HomeMy WebLinkAboutContract 47702-A3 CSC No.47702-A3 AMENDMENT No.3 TO CITY SECRETARY CONTRACT WHEREAS, the City of Fort Worth (CITY) and Stantec Consulting, Inc. , (ENGINEER) made and entered into City Secretary Contract No.47702 (the CONTRACT) which was authorized by M&C C-2657 on the 29' day of March 2016 in the amount of $989,477 . 00; and WHEREAS , the CONTRACT was subsequently revised by Amendment No. 1 in the amount of $228,803. 00 which was authorized by M&C C-28425 on October 10, 2017 and Amendment No. 2 in the amount of $361,720. 00 which was authorized by M&C C-28842 on September 11, 2018; and WHEREAS, the CONTRACT involves engineering services for the following project: Liquid Biosolids Storage Tank; and. WHEREAS, it has become necessary to execute Amendment No. 3 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in the proposal attached hereto and incorporated herein. The cost to City for the additional professional services to be performed by Engineer totals $40,000. 00. 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $1,620,000.00. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. OFFICIAL RECORD Page -1- CITY SECRETARY FT. WORTH, TX EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth ENGINEER: Stantec Consulting, Inc. 75aN4,Lu,NgA&6o Dana Burghdoff( r2,202 9:57 CSC Dana Burghdoff Alex Visotski Assistant City Manager Senior Project Manager Mar 2,2021 02/05/2021 DATE: DATE: APPROVAL RECOMMENDED: ChnLftGre�tfa�det Christopher H rder(Mar 1,202116.42 CST) Chris Harder, P.E. Director, Water Department Contract Compliance Manager: II By signing, T acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Sei awash Mir Project Manager APPROVED AS TO FORM AND LEGALITY: M&C: N/A Date: N/A 091r, 1295# : N/A oBlxk(M,2,=109:0CSr) Douglas W. Black Senior Assistant City Attorney ATTEST: 4o1 FORT A`p�►F°°°°°°°°°o o� i ° o 0.voo °2A Mary J. Kayser d�� o o*Id lc City Secretary ���°T°°°°°5 pp' EX0 `I !I OFFICIAL RECORD Page -2- CITY SECRETARY FT. WORTH, TX ® Stantec Memo To: Mir Seiavash From: Alex Visotski 200 Texas St, Fort Worth, TX 76102 12222 Merit Dr. #400 Dallas,TX 75251 File: Contract Amendment 3 Date: February 5,2021 Reference: City of Fort Worth, Contract#47702-Contract Amendment 3 Overview This proposed contract amendment (Amendment 3) seeks approval for additional scope and fee for the following activities for the City of Fort Worth (City) Contract No.47702 for the Village Creek Water Reclamation Facility Storage Tank Improvement project and City Project No.02669: 1. Additional evaluation, analysis, and support due to construction services being extended and additional documents were submitted for engineering review. Throughout the construction of the 5MG Biosolids Storage Tank,the additional engineering services were delivered to meet the need of the facility,which has exceeded the prior contractual estimates and been prolonged due to weather and COVIDI9 delays. 2. Recovering Gupta and Associates (GAI) Electrical and I&C additional fees to complete extra inspections for RLC factory testing, electrical and I&C components of the project. 3. Additional work to complete record drawings. A summary of Project Fees to Date is provided in Table Number 1 and a summary of each of Amendment 3 items and the proposed fee adjustment is provided further below. Table Number 1 Summary of Project Fees to Date Original Project Fee $989,477.00 Amendment No] $228,803.00 Amendment No2 $361,720.00 Proposed Amendment No3 $40,000.00 Revised Contract Amount $1,620,000.00 Basis for Additional Scope/Fee For this Amendment 3,STANTEC is seeking an increase in the project NTE by$40,000. A summary of Amendment 3 request is provided below, 1 of 3 February 5,2021 Mir Seiavash Page 2 of 3 Reference: City of Fort Worth,Contract#47702-Contract Amendment 3 1, Additional evaluation, analysis, and support due to construction services Throughout the construction of the 5MG Biosolids Storage Tank,the additional engineering services were delivered to meet the need of the facility,which has exceeded the prior contractual estimates and been prolonged due to weather and COVID19 delays.The following efforts are related to the additional project documentation review, planning and support for the construction schedule extension which required a further degree of effort and design features during construction to ensure the final product would meet the plant requirements. • Additional support for extra punchlist inspections and re-inspections, • Additional support for monthly progress meetings and project communication, • Additional site observations, • Development of checklists, • Coordination with the contractor and subcontractor, • Follow up with action items, • Recording modifications for records, • Review of additional Pay Apps, RFI's and Submittals,summarized in Table Number 2 I i Table Number 2 Pay BFI's Total Submittals Approved in Contract 18 20 200 Submitted to Date 19 46 253 Additional until Completion 2 3 10 Total assumed in new charge rate 21 49 263 f Stantec is seeking an additional fee of$26,870 to cover the costs of these activities. ( ' 1 2. GAI fees to complete the project „ GAI estimated$4,230 to complete extra inspections for RLC factory testing, electrical and I&C components of the project (includes the minority subconsultant 10%markup). 3. Additional work to complete record drawings. The original scope document submitted to the City did not include all the necessary work to complete the record drawings and did not account for coordinating it with our subs. i Stantec is seeking an additional fee of$8,900 to cover the costs of these activities,which also includes Stantec subconsultant contract management costs. 2 of 3 i ti February 5,2021 Mir Seiavash Page 3 of 3 Reference: City of Fort Worth,Contract#47702-Contract Amendment 3 Revised Project Schedule Assuming a written NTP of Amendment 3 is received by February 10, 2021,the project schedule will not be affected. Stantec City of Fort Worth Alex Visotsid Mir Seiavash Project Manager Project Manager I r. l� I 3of3