Loading...
HomeMy WebLinkAboutContract 54263-AD4CSC No. 54263-AD4 FORT WORTH SPINKS AIRPORT MASTER PROFESSIONAL SERVICES AGREEMENT ADDENDUM NO. 4 This Addendum No. 04 - Scope of Work (SOW) is made as of M a r 15� 2�21 , under the terms and conditions established in the MASTER PROFESSIONAL SERVICES AGREEMENT between the City of Fort Worth ("City") and Garver, LLC. ("Engineer"), the same being Fort Worth City Secretary Contract (CSC) No. 54263 (the "Master Agreement" or"MSA"). This Scope of Work is made for the following purposes, consistent with the services defined in the Master Agreement: design services for improvements to the existing perimeter fence at Fort Worth Spinks Airport. In particular, Engineer shall perForm those functions identified below in the Scope of Services, as such services are more fully detailed in the MSA. Section I. Scope of Services 1.1 General Generally, the scope of services will include design services for improvements to the existing perimeter fence at Fort Worth Spinks Airport. Improvements will consist primarily of the installation of a new perimeter fence along the Northwest property line. Assumptions: The construction phase in which the Construction Administration Service and On-Site Resident Project Representative Services will be performed will occur at the same time as the `Multi-Unit Box Hangar and Hangar Access Taxilanes (Westside Hangars) construction project (separate contract). No Pre-Bid Meeting will be held. 1.2 Surveys 1.2.1 Desiqn Survevs No design field survey will be provided or conducted. 1.2.2 Boundary Fence lines and project notes will be delineated based off record property maps and PDF related to property line boundaries provided by the City for the area shown in Appendix B. All information provided to the ENGINEER will assume to be correct. As a part of the specifications for construction of perimeter fencing, the Contractor will be required to hire a licensed surveyor to establish the property line before construction may commence. 1.3 Final Design Addendum No. 4 to CSC No. 54263 Between the City of Fort Worth and Garver, LLC Page 1 of 14 �FFICIAL REC�RD CITY SECRETARY FT. WORTH, TX Garver will serve as the City's representative in the final phase of the project and furnish consultation and advice to the City during the perFormance of this service. Garver will attend final conferences alone or with City's representatives, local officials, state and federal agencies, utility companies and others regarding the proposed project, its general design, functions, and impact. Garver will prepare a final plans, and submit copies for review and approval to the City and FAA in the number required. Garver will attend conferences for review and conduct coordination conference of interested agencies and utilities, if required. Garver will prepare detailed construction drawings, specifications, instructions to bidders, general provisions and special provisions, all based on guides furnished to Garver by the City. Contract Documents (Plans, Specifications, and Estimates) will be prepared for award of one (1) construction contract. These designs shall conform to the standards of practice ordinarily used by members of GARVER's profession practicing under similar conditions. Detailed specifications shall be developed using FAA "Standards for Specifying Construction for Airports" AC 150/5370-10 (latest edition) as well as TxDOT Standard Specification for Construction and Maintenance of Highways, Streets, and Bridges 2014 as appropriate. Garver will submit to the City of Fort Worth advance copies of the plans and specifications and cost estimates for review. Garver will make any additions to respond to comments by the City, and when the documents have been approved, Garver will furnish plans to the City for bidding and coordination purposes. 1.4 Bid Phase Services Garver will assist the City in advertising for and obtaining bids or negotiating proposals for one prime contract for construction, materials, equipment and services; and, where applicable, maintain a record of prospective bidders to whom Bidding Documents have been issued, attend a pre-bid conference and receive and process deposits for Bidding Documents. The City will pay advertising costs outside of this contract. Garver will issue addenda as appropriate to interpret, clarify or expand the Bidding Documents. Garver will consult with and advise the City as to the acceptability of subcontractors, suppliers and other persons and organizations proposed by the prime contractor(s) (herein called "Contractor(s)") for those portions of the work as to which such acceptability is required by the Bidding Documents. Garver will consult with the City concerning and determine the acceptability of substitute materials and equipment proposed by Contractor(s) when substitution prior to the award of contracts is allowed by the Bidding Documents. Garver will attend the bid opening online due to the City's COVID-19 Protocol, Garver will also prepare a bid tabulation, and assist the City in evaluating bids or proposals and in assembling and awarding contracts for construction, materials, equipment, and services. Garver will assist the City in the execution of all contract documents and furnish electronic copies of executed documents for the City, and Contractor. Addendum No. 4 to CSC No. 54263 Between the City of Fort Worth and Garver, LLC Page 2 of 14 1.5 Construction Administration Services Garver will compile bid addendums and any other necessary plan changes due to post-bid project updates and/or funding changes into a final Issued for Construction (IFC) set of plans and specifications. Garver will evaluate and respond to construction material submittals and shop drawings. Corrections or comments made by Garver on the shop drawings during this review will not relive Contractor from compliance with requirements of the drawings and specifications. The check will be for review of general conformance with the design concept of the project and general compliance with the information given in the contract documents. The Contractor will be responsible for confirming and correlating all quantities and dimensions, selecting fabrication processes and techniques of construction, coordinating his work with that of all other trades, and perForming his work in a safe and satisfactory manner. Garver's review shall not constitute approval of safety precautions or constitutes approval of construction means, methods, techniques, sequences, procedures, or assembly of various components. When certification of performance characteristics of materials, systems or equipment is required by the Contract Documents, either directly or implied for a complete and workable system, Garver shall be entitled to rely upon such submittal or implied certification to establish that the materials, systems or equipment will meet the perFormance criteria required by the Contract Documents. 1.6 On-Site Resident Project Representative Services Garver will provide part-time Resident Project Representative (RPR) services for the 45- calendar-day construction contract performance time. The proposed fee is based on approximately 15 hours per week during the construction contract perFormance time for the RPR, plus an additional one (1) weeks for weather and other delays beyond the Contractor's control. If the construction time ex tends beyond the time established in this agreement or if the City wishes to increase the time or frequency of the observation, the City will pay Garver an additional fee agreed to by the Ci ty and Garver. All RPR personnel shall have the appropriate experience and qualifications. During the construction period, Garver's RPR will provide or accomplish the following: 1. Consult with and advise the City during the construction period. Garver will submit, when requested by the City, written reports to the City on the progress of the construction including any problem areas that have developed or are anticipated to develop. In addition, Garver shall supply to the City such periodic reports and information as may be required. 2. As necessary, conduct safety meetings with the Contractor. 3. Perform intermediate inspections in advance of the final inspection. 4. Maintain a file of quantities incorporated into the work, test reports, certifications, shop drawings and submittals, and other appropriate information. 5. Monitor the contractor's conformance to the approved construction safety and phasing plan. Addendum No. 4 to CSC No. 54263 Between the City of Fort Worth and Garver, LLC Page 3 of 14 In performing construction observation services, Garver will endeavor to protect the Ci ty against defects and deficiencies in the work of the Contractor(s); but Garver does not guarantee the performance of the Contractor(s), nor is Garver responsible for the actual supervision of construction operations. Garver does not guarantee the performance of the contracts by the Contractors nor assume any duty to supervise safety procedures followed by any Contractor or subcontractor or their respective employees or by any other person at the job site. However, if at any time during construction Garver observes that the Contractor's work does not comply with the construction contract documents, Garver will notify the Contractor of such non-compliance and instruct him to correct the deficiency and/or stop work, as appropriate for the situation. Garver will also record the observance, the discussion, and the actions taken. If the Contractor continues without satisfactory corrective action, Garver will notify the City immediately, so that appropriate action under the City's contract with the Contractor can be taken. 1.7 Project Closeout Services At the conclusion of construction, Garver will assist the City with project closeout by providing a final project report which will include all necessary documents required for FAA grant closeout. Closeout documentation will be provided within 30 days of the final payment to the Contractor. 1.8 Project Deliverables The following will be submitted to the City, or others as indicated, by Garver: 1. One electronic copy of the final design plans. 2. One electronic copy of the final opinion of probable construction cost. 3. One electronic copy of the final contract documents and specifications. 4. One electronic copy of the bid design plans. 5. One electronic copy of the bid opinion of probable construction cost. 6. One electronic copy of the bid contract documents and specifications. 7. Approved submittals to the contractor. 8. Record Plans and Specification to the City. 9. Other electronic files as requested. 1.9 Extra Work The following items are not included under this agreement but will be considered as extra work: 1. Redesign for the City's convenience or due to changed conditions after previous alternate direction and/or approval. 2. Submittals or deliverables in addition to those listed herein. 3. Design of any utilities relocation. 4. Retaining walls or other significant structural design. 5. Street lighting or other electrical design. 6. Preparation of a Storm Water Pollution Prevention Plan (SWPPP). The construction Addendum No. 4 to CSC No. 54263 Between the City of Fort Worth and Garver, LLC Page 4 of 14 contract documents will require the contractor to prepare, maintain, and submit a SWPPP to DEQ as necessary. 7. Construction materials testing. 8. Construction phase services and/or construction observation. 9. Material submittal review. 10. Environmental Handling and Documentation, including wetlands identification or mitigation plans or other work related to environmentally or historically (culturally) significant items. 11. Coordination with FEMA and preparation/submittal of a CLOMR and/or LOMR. 12. Services after construction, such as warranty follow-up, project closeout, record drawings, operations support, etc. 13. Environmental Services 14. Prepare property acquisition documents. 15. Hydrology study. 16. Litigation Assistance. 17. Topographical survey establishing property lines. 18. Establishment of property or lease boundaries. 19. Pre-Bid Meeting. Extra Work will be as directed by the City in writing for an additional fee as agreed upon by the City and Garver. Section 2. Schedule: Garver shall begin work under this agreement within ten (10) days of a Notice to Proceed and shall complete the work in accordance with the schedule below: Phase Description Calendar Days Final Design 2 weeks from receipt of Notice to Proceed and property line documents from City. Bidding Phase Services As Needed Construction 45 Calendar Days from Contractor Notice to Proceed Closeout 2 weeks from receipt of contractor's closeout documents Section 3. Compensation, Reimbursable Expenses, and Billing Terms: Processing and payment of Fees and Reimbursable Expenses, including the structure of payments and invoicing therefor, shall be in accordance with the Master Professional Services Agreement. Addendum No. 4 to CSC No. 54263 Between the City of Fort Worth and Garver, LLC Page 5 of 14 The total Fee that shall be paid to Engineer for the services within this Addendum shall be an amount of $38,800 and will be paid accordance with Article 2(a) and Article 3 of the Master Service Agreement. If the City requests additional documentation of expenses, the Engineer shall provide such information if available. A copy of the fee proposal is attached as Appendix A. Engineer shall submit invoices for Fees and Reimbursable Expenses to Tyler Dale in the City's Aviation Department. On full and final completion of the Services for this Scope of Work, the Engineer shall submit a final invoice. Section 4. Counterparts; Electronically Transmitted Siqnature: This SOW may be executed in one or more counterparts, each of which when so executed and delivered shall be considered an original, but such counterparts shall together constitute one and the same instrument and agreement. Any signature delivered by a party by facsimile or other electronic transmission (including email transmission of a portable document file (pdf) or similar image shall be deemed to be an original signature hereto. Executed in multiple originals on M a r 15� 2�21 [Signature Page Follows] Addendum No. 4 to CSC No. 54263 Between the City of Fort Worth and Garver, LLC Page 6 of 14 CITY OF FORT WORTH, TEXAS: }J CL By,Fernando Costa (Mar 15, 202115:52 CDT) Fernando Costa Assistant City Manager �ate: M a r 15, 2021 APPROVAL RECOMMENDED: By: ����� Roger Venables Director, Aviation ATTEST: By: f ���f C��� 0 UU Mary Kayser City Secretary APPROVED AS TO FORM AND LEGALITY: By: � n��' �/� , r� Thomas Royce Hansen Assistant City Attorney GARVER, LLC. Digitally signed by By: Josh Crawford osh raWfb�3-os�oo� Texas Aviation Director Date: 03/12/2021 �4���n a �� ��. ���oR���a� a d a 0 p�o ° d ��g o�ld �vo °=A � oo ��d ����� o 0 �000000� a � nEX A`'�,o,��'.� Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all perFormance and reporting requirements. �,�1. � Tyler Dale (Mar 15, 2021 09:44 CDT) Tyler Dale Airport Project Coordinator Addendum No. 4 to CSC No. 54263 Between the City of Fort Worth and Garver, LLC Page 7 of 14 �FFICIAL REC�RD CITY SECRETARY FT. WORTH, TX APPENDIX A - FEE SUMMARY FORT WORTH SPINKS AIRPORT FENCE PROPERTY LINE Title I Service Final Design Bidding Phase Services Title II Service Construction Administration Services Resident Project Representative Closeout Subtotal for Title I& II Services Estimated Fees $ 10,100.00 $ 4,900.00 $ 12,600.00 $ 8,300.00 $ 2,900.00 $ 38,800.00 APPENDIX A - FEE SUMMARY FORT WORTH SPINKS AIRPORT FENCE PROPERTY LINE FINAL DESIGN WORK TASK DESCRIPTION E-5 E-3 E-1 T-2 hr hr hr hr 1. Project Management Work Order Administration and Coordination 1 4 Quality Control Review 1 4 Property Line Coordination and Airport Plat Rev. 4 Submittals to City 1 Subtotal - Project Management 2 13 0 0 2. Civil Engineering Submit 7460 for Const. and Permanent Fence 2 Preliminary Plans Fence Line Layout 2 4 Typical Details 4 4 General Notes 4 Preliminary Specifications Front Ends 1 4 Fence Specifications 4 Coordination and Prelim. Plan Review with Owner 2 Opinion of Probable Construction Cost 4 Implement Review Changes from Owner comments, Prepare and Submit Bid Documents 1 2 6 Subtotal - Civil Engineering � 7 Zg g Hours SUBTOTAL - SALARIES: DIRECT NON-LABOR EXPENSES Document Printing/Reproduction/Assembly Office Supplies/Equipment Computer Modeling/Software Use SUBTOTAL - DIRECT NON-LABOR EXPENSES: SUBTOTAL: SUBCONSULTANTSFEE: TOTAL FEE: 3 20 28 8 $9,856.00 $144.00 $50.00 $50.00 $244.00 $10,100.00 $0.00 $10,100.00 Appendix A - FEE SUMMARY FORT WORTH SPINKS AIRPORT FENCE PROPERTY LINE BIDDING PHASE SERVICES WORK TASK DESCRIPTION E-5 E-3 E-1 T-2 hr hr hr hr 1. Project Management Dispense plans and specs to prospective bidders 0 Addendums/Inquiries 4 4 Bid Opening (Online) 2 Prepare bid tabulation 1 4 Evaluate bids and recommend award 4 4 Prepare construction contracts 2 Notice to Proceed 2 Subtotal - Project Management 0 15 12 0 Hours SUBTOTAL - SALARIES: DIRECT NON-LABOR EXPENSES Document Printing/Reproduction/Assembly Office Supplies/Equipment Computer Modeling/Software Use SUBTOTAL - DIRECT NON-LABOR EXPENSES: SUBTOTAL: SUBCONSULTANTSFEE: TOTAL FEE: 0 15 12 0 $4,632.00 $168.00 $50.00 $50.00 $268.00 $4,900.00 $0.00 $4,900.00 Appendix A - FEE SUMMARY FORT WORTH SPINKS AIRPORT FENCE PROPERTY LINE CONSTRUCTION ADMINISTRATION WORK TASK DESCRIPTION E-5 E-3 E-1 T-2 hr hr hr hr 1. Project Management Monthly Invoicing 4 Prepare for and Attend Preconstruction Meeting 6 Contractor Inquiries/Clarifications 6 6 RPR Inquiries/Clarifications 12 Airport Coordination 4 Shop Drawings/Material Submittals 1 6 Review RPR weekly reports 6 Monthly Pay Requests (3 Pay Requests) 3 6 Conduct Preliminary Walk-through 4 Conduct Final Walk Through 4 Subtotal - Project Management 0 50 12 6 Hours SUBTOTAL - SALARIES: DIRECT NON-LABOR EXPENSES Document Printing/Reproduction/Assembly Office Supplies/Equipment Computer Modeling/Software Use SUBTOTAL - DIRECT NON-LABOR EXPENSES: SUBTOTAL: SUBCONSULTANTS FEE: TOTAL FEE: 0 50 12 6 $12,380.00 $120.00 $50.00 $50.00 $220.00 $12,600.00 $0.00 $12,600.00 Appendix A - FEE SUMMARY FORT WORTH SPINKS AIRPORT FENCE PROPERTY LINE RESIDENT PROJECT REPRESENTATIVE WORK TASK DESCRIPTION E-5 E-3 E-1 C-1 hr hr hr hr 1. Project Management Plan and Spec Review with Engineer - Project 2 Familiartiy Preconstruction Meeting 4 On-Site Inspection (6 Weeks @ 15 Hrs/Week) 90 Final Project Inspection and Punchlist 4 Subtotal - Project Management 0 0 0 100 Hours SUBTOTAL - SALARIES: DIRECT NON-LABOR EXPENSES Document Printing/Reproduction/Assembly Office Supplies/Equipment Computer Modeling/Software Use SUBTOTAL - DIRECT NON-LABOR EXPENSES: SUBTOTAL: SUBCONSULTANTSFEE: TOTAL FEE: 0 0 0 100 $8,300.00 $0.00 $0.00 $0.00 $0.00 $8,300.00 $0.00 $8,300.00 Appendix A - FEE SUMMARY FORT WORTH SPINKS AIRPORT FENCE PROPERTY LINE CLOSEOUT WORK TASK DESCRIPTION E-5 E-3 E-1 T-2 hr hr hr hr 1. Project Management Final Pay Request Reconciliation 1 Assemble Material Submittals 1 Coordinate with Contractor Regarding Close Out 4 Documents Record Drawings 1 4 Package Closeout Documentation 4 Subtotal - Project Management 0 10 1 4 Hours SUBTOTAL - SALARIES: DIRECT NON-LABOR EXPENSES Document Printing/Reproduction/Assembly Office Supplies/Equipment Computer Modeling/Software Use SUBTOTAL - DIRECT NON-LABOR EXPENSES: SUBTOTAL: SUBCONSULTANTSFEE: TOTAL FEE: 0 10 1 4 $2,693.00 $107.00 $50.00 $50.00 $207.00 $2,900.00 $0.00 $2,900.00 ea��