HomeMy WebLinkAboutContract 54210-CO4CSC No. 54210-004
Fc��T Wc��:'1��--s City of Fort Worth
'�� Change Order Request
Project Name: Water antl Sanitary Sewer Replacement Conlract 2014 WSM-B, Part 1 Cily Sec No.: 54210
P�ojeCl No.(S): =F��»�'=�>>7���wu�N��,wn�a�uia�.nawuva�za7� DOE No. N/A Clly Proj. No.: 2383
Water, Sewer Replacement and Pavement Rehabililalion on Bellaire Circle, Ranch View Road, Soulh Hills Circle and
Projecl DescripGon: Westcliff f2oad Soulh
Conlractor: Jackson Construclion, Ltd. Change Order #�4 Dale: 3/3/2021
City Project Mgr. Scott Taylor City Inspector: Ramon Chavez
Phone Number: 817-392-i240 Phone Number: 817-392-8306
Dept, � Water � Sewer � TPW
Onginal Conlrac( Amounl $3,573,699.00 �1,802,598.00 �1,238,615.00
Extras to Dafe �69,525,00 �a0.00 �0.00
Credits to Date $14,247.30 �v0.00 50.00
Pending Change Orders (in M8C Process)
Conlract Cost fo Date �3,628,976J0 $1,802,598.00 $1,238,615.00
Amount of Proposed Change Order •�625.00 -�210.71 50.00
Revised Contract Amounl $3,628,351.70 $1,802,387.29 �1,238,615.00
Original Funds Available for Change Orders �107,211.00 $54,078.00 �0.00
Remaining Funds Available for tnis CO $51,933.30 $54,078.00 $0.00
Additional Funding (if necessary)
CHANGE ORDERS to DATE (INCLUD/NG TNIS ONE) AS % OF ORIG/NAL CONTRACT
MAX ALLOWABLE CONTR,4CT AMOUNT (ORIGINAL CONTR,4CT COST+ 25%)
JUSTIFICATION IREASONSI FOR CHANGE ORDER
Change Order No. 4 provides for the following:
Totals Contract Time
(Calender days)
�14,912.00 540
9,525.00 085
4,247.30
�70,189.70 625
�835,71 015
0.82%
$8,268,640.00
� The installation of a 95 feet segment of a project 12" ductile iron water main by other than open cut method
across the Ranch Vie�v Road/South Hulen Street in lieu of open cut, in order to minimize disruption to traffic
and closure time of the intersection.
� Imported backfill material to replace unsuitable backfill material that was encountered during construction.
• The removal and replacement of a deteriorated sanitary sewer manhole bottom that was encountered during
construction.
Staff recommends the approval of 15 additional calendar days on the change order.
It is understood and agreed Ihal lhe acceplance of this Change Order by the contractor conslilules an accord and satisfaciion and represents payment
in (ull (bo�h lime and money) (or all costs arising oul of, or incidenlal to, ihe above Change Order. ,
Contractors Company �`ame Contractor Name � ConUactor Sign�tu - Date
Jackson Construcfion, Lld. Carmen Estep ,' ;,�;;;; ;�.'!-I, (_. �*:;`; '�,- j_n�nn��n��
1115 CGIUI
Director (Water Dept) �
r�sEv�Gaer^ ttarder-
Assislant Citv Atiorney
M&C Number N/A
� �lz
Date
. Mar22,2021
Date
M a r 22, 2021
ConstrucUon
Assistant C
na suryhdoff
M&C Dale Approved
Date .
3/4/2021
Date
3/8/2021
Date
Mar 22. 2021
OFFICIAL RECORD
���-�-�xy:��r_�:�-i
FT. WORTH, TX
' � F�OR T«(> R"T H City o� ��r� �I/c�rth
� � ' Charrc�� Orci�r Aclditions
� Project Name Water and Sanitary Sewer Replacement Contract 2014 WSN-B, Part 1 City Sec No.: 54210
Project No.(s): 5600210600430lC01780-5600210700430/C01780- DOE No. N/A City Proj. No.: 2383
Projecl Water, Sewer Replacement and Pavement Rehabilitation on Bellaire Circle, Ranch View Road, South Hills Circle and
Description Westcli(f Road South _
Contractor Jackson Construction; Ltd. Change Order:� Date: 3/3/2U21
___. , City Project Mgr, Scott Taylor ,�� Cily Inspector � Ramon Chavez
'� , � AD�ITEdNS
� DEPT Q Unit Unit Cc�si 7otal
63 24" Steel Casing Pipe (BOTC) . Water 95.00 LF $1,025.00 �4%,375.00
64 12" DIP Carrier Pipe Water 95.00 LF $245.00 $23,275.00
43 Imported Backfill Material Sewer 1,000.00 CY $32.On 532.,000.00
44 Removal and Replacement of manhole bottom Sewer 1.00 LS �2,589.29 $2,589.29
Water $120,650.00
Sewer $34,589.29
TPW
rage i oi i Additions Sub Total $155,239.29
b
C
(.
F��x-I. W���T.� � City of Fort Worth
�—`' Change Order Deletions
Project Name Water and Sanitary Sewer Replacement Contract 2014 WSM-B, Part 1 City Sec No.: 54210
Projecf No.(s): DOE No. N/A City Proj. No.: 2383
Project Description Water, Sewer Replacemenl and Pavement Rehabilitalion on Bellaire Circle, Ranch Vieav Road, South Hills Circle
and Westclilf Road Soulh
Conlractor Jackson Construction, Ltd. Change Order: �4 Date 3/3/2021
City Project Mgr. Scott Taylor City Inspeclor: Ramon Chavez
DELETIONS
Page 1 of 1
Can�racfi Compliance Mana�er
By signing r acl�nowledge that T am the person responsible
for ihe moniioring aud administration of ihis confract, inciuding
ensuring all performan.ce and repor•ting requirements.
�c�tti��2' ��'
Signature
���"" � �� � ��--
Name of Employee �
� �� ���� �����
—��..T—
Tifile
ATTEST:
� V `7�\` V
(/
Mary J. Kayser
City Secretary