HomeMy WebLinkAboutContract 53424-FP1 City Secretary 53424 -FP1
Contract No.
FORTWORTH., Date Received Mar3,2021
NOTICE OF PROJECT COMPLETION
(Developer Projects)
The Transportation and Public Works Department upon the recommendation of the Project
Manager has accepted the following project as complete:
Project Name: LAKES OF RIVER TRAILS EAST PHASE 17A
City Project No.: 102275
Improvement Type(s): ❑ Paving ® Drainage ❑ Street Lights ❑ Traffic Signals
Original Contract Price: $176,616.25
Amount of Approved Change Order(s):
Revised Contract Amount:
Total Cost of Work Complete: $176,616.25
Xl-&d0`l iyil 91-
Brandon Walker(Mar 2,202109:29 CST) Mar 2,2021
Contractor Date
Vice President
Title
Walker Utilities Inc.
Company Name
7RO Mart 2021
TRO(Mar 2,202113:17 CST) f
Project als ector Date
Patrick a dey(Mapd,2021 14:40 CST) Mar 2,2021
P ject Man er Date
e Sca rlett Morales(Mar 2,2021 14:57 CST) Mar 2,2021
FA M nag r Date
Dana Burghdoff(M r2,2021 :37 CST) Mar2,2021
Asst. City Manager Date
OFFICIAL RECORD
CITY SECRETARY
Page 1 of 2
FT. WORTH, TX
Notice of Project Completion
Project Name: LAKES OF RIVER TRAILS EAST PHASE 17A
City Project No.: 102275
City's Attachments
Final Pay Estimate
Change Order(s): ❑ Yes ® N/A
Contractor's Attachments
Affidavit of Bills Paid
Consent of Surety
Statement of Contract Time
Contract Time: 120 WD Days Charged: 147
Work Start Date: 3/3/2020 Work Complete Date: 2/3/2021
Completed number of Soil Lab Test: 69
Completed number of Water Test: 22
Page 2 of 2
FORT WORT H
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name LAKES OF RIVER TRAILS EAST PHASE 17A
Contract Limits
Project Type STORM DRAIN
City Project Numbers 102275
DOE Number 2275
Estimate Number 1 Payment Number 1 For Period Ending 3/2/2021
WD
City Secretary Contract Number Contract Time 12VM
Contract Date Days Charged to Date 147
Project Manager NA Contract is 100.00 Complete
Contractor WALKER UTILITIES,INC.
P.O.BOX 54122
HURST, TX 76054
Inspectors DICKINSON/ OVERSTREET
Tuesday,March 2,2021 Pagel of 4
City Project Numbers 102275 DOE Number 2275
Contract Name LAKES OF RIVER TRAILS EAST PHASE 17A Estimate Number 1
Contract Limits Payment Number 1
Project Type STORM DRAIN For Period Ending 3/2/2021
Project Funding
STORM DRAIN
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
---------------------------------------
1 10'CURB INLET 2 EA $5,950.00 $11,900.00 2 $11,900.00
2 15'CURB INLET 2 EA $8,000.00 $169000.00 2 $169000.00
3 48"RCP 110 LF $212.00 $239320.00 110 $239320.00
4 36"RCP 455 LF $150.00 $689250.00 455 $689250.00
5 30"RCP 250 LF $112.00 $29,000.00 250 $29,000.00
6 21"RCP 42 LF $70.00 $2,940.00 42 $2,940.00
7 Y STORM JUNCTION BOX 2 EA $69200.00 $129400.00 2 $129400.00
8 48"FLARED HEADWALL 1 EA $69350.00 $69350.00 1 $69350.00
9 MEDIUM STONE RIPRAP,DRY 42 SY $69.00 $29898.00 42 $29898.00
10 TRENCH SAFETY 911 LF $0.75 $683.25 911 $683.25
11 30"PARALLEL HEADWALL 1 EA $3,875.00 $3,875.00 1 $3,875.00
--------------------------------------
Sub-Total of Previous Unit $1769616.25 $1769616.25
--------------------------------------
Tuesday,March 2,2021 Page 2 of 4
City Project Numbers 102275 DOE Number 2275
Contract Name LAKES OF RIVER TRAILS EAST PHASE 17A Estimate Number 1
Contract Limits Payment Number 1
Project Type STORM DRAIN For Period Ending 3/2/2021
Project Funding
Contract Information 5ummary
Original Contract Amount $176,616.25
Chanize Orders
Total Contract Price $176,616.25
Total Cost of Work Completed $176,616.25
Less % Retained $0.00
Net Earned $176,616.25
Earned This Period $176,616.25
Retainage This Period $0.00
Less Liquidated Damages
Days @ /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $176,616.25
Tuesday,March 2,2021 Page 3 of 4
City Project Numbers 102275 DOE Number 2275
Contract Name LAKES OF RIVER TRAILS EAST PHASE 17A Estimate Number 1
Contract Limits Payment Number 1
Project Type STORM DRAIN For Period Ending 3/2/2021
Project Funding
Project Manager NA City Secretary Contract Number
Inspectors DICKINSON/ OVERSTREET Contract Date
Contractor WALKER UTILITIES,INC. Contract Time 120 WD
P.O.BOX 54122 Days Charged to Date 147 WD
HURST, TX 76054 Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
--------------------------------------
Total Cost of Work Completed $176,616.25
Less % Retained $0.00
Net Earned $176,616.25
Earned This Period $176,616.25
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $176,616.25
Tuesday,March 2,2021 Page 4 of 4
FoRTWo,RTH' ,
TRANSPORTATION AND PUBLIC WORKS
February 3, 2021
Walker Utilities
124 Brown Trail
Hurst,TX 76053
RE: Acceptance Letter
Project Name: Lakes Of River Trails East Phase 17A
Project Type: Storm Drain
City Project No.: 102275
To Whom It May Concern:
On February 3, 2021 a final inspection was made on the subject project. There were no punch list items
identified at that time. The final inspection indicates that the work meets the City of Fort Worth
specifications and is therefore accepted by the City. The warranty period will start on February 3, 2021,
which is the date of the final inspection and will extend of two (2)years in accordance with the Contract
Documents.
If you have any questions concerning this letter of acceptance, please feel free to contact me at 817-
392-2443. j
Sincerely,
i
Patrick a ley(MaV2,202114:40 CST)
Patrick Buckley, Project Manager
Cc:Travis Overstreet, Inspector
Mike Glover, Inspection Supervisor
Randy K Horton,Senior Inspector
Victor Tornero, Program Manager
David Gregory, Consultant
Walker Utilities, Contractor
Kenneth Newell, Developer
File
E-Mail:
Douglas W. Wiersig, P.E., PhD., Director,TPW Chris Harder, P.E.,Assistant Director,Water
Richard Martinez,Assistant Director,TPW Wendy Chi-Babulal, P.E.,Water
Marisa Conlin,Traffic Engineering Tony Sholola, P.E.,Water
Allen Hall, Superintendent,TPW Richard Zavala, Director, PARD
John Robert Carman, P.E., Director,Water David Creek,Assistant Director, PARD
Rev.9/15/16
AFFIDAVIT
STATE OF TEXAS
COUNTY OF TARRANT
Before me, the undersigned authority, a Notary Public in the state and
county aforesaid, on this day personally appeared Brandon Walker,
Vice President, of Walker Utilities Inc., known to me to be a credible
person, who being by me duly sworn, upon his oath deposed and said;
That all persons, firms, associations, corporations or other
organizations furnishing labor and/or materials have been paid in full;
That the wage scale established by the City Council in the City of Fort
Worth has been paid; and
That there are no claims pending for personal injury and/or property
damages;
On Contract described as;
Lakes of River Trails Phase 17A Water, Sanitary Sewer, and Storm Drain
Improvements City Project# 102275
BY
Subscribed and sworn before me on this 3 day of
Fi
FE-
JASON ESCOBEDO
tary Public, State of Texasmm. Expires 02-26-2025Notary ID 126817961
Public in Tarrant
County, Texas
CONSENT OF OWNER ❑
SURETY COMPANY ARCHITECT ❑
TO FINAL PAYMENT CONTRACTOR ❑
AIA DOCUMENT G 70 7 SURETY 30
OTHER ❑ BOND#4426517
PROJECT: Lakes of River Trails East Phase 17A
(name, address)
TO: (Owner) CONTRACT FOR:Installing Water,Sanitary Sewer and Storm Drain
City of Fort Worth, CFA Number CFA19-0137
1000 Throckmorton Street
CONTRACT DATE:12/30/2019
Fort Worth,TX 76102
CONTRACTOR:
Walker Utilities,Inc.
In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above,the
(here insert name and address of Surety Company)
SureTec Insurance Company
2103 CityWest Blvd.,Suite 1300
Houston,TX 77042 ,SURETY COMPANY,
on bond of
(here insert name and address of Contractor)
Walker Utilities,Inc.
P.O.Box 54122
Hurst,TX 76053 ,CONTRACTOR,
hereby approves of the final payment to the Contractor,and agrees that final payment to the Contractor shall
not relieve the Surety company of any of its obligations to
(here insert name and address of Owner)
City of Fort Worth
1000 Throckmorton Street OWNER,
Fort Worth,TX 76102
as set forth in the said Surety Company's bond
IN WITNESS WHEROF,
The Surety Company has hereunto set its hand this 2nd day of February 2021
SureTec Insurance Company
ur ornpany
A Signatur o Autho zed Representative
AttestV
(seal): Kelsey L,,dgins Witness Jennifer Clark Attorney-in-Fact
Title
AIA DOCUMENT G707*CONSENT OF SURETY COMPANY TO FINAL PAYMENT*APRIL 1970 EDITION"AIA
1970 THE AMERICAN INSTITUTE OF ARCHITECTS,1735 NEW YORK AVE.NW WASHINGTON,D.C.2006
POA a: 4221800
SureTec Insurance Company
LIMITED POWER OF ATTORNEY
Know Ail Men by These Presents, That SURETEC INSURANCE COMPANY (the "Company"), a corporation duly organized and
existing under the laws of the State of Texas, and having its principal office in Houston, Harris County, Texas, does by these presents
make,constitute and appoint
Kathy Sells, Lanny Land,Steven W. Lewis, Elena Sells, Jennifer Clark
its true and lawful Attorney-in-fact, with full power and authority hereby conferred in its name, place and stead, to execute, acknowledge
and deliver any and all bonds, recognizances, undertakings or other instruments or contracts of suretyship to include waivers to the
conditions of contracts and consents of surety for,providing the bond penalty does not exceed
Five Million and 00/100 Dollars ($5,000,000.00)
and to bind the Company thereby as fully and to the same extent as if such bond were signed by the CEO,sealed with the corporate seal
of the Company and duly attested by its Secretary, hereby ratifying and confirming all that the said Attorney-in-Fact may do in the
premises. Said appointment is made under and by authority of the following resolutions of the Board of Directors of the SureTec
Insurance Company:
Be it Resolved, that the President, any Vice-President, any Assistant Vice-President, any Secretary or any Assistant Secretary shall be and is
hereby vested with full power and authority to appoint any one or more suitable persons as Attorneys)-in-Fact to represent and act for and on
behalf of the Company subject to the following provisions:
Attorney-in-Fact may be given full power and authority for and in the name of and of behalf of the Company, to execute, acknowledge and
deliver,any and all bonds, recognizances,contracts,agreements or indemnity and other conditional or obligatory undertakings and any and all
notices and documents canceling or terminating the Company's liability thereunder, and any such instruments so executed by any such
Attorney-in-Fact shall be binding upon the Company as if signed by the President and sealed and effected by the Corporate Secretary.
Be it Resolved, that the signature of any authorized officer and seal of the Company heretofore or hereafter affixed to any power of attorney or
any certificate relating thereto by facsimile,and any power of attorney or certificate bearing facsimile signature or facsimile seal shall be valid
and binding upon the Company with respect to any bond or undertaking to which it is attached. (Adopted at a meeting held on 20,of April,
1999)
In Witness Whereof, SURETEC INSURANCE COMPANY has caused these presents to be signed by its CEO, and its corporate seal to
be hereto affixed this end day of March ;A.D. 2020 .
SURETEC INS PA NY
`�S�RnNo�o
By:
John Kno ,CE
State of Texas ss: cc co
County of Harris
On this end day of March , A.D.202o before me personally came John Knox Jr.,to me known, who, being by me duly sworn, did depose and say,
that he resides in Houston,Texas,that he is CEO of SURETEC INSURANCE COMPANY, the company described in and which executed the above
instrument;that he knows the seal of said Company;that the seal affixed to said instrument is such corporate seal;that it was so affixed by order of the
Board of Directors of said Company;and that he signed his name thereto by like order.
JACOIJEUN GHEENLEAF
Notary Public,State of Texas
Comm.Expireso5-i8-2021
,, Jacq elyn Greenleaf Notary Public
Notary ID 126903029
My commission expires May 18,2021
I,M. Brent Beaty,Assistant Secretary of SURETEC INSURANCE COMPANY,do hereby certify that the above and foregoing is a true and correct copy
of a Power of Attorney,executed by said Company, which is still in full force and effect;and furthermore,the resolutions of the Board of Directors,set
out in the Power of Attorney are in full force and effect.
Given under my hand and the seal of said Company at Houston, Texas this 4 day of � Zo7 , A.D.
A.Bre'd Beaty,A. isixnt Sec Lary
Any instrument issued in excess of the penalty stated above is totally void and without any validity.
For verification of the authority of this power you may call(713)812-0800 any business day between 8:30 am and 5:00 pm CST.