1 SECTION 00 52 43
2 AGREEMENT FOR EMERGENCY REPAIR SERVICES
3
4 THIS AGREEMENT is made by and between The City of Fort Worth, a Texas home rule municipality acting by
5 and through its duly authorized City Manager, ("City"), and Texas Materials Group, Inc. dba Texas Bit, a
6 corporation authorized to do business in Texas, acting by and through its duly authorized representative
7 ("Contractor"). City and Contractor, in consideration of the mutual covenants hereinafter set forth, agree as
8 follows:
9 Article 1.WORK
10 Contractor shall conduct emergency water main repairs at various locations identified by the Water Department.
11 Article 2.PROJECT
12 On February 14, 2021, a deep freeze began to overspread the state of Texas bringing with it several days of sub-
13 freezing temperatures along with intermittent snow, sleet, freezing rain and ice. Complicating the freezing
14 weather,the electricity grid was strained by demand and power loss was experienced at some water treatment and
15 distribution facilities. The extended cold has lowered the water temperature generally to near 40 degrees
16 Fahrenheit which is problematic when pushed through the cast iron portions of the city's water supply system.
17 Water Field Operations and on-call emergency contractors have been responding to multiple breaks in the water
18 system, but the breaks are now too numerous for these resources to handle.
19 The recommended solution was to engage additional available contractors for emergency water main repairs. Due
20 to the amount of repairs being completed by these additional contractors, there is a need to engage another paving
21 contractor to augment our on-call paving contractor in order to keep up with pavement repair subsequent to water
22 main repairs.
23 Article 3. CONTRACT TIME
24 3.1 Time is of the essence.
25 Contractor recognizes that time is of the essence, and the Contractor will be required to remain on the job until
26 pavement repair is complete. The City expects the Contractor to have a sense of urgency to complete the Work in
27 a timely manner.
28 Article 4. CONTRACT PRICE
29 City agrees to pay Contractor for performance of the Work based on Contractor's invoice an amount up to Seven
30 Hundred and Fifty Thousand Dollars ($750,000.00) This figure may be adjusted up or down as final invoices are
31 received.
32 Article 5. CONTRACT DOCUMENTS
33 5.1 CONTENTS:
34 The Contract Documents which comprise the entire agreement between City and Contractor concerning
35 the Work consist of the following:
36 1. This Agreement. OFFICIAL RECORD
37 2. Exhibits to this Agreement: CITY SECRETARY
38 a. Approved Invoice FT. WORTH, TX
39 b. Evidence of Current Insurance
Emergency Agreement— Emergency Pavement Repair Subsequent to Water Main Repair at Various locations
- 2
Agreement
Page 2 of 3
40 c. Current Prevailing Wage Rate Table incorporated by reference.
41 3. General Conditions incorporated by reference
42
43
44
45 Article 6.INDEMNIFICATION
46 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the city, its
47 officers,servants and employees,from and against any and all claims arising out of,or alleged to arise
48 out of, the work and services to be performed by the contractor, its officers, agents, employees,
49 subcontractors, licenses or invitees under this contract. This indemnification provision is specifically
50 intended to operate and be effective even if it is alleged or proven that all or some of the damages
51 being sought were caused, in whole or in part, by any act, omission or negligence of the city. This
52 indemnity provision is intended to include,without limitation, indemnity for costs, expenses and legal
53 fees incurred by the city in defending against such claims and causes of actions.
54
55 6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense, the city, its
56 officers,servants and employees,from and against any and all loss,damage or destruction of property
57 of the city, arising out of, or alleged to arise out of, the work and services to be performed by the
58 contractor, its officers, agents, employees, subcontractors, licensees or invitees under this contract.
59 This indemnification provision is specifically intended to operate and be effective even if it is alleged
60 or proven that all or some of the damages being sought were caused, in whole or in part, by any act,
61 omission or negligence of the city.
62
63 article 7.MISCELLANEOUS
64 7.1 Terms.
65 Terms used in this Agreement which are defined in Article 1 of the General Conditions will have the
66 meanings indicated in the General Conditions.
67 7.2 Assignment of Contract.
68 This Agreement, including all of the Contract Documents may not be assigned by the Contractor without
69 the advanced express written consent of the City.
70 7.3 Successors and Assigns.
71 City and Contractor each binds itself, its partners, successors, assigns and legal representatives to the other
72 party hereto, in respect to all covenants,agreements and obligations contained in the Contract Documents.
73 7.4 Severability.
74 Any provision or part of the Contract Documents held to be unconstitutional, void or unenforceable by a
75 court of competent jurisdiction shall be deemed stricken, and all remaining provisions shall continue to be
76 valid and binding upon CITY and CONTRACTOR.
77 7.5 Governing Law and Venue.
78 This Agreement, including all of the Contract Documents is performable in the State of Texas. Venue shall
79 be Tarrant County,Texas, or the United States District Court for the Northern District of Texas, Fort Worth
80 Division.
Emergency Agreement— Emergency Pavement Repair Subsequent to Water Main Repair at Various locations
- 3
Agreement
Page 3 of 3
81 7.6 Other Provisions.
82 The Contractor agrees to pay at least minimum wage per hour for all labor as the same is classified,
83 promulgated and set out by the City.
84 7.7 Authority to Sign.
85 Contractor shall attach evidence of authority to sign Agreement, if other than duly authorized signatory of
86 the Contractor.
87
88 1N WITNESS WHEREOF,City and Contractor have signed this Agreement in multiple counterparts. At least
89 one counterpart of each has been delivered to City and Contractor.
90
91 This Agreement will be effective on the last date subscribed by a signatory(which is the Effective Date of the
92 Agreement).
City of Fort Worth
Contractor: Texas Materials Group,Inc.
dba Texas Bit bAn�$ctrA6ir7df
By:Dana Burghdoff( 24,20 15:06 CST)
Dana Burghdoff
By: — Assistant City Manager
(Signature) Feb 24,2021
Title: Vice President/GM Construction Date
Sam Davis �d4oann�
(Printed Name) (� O °FORT �d
�U pad►° °�
Attest: �~g 1, d
City Secretary P.
o° o=�
Address: 420 Decker Drive, Suite 200 %* °°°°°°°°°°°°° �`b
Irving, Texas 75062 (Seal) �a�nEXAsoAp
City/State/Zip: Approved as to Form and Legality:
2/24/2021 Bee-or,
Date DBlack(Feb 24,202113:15 CST)
Douglas W.Black
Senior Assistant City Attorney
93 M&C N/A(Attached 02/23/21 Emergency Memo)
94 Date N/A(Attached 02/23/21 Emergency Memo) CONTRACT COMPLIANCE MANAGER:
95 Form 1295 N/A By signing, I acknowledge that I am the person responsible
96 for the monitoring and administration of this contract,
97 APPROVAL RECOMMENDED: including ensuring all pe for anee and reporting requirements.
98
CGt�rstoV g ffgde� /� FFICIAL RECORD
99 ChdstopherH rder(Feb 24,202111:09 CST) (7 Al/1 S n J
100 Chris Harder,P.E. Tony Sholola,P.E. CITY SECRETARY
101 Director, Water Department Assistant Water Director FT. WORTH, TX
102 200 Texas St. Fort Worth,TX-76102
Emergency Agreement— Emergency Pavement Repair Subsequent to Water Main Repair at Various locations
INTEROFFICE MEMO
Date: February 23, 2021
To: Dana Burghdoff,Assistant City Manager
From: Chris Harder,P.E., Water Director
Subject: EMERGENCY REPAIR—FEBRUARY 2021 DEEP FREEZE—PAVEMENT REPAIR
FOR MULTIPLE MAIN BREAKS
On February 14,2021,a deep freeze began to overspread the state of Texas bringing with it several days of
sub-freezing temperatures along with intermittent snow, sleet, freezing rain and ice. Complicating the
freezing weather,the electricity grid was strained by demand and power loss was experienced at some water
treatment and distribution facilities.The extended cold has lowered the water temperature generally to near
40 degrees Fahrenheit which is problematic when pushed through the cast iron portions of the city's water
supply system.Water Field Operations and on-call emergency contractors have been responding to multiple
breaks in the water system,but the breaks are now too numerous for these limited resources to handle.
The recommended solution was to engage additional available contractors for emergency water main
repairs. Due to the amount of repairs being completed by these additional contractors, there is a need to
engage another paving contractor to augment our on-call paving contractor in order to keep up with
pavement repair subsequent to water main repairs.
This memo is submitted to inform the CMO that,pursuant to the emergency authority found in City Code
Chapter 2,Article I,Section 2-9 of the City's Code of Ordinances and the Mayor's declaration of emergency
on February 17, 2021, the Water Department has instituted emergency procurement of the following
contractor to perform timely pavement repairs subsequent to water main break repairs:
• Texas Materials Group,Inc. dba Texas Bit
The contract will be in an amount up to$750,000.00 and work will be billed on a task order basis.
Waiting to bid and award a contract to perform this work is not the best interest of the health and safety of
the City of Fort Worth.In addition to the citations,above,Section 252.022 of the Local Government Code
exempts from normal bidding requirements expenditures that are necessary to preserve or protect public
health or safety of the municipality's residents and procurements necessary because of unforeseen damage
to public machinery,equipment,or property.
A confirming M&C will be circulated to ratify the above contract after the work has been performed.
APPROVED FOR EMERGENCY PROCUREMENT:
Recommended: Christopher Hard (Feb23,202117:38 CST)
Chris Harder,Director,Water Department
9890VI,
Approved as to form and Legality: DBlack(Feb 23,202117:56 CST)
Douglas W.Black,Sr.Assistant City Attorney
i D CG',7,)h# && aIPGLIGLIlI7GI/�Gf`JGIGI��
Approve: For For CG�inj,Purchasing Manager(Feb 24,202108:36 CS
Cynthia Garcia,
Assistant Director,Purchasing
bad&&d A2(4
Approve: Dana Burghdoff(4 24,20 09:51 CST)
Dana Burghdoff,Assistant City Manager
E
0
II
I
(
i
DECLARATION OF LOCAL DISASTER IN THE
CITY OF FORT WORTH, TEXAS IN RESPONSE TO
SEVERE WINTER WEATHER
WHEREAS, Texas Governor Greg Abbott signed a disaster declaration for all
254 Texas counties on February 12, 2021,upon a finding that severe winter weather poses
an imminent threat of widespread and severe property damage, injury, and loss of life due
to prolonged freezing temperatures,heavy snow, and freezing rain statewide; and
WHEREAS, President Joseph R. Biden approved an Emergency Declaration for
the State of Texas due to the severe winter weather on February 14, 2021, and
WHEREAS, the City of Fort Worth has experienced record cold temperatures
well below freezing and heavy snow and ice accumulation for multiple days; and
WHEREAS,power infrastructure throughout the state has been overburdened and
is unable to provide power to millions of Texas,including many in Fort Worth; and
WHEREAS, water service provided by the City of Fort Worth has been impacted
and sheltering and warning operations are necessary; and
WHEREAS, in response to the state of emergency resulting from the severe
winter weather, the City of Fort Worth must take necessary action to ensure the safety of
its citizens during this unprecedented circumstance; and
WHEREAS, the Mayor of the City of Fort Worth has determined that
extraordinary measures must be taken to alleviate the suffering of people and to protect
public health and safety;
NOW THEREFORE BE IT PROCLAIMED BY THE MAYOR OF THE CITY OF FORT
WORTH, TEXAS:
I.
That a state of disaster is declared for the City of Fort Worth for severe winter
weather response.
II.
That the City's Emergency Operational Plan has been implemented.
III.
That the state of disaster shall continue for a period of not more than seven days of
the date hereof,unless the same is continued by consent of the City Council of the City of
Fart Worth, Texas.
N.
That this proclamation shalt take effect immediately from and after its issuance.
ORDERED this 17"'day of February, 2021.
aP
Attest'
Mary J.Kays
City Secretary
(2)