HomeMy WebLinkAboutContract 38211-CO2 r R j CITY SECRETARY t FORT WORTH. City of Fort Worth CONTRACT NO. - a Change Order Request Project Namel 2004 Capital Improvements Projects City Sec# 1 38211 Client Project#(sA C200 541200 2094000455/P253 541200 6091700455/P258 541200 7091700455 Project Water,sewer and street improvements for College Ave.Orange SL,Lipscomb SL,and Wayside Ave. Conbxwj Continental Casualty Company Change Order# L_`____I Date 3/24J2011 City Project Mgr.I Joseph Bergeron/Richard Argomaniz City Inspector I Jerry Taliaferro Dept TPW Water Sewer Contract Time Totals D Original Contract Amount 1,602,141.40 603,360.15 16,401.20 2,221,902.75 Extras to Date $8,612.50 $3,950.00 $12,562.50 Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $1,610,753.K $607,31a.15 T. $16,401.20 $2,234,465.25 Amount of Proposed Change 6rder 2 ,920. Revised Contract Amount 10. 1 1. 2,259,385. 5 Original Funds Available for Change Orders $48,064.60 $25,000.00 $1,640.80 $74,705.40 Remaining Funds Available for this CO $39,452.10 $21,050.00 $1,640.80 $62,142.90 Additional Funding(if necessary) CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 1.69°lf► MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $Z777.378.44 A change order for this contract is necessary to account for new pay items related to the replacement of a damaged drain pipe and installation of new concrete medians at a railroad crossing. During construction it was discovered that an existing 12-inch diameter pipe under Lipscomb Street at the railroad crossing near Capps Street had collapsed. The pipe serves as a culvert for the railroad drainage ditch to carry storm water under Lipscomb Street The damaged pipe was replaced with a new 18-inch diameter reinforced concrete pipe to facilitate maintenance. Also raised concrete medians have been installed at a railroad crossing on Lipscomb Street to prevent the vehicles from passing while the railroad signal is activated. "000000r,op�®�j,®mod by: NO M&C REQUIRED d L±��L:>-�- o 0 d arty Hftxh ix, ity Secretary `boo 00o d It is understood and agreed that the acceptance of this Chang e contractor constitutes an accord and satisfaction and represents payment in full(both time and money)far all costs arising out of,or incidental to,the above Change Order. J4�\ Continental Casualty Company ,J , - - -20/ OFFiCiAi. ,*�^ �.�-:� mac' '� ,t, �".. '`;3...�'�,;. •r - �. M&C Number (--� M&C Date F ' X oKT woK1 City of Fort Worth r Change Order Additions _ Project Name 1 2004 Capital improvements Projects City Sec# 38211 Client Project# C200 541200 2094000455 I P253 541200 6091700455 I P258 541200 7091700455 Project Description Water,sewer and street improvements for College Ave.Orange St.,Lipscomb St.,and Wayside Ave. Contractor Continental Casualty Company Change Order# Date 1 3/22/2011 City Project Mgr. I Joseph Bergeron I Richard Ar omaniz City Inspector Jerry Taliaferro ADDITION5 Unit rn osTotal 61 Concrete Medians TPW $3,0uu. With ow . Concrete Head w a $51M. 54 MOB,Traffic Control,Road Closure Permit TPW 1.00 Ls $4,000.00 $4,UUU.UU a = m PW $24,920.00 x o Water $0.00 Sewer $0.00 Sub Totalions $24,7K.W Change Order Additions Page 1 of 1 ORr WORT City of Fort Worth Change Order Deletions Project Name 1 2004 Capital improvements Projects City Sec# 38211 Client Project# I C200 541200 2094000455 I P253 541200 6091700455 I P258 541200 7091700455 Project Description Water,sewer and street improvements for College Ave.Orange St.,Lipscomb St.,and Wayside Ave. Contractor Continental Casualty Company Change Order# Date 312212011 City Project Mgr. I Joseph Bergeron I Richard Ar omaniz City Inspector FJer Taliaferro DELETIONS Unit rn osTotal -n cn CJ r X 7� TPW Water $0.00 Sewer 0.00 Sub TotalDeletions Change Order Deletions Page 1 of 1 1 • MMBE Breakdown for this Change Order MWBE Sub Tyae of Serve Amount for this CO Total $O.5D Previous Change Orders A DATE AMOUNT Total $8.00 N L RECORDCRETARYRTHS TX s` PROJECT SUMMARY SHEET (Change Order Attachment) PROJECT NAME: 2004 CIP Contract 53 PROJECT LIMITS: College/Orange/Wayside/ Lipscomb BuySpeed No (T/PW): CSCO-09-00052470 BuySpeed No (Water): CSCO-09-00053146 City Project No: 00455 Contract No: CS38211 D.O.E. No: 5411 Attachment to Change Order No: 2 Today's Date: 3124111 TOTAL 9203 C116 Sewer Water Original Contract Amount: $ 2,221,902.75 $1,524,141.40 $ 78,000.00 $ 16,401.20 603,360.15 Extras to Date: $ 12,562.50 $ 8,612.50 $ - $ - $ 3,950.00 Credits to Date: $ - $ - $ - $ - $ - ontract Amount to Date: $ 2,234,465.25 $1,532,753.90 $ 78,000.00 $ 16,401.20 $ 607,310.15 nkmoui it of Proposed Change Order: $ 24,920.00 $ 24,920.00 $ - $ - - ::�evis d Contract Amount: $ 2,2690386.26 $1,557,673.90 $ 78,000.00 $ 16,401.20 $ 607,310.15 ® M ' gency Funds Avail. for Admin. Change Orders: $ 74,706.40 $ 48,064.60 $ - $ 1,640.80 $ 25,000.00 k �iRlNining Funds Available for Change Orders: $ 62,142.90 $ 39,452.10 $ - $ 1,640.80 $ 21,050.00 'Affiefibnal Funding (if necessary): $ - $ - $ - $ - $ - Prepared By: Christy Ezemack T/PW Construction Services ti PROJECT SUMMARY SHEET (Change Order Attachment) PROJECT NAME: Contract 53 College, Orange, Wayside, Lipscomb BuySpeed No: CSCO-09-00052470 Contract No: CS38211 D.O.E. No: 5411 Attachment to Change Order No: 2 Today's Date: 4/1/11 TOTAL C203 C116 Water Sewer Original Contract Amount: $ 2,221,902.76 $ 1,524,141.40 $ 78,000.00 $ 603,360.15 $ 16,401.20 Extras to Date: $ 12,662.60 $ 8,612.50 $ - $ 3,950.00 $ - Credits to Date: $ - $ - $ - $ - $ - Contract Amount to Date: $ 2,234,466.26 $ 1,532,753.90 $ 78,000.00 $ 607,310.15 $ 16,401.20 Amount of Proposed Change Order: $ 24,920.00 $ 24,920.00 $ - $ - $ - Revised Contract Amount: $ 2,269,386.26 $ 1,557,673.90 $ 78,000.00 $ 607,310.15 $ 18,401.20 Conti ncy Funds Avail. for Admin. Change Orders: $ 74,706.40 $ 48,084.60 $ - $ 25,000.00 $ 1,640.80 Remaini ig Funds Available for Change Orders: $ 62,142.90 $ 39,452.10 $ - $ 21,050.00 $ 1,640.80 Additional Funding (if necessary): $ - $ - $ - $ - $ - 1. 3 m M � � o v Prepared By: Karen Striker T/PW- Business Support