HomeMy WebLinkAboutContract 49024-A3ANIENDMENT No . 3
TO CITY SECRETARY CONTRACT No. 49024
CSC No. 49024-A3
WHEREAS, the City of Fort Worth (CITY) and Kimley-Horn and Associates,
Inc, (ENGINEER) made and entered into City Secretary Contract No. 49024,
(the CONTRACT) which was authorized by M&C C-28184 on the 17th Day of April ,
2017 in the amount of $ 1,800,000; and
WHEREAS, the CONTRACT was subsequently revised by: Amendment Number 1
in the amount of $595,000 which was authorized by M&C # C-28764 on June 28,
2018 Amendment Number 2 in the amount of $425,000 which was authorized by
M&C # 20-0334 May 19, 2020,
WHEREAS, the CONTRACT involves engineering services for the following
project:
Harmon Road Task Order Contract (US 81/287 to Golden Triangle Blvd.);
and
WHEREAS, it has become necessary to execute Amendment No. 3 to the
CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement, which
amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the additional
engineering services specified in proposal attached hereto and incorporated
herein. The cost to City for the additional design services to be performed
by Engineer totals $99,020. (See Attached Funding Breakdown Sheet, Page -4-
)
2.
Article II of the CONTRACT is amended to provide for an increase in the
fee to be paid to Engineer for all work and services performed under the
Contract, as amended, so that the total fee paid by the City for all work
and services shall be an amount of $2,919,020.
3.
All other provisions of the Contract, which are not expressly amended
herein, shall remain in full force and effect.
City of Fort Worth
Professional Services Agreement Amendment Template
Revised: March 9, 2020
Page 1 of 4
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
EXECUTED and EFFECTIVE as of the date last written by a signatory,
below.
APPROVED:
City of Fort Worth
Dqhq Bu��rl��laff
Dana Burghdoff ar 19, 2021 09:37 CDT)
Dana Burghdoff, AICP
Assistant City Manager
ENGINEER
Kimley-Horn and Associates, Inc.
� ���
Scott R. Arnold
Vice President
DATE : Mar 19, 2021
DATE : March 2, 2021
APPROVAL RECOMMENDED:
���
W Johnson �Mar R, 202116:06 CDT)
William M Johnson
Director, Transportation and Public Works Department
Contract Compliance Manager:
By signing, I acknowledge that I am the person responsible for the
monitoring and administration of this contract, including ensuring all
performance and reporting requirements.
� �, ��
J.T. Auldridge, P.E., PMP
Project Manager
City of Fort Worth
Professional Services Agreement Amendment Template
Revised: March 9, 2020
Page 2 of 4
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
APPROVED AS TO FORM AND LEGALITY:
���
DBlack (Mar 19, 2021 08:46 CDT)
Douglas W. Black
Assistant City Attorney
ATTEST:
�/��`��r�
Mary J. Kayser
City Secretary
City of Fort Worth
Professional Services Agreement Amendment Template
Revised: March 9, 2020
Page 3 of 4
q,4�����
,o,a� FORT ���
�� F000000000� d
0 0��
d�o o�
0
� � ° .1.
� �o 0
0
a o
°o o° <
� � o *,c
d�. °°�000ao° p'
M&C: N/A
Date : N/A
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
FUNDING BREAKDOWN SHEET
City Secretary No. 49024
Amendment No. 3
Department Fund-Account-Center Amount
TPW 34018-0200431-5330500-100459-002330-9999- $99,020.00
18010199
Total: $99,020.00
City of Fort Worth
Professional Services Agreement Amendment Template
Revised: March 9, 2020
Page 4 of 4
Kimley>>> Horn
March 1, 2021
J.T. Auldridge, P.E., PMP
Transportation and Public Works
City of Fort Worth
200 Texas Street
Fort Worth, Texas 76102
Re: Amendment #3 — Harmon Road Improvements from Golden Triangle Boulevard to US 287
City Project No. 100459
City Secretary Contract No. 49024
Dear JT:
Kimley-Horn and Associates, Inc. ("ENGINEER") is pleased to submit Amendment #3 in the amount of
$99,020 to the City of Fort Worth (City) for the Task Order design contract (CSN 49024) for Harmon
Road Improvements from Golden Triangle Boulevard to US Hwy 287. This amendment is to cover
additional services beyond the original scope, such as:
• Additional meetings with the CMAR Contractor during pre-construction activities
• Additional meetings and coordination with franchise utility companies
• Revisions to the traffic control plans based on schedule requirements for the water line
construction
• Design of temporary storm drain connections based on construction sequencing
• Survey beyond original scope of services
• Adjustments to the plans based up on the additional survey
A detailed scope of services for the additional services will be included in separate Task Order
Authorizations.
We appreciate the opportunity to provide these services to you. Please contact me if you have any
questions.
Very truly yours,
KIMLEY-HORN AND ASSOCIATES, INC.
f�/OI.K�e�
By: Dana Shumard, P.E.
Project Manager
ATTACHMENT B
COMPENSATION
Design Services for
Harmon Road Task Order (from Golden Triangle Boulevard to US 81/287)
City Project No. 100459
Amendment 3
Task Order Rate Schedule
Compensation
A. The ENGINEER shall be compensated in an hourly amount not-to-exceed
$99,020 for personnel time, non-labor expenses, and subcontract expenses in
performing services enumerated in Attachment A as follows:
i. Personnel Time. Personnel time shall be compensated based upon hours
worked directly in performing the PROJECT multiplied by the appropriate Labor
Cateqory Rate for the ENGINEER's team member performing the work.
Labor Cateqory Rate as presented in the rate schedule table below is the rate for
each labor category performing the work and includes all direct salaries,
overhead, and profit.
Labor Category Rate
$/hour
Project Director $230
Scheduling Specialist $215
Project Manager $200
Senior Project Engineer $175
Project Engineer $150
EIT $120
CADD $95
Administrative $85
i. Non-Labor Expenses. Non-labor expenses shall be reimbursed as Direct
Expenses at invoice or internal office cost.
Direct Expenses (non-labor) include, but are not limited to, mileage, travel and
lodging expenses, mail, supplies, printing and reproduction services, other direct
expenses associated with delivery of the work; plus applicable sales, use, value
added, business transfer, gross receipts, or other similar taxes.
ii. Subcontract Expenses. Subcontract expenses and outside services shall
be reimbursed at cost to ENGINEER plus a markup of ten percent (10°/o).
iii. Budgets. ENGINEER will make reasonable efforts to complete the work
within the budget and will keep the City informed of progress toward that end so
that the budget or work effort can be adjusted if found necessary.
City of Fort Worth, Texas
Attachment B
PMO Official Release Date: 8.09.2012
Page 1 of 4
�
ATTACHMENT B
COMPENSATION
ENGINEER is not obligated to incur costs beyond the indicated budgets, as may
be adjusted, nor is the City obligated to pay ENGINEER beyond these limits.
If ENGINEER projects, in the course of providing the necessary services that the
PROJECT cost presented in Article 2 of this Agreement will be exceeded, whether
by change in scope of the project, increased costs or other conditions, the
ENGINEER shall immediately report such fact to the City and, if so instructed by
the City, shall suspend all work hereunder.
When any budget has been increased, ENGINEER's excess costs expended prior
to such increase will be allowable to the same extent as if such costs had been
incurred after the approved increase.
B. The ENGINEER shall be paid monthly payments as described in Section II -
Method of Payment.
II. Method of Payment
A. The ENGINEER shall be paid by the City based upon an invoice created on the
basis of statements prepared from the books and records of account of the
ENGINEER, based on the actual hours and costs expended by the ENGINEER
in performing the work.
B. Each invoice shall be verified as to its accuracy and compliance with the terms of
this Agreement by an officer of the ENGINEER.
C. ENGINEER shall prepare and submit invoices in the format and including content
as presented in Exhibit B-1.
D. Payment of invoices will be subject to certification by the City that such work has
been performed.
III. Progress Reports
A. The ENGINEER shall prepare and submit to the designated representative of the
Transportation and Public Works Department monthly progress reports and
schedules in the format required by the City.
City of Fort Worth, Texas
Attachment B
PMO Official Release Date: 8.09.2012
Page 2 of 4
�
ATTACHMENT B
COMPENSATION
IV. Summary of Total Project Fees
Firm Primary Responsibility Fee Amount %
Prime Consultant
Kimley-Horn and Engineering Services $95,020 96.0%
Associates, Inc.
Proposed MBE/SBE Sub-Consultants
Gorrondona & Topographic Survey - LOMR $4,000 4.0°/o
Associates, Inc.
Non-MBE/SBE Consultants
TOTAL $99,020 100%
Project Number 8� Name Total Fee MBE/SBE Fee MBE/SBE
/o
100459 Harmon Road Amendment 3 $99,020 $4,000 4.0%
City of Fort Worth, Texas
Attachment B
PMO Official Release Date: 8.09.2012
Page 3 of 4
�
EXHIBIT "B-1"
ENGINEER INVOICE
(Supplement to Attachment B)
To be included with each task order.
City of Fort Worth, Texas
Attachment B
PMO Official Release Date: 8.09.2012
Page 4 of 4
� il
Fo a��
c�ty of Fo�t wo�tn
ACCEPTANCE OF PREVIOUS SBE COMMITMENT FORM
(for use with CHANGE ORDERS or AMENDMENTS greater than $50,000)
To be Completed by City Project Manager
Amendment (for Professional Services Agreement)
Project Name: City Project Number
Harmon Road from US 81/287 to Golden Triangle 100459
City Project Manager
Consultant: JT Auldridge
Kimley-Horn and Associates, Inc.
Original Amount of Agreement:
Total of Previous Amendments:
Amount for this Amendment:
Revised Amount of Agreement:
City's SBE Project Goal: 14 %
$1,800,000.00 Accepted SBE Commitment: 14 %
$1,020,000.00 Date of Last SBE Report: 1/31/2021
$99,020.00 Amendment #:
$2,919,020.00 Date:
3
3/2/2021
Language to be inserted in the M&C for this Agreement
Kimley-Horn and Associates, Inc. agrees to maintain its initial SBE commitment of 14% that it
made on the original agreement and extend and maintain that same SBE commitment of 14% to
all prior amendments up to and inclusive of this Amendment No. 3. Therefore Kimley-Horn and
Associates, Inc. remains in compliance with the City's BDE Ordinance and attests to its
commitment by its signature on the Acceptance of Previous SBE Commitment form executed by
an authorized representative of its company.
To be Completed by the Representative of the Consultant
Scott R. Arnold Vice President ���
Printed Signature Title Authorized Signature/Date
Kimley-Horn and Associates, Inc.
Company Name
801 Cherry Street, Suite 1300
Address
Fort Worth/TX/76102
City/State/Zip
15%
SBE % Paid to Date
Dana Shumard
Contact Name (if different)
dana.shumard@kimley-horn.com
E-mail address
817-339-2256
Phone number
as of 1 /31 /2021
Date
Fax Number
c:ity rro�ect Manager nas reviewea tne worK associatea witn tnis Hmenament,
considers it the same or similar to work in the original Agreement, and recommends that the
Consultant have the option to retain and confirm its existing SBE commitment.
JT Auldridge �""'''`''�` 3izi2oz�
City Project Manager City Project Manager Signature Date
Cheryl Jones
M/WBE Compliance Staff
404853 15%
ID # SBE Current % Level via Last Report Rec'd
03-05-21
M/WBE Signature Date