HomeMy WebLinkAboutContract 54002-A1CSC No. 54002-A1
ANIENDMENT No . 1
TO CITY SECRETARY CONTRACT
R'H�ILTA15, the City of Fort Worth (CITY) and Dal-Tech Engineering,
Inc., (ENGINEER) made and entered into City Secretary Contract No.
54002, (the CONTRACT) which was authorized by M&C 20-0378 on the 2nd
day of June, 2020 in the amount of $311,507.00; and
WHEIZP�15, the CONTRACT involves engineering services for the
following project:
Sanitary Sewer Rehabilitation, Contract 99; and
WII�IZTAS, it has become necessary to execute Amendment No . 1 to
the CONTRACT to include an increased scope of work and revised fee.
NOWT�It�rORE, CITY and ENGINEER, acting herein by and through
their duly authorized representatives, enter into the following
agreement, which amends the CONTRACT:
1. r
Article I of the CONTRACT is amended to include the additional
engineering services specified in the proposal attached hereto and ;
incorporated herein. The cost to City for the additional design services ,�
to be performed by Engineer totals $49,840.00. �
2. I
Article II of the CONTRACT is amended to provide for an increase
in the fee to be paid to Engineer for all work and services performed
under the Contract, as amended, so that the total fee paid by the City
for all work and services shall be an amount of $361,347.00.
3.
Al1 other provisions of the Contract, which are not expressly
amended herein, shall remain in full force and effect.
OFFICIAL RECORD
CITY SECRETARY
Page -1- FT. WORTH, TX
EXECUTED and EFFECTIVE as of the date last written by a signatory,
below.
APPROVED:
City of Fort Worth
Dana Bur�ah�loFF
�� ,��� _,.,� , ,��.�
Dana Burghdoff
Assistant City Manager
M a r 29, 2021
DATE:
APPROVAL RECOMNIENDED:
cGu��sErmGcer� ttar^ves-
c„-,.opn�� „n�,rv�.,->,,�or,r.nzoT,
Chris Harder, P.E.
Director, Water Department
Contract Compliance Manager:
ENGINEER
Dal-Tech Engin ering, Inc.
.�?
/ .
�
Sedi Toumani, P.E.
President
DATE: �-
By signing, I acknowledge that T am �he person responsible for the
monitoring and administration of this contract, including ensuring
al]. performance and reporting �equirements.
Name of Employee
��. �:��"�
_.�� !
Prat'ima Pdu�yal, P.E.
Project Manager
APPROVED AS TO FORM AND LEGAI�ITY:
:�0
Douglas W. Black
Senior Assistant City Attorney
�,�,-p,4Un���
ATTEST : � � �oFORT��a��
0
���No� l. ° ��� d
"r�^ �
�Vo °=d
o °
o° �
City Secretarr ��a �� �EXP?ab�
Y Y
M&C: Funding M&C 21-0163
Date: March 2, 2021
Page -2-
Form 1295: N/A
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
� �
EI�G�RlEElZING, INC.
CONSULTING CIVIL ENGINEERS / SURVEYORS
CONSTRUCTION MANAGEMENT
January 12, 2021
Pratima Poudyal, PE
Sr. Professional Engineer
City of Fort Worth — Water Department
RE: Fort Worth Sanitary Sewer Rehabilitation Project — Contract 99 — CPN 02720 - CPN 02720 -
Amendment Request No.1
Dear Ms, Poudyal,
In response to your request via email on December 7�, 2020, DAL-TECH Engineering in pleased to submit
this amendment request associated with design of water and wastewater main under Contract 99, CPN
02720.
SCOPE OF WORK
The scope of work for this amendment is shown at the following table;
Mainl Water Sewer
Lat Location From To Size Length Size Length
in. ft in, ft
L-4877 Loraine St. Angle Ave, 185' West of g 185
An le Ave.
330' South of
L-2609 Gould Ave, Angle Ave. 29�� St 8 431
80' North of Easement
Pearl Ave. 2g��, St. between 29�
L-5189 St. & 30� St. 8 575
Easement between Pearl Ave. Angle Ave.
29� St. & 30� St.
Easement between 30' North of Easement
L-6657 Pearl Ave, & Angle 29� St. between 29� 8 260
Ave. St, & 30�� St.
Sub-Total Sewer Lines 8 1451
Pearl Ave. 29� St. 30�h St. 8 621
29� St. Pearl Ave, An le Ave. 8 557
Sub-Total Water Lines 8 9178
TASKS
Task 1 — Design Management
Task 2— Professional Design Surveying
Task 3 — Preliminary Design
Page 1 of 2
17400 DALLAS PARKWAY, SUITE 110 / DALLAS, TX 75287 /(972) 250 - 2727
� !
ENGONEERING, IIoJC.
CONSULTING CIVIL ENGINEERS / SURVEYORS
CONSTRUCTION MANAGEMENT
Task 4 — Final Design
Task 5— Bid Phase Services
FEE
The total fee for the above scope of work is $49,840.00 including expenses.
The total contract amount request under this contract is as follow;
Original Contract Amount; $311,507.00
Amendment No. 1: $49,840.00
• Total Contract Amount to Date: $361,347.00
Level of Effort (LOE) sheet associated with this Amendment No,1 is attached below. Invoices will be
adjusted based on new contract amount to date.
Sincerely,
DAL-TECH Engineering
,
/ti�.�_�
Sedi Toumani, PE
President
Page 2 of 2
17400 DALLAS PARKWAY, SUITE 110 / DALLAS, TX 75287 /(972) 250 - 2727
o g D y ���
� � � D c
z� u K 3 �
� � � a ^ �
p m 33
A
� a -�
a �
0
� o x �,
� � sm m
a ' s s s
� �� "
a
�
z
'a
�
a
0
An
D
�
O
�
City of Fort Worth, Texas
Mayor and Council Communication
DATE: 03l02/21 M&C FILE NUMBER: M&C 21-0163
LOG NAME: 60SSC99A1DALTECHFUNDING
SUBJECT
(CD 2) Adopt Appropriation Ordinance in the Amount of $83,840.00 for Increased Project Costs for Sanitary Sewer Rehabilitation, Contract 99
RECOMMENDATION:
It is recommended that the City Council adopt the attached appropriation ordinance increasing receipts and appropriations in the Water and
Sewer Capital Projects Fund in the amount of $83,840.00, transferred from available funds within the Water and Sewer Fund, for the purpose of
funding the Sanitary Sewer Rehabilitation, Contract 99 project (City Project No. CO2720).
DISCUSSION:
On June 2, 2020, Mayor and Council Communication (M&C 20-0378), the City Council auihorized an engineering agreement in the amount of
$311,507.00 wiih Dal-Tech Engineering, Inc. (City Secretary Contract No. 54002) for the Sanitary Sewer Rehabilitation, Contract 99, project.
The additional appropriations in this M&C will provide for increased project management and real property acquisilion costs in the amount of
$34,000.00 and funding costs associated with proposed Amendment No. 1 to the engineering agreement in the amount of $49,840.00 for survey
and design of additional water and sanitary sewer mains on the project.
Appropriations for Sanitary Sewer Rehabilitation, Contract 99 project are as depicted below:
Fund Existing Additional Pro�ect
Appropriations Appropriations Total�
` Fu nd 56002 Projects �485,360.00 $83,840.00i $569,200.00
ProjectTotal $485,360,00 $83,840.00 $569,200.00
'Numbers rounded for presentaiion purposes.
This project is located in COUNCIL DISTRICT 2.
A Form 1295 is not required because: This M&C does not request approval of a contract with a business entity.
FISCAL INFORMATION / CERTIFICATION:
The Director of Finance certifies that funds are currentiy available in the Water & Sewer Fund and upon approval of the above recommendation
and adoption of the attached appropriation ordinance, funds will be available in the current capital budget, as appropriated, in the W&S Capital
Projects Fund for the SaniSewer Rehab Contract 99 project. Prior to any expenditure being incurred, the Water Department has the responsibility
to validate ihe availability of funds.
Submitted for City Manager's Office bv: Dana Burghdoff 8018
Originating Business Unit Head• Chris Harder 5020
Addiiional Information Contact; Pratima Poudyal 6149
�
0
�
�
n
�
�
a
d
a
r
-�
�
n
x
�
�
7
C7
z
c�