HomeMy WebLinkAboutContract 54445-CO1 CSC No.54445-001 FART WORTH. City of Fort Worth Change Order Request Project Name South Staylon Street Realignment Cily Sec# 54445 Client Project N(s)l 101555 Project Description South Slayton Street Paving and Traffic Signal Improvements Contractorl 2L Construction,L.L.C. Change Order# 1 Date 2/1912021 C ly Praject Mgr. Ronak Rekani City Inspectorl Lorne Pitts Dept. TPW Contract Time Totals CD Original Contract Amount 3,8 . 4 37 3,878.84 _ Extras to Date Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $743,878.64 AmountofPm eedChan e0rder _: .-- - - _.._ _ ON SD Revised Contract Amount - _ - - 79L983,14 Original Funds Available for Change Orders Remaining Funds Available for this CO _? Additional Funding(l necessary) $48,084,50 CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT ! a MAXALLOWABLECONTRACTAMOUNT{ORIGINALCONTRACTCOSI 25%) - y1 lip IN ACCORDANCE WITH THIS CONSTRUCTION CHANGE ORDER,THE CONTRACTOR SHALL:Furnish all labor and maledals as per attached proposed RFIs- RFI 41-The City PARD requested that crosswalk striping be added at the Intersection of Trinity Park Drive and Museum Way,Just south of West 7th Street.(item 83) RFl#3-The traffic contra:is being modified into tm phases to create continuity in the traffic flow along Museum Way Instead of detouring traffic through the nearby development.Flex base wit be substituted for time treaded subgrade.(Items 11,80,88,93,94,95;Delete items 13.14) RFI#4-City authorizes a revision to the TCP,Roadway and Proposed Signal plans regarding access to conduit and signal foundations at the NW and NE comers of N.Slayton St.(items 33,96,97;Delete Item 32) RFI#5-City authorizes a revision to Illumination plans regarding additional streetlights to be removed.(Add Item 71) It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment In full (both time and money)for all costs arising out of,or incidental to,the above Change Order.The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract,including ensuring all performance and reporting requirements. 2L Construction,L.L.C. Chip Fisher 401d t hid I Mar2,2021 — Mar2,2021 14a12,2o21 ,ss"-.�---^—a_'i`i'F= Mar 2,2021 Mar2,2021 Mar3,2021 Mara,2021 Mar 3,2021 M&C Number WA M&C Date Appmved N)A �N,� ATTEST; ao�*over 4� a 000000po MaryJ.Kayser,City Secretary ��o 000 a 0 �0 0� 000 0=� �0 �h0 o aa��>Z�EXASaQ�� OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Fo rw() TIl City of Fort Worth Change Order Additions ProjectNama I South SWWn StroetRe nment City Sec is 54445 Ckrdprojed4 tOt555 conhcw,l 21.Construdim,LLC. PMJ Ronak Rekani 771 I6tpa4ta Lortio Pdts Change Dide(Subnd8al N 0 Data 27192021 ADD[TIONS ITEM MSCRIPIFM TV--312pw n um-msm ricavaborl 0—j2i UM 4'SID MR mg 88 3217.4301 Remain 4'Pvmt Marking TPW 210.Q0000000 LF $1. 15.00 93 3211.0112 VFW Dare,Type A,GR•1 TPW 1,290.00000 Y 325.00 V . 94 3217,0007 4'SLD Pvmt Mark M Tape(W) WIN 60200000000 LF $3. M$1.806.00 tmporary q 97 an0a mast wm hm U m nS Change order Additions Page 2 of 4 IF r Wa rt City of Fort Worth Change Order Deletions Project Num I go-0StaytonN"tRe*nrmn1 Cfry Sec# L---S CiaMProject# 1 101555 Conua as 2L COnsbucSan,LL.C. R11 Ronak R� Inspector L"Pim Change Order Submaal# 0 Date 2I1412021 UELEIIUNS y re n Tpw 55 u Change Order Deletions Page 3 04 MISBEm for this Change Order Total Previous Change Orders . € „.--.�' -" x -'". ''� �� �Co�# , DATEAMOt1NT �v Total $0 00