of Wor7s beyond ReguIar Working Haurs or for Weelcend Working Hours without
City's written consent (which will not be urueasonably �c�vitk�k�eld}. Written request (by lelter ar
electronic communication} to perform Work:
for beyond Regular Worldng Hours rec�uest must be made by noon at least tr�vo {2) Business
Days prior
2. for Weekend Working Hours request must be inade by naon of the prccedix�g Thursday
for legal halidays request must be made by noon two Business Days px'ior to the legal
holiday.
6.03 Services, ll�laterials, ancl L•'quipment
A. Unless otherwise specified in the Contract Docuta�ents, Contractor shall provide and ass►zme full
responsibility for alI services, materiais, equipment, laUor, transpartalion, construction equipment
and inachinefy, tools, appliances, fuel, power, light, heat, telephone, water, sanita.ry facilities,
temporary facili�ies, and all ather facilities and incidentals necessary for the performance,
Contractor requixed testin�, start-up, and connpletion of the Worlc.
S. AlI maf:erials and equipment incorporated into the Wark shall be as specified ar, if not specified,
shall be of good quality and new, excep! as otherwise provided in the Contract Documents. All
special wananties and guarantees xequired by the Specifications shall expressly run to the benefit
of Cily. If required by City, Contractor shall �ur�ush satisfactory evidence {including reports of
reyuired tests) as to ihe source, kuid, and quality of materials and equipmez�t.
crrY o� roxr woaTx
s�r�r�DARn cor�s�rr�uc-r�o� sz��cir-�cnTlo�r Dacum�N•rs
Re��s��n: r��n,��y z, za � G
00 �z oo - �
GE�lERAL CONDI710NS
1'age 2 l of 63
C, All nlaterials and equiprnent to be incorporated into the Work shall be stored, appIied, installed,
connected, erected, protected, used, cleaned, and conditioned in accardance with instructions of
the appiicable Sup�liez•, except as otherwise xnay be pro�ided iz� the Contract Docuxn�e��ts.
D. AlI iter�as o�standaz•d equiprnent to be izacoxporated itito the Worlc shall be the lalest xr�odel at t�e
time of bid, unless otherwise specified.
C.04 PYOJL'Ct SCyIC'clz�le
A. Contractor shali adhere to the �'roject Schedule established in accordance with Para�naph 2.07
and the General Requirements as it may be adjusted from tin�e to kime as provided below.
1. Contractor shall submit to City %r acceptance (to the extent indicated in Paragraph 2.07 and
the General Requirements} proposed adjustments in the Project Schedule that will not result
in changing the Contract Titzae. Such adjustments will cornpIy with any provisions of the
General Requirements applicable thereto.
2. Contxactor sk�all sub�it to City a montbl}� Project Sc�edule with a mo��bly progxess payznent
for the duration of the Contract in accordance with the schcdule specification 01 32 1 b.
Proposed ad�ushnents in the Project Schedule that will change the Contract Tin�e shall be
submitted in accordance with the requiremenCs of Article 12. ndjushnents in Coniract Tiine
may anly be made by a Change Order.
6.05 Substitutes a��d "Or-Eqa�als "
A. Whenever an item af inaterial or equipment is speciiied or described in the Contract Documents
by using the n�me af a proprietary item or the name of a particular Supplier, the specific�tion or
description is i�ntended to establish the type, �unctioz�, appearance, a�ad quality requzxed. U�less i�ae
specification or description contains or is followed by words reading that no lilce, equivalent, or
"or-equal" item or no substitution is permitted, other items oi rr�ateriat or equi}�ment of other
Suppliers may be submitted to City far review under the circumstances descriUed be�ow.
"Or-Equul " Item.s: If in City's sale discretion an item of rnatcrial or equipment proposed by
Cor�tractor is funcCiox�ally equal to tl�at narned and sufficiently sim�ilar so that na change in
related Work will be required, it may be considered by City as an "or-equal" item, in which
case review and approval of the proposed item may, in City's sole discretion, be accomplished
without compliance with same ar ail of the rcc�uirements for approval of propased substiiute
items. For the purpases of this Paragraph 6.OS.A.1, a proposed item of material or equipmeni
will be considered functionally equal to an item sa named i£
a. the City determines t1�at:
1) it is at least equal in materials �f construction, quality, durability, appearance,
strength, and design characteristics;
C1TY OF FORT WORTH
STANI3ARD CONSTRUCTTON SPT?CIFICATION nOCUMLNTS
Revisian: tebivaty2, 2a16
00 72 00 1
GENERAL CONDITIONS
Pagc22 oIFG3
2) it will reliably p�rfarm at least equaIly well the fua�ction and ac}�ieve the results
imposed by the design concept of tlie completed ���oject as a functionix�g whole; and
3) it has a proven record of performance and availability of responsive service; and
b. Contractor certifies that, if appraved and incorporated into the Work:
I) there will be no increase in cost to ihe City or increase in Contract Time; and
2} it will eonform substantially to the detailed require�nents of the item named in the
Contract Documents.
2. Szabstitalte Iterns•:
a. If in City's sole discretion an item of material or equipment proposed by Contractar does
not qualify as an "or-equal" item under Paragrapla 6.OS.A1, it may be submitted as a
proposed substitute item.
b. Contractor shall suUinit sufficient information as provided below to allow City to determine
if the item of material or equipment proposed is essentially equivalent to that naza�ed and
arx acceplabie substitute therefor. Requests for review af �roposed substitute items of
material o�- equipment wiit not be accepted by City froin anyone other than Contractar.
c. Contractor shall make wntten application to City for review of a proposed substitute item
of material or eqUipment that Contractor seeks to furnish or use. The application shaIl
coznp�y with Secrion O1 25 Oa and:
1) shaII certify that the proposed substitute itern will:
a) perform adequately tt�e functions and achieve the resulis caIled for by flxe general
design;
b} bc similar in substance to that speci�ed;
c} be suited to the satne use as that specified; and
2) will state:
a) thc extent, if any, to which t}�e use of the proposed substitute item will prejudice
Conlractor's achtevement of final completion on time;
b) whether use of the proposed substitute item in the Work will require a change in
any of the Contract Documents (or in the provisions oF any other direct contract
with City far other work on the Project} to adapt the design to the proposed
substitute item;
CI"fY OF FORT WORTI I
S"fANllAIZD ('ONSTRUCTION SPECIFICAT[ON DOCLJMLNTS
Revisinn: Pd�ruaiy2, 2016
007200-1
GENERAL CONDITIpNS
Page 23 of G3
c) whether incoxpot�tio�a or use of tl�e propased subsfitute item in conncction with
the Wox1C is subject to payment af any license fee or royalty; and
3) will identify:
a) all variations o�tl�e proposed substitute item frain that specified;
b) available engineez'i�g, sales, maintenance, repair, and replacement services; and
4) shall contain an itemized estimate o£ all castis or cxedits tla�t will resuli directly ar
zndixectly froin use of such substitutc item, including costs of redesign and Damage
Claims af nther con#ractors affected by any resulting change.
B. Substitute Cona�truction Met.hods or Procedures: If a specific means, method, technique, sec�ue�ce,
or procedure of construction is expressly rec�uired by the Contract Documents, Contractor may
f�u�nish ar utilize' a substitute means, xnet�od, technique, sequence, ar procedure of construction
appraved by City. Cantractor shall submit sufficient infnrmation to allow City, in City's sole
discretian, to deterinine that thc suhstitute proposed is equivalent to that expressly called for by
the Contract Documeiits. Contractor shall make written appIicatian to City for re�vievv i� tk�e same
manner as those pravided in Paragrapla 6.OS.A.2.
C. City's Evc�luation: City �vill be allowed a reasanable time within which to evaluate each
propnsal or submitital z�r�ade pursuant to Paragraphs 6.05.A and b.45.B. City may require Contractor
to fun�sh additional data avout the proposed substitute. City will be the sale judge of acceptability.
No "or-equal" or substitute will Ue ordered, instafled or utilized until City's review is cor�aplete,
which will be evidenced by a Change Order in the case of a substitute and an accepted Submittal
far an "or-equal." City will advise Contractor in writing af its determination.
D. Speczal Guc�rc�r�tc.>e: City rnay require Contractor to furnish at Contractor's expense a special
performance guara�tee, wat-raz�ty, or other surety with respect to any substitute. Coratractor shall
ir�demnify c�nd ho�d hca��mless City c��ad ar�yone directly or indirectly employecl by theni from an�l
agc�inst any ancl all clainz.s, datnages, loss�s ancl expel�ses (including attorneys fees) arisircg out qf
the use of siehstitutecl mccteric�ls or eqi�ipmer�t..
E. City's Cost Reimhu��sernel�t: City will record City's costs in evaluat�ng a substitute proposed or
submitted by Contractor pursuant to Paragraphs 6.OS.A.2 and 6.OS.B. Whcther or not Citiy
approves a substitute so praposed or subtn.itited by Contracior, Contractor may be required to
reimburse City far evaluating each such proposed substitute. Contractor may also be required to
reimburse City far the charges for inalcing changes in tk�e Cantract Documents (or in the provisions
of any other direct contract with Ciry) resuIting fron� the acceptance of each proposed substitute.
F. Contrc�ctor's Expense: Cantractor shail provide alI data in support of any proposed substitute or
"or-ec�ual" at Contractor's expense.
crrY or FORT wo2T� �
S'1'ANDARD CONSTCLU{"TiQN SPP.CIPTCATION llOCUMEN'1'S
Revision: Pt�iu�y2, 2016
0072OD-1
G�NERAL COiVQITIONS
Yage 24 nf 63
G. City Subsiitute Reimbi�nsement: Costs (savings or charges) attributable to acceptance of a substitute
shall be incorporated to the Contract by Chan�e Order.
H. Tirne Extensio�xs: No addit�onal time will be granted for substitutions.
6.flb Co�icerni�zg Subcontructors, Suppliers, and Other.s
A. Co�tractor shall perform with his own organization, worlc of a value not l�ss than 35°/o of the
value einbraced on the Contract, t��less otherwise approved by the City,
B. Cantractor shall not empIoy any Subcontractor, Supplier, ar other indivzdual or entity, whether
inilially ar as a replacemenl, agau�st whom City may have rcasonable objection. Contractor shaI1
not be xequired to employ any Subcontractor, Supplier, or other individual or entity io furnish or
pex'farin any of the Work against who�a Contractor has reasonable objection (excluding those
acceptable to City as indicated ii� Paragraph 6.06.C}.
C. The City may From time to time z'equire the use of certain �ubcontractors, Suppliers, or other
individuals or entities on the p;raject, and wi11 provide such requirexa�e:�ts in tl�e Supplementary
Conditions.
D. Minos-ity Business Enterprise Compliance: It is City policy to ensure the full and equitable
participaiion by Minority Business Enterprises (MBE} in the procurement of goods and services
on a contractual �asis. If the Contract Documents provide for a MBE goal, Cantx'actor is required
to comply with the intent of i�e City's MBE Ordinance (as amended} by the following:
1. Confiractor shall, upon request by City, provide complete and accurate information regarding
actual work performecl by a MBE on tlie Contract and payxxient iherefor.
2. Contractor will noti :�xzalce additions, deletions, or substiiutions of accepted MBE withaut
written consent of the City. Any unjustified change or deletion shall be a material breach of
Contract and may result in debarmenC ixi accordance with the procedures outIined in the
Ordinance.
3. Contractar shall, upon request by City, allow an audit and/or examinatiion of any books, records,
or files in the possession of the Contractor that will substantiiate the actual worlc performed by
an MBE. Material inisrepresentation of any nature vviIl be grounds for terrnination of the
Co�tract in accordance with Paragraph 15.02.A. Any such misrepresenta�ion nnay be graunds
for disqualification of Contractor to bid on future contracts with t�te City for a period of
not less than three yea�s.
E. Contractor shail be fuIly xes�onsible to City for aEl acts and omissions of the Subcontractors,
S�xppliers, and ather individuals or entiti�s performing or furnishing any of the Wor�c just as
Conta'actor is responsible for Contractor's own acts and omissions. Nothing iz� the Contract
Documents:
c�Tv or• ��ox-r woRTii
STAAl17ARll CONSTRUCTI(�N $PT'CII�]CATIVIV DOCUivll?NTS
Revision: Fel�ruaiy2, 20l G
aonoo-i
GENERAL CONDITfONS
Yage 25 of 63
1. shall cre�te %r the benefit of any such Subcontractor, Supplier, or other individual or entity
any contractual relationship between City and any such Subcontractor, Supplier or other
individ�aal or entity; nor
2. shall create any obligation on the part of City to pay or to see to the payment of any moneys
due any such Subcontractor, Supplier, ar other individual or entity except as inay otherwise be
rec�uired by Laws and Regulafions.
F. Contractor slaall be solely xesponsible fo:r scheduling and coordinating the Work of Subcontractors,
Suppliers, and other indieiduals or entities performing or furnishing any of the Work under a direct
or indirect contract with Contractar.
G. All 5ubcontractors, Suppliers, and such other individuals or entities per%nning or furnishing any
of the Work shall communicate with City through Contractor.
H. All Work performed far Confractar by a Subcontractor or Supplier will be pursuant ta an
appropriate agreeme�l bet�vveeza Ca�tractor and the Subcontractor or Supplier which specx�caliy
biiids the �ubcontractor ar Supplier to the applicable terms and condiii.ons of the Cantract
DocUments for the bene�ii of Ciry.
6.07 Wc�ge Rates
A. Duty tr� pay Prevailing Wirge Rates. The Contractor shall comply with all requirements of
Chapter 225$, Texas Government Code {as amended), including the paymeni of not less than the
rates determined by the City Council of the City af Fort Warth to be the pre�ailing wage rates in
accardance with Chapter 2258. Such prevailrng wage rates arc included in th�se Contract
Documents.
B. Penalty.for Violation. A Contractor or any Subcontractor wl�o daes not pay t.�e prevailing wage
shall, upon demand made by the City, pay to the City $60 for each worlcer employed for each
calendar day or part of the day that the worlcer is paid less than the pre�ailing wage rates stipulated
in these contract documents. This penalty s�ia11 be retained by the City to offset its adininistrati�e
costs, pursuant to Texas Govemment Cade 2258.023.
C. Complaints of Violations and City Deter�ni�2ation of Good Cause. On receipt of infoimation,
including a complaint by a warlcer, concerning an alleged violation of 2258.023, Texas
Go�ernment Code, by a Contractor or 5ubcontractor, the City s1�aI1 malce an initial
determinatioz�, before tk�e 31 st day after the d�te the City receives the information, as to whether
good cause exists to believe that the �iolaiian occurred. The Ciry shall notify in writing the
Contractor or Subcontractor and any affected worlcer of its initial determination. Upon the City's
determination tlaat there is good cause to believe Che Contractor or Subcontractor �as vialated
Chapter 2258, the City shall retain ihe full amounts claimed by the claimant or claimants as the
difference veftiveen wages paid and wages due under the prevailing wage rates, such amounts being
subtracted from successive progress paymeilts pending a finai deterinination of the violation.
CITY OF PORT WORTI-i
STANDARBCONSTRLICT[OT�1 SPTCTPTCAT[Oh3 AOCUIvfP.�ITS
Ste`�ision: Hebnk�ry2, 2416
00 �z oo - �
G�NERAL CONDlT10N5
Page 26 of 63
D. At-bitr�ation Requirer� if'T/iolation Not Resolvecl. An issue relating to an alleged violatioz� of Section
2258.023, Texas Governn�ent Cade, including a penalty owed to the City or an af�ected warker,
sha11 be submitted tio bitidi�ig arbitration in accordance with the Texas Genez'al Arbitration Act
{Article 224 et seq., Revised Statutes} if the Cantracto�' or Subcontractor and any affected worker
does not resolve the issue by agreement before Clae 1 Sth day after the date the City malces its initial
detei7nination pursuan�t to Paragraph C above. If the persons required to arbitrate under this
section do noti agree on an arbitrator before �tie 1 lth day after the c�ate ihat arbitration is required,
a district court shall appoint an �rbitratar on the petition of a�iy of the persons. The City is not a
party in the arbitration. The decision a�d award of the arbitrator is #inal and binding on all parties
and may be enforced in any court of competent jurisdiction.
E. Reco�ds to be Maintainer� T�ae Contractor and each Subcontractor shall, for a period o� three (3)
years following the date of acceptance of the wark, maintain records that show (i) the name and
occupation of Each worlcer employed by the Co�txactor in the constniction of f11e Work provided
for in this Contract; and (ii} the actual per diem wages paid to each worlcer. The records shall be
open at all reasonable houz's for inspection by the City. The provisions of Paz'agraph 6.23, Right
to Audit, shall pertain ta this inspection.
F. Progre.s.s Pcayrnents. With each progress payinent or payroll periad, whichever is �ess, the
Con�t�actar shall submit an aFfidavit stating that the Coa�tractor has complied with the rec�uirements
of Chapter 2258, Texas Govei�ment Code.
G. Posting of Wage Rates. The Contractor shal� posi prevailing wage rates in a conspicuous p�ace at
all times.
H. Subcontractor Complianee. The Cozatraetor shall include in its subcontracis and/or shall
otherwise require all ofits Subcontractors to comply with Paragraphs A through G above.
6.08 Patent Fees c�ncl Royalties
A,. Contractor shatl pay alI license fees and. royalties and assume all cosis incident to the use in the
performance of the Work ox ihe incorporation in the Work of any inventzon, design, process,
product, or device which is the subject of patent rights or capyrighis held by others. If a particular
invention, design, process, product, or device is specifiecf in the Contract Documents for use in ilae
performance of the Work and if, ta the actual knowledge of City, its use is subject io patent rights
or copyrights calling for the payment of any license fee or royalty to others, ihe existence of such
rights shall be disclased by City in the Cont�act Documents. Failure of the City to disclose sucli
�nfo;rmation does not relie�e 1:he Contractor from itis ol�ligations to pay for the use of said fees or
royalties to others.
B. 1 o the fullest extent permitted by Laws and Regulcctians, Cont�-cretor shcall irzdemnify a�id hold
Izcarrnless City, from and agr�inst all elc�ims, eosts, losses, ccnd damages {inehidirag but not lirraitecl
to all fees ccnd charges of�engineers, architect.s, cattorneys, a�zd other��raf�ssionals and all cnurt
or a�bitration or other diapute resolution costsj c�risi�ig oict of or relating to any i��friligemelzt of
pcctent rights or copyrights inci�leizt to the use in the performance of tl�e Worlc or resulti�ag f'ronz
C17'Y OF FORT WORTH
S'1'AN�ARD CONSTRUCI'ION 5PECIFICATION DOClJMGN'1'S
Revision; Pebruary2, 2016
00724U-i
GENERAL CONDITIONS
Pagc 27 of G3
the iracorPor�ation in t.he Woriz of arzy inventio�z, desigr�, process, product, or clevice rcat .s�ecif%ecl
in the Coratrccct Documerit,s.
6.09 Permits ancl Utilities
A. Contractor obtai�xed �ermits a��d lice�2ses. Contractor shall obtain and pay for all construction
pennits and Iicenses except those pra�ided far in the 5upplementary Conditions or Contract
Documents. City shall assist Contractor, when necessary, in obtaining such pernvts and licet�ses.
Contractox shall pay all governmental charges �d inspection fees necessary for the prosecution of
the Worlc which are applicable ai ihe time of opening of Bids, or, if there are no Bids, on the
Effective Date of the Agreeineni, except far permits provided by tlie City as specified i�i 6.Q9.B,
City shall pay all charges o�uti�ity owners fox co;nt�.ections for pxoviding perrx�anent service to t11e
Wark.
B. City obtained permits a�ad licenses. City wiil obtain and pay for all permits and licenses as provided
far in the Supplementary Condiiions or Contract Documents. It will be the Confractor's
responsibil�ty to carry out tlie provisions of the permit. If the Contractor initiates changes to the
Contract and the City approves the changes, the Ca�lractar is respox�sib�e �or obtaining clearances
and eoordinating wi�li the appropriate re�latory agency. Thc City wi�l not reimburse the
Contracior for any cost assaciated with these requirements oF any City acquired permit. The
following are permiis the Ciiy wi11 obtain if required:
1. Texas Departme�lt of Transportation Permits
2. U.S. Army Corps o£Engineers Permits
3. Texas Commission on En�ironmentai Quality Permits
4. Railroad Company Permits
C. Dutstanc�irag perrnits and licenses. The City anticipates acquisition of and/or access to permits
and licenses. Any ouistanding perrnits and licenses are anticipated to be acquired in �ccard�nce
with the schedule set forth rn the Supplementary Canditians. The Project Sc�edule subn7iited by
f�e Contraetor in accordance with the Contract Dac�aments must considcr any outskanding �ennits
and licenses.
6.10 Laws cznd Re�n,rlations
A. Contractor shall give all notices required by and shall con��ly with all Laws and Reg�alations
applicable to the pertoi7nance of the Work. Except where otherwise express�y requit'ed by
applicable Laws and Regulations, the Citiy shall nat be xesponsible for moniioring Contractor's
compliance with any Laws or Regulatians.
B. If Contractor perfort�rzs aaay Woxk l�.owing or havulg reason to lcnow that it is contr�ry to Laws or
Regulations, Coniractor shall bear all claims, costs, losses, and damages (including but not limited
to all fees and charges of engineers, archifects, at�orneys, and otl�er professionals and all
CITY OF FORT WORTI I
STn1VDl�CtD C,QNSTR13CT1QN SPLCTPICAT[ON T}OCUIv1�NTS
Rct�ision: F'cbivary2, 2D] 6
oa�zoa- i
GENERAL COi�3�ITIONS
I'age28 nl'63
court or arbitration or other dispute resolutio� costs) arisi�ig out of or relating to such Worlc.
However, it s�ia�l not be Contractor's r�sponsibility to make certain that the Specifications and
Drawings are in accordance with Laws and Regulations, but th�s sha11 not relieve Contix'actar af
Contractor's obligations under Paragraph 3.02.
C. Changes in Laws or Regulations not known at the time of opening af Bids Iaaving an effect on
the cost or tiz�ne of performance of the Work may b� the subjecti of an adjustment in Contract Pric�
ar Cor�tract Time.
6.11 Tcaxes
A. On a contract awarded by the City, an arganizatio�i which qualifies for exe�nption pursuant to
Texas Tax Code, SuUchapter H, Sections l 51.3a1-335 (as amcnded), the Contractorrna.y purchase,
rent or Iease all materials, supplies and equipment used or consutned in fl�e perfornnance of this
contract by issuing lo his supplier an exemption certi�icate in lieu of the tax, said exeinption
certifca.te to coimply with State Contptrolier's Ruling .007. Any such exemption certificate issued
Co tlae Conhactor in lieu of tl�e tax shall be subject to ancE shaIl comply with the provision of Staie
Camptrollcr's Ruling .Ol l, and any other applicab�e rulings perkaining to the Texas Tax Code,
Subch�pter H.
B. Texas Tax permits and in�ox'�ation �nay be oblained from:
Coinptroller of PubIic Accounts
Sales Tax Division
Capital Station
A.ustin, TX 7$711; or
2. lttt ;//www.wi�idow.state.tx.us/taYinfo/taxfoin�s/93-�oa'�xzs.hhnl
6.12 Use ofSile ancl OtherAreas
A. Limitation on Use of Site crJ�d Other Areas:
Contracla� shall confine construction equipinent, the storage of znaterials and equipment, and
the operations of workers to the Siie and other areas permitted by Laws and Regulatians, and
shall not unreasonably enct�nr�ber the Site and other areas with construction equipment or other
materials or equipment. Contractor shall assume full responsibility for any damage to any such
land or a�ea, or to the owner or occupant thcreof, ot' of any adjacent land or areas resulting
fro� the performance of the Work.
2. At any time when, vi the judgmenti of the City, the Contractor has obshucted or closed or is
carrying on operations in a partion of a street, right-of-way, or easetrxent greater tl��n is
necessary foz' pro�er execution of the Work, the City may requue the Contractor to finish the
section on which operations are in progress befoxe work is commenced on any additional
area of the 5ite.
ClTY OF FORT WORTH
STANI�ARD C'OI�ISTRIJCTTON SYEClF[CATIpN DOCUMEN"I�S
Revision: Fcb�uary2, 2016
00�2oo-i
GENERAL CONDITIONS
Page 29 of C3
3. Sl�.ould any Damage Claim be mac�e by any sucl�. ownex ox occupant beca�se o f tk�e perfo;r�ance
of tl�.e Work, Cantractar shall promptly atie�npt to resolve tl�e Dan�age Claix�a.
4. Pursum�.t to Paragruph 6.21, Contractor shall inciervznify a�zd hol�7 harmlcss City, frorra ca�acl
crg�inst aIl claims, costs, losses, and darvzages arising out of or Yelc�ting to any claim or action,
legc�l or equitable, brought. by any such owner or occupant agai��st City.
B. Removr�l of� Debris Dasring Perfor�na�2ce af the War1i: During th� progress of the Work
Cox�t�actor shall lceep the Site and other areas free froz7a acc�rx�ulations of �vaste zaaatexials, rubbish,
and okher debris. [Zemoval and dis�asal of such waste materials, rubbish, and other dehris shall
caiiform to applicable Laws and Regulations.
C. Szte Maintenc�nce Cleaf�ing; 24 hours �fter written notice is given to the Contractor that the
clean-up on the job site is proceedir�g in a znanner unsatisfactory to the City, if the Contractor fails
to correct the unsatisf�ctory procedure, the City may take such direct action as the City deems
appropriake to correct the clean-up de�ciencies cited to the Contractor in the wrikten notice
(by lef:ter or electranic comm�nication}, and tbe costs of such direct action, plus 25 % of s�ch
costs, shall be cleducted fi•ozn tlae monies due or to beco�ne due to t�ae Cantxactor.
D. Fir�al Site Cleca�zi�a.g: Priar to Final Acceptance of the Work Contractor shall clean the Site and
the Work ar�d make it ready for uiilization 6y City or adjacent property awner. At the coinpletion
of the Work Contractar shall remove from the �itc all toals, appliances, construction equipmcnt
and machinery, and surplus materials ar�d sha11 restore to original condition or betler all pro�erty
disturbed by the Work.
E. Loading St,r�ucture.s•: Contractor shall not ioad nor permit any part of any sh-uct�.u•e to be lo�ded
in any inaanex that will e��da��.gex the sti-ucture, nor shall Contxactor subject any pa�t o� tl�e Worlc
or adjaeeiit praperty to stresses or pressures that wi�l endaiiger it.
6.13 Record Documents
A. Contractor shall naainiair� in a sa�e place at Che Site or in a place designated by the Contractox and
approved by the City, onc (i) record capy of all Drawin�s, Specificaiions, Addenda, Changc
Orders, Field Orders, and writteil interpretations and clariCcations in good order and annotated 1:0
show changes n�ade during consiructian. These recnrd. documents together with all approved.
Samples a�ad a caunierpart of all accepted Submittals will be av�ilable to City far reference. Upon
completion of the Work, these record dacuments, any operation and maintenance manUals, and
Submittals will be delivered to City prior to Final I�ispection. Contr�ctor shall include accurate
locations for buxied and innbedded itenas.
6.14 Safety and Ppotectio��
A. Contractor shall be solely responsible for initiating, maintaining and supervising all safety
precautions and programs in co�ectioza wxtb the Woz-k Such xespor�sibility does not relie�ve
Subeontractors af iheir responsibility for the safety of persons or property in the performance of
their wark, nar for compliaiice with applicable safety Laws and Regulations. Contractor shall
crrY or ro��r wo�Tx
STANT)ARU CONSTRUC"T10N SI'ECIEIC.S170N llOCUMEN7'S
Re�ision: Felnua�y2, 2U l6
00 72 UO - ]
GENERAL CONDITIdNS
Yage 30 al' 63
take all necessary precauiions for the safety of, and shall provide the necessary protection� to
prevent damage, injury o,r loss to:
1. all persons on the Site or vcrho may be affected by the Work;
2. all the Wor�i and maCerials and equipment to be incozpot�ted therein, whether in storage on
or off the Sxte; and
3. other prape�-ty al ihe Site or adjacent thereto, including trees, shrubs, lawt�s, walks,
pavements, roadways, structures, utilities, and Undergt-ound Facilities not designated for
ren�oval, relocation, or replacement in the course of construction,
B. Contractor sha11 compIy with all applicable Laws and Re��ulations reiating to the safety of
persons or property, or to the protectian of persons or propexty from damage, injury, or loss; a�.d
shall erect and maintain all necessary safeguards for such safety and protection. Contractor shall
noiify owners of adjacent property and of Underground Facilities and other t�tility owners when
prosecutian of the Worlc znay affect tihem, and snall cooperate witl� them in the protection,
renr�oval, relocation, and repla.cernex�.t of their property.
C. Contractor shali comply with the applicahle requirements of City's safety programs, if any.
D. Contractor shall inform City of the specific requirements of ContracCor's safety program, if any,
with which City's elnpIoyees and represenlatives inust compIy while at the Site.
E, All dainage, injury, ar loss to a�ay property referred to in Paragz'aph 6.14.A2 or 6.14.A.3 caused,
directly or indirectIy, in whole or in part, by Contracto:r, any Subcontractor, Supplier, or any ather
individual or entity directly or i�ictirectiy employed by any of them to perfotxn any af the Work, or
anyone far whose acts any of them �ay be liable, shall be remedied by Contractor.
F. Contractor's duties and responsibilities �or safety and for protection o� tl�.e Work shall continue
uniil such ti�nc as all the Work is coxxapleted and City has acceptec� the Wark.
6.15 Sc�f'ety Representative
Contractor shall inform City in writing of Contractor's designated safety representative al tl�e Site.
6.16 Hazard ComrnLanicatiola P�ograms
Contractor shaIl be responsible for coorciinating a�ay exchange of matei�al safety data sheets ar otl�er
hazard cornmunication infoi�nation required to be made available to oz' exchanged �etween or amang
employers in accordance with Laws or Regulations.
6. J 7 �mergencies and/or Rectification
A. In emergencies a�fecting the safety or protection of persons ar ihe Work or property at the Site oz'
adjacent there#o, Contractor is obligated to act to prevent threatened damage, injury, or loss.
Contractor shall give City pro�npt wi7tten notice if Contractor helieves that any significaut
ciTv or r=ox�r woaT�-r
STAT�Tl7AR� COAISTRIJCT[O�I 51'ECIFICATIOiV T]dCUMEN'I'S
Re��ision: February2, 2plG
ao�zoo-�
GENERAL CONDITIONS
Pagc 31 of G3
changes in thc Work or variations from the Contract Docuzx�ents have been caused thereby or are
required as a resuIt thereof. If City delermiz�es thaf a claaa�ge in the Contract Documents is required
because o� tbe action talcen by Cantractor in respanse to such an emergency, a Chan�e Order may
be issued.
B. Should the Contractor fail to respond to a request from the City to rectify any discrepancies,
omissions, or correc�ion necessary to conform with the requiren�ents of ihe Contract Documerlts,
the City shall give the Contractor �writte�a noCice tk�al sucl� work or changes are to be performed.
The writien notice shall direct atteniion to thc discrepant candition and request the Contractor to
take remedial aciion to correct the condition. In the event the Contractor daes not take positi�e
steps to fulfill this written request, or does not show just cause for not taking the proper aciion,
within 24 hours, the City may ialce suck� rerneclial action with City forces or by contract. The City
sha�l deduct an amount equal to the entire cosis for such remedial action, plus 25%, €rom any
funds due or become due tl�e Contractor on the Project.
6.18 Suhrnittals
(1.. Contractor shall submit required Submittals to City for review and acceptance in accordance
with the accepted 5chedule of Submittals (as required by Para�n-aph 2.07). Each submittal will be
identified as City rn�y require,
1. Submit number of copies specified in the General Rec�uirements.
2. Data shown on the �u6mittals wi11 be complete with respect ta quantities, dirnensions, speci�ed
performance and d�sign criteria, materials, ar�d similar daia to sl�ow City the services,
xnate:rials, and equipment Contractor proposes ta provide and to enable City to review the
information for the limited p�arposes required by Paragraph 6.18.C.
3. Submittals submitted as herein provided by Coniractor and re�iewed by City for
confornzance with the design coilcept shall be executed in conforinity witli the Contract
Documents unless otherwise required by City.
4. When Subinit#als are submitted for the purpose of showing the installation in greaiez' delail,
their review shall �ot excuse Contractor from rec�uirements shown on the Drawings and
Specifications.
5. For-�nfoxmation-OnIy submittaIs upon which the City is not expected to conduct review or
take respansive action may be so identified in the Cantract Docurnents.
b. �ubmit required iiumber of Samples specified in the Specifications.
7. Clearly identif'y each S�mple as ta material, Supplier, pertinent data such as catalag nu�mbers,
thc use for which intended ax�d othez� data as City miay xequi:re to enaUle City to review the
submittal for the limited purpases required by Paragraph 6. I$.C.
C1TY OF FORT WpRTH
STANDARD CONSTRUCTION SPL'CIl'TCATION llOCUM�;N'1'S
Rcvision: Pebnnry2, 2016
OD7200-1
GEiVERAL CQNDITIONS
1'age 32 of 63
B. Where a Submittal is required b� ihe Contract Documents or the SchedUle of Submitta�s, any
related Worlc performed prior io City's review anci acceptance of tt�e perti�ent subrnittal wiIl be
at the sole expense and responsibility of Contractor.
G City's Review.•
1. City will provide timely review of required Submitta.ls in accordance with the ScheduIe of
�ubmiitals acceptable to City. City's review and a.cceptance will be only to delermuie if the
iterns cor�ered by the submittaIs will, after i�stallation or incnrporation in the Wo�•k, conform
tio the information given in the Cantracl Documents and be compatible with the design concept
af the completed Project as a�u�.etioning whoIe as indicated by thE Conlract Dacurnents.
2. City's review and acceptance wiIl not extend to �neans, methods, teciuiiques, sequences, or
procedures af construciion (except wltere a particular n�eans, inethod, technique, sequence,
or procedure of construction is specifically and expressly called for by the Contract
Documents) ar to safety precautions or pz'ograms incident thereto. The review and acceptance
of a sepai�te item as such will not indicate approval of the assenibly in which the item
functions.
City's review and acceptaaice shall not relieve CantracCor from responsibility for any
variatian froim the requirements of the Contract Documents unless Contractor has complied
with lk�e requirements of Sec�ion O1 33 00 and City has given wi7tten accepta�ce of each
such variation by specif c writien notation thereof incorporated in or accompanying the
Submitlal. City's review axit� acceptance shall not relieve ConCractor from responsibility for
complying with the requirements of the Contract Dacuments.
6.19 Continuing the WoYk
Except as othenvise provided, Contractor shaIl carry on the Wor]< az�d adhere to the Project 5chedule
during all disputes or disagreements with City. No Work shail be delayed or posiponed pending
resolut�on o� aaly disputes or disagreements, except as Ciiy and Contractor may othez'vvise agree in
writing.
6.20 ContracioN's Ge�aercal Warranty r�nd Guarantee
A. Contractoz' wairants and guarantees to City that all Work will be in accordance with the Contract
Dacuments and wiIl noi be defective. City and its officers, directors, members, partners,
employees, agents, consuItants, and subcontractors sl�all be e�atitled to rely on representation af
Contractor's wat�ranty and guarantee.
B. Contractar's warranty and g►�arantee hereunder excludes defects or damage caused by:
abuse, modification, or improper inainten�nce or operation by persons other than� Cantractor,
Subcontractors, Suppliers, or any oCher individual or entity fo�• wh4�n Contractor is
responsiUle; ar
ciTY or roa•r woii� t�
5TN�IDAK1] COAfS'I1tUCTION SPF.CII'^ICAl ]ON DOCUM�NTS
Revision: Fetnuary2, 2p 3 6
O(} 72 00 - 1
GENERAL CONDITI�NS
Pugc 33 of 63
2. normal wear and tear under normal usage.
C. Contractor's obfigation to per#oim and complete the Work in accordance with the Contract
Documents shall be absalute. None of the follawing will constitute an accep#ance of Worl� that is
not in accordance wifh the Contract Documents or a reiease of Contractor's oblig�#ion to perform
the Work in accordance with the Contract Documents:
1. observations by City;
2. reca�nnend�tion ar payinent by City of any progress ar final payment;
the issuance of a certz�cate of Fixza] Acceptance by Ciry or any payz�aezat related t�aereto by
City;
4. use or occupancy of the Wnrk or any part thereof by City;
5. any review �nd accept�nce af a Subrnittal by City;
6. axay inspection, test, or appraval by others; or
7. aiiy correction of defective Work by City.
D. The Contractor shall remedy any defects or damages in �lie Work and pay for �ny damagc to
other work or property resulting therefrom which shall appear within a period of ftiva {2) years
froin the date of Final Accept�nce of the Work unless a longer period is specified and shall furnish
a good and sufficicnt maintenance bond, complying with the requirernents of Article
5.02.B. The City will give notice of observed defects wi�11 reasonable pramptness.
6.21 Indem�ni�cation
A. Contractor covenants and agrees �o indemnify, hold harmtess aud defend, at its ow�i
expeuse, the City, its officers, servants and employees, from and against any and all cl�ims
�rising a�t of, or alleged to arise aiit of, the work and servic�s to be performed by the
Contractor, i�s officers, agents, employees, subcontractors, liceuses or invitces uiider this
Contract. THIS �NDEMNII+TCATION PROVISION IS SPECII�'ICALLY INTENDED TO
OPERATE AND BE EFFECTIVE EVEN �F IT �S ALLEGED OR PR�VEN THAT ALL
OR SOME OF THE DAMAGES BEING SOUGHT WERE CAUSED. IN WHOLE OR IN
PART. BY ANY ACT. OMISSION OR NEGLIGENCE OF THE CITY. Tl�is xndexzanity
provision is intended �o include, without limitatian, indemnity for costs, expeuses and legal
fees incurred by the City in defending against such claims and causes of aciions.
S. Contractor covenants and agrees to indernnify and hold harmless, at its own exper�se, the City,
its afficers, serv�nts aud employecs, from and against any and all loss, damage or destructian
of property of the City, arisin�g out o�, or alleged to arise out of, the vvorl� and services to �e
performed by the Contractor, its officers, agents, empioyees, subcontractors, licensees or
invitees under this Cantract. TH1S INDEMNIFICAT�ON PROV1S10N IS
CITY OF 1'OR7' WOR'd'H
S'1�ANllAR1) COI�lS'1RUC"1'lON SP�:CINICA"CiON DOi;UMEIVTS
Revision: Feknuary2, 201 G
ao�zoo-i
GENERAL CONDITIpNS
Pagc 34 of 63
SPECIFICALLY INTENDED TO OPERATE AND BE EFFECTIVE EVEN IF IT IS
ALLEGED OR PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT
WERE CAUSED. IN WHOLE OR IN PART. SY ANY ACT OMISSION OR
NEGLIGENCE OF THE CITY.
6.22 Delegation ofProfessianal Design Services
A. Contractor will not be requix'ed to provide professional design services unless such services are
speci�ically requi�ed by the Contract Documcnts foz a portion of the Worlc or unless suc� services
are req�i�red to carry out Contractor's responsibilities for construction means, methods, techniques,
sequences and procedures.
B. If p�rofessional design services or ce�riifications by a design professional related to systems,
materials or equiprne�at are specificaIly required of Co�att'actor by the Contract Documents, City
will specify alI performance ar�d design criteria that such se�vices must satisfy. Contz�actor shall
cause sucla services or certifcations to be pxovided by a properly licensed pro�essional, whose
signature and seal shall appear ot� all drawings, calculations, specif:tcations, certifications, and
SubmittaIs prepared by such professional. S�bmittals related ta lbe Work designed or certified by
such professional, if prepared by others, sliall bear such professional's written approval when
submiCied to City.
C. City s�al� l�e entitled to rely upon the adequacy, accuracy and completeness of the services,
cerli�cations or approvals performed by such design professionais, provided City �ias specified
to Contractor performance and design criteria that such services mus( satisfy.
D. Pursuant to this Paragraph 6.22, City's review and acceptance of design calculations and design
drawings will bc only for the Iimited purpase of checking for confonnance with perfor�nance and
design critex-ia given and the design concept e�pressed in the Contract Documents. City's revtew
and acceptance of Submittals (except design calcuIations and design dravc+i�gs) wili bc ouly for
t1�e purpose stated in Paragrap� 6.18.C.
6.23 Rzght to ALadit
A. Tl�e Contractor agrees that the Citiy shall, until the expiration of three (3} years atter final
payment under this Contract, have access to and the rig�it to exan�iz�e and photocopy any directly
pertine�it books, dacuments, papers, and records of tik�e Co�itracior involving transactio�s relating
to this Contz'act. Contractor agrees that the Citiy shall have access during Regular Wa;rlcing Houts
to all �iecessaiy Contractor facilities and shall be provided adequate az�d appropx-iate worIs spacc
in order to conduct audits in coinpliance with the provisions o:F this Paragraph. The City shalt
�ive Contractor reasonable advance notice of intended audits.
B. Contractor fiu-t�er agrees to include in all its su.bco��tracts herennder a provision ta the effect ihat
the su�conta'actor agrees that the City shall, until the expiration of th��ec (3} years after final
payment under this Contract, have access to and the right to examine and photocopy any directly
pertinent books, documents, papers, and records of such Subcontractor, involving transactions ta
the subcontracC, and further, that City shall have access dunng Regular Working Hours to all
�rrY or- roK�r wo�zrl �
S'I'At�IDARD CON5TIZUC"I'IOI�I SPrCIl 1CATEOIV DOCUM[;�IT5
Revision: Febn�y2, 2016
U{] 72 00 - I
GENERAL CONDITIONS
Pagc 35 of 63
Subcontractor faciiities, and shall be provided adequate and approprzate woxlc space in order �o
conduct audits in compliance wit11 the provisions o� this Pa�'agraph. The City shall give
Subcontractor reaso�able advaz�ce natice of intended audits.
C, Contractor and Subconiractor agree to plaotacopy such docurnents as may be requested by the City.
The Ciry agrees to reimburse Contractor for the cost of the copies as follows at the rate published
in the Texas Administrati�e Code in effect as of the time copying is perforn�ed,
6.24 Noncliscri�ninatio�z
A. The Ciry is res�onsiblc for operating P�viic Transportation Programs and implementing transit-
reIated �rojects, which are funded in part with Federa� financial assistance �warded by the U.S.
Departmenti of Tx'a�sportation and the Federal Transit Admuustration {FTA), without
discriminating against any person in the United States on the basis of race, color, or national arigin.
B. Title VI, Civil Rights Act. of�19�4 c�s czrrccrzclecl.� Contraetor shall comply with the requirements of
the Act �nd the Re�ulatians as further de�ned in tl�e Supplementary Conditions far aiiy project
receiving Federal assistance.
ARTICLE 7— OTHER WORK AT THE SITE
7.01 Related Wor�k at Site
A. City may perform other worlc related to the Project at the Site with City's employees, or other
City contractors, or ti�rough o#her direct contracts therefor, or have other work performecl by utiility
owners. If such other worlr is not noted in tl�e Co�tract Docuinents, then written notice thereof
vvill be given tc� Contractor pnor to starting any such okher work; and
B. Contractioz' shall afforci each other contractor who is a party to such a direct contract, each utility
owner, and City, if City is per�'orming other work with City's employees or olher City contractors,
praper and safc access to the Site, provide a reasanable opporhuiity for the intraduction �nd storagc
of materials and ec�uipment and the execution of such othex vvoxk, and propez'ly coordinate the
Work with theirs. Contractor shall do all curiing, fitting, and patching of the Work that may bc
required io properly connect or otl�erwise make its several parts came together and properly
integrate witli suc� other work. Contractor shall nat endanger any work of others by cuiii�ag,
exca�ating, oz' otik�ez�ise a�teriilg such work; provided, however, that Contractor may cut or alter
others' warlc with the wriiten consent of Ciry and the others whose work will be affected.
C. If the proper execuiian or results of any part of Contractor's Work depends upon work performed
by oihers under this Article 7, Contractor shail inspect such other work and pramptIy report to
City in writing any delays, defectis, or de�ciencies in such other work that render it unav�ilable
or unsuitable for the proper execution and results of Contractor's Worl<. Contractor's failure to so
report will constitutc an acceptance oi such other worlc as iit and proper far urtegration with
Contractor's Worlc except for latent defects in the work provic�ed by others.
cri•Y ot� rox��� waRTl �
S"i'ANDAItD CONSTRUCTiON SPECiP[CATiON DOCIJivfrN"I�S
ae��si�n: rc�n,�ryz,ZOlb
00 72 00 - 1
GENERAL CONDITIONS
Page 36 nf b3
7.02 Coorclinatio�z
A. �f City intends ta contract with others for the performance of other work on the Project at the
Site, the following will be set forth in Supplementary Canditions:
1, the individual or entity who will have authority a�nd responsibility for coardinaiion of the
activities among the various co��tractars will be identified;
2. the specific matters to be cavered by such authority and responsibiiity will be itemized; and
3. 1he extent of such authority and responsibzlities will be provided.
f
` B. Unless otherwise provided in the Suppleme�iary Conditions, City shall have autnority %r such
conrd ination.
l
t ARTICLE $ — CITY'S RESPONSIBYLTTIES
8.01 Carrtmunications ta Contrcactor
Except as otherwise provided in the Supplementat'y Conditions, City shall issue al� communications
� to Contractor.
y $.02 Furnish Daia
,
� City shall timely furnish the d�ia required under the Contract Documents.
8.03 Pay Whe�a Due
City shall make payments to Contiactor in accordance wzih Article 14.
� 8.04 Land.s ancl Ecasement.s; Repo�ts and Tests
f
�
;
�
�
City's duties with respect to providing lands and easements and providing engineex'ing surveys to
establish refercnce points are set forth in Paragraphs 4.p1 and 4.05. �aragraph 4.02 refers to City's
iden#ifying and making a�vailable to Contractor copies ofreports of explorations and tests of subsurface
conditions and dx'awings af physical conditions relating to exis#ing surface or subsurface structures at
or contiguous to the Site that have been utilized by City in preparing the Ca��.tract Documents.
8.05 Change Orde�-s
City shall execute Change Orders in aecordance wilh Paragraph 10.03.
8.0G I�aspecCions, Test.s, a��d �1pl�rovals
�
� City's responsibiliiy vvilh x'espect to certain inspections, tests, and approvals is set forth in Paragraph
13.03.
i ciTv or- rox�r wo�rrH
i STANl7A}Z� CON57'RUC7ION SPECIFICt\TIOAI DOCI]MILNTS
Re��ision: Fehnu�y2,2016
�
ao�zoo-�
GENERAL CONDI710N5
Page 37 of 63
8.07 Lirnit,atiorzs orz City's Idesponsibilit,ies
A. The City shall not supervise, direct, or have control or authoriry over, nor be respansible for,
Contractar's means, methads, techniques, sequeiices, ar procedures af constructian, ar the safety
precautions and progratns incident thereio, or for any failure of Contractor to comply with Laws
and Regulaiions applicable to the perforn�ance of the Work. City will nat �c responsible for
Cantractar's failure to perfarm the Work in accordance with the Contract Documents.
B. City will notify the Contractor of applicable safety plans pursuant to Paragraph 6.14.
8.48 Unc�isclased Hazardnus Envi�onme�ztc�l Conciitinn
City's responsibility with respect to an undisclosed Hazardous Environmental Conditian is set forth
in Paragraph 4.06.
$.09 Compliance with Safety Progrccm
While at the Site, Ciiy's empioyces and representatives shall comply with the specific applicable
�-ec�uireinents of Contractor's safety programs of which City llas been inforined pursuant to
Paragraph b,14.
ARTiCLE 9— C�TY'S OBSERVATI�N STATUS DURING CONSTRUCTI4N
9.01 City's Projecl Manager
City will pro�iele one or more Project Manager(s) during tl�e construction periad. The duties and
responsibilities and the limitations of authority of City's Project Manager during construction are set
forth in tl�e Cant�'act Docuinents. The City's Project Manager for this Car�tract is < insert name here
�, or his/her successor pursuant to written na�ification from the Director af < insert n�anaging
depar[meni here >.
9.02 Visits to S`ile
A. City's Project Manager will mal<e visits to the Site at intervaJs appropriate to the �various stages
of construction as City deems necessary in order to obscrve the progress that has been made and
t�e quality of the various aspects of Contractor's executed Work. Based on infortnation
obtained during such visits and observatio�as, City's Project Manager will determine, in general, if
the Work is proceeding in accordance with the Caniract Documents. City's Project Manager will
nat be required to make exhaustive or cantinuous inspections an the Site to checic the quality or
quantity of the Work. City's Pr�ject Manager's ef�orts will be d�rected toward providrng City a
greatex- degree of con�idence that the cozr�pleted Worlc will conform generally io the Contract
Documents.
B. City's Project Manager's visits and observaiians are subject to all the limitations on authoriiy and
responsi�ility in the Contract Documents including those set forth in Paragraph
8.07.
C[7"Y OF FDRT WpRTi [
STl�NDARD CONSTRUC'TiON S�P.CTFiCATiON 170CUNfT•NTS
Rcvisiou: Fe6iu�vy2, 2016
QO 72 00 - 1
GENERAL COIVDlTION5
Yage 38 ofG3
9.03 Authorized T/cariations in Work
City's Project Manager may aut�aorize minor variations in the Wark from the requirexnents of the
Contract Documents which ao not invoIve an adjustment in the Contract Price or the Contract Time
and are compatible with the design concept of the co�pleted Project as a functioning whole as
uldicated by the Contract Documents. These may be accomplished by a Field Ort�er and wili be
binding on City and also an Contractor, who shall perform the Work involved promptly.
9.04 Rejecting Defective Wor1�
Cii� will have authority to reject Wark whicl� City's Project Manager believes to be de�ective, or wi11
not produce a completed Project that conforms to the Contract Documenls ox' that wili prejudice the
integz7ty of the design concept af the coinpleted Project as a functioning whole as indicated by the
Contiract Docuxnents. City will have authority to conduct specia� inspection or testing of the Work as
pravided in Article I3, whether or noti t�e Work as fabricated, installed, or cornpleCed.
9.�5 Deterrninations for WoYkPerforrned
Coniractor will c�etcf-mine the actual quantities and classifications of Work performec�. City's Project
Manager wiIl review with Contractor the preliminary deterininations on such maiters before rendering
a written recommendation. City's written decision will be final {excepl as �nadified to reflect changed
factual conditio�s or more accurate data).
9.06 Decisions on Requirements of Contract Documenls and flcce�tability of Worlc
A. Cify wiil be the initial interpreier of the requirements of the Contract Documents and judge of the
acceptability o#�the Work thcreunder.
S. City will rend.er a written decision on any issue referred.
C. City's written decision o�. the issue referred wi11 be final and binding on the Contractor, subject
to the pro�isions af Para�raph I O.Ob.
ARTICLE 10 — CHANGES IN THE WORK; CLAIMS; EXTRA WORK
10.OI Authorizeci Cha��ges in the Wo�lz
!1. Without invalidating the Contract and without notice to azay surety, Ciiy may, at any hme or fi�oim
tinae to time, order Exlra Work. Upon �otice of such Extra Worlc, Contractor shall prorr�ptly
proceed with the Worlc involved which will be per%rmed under the applicable conditions of lhe
Contract Documents (except as otherwise specifically provided). Extra Wortc shall be
m�rnorialz ced by a Change Order which rnay a r znay not precede an order of Extra woz'lc.
B. For minor changes of Work not requiring changes 10 Contract Time or Cont�act Price, a Field
Order may be issued by the City.
crry or roRT woRTi �
STAM7A1tD CONSTRUCTION SPECIFICATION DOCUtvTT:NTS
Revision: Fehruary2,2016
ao �z oo - i
GENERAL CONDITIONS
Pagc 39 of 63
10.02 Unauth.nrized Chcrnges i�z the Work
Contractor shaI] not be entiiled to an increase in the Contract Price or an extension of the Contract
Time with respect io any work performed that is not required by the Contraci Dacurnezatis as amended,
modified, or supplemented as pro�ided in Paragraph 3.04, except izz tlae case af an emergency as
provided in Paragraph 6.17.
10.03 Executiorz of�Chunge th�ders
11. City and Contractor shall execute appropriate Change Orders covering:
chaiiges in the Work which are: (i) ordered by City p�rsuant to Paragraph 10.01.A, (ii} rec�uired
because of acceptance of defecfive Work under Paragraph 13.08 or City's correction of
ciefective Work under Paragraph 13.09, or {iii) agreed to by t.�ie parties;
2. changes in the Contract Price or Contract Time which are agreed to by thc pai•ties, including
any undisputed sum or amount of time for Work actually performed,
10.04 Extra Work
A. Should a differencc arise as to what does or does not constitute Extra Wark, ar as to tihe payment
thereof, and the City insists upon its performance, the Contractor shall praceed wi�11 �e work �fter
maicing written request far written arders and s�al� �eep accuz'ate accaunt of t�e actual reasonable
cost tliereof. Contract Clairns regarding Extra Work shali be made �ursuant to Paragraph 10.06.
B. The Contractor shall furnish the City such installation records af all deviations from the original
Cont:ract Documents as may he necessary to enable the City to prep�re for permanent recoz'd a
corrected set of plans showing the actual installation.
C. The compensation agreed upan for Extra Wark whether or not initiated by a Change Oz'der shall
be a full, complete and final pa}nnent for ali costs Contractor incurs as a result or re�ating to thc
change or Extra Work, whetk�er said costs are kr�own, uxaIt�own, foreseen or unforescen at that
time, including vvit�aut lirnitation, any costs for delay, extended overhead, ripple or impact cost,
or any o�lier effect on changed or unchanged worlc as a result of the change ar Extra Woxlc.
10.05 Noii�cation to Surety
If t11e provisions of any bond require notice to be given to a surety of any ch�nge affectiing ti�ae general
scope of the Worl< or the provisians of the Contract Docurnents (includz�g, bui not limited to,
Contract Price or Contract Time), the gi�ing of any such notice will be Contractor's responsibility.
The amount of each applicable bond will be adjusted by the Cantractor ta reflect the effect af any
such change.
C[TY OF FORT WORTH
STAtQDARD COi�iSTRUCTION SPEC1H1Ct11'lON DOClJME1�IT5
Rcvision: l�ebmary2, 2016
00 �z oo - �
GENERAf� COIVDITIONS
Pagc 40 of 63
10.06 Col2tract Clccirns Pr acess
A. City's Decisiora Required: AIl Contract Claims, except those waived pizrsuant to Paragraph
14.09, shalI be re%rred to the City for decision. A decision by City shalI be required as a condition
precedent to any exercise by Contractor of ax�y rights or re�nedies he may otherwise have under
the Contracf Documents or by Laws and Regulalions in res�ect of such Contract Claims.
B. Notice:
l. Written notice stat�ng the ge�eral na�ure of each Contract Ciaim shall be delivered 6y thc
Contra.etor ta City no Iater than 15 days after the start of the event giving �7se thereto. The
xesponsibility to substantiate a Contract Claim sha11 rest with the party malcing the Contract
Claim.
2. Notice of tl�e amounl or extent of the Contract Clairn, wzth supporting data shall be de�ivered
to the City on or before 4S days fioz7n the start of the event �iving rise therelo (unless the City
allows additional time �or Contractar to submit additional ar more accurate data. in support of
sucla Coi�tract Claim).
3. A Cox�i�act Clai�n for an adjustment in Contract Price shall be prepared in accordance with
the provisions of Paragraph 12.01.
4. !1 Contract Claim for an adjustment in Contract Time shall be prepared in accordance with
the provisions of Paragraph 12.02.
5. Each Contract Claim shall he accompanied by Contraclor's written statement that the
adjustment claimed is the entire adjustxn.ent ta which the Contractor beIieves it is entitled as a
result of said even.t.
6. The City shall snbmit a�y response to the Contractor within 30 days after receipt of the
clairnant's last snbmittal (unless Conlract allows addi�ional tune).
C. City's Action: City will review eac�i Contract Claim and, within 30 days after receipt of the last
sui�rx�ittal af the Contractor, if any, talce one of the foIlowing actions in r�vritit�.g:
]. deny �he Contract Claim in whole ar in pait;
2. approve the Contract CIaim, ot-
� 3. notify Che Contractar that the City is unable to resolve the Contract Clai�n if, in the City's
__� soIe discretion, it would be inappxopriate for the City to do sn. For purposes of further
resolution of the Contracti Claim, such notice shall be deemed a denial.
crrY or� roizT wor�T�r
57�ANUARD CONSTRLJCiION SPT-CiPICA'110N DOCUMENTS
Revision: Fe�nua�y2, 24] G
oo��ao-i
GENERAL CON[]I710N5
Page 4l of b3
D. City's written action under Paragrap� �0.06.0 will be �ina1 and binding, unless City or
Contractor invoke the dispute resolution procedure set forth in Article 16 wi�l�i 30 days of such
action or denial.
E. No Contract Claim far an adjustment in Contract Price or Contract Time will be valid if �ot
submitted iz� accordance with this Paragraph 10.06.
ARTICLE 11 �- COST OF THE WORK; ALLOWANCES; UNIT PRiCE WORK, PLANS
QUANTITY MEASUREMENT
11.Oi Cn.rt nf'the Work
A. Casts I�2cluded..• The term Cost of the Work means khe sum of all costs, except those excluded in
Paragraph 11.0I.B, iiecessarily uicurred �nd paid by Contractor in the proper perfarmance of t��e
Wark. When the value of a�y Warl� covered by a Change Order, the costs to be reimbursed to
Contt'aetiaz' will be only those aciditional or incremental costs required because of the change in the
Work. Such costs shall not inciude any af the costs itemized iii Paragraph 1 LOl.B, and shall
include but not be limited fo the following items:
PayroIl cosfs for employees in the direct employ of Contractor in the perform�nce of the
Wark under schedulcs of job classifications agreed upo� by City and Caz�tr~actor. Such
enlployees shall i�clude, withaut limitation, superintendents, foremen, and other personnel
employed full time on the Work. Payroll costs for employees not enlplayed full time on the
Wark shall be apponioned on the basis of their time spent on t�ie Wark. Payroll casts shall
include;
a. salaries with a 55% markup, or
b. salaries and wages plus the cost of fiinge benefits, which sh�ll include social secu:t'i�y
contributions, unemployment, excise, and payroli taxes, r�vorkers' con�pensation, health
and retirernent bene�ts, bonuses, sick leave, �acation and holiday pay applicable thereto.
The expenses of performing Work outside of Regular Worlcing Hours, Weelcend
Working Hours, or legal holiciays, sha11 be included in the above to the extent authorized
by Ciry.
2. Cost of all rnaterials and equxpx�aei�t furnish.ed anci incarporaied in the Work, including costs
of transpartation and storage thereof, and Suppliers' �ield services required in cannection
therewith.
3. Rentals of all construction equipmeni and machinery, and the parts thereof whether rented
from Contractor oz- othez-s i� accorclance with rental agreeinents appraved by Ciry, and the
costs of transportation, laading, uriloading, assembly, dismantling, and removai thereof. All
such casts shall be in accordance with the terms of said rental agreements. The rental af any
such equipment, machinery, or parts shall cease when the use tiiereof is no longer necessary
far the Wark.
cITY or roR� wox�[-H
STANDARD CO�iSTRUCTION SI'EC1F1CtYf10N DOCUMENTS
Re�isioii: Nebmary2, 20 i b
00 �z oa - �
G�NERAL COiVQITIONS
Page 42 of 63
4. Payiments made by Contractor to ,Subcontractors for Work perfarmed by Subcontracfiors. If
required by City, Contractor shall obtain competitive bids from subcontractors acceptable to
City and Contractar and shal� deliver such bids to City, wha will then determ2ne, which bids,
if any, will be accepCable. If any subcontract provides that the Subcontractor is to be paid on
the basis oi Cost of the Work plus a fee, the Subcontractor's Cost of the Work an�d fee shall
be determined in tl�e sarne mar�.ner as Contractor's Cost of the Woz'Ic and fee as provided in
ihis Paragraph ll.01.
S. Costs of special consuliants (inc�uding but not limited to engineers, architects, testing
laboratories, surveyors, attorneys, and accountants) e�nnployed for services specifically related
to the Work.
6. Supplemezatal costs including the following:
a. The pt�aportion af necessary transportation, travel, and subsistence expenses of
Coniractor's empIoyees incurred in discharge of duties connected wxtlx the Work.
b. Cast, including transportation and mai�tenance, of all materials, supplies, equipment,
znachinery, appliances, office, and temporary facilities at the Site, and hand tools not
owned by �ie worket's, which arc cansumed in the pex'formance of the Wor1�, and cost, less
markct value, of such ilems used but �ot consumed which remain the property of
Contractor.
c. Sales, co�isumer, use, and other similar taxes �-elated to the Worlc, and for which
Contractor is liable not covered under Paragraph 6.11, as innpased by Laws and
Regula�ions.
d. Deposits los# for causes other than negligence of Coniractor, any Subcontractor, o,r
anyone directly or ir�directly employed by any of thez�o or for whose acts any of them tnay
be liable, and royalty payments and fees �or permits and licenses.
e. Losses at�d datnages {and relafed expcnses} caused by damage to the Worlc, not
cotnpezasated by �nsurance or otherwzse, sustained by Contractor �n connection with the
performance of the Work, provided such losses and datr�ages have resulled from causes
other than the ncgligence af Contractor, any Subcont�-actor, ar anyone directly or indirectly
emplayed by any of them or for whose acts any of them may be liable. Such losses sha11
include seitlements made with the written consent and approvai of City. No such losses,
damages, and expenses sl�all be included in tI�e Cost of the Work %r the pu�pose of
determuiing Cantracto;r's fee.
f. The cost ofutilities, fuel, and sanitary faciIities at the Site.
g. Minor expenses such as telegrams, long dis[a�nce teZephone calls, telephoz�e and
communication services at the �ite, expxess and courier services, and similar petry cash
itetxzs in connection with the Wprk.
CITY OF FORT WORTH
STAN]�AItD COtVSTRUCTION SI'ECIFICATIQhI QOCUMENTS
Revision: Feh�u�uy2, 2U � 6
ao �2 00 - a
GENERAL CON�ITIONS
Page 43 oi� G3
�. Tl�e costs of premiums for all bonds and insurance Contractor is required by the Contract
Dacuments to purchase and maintain.
B. Costs Fxcluded: The term Cost af the Work shall nat include any of the following items:
1. Payroll costs and other compensation of Contraetor's officers, executives, principals {of
pat�erships and sole proprietarslups), general m�nagers, safety managers, engineers,
architects, estimators, attorneys, �uditors, accauntants, purcliasing and canh�acting agents,
expediters, timekeepers, clerlcs, and other pexsonnel ez�r�ployed by Contractar, whether at the
�ite or in Contr�ctor's pnncipal or �ranch office for general adminisfration af #he Work and
not speci�cally included in the agreed upon scheciule of job classifications referred to in
Paragraph 11.O1.A.l or specifically covered by Paragraph 11.O1.A,4, all of wk�ic� ax'e to be
eonsidered adn�ur�ist�-ative costs covered by the Contractor's fee.
2. Expenses of Contractor's principal and branch offices other than Contractor's affice at the
Si�e.
3. nz�y pax� of Caniractar's capital expenses, including interest on Cantractar's capital
en�ployed for the Worlc and charges against Contractor for del�nquent payments.
4. Costs due to the negligence of Contractor, any Subcontractor, ar ai�yone directly or inc�irectly
employed by any of them or for whose acts any of the�n rnay he liable, includ.ing but not
lirnited ta, thc correciion of defective Wark, dispasal of ma�erials or equipnae:nt wz-ongly
supplied, and making good any damage to property.
5. Other over�ead or general expense costs of any lc_ind.
C. Contractor',s Fee: When all the Worlc is performeci on the basis of cost-plus, Contractor's fee
shall be detenriuied as set forth in ihe Agreement. When the vaIue of any Work cavered by a
Chaitge Order for an adjustment in Contract Price is determined on the basis of Cost of the
Work, Cantractor's fee sh�ll be determined as set �orth in Paragraph 12.01.C.
D. Document�tion: Wheilever the Cast of the Work for any p�uupose is ta be deterinined pursuant to
Paragt'apk�s 11.OJ .A and 11.01.B, Caniractor wiIl establish and inaintain records thereof in
accordance with generally accepted accounting practices and submit in a form accep#able to City
an itemized cost breakdown together with supporting data.
11.02 Allowances
A. Specifiec� ,4llawc���ce: Ii is understood that Contractor lias included in the Coiltract Price a11
allowances so nanled in the Contract Documents and shail cause the Worlc so covered tio be
pez�£ornaed far such sums and by such persons or entities as may be acceptable to City.
B. Yre-hicl �Illowr�nce.s:
1. Contractor a�-ees that:
crrY oF FoaT woR�r� �
ST'1lN�ARD CONSTRUCTiQTI SPEC[F[CATiON DOCUMTiNTS
Rcvision: Pc6n3ary 2, 201 b
007200-t
GENERAL CONOITIONS
1'age 44 of 63
a. the pre-bid allowances include the cost to ConlracCor of rnaterials and equipment required
by the alIowat�ces ta be delivered at the Site, and all applicable taxes; and
b. Contractor's costs for unloading and handling on the Siie, labor, installation, overhead,
profit, atad other expenses contemplatec� �oz' the pre-bid allowances have been included in
the allowances, and no detrzand for additional payinent on account of any of the
foregoing will be valid.
C. Co�ztiragency Allowance: Contraetoz agrees that a contingency allowance, if any, is for the sole use
of City.
D. Prior to final payment, ati appxopriate Change Order will be issued to reflect acfual amounts c�t�e
Contractor on account of Woi-k covered by allowances, and the Contract Price shall be
correspondingly adjusted.
11.03 Unit P�-ice Work
A. Where the Contrac� DocFunents provide that all o�• part of the Work is to be Unit Pr:ice Work,
initialIy t�e Contract Price will be deented to include for aIl Unit Price Woa'ic an ainount equal to
the sum of the unit price for each separately idenfiified item of Unit �:rice Work times the estima.ted
quantity of each item as indicated in the Agreemeait.
B. The estimated yuantities of i.tems of Unit Price Work are noti guaranteed and are solely for ihe
purpose of comparison af Bids and deterinining an initial Contract Price. Determinatians of the
actual quantifies anc� classifications of Unit �;rice Work performed by Contractor will be made by
City subject to the provisions of Paragraph 9.05.
C. Eac� unit pric� wi21 be deemed to inciude an amot�nt considered by Contractor to be adequate to
cover Contractor's overhead and profit for each separately identifed item. Worlc descrfbed in the
Contract Documents, or reasonably inferred as required fo�' a functionaIly complete instalIatian,
but not identified �iti the listing of unit price items shall be considered incidenial lo unit price work
listed and the cost of incidental work included as part of the tanit price.
D. City may make an adjustment in the Contract 1'nce in accordance with �aragraph 12.OI if:
1. the quantity af any item of Unit Price Warlc pe��ormed i�y Contractor differs mater�ally and
significant�y from the estimaied c�uantity of such ite�n indicated in the Agreement; and
2. t�ere is no corresponding adjustment with respeci to any other itexx� of Work.
s
:_� E. Increased or Dec�-ease�l Quantities: The City reserves the right ta order Extra Work in
accordance with Paragraph 10.01.
1. Tf the changes in quantities or the alterations do noC significantly change ihe character af
worlc under the Coniract Documen#s, thc altered work will be paid for at the Contract unit
price.
CiTY OF FORT WORTH
STANDAttD CONSTRUCTIOlV SPECIFICATION DOCUMENT$
Revision: Feb�ua�y2, 2016
00 �2 00 - �
GENERAL CDN�ITIdNS
Page 45 0£ G3
2. If the changes in quantities or alterations significantly changc the charactcr of work, the
Cantract will be amezaded by a Change Order.
lf no unit prices exist, this vvill be considered Extra Work and tlae Contract will be amended
by a Change Order in accardance with Article 12.
4. A sigiiificant change in the character of work occurs when:
a. the character of work for any Item as altered differs materially in kind or nature from that
in the Contract or
b. a Major Item of work varies by more than 25% from the on�inal Contract quantity.
5. When the q�anti�y of worlc to be done under any Major Item of the Contract is more than
125% of thc original quantity stated in the Contract, then either party ta the Contract may
request an adjustmcnt to the unit price on the portian of the work that is above 125°/4.
When �e quantity of work to be dane under any Major Itein of the Contract is less than 75%
of the original quantity stated in the Contract, tk�en either party to the Contract nr�ay request
an adjustment ta the uiiit pnce.
1 i.04 Plans Qicanlity Measir.remeni
n. Plans qua.ntities may or may not represent the exact quantity of work perfarmed or inaterial movecl,
handleci, ar placed during the execution of the Contract. The estimated bid quantitics arc
designated as fnal payment quantities, un�ess re�ised by tl�e governing �ection or this Artic�e.
B. If the quantiry measured as outlinec� under "Price and Payme�t Procedures" varies by inore than
25% (or as stipulated under "Price and Payment Procedures" for speci�ic Items} fi�om the tot�i
estimated quantity for an indi�iduaI ltem origi�ally shown in the Contract Doc�ments, an
adjustmezlt na�y be :rnade ta the quantity of aut�orized wark done far payinent purposes. The party
to the Contract rcquesting the adjustmeni will provide field measurements and caIculaEions
showing the Iinal quantity far which payment will be made. Payment for revised c�uantity will be
made at the unit price �id for that Item, except as provided for in Article l0.
C. When quantities are revised by a change in design approved by the City, by Change O:rder, or ta
correct an error, or to correct an error on the plans, the plans quantity will be increased or decreased
by the amount involved in #he change, and tlie 25% variance will apply to the new plaiis c�uantity.
D. Tf the total Contract quantity multi�lied by the unit price bid for an individual Item is Iess than
$2S0 and the �tern is zaal origi�ally a plaz�s quantiiy Itenn, t�en the Iterxi may be paici as a plans
quanti.ty Itern if the City and Contractor agree in writing to fix the final quantiry as a plans quantity.
CITY OP PORT WOR'�'H
STANl7ARD CONSTRUCT[ON SPL'CIPICATION DOCLiv1EN'1'S
Revision: Febiva�y2, 2015
oo�zoo-�
GENERAL CONDITIONS
Page 46 of 63
E. Far callout work or non-site specific Contracts, the plans quantity rneasuxement requirements are
not appIicable.
ARTICLE 12 — C�IANGE OF CONTRACT PR10E; CHANGE OF C�NTRACT TYME
12.01 Chcrnge af �Contrcrct Price
A, The Contract Price may only bc changed by a Change Order.
B. The value of any Wor1s covered hy a Change Order wiiI be determined as foliovvs:
�. where the Worlc involved is covexed by unit prices contained in the Cantract Docuinents, Uy
ap�lication of such unit pz-ices to the quantities of the items involved (subject to the provisions
of Paragraph 11.03}; or
2. where the Worlc znvolved is not covered by unit prices cantained in the Contract Documenls,
by a mutually agreed lump sum or unit price (whicn may include an allowance for ove�heacE
and profit not necessarily in a.ccordance with Paragraph 12.O1.C.2}, and shall include the cost
of any second�ry impacts thai are foreseeable at the time of pricing ll�e cost of Extra Work;
or
3. wl3ere the Work involved is not covered by unit prices contained in thc Coutract Documents
and agreeznent to a lump sum or unit price is �Zot reached under Paragraph 12.O1.B.2, on the
�asis of the Cost of the Work (detertnined as provided in Paragraph 11.01) plus a Contractor's
fee for overhead and pra�it {deternained as provided in Paragraph 12.O1.C).
C. Contractor :s Fee: The Contractar's additional fee for overhead anc� proft shaIl be determined as
follows:
1. a mutually acceptable �xed fee; or
2. if a fixed fee is not agrecd upon, then a fee based on the following pe�centages of the various
portions of the Cost of the Work:
a. for costs incurred under Paragraphs I1.O1.A,1, 11.O1.A.2. and 1 Z.Ol.A.3, the
ContracCox''s additional fee shall be 15 percent except far:
1) rental fees for Contractor's own equipmex�t using standard rentaI rates;
2) bonds and insurance;
b. for costs incurred under Paragraph 11.a1.A.4 and 11.O1.A.5, the Contractor's fee shall be
five percent (5%);
1) w�iere ane or more tiers of subcontracts are on the basis of Cost of the Worlc plus a
fee and no fxed fee is agreed upan, tlie intent of �axagraphs 12.O1.C.2.a and
12.O1.C.2.b is that the Subcontractor who acivall� �erforms the Work, at whatever
crry ar- roirr wo�T� r
STAM]AKll CONSiRLICT[ON SPECIFICATiON DOCUMEN'I'S
Revision: Fetnu�y2, 201 b
00 �z oo - i
GENERAI. GONDITIONS
Page 47 of 63
tier, will be paid a fee of 15 percent of ihe casts incurred by such Subcontractar under
Paragraphs 11.O1.A.1 and 11.01.A.2 and that any higher tier �ubcontracfor and
Contractor will each be paid a fee of �ve percent (5%) of the amount paid to the next
lower tier Subcontractor, however in na case shall thc curnulative total of �ees paid be
in excess of 25%;
e. no fee shall be payable on the basis of costs itemized unc�er Paragraphs 11.01.A.b, and
11.41.B;
d. the amount af credit io be allowcd by Contractor to City for any change which results in
a net decrease in cost will Ue the ainount of the actual net decrease in cost plus a deduction
in Coiitractor's fee by an amaunt cqual to five percent (S%) of such neti decz'ease.
12.02 Change of Contrcret Tirne
A. The Contract Time may only be changed by a Change Order.
B. No extension of the Contract Time wil] be allowed for Extra Warlc or for claimed delay unless the
Extra Worlc contemplatecl or claimed delay is shown to be on the critical path o f fl�e Project
Sch�dule or Contractor ca�a sk�ow by Critical Path Method �nalysis haw the Extra Work or claimed
delay adverseiy affects the critical path.
12.03 Delays
A. Wherc Contractor is reasonably delayed u� the perfarmance or campletion of any part of the
Work witihin t�e Contract Time due to delay beyond the control of Cantractor, the Contract Time
may be extended in an amount equal to the time last d�e to such delay if a Contract Clai�n is made
therefor. Delays beyond the control of Contractor shall includ.e, but noi be Iirnitied to, acts or
neglect by City, acts ox taeglect of utility owners or otl�er contractors perfornluig other work as
contemplated by Article 7, fires, floods, epidemics, abnormal weather conditions, or acts of God.
Such an adjustment shat] be Contractor's sole and exclusive reinedy far the delays described in
this Paragraph.
B. If Contractor is delayed, City shall not be liable to Contractor for any clairns, costs, lasses, ar
damages {ineluding bt�t ��ot limited io all fees and ch�rges of engineers, architects, attorneys, and
other professionals and ali court or arbitration or other dispute resolufion costs) sustained by
Contractor on or in connection with any other proj ect or anticipated project.
C. Contractor shall not be entitled to an adjustment in Contr�ct Price or Contract Time for deiays
within the control of Cantractor. Delays att�'ibutable to and within the cantral of a Subcontractor
ot' Supplier shall be deemed to be delays within the control of Contractor.
D. The Contractor shall xecezve no compensation far delays or hindrances to the Work, except when
direct and unavoidable extra cost to the Contractar is ca�ised by the failure of the City ta pro�ide
information or material, if any, which is to be furnished by the City.
CiTY O�' 1�OILT WORTH
STANDARll CONS'fRUC'110N SPEC[F[CATION �QC1TPvILN"TS
Revision: Febn�y2,20iG
oa �z oo - �
GEfVERAL CONDITIONS
Page 9S of 63
ARTICLE i3 — TESTS AND �NSPECTrONS; COI2RECT�ON, REMOVAL OR ACCEPTANCE OF
DEFECTIVE WORK
13.01 Notice ofDefects
Natice of aIl defective Worlc af whicli City has actuaI lcnowIedg� wiil be given to Cai7tractor.
Defective Worlc n�ay be rEjected, corrected, or accepted as provided in #his Article 13.
13.02 Access to Wvrk
City, independent �esting lahoratones, and governm�nta� agencies with jurisdictional intez'ests will
have access to t�e Siie and the Work at reasonable times for their observation, inspection, and testing.
Contractor shall provide them pxoper and safe conditions for such access and advise tliem o�
Confiractor's safety pracedures and pmgrams so that tl�ey zx�ay comply therewith as applicable.
�3.03 Tests ancllns�ectioras
A. Co�tractor shall give City tirnely notice of readiness of thc Worlc for all required inspections,
tests, or approvals and shaIl cooperate with inspection and tiesting personneI to facilitate required
inspections or tests.
B. rf Contract Docurne�ts, Laws or Regulations of any public body l�aving jurisdictio� require any
of the Wor� {or part ihereo fl to be inspecCed, testEd, or approved, Cantractar shall assume fi�l
respanszbiIity for arranging and obtazning such independent inspections, tests, retests or approvals,
pay all costs in connection therewith, and furnish City the requix'ed certificates of inspectian ox
approval; excepting, however, those fees specifically identified in the Supplementary Conditions
or any Texas Department of Licensure and Regulation (TDLR) inspections, vvhich shall he paid as
descx'ibed in the Supplementary Conditions.
C. Contractoir shall be responsible for arranging and obtaining and shall pay all costs in connection
with any inspections, tests, re-tests, or approvals requir�d #�o r City's acceptance of materials or
equipmenf: to be incorporafed in the Work; or acceptance of materials, mix desi�ms, or equipment
suh�nitted for approval prior to Contractor's purchase thereof for incorporation in the Work.
Such inspections, tests, re-tests, or appro�als shall be performed by organizations acceptable to
City.
D. City may an-ange for the se�rvices of an independent testi�ng laboratory ("Testing Lah"} io
perform any inspections or tests {"Testing") for any part of the Work, as determtned solely by
Ciry.
1. City will coordinate such Testing to the extent possible, with Contractor;
2. Should any Testing under this �ectian 13.03 D resUlt in a"fail", "did not pass" or other
similar negative result, the Contraclor shall bc responsib�e for paying for any and aIl retests,
Contractor's cancellation without cause of City initiated Testing shall be deemed a negative
result and require a xetest.
CITY OF FORT WORTH
STANUAE2D CONSTRUCi'iON 5PECIF[CATION DOCUMEN`f'S
Revision: Pebn�uy 2, 2016
aa�zoo-t
GENERA�. COt�lDITIONS
Page 49 of G3
Any amounts owed far any retest under this Section 13.03 D shall be paid directly to t11e
Testing Lab by Contractor. City will forward all invoices for retesis to Contractar.
4. If Contractor fails ta pay tlie Testing Lab, City will not issue FinaJ �aynaent u�atil the Testing
Lab is �aid.
E. If any Wark (or the worlc af others) that is to be inspected, tested, ar appgoved is covered by
Contractor without written concurrencc of City, Contractor shall, if requested by City, uncover
such Wox-lc for observation.
F. U�covering Worlc as providecl in Paragraph 13.03.E sha13 be at Contractar's expense.
G. Contractor shall have t.�e right to malce a Co�a€racl Claim regarding any retest or invoice issued
under Section 13.03 D.
13.04 U�zcovering Work
A. �f a.tzy Worlc is covered cozatxary to the Co�ntract Doci�ments or specific instructions by the City, it
must, if requested by City, be uncovered for City's obse�-vatio�a a�ad replaced at Contractar's
expense.
B. I£City considers it necessary or advisable that covered Work be observed by City or inspcctcd or
tested by others, Contractor, at City's request, sh�ll uncover, expose, or atherwise make available
�or observation, inspection, ar testing as City may require, that portion af the Work in question,
furnishing all necessary labor, material, and equipment.
If it is �ound that the uncovered Work is defecfive, Contractor shal� pay all cJ.ai:�x�s, costs,
losses, and damages {including but not li�nited to alI fees and charges of engineers, architects,
attorneys, and other professianals and all court ar other dispute resolution costs) arising out of
or relating to such uncovering, exposure, obseivatioii, inspec#ion, and testing, �id of
satisfactory replacement or reconstruction (includiz�g but �not lirniied to all costs of �epair ox
replacement of work of others}; or City sh�ll be entitled to accept defective Worlc in accordance
with Paragraph 13.08 in which case Cantractor shall still Ue responsible for all costs associated
�with exposing, obsex-ving, and testing tl�e defective Work.
2, tf the uncovered Work is not faund. to be defccti�e, Contractar shall be allowed �n increase
in the Contract Price or �n extension of the Contract Time, or bath, direetly attributable to sueh
uncovering, exposure, observafion, inspection, testin�, replacement, and reconstruction.
I3.05 City May StoP the Work
If the Work is defective, or Contractor faiIs to supply sufficient skilled workers or suitable materials
or equipment, or fails to perform the Work in such a way tl�at the canlpleted Work will conform to
the Contract Documents, City n�ay order Contractor to stop tJie Worlc, or any portion thereof, until the
cause for such order has been eliza�inated; l�owever, tk�is riglat of City io stop the Worlc shall not give
rise to any duty on ihe part of City to exercise thas right for the benefit of Cox�traetor, any
CITY OC' FORT WORTH
STANIJANI7CON5TR11CTTON 5P�CIPICAT[ON DOCLTMP..�ITS
Itevfsion: Fe6n�uy2,2016
oa �z ao - i
GENERAL CONDITfOf�lS
Page 50 of 63
Subcontractor, any Supplier, any other individual or entity, or any surety for, or employee or agent of
any of them.
13.06 Correction or Ren2ovcrl ofDefective Work
A. Promptly after receipt of written notice, Contractor sha�l correct all defective Work pursuant to
an acceptable schedule, whether ar not faUricated, installed, or completed, or, if the Work has been
rejected by City, remove it from lhe Project and z'eplace it with Work that is not defecfive.
Contiractor shall pay all claims, costs, additional testing, losses, ar�d damages (including but not
limited to all fees and charges o� e�gineers, architects, attorneys, and othea� prafessionals and all
court or arbiiration or othex di5pute resolution costs) arising o�t o� ox' relating io such correction
or remova� (includuig but noi limited to aIl costs of xepair or repIacement of work of othets).
Failuz'e to require the rernoval of any de�ective Work shall not constitute acceptance of such Work.
B. Whe� conecting defective Work under the terins of this Paragraph 13.06 or' Paragraph 13.07,
Contractor shall take no action that would void or othet-wise impair City's special warranry and
guarantee, if any, on said Work.
13.p7 Correctio�x Period
A. If within two (2) years after the date of Final Acceptance {or such Iongex period of time as inay be
prescribed by �tie terms of any applicable special guarantee requixed by fi�ie Contract Documents),
any Work is found to be dcfective, or if the repair of any damages lo tlae land or areas znade
available for Contractor's use by City or per�nitted by Laws and Regulat�ons as co�tetnplated in
Paragraph 6. t 0.A is found to be de�ective, Contractor shall promptly, vc�ithout cost Eo City and in
accordance with City's vvritten instructions:
1. repair such defective land o r areas; or
2. co�rect such defeciive Work; or
if the defective Work has been rejected by City, remove it frota� the Project and replace it
with Worlc that is not defective, and
4. satisfactorily cor�'ect or repair or remo�e and replace a�y damagc to other Wark, to the work
of others or other land or areas resuZting there�iroxn.
B. I� Contractor does �aot promptly comply with the te�-rms of City's written instnzctions, or in an
emcrgen�cy where delay would cause serious risk of lass oi- damage, City may l�a�e the defective
Work corrected or repaired or may have the rejected Worlc removed and replaced. AlI claims,
costs, losses, and dainages (including but not limited ta all fees and charges of engineers,
architects, aliorneys, and other professionals and all court or other dispute resol�tion costs) arising
out of or relating to such correction ox repair o�- such removal and replacenlent {including but not
lunited to ail costs of repair or replacement of wark of others) will be paid by Contractor.
cerY ar t�oaT woR�rH
STAIVI7ARD CONSTR[JCTION SI'ECIFICA"fION DOCUMEN'fS
Revision: Fehnruy2, 2416
UQ720U-1
GENERAL CONDIiIONS
Pagc 51 of G3
C. Irj special circumstances where a particular item of equipment is placed in continuous service
befare Final Acceptance af all the Wark, the correciion period for that itexx� nzay start to nui �i-am
an earlier date if so pravided in the Contract Documenis.
D. Where defective Work {and damage to other Work resulting therefrom) has been corrected or
removed and replaced under this Paragraph 13.07, the correction period hereunder with respect
to such Work z�ay be requixed to be e�ter�cled for an additiona] period of ane year afCer the end of
t�e initial correctian period. City shall provide 30 days written notice to Contractor should such
additional warrar�ty coverage be requirec�. Confractor may dispute this requiremenf by filing a
Cantract Claim, pursuant to Paragraph 10.06.
E. Contractor's obligations under this Paragraph 13.07 are in addition to any other obligatian or
warranty. The provisioz�s of t�ais Paragraph 13.07 shaIl r�ot be co�astrued as a substitute for, or a
waiver af, tl�e provisions of any applicable statute of limitatioil or repose.
13.08 Accer�tance ofDefective Work
If, instcad of requiring correction or remova� and replacement af defective Work, CiCy prefel-s Co
accept i.t, City may do sa. Cantractor shall pay aIi claims, costs, losses, and da�aages {including but
not Iimited to all fees and charges of engineers, architects, attorneys, and other professionals and a�l
court ar other dispute resolution costs} attributable #a City's evaluation of and deterinrnation to accept
such defective Work a�d for tk�e dizninished value of ihe Work to the extent not otherwzse paid by
Contractar. If any such acceptance occurs prior ta Final Acceptance, a Change Order will be issued
incorparating thc necessary revisions in the Contract Documents with respeci to the Work, and City
shall be entitled to an appro�riate cfecrease in the Contract Frice, reflecting the ditnitiished value of
Work so accepted.
13.09 Cily May Correct Defectzve YYorlc
A. If Coittractor fails within a reasonable time after written notice from Ci1y to correct defecti�e
Work, or to reniove and replace rejected Work as rec�uired by City in accordance with Paragraph
13.Q6.A, ox aCContractor fails to �erfarxn the Work in accordaa�ce v�rii� the Contr�ct Docu�nents,
or if Contractor faiis to comply wiih any ather provision of the Contract Dncuments, City may,
after seven (7) days written notice to Contractar, correct, or reinedy any such deficicncy,
B. In exercising the ri�hts and remedies under this Faragraph 13.09, City shall proceed
expeditiously. In cannection with such correcti�e or remedial action, City may exclude Contractor
from alI or part of ihe Site, take possession of all or part of the Work and suspend Contractoi's
services related thereto, and incorporate in the Work all materials anc� equipment incorporated in
the Work, sto�•ed at tl�e �ite or for �whic�a Czty laas paid Contz-actor but vvlaich are stored elsewi�ere.
Contractox shall allaw City, City's representatives, agents, cansultants, employees, and City's
other contractors, access ta the Site to enable City to exercise the rights and remedies under this
Paragraph.
C. All claims, costs, losses, and dama�es {including but not limited to aIl fees and charges of
engineers, architects, attorneys, and other professionals and all court or ather dispute resolution
c�r�r or r-ox��� wox � t�
S'[�ANllARllCONS'fR[1CIION Sl'ECIFICATION DOCUMEI�iTS
Ctevision: Fetnuary2,201C�
D4 72 00 - 1
GENERAL COiV�ITIONS
l'age 52 of 63
costs) incurred oi- suslained by City in exercising the rights and remedies undez' this Para�naph
13.fl9 will be charged against Contractoz', at�d a Change Order will be issued incorporafiing the
necessary revisions in the Contract Documenis with respect ta the Work, and City shalI be entitled
to an appropriate decrease in the Contract Price.
D. Contractior shall not be allowed an extension of the Contract Time because of any delay in th�
performance of the Work attributable to t.�e exercise of City's rights and remedies under this
Paragraph 13.09.
ARTTCLE 14 — PAYMENTS TO CONTRACTOR AND COMPLETION
14.01 Schedule nf Vc�lues
The Schedule of Values for lump sum contracts established as provided in Paragraph 2.07 will serve
as the basis for progress payments and wi�l be in�corpox'ated into a form of Application for Payment
acceptable to City. Progress payn�ents a�� account of Unit Price Work will be based on fihe number of
units connpleted.
14.02 Progre.ss Pc�ymelats
A. Ap�Iications for P�ymerais:
Contractor is responsibIc for providi�g all iu�formatian as required to become a vendar of the
City.
2. At least 20 days before tilae date established in the General Requirements for each progress
pay�aaent, Contractor shall submit to City %r review an Application for Payment f lled out a�d
signed by Contractor covering ihe Worlc com�leted as of the date of the E1pplication and
accotnpanied by such suppo�-ting docurnentation as is xequired by the Coniract Documents.
Tf payment is requested on tile basis of materials and equipment not incorpo:rated in the Work
but delivered and suitably stared ati the Site or at another location a�reed to in writing, the
Application for Payme�.t shall also be accompanied by a bill of sale, invoice, or other
documentation warranting that City has received thc materials and eqt�ipment free and clear of
all Liens aud e�idence that the materials and eqt�zpnraezat are covered by appropriate insurance
or other arrangements ta protect Citiy's interest therein, all of which must be satisfactory to
City.
�. Beginning with t�e seco�d Application for Payment, each Application shall include an affidavit
of Cantractor stating that previous progress payments received on account of tkae Wor1C have
been applied on account to discharge Contractor's legitiinate obligations associated with prior
Applications for Payn�ent.
5. The a.mount of retainage vvith respect to pragress payments will be as stipulated in f.�ie
Contra.ct Docurrxe�ts.
Cl'1 Y OF FORT WOCLTH
S'I�ANDARD CONSl'RUC: CI0�1 SPF,CIPiC,A170N llOCUMENTS
1ZevisiOn: Pc6ruary 2, 20 ] 6
ao�zoo-1
GENERAL CONDITIONS
Page 53 of 63
B. Review of �A��licatio�2s:
1. City will, after receipt of each Application for Payment, either indicate in writing a
recoinmendation o� pay�nent or return the Application to Co�tz'aclox i�dicatii�g reasons for
rcfusing payment. In the latter case, Coiiti-actor may malce the necessary corrections and
resuhmit the Application.
2. City's processing of any payment requested in an Application far Payment will be based on
City's observations of the executed Work, �nd on City's review of the Application far Paymenti
and the accompanying data and schedules, that to the best of City's lta�owledge:
a. the Work has pro�-essed �o �e poinE indicated;
b. t�ie c�uality of the Work is generally in �ccordance with tl�e Contract Documents (subject
to an evaluation of the Work as a functioning whole prior to or upon Final Acceptance, the
results of any subsequent tests ca�led for in ihe Cantract Documents, a final determi��ation
of quantii�es and classifcatioils for Work perfarmed under Paragraph 9.05, and any other
qualifications stated in the reconln�endaiion).
3. Processing any such p�ytnent will not thereby be d.eenled to have representied tlaat:
a. uispections made to chcck the quality or the quantity of the Worlc as it has been
perforn�ed have been exhausti�e, extended to every aspect of the Worlc in progress, or
invol�ed detailed inspections of the Work beyand the responsibilities specifically assigned
to City in the Contract Documents; or
b. there may not ve otl�er inatters or issues between the parties that might entitle Contractor
to be paid additionally by City ar enntle Ci#y to witht�ald payment io Contractor, ar
c. Contractor has complied with Laws and Regulations applicable #o Contractor's performance
of the Work.
4. City may refuse to process the whale or any p�rt af any payment because of subsequently
discovered evidence or the results of subsequent inspections or tests, and revise or revol<e
any such payment previously made, #o such extent as rnay be necessary to protect City from
loss because:
a. the Worlc is defective, ar the completecf Work has been d�tnaged by the Contractor or his
subcontractors, requiring correction or replacernent;
b. d.iscrepancies ixa quantiities contained in previous applications for payment;
c. the Contract Pr-ice has been reciuced by Ci�ange Orders;
d. City has been required to correct defective Wor�C ar complete Worl< in accoz'daa�ce with
�'aragraph 13.09; or
CITY OF FORT WORTH
STANDACtD CONSTRUCTiON SYFCIP1CA11d3�7 llOCUMEN7'S
Rcvision: Pcbivary 2, 2015
�
ao�zao-i
GENERAL CONDITIOPlS
Page 54 of G3
e. Ciry has actual knowIedge af the occurrence of any of �ie events enumerated in
Paragraph 15.02.A.
C. Ret�airiage:
1. For contracts less tha� $400,004 at the #ime of e�ecution, retainage shail be te�a percent
(10%).
f
� 2. For contracts greater than $400,Q00 at the iime of execution, retainage s�all be five percent
(5%).
D. Liquiclr�ted Damages. Por each caIendax day that any worlc shall rernai� uncompleted after the
I time specified �n the Contract Docunzents, the sUm per day specified in the A reement, will be
g
deducted from the monies due the Contractor, not as a penalty, but as liquidated data�ages suffered
( by the City.
E. Pcaymelit..• Contractor will be paid pursuant to the requirements of this Article 14 and payment
� will became due in accordance with the Cox�.tract Documents.
�
F. Recluction irz Pcry�netat:
i1. City may refuse lo xnake payment of f�ie arnount requestcd because:
� a. Liens have been filed in connect�on wilh the Work, except where Contractor has
f deliv�red a specific boud satisfactory to City to secure the satisfactiion and discharge of
such Liens;
b. Chere are ather iiems entitling City to a set-off against the amount recommended; or
,
c. City has actual lcnowledge of ihe occnrrence of any of the events enumerated in
� Paragraphs �4.02.B.�l.a through 14.02.B.4.e or Faragraph l 5.02.A.
s
2. If City refuses to malce payment af thE amoUnt re�uested, City will �ive Contractor written
� notice stating tl�e reasons for such aclion and pay Coz�iractor any amount remain�ng after
� deduction of the az�r�aunt so witlZheld. City shall pay Contractor the amonnt so withlield, or any
adjustr�ent ihereto agreed to by CiCy and Contractor, wnen Contz'actor remedies the reasons
I for such action.
14.03 Cantractor's WaNrar2ty of Tille
Contractor �rvax'rants and guarantees that tille to all Work, matei7als, and equipment covered by any
Application for Payinent, whethez' incorparated in the Proj�ct or not, wi�l pass to City no later than the
tune ofpayment free and clear of all Liens.
Cl"1'Y OF FOR7' WOitTH
57 ANDARD CONS'I'RUCTION SP�CII'ICA"170N DOCUMF.3�IT5
Revisinn: Pebivaty2, 2p ] 6
007204- l
GENERAL CON�ITIONS
Page 55 nf C3
14.04 Partial Utilizc�tion
A. Priar to Final Acceptance of all the Work, City may use or occupy any substantially completed
part of the Work which has specifically been identiiied in the Contract Documents, ar which City,
detierrzaines consiitutes a separateIy functioning and usable part of the Work that can be used
by City for its intended purpose without significant interference with Contractar's performance of
the remainder of the Work. City at any time inay notify Contractor in writing to permit City to use
ot' occupy any suck� part af the Work which City deter�nines to be ready far its inteiided use, subject
to �e following canditions:
l. Contx'actox at aaay time may notify City in writing that Contractor considers any such part of
the Work rcady for its intended use.
2. Within a reasonable time after notification as enumerated u1 Pa:ragraph J 4.OS..F1.1, Czty and
Contractor shall inake aii inspection af that part ot t11e Work to deternline its staius of
completion. If CiEy does not consicier that part of the Worlc to be substantially com�lete, City
will notify Contractor in writing gi�ir�g the reasons therefor.
3. Parlial Utilizatioza vvill not constitute Finai Acceptance by City.
14.05 Titaallnspeciion
A. Upon written notice from Coiitractor that tlie entire Worlc is complete in accordance with the
Contract Documents:
1, within 10 days, City will schedule a Final I�ispection with Caiitractor.
2. City vvill nolify Contractor in writing of all p�rticulars in whick this inspection reveals that
the Warlc is incampJ.ete ox defective. Contractor shall immcdiately take such measures as are
necessary to complete such Work or remedy suci� deficiencies.
B. No time charge will be made agauist the Cantractox' betweez� said date of notification of the City
and the date af Fina1 Inspection. 5ho�ald the City determinc t��t the Work is not ready far Final
Jnspection, City will natify the Contractor in writing of the re�sons and Contract Time will resume.
].4.06 Final Acceptarace
Upon campletion by Con#ractor to City's satisfaction, of any additional Work identified in the Final
Itaspection, City will issue ta Contractor a letter of Final Acceptance.
cr� Y or� roxi� wo��rH
S'1'ANllAItI}CONS7'R11C7'lON SP�C'1t1CA7'101+! BOCUM�:N'1'S
32e�ision: C'ehii�ary2, 2Q I G
00 �z oa- i
GENERAL CONDITIQNS
Page 5b of 63
14.07 Fiizal P�yment
A. Applicatinl� for Payment:
1. Upon Final Acceptance, and in t�e opinion of City, Contractor may noalce an application for
final payment �ollowitig the procedure for progz'ess payments in accordance with the
Contract Documents.
2. The final Applzcatian for Payment shall b� accoznpanied (except as previousIy delivered} by:
a. atl documentation called for in the Contract Docuxnents, including but not linaitied to the
evide�ce of insurance rec�uired by Paz'agraph 5.03;
b. consent of t�ie surery, if any, to final payxnent;
c. a list of all pending or released Damage Claims against City that ConC:ractor believes are
unsetiled; and
d, affidavits of payments and complete and legally effective z-eleases or waivers
(satisfactory to City) of all Lien ngl�ts arising out af or Liens filed in connection with the
Worl�
B. Puynzerzi Becomes Due:
1. After City's acceptance of the Application for Paymeni and accompanying documentation,
requested by Contractor, less previoUs payments tnade and ar�y suin City is entitled,
including but not limited to liquida.ted damages, will hecome due and payable.
2. After all Damage Claims have been resolved:
a. directly by the Contractor or;
b. Contractor provides evidence that the Damage CIaztn has been reported to Ca��l:ractor's
insurance pz'ovider for resolution.
3. The making of the final payment by the City shall not relieve the Contractor of any
guarantees or other requiretnenis of the Contract Documcnts which specifically continue
Yhereafter.
14.08 Fir�al Colnpletiolz Delc�yed c�nd Partic�! Retainage Relec�se
A. If final completian of lhe Work is sig�ificantly delayed, and if City so confirn�s, City may, upo�.
receipt of Contractor's final Application for Payment, and without terminating the Cot�l:ract, make
payment of the baIance due fo�- Ehat portion of ihe Work fizlly completed and accepted. rf the
remaining bala�ice to be held by City far Wark not fully completed or corrected is less than the
retainage stipulated in Paragraph I4.02.C, and i£ bonds have been fu�nished as required an
Paragraph 5.02, the written consent of the surety to the paytne�it of the balance due for that
C17�Y OF FORT WORTH
STANDARD CONSTRUC170N SPECiP[CAT10N DOCl1M�NTS
Itevision: Pcbivary2, 2016
oa �z oo - �
GENERAL CONDITIONS
1'age 57 of 63
portion of the Work fully completed and accepted shall be submitted by Contractor ta City with
the Applicatian for such payrx�ent. Such pay;a�e�t shall be made under the tcrms and conditions
govcrnin� final payment, except that it shall not constitute a waiver of Co�tixact Claims.
B. Pczrtic�l Retc�inc�ge kelease. Far a Contract ihat pravides for a sepax'ate �vegetative establishment
and maintenance, and test and perFarmance periods following the completion nf all othcr
cox�struclio:� �� fbe Contiract Doct�ments for all Work locations, the City may release a portian of
the amount retained provided that �11 otl�ex woxlc is coz�rzpleted as determined by thc City. Before
the re�ease, all submiltals and final quantities must be completed and accepted for all other worlc.
An amount sufiicient to ensure Contract compliance will be retained.
I4.09 Wcaiver of Clairns
The acceptance of iinal payment will constitute a release of the City from all claims or liabilities
und.er the Contract far anything done or fizrnished or relating to the work under the Contract
Documents ar any act or neglect of City related to or cannectec� with the Contract.
I\ �71 ii Cy Il 3i��.Y11.� ��1►(� C�]►[�].�L�L�lt7_;I1►1�_Y �]��.uIJ►/�YY_[�]�I
15.Q1 City May Suspenc� Wor1�
A. At �ny time and without cause, City may suspend the Work or any portion thereoF by written
notice to Contractor as�d wh�cl� znay �x the date on which Work will be resumed. Contr�ctor shall
resurrie the Work on the date so fixed. During temporary suspension af tl�e Worlc cover'ed b}� these
Cantract Documents, for any reason, the City wiil make no extra payment for stand-by time of
constnzction equipment and/or construction crews.
B. Should the Contractor not be able to complete a portion of the Project due to causes beyond the
cantral of and without the fault or n�gligence of the Contractor, ancl should i� be determined by
mutual consent of the Contracto�r and City that a solution to allow constn�ction to praceed is not
avaiIahIe wi#hin a reasonable penod of time, Contractor may request an extensian in Contract
Time, direcily attributable to any such suspension.
C. If it s1�ould become necessary to suspend the Worlc for an indeiinite period, the Coniractor shali
store all materials in such a manner that they will not abstr�et ar impede the public umiecessai�iy
nar become damagcd in any way, and he shall take every precaution to prevent damage ar
deteriorafion of the worlc performed; he shall provide suitable drainage about the work, and erect
temporary s#ructures where necessary.
D. Contractor may be reimbursed for the cost of moving his equipment off t1�e job arid returiling the
necessary equipinent to the job when it is determirzed by the City that construction may he
resumed. Such reiinbursement shali be based on actual cosi to the Contractor of moving the
equipment and no profit wiIl be allowed. Reimbursement may nat be allowed if the equipment is
moved to anaiher construction project for the City.
C1TY OF FORT WOIt"1'1 [
STAN€]i1RD L'ONSTRUCTION SPECIFICATION DOCUMEI+!'1'S
Rc��ision: Pc�liiva�y2, 2016
007200-]
GENERAL CONDITiONS
Page 58 of 63
15.�2 City lll�y Termitaate f'or Cc�use
A. The occurrence o f a�.y one or more of the foIlowing events by way of example, but not of li��itation,
may justify termination for cause:
Contractor's persistent failure to perfoz'tn the Work in accordance with the Conti�ct Documents
(incluc�ing, but not limited to, faiZure to supply sufficient skilled worlcers or suifiable materials
or equipment, failure to adhere to the Project Sched.ule established under Paragraph 2.07 as
adjusted from time to time pursuant to Paz'agraph 6.04, or failiue to adhere lo the City's
Busz�ess Diversity Enterprise Ordinance #20020-1 2-20 1 1established under Paragraph
6.06.D);
2. Contractor's disregard of Laws ar Regulations of any public body having jurisdiction;
3. Contraclor's repeated disregard af the authority of City; or
4. Contractor's violation in any substantia� way of any provisions of the Coniract Documents;
or
5. Contr�actor's failure to promptly make good any defect in �naterials or worlc�nanship, or
defects af any nature, the correction of which �as been directed iu writi�ig by the Ci.ty; or
6. Substantial indication that the Contractor has made an unauthorized assignrnent of the
Coiitract or any funds due therefrom for th� beneft of any creditor or for any other pui�ose;
or
7. Substantial evidence tI�at the Contractor has become insolvent or ba.t�lc�-upt, or otherwise
financia�ly unable to carty on the Work satisfactorily; or
$. Contractor commences Iegal actior� in a court of compete�it ju�-isdictioxa against the City.
B. If one or more of the events identified it� Paragraph 15.02A. occur, City vc+ill provide wntten notice
to Cantractor and Surety to arrange a conference with Contxactor and Surety to address
Contractor's failure to perfarm the Worlc. Conference shall be held not later than 15 days, after
receipt of r�oiice.
1. If �ie City, the Contractnr, and the Surety do not agree to alIow the Contractor to proceed to
per�orm the consiruction Contracf, the City may, to the cxtent perxnitted l�y Laws and
Regulaiions, declare a Contx'actar defauIt and formalIy tez't�iz�ate the Cnntractor's right to
coinplete the Contixact. Contractor default shall nof be declared earlier than 20 c3ays aftier the
Contractor and Surety have received notice of cnnference to address Cot�iractor's failure to
perform the Worl�.
2. If Contractor's services are terminated, Surety shal� be obligated to take over and perform t�ie
Work. Tf Surety does not co�arnence perfornlance thereof vviC��t1 15 consecutive calendar days
after date of ax� additional written notice dez�aanding Surety's performance of its
C['1�` OF FORT WOR"i H
STANDARD CON57'RUC'170N $PrCiP1CA"CiON DOCLTMLNTS
Revisio�t: Lebn�ary2, 20l G
DO 72 00 - 1
GENER/aL CONDITIDNS
1'age 59 of 63
obliga#ions, then Ciry, wiChout process or action at law, may talce aver any partion of the
Work and com�lete it as described below.
a. If Cify completes t�ie Work, City may exclude Contractor and Surety from the site and
talce possession af the Work, and all rnaterials and equipment ineorporated iz�to ihe Worlc
stored ati tk�e Site or for which City has paid Contractor or Surety but which are stored
elsewhere, and finish the Work as City may deem expedient.
Whether City or Surety coinpletes the Work, Contractor shall nat be ent�tled to receive any
further payment until tl�e War1c is finished. If the unpair� balance of the Cantract Price exceeds
all claims, costs, losses and damag�s sustained by City arising out of oz' resulting from
completing tlae Worlc, such excess will be paid to Contractor. Iisuch claims, costs, Iosses and
damages exceed such unpaid baIance, Contractor shall pay the difference to City. Such clairns,
costs, losses and damages incurred by City will be incorporated in a Change Order, pro�vided
that when exercising any righCs ox' re�edies ux�dex' this Paragraph, City shall not be required to
obtain tl�e lowest price fa�- the Work performed.
4. Neither City, nor any of its respective consultants, agents, officers, directors or cmpioyees
shall be in any way liable or accountable to Contractor ar Surety %r the method by which the
completion of the said Wark, or any portion thereof; may be accomplished or for tihe price paid
t�ierefor.
5. City, notwithstanding the method used in completing the Contract, shall nnt for�eit the right
to recover damages from Co�atractox or Su�-ety for Contractor's failure to timely complete the
entire Cozatract. Coi�iractar shall not be entitled io any claim on account of the method used
by City in corriplcting the Contract.
b. Maintenance af the Work shall continne to be Contractor's and 5�rety's responsibilities as
provided for in the bond requirements of fhe Contract Documcnts or any specxal guara�tees
provided far uncler fhe Contract Dacuments or any other obligations otk�erwzse prescribed by
law.
C. Notwiit�standing Paragraphs 15.02.B, Contraetor's seivices will nat be tenilinated if Contractor
begins within seven days of receipt of notice of intent to terminate to correct its failure to perfonn
and proceeds diligently to cure such f�ilure within na more than 3Q days of receipti of said notice.
D. Where Contractor's services ha�e been so terminated by City, the tcrmination will not af�ect az�y
rights or remedies of City agaznsti Contractar then existing or which may thereafter accrue. Any
retention oz' payment af moneys due Contractor by City will not release Cnntractor from liability.
E, If az�d to tl�.e extent that Contractor has pravided a performance bond under the provisions o#
1'aragra�h 5.02, the termination procedures of that bond shall not supersede the provisions of this
Article.
C[TY OF FORT WORTiT
STANDARD CpNSTRUCTTON SPI',CTFCCA`fION L)OCUMENIS
Rcvision: ]�ebniary2, 20 i 6
oo�zoo-�
GENERAL CONDITfOf�lS
Page 60 of G3
15.03 City May Terminate Fnr Col2venier�ce
A. City may, witho►zt cause atid wiihout prejudice to any other right or remedy of City, ter�x� izzate the
Contiract. Any termination sha21 be effected by mailing a notice o£tI�e termination to the Contractor
specifying tiic extent to which perfor�nance of Worl< undex' the contract is terminated, and the date
upon which such te�'taaination becomes effective. Receipf of the notice shall be deerned
conclusively p�resux�rred ancE established when lhe �etter is placed in tt�� United States Postai Service
Mail by the City. Further, it shall be deemed conc�uszvely presumed and established that such
ternlination is made with just cause as therein stated; and no proof in any claim, deinand or suit
shall be required of the City regarding such discretionary action.
B. After receipt of a notice of teriminaiioz�, and except as otherwise directed by the City, ihe
Contractar shalI:
1. Stop worlc under the Contract on the date and to the extent specified in the notice ofiermination;
2. place no further orders or subcontracts for materials, services or facilities except as zn�ay be
necessary for completion of such portion of the Work und�r the Con�ti��et as is not terminated;
3. terminale aIl orders and subcontr-acis to the extent that they re�ate to the performance of the
Wo�lc tennuiated hy notice oF termination;
4, transfer title to the City and deliver in �tie manner, at the Ei:txies, and to fi�ie extent, if any,
directed by the City:
a. the fabricated or unfabricated parts, Work in pz-ogress, caxnpleted Work, supplies and
other material produced as a paz'i of, or acquired in connection with the performance of,
the WorIc tertxjinated by the notice of the ienn.itlation; and
b. the completcd, o�• pariially coinpleted plans, drawings, iuformation and other pxoperty
which, if the Contract had been completed, woufd have been required to be fiunished to
the City.
5. complete performance of such Work as shaIl not have been teiYninated by the notice of
termination; and
6. take such action as may be necessary, or as the City may direct, for the protection and
preservation of the property related to its contract which is in the passession� af the
Contra.ctor and in which the �wner has or may acquire the rest.
C. At a time zzot later than 30 days after the termination date specifzed i.�r� the notice of termination,
the Contractor may submit to the City a list, certified as to quantity and quaiity, of any or all items
of tennination inventory not previously disposed of, exclusive of items the disposition of wh�ch
has been directed or authorized l�y City.
CITY OP PORT WORTII
STAT�IDARll CONSTRU['TION SPECIPICATIO]V DOCUM�:N"I�S
Revision: Fd�ruaiy2, 2016
00 �z oo - �
GENERAL CONDITIQNS
Page61 oi63
D. Nai later than 15 days thereafter, the City sha11 accept title ta such ifet�s provided, that the list
submitted shall be subject to �eriiication by the Ciry upon remaval of the items ar, if the items are
stared, within 45 days from the date of submission o� the lis1, and any necessary adjustments to
correct the list as submitted, shall be made prior to final settlement.
E. Not later th�n 60 days a�ter the z�.otice of ternunation, the Cont�-actor shall submit his termination
c�ai�ra to the City in the form and with the certiiication prescribed by the City. Unless an extension
is made in writing within such 60 day period by the Contractor, and granted by the City, any and
aIl such claims shall be concIusiveIy deemed waived.
F. In such case, Cantractor shall be paid for (without duplication of any items):
1. completed ancf acceptable WorJc e�eeuteci in accordance with thc Contraci Documeiits prior
to the effective date of texx�r�ination, including fair and reasonable sums for overhead �nd prof�t on
suc� Work;
2. expenses st�slaix�eci prior to the effective date of terminatioii in performing services and
fitrnishizag Iabar, materials, or equipment as required by �e Contract Documents i� connec�ion
with uncompleted Worlc, plus fair and reasonable sums for or�erk�ead and profit on such expenses;
and
3. reasonable expenses directiy attt'ibutable to termination.
G. In the event of the failure of� the Cantractor and City to agree upon Ehe w�ole amaunt to be paid
to the Contractar by reason of the tennuiatian af the Work, the City shall deteriz3ine, on the basis
of infarmation availal�le to it, the amaunt, if any, due to the Con#ractor by reason of the terta�inatian
and shall pay to the Contractar the amounts determined. Contxactar shall not be paid on account
af loss af anticipated profits or revenue or oCher ecano�a�ic loss arising out of or resulting from
suc1� terminaEion.
ARTICLE 16 — DISPUTE RESOLUTION
16.0 � Met.hads arzd Procedzcret
A. Either City or Contractor may xeq�est mediation of any Contract Claim submitted for a decision
under Paragraph J 0.06 before such decision becomes finaI and bincling. The request for mediation
shall be submitted ta the other party to the Cantract. Timely submission af the request shall stay
the effect of Paragraph 1 O.Ob.E.
B. City and Contractor shall participate in the xnediation process in good faith. The process shall be
commenced wil�in 60 ciays of filing of the request.
C. If the Contract Claim is noti resolved by mediation, City's action under Paragraph 10.06.0 or a
dcnial p�xrsuant io Paragraphs 10.00.C.3 or 10.06.D shall become final and binding 30 days af'ter
lermiz�ation af the �nediation unless, within that time period, City or Cantractor:
C'1TY OF F��OR"f WOKT3]
STANf]AkZD CdNSTRU('T[ON SPI?CIPICATION ].70CUM�;N7 S
Revision: Febru;vy2, 2016
aa �z oo - �
GENERAL CONDlTIONS
Pagc G2 of 63
1, elects in writing to invoke any other dispute resolufion process provided for in tlie
Supplementary Conditions; or
2. agrees with the other party #o submit the Contract Claim to another dispute resolut�on
process;or
3. gives written notice to the other party of the intent to subrnit the Contract Claim to a court of
competent jurisdiction.
I�[�fY[y113fVeul�Yy�l111/�►1�Lf111.�
17.01 GiviJ�g Notice
A. Whenever any pravision of the Contract Documents requires the giving of written x�otice, zt will
be deemed to have been valicl�y given if:
�. delzvered in person to tl�e individual or to a member af the firm or to an officer of the
corporaiion for whom it is �ntended; or
2. delivered at or se�it by registered or certified mail, postage prepaid, to the last busaness
address lcnown to the giver of the notice.
B. Business address changes m�ast be promptiy made in writing to the other party.
C. Whenever the Contract Documents specifies �iving notice by elec#�-onic means such electronic
notice shaIl be deemed sufficient upon confirmation of receipt by the receiving party.
� 7.02 Computation of Times
V�hen any period of time is referred to in the Contract Documents by days, it will Ue computed to
exclude the fiirst and include the last day of such period. If the last day of any such period fa.11s on a
5aturday or Sunday or on a day madc a legal hoIiday the next Working Day shall become i�ae Iast day
of the period.
17.03 Cumulative Remedies
Tk�e dUtzes az�d ob�igatio�s i�z�posed by tl�ese Ge�eral Coiaditions and the rights and remedies available
hereunder ta the parties hereta are in addition to, and are not to be construed in any way as a limitation
of, any ri�hts and remedies avaiia�le to any or all of them which at-e otherwise imposed or available
by Laws or Regulations, by special warranty or ��uarantee, or by other provisions of the Contracl
Docu:nrze�Cs. The provisions of tbis Paragraph will be as effective as if repeated specifically in the
Contract Documents in connection with each particular duEy, obligation, right, aud remedy to which
they apply.
c1�,Y or- ��ox�r wo�i�i-x
STAN17ACiD CO1VS"fR�1C1'[ON SPECIFICATIO�! DOCUMENTS
Revision: Febeuary 2, 201 G
oa �2 aa - �
GENERAL CONDITIdN5
1'age 63 oC 63
I7.04 Survival of Obligc�tiotas
All representations, indetaa�ifications, warranties, and guarantees made in, xequired by, ar given in
accordance with the Contract Dacuments, as well as all co�atinuing obligations indicated in the
Coniracti Documents, will survi�e final payment, coznpletion, and acceptance of the Wark or
termination or completion of the Contract or termination of the services c�f Contiractor.
17.05 Headings
ll,rticle and paragraph heaciings arc inserted for convenience only and do not constitute parts of these
CeneraI Conditians.
Cil'Y OF FORT WORTH
S"CANDARI] CONSTRtJCi�[ON SPECIPICA'#'[O]�I ]JOCUMENTS
Rc�ision: Febn�tiy2,2UlG
ao �3 00
3UPPL�.MEN'lARY COND[TIONS
1'age 1 of 7
SECTION OU 73 OU
SUPPLEMENIARY CONDITIONS
`I'O
GENERAL CONDITiONS
5upplementayy Conditions
These Supplementary Conditions n�odi ['y and supplement Section 00 72 00 - Geraea-al ContEitSons, and other
provisions of the Contract Documen[s as indicated below. Al! pa'ovisions oi`the General Conditions that are
madi [ied oa- supplemeniecl a�emain in fu]! forcc and effect as so modified or suppfemented. All provisions
of the General Conditions wl�ich a�•e not so madilied oR• supplemented �-emaira i�� �ul] force and effcct.
Defined 7'erms
The [erms used in these Sup�lemcntary Conditions which are defined in the General Conditions I�ave the
meahing assigned to lhenl in khc Gci�cral Conditions, unlcss spccifically noted herein.
� Modilicatim�s and Supplements
1'he iollo���ing arc instructions that modify or supplement specific paE•agra}�hs in the General Conditions and
. otheG� ContE act llacumcnts.
SC-3.038.2, "Resolving Aiscz•epancics"
PEans govcrn aver Specifcations.
SGa.UTA
� 13asemcnt limits shown oi� the Drawing are app�•oximate and were provided to establish a basis [or bidding.
i' Upon receiving the final easements descriptions, Coniractor shall compare ihem to lhe lines sho�vn on the
' Contract Drawings.
SC-4.41A.1., "Availability of Lands"
The fo[lowin� is a list of known out�standing i-ight-of=way, and/or easements to bc acquired, if any as of
Ontstanding Right-Of-Way, and/or Easements tn Se Acquired
YARCEL OWNER TA12G�;"1' I�A`f'L
Ni1MBLR Ol� POSSL;SSION
None
7'he Conh-actor uudcrstands and agrees that the dates listed above are esticnates anly, are nol guaranteed,
and do not bind fhc C:ity.
if Cantractor coilsiders thc fii�al easements provided to differ materiaily fi�om the repeesenlalions on the
Cantract L7rawiugs, C;ontractor shall within fve (5) Business Days and before proceeding with the Work,
notify City in w�•iting associated with the difl'ering easement line locations.
SC-4.UTA.2, "Availability ofLands"
Utilities or obstrrictiotts to be yemoved, acljusted, and/or relocated
CE1�Y OF FOR'C WOR'I�I-1 Watera�id Sani[ary Scwer Reha6ilitalion Contract ]Ol
S'['AN[�ARll CONS7�RUC7�lON SPECIFICATEON DOCUtv1ENT$ CPN 02722
Revised ll�arch 9, 2020
no �3 00
SUPPLEMENTi1RY CONDITIdNS
Page 2 of 7
The following is list of utilities and/or obstructions that l�a�e nnt heen removed, adjusied, and/or relocated
as of
LXY�CTED Ul'ILl'1'Y 11ND LOCATION
OWNEIZ
None
T�IRGET DA`I'F Ol�'
AD J U STMEAIT
The CanlracCor undez�siands and agrees thal Llle dales listed above are estimates anly, af�e nol guarantccd,
and do not bind the City.
SC-4.02A., "Subsurface anc! Physical Conditions"
The totlowing �ire reports of explorations and tcsts of subsueface conditions a� ihe sitc of the Work:
A Street C:oring Repori, peeparcd by the Ciry, providing additional info�•mation on existii�g street conditions
and aCtacl�ed hcrcii�.
T'hc followii�g are drawings of physical conditions in or rela�ing lo existii�g surface and suhsurface
st�-uctures (except ilnderg�•ound T�aci�itics) which are at or contiguous to tlac sitc of the Work:
None
SC-�4AGA., "�iazardoas Environmer�tal Conditions at Site"
'I'he fallawing are reports and cii awings of cxastiug hazai�do�as environmeratal conditions known to the Ciiy:
None
SG5.03A., "Certificates of lnsurance"
The entitics listed below are °additional insureds as their interesl may appeae" includii�g their respective
officers, directars, agenls and cinployees.
(1) �=�tY
(2) Consultant: SHIF,T,ll ]�ugiueering G��oup, PLLC
(3) Other:
SC-S.Q4A., "Cantractar's Insurance"
The limils of liability for the instit�ance eequircd by Yaa•agra�h GC-5.04 shall provide the f'ollawing
coverages i'or not less than the following amotints nr greater where eequired by laws and regulations:
5.04A. Workers' Compensalion, undcr Paragraph GC-5.04A.
SYal2rlpry Iin�itS
Ernployer',r liabiltty
$I(1�,Qp11 eacla accicler��/occ•xri�rence
�SIf1C1,000 17isease - each e�nplrryee
,�SOI),ODO Dis•ease - polic�, Jinai!
SC-5.048., "Contractor's insurance"
CITY OP POIt'I' WOKTH Walcr and Sanitary 5ewer Rehabilitation Conlracl l Ol
STANDARi] CdNS'1RUC770N SP�C[PICATION DOCUI�EN'rS CPN 02722
Rcvised Marcli 4, 2D20
00 73 00
SUl'PL�MI?N"FARY CONDITIONS
1'age 3 of 7
S.fl4B. Coinmcrcia] Genera] t�iability, under Paragraph GC-S.04B. Cont��actor's Liability Tnsurance
under Paragraph GC-5.048., ��vhich shall be an a per project basis covering the Contractor with
minimum limits of:
h 1, 000, �00 each nccr�rrence
�'Z, 000, 000 aggr�e,�ate lin�il
The policy must have an endoesemcnt (Amendment — �lggregatc Lii�lits ok�Insurance) matcing the
General A�;gregate Limits apply scparately to each job site.
1'he Commercial General Liability insurance policies shall providc "X", "C", and "U" coverage's.
Verification of such covei�age must l�e sllown ii� the Remarks �lrticle of the Certificatie of Jnsur•ance.
SC 5.04C., "Caniractor's Insurancc"
5.04C. Automobile I.iability, under Paragraph GC-5.04C. Contractor's f.iability lnsut-ance under
Paragraph GG5.04C., which shatl be in an amount not less than t[�e follawing amaunts:
(1) A.utomobile Liahility - a cocnmcrcial bi�siness policy shall provide covei•age on "Any Auto",
deiined as autos owned, hired and non-owned.
�SI, (1O(1, 000 each accidenC on a combined single [imit basis. Split limits are acceptable if iimiCs are at
least:
�K�5l1,ODO Bodil��Inj�ri���erpersor�/
u�'� 00, D00 6oclily Injr�r�� per accidenl /
$ I D0, 000 Yroper7y l�arnage
SC-5.04D., "Contractor's Insuz-ance"
1'he Conlractar's construction activities will require its employees, agents, subcontrac[ors, equipment, and
material deliveries to ci•nss rai[road }�ropea�ties and G'acks: None
`fhe Contracior shakl conduct its operatioa�s on railroad properties in such a manne3- as not to inierfere with,
hindeE-, or obstruct the railroad company in any manner whaisoevcr in the use or operation of its/their trains
or othcr property. Such operations on railroad praperlies may require that Contractor to execuEe a"Right of
�ntry Agreemenf" w�ith the particular raii3�oad cornpany or companies involved, and to this end fhe
Contiactor should satisfy itself as to the rcquirements of each railroad company and be prepared to execute
the rigllt-of-ent�y (if any} required by a railroad company. �'he requirements specifed herein liiccwise relate
to t�Ic Confractor-'s use of privaYe and/or const�-uclion access roads crossing said rail►•oad company's
properties.
T��e Contractu�l Liability coverage required by PaE•agi•aph SA4D of the General Conditions shall provide
caverage f'or not less than the fotlowing amounts, issued by coinpanies s��Eislaclary to the City and to the
Railroad Company for a term Lhat continues for so long as the Cnn[racto�•'s o��e�•ations and work cross,
accupy, or toucE� railroad property:
(]) Genera] Aggregate:
(2} Each Occurrence:
Reyuired for lhis Coratr•act
N/�
N/�4
X Not requirec�f'or• thas Conb-act
With respect to the �bove: outlined insurance requirements, the �ollowing shall govern:
CITY OF PORT WORTI I
STAN17AitD COIVSTRUCTlON SP�;CIFICATION DOCUMLNTS
Kevised March 9, 2020
Water and Sanitary Sewer Reha6ilitation Cunlracl ] O1
CYN 02722
00 73 00
SUPP1,LMt;N'iARY C4Nl7l'1�lOIVS
Page 4 01�7
1. Wl�ere a s3nglc railroad cocnpauy is involved, thc Contractor shal[ provide one insuA�ance policy in
the natne ol' thc raili•oad company. Hawevee, if inore than one grade separaiion or at-grade
crossing is al�fccted by ti�e Projcct at entirely se�d3•ate ]ocations on the line ot� lincs of t�e same
railroad company, separate coveragc may be r•equircd, each in ihe amount stated abavc.
2. Where nnorc than one railroad company is operating an the saine right-oi=way or where seve�al
raiia-aad companies arc involved antl operated on lheir own se}�aeate �-ights-of-way, ihe Contractar
may be z�cquired to p�•o�idc separate insurancc policies in ihe name af each railraad company.
3. Il; iG� addition lo a grade separaCian or an at-grade crossing, other work or activity is proposcd oi� a
railroad company's right-of-way a( a location entirely scparate lrom thc grade separation or at-
grade crossing, ii�surance coverage for this work inust be inc3udecj in the policy covering the giade
separafion.
4, lf i�o grade scparatian is invol�cd but nther �vork is proposed oi� a raila•oad cors►pany's right-o{.'-
vt�ay, afl such other work naay bc cnvered in a single policy fo�� (h�it railroad, even thougl3 the wo��k
inay be at iwo or more sepaz�atc locations.
Nn woa�k or activities oi� a raitroad cona�any's properLy to bc performed by thc Coiiiractoc• shall bc
commenced until thc Contraclor has furnished the City with an origi��al policy or poticies of the instirancc
for cach railroad company named, as requi�•ed above;. All such insurancc inust he appro�cd by the City �nd
each affected Railraad Company prior to the Contractor's beginning v,�ork.
The ii�surance specificd above musC bc carried unlil alt Work to be perloa-mcd on the raih-aad right-af way
has been complctcd and the g�-�tdc crossing, if any, is no lo�iger used by the Contracfor. ln addition,
ii�surance must bc carried dueiGig al] maintenance and/or repair work performed in fhc rail►•oad right-of-way.
Such insurance m�st i�ame the railro�ic� company as the insured, to�ether with any tenanl o�- ]cssee of the
raiiroad company operating ovcr tracks in�ol�ec� in tl�e Projec�.
SC-6.04., "Pra,ject Schedule"
Projcct schedule shall be tier 3 lor tlic �roject.
SGG.07., "Wage Rates"
'1'hc fo�lowing is thc ��revailing wage rate table(s} applicahle to Chis project and is pra�idcc� in the
Appendixes:
CFW Horizontal Wage Ratc Table
�1 copy of'the table is also a�ailable by acccssing the City's wcbsite at
ht{� �://apps.fortworth�exas.gov/ProiectResources/
You can access the file by following ihe directo�y path:
02-Construction Documents/Specif cations/Di�v00 — General Conditions
SC-G.09., "Per�nits and UtiIities"
Noi�c
5C-b.09A., "Contractor obtained permits and liceuses"
"l�he following arc known permits and/ar licenses rcquired i�y lhe C.ontract ta be acquircd by the Cont�-actor:
None
C[TY ON' F(JRT WORTH
STANpARD CONSTRliC'1'ION SPECiPiCA7'lON D[JCUMIiNTS
Rcvised Marcl� 9, 2020
Waterand Sanitary ScwerRelfabilitation Contr�ict 101
Ck'N 02722
00 �3 oa
sunrr.rMrx��,�t� cor�nrrioNs
Pagc S of 7
SC-6.095. "City obtained ��er�nits and Zicenses"
The fol�owing arc known permits and/or licenses required by the Conh-aci to be acquired by the City:
TDLR
SC-6.p9C. "Outstanding permits and licenses"
The following is a list of known ou[standing permits and/or licenses to be acqui�•cd, if any as of
None
Outstanding Permits and/or Licenses to Be Acquired
O WNEA PERMiT OK LICENSE AND LOCATTON `fARU�T D/1TE
OF POSSL:SS�ON
None
SC-6.24B., "'1'itle VI, Civii Rights Act of 19b4 as amended"
lluring tiie performance of this Contract, the Conta-actoi-, for ftself. its assignees and successors ial interest
(hereinafter ref'erred to as the "Contracior") agrccs as fallows:
1. Compliance with Regulations: The Contractor shal! comply ��vith thc Rcgulation relative to
nondiscrimination in Federally-assisted pi-ograms of the I?epartmeilt of "1'ransportation {hereinafter,
"DOT"} Title; 49, Code of Federal Regulations, Part 21, as they may bc amcnded from time to time,
(hereinafter referred to as tkae Regulations), which are herein incorporated by reference and mac�e a part
af this confract.
2. iYondiscrimination: The Contz'actoi•, with regard to the work pci•fo3•med by it during the contract, sh�ll
not discE•iminate on the grounds of race, color, or nationa! origin, in tlle selection and i�etention o P
subcontractoes, including pi-ocurements of materials and leases of equipment. The Contractor shall not
participate either directrty or indieecE[y in the discrimination prohibited by 49 CFR, seciion 21.5 ot�thc
Regulations, includEng employnnent practices when the contract covers a program sec forth in
Appendix B of the Regulations.
3. Solicifations fnr Subeontractors, lncludi�g Pirocurements af Materials a�id �qui��nent: ln al!
solicitations either by compctitive bidding or negotiation made by the contracLor for wor[c to bc
performed under a subcontract, including pa•ocuretnents of materia�s oi� ]eases of eyuipment, cach
potential subcontactor or supplier shall be notificd by the Contractor o��the Cantractor's obligations
under this contracl arad the Regulations relative lo nondiscrimination on the grounds of i-acc, cofor, or
naiional prigin.
4. Information and Re�oris: The Conlractor shall provide all in1'ormation ancf rcports required hy the
ReguEations oi• dii•ectives issued pursuant thercto, and shall permil access ta its books, records,
accounls, other sources of information and its facilities as may be dete�-mincd by City or the Texas
Depai�t�nent of Transporlation to bc pertinent to ascer•tain compli�ince with such Regulations, arders
and instructions. Where any infannation required of a contractor is in t�ie exclusive possession of
anolher who fails or refuses to lurnish this information the contraclo�- sh�ll so certify to the City, or Lhe
Texas Department of Transportation, as appropriate, and shalE set forth what efforts ii has rnade to
abtain the information.
S. Sanctions for Noncompliance: In the event of the Co�nh-actor's noncompliance wilh the
nondiscrimination provisions of this Contract, City shall i�npose such contract sanclions as it or the
Texas Departmeiit of Transportation may determine to he appropriale, including, but not limited to:
a. withllolding of payments to the Conti•actor under the ConLract until the Contractor
complies, ancE/or
CI'1'Y OF FORT WORTH Watcr and 5a�iitary Setiver Reha6iiitatian Contract 101
S'fANDARD CO�TSTRUCTION SPECfF1CltTI011 DOCUMI:NTS CPN 02722
Revised Marcl� 9, 202Q
oi �� oo-z
SL'MMAI2Y Ok�' WORK
Page 2 of 3
1 b. Excavated and waste materials shall be stoi-ed in such a way as not to interfere
2 with the use of spaces that may he designated to be left fi�ee and unabstructed
3 and sa as not to incanvenience accupants of adjacent property.
4 c. If the street is occupied by railt-aad trac�Cs, the Work shall be carried on in such
5 rnannei• as not to interfere with the opei•ation of the raiiroad.
6 I) All Work shall be in accordance vvith raili•oad requirements set fortl� in
7 Divisioii 0 as well as the railroad pez7mit.
8 D. Work within Easements
9 1. Do not enter upon priva#e property for any purpose without havin�; previously
10 obtainecE pet-mission from khe owner of such pt•opei�ty.
11 2. Da not stare equip�nent or inaterial on private property unless and untiI the
12 specified approval of the p��operly owner has been secured in writing by the
13 Contractor and a copy fuz�aished to the City.
14 3. Uniess specifically provided otherwise, clear all rights-of-way ar easements of
15 obstructions which jnust be i•emoved ta malce possible proper prosecution of the
1C Wo3�k �s a plrt ofthe project construction apet�alions.
17 4. Preseive and use eveiy precaution to prevent damage to, all trees, shiubUery, plants,
18 lawns, feiices, culverks, curbing, and all other kypes of structures or in�pro�e�x�ents,
19 to all water, sewer, and gas lines, to afl conduits, overhead pole Iiiles, or
20 appurtenances thereof, includiiig the constructian of teanporary fences and to all
21 other public ot- privaLe prope�•ty adjacent to the Work.
22 5. Notify the proper representakives of the owners or occu�ants of thc public or ��-ivate
23 lands of interest in lands which inight be affected by the Work.
24 a. Such notice shall be made at leasl 48 hotu�s in advaiice of the beginning of the
25 Work.
26
27
28
29
30
31
32
33
34
35
3C
37
38
39
�40
41
b. Notices shall be applicable to bo#h public and private ukility campaiiies and any
corporation, coinpany, individual, ar ather, either as owners or occupailts,
whose land or inkerest in laiid might be affected by the Wark.
c. Be responsible fo�• all dainage ar injury to property of any charactcr resuliing
froin any act, oinission, neglect, or aniscanduct in the rnannez- ox- method or
execution of the Work, or at any time due to defective work, material, or
equipment.
6. Fence
a. Restore all fences encountered ai�d remo�ed during canstructioz� of the I'x-oject
to the ariginaE ar a better than priginal condition.
b. Erect tempara��y fencing in place of the fencing removed vvhenever the Work is
not in progress at�d when t�e site is vacated avec7�ight, andlor at all times to
provide site security.
c. The cost foz• all �ence woz-k withan easements, incluciing remo�al, temporary
closures and replacement, shall be subsidiary to the various items bid in the
project proposal, unless a bid rtein is s�eciiicalIy provided in thc px-oposal.
CIT'i' OF FOR'I' WOR'i'H Water and 5anitaiy 5ewer Rehabilitatian ConUact ] 6l
STAI�I7Alill CONS"1RUC"1']ON SPE:C[FiCAT[ON DC1ClJNiENTS CPN 02722
Re�ised Decemher 20, 2012
Ol 11 00 3
SUMMA1tY DF WORK
Page 3 of 3
i 1 1.5 SUBMITTALS [NOT USED]
� 2 1.6 ACTION SUBMITI'ALSIINFORMATIONAL SUBMITTALS �NOT USED]
� 3 �.7 CLOSEOIIT SC]'BMITTALS [NOT USED]
` 4 I.S MAINTENANCE MAT�RIAL SUBMITTALS �NOT USED]
� 5 1.9 QUALITY ASSURANCE �NOT USED]
6 110 DELIVERY, STORAGI�, AND HANDLING [NOT USED]
� 7 1.11 FIELD �SITEj CONDITIONS (NOT USED]
' 8 1.12 WARItANTY (NOT USED]
9 PART 2- PRODUCI'S �NOT USED]
li
]3
I
�
f
�
�
10 PART 3- EXECUTION [NOT USEDJ
END OT+ SECTION
12
Revision Log
DATE NAME SUMMARY OF CHANGE
ClTY OP FORT WOk"17I Wa[er and Sanitaiy Sewer Rehabilitation Contract 101
STANDAR�I COAiS7'RUCTIOIV SPECI�ICATION DOCUMEN'E'S CPN 02722
Revised EJecember 20, 2012
- -�
I
Ol 25 00 - ]
SU135TITlJTION PROC�DURL�'S
Pdge i of 4
I
` 1
2
f
�
�
�
i
3 PART1- GENERAL
�l 1.1 SUMMARY
SECTION Ol 25 OU
SUBSTITUTION PROCEDURES
5 A. Section Includes:
G 1. The procedure for requesting the approval of substitution of a product tl�at is not
7 equivalent to a product which is specified by desc�•iptive or perforinance criteria ar
8 defined by reference to 1 or more of the foflowing:
9 a. Name of manufacturer
10 b. Naine o�`vendor
11 c. Trade name
12 d. Catalog r�uznber
13 2. Substitulions are not "or-equals".
14 B. Deviations from this City af Fort Wortli Standar�l Specification
15 1. Nane.
1C C. Rela#ed Specification Sections include, but are not necessarily lirnited to:
�7 1. Division Q— Bidding Aequirements, Cont�-act Fonns and Conditions of the Contract
1 S 2. Division 1— General itequirements
l9 1.2 PRICE AND PAYMENT PRQCEDURES
� 2Q A. Measureinent and Payinent
I 21 1. Work associated wit� this Item is considered subsidiary to the vai•ious iteins hid.
22 No separate payinent will be allowed for this Ttem.
� 23 1.3 REFER�NCES [NOT USEDJ
G 24 l.4 ADMINISTRATYVE REQUIREMENTS
s
!
�
!
I
25
26
z�
28
29
30
31
32
33
34
35
36
37
38
39
40
A. Request for Substitution - Gencral
1, Within 30 days after award of Cont�aci (unless �aoted otherwise), the City wiIl
consider foj-mat �-equests froin Cont��actor fo�- substitiition of pz-oducts in place of
those specif ed.
2. Certain types of cquipment and kinds of �naterial as•e described iz� Specifications hy
means of references to naines of manufacturers and vendors, ti-ade na�nes, or
catalog nuinbers.
a. When lhis inethad af specifying is used, it is not intended to exclude fi•om
consideration other products bearing other manufacturea�'s or vendo7's names,
trade names, or catalog nuxnbers, provided said products are "oi•-equals," as
deteaxnined by City.
3. Other types of eyuipment and kinds of rnaterial may be acceptable substitutions
under the following conditions:
a. Or-equais are unavailable due to st�ike, discontinued production ofproducts
rneetiug specified requirements, or other factoz-s beyond control of Co��tractar;
or,
CITY OF FO1tT WOI2TH Water and 5anftary Se4ver Rchabiiitation ConFract lQl
STA1+lDARll CONSTRUCTION SYECIFICATIOtV DOCllMEN"1'S CPN 02722
Revised,luly i, 2011
—}
i
01 2500-2
SUBS77TUTION PROCEDURP.S
Pagc 2 of 4
U. Contractor proposes a cost and/or time reduction incentive to the City.
2 1.5 SUBMITTALS
3 A. See Request foi- Substitution Fonn (attached}
4 B. ]?rocedure for Requesting Substitution
5 1. Suhst�tution shall be considered anly:
f a. fLfter award af Contt-act
7 b. Under the canditions stated herein
8
9
10
11
12
13
14
15
16
17
18
19
2t)
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
A0
41
42
2. Sub�nit 3 copies of each w��itten requcst far substitution, including:
a. Docuinentaiion
1) Complete data substantiaiing coinpliance of proposed substitution with
Contract Documents
2} Data relating to chang�s in coi7shuction scheduTe, when a t-eduction is
praposed
3) Data re�ating to changes in cost
b. For producis
1) Product identification
a) Manufacturez-'s narne
�) Telephonc nuinber atld representative contact name
c) Specification Sectzon or Drawing reference of originally speci�ed
product, ineluding discrete natne or tag number assfgned to original
p�•aduct in the Co�tz�act Documents
2} Manufacturer's literature cfearly mai-ked to show compliai�ce of proposed
praduct with Contract Documents
3} Itemized comparison of origina! and proposed product addressing product
characteristics ancluding, but not necessarily limited to:
a) Size
b) Composition or materials of construction
c) Weigh#
d) Electrical ar mecl�anical requirements
4) Produet cxperience
a) Location of past projects utilizing product
b} Name and telephone number of persans assaciated with referenced
projects knawledgea6le concerning proposed �roduct
c) AvailaUle field data and reports associated with proposed product
S) Satnples
a) Provide at request of City.
b} Sainples become thc property of the City.
c. For construction methods:
1} Detailed description of proposed method
2) Illustration drawings
G Appz•oval or Rejection
1. Written approval oj• rejection of substitution given by the City
43 2. City z-esez-ves the right to require pi-oposed product to comply with color and pattez7n
44 of speciiled �rnduct if ilecessary to secure design inient.
45 3. In the event the substitution is approved, the resulting cost and/or tiine reduction
46 will be documentetE by Change Order in accordance with the General Coilditioiis.
C17'Y Oi�" FORT WORTI[ Watcr and SaniSaiy SewerRehabiliLaiion Contract l0i
S"1 AI�lDARB CONSTi2UCTiON SPP:CTPICA"1�lON DOCUNiENTS CPN 02722
FCevised.Tuly 1,2011
D l 25 00 - 3
5U1�5TI1�L17�IOIV PRQCLDi7Ri;S
Page 3 of 4
�
i
E
�
1
}
1
2
3
4
5
6
7
8
9
4. No additional contract time wifl be given for substitution.
5. Substiiutian wi1I be rejected if:
a. Submiital is not tl�rough the Contractor with his stamp of approval
b. Requcst is not inade in accordance with this Specification Section
c. In the City's opinion, acceptar�ce wil� require subsiantial revision of the original
design
d. In the City's opinion, substitution will not perfo�•in adequately the funclion
cansiste�at with the design intent
1.6 ACTION SUBMITTALS/YNTORM�iTIONAL SUBMITTALS [NOT USEDj
10 1.7 CLOSEOCT'1' SUBMITTALS �NOT USED]
11 1.8 MAINTENANC� MATERIAL SUBMITTALS [NOT USED]
l2 19 QUALITY ASSURANCE
I3 A. In inaking request for substitutior� or in using an approved product, the Contractor
14 represents Chat the Conhactor:
15 1. Has tnvcstigaEed proposed product, and has deter�r►ined that it is adequate or
16 su}�eeior zn ail respects to that specified, and that it will perfoi-�n function fnr wl�icll
17 it is intended
18 2. Will }�ro�ide saine guarantee for substitute item as #`or pa-oduct specifiec!
19 3. Will cnordinate installa.tion af accepted suhstitution into Wark, to include bui.lding
20 modilications if necessary, making sucl� changes as ir�ay be required for Work to be
21 camplete in all respects
22 4. Waives all claims for additional costs reIated ta snhstitutaon which subsequently
23 a��ise
24 1.10 DELIVLRY, STORAGE, AND HANDLING [NOT USED]
25 1.11 FIELD [STI'E) CONDITIONS [NOT U�ED]
26 1.12 WARRANTY [NOT ITST;D]
27 PART 2- I'RODUCTS [NOT U�ED)
28 PART 3- EXECUTION [NOT USEllJ
29
30
31
1;ND OF �ECTION
Revisian Log
DATE NAME SUMMARY OF CHANGE
CI'I'Y OF FORT WORTH Water and Sanitary Sewer Itehabilitalinn Conlract I 01
STANDARD CONS"fRUCT101+! SPECIFICAT[QN I]OCUMENTS CP�I 02722
Revised.�uly I, 2D11
_�
S
O12500-4
SiJi35T]TUiION PROC�bU1ZES
Page 4 of 4
7
2
3
4
5
6
7
8
9
ld
11
EXHIBIT A
REQUEST FOR SUSSTITUTION FORM:
TO:
P1ZOJ�CT: DATE:
We hereby submit for yaur consideration the follawing product iiistead of the specified item for
the above praject:
SECTIQN P11R1-1GRl�PH SPECIFIED TT}:M
Proposed Substitutinn:
7 2 Reason for �uUstitukioii:
13
14
15
16
17
18
19
20
21
22
23
24
25
26
z�
28
29
30
3l
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
Include complete in�ormation on changes to Drawings and/or Speciiications which proposed
st�bstitutian will t-eyuire for its proper installation.
�'ill in Bfanks Below:
A. Will the undersigned contractor pay for changes to the hui]ding dcsign, iilcluding engineering
and de#ai{ing costs causcd l�y the requested substitution?
B. What effect does substitution l�ave on other tracfes?
C. Differences between p�•oposed substitution and s�eci
D. Differences in product cost ar product delivery time`I
ztern
�. Manufacturer`s guarantees of the proposed and specified items are:
Equal Better (explain on attich�nent}
`Che undersigned states that the function, 1ppearancc and c�uality are equivalent or superior to the
speeified item.
Subrz�iited By: Far Use by City
Signatm•e
as noted
Firm
Address
Date
Telephone
Por Use by City:
l�pproved
City
� Recommended _ Recommended
Not eecommended Received Iate
�y �
Date
Remarks
Date
lZejected
Cl"fY dF F�RT WORTFI Water and Sanitary Sewer Rehahilitation Contract 16)
S"1ANDARD CONSTRUCTION SPP.C3PICATION llOCUMEN'fS CPN 02722
Revise�l7uly 1, 20l ]
013119-I
f'12ECON5'1'RUCTION M�T"iING
Pagc l of 3
�
�
f
�
r
�
�
l
�
�
�
�
�
1
2
3 PART1- GENERAL
4 1.1 S UMMARY
SECTION OI 31 19
PREC�NSTRUCTION MEETING
5 A. Section IncIudes:
6 1. Px-ovisioiis for the precoa�structio�i �neeting ta be held prior to the start of Work to
7 clarify consh-uction contract administ�atinn procedures
8 B. Deviations fron► this City of Fort Worth Standard Specification
9 1. None.
10
11
12
13 1.2
C. Related SpecificaEion Sections include, �ut arc not ��ecessarily li�nited ta:
1. Division 0— Biddir►g Reqnirements, Contz-act Forms and Conditions of the Conh•act
2. Division 1— General Kequirements
PRICE AND �AYMENT PROCL+"llURES
14 A. Measurement and Payment
] 5 1. Work associated with this itein is considered subsidiary to the various iterr�s bid.
16 No separate payment will be allowed for Ehis Iterz�.
17 I.3 REFERENCES �NOT USED]
1 S 1.4 ADIVIINISTRATIVE REQU�REMENTS
]9
Za
zi
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
A. Coordination
1. Attend preconstruction meeting.
2. Kepresentatives of Contractor, subcontractors and suppliers attending meetings
sllall he quali�ed and authorized to act on behalf of the entiiy each represenis.
3. Meeting adininistered by City may bc iape recorded.
a. If recorded, tapes will be used to prepare ininutes and retained by City for
future refe�-cnce.
B. Preconstruction Meeting
i. A preconststiictian meetzng will be held within 14 days after the execution of the
Agreement and before Work is started.
a. Tl�e ineeting will be scheduled and actministered by the City.
2. `I'he Project Representative wil� preside at t�:e meeting, prepare the notes of the
irieeting ancf distt-ibute copies of sa�ne to alZ participants who so i•equest by fully
completing the attendance fo�'in io Ue circulated at the beginning of the meeting.
3. Attendance shall include:
a. P3•oject Representative
b. Cant�-actor's projecE inanager
c. Contractor's superintendent
d. Any subconh•actor or supplier representatives whoir� the Cont��actor rnay desirc
to invite o�� the City inay request
CITY OE FOR"f WURTE{ Watcr and Sanitary Sewer Aehabililateon Cantract ] 01
STANllAKL] CONSTRUCTiON SPI:CIPICA7'IOAi DOC[1MENTS CPId Q2722
Revised August ] 7, 2Ql 2
_7
�
O1 31 19 - 2
PRi'CO�ISTRUCT101�i M}�N'1�1NG
i'agc 2 of 3
l
2
3
4
5
6
7
8
9
�a
zz
12
13
14
15
r ��
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
4�
42
43
44
45
e. Other City representatives
f. Others as appropriate
4. Construction Schedule
a. Prepare baseline construction schedule in accordance with Section O1 32 1 G and
provide at Preconstruction Meeting.
b. City will notify Cont�•actor of any schedufe chan�;es upon Natace of
Preconsf�-uction Meeting.
5. Preliininary Agenda may include:
a. Introduction of Project Personnel
b. Ueneral Description of ProjecC
c. Status oFrighi-ot=way, utility elea�ances, easements or other pertinent pennits
d. Coniracta�•'s wot•k plan and scl�edule
e. Contract Time
f. Natice to Proceed
g. Consiruction Staking
h. Progress �ay�enks
i. Extra Work and Change Order Procedures
j. Field Orde�•s
k. Disposa) Site r�etter for Waste Material
l. Insurance Rencwals
m. Payroll Certification
n. Material Certifications and Quality Control Testing
o. Public Safety and Convenience
p. Documentation af Pre-Construction Conditions
q. Weekend Work Notification
r. Legal HoIidays
s. Trench Safety Pians
t. Confined Space Entry S#andards
u. Coordination with ihe City's representative for operations of existin� water
systems
v. Storm Water Pollution Prevention Plan
w. Coordination with othe�� Contractois
x. �arly Was-ning Systetn
y. Confractor Evaluation
z. Special Conditions applicable to the praject
aa. Damages Claiins
hb. Subnnittal Procedures
cc. Sul�stitutioil Procedures
dd. Co��respondence Routing
ee. Record Drawings
ff Temporary construction facilities
gg. MIWBE or MBE/SBE procedures
hh. Final Acceptance
ii. Final Payment
jj. Questions or Coinmei7ts
C]"1'Y dF F()CtT WORTH Wacer and Sanita�y Sewer Rehahilitation Contract ] 01
S"TANDARD CONSTRUCT]ON SPI:CIPICATION UOCUMEN7'S CPN 42722
Rnviscd August 17, 2012
�
�
4
}
t
fl� �� ��-�
PRECO%ISTRUCTipN MiiC7']NG
Page 3 of 3
� 1 1.5 SUBMITTALS [NOT USED]
' 2 1.6 ACTION SUBMITTALS/INT4RMATIDNAL SUBMITTALS [NOT ITSED]
3 1.7 CLOSEOUT SUBMITTALS [NOT USED]
f
-� 4 LS MAINTENANC� MAT�RIAL SUBMITTALS [NOT USED]
� 5 l.9 QUALITY ASSURANCE [NOT USEDj
` 6 1.10 DELIVERY, STORAG�, AND HANDLING [NOT USED]
7 l.11 FIELD [SITE] CONDITIONS [NOT IISEll�
S
� S 1.12 WARRANTY [NOT USED]
I
� 9 PART 2- YRODUCTS [NOT USED]
11
13
10 PART 3- EXECUTION [NQT USliD�
END OF SECTION
12
Revision �,pg
DATE NAME SUMMARY OF CHIINGE
CITY OF FORT WORTII Water and Sanitary Sc�vcr Rehabilitation Contract ]0]
STAt+fDARD CONSTRUCTiO�I SPLC[PICATION llOCU114EN'I'S CPN 02722
Rcviscd August 17, 2012
n�3�zo-�
PROJECT MEETINC'r5
Page l n1�3
1
2
3 PART1- GENLRAL
4 11 SUMMAIZY
SECTION 01 31 20
PROJECT MEETINGS
S A. Sectian Includes:
6 1. Prn�isians for project meetings tlu•ougliout the construction period to ena.ble orderly
7 revaew of the progress of the Work and to provide for systematic discussion of
8 potential pro�le�ns
9 B. Deviations this City of Fort Worth Standard Specification
7 0 1. Norie.
�1
12
13
14 1.2
15
1�
17
18 1.3
C. Related Specification 5ections include, but are not necessaeily limited to:
1. Division 0— Bidding Requirements, Conuact Forms and Conditions of the Contract
2. I]ivisio�� 1— General Requirements
PRICE AND PAYMLNT kROCEDURES
A. Measurelnenf and Payment
1. Work associated with this Item is considered subsidiaiy to the various ite�ns bid.
No separate payment will be allowed for this Itein.
REI+ER�NCI�S �NOT USED]
19 1.4 ADMINISTRATIVE R�QUIRENI�NTS
20 A. Coai•dination
2I 1. Schedule, attend and administer as speciiied, periodic progress meetings, and
22 specially called zneetin�s throughout progress of the Work.
23 2. Representatives of Contractor, subcontractors and suppliers attending meetings
24 shall be quaiified and authoa-ized to ack on beha�f of the entity each represents.
25 3. Meetings administered by City may be tape recorded.
26 a. If recorded, tapes will be used to pz-epare ininutes and retained by City for
27 fuiure reference.
28 4. Meetings, in addition to those speci�ed in this Section, inay be held when requested
29 by the City, Engineer or Cantractor.
30 B. Pre-Construction Nei�;hborhood Meetzn�
31 1. After ihe execution of the Agreement, but before construction is allowed to begin,
32 atYend 1 Public Meeting with affected residents to:
33 a. Present �rojectcd schedule, iilcluding construction start date
3� b. 1lnswer any consCruclion related questions
35 2. Meeting Location
36 a. Lacation of z�neetin�; to be detennined by the City.
37 3. Attendees
38 a. Contractor
C[TY pP PORT WORTH Water anc3 Sanitary Scwcr Rchube[itation ConFrdct 101
STAt�DARD CONSTRU('TION SPrCI]'1CATTON [�OCUMrN"1�5 CPN 02722
Rcvised ,Tuly 1, 20l ]
Q l 31 20 - 2
YhOJECT MEETINGS
Page 2 uf 3
1
2
3
4
5
6
7
8
9
�a
ll
12
13
14
l5
lb
]7
l8
19
za
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
3S
39
40
41
42
43
�l4
45
46
47
48
b. Project Representative
c. Other City re�resentati�ves
4. Meeting Schedule
a. In general, the neighborhaocf ineeting will occur within the 2 weeks following
the pre-constructian conference.
b. In no case will canstruction he allowed to begin until this aneeting is held.
C. Progress Meetings
1. Fot7nal project coardination meetings wili be held periodically. Meetings will he
scheduled and administered by Praject Representative.
2. Additianal progi•ess meetings to discuss specific topics will be canducted on an as-
needed basis. Such additianal ineetin�;s shall iilclude, but not be limited io:
a. Coordinating shutdowns
b. Iiistallation of piping and equi}�ment
e. Coordinatipn between other co�3struction projects
d. Resoiution nf construction issues
e. Equipment approval
3. The 1'roject Representative will preside at progress meetings, pre�are the notes of
the meeting and distriUute copies of the saine to all participants who sa request by
fully coinp]eting the attendance foem ta be circulated at thc beginning of each
�neeting.
4. Attendance shall inclucfe:
a. Contractor's project manage�•
b. Cont�actn��'S superintendent
c. Any subcontracto�• or supplier representaEi�es wham the Contractor rnay desire
ta in�ite o�� the City may request
d. Engineer's i•eprescz�tatives
e. City's repj�esentatives
f. Others, as requested by the ProjecE Representative
5. Prefiininazy l�genda may include:
a. Review of Wark pi-ogress since previaus mccting
b. Field oUservations, problems, contlicts
c. lteins which itnpcde const�-uction schedule
d. Re�iew of off=site fabricatian, delivcry schedules
e. Review oF canstz-uctian interfacing and sequencing �-ec�uireanents with other
construclion contracts
f. Car3-ective measures and procedures io regain projected schedule
g. Revisions to consteuctioz� schedule
h. Progz-ess, schedule, dw-ing succeeding Work periad
i. Coordination of schcdules
j. Review submittal schedules
k. Mainte��ance of quality standards
l. Pending changes and substitutions
in. Re�iew proposed changes Ior:
J) Effect on construction schedule and on completion date
2} �ffect on othex� coiitracts of ehe Pro�ect
n. Review Record Docuinents
o. Review �nont�ly pay request
p. Itevievv st�tus of Requests for infozxnation
CI7�Y ON ��(JRT WORTi-I Water and Sanitary Sewer Rehahiiitution Contraci 101
STAI�T]}A1217 COIVSTRUCTiON Sl'�C[FICnT[QN DOCUM�.I�!"f5 ['p�I Q2'722
Revised ,luly l, 201 l
E
�
I
013120-3
PdtO1ECT MEETINGS
Page 3 of� 3
� 1 6. Meeting Schedule
2 a. Progress meetings will be held periodicaily as deter�nined by the Project
� 3 Representative.
�i I} Additional meetings xnay be held at the request of the:
� 5 a) City
• 6 b) Engineer
7 c) Contractor
iS 7. Meeting Location
, 9 a. The City will estahlish a ir�eeting location.
10 1) To the extent pa•acticable, meetings will be held at the Site.
I 11 1.5 SUBMITTALS [NOT USED�
12 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USL+'ll]
4 13 1.7 CLOSEQUT SUBMITTALS jN0'1' USLD]
14 1.8 MAIN7'ENANCE MATERI�IL SUBMITTALS [NOT US1�Dj
; l 5 1.9 QUALITY ASSURANCE [NOT USED]
,
� 1C 3.10 llEI.IVERY, STORAGE, AND HANDLING [NOT USEDJ
I� 17 1.11 FIELD [SITEj CONDITIONS �NOT USED]
#
1 S 1.12 WARRANTY �NOT USEDI
19 PART 2- PRODUCTS [NOT USEDj
�
�
�
t
20 PART 3- EXECUTIQN �NOT US�DJ
21 END OF SECTION
22
23
Revrsi�n Log
DATE NAME SUMM�RY OF CI-�ANGE
C17'Y OF FOR'1' WO1tTH Water and Sanitary Scwcr RchubilitaFion Confract ]01
STANDARD CONSTKUC"1'ION Si'ECIFECA'1'lON DOCUMENTS CPN 02722
Revised ]uly 1, 201 L
�
I
I �
k
. �
3 PART1- G�N�RAL
4 I.1 SUMMARY
01321b-1
CONS11tUC'I'I4N PROGFtESS SCf1EDULE
Page l 0l'S
SECTION Q1 32 16
CONSTRUCTION PROGRESS SCHEDT]LE
% 5 A. Section Includ�s:
6 1. General z-equirements for the �reparation, subinattal, updat�ng, status t�eporting and
� 7 tnanageinent of the Construction Progress ScheduIe
8 2. Specific requirements are presented in the City of I'ort Worth Schedule Guidance
9 Docurnent
r
� 10 B. Deviations frorn Ehis City of Fo�'t Worth Standard Speci�catioii
� ll 1. None.
� I2
1 13
14
� 15 1.2
I
I
rr
� i�
1$
i9 1.3
i
!
(
�
l
3
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
C. Related Speciiication Sections include, but are not tzeccssariIy linnited to:
1. Division 0-- Bidding Requirelnents, Contract Fot�ms and Cnnditions of the Contract
2. Division I— General Requirements
PRICE AND PAYM�NT PROCEllURES
A. Measure�ent and Payinent
1. Work associated with this Item is considered subsidiaiy to the variaus ite�ns bid.
No separate payrnent wiil be allowed for this Itein.
REFERENCES
A. Deiinitions
1. Schedule Tiers
a. Tier 1- No schedule subinittal required by concract. S�nall, bi-ief duratzon
projects
b. Tier 2- No schedule submittal i•equared by contract, but will require some
milestone dates. SmaI2, brief diu•ation projects
c. Tier 3- Schedule submittal required by contract as described in the
Specification and herein. Majority of City }�rojccts, ii�ciuding all bond prograin
projects
d. Tier 4- Schcdule submitial required by contract as described in Ehe
Specification and herein. Laige andlox- coz�nplcx projects with long duratians
]) Examples: large wate�• pu�np sta#ion praject and associated pipeline with
intcrconnectioi� to another governmenta� entity
e. Tier 5- Scl�eduIe submittal required by contract as described in the
Specification and herein. Large and/or very co�nplex projecis with long
durations, high public visihi�ity
1) Exatnples rnight include a water or wastewater treahnent plant
2. Baseline �chedule - Initial schedule submitteci before work begins that will seive
as the baseline for measuring progress and departures froin the schedule.
3. Progress 5chedule - Monchly subtnittal af a pz�ogi-ess scheduIe documenting
progress on the prnject and any changes anticipated.
CI7'Y OF FORT WQRTF[ 1Water and Sanitary Sewer Rehabili[ation Contract ] Ol
STANDARD COI+iSTRIJCTION SPLC1PiCAT[ON DOCUZvTENTS CPhI p2722
Itcvised July i, 20] 1
ti
i
(}1 32 ]b-2
COi�lSTRUCTION 1'1tOGRESS SCiILDIJ[,1:
Page 2 of 5
1
2
3
4. Scheduie Narrative - Goncise narrative of the schedule includiilg schedule
changes, expected delays, key schedule issues, ci-itical path items, etc
�. Reference Standards
4 L City of Fort W orth Schedule Guidance Document
5 1.4 ADM�NISTRATIVE RY�QUiREMENTS
6
7
S
9
10
11
12
13
14
15
l6
]7
18
19
A. Baseline Schedule
1. General
a. Prepare a cost-loaded haseline Schedule using approved so$ware and the
Critical Path Method (CPM) as required in the City of Fort Warth Schedule
Guidance Document.
b. Review the draft cost-loaded baseIine Schedule with the City to demonstrate
understiandin� of the wark to be performed and known issues and constrainis
related to the schedule.
c. Designate an authorized re�resentative (Project Schedulei-) responsible for
developing and updating the schedule and preparing reports.
B. Progress Schedule
1. Update the progi•ess Schedulc manthly as requii-ed in the City of rort Worth
Schedule Guidance Document.
2. Preparc the Schedule Narrative to accoinpairy the manthly progress Scl�edule.
20 3. Change Orders
21 a. Incazporate appro�ed change orders, resulting in a chan�e of conh•act iime, in
22 the baseline Schedule in accordance with City of Fort Worth Sched�zle
23 Guidance Document.
24 C. ResponsibiliEy Pat� Schedule Compliance
25 1. Whenever it beco�r�es apparent frotn the cun'ent progress Schedule and CI'M Status
26 Report that delays to the critical path have i-esulicd an.d the Contract completion
27 date will not be jnet, or when so directed b� the City, make sa�ne or all o�`the
28 foftowing actions at no additional cost to the City
29 a. Subinit a Aecoveiy �'1an to the City for approv�l revised baseline Schedule
30 outlining:
31 1} A written stateinent of the steps intended to take to remave oz- arrest the
32 delay to the critical path in the a�proved schedule
33 2) Increase construction manpower in such quantities and cx-afts as will
34 substantially eliminate the backlog of wark and reiurn cuireilt Schedule to
35 �neet projected 6aseline co�npletion dates
36 3) Increase the nuzxi,ber of worlcing hnurs per shift, shifts per day, wor�iiig
37 days per week, the ainount of canstruction equipmenf, or any combination
38 of the foregoing, sufficiently to substantially eliminate ihe backlog of work
39 4) Reschedule activities to achieve inaxin�uin practical concut'rency af
40 accom�lishment of activities, and coinply with the revised schedule
41 2, if ilo written statemcnt of the steps intended to take is subrni#ted when so requested
42 by the City, the City may direct the Cantractor to iiicrease the level of effox-t in
43 ma��power (trades), equipinent and work schedule {overtirrie, weekend and holiday
44 work, etc.) to be employed by the Contractor in order to reinove or arrest the delay
45 ta the cri:tical paih in the approved schedule.
46 a. No additional cost far such wark will be considered.
CiTY O€� PORT WOR'1'lI WaLer and Sanitary 5ewer Rel�abiliLaLinn Contract 10]
STANI�ARD CON577tiJCT[QN $PP.CIPICA`1101�! DOCLJMENTS CPN 02722
Revised July 1, ZO11
�13216-3
CONSTRUCTION PROCeRE55 SCHL-DULE
Page 3 of5
D. The: Gont�-act coanpletaon tiane will be adjusted only fo�� causes specified in this
Contr-act.
3 a. Requests for an extension of any Contract co�npletion date must be
4 suppiemented with the fol�owing:
5 1) Furnish justification and supporting evidence as the City may deein
6 necessary to determine whether the reyuested extension of time is entitled
7 unde�• the pj•ovisions of this Contract.
S a) The City wiIl, after receipt of such justification and supparting
9 evidence, make findings of fact and wiil advise the Contractor, in
1Q writing thereof.
I 1 2) If the City finds that the requested extension of time is entitled, the City`s
12 detennination as to the total numher of days allowed for tlie extensions
13 shall be based upon the approved total baseline schedule and on all data
14 relevant ta the extension.
15 a) Such data shall be rncluded in the next updating of the Progress
16 schedule.
17 b) Actual defays in activities which, according to the Baseline schedule,
18 do not affect any Contract completion date showi� by the crztical path iz�
19 the network will not be the basis for a change therein.
20 2. Su�init each request £or change in Conti•act coinpletion da.te to the CiCy within 30
21 days after the heginning of the delay for which a ti�ne extension is requesled but
22 before the date of final �ayn�ent naider this Conta�act.
23 a. No t��r�e extension will be granted for requests which are not submittcd within
24 the fore�;oing time limit.
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
b. FS•om time to tiine, it may be necessary for the Contract schedule or coinpletion
time to be adjusted by the City to reflect the ef#ects of job canditions, weather,
technical difficulties, strikes, unavoidable deiays on the part of tl�e City or its
repz-esentatives, and other unforeseeable conditions wliich inay indicate
schedule adjustrnents or completion time extensions.
I} Under such conditions, the City will di�•ect the Contractor to j•escheduIe the
work or Contract completion tiine io reflect the changed conditions and tl�e
Contractor shall re�ise his schedule accordingly.
a) Na addiiional compensation will be made to the Contractar for such
schedule changes except for unavoidable overall conh�act tiine
extensions beyond the actuai completion oFunaffected work, in which
case the Contractnr shali take all possible action to minimize any time
excensian arid any additional cast ta Che City.
i�) Availahle Poai time in the Baseline schedule may be used by the City
as well as by the Conti'actoi•.
3. Ftoat or slack time is defined as the amount of time between the earliest start date
and the latest stait date or between the earliest tinish date and the fatest finisl� date
oF a chain of activities on the Baseline Schedule.
a. Float or slack time is not for the exctusive use or benefit of eitlier the
Contractor or the City.
b. Proceed with work according to early start dates, and tl�e City shall have tiie
right to reserve and appartian floa# tiine according to the needs of the project.
C17'Y OF hUK"f WOR"fH Wa[erand Sanilary Sewer Rehabiliiation Conlract ]01
STANllARD COi�f5'I RUCTI�N SPECIFICATION DOCUIv1ENT5 C'.PN 02722
Revised ]uly ], 2011
Ol32lb-4
CONSTRL7CTION PROGR�SS SCHEDULE
1'age 4 of 5
1
2
3
4
5
6
7
8
9
10
11
l2
13
14
15
16
17
c. Acknowledge and agree tl�at actual delays, affecting paths of activities
containing float tin7e, will not ha�e any effect upon contract completion times,
p�•oviding that the actual delay does not exceed the float time associated with
those activities.
�. Caordinating Schedule wiCh Qther Cantx-act Schedules
1. Where work is to be performed under this Cont�-act concun-ently with or can#ingent
upon work perfonned on the same facilities or area under other contracts, tlie
Baseline Schedule shall he coardinated with the scheclules of the other cont�acts.
a. Obtain the schedules of the other appropriate cantracts fi-oin the City for the
preparatian and updating of BaseIine scl�edule and xnal�e the required changes
in his schedule when indicated by changes in corresponding schedules.
2. In case af interfeience betwcen tl�e operations of different contractars, the City will
detei�nine lhe work p�-iority of each contractor aiid the sequence of work necessary
to expedite the completion of the entii-e Pi-oject.
a. In such cases, thc decision of the City shal] be accepted as finak.
b. The kemporary delay of any worf� due lo such circumstances shall not be
considef•ecf as jusii�xcat7€on far claijns fot- additional compensation.
18 1.5 �UBMI7'TALS
19 A. Baseline Schedule
ZO 1. Submit 5chec�ule in natrve file format and pdf fonnat as requi�-ed in the City of Fort
21 Worth Schedule Guidance Document.
22 a. Native file format includes:
23 1} Primavera (P6 03• Priinavera Contractor)
24 2. Submit draft baseline Schedule to City prior- to the pre-construction meeting and
25 bring in hat•d copy to the meeting for re�iew and discussion.
26 B. Progress Schedule
27 1. �ubmit progress Schedule in nativc file format and pdf format as required iii the
28 City of Fort Worth Schedule Guidance ]7ocument.
29 2. Submit pro�z-ess Schedule Ei7onthly no later than the last day of the znanth.
3Q
31
32
33
34
35
36
37
38
39
C. Sc]�edule Narrative
1. Submit the schedule nai7�ative in pdf Fo►'mat as required in the City of Fott Worth
Schedule Guidance Document.
2. Submit schedule narrative manthty no later than thc last day of the month.
D, Subzziittal Process
I. The City adminisCers and maz�ages schedules th►�ough Buzzsaw.
2. Contractor shall subinit docu�nents as required in thc City af Fort Warth Schedule
Guidance Docuinent.
3. Once the project has been cotnpleted and Final Acceptaiice has been issued by the
City, no further progress schedules are required.
CITY OF C'ORT WOR'1'fi Wacer and SaniLary Scwcr Reha6ilitation Contract l01
STANDARI� CONS'1'RUCT[ON SPECiPTCA1'101V DOCUMENTS CPN 02722
Rcvised July 1, 201 L
l
�
�
�
�
k
:
!
}
{
i
I
af 3z �G-s
CONSTRUCTION PRUGRE55 SCIIEDULE
Page 5 of 5
1
2
3
4
5
6
7
8
9
10
lf
12
13
l4
1.6 ACTION SUBMITTAI,S/INFORMATIONAL SUBMITTALS [NOT USEDJ
1.7 CLOSEOi1T SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUSMITTALS [NQT USED]
1.9 QUALITY ASSURANCL
A. The person preparing and revising the construction T'rogress Schedule shall be
expe�•ienced in the preparation of schedules of sinnilaa- coa�plexity.
B. Schedule and supporting docmnents addressed in this Specifcation shall be prepared,
updated and revised to accivately reflect the perPormance of the consCruction.
C. Contractor is responsible for the quality of all submitlals in lhis section meeting the
standard of care for the construction industry for siinilar projects.
1.10 DELIVERY, STORAGk�, AND HANDLING [NOT USED]
1.11 FIELD [SITE] CONDITIONS �NOT LTS�llj
112 WARRANTY [NOT USED]
PART 2 - PRODUCTS �N4T USEDJ
15 PART 3- EXECUTION [NOT USED)
16
17
18
END OT SI.CTrON
Revisian I.og
DA�'E NAME SUMMARY OF CHANGE
� C[TY OP FORT WORTH Water and Sanilary Sewer Rehahilitation ConU acE i Q]
� STANDAR� CONSTRUC"�ION SP�CIFICATION �OCUMEN"1'S CPAI 02722
Revised July E, 20] 1
�
�
�
�
i
#
!
E
c
�
3 PART1- GENERAL
4
5
6
7
8
9
10
11
72
13
14
15
]6
17
18
19
20
21
22
23
24
25
2G
27
28
29
30
31
32
33
013233-1
PItECO1V57'RUC"1lON VIaEO
Page l of 2
S�CTTON O1 32 33
PR�CONSTRUCTION VJDEO
1.1 SUMMAItY
A. Section Includes:
1. Adaninistrative and proccdural rec�uirements fox�:
a. preconstruction Videos
B. Deviations fi•om this Gity of Foi•t Worch 5tandard Specification
1. None.
C. Related Specification 5ections include, but are not necessarily limited to:
1. Divisio� 0— Bidding Rec�uiz-czxzents, Conta-act �arrns and Conditions of the Contz-act
2. Division 1— General 12equirements
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
1. Work associated with this ltem is considered subsidiary to the various ite�ns bid.
No separate payinent wi�l be allowed for thzs Itezn.
I.3 REFERENCES [NOT USED�
1.4 ADMiNISTRATIVE REQUIREMENTS
A. Preconstiuctian Video
1. Produce a preconsiruction video of the site/alignment, incl�ding all areas in the
vicinity of and to be affected by consh•uction.
a. Provide digital copy of videa upon request by the City.
2. Retain a copy of �he preconstruction video untiI the end of the ma.inCenance surety
period.
1.5 SUSMITTALS [NOT USED]
I.6 ACTION SIIBMITTALS/IN�ORMAT�ONAL SUBMITTALS [NOT USLDj
1.7 CLOSEOUT SUBMITTALS [NOT LTSED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED)
�.9 QUALITY ASSURANC� �NOT USED]
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
1.11 �'I�LD �SITE] CONDITIONS [NOT USED]
1.I2 WAItItANTY [NOT USED]
PART 2 - PRODUCTS [NOT USED]
CITY OF FORT WORTH Waler and Saniiary Se4ver Reliabilitation Conlracl [ Ol
STtiNDARD C(71V5TRlfCTIO1V SPECIFICt�T10tV DOClJivIENTS CP3+i a2722
F2cviscd luly 1, 2011
013233-2
PRECOTISTRUC"f10N V[DLO
Page 2 of 2
YART 3 - EXI,CUTION [NOT USED]
END Ol< SECTION
Revision Log
DATE NAME SUMMAR'Y pF CHANGE
CITY OP POR"C WORT[[ Watcr and Sanitary Seti�cr Rchabili[ation Confruct l01
STANDARD CONSTRtJCTiON SPECIF[CATION DOCUMENTS CPN 02722
CZcvised July I, 2011
�
�
F
�
�
� 1
f
2
5
6
7
8
9
1Q
11
12
13
1�
15
16
3 PARTI- GENERAL
4 I.1 SUMMARY
17 1.2
�ECTION O1 33 00
SUBMITTALS
O 1 33 00 - 1
SLIBMITTAL$
Page 1 oi'$
A. Section Includes:
1. General methods and requirements af submissions applicable to the following
Work-related subinittals:
a. Shop Drawrngs
b. Prodtict Data (including Standard Product List subrnittals)
c. Sainples
d. Moc�C Ups
B. Deviations fi•om this City of Fort Worth Standard Speciiication
1. None.
C. Related Specification Scctions include, b�t are not necessarily limited to:
1. I]ivision 0— Bidding Requirements, Contract Fonns and Conditions of tl�e Contract
2. Division 1— General Requirements
PRICti AND PAYMENT PROCEDURES
1S 11. Measurement and I'ayment
19 l. Work associated with this Itein is considered subsidiary to the various iteans bid.
20 No separate payrnent wift be allowed for this Itezn.
21 I.3 REI� ER�NCES [NOT USED)
22 1.4 ADMINISTRATIVE R�QUIREM�NTS
23
24
25
26
27
28
29
30
31
32
33
34
35
3b
37
38
39
40
A. Coordination
1. Notify the City ifi writing, at tlie time of submittal, of any deviations in the
submillals from khe requirements of the Gontract Docuinents.
2. Coordination of Submittal Times
a. Pt�epare, prioritize and transmit each suhmittal sufficiently in advance of
perfo�•ming the related Work or other applicable activities, or within the tiz�e
specified in the individual Work Sections, of the Specifications.
b. Cotatiractor is responsible such that the installation will not be delayed by
proccssing times including, but not limited to:
a) laisapproval and resubinittal (if required}
b) Coordination wiih othe�• suUinittals
c) Tesking
d} Purchasing
e) Fabrication
� Delivery
g) Similar sequenced activities
c. No cxtensian af tiine will be aut�iorized because af the Confractor's failuj•e to
trans�nit submittals sufficiently in adva��ce of the Work.
� CiTY pP PpRT WORTI I Water and Sanitary 5ewcr Reha[�ilitation Contract 101
l STA�117ARQ CONSTRUCTiON SF'ECIFICA'110N DOCiIM�NTS CPN 02722
Kevised �ecemf�er 20, 20i 2
4l 33 00 - 2
SUBMITTAT,S
Page 2 of 8
1
2
3
4
5
6
7
S
9
10
11
12
13
14
15
16
17
18
I9
20
d. Make submittals pro3nptly in accordance with apprn�ed schedule, and in s�ch
sequence as to cause no delay in the Work or in tlie woi-l� of any other
contractor.
B. Subinittal NuinUering
When subzx�itting shop drawings or satnples, utili�e a 9-character submittal cross-
reference identifcation nuinbering systen� ii1 the faliowin�; n�anner:
a. Use khe fiist b digits of the applicablc Specification Section Number.
b. �or the next 2 digits number use numbers 01-99 to sequentially nu�nber each
initial separate ite�n or drawing su�mztted undet• each specific Section number.
c. Last use a letter, A-Z, indicating the resubmissioi3 of the same drawing {i.e.
A-2nd submission, B=31-d subnnissioi�, C�4tE� submission, eic.). A ty��caI
se�bmittal nuznber would be as folIows:
U3 30 00-0$-B
I) Q3 30 00 is the Spccification Sectian for Concrete
2} 08 is the eighth initia] subinittal under this Specificat�inn Section
3) B is the third sub�nission (second resubmission) of that particular shop
dt-awiiig
C. Contractor Certilication
21 I. Review shop drawinbs, �roduct data and saEnples, includang those by
22 subcoiitractat•s, peiar to submission to detennine and verify the foIlowin�:
23 a. Field measure3nents
24 b. Fie1d construction criCeria
25 c. Cata[og nuznhers and similar data
26 d. Canformance with the Contract Documents
27 2. T'rovide each shop dz•awing, sam�lc and product data subinifted by ihe Contractor
28 with a Cei�ti#ication Stateinent af'fixcd includrng:
29 a. The Contractor's Company namc
30 b. �ignature of submitta] reviewez•
31 c. Certi{icafiox� �tatemeni
32 1) "By this submittal, I hex-cby represent that I have determined and verified
33 reld �r�easurements, field const��ction critc�-ia, materials, dimensions,
34 catalog nwnbers and sizxzilar data and I have checiced and coordinated each
35 ite�n wath other applicabie approvcd shop drawings."
36
37
3$
39
4d
41
42
43
44
4S
�G
D. Submitta] Fonnat
1. Folcf shop drawings lat-ger than 8%2 inches x 11 inches to 8% inches x ll inches.
2. Bind shop drawings and producf data sheets togcther.
3. Order
a. Cover Sheet
1 } Description of Paeket
2} Cont�-actar Cc:rti�cataon
b. List of items / Table af Contents
c. Product Data /Shop Drawings/Samples /Calculations
E. Subinittal Content
1. 'l'he date of submission and the dates af any previous subinissions
Cl'1'Y OF FpRT WOR'fH Water aud Sanita�y Scwer Ral�abflitatinn Contract 101
S'1'ANDA€2D CONS'1'1ZUCTI03V SPP.C1r1CA770N DQCUIVIEN'1 S CpN p2'77Z
Reviscd December 20, 2fl12
013300-3
SUBIvIITTALS
Page 3 of 8
�
2
3
4
5
G
7
$
9
10
11
12
13
14
15
16
17
18
7. 9
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
�4 ]
42
43
44
45
46
2. The Project title and number
3. Contractor identification
4. The names of
a. Contractor
b. Supplier
c. Manufacturer
5. Identification of the product, with the Specification Section nu�nbea-, page and
para�;raph(s)
6. Field diinensions, clearly identified as sucl�
7. Aelatian to adjacent or critical feaiures of t�►e Work or materials
8. Applicable standards, such as ASTM or Federal Speci�cation num6ers
9. Identiiication by highlighting of deviations from Contract Dacuments
10. Identificataon by l�ighli�htzng of revisions on �-csubmittals
11. An 8-inc11 x 3-inch blank space for Conh-actor and City stamps
F. Shop Diawings
I. As specifed in individual Worlc Sections includes, but is not necessarily liinited to:
a. Custom-prepared data such as Fabi•ication and erection/installation (working)
drawings
b. Schedu[ed information
c. Setting diagrams
d. Actual shopwork manufacturing inst�-uctions
e. Custom templates
f. Special wiz-iiz�g diagrams
g. Coordination c�rawings
h. Indzv�dual syste�n or equip�nent inspecl ion and tesE reports including:
1} Yerfonr�ance cutves and certifications
i. As applicable to the Work
2. Details
a. Relation of the various pa�ts to the znain members and lines of the slructure
b. Where correct fabrication of thc Work depends upon field measurements
1) Provide such zneasureanents and note on the drawings prior 10 su6mitting
for approval.
G. Product Data
1. For submittals of product data for products included on the City's Standard Product
I,zst, clearly identify each item selected Por use on the Project.
2. For subir►ittals of }�raduct data for pt�aducts not inciuded on the City's Siandard
Product T.ist, submittal data �nay include, but is not necessarily Iiinited to:
a. Standard }�repared data for ir�anufactueed prnducls (sometimes referred to as
catalo�; data}
1) Such as the manufacfurer's product specification and installation
instructions
2) Availability of colors and patterns
3) Manufacturer's printed staten�ents of com�liances and applicability
4} Rougliing-in dia.grains and templates
5} Catalog cuts
6) 1'z�oduct photagraphs
CiTY OF FORT WORT[ 1 Water and Sunitary Sccvcr itcEiabiliiation Contract ] Ol
STANI7ARD Cp7�STRUCTION SPECIFICA'E'!ON llOCUMEN'1�S CPN 02722
Revised llecem6cr 20, 2012
fl ] 33 ()0 - 4
S U13MITTALS
Page4oC8
1
2
3
4
5
{�
7
8
9
10
11
12
13
14
15
16
17
7) Standarcf wiring diagracns
8) Printed perfoz7iiance cur�es and operational-range c3iagrams
9) Production or quality control inspection and test rcparts and certii`ications
10} Mill reparts
11} Product operating and inaintenance instructians and recommended
spax-e-parts listing and printed product warranties
12) As applicable to the Woz-�C
H. Samples
1. As specified in indi�idual Seciions, include, but are not necesslrily liir�ited to:
a. Physical examples af the Wnt-k such as:
1} Sections ofinanufactured or fabricated Woc�k
2) Sznall cuts or containers of materials
3) Coinpleie units of repetitively used products color/texture/paitern swatclies
and raiige sets
4) S�ecimens for coord'anatian of visual effect
5) Graphic syinbols and units of Work ta be used by the City foi- independent
inspection and tcsting, as applicable to the Wark
18 i. Do not start Work requiring a shop drawinb, sanlple or product data nor any material to
19 be fabricated or iiistalled prior ta the appxoval or qualified approval of such ite�n.
24 1. Fabricaeion perfaz-med, �naterials purchased or on-site construction accomplished
21 which dnes not confonn to appea�ed shop drawings and data is at the Conti•actor's
22 risk.
23
24
25
2b
27
2R
29
30
31
32
33
34
35
3b
37
3R
39
40
41
42
43
44
45
�4b
47
2. The City will not be liable for any expezase or delay due ta correctioils or remedies
i-equired to accoinplish eonfor�nity.
3. Complete praject Worl�, inaterials, fabrication, and installations in conformance
wiih approved shop drawiiigs, applieable samples, and pt-aduct data.
J. Sub�x�ittal Distri6ution
1. Electranic Distribution
a. Can�nn de�eIopment c�f Project directory for electronic submittals to be
uploaded to Ciry's Buzzsaw site, ar another external FTP site approved by the
City.
b. Shop D�•awin�;s
1) Upload submittal to designated pt-oject diz•ectoiy and notify appropriate
Ciiy representatives via ernail of submittal posiing.
2) Hard Copies
a) 3 copies fa�� all suhmittals
b} If Contractor �-equires moie than 1 hat�d copy of Shop Drawin�;s
retiu�ned, Contractoj• shall subinit inore thaii the niunber nFcopics listed
abave.
c. I'xoduct Data
1} Upload subir�ittal to designated pj•oject directory and noEify appro�z-iate
City representatives via email of subzx�ittal posting.
2) Hard Copies
a) 3 copies for all submittals
d. Samples
J) Distributed to the Project Representativc:
2. Hard Copy Distribution {if required in lieu of elcctronic distribution}
CTTY OF FORT WORTH Water and Sanitary Sewer Rchabilitation Contracl l OP
STANllAR� CONSTit[7CTION Sl'ECIFICATIpN 170CUMEN'1'S CPN 02722
Re�ised Deccmbcr 20, 2012
oi 33aa-s
SURMITTALS
Page 5 of 8
1
z
3
4
5
6
7
8
9
ia
11
12
13
14
15
lb
17
l8
d9
zo
21
22
23
24
25
2G
27
28
29
36
31
32
33
34
35
3b
37
38
39
4a
41
42
43
44
45
4(
47
4$
a. Shop Drawings
1) Distribu#ed ta the City
2) Capies
a) S copies for mechanical submittals
b) 7 copies for alI other subinittals
c) If Contractor requires more than 3 copies of Shop Drawings retw•ned,
Contractox- shalI submit more than the number of copies listed above.
b. Product Data
1) Distz-ibuted to the City
2} Copies
a) 4 copies
c. Sainples
1) Distributed to the Projecf Representalive
2) Copies
a) Submit the number stated in thc respectivc Spccification Sections.
3. Distribute reps•oductions of approved shop drawings and copies of approved
product data and samples, where required, ta the job site file and elsewhere as
directed by the City.
a. Pro�rde munber of copies as directed by thc City but not exceeding the nuinber
previously specified.
K. Subrz�zttal Review
I. `1'he revicw of slzop drawings, data and samples wiil be for general confonnance
with tl�e design concept and Contract Documents. This is not to be consirued as:
a. T'ermiiting any departure froin the Contract requirements
b. Relie�ing the Contractor of responsibility for any errars, includir►g details,
diinensions, and materials
c. Approving departiues frotn details furnished hy the City, except as otherwise
provided herein
2. `I'he review and approva� of shop drawings, sarnples or pt-oduct data by the City
does not relieve the Cantractor fi•oin his/her responsibility with rega��c� to the
ful�lhnent of the tei�ns of the Contract.
a. All risks of en•or and o�nissian are assu2ned by the Cantractor, and ihe City will
have no responsibility the��efore.
3. The Contractor remains responsihle for c�etails and accuracy, for coordinating the
Work with all other associated work and tradcs, for sclecting fab�-ication processes,
for techniques of asseinbly and for per�oa-��ing Wo�-k i�� a safe �nanner.
4. If the shap drawings, data or samples as submitted describe variations and show a
departure from ihe CanCract requirennents whicla City �nds to be in the interest of
the City and to be so minor as not to involve a clian�;e in Contract P�-ice or time for
perforinance, the City may return the �-eviewed dz-awings without noting an
exception.
5. 5ubmiftals will he returned to the Cont�ractor under 1 of the following codes:
a. Code 1
l) "NO EXC�PTIONS TILKEN" is assignedwhen lhere are no notations or
comments on the suUinittal.
a) When returned under this code the Conu•actor may refease the
equipn�ent and/or inaterial for inanufactui•e.
b. Code 2
CTTY OP FOR'i' 1�JOli`1'H Watcr aod Sanitary Se�ver Rehahilitation Contract l01
S"I'ANDAlZI) CONS"f AUCTION SPECIFICAT101V DOCIJMENTS CPN 02722
Revised Deceinher 20, 20i 2
4I330�-6
Sl IBMiTT'AT.S
Page 6 of 8
1
2
3
4
S
b
7
8
9
]0
11
I2
i3
14
15
1C
17
18
19
20
21
22
23
24
25
2C
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
4G
�l7
4$
49
1) "�XC�PTIONS NOTED". This code is assigned when a confirjnation of
the notations and comments IS NOT required by the Contractor.
a) The Contractor may release the equip�nn,ent or material for manufactuee;
however, all notations and comments must be iilcorporated inta thc
fina� product.
c. Code 3
1) "�XCEPTIONS NOTED/RESUBMIT". `fhis combination of codes is
assi�ned when notations and comments are extensive enough to requit•e a
t•esubir�iital of the package. ,
a} The Cantractor ma� release Ehe equipment ot- rr►aterial for manufacture;
however, all notatians and comments must be incorporated into the
final product.
b) This resu6mittal is to address all comments, omissions and
non-conforining items that were noted.
c) ResubmitLal is ta be recei�ed by the City within 15 Calendar Days of
the date of the City's transmittal �•equiring the resubmittal.
d. Cade 4
J) "NOT APPROVED" is assigned when tk�e subinitfal does not meet the
intent of �he Contract Documents.
a} The Cantracior must resub�nit the entire package revised to brin� the
sub�nittal into confonnance.
U) It inay be ��ecessary to resubmit using a different manufacturer/vendar
to meet the Cant�act Documents.
6. Resub�nittals
a. Haudled in the same inanner as f rst sul�mittals
1) Corrections other than requested by the City
2} Marked with revision triangle or ather similar method
a} At Cnntractor's risk if not marked
b. Subinittals for each itez�n will be revievved na more than twice at the City's
expense.
I} All subsequent reviews will be perfoi�rned at times canvenient to tl�e City
and at the Contractor's expense, based on the City's rn• City
Representative's then prevailing rates.
2) Pravide Contractor reimbursement to the City within 30 Caleildar Days for
all such fees invoiced by thc City.
c. The neec� for inore than 1 resubnzission or any other delay in obtaining City's
review of submitkals, will not entitle the Contractor to an extensian of Caii�-act
Time.
7. Pa�-�ial Submittals
a. City reseives tl�e right to not review submittals deemed partial, at the City's
discz-etion.
b. Subinittais deemed by the City to be not complete will be returned to the
Canh�actor, and will be considered "Not Appraved" until resub�nitted.
c. The City may at its option provide a list or �nark the submittal directing the
Cont��actor io the areas that are incom�Iete.
8. Tf the Coni�•actor considers airy correction indicated on the sho� drawzngs to
constitute a change to the Conh-act Documents, then written notice �nust be
provided thereof �a the City at least 7 Calendar Days prior io i•elease foz•
manufacture.
Cl'CY OF FQRT WOkZTH Wa(er and Sanitary Sewer Rehabilitaliun Conh�act l Ol
S'1'ANDARD CQNS"l�1ZUC"]70�I SPEGPiCAT10N D�CUMENTS CPN 02722
Rei�iscd December 20, 20 ] 2
C
� 1
2
� 3
� 4
5
4
6
r �
� 8
. �
I
i
k
�
�
�
Ol 33 00 7
SUBM17"CAI.S
Page 7 ot 8
9. W�en the shop drawings have been completed to the satisfaction of tl�e City, lhe
Contractor may carry out the construction in accordance therewith and no furlhei-
changes tl�erein except upon written insEructions fi•om the City.
10. �ach submittal, appropriately coded, will be returned within 30 Calendar Days
following receipt of submittal by the City.
L. Mock ups
1. Mock Up units as speci�ed in individua! Sections, incIude, but are not necessarily
limited to, complete units of the star�dard of acceptance for that type of Wark to be
uscd on the Projecc. Remove at the cotnpletion of the Work of• wlien dix-ected.
i0 M. Quali�cations
11 I. If specifcally required ira other Sections of these Specifica.tions, sul�init a P.�.
12 Ce;rti�cation for each item required.
13 N. Requesi for Infonnation (RFI)
�4 1. ContractoE- Rcc�uest for additional infor�nation
15 a. Cia�-ificatio�� or interpi•etation of the cont��act documents
16 b. When the Contractor believes there is a conflict between Conh•act Documents
17 c. When the Conh•actor believes there is a conflict between the Drawings aiid
18 Speciiications
19 1) Identify the conflict and rec�uest clarification
20 2. Use the Request for Infoi7natinn {It�T) form provided by the Gity.
21 3. Nun�bering of RFI
22 a. Prefix with "RF'I" followed by series number, "-xxx", be�i�aning with "Ol" and
23 increasing sequentially wiih each additional transinittal.
24 4. Suf�cient information sha�l be attached to pe�rnit a written response witlZout further
25 i��fortnation.
2C 5. The City will log each requesF and wiIt review the request.
27 a. if review of #he praject iilfonnation request indicates that a change to the
28 Cont�act Documents is required, the City wiII issue a Field Order or Change
29 Order, as apprapriate.
3fl 1.5 SUBMITTALS [NOT U�ED]
31 �.6 ACTI�N SUBMITTAlaS1INFORMATTONAL SUSMITTALS �N�T USED]
32 1.7 CLOSEOUT ,SDBMITTALS [NOT USED]
33 1.8 MAINTENANCE MATERIAL SUBM�TTALS [NOT i1SED]
34 1.9 QUALYi'Y ASSURANC� [NOT USED]
35 1.10 DELIVERY, STORAGE, AND IIANDLING �NOT USED]
36
37
I.T] I+IELll [SITE� COIVDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
CTTY OF FORT WOE2TH Waler anc3 Sanitu�y Seiver Rehabilitation Contract 10!
STANDAR� CONSTRUCTION SPECIFICATiON DOCUNEENTS CPN 02722
Itevised Deccmber 20, 20 i 2
013300-8
SUBMITTALS
Page 8 01�8
1 PART 2- YIZODUCTS [N�T USED]
2 PART 3- EXECUTION [NOT U,SLI)]
3 Y+1ND O1+ S�CTION
�
Revision Log
DATE NAME SUMMARY OF CI�ANGE
72/2Q/2012 b, ;lohnson 1.4.K.8. Working Days modified to Calendar Days
CITY OF FOR7' WOIt'1'H Water and Sanitary Sewer Rehabili[aFion Coniract ]O1
S"CANUA.R.I.) COAI57'RUCT[ON SPECiF[CATiON DOC�JMP.NTS CPN 42722
Revised Dece�nber 2a, 2p12
G
s
i
}
�
� 1
. Z
�
�
�
�
E
�
�
I
i
�
E
�
3 PART1- GENERAL
4 ].1 SUMMARY
5
(
7
8
9
10
1�
12
13
14
15
]6
17
18
19
20
21
22
23
24
25
2b
SECTION Ol 35 13
SPECiAL PR0IECT PROCEDURES
O] 35 ]3 - l
SI'�CIAL PRO]ECT PROCEDUKL;S
Page 1 of 8
A. Section Includes:
1. The procedures fo�� speciat project circumstances that includes, but is not lirnited ta:
a. Coordi��ation with the Texas De�artment of Transportation
b. Work ��ear Hig�t Voltage Lines
c. Confined Space Entiy I'rogram
d. Air Pollutior� Watch Days
e. TCEQ Ai2• Permit
f. Use of Explasives, Drop Weight, Etc.
g. Water Depart�nent Noti�caCion
h. Public Notifcation Prior to Beginning Consti-�iction
i. Pubiic Notification oPTemporary Water Sez�vice Interruption during
Construction
j. Coordination with United States Army Corps ofFngineers
k. Caordinatiozl within Railr•oad �ermits a�•eas
1. Dust Cantrol
m. �inployee Parking
B. De�iations from this City ofFort Worth Standard Specz�cation
] . Noil�.
C. Related Specification Sections i�iclude, but are not necessari�y Iimited io:
1. Division 0— Bidding Req�ireinents, Contract Fonns and Conditions of the Contract
2. Divisinn 1— General Requirei�ents
3. Section 33 I 2 25 — Connection to �xistin� Water Mains
27 1.2 PRTCE AND PAYMENT PROC�DURES
28
29
30
31
32
33
34
35
36
37
3&
39
40
A. Measure�nent and Payment
1. Coordii�ation within Railroa.d permit areas
a. Measure��e��t
1) Measurement far this Itein wi17 be by lump sum.
b. Payment
1) The work �erformed and znaterials furnished in accordat�ce with this ltem
wiil be paid for a# tl�e lump sum price bid for Railroad Coaz�dination.
c. The price bid shall include:
1) Mobilization
2} Inspectiaz�
3) Safety tf•aining
4) Additioraal Insurance
5) Insurance Certificates
Ci1�Y dP FOlZ7� WOR"I�Ii Waler and 5anitaiy Sewer Rehabilitauon Contract ]Ol
STAI�DARll CON5TRlJCTION SPLCIPICAT[ON llOCUMENTS Cl'N D2722
Revised 17ecember 20, 2012
at 3s �3-z
SPECiAL PRO,�P.CT PROC�;llUKES
Page 2 uf R
1
2
3
4
5
6
7
8
9
]0
I]
]2
13
14
15
]G
17
l8
6) Other requi��ements associated witl� general coordinatian witlz Railroad,
incluciing addi#iona] empioyees required to pratect the right-of-way and
property of the Railraad frnm da�nage a��ising out of and/or from the
conskruction of the Project.
2. Railroad Flagmen
a. Measurement
1) Measurernent for this Item will be per workin� day.
b. Paymeni
1) Tl1e work perfonraed anci materials furnished in accarclance witl� this ltem
will be paid for each working cfay that Railroad Flagmen az�e preseni at the
Site.
c. The price bid shal! include:
1} Caordination for scheduling ila�men
2} FlagYnen
3} Otkaer requirements associated with Railroad
3. All other items
a. Work assaciated with these Items is co��sidered subsidiary to the various Items
Uid. No separate payment will be allowed far this Ttea�ri.
19 1.3 RFFER�NC�S
20 A. Reference Standards
21 1. Reference s�andards cited in this Specification refer ta the current reference
22 stanc4ard published ai the time of 1he latest �•e�ision date logged at the end of t11is
23 Specification, unless a date is speciiically cited.
24 2. Hea]th and Safety Code, Title 9. Safety, Subtitle A. Pui�lic Safety, Chapter 752.
25 High Voltage O�enc�ad Lines.
26 3. North Centrai Texas Council of Governments (NCTCOG) — Clcan Constructian
27 Specif cation
2x 1.4 ADMINISTRATIV� REQUIREMENTS
29 A. Coordinatic�il with the Texas Departinent of Transportation
30
31
32
33
34
js
3 fi
37
38
39
40
41
42
43
44
45
1. When work in ti�e right-af=way which is under the ju�-isdiction of the Texas
Department of Transportation ('1xD�T}:
a. Nntify the Texas Department of Transportation prior to com�nencing any wark
therein in accoa�dance with tlle pro�isions of the permit
b. Al] work perfot�med in the TxDOT right-of-way slaall be performed i3�
conlpliance with and subject to approval from the Texas Department of
Tra�lsportation
B. Work near Hi�Y� Voltage Lines
2
3
Regulatoiy Requirements
a. All Wor�C near High Voltage Lines (more than 600 volts measured between
conductors or between a canductor and the ground} shall be in accordance with
Health and Safety Cade, TEtie 9, Subtitle A, Chapter 752.
Warning sign
a. Provide sign at su£�icient size meeting all OSHA requi7•ements.
Gquipment operating within 10 feet af higl� �oltage lines will require the following
safety features
Cl'fY OF FORT WpRTH Water �nd Sanitary Sewer Rel�abililation Contract 101
S'I�ANDARD CONSTRLTCTION SPECIF1CA770N DOCUM�NTS CPN D2722
Revised December 2Q 2012
013513-3
SPP.CTA1� PRO]EC"f PRDCEDCIRES
1'age 3 of 8
1
2
3
4
5
6
7
8
9
IO
11
]2
13
14
15
I6
17
18
19
20
22
22
23
24
25
2G
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
a. Ins�ilating cage-type of guard about the boom oE• arm
b. Insulator Iinks on tlie lift hook comlections for back hoes or dippers
c. Equipmenf must meet the safety requirements as set fnrtli by OSHA and the
safety requirements ofthe owner ofihe high voltage lines
4. Woi•k within G feet of high voliage electric lines
a. Noti�cation shall be given to:
1) The power coinpany {exa�npie: ONCOR)
a) Maintain an accurate log of all suci� calls to power company and record
action taken in each case.
6. Coordination with power company
1) After ��otification coordinate with the powet• company to:
a} Erect temparary mechanical barriers, de-eneegize the la��es, or raise or
lower the lii3es
c. No personnel may work within b feet of a high voltage line before the abo�e
requirements have been met.
C. Confined Space Entry Program
1. Frovid� and follow approved Coaa�ned Space Entry Program in accordance with
OSHA requirements.
2. Confined Spaces include:
a. Manholes
b. Ali otlier confned spaces En accordance with OSHA's Pennit Rcquired for
Canfined Spaces
D. Aiz� Pollution Watch Days
1. General
a. Observe the following guidelines relating ta working on City construction sites
on days designated as "AIR POLLUTION WATCH DAYS".
b. Typical Ozone Season
1) May 1 througla October 31.
c. Critical E�nission Time
1} 6:00 a.rn. to 10:00 a.�n.
2. Watch Days
a. The Texas Coznmission on Environmental Quality {TCEQ), in coordination
with the National Weathe�• Ser•vice, will issue the Aiz� Pollution Watch by 3:00
p.m. on the afternoan prior to the WATCH day.
b. Requirements
]) Begin work after 10:00 a.m. whenever construction phasing requires the
use of motorized equipment far pEa�iods in excess of 1 haur.
2} However, the Confractor may begin work prior to t D:pO a.m, if
a} Usc of motorized equipener�t is less than 1 haur, or
b) If equipment is new and certified by EPA as "Low E�nitting", or
equipment burns Ultra Low SuEfur Diesel {ULSD), diesel emulsiof�s, or
alternative fuels such as CNG.
E. TCEQ Air Pe��tllit
1. Obtain TG�Q Air Permit for const�•uction activities per requiren�ents of'1'CEQ.
F. Use of Explosives, Drop Weight, Etc.
]. Wf�en Cont��act Documents pennit on the projec# the following wiIl apply:
Cl'I�Y OF �'ORT WpRTH Waler and 5anitaiy Sewer Rehab]]ilaGon Coniract ] Ol
STANDARD CpNSTRUC7�lON SPECIFICATION �IOCUMENTS CPN 02722
Revised December 20, 2012
013513-4
Sl'FCIAL T'1tOJ�.C:'f PROCEDUAES
Pagc 4 of &
1 a. Public Notif cation
2 1} Subnlit notice to City and proof of adequate insurance covea�age, 24 hours
3 prior to co�nmencing.
4 2) Minirnum 24 hour publie notification in accardance with 5ection Q1 31 13
5 G. Water Departmezat Goordination
G I. During the construction of this projeci, it witl be necessary ta deactivate, far a
7 �eriod of ti�ne, existing lines. The Contractor shal] be required to coordinate with
8 the Water Dcpartment to determine ihe best times for deactivating and activating
9 those li3�es.
lU 2. Coordinatc any event that will require connecting to or the operation of an existaz�.g
1 I City water line system with the City's representative.
12 a. Coord�nation shall be in accordance witll Section 33 I2 25.
13 b. If �lecded, obtain a hydeant water �neter fra�n the Water Department for use
l4 dut�ing tlle life of named praject.
15 c. In thc event that a water val�e on an existi3�g live system be turned off and on
16 to accomrnodate the construciion of the project is required, coordinate this
�7 activity lhrough the appropriate City representaEive.
18 t} Do clot operate water line valves af existing water systerr►.
19 a} l�ailure to comply wil] render the Contractor in �iolatian of Texas Penal
20 Code �l,itle 7, Chapter 28.03 {Criminal Mischie#� ar�d the Contractor
21 will be prosecuted to the full extent of the law.
22 U) In addition, the Contractor will assuine all liabilities and
23 responsibilities as a result of these actions.
2� H. Public Notification Pi•ior to 13eginning Constructian
25 1. Priar to beginni��g co�sstruction on any block in the project, on a black by block
2G basis, }�repare and deliver a notice or flyer ofthe pending canstruction to t}�e front
27 door of eac}� �-esadez�ce or business that will be impacted by constructian. The notice
28 shall be prepared as follnws:
29 a. Post notice or flyer 7 days prior to begiiming any construction activity nn each
30 block in the project area.
31 ]) Pre�are flyer on tl�e Contractor's letterhead and include the fa�lawing
32 infor�na�ion:
33 a} Name o�Project
34 b) City Project No (CPN)
35 c) Scope of Project (i.e. type af canstruction acti�ity)
36 d) Actual construction duratioil within the F�lock
37 e} Name of the contractor's forema�l and phaY-�e number
38 i� Name ofthe City's inspector and phone num6er �
39 g) Ci#y's af�er-hours phone number
40 2) A sample ofthe `pre-const�uctian noti�ication' flyer is attached as Exhibit
41 A.
42 3) Sub�nit scl�edule showin� the construction start and finish time for cach
�3 block of t�e projec# to the inspector.
44 4) Deliver f]yea� to the City Inspector for re�iew prior ta distribution.
45 b. No construc#ion will be allowed to begin on any block unti] the flyer is
46 delivered to all residents ofthe block.
47 J. Public Noti�icalion of Temporary Wa#er Service Interruption during Constructiorl
CITY QF FOCZT WORTH Watcrand 5anitary Se�ver)Zehabilit<ition Coniract IUl
STAi1DARD CO�ISTRUCTION Sl'EC1r�1CA770N DOCUMENrS CPN 02722
a���sea n����»b�T2o, 2012
Oi 35 ]3-5
SPECIAT. PRO.iEC'f 1'ROCEDURES
Page 5 of S
1
2
3
�
5
G
7
8
9
10
I�
12
13
14
15
]6
17
I8
19
20
2[
22
23
2�F
25
26
27
28
29
30
31
�2
33
34
js
36
37
38
39
q[}
41
42
43
44
45
�6
47
1. In the event it becornes necessary to teanporarily shut down water service to
residents or businesses during cnnstruction, prepar•e and deliver a notice or flyer of
the pei�ding interruption to the front door of each affected resident.
2. Prepared noticc as follows:
a. The notification or flye►• shall be posted 24 hours prior to #he temporary
i nterrupti on.
b. Prepare flyer on the contractor's letterhead and include the following
informatioza:
7) Name of the project
2) City Project Number
3} Date oI'the interruption of service
4) Period the interruption wil] take place
5) Namc of the coi�tractor's forennaz� and phone number
6) Name of the City's inspectot• and phone number
c. A sample of the teir�pora�y water service interruption notification is attached as
Exk�ibit B.
d. Deliver a copy of the temporazy interruption notificatio�l to the City inspector
for z-eview prior ta being distributed.
e. No interruption of water service can occur until the flyer has been deli�ered to
all affected residents and busii7esses.
f. Flectronic versions o�`the sample flyers can �e obtained fi�om the Project
Construction Inspectoi•.
J. Coordination with Uniced States Ariny Corps ofEngineers {USACE)
At locatio��s iz� the Project where construction activities occur in areas where
USACE permits arc r�equired, ►r►eet ail requireanents set forth in each designated
permit.
K. Coordination withiil Raiiroad Pet�mit �reas
l. At locations in the project whcre construction activities occur in areas where
z�ailroad permi#s are requi��ed, meet all requirements set forth �n each designated
rail��oad permit. This includes, but is not limited tq p��ovisio��s for:
a. Flagmen
b. Inspectors
c. Safety training
d. Additianal insurance
e. Insurance cerEificates
f Oti�er employees required to protect the right-of way and pro�erty oilhe
Railroad Company fi�om damage arising out of and/or from the construction of
the projeci. Proper utility clearance procedures sha�l be used in accordance
with the permit guidelines.
2. Obtain aE�y supplementaI inforinatio�i needed to co�r►ply with the railroad's
req u freinents.
3. Railroad Flagmen
a. Submit r�eceipts to City for veri�cation of working days that railroacf flagmen
werc present on Site.
L. Dust Control
1. Use acceptable rneasures to cantrol dust at the Site.
a. If water is used to contr•ol dust, capture and property dispose of waste water.
C1TY OF FOR']� WORT[3 Water and Sanitary 5ewer Rehahilitatinn Conlract ] 01
STANDARIJ CONST1tUCTTON SPECIFICATION DOCUMGNTS CPN 02722
itcvfsed llecember 20, 2d12
o� 3s �s-�
SPT CIAT. I'k�OJ�:C'f ['ROCEDURES
Vage F of 8
1 b. If wet saw cuttiz�g is performed, ca�ture and properly dispose of slurry.
2 M. Employee Parking
3 1. Provide pa�•king for employees at locations approved by the City.
4 1.5 SUBNIITTALS �NOT USED�
5 1.6 ACTION SUBMITTALS/iNFORMATTONAL SUBMITTALS �NOT USED]
b 1.7 CLOS�OUT SUBMITTALS [NOT USED�
7 1.8 MAINTENANCE MATER[AL SUE3MITTALS jNOT USF,D�
8 1.9 QUALITY ASSURANCE [NOT USEDJ
9 1.10 DELIVERY, STORAG�, AND HANDLING [NOT USED]
1U 1.11 �'1�LD [SITE] CONDITIONS �NOT USEDJ
1 I I..12 WARRANTY �NOT USED�
12 PART 2 - PRODUCTS (NOT �1S�DJ
13 PART 3- EXECUTIQN �NQT USTD�
14
15
END OH' SECTION
Revision I,og
DATR I�lAN1E SUMMARY Of� CIinNC;E
i.4.8 — Added requi�-enient of coml�liauce witll l-lealth amd Safety Code, Tille 9.
$13112U12 D. .lahnson Safety, Subtitle A. Public Safcty, Chapter 752. High Voltage Overhead Lines.
t.4.]� — �ldded Coutractor respnnsihility for obtainirlg a TCL'Q Air Yermit
I6
CITY OP POlZ"1' WQA"171 Water and Sanitary Sewer Rehabilitation Contract 10 i
STAN17Altll CONS"i�RUCT103Y SPrC1PTCATION llOCUME;N'f5 CPN U2722
Ae�ised llecembar 20, 2012
�
�
i
i
{
s
!
I
�
i
1
z
3
4
S
�
�
s
9
10
11
12
13
��
15
16
17
18
19
20
zl
zz
23
2�
25
26
27
2$
29
30
31
32
33
34
35
36
37
O13513-7
SP�CiAI. PRQ3�CT PROCEDIIIt�S
Page 7 of S
Qate:
CPN No.:
Project Name:
Mapsco Location:
Limits of Construc#ion:
EXHIBIT A
(To be printed on Contractor's Letterhead}
, i�
, , �
� ��
,
� �
THIS 15 TO INFORM YOU THAT UNDER A CONTRACT WITH THE ClTY OF FORT
WORTH, OUR COMPANY WILL WORK ON UTILITY LINES ON OR AROURlD YOUR
PROPERTY.
CONSTRUCTION W1LL BEGIN APPR�XIMATELY SEVEN DAYS F'RO�UI 7HE DATE
OF THIS NOTIC�.
iF YOU HAVE QUESTIONS ABOUT ACCESS, SECURITY, SAF�TY �R ANY OTHER
ISSUE, PLEASE CAL.I�:
MI'. CCONTRACTOl3'S SUPERiNTENDENT> AT <TELEPHONE NO.�
OR
Mr. �CfTY fNSPECTOR� AT � TELEPHpNE NQ.>
AFTER 4:3D PM OR ON WE�K�NDS, PLEASE CALL (817} 392 8306
PLEASE KEEP THIS FL.YER HANDY WHEN YOU CALL
CITY OF PORT WORTH Water aitd Sanitary 5ewer RehabiGtation Contract I 0]
STANDACtD CONSTRUCTION SPECIFICA'1�lON DOCUMENTS CPN 02722
Revised Dcccmber 20, 2012
_ �
O13513-5
SPP.CIAT, k'RO]EC1` 1'KOCEDURES
Pagc R of 8
1
2
EXHIBIT R
�ORT �ORTH
�:
�� �o. �
�a� ��:
I�o�r��� �� �1En�i�o��� �►���1� s�1��nCg
��'�lF��3�1PT�4H
DUF. TO L3T1LI'1'Y IIVIPRO'(rEMENTS IN YOUR NFICITRORHOOD, YOUR
WA.TF,� BEIiVIC� WILI, B�; iNTER.R.UPT�ll 03Y
BETWEE�T Tk�E �Oi3RS Oi7 AND
7F' YO[J TTAVE QUESTTONS ABOUTi 7'HIS SHUT-OUT, PLEASE CAI.E.:
M IZ. AT
(CpNTRAC'tORS SiTPEIiiNTENAEtY"C') {TELEPHaNE NUIVIB�R)
OR
MR.
(C:)T'Y ITVSPF.CT�R)
AT
(TEL���IONE NUMi3ER)
THIS INC�NVENIEI+FC� WILL BE A.S SI�ORT AS POSSIHLE.
THANK YOU,
CONTRACTOR
3
4
Cl'i�Y OF FOFLT WORTII Water and Sanitary Sewer Rehabilltatiun Contract 101
S'1'ANDARD CONS�R[JCTiON 5P1?CIPICA7�]ON llOCUMEN"fS Cl'N 02722
Revtsed December 20, 2012
�
;
I
I
�
�
I
a
;
i
�
r
�
�
k
s
;
;
Dl 45 23
'l�LS7ING AND 1NSPECTION SERVICGS
Page I of2
S�CTIOIV O1 45 23
TESTING AND INSPECTION SERViC�S
PART1- G�NERAL
l.i SUMMARY
A. Section Includes:
1. Testing and inspection services procedures and coordii7ation
B. Deviations fi•om this City of I'ort Worth Standaz�d Specification
1. None.
C. Related SpeciFcation Sections incl�de, btrt are not necessarily timited to:
�. Division 0-- Bidding Requirements, Contract Forms and Candi#ions of the Conh�aet
2. Division 1— General Requireme�its
1.2 �'RICE ANll PAYMENT PROCEDURES
A. Measurement and Yayment
l. Worlc associated with this ltem is considered subsidiary ta the v�rious Ite�ns bid.
No separate payment will be allawed for tliis Item.
a. Contractor is responsib]e for perforining, coordinating, and payment of all
Quality Contral testing.
b. City is responsihle fo�• perforining a��d paymei�t for �z-st sei of Quality
Assurance testing.
1} If the first Quality Assurance tesi perforir�ed by the City fails, the
Contractar is responsible for payment of subsequent Quality Assurance
testing until a pass�ng test occurs.
a) Fina� acceptance will not be issued �y City until all required p�yments
for tes#ing by Contractor have been paid in xuit.
1.3 REFER�NC�S [NOT USED�
].4 ADMINISTRATIVE REQUIREMENTS
A. Testing
l. Complete tesiing in accordance witl� the Contract Documents.
2. Cooz-dination
a. When lestii7g is requirecE to be performed by the City, notify City, sufficiently
in advance, when testing is needed.
6. When testing is z�equired to be completed by tlze Contractor, notify City,
sufficiently in ad�ance, that testing will be perfarmed.
3. Distribution of Testin� Reports
a. Electronic Distributior�
1} Confrm development of Project direc#oiy for electronic submittals to be
i�ploaded to the City's document mar�agemeni syste�n, ar �nother external
FTP site approved by the City.
� Cl"fY OF FORT WOi2TH Sanitary Se��erRchabilitation Contract 10]
STANDARD CONSTRUC'1'lON SPECIFICATiO�T DdCUMEN7'S CPN 02722
' Ite�ised March 9, 2020
n t as z3
TESTIIV('r AT+ID [NSP1:CTidN S1�RVIC�;S
Page 2 o f 2
2} Upload test reporfs to clesignated project directory and ��otify approp��iate
City rep��esentatives via eniail af submitta] posting.
3) Har�d Copies
a) 1 copy for aIl submittals submitted to the Project Representaiive
U. Hard Copy Distributian {if required i�� lieu of eiectronic distribution)
1} Tests perfarmed by City
a} Distribute l hard copy to tl�e Con#ractor
2} '1'ests performed by the Contractor
a) Distr�l�ute 3 hard copies to City's Project Representative
4. Pi-ovide City's P�-oject Representative with trip tickets for each delivered load of
Concrete or Lime material includin� the following informaiion:
a. Name of pit
b. Date of delivery
c. Material delivered
B. Insp ecti on
1. Inspection or lack af inspectian does not relie�e the Contractor from obligatian tn
perform work in accordance with tlle Contract Documents.
1.5 SLJ�3MiTTALS �NOT USED]
LC ACTION SUBM�TTALS/INFORMATIONAL SUBMITTALS [NOT LTS�llJ
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATEIUAL SUBMITTALS �NOT USEDj
1.9 QUALfTY ASSi1RANCE jNOT USED�
1.10 DELIVERY, ,STORAGE, AND HANDLING �NOT USED]
I.l 1 FI�Lll rSTT�] CONDITIONS (NQT USED]
1.12 WARRANTY [NOT US�llJ
PART 2- PRQDUCTS f NOT USED]
PART 3 - �XECUTION �NOT USED]
END OF SECTION
Revision Log
DATE NAME SUMMARY Ol' CIIANCiL
3/9/2020 D. V. Magana �Ze�naveci reference to Buzzsaw ancl noted that eleetranie submi[tals be uploaded
ihroagh the City's docuii�ent ii�anagcmci�f system.
Cl'1'Y Ot FORT W02TI [ Sauiiaiy Sewer Rehabililalion Con[ract
STAhIDARD CO�ISTRUCTTON Sl'�.C]N1CA']�]ON D()CUMENTS pp� Li'JV f3z'7zZ
IZevised March 9, 2020
O 1 50 00 - 1
TEM[ pRARY FACILIT[ES AND CO�TRQLS
Page 1 of4
�
�
�
�
,
9
s�cTroN oz so oa
TEMPORARY FACiLITTES AND CONTROLS
3 PART ] - GEN�R.AL
4 1.1 SUMMARY
5
f
7
S
9
10
11
12
13
14
15
]6
17
18 1.2
19
20
21
22 I.3
A. Section Tncludes:
l. Provide te�nporary facilities and cont�•ols needed fo�• the Work including, but not
necessari�y liinited to:
a. Te�npora�y utilities
b. Sanitary facilities
c. Sto�•age Sheds and Buildings
d. Dust control
e. Teinporaiy fencing of the construction sitc
B. Deviations from this City of Part Worth Standard Specifcatian
1. None.
C. Related Speciiication Sections include, but are not necessarily limited to:
1. Division 0— Bidding Requir-errzents, Cozitract Fanns and Conditions of the Contract
2. Division 1— Ueneral Requrre�nents
PRICE AND PAYM�NT PROC�DURES
A. Measurement and Payment
1. Work associated with this Item is considered subsidiary to the various Iteins bid.
No separate payinent will be allowed foa- this Itezxi.
REFERENCES [NOT USED]
23 7.4 ADMINISTRATIVE REQUIR�MENTS
24
25
26
27
28
29
30
31
32
33
3�4
35
36
37
38
39
40
A. `femporary Utilities
1. Obtaining 'I'e��poz-ary Service
a. Make an-angcir�ents witil utility seivice compariies for tem�oraey services.
b. Abide by rufes and �•egulations of utility service companies or authorities
having jurisdiction.
c. Be responsible for utilily service costs until Work is approved for Final
Acceptance.
1) Inciuded are fiteI, power, light, heat a��d other utiliYy services necessary for
execution, coinpletion, testing anc� initial operation of Work.
2. Wate��
a. Cantra.ctor to provide water �-equia-ed for and in comiection with Work to be
perforined and for specified tests of piping, equipment, devices os• other use as
required for the com�letian of the Work.
h. Provide and maintain adequatc supply of potable water for domestic
consu�nption by Contracto�- �etsonnel and City's Project 1Zepresentatives.
c. Coordination
1) Contact City 1 week before water for construction is desired
� CI7 Y OF FO1tT WORTF[ Water and Sanitary Sewer RehaUi[itatioi� Contracl 101
' S7 ANDAIZD CONSTRIJCTiON SPECiPICATION DOCUMEN7'S CPN 02722
� Revised.iuly ], 201 I
O15Q40-2
TFMPORAAY PACIT.I"1�I1;5 ANll CON7'ftOLS
l'age 2 of 4
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
l8
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
3b
37
38
39
40
41
42
43
44
45
d. Gontractor Payinent for Constt�uction Watet-
1) Obtain consh-uction watei• �neter fi•oin City �or payment as billed by City's
established rates.
3. Electricity and Lighting
a. Pro�ide and pay for electric powered service as required for Work, including
testing of Work.
1) Provide power for iighting, o�eration of equipinent, or ather use.
b. �,lectric power seivice includes teinporary power service or generatar ta
maintain operations during scheduled shutdown.
4. `�'elcphone
a. Provide emergency telephone service at Site for use by Contractor personnel
atld others perfonning work ar furnishing services at Sike.
5. �'e�nporary Heat and Ventilation
a. Provide temporaiy heal as necessary foR- pz-otectioi� or coinpletron of Work.
b. Provzde teinporary heat anc[ ventilation ta assure safe working conditions.
B. Sanitary }�acilit�es
1. Provide and inaintaiar sanitary facilities for persons on Site.
a. Comply with regulatioils of State and local departrnents of health.
2. Enforce use of sanitary facilities by construction personne] at job site.
a. Enclose and anchor sanitary facilities.
b. No cfischarge will be allowed fram these facilities.
c. Collect and store sewage and waste so as not fo cause nuisance or health
problem.
d. Haul sewage and waste off site at no less than weekly intezvals and properly
dispose in accorcfance with applicable regulation.
3. Locate facilities near Work Site and keep clean and inaintained tl�roughout Project.
4. Reinove facilities at completion of �'z-oject
C. Storage Sheds and Buildings
1. Provide adequateIy ventilated, watertight, weatherproof stox-age facilities with floor
above ground 1eveI foz• materials and equipinent susceptible to weather da�n�ge.
2. Storage of mate3•ials not susceptible to weather damage may be on bloc[cs aff
ground.
3. Store materials in a neat and orderly manner.
a. Place materials and equipment to pei7nit easy access for identification,
inspeciion and inventory.
4. Equip building with lockable doaes and lighting, and pravide eleciricaI seivice for
equiptnent space heaters and heating ar ventilation as necessary ko provide storage
envzronments acceptable to specified manufacturers.
5. Fill anc� grade site for temporary s�euctures to provide draiiiage away ft�om
temporary and existing buildings.
b. Removc buildiilg from site pi-ior ta Final Acceptance.
D. Temporary Fencing
3. Provide and maintain #or the duration ar constructian when t•equired in contract
documents
E. Dust Cantx-ol
CiTY OP POIt"1' WOR`fH Water and Sanitary Sewcr Rchabilitation Con[ract ]Ul
STANpAItT] CONS'1'RUC"i'[Oi�! SPECiFiCAT[ON DOCUMEN'1'S CPIV �2722
Revised July l, 2011
1
2
3
4
S
b
7
8
9
10
11
12
13
14
15
16
Ol 5000-3
T�MPORAI2Y NAC1Li"I'IES AND CONTROLS
Page 3 of 4
1. Conh•acEor is i•esponsib�e for maintaining �3ust control tl�rough the duratian af the
project.
a. Contractor remains on-call at all times
h. Must respond in a tim�ly manner
P. Temporaty Protection af Construction
1. Contractor or subcontractors aee resgonsible for pratecting Work froz�z damage due
to weathcr.
1.5 SUSMITTALS [NOT USED]
I.6 ACTION SUI3MITTALS/INI+ORMATIONAL SUBM�TTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT LTSEDJ
1.8 MAINTENANCE MAT�RIAL SUBMITTALS (NOT USED]
1.9 QUALITY ASSURANCE [NOT USEDJ
1.]0 llL+'LIVERY, �TORAGI�,, AND HANDLING [NOT USED]
1.1I FIELll �SYTEJ CONDITIONS (NOT USED�
1.12 WARRANTY �NOT US��I�
PART 2- PRODUCTS [NOT USI� llJ
17 PART 3 - �XECUTION [NOT USLD]
IS 31 TNSTALLERS [NOT USED�
19 3.2 EXAMINATION [NOT USED]
20 3.3 PREPARATION �NOT USED]
21 3.4 rNSTALLATION
22 A. Ternpoi•ary Facilities
23 1. Maintain all temporary facilities foi� duration of constructian aetivities as needed.
24 3.5 [REPAIR] / [RESTQRATIONJ
25 3.b RE-INSTALLATION
26 3.7 FIELD [ou� SITI: QUALITY CONTROL �NOT USED]
27 3.8 SYSTEM STARTUP [N�T USED)
28 39 ADJUSTING [NOT LTSED]
29 3.10 CLEANING [NOT USEDJ
30 3.1] CI�OSEOUT ACTIVIT��S
31 A. Teinpo�•azy Facilikies
CITY OF FORT WORTH Watcr and 5anitaEy Sewer Rehahililation Cartracl 101
S'1'ANDARD CONSTRUCTiQN SPECIFICATIOtV DOCUMrAiTS CPN 02722
Reviscd July 1, 201 I
4i 5DD0-4
l'L-'IviPOItP.RY FnC'[L[T[ES AND CONTROT.S
Pagc 4 of 4
1. Remove all temporary facilities and restoxe area after coinpletion of the Wark, to a
condition equal ta a�� better than prior to start of Worlc.
3 3.12 PR07'ECTYON [NOT USED]
4 3.13 MAINTENANCE [NOT US�D]
5 3.14 ATTACI-�MENTS [NOT tiSED]
b i1ND OF SECTION
Revision Log
DATF NAME SUMMARY OF CHANGL
CCl'Y OF FORT' W032TH \�Jatcr and Sanitary Sewer Rehahililation Contrdct I O1
S'CAI+fDARD CONSTRUCTiON SPT'CIFICA"1lON DOCUMENTS CPN 02722
Revised ,iuly l, 2011
C
�
�
�
k
�
I
aa ss z6 - �
5"1'1tEET USE PI:RMIT AND MOI]IFICATIUNS TQ TRA1=T'3C CONTKOL
Page 1 of3
]
2
S�CTTON O1 55 26
STREET US� PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL
3 PART1- GENERAL
4 1.1 SUMMARY
5
6
7
S
9
10
17.
12
13
14
15
16
A. Section Includes:
1. Adininist�•ative procedures for:
a. Street Use �'ennit
b. MocEif cation of approved trafiic cor�trol
c. Removal of Street Signs
B. Deviations from this City of Port Warth Starzdard Specification
1. None.
C. Related Specification Sections include, but ai�e not necessaa-ily limited to:
1. Dir�ision 0— Bidding Requirenients, Contract Forms and Conditions of the Contract
2. Division l— Generat Require3nents
3. Section 34 71 13 — Traffic Conti-al
1.2 PRICI� AND PAYMENT PROCEDURES
17 A. Measiu•ement and Payment
18 1. Work assnciated with this Item is co�sidered subsidiary to the vazious Items bid.
19 No separate payn�ent will be allowed for this Itein.
20 1.3 RERERENCES
21
22
23
24
25
26
27
28
29
30
3]
32
33
34
35
36
37
38
A. Refe�•ence Standards
1. Reference standards cited in this specification refer co the cuz-�-ent reference standard
published at the time of the latest a-evision date logged at the end of this
specifcation, unless a date is specifically cited.
2. Texas Mannal on Uniform Traffic Controi Devices (TMUTCD}.
1.4 ADMYNISTRATIVE REQUIREMENTS
A. Traffic Conh•ol
1. Genera]
a. When h•affic control plans are included in the Drawin�;s, provide Tr�aff c
Contral in accordance with Drawings and Section 34 71 13.
b. When h�affic control plar►s are not included in the Drawings, prepare traffic
control plans in accordaitce with Section 3� 7I 13 and submit to City for
review.
1) Allow minia�num 10 working days for review of propased Tx-af�c Controi.
B. Street Use Permit
1. Prior to installation af Tra��c Contt•ol, a City Strcet Use Permit is required.
a. To obtain Street Use Permit, submit Traf�c Co��h•ol Plans to City
'Transporta.tion and �'ublic Works De�aetmcnt.
CITY OF FORT WOR1�H Water and Sani�ary Scwer Reha6iiitation Cnntract 101
STAAlDARD CONSTRUC'r]ON SPECiTiCATiDN llOCUMENTS CPN 02722
Rcvised hily !, 2011
i
O] 552b-2
S"1'1tEET USE PEIZMIT AND MDDiPICATIONS TO TRAFFIC CON'1'KOL
Nage 2 of 3
1
2
3
4
5
6
7
8
9
ld
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
1) Allow a ininimutn of 5 working days far pennit review.
2) Contractar's responsibility to coordinate review of Traffic Control plans for
Street Use Pennit, such that construction is not delayed.
C. Modification ta Appro�ed "['raf�c Contral
1. Priar to installation traffic conrrol:
a. Sub�nit revised traffic coiitrol plans to Crty Departmenf Transportation and
Public Works Department.
1} Aevise Traffic Contral �lans in accordance with Section 34 '71 13.
2) Allow miniinum 5 working days for �•eview of revised Traffic Contx-ol.
3) It is the Contractor's responsibility to caordinate review of Traffic Cont�-ol
platls for St�•eet Use Pennit, such that canstruction is not delayed.
D. Removal of Street Sign
1. If it is detet7r�in�d that a street sign inust be removed foi- const►-uctian, tl�en cantact
City Ti-ans�ortation ai�d Public Works Department, Signs and Markii7gs Division to
remave the sign.
E. 'I'einporaiy Signage
1.. In the case af regulatory signs, replace pcimanent sign with temporaiy sign �neeting
require�nents of the latest edition of the 7'exas Manua� oii Uniform Traif c Control
Devices (VIUTCD).
2. Tnstall teinporary sign before the reinoval of pez7nanent sign.
3. Wl}en canstruction is camplete, ta the exlent that the permanei7t sign can Ue
reinstalled, contact the City Transportation and Fablic Woz-ks Departxnent, Signs
and Markit�gs Division, to reinstall the permanent sign.
P. Traffic Control Standards
1. Traffic Contral Standards can be found on the City's Buzzsaw website:
26 1.5 SUI3M1'CTALS [N�T USED]
27 1.6 ACTION �UBMITTALSIINTORMATI�NAL SUBMITTALS [NQT �]SED�
28 1.7 CLOS�OUT SUBMITTAL� [NOT USED]
29 1.8 MAINTENANC� MATERIAL SL]BMITTALS [NOT LTSEDJ
30 l.9 QUALITY ASSURANCE [NO'1' USED]
3I 1.10 DELIVERY, STORAGE, �LND HANDLING (NOT USI�llJ
32
33
1.11 FIELD [SITE] C�NllITIONS [NOT USED]
1..12 WARRANTY [NOT USEDJ
34 PART 2- PRODUCTS �NO'1' USED J
35 PART 3- LXI�.CUTION [NOT USED]
36
END OF SECTTON
CiTY OP 1=0R'1' WOR'I'1-[ Waler and Sanita�y Scwcr Reha6ilitation ConiracF lU I
STANDA.RI) CONS7RUCT[ON SPECTP3CAT[ON DOCUM�N7'S CPN 02722
Revised .luly 1, 2011
0[ 5526-3
STKEE"l� USE PERMIT AND Iv1pD]PICATIONS 7�0 "1'}ZAFFIC CONTROI..
Page 3 of 3
Revision L,og
DATE NAME SIJMMARY OF CI-IANGE
Cl"1'Y OF FORT WOR7�H Water and Sanitary 5ewer Rehahilitation Cantract ]01
S'1�ANDARD C(�NSTRL]C'1�lON Sl'EGFICATiON C]OCUMENTS CPN 02722
Reviscd duly I , 20l !
k
�
�
f
� �
2
i
�
�
i
�
t
3
i
�
t
015713-E
S7'ORM WATER PQLLUTION PR�VEN'170N
Yage 1 of 3
S�CTION O1 57 13
STORM WATER I'OLLUTION PREVENTION
3 PART1- GENERAL
4 1.1 SUMMARY
5
6
7
8
9
10
�r
�2
13
14 1.2
15
1(
17
18
I9
20
21 1.3
22
23
24
25
26
27
28
29
30
31
32
33
34 l.4
35
3C
37
A. Section Includes:
1. Procedures for Storm Water PolEutio�i Pa-evention Plans
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specificatio�i Sections include, but are not necessarily limited to:
1. Division 0— Bidding Requirements, Contract Foims and Conditions of the
Conta-act
2. Division 1— General Requiremcnts
3. Section 31 25 00 — E�-osion and Sediment Control
1'RICE AND PAYM�N'C �ROCEDURES
A. Measurement and Payynent
1. Construction Activities resulting in less than 1 acre of disturbance
a. Work associated with this Item is considered subsidiary to the various Ite�ns
bid. No separate payment wili be allowed for this Item.
2. Consh-uction Activities resulting in grea[er than 1 acre of distu�-bance
a. Measure�ncnt and Payinent sha11 bc iz� accordance with Section 31 25 00.
REI+EKLNCES
1�. Abbreviations and l�cronyms
1. Notice o£Intent: NOI
2. Notice af Tern�itaation: NOT
3. Storm Watet• Pollution Preve�itian Plan: SWPPP
4. `I"exas Coinmissian on k,r�viromnentaI Quality: 'I'CEQ
5. Notice of Change: NOC
1�. Reference Standards
1. Refe�-ence standarcEs cited in this Specification refei� to tli.e current reference
standard published at the time; of the Iatest revision date logged at the end of this
Speci�cation, unless a date is specifically cited.
2. Intcgrated Stonn Management (iSWM) Technical Manual for Construction
Cont�-ols
ADMINISTRATIVE REQUIREMENTS
A. General
1. Cont�actor is responsible far resolution and payment of any f nes issued associaied
with coinpliance to Stormwater Pollution �'revention Plan.
C[TY O� PDRT WOR"]'H Water and Sanitary Scwer Reha6ilitation Conlract l01
STA�II7ARD CONS1�1tUC1'IOt�I SP�CiFICATIDN VOCUMENTS CPN 02722
Retised July 1, 2Ul!
I
�
U15713-2
STORM WA7'L-'R 1'OLLU1'ION PREVENTION
Page 2 of 3
B. Construction AcEivities eesultin�; in:
2
3
4
5
G
7
8
4
10
11
12
13
14
15
1C
17
IS
19
20
21
22
23
24
25
26
27
28
29
34
31
32
33
34
35
3f
37
38
39
J. �ess than 1 acre of disturbance
a. Provide erosion and sedinlent control in accordance with Section 31 25 00 and
Drawings.
2. 1 to less tl�an 5 acres of distucbance
a. Texas Pollutant Discharge Elimination System (TPD��} General Const�•uction
Permit is requieed
b. Complete SWPPP in accordance with TCEQ requi�•ements
1) TCEQ Small Construction Site Natice Required under general pei-�nit
TXR150Q00
a) Sign and post at job site
E�} Prior to Preconstruction Meeting, send 1 capy to City Deparf�nent af
Transportation and Public Works, Envi�•omnenta] Di�ision, (817} 392-
6088.
2} Provide erosion and sediinent conirol in accordance with:
a} Section 31 25 00
b} Tl�e Drawings
e} TXR150000 General Pennit
d) SWP�'�'
e} TCEQ requirements
3. 5 acres ot- more of Disturbance
a. Texas Pollutant Discharge Elimination Systein {TPDES) Ceneral ConsCruction
Permit is required
b. Complete SWPPP in accordance with TCEQ requireinents
1) Prepare a"l'CEQ NOI form and subinit to TC�Q along with requi►�ed fee
a) Sigi1 and post at job site
b) Send co�y to City Departrnent of T��anspat•tatinn and Pubkic Works,
Environmental Division, {817) 392--b088.
2) TCEQ Noticc of Change required if inalc�ng changes or updaies to NOI
3) Provtde erosion and sediment control in accordance with:
a) Section 31 25 00
b} The T7rawings
c) TXR150000 General Per�nit
d} SWPPP
e} TC�Q requueinents
�} Once the projeci has been completed and all the claseout a�ec�uiceznents of
TC�Q have been met a TCEQ Notice of Termination can be subillitted.
a} Send capy to City Depart�nent of Tx-anspo�rtation and Public Worlcs,
En�vit-oninenta] Division, (817) 392-6088.
40 1.5 ,SUBMYTTALS
41
42
43
44
45
46
47
A. SWPPP
Submif i�i accordauce with Section O1 33 00, except as stated herein.
a, Priar to the Precoiistruction Meeting, submit a di•a£t cnpy nf SWPPP ta thc City
as follows:
1) l copy to thc City Project Manager
a) City I'roject Manager will forward to the City Department of
Transportation and Public Worlcs, Environmental Division for review
CiTY OF PORT WORT�T Water and Sanitaiy Scwcr Rehabilitation Contract 101
STANI7ARD C01�STRUCI'101V SPECIFICA7'lON DOCUMENTS CI'N 02722
Revised July 1, 2011
i
fI
[
�
1
�
�
i
�
�
Oi 5713-3
STORM WAT�'R I'OiLU"I'!ON PCLEV�NTION
Pagc 3 of 3
1 B. Modified SWPPP
2 1. If the SWPP�' is revised di.u•ing construction, resubinic inodified SWPPP to Ehe City
3 in accordance with Seciion O1 33 00.
4 1.6 ACTION SUBNIITTALS/INFORMATIONAL SUBMITTALS jNOT USED]
5 1.7 CLOS�OUT SUBMITTALS [NOT USED]
6 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
7 1.9 QUALITY ASSURANCE [NOT USED]
8 110 DELIVERY, ST�RAGE, AND HANDLING [NOT USED]
9 l.11 FIELD [SITE] CONDITIONS [NOT USED]
16 1.12 WARRANTY [NOT �TSED]
11 PART 2- PRODUCTS [NOT USED]
12 PART 3� EXECUTION [NOT USED]
13 END Or SECTION
14
15
Revision Log
DATL NANIE SUMMA,RY OF CHANG�
CiTY O� PDR1� WORTII Water and San3tary Sewer Rchabilitation Contract lOt
STAT�TI7AR.� CONSTRUCTiQ�I SP�CT1^1CA"1'lON DOCIINET:NTS CE'N 02722
Revised Jidy 1, 20l I
_ �
f
i
j
,
i
r
�
�
i
1
2
3 PART1- G�NERAL
�l
5
6
7
8
4
IO
]1
72
�3
14
15
16
17
]8
t9
20
21
22
23
24
25
26
27
28
29
30
3I
O15813-]
TE?�vTPO1�A1tY 1'RO]ECT SIGi`IAG�
Page 1 af3
SECTION 01 S8 l.3
"CEMPORARY PRO,TECT SiGNAG�
11 SUMMARY
A. Sectio�� Includes:
1. Teinporary Project Signage Requiretnents
B. Deviatians froin this City of Fort Woi-th Standard Specifcation
1. None.
C. Reiated Speciiicatioz� Sections include, but are not necessarily li�nited to:
1. Division d— Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1— Genet•al Requi�-ements
1.2 PRICE AND PAYMENT PROCLDURES
A. Measurejnent and Payment
1. Worlc associated witl� this Item is considered subsidia�y to the various Ice�ns bid.
No separate payment will be allowed %r this Iteax�.
i.3 RET+ERI:NCES [NOT USED]
1.4 ADMINI�TRATIVE REQU�REMENTS [NOT USED]
1S SUBMITTALS jNOT U�ED�
T.6 ACTION SUBMTTTALS/IN�'ORMATIONAL SUBMITTALS (NO`i' USED]
1.7 CLOSEOUT SUBMiTTALS �NOT USED]
�.S MAINTENANCE MATERIAL SUBMIT'1'ALS (NOT USED]
1.9 QUAI.,ITY ASSURANC� [NOT USED]
1.]0 DELIVERY, STORAGE, r�ND HANDLING �NOT USED]
1.11 r��r D�SITE] CONDITIONS [NOT USED]
1.12 WARRAN'['Y [NOT USED�
PART2- PRODUCTS
21 OWNER-FURNISHED Fo�] OWNER-SUPPLIL+'DPRODUCTS [NOT USL+'ll�
2.2 EQUTYM�NT, PRODUCT TY�ES, AND MATERTALS
A. Design Criteria
l. Pt�ovide fi•ee standing Project Designation Sign in accordance wit}� City's Standard
Details for project signs.
CITY OF FOK"I' WQRTH Wktcr and Sanitary Sewer Rehabilitation Coi�tract ] D l
STA[JDA.R.D CONSTRUCTiON SP�,C1FfCATIC)N DOCUMEAfTS CPN 02722
Revised ]uly I, 201 !
f
O1 58 13-2
1'EMP012ARY PROJECl' SIUNAGE
1'age 2 of 3
1
�
3
4
5
B. Materials
f. Sign
a. Const�-ucted of 3/-inch fix- plywood, gxade A-C (exterior} or better
2.3 ACCESSORIES [NOT USED]
2.4 50[TRCE QUALITY CONTROL [NOT iT�ED]
C PART 3 - EXECUT70N
7
S
9
ia
ll
l2
13
14
15
16
17
18
19
24
21
22
23
2�1
25
zb
27
28
29
3Q
31
3.1 INSTALLERS [NOT USED]
3.2 EXAMINATION [NOT USED]
3.3 PREPARATION [NOT USEU]
3.4 INSTALLATION
A. General
1. Provrde vertical installation at extents of project.
2. Relocate sign as needed, upon requcst of the City.
B. Moui�ting o�iions
a. Skids
b. �'asts
c. Ban•icade
3.5 REPAIR / R�S'1'ORATION [NOT USED]
3.b RE-INSTALLATION [NOT US�D�
3.7 FIELD (o�] SITE QLTALEr1,Y C4NTROL [NOT USED]
3.8 SYSTEM STARTUP [NOT USED]
3.9 ADJUSTING (NQT USED]
3.10 CLEANING INOT USED]
311 CLOSEOUT ACTIVITIES [NQT [TS�D]
3.12 PROTI;CTION [NOT USED]
3.13 MA�NTENANCE
A. General
1. Maintenance will include �ainting and repairs as needed or directed by the City.
3.14 ATTACIYMENTS �NOT USED]
END OI+ S�C'I']ON
CITY DF FORT WORTH Watcr and Sanitaiy Scwer Rehabilitation Contract 101
STANDARD CO�iSTRi7CTTON 5I'�CINTCA'170N DQCUME3�ITS CPN 02722
Rcvised July l, 20] 1
ai ss i3-3
TEMPORtIItY PItOJLCT SIGNAGE
nage 3 of 3
Revision Log
DATE NAME SUMMARY OF CHANGE
CI"1'Y OF FORT WORTF� Water and Sanilary Sewer Rehabilitaiion Contract l0]
S'1'ANDARD CONSTRUC7�ION S]'EC[FiCATiON 170CUMEN'CS CPN 02722
[2eviscd Iuiy I, 20E ]
�
�
DI GOUD
PRODUC'I' REQLi1REM�t�TS
Page ] of 2
SECT�ON 01 GO 00
PRODUCT REQt1IREMENTS
PART1- GENERAL
l.1 SUMMARY
A. Sectioi7 Tncludes:
1. References for Product Requirements and City Standard T'z�oducts List
B. Deviations from this City of Fort Worth Standard Specification
1. None.
� C. Related Specification Sections include, b�t are not necessarily limited to:
1 1. Dir�ision 0— 8iddia�g Requirements, Co�itract Fo�•ms ai�d Conditions of tlac Contract
2. Divisio�� 1— General Requirements
� 1.2 PRTC� AND PAYMENT PROCEDURES �NOT USEDJ
�
1.3 REFERENCES [N�T USEDJ
1.4 ADMINISTRATIVE REQUIREMENTS
A. A list of Ci#y approved products far use is available through the City's website aC:
https://apps.fortworthtexas.gov/Pro,jectResources/ and followi��g the directoiy path;
02 - Construction Documents/Standard ProdUcts List
B. Oniy products specifically included on City's 5tar�darcE P��oduct List in these Contract
Docuzn�ents shalI be allowed fo�• �ise on the Project.
1. Any subsequer�tly approvec! products will only be allowed for use upon specific
approval by the City.
C. Any specifc product requirements in the Contract Documents s«persede similar
praducts included on the City's Standard Product List.
1. The City reseives the right to not allow products to be usecE for ccrtain projects even
tho�gh the product is �isted on the City's Standard Product List.
D. Although a specific product is included on City's Standard Product List, not all
products fi�om that manufacturer are approved for use, including but not limited to, that
manufacturet�'s standard p��oduct.
E. See Section O1 33 DO %r submirtal ��equirements of Prod��ct Data iz�cluded on Ci#y's
Standard Product List.
�
t.5 SUBMITTALS [NOT US�D]
1.6 ACTION SUBMITTALS/INFORMATI�NAL SUBM[TTALS [NOT USEDJ
1.7 CLOS�OUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SURMITTAT,S �NQT USED]
1.9 QUALITY ASSURANC� [NOT US�D]
CITY QF FORT WORTH Watcr and Sanitary Sewer Rehabilftaifun Contract 1Dl
STA�IDAR� CONS7'RUCTIpN SP�Ci�'TCA"1�lON DOC[JMEI�ITS CPN 02722
Revised March 9, 2020
i
_ �
ai �o 00
PRQDUCT REQU1RP.iv1P.NTS
]'age 2 af 2
1.10 DFLIV�RY, STORAGE, AIVD HANDLING �NOT US�ll]
1.11 FIELU [,SITE] CONDYTYONS [NOT USE�J
1.12 WARRANTY �NOT iJSED]
PART 2 - YR011UCTS �NOT USED]
PART 3 - EXECUTION [NOT [1SED]
END OF S�CT�ON
Re�risinn Log
DATE NAML; SUMMARY OF CHANGL
10/12/12 D. Johnsoii iviodified Localion of City's 5tandard Product List
3/9/2020 ll.V. Magaiia �°11�°vcd refercncc #o Buresaw and noted ttaat the City appraved products list is
accessihle through thc City's website.
C1TY OP FOR'f WOR"I�11 Water and Sanitary Sewer Rehal7lftal2on Conlr�ct lO l
57�ANDARD CONSTRUC`CI03V SP�CIt�lC'A'1'ION llOCUMENTS CI'IV Q2722
Revised M�rch 9, 2020
�
� 1
2
�
1
�
�
l
F
�
�
k
4
�
k
�
_ �
O16b00-!
PR011UC'1' STORAC,E AND IIANDLTNG RrQUi�L�;MENTS
Page ] of 4
S�CTION 01 66 OQ
PRODUCT STORAGE AND HANDLING REQUTI�'MENTS
3 PART 1 - GENI,RAL
4 1.l SUMMAItY
A. Section Iaacludes:
i. Scheduling oFpraduct delivery
2. Packaging ofproducts for delivery
3. Protectian of products against damage from:
a. Handling
b. �xposure to elements or harsh environments
B. Deviations from this City of Fo�� Worth Standa�•d Specitcation
1. None.
C. Related Specifcation Sections include, E�ut are not necessarily limited to:
1. Division 0— Bidding Requirements, Cont�-act Fonns and Conditions of the Contract
2. Division 1-- General Requia-enaents
1.2 PRICE AND PAYMENT PROCE1lURES
A. Measu�•ernent and Payment
I. Woilc associated with this Ikein is considered subsidia�y to the various Iteins bid.
No separate payment will be allowed for I:his Item.
1..3 REFER�NC�1S �NOT U�ED)
1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED]
i.S SUBMITTAL� [NOT USED]
1.6 ACTION SUBMITTALS/iNFORMATIONAL �URMITTALS [NOT USED�
5
6
7
8
9
ia
i7
1�
I3
14
15
l6
17
18
19
20
1.7 CLOS�OUT SUBMiTTALS [NOT USED]
1.$ MAINTENANCIs MATERIAL SUBMYTTALS [NOT USED]
1.9 QUALITY ASSURANCE [NOT USED]
1.1Q DELIVERY AND HANDLING
21
22
23
24
25
2C
27
A. Delivery Requirements
1. Schedule delivery ofpraducts or equipanent as required to allow timely installation
and to avoid pz-olonged storage.
2. Provide app�•opriate perso��nel and equipinent to receive deIiveries.
3. Delivery trucks will not be per�nitted to wait extended periods of tiine on the Site
fo�• peisonnel or eyuipment to receive the delivery.
28
29
30
31
32
33
CITY OF FURT WORTE [ Water and Sa�iitary 5cwcr RehabiliFation ConfracL l01
STANDAIZD CO1VS7"RUCTi4AI SPI:CEPIC'A"1'ION DOCUMP.NTS CPN U2722
Revised .luly ], 2pl l
Ol h600-2
PRODUCT STO1tAGE ANll HANDLING REQUiREMP:NTS
Page 2 of 4
1 4. DeIzver products or equipment in rnanufacturer's ariginal unbroken cat-tons or otl�ez•
2 eontainers designed and cons�•ucted to pratect the contents fi�om physical ot-
3 enviz-onmental dainage.
4 5. Clearly aild fully anark anci identify as to �nanufacturer, ikein and installation
5 lacation.
b 6. Provide inanufactu�•er's insti-uctions for storage aiid haiidling.
7
$
9
10
11
12
13
l4
15
1f
17
B. Handling Requirexnents
1. Handle products a�� ec�ui�ment ii7 accordauce with these Contract Documents and
manufactur�r's a-ecommendations and instructions.
G. Storage Requirements
1. Store inaterials in accordance with rr�anufact�irer's recoinmendations and
requireinents nf these Specifications.
Z. Make necessaiy pro�isions for safe stoz-age of materials and equiprnent.
a. Place loose soil �naterials and inaterials to be incorpot•ated inta Work to prevent
damage to any part of WorEc or existing facilities and to inainiain fi•ee access at
all tirnes to all pa�-�s of Wark and to utility seivice company installations in
vicinity of Wot•k.
18 3,
19
20
21
22 4.
Z3
24 5.
25
26
27
28
29
30
31
32
33
34
35
36
37
38
Keep materials and equipmcni i7eatly and coinpactly stored in locations that will
cause ininiinum inconvenience to otl�er contractors, public trat�el, adjoining owners,
tenanfs and occupants.
a. An•ange storage to provide easy access for inspection.
Restrict storage to areas auail�ble an construction site foi- starage ofinatez-ial and
equipinent as shown o�f Drawin�;s, or approved by City's Project Representative.
Provide off-site storage and protection w�en on-site storage is nat adequate.
a. Provide addeesses of and access to off-site stnrage locations for inspection by
Czty's Project Representati�e.
6. Do not use la�nls, grass plots or othe�- private �raperty for starage put•poses without
written pex�x►zssion of owner or othet- person in possession or cont�•ol of pt-emises.
7
8
9.
10
Store in manufacture�•s' unopened containers.
Neatly, safely azld cornpactly stack materials delivered aud stored along iine of
Work to avoid inconvenience and damage to �raperty owners and general public
and maintain at least 3 feet fi•orn fire hydrant.
Keep pubiic and private dt-i�eways anci street crossiiigs apen.
Repair ar replace damaged lawns, sidcwalks, streets ar ather iinpro�ements to
satisfaction of Clty's Praject Rcpx-esentati�e.
a. Totai length which materials ir�ay be dist�•ibuted aEong route ofconst�ruction at
one time is l,OQO linea►- feet, unless akherwise approved in writing by City's
Project Representative.
CITY OP rOlZ'1' WOR"fH \Water and 5anicaiy Sewer Relta6ilitation Conu act ] O1
STANDARl) CONSTRUCTION SPTiCIPTCATION llOCUMEAl1'S CPN 02722
Revised July 1, 20] 1
�
� r
�
- 2
5
6
7
8
9
10
ll
12
13
�4
15
1G
17
18
19
aa
21
22
23
24
25
26
27
za
z�
30
O] Cfi00-3
1'1tO�UC T STORAGH AND HANL]LING 1ZEQUiREMENTS
Page 3 oF9
1.11 FIELD [SITE) CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
3 PART 2 - �'RODUCTS [NOT USEDj
4 PART 3 - EXLCUTION
3.1 INSTALLER� [NOT USED]
3.2 EXAMINATION [NOT USED]
3.3 PREPARATTON (N�T USED]
3.�F ERECTION [NOT USED]
3.5 REPAIR / RES`['ORATION [NOT USED]
3.6 RL+'-[NSTAI,LATION [NOT USED]
3.7 FIELD [orzJ SITE QUALITY C�NTROL
A. Tesis and Inspections
l. Ins�ect all products or equipment delivered to the site p�•ior to unlaading.
B. Non-Confonning Wo3-k
1. Reject all products or equipment that are daax�aged, used or in any other way
unsatisfactory for use on the �roject.
3.8 SYSTEM STARTUP [NOT USED�
3.9 ADJUSTING [NOT US�D]
3.� 0 CLEANING (NOT USED]
3.11 CLOSEOUT ACTIVIT�ES [NOT USED�
312 PROTECT�ON
A. ProtecC alI products o�• equipinent in accordance with manufac�urer's written directtons.
B. Store products ar equipment in locatian to avoid physical damage to items while in
sto�•age.
C. Protcct equipment fi•om exposure to elements and keep thoroughly dry if rcquired by
the znanufacturer.
3.13 MATNTENANCE jNQT USEDJ
314 ATTACHMENTS jNOT USED�
END OF SECTION
C1TY OF FOR'1' WORTF[ Watcr and Sanitary 5ewer Reliabilitation Contract ] Ol
STANDAKD i'OIVSTRUCTi41V 5P1:CIFICA"170tY DOCUtvILAiTS CP1V 62722
Revised ]uly 1, 2011
il] GbO0-4
PR011UCI� S"1'ORAGE AND HANDL[NG REQUIREMENTS
Page 4 a C 4
Revision Log
DATE NAME SUMMARY OF CHf1NGE
Cl"f Y OF FOR"f WOK"]'H Wutcr and S�nitary Sewer Reha�ilitation Contract ] Ol
STANllAAD CQNS`fAUCTIO�! SPEC[FICAT[O�I DOCUMTi%ITS Cl'N 027Z2
Revised.luly 1,2011
0! 70 00 - 1
MOBfLIZATION AND R�MOI311,I7_A"I ION
Page 1 oF3
�
3 PARTI- GENERAL
sECTrorr a� �o 00
MOBILI'LATION AND REMOBILIZIITION
� I.1 SUMMARY
5 A. 5ection Includes:
6
7
S
9
]0
]i
12
13
14
15
1G
I7
lx
19
20
21
22
23
24
25
26
27
zx
29
30
3l
32
33
34
35
36
37
38
39
40
41
�F2
43
44
2.
3
Mobiiization and Demobiiizatiorl
a. Mabilization
1) Transportation of Contractor's personnel, equipinent, and opera#ing supplies
to the Site
2) Establishment of necessary general facilities for #he Contractor's operaYion
at the Site
3} Premiums paid for performance and payix�ez�t bands
4) Transportation of Contractor's personnel, equip�nent, and operating suppiies
to a��othe�• location witl�in the designated Site
5) Relacation of necessary gene�•al facilities for the Cont�-actor's operatian
fi�om 1 location to another location on the SiEe.
b. Demobilization
1) Transportation of Contractor's personinel, eguipment, and operating supplies
away fro�n the Site including disassembly
2} Site Clean-up
3} Reznoval of all buildings and/or other facilities assembled ai ihe Site for this
Contract
c. Mobilazation and Demobilization do not include activities for specific items of
wark that are for which payme��t is provided elsewhere in the contt•act.
Remobilization
a. Remohilization for Suspension of Work specif cally reyuired i�� ihe Contract
Docurr�ez�ts or as required by City iiicludes:
1) Demobitization
a) Transporfation of Contt�actar's personnel, equapment, and operating
supplies from the Site inc]uding disassembly or tempoi•arily securing
equipment, supplies, and othcr faciliiies as designated by the Contract
Docuir►ents �lecessary to suspend the Work.
b) 5ite Clean-up as dcsignated in the Contract Docuinents
2) Remobilization
a) Transportation of Contractor's personnel, equipment, and operating
sup�Iies to the Szte necessary to resume tne Work.
b) Establishment of iiecessary general facilities for the Con#ractor's
opez�ation at the Site necessary to resume the Work.
3) Nn Payments will be m�de for:
a) Mobilizatio�� and Demobilization fi•om one location to anather on the
Site in the normal progress of performin� the Work.
b) Sta�ad-hy or idle time
c) Lost profits
Mobilizatioz�s and Demobilization for Miscellaneo��s Projects
CITY OF FORT WORTH Water and Sanitary Sewer Rehahilitation Contract ] D1
STANDARD CONS"1�RUCT[QN SPECiPiCA3�]OAI llOCUMENTS CPM 02722
Revised November 22, 20 [ 6
01 7000-2
MOBIL�ZATION AND R1iMOI31i,T7,ATION
Page 2 of 3
1
2
3
4
5
6
7
8
9
10
11
12
l3
l4
15
lb
]7
18
19
2Q
21
22
23
24
25 1.2
26
27
28
29
30
a. Mobilization and Demobilizatior7
1) MobiEization shall consist of the acti�ities and cost on a Work Order basis
necessary far:
a) Tra�sportation of Contractor's personnel, equipment, and operating
supplies to #he Site fo�• the issued Work Order.
b) Fstablishment ofnecessacy general facilities far the Contractor's
operation at the Site for the issued Work Order
2) Deinobilizatian sha]] consist of the activities and cost necessary for:
a} Transportation of Contractor's personnel, equipment, and operating
supplies from the Site including disassembEy for each issued Wark
Order
b) Site Clean-up for each issued Work Order
c} Removal af all buildings or other facilities assezxabled at the Site for
each Work Oder
b. Mobilization and Demobilization do not include activities for specific iteins oF
work for which payment is pro�ided elsewllere in tl�e contract.
4. Fmeegency Mobilizations and De�noUilization for M�scellaneaus Projecks
a. A Mobilization for Miscellaizeous Frojec#s wl�en directed by the City and the
�nobilfzation oce�rs within 24 hours afthe issuance ofthe Work Order.
B. Deviatio►as from this City of Fort Worth Standard Specification
] . None.
C. Related Specification Sections i��clude, but are not necessarily limited ta:
I. Division 0— Biddiilg RequireEnents, Contrac# Forms and ConcEitians of the Contract
2. Division 1— General Require3nents
�'R�C� AND YAYM�NT PROCEDURES
A. Measurement and Payment
1. Mobilization and Demobilization
a. Mcasure
1) This item far Water/Sewer impro�ements is considered subsidiary to the
various ltems hid.
3] 1.3 REFERENC�S [NOT [iSEDJ
32 1.4 ADMINiSTRATIVE Ii�QUIREMENTS [NOT USED]
33 1.5 SUBMITTALS [NOT USED]
34 1.6 INFORMATYONAL SUBMITTALS [NOT USED]
35 1.7 CLOSEOUT SUBMITTALS [NOT USEDJ
36 1.8 MAINT�NANCE MATERIAL ,SUBMITTALS �NOT US�D]
37 19 QUALITY ASSU�tANCE �NOT USEDJ
38 1.10 D�LIVERY, STORAGE, AND HANDLING fNOT US�Dj
39 1.I 1 FIELD [SIT�J CONDiT10NS [NOT USED]
CITY OF Ff)RT WORTH WaFcr and SaniLary Scwer Rel�abilitatiou C'ontract 3 01
S1�ANDARD C:ONSTRUCTIOhI SPT?CiPiCATION DOCLIM�:N"i�S CPN 02722
Revised Novemher 22, 2016
01 7Q 00 - 3
MOBILIZA'�IOt�T A�TI� R�;Fv10B1LIZATIL)]�i
Page 3 of3
�
s
I 1.12 WARRANTY fNOT USEDJ
2 �'ART 2 - PRODUCTS (NOT US�Dj
3 PART 3- EXECUTION [IVOT USED]
4
5
6
END OF SECTION
ltevision Log
DATE NAML SUMMlARY pF CHANGE
11122/1C Michae! Qwen 1.2 1'rice aa�d Payme�it P3•ocedures - ltevised spccifcatinn, including blue cext, to
inake spccification tlexible for either subsidiary or paid bid item for Mobilization.
t
1
�
_.�
�
�
]
{
C17'Y OF FORT WpR7H Watcr and Sanilary 5ewer Rehabilitation Contract ] Ol
STANDARD CONSTILUCT[ON SPrCIPlCA770N DOCUMENTS CPN 02722
iZevfsed November 22, 20EG
l
oi�iz�-i
CONSTRtJCT10N STAKl]VG ANDSURVEY
1'age 1 of S
�ECTION OI 71 23
CONSTRLTCTION STAKiNG AND SLTRVEY
YART 1 - GENERAL
I.1 SUNiMARY
A. Section Includes:
I. Requireinents foz• construction staking and construction suavey
B. Deviations fiom this City of Fort Worth Standard Specification
1. None.
C. Related Speci�cation Sections include, but are nat necessariiy limi#ed to:
1. Division 0— Bidding Requirements, Contract Fonns and Conditions of the Contract
2. Division 1— General Requireinents
[
�
1.2 PRICE AND PAYMENT PROCEDURES
A. Measuxeznent and �'ayiment
1. Co�ish-uction Staking
a. Measurement
1) Measurement for this Item shall be Uy lump sum.
b. Payinent
I} The work perforined and tIie materials fui�ished in accordance with this
Ttem shall be paid f��r at the lump sum price bid fai- "Canstruction �taking".
2) Payment far� "Construction S#aking" shall be made in partial payments
prorated by work coinpleted compai•ed to total work included in the l�unp
sum item.
c. The price bid shall Enclude, but not be limited to Ehe following:
I} Verification o� control data provided by City.
2) Placemeni, maintenance and replaceinent ofrequired stal�es andmarkings
in the field.
3) P�eparation and subznittal ofco�ash-uction sta�Cin� docuznea�tation in the
fo��n of "cut sheets" using th� City's standardtemplate.
2. Construction Survey
a. Measurement
1) This Item is considered subsidiaiy to tl�e vario�is Iteins bid.
6. Payment
1) The work performed aud the inaterials furnished in accordance with this
Ite�n are subsidiary to the various lte�ns bid and no otl�er compensation will be
allovved.
3. As-Built Survey
a. Measut•ement
1) Measur��nent for this Tte�r► shall bc by luinp sum.
b. Payznent
1) The worlc perfonned and the materials fiunished in accordance withthis
Itein shall be paid fo�• at the lu�np surn price bid for "�s-Built Survey".
CITY OF 1�'OR7' WOlt"1'H Water and Sanitaiy Sewer Rehabilitation Comract 101
STAIVDAItD CO1V5"I'RLIC"I'ION SP�.C1NiCA770N DOCUME3+f"1�5 CPN 02722
Revised Fehruary 14, 2018
017L23-2
CQNS"i'RUCTION STAKTNG ANE� SURVEY
Yage 2 af S
2) �'aynnent for "Conskructian Staking" shall be made in partial payinents
prorated by worlc campleted compat-ed ta total wark included in the ]um� suir�
item.
c. The pj•ice bid shall include, but not be liinited ta the fol[owin�::
1) Field aneasureinents and survey shots ta identify location of completed
faciliiies.
2) Docuinentatinn and submittal of as- built suivey data onto contx-actoz• rediine
plans and digital survey ��es.
1.3 REFERENCE�
A. Definitions
1. Consk�•�ction Suivey - The survey measui-ements made prior ta or while
consti-uction is in progress to control eleva€ion, horizontal position, di�nensions and
configuration of structlu-es/iinprovements included in the Project Drawings.
2. As-buif� �utvev —`I�he measurements inacEe after the ec�nstruetion of the
irnpro�vement features are co�nplete to provide posiiion coordzz�ates €or the features
of a projecC.
3. Constructinn Stakin� — The placerrient of stakes and �nat-kings to pz•ovide offsets
and elevations to cut and fill in arder to lacate on ehe ground the desigiled
structureslimprovemeilts inclucfed in the Project Drawizzbs. Construction staking
shall include staking ease�nents and/or c•ight o4'way if indicated oi1 theplans.
4. Survey "Field Checks" — Measureinents made after construction stakin� is
completed and before constz-uction work begins to ensure that structures marlced on
the ground are accurately located per Project Drawings.
B. Technical References
1. City of Fort Worth -- Constt-uction Siaking Standards {a�ailabfe on Cily's Buzzsaw
�+ebsite} — O1 71 23.16.01_ Attachinent A_Suivey Staking 5tandards
2. City of Fart Woith - Standard Survey Data CoElector T.ibrary (�1) iiles (available
on City's Buzzsaw website).
3. Texas Department of Trailsportation (TxDO'I'} Sutvcy Manual, latest revision
4. Texas Society oFProfessional Land Surveyors (T�PS}, Manual of ]'ractice forLand
Surveying in #he State of Texas, Category 5
1.4 ADMINISTRATiVE REQUIREMENTS
A.rClke Contractor's selection of a surveyar must comply with Texas Government
Cade 2254 (qualifications based seieetion) for this project.
1.S SUBMITTALS
A. Submitta[s, if requircd, shall be in accordance with Section OJ 33 (?0.
B. All submittals shall be received and z-e�iewed by the City prior ta deli�ery ofwork.
L6 ACTION SUBMITTALS/TNFORMATIONAL SUBMITTALS
A. kield Quality Contrn] Submittals
CITY OP 1=0R'1' W012'1'H Watcr and Sanitary Scwer Rehabilitation Conlract ] pl
STA?�IT)AR77 CONS'Cl2UCTI{]N SPCCiPiCAT]ON DOCUM�:N`I'S (;p7•I p2'722
ltcviscd ['ehruary 14, 2418
o� �� z3-3
CONS7RUC"CION STAKINU AND SURVTiY
Page 3 of 8
1. Docume��tation verifying accuracy of �eld engineering work, incIuding coordinate
conversions if plans do not indicate grid or ground coordinates.
2. Submit "Cut-Sheets" conforming to the standard temp�ate provided by the City
(refej• to O 1 71 23.16.01 — Attachment A— Survey Staking Standards).
].7 CLOSEOUT SUSMITTALS
B. As-built Redline Drawing 5ubinittal
1. Subinit As-Built Survey Red�ine Drawings documenting the locations/elevations of
constructed impravements signec� and sealed by Registered Professional Land
Surveyor (RPLS) responsible for tl�e work (refer to OI 71 23.1f.01 — AtCachinentA
— Survey Stalcing Standa�•ds) .
2. Contractor shall submit the }�roposed as-built and completed redline drawin�
subinittal one (1) week prior to scheduling t�e project finaI inspection for City
review and corninenk Revisions, if necessaiy, shall be inade to the as-built redline
drawings and resubmitted to the City prior to scheduling the construction tinal
inspection.
1.8 MAINTENANCE MAT�R�AL SUBMiTTALS [NOT USED]
1.9 QUALITY �SSURANCE
A. Construction Staking
1. Construetion staking wiI� �e performed by the Contractor.
2. Coordination
a. Coniact City's Project Representative at least one week in advance notifying
the City of when Construction Staking is scheduted.
b. It is the Conh-actor's responsibility to coordinate staking such that
construction activities are not delayed or negatively impacted.
3. General
a. Conti�actor is x-esponsible for prese�ving and inaintaining stakes. lf Ciry
surveyois at•e required to re-stalce for any reason, the Coratz�actor will Ue
responsible for costs to perfoi-�n staking. If in the opinion of the City, a
sufficient number of stakes or inarkin�;s have �een lost, destroyed distur6ed or
oz�itted that the contracted Work cannot takc place thes� t11e Contractor will be
required to stake or re-stake the cfe�cient areas.
B. Construction �urvey
�. Construction Suivey will be perfonned by the Contractor.
2. Coordination
a. Contt•actor to vcrify that horizonial and veitical control data established in the
design survey and required for const�-uction survey is available and in place.
General
a. Construction survey will be performed in order to construct the workshown
on the Conshuction Drawings and specified an tlae Contract Docuinents.
b. For constz-uction methods other than open cut, the Contractor shall perfoi•m
construction survey and verify cantrol data ancluding, but not liinited to, the
fo]lowing:
1) Verification that established bench�narks and control are accurate.
Cl'1'Y OF FORT WORTH Waterand Sanitary Sewer Rehabilitatinn Cnntract lfl3
S'fANDARD CUNSTRUCT[Oi� SPECIFECAI'ION DOCUMENTS CPN 02722
12evised Teh�•uary 14, 2018
Ol 7i 23-4
CONS`1'KL'C770N S`i'AKIN(i AND SURVP:Y
Page 4 of 8
2) Use of 13enchnlarks to furr�ish and maintain a11 refei•ence lines and grades
fa�• tunneling.
3) Use of line and grades to establish the location of the pipe.
4) Submit to the City copies of field iiatesused to establish all ]incs and
grades, if requested, and allow the City ta check �uidance system setup prior
ta Ueginning each tunneling drive.
5} Provide access for the City, if requested, to verify the guidance syste�n and
the line and grade of the carrier pipe.
6) `1 he Conh•actor reinains £ully responsible £or the accuracy af the woric and
correction of it, as required.
7) Monitor line and grade continuously duzing constructian.
8} Record deviation with respect to design �ine and grade ance a1 each pipe
joint arid submit daily records to the City.
9) If the installation does not meet the speciiied tolef•ances (as outlined iz�
Sections 33 OS 23 andlar 33 OS 24), immediately natify the City and conect
the installation in accordance with the Cnntract Documents.
C
As-Bezilt Survey
]. Required 11s-Built Stu��ey will be performed by the Cantractor.
Coordinaeion
a. Contractor zs ko coordinate with City tn confirrn which features require as-
built surveying.
b. it is the Contracfor's responsibility to coordinate the as-built survey and
required meastu-einents for iteins that are to be buried such tha# consiructian
activities are not delayect or negatively iinpacted.
c. For sewer mains and wate�- mains 12" and under in diaineter, it is acceptable
to physically measure degth and ir�ark the location during the pra�;ress of
const�-uction and take as-built suivey after the facility has been buf•ied. '�'he
Contractor is responsible for ihe quality control needed to ensure accuracy.
Genera]
a. The Contractor shall provide as-built survey including the elevation and
location (and provide written documentation to the City} of construction
feattu�es during the pro�ress of the construction including the #'ollowin�:
1} Watee L,ines
a) `�'ap af pipe e�evatians and coordinates foi• watei-lines at the followiilg
lacations:
(1) M'rnimum every 250 Iinear feet, including
(2) Horiznntal and vertical points of inflection, curvatui-e,
etc.
(3) Pire line tee
(4) Plugs, stub-outs, dead-end lines
{5) Casing pipe (each end) and all buried iittings
2) Sanitary Sewer
a} Top of pipe elevltians and coordinates for force mains and siphon
sanilary sewer lines {nan-gravity facitities) at the fnllowinglocations:
(I } Minimuir� every 250 linear feet and any buried Cttings
(2} Hox-izontal and vertical points af inilection, curvature,
etc.
3} Stonnwater — Nat Applicable
CI"{'Y QP PORT WOR'1'H Water and Sanitary Scwvcr RcUabtlita5ion Contract l01
STANDARll C�NS'1RUCFION SPECIFiCAT10N DOCUMEN'1�5 CPN 02722
lievised Fehruary 14, 2R18
nE 7► z3-s
COh3STRUCTIQN STAKING AiJD Si1RV�Y
Page S o['8
The Cont�actor shall provide as-bui�t survey including the elevation and
location (and provide written documentation to the City) of conshuction
features after the construction is campleted including the following:
1) Manho�es
a) lti�n and flowline elcvations and coordinates for each manhole
2) Water Lines
a) Cathodic protection test statioi�s
b) Saxnpling statzons
c) Meter boxes/vaults (AlI sizes)
d) rii•e hydrants
e) Valves (gate, butterfly, etc.)
#} �1ir Release valves (Manhole riin and vent pipe)
g) Blow off valves (Manhole ri�n and valve lid}
h) Pressure plane valves
i} Ua�derground Vaults
(l ) lZiin and flowline elevations and coordinates for each
Undergraund Vault.
3) Sanitary Sevver
a) Cleanouts
(1) Riin and fIowline eleva#ions and coordinates for each
b) Manholes and Junetion Stt•uctures
(1) Rim and flowline elevations and coordtnates for each
ananhole and ju��ction structure.
4) Storn�water — Not A�plicable
�.1.0 DELIVERY, STORAGE, AND HANDLING [NOT USED]
1.11 TI�LD CS�TI:� CONll�i'TONS [1VDT US�D�
112 WARRANTY
YART 2 - PRODUCTS
A. A construction su�vey will produce, but will noY be limited to:
l. Aecovery of ee�evant contral points, points Q£ curvatuz�e and points ofintea-sectian.
� 2. Establish ternpora7y horizontal and vertical control elevations {benchinarks)
� sutficiently pecYnanent and located in a mannez� to be used throughout consi�uction.
3. The location of planned facilities, easements and imp��oveinenis.
a. Establishing final line and grade stakes for piers, floors, gz-ade bea��s, paz�king
arc:as, utilities, streets, highways, tunncls, and other eonstruetion.
b. A i•ecord of revisians or carrections noted in an ordet-ly inanner forreference.
c. A drawii7g, when required by the client, indicating the lzarizontal and verfical
location of facilities, easernents and improvernents, as built.
4. Cul sheets shall he provided to the City inspector and Survey Superintendent for all
coz�struction staking projects. These cut sheets shall Ue on the standard citytetn�late
wl�ich can be obtained froin the Suivey Superintendent {S 17-392-7925).
5. Digital survey iiles in the following fonnats shali be acceptable:
a. flutoCAD (.dwg)
b. ESRI Shapefile (.shp)
G"I�Y OF l��Olt'1� WORTff Sanitary Se�ter Rehahilitatlon Contract ]0i
STAN�]AKIJ CONS"fRUC7�lON 5PECIFICATIGN DOCUME1+tTS CPN 02722
Re�ised Rel�ruary 14, 20iR
017123-(
CONS"1'RUC"1'lO1V STAKTNG AN17 SURVEY
Page 6 of 8
c. CSV file (.csv}, for�natted with X and Y coardinates in separake cotumns (use
standard temp�ates, if available}
6. Survey files shall include verticai and [�orizontal data tied to originalproject
control and benclunarks, and shatl include feature descriptions
PART 3 - EXECUTION
3.1 INSTALLERS
A. Tolerances:
The statced location of any improvement or facility should be as accu�•ate as
practical and necessary. 'I'he degree of precision required is dependent on inany
factors all of which inust remain judgmentat. The tolcrances listed hereaf�er are
based on generalikies and, under certain circumstances, shall yield to speci�c
requireinents. The surveyar shall assess any situation by review a��thc overall plans
and through consultation with responsihle partics as to the neect for s�ecific
tolerances.
a. Earthwork: Grades for earthwork oi- rou�;h cut sho.uld not exceed 0.1 ft. vertical
tolerance. Hari�onfal alignment foi• earthwo�-1� and rough cut should not exceed
l .0 ft. tolerance.
b. Horizontal alignment on a structure shall he within .O.lft tolerance,
c. Pa�ing or cancreie for st�eets, curbs, �;uttcrs, parking areas, drives, alleys and
walkways shall bc Iocated within the canfines of the site bounda�es and,
occasianaEly, along a bouncfary o�- any other restricti�e line. Away fi•om any
rest�ictive line, tliese facilities should be staked with an accuracy pr�oducingno
�nore than O.OSft. tolerance froin thcir specified locatians.
d. Undergraund and overhead utilities, such as sewers, gas, water, telephone and
electric lines, shaIl be located horizontally within their prescribed areas or
easeinents. Within assigned at-eas, these utilities should be stalced wiih an
accuracy produciilg no more than 0.1 ft tolerance franl a speciifed location.
e. The accuracy xequired for the vertical location of utilities varies widely. Many
uncierground utilities require only a�ninirnum cover aild a tolerance af 0.1 ft.
should be mai�tained. Underground and overhead utilities on pIanned pf•nfile,
but not depending on �;ravify flow for perfor�nance, should not exceec� 0. ] f�.
tolerance.
B. Suz-veying insteu�nents shail be kep� in close adjustment accoeding to manufactuee�'s
specifications or in coinpliance to standards. The City reseives the right to �•equesi a
calibration report ai any time and recommends regular maintenance scheduIe be
perfarmed by a cez•tified technician every 6 months.
1. Field measurements of angles and distances shall be done in such fashion as to
satisfy the closures and tolerances expressed in Part 3.1.A.
2. Verfical locations shall be established fi-om a pre-esta[�lished benclunark and
checked by closing to a different bench mark on the same datuin.
3. Construction sui-vey �eld wot•k shall correspond to the client's plans. Irregularities
ar co�flicts found shall be reported proin�tly to the City.
4. Revisions, corrections and other pertincnt data shall be logged far future�•e#erence.
CITY OF FORT WdRTH Sanit�ry Sewer AehahiliLaLinn Contract 101
STANJ]A1tD CONSTRUCTION SPEf']FICATION ]�OCl1MENTS CPN 02722
Revised February lA, 2UI8
U17123-7
CONSTRiJCTiON S"�AKING AND SURVEY
Page 7 of S
3.2 EXAMiNATION [NQT USED]
3.3 PREPARATION [NOT USEDJ
3.4 APPLICATION
3.5 R�PAYR / RESTORATION
A.If the Conh•actor's work damages or destroys one or nioee af the control
znonu�nents/points set by the City, the inonuments shall be adequately rcferenced for
expedient restoration.
1. Notify City if any control daka needs to he resiored or replaced due to damage
caused during consh-uction operations.
a. Contractor shall perform replacements and/ot� restorations.
b. The City �nay require at any tiine a survey "Fie1d Check" of any monument
or benclunarks that are set be verif ed by the City suiveyors before further
associated work can move forward.
3.6 RE-INSTALLATION (NOT USED]
3.7 r`TETsI) [oRJ SITE QUALITY CONTROL
A.It is the Conts•actor's responsibility to maintain all s�akes and cantrol data placed bythe
City ii� accordance with this Specification. Thts includes casements and righi of way, if
noted on ihe plans.
B. Do not changc or �-elocate stakes or control data without approval from the City.
3.8 SYSTEM �TARTUP
A. Survey Checks
1. `I'he City reserves the right to perform a S�rvey Ct►eck at any timedeemed
necessaiy.
2. Checks Uy City personnel or 3'� pat�ty contracted surveyar are not intended to
relieve tlie contractor aFhis/her responsibiiity foa-accuracy.
39 ADJUSTING [NOT USED]
310 CLEANING �NOT USED]
3.11 CLOSEOUT ACTTVYT��S [NOT USED]
3.12 PROT�CTION [NOT USED]
313 MAINTENANCE [NOT USED]
3.1� ATTACHMENTS [NOT LTSED]
LNl) OF S�CT10N
Revision Log
CITY OF FORT WORTiI Sanitary Sewer Reha6i]iEation Contracf 101
STANDACLD CONSTRUCTION SPECIFICATION 1]OCUMCNTS CPN 02722
Revised Fehruary 14, 2018
a� �i z3-s
CONS"1'RUCTION STAKiNG ANll SURVHY
1'age 8 of 8
D11TE NAME SUMMARY OF CE�ANGE
8/31/2012 D.Johnson
Added instructian and modified measurement & payment under 1.2; added
$/3 ]./2017 M. Owen definitions and references under 1.3; rnodified 1.6; added 1.7 closeout sU6mittal
�equirenients; modified 1.9 Qua3ity Assura»ce; added PART 2— PROi]UCTS ;
Added 3.1 Installers; added 3.5 Repair/Restoration; and added 3.8 System Startup.
Removed "blue fext"; revised measurement and paymeut sectinns for Construction
5taking and As-T3uilt Survey; added reference to selectioii compliance with TGC
2/14/2018 Mf Owen 2254; re�ised action and Closeovt s�bmittal requirements; added acceptahle depth
measurement criteria; revised list of items requiring as-buili survey "during" and
"after'" construcfion; and revised acceptahle digital sur�ey file fo�tnat
CiTY Ol� �-�OK7' Wf]RTH Sanitary Sewer lteha6ilitation Conti�act 101
STA]V13AR1] CiIAISTRLFCTCON SPEC[FICATidN DOCUMEN'F'S CYN 02722
Revised P'ebruary 14, z018
�
Sec�ic�n 01 %1 23.01 � Attachment A
Survey Staking Standards
February 2017
0:\Specs-Stds Governance Process�Temporary 5pec FileS�Capftal Delivery�Cap Delivery Div 01�01 71
23.16.61_Attachment A 5urvey 5taking Standards.docx
Page 1 of 22
These procedures are intended to pra�ide a standard met�od for construction staking services
associated with the City af Fort Worth projects. These are �ot to be cansidered ali inclusi�e, but only as
a general guideline. For projects on TXDQT right-of-way or through joint TXDOT participation,
adherence to the TXD4T Survey Manual shall be fo!lowed and if a discrepancy arises, the TXDOT
manualshallprevail. (http://anlinemanua]s.txdot.�o�/txdotmanuals/ess/ess.pdf)
If you ha�e a unique circumstance, pfease consult with the project rr►anager, inspectar, or sur�ey
department at $17-392-7925.
Table of Contents
I. City of Fort Worth Contact Information
II. Construction Colors
III. 5tandard Staking Supplies
fV. Sur�ey Equipment, Control, and Datum Standards
V. Water 5taking
VI. Sanitary Sewer �taking
VII. Storm Stafcing
VIII. Curb and Gutter Staking
1X. Cut Sheets
X. As-built Sur�ey
O:�Specs-Stds Go�ernance ProcesS�Temparary 5pec Files�Ca�iial Delivery�Cap Deli�ery Div 01\D1 71
23.16.01_AYtachment A_5urvey Staking 5tandard5.docx
Page 2 of Z2
�
�
I
;
t
�
�
�
1L�
Sur�ey Departme�t Contact In#ormation
Physical and mailing address:
8851 Camp Bawie West Baufevard
5uite 300
Fort Worth, 7exas 76116
Office: (8�.7) 392-7925
5urvey 5uperintendent, direct line: (817) 392-$97�.
Construction Coiors
The following colors shalf be used for staking or identifying features in the field. This
includes flagging, paint of laths/stakes, paint of hubs, and any identification such as pin flags
if necessary.
Utility
PROPOSED EXCAVATION
ALL ELECTRIC AND CONDUITS
PQ7A8l.E WA7�[i
GAS OR OIL
TELEPHOIVE/FIBER DPTIC
SURVEY CpNTRQL p01f�T5, BENCHMAitKS,
PROPERTY CORNERS, RIGHT-OF-W/1Y5, AND
ALL PAV{NG INCLUDIIVG CURB, SIDEWALK, BUILDIIVG C�RN�R5
SANITARY SEWER
iRR{GATION AND RECLAIMED WATER
fll. Standa_rd Staicing Supplies
Item
Color
WHITE
• li
Y���OW
ORAf�Cti�
pINP( I
�-a: ..
Minimum size
Lath/5take 36" tall
Woocien Nub (2"x2" min. square preferredj 6" tall
Pin Flags (2.5" x 3.S" preferred� 21" long
Guard Stakes Not required
PK or Mag nails 1" iong
Iran Rods {1/2" or greater diameterJ 18" lang
5urvey Marking Paint Water-basecE
Ffagging 1" wide
Marking Whiskers (feathers) 6" long
Taeks (for marking f�u6s) 3/4" long
O:\Specs-Stds Governance Process�7emporary Spec Files�Ca�itaf Delivery�Cap Delivery Div 01\01 71
23.16.0�._Atiachment A_Survey 5taking 5iandards.docx
Page 3 of 22
IV, Surve E ui ment Contro[ and Datum Standards
A. City Benchmarks
All city be�chmarks can be found here: http://fortworthtexas.�o�/itsolutionsJG15/
Lookfor'Zoning Maps'. Under `Layers', expand'Basemap Layers', and check an
`Benchmarks'.
B. Con�entional or Robotic Totaf Station Equipment
I. A minimum of a 10 aro-second instrument is required.
II. A copy of the latest calibration report may be requested by the City at any time.
It is recommended that an instrument be calibrated by certifi�d technician at
least 1 occurrence every 6 months.
C. f�etwork/V.R.S. and static GPS Equipment
I. It is critical that the sur�eyor verify the correct horizontal and �ertical datum
prior commencing wark. A site calibration may be req�ired and shali consist of
at least 4 controf poinYs spaced e�enly apart and in �aryirtg quadrants.
Additiona! field checks of the horizantal and �ertical accuracies shall be
completed and the City may ask for a copy of the calibratian report at any time.
II. Network GPS such as the Western Data Systems ar 5martNet systems may be
used for staking af praperty/R.O.W, forced-main water lines, and rough-grade
or�ly. No GPS stakin for concrete sanitar sewer storm drain final rade or
anvthing that needs �ertical �radin� with a toierance af 0.25' or less is
alfowed.
D. Control Paints 5et
All control points set shall be accompanied by a lath with tf�e appropriate
Northing, Easting, and Ele�a#ion (if applicable) of the point set. Control points
can be set rebar, `X' in concrete, or any other apprapriate i�em with a stable
base and of a semi-perrnanent nature. A rebar cap is optional, but preferred if
the cap is marked `control point' or similar warding.
Datasheets are required for alE control points set.
Da#asheetshould i�clude:
A. Horizontal and Vertical Datum used, Example: N.A.D.83, North Central Zane
4202, NAVD 88 Elevations
B. Grid or ground distance. — If ground, pro�ide scale �actor used and base
point caardinate, Example: C.S.F.=a.9997Z5, Base paint=North: 0, East=O
C. Geoid modef used, Example: GEOIDI2A
O:�Specs-Stds Governance Process�7emporary 5pec Files�Capital Delivery�Cap Delivery Di� 01�Q1 71
23.] 6.01_Attachment A_5�rvey Staking 5tandards.docx
Page 4 of 22
E. Preferred Grid Daturn
Although many plan sets can be in surface coordinates, the City's preferred grid datum
is listed below. Carefu! consideration must be taken to verify what daturr� each �roject is
in prior to beginning work. It is essential the surveyor be familiar with coordinate
transformations and how a grid/surface/assumed caorcEinate system affect a project.
Projected Coordinate
5ystem: NAD_1983_StatePiane_Texas_iVorth_Central_FIPS_�4202_Feet
Prajection: Lambert_Conformal_Conic
False_�asting: �.968500.00OQOOOD
�a Ise_N o rt h i ng: 65 61666.66666667
Centraf Meridian: -98.50000000
5tandard Parallel 1: 32.13333333
Standard Parallel 2: 33.96666667
Latitude_0#_0rigin: 31.66666667
Linear Unit: Foot U5
Geographic Coordinate 5ystem: GCS_North_American_1983
Dafium: D North American 1983
Prime Mer�d�an: Greenwicl�
Angular Unit: Degree
Noie: RegarcEless of whai daturn each par#icular prnject is in, deliverables to the City
must be converted/trar�slatecf ir��o this preferred grid datum. 1 copy af the deliverable
shoufd i�e in the project datum (whatever it may be) and 1 capy should be in the NRD83,
TX North Ce€�tral 4202 zone. See Preferred Frle Namrnq Convention 6eJow
F. Pr�ferred Deliverable Format
txt .csv .dwg .job
G. Preferred data Format
P, N,E,Z, D, N
Point Num6er, Northing, Easting, Elevation, Description, Notes {if applicable)
H. Preferred File Naming Canventian
This is the preferred format: City Project Number_Description_Datum.cs�
Example for a proiect that has surface caordinates which must be translated:
File 1: C1234 As-built of Water on Main 5treet Grid IVAD83 TXSP 4202.csv
0:\5pecs-Stds Governance Process\Temporary Spec Files�Capital Delivery\Cap D��ivery Div 0�.�07. 71
23.16.01_Attachment A_Survey 5taking Standards.dpcx
Page 5 of 22
—�
f
File 2: C1234_As-built of Water on Main 5treet_Project Specific Datum.csv
Example Control Stakes
D:�Specs-Stds Ga�ernance Process�7emporary Spec Files�Capital Delivery�Cap Deli�ery �€v Q1�01 71
23.16.D1_Attachment A_Survey 5taking Standards.docx
Page 6 of 22
�
�
I
,
�
�
�
I
i
�
��
��
�
�
�
�
�
�
.,�.
c�
�
�
� �
� �
� _�
� �� �
�- t�i F�
� <�
I— cn
� � �
� a �
�
� �� � EL.= �DO.OD'
: � _ ___ _ _._..__. _ ..... ........................ .._� .. ___...._.� ....._.�.. . .. .. .__ � __ .. . � _ J
_. .�
�:::,�
=;
.���i
:_�.. i
�
�
-�=? �
_'� � � �
;-.A...I �
I ,_...� � �
�I'' � r �
v_i � �
�E � � � ��
�.._... �� � � ,
� � �
---'� r�-� �--[
� �_�� �
C� --1 Q
I— C�L7 �
� ' �
V �-J �
(._) C� �
�
_ .,.
_._.. .... _.. . . _ ..__ _. _. _. _ _ -
;: CP �1 t �=�oaa.�� �=�aoo.00
� - -- �
- _.... _ .... ........ _....
��
�: �
� �
� �
� �. �
� (.,�J
i""" �
� =
��
L� �i
.._ � �—�
,—= r--
`1 LwJ
� �=
�T
�Li �
� 4�
V. Water 5takir�g Standards
O:�Specs-5ids Governance Process�Temporary Spec �iles�CapitaE Delivery�Cap Pelivery �iv 01�01 71
23.16.a1TAttachment A_Survey 5taking Standards.docx
Page 7 of 22
-i
1
A. Centerline Staking — Straight Line Tangents
I. Offset lath/stakes e�ery 2D0' on e�en stations
II. Painted blue lath/stake only, no hub is required
!I!. Grade is to top of pipe (T/Pj for 12" diameter pipes or smaller
IV. Grade to flow line (F/Lj for 16" and larger diameter pipes
V. Grade should be 350' below #he proposed top of curb line for 10" arsd smaller
diameter pipes
VL Grade should be 4.00' belaw the propos�d top af curf� line for 12" and larger
diarneter pipes
VIL Cut Sheets are required on all staking and a capy can be recei�ed from the
sur�ey superint�ndent
Optional: Actual stakes sha!! consis.t of a 60� nai! or hub seT with a whisker
8. Centerline Staking - Cur�es
I. If arc length is greater than 100', �'OC (Poin# of Cur�ature) offset stakes should
be set at a 25' inter�al
II. 5ame grading guidelines as above
I11. 5taking of radius points of greater than 100' may be omit#ed
C. Water Meter Boxes
l. 7.0' perpe�dicular offset is preferred to the center of the box
II. Center of the meter should be 3.0' behind the proposed face of cu�-b
Ili. Meter should be staked a minimum af 4.5' away from the edge of a driveway
IV. Grade is ta top of box and should be -�0.06' higi�er than the proposed top of
curb unless shown otherwise on the pfans
D. Fire Mydrants
I. Ce�ter of Hydrant should be 3.D' behind prapased face of curb
II, 5ur�ey offset stake should be 7.0' from the c�nter and perpendicular ta the curb
line or water main
ill. Grade o# hydrants should be +0.30 higher than the adjacent top of curb
E. Water VaEves & Vaults
I. Offsets shoulc� be perpendicular to the praposed water mair�
II. RIM grades should onfy be pro�ided if an plans
Example 1Nater 5takes
O:�Specs-Stds Go�ernance Process�Temporary Spec Files�Capital Delivery�Cap Delivery Div 01�01 71
23.16.01_Attachment A_Survey 5taking 5tandards.docx
Page S of 22
i
!
1
�
I
,
1
�
� {�
� �
� �
� 7' 0/S �'� W/L
� �
� �
[�7
v
�
z
x
,:
r-
�f.' �..
� �
� EI
7 �
� �
£� ky+
�. i.�
. rn:�i �-'
����
i� �
`�; rr,
`` - r�
'" �.�„`� �r�- u
lxi —i Ci'
c�::ac�
�
� C�
� �
L�
�� 7' Q'/5 � W f L
�
E�3
CC
�
C!1
O
�J
�
W r- ' E
LL � o � � �� �
U7 � � �
� �7 rs
io13��y.- 7ti1,11' � �
� �
m � � �
W � �
a
�
s
�
�
� J
W �
��
� �
L1J �
CC �
��
��
� -�
��
��
� C�
� �
�
� �
� �
� �
�}� �
LL �
I� �
C!7
�
�
�
� Y
��s �
�- ;a
t- �.
.� � �
�
�
� �
3
� � F
i 4
i
1
i
i �
�d � �
� C-3.62 �
— -....._..-..�
� ��
1 �
� �
�
�� f y � � �
sra=l+�a.at � �—�.a� i � 3
;j
�
s
� � 1
�� �
; . �
r Y
� � �
S
U'r =
7 �
� � 5
� � � 1
�
� �' •f i
�,_ ti .� �
� �
I �
Ca �tS O S'7 '�' F !
i' :J � � i
`�i � ..� f/1 y�j .{, 5l _°[ ` ;
� - ) .{^_ '.�E �� F i3_ Q �
:C i`} � i = ��51 fT_ 'G �q
� � � � —• L— 1 � � �~1 ;
Y_l i � O .'t-`j � � Lh T ��
� ti�r�� sra=o+oa €�� �7s; �~ =.a .._�= �" �,a
y�- � F —� i C3 u�
� �"� i�li
�ru��
.� 4i
� 3 e iY
O � j J J � ^
�K ' j � '-<us�
� � .._ a i,�
�] i . �. r. �.; ?
� � �afa t�_ �q6,Oq� i � � � �
� LL � - ��
� ; t?—Z"f
W F f � r �
O 2 i '�"' � �
Vl i] � ' � ._., _.l
!a� -� fJ] �
� � �
�
� Vl. Sanitary Sewer Stakin�
� O:\5pecs-Stds Governance Process\Tempprary Spec Files�Capital Delivery�Cap Delivery Di� 01�01 71
23.16.01 Attachment A_Survey Staking Standards.docx
! Page 9 of 22
—�
A. Centerline Staking — Straight Line Tangents
I. Inverts shall be field �erified and compared against the plans before staking
I!. Painted green lath/stake WITH hub and tack or marker dot, no flagging required
IIL 1 offset stake between manholes if manholes are 400' or less apart
IV. Offset stakes should be located at even distances and perpendicular to the
centerl ine
V. Grades will be per plan and the date of the plans used should be noted
VI. If multiple lines are at one manhole, each line shall ha�e a cut/fill and direction
noted
VII.. 5takes at e�ery grade break
VIIL Cut sheets are required on all staking
Optional: Acrual stakes shall cansrst of a 60D nail ar hub set with a whisker
B. Centerline Staking — Cur�es
I. If arc length is greater than 1D0', POC (Point of Cur�ature) offset stakes should
be set at a Z5' interval
II. 5taking of radius points of greaterthan 1pp' may be omitted
C. Sanitary Sewer Manholes
I. 2 offset stakes per manhole for t�e purpose of �ro�iding alignment to the
contractor
II. Flowline grade should be on the lat�/stake for each flowline and direction nated
lil. RIM grade should only be on the stake when pro�ided in the pEans
O:�Specs-Stds Governance Process�Temporary Spec Files�Capital Delivery�Cap Delivery Div 01�01 71
23.16.Q1_Attachment A_Survey Staking 5tandards.docx
Page 10 of 22
�
Example Sanitary Sewer Stakes
�
,
�
1
I
k
�
4�"
� �
� �
� �
�w
�
��
r
� �, �h
� �� �
�
� �� �
� �.�
;� =d �� �
� ��� ,�
��� �� �, �
��
� ��� � ���
� �� � �� �
� � ��� ��
� _ �f
� � 7 JS � SS J� �� sra=.�+r°i J� �u� c s� I�� e-a�� � e-o°7 �(
r
:
�r � `_ - � �
� � �� �
LL � ; �
n� �tt jjj�..
F .�'E Vi � £r3j � � �-�
L-!� � �/ 1 ��, { F 1 1
�¢ � � �f `��� S
v lX 1� �
C��� I I ����� t� '
. ..: . .. .. . . .... . . ... .. . , _ _ _ � a
I. L...
{12�Of5 � SS T STA�3+71�' �o� C-3�' �"' C-3� - F6� ���`� F3��`;�� ���
— ���ll�� [� Jf �� y� .�. ��-
� � �,� i�_ s �.
� - � .1'{�
��-.��� �
Y �� ! 1
� a 1
� � � � L�ujW � � _ 41r� �
'� � — m� m� x x. - i�
�z � �
— ,.
f �
s-� t} _ / (+ _ � .. �_ �I{I _ ...
E��� � � �� �f� `� �� ���-1�Q`T�? II� C �� ; �:'
L �� a .
N `� A � d � 7
� � S
i � �
� �� t f�
t
i�
� �
Y � R
4 � �'+ S
�- � li� �
4'. � r�
�
� �� � �
� �� � � � �= c:
� � � 1= F
G �
-� 4(5 i3 � �7
� � L. � �� L
� � ' 7� 34���'kT�� ��
� � ��... ...-�-�`...�.. '
w
F
n
�
�
i: _
r'_ �' �
-�`.� !
CS i� ~ C
�� ��
�a� � a-
F(�- ��
z
w
['� �o
u;
a
� �
w � --�
� �� I u
�� �
�� ��
,�€".i .n�-. w �
(A _ [-i�
i� FG
t�i�a �cc
t� U� Gfl
5
�
k
w ��
�
� a
try � a �
q. � �'
� [a�"��
4ci W + �-'I
ia: ���
K ���
� �c�=y�
� � F
r�7 � �j
�
C� E, C3
�� „ �
— ..... .. ... ...... ... . .......
; �J.
'
, -L �
. , . ... .. .....:. 1 .A
�...
�� � u5 = iA-L4Q6 � C-�� � �G'� = C�-4� 3 ��
� f����� � � fl�ll �fi��ll� I.�� 1 � ;�_.�_ �
���� ��, � ��
w � �- �'�-�
� � ��� �� )r 1�
V7 a - j � �
.L,, p �= �; ` � F
�--� ��
;3� �-�
� �
�� �:� �'
�u' a�
Li �+-
f� =a
�o
x�
t^
Q:\Specs-5tds Governance Process\Tempprary Spec Files�Capital Delivery�Cap Delivery Div 01�01 71
23.16.o1_Attachment A_Survey Staking 5tandards.docx
Page 11 of 22
4 f
�
� ..:-�
I` �
i1+
n.�'� 4
i2� FX t7 �
ym�
��'�
��O
�t��<<3
����
�,_ �,
�
����
�_�
i m z
—I
VII. Storm Sewer & Inlet 5�akin
A. Centerline Staking — Straight Line Tangents
I. 1 offset stake e�ery 200' on e�en stations
[I. Grades are to flowfine of pipe unless otherwise shown on plans
III. 5takes at every grade break
fV. Cut sheets are required an all staking
Optional: Actua! stakes shall consist of a 60D nai! or hub set with a whisker
B. Centerline 5taking—Curves
I. If arc length is greater than 1D0', POC {Point of Curvaturej ofFset stakes should
be set at a 25' inter�al
I!. Staking of radius points of greater than 100' may be omitted
C. Starm Drain Inlets
1. 5taking distances should be measured from end of wing
II. Standard 10' Inlet= 16A�'total length
EII. Recessed 10' Inlet - 20.4�' total length
IV. Standard double 10' inlet = 26.67'total fength
V, Recessed double 10' inlet = 30.67' total length
p. Storm Drain Manholes
I. 2 offset stakes per manhole for the purpose of pro�iding alignment to the
contractor
II. Flowline grade shauld be on the lath/stake for each flowline and directian noted
Ifl. RiM grade should only be on the stake when pro�ided in the plans
0:�5pecs-Stds Go�ernance Pracess�Temporary Spec �iles�Capital l�elivery�Cap Delivery Di� 01�01 71
23.16.�1_Attachment A_Sur�ey Staking 5tandards.docx
Page 12 of 22
Example S�orm Inlet 5takes
B%iCIC
(9os Fa.etr�.: A.aw.J
RistfT 3 ���!�I
Hi,s .'.^'1rS�� ���
���
i
£
£
;
—� _.�_
FR�f�T
{SIDE FACING �)
(a
� �'
�7 .
�'
1 �
�n
!m
� �
� m
{ H
3 �
3 �.
IC7E;t11F7E5 Yti-IIC€!
� � E7JIi 4F it-IE Ve9r�lt-
� -'�'i ! BEiiifi �T15HE�
! �_
� �
� ��� i
(soE Fanr�c R.a•x.)
P�NT � :�`Q�-
flJ� E:F'lhl'�`.'I � I A'JII
��7'
io
to
�
iyc�
f�k
`�' I
;�
E�
i�
:��,
Irn� iDc.VT,FES iN11C!i
i�+� EYd7 t� 1}sE lhiN�
,'•�� _ El�!tdG 57,�,KE[}
E �
E�
t�
z�
;+
;o
�,
��
E�
� ' QISTANCES F(� fNLET'S
--- --�"'� SFANnAR[? 10' - 16' �^.. -._
RE4�.'iSEU tU' - 2{i
STANGfFtp tlGUStE 10' - 28.6Y
PECESSE6 �Ol1BLE 70` �- �Q67 _ m.
,__.V..__.W....._.V..__...�..,...�---------------------pelvq�__�
�4 �
i
i i
i ���: � ���x i
�(y-,�
� '.1�" " j:.' _ _ 3 .�• ']� 5+1)
�! �� ' ��
�� ��Jk.i��i�� � M1� a�"!I
'pF ��f�{
ai .�h - �� �
I . .. i �R�t�.,� �� 6..���
T ` . Fi1iV.Lht6 .�.�. ~ ......
j II INLET' STAT€C�h!
; t i,�- �Fc�-r�a �ara �*�4€��j
:�
�� ��vnr�� c��,�
1 �. =a r€x� €sF ��e
�
+
0
r�
�� ro � �mi������
��.
��
�,.
HIfE 5iiF31 TP�K
�.t5�'C � .�.i i�
— -- -�•.:fRLIHE — —
Y EGi£ tiF 6AVFi.fFPdT
�� �� " ��::"� �:£ =I"�
, s:..°:
..........
�`�� � I �� r � �e= ,���� � ,:, ;> �
k.�
r�,� t�t �tu.�r
EC�Gi C�F f fi4L-SA[tJi
FR�NT
(��r�e ��,cw� �)
_ i A T_ _ _
F?F.c' %f' INLE �• .
EU� �� ?-•AI�FRiENT -.__EQGE ;f' Ris'vFi�€ENTv_ ._..
0:�5pecs-5tds Governance Process�7empprary Spec Files\Capital Deiivery�Cap Delivery Div 01�01 71
23.15.01_Attachment A_Survey 5taking 5tandards.docx
Page 13 of Z2
VII�. Curb and Gutter S#akin
A. Centerline 5taking — 5traight Line Tangents
V. 1 offset stake e�ery 50' an e�en stations
VI. Grades are to top of curb unless otherwise shawn on plans
VII. Stakes at e�ery grade break
VIII. Cut sheets are required an afl staking
Optional: Actua! stakes shall consist of a 60D nar! or hub set with a whisker
B. Centerline Staking — Curves
III. If arc fength is greater #han 10Q', POC (Point of Curvature) offset stakes should
he set at a 25' inter�al
IV. Staking of radius paints of greater than 1D0' may be omitted
0:�5pecs-Stds Governance Process�Temporary Spec Files�Capital Delivery�Cap Deli�ery Di� 01�01 71
23.16.01_Attachment A_Survey Staking Standards.docx
Page 14 of 22
Exam le Curb � Gutter Stakes
FRDN T
{siaE �a�i�c ��
F� ❑ryh�T
FR D I�l T ; O FIIIlIV I iDENi�FlES nFU
� {56E FdCINC ¢j POiNT 9'
iH�' FRO�1T a '��`��'�
(SID� FACIlVG �'�� ioEr�nnrs saaF1 P�- �UE FACIN4 ; i ��
PtlN'{ G� i7JRtP�ttiRE . � ��
� � �
1: a k � o � �
�} I � � + i A �`iPl 'i �
Ll��f� = �
} � i�EF!i!F1'S �5FFS71c T6 ,�=-i i o �r/�� �
(sroE Far,ir�c� k.a.vr.) ry �,� �. ::3�A� �� ��� �r�y � ; 4 �
� ��; ��c� n!� eur� � ..M1. � � � ❑ �
l � � f ��� �� r �; i
Pqf17' �;[31 ,�j � d ,g� I I i I
'��.� 3 N =�' � - � � � �
: �
� � �- i�x?J-neES K�iin� eS t � � �' �
n �i�:' ns mu a�s cu!-� , �---� — I I�[
r�� [ s: r.F ar�'• �= � � �
h'U� ELE51A?1Ot�! � : � r�n!ks �tan;s'. �� --ti� �
�
i - _
i t j � y.
�..,; , w J 1 1
,-� , . ,... ,..,.,. � - � --�- €— . k1
-. , , _ _..,„ rs.. , _._ .�.� r � i
_.. _. ��
. � , _ �..
, .., � �
� l- _ -�-�.��
- - - .,. _.. �,. f
,�R.,�l�n �{'f f� ; I
�_� kv3 f�; +1 � f�
�� " �.�``s ; I ` �
„ .': �T fQ� `_` ' `i` ! E ir
\
`—`----= - . ., „� {� � �j
�M
`�th +��,� `! �(
i �, r,.' /' !
�..= ' '` r� ;
� �[_fi3 �t� f.�,�l{?� _ _ � }Y �r^ ' r
_ _ �-'_�,F�� � _ - � - r�' �r y/ � r
\ �� - _ _� _ ', s
F�ACIC G` ���1�E� ���r .�_ - � _ _ - _ � - �� -
: �- :_�- _ �= � - � ` �,��� �
�� .��-- � � _ - � � �
��.�= c�� c:uh�� � � � - — A`���� C� ����
�� _ ��. - E� �-
f ��4�i� �?i�
��i��� {J� �.A9�E�;��I ��
Exam le Curb & Gutter Stakes at Intersection
O:�Specs-Stds Governance Process\Ternporary 5pec Files�Capital Delivery\Cap �elivery Div 61�p1 71
23.16.07 Attachment A_Survey Staking Standards.docx
Page 15 of 22
�
� �'"�
� � ��'��
� � � �?r�6u ,�
�? ,_ _..,G..� _ _..... ._ �
��� 10 Q 5 z Sr.a 2fi5o � F+O� -�
� � � f �im �. . . ..... �� � ;
� `�' ` �
0
�U f
�
� �=
.F.��
�,-�< ,G`4
ti�''� ---
o��p �
� y [Lt �
i�
�
d
�.
:A
�.._'
Eq..:. ._.� ` _
'.il
�
�
¢
P
� � - _ _
�
i
v�
�
�
�n
3_''-
:j
C
�1
K
�
=n
..�.. �
�
G'1
�
Y
b
�
�
7
+c
:n
�
4
za� �
�... r
U. 1:3 �t
f}. � Lh i - ..._,�_i.. _.
1j 47 - 4
G i�
�_
r�
� � �`�: ""
, ����-
__ __- ,� � � ,.,
�� r .� :J
-a
}-
f�
L� �
� � �
,�. �'j 3- 2
���5
i �� �
� h.
,�3"
.;�.�..... .�W. l��
/
Fii�i y.. f
G : �z aT. � � - =�
[n N. . y.. T
_�}_�� .�%� `�.G
_ � [AliFu.FR
�� nY�1w
^ ! h..
j'�' L+ L'S � �
� \ +�
/ ]s.' _'..1
�3 � 4 �'}...... , �
J C vl .1.0 � ', F_ �-`
�' _ i �,.
f � �J� �7N:E1SiC1 '�vi'd ,Oa � v
._� j
'n �Y�..
� ��_n�;
a �.��,�.
��;��.
o�I -,�.:�
y � r.`�7`. ? c�s �\
V R' 1
Q S�L}Z
m �:Y_1us
6'l �
edn� �o N��e
�� � a��a•is�a '.xNv3 .as � a
r�� —) � r
:r � �]
� � �: 4,� ����1 ��i
� S3 .'1 �\'i ........
-T .t �
. ` �ry
� �
�r� �'.Y. � .,.
V �s''. . L- � '1F
. ,{jz
r'-X�'� ,�iryt.1���� r ��
C�r C?i� r(,7„�
2 ti
il !. � �
— — _.,..,. . :�
: i3
i. � -1
Ej '- x
K
r- r��
a
- � e
� }
_�
.'r, �n � t-.
,!� : ... . � 7A t``lu
0:�5pecs-Stds Go�ernance Process�Temporary Spec Files�Capital Deli�ery�Cap Delivery Di� 01�01 71
23.15A1_Attachment A_Survey Staking Standards.docx
Page 16 of 22
�
�
a
�
k
R
� IX. Cu# Sheets
A. Date of field work
B. Staking Method (GPS, tota! station)
� C. Project Name
� D. City Project Number (Example: Ca1234J
E. Location (Address, cross stre�ts, GPS coordinate)
� F. 5urvey company name
' G. Crew chief name
H. A biank tempiate car� be oh�ained frorn the suruey superintendent [see item I above)
[
` Standard Citv Cut Sheet
f City Project
E Date: �Vumber;
Project Name:
� ❑ TOTAL
Staking Method; CI GPS STATION ❑ �THER
� LOCATION:
� CONSf1LTA�ITICONTRACTOR
SURVEY CR�W WITIALS
� ALL GRADES ARE TO FLOWLINE OR TOP OF CURB UNLESS O�"H�RwiSE �nrEo
,
�
4
PT # STATION OFFSET DESCRIPTION pROP. STAKED _ CUT + FILL
-LTI+R7 GRAQE ELEV.
O:\Specs�5tds Governance Prpcess�iemporary 5pec Files�Capital Delivery\Cap Delivery Div p1�0� 7J
23.16.01_Attachment A_5urvey 5taking 5tandards.docx
Page 17 of 22
X. As-built Sur�ey
A. Definition and Purpose
The purpose of an as-built s�r�ey is to �erify the asset was installed in the proper locatian
and grade. Furthermore, the informatian gathered will be used to supplement the City's G1S
data and must be in the proper farmat when submitted. See section !V.
As-built sur�ey should include the following (acEditianal items may be requested):
Manholes
Top of pipe elevatians every 2S0 feet
Harizontal and vertica! points of inflection, curvature, etc. (AI! FitringsJ
Cathadic pr�tection test statrons
Sampling stations
Meter boxes/vaults (Al! srzesJ
Frre lines
Fire hydrants
Gate valves (rim and top of nutJ
Plugs, stub-outs, dead-end lines
Air fielease valves (Manhole rim and vent pipeJ
81ow off valves (Manhale rim and valve lidJ
Pressure plane valves
Cleaning wyes
Clean outs
Casing pipe (e�ch endJ
Inverts of pipes
Turbo Meters
O:�Specs-Stds Governance Process�Temporary Spec Files�Capital Deli�ery�Cap Delivery Div 01�01 71
23.i6A1_Attachment A_5urvey Staking Standards.docx
Page l8 of 22
B. Example Deli�erable
A hand written red line by the field sur�eyor is acceptable in most cases. This should be
a copy of the plans with the point number noted by each asset. If the asset is missing,
then the surveyor shauld write "NQT FQUN�" to notify the City.
0:�5pecs�5tds Governance Process�Temporary 5pec Files�Capital �elivery�Cap Delivery Div p1�D1 71
23.16.�1_Attachment A_5urvey Staicing Standards.docx
Page 19 of 22
� .
� 9ZG12�Y -z'f�,vN�*Y 9 fiei'
3 `�• ?"� ��� �:�L
� �J. ', i I� '" �
:�,;.. �.i !�, t;�r �
�}.,•� ;.''� a �:: ,;�, �
:,,�.
t I. ��+•k � a' � rf• �,��� €
�..�J !. � '{ � � •s e
$ �: r �
�� �..�� � �� ; � �' � � '���p'e a�
�� !€¢ I�l`.' z�� a� P�
i����� �" ''�, ��� 4 .� � a�
�°� � � ae�: � ��`� � �'s �� n s �k'�'
��'a��Y � i � ( g r� �� . � #��
�
�a. , 05 "�,1i
Y� _ Zs��z;:�:: _.� i : � li
�:�;.�..
�.�.�_ � ,.���.
' S f � _ _ a�� �
�� .s ......_�..f..
,�k8����R , -_.
�' ;E II
_____ � ' ( �'I � i
��� YYti�1�`,�;;?y�l�
I;j�€` f.=fix�
�" " t
, f
� � � ..
_��,� ;_:�-��
i��,�l � �:�:
� ��:� �,
�;� y���� �i'�
;� = . �.'t � ' �
Sif ; ���;� �
. fL;
r
�"` � ����
� I ry
$_!� ��; � I�;
� =t:,�-� �;�
:-: - ;�;t�sl' li I ;�
�� �3'.i:" �.� :��� I � I il
, i,��E�l�it�_'.�f;i :.
c&I�S��'[-'�I.- �1'S,;I�F�m!
�.�; � I f .' � '�'��_�. ,I.a�
: x�l ;. �-: ' _�,..`"� il �`
�f — i _{4+��v�S'3v1. �}}y�{ � i � . I � � I -
�: '';�y_, �--:._:�, ' ��'I ,: '°
- _� :.��,�.. _,� = �� `:���
�„ =��*.n�;=_�r__ ,� �'i�.. .-
' �. ;�� :
� a r F � _.
?� . : I . L . .
��� - L ' _ _ _... _ .. _.
� . _ . � ! —`�- � -�_ - - ;-� ' a -�r r
r ' "_�� � � I�� i , , � �I G:
. . .G!_ —��f-�: .
. .,..,- ��� �-: ,';.i-�.:
.«-_,. .. ;=�_ C
. � �'.ii: ` � � ; � . . �;,. _i:��_
;_ _� ���.,.1. :� �..._:._ {;-__�;`- _��
` �:_��-i�i: �:� t_� _�-=f--='��.-.
i*�'�{I �+,�.--- T�: ':uy.:
_ - � + { � _ 1 . I I1� _ _ _ :'` _� � _- _ t r F . i
� �'—._ ' I+' _'n'SS.=-�' ' �` ' '�'� i' '!j•
� �I � h � �r � I ; 5 � � "��
4,''t� � ..._��-i�- .:. �� . ��� �� ���
,���- --i-- �;-- I'i� �a���_-.-:;;
��i�---'� �' - � �,-�t:
���.��� . _� -_ _I .� . I'i .
���� _ ���'�_ . .��... __:�- �--_ .,
F�� ;�; .-��.,�. - - �����-�-r
-�i'� .. _,r_ .i: I �.T��I , _� _ ; � : . .
- -_-�_I� �� �tIF- _ _.t.�. �.T .
-- „- `;��. �.�-fi;.��_�il' � .I
---� � � -� � C'-,�'�" ) �f. ,;,.:� � - .
' ---- �; � �� . _l_=.-�# � ��+ , ,i �'_I;.
_1'==" � �' } 7. -; 1 . i .
i � - '_sS"Fi�y^ I.rTl�Lr� '" . --�-'r.
. �i� �4'.�• .T..'.T `_ "{Y� '�� . . L �
j ., � J'�:-'- --- -� _f r _ _ � —=_: _;
� .�. --,�.: �. , ,
.i-a: .;{,.;`- �-��=�,?:r _',:•��- �_�'-"
I °. "' ��rL.�dr,i._ ... — :_,��I_"��_ �'
...'rG- �•r. -��-i} .�� �s; j. s-i�'
T::�,� . L 1�f� .. _ [__�.I
�� ---� -'--+�� � -_��-�{t�����
� i � ,r.::;•��,��---r��a�' - , I._�' -yilk�.�.:
�:��� .I; _.::"' ��. '.._—; .
�-- 'I' '_�_'i � ��= �i . _�'_i:�;�..
, ..,..�., _ � �---- �-� - � � � � - � ----
r"'—�.11 -��j'—��,'il°j;i: �.I'� '
—_ _I -' ���+.,.1t_ : kY"'4����
# ' _�.— = T �
I �3 � �i x� ' �I'� h �� F i
�.�
�
�p€
�1 �
� �3�$ �I i �� � ��`'j
f ��j tij � f._
� � �' I I �If � ' � ,
� � � & E � Pd ' , `v g�"?
. , _.
- :._ ��__.. .
��
�� � ^a � ����� �:
. _I,,
� � ,. .
4__ �_�
; � _ __ ....p. v I
� �, � i ��!�
� � u � I � "I ,�''� �4
�, �� � � ,-. ,,, ;+ ; -�� .
�t �.' ' i, ' �' � � � �kn
_ &�.i s;'
! � _��y�_.�- � _ ---'-- � ' � I I I ��',��
`��������};I .._. �' �r _ ,-I��"+'' � .
i,, �� �, ,� . ; iii
�� �. —� .�;}?.
��¢;.i �������a ��. € i��: . �:
�' 1 � 3�� � II �� I I, �
)ni� r j� t��_` ' iJ
�� �`��.. " 3^� ' .�_I~.i'f �. s: I ��u#'
P ' P,.:% f �; . ;;� ���
g � -� : fit�. „�,- .; �'. �4 ���
������'�_. '�'�� `�_ _'�r- .�;--i' ,Y
.�
����3�� ��`� �, I. : ;ry+ I ��_,' �� � .'r"2�
���������1�'j �! � �':1.. � �. E ' ti;
--� F — , ,��. .�� . - � ��u-�
� �, . .- '' i' " -� . '� �' ..�':
� �- �' �: .� . . . ,
a 5 � �.._- � M1' . '� . 'Y Y� `\
a; a: ��; ��� � _, .Y. � %�
`.t r. � �� �•.3.1{- '�e;�,�.� . '�
ssr'.�1�;1 ��� �'�'�e i�r' ��. �'�
. '':::��'. , �� ������' ``'� �
� _ ._ . — ,_. —_ ._ ._.
, � ..a_. , i v.,_i, ..,.._�
0:�5pecs-Stds Governance Process�Temporary 5pec Files�Capital deli�ery�Cap Deli�ery Di� 01�01 71
23.16.01_Attachment A_Survey Staking Standards.docx
Page 20 of 22
1
�57k �'� -:� 3�. �r.CYA�'7'CAr RtU 5TA[�i'm - tE' wt YFtDYn 1]'i3
� hf� �•L1? '� Yd SYl.1FIfllA I.W.7 ;E�Y'f!E' & SAtDAC�" fXi3T
� � Pf�`: �`lYRi�N 6t�E Vqy� � �Of�C'�f'R
,��rjy �' TY ,�tii:sM'ATER
. i- fT �''hi�� .'. . lHS7".alL- t�'�'It3 s1�'�'u�"
�XU \+ . !^�A,�X 8'T7EPY.CFJi
;�� � �, ���. #�1�."�`�YAfY£ x2f }
-. } Y 14.. ..
�;1�,�P2 �E��3TJ794 li � .++f
�4�
{UT �R 4� j 6�
�„� �¢ re� ��r °.s �
Fv�vors f4 �
. �� '�-,� � � � � �
� ��x ��t' ��
�'.�`;�*� � �� � '��y ��
:�� ���
�t1i 6 -"� ;ss� �a�'
tar e ��.�}� �
xass �x.�+�xP ra�� �
�� rmemas t�e
1BL�.`4'� FYi�7: I � �
1rrATk,J'i � � �a�
� � �,
C^c.'��StQ '�� > { { '-' ���'_' .'�'�"�'
'7E'l� 734A2 � �� , ' �1-'.�F:: Y'
�.� �a � '
�� . �� ti� � �`�= �- .�_.,
��� ,��,� �„�
,��- ���� `V' t---�
��� ��/ �
�714U'�Gl�^�l�'liL •,r _•-'^: �' �
1�}`17Itr �•� � ��:�
t�'1fS'9'E'1tP:�B 37"Av�7'B^-B'�L
� :
��.5fi� ' fdTX i�.uC1�h TEE .� �_-� > �'
/ h6^f-V'�'" VI[kr�
/ %'�1h� %1Y�IM'7+�
f �� ��� ���
�,�� ��l �����
g �c€rr ,
�e:� �r �ac�� � x.�„�
� xam �;�u��R
� `
�;�7'�9t�.Yt!
i' �"'
t`�''a , �
4 ,> �� g
d
_ � � — r r -'�re' �e.�we
� �-.a{ �i \ � � �
-� '31 =�
`'f�' ■xu
t'BY °2 .r "- .
' fi -�. f� ^..-- ..___y,,._'
-�'�—'_ ..� ff'�,.'�r"" ,
_..�
� ?� �'�i7'��'i '� + .. ,� xa �e. �
� � �
� � ����
�a a� - ��c
iN57'4.�: utF' a
� I-t2'q�+/�R7:fl�Iff7 ���,�aF«rr�rc
�. h'-63,�Q77<�4 .�.�`,e�r�W ��
"$� ���.if5'F?x'
f 57"R UdJOA? -;�'p7. d�lnYA Eev SiA. A�'.5B ^ �
qV57'ACt.e IAfSTAtA.t
r-r�u�sr�tn st�ivE ruae�vF�1:�
ST tt' i1F' t�"R>V'ER P8'� ti�63+rtts5sa�ss
L37IfNiiY 7T7 #:Xt`+i:1�lYJ��R � � �ffi�i
�
I
�
- -�
AYVPlQn.9'i79 ..
E-2�J.�u
� - = i �� -- i� .�.__.����
i. '-'- . i_. ! Ti �' -� = i.- _
- --" . .
� - �:� _ : : -
. ....._ _ . � � � _ -- : -
?' ;" - - i d E-E - -, - i -_
. .--
_ . .. --- - � � - - -
�
i ' i =-I_'_=:? ' ' — - - i� I --
c � :
_ -. � : �
�
��
� I � : -
' ' ' -- i � � � .....: _ .._- ;
� .
--- ' - � . . . , . . . .
.__ .__ .__ _ . . _ —. . . . -' `-- ' ' - - : ,'
. . . ----- . . . . - - - � ..: 1=:
. , i � -
,.—I_..? --__ .
. . . _! _ � . ._.
Ff�(JPi3S�1�
.SA4ii%kTt]' :
S�E Stf�'�
�
� ' l r �Li.ri
�- � -' -
0:�5pecs-Stds Governance Process�Temporary 5pec Files\Capital Delivery�Cap belivery Div 01�01 71
23.16A1_Attachment A_5urvey 5taking Standards.dacx
Page 21 of 22
'JLia16� f '�/1 EW 1�'+Y 5 ivfY 02��� �N :1%'YJNd .LU� �3iYSN..1�Z .t1YN�::. � ik31F3�✓ldm'31 `J.�hLc • h' 1'. i:� '.5' 4' � ir{.
� ''' `'�S,Lkil' f'f g� ' � y F2 _ _I��' ���
��'�'+i�rill �" iFk� j;�� ��.�a � 4 �;i`s FE� ' F `1�:-`?i� .'�I ' �
�s.� ' � i �{�ii �' �'[� �a�i as� �� ` i � � �". } : ' �'s � . i� . ��a
' .- l"y[L � �'i� � ${�; sS.� z5 � � �li �I ���� , I �k�l "F: . � , � i
' L�--v'.t� i..,.. � .: �i4F° 3 3� � +�.! ���� �}',�� _ �c1 . _} ���' `� � �"s
i `. � _ I i 'y{ � �3{{ � ; � Fj� � � ��. �s � . � -c `y...L..">
� � I'; i c Cs� :I" l� �'y.,
���sl:�� ��t+.'i� F i' j � � �� �s�; � � � � �t33���r,e�. "y:�3 l:qlil �_
4'. �` °si ^ is�i:`' _ � 6h �s��: �°_'.;i',; r ¢s � , J. �:���-,.:�1 ���
��_; i?;: ��;��;t � � � � ,.� � .i :�?`�'{`� z�ll; ' �:i
, : , ,a � � a. ��� � �}a � _; �: ���, � � � �:_-�� � € � � - y � �
��'�' '��-��� n��g �G ;r� �5 ��;��� � ts"'{'
��5�.. n � -a�z � II r�k�� � � � �= 7 � � !s ` �.Y �+ �+ �
a � �` e�d�i� a�e9+� u � a�a��`� � € �� a -�I� "�•
. �� �_
y�� �..
�'�
_�
i` a
��
���
�
, _-���-��-
:f'�I �.I 5��-
n _... r.
i
f_... .. a� , v
.__._.__ E._--' �
��
� �
�� ; �
�� �,�
i `-`�� ��
�..., � .,
( �
��� I�
i �
..ul i.
----�-�^� ijjj
_�.;� � i` �
iSL� �
... `� I!� � , �, � _ _ '' �
t . . _._ _... ._ _.,.._._ _.... �.:� _. -t _...;-_; ._.,_'::;--;.�y
� V �G .��if1 N: 1�7W _ " _' _ " _ � f��T" ��T I
: -.2Y._ t�'.'r:�:�_I1i .lr_�S�-"a' ��,r�r,
t.L` �� y-' . — . -_—�� i �. ��� r�..k�-:� �T�� �'w -f - �
_L.!._"� _ _ _ __ � " ":'� -.�� I � II�I "'�� 41.'~L":I.�.��.�
r—�
;'�����i� : i , , , - I i
'��'I I � _—.—.._. �� . . J:�:
� _ _5 _ ' �'- .i' 1 r 'I' � 1� T ' I'�� ��L.1I.�... i"
� � i, � � 4{� - ��,� - C��� �r I� i yI'I ,. r.;.i �,41 ;.. �� i
J� {� ' � 1 li �- � I! Li .0 .__� _� _ I. ��'-�, � :'�- ' �. �-�-"�
�i ;, I'; � x ' ' ' �;'� � .':'_-'_,. ��.� :� .��- , ,.��':. ,�.__.._:i!�,,,,��4.
1 ;�_;,�-=� -,^---�-i:
� .I �� - , � Ir'--... r �----'- --
'�.'-I I i� � !;�. � . .I. _ +�._�-,.::__ � �i. ..I
i'rlii � i i�_� � -- �i' .. �i :. � �: �.' ��. ��+;. i-.� � .4 i�
''�° ' - � � it�,� j f'�,.' ±� }.f-''. ... _� .. .�r� _. . ..
i,. I � � � � i:- � -i�;- �. . faa . F . .... _ _ ,..
'i e��{�kS'�� I��:-S'� �rfF't' �T��' ' �—'—�t�'
i --�:::_.
�� I.,'� `itaki;�. i �I.� ��'�'�..yr4 ., ., �i r.
i� : � :� ' i . ''�n #-?T_�. ... S� ' � ��fl.�v�f $
�� � � i; � . , : ; �; �=��.�' :��i ifs�?_',�- -
z
�����'�;'�'_nk.lf•�` I_;,i � - - ��; �,.� , --� --
, :
, _.-._ . : .. .
I �.. , . A � G -:.i ' ' ,_.i.;��' ' .`� �{ ..,I',;l :� ; ; .::--=--+
�. li . J ��.i }. i .. !I
����. :.�� _ .� ., . ��
. _ .' _ , ::�1;—::--:!_�'�; a'''r+-��-0J��--�r—_,., �'�yk-:
� � '', . �f;' .; ; _�: �-,-;_�r�.'.::,::� _'_,;,� � �' i�_�_�
'; `:,; � m� � i�;� _ ' k�: 11--��: —
i i,� ^� } ��- :_ -� �+'� -•�-r-1 �::._'I'
I' .i � � J I ^-f-'-;-i i Sk-.�. . ��� '� I�'��F: -f '.
.�:t �'��f'�Il I r r-�, i��.
i � II� � � _I�, . ,-�:- �� _ �, ,; ,� j;r,:�l ,--� . �..�
� I+ I $�. "' �---, �— - ; . . -!i. �#_i..�.---- �n_-= �
' '�a ' � x ��' �° � ' ' � M ..i � + i ... i
��I-I �_ � ; ` ' . =�f " ' : .I��. � � � ..—.
� v� : { _I.�..'_� -++�---
; ' ,.
�� „ ,,
# -{% u ' e
��� ��w _ `, �} i�� K��;� �� �. ___. =r.;� ��.._I. --.__.. -_��_`�;.`; �}
��� �..,... ��� E4 �1 � '.�_'' t I� �i ' ' �__� � f� � �
�` � i...__— 'i f-' ��9 'I
. ,..'� � S�I r � `� �. I � � � �. � � --I-:.I . . i � k. _�_ I
� "��__ f,� _ �� ' � - - o � . �{ ,�_.� , �,:- 1 �''"�" 7.
', x �c I -i� i '.
�w., _i...__.�
, _
.
.. �,
� i�� j �� ---- �t�__ �--'�.� = �r:
� §� .I i--- r�� --��-�:. Y��; � • ..:� . . „
x� __...._ ��' T� ` i.,: _.a �F . I .:�.'I,��: ��.,=�:-1;;--�
.,....,.�;.� . _
I . � : , i � �_ �� ��
�a. 5 �,., �+� � �•' -h-, �� � � �� �i '�f;:'..; ,j�.i.:._.._� � ,
,I ��- �1i�-.
'� 1�' �S � � _�J��. . iI 4 �"';'" �. .: j,
� 1 ' . _. � .. . � �� _� � ..
�.y._ .�I_`�`-^�- ° �+�,r'
v m ,}, *� �, . .i' i. ::. i i'�
�sr�sw� ,;' {i�� =j � � � ��, _i � �� � -' I-���-- .. �-- ��'� i, . . � I, .
�'��. � r ' � I ,� . • F � .. ' �� -- � r—� - `. . Ir) ' �.._ �'; , .
1 I I � .. _.. `. J _ I...�. 1t5'� ;y_{'lii I"_
'� V � I. � I _ - �` .i � � f � � II� �,_'",�_'' _I
-� � a I �� _ I r�iFi�_....:��.."_ " _ y . ��!�
..�� . i �._�:
, ��,_.. �, ,� � ,. ���:.:_.�_-_-�_-�._:._�_�-�{�� �-�r_:� �.
��� -�;- � } ;.�'{ . . . �;:,�_� .
�` ����� � fJ`� �� � � . I_ :��. �W�� �� �•+.I�� :�..:----I�
� 3 -��'i ( � i� '' :�}"i 4i:" L " � I� L. .��fj ����� I'iF �
{4 .$'. r — �I�.__�__.:.! i.�! F���' .I -I: I
`� [ '�� � s yyu y g '� � - J--= i, "�� ' ' '�
�� .h. f�1� �`� 1��� �ESY@5aE2il. . . � _I. _{, _. 4� II IrS C� �'.a.__"_ — I�
� . i� �i � � }•i±' � f 1 � ' \ '° °' t ��'i ;�:�f � ` � --iti'-=-��'�-� —`---rw�" 5
r n.
, t
e . . F �,� .�r
_..�� � �� � � �. �i� ���"-`t� �� - 'u�'�. ���,_1� �.� �_ ,
,. � .
_,k"`_,��'; - `��4 'z-� a� `'T`-:.;b\`�`f � ' � '�+� '� � � i�:� .�,.��' �-- T�: •.d�•.
� , ,:,�.;w
4 L5� �'' �"`���`� �� �. 'I_ 1 I �
� `��� �' �/ �1'!'==f-..� 'll.� �.�.. � _ -F� . �
_4�z�``-Lst � �C � �,I� ��dp���i�. %* -I-� -__i�-�_--�.-:L�'��� � L L,�-•-i -_
•5��}'�5��'�;'�.{{� i�'�� !y h��i �"z"s: �' .� '���~' -.._a__}._.,_ .�i �'� i
' -li-i., _.��.�� . "": '�, = 7 `
I'.�_',�it,.�',l.��,_��r; - ;�� ?� '; . ,.._.}—:��— �:.. �=t� rt ��` o--�� �r
� — — —.. .— ._
:'? i; �i p.c.y: � :: ..,.}.'_ ;�_ ��,, r . . ,f 1-�
23.16.01_Attachment A_Survey Staking Standards.docx
Page 22 af 22
eu� 2s
�z
.T/OS Oz4mRf x.Fw:WCYe
�
—:�
� ' I �
�_ .,
i .:_ :
�J �...' ti'E
�..�x.;�: -
�; �.s�
$Sa/iliArd� 5l:Wiiii
}EhVlCE M"/ Gi_"hltii�f� ,_
Rf.J. W. e �
-- � $�.
�� �
��
�� �
r�' � R1 O.RTWvYA
� �AY3
�
�
iV
�
�
�
. ��A : �. ,�
� � �� .
i,
�� � �
,� .
., .
: .:
..
a
'='—===�--- _� �==
'—=— ���— —
i��.—�—�:�,��;...�� �=�_==
,��:����.. �� ����--
-- —==���.�.
— ������
���� —���-- ����d�
;�::���_ —� == —����
���� ������
.__���
�=���
� ��-- ���_=
� � ��
a�
��� _ ����
�� . �C� ���s�6�
�_ ,��'=ay.� ���i��
������� ����?�
�— =s�--- �����
""" �.� �� �r��— � �^..vF�^�e�
�����i azc��
�am �ats� �c �,'��i�x�.
����� �.�s��,
���
W� �_ �
— ��� �������
� � _�—�� �,� ,
� ' �
��;z�
��� �����- I ����
�_._ �� _— ��-' �'
��_�m� ���— ��„ ��
���:.— ���.—����� � ��'•
'-----=� �:a `�°-��..�;
_�....._.-�,�l—
�—�_ __ �'=� � �� ��=a;
=�`�=3-��-� �� ��� i
5�=—^r- �� ����rmx� "`�r�s��
aa��aziF��,.'�B'--�+�� ��ta�
�c--i����' �� ���i
n=�a:��c�si���6'���c �..r-s"�, .,,,�a�. �i
���� ��� ��:
�� ��� �� �c� �,_�=i
������� ���C '�,� �� ���
���= �a"r'•:;a,e�c�� 9�"— ���—'"" �_�
�r,.�asas�ys��a�omaz�w c e—�
=�ca�i :a�_� �������=em_ �
���O�L1t' -����.� ���,��_�p �i
�4��a�'E = am���. �e�"�%...._� �o_� �
0:�5pec� �� � 1'� �}1�0171
Z3.16.01_AttacF�ment A_Survey 5taking Standards.docx
Page 23 of 23
Ob�iously the .cs� or .txt file cannot be signed/sealed by a sur�eyor in the format
requested. l�his is just an example and ali this information should be noted when
deii�ered to the City so it is clear to what coardinate system the dafa is in.
roi�u� n�o.
1
2
3
4
5
6
%
R
9
i(3
z�
12
i3
��
15
i6
17
d&
1g
Z(3
21
2Z
23
24
zs
26
%7
2$
29
30
33
32
33
34
35
3G
37
��
39
aa
4z
aa
43
d4
�75
4G
NORI�HING Eli5'TING ELEV.
694625�.1xy 2296if7�J.1ii5
694626U.893 229GOfi2.141
69463U7.39�J 229G038.30(i
69&622q.582 2296011.c725
594G295.23 229Gp15.11b
G94£�i9[1.�2R 1_?9G072.72Y
fi9A6136.012 2i95952.115
fi94GOf]2.267 2295319.133
69!l6W3.(�SG 2295933.415
69A5984.677 1295880.52
59q5986.A73 22958ti9.892
6945895,077 2295H50.962
6945896.591 2295$ 62.3.8 $
6945334.285 2295841.925
6945936.727 229583[1.441
6945�35.678 2295799.707
£9�5liS7.488 2295827.O1i
594S75J.77S 229575�.643
E�JA576$.563 22y577H.424
69457A3318 2295785.392
6945723.219 2295754.394
6945&82.21 22$53d4.22
G9�5621.9a2 2235659.d71
694.5G4:3.4[l7 22.3573G.03
6sass��.ass zz�s�ss.�ss
fx9A.i539.4'�8 2295667.803
G945S]9.834 2295619.49
544547.7.879 2295556.27
6345A56.557 22956�3.1�15
S9A5387.356 2795593.1i?1
.f>�A5370.&S8 2295�C.793
6y45383.53 2ZJ565:6.559
69R532i.228 27_95551.1R5
59r15319.3G5 2295539.7Z�
6j45i4�,i&9 2z95570.715
59�i5233.624 22955Ad.625
6945206R&3 72J5529.3R5
��asx�z.�ay zzssss�.��;cn
G9451]3.445 2295520.335
s�a���3.aa zzsssz�.�ns
�gasoax.oza dz�sssz.67s
es�so�s.s�� z2ssssz.la�
6�3+d5D06.397 2295518.135
694A944.782 229552�.&35
69A49A3A32 2295S5G.47°
&94486it.A16 2295534.397
bESCR[I'TIO �I
726.09 SSMH R]M
725.668 GU RiM
725.85 GV RIN1
723.3.5& SSNiH RIM
722.123 GV R[M
722.325 FH
719.44$ WM R3RA
713.331 WM Ft3M
713.652 CO RIM
717.64i2 SSN1H RINt
73.fl.046 WfvY RI1�9
7�7.72 Wfvl ItIM
�a�.zr�s wnn �inn
7Ct9.467 WM PiIfN
714.0&�4 Ct7 R f M111
7t77.774 SSMN Rlhtl
7a8392 SSM3i RIM
71I.21S SSN1N RIfYi
710 [386 GY RiM
7]0.G31 GV RIA�
712.84.9 C,Sf RIM
7tG.586 WFY Rltvi
723_7G iA+Nc Ril`,�
719.737 C{J RIN!
723.5�4 SSMH RIM
729.123 WM RIM
732.689- WM RIE1r
7A4_'�7.1 WPVI RIhR
736.�A51 C� RIM
7A0.756 GV R3M
7�t(1.97fi f,V R!M
7AQ.�6[iA i�Pi
7�#5.34 V�JhA €t!M
7dG.l77 C4 ftih/1
748.ASA 1AlNt itBM
7�E9.59 SSIN)i AIM
751.058 Whli R#M
75p.853 WM R]Nl
751.871 j/ViN RIM
�sx_�s� ss�� �inn
751.79 WNI RIM
751.$8 WiVI R[M
752.615 LV�vi ftIM
752.801 Wivi RIM
752.156 WM RINI
752.�86 SSfY�H RiM - _ ¢ �
j�, ;� � �,,,�.�.�- ����,. r -.-� . r ,,
t�-i=:�.,.� ;' �c�3.-�;` � ' �_.
�
L_� . � � ,i�,
fh1
� 4�. �i _ 1 �) e_....,
i . . � , ����. � �
�r '.. ����;�<
�,`"„_-- X�
a�- �-1""-f '� � €"F- i.,,,
�`t.:C.. '�� I i � � i
_ a . ,,
g�_1
i. i , �'Y _a� � . ��'gi
. r
;�w
��� ' . ' ' �
��
f ��n �'�-� . �F . �
�., € m'� � , , r.-�
� . , _ 1�"- � �. a
�`c � � +� ¢' . , . �
iv � � �
�.:.,r�-��.-3� ��
�3
,/
J`��� �''�k
���'� � ;�i}
���i:i
�
r �,
��r�
O:�Specs-Stds Governance Process�Temparary 5pec Files�Capital Delivery�Cap Deli�ery Div �1�01 71
23.16.D1_Attachment A_5ur�ey Staking 5tandards.docx
Page 24 of 24
C. Other preferred as-built deliverable
Some vendors have indicated thafi it is easier to deliver this informa#ion in a different
format. Below is an example spreadsheetthat is also acceptable and can be obtained by
request from the survey superintendent.
�
0:�5pecs-Stds Governance Process�Temporary Spec Files�Capi#al Delivery\Cap Delivery Div 01�01 71
23.1b.01_Attachment A_Survey Staking 5tandards.docx
Page 25 of z5
O:�Spets-Stds Go�ernance Process�Temporary Spec Files�Capital Delivery�Cap Qelivery Div 01�01 71
23.16.01_Attachment A_Survey Staking SYandards.docx
Page 26 of 26
i
r
�
O17423-I
CLEANINU
Page 1 0!'4
�
I
�
:
�
�
�
Z
2
3 PART1- GENERAL
4 I.1 SUMMARY
5
(
7
8
9
]0
11
12
13
14
SECTION 01 74 23
CLEANING
A. Section Includes:
1. Intermediate and final cleaning for Work not including speciai cleaning of closed
sysiems specified elsewhere
B. Deviations from this City of Fott Worth Standard Specificaiion
1. None.
C. Rela.ted Specification Sections include, �ut are not necessarily liinited to:
1. Divisian 0— Bidding Requirements, Conti-act �onns and Conditions of the Contract
2. Divisian l— Gez�eral Requirements
3. Section 32 92 13 — Hydro-Mulcl�ing, Seeding and Sodding
1.2 PRTCF, AND PAYMENT PROCLDUR.ES
15 A. Measuf•einent and Pay�r�cz�t
16 �. Worlc associated with this ltem is considered subsidiary to the various Items bid.
17 No separate payinent will be allowed for this Item.
18 L3 REFERLNCES [NOT USED�
19 1.4 ADMINISTRATTVI� RT;QUIREMENTS
20 A. Scheduling
21 1. Schedule cleaning operalions so that dust and other containinants disturbed by
22 cleaning process will not tall on newly painted surfaces.
23 2. Schedule �nal cleafiing upon completion of Wark and i�runediaCely prior to �aaal
24 inspect�on.
25 I.S SUBMITTALS [NOT USED]
26 L6 ACTION SUBMITTALS/INFORMATIONAL SUSMITTALS (NO'[' USED]
27 1.7 CLOSEOU"1' SUBMITTALS [NOT USEll]
28 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
29 1.9 QUALITY ASSURANCE �NOT USEI)]
30 1.I0 STORAGE, AND TIANDLING
31 A. Storage and Handling Require�ne�ts
32 1. Store cIeaning producEs and cleaning wastes in containers specifically designed for
33 those materials.
CITY OF FOCLT WORTH Wa1er and Sanitary Sctiver Reha6ilitation Con�racl 101
57'ANDtiRD CONSTRUC"I�lON SE'ECIFICATIOt�I DOCI]MT:NTS CPId 02722
Rcviscd.Iuly 1, 2al l
�
U17423-2
CLEAN[N{i
Page2 of4
1 1.11 FIELD [SITE] CONi)TTI�NS �NOT USED�
2 1.12 WAI2RANTY [N[}T USED]
3 PART2- kR�DUCTS
4 2.1 OWNER-I+URNTSI�ED �ox] OWNER-SUPPLIEDPRODUCT� [NOT USED]
5 2.2 MATERIAL�
6 A. Cleaning�lgents
7 1. Compatible with siu•face being cleaned
8 2. New and uncontaminated
9 3. Far manufaciured surfaces
10 a. Material recoinmended Uy manufacturer
11 2.3 ACCESSORIES [NOT USED�
12 2.4 S�URCE QUALITY CONTROL [NOT U�ED]
13 PART 3 - LXECUTION
14 3.1 INSTALLEAS [NOT USED]
15 3.2 �XAM�NAT�ON [NOT USEDJ
16 3.3 PREPAItATION [NOT LTSED]
17 3.4 APPLICATION [NOT USED]
18 3.5 REPAIR I RESTORATI�N [NOT USED]
19 3.6 RE-INSTALLAT�ON �NOT USED]
20 3.7 FIELD �oEij SITE QUALITY CON'1'ROTJ �NOT USED]
21 3.8 SYSTEM STARTUP [NOT USED]
22 3.9 ADJUST�NG [NOT USED]
23
24
25
2b
27
28
29
30
31
32
3.10 CLEANING
A. General
1. Prevent accuinulation o£wastes tliat create hazardaus coi�ditions.
2. Conduct cleaning and disposal operatio�s to comply with laws and safety orders of
�;overning authorities.
3. Do not dispose of volatile wastes such as �nineral s�iriis, oil or paint thiz�nez• in
stoz-m or sanitary drains or sewers.
4. Dispose of degradable debris at an approved solid waste dispasal site.
5. Dispase af nondcgradable deb�•is at an approved solid vvaste disposal siCe or in an
a[ternate manncr approved by City aud regulatory agencies.
CITX OP TORT WOR`1'H Water and Sanitaiy Sewer Rehabilitation Contr�cl 1 U3
S"�ANI7ATZIl CONS'1'KUC"CION SPECiFIC/lT[ON DOCUIviENTS CPN {12722
LteeiseB ]uly l, 2{)i 1
i
�
�
�
1
2
3
�
5
6
7
8
9
10
11
12
13
14
15
1G
17
18
19
20
21
22
23
24
25
26
27
28
24
3Q
31
32
33
34
35
36
37
38
39
40
41
42
017423-3
CI.L'ANING
Page 3 of 4
6. Handle materia�s in a controiled inanner with as few handlings as passible.
7. Thoroughly clean, sweep, wash and polish all Work and equipinent associat�d with
this project.
8. Re�nove all signs of temporary construction and activities incidental to consu•uction
of req�ired perinanent Work.
9. If praject is not cleaned to the satisfaction of the City, the City reserves the right to
have thc cleaning cotnpleted at the expense of the Contractor.
10. Da not buz�n on-site.
B. Intermediate Cleaning during Canstruction
L Keep Wark aa'eas clean so as not to hinder healih, safeiy oi' convenience of
personnel in existing facility aperataons.
2. E1t inaxiinuin weckly intei-vals, disposc of waste inaterials, debris and rubbish.
3. Confne const�uction debris daily in st7rategically located containei-{s):
a. Caver to prevent blowing by wind
b. Store debris away fro�n construction or operationaf activities
c. Haul fi•am site at a minimum of� once per weelc
4. Vacuum clean intcrior areas when ready to recei�e finish painting.
a. Cantinue vacuuxx� cleaning on an as-needed basis, until Final Acceptance.
5. Prior to storin events, thoroughly clean siie of all loose or unsecut�ed iteins, which
may becoine airborne or transpor[ed hy fEowing water du�•ing t11e storan.
C. Interior Final Cleaning
i. Remove grease, inastic, adhesives, dust, di�•t, stains, finge�prints, labels ancf other
foreign nnaterials frorn sight-exgosed surfaces.
2. Wipe a111igl�Ying fixture t•e#lectors, lenses, larnps and trims clean.
3. Wash and si�ine glazi�ig and inirrors.
4. Polish glossy surfaces to a clea�• shine.
5. Ventila.ting systems
a. Clean pennanent filters and x•eplace disposable fi3ters if ui�its were operated
during construction.
b. Clean ducts, blowers and coi�s if units were operated without filters during
const��uction.
6. Replace all burned out lamps.
7. Brooin clean process area floors.
8. Mop office ancE control room floors.
D. Extcrior (Site or Right a� Way) Final Cleaning
1. Remove trash and debris containers ft•om site.
a. Re-seed areas disturbed by location of trasiz and debris containers in accordance
witl� Section 32 92 13.
2. Sweep roadwa.y to �-emove all rocks, pieces of asphalt, concrece o�� any other object
that inay hinder ar disrupt the flow of tra��.c aIong the roadvvay.
3. Clean any interioi- areas incIuding, but not liinited to, vaults, manholes, structures,
junction boxes and inlets.
C]']'Y OF FORT WORTH Water and Sanitary SewerRcha6ilitation Contract lOk
S'1'ANDARD CONSTRUCTTON SYECIFICAT90N DOCUMEN'1'S CPN 02722
Revisccf July ] , 20l !
i
2
3
4
5
017423-4
CLEANING
k'age 4 of 4
4. If no langer required for anaintenaiice of erosion facilities, and upan appraval by
City, ��emnve erosion control froin site.
5. Clean signs, lights, signals, etc.
3.11 CLQSEOUT �CTIVITIES [NOT US�l)]
3.12 PROTECTTON [NOT USED]
6 3.13 MAINTENANCE jNOT US�D]
7 3.14 A'1'�'ACHMENTS [NOT tiSED�
& END OF �ECTION
9
Revision Log
dATF., NAME SUMMARY OF CHANGL
1Q
C1TY OF PORT WOlZ7'H Water and Sanitary Sewer Reha6ilitation Contract 10]
STANDARD CONS"1'RL'C"L70N SPEC[FICATION DOCUMI :i�ITS CPN 02722
Rcvised Ju�y l, 2011
�
�
� 1
2
�
1
�
�
�
�
�
t
;
�
�
I
t
3 PART1- GENERAL
4
5
G
7
8
9
10
il
12
13
l4
IS
16
i7
18
19
20
21
22
23
24
25
2G
SECTYON O1 77 19
CLO�EOU'I' REQUIREMENTS
0177J9-[
Cl.OSEOUT RrQlllkiElvl�:N7�S
Page I of 3
1.I SUMMARY
�1. Section Includes:
1. The �rocetiure for closing out a cont�-act
B. Deviatians fi•oin this City of Forf Worth Standard 5pecificaiion
1. None.
C. Relaied Specification Sections include, but are not necessat-i�y limited to:
1. Davision 0-- Bidding Requrrements, Contract Forins and Conditions of the Contract
2. Division 1— General Requirements
1.2 PRICE AND PAYM�NT PROCEDURES
A. Mcasurement and Payir�ent
1. Work associated with this Item is considered subsidiary to the various Items bid.
No sepa�-ate payinent wrlf 6e allowed for this Itein.
7.3 REFERENCES [NOT USED]
1.4 ADMINTSTRATIVE REQUIR�MENTS
A. Guas•anCees, Bonds and fl�idavits
1. No application for final payinent will be accepted iurtil ali guarantces, bonds,
certiiicates, licenses and affidavits rec�uired for Work or equip�nent as speci�ed are
satisfaetorily filed with the Ciiy.
$. Release of Liens or Cla.ians
l. No application for final payment wili be accepted until satisfactory e�idenec of
release of liens has been subinitted to the City.
I.5 SUBMITTALS
A. Submit all requtrcd docu�nentation to City's �'roject Representative.
CII'Y OF FORT WORTH Wa1cr and Sanitary Sewer Reliabilitation Conhact l01
S7�ANt]ARD CONSTRUCTION Sl'ECiF1CATIOtV DOCUMP:NTS CPN U2722
Revised July l, 2011
0����9-z
CLOSEOIJT REQIi]I2EFvIENTS
Page 2 nf 3
1 1.6 INFORMATTONAI. SURMITTALS [NOT USED]
2 1.7 CLOSEOUT SUBMITTALS [NOT USLD]
3 PART 2- PRODUCTS [NOT USED]
� PAR'1" 3 - IIXECUTION
5 3.1 INSTALLER� [NOT USED]
f 3.2 LXAMlNATION [NOT USED]
7
R
3.3 PREPARATTON �NOT USED]
3.4 CL�SEOUT PAOCEDURE
9 A. Prior ta requestin� Fxnal In.spectioii, subir�it:
10 1. Project Recard Docuinents in accordance with Section O1 7$ 34
1� 2. O�et-atian and Maintenance Data, rf required, in accordance with Sectinn 01 78 23
72 B. Prior to requesting Final Inspection, pet-fonr� final cleaning in accardance with Section
]3 O1 74 23.
14 C. FinalInspection
15 l. After final cleaning, pro�ide notice Co the City Pi•aject Representative tkaat the Woz•k
1 G is cornpleted.
17 a. '1'he City will mal�e an initial Final Inspectian with the Contt•actar present.
18 b. Upon coinpletion of this inspection, the City will notify the Conh-actor, in
19 writing within 10 business days, af any particulars in wk�ich this inspection
20 x-e�eals that the Worlc is defective ar incom�lete.
21 2. Upon rccciving written notice from ihe City, im�ilediate[y undeitaEce thc Work
22 rec�uired to remedy deficiencies and camplete the Work to the satisfaction of Ehe
23 City.
24 3. [7pon completion of Work associated with the items ]isted in the City's written
25 notice, inform the City, that the required Woi-k has been coxnpleted. Upan receipt
26 af this notice, khe City, in the presence of the Contractor, will make a subsequent
27 Pinal Inspection of the project.
2R 4. Provide all special accesso�•ies requieed to place each item of equipment in full
29 operaCion. These special accessory items include, but are nok lirnited to:
3Q a. Specified spare parts
31 b. Adequate ai] and �;�-ease as required for the first lu6rication of the equip�nent
32 c. Tilitial iill up of all chemical tanks and fuel tanks
33 d. Li�;ht bu]Us
3�1 e. Fuses
35 E Vault keys
36 g. 1 Iandwheels
37 h. Other expendable itetns as required for initial start-up and operation of all
38 equipment
39 D. Notice of Project Conipietion
Cl"1'Y OF FORT WORTF[ Wacer a�zd SaniLary Sewer Rchabilitution Contract ] Ol
S'1'ANDARD CONSTRtJC:TiQN SPF.CiPTCATION 170CLINi�N"fS CPN 02722
Revised July 1, Z011
�
;
;
f
t
i
�
f
I
�
f
I
�
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
z�
28
r
� 29
�
�
4
�
017719 3
CLOS�:OU7� ItEQU]REMEAITS
Page 3 n f 3
1. Once the City Projcct Representative finds the Work subsequent #o Final Inspection
to be satisFactoty, the City wiII issue a Notice of Project Completian (Green Sheet).
E. Supporting Docu�nentatioil
1. Coordinate with the City Praject Representatrve to complete the following
additional forms:
a. I'inal Payment IZequest
b. Staternent of Conh-act Time
c. 1lffidavit oi'Payrnent and Release of Liens
d. Consent of Surety to Final Payinent
e. Pipe Report (if �-ec�uared)
f. Cantractor's Evaluation of City
g. Perforanance E�aluation of Confi-actor
F. Letter of Final Acceptance
1. Upan review and acceptance of Notice of Project Completio�� and Supporting
Docu�nentation, in accordance with General Conditions, Ciky will issue Letter of
Final lAcceptance and release tl�e Pinal Paytnent Rcquest for payment.
3S REPAIR / R1;STORATION [NOT USEDJ
3.6 RE-INSTALLATTON [NOT USED]
3.7 FIELD [o�J SITE QUALITY CONTROL jNOT USED]
3.8 SYSTEM STARTUP [NOT USED]
3.9 AllJUSTING [NOT USI.D)
3.10 CLEANIIVG �NO T USEDj
3.11 CI.OSEOUT ACTIVITiES [NOT USED]
3.12 PROTECTION jNOT USED]
3.13 MAINTENANC� [NOT USED]
3.14 ATTACIiMENTS [NOT USLDJ
END OF SECTION
Revision Log
DATL NAME 3UMMARY OF CHANGE
CiTY OP FOR"!' WORTI{ Water and Sanilaiy Sctver Rehabilitation ConErac[ l01
STA]VC)ARD CONSTRUCTIQI� SPP.C[T'1CA7 CON DOCUMENTS CPN 02722
Rcviscd.luly E, 2011
O 1 78 23 - k
OPERA"I'ION ANll MA1N'1'ENANCE llA'1'A
Page l of 5
�
1
f
�
�f
�
�
2
fi� h\.�I lf �!7 �1►1 �l .7e\ /
4 ].� SUMMARY
5
6
7
8
9
10
11
12
l3
]4
15
I6
17
s�ccTroN o� 7s Zs
OPERATION AND MAINTENANCE DATA
�1. Sectian Includes:
1. Product data and �•elated infonnation appropriate for City's inaintenance and
operation of products fi.u•nished under Contr�act
2. Such products may inciude, but as•e noi liinited to:
a. Traffic Controllet�s
b. In•igation Contro�lers (to be operated by tlie City)
c. Butterfly Va[ves
B. Deviations from this Ciry ofFort Worth Standard Specification
1. None.
C. Relatcd Specif�cation Sect�ons include, but are not necessarily linlited to:
1. Division 0— Bidding Req�ireinents, Conti•act Forins and Conditions of the Cant�act
2. Division 1— General Requirements
1.2 PRICE AND PAYMENT PROCEDURES
1$ A. Measureinent and Payxnent
19 1. Work associated with this Item is conside�•ed subsidiary to the various Items bid.
20 No separate payinent will be allowed for this Item.
21 1.3 REFERENCES [NOT USED]
22 1.4 ADMINISTRATIVE REQUIREMENTS
23 E1. Schedule
24 1. Subinit inanuals in finai foi-�n to the Ci#y within 30 calendar days of product
25 s�ipinent to the project site.
26 1.5 SUBMITTALS
27 A. Sub�nittals shalf be in accordance with Section 01 33 00 . All submittals shall be
28 app�oved by lhe City prior ta defivery.
29 1.6 INFORMATIONAL �UBMITTALS
30
31
32
33
34
35
36
37
f�. Submittal Fonn
1. Prepare data ii� foi7n of an instructional inanual for use by City personnel.
2. Fonnat
a. Sizc: 8% inchcs x 11 inchcs
b. Paper
1) 40 pound rninimum, white, for typed pages
2) Holes reinforced with plastic, cloth or metal
c. Text: Manufacturer's printed data, or neatly typewritken
GTY OF FOR`1' WOK"]'H Water and Sanitary Sewer Kehahilitalion Conlract ]01
STANDARD CON5"I'1tUC"I�iON SPEC1FiCA`1lON DOCUMEN`I'S CPN 02722
Rc��iscd Decemher 20, 2012
_�
�
O] 7823-2
OPERAT[ON AND MATNTP.NANC� llA'1�A
Pugc 2 of 5
1
2
3
4
5
6
7
8
9
10
11
12
13
14
1S
l�
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
3C
,37
38
39
40
41
42
43
44
45
4b
47
48
d. Drawings
1) Provide reinforced punched binder tab, 6ind in with tex�
2} Aeduce larger drawings and fold to size of text pages.
c. Provide fly-leaf for each separate product, ar each piece o#' operrtting
equipment.
1} Pro�ide typed description of product, and major component parts of
equipfneni.
2) Pra�vide indexed tahs.
£ Cover
1) Identify each valume with fyped or printed title "OPERI�TINU 11ND
MAINTENANCE INSTRUC`J'IONS".
2) L,ist:
a) Title of Pz-oject
b) Tdentity of separate sh-ucture as appiicable
c) Identity of general subject rnattet covered in thc inanual
3. Binders
a. Commercial qualaty 3-ring binders with durable and cleanable plastic covers
b. When multiple binders are used, cori-elate the data into related consistent
g�•oupmgs.
4. If availah3e, pro�ide an elech•onic fonn of the O&M ManuaI.
B. Manual Cantent
Neatly typewritten table oF cantents for each �alume, arranged in systematic order
a. Cantractor, name of responsible principal, address and telephone nuinber
b. A list of each product required to be included, indexed to content of the volume
c. List, with each pt-oduct:
1) The name, address and tclephone number of the subcontractor or installer
2) A list of each product reAuired to be included, indexed to content of the
volume
3) Identif'y area of x-esponsibility of each
4) Local saurce of supply for parts aild replacement
d. Identiiy each product by product naine and other identifying symbols as set
for�h in Contract Documents.
2. Product Data
a. Tnclude only those sheets which are pertinent to the specific peaduci.
b. Annotate each sheet to:
1) Clearly identify specific product oi-pai-1 insta�led
2) Clearly identify da#a applicable to installation
3) Delete references ta inapplicable infot-ination
3. Drawings ,
a. S�applement product data with dt-awin�;s as necessa�y to clearIy illustrate:
1} Relat'ians of eornponent parts of �quip�nent and systems
2} Control and tlow dia�t-aans
h. Coordinate drawir�gs with information in Project Record Documents to assurc
correct illustration of completed instailation.
c. Do not use Pra�ect Record Drawings as inaintenance drawings.
4�. Written text, as i-equired to supplezx�ent product data for the particular installation:
a. Organize in consistent formai under separate headings for different procedures.
b. Pra�ide logical sequez�ce of instructions of each procedure.
Cl"1'Y OF FORT WORTI{ Water and Sanitary Sewex Rehahilitation Contruct l01
S'CANDARD CONSTRlJCTiQN SPP.CiP�CAT101V llOCUMEN"CS CPN 02722
Reviscd i]ccc�n6cr 2a, 2a l2
ai �sz3-3
OPERATION ti1�ID �v1AINTP.3tlANC� llA'PA
1'age 3 of 5
I
2
3
4
5
6
7
8
9
i0
11
12
13
14
15
16
5. Copy of each warranty, bond and se�vice contract issued
a. 1'rovide information sheet £or City personnel grving:
1) Proper procedures in event of failw•e
2) instances which might affect validity of warranties o�• bonds
C. Manual for Materials and Finishes
1. Submit 5 copies of complete inanual in final foitin.
2. ContenC, far architectural products, app�ied mate�•ials and finishes:
a. Manufacturer's data, giving £ull infonnation on products
1} Catalog nuinber, size, corr�position
2) CoIor and textu�•e designations
3) It�formation required for reordering special fna.nufactured products
b. Inst�-uctions for care and �naintenance
1) Manufacturer's recommendation foi� types of cicanin� agents and methods
2} Cautions against cleaning agents and met�ods which are detriinenta� to
product
3) Reco2mnended schedule for cleaning and maintenance
17 3. Content, fo�• moistut•e prot�ction and weather exposure products:
18 a. Manufactuf-er's data, giving full info�7nalion on �roducts
I9 1) npp�icable standards
20 2) Chemical coiripositzon
21 3) Details of installation
22 b. Insiructions for iz�spection, inaintenance and repair
23 D. Manual for Equipment and Systems
24 I. Submit 5 copies of complete r��anuai in final fo�7n.
25 2. Content, for each unit of equipment and system, as appropriate:
26 a. Description of unit and co�nponent parts
27 1) Function, noi7nal o�et•ating characteristics and limiting conditions
28 2) Perfannance curves, engineering data and tests
29 3) Carnplete nomenclature and commei�cial nurz�ber of replaceable parts
30 b. Ogerating pracedures
31 1} Start-up, break-in, routine and noimal ape�-atizz� insttuctions
32 2) Regulation, cantroI, stopping, shut-down and cmergency inst�-uctions
33 3) Sumtner and winter ogerating instructions
34 4) Special operating instructions
35 c. Maintenance procedures
3G 1) Routine operations
37 2) Guide to "trouble shooting"
38 3) Disassernbly, repair and reasseinbly
39 4} Alignfnent, adjusting and checking
40 d. Se�rvicing and lubrication sehedule
41 1) List of lubs•icants required
42 e. Manufacturer's printed operating and maincenance instz-uctions
43 t: Description of sequence of o�eration by control manufacturer
44 I} Predicted life ofparts subject to wear
45 2) Iteins ��ecoainz�nended to be stocked as spare paf-ts
46 g. As installec! control diagrams by contx-ols manufacturer
47 h. �ach conh-actoa•'s coordination drawings
48 1} As installed color coded piping dia�rams
CITY QF FOR7' WORTI3 Water and Sunitary Secver Rehabilitalion Contract l01
STAhT17Alti7 COIVSTRLJCTION SPECIFICA'f10N DOCUMGNTS ('PN 02722
Revised December 20, 2Dl 2
U17823-A
OPT RATIOIV AND MA]l+!'1'ENANCE DATA
Page 4 01� 5
1
2
3
4
5
6
7
8
9
lQ
il
I2
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
i. Cl�arts of valve tag num6ees, with location and function of each valve
j. IJist of original inanufacturet•'s spare parts, inanufacturer's cuiYent prices, and
recomfnended quantities to hc znaintained in storage
k, Other data as ��equired undef• pei�tinent Sections of Specifications
3. Cantcnt, for each elec#ric and electronic systetn, as appropriate:
a. Description of system and component pai-�s
1) Function, nanna] ope�-ating charackeristics, and limiting conditions
2} Perfo�-mance curvcs, cngineering data and tests
3} Complete notnenclature and cominercial number of repl�ceable parts
b. Circuit directories af panelbaards
I} Electi•ical service
2} Controls
3) Corz�muziications
c. As installed color coded wiring diagrams
d. Operating pxocedures
1) Routine and nonnal operaiing inst�•uctions
2) Sequences required
3) Special operating instructions
e. Maintenance pracedures
] ) Routine operations
2) Guide to "trouble shooting"
3) Disasseinbly, eepait- and reassezx�bly
4) 1ldjustinent and checking
f. Manufacturer's pi-inted operating and inaintenance insri-uctions
g. List of original �nanufacturer's spare parts, inanufacturer's currEnt prices, and
reco�ninended quantities to be z�aintained in starage
h. Other data as required under pertinent Sections of 5pecifications
4. Prepare and include additiona] data when khe need for such data becomes apparent
during instt-uction of City's personnel.
30 1.7 CLOSEOUT Si7BMITTALS [NOT LSED]
3] l.8 MAINTENANCE MATERIAL SUBMITT�ILS [NOT USED]
32 1.9 QLIALI'I'Y ASStiRANCE
33 A. Provide operation and maintenance data by pe�•sonnel with the following criteria:
34 1. Trained and expez-zenced in anaintenance and operation of descril�ed products
35 2. Slcilled as technical writer to the extent required to cozx�rnunicate essentral data
36 3. �killed as draftsman coznpetent to prepare required drawings
CITY OF 1=0R'I� WOR'1'li Water und Sunitary Sewer Rehabilitation Contract 1 O1
STANllAItll CONS'I�RUCTIQN SPL'CiFICATIOT] DOCUMEN`i'S ('PN 02722
Revised Dece�nber 20, 2012
i
i
01 7� 23 - 5
OPERAI'ION A1VD MAINTF:AIA3�lCE DATA
Page 5 of 5
1 1.10 DELIVERY, STORAG�, AND HANDLING [NOT USED]
2 1.1 � FIELD [SITI.) CONDITIONS (NOT USED]
3 1.12 WARRANTY [NOT USED]
4 PART 2- PRODUCTS [NOT US�DJ
5 PART 3- EXLCUTION �NOT USED]
6
7
END OF SECTION
Revision Log
D�,TE NAME SUMMARY OF CHf1NGE
8/3l/2012 b,Jol�ason 1.S.A.1—tilleoisectionremoved
8
� CTTY OP FOK"1' WORTH Water and Sanitary Scwcr RehabiGtalion Cnntracl I 0]
f STANTIARll CONSTRUCTiON Sl'ECIFICATION DOCLINlEN"f5 CPN 02722
' kevised Dece�nhcr 20, 2012
�
I
f
� I
2
I
�
i
�
�
�
�
_�
�
�`
3 PART1- GENERAL
4 11 SUMMARY
5
G
7
8
9
10
11
I2
13
14
15
16
17
18
19
20
21
22
23
SECTYON OI 78 39
PROJECT I�}�CORD DOCUMENTS
01 78 39 1
PRO]ECT RECORD DOCiJMrNTS
Page 1 of4
�. Section Includes:
1. Work associated with the documenting tl�e project and recording changes to �roject
documents, including:
a. Record Drawings
b. Wate�- Meter Seivice Reports
c. Sanitary Sewer Seivice 1Zeports
d. Large Wate�� Meler Reports
B. Der�iations from this City of Fort Worth Staaidard Specification
1. None.
C. Related Specification Sections include, but are not necessarily liinited to:
1. Division 0— Bidding Requirements, Contract Foi7ns and Conditions of the Confract
2. Division 1— Genet�al Requirements
1.2 PRICE AND PAYMENT PROCEDURL+'S
A. Measurement and Payment
1. Work associated with this Item is considered subsidiaiy to the various �t�zns bid.
No sepaf•ate paymenc will be a�lowed for this Itein.
I.3 REFERENCES [NOT USED�
1.4 ADMiNISTRATIVE R�QUIREMENTS [NOT USED]
1.5 SUBMITTALS
24 A. Prior to submitting � request fox Pinal Inspection, deliver Project Record DocunaenEs to
25 City's Project Representativ�.
26 1.6 ACTTON SUBMITTAL�/INFORMAT�ONAL SUSMITTAI,S [NOT USEDj
27 I.7 CLOSEQUT SUl3MITTALS [NOT USEDJ
28 1.8 MAINTENAIVCE MATL.ItIAL SUBMITTALS (NO'I' USED]
29 1.9 QUALiTY t�SSURANCE
30 A. �lccuracy of Records
31 1. Thoroughly coordinate c�anges within the Record Doctunents, making adequate
32 and pt•oper entries on each page of Specifications and each sheet of Drawings and
33 other pocuinents where such entry is requiz-ed to show tlie change properly.
34 2. Accuracy ofi•ecords shall be such that future search for items shown in the Gont�•act
35 Doctunents may re�y reasanably on information obta[ned froin the approved P�•oject
36 Record Docu�nents.
CITY OF FOIti' WORTII Wa1er and Sanitary Sewer Rchabilitation Contract E Ol
S1'ANDA1tll CONSTRIJCTIpN SP�CIPICA'1ION DOCIJN[ENTS C]'N 02722
Revised July !, 2p] 1
1
2
3
4
5
b
7
8
9
10
li
12
13
l4
15
16
01 78 39 - 2
PLtOJEC"f RECORD DOCUTvIP.I�i7'S
Pagc 2 of 4
3. To facilitate accuracy af records, make entries within 24 haurs aftej• receipt o�
information that the change has occui�•ed.
4. Pi-ovide factual iiifoi�rnatioii regarcEing al] aspects of the Work, botli concealed and
�isible, to enable future modificatian of the Work to proceed without lengthy and
expensive site a�easuremeiit, investigation and examiilation.
1.1fl STORAGE ANll Y�IANDLING
A. Storage and Handling Requieements
1. 'vlaintain the job set of Record Documeilts coinpletely protected ft-o�n deter�aration
and fro�n loss aud dama�;e until completion of the Work and tt-ansfer of all recorded
data to the final Project Record Documeilts.
2. In the event of loss of recorded data, use ineans necessary to again secure the data.
to the City's approval.
a. In such case, provide replacements to the standaeds originally required Uy the
Cnntract Documents.
1.11 I+'TLLD �SITE] CONDITIONS [NO`I' USED]
112 WAItRANTY [N�T USED]
17 PART 2 - PRODUCTS
1& 2.1 OWN�R-I+URNISHED �ox] OWNER-SUPPLIED PRODUCT� [NOT USL+'D]
l9 2.2 RECORD DOC[]MI+,NTS
20
21
22
23
24
25
26
27
A. Job set
1. Prom�tly following receipt of the Natice to Praceed, secure froin the City, at no
charge to thc Contractor, 1 coinplete set of all Documents comprising the Contract.
B. Pinal Record Docuz��ents
1. At a tiine nearing the completion of the Work and prior to Final Inspection, provide
ihe City 1 complete set of all Final Record Deawings iii the Cantraci.
23 ACCESSORIES [NOT USLI)]
2.4 SOURCY: QUALITY CONTROL [NOT USEDJ
28 PART 3 - EX�CUTION
29 3.1 INSTALLERS �NOT USED]
30 3.2 EXAMINATION [NO"1' USED]
31 3.3 PKI�,PARATION [NOT IISED]
32 3.4 MAINTENANCE DOCG'MENTS
33 A. Maintenance of 1ob �et
34 1. Iinmediately upon receipt of the job set, identify each af the Documents with the
35 title, "RF,CORD DOCUMENTS - .T013 S�T".
CiTY OC' PORT WOR"fH Watcr and Sanitary Sewer Rehabilitatinn Cnntract 101
STANI7AACJ CONS'l ItUCTION SPEC]PiCATTON DOCUM�I+!'CS CPiyI 02722
Revised July l, 2011
017b39-3
PRO]LCT RECORD �OCUMENTS
Page 3 of 4
�
2
3
4
5
6
7
8
9
10
11
12
�3
14
15
16
17
1$
19
20
21
22
23
24
25
26
27
28
29
3a
31
32
33
34
35
36
37
38
39
40
4i
42
43
44
45
46
47
2. Prescrvation
a. Considering the Contract completion time, the probahle numbe�- of occasions
upon which the job set anust be talcen out for new entries and for examinacion,
and the conditions under which ihese activities will be perfa��rned, devise a
suitable method for protecting the job sel.
b. Do not use the job set for any puipose except entry o�new data and for rer�iew
Uy the City, until start oftransfer of data to final Project Record DocwnenCs.
c. MafnCain the job set at the site of work.
3. Coordination with Construction Survey
a. At a ininimum, in accordance wiYh the inceivals set fiarth i�a Section OI 71 23,
clearly mark any deviations from Contract Documents associated wit�i
installation of the infrastructuf•e.
4. Malcing entries on Dz•awings
a. Record any deviations fram Contract Docuinents.
b. Use an erasable colored pencil (not ink or indelible pencil), cleai•ly descri�e the
change hy graphic line and note as rec�uia-ed.
c. Date all entries.
d. Call attention to the entry by a"cloud" drawn around lhe aeea ar areas affected.
e. In the event of overlapping changes, use different colors ior the overlapping
changes.
5. Conversion of schematic iayouts
a. In so�ne cases on the Drawings, ai-�-angements of conduits, circuits, piping,
ducts, and similar items, are shown sche2natically and are nat �ntended to
pot-lray precise physical Iayout.
1) kinal physical anangement is detennined by the Cant�-actoa•, subject to the
City"s approvai.
2) IIowever, design of Puture inodifications of Che facility znay require
accurate infonnation as to the finaI physical layout of itcros which af•e
sl�own only scheinatically o� the Drawings.
b. Show on the job set of Recoz•d Drawings, by di���ension accurate to within 1
inch, the centerlrne of each run of items.
1) Final physical at•1•ang�anent is determined by the Conh•actor, subject to ihe
City's approval.
2} Show, by symbal oz' �tote, the vertical location of the Item ("under slab", "iz�
ceiling plenuin", "exposed", and the lake).
3) Make all idcntification sufficiently descriptive that it inay be related
reliably io the Speciiicatians.
c. The City inay waive the requi��ements for conversion of scheinatic layouts
where, in the City's judgment, conversion selves no useful purpose. However,
do not rely upon waivers being issued except as specifically issued in writing
by the City.
B. Final Project Recox-d Doctunents
i. Transfet� of data to Drawings
a. Careful�y trai�sfer change data shown on tl�e job set of Record Drawings to the
coreesponding iinal documents, coordinating the changes as required.
b. Clearly indicate ai each affected deta.il and other Dz-awing a full descripti�n of
changes inade during construction, and the actual loeation of items.
CiTY OF FOR'�' WORTII Wa1er and 5anitary Sewer Rehabifitatinn Conlruct 101
STA�IIJARD COIdSTRE1('TIp�I SPT'CIF]CA'1�lON DOCIJMrNTS CP�I 02722
Revised Juiy l, 2�] 1
a� �a 3�-a
rao.i�r. r rcEcoRn ooc�Mrr�•rs
Pagc 4 of 4
1
Z
3
4
5
6
7
R
9
10
11
1z
]3
14
15
16
17
18
19
zo
2]
22
23
24
25
c. Cal1 attention to each entry by drawing a"cfoud" around the area or areas
affccted.
d. Make changes neatly, consistently and with the proper ir�edia to assure
longevity aild clear reproduction.
2. Transfer of data ta ather pocuments
a. If the Docuinents, other than Drawings, have been kept clean durin�; progress of
the Work, and if entries the3�eon have bcei7 arderly to the approval of the City,
the job set of those Documents, other than Drawings, will be accepted as fmal
Record Dacuments.
b. If any such Document is not so app�-oved by the City, secure a new copy of that
Documeiit froin the City at the Ciiy's usual charge for reproduction and
handling, and carefully traz�sfer the change data #o the new capy to the approval
of the City.
3.5 REPAIR 1 RESTORATION [NQT U,S�D]
3.6 RE-INS7'ALI.ATi�N �N�T USED]
3.7 FIELD �ox] SITE QUALiTY CON'1'ROL �NOT USED]
3.8 SVSTI+'�M STARTUP [NOT USED]
3.9 ADJUSTING [N�T U�ED�
3.�0 CL�ANING [NOT USED]
3.11 CLOSEOUT ACTIViT11,S [NOT USED]
3.12 PROTECTION [NOT USED]
313 MAINTENANCIa [NOT USED]
3.14 ATTACII.MENTS [NOT USED]
END Or ,SECTYON
Rcvisian Log
[]ATE NAME SUMMARY OF CHANGE
26
C1TY OT 1;0R'i' WOR"Cf3 Water and Sanitary Sewer Rehabilitation Co��tract ]O1
STAN]JAlill CONS"1'RUCT[C)N SPEC'[F1CAT[OI�I 1]OCUMrNTS Cl'N 02722
Aevised 3uly 1, 201 l
�
�
�
1
�
�
1
_ I
�
0241 ]4-1
UT[L[TY REMOVALlABANDONMLNT
Page ] of'17
1
2
3 PART1- GENERAL
4 I.1 SUMMARY
5
6
7
S
9
10
il
12
13
14
15
1(
17
18
19
20
21
22
23
24
SECTION 02 41 14
UTIY�TTY R�MOVAL/ABANDONMENT
A. Section Includes:
1. Direction for the removal, abandomnent or salva�ing of the following utilikies:
a. Catllodic P�-oCecEian 'I'est Stations
b. Water Lines
c. Gate Valves
d. Water Valves
e. Fire Hydeants
f. Water Meters and Meter Box
g. Water Samplin�; Station
h. Conc��ete Wate�- VauIts
i. Sanitary Sewe�- Lines
j. Sanitary Sewer Manhales
k. Saniiaiy Sewer Junction Boxes
1. Storm Sewer Lines
in. Stonn Sewex- Manhole Riseis
n. Storm Sewcr.lunction Boxes
o. 5torm Sewer Inlets
p. Box Culverts
q. Headwalls and Safety End Treatments
r. Trei�ch Drains
25 B. Deviations fi•om this City of kort Worth Standard SpecificaEion
2b 1. Addition of grout inspection by coupon sainpling �o�- utilities abandoned in place
27 {See 1.2Ac.9, 3.4C2e-g)
28 C. Related Speci�cation Sections inelude, but a�•e not necessarily limited to:
29 1. Di�ision 0— Bidding Requireinents, Contract Porins and Conditions of the Contracl
30 2. Division 1— Uenerai Requiremeats
31 3. Section 03 34 13 — Controlled Law Strength Material (CLSM)
32 4. Section 33 OS ] 4— Utility Trench Excavation, Embedment and Bac[cfill
33 S. Section 33 05 24 — lnsta�lation af Garrier �'ipe in Casing or Tunnel Liner Plate
34 6. Section 33 11 11 — Ductile Iron Fittings
35 7. Section 33 11 13 — Concrete Pressure Pipe, Bar-wrapped, Steel Cylinder Type
3G &. Section 33 11 14 — Buried SteeI Pi�e and Pittings
37 9. Section 33 I2 25 — Connection to �xisting Water Mains
38 1.2 PRICE AN�) PAYMENT PRQCEDURES
39 A. Utility Lines
40 1. Abandoriment of Utility Line by Grouting
Cl"1'Y OF FORT WORTi-1 Wate3� and Sanitary Sewer 2ehahilitation Cont��act ]01
S"1'ANDARD CONSTRUCl'fON SPECIFICATiON DOCUMENTS CPN 02722
Reviscd Dccem6e�� 20, 2012
0241 14-2
U'FILITY REMOVAI,/A�3A1��ONM�:N'1'
Puge 2 of l7
]
2
3
4
5
6
7
S
9
ia
11
I2
13
14
15
16
17
1s
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
4l
42
43
44
45
4�i
47
48
�
3
a. Measurement
1) Measut-ement for this Ikem shall he per cubic ylyd of existing utility line ta
be grouted. Mertsure by tickets showing cubic yaeds of gx-out applied.
b. PaymenC
1} The wot•k perfoimed atld materials fiunished in accordance with this Ite1n
and measured as provided under "Measut-einent" shall be paid for at the
unit price per cubic yard of "Line G•outinb" for:
a} Various types af utility line
c. The price bid shall include:
l) Low deiisity ceIlular grout or CLSM
2) Water
3) 1'avement removal
4) Exca�ation
S) Hauling
6) Disposal of excess matex�als
7) Furnishing, placement and coinpaction of backf 11
S) Clean-up
9) Coupon Satnple inspection of Abaildoned lines
LTtility L.ine Reinoval, Separate Trench
a. Measureinent
1) Measuretnent for lhis Itein shall be pex- linear foot af existing utility line to
be reinoved.
b. Payment
1} The wark performed and matcrials fuinished in accordance with this Item
and measured as pi-ovided under "Measureinent" shall be paid for at the
unit price bid per ]inear foot of "Reinove Line" ioi•:
a) Various types of existing utility liiie
b) Various sizes
c. The price bid shall include:
1) Reinoval and disposal of existing utility pipe
2) Pavement removal
3) Excavation
4) Hauling
5) Drsposal of excess materials
G) Fuunishing, ptaccment and coinpaction o£hackfil]
7) Cfean-up
Utility Line Reinaval, 5ame Trench
a. Measurement
1} This Ttexn is considered subsidiary the proposcd utiIity Iine being installed.
b. Payinent
1) The work performed and rnatet�ials tiumisY�ed in accordance with this Item
ai-c sul�sidiaty to tlie instal[ation of proposed utility pipe and shall he
subsidiary to the unit price bid per linear foot of pipe cainplete in �lace, and
no other compensation wzll be allowecE.
4. Manhole Abandorunent
a. Measureinent
1) Measureinent for this Item will bc per each manhole ta be abandoned.
b. Pay�nent
C1T Y OF FORT WORTH Water and Sanitaiy Sewcr Rcla�bilitation Contract l01
STI�NDARD CONSTRUC"I'lON Sl'ECIFICATION DOC[1MP.NTS CPN 02722
Rcviscd Decem6er 2D, 2012
U24114-3
l7TILITY RP.MOVAL/AI3AIVDQNMENT
Page 3 0l' 17
1
�
3
4
5
6
7
8
9
10
11
12
13
f4
15
16
1'7
18
19
20
21
22
23
24
25
2C
27
28
29
30
31
32
33
34
35
3t
37
38
39
4D
4]
42
43
44
45
46
47
48
49
5
1) Tlie work perPormed and materials furnished in accoa•dance with this Itein
and measured as provided unde�• "Measurement" shall be paid for at the
unit price hid per each "Abandon Manhole" for:
a) Va�•ious diameters
b) Varions types
c. The price bid shaIl include:
1} Re�nova] and disposal ofmanhole cone
2) Reinoval, salvage and de�ivery of fr-amc and cover to City, if applicable
3) Cutting and }�lugging of existing sewer lines
4) Concrete
5) Acceptable material for backtillin�; ar�anhole void
6} Pavetnent rerrzoval
7) Excavation
S) Hauling
9) Dis�osal of excess inaterials
�0) Fumishing, placeinent and compaction of backfill
1 I ) Sut-face restorafion
12) Clean-up
Cathodic Test Station Abandarunent
a. Measut•ement
1) Measurement for this Itein will be pea- each cathodic test station to be
abandoned.
b. PaymeYil
1} The wot'k perfor�ned and materiafs fu��ished in accordance with this Item
and ineasw-cd as provided under "Measure�nent" snall be paid for at the
unit ptxce bid per each "Abandon Cathodic Test 5tation".
c. The price bid shall inchide:
1) Abandon cathodic test station
2} CLSM
3) Pavement removal
4) Excavation
5) Hauling
6) Disposal of excess materials
7) Fu�nishil�g, placement and con�paction of ba.ckfill
S) Clean-up
B. Water Lines and Appurtenances
1. Installation of a Water Line Pressure Plug
a. Meas�rerr�ent
1) Measuremei�t for this Item shaI� be per each pressure plug to Ue installed.
b. Payment
1) The work perfonned and anaterials furnished in accordance with this ICein
and nneasured as provided under "Measureinent" shal] be paid for at the
unit price bid for each "Pz-essure PIug" installed for:
a) Various sizes
c. The price Uid sliall include:
1) I'urnishing and installing pressore piug
2} Paveinent recnoval
3) �xca�ation
4) Hauling
CT"1�Y OF FORT WORTI-I Water and Sanilary Sewer RehaUilitation ConEract J O1
S1'ANDARD CONSTCLUCT[OTI SPECIFICA'fION DQCUMI�NTS CPN 02722
Revised Dcecmbcr 20, 2012
U2 41 14 - 4
UTI[,1TY RT:M�VAL/AI3ANDONMEI�IT
Page 4 of l7
1
2
3
4
5
b
7
$
9
10
11
]2
]3
]4
75
I6
I7
18
19
20
Zl
22
23
24
25
26
27
28
29
30
31
32
33
3�l
35
3b
37
38
39
4d
41
42
43
44
45
4C
47
48
2
5) Dis�osal of excess ina�erial
6) Gaskets
7) Bolts and Nuks
S) Furnishiilg, placeineni and co�npaction of en�bedment
9) kurnishiiig, placemeni and campaction af backfill
10) Disinfection
11) Testing
12) Clean-up
Abandozunent of Water Line by Cut and installation of Abandonment Plug
a. Measurement
1) Measurernent for this Ttem shall be per each cut and a6andonment plug
installed.
b. Payment
1} The work perfor�z�ed and materiais furnished in accaedance with this 3tem
and melsured as pra�ided under "Measi.u•ement" shall be paid for at the
unit price bid for each "Water Abandonment Plug" installed for:
a) Various sizes
c. The pricc: bid shall include:
1) Ftu�nishing and ittstalling aUandomnent plug
2) Pavement rc�noval
3) Excavation
4) Haulin�;
5) CLSM
h) Disposal of excess material
7) Furnishing, placemenE and compactian of backl`ill
8) Glean-up
3. Water Valve Reinoval
a. Measut•ement
1} Measureir�ent for this Item will be per each water valve to be rcz��oved.
b. Payment
1) The work performed and materials furnished in accordance with t�is Item
and measured as pz•o�ided under "Measure�nent" shall be paid for at tl�e
unit price bid per each "Remove Water Valve" for:
a) Various sizes
c. The price bid shall incIude:
1) Removal and disposal af valve
2) CLSM
3) Pavement remnval
4) �xcavation
5) Hauling
6) Disposa] of excess materials
7) Furnishing, placemeiiE and compactian of bacl�fill
8} Clean-up
4. Water Valve Reinoval and Salvage
a. Measureinent
1) MeasuremenL for this Ttem will l�� per each wa#er valve to be reinoved and
salvaged.
b. Paynnent
CC"1'Y OF FORT WORT[[ Water and 5anitary 5cwcr Rehablitation Contract 14l
5"i'AI�lDA1ZD (:t)I�ISTRlJCTTON SPP.CTPTCATIOIV DOCUMEN'I'S CPN U2722
Revised Deccmbcr20, 2D12
024] ]4-5
UT[i.ITY RHMOVALlABANDONMENT
i'age 5 of 17
1
2
3
4
5
6
7
&
9
i0
I1
12
13
14
IS
lt
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
I} The work pet�fonned and matef•ials iuinished in accox-dance with this Item
a�1d measured as pa-ovided under "Measut�ement" shall be paid for at the
unit price bid per each "Salvage Water Valve" for:
a) Various sizes
c. The price bid shall include:
1) Remo�al and Salvage of valve
2) CLSM
3) Delivety to City
4) Paveinent removal
5} Excavation
$) Hau�ing
7) Disposal of excess inaterials
fi) Furnishing, placement and cornpactiol� of backfill
9} Clean-up
5. Water Valve Abandomnent
a. Measu�-ement
1} Measuremeni for this Itein will be pe�- each water valve to be abandoned.
b. Paytnent
1) The work perfonned and materials furnishcd in accordance with this ltem
and zx�easured as provided under "Measurefnent" shall be paid fo�• at the
unit price bid per each "Abandon Water Valve" for:
a) Various Sizes
c. The price bid shall incIude:
1) Abandonment of valve
2) CLSM
3) Pavement removal
4} Excavation
5) Hauling
6) Disposal of excess materials
7) Fux-��islaing, placement and coinpaction of backfill
8) Clean-up
6. r'ire Hydrant Reinoval and Salvage
a. Measurcment
1) Measureinent for thrs Ite�n will be per each fire hydrant to be reino�ed.
b. Payment
1} 'The work performed and materials furnished in accordance with this itc�n
and measu�•ed as provided under "Measurernent" sha[i be paid for at the
unit price bid per each "Salvage I'ire Hydrant".
e. 'I'l�e price bid sha11 include:
J.) Removal and salvage of fue hydranC
2) Deliveiy to City
3) Paveinent removal
4) Excavatian
5) Hauling
6} Disposal of excess inaterials
7) Furnishing, placement and caanpaction of backfll
8) Clean-up
7. Water Meter Removal and Salva.ge
a. Measureznent
CI"CY OF FORT WORTH Watcr and Sanitary Sewer Rehahilitation Conlracl ![}1
S7'ANDAItll CONSTRUCTION Sl'EC]F1CAT1p%1 DOCUM�N7'S CI'N 02722
Revised Dece�nbcr 20, 2012
0241 ]4-b
UT[L[TY REMOVAL/ABANDON%7P.N"F
Page (i of ] 7
1
2
3
4
5
C
7
8
9
10
ll
zz
13
14
15
1�
17
18
19
24
21
22
23
24
25
26
27
28
29
30
31
3Z
33
34
35
3C
37
3R
,39
�a
41
42
43
44
45
46
47
48
49
1} Measureinent for this Item will 6e per each water metee to be removed az�d
salvaged.
b. Payiilent
1) �'l�e work performed and materials furnished in accof•dance with this Ttc�n
and measured as provided under "Meas�•ement" shall be paid for at thc
unit price bid per each "Salvage Water Meter" for:
a) Various sizes
2) If a"Water Meter Service Relocate" is performed in accordance with
Section 33 12 10, i•emo�al and sal�age or disposal of the existing (2-inch or
sinalier) wat�er rnetet shal[ be subsidiary to thc cost of the "Waier Meter
Seivice Re�ocate", no other coxnpensation will be allowed.
c. The price hid shall include:
1) Reinoval az�d salvage of water meter
2) Delivery to City
3) Pavemcnt rennoval
4) Excavation
5) Haulin�;
b) Dispasa] of exccss materials
7) Furnishing, placenaez�t and coanpactian af bacl�fill
8} Ciean-up
S. Water Sampiing Station Removal and Sal�age
a. Measuee��ent
1} Measuretnent for this Item wilI be per each water sampIing station to be
reinoveci.
b. PaymenC
1) The work performed and materiais furnished in accordance with this item
and measured as pz•ovided under "Measurefnent" shall be paid for at the
unit price bid per each "Salvage Water Sampling Station".
c. The price bid shall inciude:
1) Removaf and salvage of water sampling siation
2) Delivery tc� City
3) Pa�ernent removal
4) Excavation
5) Haulii�g
b) Dispasal af excess inaterials
'7) Fuinishiilg, placeinent and coinpaction of backfill
$) Clean-up
9. Concrete Water Vaul[ Removal
a. Measurement
I} Measurement fai- this Item will be pet• each concrete water vault to Ue
rema�ed.
b. Paymeni
1} The warlc perfor�ned and materials furnished in accordance witl� this Itein
and measured as pz-o�ided under "Measurement" shall be paid £or at the
unit price bid per each "Re�nove Conereke Water Vault".
c. The price bid sha11 include:
1) Rernova] anc� dispasa] of concr�tc water vault
2) Removal, salvage and deli�ery of frazne and cover to City, if applicable
3) Remova[, salvage and cielivery of any �alves ta City, if applicable
CL1Y OF FOR'C WOR'CI[ Water and Sanitary Sewer Rehabilitation Coniract I O1
S'1�ANDAItll CONS7'RIJCT[ON SPECiFiCATiON DOCUMP..NTS CPN 02722
Revise� Dece�nbcr 26, 2a12
02 4l l4 - 7
UTi1.iTY RT;NiOVAL/ABANDONMEN`1'
Page 7 of 17
1
2
3
4
S
6
7
8
9
10
11
12
13
14
15
16
17
1S
19
20
21
22
23
24
25
26
27
zs
29
30
31
32
33
34
35
3b
37
38
39
�a
41
�2
43
44
45
46
47
48
49
4} Reinoval, salvage and delivery of any water meiers to Ciiy, if applicable
5) Paveinent reinoval
6) Excavation
7) Hauling
8) DisposaI of excess materials
9) Furnishing, placeinent and compaction af back�ll
10) Clean-up
C. Sanita�y Sewer Lines ai�d l�ppiu•tenances
1. Abandamnent of Sanitaay Sewer Line by Cut a�id installation of Abandonmcnt Plug
a. Measuremeni
l) Measurement for this Itein shall be per each cut and abandonment pIug
nlstalled.
b. Pay��ent
1} �'he work perfoi-�ned and inatei•ials fui�ished i�a accordance witl� tliis Itein
and zneas�ued as provided under "Measuremcnt" sha11 be paid for at the
tulit price bid £or each "Sewez- Abazadozunei�t Plug" for:
a) Vaz-ious sizes
c. The price bid shall include:
1) I'uiniisliing and installing abandonment plug
2} Pavement removal
3) Excavation
4) Hauling
S) CLSM
G) Disposal of excess materiat
7) kurnishing, placeinent and compaction of backiill
8) Cleafi-up
2. Sanitary Sewe�- Manhole Reinovai
a. Mcasureinent
I} MeasuremenC for this Itein will be per each sanitary sewer inanhole to be
removed.
b. Payment
1) The worl� performed and materials fua-nished in accordance with this Item
and measiu•ed as provided uncier "Mcasurement" shall be paid for at the
unit price bid per each "Re�nove Scwez• Manho�e" fo�•:
a) Various diameiers
c. The price bid shall include:
1) Remn�val and disposal of manhole
2) Removal, sal�age and deliveiy of frame and cover to CiYy, if applicable
3} Cuiting and plugging of existing sewer lines
4) Paveinent reznoval
5) �xcavation
F) Haulin�;
7) Dispos�l of excess inaterials
8} �urnishing, placement and campaction of backfill
4) Clean-up
3. 5anitary Sewe�- Junction Struci�u•e Removal
a. Measurement
1) Measu�-ezxzent for this Ite�n will be pec eaeh sanitary sewer.junction
shuct�re being removed.
C11�X dH k�UK7' WORT[ 1 Watcr and 5anitary Sewer Aehabililation Contract f O l
STAN13Altll CONSTRiJCTION SPL-CIPICATION llOCUMEAlTS CPN 02722
Revised Decernhcr 20, 2012
0241 l4-R
lJTII,I'T'Y R�MOVAL/Ak3ANllONMENT
Page 8 of l7
I
2
3
4
5
6
7
8
9
10
11
i2
I3
�
c.
Payment
1} The work perf'oi-�ned and znaterials fuz-nished in accardance with this Itein
and measured as provided undcr "Measurement" shall be paid for at the
lump sum hid per each "Remove Sewer �unction Box" location.
The pf•ice bid shall include:
1) Remo�al and disposal ofi junction box
2) Remo�al, salvage and deliveiy of fi•atne and cove�• to City.
3) Pavement removal
4) �xcavation
5) Ilauling
6) Disposai of excess inaterials
7} kurnishing, placeineiit and compaction of backlili
8} Clean-up
14
15
1 fi
17
rs
19
20
21
22
23
24
25
2f
27
28
29
30
31
32
33
34
35
3C
37
38
39
40
41
42
43
44
45
46
47
48
49
D. Stann Sewer Lines and Appurtenazaces
1. Abandomnent of Stonn Sewcr T,inc Uy Cut and installation of Abandonmeni Plug
a. Measuz-e�nent
1) Measureinent for this Ttern shal l be per each cut atld abandonment pfug to
be installed.
h. Payir�cnt
l) The wox-k pez-foz-nied and materia�s fiu•nished in accordance with this Item
and rneasured as provided under "Measureinent" shall be paid foi• aC the
unit price bid for each "Stonn l�bandomnent Plug" installed for:
a) Various sizes
c. The price bid shall include:
1) Fuinishing and installing abandomnent plug
2) Paveinent reina�al
3) �xcavation
4) Haulin�
5) CLSM
6} Disposal �f excess zx�ater�al
7} Furnishing, placeii7ei�t at�d compaction of backfill
8) Glean-up
2. Stnrm Sewec• Manhole Rcmoval
a. Measut-e�nent
1} Measure;mcnt for ihis Item will be per each stoim sewer inanhole to be
reinoved.
b. Payment
1) The work pe�•fnt•med and makerials furnishcd in accordance with this Itein
and measured as pro�ided under "Measuz-erz�ent" shaIl be paid for at the
unit price bid per each "Reinove Manhole Riser" for:
a) Various sizes
c. The price hid shall include:
1} Reinoval and disposal of z�anhole
2) ltemoval, salvage and deliveiy of fraine and covei- to City, if applicahle
3) Pa�ement reinoval
4) Lxcavation
5) Hauling
�} Disposa] oi'exeess n7atcrials
7} Furnishing, place;z��ex�t and coan�action of backfill
CITY OF PORT WOATH Water and 5anitary Scwcr Rchabilitation Contract l01
STANDARD CONSTRUCTION Sl'ECIFICA'1']ON DOCUMENTS CPN 02722
Revised December 20, 2012
az a> > a - 9
UI'ILlTY REMpVALlAi3ANpONMENT
Page 9 of l7
1
2
3
4
5
6
7
S
9
10
11
12
13
14
15
16
17
l8
i9
aa
2]
22
23
2A
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
4d
41
42
43
44
45
4(
47
48
49
8} Clean-up
3. Storin Sewer Junctian Box Reinoval
a. Measurement
1) Measux-ez��eiit for tYtis Itern will be per eacli stonn sewer junction structure
to be reyr►oved.
b. Payment
1) The work perfonned and inaterials fi�rnished in accordance with this Itein
and irzeasuz-ed as provided under "Measure�nent" shall be paid for at the
unit priec bid per each "Remove Sto�-im Junction Box" for:
a) Various sizes
c. The price bid shall include:
]) RemovaI and disposal of junction box
2} Re�noval, salvage and deiiveiy of fraine and cover to City, if appIicable
3) Pavement re�nova]
4) �.xcavation
5) Hauling
6) Disposal of excess inaterials
7} �'ut�ishing, placement and compactian of backfill
8) Clcan-up
4. Storm Sewer.Tunction Str�ucture RemovaI
a. Measurement
1} Measureinent for this Item will be per eac�i stonn sewer junction structure
being removed.
b. Payn�ent
l) The wos•I� perfonned and tx�;aterials f�rnished tn accordance with ihis Itean
azid ineasured as provided under "Measurement" shall be paid for at #he
lump sum bid pei• each "Rcznove Sforrn Junciion Structure" location.
c. The p�-ice hid shall include:
1) Removal and disposal of junction structure
2} Removal, salvage and delivery oi frame and cover to City, if applicable
3} Paveinent removal
4) Excavation
5) Hauling
6) Disposal of excess materials
7) Furnishing, placeinenk and compaction ofbackfll
8) Clean-up
5. Stonn Sewer Inlet Ae�noval
a. Measurement
1) Measureinent foz� this ltem will be per each stonn sewer inlet to be
removed.
b. Payineni
1) The work perfonned and inaterials furnished in accordance witl� this Item
and zneasured as provided undcr "Measurement" shall be paid fo�• at the
unit price bid per each "Ren�ove Stoi-m In1eC" for:
a) Vaa•ious types
b) Various sizes
c. �'h,e price bid sha�l include:
1} Reinoval and disposal of ir�let
2) Pave�nent removal
CITY OP FORT WOR'I'H Waler and Sanilary Sewer Aehabilitation Contracl t 01
STANDAR�I CONS7'itUC'170N SPL-CiPICATION IJOCUMENTS CPN 02722
Revised December 20, 2� ] 2
02 41 14- 10
lJT1L[TY CtEMOVr�L/AI3ANt�ONMEN7'
Pagc l0 of ] 7
1
2
3
4
5
b
7
&
9
10
11
12
13
14
15
]6
27
18
19
20
21
22
23
24
25
26
27
28
29
3d
31
32
33
34
35
36
37
38
39
4�
41
42
43
44
45
46
47
48
49
3} Excavation
4) Hauling
5) Disposal of excess materials
6) Fuenishing, placement and coinpaction ofbackfll
7) Clean-u�
6. Storin Sewer Junction Box Removal
a. Measurelnent
1) Measurennent for this Itein shall he per linear Font of existing storm sewer
box io be removed.
b. 1'ayment
1} The work perfonned and materials furnished in acco�•dance with this Item
aiid ineasured as provided under "Measurcment" shali be paid for at the
unit price bid per linear foot of "Retnove Stozx�n Junction Box" for all sizes.
c. The price bid shall include:
I) Removal and disposal of Sto��n Sewer Bax
2) Pavement t-emoval
3} Excav�tion
4} Hauling
5} Disposal of excess materials
6) Purnishing, placerr�ent and coinpaction of backiill
7) Clean--up
7. Headwa�i/SF_.T Reinoval
a. Measurement
1) Measurement for this Itein will be per each headwall ar safety end
h�ea#inent (SET) to he removed.
b. Payinent
1} The work performed and materials furnished in accordance wrth this Itein
and measured as provided under "Measurcinent" shall Ue paid for at the
unii price bid per each "Reinave 1l.eadwa11/SET".
c. The price bid shail include:
1) Removal and disposal ofHeadwall/SE7'
2) Pavement rema�val
3} Excavaiion
4} Hauling
5} Disposal of excess anatec-ials
fi} Furnishing, placement and compaction af backfill
7) Cleau-u�
8. Trench Drain Reinavll
a. Measurement
1) Measurement for this Ite�n shall l�e per linear foot of stt�eul sewer tx-cnch
drain to 6e removed.
b. 1'ayinent
J) The work perfat-med and materials fu�-nished in accordance with this Item
and measured as provided undei- "Measux-eznent" shall be �aid for at the
unit price 6id per lineat- £ont of "Ren�ave `I'rcnch Drain" foj-:
a) Various sizes
c. Tl�e price bid shall include:
1} 12ernovxl atld disposal of stonn sewer line
2} Paveinen# �-eino�val
CTTY OP PORT WOR7'H Wate�� and Sanitary Sewer Itehahilitation Contruct I Ol
STANDARD CONS'1'KUC'i'lON SPECIFiCATiON DOCUMP.NTS CPN 02722
itevised Dece�nber 20, 20 t 2
F
�
G
024114-I]
iI7�ILITY REMOVALIAB/�NDONMI;t�IT
Page 1 ] of 17
F
i
i
�
�
�
r
�
;
�
�
l
f
1
2
3
4
5
6
7
S
9
10
ll
12
i3
14
15
16
17
18
is
3) Excavation
4) Hauling
S) Dispasal of excess materials
6) Furnishing, placement and compaction of backfill
7} Clean-up
1.3 REFERENCES [NOT USED]
l.4 ADMINISTRATIVE REQUIREMENTS
A. Coordination
1. Contact Inspector and the Waier Department kieId O�eration S#orage Ya�•d for
coordination of salvage material return.
i.5 SUSM�TTALS [NOT USED]
l.6 ACTION SUBMYTTALS/INFORMATIONAL SUBMITTALS �NOT USEDJ
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUSMITTALS [NOT USED]
1.9 QUALITY �1SSURANCE jNOT USED]
1.10 DELIVERY, STORAGE, AND HANI)LING
A. Storage and Handling Rec�uireznents
1. Protect and sal�age all rnaterials such that no daina�c occurs during deliveiy to tl�e
Ciry.
CITY pF FORT WOR"fH Water and Sanitary Scwcr itehabilitation Conu-act ] 01
STANDARD CONSIRUCTION SPECIFECATION llOCUMENTS CPN U2722
Rcvised lleceinher 20, 2012
�
02n114-]2
i)TILITY RLMOVAI./AFiAiQi70�IMEN7�
Pagc 12 of l7
�
2
1.11 FIELD [SITE] CONDITIONS [NOT USLDJ
i.12 WARRANTY INOT USED]
3 PART2- PRODUCTS
4 2.1 OWNER-FURNISHED �oR� QWNER�SUPPLItiD �'R�DUCTS [NOT USED]
5 z.2 MATERIALS
6 2.3 ACC�SSORI�S [NOT USED]
7 2.4 SOURCE QUALITY CONTROL [NOT USED]
8 PART 3 - EXECUTION
9 31 INSTALLERS [NOT USED]
l 0 3.2 EXAMINATION [NOT USED]
11 3.3 PREPARA`I,�ON (NO'C USIIDJ
12 3.4 REMOVAL, �ALVAGE, AND ABANDQNMENT
13
14
15
76
17
18
1�
20
2l
22
23
24
25
26
27
28
29
30
31
32
33
34
35
3C
37
,3$
A. General
1. Manhole Abandor►ment
a. All inanholes that are ko be taken ouk of seivice are to be remo�ed unless
specifically requested and/or approved by City.
b. F�cavate and backfill in accordance with Sectian 33 OS 10.
c. Kemovc and salvage manhole frame and cover as coordinated with City.
d. Delivet- salvaged anaterial to the City.
e. Cut and plug sewer �ines to be abandoned.
f.. Backfill inanhole void in accordance with City Standard Details.
B. Waler Lines and Appurtenances
l. Watex- Line Pressure Pdugs
a. Ductile Iron Water Liiies
1} Excavatc, ez��bed, and backfill in accardance with Sectron 33 OS 10.
2) Piug with an MJ Plug with inechanical restraint aud blocking in accoi•dance
wiih Section 33 1 I 11.
3) Perfor�n Cut and Plug in accardance wiih Section 33 J 2 25.
b. PVC C900 and C905 Watet� Lines
1) Excavate, emhed, ancf back#ill in accox-dance with Section 33 �5 10.
2) Plug with an MJ Plug with n�eehanical resh•aint and b�ocking in accordance
wath Section 33 11 11.
3) Perfarm Cut and Plug in accordance with Section 33 I2 25.
c. Concrete Pressure Pipe, Bar Wrapped, Steel Cylinder Type Wafer Lines
l) E.xcavate, embcd, and Uackfill in accordance with Section 33 OS IO
2) Plug using:
a} A fabricated plug resh•ained by welding or by a Snap Aing in
accorda�ce with Section 33 11 13; or
C1TY O� PORT WOR7'H Water and Sanilary Sewer l2ehahilitation Coniruct I O1
STANDARD CONS'LRUC7'lON Sl'ECIFICA"1'101+! DOCUMEN'CS CPN 02722
Itevised Deceuther 20, 2012
p241 14- 13
U'1'ILI'I'Y REMOVAL/ABANDONMEN"1�
Pagc l3 of ] 7
1
2
3
4
5
6
7
8
9
10
11
12
13
14
IS
lb
17
18
I9
20
21
22
23
24
25
26
27
2S
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
��
3.
4.
S
b) A blind flange in accordance with Section 33 11 13
3) 1'ca-foa�rn Cut and Plug in accordance wit11 Section 33 12 2S.
d. Buried Steel Water Lines
1) Excavate, einbed, and backfill in accordance with Sectian 33 p5 10.
2) Piug using:
a) A fabricated plug restrained Uy welding in accordance with �ection 33
11 14; or
b) A�lind flange in accordance with Section 33 11 14
3) Perform Cut and Plug in accor•dance with Scction 33 12 25.
Water Line �bandonment Plug
a. Excavate and backfll in accordance wiih Section 33 05 10.
b. Plug with CLSM in accordance with Section 03 34 13.
Water Line Abandonrz�ent by Grouting
a. Excavate and backfill in accordance with Section 33 OS I0.
U. Dewater Proin existzng line #o be g��outed.
c. Pill line with Low De��sity Cellular Grout in accordance with Sectiori 33 05 24
or CLSM in accordance with 03 34 13.
d. Dispase of any excess maCe�ial.
Water Line Removal
a. Excavate and backfill in accordance with Section 33 OS 10.
b. Cut existin�; Iine fi•om the ittility system priar to �•e�noval.
c. Cut any services grior to reinova�.
d. Reinove existing pipe line and properiy dispose as approved by City.
Water Valve Removal
a. Exca.vate and backfill in accordance with Scction 33 05 14.
b. Reinove and disgose of valve bonnet, wed�e and stein.
c. Pill vaIve body with CLSM in accordanee with Section 03 34 13.
6. Water Valve Removal and Salvage
a. �xcavate and backfiil in accordance witE� Section 33 OS 10.
b. Remove �alve bonnet, wedge anc� stean.
c. Deliver salvaged material to the Water Department Field O�eration Storage
Yat�d.
d. Pi•otect salvaged materials fi•om da�nage.
e. Fiif vaivc body with CLSM in accordance with Section �3 34 13.
7. Water Valve Abandoninent
a. Excavate and backfll in accordance with Section 33 OS f 0.
b. Remave tl�e top 2 feet of lhe valve stack and any valve extensions.
c. Fill the rema.ining va�ve stack with CLSM in accordance with Section 03 34 13.
8. ��z-e Hydrant Reinoval and Salvage
a. Excavate and backfill iz� accordance with Section 33 OS 10.
b. Remove Fire Hydrant.
c. Place abandomnent pIug o1Z fire hydrant lead lin�.
d. Deliver salvaged firc hydrant ta the Water Departinent Pield Operatinn Siorage
Yai•d.
e. P�•otect salvaged materials froin dainage.
9. Water Meter Reinoval and Sal�age
a. Reinove and salvage water �neter.
b. Ret�rn salvaged ineter to Project Representative.
C]TY OP POR'f WORT!-i WaLer and Sanitery 5cwcr Rehabilitation Contract 101
STAIVDARD CONSl'RUCT[QN $PP.CIP[CATIO�+f DOCUMENTS CPN a2722
Revised December 20, 2012
U241 14- ]4
iJT1L1"1'Y 1�:MOVAL/Af3ANDONMIiNT
Page 14 af i 7
1
2
3
4
5
(
7
8
9
10
11
12
13
14
35
k6
17
18
19
20
21
22
23
24
25
11
12
c. City will provide replaceinent meter for installatioil.
d. Mcter Box and Lid
1) Remave and salvage cast iz•on inefer Uox lid.
2) Remo�e aiid dispose of any non-cast iran meter box lid.
3) Retlu•n salvaged inaterial to the Water Depa�-tmenl Field Operation Storage
Yard.
4) lZe�nove and dispose of zneter box.
10. Water Sajnple Station Removal and Salvage
a. Remove and sal�a�e existin�; water sainple siation.
b. Deliver salvaged materiat to the Water De�artinent Field Operation Storage
Yard.
Concrete Water Vauft Reir�oval
a. Excavate and backfill in accordance with Section 33 OS l0.
b. Re�nove and sa[vage vault lid.
c. Remove and salvage �ai�es.
d. Reinove and salva�e meters.
e. Deliver sal�aged zxzaterial to the Water Department l�ieid Opes-akion Storage
Yard.
£ Reinave anci dispose of any piping or other appurtenances.
g. Demolish and remove entire canerete �ault.
h, Dispose of all excess materials.
Cathodie '1'est Station 1lbandonmenC
a, Excavate ai�d backfill in accordlnce with Scction 33 OS 10
b. Remove the top 2 feet of the cathndic test station stack aiid contents.
c. Fi11 aray �-ezz�aining voids with CLSM in lceordance with �ection 03 34 13.
26 C. Sanitary Sewer Lines and Apptu•tenances
27 1. Sanitaiy Sewer Line Abandonrnent Plug
28 a. Excavate and backfil] in accordance with Section 33 QS 10.
29 b. Remove and dispose of any sewage.
30 c. Piug with CLSM in accordance with 5ection 03 34 l3,
31
32
33
34
35
3b
37
38
39
4Q
41
42
43
4�1
45
46
47
�l8
2. Sanitary Sewer Line Abandoilment by Grouting
a. �xcavate and backfill in accordance with Section 33 05 l0.
b. Dewater and dis�ose of any sewage fratn the existing ]ine to be grouted.
c. Fill line with Law Deilsity Cellular Grout in accordance with Section 33 OS 24
or CLSM in accardazice with 03 34 13.
d. Dispose of any excess material.
e. Perforin Coupon Inspections of �;routed pipe to ensure entiee line is filled with
grout.
f. Coupon satnples shal] be taken at the center of the a6andoned sectiaa� and at 50
foot increments both u�stz-cazxi and dowiistreain fi•o�n centet- unti] approved by
ihe Inspector and ihe Praject Managee.
g. Durin�; the Final Inspection, all coupons will l�e pro�ided to r'ield Operations
representativcs far a visual inspection ap�raval.
3. Sanitaiy Sewer Line Reznoval
a. Excavate and backfill in accordance with Sectian 33 �5 10.
b. Cut existing line f'ro�n the utility systein prior to ee�noval.
c. Cut any se�-�ices prior to removal.
d. Remove existing pipe line and properly dis�ose as approved by City.
CiTY OF FOR'1' WOR'fli Watcr and Sanitary Sewer Rehabili(ation Concract I O1
STAN]JAR.D CONSTRUCTI{]N SP�CIPiCATTON ]70CUMEN"FS C€'T�I 02722
Revised Dece�nher 20, 2012
0241 14- l5
UTILITY REMOVAL/Ai3A1V1]ONMENT
P1ge 15 af 17
1
2
3
4
5
C
7
8
9
10
11
l2
I3
14
15
16
17
]8
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
4. Sanitaiy Sewer MailhoIes Reinaval
a. All sanitary sewer inanholes that are to be taken ouC of service are to be
re�noved unless speciiicaEly requested and/or approvcd by City.
b. �xcavate and backfill in accordance with Section 33 OS 14.
c. Remove and salvage manhole fraine and cover.
d. Delivez- salvaged material ta the Water Depai-tment Field Operation Storage.
e. Demolish and remove entare concrete inanhnle.
f. Cut and plug sewer Iines to be abandoned.
5. Sanitary Sewer Junction Structu�-e Re�novaI
a. Excavate and backfill in accordance with Seciion 33 OS 1.0.
b. Reinove and salvage inanhale fraine and covet�.
c. Deliver salvaged rnaterial to the Water Departinent Field Operation Starage.
d. Demolish ancf reinovic enti�•e concrete manhole.
e. Cut and plug sewer lines to Ue abandoned.
D. Stortn Sewer Lines and Appurtenances
1
2
3.
4
Stonn Sewer Abandon�nent i'lug
a. Excavate and backfill in accardance witY� Section 33 05 10.
b. Dewater line.
c. Plug with CLSM in accordancc with Section 03 34 13.
Siorm Sewer I,ine 1lbandonment by Grouting
a_ Excavate and backfill in accordance with Section 33 OS 10.
h. Dewater the exisiing line to be grouted.
c. Fill iine with Low Densaiy CeIIular Grout in accordance with Seciion 33 OS 24
or C�SM in accar�dance wiih 03 34 I3.
d. Dispose of any excess matcrial.
5torm Sewer Line Remova]
a. Excavate and backfill in accoz-dance with Section 33 OS 10.
b. Reinove exisling pipc line and properly dispose as approved by City.
Stonn Sewer Manhale IZeanoval
a. All stonn sewe�• inanholes that are to be taken out of scz-vice are to be reinov�d
unless specifically requested and/or approved by City.
b. Excavate and backfill in accordance with Section 33 45 10.
c. Deinolish and remove cntire concrete manhole.
d. Cut and plug stonn sewer lines to be abandoned.
5. Storm Sewer Junction Box and/or Junciion Structure Removal
a. �xcavate and backfill in accordafice with Section 33 OS 10.
b. Deinolish and re�novic entire concrete structure.
c. Cat and plug stonn sewer lines to be abandoned.
G. Stonn Sewer Ja�let Reinoval
a. Excavate and backfll in accardance with Section 33 05 I0.
b. Deinolish and remove entire concrete inlet.
c. Cut and plug stonn sewer lines to be abancEoned.
7. Stonn Sewez-13ox Removal
a. Excavate and backfill in accorda�ace with Section 33 05 10.
b. Cut existing line froin the utility system prior to removal.
c. Cut any seivices prio�- to remo�al.
d. Remove existing pipc line and properly dispose as approved by City.
C�TY OF PORT WOK7'H Water anc1 Sanita�y Scwer lZehabilita[ion Contract I Oi
STANiJARD CON51'RUCT[ON SPEC1PiCAT10N llOCUMENTS CPN 02722
Revised llecember 20, 2012
0241 14- I6
UTIL[TY REMOVAI.,IAI3Al�II�ONMP.NT
Page 16 of 17
1
2
3
4
5
Cz
7
8
9
]�
11
]2
13
14
15
16
17
18
8. Headwall/SET Removal
a. Excavate and hackfil] in accordance with Seciion 33 OS 10.
b. Dexz�olish and reinove entire concrete inlet.
c. Cut and plug stat-in sewer lines to be abandoned.
9. 5torin Sewei• `I'rench Drain Aemo�al
a. Excavate and bacicf I1 in accordance with Sectian 33 OS l0.
b. I�e�move existing pipe line and dispose as approved by City.
3.5 REPAIR / RESTORATION [NOT LTSED]
3.6 RE-INSTALLATION [NOT U�ED]
3.7 I�II+�I..11 [oR] SITE QUALITY CONTROL
3.8 SYSTEM STARTUP [NOT USED]
3.9 AllJUST'INC [N�T U�ED]
310 CLEANING [NOT USED�
3.l l. CLOSEOUT ACTIVITIES [NOT USED]
3.12 PRO'1'�C`l`YON iNOT USED�
313 MAiNTENANCE [NOT USED]
3.14 ATTACHM�N'I'S [NOT USI;D]
CITY Ol'rOR'C WOkZ"1'H Waterand Sanitary Sewer Rehahililatinn ConFract 1Ql
5TAN17ARC3 CONS7�ktUC1lON SPECIFICATION DUCUMENTS CPI� 02722
Re�ised December 20, 2012
0241 14- l7
U"1'1L1TY AEMOVAL/r1BANDONMT'iV7�
Pagc 17 of 17
END O�+ S�CTION
Revision Log
DA"T'� NAME SUMMAI2Y O�' CHANGE
1.2.G.3.c. — include Frame and Cover in Payment description
12/20/ l2 D. 7ohnspn Throughout — added abandonment of storm and sewer manholcs when reguested
and/or approved by City
08/15/l9 �I. Lundville Uti[ity Gronting Changes
CITY UF FQRT WORTH Water and Sanitary Scwcr Rehabililation Conlract t 01
STANDARD CONSTRUC'1'lON SPEC[FICATION DOCUMENTS CE'N 02722
Rcviscd I]ecember20, 2U12
33 12 10 - E
WATER SC:RVTC1;5 ]-11�lCH TO 2-I11CH
1'age l af ] 7
S�CTYON 33 l 2] 0
WATER SERVICES 1-INCH TO 2-INCH
�
PART1- GENERAL
1.1 SUMMARY
A. Section lnciudes:
I. Lead-free 1-inch to 2-inch water service Iines from the wa#er main to the right-of
way, fttings a��d water meter boxes complete in place, as shown on the Drawings,
directed by the E��gineer, and specifed lacrein for:
a. New Water Se�vice
b. New Water Service (Bored)
c. Wa.ter Meter Service Relocate
d. Private Water Service
B. Deviations from this City of Fart Worth Standai•d Specification
I. Sectioz� 1.2 11.3.c.6) shall be changed to reflect existing meters and transceive�•s to
be t�e�noved and re��sed.
O
C. Products Installed but not Furnished Under this Section
I. Water meters for various sizes
D. Related SpeciFieation Sectioa�s include, but are not necessarily limited to:
1. Division 0— Bidding Requirements, Contract Fozms and Conditions of the Contt•act
2. Division 1— Gei�eral Requirements
3. Section 33 Q4 40 -- Cleaning and Acceptance Testin� of Water Mains
4. Section 33 OS 10 -�� Utility Trenc�a Fxcavation, Embedment and Back�ll
5. Sectio�� 33 12 25 -- Co��nectioii to Existing Water Mains
�
I
1.2 �'RIC� AND PAYMI?NT PROCEDURES
A. Measurement and Payment
� 1. New Waker Service
a. Measureinent
I) Measurement for tnis Item shall be per eacl� new "Water Service" complete
` in place from the tap of the main tn the instal�ation of the meter ba� and
� associated appurtenances where the service line is instalIed by opcn cut
construction.
b. Payment
' 1) The woz�k performed and materials furnished in accordancc with this Item
j
� and measured as provided u��dea� "MeasuremenY' will he paid fo►• at the �nit
price E�ad per each "Water Sei�+ice" tnstalled for:
; a) Various sizes
ic. 'Fhe price bic� shall include:
I} Furnishing and insta.11ing New Service Line as specified by the Drawings
2) Submitting product data
� 3) Tapping saddle
4) Corporation stop
4
cr�Y or roR1� woR�r� 1
STA�TDAitl7 COl�lSTRUCTIO[+I SPP.CIFCCA7lON DOCIIM�I�ITS
Revised i'oUruary 14, 2017
Water & Sanilary Sewer Rel�abilitatin�2 Contracl 101
CPN 02722
- �I
f
33 Y210-2
WA'1ER SE[tV10E5 l-[NC[] TD 2-]NCH
Page 2 of 17
5} Curb stop
6} Fittings
7) Service line insta[lec� by open cut
8) Coi�nection to meter
9) Meter Box and Lid
1 Q} Paveinent remova]
11} Excavation
12} Hauling
] 3} Disposal of excess �nateria!
14) Surface Restoratin�� assaciatcd witE�► Meter I3ox installation and connection,
excluding grass (seeding, sodding or hydro-mulch paid separately)
1S) Clean-up
16) Disinfection
17) Testing
2. New Bored Water Sei�vice
a. Measurement
1) Measurement #or this Item s11a.11 be per each new Watef- Servicc compleke in
place fram the tap of the main ta the installation of the meter box and
associated a�purtenances wvhere the service line is installed by t��enchless
inethod,
b. Payment
1) The work pez�foi�med arsd �naterials fur��ished in accordance with this Tten7
and meas�arecl as pro�vided under "Measurement" will be paid for at the uni#
price bid per each `Bo��ed Water Service" instalied fnr:
a) Vaeious sizes
c. The price bid shall include:
1) Submitting praduct data
2) Tapping saddle
3) Carporat�on stop
4} Curb stog
5) Fittings
6} Service lizae installed by trenchless method
7} Connection to meier
8} Meter Box a�.�d Lid
9} Pavement removal
10) Excavation
11 } I Iauling
12} Disposal of excess ma#eria]
13} Surfaee restoration associated with Mete�� Box insta�lation and cannectiors,
exeludi�3g grass {seeding, sodding or l�ydro-mulch ��aid se�arately}
14) Clean-up
15) Disinfection
l6) Testing
3. Watert• Mcter Service Reconnect
a. Measurement
I} Measurement for this Itetn shall be per each Water Meter Se�vice
Reconnect complete in place fro�n public service linc comiection to pri�ate
ser�ice liile contiection.
b. Payment
Ct'fY OF F�CZT WOCiT}I Walc r& Sanilary Sewer Reha6ilitation Cantract 101
S7�ANDAAD COTISTRUCTIO%T SPl?CIFICA110N L]OCUMENTS CPN 02722
Aevised February ]4, 2017
33 �z �0-3
WA7'�R SlI�V10ES I-1NCH TO 2-INCI-I
Page 3 of l7
1) Tl�e work performed in conju��ction with relocation of the ineter, associated
private servic� line, fittings and meter box S feet oa� less in any direction
fi-am centex�li��e of existing meter location and the mater•ials futnished in
accordance with this Iterrf will be paid for at the unii price bid pe�� each
"Water Meter Seivice, Recon��ection" ii�stalled for:
a} Various size of services
e. The prace bid shall include:
1) Pri�ate service line
2) Fittings
3) Private comiection to water meter
4) Connection to existing pri�ate service line
5) Ct�t and crimp of existing ser�ice
6) Removal and Reuse of tlae existing water meters anrl trrcnseeivers
7) Pavemenf removal
8} Excavation
9) Hauling
10) Disposal of excess inaterial
11) Sur£ace restaration for area disturbed for installation of ineter box,
excluding grass (seeding, sodding or hydro-muich paid separately)
I2) Clean-up
13) Cleani��g
14} Disinfeclion
i5) Testing
Frivate Water Service Relocation
a. Measurement
1) Measurement for this Itena shatl be per linear foot of F�•ivate Service
relocation complete in place from the meter box to a connection to the
existi��g service line on private property.
b. Payment
1) The work performed in coz�junction wilh Private Ser�ice Line installation
where the meter and meter boxes are inovec� inore t��an 5 feet in any
direction fi�om ccz�terline of existing meter location and matet�ials furnished
in accordance with tE�c Item ancf ineasured as provided under
"Measurement" wilt be paid for at the unit price bid per linear fooi of
"Private Water Scrt•vice" perforn�ed far:
a) Various service sizes
c. The prtce bid shall include:
1) Obtaaning appropr�iate permit
2) Obtai��ing Right of Entry
3) Submitting product data
4) 1'rivate service line
5} Fittings
6) Backflow preventer, ck�eck valve, and isolation valve relocation, if
appIicable
7) Co��nectiar� to exista��g private service line
8) Pa�e�nent remaval and replaeement
9} Excavatio�l
10) Hauling
1 1} Disposal of excess material
CI"fY Ot FOR"I� WORTI[ Water& Sanitary Sewer Rehabilitation Contraci E01
S1�AAIDARD CONSTRUCTIOi`T SPTiCIPiCATION fJOCUMENTS CPN D2722
Revised Fe6ruary 14, 2017
33 12 10 - 4
WATER SEKViCES 1-]NC] i i0 2-iNCH
1'age 4 of 17
l2) Surface restoration, excludi���; grass (seeding, soddzng or lrydro-mulch paid
separately)
13) Clean-up
14) Cleaning
15) Disinfection
16} Testing
1.3 REFERENCES
A. Definitions
1. New Sez�vice
a. Installation of new 1-inch to 2-inch Water Seavice Line by open cut
construction from the water main to the right-of=way, includi��g cnrporatioza
stop, curb stop, fittings and watei� meter boxes compte#e in place, as shown on
ihe Drawings.
2. New Se�-vice {Bored)
a. Insta�lation of new 1-inch to 2-inch Water Ser�ice Line by t�-enchless
coilstruction method frorn the water �nain to the right-of-way, including
coz�poration siop, curb stop, fittings and water meter boxes complete in place, as
shown on the Drawings.
3. MeteE• Se►vice lZeconnecfion
a. Relocation and recannection of the private sez-�ice liue froEn an existing meter
ta bc abancianed and a new meter instal[ed that lies within 5 feet of the existing
meter.
4. Private Scrvice Relocation
a. Relocation and reconnection of private se�vice line behind the water meter
where the existing meter ta be abandoned and the new c�7eter installed is greater
than 5 feet of the existing meter. A licensed piumUcz is c�equn�ed to relocate tl�e
private service.
5. Lead-free
a. Lead-free pipes and plumbing fittings and fixtures shall contaEn less th�1 0.25
percent lead in accordance with tl�e reductfon oi�J,ead in Drinkin�; Water Act
(P.L. I 11-38Q).
B. Reference Standards
1. Reference stai�dards cited in tE�is Specification refer to tE�e currcnt i•e#'erence
standard published at tt�e time of t�e latest revisian date logged at the encE of this
Specification, unless a date is specifically cited.
2. ASTM International (ASTM):
a. A48, SEandard Specification far Gray Iron Castings.
h. A53b, Standard Specification for Ductilc Iron Castings.
c. 888, Standard Specificatian far Seainless Coppe�• Wate3• Tube.
d. $98, Standard Speciiication for Copper-Silicon Alloy Rod, Bar and Shapes.
e. C131, Siandard Specificatian for Resistance to Degratlation of Small-Size
Caarse Aggregate by Abrasion and lmpact in the Los Angeles Machine.
f. C] 50, Standard S�ecificatinn for Portland Cement.
g. C330, Standard Specificaticm for Ligl�tweight Aggregates far Structural
Concrete.
h. C857 (i2L), Standard Practice foz� Minimum Steuctural Design Lnading for
Underground Precast Concrete Utility Structures
C[TY Ol� FORT WORF[I Water & Sanitary Sewer Kehabilitation Contract l0i
STANDARll C'ONSTRI.-CTiON S�i'CiPICATTOIV DOCUNtENTS CP1V 02722
Revised FeUru�ry l4, 2U 17
33 ]210-5
WATP,R ST:'RV1C�;S 1-WCH TO 2-INCN
Page 5 of [ 7
�
3.
4,
5.
6.
i. D883, Standard Tenninology Relating to Plastics.
j. D 1693, Standard Test Met�iod for Environmenta] Stress-Cracking of Echylene
Piastics
America�7 Water Works Association {AWWA}:
a. C700, Cold-Wa#er Meters - Displacement Type, Bronze Mazn Case.
b. C800, Underground Service Line Valves and Fittings.
NSF Internatfonal (NSF):
a. 61, Drinking Water Systezn Components - Health Cffects.
Reduction ofLead in Drinking Water Act
a. Public Law 111-380 (P.L. I 1 i-380}
Genera] Se�-vices Administratinn (GSA):
a. RR-F-621E, Frames, Covers, G��atings, Steps, Sump and Catch Basin, Manhole
1.4 ADM�N�STR.ATIVE REQUIREMENTS
A. Scheduli�ig
l. Provide advance notice far service inten�upiions and meet reqE�iremeiits of Division
Q a��d Division 1.
O
I
,
'
�
�
�
1.5 SUBMITTALS
A. 5ubmittals shall be in accordai�ce with Sec#ion OI 33 00.
B. All submittals shail be approved by the City prior to deli�ery.
�.6 ACTION SUBMITTALSIINFORMAT�ONAL SUBMITTALS
A. Product Data, if applicable:
1. Tapping Saddle
2. Corporation stop
3. Curb Stop
4. 5ervice Line
5. Meter Box
6. Meter Box Lid
B. Certificates and Test Reports
1. Pz-zor to shipment of any Water Service cornponei7ts, the r�aaz�ufacturer shall submit
the following:
a. A Cer�ificate of Adequacy of Design stating that the components to be
furnished comp2y with aII a�egulatory requirements idcntifed ii� this Section
including:
1) The Reduction ofLead in Drinking WaterAct (P.L. l 11-380)
2) AWWA C800
3} NSF 61
1.7 CLOS�OUT SUBMITTALS [NOT USED]
1.8 MAINT�NANCE MAT�RIAL SUBMITTALS �NOT USED]
1.9 Qi1AL[TY ASSURANC�
A. Qualifications
ci�Y or roaT wok�rr�
STAi�1DAitD CONSTKUC710N SPECIFICAT[ON UOCUMENTS
ReviserE Pebruary 1�3, 2017
Waler� Sa�iiFary Se�uer Rehabi]ilalion Cuntract l0]
CPN 02722
f
331210-6
WATERSERVICES 1-INC]iTO2-TT+ICH
Page 6 of 17
1. Manufact�frers
a. Water Ser�ices shaE[ aneet or exceed the latest revisions of1�WWA C800, NSF
GI, the Reductio�l of Lead in Drinking Water Act a�id shall meet or exceed tl�e
requirements af this Specificatiozi.
1.10 DELIV�RY, STORAGE, AND HANDLING
A. Storage and Handling Requiremenis
I. Protect all parts such that no damage or deteriaration wiI] nccur during a prolonged
delay fro�n tl�e tiine of shipment Lmtil installation is compieted and the units and
equipment arc zeady #`or operation.
2. E'rotect all equipment and pa�s against any damage during a prolanged period at the
site.
3. Prevent plastic and similar brittle items from bei��g directly exposed ta sunlight or
extremcs �n temperatuee.
4. Secure and maintain a location to store the material in accordance with Section �l
66 0�.
1.11 FIELD �SIT�] CONDITIONS fNOT USED�
1.12 WARRANTY [NOT US�ll]
PART2- YRODUCTS
2.1 OWN�R-�'URIVISHED PRODUCTS
A. Water meters for various sizes
2.2 EQUIPMENT, PRODUCT TYY�S, AND MATERIALS
!1. Ma��ufacturers
1. Only tkae znanufact��rers as listed on the City's Standard Products List will be
considereci as sllown in Section O1 60 00.
a. The manufacturer must comply with ihis Specification and related Sections.
2. Any product tl�at is not listed on the Staildard Products List is considez�ed a
substitution and sl�all bc submitted in accardanee with Sectian Ol 25 00.
3. Thc Water Seivices and appurtenances shalE be new and the product of a
manufacturer rcgulaz�ly engaged in the rnanufacturing of Water Ser�ices and
appurtenances having similar ser�ice and size.
B. Descriptioz�
1. Regulatory Requirements
a. All materials shall conform to the Reduction of Lead in Drinking Water
Act (P.L. 111-380}. This Act defines "Lead-free" for pipes and other
appurtcnances to be less than 0.25 percen# lead.
b. Water Services shall meet nr exceed the ]atest revisions of AWW11 C800 and
shail ir�eet or exceed the requirements of this Specification.
c. All Water Services components i�ti contact with pota6le water shall conform ta
tE�e requirements of NSF b 1.
C. MaterialslDesign Criteria
C1TY OC' POR"1' WOR"1'H Water & Snnitary Sewer Rehahilitacion Coniracl 101
STANUAKIJ CONS'CRUC7�lOAI SPECIF[CATIpA! DQCUM1iNTS CPid 02722
Revised Februaiy 14, 2017
33 t2 1D-7
WA"1��:R SERVICES ]-]NCH T02-INCH
Page 7 nf 17
Service Lines
a. Provide Type K Copper Ti�bing per ASTM B88.
b. Furnish in the annealed conditions, unless otherwise specified in the Cantract
Documents.
2. Scrvice Cauplings
a. Fitting Ends
1} Flared Copger Tubing with thread dimensions p�r AWWA C800
2) Pro�ide coup]ing nuts with a machined beaz�ing skzrt ofa length equal to the
t�ibing oute�� diameter (O.D.}.
b. Provide with l�exagona! wrench grip compatible wilh the coupling size.
c. Provide lead-free service couplings in accot�dance with the Reduction of Lead
in Drinking Water Act.
3. Corporacion stops
a. Provide b�•ass castings per AW WA CSDO for:
�} Bodies
2) Plugs
3) D washers
4) 8ottoin nuts
b. Machi��ing and Pinishing of Surfaces
1) Provide 1'/ incl� per foot or 0.1458 inch per inch f 0.007 inch per inch
iaper of the seating surfaces Por the key and body.
2) Reduce large end of the tape��ed surface of the key in diametcr by chamfer
oz� turning for a dista��ce that will bring the largest end of the sea#ing surface
of the key into the largest diameter of the seating su3•face of the body.
3) Relieve taper sea# in the body on the small end.
4) Extend small end of tl�e lcey there-through to prevent the wearing af a
shoulder and facilitate proper seating of key.
5} Design key, key nut and washer such that if the key nut is tightened to
failure point, tl�e stem end of the key shall not fracture.
6) Design nut and stein to withstand a turning force on ihe nut of at least 3
times the necessaiy effort lo properly seat the key without fai]ure in any
manner.
7} Port through corporation stop shall be ful� size to eliminate turbulence in
t��e flow way.
8) Design stop for rotation about the axis of the flow passageway inside the
follawing zninimuin circles in ordcr to properly clear the tapping machine:
a} Two 7/8-inch for 1-ir�ch corpoz�ation stops
b) Four 15/16-inch for 1%z -inch a��d 2-inch corporation stops
c. Provide lead-free corpoi-ation stops in accordance with the Reduction of LeacE i��
Drinking Water Acf.
Cu�•b Stops
a. Provide brass castings per AWWE1 C80p.
h. Valve plugs shall be:
1} Cylindertype
2} Plug type, or
3) Bat� type
c. I1�corparate fuil f[aw po��ting.
d. Provide fot• full 360 degree plug rotation clockwise or counte�•-clockwise.
e. Overall LeragtE�
CITY OP I'4RT WOTtTH Water & San�tary Sewer Rehabilitation Coutract � Ol
STANDARD CdN3T12UC"I�I{)]�i SPI:C1PiCAT]ON llOCUMENTS CPN 02722
Revised I'ebruary 14, 2017
33121U-8
WATP.RSrRVICrS I-1T�CH"f02-1NC1[
Pagc R oC 17
f,
g-
h.
1) 3-5116 inch + 1l8 inch for 1-inch diameter
2) 4-1132 inch + 9.32 for 1-inch diameter
Cylindrical Plug Type
1) Provid� O-ring seal at top and bot�om.
a) O-ring at top only is acceptab]e if bottom nf curU stop bady is closed.
2} Seals sha11 be Buna N.
3} 1 O-ring sea] shal] surround the outlet po3-t of the curb stop ar7d act to
effccti�ely seal in the closed pasition.
4} The part in the p3ug shall provide a straight through, fuli size ilow way, so
shaped as to eliminate turbuleilce.
5} All waterways shall be smooth and fi•ee of burrs or rough areas.
6) Design the curb stop to provide ease and accuracy af operation and pasitive
shut-off of water.
Tapered Plug Type
l) Prn�ide O-ring seal at top and bottom.
2) `I'lie tapered plug and cylindrical recess i�� the valve body shatl be machined
to match within approved mauuFactu�•ing toLerances.
3} Inlet and outlet ports shal] be seaied hy O-rings or comk�ination Teflon U-
shaped seal rings backed with O-rings.
4) Th.e port in the plug shall pro�ide a straight through, full size flow way, so
shaped as to eliir�inate turb�flence.
S} All wate�-ways shall be s�nootts and free of bE�rrs or rough areas.
6} Design the curb stop to �rovide ease and accuracy of opet�ation and positive
shut-off of water.
Ball Plug Type
1} Provide double O-ring seals an the stem.
2) The ball shall seal abainst rubber riilgs mounted in ihe valve body at the
inlet and outlet ports_
3) The ball shall be bronze with a sinootkl Te£�on coating.
4) The port in the plug shal] provide a straight through, full size flow way, sa
shaped as to elin7inate turbulence.
5} All waterways shall be sinnoth and free of burrs or �•ough areas.
1'ro�vide lead�free curb stops in accoz�dance with the Reduction of Lead in
Drinking Water Act.
5. Straight Adapfers
a. Brass castings and threads pe�� AWWA C800
b. Provide lead-free straight acEapters in accorcfance with #he Reduction of Lead in
Drinking Water Act.
G. Three Part Copper Unions
a. I3rass castings and threads per AWWA C$00
U. Provide lead-free Three Part Copper Unions in accordance with the Reduction
of Lead in Drinking Water Act.
Siraight Metez- Couplings
a. Brass castings per AWWA C800
b. Threads per AWWA C700
c. Tailpiece wit17 outside iron �i�e thread
d. Cl�amfer corners on threaded end of ineter nut.
e. Machine inside and outside of tailpiece.
Ci'fY OF FORT WORTE] Watcr & Sanilary Scwer Rehdbilit�ition Contract lUl
S"I�ANDARD CONSTRUCT[ON SPl?CIFICATIOt�! 1]OCUMEN'CS CPN 02722
Revised February l4, 2017
3312J0-<J
WAT�R S�RVICES I-INCH 7'O 2-INCf�I
Page 9 oF 17
f. Provide iead-free Straight Meter Coupiings in accordance with the Rediictian of
Lead in Dririlcing Water Act.
8. Branch Connections
a. Bz-ass castings per AWWA C800
b. Inlet and outlet connections per A W WA C$04
c. Provide lead-free branch connections in accordance with the Reduction ofLeacE
in Drinking Water Act.
9. Service Saddles
a. Castiugs
1) Brass or Nylon coated ductile iron casti��gs per AWWA C800
2} Free of porosity with sharp edgcs z�e�noved
3) SaddIe
a) Form to �t firmiy against side vf �r�aximun� diameter ofwaiea� main
with approximately 1 SO degrees wrap around.
4} Outlet
a} Design outict boss for no thread distot�tion by bendir�g �noments.
b) Tapped for tapez� thz�eaded corporation stop confo�•ming to AWWA
C800.
b. Straps
1) Conform to ASTM B98.
2} Fo���n flat to Zit unif`orinly against #he wali of the water main.
3) Shall be double straps
4) Rod diametez� not less than 5/8 inch flattened to 1 inch on one side.
5) Straps shall be tiueaded 5/8 inch (i 1-NC-2A} foe a distance such that'h
inch remains aftez� clamp is fiilly tightened on #he pipe.
6) Chamfer strap ends to protect the starting threads.
7) Ti�e threads shall be full and free from shear.
8) �4-inch and larger pipe sha21 be in accardance with Section 33 12 25.
c. Nuts
t } Bronze material
a) Saine inaierial as straps
2) Ditnensions ec�ual to or Iarger than heavy hexagon nuts
3) Tapped 5/8 inch {1 I-NG2B)
d. Gaskets
I) Neoprene rubber material
Z) Cemented to saddle and positioz�ec� to facilitate installation
10. Brass l�langed Angle Valve
a. �'or 1'/a-inch and 2-inch services
b. I3rass castings per AWWA C800
c. Valve Body with integral outlet flaa�ge and inlet wi�enching flat
d. Fit together key and body by turning key and reaming body
1) Key witE� O-ring sea] seat ai the upper end
2) Lap 1<ey and body seat are to confonn to corporat�on stop z�Equirements of
this Speci�cation.
3} The outfet flange sha21 contain an O-ri��g seat o�� a uniform Ilat drop-in
flange gasket surface.
4) Drop-in flange gasket surface shall contain gasket retai��ing grooves inilled
circular about the axis of the t7ange.
CiTY OF' PO�T WOIZ"1'H Water & Sanitary Sewer Rel�abilit�tinn Contr�ct 10]
STANDARI� CONSTEZUC770N SPECIFICAT�lON DOCUMEI�iTS CPN 02722
Revised �'ebruary ]4, 20J 7
33 iz io - �o
w�xi.x sf�x��c�s i-�Nc�� To 2-ir�c�i
Page 10 of 17
S) The size of the outlet ilange and the diameter and spaci»g of the boh ho[es
shal] conform to �WWA C700.
6) The flange on 2-inch an�le valves shall l�e dauble drilled to permii
connection to 1 %2 -inch rr►eters.
7) The inlci part of the valve shall be tapered to confann to AWWA C$�0
tape�• pipe thread.
S) The key cap shal] include a wrenching tee marked wiih a raised or recessed
arrow to show whether the �alve is open or closed.
9} Valve l�ssembly (main body, lcey, key cap)
a) Brass material per AWWA C800
b) O-ring seal oil the top of the key between t11e key a��d body seat
c} Key cap shall ca�nplete the assembly by attaching to the key by ineans
of a strong bronze pin wi#h p�ospho�• bronze spring washer(s}
depressed between the key cap and the top nf the valve main body.
d) Provide with padlock wings far locking t11e val�e in the closed position.
e) There shall be a uniform apptication of cold water valve grease
hetween the body and ihe key.
fl The valve shall be capable of being easily opened and stopping liigs.
g) The waterway thro�gh the �alve shall be smooth a��d rounded far
rni�aiinuin pressure loss, and sha11 �e free of burrs or fins.
h) '1'he valve sha11 be strc�ng, well desigr�ed, neat in appearance, water-
tight and ezitzrely adequate for the intended purpose.
i} Pro�vide with either a high quality rubber drop-in gasket or an O-ring
seal depending on the manufacturer's flange seal surface design choice.
e. Provide lead-Pree brass flanged an�]e valves in accordartce wiih ihe Reduction
of Lead in Drinking Water Act.
1 1. Metef• Boxes shall:
a. Se constructed o%
1) Polyme�•, black palyethylene material as defiiled in ASTM D883.
a} Mi�zimurn wall thickness of 3/8-inch thraughnut witl� no bEowing
agents or foaming plastics
b) Body shal] be black thrnughout, blended at the tiine of manufacture,
and shall ha�ve a molded recycled emblezx� witl� a minimum of 35
percent Post fndustrial/ Pre Consumer Recycled Content- verified wit�►
a Leed Product Documentation.
c) Ha�e a tensile strength greater than 1700 pouilds �er square inc}a (psi}.
d} Smooth edges and co►�ners and be free fram sharp edges so the unit can
l�e handled safely without gloves.
e) Extez�ior free �'rom seams or parting �ines.
fl Have crush resistant ribhing along the outside of the box.
g) FIave a flange arau��d the lid opening to hetp pr•evenc settling and aide
in adjustinent to grade.
h) Not to be instailed in �•oadway — designed to withstand laading in non-
deliberate and incidental t►-af�c only.
2) Concrete
a) F�-aine of No. 6 gauge wire welded closed
b) T'ype 1 or Type 1[ Portland cement, in accordance wiih ASTM C15D,
partianed witl� li�htwcigi�t aggregate, in accordance with ASTM C330
(1} Percentage of wear not to exceed 40 per ASTM C131
{2) Minizx�una 28 day conlpressive strength of 3,000 psi
CI7�Y OF FOR"I� WORTI[ Water& 5anitary Sewer 12eh�ibilitation Contract 10]
S'1�ANDAAD C'ONSTRt1CTiON SP1:CIrICA770N llOCUMENTS CPN 02722
Revised February 14, 20i7
331210-I]
WA'1�ER SERWICES l-INCI� TO 2-INCH
Page l 1 of 17
b. Be able to withstand a minimum 15,000 pounds vertical load
c. Wiihstand a minimum 400 pounds sidewall load.
d. Have pipe holes measuring a minirrzum of 2-l/2" x 3-1/4".
e. 1-inch Slandard Meter Box (Class A)
1) For use with services utilizing 5/8-i»cl� x 3/a-incl�, 3/-znch or 1-inch meter
Single or Dua] se�vice m�ter.
2) Poiymer
a) Size: working of no# ]ess tha�� 10 i»ches x'16 ir�ches, 12 inches higl�
3) Concrete
a) Size: wnrking area not Iess tnan 10-inches x 16-inches, I2 inches l�igh
f. 2-inch Sta�xdard MeEer Box (Class C)
1) For use with seivices �tilizing 1-1/2-ineh or 2-inch Singie service �neter.
2) Polymer
a) Size: working area not less than 14-inches x 2$-inches, i 2 incl�►es high
3) Co»crcte
a} Size: working area nat less tl�an IS-ia�ches x 26-�/2-inches, 12 inches
��igh
g. Bullhead Standard Meter Box (Class B)
1) For use with services utilizing two 5/8-inch x}/4-inch or 3/4-inch or I-inch
Single service meter.
2} Palymer
a) Size: working area not less than i S-inches x 1.8-i��ches, 12 nlches high
3) Concrete
a) Size: working area not less t��an IS-inches x 18-inches, 12 ii�ches high
12. Meter Box I.ad
a. Meter Box Lids Shall:
1) Be solid throughout with reinforcing ribs.
2) Have Ciry of Fart Worth `Mo]ly' logo molded ii�to the lid.
3) Bear the Manufacturer's IS {name or logo) and Cot�ntry oPOrigin.
4) Be designed both with and witl�out AMI receptacles
5} Have a mo�ded h•ead-plate
6) Seat securely and evenl.y inside the meter box and shall not overlap thc top
ed�e of the meter box.
7) TIave a molded picic ba�� for use by meter reading tool.
8} I-�ave Automated Meter Infrastructure (AMI) snap locking slide mounts for
nuinher of ineters/endpoints associated with meter box
9) Have an opcning to accept the AMI end-point. Opei�ing shall accommodate
an endpoint with a 1-7/8 inches diameter.
10) Have recessed AMI end point area, tv alleviate a trip hazaz�ci, centered over
AMI slide rnount. Recess area should be 4-112 inches in diameter and 3/8"
deep.
1 1} Have built-in anti-flotation devices.
b. Casl Iron or Ductile Iron
2} Lids for Concrete Meter Boxes sha�] be constructed out of a cast iron and
meet RRF-621 specification.
2) Shal] wit�stand a minimum vertical �oad of 15,000 pounds
3) Coat castings with a bituminaus ea�ulsi�ed asphalt uuless otherwise
specified in the Contract Documents, ground smooth, a��d deaned witl� shot
blasting, ta get a unifo�xn quality Pi�ee froni strength defects a�1d distortions.
CITY OP POItT WORTH Watei & Sanitary Sewer Reiiabilitalion Contract 101
STANDARD C4N5TTtUC'IlON 5PECIFICATIOIV DOCUMBNTS Cl'N 02722
Rcviscd PeUricary 14, 2017
33 L2 ]0- l2
WAT�R ST'RV[CP.S 1-INCH TO 2-1NCf-]
Page 12 of 1?
4) Dimensions shall be within industiy standards offl/t6 inch per foot.
5) ShaEt have a plug insez-ted an to the AMI receptacle to avoid water entering
through npening unti] the AMI receptacle is used
6} Be a i�inimum of 1-3/4 inches thick aE reinforcing rbs.
7} Casting weights may vary :�5 percent fi•om drawing weight per indust�y
standards.
c. Plastic(Composite)
1) The lid sl�all ;
a) Constructed of Engineered Plastic as defined in ASTM D&83
(1) Ha�e a inolded recycled emblem with a minimum of 50 percent
Yost Consumer Recycled a��d 50 percent Post Industrial/ Pre
Consumer Recycled Conten#- v�rified with a Leed Product
Docwneniafion.
(2} 13e designed to fit a concretc bo�cast iron bax in retrofit
[nstallatians.
(3} Have a tensile strength g1•eaier Yhan 1700 psi,
{�) Ilave a`[cnock-out" plug ta accept the AMI end- point. Knack-aut
diameter shal[ be I-718 inch diarneter. A removable p�ug may be
substituted for the �nock-out plug.
(5) Be cnnstructed out of a composite material blend for maximuzn
durability and corrosion resistance.
(6) Be black throughout with iio blowing agents or foamin� plastics
(7) Smoot}a cdges and corners and be free from sharp edges so the unit
caE� be hand[ed safely without gloves.
(8) �xteriaz� firee from seams or parti��g ]ines.
(9) Have a molded tread-pattern- tread di�nensions shall be . i88-inch x
.938-inch x .150-inch deep.
{ 10} Ha�e "City oPI'ort Worth" �r�alded into the lid.
{ 1 I} Have "Water Meter" molded into #he lid- Fon� sl�all be standard
Fada] CNC font with 1-inch characters x, l SO-inch deep.
{12} Have a molded pick hole pocket- dimensions s11a11 be 3-inch x
9116-inch x Thru Hole �vith 3116-inch 3Q4 stainless s#eel ��od.
(13} Have 2 pieces of'/Z-inch rebar locat�d in lid pockets for
locatability as shown in Drawings.
(l4) Have location capabiEity using meta] detector.
b) Domestic Manufacture Only-Made in USA molded on Lid.
c) Nok to be instailed in roadway or parking area
d} Be designed to with�stand H-IO loading for non-deliberate and
incidental traffic anly as .
e) T-Tave ultra�iolet protectzaz�.
2) l-inch 5tandard P�astic Meter Box Lid (Class A)
�} For use witla services utilizing 5/8-inch x 3/4-inch, 3/4-inch or 1-inch
meter Single or D�al service metez�.
b} Sizc: 11-7/8-inch x 17-7/8-inch, 1-112 inches high
c} For use with Class A Standard Mctei- Box.
d) Polyme�� lid sha11 seat e�enly inside meter box and shall not overlap the
tap edge of t11e meter bax.
3} 2-inch Standard Plastic Meter Bax Lid {Class C}
a) For use with services utilizing 1-1/2-inch ar 2-inch Single service
meter.
C]"CY [)F FORT WQRTH Water & Sanitary Sewer Rehab]]iiatfun Cm�tract 101
STANDARD CONSTRUC770N SP�,C[FICAT[ON DOCUMGhITS CPN 02722
Cievised Pebruary I4, 2017
33 ]2 10- t3
WATER SERVICE$ l-iNCH TO 2-TNCH
Page ] 3 of' 17
b) Size 27-inches x IS-1/4-inches, 1-7/8 i��ches high
c) For Eise with Class C Standard Meter T3ox.
d) Polymer !id shali scat evenly ii�side meter box ancf shal] not overlap the
top edge of the �netcr box.
4) BullE�ead Standard Plastic Meier Box Lid (Class B)
a} For use with seivices utilizing twa S/$-inch x 3/4-inch or 3/a-inck� or 1-
inch Single seivice meter:
b) Size: 16-5/8anch x 14-5/8-inch, 1-3/4 inches high
c) Fo�� use with Class B Standard Meter Box.
d} �'olymer lid shall seaf evenly inside ineter box and sl�ail not ovea�Rap the
top edge of the meter box.
13. Horizontal Check Valve
a. �quip 1'/z-i�ach and 2-inch Water 5ervices with a horizonta] checic valve, with
pipe pli�g, only if specified in the Drawings.
b. If af1 existii�g backflow preventer is prese��t, the Contractor is to leave it, and is
not required !o provide an additional horizontal check valve.
c. Provide lead-free horizontal check va]ves in accordancc with the Rednction af
I,ead in Drinking Water Act.
14. Se�vice Ma�'t�er
a. 3 iEich wide, 5 mil blue vir�y] tape
2.3 ACCESSORI�S �NOT USEDJ
2.4 SOURC� QUALITY CONTROL
A. Tests and Inspections
1. At the City's option, the manufacturer shall be required to pro�ide certification
records showing co�iformance of materials, design and testing to these
Specifications.
2. The test procedures shall confo�•m to AWWA C800.
a. In the event that a chosen valve fails the City's hydrostatic test, the cost of the
test s]�ali be at the expense of the supplier.
b. Praof testing of tl�c remaindei� of tile �alves shall 6e at the cost and
respousibility of the su��lier.
c. These tests will be the basis of acceptance or rejection of the remainder of the
shipineE�t by the City.
3. The City reserves khe ri�ht to select products at rar�dom for testing. The fai�u►•e of
materials to con#orm to the applicable Specificatiora ��ay z�esult in the rejection of
the entire slaipment.
B. Mar�ing
Service saddle castin�s shall be_clearly marlccd by letters and numerals cast thereoii
shawing:
a. Manufacture�'s name
b. Typc
c. Size of Pipe
CTTY QF P012x WOA"1H Water & Sanitary Sewer Rchabilitaiion Contract 10!
STANIIARD CONS'fAUC'f10N 5PECIFICATION DOCUMENTS CPN 02722
Rcviscd Pe6runry ]4, 2017
33 ]2 l�- l4
WATLR ST:RVICP.S 1-T11CH TO 2-1NCE1
Page 14 of l7
PART 3 - �XECUTION
3.1 INSTALLERS
A. A licensed plumber is required for installatians on the outlef side of the service meter.
3.2 EXAMINAT�ON �NOT USEDJ
3.3 PREPARATION �NOT USED]
3.4 INSTALLATiON
�1. General
1. Install Water Servzces and appurtenances in accnrdance with AWWA C800.
2. Insta]] Water Service Lines 5 feet north or east nf center oi� lot frontage on lats 75
feet or wide��, or where shown on Drawings.
3. lnstall Water Service Lines on lot center liile o�� lots less thau 7S feet wide, unless
otherwise sl�awn on the Drawin�s.
4. Install services at a minimum depth of 36 inches below final grade/k�roposed top of
curb, unless otherwise specified in the Co�ltract Docu�nents.
5. Perfonn leak tests in accordance with Section 33 04 40.
b. Replace existing 3/a-inch Scrvi.ce Lines with 1-inch new Service Line, tap, and
co�poration.
7. Iustall replaced or relocated services with the ser�ice main tap and service line
bein� in ]ine witl� the servicc ineter, unless otF►erwise directed �y the City.
8. Excavate, embed and backfill trenches in accordance with Sectio�133 OS 10.
S. Handlii�g
1. Hau] and distribLrte Service Lines �tt�ings at the }�roject s�te ai�d haz�dle with care to
avoid damage.
a. Inspect each segment of Service Line and reject or repair any dainaged pipe
prior to lawering into the tz'e��cli.
b. Do not handle the pipe in such a way that wiil darnage the pipe.
2. At the clase of each aperating ciay:
a. Keep the pipe clean and Pree of debris, dir�, anirraals and trash — during and after
ti�e layi��g operation.
b. Effecti�ely seal the open end of the pipe using a gasketed ni�ht cap.
C. Service I.ine Installation
Service Taps
a. Only ductiEe iron pipe may Ue directly tapped.
b. Install ser�ice taps and/or tap asse�nblies of the specified size as indicated on
the Drawings, or as specified hy the Ei1giY�cer.
c. Perforn7 taps on a water systezaa that is either uncharged or under pressure.
d. Taps consist of:
1) For Cor►crete Press�az�e Pipe or Stee] Pipe
a) Standard internal pipe threaded holes in tl�e pipe walls
{1) Made during pipe fabrication
{2) Prnvide tapered threaded outlet with ec threads for up to 2-irach.
CI7�Y OF FORT WORTH Water & Sanitary Sewer Rehabililalion Contract l01
STANDARD CONSTKUCTION 5PECIFICAT[ON DOCLJMPNTS CYI� 02722
Revised Fehruary 14, 2017
33 i210- 15
WATER SERVICES I-1NCH TO 2-INCH
Page l5 of 17
{3) Provide flange outie# with flange to thread insulator adaptor kits for
4-incl� and larger taps.
2} Other pipe materials
a} Br•onze service clamp with a seaied, tlu-eaded port thro��gh which the
pipe wall is drilled to complete a service port
e. Tap �lssemblies
1) Consist of corpo�•ation stop with iron to co�per coi�nectior� attached to:
a) Copper fiubing terininating as shown on the City's Standard Detail
b) May be required adjacent to gate val�es
c) lnstall as shown on the Drawings, or as directed by the �ngineer.
d) When required, shall be ii�cluded in the unit �rice bid for instafling gate
valve.
2} Chlorination and testing p�z�•poses
a) No separate payment wiil be made for taps required for testing and
chlorination.
2. lnstallation af Water Services
a. Install tap anci Service Line in accordance with City Details.
b. Install meter box in accordance with City Details.
1) Adjustment oPihe Service Lii1e to prope�� zneter placement height shall be
considered as pa��t of the Meter Box insta]]ation.
3. Trenching
a. Provide a trench widtl� suf�iciently wide to allow for 2 inches of granulat•
einbedinent on either side of the Service Line.
4. Bored Services
a. Services shall i�e hored utilizing a pilot hole having a diameter %z a��ch to 3/n
inches iarger than the Service Line.
S. Arrangement
a. Arrange carporaiion stops, branches, curb stnps, meter• spuds, meter boxes ai�d
other associate appw-�enances as shown in the City Detail., azid to the approval
of the �ngineer.
6. Service Marker
a. When Mete�� Sox is not installed immediately suhseque�lt to seivice instal�ation:
1) Mark Cu� b Stop with a stri�� af blue vi��yl tape fastened to the end of the
se�vice and extcnding tl�raugh ihe backfill approximately b inches above
ground at the Meter Box location.
b. �nstallation of service taps only:
1) Attach set•�vice marker tape ta tl�e corpozation stop or plu� and extend
upward and norma] to the main through the backfill at the adjacent trenck�
edge to ai least 6 inches above grou��d to flag the tap location.
7. Corpo��atio�l stops
a. Fully open corporation stop prior to back�ll.
D. Removal af Existing Water Meters
1. R�move, tag and collect existiilg Water Sezvice ineter for pickup by the City for
reconditioning or replaceinent.
2. Atter insiallation of the Wate�� Service in the proposed location and receipt of a
meter froan the City inspector, install the ineter.
CITY OF PORT WORTl-I Water 8c Sanitary Sewer Rchabilitation Contract JO]
STAt�1DARD CONSTRUCf10N SPECIF[CATION DQCUMP.NTS Cl'N 02722
Re�iscd Pcbruary 34, 2017
331210-1G
W�1TE2 $ERVIC�S i-1NC111�Q 2-lI�C:H
Page 16 of 17
3. Resct #he ineter box as necessary ta be flush wiih existing ground or as otherwise
diz�ecied by the City.
4. All such wo�•k on the outlet side of tl�e ser�ice meter sl�all be performed by a
licensed plumber.
3.5 REPAIR / RI�,STORATION [NOT USED�
3.6 R�-INSTALLAT�ON [NOT US�D]
3.7 FIELD �o�i] SITE QUALITY CONTROL
A. Field "1'ests and Inspections
1. Check eac17 Water Service insfallation for leaks and fuli flow through the curb stop
at the time the main is tested in accordance with 5ection 33 Q4 40.
3.8 SYSTEM STARTUP �NOT USEDJ
3.9 ADJUSTTNG (NOT USE�]
3.10 CL�ANING [NOT US�D�
3.11 CLOS�OUT ACTIVITI�S [NOT USED�
3.12 PROTECTION (NOT US�ll]
3.13 MAINTENANCE [NOT USED1
3.�4 ATTACHMENTS [NOT US�DJ
END OF S�CTiON
CI"fY {)F FORT WORTH WaterXc Sanitary Sewer Rehabiiitatian Cuniract ial
S"CANBARD CQNSTRUCTIdN Sl'ECIFICATION DOCUN�TiNTS CPN Q2722
Revised February I A, 2017
33 12 10- i7
WATrR SIiRVICES l-lNCH TO 2-[NCH
Page 17 of l 7
Re�ision Log
UATE NAME SUMMARY Ol� CI-IANGE
Added Blue Tcxt for clarificalron
L2 A. —Re�ision ta itcros included in price bid
Specification �nodilEed lo be in accordance with the Reductiot� of� Lead in Drinking
12/20/2012 D. 7oh�ison Water Acl —All materials shall Ue lcad fi•ee in accorcEance witli this Act.
1.2.A.3 — Water Meter Servece Relocatc was renamed Waler Ivleter Seivicc
Reconnect
1.6.8. — addcd ce�•cification subaniEt��ls for coenpliancc �vith regulaLory requirements
Added the �iu•ase `, including ��ass' to lmes;
Pat�t I, 1.2.A.I.c.l4, Paitl, 1.2.A.2.c.13, Parl 1, 1.2.A.2.c.13, Pari 1,1.2.A.3.c.11,
2/13/2013 F. Griffin Parl], 1.2.A.4.c.11
Added t3�e phrase `and replaceme�al' to line Part 1,1.2.A.Q.c.7
Revised lines ��ith `including grass' replacing with `excluding grass (seedi3�g,
4/2G/20] 3 F. Griffin soddittg ar hydromulching paid separale[y)'
included in Part 1, 1.2, A, 1, c, 14; Part 1, ].2, A, 2, c, 13; Part 1, 1.2, A, 3, c, 1 i;
Pa��l I, 1.2, A, 4, 2, 11
C/19l2Q13 D. JoEuison �•2•A.4.c —Addition of'privale wateG� seivice appurtei}ai�ecs relocalion to being
incl«ded in the tincar tooi rice oC �7vate water se�viccs
] 1/21/2016 W. Nnrwood Requirc meter box suitaUle for AMi n�ctcr. 2.2,C, I 1& 2.2,C, ] 2
11/21/2016 W. ]Vorwood Require set�+ice saddle with douUlc straps. 2.2,C,9,6
2/14/17 W. Norwood 2.2, C, 9.a.3 Removc table "Pit Conlour of pipe..."
2114I17 W. No�wood 3.4, C, l.d.{2) Removc itylon sleeve inserts, require cc thrcads.
C1TY OF FORT WORTH Water & Sauitary Sewer Rehabilitalion ConErdct l01
STANDAAD CONSTRUC'170N SPECIFICATiON ]70CUMENTS Cl'N 02722
Revised February i9, 2017
Al'PENDIX
GC-4.01 Avaalability of Lands: None
GC-4.02 Subsua�face and P��ysical Conditions: Street Core Report
GC-4.04 Underground Facilities: None
GC-4.06 Hazardous Environmental Condition at Site: None
GC-6,06.D Minority and Women Owned Business F��terpi�ise Compliance:
MBE Special Tnstructions Poa�zn
MBE Prime Contractor Waiver Forin
MBE Good Faith Effort Forin
MBE Joint Vent�n•e Forin
MBE Subcontractor-Supplier Utilization Fo�•m
GC-6.07 Wage Rates:
Wage rate Table
GC-G.09 Perinits and Utilities: None
GC-6.24 Nondiscrimination: None
GR-O] 60 00 Pt�oduct Requirements:
Standaa'd Products List
CITY O� PORT WOR'1'H Water and Sanitary Sewer Rehabilitation Contract 101
STANI�ATZi) CONSTRUC�IOt�T SPL'-CIFICAT[ON DOCUM�NTS CPN 02722
Revised July 1, 20l [
GC-4.01 Avail�b�l�ty of �,and�
TI��S PA�� L�EF`T �l�T�'EN�`1���TA]LIlY ]BI�A�T]�
CiTY OF 1=0R7' 1WORT13 Water and Sanitary Sewer ftehabilitation Contract 10i
STAIVDARll CONSTRIJCTION SPECTFICA'1'ION DOCUMENTS CPAI 02722
Revised July 1, 201 I
�C-4.02 S�b�u�face and Phys�.cai Conclitio��
`�'I�gS P�G� If]E��' I�TT��T�'��NA]L�L�' �1�,ANK
CITY C?F FDRT WpRTH Water aod Sanitary Sewer Rehabilitation Contract 101
STANDA�tD CONSTRUCTION SI'ECIFICATIO7*i DOCUMEN7'S CPN 02722
Revised .luly ] , 2011
�� �� ��� �x � t�:�
City of Fort Worth
Capital Dcfivery Division/Soil Lab
8851 Camp Bowie Blvd #3Q0
Fort Warth, TX 76] 16
Laboratory Test Results for
A Street Caring Project
Projecf: Water & Sewer Main Replacement Contract 2015 A
CPN# 0273 8
Date Tested: 9/25/2019 to 10/02/2019
Requesfed by: C Underwood
Phone: S 1'1-392-7920
This report presents tlie res�lts of a street coring project for (Water & Sewer Main Replacement Cantract 2015 A,
Firsti Renewal}. Mr. Uday Ban�ale & Mr. Stephen Overtan performed the cox'es, and subgrade lab tests. Mr.
ZeIalem Arega reviewed and appra�ved tl�e results.
�Yii�to�� Tera•�ce Wes# _ —
(I':e�-�CLill llr �� 1��'tnton 'Tc�r�ce l+z�stj
HQLE # J
LOCATION: 2439 Winton Ten•ace W. {E/4)
Z.00" HMAC
5.00" Concrete {3935)psi
7.50" PaIc Brawn Sandy Clay wlGt-avel
3.50" Pale Byown Sandy Clay
ATTERBURG LIMZTS: LL: 38.00 PL: 14.30 PI: 23.70 SHRKG: 10%
HOLE # 2
LOCATION: 2332 Winton Terrace W. (W/4)
2.75" HMAC
4.25" Concrete (7433)psi
1 1.50" Yale Brown Clay w/Gravel
ATTERBURG LIMITS: LL: 37.30 PL: ] 5.80 PI : 21.50 SHRKG: 10%
HOLE # 3
LOCATION: 2401 Winton Terrace W. (E/4)
2.fl0" HMAC
5.00" Concretc (Broken}
$.50" Brownish Gray Clay w/Gra�ei
11TTERSURG LIMITS: LL: 37.1 Q PL: 15.10 PI : 22.00 SHRKG: l fl%
Page 1 of 4
�� r�� �� �� ��
�,..�
City of Fort Worih
Capital Delivery Di�ision/Soil Lah
8851 Ca�np Bowie Blvd #300
Fort Worth, TX 7611 G
Phor�e: 817-3 92-7920
HOLE # 4
LOCATION: 2240 Winton Terrace W. {W/4}
3.75" HMAC
5.25" Concrete (4903}psa
5.00" Brownish Gray Clay w/Gravel _
3.00" Bi•own Clay
ATTERBURG LIMTTS: LL: 43.10 FL: 1630 PI: 26.80 SHRKG: 13%
HOLE # 5
LOCATION: 2317 Winton Terrace W. (E/4)
3.00" HMAC
S.Ofl" Concrete (Brolcen)
2.00" Bt-own C�ay
2.00" Stone
7.50" Pale Brown Sandy Ciay
ATTERBURG LIMITS: LL: �2.40 PL: I7.I0 PI: 25.30 SHRKG: 12%
HOLE #� 6
LOCATTON: 2205 Winton Terrace W. {W/4)
2.25" HMAC
6.00" ConcreEe (6337)psi
6.75" B�-own Sandy Clay w/Gravel a�ad Stone
ATTERBURG LIMIT�: LL: 3$.70 PL: 16.50 PI: 23.20 SHRKG: 12%
HOLE # 7
LOCATION: 2229 Winton Terrace W. {E/4)
3.00" 1IMAC
5.50" Concrete (4945)psi
7.50" Brown Clay
ATTERBURG LIMITS: LL: 39.10 PL: 16.24 PI: 22.86 SHRKG: 10%
HOLE # 8
LOCATION: 2424 Winton Terrace W. {W/4)
3.00" HMAC
5.50" Concrete (58$1}psi
S.SO" Biown Clay w/Gravel
4.00" PaIe Brown Clay
Page 2 0� 9
���� ��������
�
City of Fort W orth
Capital Delivery Division/Soii Lab
8851 Cai17p Bowie Blvd #300
Fort Worth, '1'X 76116
�'4'i€tto�� -E'er�i�nce C_�sr
[F'�rl:liill I�r. tu �ii��lc�M� -["�rriice �festj
1'hane: S 17-392-7920
HOLE # 9
LOCATION: 2222 Winton Terrace E. (S/4)
2.00" HMAC
5.00" Concrete {6123)psi
6.00" Pale Brown C[ay w/Stone
3.50" Pale Brown Clay
HOT.E # 1 Q
LOC�ITION: 2228 Winton Terrace E. {N/4)
2.75" J-IM.AG
4.50" Concrete (7460}psi
2.75" Bt-ow� Clay w/Stone
5.00" Pale B�-own Clay
ATTERBURG LiMITs: LL: 63.40 PL: 19.30 PI: 44. I O�SHRKG: 17%
HOLE # 11
LOCATION: 2308 Winton Terrace E. (S/4)
2.00" HMAC
4.25" Cancrete {7390)psi
3.25" Light Gray Clay w/Grave[ and Stone
6.50" Stone
HOLE # 12
LOCATION: 2440 VVinton Terrace E. (N/4)
2.54" HMAC
s.aa" Concrete (6921}psi
5.50" Brownish Ciray Sandy Clay w/Gravel a��d Stone
2.50" Brovvn Clay w/Stone
Page 3 of 4
�o���'����r��
�
City of Fort Worth
Capital Delivery Division/Soil Lab
8851 Cainp Bowie Blvd #300
Fori Worth, TX 76116
Phone: 817-3 92-7920
HOLE # 13
LOCATIQN: 2412 Winton Tenace E. (,S/4)
2.00" HMAC
5.50" Concrete (Brolcen)
l.75" Pale Bz'own 5and w/Gravel and Stone
G.25" �ale Brow�� Sandy Clay w/Grave[ aild Stane
HOLE # 14
LOCATION: 242$ Wi�toi� Terrace E. (N/4)
2.50" HMAC
4.50" Concrete (5716)psi
8.00" Browr� Clay w/Gravel and Stone
f1TTERBURG LIMITS: LL: 41.00 PL: 19.10 PI: 21.90 SIIRI�G: 12%
HOLE # 15
LOCATION: 2440 Winton Terrace E. (W/4)
2.75" HMAC
5.50" Concrete (6281)psi
3.75" Pale B�•own Clay w/Gravel and Stone
5.50" Bi-own Clay w/Gt•avel and Stone
HOLE # 16
LOCATTON: SS' North of Farkhill (E/4)
4.50" HMAC
6.25" Concrete (6381)psi
6.25" Pale Brown C�ay w/Gravel and Stone
ATTERBURG LIMITS: LL: 38,2Q PL: 15.90 PI: 22.30 SHRICG: 10%
Page 4 of 4
GC��eO� gJnde�g�ound �acili�aes
�']HC�S �A�� I1]E�'T �l�T�']EIiTT][�1�TA��Y 1��A�l�T]�
CI"fY OF FORT WORTI� Water and Sanitary Sewer Rehabifitation Contract 101
STANDAR� CONSTRUCTION SPEC[FICAT[ON DOCUMENTS CPN 02722
Revised Iu�y 1, 2011
G-�a�4.0� ]E�azardo�� Environ�ner�tal Condi�Yon at Site
'I'�I�S PAG]E L]EF�' �l\T'�'El�T�'��l�TAY1�� ��L�llT][�
CI"1"Y OF FORT WOF2TIi Water anrl Sanitary Sewer Reha6ilitation Contract 101
STAIVDARD CONSTRUCTTON SI'EC[FICAT[ON DOCUMENTS C�'N 02722
Revised,luly ], 201 ]
GC-6.Ob.D 1���.oriiy and VVoxnex� �wned �usines�
�nte�-pr��e �omp��ance
'�']HC]CS �P��� If�]�� �l\T'�`]E�T'�C`��I�TA�L,LY ]�L�l�TI�
CITY OF PORT WORTH Waicr and Sanitary Sewer Rehak�ilitation Contract 101
STANDARD CON57�RUC'1'fON 51'ECIFlCATION DOCUMF_N'fS CPN 02722
Rcviscd July 1, 2Q1 l
F"����� ������T F�FZ YIIfIS�E �C�N i R�►C� G���
Check type of contraci: 0 Construction 0 CMAR � Construction Managernent
0 DesignlBuild [� Professional 0 CISIP 0 Other, please explain
DEF�T. Name: Water Department ��r$t Advertise Daie: 9-24-20 Date Submitted OBD: 9-9-2fl
�S THIS CQNTRACT ASSOCIATED WITH TRV? Yes [] Na ❑✓ OR WITH SN-121TR Yes Q No j�✓
Doii�tr value of TRV conh�act portion $ N�A SH-12I TR contract portioii $��A
IS THIS A FEDERALLY FUNDED CONTRACT? Yes ❑ No0 !S THIS A CIP CONTRACT? Yes❑ Na�
15 TMIS A BOND FUND�D CONTRACT? Yes ❑ No ,[]✓ If yes, what year N�A
Construc#ion: 15 TH15 A�UMP SUM GONTRACi? Yes [� No0✓ 81Q aATE N�A
Pro#essional: IS 7HlS A FIXEO FEE NOT-TO-�XCEED CONTRAC7? Yes ❑ No❑✓
fS 7HIS A HOURLY NOT-'TD-�XCEED CONTRAC7? Yes ❑ Mo❑✓
IS THIS A COMBINED PR0.IECT? Yes ❑ Na Q✓
iS TMfS A REV1SfON? Yes [] PVo�✓ If yes, enter the revisior� numher NIA
IS TFilS A CHANGE ORE}ER? Yes ❑ No ❑✓ En#er # N�'4 Contrackor: ��A
IS THIS AN AMENDMENT? Yes� I�o�Enter # N�'� Design Firm: N�'°`
If Yhis is not the iniFiai change orderlamendment, suhmit copies of ali previotas change orderlamendments regardless of vdhether
a Nk&C was required forfunding.
CONTRACT €�I�iME {�escription Includi�g Street Names]' Water and Sanitary Sewer RehabiEitatior� Contract 1 D1
Winton Terrace E(Park Hiil Dr - Winton Terrace W) end Winton Terrace W(Park Hilf Dr - Winion Terrace E)
I C�ec{c appficabfe boxe�: ❑ Concrete �aving ✓� Asphal# Paving ❑ Drainage �✓ VSlater 0 Sewer
❑otr,er a�te���t�s Capi#al Project# ��7�2 Other Project# N/A
TOTAL, CONTR�►CT ESTfMATE; $ �,541,150.73
(Please d�7iACb individual sub-tatafs for contracts rrvith multiple ur�ifs/sections including contin�ency.
If the dacumeniation is nat clear and concise, it will be returned �a the department.)
�igi[ally signe�! by J. Chris
J Chris Underwood J. Chris Underwood U����a� 817-392-2629
bate: 2020,09.0fl 15:4423-OS'00' EXT,
Praject Manager (PRINiEDj Project Manager (SIGNATUREj
�AT�: g-9-2� fVame of Design Firm Shield Engine�ring Group
Check here to acknowledge that if pay item quantities are added to ihe proposal section after an M1SBE goal has 6een
��rovided by the Oifice vf Business Diversity, the revised proposai must be submitfed fo the Office of Business
Diversity for re�iew. A com�liance review will not be performed if additional pay items or quantities, which wil�
potentially impacf the MISIDB� goal, are added to fhe proposal sec#ion after the issuance of a M1SBE goal,
TNIS PORTION TO BE COMPLETED BY OFF1C� OF BUSINESS QIVERSlTY
Prof. 5BE Goal Const. MBE Goal Const. SBE Gaal
MISBE PROJECT GOAL:
% �� % %
Comments:
Patt V Y � � S� n �igitally signed 6y Pa1ty Wilson
OBD Specialist: Y oa�e:2o2o.o9.,Q,o:o,:,4-05�00� EXT: 2678
Office of Business Di�ersity
Email: mwbeoffic� ,fart►�orth��x��.qc�y
DATE: 9/1012�
Rev, 04-fl3-2019
�`oa�T �oR�r'x
`1'T�i�!��l��llt,��i'�.r�1'[41.�I�' �/6/20�ii(C��[1?��9)
Ci�y o�' �or� �lorth
!l�inoriiy �usiness IEn�erprise Speci�icafions
SPEGI�►L INSiRUCiIOiV� ��R O���RO�S
APPLICATION OF POLICY
Jf itxti to#aC dolFar value of tfti� c�t�#rs�r,t I� $50�Q00,01 4T �T1�fEF titen a�u1B� su�contracting a�f i5 ap�l{c�ble,
POLlCY STATEMENT
it is the policy of the City of Fort Worth to ensure the full and equitable participation by Minority Business Enterprises
(MBE) in the procurement of all goods and services. All requirements and regulations stated in the City's current
Business Diversity Enterprise Ordinance applies to this hid.
M�� �RO.I�CT G�AL�
The City's MB� goal on this project is � 2
% of the base bici value of th� confract.
Note: ff boih �A�E and SBE subcontracting gaals are estal�IEshecf for this projeci, th�n an pf€erar must subrnit bath a
MBE Utilization Form and a SSE !lYilization Fqrm to be deemed responsive.
COMPLIANC� TO BID SP�CIFICATIONS
On City contracts $50,000.01 or more wt�ere a MBE subcontracting goal is applied, Offerors are required to comply
with khe infent of the City's Business Diversity Enterprise Ordinance by one of the following:
1. Meet ar exceed the above stated MBE goal through MBE subcontracting participation, ar
2. Meet or exceed the above stated MBE goal through MBE Joint Venture participation, or;
3. Good Faith EfFort documentation, or;
4. Prime Waiver documentation.
SUIBMfTTAL OF REQIl1RED DOCUMENTATION
The applicable documents must be received by the by the assigned City of Fort Worth Project Manager or
Department Designee, wifhin the following times ailocated, in ord�r�r i�r Ihe �nlir� lsi�l �r,� n� rnr��irtr�rn�E r�rs�srFns�ve ku
ah€� �p��-F�!C�li[iri4. -f�r:� ��Ifr.r-�r °:li�ll �14�AIL 11�!� h�iCs� r,fir�,t+rri=.fnittR�t_��s :r� CirF• �ssi��iie� +',ily c�l Fnrt tiNr,rih
f'r�s;�ff JNr�n����i �7r �i���:�arrirr�:rir l�x��±y�,µe A fax�J capy wil� ��ot I�� �r,r.e����r.!
1. Subcontractor Lltilization Form, if goal is received no later f�an 2:00 p.rrt., on fi�e second Cify business day
met or exceeded: after the bid opening date, exclusive of the bid opening date.
2. Good Faith Effort and Subcontractor received no later than 2:00 p.m., on the second City business day
Utilization Form, if participaifon is less than after the bid opening date, exclusive of the bid opening date.
stated gaal:
3. Good Faith Effort and Subcontractor received no later fhan 2:00 p.m., on fhe second Cify business day
Utilization Form, if no MBE participation: after th� �id opening date, exdusive of the bid npening date.
4. Prime Contractor Waiver F'orm, if you will received no later tF�an 2:00 p.m., on the second City business day
perform all subcontracting/suppfier work: afte�r the bid opening date, exdusive of the bid opening date.
5. Joint Venture Form, if goal is met or received no later tha� 2:00 p.m., on the second City business day
exceecied: aft�r the bid apening date, exclusive of the bicE opening date.
FA�I.UF�E T{3 C��:7fxL� ti'�11��-f i'H� �iTY'S E3kJSi1�i�5S �lV�F2SITY ENT�RPf2�S'� �R�ih!�1F�1C�� WiLL C�E�`CJL1` ID#
7i�� EGaD ��INfi �p�l�f��RED NOhi�R�Sr=�i��IV� 70 S��Cf��C�1iIpN5,
iFAILUI#� 70 9U��A1'C'CFiE Ft��IUfR�� h1�� ��CUR:�ENTATION hI�+ILL I��SUL'� IN �HE �117 a�11+�G {:�NS�pE�E�
#�1QN•F2E�P�#�fSIV�, A 9�COh10 �AI�Utl�� Ndl�l. �r:SU�„T Ih! TH� O��ERD�t BECNCy [}I��llA�l���b ��f� A
R�F�f�� �F Cl�� Y�J�R, TNft�� FAILl��3�S �N A�rVE Y��AR P��iOC� bVll�l. R�SU�.'F I,�l �����UALf�I�AI'IOt�!
����o� a� r�r��� �r��.�s,
Any questions, please contact the Office of Business �iversity at (817) 392-2674.
Office of Business Diversi#y
Email: mwbeoffice@fortworthtexas.gov Tei3��oraril}� Revised April b, 2020 due to COV1D19 �mergency
Phone: (817} 392-2674
A7TACHMEhlT 1A
Page 1 of 4
F��T �Vo�'�`�
City of �ori �iVorih
Offiice of �usiness �iversity
rii��� Subcon�rac�orsl�uppliers Ufili�ation �orm
OFFEROR COMPANY NAME: Check applicable bax to describe
pfferor's Certification
PRpJECT NAM�:
fV�/WlDBE NflN-MMNDBE
Water and Sanitary Sewer Rehabilifat�on Confiract 101 B'o °ATE
City's MBE Project Goa�: Offeror's MBE Project Commitment: C'FtOJECT NUM13�R
12 0�0 0�o CPN 02722
ldentify ail subcontractorslsuppliers you will use on ihis project
'F�il�r� t� compl.8#e Ehis faem, ir� its �:ntlre�y w�rltl3 �Qq;;�s;�d docum��lat�nn, and rec:�l�red ts� thc: Ps�r�haswng
a�i�+isi�xn n� lab�r l#��Er� 2:00 p_rrw, �r� Ehi: s+vc�xr�cl �:iCy �usin�ss ciay ��t�r bic� cape:nwr�c�, �x�.r�srve of k�ic: r���,�ri�ng d�#�,
w��l �cs�l� i� !h� h{c� �e��g c���sirie�d non-��5p�fnsi�r� #o his� sp�r,i�ic��FonS
I�h� �ndcrsigr�e� Qf#�e�r �gr��'�s ta �ntcr into s� finrm�� 3;�r���r��nt wiin the MB�_ fi�7n�s) lis�ed In t�sis �tili��tion
is�h�d�.�li;, COrld��a[1ClL�C1 41�rOr1 LXL-•L`41t1r�r1 t]f �] r;�ititr���,� wo�4� �h�r ��iy f�f ��z�� W��th '� Fr.� irrkcsn[ic����,� ����ls�� Icno�ti��g
�masre�res��ntat��n nf fact� is gre�un�l5 fnr [:crr��irle��tior� nf rlisqua�tfis�,�#is7+� �n� v�+�li r�s�xl# In �he hi�i �}eir��
c�sr�sir��f�r� r�or�-e�spansivtr tt� t�ir� sp��iiic�ali�ns_
MBEs listed toward meeting the project goal must he located in the six (6) county marketplace at the time of
bid or the business has a Significant B�asiness Presence in the Marketplace. Marketplace is the geographic
area of Tarran#� Dallas, �entont Johnson, Parker, and Wise caunties.
Prime �ankraetaes musf id�n�i�y by �iee leve� af �II s�ben�tr:��:#or�{s�;�,pliers_ Ti�r: m��ns the lev�l nf
�uh�r�t�act��7� k��:r�w lf�e: ���i�� c�rn�rt3ult�rlc�xnsulfar�l �_c�, a s#ir�:�i pr�yr�����1 lrr�rn L��� primc� ��infr�ctc�r t� �
suhconi�;�c��r is can��d��ed ��r El�r. ��78]�IZl�fl� �}+ ��lJ�7C0{I�f2�tOf �� IfS SU�3�7EE�f IS GOfkS���f�� �"y k�er_ Th� prim�
r;r��ie�r��r 3s res�so�s€��� kL, �.Frnvic�� �ruc�f �f payr�7�ni u� a�l �;�roc! su�xc:�nt���t�rs Idr���if�r�r! as a#�+i6� �a�cf
r.nr,�n#in� fhns� �ic�aJt��s tnw{�rrls ���x��:[ii��7 kh� �;4�i}tr�cE c�or��rr7i#te� c�na�,
ALL MBEs MUS7 B� C�R7IFI�D BEFORE CONTRACT AWARD,
Certification means those firms, located within the Marketplace, that have been determined fo be a bonafide minority
business enierprise by the North Central Texas Regional Certification Agency {NCTRCA) and the DallaslFart Wor#h
Minority 5upplier Develapment Councii (DIFW MSDC).
if i�a��irtg serv��es ar� utili�ed, #he C}ffe��r wif� h� c}{ven r,redit as lor�c} a� t�3e M13� �is€ed owrrs ��n�i
a�e��te� �# Je�s� �r�e f�all� lir.�rrs�� and o�ea��#�or�aC #r�,ck to �e usec� on th� can#r,�ct. Th� h��� may lease
�r�cks frakn �noth�a- fV1E�E firrri_ rncludir7� f+�r��3� uwrr��-o���rat�d, �ncl re�eive full h�48� �r��dlk. i'he Nf�E m�y
leas� t��rcks �rnert nnr�-P�+1B�5, inr,f�c�in� n�yvn�r-n�ef�ket�. �3�t wi�l nnly� rec;�ive �re�it fnr fF�� �ees 3�d
c�oF�7nii�sic�rss curn�d by lkYe h,�l�� �� �ulliri��i in llr� I��S� �gr���i�n�_ __
Rev. 21i 3I19
F()RT'��VOR'FH A77ACHMENT 1A
�~ Page 2 of 4
Off�rors are requirad to identify ALL subcontractorslsuppGers, regardless of status; i.e., �4u�arily and nan-h,7f3�s. MBE firms are to be
listed firsf, use additional sheets if necessary. Please note that only certified MBEs wi�f be counted to meet an MSE goal.
_ �
SUBCONTRACTORISUPPLIER °
Company lJame T M w " Uetail �etail
Address i g g Suhcontracting Supplies
TelephonelFax e � E M Work Purchased Dollar Amount
Email � �
Contact Person �
� �
� �
� �
� � �
� �
� � �
Rev. 519 5119
����H ATTACHMENT9A
T�� Page3o(4
Offerors are requirecE to identify ALL subcontractors/suppliers, regardfess af status; i.e., Mi±x�riiy �i�a� i�{�rr-#����. MBE firms are to be
iisted first, use additional sheets if necessary. Please nofe that only certified MBEs wifl be counted to meet an MBE goaf.
__ N
SUBCONTRACTOiiISUPPL.I�R "
Company Name T M w � 13etaif Detail
Address i g g Subcontracting Supplies Dollar Amouni
Telephonel�ax e E E bd Woric Purchased
Email r �
Contaci Person E
� �
� �
� �
� �
Water 9-24-20 9-9-20
Department
❑ ❑
NIA N/A NIA
❑ ❑
Rev. 5l15/19
F`o��r �o��rx
_�.
A7TACHNfENT 1A
Page 4 of 4
Total Dollar Amount of MBE SubcontractorslSuppliers $
Total Dailar Amount af Nan�MBE Subcon#rac#ors/Suppliers $
TOTAL DOLLAR AMOUNT OF ALL SUBCONTRACTORSISUPPLIERS $
��i'h� O�f���r ti�i�� �o# r�i�k� arJ��f�ior�s. cl�lel�o�s, or sut�slit��#ie�ns �r� this cerkif4eci lis[ wl�fiau� [ha pnnr ap{�rnv�l o� the
Of�ic� �f k3�sir7ess D:�+�rsily khra4a�i� khe subrrrr�ta� of � Reqe�es# For Apprav�� of �har�r�el�Vddr'�i�r�
forrra_ Ar�y �+�ju5lified c#��ny� tar dciclior� �hall he � m��eri�C ��re���► o� �{�nlr���t �r�d may r�s«Gt ��z de�a3�Rt�e�t it7
���ofic.t �ii�i �h� p�a�ed�f�s n�tlin��4 ��l tY��: o�s�in�ri�:�_ Tht3 �ff�F�r �h�ll s�i#��7�i1 �� �l�k�il�c! �:}xpl���ati�n t��
h�w il�e re�u�st��1 �;�a�r�i�f�sJ�ilion or �e!eti�n will affec# tl�e corr7rnit�r�� fk+1�i� g�ar_ IF I#�� �3�t,3ii �x��l���wali�n is
not subrnitled_ i� vui11 affe�;# th8 fi���E {yo�'�����n�.e t�et�:mki�tiaiian_
By affixing a signature ta this form, the Offieror further agrees to provic�e, directly to the City upan request,
complete and accurate information regarding actua! work p�rformed by afl subcontractors, including MBE{s) and
ar�y speciaf arrangements with MBEs. The Offeror also agrees to allow an audi# andlor examination of any
books, records and fif�s f�eld by their company. The Offeror agrees to allow the transmission of intervi�ws with
owners, pr�ncipals, officers, em}aloyees and applicable subcorttractors/suppliers participatir�g on the contract that
wil� substantiate the actuaf work performed by the MBE(s} on this contract, by an aufhorized officer or emplayee
of the City. Any intentiona! and/or knowing misrepresentation of facts will be graunds for terminafing the contract
or debarment from City work for a period of not less than three (3) years and for initiatin� action under Federal,
Stafe or Local laws concerning false statements. Any faiiure to comply with this ordinance creates a material
breach ofi the confract and may result in a determination of an irres�ansible Offeror and debarment from
participating in City work for a periad of time nof less than one (1) year.
Autho{zed Signature Printed Signafure
Tifle
Company Name
Address
CitylStatelZip
Office of Business Diversity
�mail: mwbeoffrce@foriwort�texas.gpv
Phone: {8'f 7) 392-2674
Contact NamelTitls (if different)
Telephone andlor Fax
E-mail Address
bate
Rev. 5I15119
T�`C)kT �UR�'H
_ ,�.,.,_..�
Ci�y ofi �'ort �lorih
�linori�y �usiness �nterprise Speciiica�ions
Prime �on�ractor �iblaiver Form
ATTAGHMENT1B
Page 1 of 1
OFFEROR COMPANY NAME: Check applicable box to describe Dfferor^s
Certification
PROJECT NAME: MIWIDBE f�iON-MNUlDBF_
Water and Sanitary Sewer Rehabilitation Contract � 01 BID �ATE
City's MBE Project Goal: Offeror's MBE Projeci Commifrr�ent: PROJECT NUMBER
� z a�a a�a CPN 02722
If both answers to this form are YES, do nof comple#e ATTACHMENT 1C {Good Faiih Effort Form). Afl questions on
this form must be completed and a detailed ex�fanafion provided, if applicable. If the answer to either question is
N�, then you must complete ATTACHMENT 1G This form is anly applicable if �� answers are yes.
F�i�ureto c�mplete l�t�s fotrrt in iks e�tit�re�y ar�d h� reGei�+2d by �Iie.PurchasFnc�_Division r�� fat�r tk�ai� 2;�4
�,.�n., �n #he s2�����1 �iiV I�usir��ss d�y �f#�r hfd oPe�ki�€k, exclkis�ve a� ti�� bid o�onin� da1e, wiil re.,ult ir�
#he bRc! �ieing c�ns�de��d non-r�sparrsive !o bFd s�eciiic�tlons_
Wilf you perform this entire con#ract wifhout suhcontractors? YES
ff yes, please pro�ide a detaiied expfanation that pro�es based on khe size and scope of this �Q
project, this is your normal business practice and provide an o{�erational profile of your business.
Will you perform this entire contract without suppliers? �E�
!f yes, please provide a detailed explanation that proves based on the size and scope of fhis
project, this is your normal business practice and prov�de an inventory profile of your business. R!O
The Offeror furthar a�rees to provide, directly to the City upon request, compiete and accurate information
regarding acfuaf work performed by alf subcantraciors, including MBE{s} on this contract, the paymen# thereof and
any proposed changes to the original M6E(s) arrangements submitted with this bid. The Offeror also agrees to
allow an audif and/or examination of any boaks, r�cords and fifes held by their company that wiil substantiate the
actuaf work performed by the MBEs on this con#ract, by an authorized officer or employee of the City. Any
intentional and/or knowing misrepresentatian of facts will be grounds for terminating the contract or debarment
from City work for a period of not less than three (3} years and for initiating action under F�deral, Sfate or Local
laws concerning fafse statements. Any failure to comply with this orclinance creates a material breach of contract
and may result in a determination af an irresponsil�le Offeror anci barred from participating in City wark for a
period of time not less than one 1 ear.
Authorized Signature
Title
Company Name
Address
CitylStatelZip
Office of Business Diversity
Email: mwbeoffice@fortworthtexas.gov
Phone: (817) 392-2&74
Printed Signature
Coniact Name {if different�
Phone Num6er Fax Number
Email Address
Oate
Rev. 579 5I19
Ai7ACHMENT 1C
Page 1 of 4
Ft7RT �C.�RTH
Ci�y o� �or� UVorth
iUiinori�y �usiness �nierprise
1VI�E �ood �aith �ffori �orm
OFFERpR COMPANY NAME: Check applicable bax to describe
Offeror's Certificafion
PRDJECT IVAME: 1V1NV1DBE NbN-MNUIfJBE
Water and Sanitary Sewer Rehabilitation Contract 101 $I� DATE
City's MBE Project Goal: Offeror's MBE Project Commifinenf: PROJECT NUMBER
12 fl�o o�a CPN 02722
ffi Ihe i�ifaear d�� I�Oy RryFiS} O� E�G48d 4N� hAI�E suh�anlrac#ing �a�l fcr C#�iy �rajeGl, Ihe C]Ffer�r mU51 corrr�lete t37f5
f UYflt_
If the Of�eror's methad of compliance with the MBE goal is hased upan demonstration of a
"good fiaith effort", ihe OfFeror will have the burden of carrectly and accurately preparing and
submitting the documentation required by the City. Compliance with each item, 1 thru 1'1 below,
shall satisfy the Gaod Faith Effort requirement absenf proof of fraud, intentional andlor knowing
misrepresenfatian af ti�e facis or intentional discrimination by the �fferor.
F�ilufa to �vm��ete thEs Forx'ra. in it� eniar�ly vrit� supparting document�tion, �r�d rece��+erJ Ixy 13�e
P�rrcha�ing i�iv�saor� �o f�te�' tl�an 2:04 p_m. an the s¢�ond City h�,s9n�ss ��y a#ker k�id o�enin�, �xcl�sEv�
of �id ���ni��� date, will res�lt in the bid bol��g cor�si�ered n�n-respons€ve to f�ici sr�cifications.
1.j Please list each and e�ery s�bcontracting andlor supplier opportunity for the camplefion of this
project, regardless of whether it is to be provided by a MBE or nan-MBE. {DO NOT LIST NAMES OF
�IRMS On afl projects, the Offeror must list each subcontracting a�d or suppEier opportunity
regardless of tier.
{Use addifiona! sheets, if necessary)
List of Subcontracting Opportunities List of Supplier Opportunities
Rev. 5115I19
ATTACHMENT 1C
Page 2 of 4
2.) Ohtain a current (not more than two {2) rnonths old from the bid open date} list of MBE subcontractors
andlor suppliers from the City's Office of Business Diversity.
❑ Yes Date of Listing
❑ No
3.) Did you solicit bids firom MBE firms, within the subcontracting andlor sup�lier areas previously listed,
at least ten calendar days prior to bid opening by mail, exclusive of the day the bids are open�d?
� Y@S {!f yes, attach MBE mai! listing to include name of firm and address and a dated copy of ietter mailed.)
❑ Na
4.} Did you soiicit 6ids from MB� firms, wftf�in the subcontracting andlor supplier areas previously listed,
at least ten ca�endar days prior to bid opening by teiephone, exclusive of the day the bids are opened?
� YBS (If yes, attach list to Enclude name af MBE firm, ep rson contacted, phone number and date and time of contact.j
❑ No
5.) Did you solicit bids from MB� firms, wi#hin the subcontracting andlor supplier areas previousfy listed,
a# least ten calendar days prior to bid opening by facsimile (fax), exclusi�e of the day the bids are
apened?
❑ Yes (If yes, atfach list to include nama of MBE firm, fax number and dake and time of contact. In addition, if the fax
is returned as undeliverable, then tha# "undeliverable confirmation" received must 6e printed directlyfrom the
facsimile for proper documen#ation. Faiiure to submit confirmation andlor "undelivera6le confirmation"
documentafion may render the GFE non-responsive.j
❑ NO
6.) Did you soficit bids from MBE firms, within the subcontracting andlor supplier areas previously lisiecf,
at least ten calendar days prior to t�id opening by email, excf�sive of the day ihe bids are opened?
❑ Yes (If yes, atfach email confirmation to include name of MBE firm, date and time. In addition, if an email is returned
as undelivera6le, then that "undeliverabfe message" receipt must qe printed directlyfrom the email system for
proper documentation. �ailure to submit confirrnation andlor "undelEverable message" documentaiion may
render the GFE npn-responsive.)
❑ No
N�TE: TI�� faur methods id��tified �bove �re ac�e�t��le far solicitinc� hids. �r�d eacl� s�l�cted m�thod
m�as# �e ap��aed lo lh2 aMpli�abl� cantr�cl, 7i7� OT�eror rrfus[ daUum�r�t lhit �ritlae�r a# le��# two a�tempts
wer� rr��d� �sing l�.�a o� #he fa�r r��e#ftiocls or tl�at at I��sl on� st+c�essiu� conRact was ma�e uair�g vna o#
1F�� fa4�r �etho€fs ie� c;rclesr ta d�a�ed �c�p�nsive ko t#tie Go�ci Failh �ffurt re�:::r��n�n#. �
f�0'�E: Tl�e Off�rsxr m�,st cnr�#ac! #13� er�tire �VE�E list s�ec�ffc #o ea�� su�►c�ntracti�� a�d s
op�ar#unity ko be in con���l�aioce w�t#� �u�staon- 3 ti�r{t E�_
7.) Did you provide plans and specifications to po#ential MBEs?
❑ Yes
� No
8.) Did you provide the information regarding fhe locat�on of plans and specifications in order to assist
the MBEs?
� Yes
❑ No
Rev. 5115I99
ATTACNM�N7 1C
Page 3 of 4
9.} Did you prepare a quotation for the MB�s to bid on goodslservices specific to their s6cilE se#?
(If yes, atiach all copies af quotations.)
Yes
� No
'!0.) Was the contact information on any of the listings not valid?
�� {If yes, attach the information that was not valid in order for the Office af Business Diversity to address
Yes Yhe corrections needed.)
� No
'I1.)Submit documentation if MB� q�otes were rejected. The documentation submi#ted should be in the
forms of an afifidavit, include a detailed explanation of why the M�� was rejec#ed and any supporting
documentation t�e �fferor wish�;s to be cansidered by the City. In the event of a bona fide dispute
concerning quotes, the Offeror will provide for confidential in-camera access to an inspectinn of any
reievant clocumentation by City personnel.
Please use additional sheets, ffnecessa , and attach.
Compan EVame Tefephone Confact Person 5cope of Work Reason #or Rejection
ADDi710NAL INFORMATION:
Piease provide additional information you tee� will further explain your good and honest effarts to obtain
MBE participatio� on this project.
The Offeror �urther agrees to provide, directly to the City upon request, complefe and
accurate intormation regarding actual wor� performed on this cantrac#, the payment
thereof and any proposed changes to ti�e original arrangements subrrtitted with ihis bid.
The OfFeror also agrees #o allow an audit andlor exa�nination of any books, records ar�d
files held by th�ir company fhat will substantiate th� actuaf work performed on #his
contract, by an authorized officer or employee of the City.
Any intentional andlor knowing misrepresentation of facts will be grounds for
terminating the contrac# or debarment from City wor4� for a period of not less than three
(3) years and for initiating ac#ion under Federai, 5#ate or Local laws concerning faFse
statements. Any failure to comply with this ordinance shalf create a materia! breach of
contract and may resuft in a determina#ion of an irresponsible Offeror and debarment
frorr� partic�pating in City work for a period of time nof less than one (1} year.
Rev. 51151i9
AiTACHMENTIC
Page4afa
The undersigned ceriifies that the information provided and the iiliBE{s) fisted waslwere
contacted in good faith. It is understood that any MBE{s) listed in Attachment 1 C will be
contacted and #he reasons for not using them wilf be verified by the City's OfFice
of Business Diversity.
Auti�orized Signature
7itle
Company Name
Address
CitylStatelZip
Office of Business Diversity
Email: mwbeoffice@for#workhiexas.go�
Phone: (817) 392-2674
NIA
Printed Signature
Contact I�ame and Tiile (if different)
Phone Number
Fax Number
Emaii Address
Date
Rev. 5195I79
Joini Venlure
Page 1 of 3
�`QRT WORTH
CYTY OF FORT WORTH
MBE Joint Venture Eli�ibili�_y Form
A1l qrrestioras niust 6e answer•ed,• use "N/A" ifreot applrcahle.
Name of City praject:
1. Joint venture informaEion:
A joint venture form musl be completed on each prnject
RFP/Bid/P�•oject Namber; _
Joi�It Venture Name:
Joint Ventu�-e Address:
(!f applica6le)
Telephone: Pacsimile: E-mail
Cel ] ular:
Idez�tify the firms that comprise tlie joint venture:
Please attach extra sheets it addrtlonal space is required to provide detailed explanaiions of work to he performed by each frrm comprising the
joint venture
[41BE firm �Ton-1VI13L+' iirm
name: namc:
BiEsiness Address: Businc:ss Address:
City, Statc, 7ip: City, Stale, Zip:
Tele�honc E-mail Te3ephone Eanail
Cellu�ar Facsimile Cellular Facsiinile
Certi�cation Status:
Name of Certifying Agcncy:
2. Scope of vvor� erformed b the Joint Venture:
Describe the sco e of work of the MB�: Describe tiae sco e of work of the nan-Mi3E:
Rev. 5I15119
Joinl Venlure
Page 2 of 3
3. What is the percentage of MBE pa�•ticipxtion on this joint ventux'e that you wish to be counfed toward
meeting the project gaal?
4. Attach a copy of the joint venture agreement.
5. List components af owtiership of joint venture: {Do not complete iJlhrs injormtttaon is clescribed in joinl vente�re agreement)
Profit and loss sharing:
Ca}�ita� con6�ibtttioi�s, includrng
equipment:
Othe3- applicable ownership interests:
6. Identify by name, race, sex and firm ihose individnals (with tittes} wlto are responsible for the day�to-day
managcment and decision making of the joint veniure:
Financial decisions
(to lnclude Aecuimt Paya6le and Receivahle}:
Management decisions:
a. Estimating
-------------- --------
b. Marketing and Sales
----------------------------------------
c. Hiring and Tirin� qf maG�agemcnt
personnel
cl. � Purchasing of YnajoE' equipinent
andbr supplies
Supervision of field operations
The City's Office o# Business Di�ersity wifl review your joint venture submission and will have finaf
approval of the MB� percentage appfied toward the goal for the project listed on this form.
NOTE:
From and after the date of projecf award, if any of the participants, the individually defined scapes af work or
the dollar amountslpercentages change from the originally approved information, then the participants must
inform the City's Office of Business Diversiky immediately for appro�al. Any unjustified change or
delefion shall be a material breach of contracf and may result in debarment in accord with the procedures
outlined in the City's BDE Ordinance.
Rev. 5l1519 9
�
�
Joint Venture
�
i
t
Pa e3of3
—_ _
AFFIDAVIT
The undersigned affinns that the fot•egoing stateinents are U�ue and carreci and include all inaterial information
necessary to identify and explain tlie terzns and operation of the joint venture. Furtherinore, the undersigned shall
agree to provide to Ehe joint �enture the statEd scope of work, decision-making responsibilities and pay�nents
herein.
The City also reserves the ri�ht to request any additional information deemed necessary to determine if the joint
veniure is eligible. Faiiure to cooperate and/or pro�ide requested infonnation within t�1e time speci�ed is grounds
for tennination of the eligibility pt•ocess.
The undersigned agree to pennit audits, interviews with owners and exainination of the baoks, records and files
of the joint venture by any authorized representatives of the City of Fort Worth. Failure to comply with this
provision shalI result in the tennination of any contract, which may be awarded under the provisio�as of this ,joint
venture's eiigibility and inay initiate action under Pederal, State and/or Local laws/ordinances concerning false
statements or willful misrepresentation of facts.
--------------------------------------______--_--------------------------------- ---------------------------------------------------------------------------------
Name of MB�. finn Name of non-MBE finn
Printed Name oF p�yner Printed Name nf Owner
Signature of Owner Signature of Owner
Printed Name of Owner Printed Name of O�vner
Signature of Owner Signature of Ot�ne��
Title "fitie
]7afe llate
Notarization
State of
On this
County of
day of , 20 , before ine appeared
and
to rrie personally known and who, beiii� duly swnrn, did execute the foregoing afrdavit and did state that they were
properly authorized to execute this affida.vit and did so as their free act and deed.
Notary �'ublic
Print Name
Notary Public
Signature
Coin2nissiori �xpires
�
i Office of Business Dive1•sity
Email: mwbeoffice@fortworthtexas.gov
� Phone: (8I7) 392-2G74
(scnl)
Rev. 5l15119
GC�6°07 �Vage ]�ates
'�'�IIS �P��]E �]��'�' Y�T���I'�'I�l�A]L��' ��L�l�Tl�
CITY OP FORT WORTI [ Water a�td Sanitary Sewer Reha6ilitation Contract 10}
STAAlUAltil CONSTF2[1CTiON SP�CiF1CA'1'ION DpCUMENTS CPhI 02722
Revlsed luly 3, 20] 1
i
�
� 8/2$/2014
i
beta.SAM.gov
I �
� "General Decision NumbeM: TX20190025 04/12/2019
� Superseded General Decisipn Num6er: TXZ0180036
� State: 7exas
f
Construction Type: Meavy
i
�
�
�
�
�f
Counties: 7ohnson, Parker and Tarrant Counties in Texas,
Heavy Construction Proje�ts (Including Water and Sewer Lines)
NOYe: Under Executive Order (EO) 13658, an hourly mini.mum arage
nf $10.60 for calendar year 2019 appiies to all �ontracts
subject to the Davis-Bacon Act for which the �ontract is
awarded (and any solicitation was issued) on or a€ter ]anuary
1, 2615. If this contract is cover'ed by the E0, the corstractar
must pay all workers in any classification listed on this wage
cEetermination at least $19.69 per hpur {or the applicable wage
rate list2d on this wage determination, if it is higher) far
all hours spent performing pn the �ontract in calendar year
2019. If this cantract is [overed by the E4 and a
classification considered hecessary for performance of work on
the contract does not appear on this wage determination, the
contractor must pay workers in that classiFication at least the
wage rate determined through �he conformance process se# forth
in 29 CFR S.S(a)(1)(ii) (or fihe EO minimum wage rate,if it is
higher tF�an the conformed wage rate). The EO minimum wage rate
wzll be adjusted annually. Please note thaf this EQ appJ.ies to
the above-mentioned types of contracts entered into by the
federal government that are subject to the Davis-Bacon Rct
itself, but it does not apply to rontrattis subject only to the
pavis-Bacon Related Acts, including those set forth at 29 CFR
5.1{a)(2)-(60). Additional infarmati.o� on contractor
requirements and worker protecYions under the EO is avai�.able
at www.dol.gov/whd/gaveantracts.
� https://beta.sam.gov/wage-determination/TX2019D026/1/document 1/7
8/2$/2019
PM1odification Number
e
�
Publicatiqn €}ate
01/94/2019
e4/iz/�ei�
* PLUM0146-602 11/07/Z018
Rates Fringes
beta.SAM.gov
PLUM$�R/PIPEFITTER ...............$ 31.08 9.45
___________ _______. _._ ...__----------------------------------
Sl1T7C1990- 041 06/61 /1990
Rates
CARPENTER ........................$ 10.40
Concrete Finisher ................$ 9.81
�LECTiiICIAN ......................$ �3.�6
Form Setter ......................$ 7.86
Laborers:
Common ......................$ 7.25
fJtility .....................$ 8.09
PAINTER ..........................$ 10.89
Pipelayer ........................$ 8.43
Power equipment operators:
Sackhoe .....................$ 11.89
Bulldozer ...................$ 19.76
Crane .......................$ 7.3.16
Frant End Laader.,...,......� 10,54
Mechanic ....................$ 10.93
Scraper .....................$ 16.99
Reinforcing SteeJ. Setter.........$ 10.54
Fringes
$3.64
3.30
3.30
https://i�eta sam, gov/wag e-d eterm in ati on/TX20190026/1 /docu m en[ 2/7
' 8/28/2019 beta.SAM.gov
. TRUCK DRIVER .....................$ 7.34
� " -------------------------------------------------.. __-_ -----
WELaERS - Receive rate prescribed fpr �raft performing
operation to which welding is zn[i.dental.
�j
[ -_-_—����__________________________________��«_-__---__ -_-��
_ _ _________ _ _ _ ____ _
� Note: Executive Qrder (EO) 13706, Establishing Paid Sick Leave
�
for Federa3 ContraCtors applies to all contracts subject to the
� Davis-Bacan A[t for which the contract is awarded (and any
f so74citatipn was issued) on or after January 1, 2017. If this
cpnYract i.s covered by the E0, the contractor must provide
� empldyees with 1 hour of paid sick Ieave �For every 30 hours
they work, up to 56 hours of paid sick leave each year,
� Employees must be permitted to use paid sick leave fvr their
own allness, injury or ather ftealth-related needs, in[ludi.ng
� preverrtive care; to assist a family me�ber (or persan who is
like family #o the employee) who is ill, injured, or has other
health-related needs, including preventive Care; or for reasons
Iresu].ting -From, or to assist a Family mem6er (ar person who is
like family to the en�ployee) who is a vi�tim of, domestic
� violence, sexual assault, or stalking. Additzonal information
on contractor requirements and worker protections under the EO
is available at www.dol.gov/whd/govtontracts.
fJnlisted classifications needed for work not inciuded within
j the scope oF the classi#zcatzons listed may be added after
�
y award only as provided in the J.abor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
i------------------------..__-------- ---------------------------
�
� The body of each wage determination lists the classification
i
and wage rates that have been found to he prevai�.ing for the
� cited type(s) of constru�tion in the area covered by the wage
i
• determination. 7he classi#i�ations are J.isfied in alphabetical
I orcfer of ""identifiers"" that indicate wheth2r the particular
'i rate is a unipn rate (current union negotiated rate for 1oca1),
j hYtps://be#a.sam.go�/wage-determination/TX20190026/1/document 3/7
}
}
8/28/2019
a survey rate (weighted average rate) ar a union average rate
(weighted union average rate}.
Union Rate Identifiers
A four 1et#er classifica�ion abbreviation identifier enclosed
in dotted lines peginning with characters other than ""SU"" or
""IiAVG"" denotes that the union classifi�ation and rate were
prevailing for that classification in th2 survey. Exainple:
P�UM9198-605 07/01/2914. PLI�M is an ahbreviation identifier of
the vnion which prevailed in the s�trvey for this
beta.SAM.gov
cl.assifieation, which in this example would 6e Plumbers. 0198
indicates tf�e local union number or distr3ct council rtumber
where applicable, i.e., Plumbers Local 0198. The nex� number,
005 in the example, is an internal number used in pro�essing
the wage determination. 07/01/2914 is the effpCti�e dete of the
most current negotiated rate, which in this example is July 1,
2914.
Union prevaiiing wage rates are updaYed ta ref7ect aIl rate
changes in the collective bargaining agreemer�t (CBA) governing
this classificat3on and rate.
Survey Rate Identifiers
tlassifications listed under the ""SU"" identifiier indicate that
no one rate pre�ailed for thi.s classification in the survey and
the published rate is derived 6y eomputing a weighted average
rate f�ased an all the rates reported in the survey for that
classifzcation. As this weighted average rate includes all
rates reported in the survey, it may include both union and
non-union ratas. Example: 5ULA2012-007 5/13/2914, Sli �nditates
the rates are survey rates based on a weighted average
calculation of rates and are not majority rates. Lq indicates
the 5tate of Louisiana. 2012 is the year of survey on which
these classifi wtions and rates are based. The next nuni6er, 007
in the example, is an internal num6er used in producing the
wage determination. 5/i3/2014 inditate5 the survey completion
date for the classifications and rates under that identifier.
Survey wage rates ar'e rtot updated ancf remain in eFfect until a
https://beta.sam.gov/wage-determination/TX20190Q26/1 /documenY 4/7
� 8/28/2D19
inew survey is conducted.
4
Union Average Rate Identifiers
� Classification(s) J.zsted under the UAVG identifier indi[ate
that no single majority rate prevailed for those
� classifi�atipns; however, 190% o� the data reported for the
classifica�iorts was union data. EXAh1PLE: UAVG-OH-0010
� 08/29/2014. UAVG indicates that the rate is a weighted uni.on
f
average rate. OH indicates the state. ihe nex# number, 9919 in
� the example, is an internal number used in prodacing the wage
determination. 98/29/201A indicates the survpy compJ.etion date
for the classi-Ficativns and rates under that identi-Fier.
A UAVG rate will be updated once a year, usually in ]anuary of
each year, to reflect a weighted average of the current
negotiated/C6A rate of the unipn lo�als frorn which the rate is
based.
----------------------------------------------------------------
WAGE DETERMINATION APPEAL5 PROCE55
I1.) Has there been an initial decision in the matter? Thi5 can
be:
� * an existing published wage determination
* a survey underlying a wage determinatipn
1
� * a lJage anQ Hour Divisinn letter setting forth a position on
1
3
a wage determination matter
� � a conformance (additional classifi[ation and rate) ruling
On survey related mat#ers, initial contact, inclnding requests
� for summaries of surveys, shouJ.d be with the Wage and Hour
Regional Office for the area in which the survey was conducted
� 6ecause t�ose Regional Offires have responsibility for the
' Davis-Bacon survey program. If the response from this initial
i
conta[t is r�ot satisfactory, then the process described in 2.)
I
� and 3.) s�ould 6e followed.
beta.SAM.gav
https://6eta sam.gov/wag e-d etermination/TX20190026/1 /document 5/7
8/28/2019
With regard to any ❑thei, matter not yet ripe for the �orrnal
process described here, initial corttac� should be with the
8ranch of Construction Wage Determinations. Write to:
Branch o� Constructian Wage Determinations
lJage and Fiour Di�isian
L1.5. Department pf La�ar
20� Cnns�itutipn Avenue, N.W.
Washington, DC 20219
beta.SAM.gov
2,) Tf the answer to the questa.on in 1.) a.s yes, then an
interested party (t�ose affected by the action) can request
review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
fJ.S. Department of La6or
200 Constitution Avenue, N.W.
Washington, [7C 20210
The request should be accompanied by a full statement o� the
interested party's position and by any information (wage
payment data, praject description, area practice material,
etc.} that the requestor considers relevant ta the issue.
3.) Tf the deeision of the Administrator is not favqrable, an
interested party may appeal directly to the Administrative
Re�iew Board (formerly t�e Wage Appeals Baard}. Write tp;
Admanzstrative Review Board
U.S. �epartment of Labor
200 Constitution Avenue, N.W.
Washington, �C 20210
4.) A11 decisivns by the Administrative Review Board are final.
-----------------------------------------------------------------
EN� OF GENERAL DECISION"
https://beta.sam.gov/wage-determinationlTX2�190026/l/do�ument 6/7
8/28/2D19
beta.SAM.gov
https://betasam.gov/wage-determination/TX20190026/1/document 7/7
GC�6e�9 �e�-m�ts and �Jtili��es
T�IIS ]����E 1LE1��' �.I�TT�CI�TI�l�T��L�' 1��A�TK
CITY OF POR7' WORTiI Water and Sanitary Sewer Rehabilitation Contract 101
STAN17A1� CQNSTRUCT[ON SP�CIFICATIDN DOCUMCI�!'f5 CPN 02722
Revised JiEly l, 201 !
GC�f.�� I�1o�d�scpixnina��o�n
'�'JE��S ]PAG�E ]�.]�1�'�' Il�T'I"�Cl�T'Y,I�llT�L��.' �]LAl��
CITY OP FOltf WQRTH Water anc� Sanifary Sewer Rehabilitation Contract 101
STAtJDA[ZLJ CUNSTRItCTiON SPIiCIFiCAT[ON DOCUMEN"CS C]'N 02722
Rcvised Ju[y !, 201 l
GJ��O1 GO 00 ]�rocluct l�equfl�eme���
'I'I��S PAGE L1E�7� �l�T �T]E�T7['��I�T�JLI�� ��.A►.l�T]C�
CNTY OF FOR�' WORTH Water and Sanitary Sewer Rehabilitation Contract 101
STAND1iRD CONSTItUC"1�ION SPECIFICAI'ION DOCUMi'NTS CPN 02722
Revised .luly l, 2011