HomeMy WebLinkAboutContract 54210-CO4CSC No. 54210-004 Fc��T Wc��:'1��--s City of Fort Worth '�� Change Order Request Project Name: Water antl Sanitary Sewer Replacement Conlract 2014 WSM-B, Part 1 Cily Sec No.: 54210 P�ojeCl No.(S): =F��»�'=�>>7���wu�N��,wn�a�uia�.nawuva�za7� DOE No. N/A Clly Proj. No.: 2383 Water, Sewer Replacement and Pavement Rehabililalion on Bellaire Circle, Ranch View Road, Soulh Hills Circle and Projecl DescripGon: Westcliff f2oad Soulh Conlractor: Jackson Construclion, Ltd. Change Order #�4 Dale: 3/3/2021 City Project Mgr. Scott Taylor City Inspector: Ramon Chavez Phone Number: 817-392-i240 Phone Number: 817-392-8306 Dept, � Water � Sewer � TPW Onginal Conlrac( Amounl $3,573,699.00 �1,802,598.00 �1,238,615.00 Extras to Dafe �69,525,00 �a0.00 �0.00 Credits to Date $14,247.30 �v0.00 50.00 Pending Change Orders (in M8C Process) Conlract Cost fo Date �3,628,976J0 $1,802,598.00 $1,238,615.00 Amount of Proposed Change Order •�625.00 -�210.71 50.00 Revised Contract Amounl $3,628,351.70 $1,802,387.29 �1,238,615.00 Original Funds Available for Change Orders �107,211.00 $54,078.00 �0.00 Remaining Funds Available for tnis CO $51,933.30 $54,078.00 $0.00 Additional Funding (if necessary) CHANGE ORDERS to DATE (INCLUD/NG TNIS ONE) AS % OF ORIG/NAL CONTRACT MAX ALLOWABLE CONTR,4CT AMOUNT (ORIGINAL CONTR,4CT COST+ 25%) JUSTIFICATION IREASONSI FOR CHANGE ORDER Change Order No. 4 provides for the following: Totals Contract Time (Calender days) �14,912.00 540 9,525.00 085 4,247.30 �70,189.70 625 �835,71 015 0.82% $8,268,640.00 � The installation of a 95 feet segment of a project 12" ductile iron water main by other than open cut method across the Ranch Vie�v Road/South Hulen Street in lieu of open cut, in order to minimize disruption to traffic and closure time of the intersection. � Imported backfill material to replace unsuitable backfill material that was encountered during construction. • The removal and replacement of a deteriorated sanitary sewer manhole bottom that was encountered during construction. Staff recommends the approval of 15 additional calendar days on the change order. It is understood and agreed Ihal lhe acceplance of this Change Order by the contractor conslilules an accord and satisfaciion and represents payment in (ull (bo�h lime and money) (or all costs arising oul of, or incidenlal to, ihe above Change Order. , Contractors Company �`ame Contractor Name � ConUactor Sign�tu - Date Jackson Construcfion, Lld. Carmen Estep ,' ;,�;;;; ;�.'!-I, (_. �*:;`; '�,- j_n�nn��n�� 1115 CGIUI Director (Water Dept) � r�sEv�Gaer^ ttarder- Assislant Citv Atiorney M&C Number N/A � �lz Date . Mar22,2021 Date M a r 22, 2021 ConstrucUon Assistant C na suryhdoff M&C Dale Approved Date . 3/4/2021 Date 3/8/2021 Date Mar 22. 2021 OFFICIAL RECORD ���-�-�xy:��r_�:�-i FT. WORTH, TX ' � F�OR T«(> R"T H City o� ��r� �I/c�rth � � ' Charrc�� Orci�r Aclditions � Project Name Water and Sanitary Sewer Replacement Contract 2014 WSN-B, Part 1 City Sec No.: 54210 Project No.(s): 5600210600430lC01780-5600210700430/C01780- DOE No. N/A City Proj. No.: 2383 Projecl Water, Sewer Replacement and Pavement Rehabilitation on Bellaire Circle, Ranch View Road, South Hills Circle and Description Westcli(f Road South _ Contractor Jackson Construction; Ltd. Change Order:� Date: 3/3/2U21 ___. , City Project Mgr, Scott Taylor ,�� Cily Inspector � Ramon Chavez '� , � AD�ITEdNS � DEPT Q Unit Unit Cc�si 7otal 63 24" Steel Casing Pipe (BOTC) . Water 95.00 LF $1,025.00 �4%,375.00 64 12" DIP Carrier Pipe Water 95.00 LF $245.00 $23,275.00 43 Imported Backfill Material Sewer 1,000.00 CY $32.On 532.,000.00 44 Removal and Replacement of manhole bottom Sewer 1.00 LS �2,589.29 $2,589.29 Water $120,650.00 Sewer $34,589.29 TPW rage i oi i Additions Sub Total $155,239.29 b C (. F��x-I. W���T.� � City of Fort Worth �—`' Change Order Deletions Project Name Water and Sanitary Sewer Replacement Contract 2014 WSM-B, Part 1 City Sec No.: 54210 Projecf No.(s): DOE No. N/A City Proj. No.: 2383 Project Description Water, Sewer Replacemenl and Pavement Rehabilitalion on Bellaire Circle, Ranch Vieav Road, South Hills Circle and Westclilf Road Soulh Conlractor Jackson Construction, Ltd. Change Order: �4 Date 3/3/2021 City Project Mgr. Scott Taylor City Inspeclor: Ramon Chavez DELETIONS Page 1 of 1 Can�racfi Compliance Mana�er By signing r acl�nowledge that T am the person responsible for ihe moniioring aud administration of ihis confract, inciuding ensuring all performan.ce and repor•ting requirements. �c�tti��2' ��' Signature ���"" � �� � ��-- Name of Employee � � �� ���� ����� —��..T— Tifile ATTEST: � V `7�\` V (/ Mary J. Kayser City Secretary p,o,w-FORT "a�I, p O�000000000� Y ��o� �o��� �o 0 0 �o o= �o 0 o � o � 0 ��oo o�c� o A �T 0��00000o p.