HomeMy WebLinkAboutContract 54212-CO1 CSC No.54212-COl FORT WORTH. City of Fort Worth 110r� Change Order Request Project Name 2018 CIP Year 2 Contract 17 City Sec# 54212 Client Project#(s) 101477-1 Project Description This is a combined street paving improvements,storm drain and water and sanitary sewer main replacements for 2018 Bond Street Reconstruction Contract 17 Project in Council District 9. Contractor Stabile&Winn,Inc. Change Order# 1 Date 2/8/2021 City Project Mgr. Mary Hanna City Inspector William Mattegat Dept. Unit 1(Water) Unit 2(Sewer) Unit 3(Paving) Unit 4(Drainage) Totals Contract Time CD Original Contract Amount $1,675,777.50 $653,464.50 $4,217,834.30 $224,475.00 $6,771,551.30 450 Extras to Date Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $1,675,777.50 $653,464.50 $4,217,834.30 $224,475.00 $6,771,551.30 450 Go to ADD&DEL Tabs to Enter CO Backup $0.00 $0.00 $42,150.00 $0.00 $42,150.00 28 Revised Contract Amount $1,675,777.50 $653,464.50 $4,259,984.30 $224,475.00 $6,813,701.30 478 Original Funds Available for Change Orders $0.00 Remaining Funds Available for this CO $0.00 $0.00 $0.00 $0.00 Additional Funding(if necessary) $42,150.00 1 $42,150.00 CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 0.62% MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $8,464,439.13 JUSTIFICATION(REASONS)FOR CHANGE ORDER This change order is due to conflicts with existing street light conduits.The existing conduits for the street lighting within the roadway paving limits in Irwin St,Magnolia Ave and Willing Ave are approx.12'deep and in conflict with the proposed paving improvements on these streets. This change order will add a new bid item to replace the street lighting conduit and wiring by bore.It also include a renegotiated bid price for the street light conduit by open cut since the quantity has increased significantly to warrant a revised pricing for that item.We also added a bid item for Electrical subcontractor mobilization to these new locations. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money)for all costs arising out of,or incidental to,the above Change Order. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract,including ensuring all performance and reporting requirements. Contractors Company Name Contractor Name Contract Signature Date Stabile&Winn,Inc. Jerry Henderson J"'^ Feb 10,2021 Inspector/Inspection Supervisor Date Project and Contract Compliance Manager Date reb n,mn reb n,mr. •N% Feb 17,2021 Program Manager Date Senior Capital Project Officer Date - zm Feb 17,2021 Feb 17,2021 Assistant Director(Dept) Date Director,Contracting Department(Dept) Date [aarew nr6— Feb 18,2021 Feb 18,2021 Assistant City Attorney Date Assistant City Manager Date Feb 22,2021 Feb 22,2021 Council Action if require M&C Number NIA M&C Date Approved ATTEST:�� �\ gd44U���� aF°FOR o 4� aryJ.Kayser,City Secretary o° °o0��d OFFICIAL RECORD ~o °ZC CITY SECRETARY Ov°o ° a*�� FT. WORTH TX°°°°°°°°°°°°° a at,1*xwk 4p Foer WORTH City of Fort Worth '"W—-- Change Order Additions Project Name 2018 CIP Year 2 Contract 17 City Sec# 54212 Client Project# 101477-1 Contractorl Stabile&Winn,Inc. PM Mary Hanna Inspector William Maltegat Change Order Submittal# = Date 218@021 ADDITIONS ITEM DESCRIPTION UU,I Qty Unit Unit Cost Total 2"Conduit PVC Sch 40(T)(Open Cut) Unit 3(Paving) 900.00000000 LF 21.80 Conduit PVC ch B Bore Unit Paving LF III-89 Mobilizations for Electric SubContractor Unit 3(Paving) 2.00000000 EA $4,325.00 Unit 1(Water) .00 Unit 2(Sewer) $0.00 Unit 3(Paving) $78,670.00 Unit 4(Drainage) $0.00 Sub Total Additions Change Order Additions Page 2 of 4 F'nRr� wv City of Fort Worth T Change Order Deletions Project Name 1 2018 CIP Year 2 Contract 17 City Sec# 54212 Client Project# 1 101477-1 Contractor Stabile 6 Winn,Inc. PM Mary Hanna Inspector William Maltegat Change Order Submittal# 0 Date 218I2021 DELETIONS ITEM DESCRIPTION DEPT Qty Unit UnitCost Total III-17 mt avmg 864 ALLOWANCE Unit 3(Paving) 0.25000000 LS 100,0 00.00 Unit 1(Water) 0.00 Unit 2(Sewer) $0.00 Unit 3(Paving) $36,520.00 Unit 4(Drainage) $0.00 Sub TotalDeletions 5 Change Order Deletions Page 3 of 4 MISBE for this Change Order M/SBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders Co# DATE AMOUNT Total $0.00