HomeMy WebLinkAboutContract 38054-CO2 LOFFICIAL RECORD
ECRETARY City of Fort Worth CITY SECRETARY
ORTH,TX Change Order Request CONTRACT NO. b5+C�CG,
Change Order No. Date TPW Project No. Funding(FAG)
2 (two) 10/19/09 C 295 541200
208090023880
Facility and Project Description City Secretary Contract No.
Nashville Neighborhood Policing District No. 6 38054
ORIGINAL CONTRACT AMOUNT................................................................ $8,216,000
EXTRAS TO DATE..................................................................... $ 6,087
CREDITS TO DATE.................................................................... 0
CONTRACT COST TO DATE.................................................................................................. $ 8,222,087
AMOUNT OF PROPOSED CHANGE ORDER............................................................................ $ 23,698
REVISED CONTRACT AMOUNT............................................................................................. $8,245,785
ORIGINAL FUNDS AVAILABLE FOR CHANGE ORDERS............................................................ $ 144,000
REMAINING FUNDS AVAILABLE FOR CHANGE ORDERS......................................................... $ 114,215
ADDITIONAL FUNDING (IF NECESSARY)...... ....... ................................................................. 0
IN ACCORDANCE WITH THIS CHANGE ORDER, THE CbNTRACTOR SHALL:
Provide all labor and materials as per PCR's 1,3,5,9,10,14 and 15 attached Add $ 23,698
------------------------------------------------------------------------------------------------------------------------------
Total Add $ 23,698
PCR's 2,8,11,12,and 13 are rejected
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full(both time
and money)for all costs arising out of,or incidental to,the above Change Order
Contractor's Name
Crossland Construction Company, Inc.
Original Contract Time Additional Approved Time To Date Approved Contract Time To Date Additional Time For This Change Order
430 cd 0 430 cd 9 cd
Contra r-Cro p,
Co ction Company Date Co ucti a ag Date
�a/t I)eI f��9
Chief,Archite ural Services Division Date Director,Transportation and Public works Date
co
Project A hiteQt/ ins+Will Date itntforney I Date
C' /y Date Council Action(ft R,ehuir-e-j7Date1/8 08
///�9 ❑ Approved El Disapproved
❑ Other �. N0 Nlf$r rUT BJtRE
Distribution: MWA I�y� �OoO D04
File p u ppp Y
Construction Manager o
Project Manager p u o�
Contractor rv� rk 0
arty Hendrix, dty Secretary d '0d
o
OD cop 1 A08:32 I N
TPW Facilities Management Division
Change Order Form(12119101)
Change Order 2 Nashville Neighborhood Policing District No. 6
PCR 001- Remove soil as per Environmental Management direction at
various locations of UST's uncovered during excavation ADD $ 5,907
PCR 002- Water line Bore (REJECTED) No Change
PCR 003— Credit for Water Extensions (DEDUCT) ($14,515)
PCR 005-Concrete repairs due to thermal expansion ADD $ 6,816
PCR 008- Reroute Gas Line (REJECTED) No Change
PCR 009- Raise Steel at Front Entry ADD $ 5,067
PCR 010—Add I beam reinforcement to minimize deflection ADD $ 10,408
PCR 011 - Add tube steel supports hallway windows (REJECTED) No Change
PCR 012-ADD Expansion Joints at paving area(REJECTED) No Change
ASI 013- Add West Canopy Support (REJECTED) No Change
ASI 014- Add Steel as per SK 14 ADD $ 1,515
ASI 015- Add steel as per PR-4 Option 1 ADD $ 8,500
------------------------------------------------------------------------------------------------------------
Total This Change ADD $ 23,698
C'ROSSLAND Potential Change Orders
CONSTRUCTION COMPANY, INC. Summary, Grouped by Company ID �J6 t
Fort Worth Police and Traffic Facility g 6 Project ate 146015.000 Crossland Construction Co.,Inc.
1100 Nashville Ave. Tel: 214-578-0743 Fax: NA
Fort Worth,Texas 76102
item No Description BUdget Allocation Estimate Proposed Approved Applied Change Order QLJote Due Quote ReCd,
No Company Assigned Date: 11'
001 Soil Removal for EPA 5,370.00 5,370.00 5,370.00 5,370.00 3/30/2009
Level 001 10.00%Overhead&Profit 537.00 537.00 537,00 537.00
Prolog Manager Printed on: 3/23/2009 Texas Page 1
Utilities, Inc., DBA H & VIl Utility Contractors
V
CHANGE ORDER REQUEST NO, 1
For Nashville Neighborhood Policing District
_CONTINUATION SHEET AIA DOCUMENT G703(Instructon on reverse lade) Page ,of____pages
L AIA Document G702,APPLICATION AND CERTIFICATE FOR PAYMENT Original Subcontract sum 287,570.37
containing ContacEDrs signed Cerf+ficadan,is atmohed, This Change Order 5,370.00
In tabulations below,amDurris ane stated to the nearest dollar, Prior Change Orders 0.00
Use Cokimn i on Contracts where variable retainage for line items may apply. Subcontract Sum to Date 292,940.37
A 8 C D _ E F G H 1
WORK COMPLETED MATERIALS TOTAL WUANCE
IrEW SCHEDULED f FROM PREVIOUS PRESENTLY) COMPLETED % TO RETAINAGE '•
NO. DE9 RWfION OF WORK VALUE I APPUCATION � THIS PERIOD STORED AND STORED (010) FINISH (IF VARIABLE
I '10♦E) 1 (NOT IN TO L1ATE (CrG) RATE
' _ t D OR E) IDFE+F)
I March 3 10 Hr, Excavator Rental 4
$150.001hr 1,5.0.00 1,500.001 1,500.00 100%, 0
8.5 Hr. Large Dump Truck I
§$90.001hr 765.Q0 i 765.00 765.00 10!096 0
19.5 Hr.Dump Truck(2
$70.00 tx. 1,3f5A0 �1 _ 1,365.00 1,365.00` 100°y6 0
i ..
Total 3,630,00 3,630.0011 3,630.00
March 4 ;6 Hr. Exmwtor Rental
.@$150.001hr 900.00 900.00 j 900.00 100'A 0
12 Hr. Dump Truck(2) ,
070.1001hr 840.00 840.00 840.00 100%1 0.
Total 1,740.001 1,740.00 - 1,740.00 ;�
Total for change order 5,370.00 1 5,3701%1 6.370,001 1 —
Approved by For Crossland Construction Co., Inc. Date:
' CROSSLAND
Potential Change Orders
CONSTRUCTION COMPANY, INC. Summary,Grouped by Company ID L-1 VV6 3
Fort Worth Police and Trafflc Facility#6 Project# 146015.000 Crossland Construction Co.,Inc.
1100 Nashville Ave. Tel: 214-678-0743 Fax: NA
Fort Worth,Texas 76102
Itern No_ Description BUdget Allocation Estimate Proposed Approved -Apphed Change Order Quote D�ie Quote Reo'd
No Company Assigned 109
001 Water Line Scope Reduction (13,823.55) (13,823.55) (13.823.55) (13,823.55) 4/3/2009
002 Original Bid P&O @ 5% - (691.18) (691.18) (691.18) _ (691.18) 413l2009
Prolog Manager Printed on: 3/27/2009 Texas Page 1
Utilities, Inc., DBA H & W Utility Contractors
CHANGE ORDER REQUEST NO. 3
For Nashville Neighborhood Policing District
CONTINUATION SHEET AIA DOCUMENT G703(Insiructon on reverse side) Page `of pages
AIA Document G702,APPLICATION AND CERT FICATE FOR PAYMENT
omtaining Contractor's soned Cerfificalbkn,is attached.
In tabulations below,amounts are stated:a the nearest dollar.
Use Colunn 1 on Contracts where varlabia re%ireage for li-'le items may apply.
A B C t] F
i V ORK COMPLETED MATERIALS TOTAL BALANCE
ITEM ! SCHEDULED FROM FF&VIDl1S I ' PRESENTLY] CCNPLETED�'d To RETAIHAGE
NO. i DESCRIPTION OFWORK 1 VALUE i APPLICATION THIS PERIOD I STORED ANDSTORED (['s/G) NNSH (IF VARIABLE) l
i '(D+E) 1 (NOT IN TO DATE (C!3) I RATE +
D OR E) (C+E+F)
- --------------
I LINE i -�--- -
Reductions-Avenue D � -
- _
--- 8--x B"Tee ---
^ _---�8,� ate valve,fi=a hydrant -- - - - - -
t -g--- - .. - - '. -
Nashvtlle !
17 x 6"Tapping Sleeve
W,Gate Valve
1 4"Gate Valve
I
4"tapping sleeve _ a ----
_ Water line
This work was performed , !� --
b City of Fort Worth Crews.
Total for change order I(I 3 823-55 0001 0.0ol 0,001 1 0.00
Approved by For Crossland Construction Co., Inc. Date:
,
a
CROSSLAND Potential Change Orders I J
CONSTRUCTION COMPANY, INC. Summary,Grouped by Company
Fort Worth Police and Traffic Facility#6 Project M 146015.000 Crossland Construction Co.,Inc.
1100 Nashville Ave. Tel: 214-578-0743 Fax: NA
Fort Worth,Texas 76102
Item No Description Bu•• • •n Estimate Proposed Ap• • -• Applied Change Order Quote Due,Ouote-Rec'd
■ Company Assigned D. 119
001 Concrete Fix at Foundation- 6,196.00 6,196.00 6.196.00 6,196.00 7/24/2009
Crossland Numbers
Level 001 10.009'6 Overhead&Profit 619.60 619.60 619.60 619.00
Markup
Prolog Manager Printed on: 9/22/2009 Texas Page 1
rage i or,i ,
Aaron Hight
From: Mike Crossland
Sent: Thursday,September 17, 2009 12:03 PM
To: Aaron Hight
AARON,
I TALKED TO MARK ON THE PHONE AND DISCUSSED THE SERCO FIX AT THE
PIERS/GRADEBEAM AT THE CRAWLSPACE AND HERE IS WHAT I WORKED UP.
LABOR:3 MEN X 5 DAYS @ 10hrs day= 150 mn.hr.X 28.00hr._$4,200.00
MAT. 11 BAGS SILKA @$48.00 ea. =$528.00
1 GAL SURFACE PREP @$80.00
TOOL RENTAL CHIPPING HAMMERS @$450.00
CIRC.FANS @$200.00
WORK TRUCK,
TOOLS @$ 175.00
DISPOSALABLES
TOTAL: @$5,633,00
P&0 : @ $ 563.00
CERCO TOTAL:: =$6196.00
SOMETHING TO KICK AROUND
C8
03—ma II �LS
Mike Crossland
Owner,Vice-President,Texas Division Manager
861 N Coleman,P.O. Box 279
Prosper,TX 75078
Phone: 972-347-5659 Fax:972-347-5684
Cell: 469-952-7740
mcrosslandP cross)andconstruction.com
website:www.crossiandconstruction.com
( 1 Please consider the environment before printing this e-mail.
9/22/2009
' CROSSLAND
Potential Change Orders
Summary,Grouped by Company ID
CONSTRUCTION COMPANY, INC.
Fort Worth Police and Traffic Facility It 6 Project 4 146015.000 Crossland Construction Co.,Inc.
1100 Nashville Ave. Tel: 214-578-0743 Fax: NA
Fort Worth,Texas 76102
Item No Description Budget Allocation Estimate Proposed Approved Applied Change Order Quote Due Quote Rec'd
'No Corn LAssigned Date: 8/21/2009',
001 Materials 1,100.00 1,100.00 1,100.00 1,100.00 8/28/2009
002 Labor and Equipment 3,506.00 3,506.00 3,506.00 3,506.00 8/28/2009
Level 001 10.00%Overhead&Profit 460,60 460.60 460.60 460.60
Markup
Prolog Manager Printed on: 9/22/2009 Texas — Pagel
A & S Steel
1701 Brennan Ave
Fort Worth, TX 76106
Subcontract Modification
##1
DATE: 18-Aug-09 JOB# 9022
CONTRACT#
TO: CROSSLAND CONSTRUCTION COMPANY INC
833 S. EAST AVE PROJECT:
COLUMBUS, KS 66725 Fort Worth Police&Traffic Faciltiy#6
Original Contract Amount
Prior Approved Change Orders $0.00
Scope: Raise roof southeast Equipment $7 800.00
G-9 to K 6.1 to 7 C2M ena s $1,000.00�-
$12,103.00
profit $2,302.00
Change Order Amount $23,205.0 1 /°O
Total Approved Change Orders
Total Contract Amount
A& S Steel, Ltd Crossland Construction Company, Inc
Signature Signature
Printed Namefritle Printed Name/Title
Date Date
CUSTOMER
PHONE #
FAX#
DATE
P.O.NUMBER _
1850 E.53rd St. North•P.O.Box 574 Fax:(316)744-8463 APPX.SHIP DATE
Wichita Kansas 67201 • 316 744-7587 Call Toll Free: 1-800-835-2779
Roof Pitch —.. __ ...
IRA 1st— ' 9(YJI IFtA-rcy
of" 6 w Y I U
r y
7 w ,as' W W . moo
4�
w 14 7Uo- l
N �2 - SoJr
u bey
AT
Z04)
f s -
t,t
2r
y 1
Project Name Address City/Stateer
Job Phone Contact _ f
NOMINAL THICKNESS WIDTH FACING TABS ACCESSORIES
R-10 3" 36" WV 2.3• Roils 3"x 160`Tgw v
R-13 4" 46" VRRPlus 1-5" Type
R-19 6" e0" WMP-VR DER Cans 78 77 Spray Adhesive
OTHER 72" WM"0 ROLLS DOUBLE FACED TAPE
OTHER
METAL BUILDING INSULATION AND ACCESSORIES
'CROSSLAND
Potential Change Orders
CONSTRUCTION COMPANY, INC. Summary, Grouped by Company ID^ (--Cm �
Fort Worth Police and Traffic Facility#6 Project# 146015.000 Crossland Construction Co.,Inc.
1100 Nashville Ave. Tel: 214-57"743 Fax: NA
Fort Worth,Texas 76102
Item No Description Budget Allocation Estimate Proposed Approved Applied Change Order Quote Due Ouote Rec'd
No Company Assigned Date: 8/2812009
001 Steel Improvements-Materials 2,194.60 2,194.60 2,194.50 2,194.50 9/4/2009
002 Steel Improvementrs-Labor$ 3,417.00 3,417.00 3,417.00 3,417.00 9✓4/2009
Equipment
003 Stud Rework 3,850.00 3,850.0o 3,850.00 3,850.00 9/4/2009
Level 001 10.00%Overhead$Profit 946.15 946.15 946.15 946.15
Markup
Prolog Manager T Printed on: 9/22/2009 Texas -Yr Pagel
A & S Steel
1701 Brennan Ave
Fort Worth, TX 76106
Subcontract Modification
#3
DATE: 28-Aug-09 JOB# 9022
TO: CROSSLAND CONSTRUCTION COMPANY INC CONTRACT#
833 S. EAST AVE PROJECT:
COLUMBUS, KS 66725 Fort Worth Police&Traffic Faciltiy#6
Original Contract Amount
Prior Approved Change Orders
Scope: add fiat bar to w18#97 @ north east corner G 1
40 ft 7/8 x 12 flat bar-971.00 40 ft 1 x 10 flat bar=924.00 50 Ibs weld rod=100.00 1,995.00
Man lift 32480 a day $1,440.00
field labor 3 men 4days=96 @55.00=5280.00.00 $5,280.00
profit $871.50 Pt,
Change Order Amount $9,586.50 � i4Y.s�
Total Approved Change Orders
Total Contract Amount
A & S Steel, Ltd Crossland Construction Company, Inc
Signature Signature
Printed Name/Tide Printed Name/Tide
Date Date
CUSTOMER
PHONE #
wM FAX#
-. DATE
P.O.NUMBER
1850 E. 53rd St. North•P,O. Box 574 Fax: (316)744-8463 APPX,SHIP DATE —
Wichita Kansas 67201 • 31 fi 744-7587 Call Too{Free: 1-800-835-2779
Roof Pitch
AK
CAN rL( BIZ � ZIA)y
R S L
Poe
tmcr
� P
p Ou 4_ fZ
a��v
T --pp
6, (-Z
71
Project Name Address City/State
,lob Phone Contact
NOMINALTHICKNESS WIDTH FACING TABS ACCESSORIES
R-10 3• 36• WV 2.3• Rolls 3':150'Taps
R-13 4•_ ._ 48• VRRPIus 1-4• Type
R-19 V' so*_ WMP•VR OTHER _Cans 76 77 Spray Adhaslve
OTHER 72• WMP-SO ROLLS DOME FACED TAPE
OTHER
METAL BUILDING INSULATION AND ACCESSORIES
Simco Construction, Estimate
2100 N. Hwy 360. - Ste. 105
Grand Prairie,TX 75050 Date Estimate#
8/31/2009 1981
Name /Address
CROSSLAND CONSTRUCTION INC.
861 N. COLEMAN P.O. BOX 279
PROSPER, TEXAS 75078
Terms Project
ET.WORTH POLICE
Item Description Total
MISCELLANEOUS CHANGE ORDER#2 0.00
MISCELLANEOUS REMOVE FRAMING FOR STEEL TO BE INSTALLED AT 2,500.00
SMOKE WALL
MISCELLANEOUS INSTALL FRAMING BACK AT SMOKE WALL 1,000.00
MISCELLANEOUS 10% OVER HEAD AND PROFIT 350.00
Subtotal $3,850.00
Sales Tax (1.0°!0) $0.00
Total $3,850.00
CROSSLAND Potential Change Orders
CONSTRUCTION COMPANY, INC. summary,Grouped by Comp ny ID Ike
Fort Worth Police and Traffic Facility#6 Project# 146015.000 Crossland Construction Co.,Inc.
1100 Nashville Ave. Tel: 214-578-0743 Fax: NA
Fort Worth.Texas 76102
Itern No Description _Pudget Allocation Estimate Proposed Approved Applied Change Order QL1ote DUe Quote Rec'd
:,-No Company Assigned Date: 10/612009
001 Labor&Equipment 1,127.00 1,127.00 1,127.00 1,127.00 10/13/2009
002 Materials v 250.00 250.00 250.00_ ^T 250.00 10/13/2009
Level 001 10.00%Overhead&Profit 137.70 137.70 137.70 137.70
Markup ___.---
Prolog Manager Printed on: 10/6/2009 Texas Page 1
CUSTOMER
PHONE #
FAX#
DATE
OW P.O.NUMBER
1850 E. 53rd St.North•P.O. Box 574 Fax: (316)744-8463 APPX.SHIP DATE
Wichita Kansas 67201 • 316 744-7587 Call Toll Free: 1-800-WS-2779
1
Roof Pitch
d200 r
f
20e+
Project Name Address City/State
Job Phone Contact
r NOMINAL THICKNESS WIDTH FACING TABS ACCESSORIES
R-10 $' 380 WV 2-3- ^Rcus3':1WTaps
R-13 4' 48" VRRPIus 1.6" Typ•
60' WMP-VR OTHER _Cans 76 77 Spray Adhsstve
OTHER 72' WMP40 ROLLS DOUBLE FACEDTAPE
OTHER
METAL BUILDING INSULATION AND ACCESSORIES
CROSSLAND Potential Change Ordersj
CONSTRUCTION COMPANY, INC. Summary,Grouped by Company ID -5VV 1-e�
`eq( A b-�r "zJ"4 k
Fort Worth Police and Traffic Facility#6 Project# OSTX09MC Crossland Construction Co.,Inc.
1100 Nashville Ave. Tel: 214-578-0743 Fax: NA
Fort Worth,Texas 76102
Item No Description BudgetAllocation Estimate Pr••• • Approved Applied Change Order QLIote Due Quote
001 Labor&Equipment _ 3,772.00 3,772.00 3.772.00 3,772.00 10/13/2009
002 Steel Materials ^11993.00 1,993.00 1,993.00 1,993.00_ 10/13/2009
004 Core Drill Sub 1,512.00 1,512.00 1,512.00 1,512.00 10/13/2009
003 Grout Materials 250.00 250.00 250.00 250.00 10/13/2009
005 Superintendent Supervision(4 _ 200.00 200.00 200.00 200.00 10/13/2009 T
Hours at$50 per hour)
Level 001 10.00%Overhead&Profit 772.70 772.70 772.70 772.70
Markup
Prolog Manager Printed on: 10/12/2009 Texas Pagel
CUSTOMER ...........9 W PHONE 0 ..........4I LW FAX*-.-
DATE
PO.NUMBER
1850 E. 53rd St. North a P.O. Box 574 Fax: (316)744-8463 APPX.SHIP DATE
Wichita. Kansas 67201 *(316)744-7587 Call Toll Free: 1-800-835-2779
Roof Pitch .............. ...........
Too WWA,<.uwerb wo k
?I qM, 11 rl_lv�
(54-
1--wr. walk C�k�s 0-toD.
Caw :
r
-a,—3 ocvr-*—
rt r- 12
evil.-
L Citv
Project Name S SS City/State
Job Phone Contact
NOUNALT"ICKNEM WIDTH FACING TABS ACCESSORIES
A-10 31 36- wv 2-3- ReNs 3'x 1 SW Taps
R-134" 46"— VRRF4u*— 1.4. Type_
116".-- 6"-- WMP-VFI arNER —Carts 78---77-_Spray AdFwlw
*T"" 72-- WIAP-Sk— ROLLS DOUBLE FACED TAPE
OTHER
METAL,jpUILDINQ INSULATION AND ACCESSORIES
October 9, 2009
PHONE:972-434-8722;FAx 214-222-8502
CROSSLAND CONSTRUCTION
ATTENTION: MARK
FAX:
PHONE: 214-578-0743
E-MAIL:MBELTZt7U CROSSLANDCONSTRUCTION.COM
PROJECT NAME: FORT WORTH POLICE DEPT
PROJECT LOCATION: FORT WORTH TEXAS
BID PROPOSAL
WE APPRECIATE THE OPPORTUNITY TO BID THE CORE DRILLING
CORE DRILL( 54)HOLES 6"X 5" 28.00 PER HOLE
LUMP SUM TOTAL=$ 1,512.00
NO CORE CATCHER PROVIDED ON JOB
LEAVE CORES IN PLACE FOR CONTRACTOR REMOVAL
CONDITIONS:
1. INCLUDES INSURANCE
2. EXCLUDES BOND&PERMITS
3. BASED ON 100%CRUSHED LIMESTONE
THANK YOU,
JOE GILBREATH ACCEPTED:
972-880-8938
JG
PO Box 337 803 N.KEALY ST.
LEwisvu.LE,TExAs 75067 LEWtSVU-LE,TEXAS 75067
QUOTATION
King Architectural Metals Order Number
PO Box 271169 2806046
Dallas, TX 75227 Order Date Page
USA
214.388.9834 10/6/2009 10:09:51 1 of 1
Bill To: Ship To:
Crossland Construction Co. Inc Crossland Construction Co. Inc
P 0 BOX 45 1100 Nashville Ave
Columbus,KS 66725 Fort Worth,TX 76105
620.429.1414
Requested By: Mr. Mike.....
Customer ID: 1899487
PO Number Ship Route Taker
100609 COMM GLORIA.PENA
Qum w ies Pricbeg
Item ID UOM Una F.stnided
EOrdered 9Uoc w Rerwb*f UU" ° Item Nscrl�ion Una Size Price Pried
U,sK S'e
30.0000 0.0000 30.0000 EA 645X6.70-20 EA 64.76667 L,943.00
1.0 Channel,5"X 6.70#,20R Length 1.0
Total Ives:I SUB-TOTAL: 1,943.00
TAX: 0.00
SAW CUT: 50.00
AMOUNT DUE. 1,993.00
Terms and Conditions for Quotes
All pricing is valid for 30 days excluding "stock length steel", which is valid for 24 hours.