HomeMy WebLinkAboutContract 55404 CSC No. 55404 CITY OF FORT WORTH, TEXAS STANDARD AGREEMENT FOR ENGINEERING RELATED PROFESSIONAL SERVICES This AGREEMENT is between the CITY OF FORT WORTH, a Texas home-rule municipality ("CITY"), and LOCKWOOD, ANDREWS & NEWNAM, INC., authorized to do business in Texas, ("ENGINEER"), for a PROJECT generally described as: 28th Street at Decatur HROM Project (CPN 103052). Article I Scope of Services The Scope of Services is set forth in Attachment A. Article II Compensation and Term of Agreement A. The ENGINEER's compensation shall be in the amount up to $714,761.00 as set forth in Attachment B. B. Unless otherwise terminated pursuant to Article VI. D. herein, this Agreement shall be for a term beginning upon the effective date, as described below, and shall continue until the expiration of the funds or completion of the subject matter contemplated herein, whichever occurs first. Article III Terms of Payment Payments to the ENGINEER will be made as follows: A. Invoice and Payment (1) The Engineer shall provide the City sufficient documentation, including but not limited to meeting the requirements set forth in Attachment D to this AGREEMENT, to reasonably substantiate the invoices. (2) The ENGINEER will issue monthly invoices for all work performed under this AGREEMENT. Invoices are due and payable within 30 days of receipt. OFFICIAL RECORD City of Fort Worth,Texas CITY SECRETARY Standard Agreement for Engineering Related Design Services Revised Date:11.17.17 Page 1 of 17 FT. WORTH, TX (3) Upon completion of services enumerated in Article I, the final payment of any balance will be due within 30 days of receipt of the final invoice. (4) In the event of a disputed or contested billing, only that portion so contested will be withheld from payment, and the undisputed portion will be paid. The CITY will exercise reasonableness in contesting any bill or portion thereof. No interest will accrue on any contested portion of the billing until mutually resolved. (5) If the CITY fails to make payment in full to ENGINEER for billings contested in good faith within 60 days of the amount due, the ENGINEER may, after giving 7 days' written notice to CITY, suspend services under this AGREEMENT until paid in full. In the event of suspension of services, the ENGINEER shall have no liability to CITY for delays or damages caused the CITY because of such suspension of services. Article IV Obligations of the Engineer Amendments to Article IV, if any, are included in Attachment C. A. General The ENGINEER will serve as the CITY's professional engineering representative under this Agreement, providing professional engineering consultation and advice and furnishing customary services incidental thereto. B. Standard of Care The ENGINEER shall perform its services: (1) with the professional skill and care ordinarily provided by competent engineers practicing in the same or similar locality and under the same or similar circumstances and professional license; and (2) as expeditiously as is prudent considering the ordinary professional skill and care of a competent engineer. C. Subsurface Investigations (1) The ENGINEER shall advise the CITY with regard to the necessity for subcontract work such as special surveys, tests, test borings, or other subsurface investigations in connection with design and engineering City of Fort Worth,Texas Standard Agreement for Engineering Related Design Services Revised Date:11.17.17 Page 2 of 17 work to be performed hereunder. The ENGINEER shall also advise the CITY concerning the results of same. Such surveys, tests, and investigations shall be furnished by the CITY, unless otherwise specified in Attachment A. (2) In soils, foundation, groundwater, and other subsurface investigations, the actual characteristics may vary significantly between successive test points and sample intervals and at locations other than where observations, exploration, and investigations have been made. Because of the inherent uncertainties in subsurface evaluations, changed or unanticipated underground conditions may occur that could affect the total PROJECT cost and/or execution. These conditions and cost/execution effects are not the responsibility of the ENGINEER. D. Preparation of Engineering Drawings The ENGINEER will provide to the CITY the original drawings of all plans in ink on reproducible mylar sheets and electronic files in .pdf format, or as otherwise approved by CITY, which shall become the property of the CITY. CITY may use such drawings in any manner it desires; provided, however, that the ENGINEER shall not be liable for the use of such drawings for any project other than the PROJECT described herein. E. Engineer's Personnel at Construction Site (1) The presence or duties of the ENGINEER's personnel at a construction site, whether as on-site representatives or otherwise, do not make the ENGINEER or its personnel in any way responsible for those duties that belong to the CITY and/or the CITY's construction contractors or other entities, and do not relieve the construction contractors or any other entity of their obligations, duties, and responsibilities, including, but not limited to, all construction methods, means, techniques, sequences, and procedures necessary for coordinating and completing all portions of the construction work in accordance with the Contract Documents and any health or safety precautions required by such construction work. The ENGINEER and its personnel have no authority to exercise any control over any construction contractor or other entity or their employees in connection with their work or any health or safety precautions. (2) Except to the extent of specific site visits expressly detailed and set forth in Attachment A, the ENGINEER or its personnel shall have no obligation or responsibility to visit the construction site to become familiar with the progress or quality of the completed work on the PROJECT or to determine, in general, if the work on the PROJECT is being performed in a manner City of Fort Worth,Texas Standard Agreement for Engineering Related Design Services Revised Date:11.17.17 Page 3 of 17 indicating that the PROJECT, when completed, will be in accordance with the Contract Documents, nor shall anything in the Contract Documents or this AGREEMENT between CITY and ENGINEER be construed as requiring ENGINEER to make exhaustive or continuous on-site inspections to discover latent defects in the work or otherwise check the quality or quantity of the work on the PROJECT. If the ENGINEER makes on-site observation(s) of a deviation from the Contract Documents, the ENGINEER shall inform the CITY. (3) When professional certification of performance or characteristics of materials, systems or equipment is reasonably required to perform the services set forth in the Scope of Services, the ENGINEER shall be entitled to rely upon such certification to establish materials, systems or equipment and performance criteria to be required in the Contract Documents. F. Opinions of Probable Cost, Financial Considerations, and Schedules (1) The ENGINEER shall provide opinions of probable costs based on the current available information at the time of preparation, in accordance with Attachment A. (2) In providing opinions of cost, financial analyses, economic feasibility projections, and schedules for the PROJECT, the ENGINEER has no control over cost or price of labor and materials; unknown or latent conditions of existing equipment or structures that may affect operation or maintenance costs; competitive bidding procedures and market conditions; time or quality of performance by third parties; quality, type, management, or direction of operating personnel; and other economic and operational factors that may materially affect the ultimate PROJECT cost or schedule. Therefore, the ENGINEER makes no warranty that the CITY's actual PROJECT costs, financial aspects, economic feasibility, or schedules will not vary from the ENGINEER's opinions, analyses, projections, or estimates. G. Construction Progress Payments Recommendations by the ENGINEER to the CITY for periodic construction progress payments to the construction contractor will be based on the ENGINEER's knowledge, information, and belief from selective sampling and observation that the work has progressed to the point indicated. Such recommendations do not represent that continuous or detailed examinations have been made by the ENGINEER to ascertain that the construction contractor has completed the work in exact accordance with the Contract Documents; that the final work will be acceptable in all respects; that the ENGINEER has made an examination to ascertain how or for what purpose City of Fort Worth,Texas Standard Agreement for Engineering Related Design Services Revised Date:11.17.17 Page 4 of 17 the construction contractor has used the moneys paid; that title to any of the work, materials, or equipment has passed to the CITY free and clear of liens, claims, security interests, or encumbrances; or that there are not other matters at issue between the CITY and the construction contractor that affect the amount that should be paid. H. Record Drawings Record drawings, if required, will be prepared, in part, on the basis of information compiled and furnished by others, and may not always represent the exact location, type of various components, or exact manner in which the PROJECT was finally constructed. The ENGINEER is not responsible for any errors or omissions in the information from others that is incorporated into the record drawings. I. Minority Business and Small Business Enterprise (MBE)(SBE) Participation In accord with the City of Fort Worth Business Diversity goals (Chapter 20, Article X of the City's Code of Ordinances a/k/a Ordinance No. 20020-12- 2011, as amended), the City has goals for the participation of minority business enterprises and/or small business enterprises in City contracts. Engineer acknowledges the MBE and SBE goals established for this contract and its accepted written commitment to MBE and SBE participation. Any misrepresentation of facts (other than a negligent misrepresentation) and/or the commission of fraud by the Engineer may result in the termination of this Agreement and debarment from participating in City contracts for a period of time of not less than three (3) years. J. Right to Audit (1) ENGINEER agrees that the CITY shall, until the expiration of five (5) years after final payment under this contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers and records of the ENGINEER involving transactions relating to this contract. ENGINEER agrees that the CITY shall have access during normal working hours to all necessary ENGINEER facilities and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this section. The CITY shall give ENGINEER reasonable advance notice of intended audits. (2) ENGINEER further agrees to include in all its subconsultant agreements hereunder a provision to the effect that the subconsultant agrees that the CITY shall, until the expiration of five (5) years after final payment under the subcontract, have access to and the right to examine and photocopy any City of Fort Worth,Texas Standard Agreement for Engineering Related Design Services Revised Date:11.17.17 Page 5 of 17 directly pertinent books, documents, papers and records of such subconsultant, involving transactions to the subcontract, and further, that the CITY shall have access during normal working hours to all subconsultant facilities, and shall be provided adequate and appropriate work space, in order to conduct audits in compliance with the provisions of this article together with subsection (3) hereof. CITY shall give subconsultant reasonable advance notice of intended audits. (3) ENGINEER and subconsultant agree to photocopy such documents as may be requested by the CITY. The CITY agrees to reimburse ENGINEER for the cost of copies at the rate published in the Texas Administrative Code in effect as of the time copying is performed. K. INSURANCE (1) ENGINEER'S INSURANCE a. Commercial General Liability — the ENGINEER shall maintain commercial general liability (CGL) and, if necessary, commercial umbrella insurance with a limit of not less than $1,000,000.00 per each occurrence with a $2,000,000.00 aggregate. If such Commercial General Liability insurance contains a general aggregate limit, it shall apply separately to this PROJECT or location. i. The CITY shall be included as an additional insured with all rights of defense under the CGL, using ISO additional insured endorsement or a substitute providing equivalent coverage, and under the commercial umbrella, if any. This insurance shall apply as primary insurance with respect to any other insurance or self- insurance programs afforded to the CITY. The Commercial General Liability insurance policy shall have no exclusions or endorsements that would alter or nullify: premises/operations, products/completed operations, contractual, personal injury, or advertising injury, which are normally contained within the policy, unless the CITY specifically approves such exclusions in writing. ii. ENGINEER waives all rights against the CITY and its agents, officers, directors and employees for recovery of damages to the extent these damages are covered by the commercial general liability or commercial umbrella liability insurance maintained in accordance with this agreement. b. Business Auto — the ENGINEER shall maintain business auto liability and, if necessary, commercial umbrella liability insurance with a limit of not less than $1,000,000 each accident. Such insurance shall cover City of Fort Worth,Texas Standard Agreement for Engineering Related Design Services Revised Date:11.17.17 Page 6 of 17 liability arising out of "any auto", including owned, hired, and non-owned autos, when said vehicle is used in the course of the PROJECT. If the engineer owns no vehicles, coverage for hired or non-owned is acceptable. i. ENGINEER waives all rights against the CITY and its agents, officers, directors and employees for recovery of damages to the extent these damages are covered by the business auto liability or commercial umbrella liability insurance obtained by ENGINEER pursuant to this agreement or under any applicable auto physical damage coverage. c. Workers' Compensation — ENGINEER shall maintain workers compensation and employers liability insurance and, if necessary, commercial umbrella liability insurance with a limit of not less than $100,000.00 each accident for bodily injury by accident or $100,000.00 each employee for bodily injury by disease, with $500,000.00 policy limit. i. ENGINEER waives all rights against the CITY and its agents, officers, directors and employees for recovery of damages to the extent these damages are covered by workers compensation and employer's liability or commercial umbrella insurance obtained by ENGINEER pursuant to this agreement. d. Professional Liability — ENGINEER shall maintain professional liability, a claims-made policy, with a minimum of $1,000,000.00 per claim and aggregate. The policy shall contain a retroactive date prior to the date of the contract or the first date of services to be performed, whichever is earlier. Coverage shall be maintained for a period of 5 years following the completion of the contract. An annual certificate of insurance specifically referencing this project shall be submitted to the CITY for each year following completion of the contract. (2) GENERAL INSURANCE REQUIREMENTS a. Certificates of insurance evidencing that the ENGINEER has obtained all required insurance shall be attached to this AGREEMENT prior to its execution. b. Applicable policies shall be endorsed to name the CITY an Additional Insured thereon, subject to any defense provided by the policy, as its interests may appear. The term CITY shall include its employees, officers, officials, agents, and volunteers as respects the contracted services. City of Fort Worth,Texas Standard Agreement for Engineering Related Design Services Revised Date:11.17.17 Page 7 of 17 c. Certificate(s) of insurance shall document that insurance coverage specified in this agreement are provided under applicable policies documented thereon. d. Any failure on part of the CITY to attach the required insurance documentation hereto shall not constitute a waiver of the insurance requirements. e. A minimum of thirty (30) days notice of cancellation or material change in coverage shall be provided to the CITY. A ten (10) days notice shall be acceptable in the event of non-payment of premium. Notice shall be sent to the respective Department Director (by name), City of Fort Worth, 1000 Throckmorton, Fort Worth, Texas 76102. f. Insurers for all policies must be authorized to do business in the State of Texas and have a minimum rating of A:V or greater, in the current A.M. Best Key Rating Guide or have reasonably equivalent financial strength and solvency to the satisfaction of Risk Management. g. Any deductible or self insured retention in excess of $25,000.00 that would change or alter the requirements herein is subject to approval by the CITY in writing, if coverage is not provided on a first-dollar basis. The CITY, at it sole discretion, may consent to alternative coverage maintained through insurance pools or risk retention groups. Dedicated financial resources or letters of credit may also be acceptable to the CITY. h. Applicable policies shall each be endorsed with a waiver of subrogation in favor of the CITY as respects the PROJECT. i. The CITY shall be entitled, upon its request and without incurring expense, to review the ENGINEER's insurance policies including endorsements thereto and, at the CITY's discretion; the ENGINEER may be required to provide proof of insurance premium payments. j. Lines of coverage, other than Professional Liability, underwritten on a claims-made basis, shall contain a retroactive date coincident with or prior to the date of the contractual agreement. The certificate of insurance shall state both the retroactive date and that the coverage is claims-made. k. Coverages, whether written on an occurrence or claims-made basis, shall be maintained without interruption nor restrictive modification or changes from date of commencement of the PROJECT until final payment and termination of any coverage required to be maintained after City of Fort Worth,Texas Standard Agreement for Engineering Related Design Services Revised Date:11.17.17 Page 8 of 17 final payments. I. The CITY shall not be responsible for the direct payment of any insurance premiums required by this agreement. m. Sub consultants and subcontractors to/of the ENGINEER shall be required by the ENGINEER to maintain the same or reasonably equivalent insurance coverage as required for the ENGINEER. When sub consultants/subcontractors maintain insurance coverage, ENGINEER shall provide CITY with documentation thereof on a certificate of insurance. L. Independent Consultant The ENGINEER agrees to perform all services as an independent consultant and not as a subcontractor, agent, or employee of the CITY. The doctrine of respondeat superior shall not apply. M. Disclosure The ENGINEER acknowledges to the CITY that it has made full disclosure in writing of any existing conflicts of interest or potential conflicts of interest, including personal financial interest, direct or indirect, in property abutting the proposed PROJECT and business relationships with abutting property cities. The ENGINEER further acknowledges that it will make disclosure in writing of any conflicts of interest that develop subsequent to the signing of this contract and prior to final payment under the contract. N. Asbestos or Hazardous Substances (1) If asbestos or hazardous substances in any form are encountered or suspected, the ENGINEER will stop its own work in the affected portions of the PROJECT to permit testing and evaluation. (2) If asbestos or other hazardous substances are suspected, the CITY may request the ENGINEER to assist in obtaining the services of a qualified subcontractor to manage the remediation activities of the PROJECT. O. Permitting Authorities - Design Changes If permitting authorities require design changes so as to comply with published design criteria and/or current engineering practice standards which the ENGINEER should have been aware of at the time this Agreement was executed, the ENGINEER shall revise plans and specifications, as required, at its own cost and expense. However, if design City of Fort Worth,Texas Standard Agreement for Engineering Related Design Services Revised Date:11.17.17 Page 9 of 17 changes are required due to the changes in the permitting authorities' published design criteria and/or practice standards criteria which are published after the date of this Agreement which the ENGINEER could not have been reasonably aware of, the ENGINEER shall notify the CITY of such changes and an adjustment in compensation will be made through an amendment to this AGREEMENT. P. Schedule ENGINEER shall manage the PROJECT in accordance with the schedule developed per Attachment D to this AGREEMENT. Article V Obligations of the City Amendments to Article V, if any, are included in Attachment C. A. City-Furnished Data ENGINEER may rely upon the accuracy, timeliness, and completeness of the information provided by the CITY. B. Access to Facilities and Property The CITY will make its facilities accessible to the ENGINEER as required for the ENGINEER's performance of its services. The CITY will perform, at no cost to the ENGINEER, such tests of equipment, machinery, pipelines, and other components of the CITY's facilities as may be required in connection with the ENGINEER's services. The CITY will be responsible for all acts of the CITY's personnel. C. Advertisements, Permits, and Access Unless otherwise agreed to in the Scope of Services, the CITY will obtain, arrange, and pay for all advertisements for bids; permits and licenses required by local, state, or federal authorities; and land, easements, rights- of-way, and access necessary for the ENGINEER's services or PROJECT construction. D. Timely Review The CITY will examine the ENGINEER's studies, reports, sketches, drawings, specifications, proposals, and other documents; obtain advice of City of Fort Worth,Texas Standard Agreement for Engineering Related Design Services Revised Date:11.17.17 Page 10 of 17 an attorney, insurance counselor, accountant, auditor, bond and financial advisors, and other consultants as the CITY deems appropriate; and render in writing decisions required by the CITY in a timely manner in accordance with the project schedule prepared in accordance with Attachment D. E. Prompt Notice The CITY will give prompt written notice to the ENGINEER whenever CITY observes or becomes aware of any development that affects the scope or timing of the ENGINEER's services or of any defect in the work of the ENGINEER or construction contractors. F. Asbestos or Hazardous Substances Release. (1) CITY acknowledges ENGINEER will perform part of the work at CITY's facilities that may contain hazardous materials, including asbestos containing materials, or conditions, and that ENGINEER had no prior role in the generation, treatment, storage, or disposition of such materials. In consideration of the associated risks that may give rise to claims by third parties or employees of City, City hereby releases ENGINEER from any damage or liability related to the presence of such materials. (2) The release required above shall not apply in the event the discharge, release or escape of hazardous substances, contaminants, or asbestos is a result of ENGINEER's negligence or if ENGINEER brings such hazardous substance, contaminant or asbestos onto the project. G. Contractor Indemnification and Claims The CITY agrees to include in all construction contracts the provisions of Article IV.E. regarding the ENGINEER's Personnel at Construction Site, and provisions providing for contractor indemnification of the CITY and the ENGINEER for contractor's negligence. H. Contractor Claims and Third-Party Beneficiaries (1) The CITY agrees to include the following clause in all contracts with construction contractors and equipment or materials suppliers: "Contractors, subcontractors and equipment and materials suppliers on the PROJECT, or their sureties, shall maintain no direct action against the ENGINEER, its officers, employees, and subcontractors, for any claim arising out of, in connection with, or resulting from the engineering services performed. Only the CITY will be the beneficiary of City of Fort Worth,Texas Standard Agreement for Engineering Related Design Services Revised Date:11.17.17 Page 11 of 17 any undertaking by the ENGINEER." (2) This AGREEMENT gives no rights or benefits to anyone other than the CITY and the ENGINEER and there are no third-party beneficiaries. (3) The CITY will include in each agreement it enters into with any other entity or person regarding the PROJECT a provision that such entity or person shall have no third-party beneficiary rights under this Agreement. (4) Nothing contained in this Section H. shall be construed as a waiver of any right the CITY has to bring a claim against ENGINEER. I. CITY's Insurance (1) The CITY may maintain property insurance on certain pre-existing structures associated with the PROJECT. (2) The CITY may secure Builders Risk/installation insurance at the replacement cost value of the PROJECT. The CITY may provide ENGINEER a copy of the policy or documentation of such on a certificate of insurance. (3) The CITY will specify that the Builders Risk/installation insurance shall be comprehensive in coverage appropriate to the PROJECT risks. J. Litigation Assistance The Scope of Services does not include costs of the ENGINEER for required or requested assistance to support, prepare, document, bring, defend, or assist in litigation undertaken or defended by the CITY. In the event CITY requests such services of the ENGINEER, this AGREEMENT shall be amended or a separate agreement will be negotiated between the parties. K. Changes The CITY may make or approve changes within the general Scope of Services in this AGREEMENT. If such changes affect the ENGINEER's cost of or time required for performance of the services, an equitable adjustment will be made through an amendment to this AGREEMENT with appropriate CITY approval. City of Fort Worth,Texas Standard Agreement for Engineering Related Design Services Revised Date:11.17.17 Page 12 of 17 Article VI General Legal Provisions Amendments to Article VI, if any, are included in Attachment C. A. Authorization to Proceed ENGINEER shall be authorized to proceed with this AGREEMENT upon receipt of a written Notice to Proceed from the CITY. B. Reuse of Project Documents All designs, drawings, specifications, documents, and other work products of the ENGINEER, whether in hard copy or in electronic form, are instruments of service for this PROJECT, whether the PROJECT is completed or not. Reuse, change, or alteration by the CITY or by others acting through or on behalf of the CITY of any such instruments of service without the written permission of the ENGINEER will be at the CITY's sole risk. The CITY shall own the final designs, drawings, specifications and documents. C. Force Majeure The ENGINEER is not responsible for damages or delay in performance caused by acts of God, strikes, lockouts, accidents, or other events beyond the control of the ENGINEER that prevent ENGINEER's performance of its obligations hereunder. D. Termination (1) This AGREEMENT may be terminated a.) by the City for its convenience upon 30 days' written notice to ENGINEER. b.) by either the CITY or the ENGINEER for cause if either party fails substantially to perform through no fault of the other and the nonperforming party does not commence correction of such nonperformance within 5 days' written notice or thereafter fails to diligently complete the correction. (2) If this AGREEMENT is terminated for the convenience of the City, the ENGINEER will be paid for termination expenses as follows: a.) Cost of reproduction of partial or complete studies, plans, specifications or other forms of ENGINEER'S work product; City of Fort Worth,Texas Standard Agreement for Engineering Related Design Services Revised Date:11.17.17 Page 13 of 17 b.) Out-of-pocket expenses for purchasing electronic data files and other data storage supplies or services; c.) The time requirements for the ENGINEER'S personnel to document the work underway at the time of the CITY'S termination for convenience so that the work effort is suitable for long time storage. (3) Prior to proceeding with termination services, the ENGINEER will submit to the CITY an itemized statement of all termination expenses. The CITY'S approval will be obtained in writing prior to proceeding with termination services. E. Suspension, Delay, or Interruption to Work The CITY may suspend, delay, or interrupt the services of the ENGINEER for the convenience of the CITY. In the event of such suspension, delay, or interruption, an equitable adjustment in the PROJECT's schedule, commitment and cost of the ENGINEER's personnel and subcontractors, and ENGINEER' compensation will be made. F. Indemnification In accordance with Texas Local Government Code Section 271.904, the ENGINEER shall indemnify or hold harmless the CITY against liability for any damage committed by the ENGINEER or ENGINEER's agent, consultant under contract, or another entity over which the ENGINEER exercises control to the extent that the damage is caused by or resulting from an act of negligence, intentional tort, intellectual property infringement, or failure to pay a subcontractor or supplier. CITY is entitled to recover its reasonable attorney's fees in proportion to the ENGINEER's liability. G. Assignment Neither party shall assign all or any part of this AGREEMENT without the prior written consent of the other party. H. Jurisdiction The law of the State of Texas shall govern the validity of this AGREEMENT, its interpretation and performance, and any other claims related to it. The venue for any litigation related to this AGREEMENT shall be Tarrant County, City of Fort Worth,Texas Standard Agreement for Engineering Related Design Services Revised Date:11.17.17 Page 14 of 17 Texas. I. Severability and Survival If any of the provisions contained in this AGREEMENT are held for any reason to be invalid, illegal, or unenforceable in any respect, such invalidity, illegality, or unenforceability will not affect any other provision, and this AGREEMENT shall be construed as if such invalid, illegal, or unenforceable provision had never been contained herein. Articles V.F., VI.B., VI.D., VI.F., VI.H., and VI.I. shall survive termination of this AGREEMENT for any cause. J. Observe and Comply ENGINEER shall at all times observe and comply with all federal and State laws and regulations and with all City ordinances and regulations which in any way affect this AGREEMENT and the work hereunder, and shall observe and comply with all orders, laws ordinances and regulations which may exist or may be enacted later by governing bodies having jurisdiction or authority for such enactment. No plea of misunderstanding or ignorance thereof shall be considered. ENGINEER agrees to defend, indemnify and hold harmless CITY and all of its officers, agents and employees from and against all claims or liability arising out of the violation of any such order, law, ordinance, or regulation, whether it be by itself or its employees. K. Immigration Nationality Act ENGINEER shall verify the identity and employment eligibility of its employees who perform work under this Agreement, including completing the Employment Eligibility Verification Form (1-9). Upon request by CITY, ENGINEER shall provide CITY with copies of all 1-9 forms and supporting eligibility documentation for each employee who performs work under this Agreement. ENGINEER shall adhere to all Federal and State laws as well as establish appropriate procedures and controls so that no services will be performed by any ENGINEER employee who is not legally eligible to perform such services. ENGINEER SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES, LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY ENGINEER, ENGINEER'S EMPLOYEES, SUBCONTRACTORS, AGENTS, OR LICENSEES. CITY, upon written notice to ENGINEER, shall have the right to immediately terminate this Agreement for violations of this provision by ENGINEER. L. Prohibition On Contracts With Companies Boycotting Israel ENGINEER acknowledges that in accordance with Chapter 2270 of the City of Fort Worth,Texas Standard Agreement for Engineering Related Design Services Revised Date:11.17.17 Page 15 of 17 Texas Government Code, CITY is prohibited from entering into a contract with a company for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel" and "company" shall have the meanings ascribed to those terms in Section 808.001 of the Texas Government Code. By signing this contract, ENGINEER certifies that ENGINEER'S signature provides written verification to the CITY that ENGINEER: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. This AGREEMENT, including its attachments and schedules, constitutes the entire AGREEMENT, which supersedes all prior written or oral understandings, and may only be changed by a written amendment executed by both parties. This AGREEMENT may be executed in one or more counterparts and each counterpart shall, for all purposes, be deemed an original, but all such counterparts shall together constitute but one and the same instrument. The following attachments and schedules are hereby made a part of this AGREEMENT: Attachment A- Scope of Services Attachment B - Compensation Attachment C -Amendments to Standard Agreement for Engineering Services Attachment D - Project Schedule Attachment E - Location Map Duly executed by each party's designated representative to be effective on the date subscribed by the City's designated Assistant City Manager. BY: BY: CITY OF FORT WORTH LOCKWOOD, ANDREWS & NEWNAM, INC Dana Burandaff 4 711 N,C F221led Dana Burghdoff(Mar 11,202117:26 CST) Justin C.Reeves(Mar 8,202122:49 C55) Dana Burghdoff Justin C. Reeves, PE Assistant City Manager Vice President Date: Mar 11,2021 Date: Mar 8,2021 APPROVAL RECOMMENDED: William Johm (Mar 11,202109:57 C" By. William Johnson Director, Transportation & Public Works OFFICIAL RECORD City of Fort worth,Texas CITY SECRETARY Standard Agreement for Engineering Related Design Services Revised Date:11.17.17 FT. WORTH TX Page 16 of 17 Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Michael Wellbaum, PE, CFM Project Manager APPROVED AS TO FORM AND LEGALITY Bee-or, By: Mack(Mar 11,202115:53 CS-0 Doug Black Assistant City Attorney ATTEST: da �°ad� Form 1295 No. 2021-707487 FOROFk-C �O�alt ��� pr �o� 0. 0 .P - 21-0148MaryJ. Kayser M&CNo.a City Secretary o� ° °°°°°°°°CP a M&C Date: 03/02/2021 OFFICIAL RECORD City of Fort worth,Texas CITY SECRETARY Standard Agreement for Engineering Related Design Services Revised Date:11.17.17 FT. WORTH TX Page 17 of 17 ATTACHMENT "A" Scope for Engineering Design Related Services for Storm Water Improvements Projects The scope set forth herein defines the work to be performed by the ENGINEER in completing the project. Both the CITY and ENGINEER have attempted to clearly define the work to be performed and address the needs of the Project. Under this scope, "ENGINEER" is expanded to include any sub-consultant, including surveyor, employed or contracted by the ENGINEER. OBJECTIVE The detailed design of a natural stream (herein referred to as "Lebow Channel"), a portion of Segments L3 and L4 at NE 281h Street, near the intersection of Decatur Avenue, totaling approximately 1,500 linear feet. A schematic design has been provided by the CITY for the basis of detailed design. Design includes: • Natural stream channel design; • Vegetation, landscaping, and maintenance plans; • Retaining wall design for access ramp; • Coordination with existing storm drain; • Trail crossing layout (to be constructed later); WORK TO BE PERFORMED Task 1. Design Management Task 2. Conceptual Design Task 3. Preliminary Design Task 4. Final Design Task 5. Bid Phase Services Task 6. Construction Phase Services Task 7. ROW/Easement Services Task 8. Survey Services Task 9. Permitting Task 10. Plan Submittal Checklists TASK 1. DESIGN MANAGEMENT. ENGINEER will manage the work outlined in this scope to ensure efficient and effective use of ENGINEER's and CITY's time and resources. ENGINEER will manage change, communicate effectively, coordinate internally and externally as needed, and proactively address issues with the CITY's Project Manager and others as necessary to make progress on the work. 1.1. Managing the Team • Lead, manage and direct design team activities City of Fort Worth,Texas Attachment A PMO Release Date:07/23/2012 Page 1 of 22 • Ensure quality control is practiced in performance of the work • Communicate internally among team members • Task and allocate team resources 1.2. Communications and Reporting • Attend a pre-design project kickoff/chartering meeting with CITY staff to confirm and clarify scope, understand CITY objectives, and ensure economical and functional designs that meet CITY requirements. • Conduct and document biweekly project update meetings with CITY Project Manager. • Conduct review meetings with the CITY at the end of each design phase. • Conduct and document biweekly design team meetings. • Prepare invoices, in accordance with Attachment B to this Standard Agreement and submit monthly in the format requested by the CITY. • Prepare and submit monthly progress reports in the format provided by the respective CITY Department. • Prepare and submit baseline Project Schedule initially, and Project Schedule updates with a schedule narrative monthly, as required in Attachment D to this Standard Agreement and according to the City of Fort Worth's Schedule Guidance Document. • Complete Monthly M/WBE Report Form and Final Summary Payment Report Form at the end of the project. • Coordinate with other agencies and entities as necessary for the design of the proposed infrastructure, and provide and obtain information needed to prepare the design. • With respect to coordination with permitting authorities, ENGINEER shall communicate with permitting authorities such that their regulatory requirements are appropriately reflected in the designs. ENGINEER shall work with regulatory authorities to obtain approval of the designs, and make changes necessary to meet their requirements, as part of the design scope. • Personnel and Vehicle Identification: When conducting site visits to the project location, the ENGINEER or any of its sub-consultants shall carry readily visible information identifying the name of the company and the company representative. ASSUMPTIONS • Design phase duration of 9 months • Construction Phase duration of 9 months • 9 monthly progress reports • 9 monthly design schedule updates • 24 M/WBE reports City of Fort Worth,Texas Attachment A PMO Release Date:07/23/2012 Page 2 of 21 DELIVERABLES A. Meeting summaries with action items B. Monthly invoices C. Monthly progress reports D. Baseline design schedule E. Monthly schedule updates with schedule narrative describing any current or anticipated schedule changes F. Monthly M/WBE Report Form and Final Summary Payment Report Form G. Plan Submittal Checklists (See Task 10) TASK 2. CONCEPTUAL DESIGN (30 PERCENT). The Conceptual Design shall be submitted to CITY per the approved Project Schedule. The purpose of the conceptual design is for the ENGINEER to identify, develop, communicate through the defined deliverables, and recommend the design concept that successfully addresses the design problem, and to obtain the CITY's endorsement of this concept. ENGINEER will utilize concepts and criteria contained in the current CITY— iSWM Criteria Manual for Site Development and Construction for conceptual planning and design. ENGINEER will develop the conceptual design of the infrastructure as follows. 2.1. Data Collection • In addition to data obtained from the CITY, ENGINEER will research and make efforts to obtain pertinent information to aid in coordination of the proposed improvements with any planned future improvements that may influence the project. ENGINEER will also identify and seek to obtain data for existing conditions that may impact the project including; utilities, agencies (such as TxDOT and railroads), CITY Master Plans, CITY drainage complaint files, existing applicable drainage studies, FEMA floodplain and floodway maps, existing models of project area (if any) and property ownership as available from the Tax Assessor's office. 2.1.1 Site Visit— ENGINEER will perform up to two site visits to confirm project constraints, observe existing conditions stream mechanics, and adjacent contributing watershed characteristics. 2.2. Drainage Computations • ENGINEER will illustrate the watershed boundaries based on contour data and field verification and document existing street, right-of-way and channel capacities for the project site. A drainage area map will be drawn at maximum 1" = 200' scale from available 2-foot contour data with the contours labeled. Data source and year will be provided by the CITY. Calculations regarding street and right-of-way capacities and design discharges (5-year and 100-year frequencies) at selected critical locations will be provided. Other frequencies as required by iSWM criteria may be appropriate for outfalls and sensitive locations. Capacities of existing channel will be calculated and shown. All calculations shall conform to City of Fort Worth,Texas Attachment A PMO Release Date:07/23/2012 Page 3 of 21 CITY criteria delineated in the current CITY iSWM Criteria Manual for Site Development and Construction. All locations in the project area where 100-year runoff exceeds available channel and right-of-way capacities shall be clearly identified. The ENGINEER's responsibility includes recommendations for improvements of the existing system as deemed reasonable and consistent with CITY standards. 2.2.1 Hydrology— In accordance with the previous phase, the Lebow Watershed LOMR HEC-HMS model (effective April 28, 2016)will be the basis of this design. LAN will review the HEC-HMS model prepared in the previous phases and will update the post-project model to include revised channel routing within the limits of the project. Contributing drainage areas, inputs, and attribute values will be verified. Routing updates will be prepared according to the current CITY iSWM Criteria Manual for Site Development and Construction (2015). The schematic study shows no adverse impacts downstream of the project; therefore, mitigation for impacts downstream are not included in the project scope. Hydrologic results will be summarized in the flood study report. 2.2.2 Hydraulics— In accordance with the previous phase, the Lebow Watershed LOMR HEC-RAS model (effective April 28, 2016)will be the basis of this design. LAN will review the schematic HEC-RAS model prepared by the previous consultant and will update the model based on the final grading and design refinements. Model items to be updated will consist of: • Project flows based on revised HEC-HMS routing • Channel geometry • Manning's n values • Expansion and contraction coefficients • 28th Street Bridge crossing modifications • LOS check 2.2.3 Sediment Transport Analysis, Erosion and Shear Stress Evaluation — Due to the widened section of Lebow Creek at 28th street, lower velocities at this crossing may result in sediment aggradation and can reduce the crossing's capacity if not properly addressed. LAN will consider the modeling effort performed by the previous consultant for high shear stress locations and will assess pre-project versus post- project relationships of bankfull shear stress, velocity, and stream power versus stage and discharge to ensure that the pilot channel design transports appropriate particles sizes at bankfull discharge. Sediment transport calculations will be performed using HEC-RAS. The schematic pilot channel design approved in the USACE Permit Number SWF-2010-00470 will be used as the basis of this design. The location and placement of erosion control measures will be refined in two (2) iterations to ensure the resultant geometry achieves a sediment balance throughout the project limits. Each of the erosion control measures will be detailed in the plans. 2.3. Subsurface Utility Engineering Provide Subsurface Utility Engineering (SUE) to Quality Level A, as described below. The SUE shall be performed in accordance with Cl/ASCE 38-02. Quality Level D City of Fort Worth,Texas Attachment A PMO Release Date:07/23/2012 Page 4 of 21 • Conduct appropriate investigations (e.g., owner records, County/CITY records, personal interviews, visual inspections, etc.), to help identify utility owners that may have facilities within the project limits or that may be affected by the project. • Collect applicable records (e.g., utility owner base maps, "as built" or record drawings, permit records, field notes, geographic information system data, oral histories, etc.) on the existence and approximate location of existing involved utilities. • Review records for: evidence or indication of additional available records; duplicate or conflicting information; need for clarification. • Develop SUE plan sheets and transfer information on all involved utilities to appropriate design plan sheets, electronic files, and/or other documents as required. Exercise professional judgment to resolve conflicting information. For information depicted, indicate: utility type and ownership; date of depiction; quality level(s); end points of any utility data; line status (e.g., active, abandoned, out of service); line size and condition; number of jointly buried cables; and encasement. Quality Level C (includes tasks as described for Quality Level D) • Identify surface features, from project topographic data and from field observations, that are surface appurtenances of subsurface utilities. • Include survey and correlation of aerial or ground-mounted utility facilities in Quality Level C tasks. • Survey surface features of subsurface utility facilities or systems. • The survey shall also include (in addition to subsurface utility features visible at the ground surface): determination of invert elevations of any manholes and vaults; sketches showing interior dimensions and line connections of such manholes and vaults; any surface markings denoting subsurface utilities, furnished by utility owners for design purposes. • Exercise professional judgment to correlate data from different sources, and to resolve conflicting information. • Update (or prepare) plan sheets, electronic files, and/or other documents to reflect the integration of Quality Level D and Quality Level C information. • Recommend follow-up investigations (e.g., additional surveys, consultation with utility owners, etc.) as may be needed to further resolve discrepancies. • Provide Quality Level C to identify overhead utilities on the project and provide the overhead utility information on the SUE plan sheets. Level B (includes tasks as described for Quality Level C) • Select and apply appropriate surface geophysical method(s)to search for and detect subsurface utilities within the project limits, and/or to trace a particular utility line or system. • Based on an interpretation of data, mark the indications of utilities on the ground surface for subsequent survey. Utilize paint or other method acceptable for marking of lines. • Unless otherwise directed, mark centerline of single-conduit lines, and outside edges of multi-conduit systems. • Resolve differences between designated utilities and utility records and surveyed appurtenances. City of Fort Worth,Texas Attachment A PMO Release Date:07/23/2012 Page 5 of 21 • Recommend additional measures to resolve differences if they still exist. Recommendations may include additional or different surface geophysical methods, exploratory excavation, or upgrade to Quality Level A data. • As an alternative to the physical marking of lines, the ENGINEER may, with CITY's approval, utilize other means of data collection, storage, retrieval, and reduction, that enables the correlation of surface geophysical data to the project's survey control. Level A • Expose and locate utilities at specific locations. • Tie horizontal and vertical location of utility to survey control. • Provide utility size and configuration. • Provide paving thickness and type, where applicable. • Provide general soil type and site conditions and such other pertinent information as is reasonably ascertainable from each test hole site. 2.4. Geotechnical Investigation • Soil investigations, including field and laboratory tests, borings, related engineering analysis and recommendations for determining soil conditions will be made. In addition to the above investigations, borings and appropriate field and laboratory analysis will be made at reasonable intervals along the project alignment for the Contractor's use in determining soil conditions for preparing bids and a Trench Safety Plan. • The ENGINEER shall prepare a detailed geotechnical engineering study in conformance with the City of Fort Worth Pavement Design Standards Manual, 2005. The study shall include recommendations regarding utility trenching and identifying existing groundwater elevation at each boring. 2.5 The Conceptual Design Package shall include the following: • Written summary of alternative design concepts considered, strengths and weaknesses of each, and the rationale for selecting the recommended design concept. • Cover sheet • Drainage area map with supporting drainage computations in the CITY's standard tabular format. • Conceptual iSWM Checklist in accordance with the current iSWM Criteria Manual for Site Development and Construction. Include documentation that the proposed storm water project will not impact upstream and downstream properties. • SUE Plan sheets sealed by a licensed professional engineer registered in the State of Texas. • Horizontal alignment (excluding profiles) of proposed storm water improvements, including existing lot layout, streets, street right-of-way, proposed easements, and existing utilities gathered during the SUE within the project limits. City of Fort Worth,Texas Attachment A PMO Release Date:07/23/2012 Page 6 of 21 • Proposed phasing of water, sanitary sewer, street and drainage work documented in both the project schedule and narrative form. • Documentation of key design decisions (Project Decision Log). • Estimates of probable construction cost. ASSUMPTIONS • All storm water calculations and design shall conform to the current CITY iSWM Criteria Manual for Site Development and Construction. • The SUE and SUE plan sheets shall be in accordance with Cl/ASCE 38-02. Two (2) QLA test holes will be obtained on utilities crossing the proposed alignment. • No hard copies of the conceptual design package will be delivered. Drawings will be half size (11"x 17"). Conceptual design package will be submitted in PDF format for review. • DWF files created from design CAD drawings will be uploaded to the designated project folder in BIM360 • All submitted documents and checklists will also be uploaded t the designated project folder in BIM360 • ENGINEER shall not proceed with Preliminary Design activities without written approval by the CITY of the Conceptual Design Package. DELIVERABLES A. Conceptual Design Package. B. Conceptual iSWM Checklist TASK 3. PRELIMINARY DESIGN (60 PERCENT). Preliminary plans shall be submitted to CITY per the approved Project Schedule. ENGINEER will develop the preliminary design of the infrastructure as follows. 3.1. Development of Preliminary Design Drawings shall include the following: • Cover Sheet • Drainage area maps showing proposed improvements with drainage calculations and hydraulic computations in accordance with the current iSWM Criteria Manual for Site Development and Construction. • A Project Control Sheet, showing all Control Points, used or set while gathering data. Generally on a scale of not less than 1:400. The following information shall be indicated for each Control Point: Identified (existing City Monument#8901, PK Nail, 5/8" Iron Rod); X, Y and Z Coordinates, in an identified coordinate system, and a referred bearing base. Z coordinate on City Datum only; descriptive location (i.e. set in the centerline of the inlet in the South curb line of North Side Drive at the East end of radius at the Southeast corner of North Side Drive and North Main Street). City of Fort Worth,Texas Attachment A PMO Release Date:07/23/2012 Page 7 of 21 • Overall project easement layout sheet(s). • SUE plan drawings. • Preliminary iSWM Checklist in accordance with the current iSWM Criteria Manual for Site Development and Construction • Plan and profile drawings of proposed stormwater improvements, including existing lot layout with property ownership, streets, curb lines, driveways, medians (if applicable), sidewalks, existing and proposed water and sanitary sewer mains, existing utilities gathered during the SUE and existing utility easements within the project limits. • No less than two bench marks per plan/profile sheet. • The ENGINEER will prepare standard and special detail sheets that are not already included in the City's standard details. These may include connection details between various parts of the project, tunneling details, boring and jacking details, waterline relocations, details unique to the construction of the project, trenchless details, and special service lateral reconnections. 3.2 Constructability Review • Prior to the 60 percent review meeting with the CITY, the ENGINEER shall schedule and attend a project site visit with the CITY Project Manager and Construction personnel to walk the project. The ENGINEER shall summarize the CITY's comments from the field visit and submit this information to the CITY in writing. 3.3 Public Meeting • After the preliminary plans have been reviewed and approved by the CITY, the ENGINEER shall attend public meeting to help explain the proposed project to residents. The CITY shall select a suitable location and mail the invitation letters to the affected customers. The ENGINEER shall coordinate with CITY GIS staff to identify affected property owners/residents and develop a spreadsheet listing addresses of those to invite to the public meeting. 3.4 Utility Clearance • The ENGINEER will consult with the CITY's Transportation and Public Works Department, Water Department, and other CITY departments, public utilities, private utilities, and government agencies to determine the approximate location of above and underground utilities, and other facilities (current and future) that have an impact or influence on the project. ENGINEER will design CITY facilities to avoid or minimize conflicts with existing utilities, and where known and possible consider potential future utilities in designs. • The ENGINEER shall upload individual DWF files for each plan sheet of the approved preliminary plan set to the designated project folder in BIM360 for forwarding to all utility companies which have facilities within the limits of the project. The DWF files should be created directly from the CAD files as opposed to PDF files. City of Fort Worth,Texas Attachment A PMO Release Date:07/23/2012 Page 8 of 21 3.5 Traffic Control Plan • Develop a traffic control plan utilizing standard traffic reroute configurations posted as "Typicals" on the CITY's BIM360 website. The typicals need not be sealed individually, if included in the sealed contract documents. • Develop supplemental traffic control drawings as needed for review and approval by the Traffic Division of the Transportation and Public Works Department. These drawings shall be sealed by a professional engineer registered in the State of Texas. ASSUMPTIONS • All stormwater calculations and design shall conform to the current CITY iSWM Criteria Manual for Site Development and Construction. • 4 borings at an average bore depth of 30 feet each will be provided. • Traffic Control "Typicals"will be utilized to the extent possible. It is assumed an additional two (2) project specific traffic control sheets will be developed. It is assumed TxDOT approval is not required. • No hard copies of the geotechnical report will be delivered to the CITY. PDF report will be provided to the City. • Digital format (PDF) plans will be delivered for Utility Clearance. • 2 sets full size plans will be delivered for Constructability Review. Digital format (PDF)will also be provided • Digital format (PDF) drawings will be delivered for Preliminary Design Review. • DWF files created from design CAD drawings will be uploaded to the designated project folder in BIM360. • All submitted documents and checklists will also be uploaded to the designated project folder in BIM360. • ENGINEER shall not proceed with Final Design activities without written approval by the CITY of the Preliminary Design plans. DELIVERABLES A. Preliminary Design drawings B. Preliminary iSWM Checklist C. Utility Clearance drawings D. Geotechnical Report E. Documentation of key design decisions (Project Decision Log) F. Estimates of probable construction cost G. Public Meeting exhibits City of Fort Worth,Texas Attachment A PMO Release Date:07/23/2012 Page 9 of 21 H. Traffic Control Plans TASK 4. FINAL DESIGN (90 PERCENT) AND FINAL CONSTRUCTION DOCUMENTS (100 PERCENT). Final draft construction plans and specifications included iSWM Construction Plan shall be submitted to CITY per the approved Project Schedule. Upon approval of the Preliminary plans, ENGINEER will prepare construction plans as follows: • Prepare and Final iSWM Checklist in accordance with the current CITY iSWM Criteria Manual for Site Development and Construction. • The ENGINEER shall submit a final design estimate of probable construction cost with the final design plans submitted. This estimate shall use ONLY standard CITY bid items. 4.2 Public Meeting • After the preliminary plans have been reviewed and approved by the CITY, the ENGINEER shall prepare project exhibits, and attend public meeting to help explain the proposed project to residents. The CITY shall select a suitable location and mail the invitation letters to the affected customers. The ENGINEER shall coordinate with CITY GIS staff to identify affected property owners/residents and develop a spreadsheet listing addresses of those to invite to the public meeting. 4.3 Prepare and submit final Construction Drawings. Following a 90% construction plan review meeting with the CITY, the ENGINEER shall submit Final Plans (100%)to the CITY per the approved Project Schedule. Each plan sheet shall be stamped, dated, and signed by the ENGINEER registered in State of Texas. ASSUMPTIONS • All stormwater calculations and design shall conform to the current CITY iSWM Criteria Manual for Site Development and Construction. • Digital format (PDF) drawings and specifications will be delivered for the 90% design. • A DWF file for the 90% Design will be created from design CAD drawings and will be uploaded to the project folder in BIM360. • Digital format (PDF) drawings and specifications will be delivered for the 100% design. • A DWF file for the 100% Design will be created from design CAD drawings and will be uploaded to the project folder in BIM360. DELIVERABLES A. 90% construction plans specifications. B. 100% construction plans and specifications. C. Final iSWM Checklist City of Fort Worth,Texas Attachment A PMO Release Date:07/23/2012 Page 10 of 21 D. Documentation of key design decisions (Project Decision Log). E. Detailed estimates of probable construction cost for the authorized construction project, including summaries of bid items and quantities using the CITY's standard bid items and format. F. Original cover mylar for the signatures of authorized CITY officials. TASK 5. BID PHASE SERVICES. ENGINEER will support the bid phase of the project as follows. 5.1. Bid Support • The ENGINEER shall upload all plans and contract documents onto BIM360 for access to potential bidders. • Contract documents shall be uploaded in a .xIs file. • Unit Price Proposal documents are to be created utilizing CFW Bidtools only and combined in a specified spreadsheet workbook, Bid Proposal Worksheet Template, and will be populated and configured so that all pages are complete and the Summary Worksheet(s) in the workbook detail and automatically summarize the totals from the inserted Unit Price Proposal document worksheets. • Plan Sets are to be uploaded to BIM360 in two formats, .pdf and .dwf files. The .pdf will consist of one file of the entire plan set. The .dwf will consist of individual files, one for each plan sheet, and will be numbered and named in a manner similar to that of the plan set index. • The ENGINEER shall sell contract documents and maintain a plan holders list on BIM360 from documents sold and from Contractor's uploaded Plan Holder Registrations in BIM360. • The ENGINEER will develop and implement procedures for receiving and answering bidders' questions and requests for additional information. The procedures shall include a log of all significant bidders questions and requests and the response thereto. The log shall be housed and maintained in the project's BIM360 folder titled Request for Information. The ENGINEER will provide technical interpretation of the contract bid documents and will prepare proposed responses to all bidders questions and requests, in the form of addenda. The ENGINEER shall upload all approved addenda onto BIM360 and mail addenda to all plan holders. • Attend the prebid conference in support of the CITY. • Assist the CITY in determining the qualifications and acceptability of prospective contractors, subcontractors, and suppliers. • Attend the bid opening in support of the CITY. • Tabulate and review all bids received for the construction project, assist the CITY in evaluating bids, and recommend award of the contract. A copy of the Bid City of Fort Worth,Texas Attachment A PMO Release Date:07/23/2012 Page 11 of 21 Tabulation and the CFW Data Spreadsheet created utilizing CFW Bidtools only are to be uploaded into the project's Bid Results folder on BIM360. • Assist the CITY with assembling and awarding contracts for construction, materials, equipment, and services. • Incorporate all addenda into the contract documents and issue conformed sets. 5.2 Final Design Drawings • Final Design Drawings shall be submitted as an Adobe Acrobat PDF format (version 6.0 or higher)file and DWF format. There shall be one (1) PDF file and one (1) DWF file (created from CAD application of drawing)for the TPW plan set and a separate PDF and DWF file for the Water plan set. Each PDF and DWF file shall be created from the original CAD drawing filess and shall contain all associated sheets of the particular plan set. Singular PDF and DWF files for each sheet of a plan set will not be accepted. PDF and DWF files shall conform to naming conventions as follows: I. TPW file name example — "W-1956_org47.pdf' where "W-1956" is the assigned file number obtained from the CITY, "_org" designating the file is of an original plan set, "47" shall be the total number of sheets in this file. Example: W-0053 org3.pdf and K-0320 org5.pdf II. Water and Sewer file name example — "X-35667_org36.pdf' where "X- 35667" is the assigned file number obtained from the CITY, "—org" designating the file is of an original plan set, "36" shall be the total number of sheets in this file. Example: X-12755_org18.pdf Both PDF and DWF files shall be uploaded to the project's Record Drawing folder in BIM360. • In addition to the PDF and DWF files, the ENGINEER shall submit each plan sheet as an individual DWG file with all reference files integrated into the sheet. If the plans were prepared in DGN format, they shall be converted to DWG prior to uploading. The naming convention to be used for the DWG files shall be as follows: I. TPW files shall use the W number as for PDF and DWF files, but shall include the sheet number in the name—'W-1956—SHT01.dwg", "W- 1956—SHT02.dwg", etc. City of Fort Worth,Texas Attachment A PMO Release Date:07/23/2012 Page 12 of 21 II. Water and Sewer file names shall use the X number as for PDF and DWF files, but shall include the sheet number in the name — "X- 12155—SHT01.dwg", "X-12755—SHT02.dwg", etc. For information on the proper manner to submit files and to obtain a file number for the project, contact the Department of Transportation and Public Works Vault at telephone number(817) 392-8426. File numbers will not be issued to a project unless the appropriate project numbers and fund codes have been assigned and are in the Department of Transportation and Public Works database. ASSUMPTIONS • The project will be bid only once and awarded to one contractor. • 1 sets of construction documents will be sold to and made available on BIM360 for plan holders and/or given to plan viewing rooms. • 5 sets of construction documents will be printed and made available for purchase by planholders and/or given to plan viewing rooms. • 1 set of full-size size plans and specifications (conformed, if applicable)will be delivered to the CITY. • PDF, DWF and DWG files will be uploaded to BIM360. DELIVERABLES A. Addenda B. Bid tabulations C. Recommendation of award D. Construction documents (conformed, if applicable) E. CFW Data Spreadsheet TASK 6. CONSTRUCTION PHASE SERVICES. ENGINEER will support the construction phase of the project as follows. 6.1 Construction Support • The ENGINEER shall attend the preconstruction conference. • After the pre-construction conference, the ENGINEER shall provide project exhibits and attend public meeting to help explain the proposed project to residents. The CITY shall select a suitable location and mail the invitation letters to the affected customers. • The ENGINEER shall visit the project site at requested intervals as construction proceeds to observe and report on progress. City of Fort Worth,Texas Attachment A PMO Release Date:07/23/2012 Page 13 of 21 • The ENGINEER shall review shop drawings, samples and other submittals submitted by the contractor for general conformance with the design concepts and general compliance with the requirements of the contract for construction. Such review shall not relieve the Contractor from its responsibility for performance in accordance with the contract for construction, nor is such review a guarantee that the work covered by the shop drawings, samples and submittals is free of errors, inconsistencies or omissions. The ENGINEER shall log and track all shop drawings, samples and other submittals in BIM360. • As requested by the CITY, the ENGINEER shall provide necessary interpretations and clarifications of contract documents, review change orders, and make recommendations as to the acceptability of the work. • The ENGINEER shall attend the "Final' project walk through and assist with preparation of final punch list. 6.2 Record Drawings • The ENGINEER shall prepare record drawings from information provided by the CITY depicting any changes made to the Final Drawings during construction. The following information shall be provided by the CITY: o As-Built Survey o Red-Line Markups from the Contractor o Red-Line Markups from City Inspector o Copies of Approved Change Orders o Approved Substitutions • The ENGINEER shall modify the Final Drawings electronically and shall place a stamp on the plans indicating that they represent Record Drawings of the project as constructed. The stamp shall be signed and dated by the ENGINEER and shall be placed on each plan sheet, whether there are any revisions on the sheet or not. Each sheet shall clearly indicate all changes which apply to that sheet by clouding and numbering, or other suitable means. • The following disclaimer shall be included with the Record Drawing stamp: o These Record Drawings were prepared using information provided by others and represent the as constructed conditions to the extent that documented changes were provided for recording. The ENGINEER assumes no liability for undocumented changes and certifies only that the documented changes are accurately depicted on these drawings. • The ENGINEER shall submit a set of sealed Final Drawings, modified and stamped as Record Drawings, on mylar for record storage. The ENGINEER may keep copies of the information provided by the CITY for their files, but all original red-lined drawings shall be returned to the CITY with the mylars. • Record Drawings shall also be submitted as an Adobe Acrobat PDF format (version 6.0 or higher)file and DWF format. There shall be one (1) PDF file and one (1) DWF file for the TPW plan set and a separate PDF and DWF file for City of Fort Worth,Texas Attachment A PMO Release Date:07/23/2012 Page 14 of 21 the Water plan set. Each PDF and DWF file shall contain all associated sheets of the particular plan set. Singular PDF and DWF files for each sheet of a plan set will not be accepted. PDF and DWF files shall conform to naming conventions as follows: I. TPW file name example — "W-1956_or947.pdf" where "W-1956" is the assigned file number obtained from the CITY, "_org" designating the file is of an original plan set, "47" shall be the total number of sheets in this file. Example: W-0053 org3.pdf and K-0320 org5.pdf II. Water and Sewer file name example — "X-35667_org36.pdf" where "X- 35667" is the assigned file number obtained from the CITY, "_org" designating the file is of an original plan set, "36" shall be the total number of sheets in this file. Example: X-12755—org18.pdf Both PDF and DWF files shall be uploaded to the project's Record Drawing folder in BIM360. For information on the proper manner to submit files and to obtain a file number for the project, contact the Department of Transportation and Public Works Vault at telephone number(817) 392-8426. File numbers will not be issued to a project unless the appropriate project numbers and fund codes have been assigned and are in the Department of Transportation and Public Works database. 6.3 Mitigation Specialist Construction Monitoring The approved USACE permit included a special condition that requires the City of Fort Worth to have a mitigation specialist oversee the construction of the project. The special condition states that"The permittee shall retain a qualified mitigation specialist (biologist, ecologist or other specialist qualified in stream and wetland restoration, enhancement, and creation work), to oversee project construction to the extent necessary to ensure compliance with all mitigation requirements of this permit. The permittee shall have this mitigation specialist conduct all monitoring and produce any required monitoring reports." Under this task we will provide professional services to conduct nine (9) construction inspections during the 290-day construction period. We will prepare a brief memorandum documenting the site inspection as it relates to the conditions of the section 404 permit and mitigation plan. 6.4 Archeologist Construction Monitoring Similar to the mitigation specialist, the USACE conditioned the individual permit to require an archeologist providing construction monitoring. The special condition stipulated "During construction, a qualified archeologist will periodically monitor the permit area for the presence of buried features or sites. If buried cultural remains are City of Fort Worth,Texas Attachment A PMO Release Date:07/23/2012 Page 15 of 21 encountered during construction, the remains shall be avoided and the USACE contacted to assess the site for eligibility to the National Register of Historic Places and to comply with 33CFR325 (Appendix C) and 36 CFR 800." We will provide professional services to conduct six (6) construction inspections during and shortly after earth disturbing activities have occurred. We will provide a brief memorandum of the findings regarding cultural resources. In the unlikely event that a cultural resources artifact or site is identified, we will request a work stoppage in the immediate vicinity and provide necessary coordination documentation to the USACE. The USACE will determine the next steps required to alleviate the Section 106 process, which are specifically excluded from this task. Special Conditions: This scope of services is to provide a construction monitoring on Lebow Channel at 28th Street. In the event that an unexpected archeological site is unearthed during this project, the USACE will provide the coordination with the State Historic Preservation Officer and determine the mitigation requirements to alleviate the impacts. Due to the speculative nature of this mitigation potential, we specifically exclude these services from this agreement. If a site is identified and after the mitigation requirements are identified, we will provide an additional agreement for these services. Similarly, if there is some mitigation that is desired to be changed or the individual permit is necessary to be changed, these services will be conducted under another agreement. ASSUMPTIONS • 8 site visits are assumed. • 10 submittal reviews are assumed. • 5 Change Orders and/or RFI's are assumed. • One copy of full size (22"x34") mylars will be delivered to the CITY DELIVERABLES A. Public meeting exhibits B. Response to Contractor's Request for Information C. Review of Change Orders D. Review of shop drawings E. Final Punch List items F. Record Drawings TASK 7. ROW/EASEMENT SERVICES. ENGINEER will support and perform activities related to ROW and easements as outlined below, per scoping direction and guidance from the CITY's Project Manager. 7.1. ALTA Survey • The survey will meet the minimum standard detail requirements for an ALTA/NSPS Land Title Survey for Items 1, 2, 3, 4, 13, &20 of Table A thereof. City of Fort Worth,Texas Attachment A PMO Release Date:07/23/2012 Page 16 of 21 7.2 Right-of-Way/Easement Preparation and Submittal. • The ENGINEER shall prepare documents to be used to obtain right-of-way and permanent and/or temporary easements required to construct the improvements. • The documentation shall be provided in conformance with the checklists and templates available on the CITY's BIM360 site. 7.3 Temporary Right of Entry Preparation and Submittal • Prior to construction, the ENGINEER shall prepare, mail and obtain Temporary Right of Entries from landowners. It is assumed that letters will only be required for land owners adjacent to temporary construction easements or who are directly affected by the project and no easement is required to enter their property. • The documentation shall be provided in conformance with the checklists and templates available on the CITY's BIM360 site. 7.4. Complete and Submit Park Conversion Application • Coordinate and attend meetings with PARD. • Prepare exhibits for Park Conversion application. • Prepare and submit Park Conversion Application. • Prepare and submit access agreement(s)for Trail Drivers' Park ASSUMPTIONS • Right-of-Way research includes review of property/right-of-way records based on current internet based Tarrant Appraisal District (TAD) information available at the start of the project and available on-ground property information (i.e. iron rods, fences, stakes, etc.). It does not include effort for chain of title research, parent track research, additional research for easements not included in the TAD, right-of-way takings, easement vacations and abandonments, right-of-way vacations, and street closures. • Up to 2 ROW/Easement documents • Up to 2 temporary right-of-entry documents and/or access agreements for Trail Drivers' Park. DELIVERABLES A. Right-of-Way, easement exhibits and metes and bounds provided on CITY forms. Instrument corners will be staked once final documents have been approved by CITY. B. Temporary Right of Entry Letters C. Park Conversion Application TASK 8. SURVEY. City of Fort Worth,Texas Attachment A PMO Release Date:07/23/2012 Page 17 of 21 ENGINEER will provide survey support as follows. 8.1 Design Survey • ENGINEER will perform field surveys to collect horizontal and vertical elevations and other information needed by ENGINEER in design and preparation of plans for the project. Information gathered during the survey shall include topographic data, utilities as required by the SUE, structures, trees (measure caliper, identify overall canopy, and have qualified arborist identify species of trees), and other features relevant to the final plan sheets. Existing drainage at intersections will be verified by field surveys. Spot elevations will be shown on intersection layouts with cross slope to fit intersecting grade lines. • The minimum survey information to be provided on the plans shall include the following: — A Project Control Sheet, showing ALL Control Points, used or set while gathering data. Generally on a scale of not less than 1:400: — The following information about each Control Point; a. Identified (Existing. CITY Monument#8901, PK Nail, 5/8" Iron Rod) b. X, Y and Z Coordinates, in an identified coordinate system, and a referred bearing base. Z coordinate on CITY Datum only. c. Descriptive Location (Ex. Set in the centerline of the inlet in the South curb line of North Side Drive at the East end of radius at the Southeast corner of North Side Drive and North Main Street). ASSUMPTIONS None. DELIVERABLES A. Copies of field survey data and notes signed and sealed by a licensed surveyor. B. Drawing of the project layout with dimensions and coordinate list. TASK 9. PERMITTING. ENGINEER will provide permitting support for the CITY to obtain agreements and/or permits normally required for a project of this size and type, as follows. 9.1. Submit Flood Study Report and obtain Floodplain Development Permit A floodplain development permit is required that will demonstrate no rise in water surface elevations with the proposed final design. LAN will coordinate with the City of Fort Worth Storm Water department in obtaining the necessary floodplain development permit. This will require LAN coordinating with the City, updating H&H models, submitting the permit application, and providing a flood study report. Effort includes a draft and final submittal. 9.2. Review Design for Compliance with USACE Permit City of Fort Worth,Texas Attachment A PMO Release Date:07/23/2012 Page 18 of 21 The engineering design documents of Lebow Channel Project Segments L3 and L4 will be reviewed for compliance with the approved USACE permit by third-party review. Third-party reviewer will be available for design, client, and USACE meetings as the project design documents are drafted. Third-party reviewer will review the project design documents to ensure consistency with the Section 404 permit and mitigation plan, and provide limited coordination with the USACE regarding any potential deviations the project design takes from the approved mitigation plan. 9.3. USACE Preconstruction Notification In accordance with the approved USACE permit, the USACE will be notified at least 2 weeks prior to preconstruction meeting. Within two weeks, written confirmation will be provided to the USACE that the meeting(s)was/were held. 9.4. TxDOT Coordination An adjacent TxDOT project is being concurrently designed which includes drainage improvements to the nearby NE 28th St sump. LAN understands that the design criteria used for the 28th St sump may not be consistent with the City of Fort Worth criteria and coordination with TxDOT is required to ensure the NE 28th sump improvements ties into the channel improvements appropriately. LAN will coordinate with TxDOT as required in providing the design details for the improved channel and reviewing the adjacent project. 9.5. TxDOT Bridge Scour Analysis LAN will perform Bridge Scour calculations and recommend scour countermeasures in accordance with appropriate TxDOT, Federal, State, and City guidelines. These findings will be summarized in the flood study report and submitted electronically to TxDOT with one round of comments and a final report. 9.6. Tree Survey and City Forestry Permit The Surveyor shall tie in all 6" trees (dbh) and greater, record species, general health, diameter, and crown radius. All surveyed trees will be tagged with tree number. City Forester permits for Tree Removal and Tree Planting will be prepared and submitted. 9.7. Prepare and Submit LOMR Based on past meetings with the City of Fort Worth and FNI, it is understood that a CLOMR is not required for the channel since no fill is proposed in the floodway and there is no increase in the water surface elevations of the creek. A LOMR will be required for this project once the construction of the channel is completed in accordance with the proposed design plans. LAN will prepare the required documents for this LOMR and coordinate with the City and FEMA, as required. ASSUMPTIONS • Permit preparation will begin after approval of the Conceptual Design. • TxDOT Coordination and Bridge Scour Analysis: 3 meetings with TxDOT to review bridge scour analysis and adjacent project coordination. City of Fort Worth,Texas Attachment A PMO Release Date:07/23/2012 Page 19 of 21 • City Forester: 1 meeting DELIVERABLES A. Flood Study Report for Floodplain Development Permit B. Bridge Scour Report to TxDOT C. Tree survey: Microsoft Excel table, table in CAD, and a brief report documenting methods and findings from a certified Arborist. D. City Forester: Tree Removal Permit Application, Tree Planting Permit Application. TASK 10. PLAN SUBMITTAL CHECKLISTS Engineer shall complete and submit Plan Submittal Checklists in accordance with the following table: PLAN SUBMITTAL CHECKLIST REQUIREMENTS Street Water Traffic Traffic Traffic Traffic Storm Storm Lights /Sewer Traffic Control Control Control o 0 0 Attachment"A" Signal Engineering 30% 60/0 90/o Type (Submit All Water Water (Submit (Submit c 30% 60% All @ All @ (Submit All @ 30%) 30% 60%) @ 60/o) Required for all work in City ROW Storm Water x x x x x City of Fort Worth,Texas Attachment A PMO Release Date:07/23/2012 Page 20 of 21 Additional Services not included in the existing Scope of Services — CITY and ENGINEER agree that the following services are beyond the Scope of Services described in the tasks above. However, ENGINEER can provide these services, if needed, upon the CITY's written request. Any additional amounts paid to the ENGINEER as a result of any material change to the Scope of the Project shall be agreed upon in writing by both parties before the services are performed. These additional services include the following: • Negotiation of easements or property acquisition. • Services related to development of the CITY's project financing and/or budget. • Services related to disputes over pre-qualification, bid protests, bid rejection and re-bidding of the contract for construction. • Construction management and inspection services. • Performance of materials testing or specialty testing services. • Services necessary due to the default of the Contractor. • Services related to damages caused by fire, flood, earthquake or other acts of God. • Services related to warranty claims, enforcement and inspection after final completion. • Services to support, prepare, document, bring, defend, or assist in litigation undertaken or defended by the CITY. • Performance of miscellaneous and supplemental services related to the project as requested by the CITY. • Modifications to the approved USACE Section 404 permit. • Additional mitigation or cultural resources monitoring or reporting requirements above those stated in the approved USACE Section 404 Permit Number SWF- 2010-00470 dated June 26, 2018. • Property abstracting services. • Staking of existing property corners. City of Fort Worth,Texas Attachment A PMO Release Date:07/23/2012 Page 21 of 21 ATTACHMENT B COMPENSATION Design Services for 28th Street at Decatur HROM Project City Project No. 103052 Lump Sum Project I. Compensation A. The ENGINEER shall be compensated a total lump sum fee of $714,761.00 as summarized in Exhibit B-1 — Engineer Invoice and Section IV—Summary of Total Project Fees. The total lump sum fee shall be considered full compensation for the services described in Attachment A, including all labor materials, supplies, and equipment necessary to deliver the services. B. The ENGINEER shall be paid monthly payments as described in Section II - Method of Payment. II. Method of Payment A. Partial payment shall be made to the ENGINEER monthly upon City's approval of an invoice prepared and submitted by the ENGINEER in the format and including content as presented in Exhibit B-1, Progress Reports as required in item III. of this Attachment B, and Schedule as required in Attachment D to this Agreement. B. The estimated current physical percent complete as required on the invoice shall be calculated from the progress schedule as required in Attachment D to this Standard Agreement and according to the current version of the City of Fort Worth's Schedule Guidance Document. C. The cumulative sum of such monthly partial fee payments shall not exceed the total current project budget including all approved Amendments. D. Each invoice shall be verified as to its accuracy and compliance with the terms of this Agreement by an officer of the ENGINEER. III. Progress Reports A. The ENGINEER shall prepare and submit to the designated representative of the Transportation and Public Works Department monthly progress reports and schedules in the format required by the City. City of Fort Worth,Texas Attachment B PMO Official Release Date:8.09.2012 Page 1 of 3 B-1 ATTACHMENT B COMPENSATION IV. Summary of Total Project Fees Firm Primary Responsibility Fee Amount % Prime Consultant Lockwood, Andrews & Hydrology, Hydraulics, $512,312 71.68 Newnam, Inc. Channel Design, Permitting Proposed MBE/SBE Sub-Consultants HVJ Geotechnical Investigation and $29,810 4.17 Testing IES Mitigation Consulting, $40,054 5.60 Construction Monitoring, and Compliance Monitoring NDMCE Structural Engineering $70,000 9.79 PKCE Landscape Architecture $28,750 4.02 Rios Group Subsurface Utility Engineering $12,075 1.69 (QL A) Spooner Surveyors Topographic Survey, ALTA, $21,760 3.04 Easement Services, Tree Survey Non-MBE/SBE Consultants None TOTAL $714,761 100% Project Number& Name Total Fee MBE/SBE Fee MBE/SBE 103052 28th Street at Decatur HROM $714,761 $202,449 28.32% City MBE/SBE Goal = 10% Consultant Committed Goal = 28% City of Fort Worth,Texas Attachment B PMO Official Release Date:8.09.2012 Page 2 of 3 B-2 EXHIBIT "B-1" ENGINEER INVOICE (Supplement to Attachment B) Insert required invoice format following this page, including negotiated total budget and allocations of budgets across work types and work phases. City of Fort Worth,Texas Attachment B PMO Official Release Date:8.09.2012 Page 3 of 3 B-3 k2 \ ` m Li c £ \ � u = 2 � { - �IL | 0 _ kCL I � ! CL . .. ■ | ; _ c § 77 qE . 2 ■ 0 E ■ § � ; / a ■ o a3 � §zo ; \ fA - I o ! £ EZ LU a E � � - 0 \ 0 } \ kk © } } O'OL; . iz dN [J 2) ■ , = sue; E 0 § Z EkiL £ CL C § � � k ° O 0 ; . § I ICLe L) E 0 v2 � �: / LU ; § kk k icj b ii� § o " � 2 �I■000 _ . . _ .. § � « a E aa� sss � 2 'IL E �� ''� e . . . . .. � # o IL a § 5 0 ■■IL■■_ ■ ! ! ! ! !! to |2-_-__-----_ � §§ a2 �> k� CL � qI� .! § ■ 7 ° c ,■ 0 - : m | § § § 2 § 2! | I � lg » t0o #�2; =;s2;;� ; a �k 3 k a.2 E.|!c. , e k2 T ,fJ . ; ■ �.2% § / 0 | . � . f § _ 99999292299 ■ . 72 § ! R` ' k2 _ Ek! °% 49 ! /§ 99cc $ -;-- ------- go w A ■ B ;; 2 Ll BB ! ■$ kfk §») �£!££! | §! ƒ !! E a..2 |{ § !k |kk�kb| `a.Li d E / § C) A ! & ) \ e \ | 9 04 !! © _`CD� � - - 2 C,4 ! . j j _ . § ..■ E ff | | . cn c aa� a�e�v��,.���v , • ■ 0aƒka« g «'E z f £B£&0`&. 355!##!G3ILC E ;1m§ § = 'a 22k k Bl „! !C a ® ƒ) E kkE»0a» o jj!! !! aal9L 0 ATTACHMENT "C" CHANGES AND AMENDMENTS TO STANDARD AGREEMENT Design Services for 28th Street at Decatur Hazardous Road Overtopping Mitigation Project City Project No. 103052 None. City of Fort Worth,Texas Attachment C PMO Release Date:05.19.2010 Page 1 of 1 FORT WORTH ATTACHMENT "D" PROJECT SCHEDULE A. ENGINEER Project Schedule Development ENGINEER shall prepare a project schedule for the services to be provided in fulfilling the requirements of the Agreement and encompassing the Scope of Work defined in Attachment A to the Agreement. ENGINEER shall prepare and maintain project schedule throughout the life of the project as defined in the Agreement in compliance with the City's Specification 00 31 15 entitled Engineer Project Schedule. ENGINEER's project schedule will follow the Critical Path Methodology (CPM) for planned sequencing of the work activity and timing of the work. B. Schedule "Tier" Selection City has identified three "Tier" levels for project schedules as defined in City's Specification 00 31 15, to align with the size and complexity of the project as a basis for schedule development. City's Project Manager will determine the "Tier" level for the ENGINEER's project schedule as part of the negotiation of the Agreement. C. Project Baseline Schedule ENGINEER will produce an initial project schedule and submit as a "baseline" for review and acceptance by City's Project Manager as defined in City's Specification 00 31 15 which will be referred to as the Project Baseline Schedule. Updates to the baseline schedule follow the requirements of City's Specification 00 31 15. D. Project Progress Schedule ENGINEER will provide to the City, monthly updates to their project schedule indicating progress of the Work in compliance with the requirements of City's Specification 00 31 15 and said schedule will be referred to as the Project Progress Schedule. E. Master Project Schedule City will develop and maintain a master project schedule for the overall project. ENGINEER's project baseline and progress schedule submittals will be an integral part of the development and updating process of City's Master Project Schedule. City of Fort Worth,Texas Attachment D Revision Date:07.20.2018 Page 1 of 1 �T NE 29TH ST. LEBOW CHANNEL IMPROVEMENTS o � a w = m w cvn � v m n al > M . r NE 28TH ST. w a Jam. ul1'Al' w LZL ZZ 8 N ° I +•� AL 4 0 250 500 _W _ ,.f�#y GRAPHIC SCALE IN FEET _ V} - SCALE: 1"=250' - 5 LEBOW CHANNEL Lockwood, Andrews PROJECT 103052 - 28TH ST. AT DECATUR HROM & Newnam, Inc. A LEO A DALY COMPANY AERIAL EXHIBIT U O City of Fort Worth, Texas Mayor and Council Communication DATE: 03/02/21 M&C FILE NUMBER: M&C 21-0148 LOG NAME: 20SWM 28TH STREET AT DECATUR HROM DESIGN SUBJECT (CD 2)Authorize Execution of an Engineering Agreement with Lockwood, Andrews & Newnam, Inc. in the Amount Not to Exceed $714,761.00 for the 28th Street at Decatur Hazardous Road Overtopping Mitigation Project RECOMMENDATION: It is recommended that the City Council authorize execution of an engineering agreement with Lockwood, Andrews & Newnam, Inc. in the amount not to exceed $714,761.00 for the 28th Street at Decatur Hazardous Road Overtopping Mitigation project (City Project No. 103052). DISCUSSION: The engineering agreement recommended by this Mayor and Council Communication (M&C)will provide for engineering and design services related to the 28th Street at Decatur Hazardous Road Overtopping Mitigation (HROM) project. The project is a continuation of improvements to Lebow Channel and will mitigate the risk of hazardous road overtopping near the intersection to better protect drivers from road flooding. It will also reduce flooding at the 28th Street railroad underpass west of the intersection during intense storm events. In May 2018, the Transportation and Public Works Department (TPW), Stormwater Management Division, published a Request for Qualifications (RFQ)for various engineering consulting services. Based on the results of the RFQ, Lockwood, Andrews & Newnam, Inc. (LAN)was selected as the most qualified consultant to design this project and proposes to perform design and engineering services for a fee not to exceed $714,761.00. The services provided will include designing channel improvements both upstream and downstream of the 28th Street crossing of Lebow channel. The channel improvements will consist of deepening and widening the channel and opening up the culvert under 28th Street to provide more capacity in the channel to convey floodwaters and protect drivers from the 100-year flood event at this crossing. The project will also include mitigation for impacts to the natural channel by incorporating channel restoration activities into the project. The engineer will also prepare plans and specifications for construction and provide services during bidding and construction. Staff considers the fee to be fair and reasonable for the scope of services proposed. Office of Business Equity— Lockwood, Andrews & Newnam, Inc. is in compliance with the City's BDE Ordinance by committing to 28% SBE participation on this project. The City's SBE goal on this project is 10%. This project is located in COUNCIL DISTRICT 2. FISCAL INFORMATION / CERTIFICATION: The Director of Finance certifies that funds are available in the current capital budget, as previously appropriated, in the Storm Water Rev Ref Bonds 2020 Fund for the 28th Str at Decatur HROM project to support the approval of the above recommendation and execution of the engineering design agreement. Prior to any expenditure being incurred, the Transportation & Public Works Department has the responsibility to validate the availability of funds. Submitted for City Manager's Office by: Dana Burghdoff 8018 Originating Business Unit Head: William Johnson 7801 Additional Information Contact: Linda Young 2485