Loading...
HomeMy WebLinkAboutContract 55351 Received Date: Mar 1,2021 Received Time: 10:27 am Developer and Project Information Cover Sheet: Developer Company Name: Forestar(USA)Real Estate Group,Inc. Address, State,Zip Code: 2221 E.Lamar Blvd., Suite 790,Arlington, TX 76006 Phone&Email: (817)769-1873,kevinlazares@forestar.com Authorized Signatory, Title: Daniel C. Bartok,Chief Executive Officer Project Name: Watersbend South Phase 3A Brief Description: Water, Sewer,Paving, Storm Drain, Street Lights Project Location: Wagley-Robertson Rd. &Bailey Boswell Dr. Plat Case Number: None Provided Plat Name: Watersbend South Mapsco: [Mapsco] Council District: 7 CFA Number: CFA20-0087 City Project Number: 102844 1 IPRC20-0093 OFFICIAL RECORD City of Fort Worth,Texas CITY SECRETARY Standard Community Facilities Agreement Rev.2/21 FT.WORTH, TX City Contract Number: 55351 STANDARD COMMUNITY FACILITIES AGREEMENT This COMMUNITY FACILITIES AGREEMENT ("Agreement") is made and entered into by and between the City of Fort Worth ("City"), a home-rule municipal corporation of the State of Texas, acting by and through its duly authorized Assistant City Manager,and Forestar(USA)Real Estate Group, Inc.("Developer"),acting by and through its duly authorized representative.City and Developer are referred to herein individually as a"party"and collectively as the"parties." WHEREAS, Developer is constructing private improvements or subdividing land within the corporate limits of Fort Worth,Texas or its extraterritorial jurisdiction,for a project known as Watersbend South Phase 3A("Project"); and WHEREAS, the City desires to ensure that all developments are adequately served by public infrastructure and that the public infrastructure is constructed according to City standards; and WHEREAS, as a condition of approval of the Project,Developer is required to bear a portion of the costs of municipal infrastructure by constructing the public infrastructure necessary for the Project as described in this Agreement("Community Facilities"or"Improvements"); and WHEREAS,as a condition of approval of the Project,Developer is required to meet the additional obligations contained in this Agreement, and Developer may be required to make dedications of land,pay fees or construction costs, or meet other obligations that are not a part of this Agreement.; and WHEREAS,the City is not participating in the cost of the Improvements or Project; and WHEREAS, the Developer and the City desire to enter into this Agreement in connection with the collective Improvements for the Project; NOW,THEREFORE,for and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: 1. CFA Ordinance The Community Facilities Agreements Ordinance("CFA Ordinance"),as amended,is incorporated into this Agreement by reference, as if it was fully set forth herein. Developer agrees to comply with all provisions of the CFA Ordinance in the performance of Developer's duties and obligations pursuant to this Agreement and to cause all contractors hired by Developer to comply with the CFA Ordinance in connection with the work performed by the contractors. If a conflict exist between the terms and conditions of this Agreement and the CFA Ordinance,the CFA Ordinance shall control. OFFICIAL RECORD City of Fort Worth,Texas CITY SECRETARY Standard Community Facilities Agreement Rev.2/21 FT.WORTH, TX 2. Incorporation of Engineering Plans The engineering plans for the Improvements that have been approved by the City ("Engineering Plans")are incorporated into this Agreement by reference as if fully set out herein. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the Improvements required by this Agreement. 3. Description of Improvements; Exhibits and Attachments The following exhibits describe the general location, nature and extent of the Improvements that are the subject of this Agreement and are attached hereto and incorporated herein by reference: ® Exhibit A: Water ® Exhibit A-1: Sewer ® Exhibit B: Paving ® Exhibit B-1: Storm Drain ® Exhibit C: Street Lights & Signs The Location Map and Cost Estimates are also attached hereto and incorporated herein by reference. To the extent that Exhibits A, A-1, B, B-1, C, the Location Map, or the Cost Estimates conflict with the Engineering Plans, the Engineering Plans shall control. If applicable, Attachment 1 — Changes to Standard Community Facilities Agreement, Attachment 2 — Phased CFA Provisions, and Attachment 3 — Concurrent CFA Provisions, are attached hereto and incorporated herein for all purposes. 4. Construction of Improvements Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and specifications, the Engineering Plans, the Cost Estimates provided for the Improvements,and this Agreement. Developer acknowledges that City will not accept the Improvements until the City receives affidavits and lien releases signed by Developer's contractors verifying that the contractors, and all subcontractors and material suppliers, have been paid in full for constructing the Improvements, and consent of the surety on payment and performance bonds provided for the Improvements. 5. Financial Guarantee Developer has provided the City with a financial guarantee in the form and amounts set forth in this Agreement which guarantees the construction of the Improvements and payment by Developer of all contractors, subcontractors, and material suppliers for the Improvements ("Financial Guarantee"). Developer shall keep the Financial Guarantee in full force and effect until released by the City and shall not reduce the amount of the Financial Guarantee unless authorized by the City in accordance with the CFA Ordinance. City of Fort Worth,Texas Page 3 of 15 Standard Community Facilities Agreement Rev.2/21 6. Completion Deadline; Extension Periods This Agreement shall be effective on the date this Agreement is executed by the City's Assistant City Manager ("Effective Date"). Developer shall complete construction of the Improvements and obtain the City's acceptance of the Improvements within two (2) years of the Effective Date ("Term"). If construction of the Improvements has started during the Term, the Developer may request that this Agreement be extended for an additional period of time("Extension Period"). All Extension Periods shall be agreed to in writing by the City and the Developer as set forth in a written amendment to this Agreement. In no event shall the Term of this Agreement plus any Extension Periods be for more than three years. 7. Failure to Construct the Improvements (a) The City may utilize the Developer's Financial Guarantee to cause the completion of the construction of the Improvements if at the end of the Term, and any Extension Periods, the Improvements have not been completed and accepted by the City. (b) The City may utilize the Developer's Financial Guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of the Improvements before the expiration of the Term, and any Extension Period, if the Developer breaches this Agreement,becomes insolvent,or fails to pay costs of construction. (c) If the Financial Guarantee is a Completion Agreement and the Developer's contractors or suppliers are not paid for construction costs or materials supplied for the Improvements the contractors and suppliers may place a lien upon any property which the City does not have an ownership interest that is the subject of the Completion Agreement. (d) Nothing contained herein is intended to limit the Developer's obligations under the CFA Ordinance, this Agreement, the Financial Guarantee, Developer's agreements with Developer's contractors, or other related agreements. 8. Termination If Developer desires to terminate this Agreement before Developer's contractors begin constructing the Improvements, Developer agrees to the following: (a) that Developer and City must execute a termination of this Agreement in writing; (b) that Developer will vacate any final plats that have been filed with the county where the Project is located; and (c) to pay to the City all costs incurred by the City in connection with this Agreement, including time spent by the City's inspectors at preconstruction meetings. 9. Award of Construction Contracts City of Fort Worth,Texas Page 4 of 15 Standard Community Facilities Agreement Rev.2/21 (a) Developer will award all contracts for the construction of the Improvements and cause the Improvements to be constructed in accordance with the CFA Ordinance. (b) Developer will employ construction contractors who meet the requirements of the City to construct the Improvements including,but not limited,to being prequalified,insured,licensed and bonded to construct the Improvements in the City. (c) Developer will require Developer's contractors to provide the City with payment and performance bonds naming the City and the Developer as dual obligees, in the amount of one hundred percent (100%) of the cost of the Improvements as required by the CFA Ordinance. The payment and performance bonds shall guarantee construction of the Improvements and payment of all subcontractors and material suppliers. Developer agrees to require Developer's contractors to provide the City with a maintenance bond naming the City as an obligee, in the amount of one hundred percent(100%) of the cost of the Improvements, that guarantees correction of defects in materials and workmanship for the Improvements by the contractor and surety for a period of two (2) years after completion and final acceptance of the Improvements by the City. All bonds must be provided to the City before construction begins and must meet the requirements of the City's Standard Conditions,Chapter 2253 of the Texas Government Code,and the Texas Insurance Code. (d) Developer will require Developer's contractors to provide the City with insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City must be named as an additional insured on all insurance policies. The Developer must provide the City with a Certificate of Insurance (ACORD or form approved by the State of Texas), supplied by each contractor's insurance provider,which shall be made a part of the Project Manual. (e) Developer will require the Developer's contractors to give forty-eight(48)hours' advance notice of their intent to commence construction of the Improvements to the City's Construction Services Division so that City inspection personnel will be available. Developer will require Developer's contractors to allow construction of the Improvements to be subject to inspection at any and all times by the City's inspectors. Developer will require Developer's contractors to not install or relocate any sanitary sewer, storm drain, or water pipe unless a City inspector is present and gives consent to proceed,and to allow such laboratory tests as may be required by the City. (f) Developer will not allow Developer's contractors to begin construction of the Improvements until a notice to proceed to construction is issued by the City. (g) Developer will not allow Developer's contractors to connect buildings to service lines of sewer and water mains constructed pursuant to this Agreement, if any, until said sewer, water mains and service lines have been completed to the satisfaction of the City. 10. Utilities Developer shall cause the installation or adjustment of utilities required to: (1) serve the Project; and (2) to construct the Improvements required herein. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the Improvements to be constructed pursuant to this Agreement. City of Fort Worth,Texas Page 5 of 15 Standard Community Facilities Agreement Rev.2/21 11. Easements and Rights-of-Way Developer agrees to provide,at its expense,all necessary rights-of-way and easements required for the construction and dedication to the City of the Improvements provided for by this Agreement. 12. Liability and Indemnification (a) DEVELOPER HEREBY RELEASES AND AGREES TO INDEMNIFY, DEFEND AND HOLD THE CITY HARMLESS FOR ANY INADEQUACIES IN THE PRELIMINARY PLANS, SPECIFICATIONS, ENGINEERING PLANS, AND COST ESTIMATES SUPPLIED BY THE DEVELOPER FOR THIS AGREEMENT. (b) THE DEVELOPER COVENANTS AND AGREES TO, AND BY THESE PRESENTS DOES HEREBY FULLY INDEMNIFY, HOLD HARMLESS AND DEFEND THE CITY, ITS OFFICERS,AGENTS AND EMPLOYEES FROM ALL SUITS, ACTIONS OR CLAIMS OF ANY CHARACTER, WHETHER REAL OR ASSERTED,BR UGHT FOR OR ONACCO UNT OF A NY INJURIES OR DAMAGES SUSTAINED B Y A NY PERS ONS,INCL UDING DEATH, OR TO ANY PROPERTY, RESULTING FROM OR IN CONNECTION WITH THE CONSTRUCTION,DESIGN, PERFORMANCE OR COMPLETION OF ANY WORK TO BE PERFORMED BY SAID DEVELOPER, ITS CONTRACTORS, SUBCONTRACTORS, OFFICERS, AGENTS OR EMPLOYEES, OR IN CONSEQUENCE OF ANY FAILURE TO PROPERL Y SAFEGUARD THE WORK, OR ONACCOUNT OF ANY ACT,INTENTIONAL OR OTHERWISE, NEGLECT OR MISCONDUCT OF SAID DEVELOPER, ITS CONTRACTORS, SUB-CONTRACTORS, OFFICERS, AGENTS OR EMPLOYEES, WHETHER OR NOT SUCHINJURIES,DEATH OR DAMAGES ARE CAUSED,IN WHOLE OR IN PART, BY THE ALLEGED NEGLIGENCE OF THE CITY OF FORT WORTH, ITS OFFICERS,SERVANTS, OR EMPLOYEES. (c) DEVELOPER WILL REQUIRE ITS CONTRACTORS TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY, ITS OFFICERS, AGENTS AND EMPLOYEES FROM AND AGAINST ANY AND ALL CLAIMS, SUITS OR CAUSES OF ACTION OF ANY NATURE WHATSOEVER, WHETHER REAL OR ASSERTED, BROUGHT FOR OR ON ACCOUNT OF ANY INJURIES OR DAMAGES TO PERSONS OR PROPERTY, INCLUDING DEATH,RESULTING FROM, OR IN ANY WAY CONNECTED WITH, THE CONSTRUCTION OF THE IMPROVEMENTS CONTEMPLATED HEREIN, WHETHER OR NOT SUCH INJURIES, DEATH OR DAMAGES ARE CAUSED, IN WHOLE OR IN PART, BY THE ALLEGED NEGLIGENCE OF THE CITY OF FORT WORTH, ITS OFFICERS, SERVANTS, OR EMPLOYEES. FURTHER, DEVELOPER WILL REQUIRE ITS CONTRACTORS TO INDEMNIFY, DEFEND, AND HOLD HARMLESS THE CITY FOR ANY LOSSES, DAMAGES, COSTS OR EXPENSES SUFFERED BY THE CITY OR CAUSED AS A RESULT OF SAID CONTRACTORS' FAILURE TO COMPLETE THE WORK AND CONSTRUCT THE IMPROVEMENTS IN A GOOD AND WORKMANLIKE MANNER, FREE FROM DEFECTS,IN CONFORMANCE WITH THE CFA ORDINANCE, AND INACCORDANCE WITHALL PLANS AND SPECIFICATIONS. 13. Right to Enforce Contracts City of Fort Worth,Texas Page 6 of 15 Standard Community Facilities Agreement Rev.2/21 Upon completion of all work associated with the construction of the Improvements,Developer will assign to the City a non-exclusive right to enforce the contracts entered into by Developer with its contractors,along with an assignment of all warranties given by the contractors,whether express or implied. Further,Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. 14. Estimated Fees Paid by Developer; Reconciliation Prior to execution of this Agreement, Developer has paid to the City the estimated cost of administrative material testing service fees, construction inspection service fees,and water testing lab fees in the amounts set forth in the Cost Summary section of this Agreement. Upon completion of the construction of the Improvements, the City will reconcile the actual cost of administrative material testing service fees, construction inspection service fees, and water testing lab fees with the estimated fees paid by Developer. If the actual costs of the fees are more than the estimated payments made by the Developer, the Developer must pay the difference to the City before the Improvements will be accepted by the City. If the actual costs of the fees are less than the estimated payments made by the Developer,the City will refund the difference to the Developer. If the difference between the actual costs and the estimated payments made by the Developer is less than fifty dollars($50.00),the City will not issue a refund and the Developer will not be responsible for paying the difference. The financial guarantee will not be released by the City or returned to the Developer until reconciliation has been completed by the City and any fees owed to the City have been paid by the Developer. 15. Material Testing The City maintains a list of pre-approved material testing laboratories. The Developer must contract with material testing laboratories on the City's list. Material testing laboratories will provide copies of all test results directly to the City and the Developer. If the Improvements being constructed fail a test, the Developer must correct or replace the Improvements until the Improvements pass all retests. The Developer must pay the material testing laboratories directly for all material testing and retesting. The City will obtainproof from the material testing laboratories that the material testing laboratories have been paid in full by the Developer before the City will accept the Improvements. 16. Notices All notices required or permitted under this Agreement may be given to a party by hand- delivery or by mail, addressed to such party at the address stated below. Any notice so given shall be deemed to have been received when deposited in the United States mail so addressed with postage prepaid: CITY: DEVELOPER: Development Coordination Office Forestar(USA)Real Estate Group, Inc. City of Fort Worth 2221 E. Lamar Blvd., Suite 790 200 Texas Street Arlington, Texas 76006 Fort Worth,Texas 76102 City of Fort Worth,Texas Page 7 of 15 Standard Community Facilities Agreement Rev.2/21 With copies to: City Attorney's Office City of Fort Worth 200 Texas Street Fort Worth,Texas 76102 and City Manager's Office City of Fort Worth 200 Texas Street Fort Worth,Texas 76102 Or to such other address one party may hereafter designate by notice in writing addressed and mailed or delivered to the other party hereto. 17. Right to Audit Developer agrees that, until the expiration of three (3) years after acceptance by the City of the Improvements constructed pursuant to this Agreement, that the City shall have access to and the right to examine any directly pertinent books, documents, papers and records of the Developer involving transactions relating to this Agreement. Developer agrees that the City shall have access during normal working hours to all necessary Developer facilities and shall be provided adequate and appropriate workspace in order to conduct audits in compliance with the provisions of this section. The City shall give Developer reasonable advance notice of intended audits. Developer further agrees to include in all contracts with Developer's contractors for the Improvements a provision to the effect that the contractor agrees that the City shall,until the expiration of three (3)years after final payment under the contract, have access to and the right to examine any directly pertinent books, documents, papers and records of such contractor, involving transactions to the contract, and further,that City shall have access during normal working hours to all of the contractor's facilities,and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this section. City shall give Developer's contractors reasonable advance notice of intended audits. 18. Independent Contractor It is expressly understood and agreed that Developer and its employees, representative, agents, servants,officers,contractors, subcontractors,and volunteers shall operate as independent contractors as to all rights and privileges and work performed under this Agreement, and not as agents, representatives or employees of the City. Subject to and in accordance with the conditions and provisions of this Agreement, Developer shall have the exclusive right to control the details of its operations and activities and be solely responsible for the acts and omissions of its employees, representatives, agents, servants, officers, contractors, subcontractors, and volunteers. Developer acknowledges that the doctrine of respondeat superior shall not apply as between the City and its officers, representatives, agents, servants and employees, and Developer and its employees, representatives, agents, servants, officers, contractors, City of Fort Worth,Texas Page 8 of 15 Standard Community Facilities Agreement Rev.2/21 subcontractors, and volunteers. Developer further agrees that nothing herein shall be construed as the creation of a partnership or joint enterprise between City and Developer. It is further understood that the City shall in no way be considered a co-employer or a joint employer of Developer or any employees, representatives, agents, servants, officers, contractors, subcontractors, and volunteers of Developer. Neither Developer,nor any officers, agents, servants, employees or subcontractors of Developer shall be entitled to any employment benefits from the City. Developer shall be responsible and liable for any and all payment and reporting of taxes on behalf of itself, and any of employees, representatives, agents, servants, officers, contractors, subcontractors, and volunteers. The City, through its authorized representatives and employees, shall have the sole and exclusive right to exercise jurisdiction and control over City employees. 19. Applicable Law; Venue This Agreement shall be construed under and in accordance with Texas law. Venue shall be in the state courts located in Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort Worth Division. 20. Non-Waiver The failure of the City to insist upon the performance of any term or provision of this Agreement or to exercise any right herein conferred shall not be construed as a waiver or relinquishment to any extent of City's right to assert or rely on any such term or right on any future occasion. 21. Governmental Powers and Immunities. It is understood that by execution of this Agreement, the City does not waive or surrender any of its governmental powers or immunities. 22. Headings The paragraph headings contained herein are for the convenience in reference and are not intended to define or limit the scope of any provision of this Agreement. 23. Severability In the event that any clause or provision of this Agreement shall be held to be invalid by any court of competent jurisdiction, the invalidity of such clause or provision shall not affect any of the remaining provisions hereof. 24. Review of Counsel City and Developer, and if they so choose,their attorneys,have had the opportunity to review City of Fort Worth,Texas Page 9 of 15 Standard Community Facilities Agreement Rev.2/21 and comment on this document;therefore any rule of contract construction or interpretation that would normally call for the document to be interpreted as against the drafting party shall not apply in interpretation of this Agreement, and each section, portion, and provision of this Agreement shall be construed solely on the basis of the language contained therein, regardless of who authored such language. 25. Prohibition on Boycotting Israel Developer acknowledges that in accordance with Chapter 2271 of the Texas Government Code, the City is prohibited from entering into a contract with a company with 10 or more full-time employees that has a value of$100,000 or more that is to be paid wholly or partly from public funds of the City for goods or services unless the contract contains a written verification from the company that it: (1)does not boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel" and"company"has the meaning ascribed to those terms by Chapter 2271 of the Texas Government Code. To the extent that Chapter 2271 of the Government Code is applicable to this Agreement, by signing this Agreement, Developer certifies that Developer's signature provides written verification to the City that Developer: (1)does not boycott Israel; and(2)will not boycott Israel during the term of this Agreement. 26. Immigration and Nationality Act Developer shall verify the identity and employment eligibility of its employees who perform work under this Agreement, including completing the Employment Eligibility Verification Form (I-9). Upon request by City, Developer shall provide City with copies of all I-9 forms and supporting eligibility documentation for each employee who performs work under this Agreement. Developer shall adhere to all Federal and State laws as well as establish appropriate procedures and controls so that no services will be performed by any Developer employee who is not legally eligible to perform such services.DEVELOPER SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES, LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY DEVELOPER, DEVELOPER'S EMPLOYEES,SUBCONTRACTORS,AGENTS,OR LICENSEES. City,upon written notice to Developer, shall have the right to immediately terminate this Agreement for violations of this provision by Developer. 27. Amendment No amendment, modification, or alteration of the terms of this Agreement shall be binding unless the same is in writing, dated subsequent to the date hereof, and duly executed by the City and Developer. 28. Assignment and Successors Developer shall not assign or subcontract all or any part of its rights,privileges,or duties under this Agreement without the prior written consent of City. Any attempted assignment or subcontract without the City's prior written approval shall be void and constitute a breach of this Agreement. 29. No Third-Party Beneficiaries City of Fort Worth,Texas Page 10 of 15 Standard Community Facilities Agreement Rev.2/21 The provisions and conditions of this Agreement are solely for the benefit of the City and Developer, and any lawful assign or successor of Developer, and are not intended to create any rights, contractual or otherwise,to any other person or entity. 30. Compliance with Laws,Ordinances,Rules and Regulations Developer, its officers, agents, servants, employees, and contractors, shall abide by and comply with all laws, federal, state and local, including all ordinances, rules and regulations of City. It is agreed and understood that, if City calls to the attention of Developer any such violation on the part of Developer or any of its officers, agents, servants, employees, or subcontractors, then Developer shall immediately desist from and correct such violation. 31. Signature Authority The person signing this Agreement on behalf of Developer warrants that he or she has the legal authority to execute this Agreement on behalf of the Developer, and that such binding authority has been granted by proper order,resolution,ordinance or other authorization of the entity. The City is fully entitled to rely on this warranty and representation in entering into this Agreement. 32. Counterparts This Agreement may be executed in multiple counterparts, each of which will be deemed an original,but which together will constitute one instrument. 33. Entire Agreement This written instrument, together with any attachments, exhibits, and appendices, constitutes the entire understanding between the City and Developer concerning the work to be performed hereunder, and any prior or contemporaneous, oral or written agreement that purports to vary from the terms hereof shall be void. [REMAINDER OF PAGE INTENTIONALLY BLANK] City of Fort Worth,Texas Page 11 of 15 Standard Community Facilities Agreement Rev.2/21 34. Cost Summary Sheet Project Name: Watersbend South Phase 3A CFA No.: CFA20-0087 City Project No.: 102844 1 IPRC20-0093 Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $ 355,796.84 2. Sewer Construction $ 296,598.51 Water and Sewer Construction Total $ 652,395.35 B. TPW Construction 1. Street $ 902,469.10 2. Storm Drain $ 288,818.75 3. Street Lights Installed by Developer $ 105,829.20 4. Signals $ - TPW Construction Cost Total $ 1,297,117.05 Total Construction Cost(excluding the fees): $ 1,949,512.40 Estimated Construction Fees: C. Construction Inspection Service Fee $42,875.00 D. Administrative Material Testing Service Fee $16,709.00 E. Water Testing Lab Fee $1,290.00 Total Estimated Construction Fees: $ 60,874.00 Choice Financial Guarantee Options,choose one Amount Mark one Bond= 100% $ 1,949,512.40 X Completion Agreement= 100%/Holds Plat $ 1,949,512.40 Cash Escrow Water/Sanitary Sewer= 125% $ 815,494.19 Cash Escrow Paving/Storm Drain= 125% $ 1,621,396.31 Letter of Credit= 125% $ 2,436,890.50 City of Fort Worth,Texas Page 12 of 15 Standard Community Facilities Agreement Rev.2/21 IN WITNESS WHEREOF,the City and Developer have each executed this Agreement by their duly authorized signatories to be effective on the date executed by the City's Assistant City Manager. CITY OF FORT WORTH DEVELOPER FORESTAR(USA)REAL ESTATE Oar guys GROUP,INC. Dana Burghdoff( 26,20 14:29 CST) 471>a1VwWt13 Dana Burghdoff Daniel C Bartok(Feb 26,202110:19 CST) Assistant City Manager Daniel C. Bartok Chief Executive Officer Date: Feb 26,2021 Recommended by: Date: Feb 26,2021 Evelyn Roberts/Jennifer Ezernack Project Assistant Planning and Development Approved as to Form &Legality: Richai A.McCracken(Feb 26,202111:48 CST) Richard A. McCracken Contract Compliance Manager: Sr.Assistant City Attorney M&C No. NSA By signing, I acknowledge that I am the person Date: Feb 26,2021 responsible for the monitoring and administration of this contract,including Form 1295: NSA a��FORr��aa ensuring all performance and reporting OF°°° °°° �L d a�a °o Od requirements. G 1'o g�-t�d ATTEST: °o�v =o 479#/ S(W* A101-6�I ° zoo,�,61, 000000001y Janie Scarlett Morales(Feb 26,202111:38 CST) nd� l � Janie Scarlett Morales Mary J. Kayser/Ronald Gonzales Development Manager City Secretary/Assistant City Secretary OFFICIAL RECORD City of Fort Worth,Texas CITY SECRETARY Standard Community Facilities Agreement Rev.2/21 FT.WORTH, TX The following attachments are incorporated into this Agreement. To the extent a conflict exists between the main body of this Agreement and the following attachments, the language in the main body of this Agreement shall be controlling. Included Attachment ® Attachment 1 -Changes to Standard Community Facilities Agreement ❑ Attachment 2—Phased CFA Provisions ❑ Attachment 3—Concurrent CFA Provisions ® Location Map ® Exhibit A: Water Improvements ® Exhibit A-1: Sewer Improvements ® Exhibit B: Paving Improvements ® Exhibit B-1: Storm Drain Improvements ® Exhibit C: Street Lights and Signs Improvements ® Cost Estimates (Remainder of Page Intentionally Left Blank) City of Fort Worth,Texas Page 14 of 15 Standard Community Facilities Agreement Rev.2/21 ATTACHMENT"I" Changes to Standard Community Facilities Agreement City Project No. 102844 1 IPRC20-0093 None City of Fort Worth,Texas Page 15 of 15 Standard Community Facilities Agreement Rev.2/21 CV O N Qo -HICKS � Uo 0 o - z CD W 0 a 7 PRO CT LOC ION o C , rion �0 w I56 U o 0 Q d� � a O 9Cj�9 a L n a ❑RT WORTH CITY LIMIT SAGINAW CITY LIMIT BAILEY - BOSWELL O N IT-1 a 6 QJ � KE co O V HCHNHT�p J77�,; ¶JSV AI P nJ14 L il1LelCaa Il to e�9�®®9 L o CPN 102844 c' MAPSCO#19 a� r) co WA Jl ERS B END 0 U) SOUTH PHASE 3A c 0 n LOCATED HN i QJ C= OF FORT WORTH,, TEXAS JANUARY, 2021 PREPARED FOR: PREPARED BY, FORE STAR Q GOODWW21. INt 4Mi ARSHAa g 0 14755 PMTON ROAD,SUITE 130 CIVIL ENGINEERS-PLANNERS-SURVEYORS DAUAS,TX 75254 2ao5 MustanMetro(817)3 914373 76051 w 972-702-8699 VV A 11 ERS B END SOLD PHASE 3A WATER E=I�17 C"A"° CPN 1022844 _ N 92 WE 5Lo so 95x 0 S 69 SCALE- 1" 300' 13 5 ]] 0 6] 78 8"WATER LINE Bs I. 6 Ln N NOT EXISTING INFRASTRUCTURE a5 6° 75 (CPN 102847) is ii 0 74 73 72 03 B2 0 JF4 DRd"B 9 6 6 1 0 8"WATER LINE OCK70 NOT EXISTING INFRASTRUCTURE 5 15 2 —20 BL 36 Q (CPN 10284,9 „ 14 3 69 W H 33 4 U _ BLOCK 34 BLOG(35 Q 2 6] 5 2 5 66 NO8 „ 6 ii II 65 Q� El AiES P PPSEK2 U) FUIURE ] ,O ] 10 ] 64 Q 29 B 1 9 B 9 6 9 Ell. 9 6 fi3 YV 9 62 —c 52% X. 10 w T LINE21 ° Q 4 B O 15 61 EX 8"WATER LINE T B R M V D I 90 3] 30 39 40 41 42 43 49 45 4fi 47 48 49 50 51 60 E)( 10"WATERLINE o (DOE#4286) 36 °=K 3fi „ 1 4] 3 56 u) 35 oL 14 BLOCK 20 L 6 5] 34 33 32 31 30 29 20 2] 26 25 24 23 22 I 2O IS 15 5fi BLOC ,5 / 53K ,]K 95% M II[E n 9 a 5 1 10 11 aA IS ,9 55 fi 54 C V J a 3 12 4i � 2e 2 50 51 53 EX.8"WATER LINES 21 52 a) (CPN 102051) ASE N 26 3 a? 0 / c 0 n LEGEND W PROPOSED WATER LINE PREPARED FOR W EXISTING WATER LINE PREPARED BY �j&�W_ �i 4 R E STAR 3: NOTE : G OODWIN- 3� ALL WATER LINES SHOWN MLARSHAL]L, 8 ARE 8" IN DIAMETER UNLESS CIVIL ENGINEERS—PLANNERS--SURVEYORS 14755 PRESTON ROAD,SII1TE 130 OTHERWISE NOTED 2�Mustang Drive,Grapevine,Texas 76051 DALLAS,TX 75254 O Metro(81 n 329-4373 972-702-8699 W WA]TDDD o DND SOUTH PHASE 3A SEWER E=rr"A-1 CP 10284'�4 N N W E O N 8 OSC�IEo ll°° e ®®9 IX 10"S.S.LINE(DOE#4476) O En� ]]66 r N 8"S.S.LINE - 67 B NOT EXISTING INFRASTRUCTURE s 5 9 B6 7s 76 o (CPN 102847) I D � L 64 91 12 a i0 6 74 73 72 B2 0 L 16 ID 16 171 Q S 2 15 70 w BLOCK 36 BOCK 20 U 14 3 19 B9 3 �l 6B n I q 13 4 3 M BLOCK 34 BLOCK 35 6] 2 g 12 5 1-1 13 66 (n ] rf ii 6 II 6 11 6 x FOSSL P 65 0 0 61 9 � 31 0 29 20 @n e 9 0 8 9 8 63 !0 9 62 V l 52% 0 20 qg a- 15 61 a9 37 38 39 40 41 42 43 44 45 46 47 46 99 50 51 60 r) u) BLOCK 36 59 31 L i q] 13 56 O 35 14 19LOC%20 6 57 / 9 95 34 33 32 1177 7 26 25 24 23 22 21 20 15 56 M & 19 n 53x 17x 95x 1111E'A 9 6 55 /0 12 _K 0B 19 16 v J f I/ Vn� 64 9 3 2 ai 2e 2B J 50 51 53 7 52 O 26 3 EX.8"S.S.LINE / (CPN 102051) c 0 n a� PMPAR ED FOR: u) LEGEND o S PROPOSED SEWER LINE PREP BY: �j f ORESTAR S EXISTING SEWER LINE (Cu�ARSNL � NOTE : CIVIL ENGINEERS—PLANNERS—SURVEYORS 14755 PRESTON ROAD,SUITE 130 ALL PROPOSED SANITARY SEWER 2405 Mustang Di (, 3 Grapevine,Texas 76051 DALLAS,TX 75254 Metro 0— LINES SHOWN ARE 8" IN DIAMETER 972-702-8699 / UNLESS OTHERWISE NOTED w WATBRSBBND SOUTH PHASE 3A PAR p1Tp�-a ii;RFi[I�itT rr"B" 1� lllC�P]1�T1G1�1®lf2]Ll84 1l 1� � 9 17 N sl 95x W N 16 B9 0 S DM VE N SCALE. R e 300' 6 6 6 w U 05 60 73 O B1 j 4 ]3 ]2 4 B3 62 Lc) NE.L CPN 102847''' N - 6 JI 70 2 15 2 15 2 BLOIX 20 BLOIX 36 O 4 } 14 3 fi9 13 9 13 68 Q W 4 BLOCK 34 w. fiLOIX 35 4 ® 0 12 6] 2 5 5 66 Q 11 k 6 II 6 11El fi 65 ] 10 - ] 10 ] W TUIE N E W 64 Q 31 1. 29 26 0 9 2 e 9 6 9 8 fi3.. NO R EX DOE#428862 N s2x U) 10 ED eLo 1s 61 L 0 n 37 }8 39 40 41 92 43 44 45 46 4] 98 49 50 51 fi0 8 12 � BLOCK 3fi 59 21 13 36 Q 58 � 14 BLOCK 20 5] 34 3] 32 31 30 29 26 2J 2fi 25 24 23 22 21 20 B 15 Sfi BLOL IS 44x u) 53x I]x 95% L Q� F 9 55 1 1 4 1 JL 19 Ifi / 0 M EX CPN 102051) 54 n 6 6 7`7 ::LEGEND0 fi3 � a a� PROPOSED 29 ' B-B ROADWAY PROPOSED 37' B-B ROADWAY cn W/ 50' R.0. W. W/ 60' R.0. W. °J 6 H PCC PAVEMENT W/ 6" 8 H PCC PA VEMENT W/ 8" LIME-STABILIZED SUBGRADE LIME-STABILIZED SUBGRADE O ADA RAMPS PER THIS CONTRACT n— SIDEWALK PER THIS CONTRACT SIDEWALK BY HOMEBUILDER r) PREPARED FOR: a� IPIRBPARM BY: F4 R E STAR IV ARSHAL L B 14755 PRESTON ROAD,SUITE 130 C0 CIVIL ENGINEERS—PLANNERS—SURVEYORS O 2405 Mustang Drive,Grapevine,Texas 76051 DALLAS,TX 75254 Metro(817)329-Q73 972-702-8699 W WATERS BEND LAND SOS PHASE 3A STORM DRAIN EXHIBIT"B-1" CCPN 102844 N WE SCALE.E. b" _ 300' BLOCI 28Do 95% B9 N 0 JJ a 12k 12' I— B, ,g CONSPM aILVERT u J ® 9 71 5 B H PHASRE BN 9 (� S, fi0 75 D W Bq 61 i2 ii i0 Z B B2 ]4 J3 J2 0 N.E.L(CPN 10284 Q 6 ® ]1 2 15 2 15 2 0 Q 6LOCK 20 6LOCK 3fi 14 3 14 69 3 y 13 4 13 fib Q SOCK 34 BL XK 35 4 � N 6] 5 0 5 12 5 12 5 1 Z fib U II 6 11 fi 65 El 551L 7 lo W W 64 1 11 30 29 29 B 9 B 9 Z � � 6 9 8 83 EX. DOE#4286 $ 9 62 0 52% ^ DR 0 V l HOC 15 61 1 20 49 II 3] 39 39 40 4274J441 46L4. 50 51 60 � q9 12 fi0IX 36 36 59 u) 21 q, 13 ss q6 35 OL 14 &OIX 20 O5] 4 5 34 33 32 31 30 29 28 2J 2fi 25 24 23 22 21 20 �l 15 56 / R 15 M 4q. 53% IJ% 95% PHISE BEND 9 6 ] 3 4 ] 1, 55 LOCI 0 g 6 0 Cn 8� II/ 8T EX. CPN 102051) 4 3 2 I q� II II 2B S S3 _ so s1 s2 r) e] J) - EHSBEND UTH PHASE 26 3 O u) C O n C r) PREPARED FOR: co � LEGEND B ��� Fo R E STAR � sir: p PROPOSED STORM DRAIN LINE DOODWIN-1 —�V EXISTING STORM DRAIN LINE MARSHALL 14755 PRESTON ROAD,SUITE 130 CIVIL ENGINEERS-PLANNERS-SURVEYORS O PROPOSED STORM DRAIN INLET 2405 Mustang Drive, Grapevine, -4373�76051 DALLAS,TX 75254 972-702-8699 / PROPOSED STORM DRAIN AND HEADWALL W VGAT BRSBBND SOUTH PHASE 3A STREET LIGHTS &STREET NAME SIGNS SIT rucelrr CPN 102W _ N N 0 W E N M S N SCALE: 1" e 300' 715o 90Ln 11 ]] c e�• ]y ]6 e 6 V fis so ]s SOUIH PHASE W e9 61 O la11 03 74 73 ]z Q N.E.I.(CPN 10284 U 16 D� 1 71 6 Q 2 15 z 15 2 ]0 BLO[K 2tl M BLOU 36 14 3 14 3 69 U) ^ ^ q 13 4 13 6B p ® o BLOCK 34 BLOLK 33 4 6] 1� w 12 5 12 5 66 -c 5 II U 6 II 6 11 fi 65 0 7 lo I3 W 64 J 3I 30 19 2. � � B 9 2 e 9 6 9 a 63 o EX DOE#4286 q s 52 Q) 52% 10 u) BLOL 15 L 0 11 61 37 38 39 40 41 42 43 44 45 46 47 4a 49 50 51 60 O 40 12 42 36 BLOCK 36 39 15 ] 59 M 6 35 OL Me.A Ad im 14 fi OG 20 5] a 45 34 33 32 31 30 2a 2] 26 25 24 23 22 21 20 15 I Sfi BLOC 15 0 O 53% 17% 95% AlEllBEll lHjlE 9 3 9 6 55 � 1g I6 CK EX. CPN 102051) 54 2 9I ? e 9 93 2a I 53 50 51 p 52 2] EX *ATERSBEND N 6 c O n Q) r) LEGEND PREPAMDFOR: a� ♦� LIGHT POLE GOOD nNl �� Fo R E STAR ,;I- G-& EXISTING LIGHT POLE CIVIL ENGINEERS—PLANNERS—SURVEYORS 14755 PRES7T7O�N(+ROAD,SUITE 130 Q0 2405 Mustang Drive,Grapevine,Texas 76051 DALLAS,TX 75254 O Matro(817)329-4373 PROPOSED STREET NAME SIGN A972-702-8699 W SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM Watersbend South,Phase 3A,City Project#102844 UNIT PRICE BID Project Item Information VENUS Bidlist Description Specification Unit of Bid Unit Price Bid Value Item Section No. Measure uantit Water Facilities 1 0241.1118 8"Pressure Plug 0241 14 EA 5 $270.64 $1,353.20 2 3305.0003 8"Waterline Lowering 33 05 12 EA 7 $3,612.16 $25,285.12 3 3305.0109 Trench Safety 330510 LF 5,600 $0.14 $784.00 4 3311.0001 Ductile Iron Water Fittings w/Restraint 3311 11 TON 1.6 $8,724.15 $13,958.64 5 3311.0241 8"PVC Water Pipe 3311 10, LF 5,506 $25.18 $138,641.08 3311 12 6 3311.0262 8"PVC Water Pipe,CSS Backfill 3311 10,33 LF 89 $54.68 $4,866.52 11 12 7 3311.0361 10"PVC Water Pipe 3311 10,33 LF 5 $86.50 $432.50 11 12 8 3312.0001 Std.Fire Hydrant Assembly w/6"Gate Valve&Valve Box 33 12 40 EA 6 $4,197.99 $25,187.94 9 3312.0117 Connect to Existing 8"W.L. 33 12 25 EA 3 $530.49 $1,591.47 10 3312.0118 Connect to Existing 10"W.L. 33 12 25 EA 1 $656.43 $656.43 11 3312.2003 1"Domestic Water Services 33 12 10 EA 106 $856.39 $90,777.34 12 3312.3003 8"Gate Valve 33 12 20 EA 17 $1,215.18 $20,658.06 13 3312.3004 10"Gate Valve 34 12 20 EA 1 $1,973.06 $1,973.06 14 9999.0001 Automatic Flusher 00 00 00 EA 2 $5,598.57 $11,197.14 15 9999.0002 Remove Ex.W.L. 00 00 00 LF 11207 $13.74 $16,584.18 16 9999.0003 1"Irrigation Service 00 00 00 EA 2 $925.081 $1,850.16 Water Subtotal 1 $355,796.84 Sanitary Sewer Facilities 17 0241.1118 8"Pressure Plug 0241 14 EA 2 $214.54 $429.08 18 3301.0002 Post-CCTV Inspection 33 01 31 LF 4,004 $2.58 $10,330.32 19 3301.0101 Manhole Vacuum Testing 3301 31 EA 14 $257.61 $3,606.54 20 3305.0109 Trench Safety 330510 LF 4,004 $0.26 $1,041.04 21 3305.0113 Trench Water Stops 33 05 15 EA 9 $267.91 $2,411.19 22 3331.3101 SDR-26 4"Sewer Services 3331 50 EA 108 $822.04 $88,780.32 3311 10, 23 3331.4115 8"SDR-26 PVC Sewer Pipe 3331 12, LF 3,678 $29.21 $107,434.38 33 31 20 24 3331.4116 8"PVC Sanitary Sewer Pipe w/CSS Back-fill 3311 10, LF 326 $59.57 $19,419.82 3311 12 25 3339.0001 Epoxy Manhole Liner 33 39 60 VF 23 $314.85 $7,241.55 26 3339.1001 4'Std.Dia.Manhole 33 39 10, EA 14 $3,211.45 $44,960.30 33 39 20 27 3339.1003 4'Extra Depth Manhole 33 39 10, VF 31 $249.99 $7,749.69 33 39 20 28 9999.0004 Connect to Existing 8"Sewer 006000 EA 2 1 $669.77 $1,339.54 29 19999.0005 Connect to Existing 5'Manhole 0000 00 EA 1 $1,854.74 $1,854.74 Sanitary Sewer Subtotal $296,598.51 CITY OF FORT WORTH WM-b®d Swth Phase 3A STANDARD CONSTRUCTION BUD PROPOSAL-DEVELOPER AWARDED PROJECTS City Project#102844 F-Revised Apd12,2014 00 42 43_Bid Proposal SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM Watersbend South,Phase 3A,City Project#102844 UNIT PRICE BID Project Item Information VENUS Bidlist I Description Specification I Unit of I EB�id Unit Price Bid Value Item Section No. Measure Storm Drain Facilities 30 3305.0109 Trench Safety 330510 LF 1,837 $0.26 $477.62 31 3305.0112 Concrete Collar 33 05 17 EA 2 $1,133.46 $2,266.92 32 3341.0201 21"Class III R.C.P. 3341 10 LF 158 $52.08 $8,228.64 33 3341.0205 24"Class III R.C.P. 3341 10 LF 53 $60.75 $3,219.75 34 3341.0208 27"Class III R.C.P. 3341 10 LF 867 $66.41 $57,577.47 35 3341.0302 30"Class III R.C.P. 3341 10 LF 135 $77.90 $10,516.50 36 3351.0311 36"Class III R.C.P. 3341 10 LF 146 $103.56 $15,119.76 37 3341.0312 42"Class III R.C.P. 3341 10 LF 215 $136.57 $29,362.55 38 3341.1103 4'x4'Box Culvert 3341 10 LF 261 $221.00 $57,681.00 39 3349.0001 4'Storm Junction Box 33 49 10 EA 2 $3,778.17 $7,556.34 40 3349.0003 6'Storm Junction Box 34 49 10 EA 1 $7 522.00 $7,522.00 41 3349.4104 21"SET 33 49 10 EA 1 $2,318.43 $2,318.43 42 3349.4107 30"SET 33 49 40 EA 1 $3 068.34 $3,068.34 43 3349.5001 10'Curb Inlet 33 49 20 EA 1 $4,728.44 $4,728.44 44 3349.5002 15'Curb Inlet 33 49 20 EA 8 $5 970.66 $47,765.28 45 3349.8002 15'T pe 2 Inlet 34 49 20 EA 1 $6,481.28 $6,481.28 46 9999.0006 4'x4'SET 00 00 00 EA 1 $5 260.82 $5,260.82 47 9999.0007 Class I Rock Riprap 00 00 00 SY 9 $64.74 $582.66 48 9999.0008 Class III Rock Riprap 00 00 00 SY 211 1 $90.451 $19,084.95 Storm Drain Subtotal $288,818.75 Water/Sanitary Sewer/Storm Drain Facilities Subtotal $941,214.10 Bid Summary Water/Sanitary Sewer/Storm Drain Facilities Subtotal $941,214.10 Total Bid $941,214.10 Performance/Payment and 2-year Maintenance Bonds $19,726.93 Grand Total $960,940.73 The bid is submitted by the entity listed below: Company:Venus Construction By: Street Address:1426 S.Main Print Name City,State,Zip Code:Mansfield,TX 76063 / Phone:817-477-2050 �G „nature ir1e: President Date:12-1-20 Contractor agrees to complete WORK for FINAL ACCEPTANCE within 50 working days after the date when the CONTRACT commences to run as provided in the General Conditions. END OF SECTION CITY OF FORT WORTH WM-b®d Swth Phase 3A STANDARD CONSTRUCTION BUD PROPOSAL-DEVELOPER AWARDED PROJECTS City Project#102844 F-Revised Apd12,2014 00 42 43 Bid Proposal SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM Watersbend South,Phase 3A,City Project#102844 UNIT PRICE BID Project Item Information GTI Bidlist Description Specification Unit of Bid Unit Price Bid Value Item Section No. Measure Quantity Paving Facilities 1 3211.0400 Hydrated Lime @ 30 lbs./S.Y.(Collector) 32 11 29 TON 90.0 $160.00 $14,400.00 2 3211.0400 Hydrated Lime 30 lbs./S.Y. Residential 3211 29 TON 216.01 $160.00 $34,560.00 3 3211.0501 6"Lime Treated Sub grade(Residential) 32 11 29 SY 14,352 $3.35 $48,079.20 4 3211.0502 8"Lime Treated Sub grade(Collector) 3211 29 SY 5,966 $3.60 $21,477.60 5 3213.0101 6"Concrete Pavement Residential 32 13 13 SY 13,497 $33.20 $448,100.40 6 3213.0103 8"Concrete Pavement Collector 32 13 13 SY 5,652 $35.45 $200,363.40 7 3213.0301 5'Concrete Sidewalk 31 1320 SF 6,886 $5.50 $37,873.00 8 3213.0301 6'Concrete Sidewalk 31 1320 SF 6,891 $5.50 $37,900.50 9 3213.0501 R-1 Ram 32 13 20 EA 8 $2,200.00 $17,600.00 10 3213.0506 P-1 Ram 321320 EA 12 $1 800.00 $21,600.00 11 9999.0009 Concrete Header 00 00 00 LF 124 $10.00 $1,240.00 12 9999.0010 Install End of Road Barricade 00 00 00 EA 4 $1 000.00 $4,000.00 13 9999.0011 Connect to Existing Pavement 00 00 00 EA 3 $350.00 $1,050.00 14 9999.0012 Remove End of Road Barricade 00 00 00 EA 3 $450.00 $1,350.00 15 9999.0013 R1-1 Stop Sin 00 00 00 EA 7 $125.00 $875.00 16 9999.0014 St Marker Blade 00 00 00 EA 32 $250.00 $8,000.00 17 Traffic Control DuringConstruction 00 00 00 MO 2 $2 000.00 $4,000.00 Paving Subtotal $902,469.10 Bid Summary Paving Facilities Subtotal $902,469.10 Total Bid $902,469.10 Performance/Payment and 2-year Maintenance Bonds $13,500.00 Grand Total $915,969.10 The bid is submitted by the entity listed below: p Company:Glenn Thurman,Inc. By:/\I e-tq"4- '�i4 r11 Lc re- Street Address:P.O.Box 850842 Pri Name City,State,Zip Code:Mesquite,TX 75185 Phone:972-286-6333 Signature Title: CONTRACT MANAGER Date: Contractor agrees to complete WORK for FINAL ACCEPTANCE within 60 working days after the date when the CONTRACT commences to run as provided in the General Conditions. END OF SECTION CRY OF FORM WORTH Wad-kn South Ph-M 2844 STANDARD CONSTRUCTION BID PROPOSALDEVEIDPER AWARDED PROJECTS City 3 Bidjt#.p-d F-Rrvns April 2,2014 1104243_Aid Propwal SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM Watersbend South,Phase 3A,City Project#102844 UNIT PRICE BID Project Item Information IUC Bidlist Specification Unit of Bid Description Unit Price Bid Value Item Section No. Measure Quantity Street Lighting Facilities 1 2605.3011 2"CONDT PVC SCH 40 26 05 33 LF 3015 $8.49 $25,597.35 2 3441.1408 NO 6 Insulated Elec Condr 3441 10 LF 9045 $0.93 $8,411.85 3 3441.1633 Type 33B Arm 34 41 20 EA 21 $286.00 $6,006.00 4 3441.3201 LED Lighting Fixture R-2 34 41 20 EA 17 $258.00 $4,386.00 5 3441.3201 LED Lighting Fixture R-4 344120 EA 4 $258.00 $1,032.00 6 3441.3301 Rdwy Ilium Foundation TY 1 2 and 4 3541 20 EA 21 $1 072.00 $22,512.00 7 3441.3341 Rdwy Ilium TY Pole 3541 20 EA 21 $1,804.001 $37 884.00 Street Lighting Subtotal $105,829.20 Bid Summary Street Lighting Facilities Subtotal $105,829.20 Total Bid $105,829.20 Performance/Payment and 2-year Maintenance Bonds Included Grand Total $105,829.20 The bid is submitted by the entity listed below: Company:Independent Utility Contruction,Inc. By: Richard Wolfe Street Address:5109 Sun Valley Drive Print Name City,State,Zip Code:Ft.Worth,TX 76119 Phone:817-478-4444 eabLK Signature Title: President Date: 12/02/2020 Contractor agrees to complete WORK for FINAL ACCEPTANCE within 30 worldng days after the date when the CONTRACT commences to run as provided in the General Conditions. END OF SECTION CITY OF FORT WORTH W.W.bend South Phase 3A STANDARD CONSTRUCTION BID PROPOSAGDEVffiAPER AWARDED PROJECTS City Project#102844 Form Revised April 2,2014 00 42 43_Bid Proposal