HomeMy WebLinkAboutContract 38135-A2 (2) CITY SECRETARY,
CONTRACT No. -
AMENDMENT No.2
TO CITY SECRETARY CONTRACT No. 38135
WHEREAS, the City of Fort Worth (CITY) and URS Corporation,
(ENGINEER) made and entered into City Secretary Contract No. 38135, (the
CONTRACT) which was authorized by M&C C-23177 on the 11th day of
November, 2008 in the amount of $ 634, 007 . 00; and
WHERAS, the CONTRACT was subsequently revised by: Amendment No. 1 in
the amount of $9, 306. 00 administratively authorized on October 20, 2009;
and
WHEREAS, the CONTRACT involves engineering services for the
following project :
Storm Water Utility Project - Forest Park Parkview Storm Drain (City
Project No. 00674) ; and
WHEREAS, it has become necessary to execute Amendment No. 2 to the
CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement,
which amends the CONTRACT:
1 .
Article I of the CONTRACT is amended to include the additional
engineering services specified in a proposal dated November 7, 2012, a
copy of which is attached hereto and incorporated herein. The cost to
City for the additional design services to be performed by Engineer
totals $9, 721 . 00. (See Attached Funding Breakdown Sheet, Page -3-)
2 .
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $653, 034. 00.
3 .
All other provisions of the Contract, which are not expressly
amended herein, shall remain in full force a ct.
City of Fort Worth CORD
Professional Services Agreement Amendment Template OFFICIAL RE
PMO Official Release 8/1/2012
Page 1 of 3 ClTy SFCRETAR
01-0 9-1 3 P 1 2 : 19 IN Q��J sue[
s W0��•�'i� 1 A
EXECUTED and EFFECTIVE as of the date last written by a signatory,
below.
APPROVED:
City of Fort Worth ENGINEER
URS Corporation
Z:Al-,
Fernando Costa Dev Rastogi, P.E.
Assistant City Manager Vice President
DATE: _ /? DATE: _ 2_
APPROVAL RECOMMENDED:
Douglas W. k�rsig, P.E.
Director, Department of Transportation/Public Works
APPROVED AS TO FORM AND LEGALITY: M&C:q�71� _ Nl-�-
Date :
Do las W. Black
Assistant City Attorney
4a If OR h��
ATTEST: A O'*O000000O°o ��
pro°
O d$�
0
a ry Ka � �0 °o° o
City Secret , °OoppO°
City Fort Worth OFFICIAL RECORD
Professional Services Agreement Amendment Template
PMO Official Release 8/1/2012 CITY SECRETARY
Page 2 of 3
FT. WORTH, TX
FUNDING BREAKDOWN SHEET
City Secretary No. 38135
Amendment No . 2
Department Fund-Account-Center Amount
TPW P229-531200-209280067430 $9, 721 . 00
Total : $9, 721 . 00
City of Fort Worth
Professional Services Agreement Amendment Template
PMO Official Release 8/1/2012
Page 3 of 3
November 7, 2012
Mr. Michael A. Owen, P.E.
Senior Professional Engineer
Transportation &Public Works Department
City of Fort Worth
1000 Throckmorton Street
Fort Worth, Texas 76102
Re: Request for Amendment No. 2—Additional Services for Storm Drain Improvements
FOREST PARK—PARKVIEW STORM DRAINAGE IMPROVEMENTS
City Project No.00674
URS Project No. 25337785
Dear Mr. Owen:
This letter is for requested additional engineering services for the above referenced project. The services
for Amendment No. 2 are in addition to or modify our current scope of services. A description of the
additional services and associated fees are provided below. A detailed breakdown of the proposed fee for
these additional services is also attached.
URS —ADDITIONAL ENGINEERING DESIGN SERVICES
1.Design Storm Drain Inlet with a lateral connection on Forest Park Blvd.: The City has informed
URS about a drainage related complaint filed by a local Citizen. This complaint is about a low spot
formed due to curb and gutter settlement on Forest Park Blvd. in front of Lot 2, Block 34R, Edward
Heirs Addition. The Citizen has observed that for the last several years during any rain event, water
ponds at the above location. The City has asked URS to design a storm drain inlet at the above location
with a lateral connection to the existing storm drain underneath the median in Forest Park Blvd.
a. Storm Drain Inlet Design: Provide engineering services for the design of a suitable storm
drain inlet to collect the rain water at the above mentioned location and design the storm
drain lateral to connect this inlet to the nearest existing storm drain in Forest Park Blvd.
This will require addition of three sheets- local drainage area map, storm drain calculations
and a plan &profile sheet for the proposed storm drain.
b. Adjust existing 12" Water line: The existing 12" Water line in the west parkway of Forest
Park Blvd. may obstruct the proposed storm drain lateral. To avoid this, the existing 12"
Water line may need to be lowered. The proposed additional engineering services by URS
will include a plan and profile sheet showing the adjustments to the existing 12" Water line to
facilitate the construction of the proposed storm drain inlet and lateral.
URS Corporation
1300 Summit Avenue,Suite 600
Fort Worth,TX 76102
Tel:817.390.1000
Fax:817.882.9462
www.urscorp.com
Mr. Michael A. Owen, P.E.
November 6, 2012
Page 2 of 2
The proposed fee for the services as described above will not include the following services:
1. Additional Topographic survey, as it is assumed that existing Topographic survey is sufficient to
provide the above mentioned design services.
2. Geo-Technical exploratory borings.
3. Analysis of the existing storm drain system.
4. Paving improvements beyond the normal limits (as defined by the City Standard pavement trench
repair details) of the proposed storm drain improvements.
5. Traffic control plans.
6. Preparation of Specifications and contract documents.
We therefore request a contract amendment to increase the lump sum fee amount by $9,721.00
Original Lump Sum Amount $ 634,007.00
Amendment No. 1 $ 9,306.00 -Approved 11-05-2012
Amendment No. 2 $ 9,721.00 - Requested herein
Total Revised Amount $ 653,034.00
Please contact me if you have any questions regarding this contract amendment. Thank you for the
opportunity to continue providing professional engineering services to the City of Fort Worth.
Sincerely,
URS CORPORATION
Richard W. Albin, P.E.
Senior Project Manager
RWA: mgp
Level of Effort Spreadsheet
TASK/HOUR BREAKDOWN
Additional Design Services for
STORM WATER UTILITY PROJECT FOREST PARK-PARKVIEW STORM DRAIN-Amendment No.2
City Project No.00674
Labor hours Expense
Task No. Task Description Project Project Project626
CADD Administrative Total Labor Subconsultant Total Expense Task Sub Total
Director Mana er Engineer Cost Travel Reproduction Cost
Rate $215 $195 $120 $80 $60 MWBE Non-MWBE
1.0 Additional Design Services 0 2 41 18 0 $9 116.00 $0.00 $0.00 $0.00 $0.00 $0.00 $9 116.00
1.1 Process Surve DTM Surface 0 8 0 $822.00 $0.00 $822.00
1.2 Pre are Drains a Area Ma 2 4 0 $924.00 $0.00 $924.00
1.3 Desi n Inlet&Storm Drain Lateral 1 6 0 $1,279.00 1 $0.00 $1,279.00
Prepare COFW Standard Storm Drain
Calculation Tables for PROPOSED STM.
1 A DRAIN only. 1 28 10 0 0 $4 465.00 $0.00 $4,465.00
Prepare Storm Drain Plan&Profile(P&P)
1.5 Sheet 0 4 4 8 0 $1,484.00 $0.00 $1,484.00
1.6 Prepare P&P Sheet for WTR.Line Adjustment 1 4 6 $964.00 $0.001 $964.00
1.7 Quantities&Cost Opinion 0.5 1.5 $196.50 $0.00 $196.50
2.0 Construction Administration 0 2 1 0 0 0 $510-001 $0.00 $0.00 $0.00 $0.00 $0.00 $510.00
2.1 Construction Coordination 21 1 $510.00 $0.00 $510.00
3.0 Reproduction 1 01 0 0 0 0 0 $0.00 $95.00 $95.00 $95.00
3.1 1 1 1 $0.00 $0.00 $0.00
Totals 01 0 $9,626.001 $0.001 $0.00 $0.00 $95.001 $95.00 $9,721.00
Project Summs
Total Hours $90.00
Total Labor $9,626.00
Total Expense $95.00
MWBE Subconsultant $0.00
Non-MWBE Subconsultant $0.00
10% Sub Markup $0.00
MWBE Participation 0.0%
Total Project Cost 9,721.00
City of Fort Worth,Texas
Attachment B-Level of Effort Supplement
PMO Official Release Date:5.19.2010
1of1