HomeMy WebLinkAboutContract 51833-FP1FORT�V�RTH
V.r��_
��
WATER DEPARTMENT
ENGINEERING AND FISCAL SERVICES
NOTICE OF PROJECT COMPLETION
CSC No. 51833-FP1
DOE. Ne: N/A
Regarding contract 51833 for Marine Creek Interceptor M-279A & M-365 Phase II Part I as required bj� the �Vater
Department as appioved b5� CitS� Council on 1/15/19 through l�I&C G28990 the Directoi of the �Vater Department,
upon the recommendation of the Si. Capital Projects Officer, Capital Projects Delivei5�, Water Department, has accepted
the project as complete.
Original Contract Prices:
Amount of Approved Change Orders:
Revised Contract Amount:
Total Cost Work Completed:
Less Deductions:
Liquidated Damages:
Other Deductions(see comments):
Total Deduction Amount:
Total Cost Work Completed:
Less Previous Payments:
Final Payment Due
�
/���
� � l,J v `7
$2,897,370.00
$0.00 Ns 1
$2,897,370.00
$2,790,658.00
$0.00
�2,790,658.00
$2,638,965.15
�151,692.85
Days @ $630.00/ Day
� ( � �
Date
RecommencYed for Acceptance
Assistant Director, Water Department
christo�her Ha��1er
ChristopherHarder(Mar22,20211334CDT)
Accepted
Director, Water Department
7�c�� SG�z.��e.G.G
DanaBurghdoff(A4ar22,20" 14�21CDT�
City Manager
Mar 23, 2021
Date
M a r 23, 2021
Date
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Project Name: I�Iai7ne Creek Interceptoi M-279A & I�I-365 Phase II Part I DOE. Ns: N/A
Comments:
Received 03/17/21
PO 11474
Receipt 40391 03/19/21 HO
City Project Numbers 100274
Contract Name Marine Creek Interceptor M-279A & M-365 Phase II Part 1
Contract Limits West side of Marine Creek Lake
Project Type Sewer
Project Funding
Project Manager NA
lnspectors Johnson / Drake
Contractor VENUS CONSTRUCTION COMPANY
1426 S. MAIN P O BOX 90
MANSFIELD, TX 76063
DOE Number 1002
Estimate Number 19
Payment Number 19
For Period Ending 3/15/2021
City Secretary Contract Number 51833
ContractDate I/IS/2019
Contract Time 540 CD
Days Charged to Date 303 CD
Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Funcl Account Center Amount Gross Retainage Net
Funded
1 56016--2060000 $2,897,370.00 $12,799.97 $ + 138,892.88 $151,692.85
56016--2060000--100274-RETAI N--
Total Cost of Work Completed
Less � % Retainecl
Net Carned
Earned This Period $151,692.85
Retainage This Period $0.00
Less Liquiclatecl Damages
0 Days @ $0.00 / Day
LessPavement Deficiency
Less Penalty
Less Previous Payment
Plus Material on Hancl Less IS%
Balance Due Tl�is Payment
$2,790,658.00
$0.00
$2,790,658.00
$0.00
$0.00
$0.00
$2,638,965.15
$0.00
$151,692.85
Tuesday, March 16, 2021 Page 5 of 5
FORTWORTH
l�Iarch 17, 2021
Venus Construction Compan3T
1426 S. Main P O Boz 90
l�iansfield, T�i 76063
Re: Acceptance Letter
Project Name: l�Iarine Creel� Interceptor IVI-279A & NI-365 Phase II Part I
Project T�jpe: Se�ver
Pioject N�: 100274
D.O.E. N's: N/sl
Contract N�: 51833 Dated: 1/15/2019
Gendeman:
On September 13, 2020 a final u�spection was made on die subject project There �vere no punch list items
identified at the time. The Final inspection indicates that the �vork meets the Cit�r of Fort ��oith specific�tions and
is therefore accepted b5r the Cit��. The �varrant�r period �vill start on Septembei 13, 2020, which is the date of final
inspection and �vill eztend for (2) ��ears in accordance �vith the Cont�-act Documents.
If 3=ou ha�re anjr questions concerning tlus letter of acceptance, please feel free to contact me at (817) 392-605�
Youts Tiuly,
.� � ( -
+�� �- �� � �� J � V
��� G D
TonS� Sholola, P.E., Assistant Diiector Water Department
MP /
cc: Chris Harder, P.E., Director, Water Department
Lauia Wilson, P.E., Deput�� Director, `Y/ater Department
Captain Nlichael Skains, Fire Department
Cesar Zavala, Field Opeiations Superintendent, ���ater Department
Bill Lundvall, Field Operations Superintendent, �Vaste �Y�ater Department
\��altei Nonvood, P. E. , Pioject Manager
Leah Hodge, P. E., Halff, Consultant
Venus Cons�-uction CompanSr, Contractor
David Johnson, Inspection Supei�Tisor, ��ater Engineering and Fiscal Services
Carmen Dralie, Inspector, ��atei EngineeiYng and Fiscal Sei-�rices
File
WATER DEPARTMENT
ENGINEERING AND FISCAL SERVICES
THE CITY OF FORT WORTH * lOOO THROCKMORTON STREET * FORT WORTH, TEXAS %6102
817-392-8240 * Faac 817-392-8195
�p Prin[ed on recycled paper
FtJRT �YC�I�TH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name Marine Creek Interceptor M-279A & M-365 Phase II Part I
Contract Limits West side of Marine Creek Lake
Project Type Se�ver
City Project Numbers ]00274
DOE Number 1002
Estimate Number 19 Payment Number 19 For Period Ending
City Secretary Contract Number 51833
Contract Date I/15/2019
Project Manager NA
Contractor VENUS CONSTRUCTION COMPANY
1426 S. MAIN P O BOX 90
MANSFIELD, TX 76063
Inspectors Johnson / Drake
3/15/2021
CD
Contract Time 54�D
Days Charged to Date 303
Contract is 96.000 Complete
Tuesday, March 16, 2021 Page 1 of 5
City Project Numbers 100274
Contract Name Marine Creek Interceptor M-279A & M-365 Phase II Part I
Contract Limits West side of Marine Creek Lake
Project Type Sewer
Project Funding
Unit I Sewer Improvements
Item Description of Items
No.
1 A 36" DIP with Protecto 401 Sewer, Sel
1B 36° Hobas Sewer, Select Backfill, Su
1C 36" Flowtite Sewer, Select Backfill,
2A 42" DIP with Protecto 401 Se�ver, Sel
2B 42" Hobas Sewer, Select Bacicfill, Su
2C 42" Flo���tite Sewer, Select Bac�ll,
3A 36" Sewer Carrier Pipe (DIP with Pro
3B 36" Sewer Carrier Pipe (Hobas), Subj
3C 36" Se�ver Carrier Pipe (Flo���tite), S
4 60° Tunnel Liner Plate By Other Than
5 18" Sewer Abandonment Plug
6 30" Se�ver Abandonment Plug
7 Remove 5' Sewer Manhole
8 Remove Headwall/Safety Eud Treatment
9 Concrete Encase Sewer Pipe
10 SWPPP > I acre
I 1 Remove and Replace 6" Conc Trail Per
12 Barbed Wire Fence, Metal Posts
13 Smooth Wire Fence, Metal Posts
14 Topsoil
IS Seeding Broadcast
16 Seeding, Soil Retention Blanket
17 Pre-CCTV Inspection
18 Post-CCTV Inspection
19 Manhole Vacuum Testing
20 Bypass Pumping
21 Exploratory E�cavation of E�isting U
22 Trench Safety
23 Utility Markers (Sewer)
24 Concrete Collar
25 Trench Water Stops
DOE Number 1002
Estimate Number 19
Payment Number 19
For Period �nding 3/15/2021
�stimated Unit Unit Cost Estimated Completed Completed
Quanity Total Quanity, Total
3380 LF $0.00 $0.00
3380 LF $230.00 $777,400.00 3374 $776,020.00
3380 LF $0.00 $0.00
1570 LF $0.00 $0.00
1570 LF $252.00 $395,640.00 1570 $395,6�40.00
1570 LF $0.00 $0.00
240 LF $0.00 $0.00
240 LF $240.00 $57,600.00 240 $57,600.00
240 LF $0.00 $0.00
240 LF $1,400.00 $336,000.00 240 $336,000.00
2 EA $830.00 $1,660.00 2 $1,660.00
4 EA $1,250.00 $5,000.00 4 $5,000.00
12 EA $1,450.00 $17,400.00 12 $17,400.00
3 EA $1,300.00 $3,900.00 3 $3,900.00
500 CY $245.00 $122,500.00 500 $122,500.00
1 LS $65,000.00 $65,000.00 1 $65,000.00
3540 SF $9.00 $31,860.00 8151 $73,359.00
25 LF $25.00 $625.00 50 $1,250.00
40 LF $25.00 $1,000.00
1000 CY $17.00 $17,000.00 1000 $17,000.00
8900 SY $0.35 $3,115.00 8900 $3,115.00
100 SY $8.00 $800.00 100 $800.00
5200 LF $5.00 $26,000.00 5200 $26,000.00
5200 LF $3.00 $15,600.00 5200 $15,600.00
17 EA $380.00 $6,460.00 17 $6,460.00
1 LS $490,000.00 $490,000.00 1 $490,000.00
10 EA $1,500.00 $15,000.00 8 $12,000.00
4950 LF $1.00 $4,950.00 4950 $4,950.00
l LS $750.00 $750.00 I $750.00
16 EA $700.00 $11,200.00 16 $11,200.00
12 EA $3,500.00 $42,000.00 12 $d2,000.00
Tuesday, Marcli ] 6, 2021 Page 2 of 5
City Project Numbers 100274
Contract Name Marine Creek Interceptor M-279A & M-365 Phase II Part I
Contract Limits West side of Marine Creek Lake
Project Type Sewer
Project Funding
DOE Number 1002
Estimate Number 19
Payment Number 19
For Period Ending 3/15/2021
26 Epoty Structure Liner (for Existing 300 SF $34.00 $10,200.00 300 $]0,200.00
27 48" Flared Headwall, 1 pipe 1 EA $11,000.00 $11,000.00
28 12" Safety End Treatment (SET), 1 pi 2 EA $350.00 $1,700.00 2 $1,700.00
29 12 RCP, Class III 20 LF $85.00 $1,700.00 20 $1,700.00
30 Interlocking Articulating Concrete B 1760 SF $21.00 $36,960.00 1760 $36,960.00
31 Construction Allowance 1 LS $120,000.00 $120,000.00
32 Construction Staking 1 LS $13,000.00 $13,000.00 1 $13,000.00
33 GPS As Built Red Line Survey 1 LS $10,000.00 $10,000.00 I $] 0,000.00
34 Modify E�isting Sanitary Sewer Junct 1 LS $18,000.00 $18,000.00 1 $18,000.00
35 Temporary Asphalt Trail 1000 LF $23.00 $23,000.00 984 $22,632.00
36 Remove Asph Sidewalk and Replace 4" 330 SF $8.00 $2,640.00 444 $3,552.00
37 Changeable Message Sign 1 LS $14,000.00 $14,000.00
Sub-Total of Previous Unit $2,710,660.00 $2,602,948.00
Unit II Alternate Bid 1
Item Description of Items �stimated [init Unit Cost �stimated Completed Completed
No. Quanity Total Quanity Total
A1- 5' Concrete Manhole 11 EA $7,000.00 $77,000.00 8 $56,000.00
A1- 5' Concrete Drop Manhole 1 EA $9,000.00 $9,000.00 1 $9,000.00
Al- 6' Concrete ManUole 1 EA $10,000.00 $10,000.00 2 $20,000.00
Al- T Concrete Manhole 3 EA $12,000.00 $36,000.00 4 $48,000.00
A1- 5' Estra Depth Concrete Manhole 22 VF $250.00 $5,500.00 22 $5,500.00
Al- 6' Extra Depth Concrete Manhole 4 VF $340.00 $1,360.00 4 $1,360.00
AI- 7' Extra Depth Concrete Manhole IS VF $450.00 $6,750.00 IS $6,750.00
Al- Epoxy Manhole Liner 137 VF $300.00 $41,100.00 137 $41,100.00
Sub-Total of Previous Unit $1s6,71o.00 $187,710.00
Tuesday, March 16, 2021 Page 3 of 5
City Project Numbers 10027d
Conh�act N�me �9arine Creek Inrerceptor M-279A & M-36S Phase Il Part I
Conh•act Limits 1Vest side of Mnrinc Creek Lnkc
Project Type Se���er
Pruject Funding
UOC lYumber 1002
Gstim�te Number 19
P�}'ment Number I9
Por Period Ending 3/I�/2021
Contract Lif'ormatiou Summa�ry
Originnl Conu��ct Amount
52,89J,370.00
CI►a�i�c Orde�•s
. � L"�r�= D�te 3 ���/,?G� �
Cn ract„r
n;�c��/G—�/
Inspection Supeivisor
_Ff/�il �%�U,G� D�te 7 �l '�/Z.�
Projecl h1ana�er
Asst. Direcror/T'PW
Christo�he✓ Harder
en��seopr��H��d��iM��zzzc�ii3�s<eoi) n�tC
Director ( Contr�etine Deparunent
Total Contrnct Price S2,S97,370.OU
Tulril Cost of 1Vorlc Compieted �z,790,G53.U0
Less 0 % Ret�ined 50.00
Net Earned $2,790,658.00
E�i•ned This Period 51�1,G92.90
Ret�inage This Period �0.00
Less Liquid�ted U�mages
D�ys r� I Day
LessP�vement Deficiency
Less Pen�lty
Less Previous P�yment
Plus Alnterinl on H�nd Less l5%
Bnlnnce Due This Pnyment
S0.00
�0.00
$0.00
�2,638,9G5.15
�0.00
8151,G92.8�
Tiiesday, March 16, 2U21 Page a of 5
FoR�r �aR�� rE��o3,0�;07
WATER ENGIIVEERING & FISCAL SERVI�ES
FINAL STATEMENT OF COIVTRACT TIME
FINAL �TAT�M�(VT N0.:19
NAM� OF PROJGCT: Marine Creek Interceptor M-279A and N1-36� Phase 11 Part I
PROJECT NO.: 10027d CONTRACTOR: Venus Consh�ction Co.
CITY PROJECT 100274
PERIOD FROM:03/25/19 TO: 03/] 5/21 FINAL INSP�CTION DATE: 9/13/2020
WORIC ORD�R ETFECTIV�: 3/25/2019 CONTRACT TLiYI�; 54� Q WD QQ CD
DAY OF D`4Y� REASON FOR DAYS DAY OF DAYS ��ASON FOR DAYS
MONTH �'HARGED CREDITED 170NTH CHARGED CREDIT�D
DURWG DURING
1. 16.
2. 17.
3. 18.
4. 19.
S.
6.
i.
S.
9.
10.
11.
12.
13.
14.
15.
20.
21.
22.
23,
24.
25.
26,
27,
28.
29.
30,
31.
SAT, SUN, RAIN, TOO WE'1', UTILITIES DAYS TOTAL
& HOLIDAYS & TOO COLD RELOCATIONS OTH�RS �` CHARGED DAYS
THIS
PERIOD 0 0
PREViOUS
303 303
YE1tIOD
TOTALS
TO DATE 303 �03
;:x�;�viAtc�c�;
:� ��___._ 3 /�/6/.�.:�1 r (�� ; �- �rf�r��Y� oaa�z 3 -� � -
1CTOR DATE INSPECTOR DATE
Capital Projects Deli��eL-�r, �l'�ater I�epartment
The Cit�• of Fort \\`ai�h • 100U T1u•odcrnorton Street • Fort tCTortli, TL 76012-G311
(817) 392 - �4�7? � Fa�: (817} 392 - S4C0
FoR�i���T�
Capital P��ojects Deliveiy, Water Departrnent
PERFORMANCE EVALUATION OF CONTRACTOR
I) CONTRACTOR cSt PROJECT DATA
�\'mne oJConrrn��a�
VEMJS
Ifiuer Exgi�reeriilg /nsyerlur
Carmen Drake
fl'nler F.ngineering Inspeciar
U N/ater ❑ Waste Water
lni�inl Conn•nc! �bnount
❑ Storm Drainage ❑ Pavement
2, 897,370.00
Finn( Co�ihnc� �In+orort
$2.777.8SS,U0
II) PERFOR;ViANCG L'VALUATION
Frojecl A'ame
Marine Creek In�
DOE 1VunrGer
CPN 10027=}
Prnjn.cl,llnnn�er
Nalter Nor�vood
Frojecr Di(Tculry�
� Simple
Dnle
3/ I S/202 l
aFv: ozno�o�
Iv1-279 & M-365 Phase 2 Part 1
L� Routine � Complex
0- Liadequare 1- Deficient 2- Standard 3- Good 4- ExceUent
ELENENT «'EiGHT ( k) APPUCABLE (Y ! N) RATII�'G (0 - d) MA,l' SCOR6 SCORE
I Submission ofDocuments 2 Y 3 3 6
2 Yublic Notifications 5 Y 3 20 1�
3 Plans on Site 5 Y 3 20 1�
4 Field Supervision 15 1' 3 60 45
5 V1�ork Pcrformed 15 Y 3 60 �1�
6 I�inishedProduct 1� Y 3 b0 d5
7 1ob Site Safet}� I S Y 3 60 4�
$ Traffic Control h�faintenance 15 1' 3 60 4�
9 Dail�� Clean Up 5 Y 3 20 1�
10 Citizen's Complaint Resolution 5 Y 4 20 20
11 Pro erry Restoration � Y 3 2U 15
12 After Hours Response _5 Y 3 20 15
13 ProjectCompletion 5 Y 3 20 IS
TOT.AL ELEMENT SCORE (A) 341
BONUS PO[t�rTS (2i \4�sinwm) (B')
III) CONTRACTOR'S RATING
TOTAL SCORG (TS) 341
Maximum Scorz (MS) = 4�18 or sum of applicable element score maximums ����11C}1 = d�18
Rnting ( [TS / MS] �° 100%) 3={1 ! �t4g — 7G°/a
Perform�nce Category Good
<20% =1i�adeqirnle 20% to -��FO''/o = Deficieit� =103'o to •=60% = Srandr�rd 60% to = 80% = Good >_80% — �rcelle�rl
Inspectm�'s Comments (I\CLLIDI\G L." 'LA\ATION Or I30\US POINTS :�«'ARDI;D)
/
/
� j,
�� ,� ��
Signattn'e Inspector Il,i;�l;'� /" �•'- Signature Contractor
Sigiiature Inspector's Supervisor _��� - Y�—'
CONTR�ICTOR'S C0�4A4ENTS
�
Clpital Piojects Deliven�, \��atei DePartment
T`he Cit}� of Fort 1C�orcl� • 1000 Throcl;�noiton Street ° For[ \�`ordi, 'I'<Z 7C012-G311
(817) 392 - �{=�77 • Fas: (817) 392 - 8=460
��(��'�' �aRz'�I
Capital Projects Deliveiy, ��/atcr Department
COIVTRA.CTOR'S E�'ALUATION OI' CITY
I) PROJ�CT INFORMATION _
A'nure ojComrnc�or
venus
IYu(er Engineering /nspec(or
Carmen Drake
DOF. A�rimher Prnjecl ni�c�rlh�
100274 QQ Simple Q Routine
Inili�l Conh�acl Anrnunl ^�
2,97,370.00
lt) PFRFORMANC� EVALUATION
Labs
Q Complex
0- Tnadequate __l - Deficient 2; Standard �- Good 4- Excellent
ELE\-fENT RATING ELEMENT
(0-<I)
INSPECTION EVALUATION
1 �lvailabiliry of Inspector �
2 I�iowledge of Inspector
3 Accuracy of Measured Quantiti
4 Display Of Profession�lism
5 Citizen Complaint Resolution
6 Perfornlance - Setting up Valve
ADMINISTRATION
1 Change Order Pirocessing Time
2 Timliness of Conh�actor Paymei
3 Bid OpeninQ to Pre-Con Meetir
Timeframe
REV: �2,22,��
Date, � 15-Mar-21 _
f'rujecl A'anre
Marine Creek Interceptor M- 279 & M-365 Phase 2 Part I
I'rujec! h/anager
Ry1n Bowman � ,_�_
T}g�� ql�Cnnh•ncl
❑ Water ❑ Waste Watcr ❑ Storm Drainage ❑ Pavement
Final CoitOnc� �l»iomil � ^
RATING
(� - �+)
PLANS & SPECIFICATIONS
I Accuracy of Plans to E�isting Couditions
2 Clarity & Sufficiency of Detlils
3 npplicability of Specifications
4 ^Accuracy of Plan Quantities
PROJECT MANAGER �VALUATION
1 ICno�vledge And/Or Pcoblem Resolution
2 Availability of Project Manager
3 Communicatiou
4 Resolution of Utility Conflicts
III) CnMMLNTS & SIGNATURES
co;�-iNirNTs
Si�nature ConU�actor
Signaltu-e Inspector
Signature Inspector's Supervisor
INSPLCTOR'S COMiVIENTS
Capital Projects Deli��er}�, ��jater Deparmient _
The Cit}� of Fart ���ordi • 1000 Tlicocl;morton Strect • Fort �l'%orth, T� 76012 G311
(81 �) 392 - 4�77 � Fa�: (817) 392 - 5460
PROJECT NAME:
PROJECT NUMBER:
DOE NUMBER:
PIPE LAID
FII2E HYDRANTS:
PIPE ABANDONED
DENSITIES:
NEW SERVICES:
PIPE LAID
HOBAS
Carrier PIPE HOBAS
PIPE ABANDONED
DENSITIES:
NEW SERVICES:
FORTWORTH
_�_ _ � _ _ , _
L� � 3-: j= -- , _
'.
WATER ENGINEERING & FISCAL SERVICES
PIPE REPORT FOR:
Mai•ine Creek Interceptor M- 279 A& M-365 Phase 2 Part 1
100274
SIZE
SIZE
yes
SIZE
36
36
SIZE
WATER
TYPE OF PIPE
VALVES (16" OR LARGER)
TYPE OF PIPE
SEWER
TYPE OF PIPE
TYPE OF PIPE
PASSED
LF
LF
LF
LF
3380
240
�U-�TER ENGINEERING & FISC �I, SER��ICES
The Cit�� of Fort ��/orth • 1000 Throckmorton Stseet • Fort �/oidi, TZ 76012-6311
(817) 392 - 4477 • Fa1: (817) 392 - 8460
APFIDAVIT
STATE OP Texas
COUNTY OF Tarrant
Before me, the i.uldersigned authority, a notary public in the state
aud county aforesaid, on this day personally appeared Samuel McAda,
Vice President Of Venus Construction Company, Icnown to me to be a
credible person, who being by me duly sworn, upon his oath deposed and
said;
That all persons, firms, associations, corporations, or other
organizations fuinishing labor and/or materials have been paid in fiill;
That the wage scale established by the City Council in the City of
Fort `Vorth has been paid in fiill;
That there are no claims pending for personal injury and/or
property damages;
On Contract described as;
Ivlarine Creelc
City Project #100274
BY
amuel McAda / Vice President
Subscribed and sworn before me on this date 10 of March, 2021.
�:z.�r-•�•�a_-sr�:�-•��:..c�rs..-�is.c;r-..r.»a ::r�
i ,= s`'"YP"e�'� VANESSARENFR04V i
o • <c.
°�`��-�,`•�`- My Notary ID # 12869261�} j
�Czi'k..��'�► � �'T�.•�E�� � Cxpires July 28, 2023
C/ lc/ �'•�. „ •� �
Notary Public Tarrant County �`''�''�'' �'�"�'�'=�"'' `��''�""`"��"
PO 8o;c 90 - f�/lar�s�ield, T)C 760b3 �{817) 477-2050 � fAX (II17) �73-93b6
WVUIIU.VEPJUSCOPISTRUC i I ON.COM
03/12/2021
City of Fort Worth
CFA Administration
1000 Throcl<morton St.
Fort Worth, TX 76102
RE: Marine Creek Interceptor M-279A & M-365 Improvements-Phase II
City Project #100274
The purpose of this letter is to acknowledge that we have been paid in full by City of Fort Worth for the
public improvements constructed to serve Marine Creek Interceptor M-279A & M-365 Improvements-
Phase II.
Phase 4 in Fort Worth, Texas. As a result, we hereby waive, release and relinquish all rights to assert any
claim or demand for lien in connection with this project.
Please feel free to contact me with any questions you may have.
Sincerely,
Samuel McAda
PO Box 90 - Mansfield, TX 76063 �(817) 477-2050 � FAX (817) 473-9366
WWW.VENUSCORfSTRUCTION.COM
THE The Guarantee Company of North America USA
GUARANTEE� One Towne Square, Suite 1470
,_ Southfield, Michigan 48076
Phone: 248-281-0281 Fax: 248-750-0431
www.gcna.com
Bond Number 75170105
CONSENT OF SURETY COMPANY
TO FINAL PAYMENT
OWNER ❑
ARCHITECT ❑
CONTRACTOR ❑
SURETY ❑
OTHER ❑
PROJECT: MARINE CREEK INTERCEPTOR M-279A & M-365 IMPROVEMENTS - PHASE lI, City Project No. 100274
(name, address)
TO (OwnerJ
City of Fo�rt Woi�th
1000 Throckmorton Street
Foi•t Worth, TX 76102
ARCHITECT'S PROJECT NO.
CONTRACT FOR: MARINE CREEK INTERCEPTOR M-279A
& M-365 IMPROVEMENTS - PHASE II, City Project No. 100274
CONTRACT DATE: January 15th, 2019
CONTRACTOR: Venus Construction Company (1426 S. Main, Mansfield, TX 76063
In accordance with the provisions of the Contract beiween the Owner and the Contractor as indicated above, the
(here insert name and address of Surety as it appears in the bond).
The Guarantee Company of North America USA One Towne Square #147a Sot►tftfield, MI 48076 , SURETY COMPANY,
on bond of (here insert name and address of Contractor)
Venus Construction Company (1426 S. Main, Mansfield, TX 76063 , CONTRACTOR,
Hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall not
relieve the Surety Company of any of its obligations to (here insert name and address of Owner)
City of Fort Worth (1000 Throckmoi�ton Street, Fort Worth, TX 76102) , OWNERS,
As set forth in the said Surety Company's bond.
IN WITNESS WHEREOF, the Surety has hereunto set its hand this 1 Ith day of Macch 2021
The Guarantee Company of North America USA
Surety,Company �
��
�-.� ��u�������/� �_ � -
' Signature of Authorized Representative
ATTEST: � Lloyd Ray Pitts Jr - Attorney-In-Fact ___
(Seal): Melissa Pitts, Bond Secretary Title
The language in this document confirms exactly to the language used in AIA Document G707 — Consent of Surety Company to Final F'ayment.
intact
INSURAPJCE
POWER OF ATTORNEY
KNOW ALL BY THESE PRESENTS: That THE GUARANTEE COMPANY OF NORTH AMERICA USA, a corporation organized and existing under the laws of the
State of Michigan, having its principal office in Southfield, Michigan, does hereby constitute and appoint William D. Birdsong, Lloyd Ray Pitts Jr., Jordan A. Pitts
its true and lawful attorney(s)-in-fact to execute, seal and deliver for and on its behalf as surety, any and all bonds and undertakings, contracts of indemnity and
other writings obligatory in the nature thereof, which are or may be allowed, required or permitted by law, statute, rule, regulation, contract or otherwise.
The executlon of such instrument(s) in pursuance of these presents, shall be as binding upon THE GUARANTEE COMPANY OF NORTH AMERICA USA as fully
and amply, to all intents and purposes, as if the same had been duly executed and acknowledged by its regularly elected officers at the principal office.
The Power of Attorney is executed and may be certified so, and may be revoked, pursuant to and by authority of Article IX, Section 9.03 of the ey-Laws adopted
by the Board of Directors of THE GUARANTEE COMPANY OF NORTH AMERICA USA at a meeting held on the 31 st day of December, 2003, The President, or any
Vice President, acting with any Secretary or Assistant Secretary, shall have power and authority:
1. 7o appoint Attorney(s)•in-fact, and to authorize them to execute on behalf of the Company, and attach the Seal of the Company thereto, bonds and
undertakings, contracts of indemnity and other writings obligatory in the nature thereof; and
2. To revoke, at any time, any such Attorney-in•fact and revoke the authority given, except as provided below
3. In connection with obligations in favor of the Florida Department of Transportation only, it is agreed thatthe power and authority hereby given to the Attorney-
in-Fact includes any and all consents for the release of retained percentages and/or final estlmates on engineering and construction contracts required by the
State of Florida Department of Transportation. It is fully understood that consenting to the State of Florida Department of Transportation making payment of
the final estimate to the Contractor and/or its assignee, shall not relieve this surety company of any of its obligations under its bond.
4. In connection with obligations in favor of the Kentucky Department of Highways only, it is agreed that the power and auchority hereby given to the Attorney-in-
Fact cannot be modified or revoked unless prior written personal notice of such intent has 6een given to the Commissioner — Department of Highways of the
Commonweaith of Kentucky at least thirty (30) days prior to the modification or revocation.
Further, this Power of Attorney is signed and sealed by facsimile pursuant to resolution of the Board of Directors of the Company adopted at a meeting duly
called and held on the 6th day of December 2011, of which the following is a true excerpt:
RESOLVED that the signature of any authorized officer and the seal of the Company may be affixed by facsimile to any Power of Attorney or certification thereof
authorizing the execution and delivery of any bond, undertaking, contracts of indemnity and other writings obligatory in the nature thereof, and such signature and
seal when so used shall have the same force and effect as though manually affixed.
JP�ts i EF �,o
e� �.o
�4 9,�
O ���' ,�jQ%
/
y�RTH aMER��
5TA7E.OF MINNESOTA
Hennepin County
IN WITNESS WHEREOF, THE GUARANTEE COMPANY OF NORTH AMERICA USA has caused this instrument to be signed and its
corporate seal to be affixed by its authorized officer, this 26th day of May, 2020.
THE GUARANTEE COMPANY OF NORTH AMERICA USA
%��''�(�l/
Paul J. Brehm, Senior Vice President
�i/�
Chad A. Anderson, Senior Vice President Specialty
On this 26th day of May, 2020 before me came the individuals who executed the preceding instrument, to me personally known, and being by me duly sworn, said
that each is the hereln described and authorized officer of The Guarantee Company of North America USA; that the seal affixed to said instrument is the
Corporate Seal of said Company; that the Corporate Seal and each slgnature were duly affixed by order of the Board of Directors of said Company.
IN WITNESS WHEREOF, I have hereunto set my hand at The Guarantee Company of Nor[h America
� ` ALISON DWAN NASH•TROUT USA offices the day and year above written.
,'ia��
��NOTARYPUBLIC•MINNESOTA �
My Cammission Explres ��1�. �1di ��
�,.,�' January 31, 2025
I, Chad A. Anderson, Senior Vice President of THE GUARAN7EE COMPANY OF NORTH AMERICA USA, do hereby certify that the above and foregoing is a true
and correct copy of a Power of Attorney executed by THE GUARANTEE COMPANY OF NORTH AMERICA USA, which is still in full force and effect.
��p;[+TEB Q
G" �1jo
�t vy
p: � .c
g,� N!� �ye
y� �p�
R� ntaeF`
11th Ma rch 2oZ�
IN WITNESS WHEREOF, I have thereunto set my hand and attached the seal of said Company this_ day of
��
Chad A. Anderson, Senior Vice President Specialty
Please direct bond verifications to surety�o intactinsurance.com
THE
GUARANTEE"�
TEXAS CONSUMER NOTICE
7. IMPORTANT NOTICE
To obtain information or make a complaint:
2. You may contact your agent at:
3. You may call The Guarantee Company of North
America USA's toll-free telephone number for
information or to make a complaint at:
1-866-328-0567
AVISO IMPORTANTE
Para obtener informacion o presentar una queja:
Puede contactar a su agente en:
Puede Ilamar al numero de tel�fono gratuito de
The Guarantee Company of North America USA
para obtener informacibn o presenter una queja en:
1-866-328-0567
4. You may also write to The Guarantee Company of I Tambien puede escribir a The Guarantee Company of
North America USA at: North America USA a;
One Towne Square, Suite 1470
Southfield, Michigan 48076
Web: www thequaranteeus.com
E-mail: Claims US(a�theauarantee com
Fax: 248-750-0431
5. You may contact the Texas Department of
Insurance to obtain information on companies,
coverages, rights or complaints at: 1-800-252-
3439
6. You may write the Texas Department of
Insurance:
333 Guadalupe Street
P.O. Box 149104
Austin, TX 78701
Fax: (512) 490-1007
Web: http�//ww.tdi.texas.qov
E-mail: ConsumerProtectionCc�tdi.texas.qov
One Towne Square, Suite 1470
Southfield, Michigan 48076
Web: www.theauaranteeus.com
E-mail: Claims US(cilthequarantee.com
Fax: 248-750-0431
Puede comunicarse con el Departamento de Seguros de
Texas para obtener informacidn sobre companias,
coberturas, derechos o quejas en: 1-800-252-3439
Puede escribir al Departamento de Seguros de
Texas:
333 Guadalupe Street
P.O. Box 149104
Austin, TX 78701
Fax: (512) 490-1007
Web: http://ww.tdi.texas.qov
E-mail: ConsumerProtection(cr�tdi.texas.qov
7. PREMIUM OR CLAIM DISPUTES: DISPUTAS PREMIUM O DE RECLAMACIbN:
Should you have a dispute concerning your Si tiene una disputa sobre su prima o sobre un reclamo,
premium or about a claim you should contact the debe comunicarse primero con el (agente) (compania)
(agent) (company) (agent or the company) first. If agente o la compa►ila). Si la disputa no se resuelve,
the dispute is not resolved, you may contact the puede comunicarse con el Departamento de Seguros de
Texas Department of Insurance. Texas (TDI).
8. ATTACH THIS NOTICE TO YOUR POLICY:
This notice is for information only and does not
become a part or condition of the attached
document.
ADJUNTE ESTE AVISO A SU POLITICA: Este aviso es
solo para informaci0n y no se convierte en parte o
condicibn del documento adjunto.
Rev 10l1012019 Page 1 of 1
CSC No. 51833-COl
�c�7��r' 'VVt��_� � C:ity of Foi�iliVor�h
----�=r�.-
�" �s'��� � Ghange Order Request
Projecl Name; Marine Creek Intercepfor M-279A & M-365 Improvements - Phase II, Part I City Sec No.: 51833
Projec� No,(S): 59607•0700430�100274•001780 DOE No. N/A Ciry Proj. No.; 100274
Project Descriphon;l Inslallafion of 3,620 If of 36 inch dia, sewer antl 1570 If of 42 inch Qia. Sewer in the Marine Creek Basin,
ConUaclor: Venus Construction Company, Inc, Change Order #� Date: 12/8/2020
Cily Project Mgr. Walter Nonvootl � City Inspector: Carmen Drake
Phone Number: (817)392-5026 Phone Number: (817)392-8347
Dept, Sewer
Original Contract Amount $2,897,37(
E�ras to Date
Credits to Dafe
Pending Change Ortlers (in M&C Process)
Confracf Cost lo Dale $2,897,370
Amount of Proposed Chanae Order $O.OD
Orfginal Funds Available for Change Orders
Remaining Funds Available for this CO
Addi�onal Funding (if necessary)
Totals � Contract Time
00
CHANGE pRDERS to DATE (1NCl.UDING TH1S aNEJ AS % OF ORIGINAL CONTRACT 0.00%
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%J �3,621,712.50
JUSTIFICA'
ORDER
This provides an additional 270 calendar days on the project for the following:
° Time period for Barnett Gathering to adjust its gas mains that were in conflict with the project.
• Removal and replacement of super saturated backfill material due to ground water penetration.
• Re-establishment of vegetation to satisfy property owners.
It is understood and agreed thaf the acceptance of fhis Change Order by fhe conlraclor consfilutes an accord and satisfaction and represents payment
in full (bolh time and money) for all cosfs arising out of, or incidental to, the above Change Order.
Contractor's Com an Name Contractor Name Contraclor Si nature Date
Venus Construction Company, Inc. Josh McAtla r 5('t M 4' ,f�/ 4'/d�•"'
Fo R �t' V�c� R'� � City ofi �or� Wo�ih
---�> _ �,_��_
-���`� �hange �rc��f� Addiii�hs
Project Name Marine Creek Interceptor M•279A & M-365 Improvemenls - Phase II, Part I City Sec No.: 51833
Projec( No,(s): 59607-0700430-100274-001780 DOE No, N A Cily Praj, No.: 100274
Projecl Installation of 3,620 If of 36 inch dia. sevrer and 1570 If of 42 inch Dia. Sewer in Ihe Marine Creek Basin.
Description
Contractor Venus Conslrucfion Company, Inc. Change Ortlerr� Date; 12/812020
City Project Mgr. Walter Norwood Ciry Inspeclor Carmen Drake
ADDITIONS
FO R�' V�� ��' �-s �ity of For� Worth
---��- -- .=�--------
--`�°�;~ - - �hange 8rder �eletions
Project Name Marine Creek Interceptor M-279A & M-365 Improvements - Phase II, Part I City Sec No.: 51833
Projecf No.(s): 59607-0700430-100274-001780 DOE No. N/A City Proj. No.: 100274
Project Description Installa�ion of 3,620 If of 36 inch dia, sewer and 1570 If of 42 inch Dia. Sewer in the Marine Creek Basin.
Conlractor Venus Construction Company, Inc, Change Order: � Date 12/BI2020
City Project Mgr. Walfer Nonvood Ciry Inspector: Camien Drake
DELETIONS
Page 1 of 1
.Confiract Compliance Mana�er
By signing I acicnowledge that I am the person responsible
for the monitoring and adininistraiion of this coniract, including
ensuiing all pei�'oiznance and reporting requiz�ements.
G�'.� , � �����
Signature
�"��f�7��y .i/vl/'�/�,�,}�'�>�`� .
Name of Employee
�%'� %n
/� ' � �i� !"��lc/V ) C% " �.
Title
ATTEST:
`v�U �' 0
MaryJ. Kayser
City Secretary