HomeMy WebLinkAboutContract 55356 Received Date: Mar 1,2021
Received Time: 12:48 pm
Developer and Project Information Cover Sheet:
Developer Company Name: Forestar(USA)Real Estate Group,Inc.
Address, State,Zip Code: 2221 E.Lamar Blvd., Suite 790,Arlington, TX 76006
Phone&Email: (817)769-1873,kevinlazares@forestar.com
Authorized Signatory, Title: Daniel C. Bartok,Chief Executive Officer
Project Name: Watersbend South Phase 3B
Brief Description: Water, Sewer,Paving, Storm Drain, Street Lights
Project Location: Wagley-Robertson Rd. &Bailey Boswell Dr.
Plat Case Number: None Provided Plat Name: Watersbend South
Mapsco: [Mapsco] Council District: 7
CFA Number: CFA20-0088 City Project Number: 102847 1 IPRC20-0094
City of Fort Worth,Texas OFFICIAL RECORD
Standard Community Facilities Agreement CITY SECRETARY
Rev.2/21
FT. WORTH, TX
City Secretary Contract No.: 55356
STANDARD COMMUNITY FACILITIES AGREEMENT
This COMMUNITY FACILITIES AGREEMENT ("Agreement") is made and entered into by
and between the City of Fort Worth ("City"), a home-rule municipal corporation of the State of Texas,
acting by and through its duly authorized Assistant City Manager,and Forestar(USA)Real Estate Group,
Inc. ("Developer"), acting by and through its duly authorized representative. City and Developer are
referred to herein individually as a"party"and collectively as the"parties."
WHEREAS, Developer is constructing private improvements or subdividing land within the
corporate limits of Fort Worth,Texas or its extraterritorial jurisdiction,for a project known as Watersbend
South Phase 3B("Project"); and
WHEREAS, the City desires to ensure that all developments are adequately served by public
infrastructure and that the public infrastructure is constructed according to City standards; and
WHEREAS, as a condition of approval of the Project,Developer is required to bear a portion of
the costs of municipal infrastructure by constructing the public infrastructure necessary for the Project as
described in this Agreement("Community Facilities"or"Improvements"); and
WHEREAS,as a condition of approval of the Project,Developer is required to meet the additional
obligations contained in this Agreement, and Developer may be required to make dedications of land,pay
fees or construction costs, or meet other obligations that are not a part of this Agreement.; and
WHEREAS,the City is not participating in the cost of the Improvements or Project; and
WHEREAS, the Developer and the City desire to enter into this Agreement in connection with
the collective Improvements for the Project;
NOW,THEREFORE,for and in consideration of the covenants and conditions contained herein,
the City and the Developer do hereby agree as follows:
1.
CFA Ordinance
The Community Facilities Agreements Ordinance("CFA Ordinance"),as amended,is incorporated
into this Agreement by reference, as if it was fully set forth herein. Developer agrees to comply with all
provisions of the CFA Ordinance in the performance of Developer's duties and obligations pursuant to this
Agreement and to cause all contractors hired by Developer to comply with the CFA Ordinance in
connection with the work performed by the contractors. If a conflict exist between the terms and conditions
of this Agreement and the CFA Ordinance,the CFA Ordinance shall control.
2.
Incorporation of Engineering Plans
City of Fort Worth,Texas OFFICIAL RECORD
Standard Community Facilities Agreement CITY SECRETARY
Rev.2/21
FT. WORTH, TX
The engineering plans for the Improvements that have been approved by the City ("Engineering
Plans")are incorporated into this Agreement by reference as if fully set out herein. Developer shall provide
at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to
construct the Improvements required by this Agreement.
3.
Description of Improvements; Exhibits and Attachments
The following exhibits describe the general location, nature and extent of the Improvements that
are the subject of this Agreement and are attached hereto and incorporated herein by reference:
® Exhibit A: Water
® Exhibit A-1: Sewer
® Exhibit B: Paving
® Exhibit B-1: Storm Drain
® Exhibit C: Street Lights & Signs
The Location Map and Cost Estimates are also attached hereto and incorporated herein by
reference. To the extent that Exhibits A, A-1, B, B-1, C, the Location Map, or the Cost Estimates
conflict with the Engineering Plans, the Engineering Plans shall control. If applicable, Attachment 1 —
Changes to Standard Community Facilities Agreement, Attachment 2 — Phased CFA Provisions, and
Attachment 3 — Concurrent CFA Provisions, are attached hereto and incorporated herein for all
purposes.
4.
Construction of Improvements
Developer agrees to cause the construction of the Improvements contemplated by this Agreement
and that said construction shall be completed in a good and workmanlike manner and in accordance with
all City standards and specifications, the Engineering Plans, the Cost Estimates provided for the
Improvements,and this Agreement. Developer acknowledges that City will not accept the Improvements
until the City receives affidavits and lien releases signed by Developer's contractors verifying that the
contractors, and all subcontractors and material suppliers, have been paid in full for constructing the
Improvements, and consent of the surety on payment and performance bonds provided for the
Improvements.
5.
Financial Guarantee
Developer has provided the City with a financial guarantee in the form and amounts set forth in
this Agreement which guarantees the construction of the Improvements and payment by Developer of
all contractors, subcontractors, and material suppliers for the Improvements ("Financial Guarantee").
Developer shall keep the Financial Guarantee in full force and effect until released by the City and shall
not reduce the amount of the Financial Guarantee unless authorized by the City in accordance with the
CFA Ordinance.
6.
Completion Deadline; Extension Periods
City of Fort Worth,Texas Page 3 of 18
Standard Community Facilities Agreement
Rev.2/21
This Agreement shall be effective on the date this Agreement is executed by the City's Assistant
City Manager ("Effective Date"). Developer shall complete construction of the Improvements and
obtain the City's acceptance of the Improvements within two (2)years of the Effective Date ("Term").
If construction of the Improvements has started during the Term, the Developer may request that this
Agreement be extended for an additional period of time("Extension Period"). All Extension Periods shall
be agreed to in writing by the City and the Developer as set forth in a written amendment to this Agreement.
In no event shall the Term of this Agreement plus any Extension Periods be for more than three years.
7.
Failure to Construct the Improvements
(a) The City may utilize the Developer's Financial Guarantee to cause the completion of the
construction of the Improvements if at the end of the Term, and any Extension Periods, the
Improvements have not been completed and accepted by the City.
(b) The City may utilize the Developer's Financial Guarantee to cause the completion of the
construction of the Improvements or to cause the payment of costs for construction of the
Improvements before the expiration of the Term, and any Extension Period, if the Developer
breaches this Agreement,becomes insolvent, or fails to pay costs of construction.
(c) If the Financial Guarantee is a Completion Agreement and the Developer's contractors or suppliers
are not paid for construction costs or materials supplied for the Improvements the contractors and
suppliers may place a lien upon any property which the City does not have an ownership interest
that is the subject of the Completion Agreement.
(d) Nothing contained herein is intended to limit the Developer's obligations under the CFA
Ordinance, this Agreement, the Financial Guarantee, Developer's agreements with Developer's
contractors, or other related agreements.
8.
Termination
If Developer desires to terminate this Agreement before Developer's contractors begin
constructing the Improvements, Developer agrees to the following:
(a) that Developer and City must execute a termination of this Agreement in writing;
(b) that Developer will vacate any final plats that have been filed with the county where the Project
is located; and
(c) to pay to the City all costs incurred by the City in connection with this Agreement, including
time spent by the City's inspectors at preconstruction meetings.
9.
Award of Construction Contracts
(a) Developer will award all contracts for the construction of the Improvements and cause the
Improvements to be constructed in accordance with the CFA Ordinance.
City of Fort Worth,Texas Page 4 of 18
Standard Community Facilities Agreement
Rev.2/21
(b) Developer will employ construction contractors who meet the requirements of the City to construct
the Improvements including,but not limited,to being prequalified,insured,licensed and bonded to
construct the Improvements in the City.
(c) Developer will require Developer's contractors to provide the City with payment and performance
bonds naming the City and the Developer as dual obligees, in the amount of one hundred percent
(100%) of the cost of the Improvements as required by the CFA Ordinance. The payment and
performance bonds shall guarantee construction of the Improvements and payment of all
subcontractors and material suppliers. Developer agrees to require Developer's contractors to
provide the City with a maintenance bond naming the City as an obligee, in the amount of one
hundred percent(100%) of the cost of the Improvements, that guarantees correction of defects in
materials and workmanship for the Improvements by the contractor and surety for a period of two
(2) years after completion and final acceptance of the Improvements by the City. All bonds must
be provided to the City before construction begins and must meet the requirements of the City's
Standard Conditions,Chapter 2253 of the Texas Government Code,and the Texas Insurance Code.
(d) Developer will require Developer's contractors to provide the City with insurance equal to or in
excess of the amounts required by the City's standard specifications and contract documents for
developer-awarded infrastructure construction contracts. The City must be named as an additional
insured on all insurance policies. The Developer must provide the City with a Certificate of
Insurance (ACORD or form approved by the State of Texas), supplied by each contractor's
insurance provider,which shall be made a part of the Project Manual.
(e) Developer will require the Developer's contractors to give forty-eight(48)hours' advance notice
of their intent to commence construction of the Improvements to the City's Construction Services
Division so that City inspection personnel will be available. Developer will require Developer's
contractors to allow construction of the Improvements to be subject to inspection at any and all
times by the City's inspectors. Developer will require Developer's contractors to not install or
relocate any sanitary sewer, storm drain, or water pipe unless a City inspector is present and gives
consent to proceed, and to allow such laboratory tests as may be required by the City.
(f) Developer will not allow Developer's contractors to begin construction of the Improvements until
a notice to proceed to construction is issued by the City.
(g) Developer will not allow Developer's contractors to connect buildings to service lines of sewer and
water mains constructed pursuant to this Agreement, if any, until said sewer, water mains and
service lines have been completed to the satisfaction of the City.
10.
Utilities
Developer shall cause the installation or adjustment of utilities required to: (1) serve the Project;
and (2) to construct the Improvements required herein. City shall not be responsible for payment of any
costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with
any of the Improvements to be constructed pursuant to this Agreement.
11.
Easements and Rights-of-Way
City of Fort Worth,Texas Page 5 of 18
Standard Community Facilities Agreement
Rev.2/21
Developer agrees to provide,at its expense,all necessary rights-of-way and easements required for
the construction and dedication to the City of the Improvements provided for by this Agreement.
12.
Liability and Indemnification
(a) DEVELOPER HEREBY RELEASES AND AGREES TO INDEMNIFY, DEFEND AND
HOLD THE CITY HARMLESS FOR ANY INADEQUACIES IN THE PRELIMINARY
PLANS, SPECIFICATIONS, ENGINEERING PLANS, AND COST ESTIMATES
SUPPLIED BY THE DEVELOPER FOR THIS AGREEMENT.
(b) THE DEVELOPER COVENANTS AND AGREES TO, AND BY THESE PRESENTS DOES
HEREBY FULLY INDEMNIFY, HOLD HARMLESS AND DEFEND THE CITY, ITS
OFFICERS,AGENTS AND EMPLOYEES FROM ALL SUITS, ACTIONS OR CLAIMS OF
ANY CHARACTER, WHETHER REAL OR ASSERTED,BR UGHT FOR OR ONACCO UNT
OF A NY INJURIES OR DAMAGES SUSTAINED B Y A NY PERS ONS,INCL UDING DEATH,
OR TO ANY PROPERTY, RESULTING FROM OR IN CONNECTION WITH THE
CONSTRUCTION,DESIGN, PERFORMANCE OR COMPLETION OF ANY WORK TO BE
PERFORMED BY SAID DEVELOPER, ITS CONTRACTORS, SUBCONTRACTORS,
OFFICERS, AGENTS OR EMPLOYEES, OR IN CONSEQUENCE OF ANY FAILURE TO
PROPERL Y SAFEGUARD THE WORK, OR ONACCOUNT OF ANY ACT,INTENTIONAL
OR OTHERWISE, NEGLECT OR MISCONDUCT OF SAID DEVELOPER, ITS
CONTRACTORS, SUB-CONTRACTORS, OFFICERS, AGENTS OR EMPLOYEES,
WHETHER OR NOT SUCHINJURIES,DEATH OR DAMAGES ARE CAUSED,IN WHOLE
OR IN PART, BY THE ALLEGED NEGLIGENCE OF THE CITY OF FORT WORTH, ITS
OFFICERS,SERVANTS, OR EMPLOYEES.
(c) DEVELOPER WILL REQUIRE ITS CONTRACTORS TO INDEMNIFY, DEFEND AND
HOLD HARMLESS THE CITY, ITS OFFICERS, AGENTS AND EMPLOYEES FROM
AND AGAINST ANY AND ALL CLAIMS, SUITS OR CAUSES OF ACTION OF ANY
NATURE WHATSOEVER, WHETHER REAL OR ASSERTED, BROUGHT FOR OR ON
ACCOUNT OF ANY INJURIES OR DAMAGES TO PERSONS OR PROPERTY,
INCLUDING DEATH,RESULTING FROM, OR IN ANY WAY CONNECTED WITH, THE
CONSTRUCTION OF THE IMPROVEMENTS CONTEMPLATED HEREIN, WHETHER
OR NOT SUCH INJURIES, DEATH OR DAMAGES ARE CAUSED, IN WHOLE OR IN
PART, BY THE ALLEGED NEGLIGENCE OF THE CITY OF FORT WORTH, ITS
OFFICERS, SERVANTS, OR EMPLOYEES. FURTHER, DEVELOPER WILL REQUIRE
ITS CONTRACTORS TO INDEMNIFY, DEFEND, AND HOLD HARMLESS THE CITY
FOR ANY LOSSES, DAMAGES, COSTS OR EXPENSES SUFFERED BY THE CITY OR
CAUSED AS A RESULT OF SAID CONTRACTORS' FAILURE TO COMPLETE THE
WORK AND CONSTRUCT THE IMPROVEMENTS IN A GOOD AND WORKMANLIKE
MANNER, FREE FROM DEFECTS,IN CONFORMANCE WITH THE CFA ORDINANCE,
AND INACCORDANCE WITH ALL PLANS AND SPECIFICATIONS.
13.
Right to Enforce Contracts
Upon completion of all work associated with the construction of the Improvements,Developer will
assign to the City a non-exclusive right to enforce the contracts entered into by Developer with its
contractors,along with an assignment of all warranties given by the contractors,whether express or implied.
City of Fort Worth,Texas Page 6 of 18
Standard Community Facilities Agreement
Rev.2/21
Further,Developer agrees that all contracts with any contractor shall include provisions granting to the City
the right to enforce such contracts as an express intended third party beneficiary of such contracts.
14.
Estimated Fees Paid by Developer; Reconciliation
Prior to execution of this Agreement, Developer has paid to the City the estimated cost of
administrative material testing service fees, construction inspection service fees,and water testing lab fees
in the amounts set forth in the Cost Summary section of this Agreement. Upon completion of the
construction of the Improvements, the City will reconcile the actual cost of administrative material testing
service fees, construction inspection service fees, and water testing lab fees with the estimated fees paid
by Developer. If the actual costs of the fees are more than the estimated payments made by the Developer,
the Developer must pay the difference to the City before the Improvements will be accepted by the City. If
the actual costs of the fees are less than the estimated payments made by the Developer,the City will refund
the difference to the Developer. If the difference between the actual costs and the estimated payments made
by the Developer is less than fifty dollars($50.00),the City will not issue a refund and the Developer will
not be responsible for paying the difference. The financial guarantee will not be released by the City or
returned to the Developer until reconciliation has been completed by the City and any fees owed to the City
have been paid by the Developer.
15.
Material Testing
The City maintains a list of pre-approved material testing laboratories. The Developer must
contract with material testing laboratories on the City's list. Material testing laboratories will provide copies
of all test results directly to the City and the Developer. If the Improvements being constructed fail a test,
the Developer must correct or replace the Improvements until the Improvements pass all retests. The
Developer must pay the material testing laboratories directly for all material testing and retesting. The City
will obtainproof from the material testing laboratories that the material testing laboratories have been
paid in full by the Developer before the City will accept the Improvements.
16.
Notices
All notices required or permitted under this Agreement may be given to a party by hand-
delivery or by mail, addressed to such party at the address stated below. Any notice so given shall be
deemed to have been received when deposited in the United States mail so addressed with postage
prepaid:
CITY: DEVELOPER:
Development Coordination Office Forestar(USA)Real Estate Group, Inc.
City of Fort Worth 2221 E. Lamar Blvd., Suite 790
200 Texas Street Arlington, Texas 76006
Fort Worth,Texas 76102
With copies to:
City Attorney's Office
City of Fort Worth,Texas Page 7 of 18
Standard Community Facilities Agreement
Rev.2/21
City of Fort Worth
200 Texas Street
Fort Worth,Texas 76102
and
City Manager's Office
City of Fort Worth
200 Texas Street
Fort Worth,Texas 76102
Or to such other address one party may hereafter designate by notice in writing addressed and
mailed or delivered to the other party hereto.
17.
Right to Audit
Developer agrees that, until the expiration of three (3) years after acceptance by the City of the
Improvements constructed pursuant to this Agreement, that the City shall have access to and the right to
examine any directly pertinent books, documents, papers and records of the Developer involving
transactions relating to this Agreement. Developer agrees that the City shall have access during normal
working hours to all necessary Developer facilities and shall be provided adequate and appropriate
workspace in order to conduct audits in compliance with the provisions of this section. The City shall give
Developer reasonable advance notice of intended audits.
Developer further agrees to include in all contracts with Developer's contractors for the
Improvements a provision to the effect that the contractor agrees that the City shall,until the expiration of
three (3)years after final payment under the contract, have access to and the right to examine any directly
pertinent books, documents, papers and records of such contractor, involving transactions to the contract,
and further,that City shall have access during normal working hours to all of the contractor's facilities,and
shall be provided adequate and appropriate work space in order to conduct audits in compliance with the
provisions of this section. City shall give Developer's contractors reasonable advance notice of intended
audits.
18.
Independent Contractor
It is expressly understood and agreed that Developer and its employees, representative, agents,
servants,officers,contractors, subcontractors,and volunteers shall operate as independent contractors as to
all rights and privileges and work performed under this Agreement, and not as agents, representatives or
employees of the City. Subject to and in accordance with the conditions and provisions of this Agreement,
Developer shall have the exclusive right to control the details of its operations and activities and be solely
responsible for the acts and omissions of its employees, representatives, agents, servants, officers,
contractors, subcontractors, and volunteers. Developer acknowledges that the doctrine of respondeat
superior shall not apply as between the City and its officers, representatives, agents, servants and
employees, and Developer and its employees, representatives, agents, servants, officers, contractors,
subcontractors, and volunteers. Developer further agrees that nothing herein shall be construed as the
creation of a partnership or joint enterprise between City and Developer. It is further understood that the
City shall in no way be considered a co-employer or a joint employer of Developer or any employees,
City of Fort Worth,Texas Page 8 of 18
Standard Community Facilities Agreement
Rev.2/21
representatives, agents, servants, officers, contractors, subcontractors, and volunteers of Developer.
Neither Developer,nor any officers, agents, servants, employees or subcontractors of Developer shall be
entitled to any employment benefits from the City. Developer shall be responsible and liable for any and
all payment and reporting of taxes on behalf of itself, and any of employees, representatives, agents,
servants, officers, contractors, subcontractors, and volunteers.
The City, through its authorized representatives and employees, shall have the sole and exclusive
right to exercise jurisdiction and control over City employees.
19.
Applicable Law; Venue
This Agreement shall be construed under and in accordance with Texas law. Venue shall be in
the state courts located in Tarrant County, Texas or the United States District Court for the Northern
District of Texas, Fort Worth Division.
20.
Non-Waiver
The failure of the City to insist upon the performance of any term or provision of this Agreement
or to exercise any right herein conferred shall not be construed as a waiver or relinquishment to any extent
of City's right to assert or rely on any such term or right on any future occasion.
21.
Governmental Powers and Immunities.
It is understood that by execution of this Agreement, the City does not waive or surrender
any of its governmental powers or immunities.
22.
Headings
The paragraph headings contained herein are for the convenience in reference and are not intended
to define or limit the scope of any provision of this Agreement.
23.
Severability
In the event that any clause or provision of this Agreement shall be held to be invalid by any
court of competent jurisdiction, the invalidity of such clause or provision shall not affect any of the
remaining provisions hereof.
24.
Review of Counsel
City and Developer, and if they so choose,their attorneys,have had the opportunity to review
and comment on this document;therefore any rule of contract construction or interpretation that would
normally call for the document to be interpreted as against the drafting party shall not apply in
interpretation of this Agreement, and each section, portion, and provision of this Agreement shall be
City of Fort Worth,Texas Page 9 of 18
Standard Community Facilities Agreement
Rev.2/21
construed solely on the basis of the language contained therein, regardless of who authored such
language.
25.
Prohibition on Boycotting Israel
Developer acknowledges that in accordance with Chapter 2271 of the Texas Government Code,
the City is prohibited from entering into a contract with a company with 10 or more full-time employees
that has a value of$100,000 or more that is to be paid wholly or partly from public funds of the City for
goods or services unless the contract contains a written verification from the company that it: (1)does not
boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel"
and"company"has the meaning ascribed to those terms by Chapter 2271 of the Texas Government Code.
To the extent that Chapter 2271 of the Government Code is applicable to this Agreement, by signing this
Agreement, Developer certifies that Developer's signature provides written verification to the City that
Developer: (1)does not boycott Israel; and(2)will not boycott Israel during the term of this Agreement.
26.
Immigration and Nationality Act
Developer shall verify the identity and employment eligibility of its employees who perform work
under this Agreement, including completing the Employment Eligibility Verification Form (I-9). Upon
request by City, Developer shall provide City with copies of all I-9 forms and supporting eligibility
documentation for each employee who performs work under this Agreement. Developer shall adhere to all
Federal and State laws as well as establish appropriate procedures and controls so that no services will be
performed by any Developer employee who is not legally eligible to perform such services.DEVELOPER
SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES,
LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY DEVELOPER,
DEVELOPER'S EMPLOYEES,SUBCONTRACTORS,AGENTS,OR LICENSEES. City,upon written
notice to Developer, shall have the right to immediately terminate this Agreement for violations of this
provision by Developer.
27.
Amendment
No amendment, modification, or alteration of the terms of this Agreement shall be binding unless
the same is in writing, dated subsequent to the date hereof, and duly executed by the City and Developer.
28.
Assignment and Successors
Developer shall not assign or subcontract all or any part of its rights,privileges,or duties under this
Agreement without the prior written consent of City. Any attempted assignment or subcontract without the
City's prior written approval shall be void and constitute a breach of this Agreement.
29.
No Third-Party Beneficiaries
The provisions and conditions of this Agreement are solely for the benefit of the City and
Developer, and any lawful assign or successor of Developer, and are not intended to create any rights,
contractual or otherwise,to any other person or entity.
City of Fort Worth,Texas Page 10 of 18
Standard Community Facilities Agreement
Rev.2/21
30.
Compliance with Laws,Ordinances,Rules and Regulations
Developer, its officers, agents, servants, employees, and contractors, shall abide by and comply
with all laws, federal, state and local, including all ordinances, rules and regulations of City. It is agreed
and understood that, if City calls to the attention of Developer any such violation on the part of Developer
or any of its officers, agents, servants, employees, or subcontractors, then Developer shall immediately
desist from and correct such violation.
31.
Signature Authority
The person signing this Agreement on behalf of Developer warrants that he or she has the legal
authority to execute this Agreement on behalf of the Developer, and that such binding authority has been
granted by proper order,resolution,ordinance or other authorization of the entity. The City is fully entitled
to rely on this warranty and representation in entering into this Agreement.
32.
Counterparts
This Agreement may be executed in multiple counterparts, each of which will be deemed an
original,but which together will constitute one instrument.
33.
Entire Agreement
This written instrument, together with any attachments, exhibits, and appendices, constitutes the
entire understanding between the City and Developer concerning the work to be performed hereunder, and
any prior or contemporaneous, oral or written agreement that purports to vary from the terms hereof shall
be void.
[REMAINDER OF PAGE INTENTIONALLY BLANK]
City of Fort Worth,Texas Page 11 of 18
Standard Community Facilities Agreement
Rev.2/21
34.
Cost Summary Sheet
Project Name: Watersbend South Phase 3B
CFA No.: CFA20-0088 City Project No.: 102847 1 IPRC20-0094
Items Developer's Cost
A. Water and Sewer Construction
1. Water Construction $ 296,652.78
2. Sewer Construction $ 277,190.57
Water and Sewer Construction Total $ 573,843.35
B. TPW Construction
1. Street $ 817,220.45
2. Storm Drain $ 192,934.90
3. Street Lights Installed by Developer $ 81,085.84
4. Signals $ -
TPW Construction Cost Total $ 1,091,241.19
Total Construction Cost(excluding the fees): $ 1,665,084.54
Estimated Construction Fees:
C. Construction Inspection Service Fee $41,405.00
D. Administrative Material Testing Service Fee $14,896.00
E. Water Testing Lab Fee $1,050.00
Total Estimated Construction Fees: $ 57,351.00
Choice
Financial Guarantee Options,choose one Amount Mark one
Bond= 100% $ 1,665,084.54 X
Completion Agreement= 100%/Holds Plat $ 1,665,084.54
Cash Escrow Water/Sanitary Sewer= 125% $ 717,304.19
Cash Escrow Paving/Storm Drain= 125% $ 1,364,051.49
Letter of Credit= 125% $ 2,081,355.68
City of Fort Worth,Texas Page 12 of 18
Standard Community Facilities Agreement
Rev.2/21
IN WITNESS WHEREOF,the City and Developer have each executed this Agreement by their
duly authorized signatories to be effective on the date executed by the City's Assistant City Manager.
CITY OF FORT WORTH DEVELOPER
FORESTAR(USA)REAL ESTATE
Oar guys GROUP,INC. _I Dana Burghdoff( 27,20 10:38 CST)
Dana Burghdoff Daniel C Bartok(Feb 26,202110:21 CST)
Assistant City Manager Daniel C. Bartok
Chief Executive Officer
Date: Feb 27,2021
Recommended by: Date: Feb 26,2021
Evelyn Roberts/Jennifer Ezernack
Project Assistant
Planning and Development
Approved as to Form &Legality:
—
Richard A.McCracken(Feb 26,202111:50 CSC
Richard A. McCracken Contract Compliance Manager:
Sr.Assistant City Attorney
M&C No. N/A By signing, I acknowledge that I am the person
Date: Feb 26,2021 responsible for the monitoring and
N/A administration of this contract,including
Form 1295: a FpRr�a ensuring all performance and reporting
OF°°°°°°°°°kad
°o� requirements.
d~o� ���dd
ATTEST:
° °
° ° °
° o°O d Janie Sca rlett Morales(Feb 26,202111:32 CST)
�n ExA4�p Janie Scarlett Morales
Mary J. Kayser/Ronald Gonzales Development Manager
City Secretary/Assistant City Secretary
City of Fort Worth,Texas OFFICIAL RECORD
Standard Community Facilities Agreement CITY SECRETARY
Rev.2/21
FT. WORTH, TX
The following attachments are incorporated into this Agreement. To the extent a
conflict exists between the main body of this Agreement and the following attachments, the
language in the main body of this Agreement shall be controlling.
Included Attachment
® Attachment 1 -Changes to Standard Community Facilities Agreement
® Attachment 2—Phased CFA Provisions
❑ Attachment 3—Concurrent CFA Provisions
® Location Map
® Exhibit A: Water Improvements
® Exhibit A-1: Sewer Improvements
® Exhibit B: Paving Improvements
® Exhibit B-1: Storm Drain Improvements
® Exhibit C: Street Lights and Signs Improvements
® Cost Estimates
(Remainder of Page Intentionally Left Blank)
City of Fort Worth,Texas Page 14 of 18
Standard Community Facilities Agreement
Rev.2/21
ATTACHMENT"I"
Changes to Standard Community Facilities Agreement
City Project No. 102847 1 IPRC20-0094
None
City of Fort Worth,Texas Page 15 of 18
Standard Community Facilities Agreement
Rev.2/21
ATTACHMENT "2"
Phased CFA Provision
City Project No. 102847
The improvements being constructed by Developer pursuant to this Agreement will
connect to improvements Developer is constructing under a separate Community Facilities
Agreement that have not been completed and accepted by the City. Therefore, this Agreement
shall be considered a"Phased CFA"and the provisions contained in this section shall apply to this
Agreement.
The improvements being constructed by Developer under the separate Community
Facilities Agreement shall be defined as the "Parent Project." The improvements being
constructed by Developer under this Agreement shall be defined as the"Child Project."
Developer acknowledges and agrees that due to Developer's election to construct a Phased
CFA,the potential exists for technical, delivery, acceptance or performance problems(hereinafter
"Construction Problems"). Construction Problems may include, but are not limited to: failure of
the improvements to comply with the approved plans or City Specifications; failure of the
improvements in the Parent Project and the Child Project to properly connect to each other;
changes to the design or construction of the improvements in the Parent Project that impact the
design and construction of the improvements in the Child Project; construction delays, delay
claims, or claims for liquidated damages; increased costs for the Developer; failure of the
improvements to pass inspection or material testing; or rejection by the City of some or all of the
improvements and Developer having to remove and reconstruct the improvements at Developer's
expense. In addition, Developer understands and agrees that disputes may arise between
Developer's contractors or their subcontractors relating to responsibility for the Construction
Problems. Developer shall be solely responsible for resolving disputes between contractors or
disputes between contractors and subcontractors.
Developer further acknowledges and agrees that Developer has notified all of Developer's
contractors for the Project that Developer has elected to construct a Phased CFA, the provisions
of this section, the risks associated with a Phased CFA, and that the City shall not bear any
responsibility for Developer's decision to proceed with a Phased CFA.
Developer shall not make the final connection of the improvements in the Child Project to
the improvements in the Parent Project until the improvements in the Parent Project have been
constructed and accepted by the City and the City has consented to Developer making the
connection.
Developer agrees that if this Agreement is for improvements relating to the construction,
renovation or modification of one or more single family residential homes or structures, the City
will not record the plat related to the Project until the improvements are constructed and accepted
City of Fort Worth,Texas Page 16 of 18
Standard Community Facilities Agreement
Rev.2/21
by the City. Developer agrees that if this Agreement is for improvements relating to the
construction, renovation or modification of one or more commercial buildings or structures, the
Developer shall not receive a Certificate of Occupancy from the City for the building(s)related to
the Project until the improvements in this Agreement are constructed and accepted by the City.
Developer further understands and agrees that completion of the improvements under this
Agreement does not entitle Developer to obtain a final plat of the property until all other
requirements of Federal law, State law, or the City Code relating to the filing and recording of a
final plat have been met by Developer.
BY CHOOSING TO CONSTRUCT A PHASED CIA, DEVELOPER ASSUMES
ALL RISKS AND DEVELOPER SHALL BE LIABLE AND RESPONSIBLE FOR ANY
AND ALL DAMAGES, INCLUDING BUT NOT LIMITED TO ANY AND ALL
ECONOMICDAMAGESPROPERTYLOSS,PROPERTYDAMAGESAND PERSONAL
INJURY, (INCLUDINGDEATII), OF ANY"VD OR CHARACTER, WHETHER REAL
ORASSERTED. DEVELOPER HEREBYEXPRESSLYRELEASESANDDISCHARGES
CITY FROM ANY AND ALL LIABILITY FOR DAMAGES, INCLUDING, BUT NOT
LIMITED TOANYANDALL ECONOMICDAMAGES,PROPERTYLOSS,PROPERTY
DAMAGE AND PERSONAL INJURY(INCLUDING DEATH)ARISING OUT OF OR IN
CONNECTION WITH,DIRECTLY OR INDIRECTLY, THE CONSTRUCTION OF THE
IMPROVEMENTS OR DEVELOPER'S DECISION TO CONSTRUCT A PHASED CIA.
DEVELOPER,AT ITS SOLE COSTAND EXPENSE,AGREES TO AND DOES HEREBY
INDEMNIFY, DEFEND PROTECT, AND HOLD HARMLESS CITY, AND CITY'S
OFFICERS, REPRESENTATIVES, AGENTS, EMPLOYEES, AND SERVANTS FOR,
FROMAND A GAINSTANYAND ALL CLAIMS(WHETHER ATLA W OR INEQUITI9,
LIABILITIES, DAMAGES (INCLUDING ANY AND ALL ECONOMIC DAMAGES,
PROPERTYLOSS, PROPERTYDAMAGES AND PERSONAL INJURIES INCLUDING
DEATH), LOSSES, LIENS, CAUSES OF ACTION, SUITS, JUDGMENTS AND
EXPENSES (INCLUDING, BUT NOT LIMITED TO, COURT COSTS, ATTORNEYS'
FEES AND COSTS OF INVESTIGATION), OF ANY NATURE, "VD OR
DESCRIPTIONARISING OR ALLEGED TO ARISE BY OR INANY WAYRELATED
TO CONSTRUCTION OF THE IMPROVEMENTS OR DEVELOPER'S CHOICE TO
CONSTRUCT A PHASED CIA, OR (2) BY REASON OF ANY OTHER CLAIM
WHATSOEVER OF ANY PERSON OR PARTY OCCASIONED OR ALLEGED TO BE
OCCASIONED IN WHOLE OR IN PART BY THE CONSTRUCTIONS OF THE
IMPROVEMENTS OR DEVELOPER'S CHOICE TO CONSTRUCT A PHASED CIA
WHETHER OR NOT SUCH INJURIES, DEATH OR DAMAGES ARE CAUSED, IN
WHOLE OR IN PART, BY THE ALLEGED NEGLIGENCE OF THE CITY OF FORT
WORTH,ITS OFFICERS, SERVANTS, OR EMPLOYEES.
City of Fort Worth,Texas Page 17 of 18
Standard Community Facilities Agreement
Rev.2/21
DEVELOPER:
FORESTAR (USA) REAL ESTATE
GROUP, INC.
Daniel C Bartok(Feb 26,202110:21 CST)
Daniel C. Bartok
Chief Executive Officer
City of Fort Worth,Texas Page 18 of 18
Standard Community Facilities Agreement
Rev.2/21
N
O
N
I`10
N -HICKS 0
}
L0 0 oo a pP
w o
O P W
PF O
L/�
N 3 W a
a n PRO C
LL_ o LOCH N
B 7 1
� � J
o F A
L =
9-
Q 156
U a
d w
y
N N
❑RT WORTH CITY LIMIT
SAGINAW CITY LIMIT
BAILEY - BOSWELL
O
g e N Ri
#wuan Ca Nv
RKE A
PAO
rn
VHCENHTY MAP
SCAM: 1 " e 4,500'
o CPN 102847
"' MAP800#19V
I=
N WATERLSILODEND
To
0
/
LOCAM IN
CTTY OF FORT NORTH, SAS
V) JAN NARY,2021
PREPARED FOR:
0
PREPARED BY:
FORE STAR GOODWIN!
� SUITE �nrAR� n n.
0 14755 PRESTON ROAD,ST7 ITE 130 CIVIL ENGINEERS-PLANNERS-SURVEYORS
DAU AS,TX 75254 � Mobo��� '�'
329-4373
972-702-8699
WATERSBEND
SOUTH PHASE 3B
WA M EXMrr 91A.21
CPN 102$47
N
N
O
N W E
LDLD S
O SCAM: 1" 300'
CD
O
LD
N
N SROSL)�IYi
LL 2
iff
L
92
29 28 27 26 25 24 23 22 PI PO 5"
0 91
O EX.8'WATER UN 26 90
I_ (DOE#3W4 21
ea
Q 30X 1 P 3 4 5 6 7 8 9 10 11 IP 13 14 15 16 17
LL
U
m 87
I 1 P 3 4 5 6 7 8 9 I P 3 4 5 6 7 8 9
N
� LOC K 30e ac al
0
L �
54 60 58 16 5 1413 12 11 10 18 17 16 15 14 13 12 11 10
I DC.8'WATER LINE
L (DOE#30187)
O
(n 2r3 .
6 7 8 9 I 16 1 1B 1
I IfW WATER LINE
o ffi P 15 P 15 2 TOOTING INFRASTRUCTURE
N 3 14 3 4 wA R END (CPN 102M)
L 15 14 13 12 11 10 9 P
4 13 4 TO BE RUCTgD
L 3
BLOCK 34
0 5 1P 5 12 5
B 6NO II 6 6
/
7 10 7 10 F7
L 8 9 8 9 8
0- 2B
L
8'WATER UNE
p NOT EXISTING INFRASTRUCTURE 8'WATER LINE
C!) (CPN 102844) NOT EXISTING INFRASTRUCTURE
(CPN 102844)
c
N
L
0
c
0
/ LEGEND
PREP
_w PROPOSED WATER LINE ARED FOR.
0o EXISTING OR FORE STAR
` W NOT EXISTING INFRASTRUCTURE (NEI)
3: WATER LINE PRWARMBY. _--mal?
I NOTE I (3OODVti`lN= 14755 PRESTON ROAD,SUITE 130
ALL WATER LINES SHOWN DALLAS,TX 75254
o ARE 8' IN DIAMETER UNLESS CMLENGINEERS-PLANNERS-SURVEYORS 76051 972AS,TX 99
OTHERWISE NOTED P4� "s°"�(8,7)325.373�
w
WATERSBEND
SOUTH PHASE 3B
SEWER EXMrr"A-1"
C?N 102847
N
N W E
O
N 3
SCAM: 1" 300'
M
O
CD
O
Lo
N
4) B1lO��lPi
LL z
92
L 91
29 28 27 26 25 24 23 22 21 20 19 IB
O 90
L zl
Sox 89
Q1 2 3 4 5 J. 7 6 9 10 II 5! 13 14 IS Ni I7
LL 88
U e7
m
I� 1 2 3 4 5 6 7 8 9 1 2 3 4 5 6 7 8 9
85
OLC Mc e1
L l 6o 15 1413 12 11 10 IS 17 16 15 14 13 12 11 10 84
83
Em
7
O z 3 4 S 6 7 8 9 1 16 1 16 W SEWER UNE
NOT E aS77NG INFRASTRUCTURE
a 2 15 14 2 5 z (CPN 1028")
S- 3 14 3 I4 WA R END
UT 15 14 13 12 Ll 9 R
L 4 13 4 To BE RULT4 D
to
L
BLOCK 34
_ 5 12 S 12 5
!7
9 6 II 6 6
7 10 7 0 7
L Zg e 9 8 9 B
L
D
O
C
L
L
!>7
C
!7
PPM/RM POP,
U,
i LEGEND
�S PROPOSED SEWER LINE r �B GOOD WIN!
f ORES TAR
S TBC SEWER HAIL
sj- NOTE av1L ENGINEERS-PLANNERS-SURVEYORS
14755 PRESTON ROAD,SUITE 130
2405 T ALL PROPOSED SANITARY SEWER """�'M Drive, 29 DALLA 02-4%92S4
o LINES SHOWN ARE S' IN DIAMETER 972-702-8699
'-' UNLESS OTHERWISE NOTED
w
WATERSBEND
SOUTH PHASE 3B
PAVING lEXMIT"B"
CPN 102847
N
N W E
O
N g
rl-
1.0 SCALE. 1" 300'
M
O
CD
O
�rol�aava
Lo FTfl
N 99
�
EX(D06#309 zs 26 27 zs zs za 23 zz 91 zo re Is
81
eo
7 21
L �
30X 1 2 3 4 5 6 7 8 9 10 II 12 13 14 4S Ni 17
O
L �
+ 87
Q
LL • 1 z 3 4 5 6 7 8 9 1 P 3 4 5 6 7 8 9 86
ULOC K 30 'l !LC 1.1 85
m
54 83
BO
� 5B � 16 1413 12 II W • 18 17 16 15 14 312 II 10 �
N �
EX(DOE#"4 •', -`"•• f' + •�• ",. N.E.I. CPN102844)
2 3 4 5 6 7 8 9 f• 1 IB 1 16
L z 15 •: z 15 2
7 '
Q } 3 14 3 14 WA R END
jj
(f) 15 14 13 12 II 10 9 p R
} 4 4 �3 BE N RUCTE
IX(DOES •. BLOCK 34
5 12 r 5 12 5
� B 6 II r 6 II 6
L
0) f 7 10 7 O 7
!7 '
P8 8 9 •� 8 9 8
/CPN f02894)
L LEGEND
c
i PROPOSED 29'B—B ROADWAY PROPOSED 37'B—B ROADWAY
W/50'R.O.W. W/ 60'R.O.W.
0 6' PCC PAVEMENT W/ 6' 8' PCC PAVEMENT W/ 8'
LIME—STABILIZED SUBGRADE LIME—STABILIZED SUBGRADE
c
0
SIDEWALK PER THIS CONTRACT
c
SIDEWALK BY HOAEBUILDER PREPARM FOR.
U,
Q ADA RAMPS PER THIS CONTRACT
�
�ARMBY' j ik— F4 R E STAR
GOODVENI
MARSffIAU 14755 PRESTON ROAD SUITE 130
Q0 CIVIL ENGINEERS—PLANNERS—SURVEYORS
o 2405 W Drive,Grapevine,ragas 76051 DAU AS,TX 75254
j ""str°cS"6 972-702-8699
VV ATERSBEND
SOUTH PHASE 3B
STORM DRAIN EXHIBIT"B-1"
CPN 102U7
N
N W E
O
CV S
CV ��yy pp� 77Qp ¶
SCAM: ll VV = 300'
O
CD
O
LO
CV FT—n
L L 9z
=7 EX(DOE#";9 1 29 28 27 26 25 24 23 22 21 20 19 IB 91
L
90
21
0 89
L 30x 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
66
a 87
1 2 3 4 5 6 7 8 9 1 2 3 4 5 6 7 8 9
m 85
NOal
1 84
54 60 16 15 14 13 12 11 10 18 17 16 15 14 13 Y2 11 10
0 59 63
L
I
DG(DOE#";9
L 5 s 7 e 9 1 M 1 6 IN--E..(CPN low")
7 p 3 4
0 LOO 2 15 2 15 2
U)
1 3 14 3 14 WA R END
15 14 13 12 11 10 9 R
413 �3 BE N RUC 4 D
N 4
DL(DOE#42j 5 BLOCK 34 2 5
L
N 9 g II 6 II 6
!7
7 10 7 10 7
>M 28 8 9 8 9 B
L N.E./.(CPN 1Q2B44)
L
0
Cn
c
N
L
N
0
c
0
c
PUPARM FOR.
i LEGEND
� � PROPOSED STORM DRAIN LINE mwAxmsY:
0 � BORE STAR
1 EXISTING STORM DRAIN LINE hf=GOODWIIN!�'S" s -�?
14755 PREST IN ROAD SUITE 130
CIVIL ENGINEERS--PLANNERS—SURVEYORS �
C9 PROPOSED STORM DRAIN INLET 24MMustang I no, axes 76051 DAU AS,TX 75254
O AAe1rO(817)32e-4M 972-702-8699
/ PROPOSED STORM DRAIN AND HEADWALL
L,J[W.— --..i
WATERSBEND
SOUTH PHASE 3B
STREET LIGHTS&STREET ElET NAME SIGNS
IIrXM rr nCv_1"
CPN 102547
N
N
O
N W E
rn S
LD
O cylVL'J SE1 a 1" = 300'
CD
O
LD
CV
N
LL_
L
2 �001�
O 92
I--
EX.(DOE#"29 29 28 27 26 25 24 23 22 21 20 19 19 91
Q1W KIN 90
LL 21
U 3ox 89
I 2 3 4 5 6 7 a 8 10 II 12 13 14 1516 17
m
I 80
� TaAZr
� 87
V1 p 1 Y 3 4 5 6 7 8 9 I Y 3 4 5 6 7 a 9 a6
L
NU L4 31
L 54 60
IS 14 13 12 II 10 19 17 W 15 �14 13 IY II 105B IS
U) nlsl�9i N.E.L(CRY f02 ")
N
2 3 4 5 6 7 8 9 I 16 1 16 1
L Y 15 p 15 2
to
L
3 M 3 14 U R END 3
15 A 13 12 11 10 9 R
4 13 4 IO BE N RUCT4 D
JlLaCLm LOCK 34 3
/ 5 12 5 12 5
L B 6 II 6 II 6
7 10 7 10 7
L
D 28 a 8 e e 8
O
� N.EI. 10284J
c
N
L
N
0
c
p
c
N
LEGEND �`RM�P`
p ARBD BY:
� �
♦� LIGHT POLE GOOD! 4 R E STAR
MAUHALL
TBC LIGHT POLE CIVIL ENGINEERS—PLANNERS—SURVEYORS 14755 PRESTON ROAD,SUITE 130
2405 Mueteng Drive, repevine,Texas 78051
DALLAS,TX 752M
0 Metro(817)329.4373
/ 972-702—M
PROPOSED STREET NAME SIGN
LLJ
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
Watersbend South,Phase 3B,City Project#102847
UNIT PRICE BID
Project Item Information VENUS
Bidlist Specification Unit of Bid
Item Description Section No. MeasureQuantityUnit Price Bid Value
Water Facilities
1 13305.0003 8"Waterline Lowering 33 05 12 EA 8 $3,606.44 $28,851.52
2 3305.0109 Trench Safety 330510 LF 5,388 $0.14 $754.32
3 3311.0241 8"PVC Water Pipe 3311 10, LF
331112 5,388 $25.18 $135,669.84
4 3312.0001 Std.Fire Hydrant Assembly w/6"Gate Valve&Valve Box 33 12 40 EA 4 $4 197.99 $16,791.96
5 3311.0001 Ductile Iron Water Fittings w/Restraint 3311 11 TON 1 $9,124.86 $9,124.86
6 3312.0117 Connect to Existing 8"W.L.Stub-out 33 12 25 EA 8 $530.49 $4,243.92
7 3312.2003 1"Domestic Water Services 33 12 10 EA 104 $856.39 $89,064.56
8 13312.3003 8"Gate Valve 33 12 20 EA 10 $1,215.18 $12,151.80
Water Subtotal $296,652.78
Sanitary Sewer Facilities
9 3301.0002 Post-CCTV Inspection 3301 31 LF 3,857 $2.58 $9,951.06
10 3301.0101 Manhole Vacuum Testing 3301 31 EA 15 $257.61 $3,864.15
11 3305.0109 Trench Safety 330510 LF 3,857 $0.26 $1,002.82
12 3305.0113 Trench Water Stops 330515 EA 6 $267.91 $1,607.46
13 3331.3101 SDR-26 4"Sewer Services 3331 50 EA 107 $822.04 $87,958.28
3311 10,
14 3331.4115 8"SDR-26 PVC Sewer Pipe 3331 12, LF 3,655 $29.21 $106,762.55
33 31 20
15 3331.4116 8"PVC Sanitary Sewer Pipe w/CSS Back-fill 3311 10, LF 202 $59.57 $12,033.14
3311 12
16 3339.1001 4'Std.Dia.Manhole 33 39 10, EA 15 $3,211.45 $48,171.75
33 39 20
17 3339.1003 4'Extra Depth Manhole 33 39 10, VF 18 $249.99 $4,499.82
33 39 20
18 9999.0002 Connect to Existing 8"Sewer 00 00 00 EA 2 $669.771 $1,339.54
Sanitary Sewer Subtotal 1 $277,190.57
CITY OF FORT WORTH Watersb®d South Phase 3B
STANDARD CONSTRUCTION BID PROPOSAL-DEVELOPER AWARDED PROJECTS City Project#102847
Form Revised April 2,2014 00 42 43_Bid Proposal
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
Watersbend South,Phase 3B,City Project#102847
UNIT PRICE BID
Project Item Information VENUS
Bidlist Description Specification I Unit of I Bid Unit Price Bid Value
Item Section No. Measure uantit
Storm Drain Facilities
19 3305.0109 Trench Safety 330510 LF 1,370 $0.26 $356.20
20 3305.0112 Concrete Collar 330517 EA 1 $1,133.46 $1,133.46
21 3349.5001 10'Curb Inlet 33 49 20 EA 2 $4,728.44 $9,456.88
22 3349.5002 15'Curb Inlet 33 49 20 EA 8 $5,970.66 $47,765.28
23 3341.0201 21"Class III R.C.P. 3341 10 LF 152 $52.08 $7,916.16
24 3341.0205 24"Class III R.C.P. 3341 10 LF 592 $60.75 $35,964.00
25 3341.0208 27"Class III R.C.P. 3341 10 LF 214 $66.41 $14,211.74
26 3341.0302 30"Class III R.C.P. 3341 10 LF 131 $77.90 $10,204.90
27 3341.0409 48"Class II R.C.P. 3341 10 LF 281 $161.44 $45,364.64
28 3349.0001 4'Storm Junction Box 33 49 10 EA 3 $3,778.17 $11,334.51
29 3349.0002 5'Storm Junction Box 33 49 10 EA 1 $5 203.58 $5,203.58
30 9999.0003 Class II Rock Riprap 00 00 00 SY 29 $77.55 $2,248.95
31 9999.0004 Connect to Existing 30"R.C.P. 00 00 00 EA 1 1 $1,774.601 $1,774.60
Storm Drain Subtotal $192,934.90
Water/Sanitary Sewer/Storm Drain Facilities Subtotal $766,778.25
Bid Summary
Water/Sanitary Sewer/Storm Drain Facilities Subtotal $766,778.25
Total Bid $766,778.25
Performance/Payment and 2-year Maintenance Bonds $17,328.07
Grand Total $784,106.32
The bid is submitted by the entity listed below:
Company:Venus Construction By:
Street Address:1426 S.Main Print Name
City,State,Zip Code:Mansfield,TX 76063 �rY Phone:817-477-2050
6�4mature
Title:President
Date:12-1-20
Contractor agrees to complete WORK for FINAL ACCEPTANCE within 45 working days after the date when
END OF SECTION
CITY OF FORT WORTH Watersbend South Phase 3B
STANDARD CONSTRUCTION BID PROPOSAL-DEVELOPER AWARDED PROJECTS City Project#102847
Form Revised April 2,2014 00 42 43_Bid Proposal
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
Watersbend South,Phase 311,City Project 9102847
UNIT PRICE BID
Project Item Information GTI
Bidlist Specification Unit of Bid Unit Price Bid Value
Description Section No. Measure nri
Item
ty
Paving Facilities
1 3211.0400 Hydrated Lime 42lbs./S.Y. Collector 321129 NSF
145.0 $160.00 $29,280.00
00
2 3211.0400 Hydrated Lime 32lbs./S.Y. Residential 321129 183.0 $1$3.35 $38286.65
3 3211.0501 6"Lime Treated Sub grade Residential 32 11 2911.399
$3.35 $38,186.65
4 3211-0502 8"Lime Treated Sub grade Collector 32 11 29 6,904 $3.60 $24 854.40
5 3213.0101 6"Concrete Pavement Residential 32 13 13 10,674 $33.20 $354,376.80
6 3213.0103 8"Concrete Pavement Collector 32 13 13 6,558 $35.45 $232 481.10
7 3213.0301 5'Concrete Sidewalk 31 13 20 3.723 $5.50 $20 476.58 3213.0301 6'Concrete Sidewalk 31 1320 9,280 $5.50 $51,040.00
9 3213.0501 R-1 Ram 32 13 20 FA 4 $2,200.0D $8 800.00
10 3213.0506 P-1 Ramp 321320 FA 8 $1,800.00 $14400.00
11 9999.0006 Connect to Basting Pavement 00 00 00 FA 8 $300.00 $2,400.00
12 9999.0006 Remove End of Road Barricade 00 00 00 FA 8 $450.00 $3 600.00
13 9999.0007 R1-1 Stop Sin 000000 EA 9 $125.00 $1,125.00
14 9999.0008 St Marker Blade 00 00 00 EA 36 $250.00 $9,000.00
15 Traffic Control 00 00 00 MO 1 2 $2,000.00 - $4,000.00
Paving Subtotal $817,220.45
Bid Summa
Pavincl Facilities Subtotal $817,220.45
Total Bid $817,220.45
Performance/Payment and 2-year Maintenance Bonds $12,500.00
Grand Total $829,720.45
The bid is submitted by the entity listed below:
e.
Company:Glenn Thurman,Inc. By:
Street Address:P.O.Box 850842 C e
City,State,Zip Code:Mesquite,TX 75185
Phone:972-286-6333
Signatare
Title: CONTRACT MANAGER
Date:
Contractor agrees to complete WORK for FINAL ACCEPTANCE within 60 worlflng days after the date when
END OF SECTION
Waterebwd Smlh PGecc3A
-OF-WORM Cin Anjct MI0284]
SieW DARO CONSfRUCT10N AID PROPOSAL-0E V ELOPER AW AAl>ID➢ROIEC'CS
004243 Bid Popaai
Fa®R<vised Ap,d 2,2014
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
Watersbend South,Phase 3B,City Project#102847
UNIT PRICE BID
Project Item Infi irnation IUC
Bldhst Description Specification Unit of Bid Unit Price Bid Value
Item Section No. Measure Quantity
Street Licihtinci Facilities
1 2605.3011 2"CONDT PVC SCH 40 T 26 05 33 LF 2,104 $8.83 $16 578.32
2 3441.1408 NO 6 Insulated Elec Condr 3441 10 LF 6,312 $0.96 $6,059.52
3 3441.1633 Type 33B Arm 34 41 20 EA 16 $293.00 $4 688.00
4 3441.3201 LED Lighting Fixture R-2 34 41 20 EA 14 $262.00 $3,668.00
5 3441.3201 LED Lighting Fixture R-4 34 41 20 EA 2 $262.00 $524.00
6 3441.3301 Rdwy Ilium Foundation TY 1 2 and 4 34 41 20 EA 16 $1,114.00 $17,824.00
7 3441.3341 Fdwy Ilium TY Pole 344120 EA 16 $1,659.UU $29,744.00
Street Lighting Subtotal $61,065.64
Bid Summary
Street Lighting Facilities Subtotal $81,085.84
Total Bid $81,085.84
Performance/Payment and 2-year Maintenance Bonds Included
Grand Total $81,085.84
The bid is submitted by the entity listed below:
Company:Independent Utility Construction,Inc. By: Richard Wolfe
Street Address:5109 SunValley Drive Print amc
City,State,Zip Code:Ft.Worth,TX 76119
Phone:8174784444
Si to
Title: President
Date: 12/02/2020
Contractor agrees to complete WORK for FINAL ACCEPTANCE within 30 woridng days after the date when
END OF SECTION
CITY OF PORT WORTH wafae South Pheee 3H
STANDARD CUNSTRUMM HH)PROPOSA DEVELOPER AWARDED PROHICTS Chyi?Mx#102847
Form Review Ap—,2014 004243_HWPIo—i