Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Contract 37420 (2)
0.0.E. Fllt: CONTRACTOR'S BONDING CO. CONSTRUCTION'S COPY CLIENT-?EP.4 RTM~~lc1FICATIONS AND CONTRACT DOCUMENTS WATER MAIN REPLACEMENTS CONTRACT 2007 A MIKE MONCRIEF MAYOR PROJECT NUMBERS: WATER-P253-6011700972 CITY PROJECT NO. 972 DOE NO. 5965 APRIL2008 DALE A. FISSELER, P.E. CITY MANAGER A. DOUGLAS RADEMAKER, P.E. -DIRECTOR DEPARTMENT OF ENGINEERING OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX PREPARED BY: DEPARTMENT OF ENGINEERING o~-11-oa P12:06 , , SPECIAL CONTRACT DOCUMENTS FOR WATER MAIN REPLACEMENTS CONTRACT 2007 A PROJECT NUMBER(S): WATER-P253-6011700972 D.O.E. No . 5965 CITY PROJECT No . 972 DALE A. FISSELER, P .E. CITY MANAGER S. FRANK CRUMB DIRECTOR WATER DEPARTMENT A. DOUGLAS RADEMAKER, P .E ., DIRECTOR DEPARTMENT OF ENGINEERING PREPARED BY DEPARTMENT OF ENGINEERING CITY OF FORT WORTH, TEXAS WATER MAIN REPLACEMENTS CONTRACT 2007A PROJECT NUMBERS: WATER-P253-6011700972 D.O.E. No. 5965 CITYPROJECTN~972 S. FRANK CRUMB, P.E. DIRECTOR WATER DEPARTMENT 2008 APPROVED ~ k.!.litt~ ~ A. ouGLASRADEMAKiR:P.E.,DlllECTOR,DENGINEERIN G APPROVED /~ mrf EPARTMEN T DA TE NOTICE TO BIDDERS Sealed proposals for the following: WATER MAIN REPLACEMENTS CONTRACT 2007 A PROJECT NUMBERS : WA TER-P253-6011700972 DO E NO . 5965 CITY PROJECT NO. 972 Addressed to Mr. Dale A. Fisseler , City Manager of the City of Fort Worth , Texas , will be received at the Purchasing Office until 1:30 P.M., Thursday, May ~9 , 2008 and then publicly opened and read aloud at 2:00 P.M. Plans , Specifications and Contract Documents for this project may be obtained at the office of the Department of Engineering, Municipal Office Building, 1000 Throckmorton Street, Fort Worth , Texas . Sets of documents may be purchased for a non-refundable price of $20.00. Bid security is required in accordance with the Special Instructions to Bidders. The City reserves the right to reject any and/or all bids and waive any and/or all irregularities . No bid may be withdrawn until the expiration of ninety (90) days from the date the M/WBE UTILIZATION FORM , PRIME CONTRACTOR WAIVER FORM and/or the GOOD FAITH EFFORT FORM ("Documentation") as appropriate is received by the City . The award of contract, if made , will be within ninety (90) days after this documentation is received, but in no case will the award be made until the responsibility of the bidder to whom it is proposed to award the contract has been verified . Bidders are responsible for obtaining all addenda to the contract documents and acknowledging receipt of the addenda by initialing the appropriate spaces on the proposal form. Bids that do not acknowledge receipt of all addenda may be rejected as being non- responsive. Information regarding the status of addenda may be obtained by contacting the Department of Engineering at (817) 392-7910. Bidders shall not separate , detach or remove any portion, segment or sheets from the contract document at any time. Bidders must complete the proposal section(s) and submit the complete specifications book or face rejection of the bid as non-responsive. It is recommended that the bidder make a copy of the forms included in the Minority and Women Business Enterprise section for submittal within the time-line stated below or the bidder may request a copy of said forms from the City Project Manager named in this solicitation. In accord with City of Fort Worth Ordinance No. 15530, the City of Fort Worth has goals for the participation of minority business enterprises and women business enterprises in City contracts . A copy of the Ordinance can be obtained from the Office of the City Secretary. The bidder shall submit the MBE/WBE UTILIZATION FORM SUBCONTRACTOR/SUPPLIER UTILIZATION FORM , PRIME CONTRACTOR W AIYER FORM, GOOD FAITH EFFORT FORM with Documentation") and/or the JOINT VENTURE FORM as appropriate. The Documentation must be received by the managing department no later than 5:00 p.m., five (5) City business days after the bid opening date. The bidder shall obtain a receipt from the appropriate employee of the managing department to whom delivery was made. Such receipt shall be evidence that the documentation was received by the City. Failure to comply shall render the bid non- respons1ve. As mandated by Fort Worth City Council Resolution 3535, all cement utilized for this project shall be procured from a kiln utilizing a dry kiln process or from any kiln that does not produce an excess of 1. 71b of NOx emissions per ton of clinker produced. Bidder shall submit the 'Green Cement Policy Compliance Statement' at the time of bid opening of the project. A copy of the Compliance Statement is included in the Contract Documents. Failure to comply with the 'Green' Cement Policy shall be grounds for rejecting the bid as non-responsive. For additional information, contact Adolfo Lopez @ (817) 3 92-7829. DALE A. FISSELER, P .E . CITY MANAGER Advertising Dates: May 1, 2008 May 8, 2008 MARTHA A. HENDRIX CITY SECRETARY Department of Engineering A. Dou ademak:er , Director Bryan Beck, P .E. Manager, Engineering Services SPECIAL INSTRUCTIONS TO BIDDERS 1) PREOUALIFICATION REQUIREMENTS: All contractors submitting bids are required to be prequalified by the Fort Worth Water Department prior to submitting bids . This prequalification process will establish a bid limit based on a technical evaluation and financial analysis of the contractor. It is the bidder's responsibility to submit the following documentation: a current financial statement, an acceptable experience record, an acceptable equipment schedule and any other documents the Department may deem necessary, to the Director of the Water Department at least seven (7) calendar days prior to the date of the opening of bids . a) The financial statement required shall have been prepared by an independent certified public accountant or an independent public accountant holding a valid permit issued by an appropriate State licensing agency and shall have been so prepared as to reflect the financial status to the submitting company. This statement must be current and not more than one (I) year old. In the case that a bidding date falls within the time a new statement is being prepared, the previous statement shall be updated by proper verification . b) For an experience record to be considered to be acceptable for a given project, it must reflect the experience of the firm seeking qualification in work of both the same nature and technical level as that of the project for which bids are to be received. c) The Director of the Water Department shall be the sole judge as to the acceptability for financial qualification to bid on any Fort Worth Water Department project. d) Bids received in excess of the bid limit shall be considered non-responsive and will be rejected as such. e) The City, in its sole discretion, may reject any bid for failure to demonstrate experience and/or expertise. t) Any proposals submitted by a non-prequalified bidder shall be returned unopened, and if inadvertently opened, shall not be considered . g) The City will attempt to notify prospective bidders whose qualifications (financial or experience) are not deemed to be appropriate to the nature and/or magnitude of the project on which bids are to be received. Failure to notify shall not be a waiver of any necessary prequalification. 2. BID SECURITY: A cashier's check, or an acceptable bidder's bond, payable to the City of Fort · Worth, in an amount of not less than five (5%) percent of the largest possible total of the bid submitted must accompany the bid, and is subject to forfeiture in the event the successful bidder fails to execute the Contract Documents within ten (10) days after the contract has been awarded To be an acceptable surety on the bid bond, the surety must be authorized to do business in the state of Texas. In addition, the surety must (1) hold a certificate of authority from the Untied States secretary of the treasury to qualify as a surety on obligations permitted or required under federal Jaw; or (2) have obtained reinsurance for any liability in excess of $100,000 from a reinsurer that is authorized and admitted as a re insurer in the state of Texas and is the holder of a certificate of authority from the Untied States secretary of the treasury to qualify as a surety on obligations permitted or required under federal law. Satisfactory proof of any such reinsurance shall be provided to the City upon request. The City, in its sole discretion, will determine the adequacy of the proofrequired herein. 3 . BONDS: A performance bond, a payment bond, and a maintenance bond each for one hundred (100%) percent of the contract price will be required, Reference C 3-3.7. 4 . WAGE RATES: Section C3-3.13 of the General Conditions is deleted and replaced with the following: 06/04/03 (a) The contractor shall comply with all requirements of Chapter 2258, Texas Government Code, including the payment ofnot less than the rates determined by the City Council of the City of Fort Worth to be the prevailing wage rates in accordance with Chapter 2258, Texas Government Code . Such prevailing wage rates are included in these contract documents . (b) The contractor shall, for a period of three (3) years following the date of acceptance of the work, maintain records that show (i) the name and occupation of each worker employed by the contractor in the construction of the work provided for in this contract; and (ii) the actual per diem wages paid to each worker. These records shall be open at all reasonable hours for inspection by the City. The provisions ofD-3 Right to Audit pertain to this inspection. ( c) The contractor shall include in its subcontracts and/or shall otherwise require all of its subcontractors to comply with paragraphs (a) and (b) above . (d) With each partial payment estimate or payroll period, whichever is less , an affidavit stating that the contractor has complied with the requirements of Chapter 2258 , Texas Government Code . The contractor shall post the prevailing wage rates in a conspicuous place at the site of the project at all times. 5. AMBIGUITY: In the case of ambiguity or lack of clearness in stating prices in the Proposal, the City reserves the right to adopt the most advantageous construction thereof to the City or to reject the Proposal. 6 . BIDDER LICENSE: Bidder must be a licensed Contractor in the State of Texas. 7. NONRESIDENT BIDDERS: Pursuant to Article 601g, Texas Revised Civil Statutes, the City ofFort Worth will not award this contract to a nonresident bidder unless the nonresident's bid is lower than the lowest bid submitted by a responsible Texas resident bidder by the same amount that a Texas resident bidder would be required to underbid a nonresident bidder to obtain a comparable contract in the state in which the nonresident's principal place of business in located. "Nonresident bidder" means a bidder whose principal place of business is not in this state, but excludes a contractor whose ultimate parent company or majority owner has its principal place of business in this state. This provision does not apply if this contract involves federal funds . The appropriate blanks of the Proposal must be filled out by all nonresident bidders in order for the bid to meet specifications. The failure of a nonresident contractor to do so will automatically disqualify that bidder. 8. PAYMENT: If the bid amount is $25,000.00 or less, the contract amount shall be paid within forty- five (45) calendar days after completion and acceptance by the City. 9. AGE: In accordance with the policy ("Policy") of the Executive Branch of the Federal Government, Contractor covenants that neither it nor any of its officers, members , agents employees, program participants or subcontractors, while engaged in performing this contract, shall, in connection with the employment, advancement or discharge of employees or in connection with the terms, conditions or privileges of their employment, discriminate against persons because of their age except on the bases of a bona fide occupational qualification, retirement plan or statutory requirement. Contractor further covenants that neither it nor its officers, members , agents, employees, subcontractors, program participants, or persons acting on their behalf, shall specify, in solicitations or 06/04/03 advertisements for employees to work on this contract, a maximum age limit for such employment unless the specified maximum age limit is based upon a bona fide occupational qualification, retirement plan or statutory requirements . Contractor warrants it will fully comply with the policy and will defend, indemnify and hold City hannless against any claims or allegations asserted by third parties or subcontractor against City arising out of Contractor's and/or its subcontractors' alleged failure to comply with the above referenced Policy concerning age discrimination in the perfonnance of this agreement. I 0 . DISABILITY: In accordance with the provisions of the Americans With Disabilities Act of 1990 ("ADA"), Contractor warrants that it and any and all of its subcontractors will not unlawfully discriminate on the basis of disability in the provision of services to the general public, nor in the availability, tenns and/or conditions of employment for applicants for employment with, or employees of Contractor or any of its subcontractors. Contractor warrants it will fully comply with AD A's provisions and any other applicable federal, state and local laws concerning disability and will defend, indemnify and hold City harmless against any claims or allegations asserted by third parties or subcontractors against City arising out of Contractor's and/or its subcontractors' alleged failure to comply with the above referenced laws concerning disability discrimination in the performance of this agreement. 11. MINORITY AND WOMEN BUSINESS ENTERPRISES: In accord with City ofFort Worth Ordinance No. 15530 , the City of Fort Worth has goals for the participation of minority business enterprises and women business enterprises in City contracts . A copy of the Ordinance can be obtained from the Office of the City Secretary. The bidder shall submit the MBE/WBE UTILIZATION FORM, SUBCONTRACTOR/SUPPLIER UTILIZATION FORM, PRIME CONTRACTOR W AIYER FORM and/or the GOOD FAITH EFFORT FORM ("with Documentation") and/or the JOINT VENTURE FORM as appropriate. The Documentation must be received by the managing department no later than 5:00 p .m ., five (5) City business days after the bid opening date. The bidder shall obtain a receipt from the appropriate employee of the managing department to whom delivery was made . Such receipt shall be evidence that the documentation was received by the City. Failure to comply shall render the bid non-responsive . Upon request, Contractor agrees to provide the Owner complete and accurate information regarding actual work performed by a Minority Business Enterprise (MBE) and/or women business enterprise (WBE) on the contract and payment thereof. Contractor further agrees to permit any audit and/or examination of any books, records or files in its possession that will substantiate the actual work performed by an MBE and/or WBE. The misrepresentation of facts (other than a negligent misrepresentation) and/or commission of fraud by the Contractor will be grounds for termination of the · contract and/or initiating action under appropriate Federal, State or local laws or ordinances relating to false statements. Further, any such misrepresentation of facts ( other than a negligent misrepresentation) and/or commission of fraud will result in the Contractor being determined to be irresponsible and barred from participating in City work for a period of time ofnot less than three (3) years . 12. FINAL PAYMENT, ACCEPTANCE AND WARRANTY: a. The contractor will receive full payment (less retainage) from the city for each pay period . b. Payment of the retainage will be included with the final payment after acceptance of the project as being complete. c . The project shall be deemed complete and accepted by the City as of the date the final punch list has been completed, as evidenced by a written statement signed by the contractor and the City. d. The warranty period shall begin as of the date that the final punch list has been completed . 06/04/03 e. Bills Paid Affidavit and Consent of Surety shall be required prior to final payment becoming due and payable. f. In the event that the Bills Paid Affidavit and Consent of Surety have been delivered to the city and there is a dispute regarding (i) final quantities , or (ii) liquidated damages , city shall make a progress payment in the amount that city deems due and payable. g. [n the event of a dispute regarding either final quantities or liquidated damages, the parties shall attempt to resolve the differences within 30 calendar days . 06/04/03 PART B -PROPOSAL This proposal must not be removed from this book of Contract Documents. TO : Dale A. Fisseler, P .E. City Manager Fort Worth, Texas Fort Worth, Texas PROPOSAL FOR: The furnishing of all materials , except materials specified to be furnished by the City, equipment and labor for the installation of six-inch through fifteen-inch sanitary sewer mains, manholes, and sewer service connections along with any and all necessary appurtenances and incidental work to provide a complete and serviceable project designated as: WATER MAIN REPLACEMENTS CONTRACT 2007 A WATER PROJECT NO: P253-6011700972 DOE NO: 5965 CITY PROJECT NO : 972 Pursuant to the foregoing 'Notice to Bidders', the undersigned Bidder, having thoroughly examined the Contract Documents, including plans, special contract documents, and the General Contract Documents and General Specifications for Water Department Projects , the site of the project and understanding the amount of work to be done, and the prevailing conditions, hereby proposes to do all the work, furnish all labor, equipment and material except as specified to be furnished by the City, which is necessary to fully complete the work as provided in the Plans and Contract Documents and subject to the inspection and approval of the Director of the City Engineering Department of the City of Fort Worth, Texas; and binds himself upon acceptance of this Proposal to execute a contract and furnish an approved Performance Bond, Payment Bond, Maintenance Bond, and such other bonds, if any, as may be required by the Contract Documents for the performing and completing of the said work. Contractor proposes to do the work within the time stated and for the following sums: ITEM APPROX. DESCRIPTION OF ITEMS WITH NO. QUANTITY BID PRICES WRITTEN IN WORDS UNIT PRICE TOTAL AMOUNT (Furnish and install, including all appurtenant work, complete in place, the following items) B-1 ITEM APPROX. DESCRIPTION OF ITEMS WITH UNIT TOTAL NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT 1. 50 L.F . 4 -Inch PVC Pipe (DR-14); Per Linear Foot: ---(bi r~::J Dollars $ I 500 -00 and ND Cents $ 31). 00 2. 1000 L.F . 6-Inch PVC Pipe (DR-14); Per Linear Foot: _/. F '1J~ lh·i(b ~ Dollars 2-15,00 and )\)0 Cents $ $ ~cc000 3 . 2000 L.F . 8-Inch PVC Pipe (DR-14); Per Linear Foot: .i:;; {l._j ~ J.JL Dollars $ 90 tw 0 D Cents $ 4500 and O l 4. 500 L.F. 10-Inch PVC Pipe (DR-14); Per Linear Foot: -~ l§kl+-t-o{b~, Dollars Lf[O O and N O Cents $ $ .;21, (£(). O"D 5. 1000 L.F . 12-Inch PVC Pipe (DR-14); Per Linear Foot: ,,...- t-',f ±,l Dollars $ 50. coo. oD and NO ) Cents $ '50 . 00 6 . 50 L.F. 4-Inch Ductile Iron Pipe, Class 51 ; Per Linear Foot: --=rG\ v't:,~ t=;jQ __ Dollars $ I, 1SO·C)O and NO Cents $ 35.Db 7. 100 L.F . 6-Inch Ductile Iron Pipe, Class 51; Per Linear Foot: ,,....-- H){b ~ Dollars 4 0.6 D and (\\1) Cents $ $ 'ii {t{) DO B-2 ITEM APPROX . D E SCRIPTION O F IT EMS WITH UNIT TOTAL NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT 8 . 500 L.F . 8-Inch Ductile Iron Pipe, Class 51 ; Per Linear Foot: t:fb~ Dollars and ND Cent s $ 21).oo $ ;;).5/>0V. DD 9. 100 L.F . IO-Inch Ductile Iron Pipe, Clas s 51 ; Per Linear Foot: ~:f±ar'~ Dollars $ :> .'SOO· oo Cents $ 55.00 and }\) • 10. 100 L.F . 12-Inch Ductile Iron Pipe, Class 51 ; Per Linear Foot: S ; X ± ;:j: t=°~ J'Q..-Dollars and J\JO Cents $ (o5?D $ ft;,5C(),CO 11. 250 L.F . 16-Inch Ductile Iron Pipe, Class 51 ; Per Linear Foot: SeitQY1:I:: ~ r, J.12. Dollars 1500 $ 18', ,50. rP and J\)0 Cents $ 12. 250 L.F . 24-Inch Ductile Iron Pipe, Class 51 ; Per Linear Foot: . o~>Q__ Y u Dl ct I\Q cl -(g Di Dollars and ~JO Cents $ 110 . oo $ ;;/]. Y)O O V ' I 13 . 500 L.F. 16-Inch Pretensioned Concrete Cy linder Pipe Class 150; Per Linear Foot: ---5P~\o~i~ \ 1,0D Dollars $ 3~ DDD oO Cents $ 7~ 00 and I\JD J B-3 ITEM APPROX. DESCRIPTION OF ITEMS WITH UNIT TOTAL NO . QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT 14. 500 L.F . 24 -Inch Pretensioned Concrete Cylinder Pipe Class150; Per Linear Foot: o~ UuiJd,~.d ~.\}{L Dollars and l\ID Cents $ )05_D6 $ 5.;?, :500. {)O . 15 . 50 L.F . 4-Inch Ductile Iron Carrier Pipe, Class 51 , with Casing Spacers; Per Linear Foot: i:=v,b~ I WD Dollars $ ~,J oo. oo Cents $ 1J. oo and JJ 16. 50 L.F. 6-Inch Ductile Iron Carrier Pipe , Class 51 , with Casing Spacers ; Per Linear Foot: ~ ri-~ E i_;)h -l-Dollars and tJO Cents $ '-f 0.00 $ d , l/Do.DeJ 17. 50 L.F. 8-Inch Ductile Iron Carrier Pipe, Class 51 , with Casing Spacers ; Per Linear Foot: F;4= t.---1 JW D Dollars and I Cents $ 2)d, 00 $ d 6 00.oO /\IQ 0 J 18 . 50 L.F . 10-Inch Ductile Iron Carrier Pipe , Class 51, with Casing Spacers ; Per Linear Foot: s; t,.'b 'f-Dollars and NlJ Cents $ t;, Q _DD $ ~ toD. DD i 19. 50 L.F. 12-Inch Ductile Iron Carrier Pipe , Class 51 , with Casing Spacers; Per Linear Foot: Er nt f-Dollars $ 'J, O)D. O D and ~1'JO -Cents $ garo B-4 ITEM APPROX. DE SCRIPTION O F ITE MS WITH UNIT TOTAL NO . QUANTITY BID PRICE S WRITTEN IN WORDS PRICE AMOUNT 20 . 50 L.F. 16-Inch Ductile Iron Carrier Pipe, Class 51 , with Cas ing Spacers; Per Linear Fo ot: n ><le.... Hu J-,Ja reci Dollars and NO Cents $ /CD. 06 $ 5 O'.b.~D 21. 50 L.F. 24-Inch Ductile Iron Carrier Pipe, Clas s 51 , w ith Casing Spacers; Per Linear Foot: 0 hlQ. .. Y U Nd J\D. tl bl ft'-/ Dollars /2().0D $ 7, 5DO. Do and ND Cents $ 22 . 50 L.F . 16-Inch Casing Pipe by Boring, and Jacking with Pressure Grout; Per Linear Foot: 11.QQ ij u _N rJ Mci 1€ ~ Dollars $ I 0 1 6co. oo and ND Cents $ dJQ.00 23. 50 L.F. 18-Inch Casing Pipe by Boring, and Jacking with Pressure Grout; Per Linear Foot: -y; ')() Af w~d NJ ~ Tu 'i (b ~ Dollars and NO Cents $ c:F{). DD $ 1 l, 5w. ov 24. 50 L.F . 24-Inch Casing Pipe by Boring, and Jacking with Pressure Grout; Per Linear Foot: ~Q t:!UN~ ~1j.f~ hlenollars and)\ l O Cents $ ~(Jij.oo $ J3 ,J,5/). DO 25. 50 L.F . 30-Inch Casing Pipe by Boring, and Jacking with Pressure Grout; Per Linear Foot: ~O J-f Y.Nd NciZ1§Dith®ollars $ .1'85· 00 $ 14 ~.50. 00 and 1\ )Q Cents ,,~ B-5 ITEM APPROX. DE SCRIPTION OF ITEMS WITH UNIT TOTAL NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT 26. 50 L.F . 36-Inch Casing Pipe by Boring, and Jacking with Pressure Grout ; Per Linear Foot: --yh(gL~ll~Xh.Qct 1~¥GJ eDollars .-V,5. DO $ ) I_, .).:5/). cf:; and NO Cents $ i 27. 50 L.F. 16-Inch Casing Pipe by Direct Bury; Per Linear Foot: Eig_ o -1:,,-:J_ Dollars W).1)0 ~ CtJlJ .oo and L""\J D Cents $ $ } 28 . 50 L.F . 18-Inch Casing Pipe by Direct Bury; Per Linear Foot: 0.,1 Q. Yu Nd I\Q.d Dollars ;1 $ J Cf) .oo $ 5 [j/)0.0 () and 1\lD Cents ) 29. 50 L.F . 24-Inch Casing Pipe by Direct Bury ; Per Linear Foot: O~e. ~u.Ndred ]gt-J Dollars and ;\J 0 Cents $ J/0. OD $'56cQDZl } 30. 50 L.F. 30-Inch Casing Pipe by Direct Bury; Per Linear Foot: 0 N-Q. HU Nd I\Pcl \ wPYJi.'--[ Dollars JJo.w and N O 1 Cents $ $ 02 rm. t>D / 31. 50 L.F. 36-Inch Casing Pipe by Direct Bury; Per Linear Foot: () 6)Q_ ~ Li At\ f\.Od \h \{-b j Dollars and A) Q Cents $ /~0Db $ /p ,3XJ t)O 32 . 5 E.A. 4-Inch Gate Valve w/Cast Iron Box and Lid ; Per Each: Fi v~ ~u Ndr{tJ Dollars ~oo.oD $ d-1 5C:(J. tJD and M Cents $ B-6 ITEM APPROX. DESCRIPTION OF IT EMS WITH UNIT TOTAL NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT 33 . 10 E .A. 6-Inch Gate Val ve w/Cast Iron Box and Lid; Per Each: Seue n ~ u K<l l-Ocl, t\r-t ~ Dollars and ND Cents $ 7::i).o-o $ 16CO. oo 34 . 10 E.A. 8-Inch Gate Valve w/Cast Iron Box and Lid; Per Each: Ohl. ~ -rhou.Qn t:Jrl Dollars and NO Cents $ ),Cll).OO $ JO. ooo .0 D . 35 . 2 E.A. IO-Inch Gate Valve w/Cast Iron Box and Lid ; Per Each: -Tu>eh,~ ±:lu ~~ f-Q.d Dollars and ND Cents $ }.J.co. 00 $ d./--/00, OD I 36. 2E.A. 12 -Inch Gate Valve w/Cast Iron Box and Lid; Per Each: {:°"; f1 ee ~ 4 u Ne\ red Dollars and NO Cents $ l ,::oo.o 0 $ ~ rco .a:> J 37 . 2 E .A. 16-Inch Double Disk Gate Valv e and Vault; Per Each: ~~ b:t, '/ ~;\/ IL ~~ J\'ll t ~ Dollars Cents $ ~1~0 oo $ l 71 ooo. oo an NO 38. 2 E.A. 16-Inch Resilient-Seated Gate Valve and Vault; Per Each: N ·\ sJ ~+~ t=', V'Q.. ~uti\rtdDollars and I\,) O Cents $9,'StoOO $ 14', 007). Ol) 39. 5 E.A. 24-Inch Resilient-Seated Gate Valve and Vault; Per Each: -r we,)\) ~ ,ihO\.l&l Ylcl Dollars $ I J , ax/XJ $ loO CCO, OD and N O Cents I I B-7 ITEM APPROX. DESCRIPTION OF ITEMS WITH UNIT TOTAL NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT 40 . 1 E .A. Cut-In 4 " Gate Valve w/ Cast Iron Box and Lid ; Per Each: l=""; f-t e P r-J t!u Nd t\Qcl Dollars and ,D/0 Cents $ I i':f;D .tx> $ I , SQD _D'D 41. 2 E.A. Cut-In 6" Gate Valve w/ Cast Iron Box and Lid; Per Each: E .p-hteerJ UuJ-Jd rQc-l Dollars $ l rwP 0 Cents $ 3. boo /x5 an /\lO I . 42 . 5 E .A. Cut-In 8" Gate Valve w/ Cast Iron Box and Lid; Per Each: ---rwf>0 ±~IL<JD !k ~ t11-J Dollars $ d J/JD. DD $ I/ CQQ. otJ and J\l O Cents I ) 43. 2 E.A. Cut-In 1 O" Gate Valve w/ Cast Iron Box and Lid; Per Each: ~e()j ~ t,JQ ~Ur.j c\~d Dollars and N tJ Cents $ d 1 5P?,DO $ 5 ,b::Q.D0 44. 2E.A. Cut-In 12" Gate Valve w/ Cast Iron Box and Lid; Per Each: · lli(~u.Scm Dollars 3 too.00 $ lo ' tro . cl) and NO Cents $ 45. 5 E.A. Remove Gate Valve and Box, Plug 12" or Smaller Mains in Separate Trench; Per Each: [;~~ U VN S1 fQcl Dollars $ a .~Cf>.oo and /\)D Cents $ 5coDD 46. 2 E.A. Remove and Salvage 16" Gate Valve and Vault; Per Each: 01\1 o:-tho u ~ X\cl Dollars I cxd° $ /J/Jboa and NO Cents $ I B-8 ITEM APPROX. DES CRIPTION OF ITEMS WITH UNIT TOTAL NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT 47 . 3 E.A. Remove and Sal vage 24 " Gate Valve and Vault; Per Each: ~ J-teeN M uqJd l'Q,d Dollars $ '-f ;fl). {Jl) and rJO Cents $ 1 p CD{X) • 48 . lOT.N . Cast Iron/Ductile Iron Fittings, Less than 16-Inch Diameter; Per Ton: ~< -b'-l Vi~ U-u rlcl red Dollars and NU Cents $ L/ ;po. tD $ 'IS CCO· oo 49. 10 T.N. Cast Iron/Ductile Iron Fittings, 16-Inch Diameter and Larger; Per Ton: .r; J~ -rhovSa ncl Dollars $ 6 ,a.JD-OD and N O Cents $ (52Cll)_ OD 50 . 10 E.A. Standard Fire Hydrant, 3 '-6 " Bury Depth; Per Each: ---r,:;lPgM E'i<;jbr WutlC\ rid Dollars $d[tDW $ ~, 00'.) ex:> and Cents I , 51. lOV.F . Fire Hydrant Bbl. Extension, Per Vertical Foot: -rh 0QQ. ~ u NO re_ d Dollars &;;D. Ci) $ 3 om.66 and tvD Cents $ 52. SE.A. Remove Existing Fire Hydrant; Per Each: ~u r il u,~ (Q__d._ Dollars and ~ o Cents $ !l._to/X> $ cl,an a:, B-9 ITEM APPROX. DE SCRIPTION OF ITEMS WITH NO . QUANTITY BID PRICES WRITTEN IN WORDS 53. 1 E .A . Install I-Inch Air and Vacuum Release Valve wNault; Per Each: -:Jbfee thouf::£:l ru Dollars and tJ ;D. Cents . 54 . 1 E.A. Install 2-Inch Air and Vacuum Release Valve wN ault ; Per Each: Jbi<h~ r,'J~ Uur\\O~ Dollars and ,N Q Cents 55 . 1 E.A. Install 4 -Inch Blow Off w/ 4 " Gate Valve & Sump Manhole, Per Each: Jh ,QQ:lhouSd ~ Dollars and NO Cents 56. 1 E.A. 24" x 24" Tapping Sleeve and 24-Inch Valve w/Box ; For C.I., D.I., or Concrete Main; Per Each: C~ Wee l")\hou 9> (\,,i Dollars Cents a a N O 57. 1 E.A. 24" x 16 " Tapping Sleeve and 16-Inch Valve w/Box; For C.I., D.I., or Concrete Main; Per Each: ~ ~ ~1~ :Jbou~ o cl-Dollars and NO Cents 58. 1 E.A. 24" x 12 " Tapping Sleeve and 12-Inch Valve w/Box; For C.I., D.I., or Concrete Main; Per Each: h .J{l__ lhoy sa r1ol Dollars and NQ Cents B-10 UNIT PRICE TOTAL AMOUNT $ 5 DDDcµ $ 3 C[f) ro l $ 3 ,:x;p.00 $ 3,:500.00 $ Q (JD/JD $ I ). Ci)() ()1) I $ '5 ,CCO. DO $ ~,CifD. (JO ITEM APPROX. DESCRIPTION OF ITEMS WITH NO. QUANTITY BID PRICES WRITTEN IN WORDS 59. 1 E.A. 24 " x 1 O" Tapping Sleeve and 10-Inch Valve w /Box; For C.I., D.I., or Concrete Main; Per Each: k)(-b,~ F; J~ HUNdrQd Dollars Cents and N 60. 1 E.A. 24" x 8" Tapping Sleeve and 8-Inch Valve w/Box; For C.I., D.I ., or Concrete Main; Per Each: h2-< +..~1Jb ffi0 .Jf~ Nd, Qd Dollars and ND Cents 61. 1 E.A. 24" x 6" Tapping Sleeve and 6-Inch Valve w/Box ; For C.I., D.I ., PVC or Concrete Main; Per Each: ro u. y -rhoit~nd Dollars and )\JO Cents 62. 1 E.A. 16" x 16" Tapping Sleeve and 16-Inch Valve w/Box ; For C.I., D.I., PVC or Concrete Main; Per Each: Jet-J Tuousam Dollars and NQ Cents 63. 1 E.A. 16" x 12 " Tapping Sleeve and 12-Inch Valve w/Box; For C.I., D.I ., PVC or Concrete Main; Per Each: fv I '/:;6 Q )ll.Q... J./ud:J rod Dollars and ) Cents 64. 1 E.A. 16" x 1 O" Tapping Sleeve and 10-Inch Valve w/Box; For C.I., D.I., PVC or Concrete Main; Per Each: Jh ·~ { t ffry(l.().Q_~\J 1')(\'ttj Dollars and tJ:o Cents B-11 UNIT PRICE TOTAL AMOUNT $ {j_ )(X). Ob $ j)Do JJD } I ITEM APPROX. DESCRIPTION OF ITEMS WITH UNIT TOTAL NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT 65. 1 E.A. 16 " x 8" Tapping Sleeve and 8-Inch Valve w/Box; For C.I ., D.I ., PVC or Concrete Main; Per Each: -rh\< -b~ 0 !\NL }4u,~d~Dollars and p t:D Cents $ .3,JbD .eo $ 3 , Joo.VO 66. 1 E .A. 16 " x 6" Tapping Sleeve and 6-Inch Valve w/Box ; For C.I ., D.I., PVC or Concrete Main ; Per Each: ~Wfn:i~ 5) "i,. J+tJr-rl ~ Dollars $ ~) rocoo-o and N D -Cents $ .;>_ (a DO. OD . J 67 . 1 E .A . 16 " x 4 " Tapping Sleeve and 4 -Inch Val ve w/Box; For C.I ., D.I ., PVC or Concrete Main; Per Each: -r LCQY]:i ~ 0 ~ J.J I v~a 6'0 rl Dollars and (\IQ Cents $ d J[J).DD $ ;:;;, L0D ,D6 ' 68 . 1 E .A. 12 " x 12 " Tapping S leeve and 12 -Inch Valve w/Box; For C.I., D.I., PVC or Concrete Main; Per Each: Fou ,-rhbil Sa('\cl. Dollars $ 'h ® po and (b..\Q Cents $ '-f,ClX). ()() 69 . 1 E.A. 12" x 10" Tapping Sleeve and I O-Inch Valve w/Box ; For C.I., D.I., PVC or Concrete Main; Per Each: --Jh·u~~±fT \DO LluNa "°cl Dollars $ ~::WV OD and f\) I) Cents $ 3d!JJ.oo I l . 70 . 1 E .A. 12" x 8" Tapping Sleeve and 8-Inch Valve w/B ox; For C.I., D.I ., PVC or Concrete Main; Per Each: -rh :(~~hou ~ yx::J Dollars and ."'IJ Cents $ 5'l txxJ. Ci) $ :3 .WD P0 B-12 ITEM APPROX. DESCRIPTION OF ITEMS WITH NO . QUANTITY BID PRICES WRITTEN IN WORDS 71. 1 E.A. 12 " x 6" Tapping Sleeve and 6-Inch Valve w/Box ; For C.I., D.I., PVC or Concrete Main; Per Each: "J r.,ceo t 1 F; v l )-Jt.1r,d nd Dollars and 1\)0 Cents 72. 1 E .A. 12 " x 4 " Tapping Sleeve and 4-Inch Valve w/Box ; For C.I., D.I ., PVC or Concrete Main; Per Each: ~~1,Q~o~fh __ o_11~8,l_Y1_cl~ __ Dollars and NO Cents 73 . 1 E.A. 10 " x 10 " Tapping Sleeve and 10-Inch Valve w/Box; For C.I., D.I ., PVC or Concrete Main ; Per Each: ~at~ s; 1( HuNd®ollars and )\,)\') Cents 74. 1 E.A. 10 " x 8" Tapping Sleeve and 8-Inch Valve w/Box; For C.I ., D.I., PVC or Concrete Main; Per Each: ~:ieo:\ ~ lwo l11Ndv-Q::{ Dollars and f\)0 Cents 75. 1 E.A. 10" x 6" Tapping Sleeve and 6-Inch Valve w/Box; For C.I., D.I., PVC or Concrete Main; Per Each: ----r:oo:Tbov~ n:i Dollars and NO Cents 76 . 1 E .A. 10" x 4 " Tapping Sleeve and 4-Inch Valve w/Box; For C.I., D.I., PVC or Concrete Main; Per Each: 2e 00,,ntee DJ ~ rt Nd~ Dollars and f\\ {J · Cents B-13 UNIT PRICE TOTAL AMOUNT $ J ,]Cf) oo $ /1 )oo. 06 ITEM APPROX. D E SCRIPTION OF ITEMS WITH UNIT T OTAL NO. QUANTITY BID PRICE S WRITTEN IN WORDS PRIC E AMOUNT 77. 1 E.A. 8" x 8" Tapping Sleeve and 8-Inch Valve w/Box; For C.I ., D.I ., PV C or Concrete Main ; Per Each: 1 wen± '-I O JV.Q • UuJSJ ~Dollars $ ;1 l DO ,D?J and Nb Cents $ .;:) 'J oo .tii I ') 78 . 1 E .A. 8" x 6" Tapping Sleeve and 6-Inch Valve w/Box; For C.I., D.I ., PVC or Concrete Main ; Per Ea ch : IU)oTh DU~ v\cl Dollars $~C{)O·D6 $ ~CCO·C>O . and "'I 0 Cents I 79 . 1 E.A. 8" x 4 " Tapping Sleeve and 4-Inch Val ve w/Box; For C.I., D.I ., PVC or Concrete Main; Per E ach : SiM:t,i:-J Mui".lof(?d, Dollars and ~~J Cents $ J laQO ,DD $ I, laoo.on I I 80 . 1 E .A. 6 " x 6" Tapping Sleeve and 6-Inch Valve w/Box; For C.I ., D.I ., PVC or Concrete Main; Per Each: Eig~±ee~ W IJl~\n Y'.C,d-Dollars and t\}Q Cents $ 1,800.00 $ I , ~tl).D?:) 81. 1 E.A. 6" x 4 " T apping Sleeve and 4-Inch Valve w/Box; For C.I., D.I., PVC or Concrete Main; Per Each: --. i ~YNO~ Dollars \-\ i eerJ $ I ,'::iio. 00 l1~·tb and ~O Cents $ 82. 10 E .A. 2-Inch Service Taps to Main; Per Each: Ol'v-L \ hoy~ \'\cl Dollars and NO Cents $ l(i>D.DO $ ,o,oco 0""6 B-14 ITEM APPROX. DESCRIPTION OF ITEMS WITH UNIT TOTAL NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT 83 . lOE.A. 1-1/2-Inch Service Taps to Main ; Per Each: 1h~e___ blu~~d Dollars and f\)Q Cents $ CJco.oo $ q ocoon l 84 . lOE.A. 1-Inch Service Taps to Main; Per Each: s;x. /~ur-1d~ Dollars and NO Cents $ (d:)oro $ (r; ooo.~ I 85. 10 E.A. 3/4-Inch Service Taps to Main; Per Each: fou c bJ t.iNd r-Qd__ Dollars and /\,)0 Cents $ Jj.DQ.(J6 $ l/,OCb,oei • 86. 100 L.F . Install 2-Inch Copper Service; Per Linear Foot: -:fu 'Pei~ f i3}'.rt-Dollars $ f).800, OD Cents $ dgoo and NO ) 87. 100 L.F. Install 1-1/2-Inch Copper Service ; Per Linear Foot: ~n±~ S'1-:t. Dollars and NO Cents $ o<&; .cx:J $ ~ (,p co. DO 88. 1000 L.F . InstalH-Inch Copper Service ; Per Linear Foot: ---lweni--~ i=-i ~.Q_, Dollars $ c:;?5.DO and No Cents $ ;JS CDr>. 075 89. 100 L.F . Install 3/4-Inch Copper Service; Per Linear Foot: -fDQoi~ Foyr Dollars $ J.~J. OD $ ~#Oo. 60 and 1'1\J Cents . B-15 ITEM APPROX. DESCRIPTION OF ITEMS WITH UNIT TOTAL NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT 90. 5 E .A. Relocate 2-Inch Service Meters , and Meter Boxes ; Per Each: i:°';..;~ W ui'-ld rQo/ Dollars and '-\10 Cents $ ~DD6 $ cQ/5w.oo 91. 5 E .A. Relocate 1-1/2 -Inch Service Meters , and Meter Boxes ; Per Each: fou, ~UNdf\Od J;:; f 1 -..[ Dollars and NlJ i Cents $ ·4 (5{). DO $ ;;) q\1::;?. {)D J 92. 5 E.A. Relocate I-Inch Service Meters , and Meter Boxes; Per Each: +ou.r ll W-._\ d Y"'oci Dollars and r:J O Cents $ 4Do.DO $ c;:1)t[)Q/f0 93. SE.A . Relocate 3/4-Inch Service Meters , and Meter Boxes ; Per Each: "1b f~. J1 UNd r~d b :f +--/Dollars $ J, 7j0.D0 and t-..) IJ 1 Cents $ 332.on ' 94 . 5 E .A. Install Multiple Service Branches For 2-Inch Copper Service; Per Each Fi J e.... Hul-lcl c~ Dollars and r-J o Cents $ t{)Ooo $ dJ ,500.00 95 . 5 E.A. Install Multiple Service Branches For 1-1/2-Inch Copper Service ; Per Each: f:ou Y lJ u N cl iQd Dollars and 1\)1) Cents $ voo .01) $ d caJOD I B-16 ITEM APPROX. DESCRIPTION OF ITEMS WITH UNIT TOTAL NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT 96. SE.A. Install Multiple Service Branches For I-Inch Copper Service; Per Each: JL re-e HurJci ~ Dollars and J\IO Cents $ /5/:i)_DD $ J \ :<,co . l?o 97 . 50 E.A. Furnish and Set Class 'C ', Plastic Meter Boxes; Per Each: Chi£ .. td:UNd N>cl ~f tjDollars Jj0.06 $ ]5W-CJ) and NO Cents $ 98. 50 E .A. Furnish and Set Class 'B ', Plastic Meter Boxes; Per Each: 0 ~l :Q H UN cl c_e d S ~xt /-Dollars and ;.JO Cents $ )/cf}D() $ ~6to.~ 99 . SOE.A. Furnish and Set Class 'A ', Plastic Meter Boxes ; Per Each : 0,1:ll~ , bl I 11"1 d ~ ~ ~lQ ab-/ Dollars 1,0.o tJ 'D15oD.co and NO Cents $ $ ' , 100. 4000 L.F. Furnish and Lay 2-Inch Pipe and Fittings for Temporary Service; Per Linear Foot: rour Dollars Lj _ /JO $ J & ,()CJO. QO and ND Cents $ 7 101. 5 E.A. Water Sample Station Installation, Fig. 33 or 34; Per Each: · 11~ bJ luJd (\[bJ Dollars $ ,3DfXJ $ ii~OO_oV and ~o Cents B-17 ITEM APPROX. DESCRIPTION OF ITEMS WITH UNIT TOTAL NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT 102 . 5 E.A. Relocate Sprinkler System Backflow Preventor or Control Valve & Box ; Per Each: ~ \/e_, ).J Lt .t--1 d re.cl_ Dollars and /\)0 Cents $ 500.to $~ I '5{'.)0, C)l) , 103. 10 E .A. Cut and Plug Existing Mains in Separate Trenches, All sizes , Day Or Night; Per Each: ()~ e_'j"h OMS-a nci.-Dollars l ta) OlJ $ LD DOD, t;D and .N D Cents $ • ) . J 104 . 1000 L.F . Trench Safety System; Per Linear Foot: JJDJJ(:_ Dollars ot1). oo andf(}Jf'n+y :f i v'.Q__ Cents $ O .cJS $ 105 . 100 L.F. Extra Depth of Water Mains; Per Linear Foot: D /\J"L-Dollars / .00 /C().D?> and AJD Cents $ $ 106. 18 L.F. 12 -Inch CL 51 DIP , for Sanitary Sewer Replacement at Variable Depth; Per Linear Foot: £~bb¥ Dollars $ I, LJ'ID-OD Cents $ 3'2.DD an [\JD 107. 18 L.F. IO-Inch CL 51 DIP , for Sanitary Sewer Replacement at Variable Depth; Per Linear Foot: OQ\}-0 o± ~ Dollars $ 7D. 00 $ L,Jh_O.D7J Cents and l\l !J B-18 ITEM APPROX. DESCRIPTION OF ITEMS WITH UNIT TOTAL NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT 108 . 18 L.F. 8-Inch Cl. 51 DIP , for Sanitary Sewer Replacement at Variable Depth; Per Linear Foot: s · s J'f<__ Dollars ana ;$J Cents $ {toPO $ I, J]O, oo 109 . 18 L.F. 6-Inch Cl. 51 DIP , for Sanitary Sewer Replacement at Variable Depth; Per Linear Foot: ti & + '-I Dollars $ croo.00 and i:"-10 Cents $ [)0. OD 110 . 2 E.A. Dehole, 0 ft. - 5 ft. in Depth; Per Each: ~~U\-11 cd Dollars CD Cents $ , cm $ d ax;($') • I 111. 2E.A. Dehole, 5 ft. -10 ft. in Depth; Per Each: elevon J.! u ~d r'JJc-1. Dollars $ 1 LDO·o6 and tJO Cents $ ~aoo.oo v) 112 . 2E.A. Dehole, 10 ft. -20 ft . in Depth; Per Each: ~JuQ lluu\\<10cl Dollars $ ~Jioo .(J) $ d, 1100-60 and NO Cents 113. 20E.A. Job Move In; Per Each: 1:~g \;~u~~ Dollars k}7::f)o.m Cents $ :=so, w /XJ J B-19 ITEM APPROX. DESCRIPTION OF ITEMS WITH UNIT TOTAL NO . QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT 114 . 10 E.A. Emergency Situation Job Move In; Per E ach : --f;A -e<d ~ Si 'I, Yu IUJ ~ Dollars $ d ,/dXJ.cP $ d-{Q ffi) D~ and rJ D Cents J 115. 100 L.F. Hydro Mulch Seeding; Per Linear Foot: -re 1"1 Dollars and )'\.HJ Cents $ JO.CO $ } 1 0D000 116. 100 L.F. Sodding ; Per Linear Foot: 1we l u'{) Dollars /;),.DO /.~DD·DD ~ and NO Cents $ $ 117. 25 L.F . Concrete Encasement, Per Fig. 20 ; Per Linear Foot: ___-,-- I wen±~ Dollars 5oo.D6 and ,J O Cents $ ao.oo $ 118. 5 C.Y. Concrete Riprap ; Per Cubic Yard: --rlU) Bu cl~< Qsl '\]AU?~~ r, ~ Dollars $ J [d-5 .60 and }',l O Cents $ ~.;;;l.'5.60 vJ 119. 100 C .Y. Flowable Fill, In Lieu of Backfill ; Per Cubic Yard: 0 [j Q___ u lJ Nd fed---f'u>enf1./Dollars J;J],Ob $ I~, Olb. ~b and N'O r Cents $ ' 120. 10 C.Y. Crushed Limestone ; Per Cubic Yard: _-../' l @)(J t+ Dollars c9D. 00 $ d)oo .tJ0 and J\JO Cents $ B-20 ITEM APPROX. DESCRIPTION OF ITEMS WITH UNIT TOTAL NO. QUANTITY BID PRICE S WRITTEN IN WORDS PRICE AMOUNT 121. 10 C.Y. Class 'B ' Concrete (2500#); Per Cubic Yard : 0PU~v,j ~ Dollars $ ;b0.00 and ND Cents $ 1 o.W 122 . 10 C.Y. Class 'E' Concrete (1500#); Per Cubic Yard: '5-euen:l ~ Dollars $ 700. ~o and ~:\) O Cents $ 1 0 .00 123. 100 L.F . Concrete Curb and Gutter Replacement; Per Linear Foot: lh)Cb~I Dollars 30.t:6 $ 3, bCD.tD and ND I Cents $ 124 . 100 L.F . Concrete Curb Attached to Concrete Pavement Replacement ; Per Linear Foot: 'lilleoi~f Dollars Cents $ d.0.00 $ ~ CCQOO and J\jD 125. 200 S.F . Concrete Sidewalk or Driveway Replacement; Per Square Foot: h':f±eebl Dollars $ 3 I ODD· 00 and l'\..)0 Cents $ )~ 00 • } 126. 750 S.F. Replace Paving in Parking Areas ; Per Square Foot: C@n+-Dollars i .cn $ 4;/YfJ,OlJ and 7'}0 Cents $ " i B-21 ITEM APPROX. DESCRIPTION OF ITEMS WITH NO. QUANTITY BID PRICES WRITTEN IN WORDS 127. 500 L.F . 128. 2500 S.F. 129. 100 L.F . 130. 500 L.F . 131. 2500S.F. 132 . 500 L.F. Concrete Pavement on 2:27 Concrete Base; Per Linear Foot: _S~i· x~+~j-1-------Dollars and "' J O Cents . Concrete Pavement Replacement, Over Existing Base; Per Square Foot: -"s=-'·>~X.~ _______ Dollars and N L) Cents Brick on Reinforced Concrete Base ; Per Linear Foot : S~e~,l~O~O~"'t~'-(1---H_N-e-____ Dollars and /'JO Cents Min 2-Inch HMAC on 2:27 Concrete Base; Per Linear Foot : ~£-·,~+-~_') ______ Dollars and ._j O Cents Min 2-Inch HMAC Pavement Replacement over Existing Base; Per Square Foot: 'Fi J Q_. Dollars ---------- and N'O Cents 2-Inch HMAC on 2:27 Concrete Base ; Per Linear Foot: -+f-', ~+_-t -+4 _____ Dollars and }Jj) Cents B-22 UNIT PRICE TOTAL AMOUNT $ <::, .oo $ l'=\ Wo.oo $ f50.0b $~'.5.@. oo $ 60. 61) $ ~' CiJl). () 0 ITEM APPROX. DE SCRIPTION OF ITEMS WITH UNIT TOTAL NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT 133. 100 L.F . Min 1-1/2-Inch HMAC on Reinforced Concrete Base ; Per Linear Foot: NJ ±?cS----r-w o Dollars Cents $ SJi . ro $ 5 , .).oo .oo and N 134 . 100 L.F . 2-Inch HMAC on 8-Inches Crushed Stone Base (Temp. P vmt.); Per Linear Foot: 1 b i<b ¥ Dollars and NO Cents $ 30.DO $ 3 ,ocoP'b 135 . 1000 L.F . 2 -Inch Hot Mix Rolled Temporary Pavement, Fig. A , Per Linear Foot: ,--~, ~J-.Q_ Dollars /.),. oo . $ J~ coo.Co and /\I 0 Cents $ } 136 . 1000 L.F. Flex Base Material, Temporary Paving Repair, Fig. A; Per Linear Foot: b \J~ Dollars and I\} 0 Cents $ 5.00 $5 (X)O ,CP I 137. 50 E.A. Traffic Permit for Utility Street Cuts; Per Each: Fifty Dollars and No Cents $ 50.00 $ 2,500.00 138 . 1 E.A. 1 O" Turbo Meter Installation w/6 " Bypass in Vault, Per WTR-029 ; Per Linear Foot: If>~· 1 ~Ou~ rd Dollars $ JD ,rx::000 $ /0,ClO. 6"6 and N o Cents B-23 ITEM APPROX. DESCRIPTION OF ITEMS WITH NO. QUANTITY BID PRICES WRITTEN IN WORDS 139. 140 . 141. 142. 143. 1 E.A. 1 E.A . 1 E.A. 1 E.A. 20E.A. 8" Turbo Meter Installation w /6" Bypass in Vault, Per WTR-029 ; Per Linear Foot: Ejght lhousa ill Dollars an N O Cents . 6" Turbo Meter Installation w /4 " Bypass in Vault, Per WTR-029; Per Linear Foot: &'1en:JbD \J Sa. {]cl Dollars and N O Cents 4" Turbo Meter Installation w /2" Bypass in Vault, Per WTR-029; Per Linear Foot: --'S~i x__,_=rh~~O~u=Sq,~ccl~ __ Dollars and )'\\ D Cents 3" Turbo Meter Installation w/2 " Bypass in Vault, Per WTR-029; Per Linear Foot: ~f ~i~v~~Q}J~~O~\l~S'a~Ccl,~ __ Dollars and N (J Cents Traffic Control Plan Design and Installation as Required, Per Each: F, \l ~ U u Nci (l(b! Dollars and ND Cents TOTAL AMOUNT BID * Type of Pipe Used / PVCDR-14: 0 DIP Class 51: / RCCP Class 150: B-24 UNIT PRICE TOTAL AMOUNT $ Z: CCD·r:J) $ 8 006P0 I ......_..,~- $ 7 /)[J)·(J) $ ]1DD0 (iD PART B -PROPOSAL (Cont.) Within ten (10) days after acceptance of this Proposal , the undersigned will execute the formal contract and will deliver an approved Surety Bond and such other bonds as required by the Contract Documents, for the faithful performance of the Contract. The attached bid security in the amount of 5% is to become the property of the City of Fort Worth, Texas, in the event the contract and bond or bonds are not executed and delivered within the time above set forth, as liquidated damages for the delay and additional work caused thereby. The undersigned bidder certified that he has been furnished at least one set of the General Contract Documents and General Specifications for Water Department Projects dated January 1, 1978, and that he has read and thoroughly understands all the requirements and conditions of those General Documents and the specific Contract Documents and appurtenant plans. The undersigned assures that its employees and applicants for employment and those of any labor organization, subcontractors, or employment agency in either furnishing or referring employee applicants to the undersigned are not discriminated against as prohibited by the terms of City Ordinance No. 7278 as amended by City Ordinance No. 7400. The Bidder agrees to begin construction within 10 calendar days after issue of the work order, and to complete the contract within 365 calendar days after beginning construction as set forth in the written work order to be furnished by the Owner. (Complete A or B below, as applicable:) __ A . The principal place of business of our company is in the State of ___ _ Nonresident bidders in the State of , our principal place of business, are required to be __ percent lower than resident bidders by state law. A copy of the statue is attached. Non resident bidders in the State of , our principal place of business, are not required to underbid resident bidders. ~. The principal place of business of our company or our parent company or majority owner is in the State of Texas. B-25 I (we) acknowledge receipt of the following addenda to the plans and specifications , all of the provisions and requirements of which have be e n taken into consideration on preparation of the foregoing bid: Addendum No. 1 (Initials) __ _ Addendum No. 2 (Initials) __ _ (Seal) Date: 05 ) J-0)) D ~ Addendum No . 3 (Initials) ___ _ Addendum No. 4 (Initials) ___ _ Respectfully submitted, Address: ---:p. D .Oo:& 1 'S 4-Ll ~ F-L LAJ o.(th ,I Y-: 1 lo I I°/ Telephone: { C j ~3 Dll u LJ ") 7LJ.3 B-26 GREEN CEMENT POLICY COMPLIANCE STATEMENT (To be furnished by the Contractor to the City at the time of bid opening) (Submit separate forms for each supplier I product supplier) Name of Project: Wo. + ex:: mo 'i n ~ e p let l -Q__r(J eat~ Jro1 A City Proj. No.: __ q_,_.._ci......,_ ____________ _ This is to certify that the cement to be utilized for the above project will meet the following criteria: The cement was manufactured in a kiln utilizing the dry process (list source below) or in a kiln that meets the emission standard of 1. 71b or less of NOx / ton of clinker released into the atmosphere . Name of Manufacturer _:T] ____ ..._X_"""'L ________________ _ Address of Manufacturer: \:o1*'--\ Uru:t:.h 1--( -Q,)!..Cl.S CONTRACTOR SUPPLIER Je,( ,,) Qom-\SQ r m a-x: Ur,· tJ) Name ~(Q~j deV1+ Name ~ l {!'::, ~p{Q9?0:kd',JQ... T1 e Title CooctlS9cllrost(] ,d roo -rx, LP Company Gw101.t1D ed·, 11Jy( Company ~~1lu ~~y, 111./3 Phone Number - - - - - - - ...,.. - - - - - - - FORT WORTH "-, •. ---City of Fort Worth Minority and Women Business Enterprise Specification ~\ \ SPECIAL INSTRUCTIONS FOR BIDDERS APPLICATION OF POLICY '1 \ 0 S'o 0 / If the total dollar value of the contract is $25 ,000 or more, the M/WBE goal is applicable. If the total dollar value of the contract is less than $25 ,000 , the M/WBE goal is not applicable. POLICY STATEMENT It is the policy of the City of Fort Worth to ensure the full and equitable part icipation by Mino rity and Women Business Enterprises (M/WBE) in the procu rement of all goods and seNices to the City on a contractua l basis . All requirements and regulat ions stated in the City 's current Minority and Women Bus iness Enterprise Ord inance apply to this bid . M/WBE PROJECT GOALS The City's M/WBE goal on this proj ect is \ ((2 % of the total bid (Base bid applies te Parl1s aR&I CeA1AU,1Rity Senricesj. COMPLIANCE TO BID SPECIFICATIONS On City contracts of $25,000 or more , bidders are required to comply w ith the i ntent of the City's M/WBE Ordinance by either of the following : 1. Meet or exceed the above stated M/WBE goal, or 2. Good Faith Effort documentation, or; 3. Waiver documentation , or; 4. Joint Venture. 1. Subcontractor Utilization Form , if goal is received by 5 :00 p.m., five (5) City business days after the bid met or exceeded : opening date , exclus ive of the bid opening date . 2. Good Faith Effort and Subcontractor received by 5 :00 p.m., five (5) City business days after the bid Utilization Form , if participation is less than opening date , exclus ive of the bid opening date . stated i:ioal : 3. Good Faith Effort and Subcontractor received by 5 :00 p.m., five (5) City business days after the bid Utilization Form , if no M/WBE participation : open inQ date , exclusive of the bid opening date . 4. Prime Contractor Waiver Form , if you will received by 5 :00 p.m ., five (5) C ity business days after the bid perform all subcontracting/supplier work: opening date , exclusive of the bid opening date . 5. Joint Venture Form , if utilize a joint venture received by 5:00 p.m., five (5) City business days after the bid to met or exceed Qoal. opening date , exclusive of the bid opening date . FAILURE TO COMPLY WITH THE CITY'S M/WBE ORDINANCE, WILL RESULT IN THE BID BEING CONSIDERED NON-RESPONSIVE TO SPECIFICATIONS Any questions, please contact the M/WBE Office at (817) 392-6104. Re v. 11 /1 /05 - - - - - - - - - - - - - FORT WORTH ~ City of Fort Worth Os '<? S>, ATIACHMENT 1A Pag e 1 of 4 Oc9 Subcontractors/Suppliers Utilization Form J:>o /··s 0 PROJECT NAME: ~ie r /11ai n f1 ep /a um-Pnfs ~Y?:l~'f ;){;dJ, City's M/WBE Project Goal: % Prime's M/WBE Project Utilization: I;;.__ % Identify all subcontractors/suppliers you will use on this project Failure to complete this form , in its entirety with requested documentation, and received by the Managing Department on or before 5:00 p.m . five (5) City business days after bid opening , exclusive of bid opening date, will result in the bid being considered non -responsive to bid specifications. The undersigned Offerer agrees to enter into a formal agreement with the M/WBE firm(s) listed in this utilization schedule, conditioned upon execution of a contract with the City of Fort Worth . The intentional and/or knowing misrepresentation of facts is grounds for consideration of disqualification and will result in the bid being considered non-responsive to bid specifications M/WBEs listed toward meeting the project goal must be located in the nine (9) county marketplace or currently doing business in the marketplace at the time of bid. Marketplace is the geographic area of Tarrant , Parker, Johnson , Collin, Dallas , Denton , Ellis , Kaufman and Rockwall counties . Identify each Tier level. Tier is the level of subcontracting below the prime contractor, i.e ., a direct payment from the prime contractor to a subcontractor is considered 151 tier, a payment by a subcontractor to its supplier is considered 2"d tier ALL M/WBEs MUST BE CERTIFIED BEFORE CONTRACT AWARD. Certification means those firms , located or doing business at the time of bid opening within the Marketplace, that have been determined to be bonafide minority or women businesses by the North Central Texas Regional Certification Agency (NCTRCA), or the Texas Department of Transportation (TX DOT), highway division . Disadvantaged Business Enterprise (DBE) is synonymous with Minority/Women Business Enterprise (M/WBE). If hauling services are utilized, the prime will be given credit as long as the M/WBE listed owns and operates at least one fully licensed and operational truck to be used on the contract. The M/WBE may lease trucks from another M/WBE firm, including M/WBE owner-operators , and receive full M/WBE credit. The M/WBE may lease trucks from non-M/WBEs , including owner-operators, but will only receive credit for the fees and commissions earned by the M/WBE as outlined in the lease agreement. Rev. 5/30/03 - - - - - - - - - - - - - - - - -- fORTWORTH ~ ATIACHMENT 1A P age2 of 4 Pri mes a re requ ired to identify ALL subcon tractors/s upp liers , regardless of status ; i .e ., Minority, Women and non -M/WBEs. Please list M/WBE firm s fi rst, use add itional sheets if necessary . Certification N (check one) 0 SUBCONTRACTOR/SUPPLIER n T T Detail Detail Company Name i N C X M Subcontracting Work Supplies Purchased Dollar Amount Address e M w T D w Telephone/Fax r B B R 0 B E E C T E A ./ --(,-,,_uc; ~ ..-4, gJ, 3DO·otJ ROB E RT G RAN ADOS T RUC KI NG (/ l-/cu~-1 O ~ 4608 Sandage Fort Worth, Texas 76115 ~<p)US (817) 875 -2400 Co~+e 1> ? g-CXO· ot> COWTO WN RE DI-MIX 7' eel i-rn/x I PO Box 162327 I Iv ... )·'· Fort Wo rth , Texas 76 161 V (817)759-1919 f (817) 759-1716 TruBlue Services, LLC H-ycl YDmulcJt... $}, di(J), 00 8716 S . Water Tower Rd . ,,,...,.i...-Sudi~""" Fort Worth , Texas 76 179 I phone :8 17-9 17-3238 ~tWti<s 1\ pe I P,.\-l i~ $ 35~5CD· oo 't Vo I ..J-.e.s NATION AL WATERWORKS I .//' PO B ox 840700 D allas , T exas 752 84 (800) 252-1 557 Aspro 1~ i>t, ooo ,00 REYNOLDS ASPHAL T & V CONSTRUCTION COM PAN1 I ...... PO Box 370 Eu less , Texas 76039 (8 17) 267 -3 131 Rev. 5/30/03 - - - - - - - - - - - - - - - - foRTWORTH ~ ~ \ ~ '.t) \ Total Dollar Amount of M/WBE Subcontractors/Suppliers oo> Al ,,. Total Dollar Amount of Non-M/WBE Subcontractors/Suppliers $ V ·t ,f) '-,?. ATIACHMENT 1A Page 4 of 4 J /.p0, 5 OQ. OD 3:Jtp. f5DO . DD TOTAL DOLLAR AMOUNT OF ALL SUBCONTRACTORS/SUPPLIERS $ <::> cJO s 11, ooo . The Contractor will not make additions , deletions, or substitutions to this certified list without the prior approval of the Minority and Women Business Enterprise Office Manager or designee through the submittal of a Request for Approval of Change/Addition. Any unjustified change or deletion shall be a material breach of contract and may result in debarment in accord with the procedures outlined in the ordinance. The contractor shall submit a detailed explanation of how the requested change/addition or deletion will affect the committed M/WBE goal. If the detail explanation is not submitted, it will affect the final compliance determination. By affixing a signature to this form, the Offeror further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed by all subcontractors, including M/W/DBE(s) arrangements submitted with the bid. The Offeror also agrees to allow an audit and/or examination of any books , records and files held by their company. The bidder agrees to allow the transmission of interviews with owners, principals, officers, employees and applicable subcontractors/suppliers/contractors participating on the contract that will substantiate the actual work performed by the M/W/DBE(s) on this contract , by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance and create a material breach of contract may result in a determination of an irresponsible Offeror and barred from participating in City work for a period of time not less than one (1) year. b:\So( CDY'E.r<w zl:ior\J,X LP Company Name ~. '°2':{ l'c,l}4g Address F-t.. Wol-lh ~x 1 (; / 14 City/State/Zip ~£ctame/Title (if different) ~ . 1 , -r'h cxH2..-'. i-Cl-'t · . in -D~y--119~ <o:17 =5 clf-4551,, Telephone and/or Fax I ~ -0--cr-~ @., C-Oac:ct:s:() r. corn ii Address Rev. 5/30/03 - - - - - - - - - - - - - - - - - FORT WORTH ---•. ~ City's M/WBE Project Goal: J % City of Fort Worth Good Faith Effort Form ATTACHMENT 1C Page 1 of 3 If you have failed to secure M/WBE participation and you have subcontracting and/or supplier opportunities or if your DBE participation is less than the City's project goal, you must complete this fonn. If the bidder's method of compliance with the M/WBE goal is based upon demonstration of a "good faith effort", the bidder will have the burden of correctly and accurately preparing and submitting the documentation required by the City. Compliance with each item, 1 thru 6 below, shall satisfy the Good Faith Effort requirement absent proof of fraud, intentional and/or knowing misrepresentation the facts or intentional discrimination by the bidder. Failure to complete this form, in its entirety with supporting documentation, and received by the Managing Department on or before 5:00 p.m . five (5) City business days after bid opening, exclusive of bid opening date, will result in the bid being considered non-responsive to bid specifications. 1.) Please list each and every subcontracting and/or supplier opportunity} for the completion of this project, regardless of whether it is to be provided by a M/WBE or non-M/WBE. (DO NOT LIST NAMES OF FIRMS) On Combined Projects, list each subcontracting and or supplier opportunity through the 2"0 tier. (Use additional sheets, if necessary) List of Subcontracting Opportunities List of Supplier Opportunities Rev. 05/30/03 -I - - - - - - - - - - - - - - - - - - ATTACHMENT 1C Page 2 of 3 2.) Obtain a current (not more than three (3) months old from the bid open date) list of M/WBE subcontractors and/or suppliers from the City's M/WBE Office. __ vfe: Date of Listing ..!}:j_t D'] I 0'3 __ No 3.) Did you solicit bids from M/WBE firms, within the subcontracting and/or supplier areas previously listed , at~st taA calaAdar d~Fier tg bid opeoi.Q9 by mail, ~xclusive of the day the bids are opened? +h f.;de,,.1/ b\d JC..5W€'0l... mo.ct -t. ova d c:i.b l e ~S (If yes, attach M/WBE mail listing to include name of firm and address and a dated copy of letter mailed.) __ No 4.) Did you solicit bids from M/WBE firms , within the subcontracting and/or supplier areas previously listed, at least teA~leAElar~ayspt'ieF k> bid operringby telephone, exclusive of the day the bids are opened? -t-n e... a."""'{ b Id. ba:)ll. S W,e, ~ Yr'lt:1Cl e Cl\)a ; \ ~ b l -e. _0es (If yes, attach list to include fl™ of M/WBE firm, person contacted, phone number and date and t ime of contact.) __ No NOTE: A facsimile may be used to comply with either 3 or 4, but may not be used for both. If a facsimile is used, attach the fax confirmation, which is to provide M/WBE name, date , time, fax number and documentation faxed. NOTE: If the list of M/WBEs for a particular subcontracting/supplier opportunity is ten (10) or less, the bidder must contact the entire list to be in compliance with questions 3 and 4. If the list of M/WBEs for a particular subcontracting/supplier opportunity is ten (10) or more, the bidder must contact at least two- thirds (2/3) of the list within such area of opportunity, but not less than ten to be in compliance with questions 3 and 4. 5.) Did you provide plans and specifications to potential M/WBEs or information regarding the location of plans and specifications in order to assist the M/WBEs? ./ves __ No 6.) Submit documentation if M/WBE quotes were rejected. The documentation submitted should be in the forms of an affidavit, include a detailed explanation of why the M/WBE was rejected and any supporting documentation the bidder wishes to be considered by the City. In the event of a bona fide dispute concerning quotes, the bidder will provide for confidential in-camera access to and inspection of any relevant documentation by City personnel. (Please use additional sheets, if necessary, and attach.) Company Name Teleph9ne Contact Person _ Scope ,9f Work Reason for Rejection Jp J (A 1) 1'1 /( Jr 1 !'. (I ~ Ill 0 A. 1 1 J, \ --V -- Rev. 05/30/03 - - - - - - - - - - - - - - - - - ADDITIONAL INFORMATION : ATTACHMENT 1C Page 3 of 3 Please provide additional information you feel will further explain your ~~d and honest efforts to obtain M/WBE partici pation on this project. 2..o 'o c9,o /. ·.s 0 ~ 0 The bidder further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed on this contract, the payment thereof and any proposed changes to the original arrangements submitted with this bid. The bidder also agrees to allow an audit and/or examination of any books, records and files held by their company that will substantiate the actual work performed on this contract, by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance and creates a material breach of contract may result in a determination of an irresponsible offeror and barred from participating in City work for a period of time not less than one (1) year. The undersigned certifies that the information provided and the M/WBE(s) listed was/were contacted in good faith. It is understood that any M/WBE(s) listed in Attachment 1 C will be contacted and the reasons for not using them will be verified by the City's ffice gnat CQS\dQ(}t Title Coca±££ <Ll20~ru (j ioolX Lf Company Name Contact Name and Title (if different) ~1 ~.')3£1-/74:2> (g1 ~d3't dfSj{p ho e Number Fax mber Po~ 16Y:4g Address BLLlc{tb ~x 1 (,p ,, 4 City/State/Zip 1 1 'J £ ~~~i s@; COO a±-SQ ( CD«) 5/a9Jag Date 1 1 Rev. 05/30/03 - .... - - - - - Cl-1 Cl-1. l Cl-1.2 Cl-1.3 Cl-1 • .C Cl-1.S Cl-1.6 Cl-1.i Cl-1.8 Cl-1.9 Cl-l.10 Cl-1.ll Cl-l.12 Cl-l.13 Cl-l.14 Cl-l.15 Cl-l.16 Cl-1.17 Cl-l.18 Cl-l.19 Cl-1.20 Cl-1.21 Cl-1.22 Cl-l.23 Cl-1.24 Cl-1.25 Cl-1.26 Cl-1.27 Cl-1.28 Cl-l.29 Cl-l.30 Cl-l.31 Cl-l.32 C2-2 c2-2.1 c2-2.2 C2-2.3 c2-2., c2-2.s C2-2.6 PART C -GE!'Il:RAL CONDITIONS TABLE OF CONTENTS NOVEMBER, l, 19Bi T~BLE OF CONTENTS DEFINITIONS Definition of Terms Contract Documents Notice to Bidders Propo6al Bidder General Conditions Special Conditions Specifications Bond Contract Plans City City Council Mayor City Manager City Attorney Director of Public Works Director, City Water Department Engineer Contractor Sureties The Work or Project Working Day calendar Day Legal Holiday Abbreviations Change Order Paved Streets and Alleys Unpaved Streets and Alley• City Streets Roadway Gravel Street INTERPRETATION AND PREPARATION OF PROPOSAL Proposal Form Interpretation of Ouantitiea Examination of Contract Documents and Site Submitting of Proposal Rejection of Proposals Bid Security Cl> Cl-1 Cl> Cl-1 < l > Cl-1 <2> Cl-1 ( 2) Cl-1 < 2 > Cl-1 C 2) Cl-1 C 2 > Cl-1 C 2) Cl-1 C2> Cl-1 C3) Cl-1 ( 3 > Cl-1 (3> Cl-1 (3 > Cl-1 (3 > Cl-1 (3) Cl-1 (3) Cl-1 < 4 > Cl-1 (4) Cl-1 C 4 > Cl-1 (4) Cl-1 C4 > Cl-1 C4 > Cl-1 (4 > Cl-1 (4) Cl-1 < 4 > Cl-1 (5) Cl-1 (6 > Cl-1 <6 > Cl-1 (6) Cl-1 (6 > Cl-1 f6 > Cl-1 < 6 > C2-2 Cl> C2-2 Cl) C2-2 C2) C2-2 (3) c2-2 CJ> c2-2 <3> C2-2.7 Delivery of Proposal c2-2 ( 4) c2-2.e Withdrawing Proposals C2-2 ( 4 ) C2-2.9 Telegraphic Modification of Proposals ::2-2 ( 4) C2-2.l0 Public Opening of Proposal C2-2 ( .. ) C2-2.ll Irregular Proposals C2-2 ( 4) c2-2.12 Disqualification of Bidders C2-2 ( 5) C3-3 AWARD AND EXECUTION OF DOCUMENTS C3-3.l Consideration of Proposals C3-3 ( l} C3-3.2 Minority Business Enterpise Women-Owned Business Enterprise compliance C3-3 Cl) C3-3.3 Equal Employment Provisions C3-3 Cl) C3-3., Withdrawal of Proposals CJ-3 (2) CJ-3.S Award of Contract CJ-3 (2) C3-3.6 " Return of Proposal Securities C3-3 (2) C3~3.7 Bonds C3-3 (2) C3-3.8 Execution of Contract C3-3 (') C3-3.9 Failure to Execute Contract CJ-3 ( .. ) Cl-3.10 Beginning Work CJ-3 (') Cl-3.11 Insurance C3-3 ( .. ) C3-3.12 Contractor's Obligations C3-3 (7) C3-3.13 Weekly .Payroll C3-3 (7) C3-3.14 Contractor's Contract Administration C3-3 (7) C3-3.15 Venue C3-3 (8) C4-4 SCOPE OF WORlt c,-,.1 Intent of Contract Documents c,-.c (1) c,-,.2 Special Provisions C4-4 (1) C4-4.3 Increased or Decreased ouantitie• C4-4 (1) C4-4.4 Alteration of Contract Docwnenta C4-4 (2) C4-4.S Extra Work C.t-4 (2) C4-4.6 Schedule of Operation• C4-4 (3) c,-.c.7 Progress Schedule• for Water and Sewer Plant Facilities C4-4 (4) cs-s CONTROL OF WORJt AND MATERIALS cs-s.1 Authority of Engineer cs-s (1) cs-s.2 Conformity with Plans cs-s (1) ' cs-s.3 Coordination of Contract Documents cs-s (2) CS-5.4 Cooperation of Contractor cs-s (2) cs-s.s Emergency and/or Rectification Work cs-s (3) cs-s.6 Field Office cs-s (3) cs-s., Construction Stakes cs-s (3) CS-5.8 Authority and Dutie• ·of Inspectors cs-s (4) cs-s.9 Inspection cs-s (5) CS-5.10 Removal of Defective and tJnauthorized Work cs-s (5) CS-5.11 Substitute Material• or Equipment cs-s (5) CS-5.12 Samples and Teats of Materials cs-s (6) cs-s.13 Storage of Materials cs-s (6) cs-s.1, Existing Structures and Utilities cs-s (7) CS-5.15 :nterruption of Service cs-s (7) cs-s.16 Mutual Responsibility of Contractor• cs-s (8) y CS-5.17 Cleanup cs-s (8) CS-5.18 Final Inspection cs-s (9) (2) - - ..... - - - - - C6-6 C6-6.l C6-6.2 C6-6.3 C6-6.4 C6-6.5 C6-6.6 C6-6.7 C6-6.8 C6-6.9 C6-6.10 C6-6.ll C6-6.12 C6-6.l3 C6-6.14 C6-6.15 C6-6.l6 C6-6.l7 C6-6.l8 C6-6.l9 C6-6.20 C6-6.21 C7-7 C7-7.l C7-7.2 C7-7.3 C7-7 • .C C7-7.5 C7-7.6 C7-7.7 C7-7.S C7-7.9 C7-7.l0 C7-7.11 C7-7.12 C7-7.13 C7-7.1.C C7-7.15 C7-7.l6 C7-7.17 C8-8 C8-8.l C8-S.2 LEGAL RELATIONS AND PUBLIC RESPONSIBILITY Laws to be Observed Permits and Licenses Patented Devices, Materials and Processes Sanitary Provisions Public Safety and Convenience Privileges of Contractor in Streets, Alleys, and Right-of-Way Railway Crossings Barricades, Warnings and Watchmen Use of Explosives, Drop Weight, etc. Work Within Easements Independent Contractor Contractor's Responsibility for Damage Claims Contractor's Claim for Damages Adjustment of Relocation of Public Utilities, etc. Temporary Sewer Drain Connections Arrangement and Charges of Water Furnished by City Use of a Section of Portion of the Work Contractor's Responsibility for Work No Waiver of Legal Rights Personal Liability of Public Officials State Sales 'l'ax PROSECUTION AND PROGRESS Subletting Assignment of Contract .Prosecution of the Work Limitations of Operations Character of Workman and Equipment Work Schedule Time of Commencement and Completion Extension of time of Completion Delays Time of Completion Suspension by Court Order Temporary Suspension Termination of Contract due to Nat1onal Emergency Suspension of Abandonment of the Work and Annulment of Contract Fulfillment of Contract Termination for Convenience of the Onwer Safety Methods and Practices MEASUREMENT ANO PAYMENT Measurement of Quantities Unit Prices ( 3) C6-6 Cl) C6-6 Cl> C6-6 ( 1} C6-6 (2) C6-6 C2) C6-6 (3) C6-6 (4) C6-6 < 4) C6-6 (5) C6-6 C 6 > C6-6 (8) C6-6 ( 8) C6-6 ClO) C6-6 ClO) C6-6 (10) C6-6 Cll} C6-6 Cll) C6-6 Cll >· C6-6 Cl2) C6-6 Cl2) C6-6 Cl2> C7-7 C 1 > C7-7 Cl) C7-7 Cl) C7-7 C2) C7-7 (2) C7-7 (3) C7-7 C.C> C7-7 (4) C7-7 C.C) C7-7 CS) C7-7 t6 > C7-7 (6) C7-7 (7) C7-7 (7) C7-7 (9) C7-7 (10) C7-7 (13) CB-8 (l) CB-8 Cl) 'i' CS-8.3 cs-e., ce-e.5 C8-8.6 CB-8.7 cs-e.e CS-8.9 CB -8.10 ce-e.11 C8-8.l2 CS-8.13 Lump Sum Scope of Payment Partial Estimates and Retainage Withholding Payment Final Acceptance , Final Payment Adguacy of Design General Guaranty Subsidiary Work Miscellaneous Placement of Material Record Documents . . ' ' (4) CB-8 CB-8 ce-e ce-e CB-8 CS-8 ce-e CS-8 CS-8 CB-8 CB-8 1 ,, ( 1) Cl) ( 2) ( 3) ( 3) ( 3) ( 4) "') (5) (5) ( 5) . -. y ' - - - - - - - - - - - - - PART C -GENERAL CONDITIONS Cl-1 DEF!NIT!ONS SECTION Cl-1 DEFINITIONS Cl-1.l DEFINITIONS OF TERMS: Whenever in these Contract Documents the following terms or pronouns in place of them are used, the intent and meaning shall be understood and interpreted as follows: Cl-1.2 CONTRACT DOCUMENTS: The Contract Documents are all of the written and drawn documents, such as specifications, bonds, addenda, plans, etc., which govern the terms and performance of the contract. These are contained in the General Contract Documents and the Special Contract Documents. a. b. GENERAL CONTRACT DOCUMENTS: The General Contract Documents govern all Water Department Projects .and include the following items: PART A -NOTICE TO BIDDERS (Sample) PART B -PROPOSAL ( Sample·) PART C -GENERAL CONDITIONS (CITY) (Developer) PART D -SPECIAL CONDITIONS PART E -SPECIFICATIONS PERMITS/EASEMENTS PART F -BONDS PART G -CONTRACT (Sample) (Sample) White White Canary Yellow Brown Green El-White E2-Golden Rod E2A-White Blue White White SPECIAL CONTRACT DOCUMENTS: The Special Contract Documents are prepared for each specific project as a supplement to tbe General Contract Documents and include the following items: PART A -NOTICE TO BIDDERS (Advertisement) Same as above PART B -PROPOSAL (Bid) PART C -GENERAL CONDITIONS PART D -SPECIAL CONDITIONS PART E -SPECIFICATIONS PERMITS/EASEMENTS PART F -BONDS PART G -CONTRACT PART B -PLANS (Usually bound separately) Cl-1 (1 > Cl-1.3 NOTICE TO BIDDERS: All of the legal publications either actually published in public advertising mediums or furnished direct to interested parties pertaining to the work contemplated under the Contract Documents constitutes the notice to bidders. Cl-1.4 PROPOSAL: The completed written and signed offer or tender of a bidder to perform the work which the Owner desires to have done, together with the bid security, constitutes the . Proposal, which becomes binding upon the Bidder when it is officially received by the OWner, has been publicly opened and read and not rejected by the OWner. Cl-1.5 BIDDER: Any person, persons, firm, partnership, company, association, corporation, acting directly or through a duly authorized representative, submitting a proposal for performing the work contemplated under the Contract Documents, constitutes a bidder. Cl-1.6 GENERAL CONDITIONS: The General Conditions are the usual construction and contract requirements which govern the performance of the work so that it will be carried on in accordance with the customary proced~re, the local statutes, and requirements of the City of Port Worth'• charter and promulgated ordinances. Wherever there may be a conflict between the General Conditions and Special Conditions, the latter shall take precedence and shall govern. Cl-1.7 SPECIAL CONDITIONS: Special conditions are the apecific requirements which are necessary for the particular project covered by the Contract Documents and not specifically covered in the General Conditions. When considered with the General Condition• and other elements of the Contract Documents they provide the information which the Contractor and owner should have in order to gain a thorough knowledge of the project. Cl-1.8 SPECIFICATIONS: The Specifications is that section or part of the Contract Documents which aeta forth in detail the requirements which must be met by all material•, construction, workmanship, equipment and services in order to render a completed and useful project. Whenever reference ia made to atandard specifications, regulations, requirements, statutes, etc., such referred to documents ahall become a part of the contract Documents just as though they were embodied therein. cl-1.9 BOND: The bond or bonds are the written guarantee or security furnished by the Contractor for the prompt and Cl-1 (2) - - - -. - - - - - -· faithful performance of the contract and include the following: a. b . c. d. Performance Bond (see paragraph C3-3.7) Payment Bond (see paragraph C3-3.7> Maintenance Bond (see paragraph C3-3.7) Proposal or Bid Security Csee Special lnstruction6 to Bidders, Part A and C2-2.6> Cl-1.10 CONTRACT: The Contract is the formal signed agreement between the Owner and th~ Contractor covering the mutual understanding of the two contracting parties about the project to be completed under the Contract Documents. Cl-1.11 PLANS: The plans are the drawings or reproductions therefrom made by the OWner' s representative showing in detail the location, dimension and position of the various elements of the project, including such profiles, typical cross-sections, layout diagrams, working drawings, preliminary drawings and such supplemental drawings as the Owner may issue to clarify other drawings or for the purpose of showing changes in the work hereinafter authorized by the Owner. The plans are usually bound separately from other parts of the Contract Documents, but they are a part of the Contract Documents just as though they were bound therein. Cl-1.12 CITY: The City of Port Worth, ·Texas, a municipal corporation, authorized and chartered under the Texas State Statutes, acting by and through its governing body or its City Manger, each of which is required by charter to perform specific duties. Responsibility for final enforcement of Contracts involving the City of Port Worth is by Charter vested in the City Manager. The terms City and Owner are 1,ynonymous. Cl-1.13 CITY COUNCIL: The duly elected and qualified governing body of the city of Port Worth, Texas. Cl-1.14 MAYOR: The officially elected Mayor, or in his absence, the Mayor Pro tem of the City of Port Worth, Texas. Cl-1.15 CITY MANAGER: The officially appointed and authorized City Manager of the City of Port Worth, Tex~s, or bis duly authorized representative. Cl-1.16 CITY ATTORNEY: The officially appointed City Attorney of the City of Fort Worth, Texas, or his duly authorized representative. Cl-1 (3) Cl-1.17 DIRECTOR OF PUBLIC WORKS: The duly appointed official of the City of Fort Worth, referred to in the Charter as the City Engineer, or his duly authorized representative. Cl-1.18 DIRECTOR, CITY WATER DEPARTMENT: The duly appointed Director of the City Water Department of the City of Fort Worth, Texas, or his duly authorized representative, assistant, or agents. Cl-l.19 ENGINEER: The Director of Public Works, the Director of the Fort Worth City Water Department,.. or. t.h.e.i..r duly authorized assistants, agents, engineers, inspectors, or superintendents, acting within the scope of the particular duties entrusted to them. Cl-1.20 CONTRACTOR: The person, persons, partn~rship, company, firm, association, or corporation, entering into a contract with the Owner for the execution of the work, acting directly or through a duly authorized representative. A sub-contractor is a person, firm, corporation, or others under contract with the principal contractor, supplying labor and materials or only labor, for work at the site of the project. Cl-l.21 SURETIES: The Corporate bodies which are bound by such bonds are required with and for the Contractor. The sureties engaged are to be fully responsible for the entire and satisfactory fulfillment of the Contract and for any and all requirements as set forth in the Contract Documents and approved changes therein. Cl-1.22 THE WORK OR PROJECT: The completed work contemplated in and covered by the Contract Documents, including but not limited to the furnishing of all labor, materials, tools, equipment, and incidentals necessary to produce a completed and serviceable project. · Cl-1.23 WORKING DAY: A working day ia ~efined as a calendar day, not including Saturdays, Sundays, and legal bolidays, in which the weather or other conditions not under the control of the Contractor permit the performance of the principal unit of work for a period of not less than seven (7) hours b~tween 7:00 a.m. and 6:00 p.m., with exceptions aa permitted in paragraph C7-7.6. Cl-1.24 CALENDAR DAYS: A calendar day is any day of the week or month, no days being excepted. cl-1.25 LEGAL HOLIDAYS: Legal holidays shall be observed as prescribed by the City Council of the City of Port Worth for observance by City employees as follows: Cl-1 (4) - - - - - - - - l. 2. 3. 4. 5. 6. 7. 8. 9. New Year's Day M. L. King, Jr. Birthday Memorial Day Independence Day Labor Day Thanksgiving Day Thanksgiving Friday Christmas Day Such other days in lieu of holidays as the City Council may determine .January l Third Monday in January Last Monday in May July 4 First Monday in September Fourth Thursday in November Fourth Friday in November · December 25 When one of the above named holidays or a special holiday is declared by the City Council, falls on Saturday, the holiday · shall be observed on the preceding Friday or if it falls on Sunday, it shall be observed on the following Monday, by those employees working on working day operations. Employees working calendar day o~erations will consider the calendar holiday as the holiday. Cl-l.26 ABBREVIATIONS: Wherever the abbreviations defined herein appear in Contract Documents, tbe intent and meaning shall be as follows: · AASHTO - ASCE LAW ASTM AWWA ASA HI Asph. Ave. Blvd. - CI CL GI Lin. lb. MB Max. American Assoc.iation of MGD State Highway Transportation Officials American Society of Civil Engineers In Accordance With American Society of Testing Materials American Water Work& Association American Standards Association Hydraulic Institute Asphalt Avenue Boulevard cast Iron Center Line Galvanized Iron Linear or Lineal Pound Manhole Maximum Cl-1 (5) -Million Gallons Per Day CFS Cubic Foot per Second Min. -Minimum Mono.-Monolithic I Percentum R Radius I.D. -Inside Diameter O.D. -Outside Elev.- F - Diameter . Elevation Pabrenheit Centigrade C - In. Pt. St. CY Yd. SY L.!'. D.I. Inch -Poot -.Street Cubic Yard -Yard -Square Yard -Linear Poot -Ductile Iron Cl-1.27 CHANGE ORDER: A •change Order• is a written supplemental agreement between the Owner and the Contractor covering some added or deducted item or feature which may be found necessary and which was not specifically included in the scope of the project on which bids were submitted. Increase in unit quantities stated in the proposal are not the subject matter of a Change Order unless the increase or decrease is more than 251 of the amount of the particular item or items in the original proposal. All •change Orders• shall be prepared by the City from information as necessary furnished by the Contractor. Cl-1.28 PAVED STREETS AND ALLEYS: A paved street or alley shall be defined as a street or alley having one of the following types of wearing surfaces applied over the natural unimproved surface: l. Any type of asphaltic concrete with or without separate base material. 2. Any type of asphalt surface treatment, not including an oiled surface, with or without separate base material. 3. Brick, with or without separate base material. ,. Concrete, with or without separate base material. 5. . Any combination of the above. Cl-l.29 UNPAVED STREETS OR ALLEYS: An unpaved atreet, alley, roadway or other surface is any area except those defined above for •paved Streets and Alleys.• Cl-1.30 CITY STREETS: A city street is defined as that area between the right-of-way lines aa the street is dedicated. Cl-1.31 ROADWAY: parallel lines two (4') feet back of exists. The roadway is defined as the area between t2'> feet back of the curb lines or four the average edge of pavement where no curb Cl-l.32 GRAVEL STREET: A gravel street is any unpaved street to which has been added one or more applications of gravel or .similar material other than the natural material found on the street surface before any i:nprovement was made. Cl-1 (6) - - - - - - - - - - SECTION C -GENERAL CONDITIONS C2-2 INTERPRETATION AND PREPARATION OF PROPOSAL SECTION C2-2 INTERPRETATION AND PREPARATION OF PROPOSAL C2-2.l PROPOSAL FORM: The Owner will furnish bidders with proposal form, which will contain an itemized list of the items of work to be done or materials to be furnished and upon which bid prices are requested. The Proposal form will state the Bidder's general understanding of the project to be completed, provide a space for furnishing the amount of bid security, and state the basis for entering into a formal contract. The Owner will furnish forms for the Bidder's ·Experience Record,• •Equipment Schedule,• and •rinancial Statement,• all of which must be properly executed and filed with the Director of the City Water Department one week prior to the hour for opening of bids. The financial statement required .shall have been prepared by an independent certified public accountant or an independent public accountant holding a valid permit issued by an appropriate state licensing agency, and shall have been so prepared as to reflect the current financial status. This statement must be current and not more than one Cl) year old. In · the case that a bidding date falls within the time a new statement is being prepared, the previous statement shall be updated by proper verification. Liquid assets in the amount of ten (101) percent of the estimated project coat will be required. For an experience record to be considered to be acceptable for a given project, it must reflect the experience of the firm seeking qualification in work of both the same nature and magnitude as that of the project for which bid• are to be received, and such experience must have been on projects completed not more than five CS) years prior to tbe date on which are to be .received. The Director of the Water department shall be sole judge as to the acceptability of experience for qualification to bid on any Fort Worth Water Department project. The prospective bidder shall schedule the equipment he has available for the project and state that he will rent such additional equipment as may be required to complete the project on which he submits a bid. c2-2.2 INTERPRETATION OF QUANTITIES: The quantities of work and materials to be furnished as may be listed in the proposal C2-2Cl) f orms or other parts of the Contract Documents will be c onsidered as apEroximate only and will be used for the purpose of comparing bids on a uniform basis . Payment will be made to the Contractor for only· the actual quantities of work performed or materials furnished in strict accordance with the Contract Documents and Plans. The quantities of work to be performed and materials to be furnished may be increased or decreased as hereinafter provided, without in any way i nvalidating the unit prices bid or any other requirements of the Contract Documents. C 2-2. 3 EXAMINATION OF CONTRACT DOCUMENTS AND SITE OF PROJECT: Bidders are advised that the Contract Documents on file with the Owner shall constitute all of the information which the Owner will furnish. All additional information and data which the owner will supply after promulgation of the formal contract documents shall be issued in the form of written addenda and shall become part of the Contract Documents just as though such addenda were actually written into the original Contract Documents. Bidders are required, prior to the filing of proposal, to read and become familiar with the Contract Documents, to visit the site of the project and examine carefully all local conditions, to inform themselves by their own independent research and investigations, tests, boring, and by such other means as may be necessary to gain a complete knowledge of the conditions which will be encountered during the construction of the project. They must judge for themselves the difficulties of the work and all attending circumstances affecting the cost of doing the work or the time requi~ed for its completion, and obtain all information required to make an intelligent proposal. No information given by the Owner or any representative of the Owner other than that contained in the Contract Documents and officially promulgated addenda -··-·thereto, shall be binding upon the OWner. Bidders shall rely exclusively and solely upon their own estimates, investigation, research, tests, explo~ations, and other data which are necessary for full and complete information upon which the proposal is to be based. It i& mutually agreed that the submission of a proposal is prima-facie evidence that the bidder has made the investigations, examinations and ·tests herein required . Claims for additional compensation due to variations between conditions actually encountered in construction and as indicated in the Contract Documents will not be allowed. The logs of Soil Borings, if any, showing on the plans are for general information only and may not be correct. Neither the C2-2C2> -- - ,,. ' - - - - - - - - - Owner nor the Engineer guarantee that the data shown is representative of conditions which actually exist. C2-2.4 SUBMITTING OF PROPOSAL: The Bidder shall submit his Proposal on the form furnished by the Owner. All blank spaces applicable to the project contained in the form shall be correctly filled in and the Bidder shall state the prices, written in ink in both words and numerals, for which he proposes to do the work contemplated or furnishe the materials required. All such prices shall be written legibly. In case of discrepancy between the price written in words and the price written in numerals, the price most advantageous to the City shall govern. If a proposal is submitted by an individual, his or her name must be signed by him (her) or his (her) duly auth~rized agent. lf a proposal is submitted by a firm, association, or partnership, the name and address of each member must be 9 i ven, and the proposal must be signed by a member of the firm, association, or partnership, or by a person duly authorized. If a proposal is submitted by a company or corporation, the company or corporate name and business address must be given, and the proposal signed by an official or duly authorized agent. The corporate seal must be affixed. Power of Attorney authorizing agents or others to sign proposal must be properly certified and must be in writing and submitted with the proposal. c2-2.s REJECTION OF PROPOSALS: Proposals may be rejected if they show any alteration of words or figures, additions not called for, conditional or uncalled for alternate bids, incomplete bids, erasures, or irregularities of any kind, or contain unbalance value of any items. Proposal tendered or delivered after the official time designated for receipt of proposal shall be returned to the Bidder unopened. C2-2.6 BID SECURITY: No proposal will be considered unless it is accompanied by a •proposal Security• of the character and in the amount indicated in the •Notice to Bidders• and the •proposal.• The Bid Security is required by the Owner as evidence of good faith on the part of the Bidder, and by way of a guaranty that if awarded the contract, the Bidder will within the required time execute a formal contract and furnish the required performance and other bonds. The bid security of the three lowest bidders will be retained until the contract is awarded or other disposition is made thereof. The bid security of all other bidders may be returned promptly after the canvass of bids. C2-2C3) C2-2.7 DELIVERY OF PROPOSAL: No proposal will be considered unless it is delivered, accompanied by its proper Bid Security, to the City Manager or his representative in the official place of business a~ set forth ln the •Notice to Bidders.• It is the Bidder's sole responsibility to deliver the proposal at the proper time to the proper place. The mere fact that a proposal was dispatched will not be considered. The Bidder must have the proposal actually delivered. Each proposal shall be in a sealed envelope plainly marked with the word ·PROPOSAL,• and the name or description of the project as designated in the ·Notice to Bidders.• The envelope shall be addressed to the City Manager, City Ball, Fort Worth, Texas. c2-2.e WITHDRAWING PROPOSALS: Proposals actually filed with the City Manager cannot be withdrawn prior to the time aet for · opening proposals. A request for non-consideration of a proposal must be made in writing, addressed to the City Manager, and filed with him prior to the time set for the opening of proposals. After all proposals not requested for non-consideration are opened and publicly read aloud, the proposals for which non-consideration requests have been properly filed may, at ~be option of the Owner, be returned unopened. C2-2.9 TELEGRAPHIC MODIFICATION OF PROPOSALS: Any bidder· may modify his proposal by telegraphic communication at any time prior to the time set for opening proposals, provided such telegraphic communication is received by the City Manager prior to the said proposal opening time, and provided further, that the City Manager is satisfied that a written and duly authenticated confirmation of such telegraphic communication over the signature of the bidder was mailed prior to the proposal opening time. If such confirmation is not received within forty-eight (48) boura after the proposal opening time, no further consideration will be given to the proposal. c2-2.10 PUBLIC OPENING OF PROPOSAL: Proposals vbicb have been properly filed and for which no •Non-consideration Request• has been received will be publicly opened and read aloud by the City Manager er bis authorized representative at the time and place indicated in the •Notice to Bidders.• All proposals which have been opened and read will remain .on file with the owner until the contract has been awarded. Bidders or their authorized representatives are invited to be present for the opening of bids. c2-2.ll IRREGULAR PROPOSALS: Proposals shall be considered as being •irregular• if they show any omissions, alterations of form, additions, or conditions not called for, unauthorized alternate bids, or irregularities of any kind. However, the C2-2(4) - - - .... ~ r-.. - - - Owner reserves the right to waive any and all irregularities and to make the award of the contract to the best interest of the City. Tendering a proposal after the closing hour is an irregularity which cannot be waived. C2-2.12 D1SQUAL1F1CAT10N OF BlDDERS: Bidders may be disqualified and their proposals not considered for any of, but not limited to, the following reason: a. b. c. d. e. f. g. h. Reasons for believing that collusion exists among bidders. Reasonable grounds for believing that any bidder is interested in more than one proposal for work contemplated. The bidder being interested in any litigation against the Owner or where the Owner may have a claim against or be engaged in litigation against the bidder. · The bidder being in arr~ars on any existing contract or having defaulted on a previous contract. The bidder having performed a prior contract in an unsatisfactory manner. Lack of competency as revealed by the financial statement, experience record, equipment schedule, and such inquiries as the OWner may see fit to make. Uncompleted work which, in the judgment of the Owner, will prevent or hinder the prompt completion of additional work if awarded. The bidder not filing with the Owner, one week in advance of the hour of the opening of proposals the following: · 1. 2. 3. Financial Statement showing the financial condition of the bidder as specified in Part •A• -Special Instructions. A current experience record showing especially the projects of a nature similar to the one under consideration, which have been successfully completed by the Bidder. An equipment schedule showing the equipment the bidder has available for use on the project. The Bid Proposal of a bidder who, in the judgment of the Engineer, is disqualified under the requirements stated herein, shall be set aside and not opened. C2-2C5) - !111"'. - PART C -GENERAL CONDITIONS C3-3 AWARD AND EXECUTION OF DOCUMENTS SECTION C3-3 AWARD AND EXECUTION OF DOCUMENTS: C3-3.l CONSIDERATION OF PROPOSALS: After proposals have been opened and read aloud, the proposals will be tabulated on the basis of the quoted prices, the quantities shown in the proposal, and the application of such formulas or other methods of bringing items to a common basis as may be established in the Contract Documents. The total obtained by taking the sum of the products of unit prices q .uoted and the estimated quantities plus any lump sum items and such other quoted amounts as may enter into the cost of the completed project will be considered as the amount of the bid. Until the award of the contract is made by the Owner, the right will be reserved to reject any or all proposals and waive technicalities, to re-advertise for new proposals, or to ~roceed with the work in any manner as maybe considered for the best interest of the OWner. C3-3.2 MINORITY BUSINESS ENTERPRISE/WOMEN-OWNED BUSINESS ENTERPRISE COMPLIANCE: Contractor agrees to provide to Owner, upon request, complete and accurate information regarding actual work performed by a Minority Business Enterprise <MBE) and or a a Woman-owned Business Enterprise (WBE) on the contract and the payment therefor. Contractor further agrees, upon request by Owner, to allow and audit and/or an examination of any books, records, or files in the possession of Contractor that will substantiate the actual work performed by the MBE or WBE. Any material .misrepresentation of any nature will be grounds for termination of the contract and for initiating any action under appropriate federal, state or local laws and ordinances relating to false statements: further, any such misrepresentation may be grounds for disqualification of Contractor at Owner's discretion for bidding on future Contracts with the Owner for a period of time of not less than six (6) months. C3-3.3 EQUAL EMPLOYMENT PROVISIONS: The Contractor shall comply with current City Ordinance prohibiting discrimination in employment practices. C3-3 Cl) The Contractor shall post the required notice to that effect on the project site, and, at his request, will be provided assistance by the City of Fort Worth's Equal Employment Officer who will refer any qualified applicant he may have on file in his office to the Contractor. Appropriate notices may be acquired from the Egual Employment Officer. C3-3.4 WITHDRAWAL OF PROPOSALS: After a proposal has been read by the Owner it cannot be withdrawn by the Bidder within . forty-five (45) days after the date on which the proposals were opened. C3-3.S AWARD OF CONTRACT: The Owner reserves the right to withholdfinal action on the proposal& for a reasonable time, not to exceed forty-five (45) days after the date of opening proposals, and in no event will an award be made until after investigation& have been made as to the responsibility of the proposed awardee •.. The award of the contract, if an 'award is made, will be to the lowest and best responsible bidder. The award of the contract shall not become effective until the Owner has notified the Contractor in writing of such award. C3-3.6 RETURN OP PROPOSAL SECURITIES: AB aeon as proposed price totals have been determined for comparison of bids, the Owner may, at its discretion, returti the proposal security which accompanied the proposals which, in its judgment, would not be considered for the award. All other proposal securities, usually those of the three lowest bidders, will be retained by the Owner until the required contract haa ·been executed and bond furnished or the Owner baa otherwise disposed of the bids, after vbicb they will be returned by the City Secretary. C3-3.7 BONDS: With the execution and delivery of the Contract Documents, the Contractor shall furnish to, and file with the OWner in the amounts herein required, the following bonds: a. PERFORMANCE BOND: A good and sufficient performance bond in an amount ~not leas than 100 percent of the amount of the contract, as evidenced by the proposal tabulation or otherwise, guaranteeing the full and faithful execution of the work and performance of the contract, and for the protection of the owner and all other persona against damage by reason of negligence of the Contractor, or improper execution of the work or the use of ·inferior materials. This pe~formance C3-3 C2) ,_,. b. c. d. bond shall guarantee the payment for all labor, materials, equipment, supplies, and services used in the construction of the work, and shall remain in full force and effect until provisions as above stipulated are accomplished and final payment is made on the project by the City. MAINTENANCE BOND: A good and sufficient maintenance bond, in the amount of not less than 100 percent of the amount of the contract, as evidenced by the proposal tabulation or otherwise, guaranteeing the prompt, full and faithful performance of the general guaranty which is set forth in paragraph CB-8.10. PAYMENT BOND: A good and sufficient payment bond, in an amount not less than 100 percent of the amount of the contract, as evidenced by the proposal tabulation or otherwise, guaranteeing the prompt, full and faithful payment of all claimants as defined in Article 5160, Revised Civil Statutes of Texas, 1925, as amended by Bouse Bill 344 Acts 56th Legislature, Regular Session, 1959, effective April 27, 1959, and/or the latest .version thereof, supplying labor and materials in the prosecution of the work provided for in the contract being constructed under these specificatio~s. Payment Bond shall remain in force until all payments as above stipulated are made. OTHER BONDS: Such other bonds as may be required by these Contract Documents shall be furnished by the Contractor. No sureties will be accepted by the Owner which are at the time in default or delinquent on any bonds or which ar~ interested in any litigation against the owner. All bonds shall be made on the forms furnished by the Olffler and shall be executed by an approved surety company doing business in the City of Fort Worth, Texas, and which is acceptable to the owner. In order to be acceptable~ the name of the surety shall be included on the current U.S. Treasury list of acceptable sureties, and the amount of bond written by any one acceptable company shall not exceed the amount shown on the Treasury list for that company. Each bond shall be properly executed by both the Contractor and Surety Company. Should any surety on the contract be determined unsatisfactory at any time by the Owner, notice will be given the Contractor to that effect and the Contractor shall immediately provide a C3-3 (3) new surety satisfactory to the Owner. No payment will be made under the contract until the new surety or sureties, as required, have qualified and _have been accepted by the Owner. The contract shall not be operative nor will any payments be due or paid until approval of the bonds by the Owner. C3-3.8 EXECUTION OF CONTRACT: Within ten (10) days after the Owner has by appropriate resolution, or otherwise, awarded the contract, the Contractor shall execute and file with the Owner the Contract and such bonds as may be required in the Contract Documents. No contract shall be binding upon the owner until it has been attested by the City Secretary, approved as to form and ·1egality by the City Attorney, and executed for the Owner by either the Mayor or City Manager. C3-3.9 FAILURE TO EXECUTE CONTRACT: The failure of the Awardee to execute the required bond or bonds or to sign the required contract within ten ClO> days after the contract is awarded shall be considered by the owner as an abandonment of his proposal, and the owner may annul the Award. By reason of the uncertainty of the market prices of material and labor, and it being impracticable and difficult to accurately determine the amount of damage& occuring to the Owner by rea&on of said awardee'• failure to execute said bonds and contract within ten (10) days, the proposal security accompanying the proposal aball be the agreed amount of damages which Owner will suffer by reaaon of aucb failure on the part of the Awardee and shall thereupon immediately be forfeited to the OWner. The filing of a proposal will be considered a• an acceptance of this provision by the Bidder. :3-3.10 BEGINNING WORK: Tbe Contractor .shall not commence ~ork until authorized in writing to do ao by tbe Owner. ·· h ould the Contractor fail to commence work at the site of the r oject within the time stipulated in tbe written u thorization usually termed tbe •work Order• or •proceed )rder•, it is agreed that the Surety Company will, within ten ClO> days after the commencement date aet forth in such written authorization, commence the physical execution of the :on tract. :3-3.11 INSURANCE: The Contractor aball not commence work 1nder this contract until he bas obtained all the insurance ~equired under the Contract Documents, and aucb insurance bas >een approved by the Owner. The prime Contractor shall be ~esponsible for delivering to the Owner the aub-contractora• C3-3 (4) - certific~te of insurance for approval. The prime contractor shall indicate on the certificate of insurance included in the documents for execution whether or not his insurance covers sub-contractors. lt is the intention of the owner that the insurance coverage required herein shall include the coverage of all sub-contractors. a. b. c. COMPENSATION INSURANCE: The Contractor shall maintain, during the life of this contract, Workers• Compensation Insurance on all of his employees to be engaged in work on the project under this contract, and for all sub-contractors. In case any class of employees engaged in hazardous work on the project under this contract is not protected under the Workers' Compensation Statute, the Contractor shall provide adequate employer's general liability insurance for the protection of such of his employees not so protected. COMPREHENSIVE GENERAL LIABILITY INSURANCE: The Contractor shall procure and shall maintain during the life of this contract. Cont r .a ct or • s Comprehensive General Liability Insurance (Public Liability and Property Damage Insurance) in an amount not less than $500,000 ~overing each occurrence on account of bodily injury, .including death, and in an amount not less than $500,000 covering each occurrence on account of property damage with $2,000,000 umbrella policy coverage. ADDITIONAL LIABILITY: The Contractor shall furnish insurance as separate policies or by additional endorsement to one of the above-mentioned policies, and in the amount as set forth for public liability and property damage,_ the following insurance: 1. Contingent Liability (covers ~eneTal Contractor'• Liability for acts of sub-contractors). 2. Blasting, prior .to any blasting being ,done. 3. Collapse of buildings or structures adjacent to excavation (if excavations are to be performed adjacent to same>. Damage to underground utilities for-$500,000. C3-3 (5) 4. . e. f. 9. S. Builder's risk (where above-ground structures are involved). 6 • C o n t r a c t u a ·1 L i a b i l i t y < c o v e r s a 11 indemnification requirements of Contract). AUTOMOBILE INSURANCE -BODILY INJURY AND PROPERTY DAMAGE: The Contractor shall procure and maintain, during the life of this Contract, Comprehensive Automobile Liability insurance in an amount not less than $250,000 for injuries including accidental death to any one person and subject to the same limit for each person an amount not less than $500,000 on account of one accident, and automobile property damage insurance in an amount not less than $100,000. SCOPE OF INSURANCE AND SPECIAL HAZARD: The insurance required under the above paragraphs shall provide adequate protection for the Contractor and bis sub-contractors, respectively, against damage claims wbich may arise from operations under this contract, whether such operations be by the insured or by anyone directly or indirectly employed by him, and also against any of the following special · hazards which may be encountered in the performance of the Contract. PROOF OP CARRIAGE OP INSURANCE: The Contractor shall furnish the Owner with satisfactory proof of coverage by insurance required in these Contract Documents in amounts and by carriers satisfactory to the Owner. (Sample attached.) All insurance requirements made upon the Contractor shall apply to the sub-contractor, should the Prime Contractor's insurance not cover the sub-contractor's work operations. LOCAL AGENT FOR INSURANCE AND BONDING: The insurance and bonding companies with whom the Contractor's insurance and performance, payment, maintenance and all such other bonds are written shall be represented by an agent or agents having an office located within the city limits of the C3-3 (6) - - ,- - City of Fort Worth, Tarrant County, Texas. Each such agent shall be a duly qualified, one upon whom service of process may be had, and must have authority and power to act on behalf of the insurance and/or bonding company to negotiate and settle with the City of Fort Worth, or any other claimant, any claims that the City of Fort Worth or other claimant or any property owner who has been damaged, may have against the Contractor, insurance, and/or bonding company. If the local insurance representative is not so empowered by the insurance or bonding companies, then such authority must be vested in a local agent or claims officer residing in the Metroplex, the Fort Worth-Dallas area. The name of the agent or agents shall be set forth on all of such bonds and certificate& of insurance. C3-3.l2 CONTRACTOR'S OBLIGATIONS: Under the Contract, the Contractor shall pay for all materials, labor and services when due. C3-3.l3 WEEKLY PAYROLL: A certified copy of each payroll covering payment of wages to all person engaged in work on the project at the site of the project shall be furnished to the Owner's representative within seven (7) days after the close of each payroll period. A copy or copies of the applicable minimum wage rates as set forth in the Contract Documents shall be kept posted in a conspicuous place at the site of the project at all times during the course of the Contract. Copies of the wage rates will be furnished the Contractor, by the Owner; however, posting and protection of the wage rates shall be the responsibility of the Contractor. C3-3.14 CONTRACTOR'S CONTRACT ADMINISTRATION: Any Contractor, whether a person, persons, partnership, company, firm, association, corporation or other who is approved to do business with and enters into a contract with the City for construction of water and/or sanitary sewer facilities, will have or shall establish a fully operational business office within the Fort Worth-Dallas metropolitan area. The Contractor shall charge, delegate, or assign this office <~r he may delegate his Project Superintendent> with full authority to transact all business actions required in the performance of the Contract. This local authority shall be made responsible to act for the Contractor in all matters pertaining to the work governed by the Contract whether it be administrative or otherwise and as such shall be empowered, thus delegated ana dir~cted, to settle all material, labor or other expenditures, all claims against the work or any other C3-3 (7) '. " matter associated such as maintaining adequate and appropriate insurance or security coverage for the project. Such local authority for administration of the work under the Contract shall be maintained until all business transactions executed as part of the Contract· are complete. Should the Contractor's principal base of operations be other than in the Fort Worth-Dallas metropolitan area, notification of the Contractor's assignment of local authority shall be made in writing to the Engineer in advance of any work on the project, all appropriately signed and sealed, as applicable, by the Contractor's responsible officers with the understanding that this written assignment of authority to a local representative shall become part of the project Contract as though bound directly into the project documents. The intent of these requirements is that all matters associated with the Contractor's administration, whether it be oriented in furthering the work, or other, be governed direct by local authority. This same requirement is imposed on insurance and surety coverage. Should the Contractor's local representative fail to perform to the satisfaction of Engineer, the Engineer, at his sole discretion, may demand that such local representative be replaced and the Engineer may, at his sole discretion, stop all work until a new local authority satisfactory to the Engineer is assigned. No credit of working time will be for periods in which work stoppages are in effect for this reason. C3-3.l5 VENUE: Venue of any action hereinunder shall be exclusively in Tarrant County, Texas. C3-3 (8) '·. - ...... _ ....... -' ' - , " - - SECTION C4-4 SCOPE OF WORK PART C -GENERAL CONDITIONS C4-4 SCOPE OF WORK C4-4.l INTENT OF CONTRACT DOCUMENTS: It is the definite intention of these Contract Documents to provide for a complete, useful project which the Contractor undertakes to construct or furnish, all in full compliance with the requirements and intent of the Contract Documents. It is definitely understood that the Contractor shall do all work as provided for in the Contract Documents, shall do all extra or special work as may be considered by the Owner as necessary to complete the project in e satisfactory and acceptable manner. The Contractor shall, unless otherwise specifically stated in these Contract Documents, furnish all labor, tools, materials, machinery, equipment, special services, end incidentals necessary to the prosecution and completion of the project. C4-4.2 SPECIAL PROVISIONS: Should any work or conditions which are not thoroughly end satisfactorily stipulated or covered by General or Special Conditions of these Contract Documents be anticipated, or should there be any additional proposed work w~ich is not covered by these Contract Documents, then •special Provisions• covering all such work will be prepared by the Owner previous to the time of receiving bids or proposals for such work and furnished to the Bidder in the form of Addenda •. · All such •special Provisions• shall be considered to be a part of the Contract Documents just as though they were originally written therein. C4-4.3 INCREASED OR DECREASED QUANTITIES: The OWner reserves the right to alter the quantities of the work to be performed or to extend or shorten the improvements at any time when and as found to be necessary, and the Contractor shall perform the work as altered, increased or decreased at the unit prices. ·such increased or decreased quantity shall not be more than 25 percent of the contemplated quantity of auch item or items. When such changes increase or decrease the original quantity of any item or items of work to be done or materials to be furnished by the 25 percent or more, then either party to the contract shall upon written request to the other party be entitled to a revised consideration upon that portion of the work above or below the 25 percent of the original quantity stated in the proposal1 such revised consideration to be determined by special agreement or as hereinafter provided for •Extra work.• No allowance will be made for any changes in anticipated profits nor shall such changes be considered as C4-4 Cl) waiving or invalidating any conditions or provisions of the Contract Documents. Variations in quantities of sanitary sewe~ pipes in depth categories, shall be interpreted herein as applying to the overall quantities or sanitary sewer pipe in each pipe size, but not to the various depth categories. c,-4.4 ALTERATION OF CONTRACT DOCUMENTS: By Change Order, the Owner reserves the right to make such changes in the Contract Documents and in the character or quantities of the work as may be necessary or desirable to insure completion in the most satisfactory manner, provided such changes do not materially alter the original Contract Documents or change the general nature of the project as a whole. Such changes shall not be considered as waiving or invalidating any condition or provision of the Contract Documents. C4-,.S EXTRA WOR~: Additional work made necessary by changes and alterations of the Contract Documents or of quantities or .for other reasons for which no prices are provided in the Contract Documents, shall be defined aa •Extra Work• and shall be performed by the _Contractor in accord~nce with these Contract Documents or approved additions thereto; provided, however, that before any extra work is begun a •change Order• shall be executed or written order issued by the Owner to do the work for payments or credits as shall be determined by one or more combination of the following methods: a. Onit bid price previously approved. b. An agreed lump sum. c •. The actual reasonable cost of <l> labor, <2> rental of equipment used o~ the extra work for the time so used at Associated General Contractor& of blerica current equipment rental rates, (3) materials entering permanently into the project, and <4> actual cost of insurance, bonds, and social security as determined by tbe Owner, plus a fixed fee to be agreed upon but not to e~ceed 101 of the actual cost of such extra wo~k. The fixed fee is not to include any additional profit to the Contractor for rental of equipment ovned by him and used for the extra work. The fee aball be full and complete compensation to cover the cost of superintendence, overhead, other profit, general and al 1 other expense not included in < l >, < 2 > , (3), and C4) above. The Contractor shall keep accurate cost records on the form and in the method C4-4 (2) ...... - - .... - - suggested by the Owner and shall give the Owner access to all accounts, b.ills, vouchers, and records relating to the Extra Work. No -change Order-shall become effective until it has been approved and signed by each of the Contracting parties. No claim for Extra Work of any kind will be allowed unless ordered in writing by the Owner. ln case any orders or instructions, either oral or written, appear to the Contractor to involve Extra Work for which he should receive compensation, he shall make written request to the Engineer for written orders authorizing such Extra Work, prior to beginning such work. Should a difference arise as to what does or does not constitute Extra Work, or as to the payment thereof, and the Engineer insists upon its performance, the Contractor shall proceed with the work after making written request for written orders and shall keep an accurate account of the actual reasonable cost thereof as provided under method (Item C). Claims for extra work will not be· paid unless the Contractor shall file his claim with the Owner within five (5) days before the time for making the first estimat~ after such work is done and unless the claim is supported by satisfactory vouchers and certified payrolls covering all labor and materials expended upon the said Extra Work. The Contractor shall furnish the Owner such installation records of all deviations from the original Contract Documents as may be necessary to enable the Owner to prepare for permanent record a corrected set of plans showing the actual installation. The compensation agreed upon for 'extra work' whether or not iniitiated by a 'change order• shall be a full, complete and final payment for all costs Contractor incurs as a result or relating to the change or extra work, whether said costs are known, unknown, foreseen or unforeseen at that time, including without limitation, any costs for delay, extended overhead, ripple or impact cost, or any other effect on changed or unchanged work as a result or the change or extra work. C4-4.6 SCHEDULE OF OPERATIONS: Before commencing any work under this contract, the Contractor shall submit to the Own~r and receive the owner's approval thereof, a •schedule of operations,• sho~i~g ~ya straight line _method the date of commencing and finishing each of the maJor elements of the contract. There shall be also shown the estimated monthly cost of work for which estimates ar~ to be expected. Tber~ C4-4 (3) shall be presented also a composite graph showing the anticipated progress of construction with the time being ;lotted horizontally and the percentag~ of completion plotted ~ertically . The progress charts shall be prepared on 8-l/2R x 11a sheets and at least five black or blue line prints shall be furnished to the Owner. C4-4.7 PROGRESS SCHEDULES FOR WATER AND SEWER PLANT FACILITIES: Within ten <lO> days prior to submission of first monthly progress· payment, the Contractor shall prepare and submit to the Oll>'ner for approval six copies of the schedule in which the Contractor proposes to carry on the work, the date of which he will start the several major activities <including procurement of materials, plans, and equipment> and the contemplated dates for completing the same. The schedule shall be in the form of a time schedule Critical Path "ethod (CPM) network diagram. ~s the work progresses, the Contractor shall enter on the diag~am the actual progress at the end of each partial payment period or at such intervals as directed by the Engineer. The Contractor shall also revise the schedule to reflect any adjustments in contract time approved by the Engineer. Three copies of the updated schedule shall be delivered at such intervals as directed by the OWner. As a minimum, the construction schedule shall incorporate all work elements and activities indicated in the proposal and in the technical specifications. Prior to the final drafting of the detailed construction schedule, the Contractor shall review the draft schedule with the Engineer to ensure the Contractor's understanding of the contract requirements. The following guidelines shall be adhered to in preparing the construction schedule: a. Milestone dates and final project completion dates shall be developed to conform to time constraints, sequencing requirements and completion time. b. The construction process shall be divided into activities with time durations of approximately fourteen (14) days and construction values not to exceed $50,000. Fabrication, delivery and submittal activities are exceptions to this guideline. C4-4 (4) ..... - ' -- .- - ,.~ .... - - - c. Dur~tions shall be in ca l endar days and normal holiday~ and ~eather conditions over th~ duration of the contract shall be accounted for within the duration of each activity. d. e. f. One critical path shall be shown on the construction schedule . Float time is defined as the amount of time between the earliest start date and the latest start date of a chain of activities of the CPM construction schedule. Float time is not for the exclusive use or benefit of either the Contractor or the Owner. Thirty days shall be used for submittal review unless otherwise specified. The construction schedule shall as a minimum be divided into general categories as indicated in the Proposal and Technical Specifications and each general category shall be broken down into activities in enough detail to achieve activities of approximately fourteen · Cl~) days duration. ~or each general category, the construction schedule shall identify all trades or subcontracts whose work is represented by activities that follow the guidelines of this Section. For each of the trades or subcontracts, the construction schedule shall indicate the following procurements, construction and preacceptance activities and events in their logical sequence for equipment and mat~rials. 1. 2. . 3. 4. 5. 6. Preparation and transmittal of submittals. Submittal review periods. Shop fabrication and delivery • Erection or installation. Transmittal of manufacturer'& operation and maintenance instructions. Installed equipment and mat~rials testing. 7. OWner's operator instruction <if applicable>. 8. Final inspection. C4-4 (5) 9 .. Operational testing. 10 . Final inspection. If, in the opinion of the Owner, work accomplished falls behind that scheduled, the Contractor shall take such action as necessary to improve his progress. In addition, t he Owner may require the Contractor to submit a revised s chedule demonstrating his program and proposed plan to make up lag in scheduled progress and to insure completion of the work within the contract time. If the Owner finds the proposed plan not acceptable, he may require the Co ntractor to increase the work force, the construction plant and equipment, the number of work shifts or the overtime oper5tions without additional cost to the OVner. Fa i lu·re pf the Contractor to comply with these requirements shal l be con'sidered grounds for determination by the Owner that the Contractor i-s failing to prosec:ute the work with such diligence as will insure its completion within the t ime specified. C4-4 (6) - ., 7) .. "' - - -.. - FART C -GENERAL CONDITIONS CS-5 CONTROL OF WORK AND MATERIALS SECTION CS-5 CONTROL OF WORK AND MATERIALS CS-5.l AUTHORITY OF ENGINEER: The work shall be performed to the satisfaction of the Engineer and in strict compliance with the Contract Documents. He shall decide all questions which arise as to the quality and acceptability of materials furnished, work performed, rate of progress of the work, overall sequence of the construction, interpretation of the Contract Documents, acceptable fulfillment of the contract, compensation, mutual rights between Contractor and Owner under these Contract Documents, supervision of the work, resumption of operations, and all other questions or disputes which may arise. Engineer will not be responsible for Contractor's means, methods, techniques, sequences or procedures of construction, or the safety precaution and programs incident thereto, and he will not be responsible for Contractor's failure to perform the work in accordance with the contract documents. Be shall determine the amount and quality of the ·work completed and materials furnished, and bis decisions and estimates shall be final. Bis estimates in auch event shall be a condition to the right of the Contractor to receive money due him under the Contract. The Owner ahall have executive authority to enforce and make effective such necessary decisions and orders as the Contractor fail• to carry out promptly. In the event of any dispute between the Engineer and Contractor over the decision of the Engineer on any such ~atters, the Engineer must, within a reasonable time, upon written request of the Contractor, render and deliver to both the owner apd Contractor, a written decision on the matter in controversy. CS-5.2 CONFORMITY WITB PLANS: The finiahed project in all cases shall conform with lines, gradea, croaa-sections, finish, and dimensions shown on the plans or any other requirements otherwise described in the Contract Documents. Any deviation from the approved Contract Documents required by the Eng'ineer during construction will in all cases be determined by the Engineer and authorized by the Owner by Change Order. cs-s (1) CS-5.3 COORDINATION OF CONTRACT DOCUMENTS: The Contract Documents are made up of several sections, which, taken together, are intended to describe and provide for a complete and useful project, and any requirements appearing in one of the sections is as binding as though it occurred in all sections. In case of discrepancies, figured dimension shall govern over scaled dimensions, plans shall govern over specifications, special conditions shall govern over general ··onditions and standard specifications, and quantities shown on the plans shall govern over those shown in the proposal. The Contractor shall not take advantage of any apparent error or omission in the Contract Documents, and the Owner shall be permitted to make such corrections or interpretations as may be deemed necessary for the fulfillment of the intent of the Contract Documents. In the event the Contractor discovers an apparent error or discrepancy, be shall immediately call this condition to the attention of the Engineer. In the event of a conflict in the drawings, specifications, or other portions of the Contract Documents which were not reported prior to the award of Contract, the Contractor shall be deemed to have quoted the most expensive resolution of tbe conf·lict. cs-s.• COOPERATION OF CONTRACTOR: The Contractor will be furnished with three sets of the Contract Documents and shall have avaiiable on tbe site of the project at all times one set of such Contract Documents. The Contract shall give to the work the constant attention necessary to facilitate the progress thereof and shall cooperate with the Engineer, his inspector, and other Contractors in every possible way. The Contractor shall at all times have competent personnel available to the project site for proper performance of the work. The Contractor shall provide and maintain at all times at the site of the project a competent, English-speaking superintendent and an assistant who are fully authorized to act as the Contractor's agent on the work. Such superintendent and his assistant shall be capable of reading and understanding the Contract Documents and shall receive and fulfill instructions from the Owner, the Engineer, or bis authori:ed representatives. Pursuant to this responsibility of the Contractor, the Contractor shall designate in writing to the project superintendent, to act as the Contractor'• agent on the work. Such assistant project superintendent shall be a resident of Tarrant County, Texas and shall be subject to call, as is the project Superintendent, at any time of the day or night on any day of · the week on which the Engineer determines that circumstances require the presence on the project site of a representative of the Contractor to cs-s (2) - - - - - _, - adequately provide for the safety or convenience of the traveling public or the owners of property across which the project extends or the safety of property contiguous to the project routing. The Contractor shall provide all facilities to enable the Engineer and his inspector to examine and inspect the workmanship and materials entering into the work. CS-5.5 EMERGENCY AND/OR RECTIFICATION WORK: When, in the opinion of the Owner or Engineer, a condition of emergency exists related to any part of the work, the Contractor, or the Contractor through his designated representative, shall respond with dispatch to a verbal request made by the owner or Engineer to alleviate the emergency condition. Such a response shall occur day or night, whether the project is scheduled on a calendar-day or on a working-day basis. Should th·e Contractor fail to respond to a request from the Engineer to rectify any discrepancies, omissions, or corrections necessary to conform with the requirements of the project specifications or plans, the Engineer shall give the Contractor written notice that such work or changes are to be performed. The written notice shall direct attention to the discrepant condition and request the Contractor to take remedial action to correct the condition. In the event the Contractor does not take positive steps to fulfill this written request, or does not show just cause for not taking the proper action, within 24 hours, the City may take such remedial action with City forces or by contract. The City shall then deduct an amount equal to the entire costs for such remedial action, plus 251, from any funds due the Contractor on the project. CS-5.6 FIELD OFFICE: The Contractor shall provide, at no extra compensation, an adequate field office for use of the Engineer, if specifically called for. The field office shall be not less than 10 by 14 feet in floor area, substantially constructe~, well heated, air conditioned, lighted, and weather-proof, so that documents will not be damaged by the elements. CS-5.7 CONSTRUCTION STA~ES: The City, through its Engineer, .will furnish the Contractor with all lines, grades, and measurements necessary to the proper prosecution and control of the work contracted for under these Contract Document&, and lines, grades and measurements will be established by means of stakes or other customary method of marking as may be found consistent with good practice. cs-s (3) These stakes or markings shall be set sufficiently in advance of construction operations to avoid delay. Such stakes or markings as may be established for the Contractor's use or guidance shall be preserved .by the Contractor until he is authorized by the Engineer to remove them. Whenever, in the opinion of the Engineer, any stakes or markings have been carelessly or willfully destroyed, disturbed, or removed by the Contractor or any of his employees, the full cost of .replacing such stakes or marks plus 251 will be charged against the Contractor, and the full amount will be deducted from payment due the Contractor. CS-5.8 AUTHORITY AND -DUTIES OF CITY INSPECTORS: City Inspectors will be auLborized to inspect all work done and to be done and all materials furnished. Such inspection may extend to all or any part of the work, and the preparation or manufacturing of the materials to be used or equipment to be installed. A City Inspector may be stationed on the work to report to the Engineer aa to the progress of the work and the manner in which it is being perf.ormed, to report any evidence that the materials being furnished or the work being performed by the Contractor fail• to fulfill the requirements of the Contract Documents, and to call the attention of the Contractor to any aucb failure or other infringements. Such inspection or lack of inspection will not relieve the Contractor from any obligation to perform the work in accordance with the requirements of tbe Contract Documents. In case of any dispute arising between tbe Contractor and the City Inspector as to the materials or equipment furnished or the manner of performing the work, the City Inspector will have authority to reject materials or equipment to suspend work until the question at iaaue can be referred to and be decided by the Engineer. The City Inspector will not, however, be authorized to revoke, alter, enlarge, or release any requirement of these Contract Documents~ nor to approve or accept any portion or section of the work, nor to issue any instructions contrary to the requirements of .the Contract Documents. Be will in no case act as superintendent or foreman or .Perform any other duties for the Contractor, or interfere with the management or operation of the work. Be will not accept from the Contractor any compensation in any form for performing any duties. The Contractor ahall regard and obey the directions and instructions of tbe City Inspector or Engineer when the same are consistent with the obligations of the Contract Documents, provided, however, should the contractor object to any orders or instruction& of the City Inspector, the Contractor may within six days make written .appeal to the Engineer for his decision on the matter in controversy. cs-s (4) .. - -. - - - - - .. -. - - CS-5.9 INSPECTION: The Contractor shall furnish the Engineer with every reasonable facility for ascertaining whether or not the work as performed is in accordance with the requirements of the Contract Document6. If. the Engineer so requests, the Contractor shall, at any time before acceptance of the work, remove or uncover such portion of the finished work as may be directed. After examination, the Contractor shall restore said portions of the work to the 6tandard required by the Contract Documents. Should the work exposed or examined prove acceptable, the uncovering or removing and replacing of the covering or making good of the parts removed shall be paid for as extra work, but should be work so exposed or examined prove to be unacceptable, the uncovering or removing and the replacing of all adjacent defective or damaged parts shall be at the Contractor's expense. No work shall be done or materials used without ~uitable supervision or inspection. CS-5 .10 REMOVAL OF DEFECTIVE AND UNAUTHORIZED WOU: All work, materials, or equipment which has been rejected shall be remedied or removed and replaced in an acceptable manner by the Contractor at his own expense. Work done beyond the lines and grades given or as shown on the plans, except as herein specifically provided, or ·any Extra Work done without written authority, will be considered as unauthorized and done at the expense of the Contractor and will not be paid for by the Owner. Work so done may be ordered removed at the Contractor's expense. Upon the failure on the part of the Contractor to comply with any order of the Engineer made under the provisions of this paragraph, the Engineer will have the authority to cause defective work to be remedied or removed and replaced and unauthorized work to be removed, and the cost thereof may be deducted from any money due or to become due to the Contractor. Failure to require the removal of any defective or unauthorized work aball not constitute acceptance of such works. cs-5.ll SUBSTITUTE MATERIALS ORE UIPMENT: If the Speci ications, law, ordinance, codes or regulations permit Contractor to furnish or use a substitute that is equal to any material or equipment specified, and if Contractor wishes to furnish or use a proposed substitute, be aball, prior to the preconstruction conference, make written application to ENGINEER for approval of such substitute certifying in writing that the proposed substitute will perform adequately the functions called for by the general design, be similar and of equal substance to that specified and be suited to the same use and capable of performing tbe same function as that specified; and identifying all variations of the proposed cs-s (5) ~ubstitute from that .specified and indicating available maintenance service. No substitute shall be ordered or installed without the written .approval of Engineer who will be the judge of the equality and may require Contractor to furnish such other data about the proposed substitute as he considers pertinent. No substitute shall be ordered or installed without such performance guarantee and bonds as Owner may require which shall be furnished at Contractor's ·expense. Contractor shall indemnify and hold harmless Owner · and Engineer and anyone directly or indirectly employed by either of them from and against the claims, damages, losses and expenses (including attorneys fees> arising out of the use of substituted materials or equipment. cs-s.12 SAMPLES AND TESTS OR MATERIALS: Where, in the opinion of the Engineer, or as called for in the Contract Documents, te~ts of materials or equipment are necessary, such tests will be made at the expense of and paid for direct to the testing agency by the Owner unless otherwise specifically provided. rhe failure of the OWner to make any tests of materials aball ,e in no way relieve the Contractor of bis responsibility of furnishing materials and equipment fully conforming to the requirements of the Contract Documents. Tests and sampling of materials, unless otherwise specified, will be made in accordance with the latest methods prescribed by the American Society for Testing Materials or specific requirements of the Owner. The Contractor shall provide such facilities as the Engineer may require for collecting and forwarding samples and shall not, without specific written permission of the Engineer, use the materials represented by the samples until tests have been made and the materials approved for use. The Contractor will furnish adequate samples without charge to the OWner. In case of concrete, the aggregates, design minimum, and the mixing and transporting equipment shall be approved by the Engineer before any concrete is placed, and the Contactor shall be responsible for replacing any concrete which does not meet the requirements of the Contract Documents. Tests shall be made at least 9 days prior to the placing of concrete, using samples from the same aggregate, cement, and mortar which are to be used later in the concrete. Should the source of supply change, new tests shall be made prior to the use of the new materials. cs-5.13 STORAGE OF MATERIALS: All materials which are to be used in the construction operation shall be stored so a• to insure the preservation of the quality and fitness of the work. When directed by the Engineer, they shall be placed on wooden platforms or other hard, clean durable surfaces and not on the cs-s (6) - - .... - - - - -- - - ground, and shall be placed under cover when directed. Stored materials shall be placed and located so as to facilitate prompt inspection . CS-5.14 EXISTING STRUCTURES AND UTILITIES: The location and dimensions shown on the Plans relative to existing utilities are based on the best information available. Omission from, or the inclusion of utility locations on the Plans is not to be considered as the nonexistence of, or a definite location of, existing underground utilities. The location of many gas mains, water mains, conduits, sewer lines and service lines for all utilities, etc., is unknown to the Owner, and the Owner assumes no responsibility for failure to show any or all such structures and utilities on the plans or to show them in their exact location. It is mutually agreed that such failure will not be considered sufficient basis for claims for additional compensation for Extra Work or for increasing the pay quantities in any manner whatsoever, unless an obstruction encountered is such as to necessitate changes in the lines and grades of considerable magnitude or requires the building of special works, provision for which is not made in the Contract Documents, in which case the provision in these Contract Documents for Extra Work shall apply. It shall be the Contractors responsibility to verify locations of adjacent and/or conflicting utilities sufficiently in advance of construction in order that he may negotiate such local adjustments as necessary in the construction process to provide adequate clearances. The Contractor shall take all necessary precautions in order to protect all existing utilities, structures and service lines. Verification of existing utilities, structures and service lines shall include notification of all u~ility companies at least forty eight (48) hours in advance of construction including exploratory excavation if necessary. All verification of existing utilities and their adjustment ahall be considered as subsidiary work. cs-S.15 INTERRUPTION OF SERVICE: a. Normal Prosecution: In the normal prosectuion of work where the interruption of service is necessary, the Contractor, at least 24 hours in advance, shall be required to: l. Notify the Water -Department's Distribution Division as to location, time, and schedule of service interruption. cs-s (7) b. 2. Notify each customer personally through responsible personnel as to time and schedule of the interrup;ion of their service, or 3. In the event that personal notification of a customer cannot be made, a prepared tag form shall be attached to the customer's entrance door knob. The tag shall be durable in composition, and in large bold type shall say: •NOTICE• Due to Utility Improvement in your neighborhood, your (water) <•ewer) service will be inter- rupted on between the houra of and •. ---- Thia inconvenience will be aa abort as possible. Thank you, Contractor Address Phone Emergency: In tbe event that an unforeseen aervice interruption occurs, notice shall be as above,but immediate. cs-S.16 MUTUAL RESPONSIBILITY OF CONTRACTORS: If, through acts or neglect on tbe part of the Contractor, any other Contractor or any sub-contractor ahall suffer loss or damage on the work, tbe Contractor agrees to settle with auch other Contractor or sub-contractor by agreement or arbitration. If such other Contractor or sub-contractor shall assert any claim against the Owner on account of any damage alleged to have been sustained, the Owner will notify tbe Contractor, who shall indemnify and save harmless the OWner against any such claim. cs-S.17 CLEAN-UP: Clean-up of surplus and/or waste materials accumulated on the job site daring the prosecution of the work under these Contract Documents shall be accomplished in keeping with a daily routine established to the the satisfaction of the Engineer. Twenty-fours fours after written notice is given to the Contractor that tbe clean-up on t he job site is proceeding in a manner unsatisfactory to the E ngineer, if the Contractor fails to correct the cs-s (8) - - - .- - unsatisfactory procedure, the City may take such direct action as the Engineer deems appropriate to correct the clean-up deficiencies cited to the Contractor in the written notice, and the costs of such direct iction, plus 25% of such costs, shall be deducted from monies due or to become due to the Contractor. Upon the completion of the project as a whole as covered by these Contract Documents, and before final acceptance and final payment will be made, the Contractor shall clean and remove from the site of the project all surplus and discarded materials, temporary structures, and debris of every kind. Be shall leave the site of all work in a neat and orderly condition equal to that which originally existed. Surplus and waste materials removed from the site of the work shall be disposed of at locations satisfactory to the Engineer. The Contractor shall thoroughly clean all equipment and materials installed by him and shall deliver over such materials and equipment in a bright, clean, polished and new appearing condition. No extra compensation will be made to the Contractor for any clean-up required on the project. CS-S.18 FINAL INSPECTION: Whenever the work provided for in and contemplated under the Contract Documents has been satisfactorily completed and final cleanup performed, the Engineer will notify the proper officials of the Owner and request that the Final inspection be made. Such inspection will be made within 10 days after such notification. After such final inspection, if the work and materials and equipment are found satisfactory, the Contractor will be notified in writing of the acceptance of the same after the proper resolution has been passed by the City Council. No time charge will be made against the Contractor between said date of notification of the Engineer and the date of final inspection of the work. cs-s (9) - - - - - ,- - -· - PART C -GENERAL CONDITIONS C6-6 LEGAL RELATIONS AND PUBLIC RESPONSIBILITY SECTION C6-6 LEGAL RELATIONS AND PUBLIC RESPONSIBILITY C6-6.l LAWS TO BE OBSERVED: The Contractor shall at all times observe and comply with all Federal and State Laws and City ordinances and regulations which in any way affect the conduct of the work or his operations, and shall observe and comply with all orders, laws, ordinances and regulations which exist or which may be enacted later by bodies having jurisdiction or authority for such enactment. No plea of misunderstanding or ignorance thereof will be considered. The Contractor and his Sureties shall indemnify and save harmless the City and all of its officers, agents, and employees against any and all claims or liability arising from or based on the violation of any such law, ordinance, regulation, or order, whether it be by himself or bis employees. C6-6.2 PERMITS AND LICENSES: The Contractor shall procure all permits and licenses, pay all charges, costs and fees, and give all notices necessary and incjdent to the due and lawful prosecution of the work. C6-6.3 PATENTED DEVICES, MATERIALS AND PROCESSES: If the Contractor is required or desires to use any design, device, material, or process covered by letter, patent, or copyright, he shall provide for such use by auitable legal agreement with the patentee or owner of aucb patent, letter, or copyrighted design. It is mutually agreed and understood that without exception the contract prices shall include all royalties or cost arising from patents, trade-marks, and copy rights in any way involved in the work. The Contractor and bis sureties shall indemnify and save harmless the Owner from any and all claims for infringement by reason of the use of any such patented design, device, material or process, or any trade-mark or copy right in connection with the work agreed to be performed under these Contract Documents, and shall indemnify the Owner for any cost, expense, or damage which it may be obliged to pay by reason of auch infringement at any time during the prosecution of the work or after completion of the work, provided, however, that the Owner will assume the responsibility to defend any and all auita brought for the infringement of any patent claimed to be infringed upon by · the design, type of construction or material or equipment specified in the Contract Documents furnished the Contractor by the owner, and to bold the Contractor harmless on account of such suits. C6-6 Cl) C6-6.~ SANITARY PROVISIONS: The Contractor shall establish and enforce among his employees such regulations in regard to cleanliness and disposal of garbage and waste as will tend to prevent the inception and spread of infectious or contagious diseases and to effectively prevent the creation of a nuisance about the work on any property either public or private, and such regulations as are required by Law shall be put into immediate force and effect by the Contractor. The necessary sanitary conveniences for use of laborers on the work, properly secluded from public observation, shall be constructed and maintained by the Contractor and their use shall be strictly enforced by the Contractor. All such facilities shall be kept in a clean and sanitary condition, free from objectionable odors ao as not to cause a nuisance. All sanitary laws and regulation& of the State of Texas and the City shall be strictly complied with. C6-6. 5 PUBLIC SAFETY AND CONVENIENCE: Material• or equipment stored about the work shall be ao placed and used, and the work shall at all times be ao conducted, aa to cauae no greater obstruction or inconvenience to the public than is considered to be absolutely necessary by the Engineer. The Contractor is required to maintain at all time• all phase• of bis work in such a manner aa not· to impair the safety or convenience of the public, including, but not limited to, safe and convenient ingress and egress to property contiguous to the work area. The Contractor ahall make adequate provision• to render reasonable ingress and egress for normal vehicular traffic,·except during actual trenching or pipe inatallation operations, at all driveway croaainga. Such provisions may include bridging, placement of crushed atone or gravel or aucb ~ other means of providing proper ingress a~d egreaa for the property served by the driveway aa the Engineer may approve aa appropriate. Such other meana may include the diveraion of driveway traffic, with specific approval by the Engineer. If diversion of traffic ia approved by the Engineer at any location, the Contractor shall make arrangement• aatiafactory to the Engineer at any location, the Contractor aball make arrangements satisfactory to the Engineer for the diversion of traffic, and shall, at bis ovn expense, provide all material• and perform all work neceaaary for the construction and maintenance of roadways and bridges for aacb diveraion of traffic. Sidewalks must not be obstructed except by special permission of the Engineer. The materials excavated .and the construction materials aucb as pipe used in the construction of the work shall be placed ao as not to endanger the work or prevent free access to all fire hydrants, fire alarm boxes, police call boxes, water valves, C6-6 (2) ,.... ' '. ,_ - = ' .....::·.-.' - - gas valves, or manholes in the vicinity. The O\rlller reserves the right to remedy any neglect on the part of the Contractor as regards to public convenience and safety which may come to its attention, after twenty-four hours notice in writing to the Contractor, save in cases of emergency when it shall have the right to remedy any neglect without notice, and in either case, the cost of such work done or materials furnished by the owner or by the City shall be deducted from monies due or to become due to the Contractor. The Contractor, after approval of the Engineer, shall notify the Fire Department Headquarters, Traffic Engineer, and Police Department, when any street or alley is requested to be closed or obstructed or any fire hydrant is to be made inaccessible, and, when so directed by the Engineer, shall keep any street, streets, or highways in condition for unobstructed use by fire apparatus. The Contractor shall promptly notify the Fire Department Headquarters when all such obstructed streets, alleys, or hydrants are again placed back in service. Where the Contractor ia required to construct temporary bridges or make other arrangements for crossing over ditches or streams, bis responsibility for accidents in connection with such crossings shall include the roadway approaches as well as the structures of such crossings. The Contractor shall at all times conduct bis operation and the use of construction machinery so as not to damage or destroy trees and shrubs located in close proximity to or on the site of the work. Wherever any such damage may be done, the Contractor shall immediately satisfy all claims of property owners, and no payment will be made by the Owner in settlement of such claims. The Contractor aball file with the Engineer a written &tatement showing a11 · such claims adjusted. C6-6.6 PRIVILEGES OF CONTRACTOR IN STREETS, ALLEYS, AND RIGHT-OF-WAY: For the performance of the contract, the Contractor will be permitted to use and occupy such portions of the public streets and alleys, or other public p1aces or other rights-of-way as provided for in the ordinances of the City, as shown in the Contract Documents, or as may be specifically authorized in writing by the Engineer. A reasonable amount of tools, materials, and equipment for construction purposes may be stored in such space, but no more than is necessary to avoid delay in the construction operations. Excavated and waste materials shall be piled or stacked in such a way as not to interfere with the use of spaces that may be designated to be left free and unobstructed and so as not to inconvenience occupants of adjacent property. If the street is occupied by railway tracks, the work shall be C6-6 (3) carried on in such manner as not to interfere with the operation of trains, loading or unloading of cars, etc. Other contractors of the Owner may, for all purposes required by the contract, enter upon the work and premises used by the Contractor and shall be provided all reasonable facilities and assistance for the completion of adjoining work. Any additional grounds desired by the Contractor for his use shall _be provided by him at his own cost and expense. C6-6.7 RAILWAY CROSSINGS: When the work encroaches upon any right-of-way of any railway, the City will secure the necessary easement for the work. Where the railway tracks are to be crossed, the Contractor shall observe all the regulations and instructions of the railway company as to the methods of performing the work and take all precaution& for safety of property and the public. Negotiations with the railway companies for permits shall be done by and through tbe City. The Contractor shall give the City notice not less than five days prior to the time of bis intentions to begin work on that portion of tbe project which i• related to the railway properties. The Contractor will not be given extra or additional compensation for aucb railway crossings unless specifically set forth in the Contract Documents. C6-6.S BARRICADES, WARNINGS AND WATCHMEN: Where tbe vork is carried on in or adjacent to any street, alley, or public place, the Contractor shall at bis own expense furnish, erect, and maintain such barricades, fences, light• and danger signals, ahall provide auch watchmen, and shall take all aucb other precautionary measures for tbe protection of persona or property and of the work•• are necessary. Barricades and fences shall be painted in a color that will be visible at night. From sunset to sunrise the Contractor ahall furnish and .maintain at least one easily visible burning light at each barricade. A sufficient number of barricades shall be erected and maintained to keep p~deatriana away from, and vehicles from being driven on or into, any work ander construction or being maintained. The Contractor ahall furniab watchmen and keep them at their respective aaaignmenta in sufficient . numbers to protect the work and prevent accident or damage. All installations and procedures shall be consistent with the provisions set forth in the •19eo Texas Manual on Uniform 'l'raffic Control Devices for Streets and Bigbwaya• iaaued under the authority of the •state of 'l'exaa Uniform Act Regulating 'l'raffic on Highways•, codified as Article 6701d Veron'• Civil Statutes, pertinent sections being Section Noa. 27, 29, 30 and 31. C6-6 CC) - - The Contractor will not remove any regulatory sign, instructional sign, street name sign, or other sign which has been erected by the City. If it is determined that a sign must be removed to permit required construction, the Contractor shall contact the Transportation and Public Works department, Signs and Markings Division (phone number 8780-8075), to remove the sign. In the case of regulatory signs, the Contractor must replace the permanent sign with a temporary sign meeting the requirements of the above referenced manual and such temporary sign must be installed prior to the removal of the permanent sign. !f the temporary sign is not installed correctly or if it does not meet the required specifications, the permanent sign shall be left in place until the temporary sign requirements are met. When construction work is completed to the extent that the permanent·sign can be re-installed, the Contractor shall again contact the Signs and Markings Division to re-install the permanent sign and shall leave his temporary sign in place until such re-installation is completed. The Contractor will be held responsible for all damage to the work or the public due to failure of barricades, signs, fences, lights, or watchmen to protect them. Whenever evidence is found of such damage to the work the Engineer may order the damaged portion immediately removed and replaced by the Contractor at the Contractor's own expense. The Contractor's responsibility for the maintenance of barricades, signs, fences and lights, and for providing watchmen &hall not cease until the project shall have been completed and accepted by the Owner. No compensation, except as specifically provided in these Contract Documents, will be paid to the Contractor for the work and materials involved in the constructing, providing, and maintaining of barricades, signs, fences, and lights or for salaries of watchmen, for the subsequent removal and disposal of such barricades, signs, or for any other incidentals necessary for the proper protection, safety, and convenience of the public during the contract period, as this ~erk is considered to be subsidiary to the several items for which unit or lump sum prices are requested in the Proposal. C6-6.9 USE OF EXPLOSIVES, DROP WEIGHT, ETC.: Should the Contractor elect to use explosives, drop weight, etc., in the prosecution of the work, the utmost care shall be exercised at all times so as not to endanger life or property. The · contractor shall notify the proper representative of any public service corporation, any company, individual, or utility, and the owner, not less than twenty-four hours in C6-6 CS> advance of the use of any activity which might damage or endanger their or his property along or adjacent to the work. Where the use of explosives is to be permitted on the project, as specified in the Special Contract Documents, or the use of explosives is requested, the Contractor shall submit notice to the Engineer in vriting twenty-four hours prior to commencing and shall furnish evidence that he has insurance coverage to protect against any damages and/or injuries arising out of such use of explosives.· · All claims arising out of the use of explosives shall be investigated and a written report made by the Contractor's insurers to the Engineer within ten ClO> days after receipt of written notice of the claim to the Contractor from either the City or the claimant. The City shall proceed to give ~otice to the Contractor of any such claim. The use of exploa-i ves may be suspended by the Engineer if any complaint is received and such use shall not be resumed until the cause of the complaint bas been addressed. Whenever explosives are stored or kept, they shall be stored in a safe and secure manner and all storage places shall be plainly marked •DANGEROUS EXPLOSIVES• and shall be under the care of a competent watchman at all times. All vehicles in which explosives are being transported shall be plainly marked as mentioned above and shall, insofar aa possible, not use heavy traffic routes. C6-6.l0 WOR~ WITHIN EASEMENTS: Where the work passes over, through, or into private property, the OVner will provide aucb right-of-way or easement privileges aa tbe City may deem necessary for the prosecution of the work. Any additional · rights-of-way or work area considered necessary by the . Contractor shall be provided by bim at hia own expense. Such additional rights-of-way or work area shall be acquired for the benefit of the City. The City shall be notified in writing as to the rights so acquired before work begins in the affected area. The Contractor shall not enter upon private property for any purpose without having previously obtained permission from the owner of such property. 'l'be Contractor will not be allowed to store equipment or material on private property unless and until the specified approval of the property owner has been aecured in writing by the Contractor and a copy furnished to the Engineer. Unless specifically provided otherwise, the Contractor shall clear a1; rights-of-way or easements of obstructions which must be removed to make possible proper prosecution of the work as a part of the project construction operations. The Contractor shall be responsible for the preservation of and shall use C6-6 (6) - [ - - - every precaution to prevent damage to all trees, shrubbery, plants, lawns, fences, culverts, curbing, and all other types of structures or improvements, to all water, sewer, and gas lines, to all conduits, overhead pole lines, or appurtenances thereof, including the construction of temporary fences, and to all other public or private property along adjacent to the work. The Contractor shall notify the proper representatives of Oli?lers or occupants of public or private lands or interest in lands which might be affected by the work. Such notice shall be made at least 48 hours in advance of the beginning of the work. Notices shall be applicable to both public and private utility companies or any corporation, company, individual, or other, either as owners or occupants, whose land or interest in land might affected by the work. The Contractor shall be responsible for all damage or injury to property of any character resulting from any act, omission, neglect, or misconduct in the manner or method or execution of the work, or at any time due to defective work, material, or equipment. When and where any direct or in~irect or ~njury is done to public or private property on account of any act, omission, neglect, or misconduct in the execution of the work, or in consequence of the non~execution thereof on the part of the Contractor, be shall restore or have restored at his own cost and expense such property to a condition at least equal to that existing before such damage or injury was done, by .repairing, rebuilding, or otherwise replacing and restoring as may be directed by the Owner, or he shall make good such damages or injury in a manner acceptable to the owner of the property and the Engineer. All fences encountered and removed during construction of this project shall be restored to the original or a better than original condition upon completion of this project. When wire fencing, either wire mesh or barbed wire is to be crossed, the Contractor shall aet cross braced posts on either side of permanent easement before the fence is cut. Should additional fence cuts be necessary, the Contractor shall provide cross braced posts at point of the proposed cut in addition to the cross braced posts provided at the permanent easements limits, before the fence ia cut. Temporary fencing shall be erected in place of the fencing removed whenever the work is not in progress and when the site is vacated overnight, and/or at all times to prevent livestock from entering the construction area. The cost for fence removal, temporary closures and replacement shall be subsidiary to the various items bid in the project C6-6 (7) proposal. Therefore, no separate payment shall be allowed for any service associated with this work. In case of failure on the part of the Contractor to restore such property to make good such damage or injury, the Owner ~ay, upon 48 hour written notice under ordinary circumstances, and without notice when a nuisance or hazardous condition results, proceed to repair, rebuild, or otherwise restore such property as may be determined by the Owner to be necessary, and the cost thereby will be deducted from any monies due or to become due to the Contractor under this Contract. C6-6.ll INDEPENDENT CONTRACTOR: It is understood and agreed by the parties hereto that Contractor shall perform all work and services hereunder as an independent contractor, and not as an officer, agent, servant or employee of the Owner. Contractor shall have exclusive control of and the exclusive right to control the details of all the work and services performed hereunder, and all persons performing same, and shall be solely responsible for the acts and omissions of ita officers, agents, aervants, employees, contractors, subcontractors, licensees and invitee&. The doctrine of respondeat superior ahall not apply as between Owner and Contractor, its officers, agents, employees, contractors and subcontractors, and nothing herein shall be construed as creating a partnership or joint enterprise .between Owner and Contractor. C6-6.12 CONTRACTOR'S RESPONSIBILITY FOR DAMAGE CLAIMS: Contractor covenants and agrees to, and does hereby indemnify, hold harmless and defend Owner, ita officer•, agents, servants, and employees from and against any an all claims or suits for property damage or loss and/or personal injury, including death, to any and all persons, of vhataoever kind or character, whether real or aaaerted, arising out of or in connection with, directly or indirectly, tbe work and aervicea t -o be performed hereunder by Contractor, ita officer•, agents, employees, contractors, aubcontractora, licensees or invitee•, wh~ther or not caused, in whole or in part, by alleged negligence on ·the part of off icera, agent•, servant•, employees, contractors, aubcontractora, licensees and invitees -of the Owner; and said Contractor does hereby covenant and agree to assume all liability and responsibility of OWner, ita officers agents, servants and employees for property damage or loss, and/or personal injuries, including death, to any and all persons of whatsoever kind or character, whether real or asserted, arising out of or in connection with, directly or indirectly, the work and services to be performed hereunder by contractor, its officers, agents employees, contractors, subcontractors, iicensees and invitees, whether or not caused, C6-6 (8) f .- :- in whole or in part, by alleged negligence of officers, agents, servants, employees, contractors, subcontractors, 1icensees or invitees of the Owner. Contractor likewise covenants and agrees to, and does hereby, indemnify and hold harmless Owner from and against any and all injuries,loss or damages to property of the Owner during the performance of any of the terms and conditions of this Contract, vhether arising out of or in connection with or resulting from, in whole or in part, any and all alleged acts or omissions of officers, agents, servants, employees, contractors, subcontractors, licenses, or invitees of the Owner. ln the event a written claim for damages against the contractor or its subcontractors remains unsettled at the time all work on the project has been completed to the satisfaction of the Director of the Water Department, as evidenced by a final inspection, final payment to the Contractor shall not be recommended by the Director of the Water Department for a period of 30 days after the date of such final inspection, unless the Contractor shall submit written evidence satisfactory to the Director that the claim baa been settled and a release has been obtained from the claimant involved. If the claim concerned remains unsettled as of the expiration of _ the above 30-day period, the Contractor may be deemed to be entitled to a semi-final payment for work completed, such semi-final -payment to be in an amount equal to the total dollar amount then due less the dollar value of any written claims pending against the Contractor arising out of the performance of such work, and such semi-final payment may then be recommended by the Director. The Director shall not recommend final payment to a Contractor against whom such a claim for damages is outstanding for a period of 6ix months following the date of the acceptance of the work performed unleaa the Contractor submits evidence in writing sati6factory to the Director that: 1. The claim bas been settled and a release bas been obtained from the claimant involved, or 2. Good faith efforts have been made to settle such outstanding claims, and such good faith efforts have failed. If condition Cl> above ia met at any time within the six month period, the Director shall recommend that the final payment to the Contractor be made. If condition (2) above is met at any time within the six month period, the Director may recommend that the final payment to the Contractor be made. At the C6-6 (9) ex p iration of the six month period the Director may recommend t h at final payment be made if all other work has been performed and all other obligations of the Contractor have been met to the satisfaction of the Director. The Director may, if he deems it appropriate, refuse to accept bids on other Water Department Contract work from a Contractor against whom a claim for damages is outstanding as a result of work performed under a City contract. C6-6.13 CONTRACTOR'S CLAIM FOR DAMAGES: Should the Contractor claim compensation for any alleged damage by reason of the acts or omissions of the owner, he shall within three days after the actual sustaining of such alleged damage, make a written statement to the Engineer, setting out in detail the nature of the alleged damage, and on or before the 25th day of the month succeeding that in which any such damage is .claimed to have . been sustained, the Contractor shall file with the Engineer an itemized statement of the details and amount of such alleged damage and, upon request, shall give the Engineer access to all books of account, receipts, vouchers, bills of lading, and other books or papers containing any evidence as to the amount of such alleged damage. Unless such statements shall be filed as hereinabove required, the Contractor'• claim for compensation shall be waived, and be shall not be entitled to payment on account of such damages. C6-6.l4 ~DJ~STMENT OR RELOCATION OF PUBLIC UTILITIES< ETC.: In case it is necessary to change, move, or alter in any manner the property of a public utility or others, the said property shall not be moved or interfered with until orders thereupon have been issued by the Engineer. Tbe right is reserved to the owners of public utilities to enter the geographical limits of the Contract for the purpose of making such changes or repairs to their property that may be necessary by the performance of this contract. C6-6.1S TEMPORARY SEWER AND DRAIN CONNECTIONS: When existing sewer lines have to be taken up or removed, the Contractor shall, at his own expense and cost, provide and maintain temporary outlets and connections for all private or public dr ains and sewers. The Contractor shall also take care of all sewage and drainage which will be received from these drains and sewers, and for this purpose he ~ball provide and maintain, at his own cost and expense, adequate pumping facilities and temporary outlets or diversions. The contractor, at his ovn cost and expense, shall construct s uch troughs, pipes, or other structures necessary, and be prepared at all times to dispose of drainage and sewage C6-6 (10) received from these temporary connections until such ·times as the permanent connections are built and are in service. The existing sewers and connections shall be kept in service and maintained under the Contract, except when specified or ordered to be abandoned by the Engineer. All water, sewage, and other waste shall be disposed of in a satisfactory manner so that no nuisance is created and so that the work under construction will be adequately protected. C6-6.16 ARRANGEMENT AND CHARGES FOR WATER FURNISHED BY THE CITY: When the Contractor desires to use City water in connection with any construction work, he shall make complete and satisfactory arrangements with the Port Worth City Water Department for so doing. City water furnished to the Contractor shall be delivered to the Contractor from a connection on an existing City main. All piping required beyond the point of delivery shall be installed by the Contractor at his own expense. The Contractor'& responsibility in the use of all existing fire hydrant and/or valves is detailed in Section E2-l.2 USE OF FIRE HYDRANTS AND VALVES in these General Contract Documents. When meters are used to measure the water, the charges, if any, for water will be at the regular established rates. When meters are not used, the charges, if any, will be as prescribed by the City Ordinance, or where no ordinance applies, payment shall be made on estimates and rates established by the Director of the Fort Worth Water Department. C6-6.l7 USE OF A SECTION OR PORTION OF THE WO~: Whenever, in the opinion of the Engineer, any section or portion of the work or any structure ia in suitable condition, it may be put into use upon the written order of the Engineer, and such usage shall not be held to be in any way an acceptance of said work or structure or any part thereof or as a waiver of any of the provisions of these Contract Documents. All necessary repairs and removals of any section of the work so put into use, due to defective materials or workmanship, equipment, or to deficient operations on the part of the Contractor, shall be performed by the Contractor at his own expense. C6-6.l8 CONTRACTOR'S RESPONSIBILITY FOR THE WOR~: Until written acceptance by the Owner as provided for in these contract Documents, the work shall be under the charge and care of the Contractor, and be shall take every necessary precaution to prevent injury or damage to the work or any part C6-6 Cll) thereof by action of the elements or from any cause whatsoever, whether arising from the execution or nonexecution of the work. The Contractor shall rebuild, repair, restore, and make good at his own expense all injuries or damage to any portion of the work occasioned by any of the hereinabove causes. C6-6.l9 NO WA:rvER OF LEGAL RIGHTS: Inspection by the Engineer or any order by the Owner by payment of money or any payment for or acceptance of any work, or any extension of time, or any possession taken by the City shall not operate as a waiver of any provision of the Contract Documents. ~ny waiver of any breach or Contract shall not be held to be a waiver of any other or subsequent breach. The Owner reserves the right to correct any error that may be discovered in any estimate that may have been paid and to adjust the same to meet the requirements of the Contract Documents. C6-6.20 PERSONAL LIABILITY OF PUBLIC OFFICIALS: In carrying out the provisions of these Contract Documents or in exercising any power of authority granted thereunder, there shall be no liability upon the authorized representatives of the Owner, either personally or otherwise as they are agents· and representatives of the City. C6-6.21 STATE SALES TAX: On a contract awarded by the City of Fort Worth, an organization which qualifies for exemption pursuant the provisions of Article 20.0, <B> of the Texas Limited Sales, excise, and Ose Tax ~ct, the Contractor may purchase, rent or lease all materials, supplies and equipment used or consumed in the performance of this contract by issuing to his supplier an exemption certificate in lieu of the tax, said exemption certificate to comply with State Comptroller's Ruling .007. Any such exemption certificate .issued by the Contractor in lieu of the tax shall be subject to and shall comply with the provisions of State Comptroller'• Ruling .011, and any other applicable State Comptroller rulings pertaining to the Texas Limited Sale•, Excise, and Oae Tax Act. on a contract awarded by a developer for the construction of a publicly-owned improvement in a street right-of-way or other easement which bas been dedicated to the public and the City of Fort worth, an organization which qualifies for exemption , pursuant to the provisions of Article 20.04 <B> of tbe Texas limited sales, Excise, and Use Tax Act, the Contractor can probably be exempted in the same manner stated above. C6-6 (12) \ , l - Limited Sale, Excise and Use Tax permits and information can be obtained from: Comptroller of Public Acco·unts Sale Tax Division Capitol Station Austin, TX C6-6 (13) PART C -GENERAL CONDITIONS C7-7 PROSECUTION AND PROGRESS SECTION C7-7 PROSECUTION AND PROGRESS: C7-7.l SUBLETTING: The Contractor shall perform with his own organization, and with the assistance of workman under his immediate superintendance, work of a value of not less than fifty (501) percent of the value embraced in the contract. If the Contractor sublets any part of the work to be done under these Contract Documents, he will not under any circumstances be relieved of the responsibility and obligation assumed under these Contract Documents. All transactions of the Engineer will be with the Contractor. Subcontractors will be considered only in the capacity of employees or workmen of the Contractor and shall be subject to the same requirements as to character and competency. The Owner will not recognize any subcontractor on the work. The Contractor shall at all times, when the work is in operation, be represented either in person or by a superintendent or other designated representatives. C7-7. 2 ASSIGNMENT OF CONTRACT: -The Contractor shall not assign, transfer, sublet, convey, or otherwise dispose of the contract or his rights, title, or interest in or to the same or any part thereof without the previous consent of the Owner expressed by resolution of the City Council and concurred in by the Sureties. If the Contractor does, without such previous consent, assign, transfer, sublet, convey, or otherwise dispose of the contract or bis right, title, or interest therein or any part thereof, to any person or persona, partnerahip, company, firm, or corporation, or doe• by bankruptcy, voluntary or involuntary, or by assignment under the inaolvency laws of any state, attempt to dispose of the contract may, at the option of the Owner be revoked and annulled, unless the Sureties shall successfully complete said contract, and in the event of any such revocation or annulment, any monies due or to become due under or by virtue of aaid contract shall be retained by the owner as liquidated damages for the reason that it would be impracticable and extremely difficult to fix the actual damages. C7-7.3 PROSECUTION OF THE WOR~: Prior to beginning any construction operation, the Contractor shall submit to tbe Engineer in five or more copies, if requested by the Engineer, a progress schedule preferably in chart or diagram form, or a brief outlining in detail and step by step the manner of C7-7 (1) prosecuting the work and ordering materials and equipment which he expects to follow in order to complete the project in the scheduled time. There shall also be submitted a table of estimated amounts to be earned· by the Contractor during each monthly estimate period. The Contractor shall commence the work to be performed under this contract within the time limit stated in these Contract Documents and shall conduct the work in a continuous manner and with sufficient equipment, materials, and labor as is necessary to insure its completion within the time limit. The sequence requested of all construction operations shall be at all times as specified in the Special Contract Documents. Any deviation from acub sequencing shall be submitted to the Engineer for bis approval. Contractor shall not proceed with any deviation until he has received written approval from the Engineer. Such specification or approval by the Engineer shall not relieve the Contractor from the full responsibility of the complete performance of tbe Contract. The contract time may be changed only as set forth in Section C7-7.8 •Extension of Time of Completion• of this Agreement, and a progress schedule shall not constitute a change in the contract time. · c,-,., LIMITATIONS OP OPERATIONS: The working operations shall at all times be conducted by the Contractor so ·aa to create a minimum amount of inconvenience to tbe public. At any time when, in the judgment of the Engineer, the Contractor has obstructed or closed or ia carrying on operation• in a , portion of a street or public way greater than ia necessary for the proper execution of the .work, tbe Engineer may require the Contractor to finish the section on which operations are in progress before the work ia commenced on any additional. section or street. C7-7. S CHARACTER OF WORJCMEN AND EQUIPMENT: Local labor ahall be used by the Contractor is available. The Contractor may bring in from outside the City of Fort Worth bia key men and his superintendent. All other workmen, including equipment operators, may be imported only after the local supply ia exhausted. The Contractor shall employ only such superintendents, foremen, and workmen who are careful, competent, and fully qualified to perform the duties or taska assigned to them, and the Engineer may demand and secure the summary dismissal of any person or persona employed by the contractor in or about or on the work who, in the opinion of the owner, shall misconduct himself or be found to be incompetent, disrespectful, intemperate, dishonest, or C7-7 C2) \ otherwise objectionable or neglectful in the proper performance ~f his or their duties, or who neglects or refuses to comply with or carry out the directions of the Owner, and such person or persons shall not be employed again thereon without written consent of the Engineer. All workmen shall have sufficient skill, ability, and experience to properly perform the work assigned to them and operate any equipment necessary to properly carry out the performance of the assigned duties. The Contractor shall furnish and maintain on the work all such equipment as is considered to be necessary for prosecution of the work in an acceptable manner and at a satisfactory rate of progress. All equipment, tools, and machinery used for handling materials and executing any part of the work shall be subject to the approval of the Engineer and shall be maintained in a satisfactory, safe and efficient working condition. Equipment on any portion of the work shall be such that no injury to the work, workmen or adjacent property will result from its use. C7-7.~ WORK SCHEDULE: Elapsed working days shall be computed starting with the first day of work completed as defined in Cl-1.23 •woRKING DAY· or the date stipulated in the •woRK ORDER· for beginning work, whichever comes first. Nothing in these Contract Documents shall be construed as prohibiting the Contractor from working on Saturday, Sunday or Legal Holidays, providing that the following requirements are met: a. A request to work on a specific Saturday, Sunday or Legal Holiday must be made to the Engineer no later than the proceeding Thursday. b. Any work to be done on the project on such a specific Saturday, Sunday or Legal Soliday must be, in the opinion of the Engineer, essential to the timely completion of the project. The Engineer's decision shall be final in response to such a request for approval to work on a specific Saturday, Sunday or Legal Holiday, and no extra compensation shall be allowed to the Contractor for any work performed on such a specific Saturday, Sunday or Legal Holiday. calendar Days shall be defined in Cl-l.24 and the Contractor may work as he so desires. C7-7 (3) C7-7.7 TIME OF COMMENCEMENT AND COMPLETION: The Contractor shall commence the working operations within the time specified in the Contract Documents and set forth in .the Work Order. Failure to do so shall . be considered by the Owner as abandonment of the Contract by the Contractor and the Owner may proceed as he sees fit. The Contractor shall maintain a rate of progress such as will -insure that the _whole work will be performed and the premises cleaned up in accordance with the Contract Documents and within the time established in such documents and such extension of time as may be properly authorized by the Owner. C7-7.B EXTENSION OF TIME COMPLETION: The Contractor's request for an extension of time of completion shall be considered only when the request for such extension is submitted in writing to the Engineer within seven days from and after the time alleged cause of delay shall have occurred. Should an extension of the time of completion be requested such request will be forwarded to the City Council for approval. In adjusting the contract time for completion of work, consideration will be given to unforseeable causes ~eyond the control of and without the fault or negligence of the Contractor, including but limited to acts of the public enemy, acts of the Owner, fire, flood, tornadoes, epidemics, quarantine restrictions, strikes, freight embargoes, or delays of sub-contractors due to such causes. When the date of completion ia baaed on a calendar day bid, a request for extension of time because of inclement weather wi11 not be considered. A request for extension of time due to inability to obtain supplies and material• will be considered only when a review of the Contractor's purchase order dates and other per~inent data aa requested by the Engineer indicates that the Contractor bas made a bonafide attempt to secure delivery on acbedule. This shall include efforts to obtain the supplies and materials from alternate sources in case the first source cannot make delivery. If satisfactory executio~ and completion of the contract should require work and materials in greater amounts or quantities than those set forth in the approved Contract Documents, then the contract time may be increased by Change Order. c~-7.9 DELAYS: The Contractor shall receive no compensation !--delays or hindrances to the work, except when direct and u ~voidable extra cost to the Contractor is caused by the failure of the City to provide information or material, if C7-7 (4) any, which is to be furnished by the city. When such extra compensation is claimed a written statement thereof shall be presented by the Contractor to the Engineer and if by him found correct shall be approved and referred by him to the Council for final approval or disapproval; and the action thereon by the Council shall be final and binding. If delay is caused by specific orders given by the Engineers to stop work, or by the performance of extra work, or by the failure of the City to provide material or necessary instructions for carrying on the work, then such delay will entitle the Contractor to an equivalent extension of time, his application for which shall, however, be subject to the approval of the City Counc i 1; and no such extension of time shall re-lease the Contractor or the surety on his performance bond from all bis obligations hereunder which shall remain in full force until the discharge of the contract. C7-7.10 TIME OF COMPLETION: The time of completion is an essential element of the contract. Each bidder shall indicate in the appropriate place on the last page of the Proposal the number of working days or calendar days that he will require to fully complete this contract or the time of completion will be specified by the City in the Proposal section of ~he contract documents. The number of days indicated ·shall be a realistic estimate of the time required to complete the work covered by the specific contract being bid upon. The amount of time so stated by the successful bidder or the City will become the time of completion specified in the Contract Documents. For each calendar day that any work shall remain uncompleted after the time specified in the Contract Documents, or the increased time granted by the Owner, or as automatically increased by additional work or materials ordered after the contract is signed, the sum per day given .in the following s6hedule, unless otherwise specified in other parts of the Contract Documents, will be deducted from monies due the Contractor, not as a penalty, but as liquidated damages suffered by the OWner. AMOUNT OF CONTRACT Less than $ 5,000 inclusive $ 35.00 $ 5,001 to $ 15,000 inclusive $ ,s.oo $ 15,001 to $ 25,000 inclusive $ 63.00 $ 25,001 to $ 50,000 inclusiv~ $ 105.00 $ 50,001 to $ 100,000 inclusiv~ $ 154.00 $ 100,001 to $ 500,000 inclusive $ 210.00 C7-7 CS) •• $ 500,001 to $1,000,001 to $2,000,001 and over > , $1,000,000 inclusive$ $2,000,000 inclusive$ s 315.00 420.00 630.00 The parties hereto understand and agree that any harm to the City caused by the Contractor's delay in completing the work hereunder in the time specified by the Contract Documents would be incapable or very difficult of accurate estimation, and that the •Amount of Liquidated Damages Per Day•, as set out above, is a reasonable forecast of just compensation due the City for harm caused by any delay. C7-7.ll SUSPENSION BY COURT ORDER: The Contractor shall , suspend operations on such part or parts of the work ordered by any court, and will not be entitled to additional compensation by virtue of such court order. Neither will he be liable to the City in the event the work is suspended by a Court Order. Neither will the Owner be liable to the Contractor by virtue of any Court Order or action for wbicb the OWner is not solely responsible. C7-7.12 TEMPORARY SUSPENSION: The Owner shall have the right to suspend the work operation wholly or in part for such ,period or periods of time as he may deem necessary due to unsuitable weather conditions or any other unfavorable conditions which in the opinion of the OWner or Engineer cause further prosecution of the work to be unsatisfactory or detrimental to the interest of the project. During temporary suspension of work covered by this contract, for any reason, the Owner will make no extra payment for atand-by time of ,\ construction equipment and/or construction crews. If it should become necessary to suspend work for an indefinite period, the Contractor shall store all materials in such manner that they will not obstruct or impede the public unnecessarily nor become da~ged in any way, and be shall take every precaution to prevent damage or deterioration of the work performed: he shall provide suitable drainage about the work, and erect temporary structures vhere necessary. Should the Contractor not~ able to complete a portion of the project due to causes beyond the control of and without the fault or negligence of the Contractor as set forth in Paragraph C7-7.8 EXTENSION OP THE TIME OF COMPLETION, and should it be determined by mutual consent of the Contractor and the Engineer that a solution to allow construction to proceed is not available within a reasonable period of time, then the Contractor may be reimbursed for the cost of moving his eguipment off the job and returning the necessary eguipment to the job when it is determined by the Engineer } . C7-7 (6) l that constr~ction may b~ r~sumed. Such reimbursement shall be ba5ed on ect~al cost to the Contractor of movin3 the eg~ipment and no profit will be allowed . No reimbursement sh~ll be allowed if the e~uipment is mov~a to another construction project for the City of Fort ~orth. The Contractor shall not suspe~d work without written notice from the Engineer and shall proceed with the work operations promptly when notified by the Engineer to so resume operations. C7-7.l3 TERMINATION OF CONTRACT DUE TO NATIONAL EMERGENCY: Whenever, because of National Emergency, so declared by the President of the United States or other la~ful authority, it becomes impossible for the Contractor to obtain all of the necessary labor, materials, and equipment for the prose:ution of the work with reasonable continuity for a p~riod of two months, the Contractor shall within seven days notify the City in writing, giving a detailed statement of the .efforts whlch ~ave been made and listing all necessary items of labor, materials, and equipment not obtainable. If, after investigations, the Owner finds that such conditions existing and that the inability of the Contractor to proceed is not attributable in whole or in part to the fault or neglect of the Contract, then if the Owner cannot after reasonable effort assist the Contractor in procuring and making available the necesoary labor, materials and equipment within thirty days, the Contractor may request the Chmer to term.i.nat'! ttie contrsct and the 0"7Tl~r may comply with the request, and th~ termination shall be conditioned and based upon a final settlement mutually acceptable to both the Owner and the Contractor and final payment shall be made in accordance with the terms of the agreed settlement, which shall include, but not be limited to, the payment for all work executed but no anticipate~ profits on ~ork ~hich has not been performed. C7-7.l4 SUSPENSION OR ABANDONMENT OF THE WORK AND ANNULMENT OF CONTRACT: T~e work operations on all or any portion or section of t~e work under Contr~ct shall be suspended immediately on written ~rder of the Engineer or the Contr~ct m~y be declared cancell~d by the City Council for any good an~ sufficient cause. The following, by way of exampl~, but not of limitation, may be considered grounds for suspension or ~ancellation: F~ilure of the Contractor to commence work operations within the time specified in the W~rk -Order issued by the t:Mner. C7-7 C7 > b . Substantial evidence that progress of the work operations by Contractor is insufficient to complete the work within the specified time. c. Failure of the Contractor to provide and maintain sufficient labor and equipment to properly execute the working operations. d. Substantial evidence that the Contractor has abandoned the work. e. Substantial evidence that the Contractor has become insolvent or bankrupt, or otherwise financially unable to carry on the work satisfactorily. f. Failure on the part of the Contractor to observe any re~uirem~rtts ~f the Contract Docum~nts or to comply with any orders given by the Engineer or e>vner providea for in these Contr,sct Documents. g. Failure of the Contractor ·promptly to make good any defect in materials or workmanship, or any defects of any nature the correction of which has been directed in writing by the Engineer or the Owner. b. Substantial evidence of collusion for the purpose of illegally procuring a contract or perpetrating fraud on the City in the construction o! work under contract. i. A substantial indication that the Contractor has made an unauthorized assignment of the contract o.r any funds due therefrom for tbe benefit of any creditor or for any other purpose. j. If the Contractor shall for any cause whatsoever not ·carry on the working operation in an acceptable· manner. k. If the Contractor commence• legal action against the OWner. A copy of the suspension order or action of the City Council shall be served on the Contractor's Sureties. When work is suspended for any cause or causes, or wben the contract ia cancelled, the Contractor shall discontinue the work or such part ther~of as the Owner shall designate, whereupon the sureties m~y, at their option, assume the contract or that portion thereof which the Owner baa ordered the Contractor to discontinue, and may perform the same or may, with the written C7-7 (8) - consent of ~he Owner, sublet th~ work or that portion of the work as taken ov~r, provided however, that the Sure~ies shall exercise their option, if at all, within two weeks after the ~ritten notice to discontinue the work has been served upon the Contractor and upon the Sureties or their authoriz~d agents. The Sureties, in such event shall assume the Contractor'b place in all respects, and shall be paid by t~e Owner for all work performed by them in accordance with the terms of the Contract Doc~rnents. All monies remaining due the Contractor at the time of this default shall thereupon become due and payable to the Sureties as the work progresses, subject to all of the terms of the Contract Documents. ln case the Sureties do not, within the hereinabove specified time,_exer~ise their right and option to ar,some the contract responsibi'lities, or that portion thereof which the Owner has ordered by the Contractor to discontinue, then the Owner .shall have the power to complete, by contract or otherwise, as it may determine, the work herein described or such part thereof as it ~ey deem necessary, and the Contractor hereto agrees that the Owner shall have the right to take possession of and use any materials, plants, tools, equipment, supplies, and property of any kind provided by the Contractor for the purpose of carrying on the work and to procure other tools, equipment, materials, labor and property for the completion of the work, and to charge to the account of the Contractor of said contract expense for labor, materials, tools, equipment, and all expenses incidental thereto. The expense so charged shall be deducted by the Owner from such monies as may be due or may become due at any time thereafter to the Contractor under and by virtue of the Contract or any part thereof. The Owner shall not be requir~d to obtain the lowest bid for the ~ork completing the contract, but the expense to be deducted shall be the actual cost of the owner of such work. ln case such expenses shall exceed the amount which would have been payable under the Contract if the same had been completed by the Contractor, then the Contractor and his Sureties shall pay the amount of such excess to the City on notic~ from th~ o~ner of the excess due. When any particular part of t~e work is being carried on by the Owner by contract or other~is~ under the provisions of this section, the Contractor shall continue the remainder of the WQrk in conformity with the terms of the Contract Doc~nts and i~ such a manner as to not hinder or interfere with performance of the work by the Owner. C7-7.15 FULFILLMENT OF CONTRACT: The Contract will be consid2red as having been fulfilled, oave as pr~vided in any bond or bonds or by law, when all the work and all sections or parts of the project covered by the Contract Documents have C7-7 (9) been finished and completed, the final inspection made by the Engineer, and th~ final acceptance and final payment made by the OWner . C7-7.16 TERMINATION FOR CONVENIENCE OF THE OWNER: A . B. NOTICE OF TERMINATION: The performance of the work under this contract may be terminated by the Owner in whole, or from time to time in part, in accordance with this section, whenever the Owner shall determine that such termination is in the best interest of the Owner. Any such termination shall be effected by mailing a notice of termination to the Contractor specifying the extent to which performance of work under the contract is terminated, and the date upon which such termination becomes effective. Receipt of tbe notice shall be deemed conclusively presum~d and established when the letter is placed in the Onited States Mail by the Owner. Further, it shall be deemed conclusively presumed and established that such termination is mad~ with just cause as therein stated: and no proof in any claim, demand or suit shall be required of the Owner regarding such discretionary action. CONTRACTOR ACTION: After receipt of a notice of termination, and except as otherwise directed by the Engineer, the Contractor shall: 1 . Stop work under the contract on the date and to the extent specified in the notice of termination: 2~ place no further orders or subcontracts for materials, services or facilities except as may be necessary for completion of such portion of the work under the contract aa ia not terminated: 3. terminate all orders and •ubcontracts to the extent that they relate to the performance of work terminated by the notice of termination: 4. transfer title to the Owner and deliver in the manner, at the times, and to the extent, if any, dir~cted by the Engineer: C7-7 ClO> \ a. the fabric3t~d or un!abricated part~, work in pro~ess, compl2ted work, supplies and other material produced a$ a part of, or acgui~ed in connection with the performance of, the work terminated by t~e notice of termination; and b. the completed, or partially completed plans, drawing~, information and other property which, if the contract had been completed, would have been reguired to be furnished to the owner. S. complete performance of such part of the work as shall not have been terminated by the notice of termination; and 6. take such action a~ ~ay be necessary, or as the Engineer may direct, for the protection and preservation of the property related to its contract which is in the possession of the Contractor and in which the Owner has or may acquire the rest. ~ta time not later than 30 days a!t~r the termination date specified in the no~ice of termination, the Contractor ~ay submit to the Engineer a list, certified as to quantity and guality, of any or all items of termination inventory not previously disposed of, exclusive of it~ms the disposition of which has been directed or authorized by the Engineer. Wot later than 15 days theraafter, the Owner shall accept title to such items provided, that the list submitted shall be subject to verification by the Engineer upon removal of the items or, if the items are stored, within 45 days from the date of submission of the list, and any necessary adjustments to correct the list as submitted, shall be made prior to final settlement. C. TERMINATION CLAIM: Within 60 days after notice of term1nat1on, the Contractor shall submit his termination claim to the Engineer in the form and with the certification pres=ribed by the Engineer. Unless one or more ext~nsions in writing a~~ granted by the Own~r upon request of th~ Contractor, made in writing within such 60-day period or authorized extension thereof, any and all such claims shall be conclusively deemed waiv~d. C7-7 (11) D. E. F. G. AMOUNTS: Subject to the provisions of Item C7-7.l6<C>, the Contractor and Owner may agree upon the whole or any part of the amount or amounts to be paid to the Contractor by reason of the total or partial termination of work pursuant hereto; provided, that such agreed amount or amounts shall never exceed the total contract price as reduced by the amount of payments otherwise made and as further reduced by the contract price of work not terminated. The contract shall be amended accordingly, and the Contractor shall be paid the agreed amount. No amount shall be due for lost or anticipated profits. Nothing in C7-7.l6CE) hereafter, prescribing the amount to be paid to the contractor in the event of failure of the Contractor by reason of the termination of work pursuant to this section, shall be deemed to limit, restrict or otherwise determine or affect the amount or amounts which may be agreed upon to be paid to the Contractor pursuant to this paragraph. FAILURE TO AGREE: In the event of the failure of the Contractor and the Owner to agree as provided in C7-7.l6 <D> upon the whole amount to be paid to the Contractor by reason of the termination of work pursuant to this section the OWner shall determine, on the basis of information available to it,· the amount, if any, due to the Contractor by reason of the termination and aball pay to the Contractor the amounts determined. No amount ahall be due for lost or anticipated profita. DEDUCTIONS: In arriving at the amount due the contractor under tbia section, there ahall be deducted (a) all unliquidated advance or other payments on account iheretofore made to the Contractor, applicable to the terminated portion of this contract: (b) any claim which the Owner may have against the Contractor in connection with this contract: and <c> the agreed price for, or the proceeds of sale of, any materials, supplies or other things kept by the Contractor or sold, pursuant to the provisions of this clause, and not otherwise recovered by or credited to the OWner. ADJUSTMENT: If the termination hereunder be partial, prior to the settlement of the terminated portion of this contract, the Contractor may file with the Engineer a request in writing f~r an C7-7 (12) equitable adjustment of the price or prices specified in the contract relating to the continued portion of the contract (the portion not terminated by the notice of termination), such equitable adjustment as may be agreed upon shall be made in such price or prices: nothing contained herein, however, shall limit the right of the Owner and the Contractor to agree upon the amount or amounts to be paid to the Contractor for the completion of the continued portion of the contract when said contract does not contain an established contract price for such continued portion. B. NO LIMITATION OF RIGHTS: Nothing contained in this section shall limit or alter th~ rights which the owner .may have for termination of this contract under C7-7.l~ hereof entitled •suspension of Abandonment of the work and Amendment of Contract• or any other right which Chimer may have for default or breach of contract by Contractor. C7-7.17 SAFETY METHODS AND PRACTICES: The Contractor shall be responsible for initiating, maintaining, and supervising all safety precautions and programs in connection with the work at all times and shall assume all responsibilities for their enforcement. The Contractor shall comply with federal, state, and local laws, ordinances, and regulations so as to protect person and property from injury, including death, or damage in connection with the work. C7-7 (13) - -.. ,.._ PART C -GENERAL CONDITIONS cs~e MEASUREMENT AND PAYMENT SECTION C8-8 MEASUREMENT AND PAYMENT CB-8.l MEASUREMENT OF QUANTITIES: The determination of quantities of work performed by the Contractor and authorized by the Contract Documents acceptably completed under the terms of the Contract Documents shall be made by the Engineer, based on measurements made by the Engineer. These measurements will be made according to the United States Standard Measurements used in common practice, and will be the actual length, area, solid contents, numbers, and weights of the materials and items installed. CB-8.2 UNIT PRICES: When in the Proposal a •unit Price• is set forth, the said •unit Price• shall include the furnishing by the Contractor of all labor, tools, materials, machinery, equipment, appliances and appurtenances necessary for the construction of and the completion in a manner acceptable to the Engineer of all work to be done under these Contract Documents. The •unit Price• shall include all permanent and temporary protection of overhead, surface, and underground structures, cleanup, finished, overhead expense, bond, insurance, patent fees, royalties, risk due to the elements and other causes, delays, profits, injuries, damages claims, taxes, and all other items not specifically mentioned that may be required to fully construct each item of the work complete in place and in a satisfactory condition for operation. CB-8.3 LUMP SOM: When in the Proposal a •Lump Sum• is set forth, the said •Lump sum• shall represent the total cost ·for the Contractor to furnish all labor, tools, materials, ·machinery, equipment, appurtenances, and all aubsidary work necessary for the construction and completion of all the work to provide a complete and functional item as detailed in the Special Contract Documents and/or Plans. CB-8.4 SCOPE OF PAYMENT: The Contractor aball receive and accept the compensation, as herein provided, in full payment for furnishing all labor, tools, materials, and incidentals for performing all work contemplated and embraced under these contract Documents, for all loss and damage arising out of the nature of the work or from the action of the elements, for any unforesee~ defects or obstructions which may ariae or be encountered during the prosecution of the work at any time CS-8 Cl> ~efore its final acceptance by the owner, (except as provided in paragraph CS-5.14) for all risks of whatever description connected with the prosecution of the work, for all expense i ncurred by or in consequence of suspension or discontinuance of such prosecution of the working operations as herein specified, or any and all infringements of patents, trademarks, copyrights, or other legal reservations, and for e ompleteing the work in an acceptable manner according to the terms of the Contract Documents. The payment of any current or partial estimate prior to final acceptance of the work by the Owner shall in no way constitute an acknowledgment of the acceptance of the work, materials, or equipment, nor in any way prejudice or. affect the obligations of the Contractor to repair, correct, renew, or replace at his own and proper expens~ any defects or imperfections in the construction or in the strength or quality of the material used or equipment or machinery furnished in or about the construction of the work under contract and its appurtenances, or any damage due or attributed to such defects, which defects, imperfection, or damage shall have been discovered on or before the final inspection and acceptance of work or during the one year guaranty period after final acceptance. The Owner shall be the sole judge of such defects, imperfections, or damage, and the Contractor shall be liable to the Owner for failure to correct the same as provided herein. C8-8.S PARTIAL ESTIMATES AND RETAINAGE: Between the lat and 5th day of each month the Contractor shall submit to the Engineer a statement showing an eatimate of tbe value of the work done during the previous month, or estimate period under the Contract Documents. Not later than the 10th day of the month the Engineer aball verify such estimate, and if it is found to be acceptable and the value of work performed since the last partial payment was made exceeds one hundred dollars ($100.00) in amount, 901 of such estimated sum will be paid to the Contractor if the total contract amount ia less than $.C00,000, or 951 of such estimated sum will b .e paid to the Contractor if the total contract amount is $400,000 or greater within twenty-five (25> days after the regular eatimate period. The City will have the option of preparing estimates on forms furnished by the City. The partial estimate may include acceptable nonperishable materials delivered to the work which are to be incorporated into the work -as a permanent part thereof, but which at the the time of the estimate have not been installed. (such payment will be allowed on a basis of 851 of the net invoice value thereof.> The Contractor shall furnish the Engineer such information as be may request to aid cs-s (2) - -· - - - - - him as a guid~ in the verification or the preparation of partial estimates. !t is understood that the partial estimate from month to month will be approximate only, and all partial monthly estimates and payment will be subject to correction in the estimate rendered following the discovery of an error in any previous estimate,and such estimate shall not, in any respect, be taken as an admission of the Owner of the amount of work done or of its quality of sufficiency, or as an acceptance of the work done or the release of the Contractor of any of his responsibilities under the Contract Documents. The City reserves the right to withhold the payment of any monthly estimate if the contractor fails to perform the work strictly in accordance with the specifications or provisions of this contract. CB-8.6 WITBBOLDING PAYMENT: Payment on any estimate or estimates may be held in abeyance if the performance of the construction operations is not in accordance with the requirements of the Contract Documents. ce-e.7 FINAL ACCEPTANCE: Whenever the improvements provided for by the Contract Documents shall ·have been completed and all requirements of the Contract Documents shall have been fulfilled on the part of the Contractor, the Contractor shall notify the Engineer in writing that the improvements are ready for the final inspection. The Engineer shall notify the appropriate officials of the Owner, will within a reasonable time make such final inspection, and if the work is satisfactory, in an acceptable condition, and has been completed in accordance with the terms of the Contract Documents and all approved modifications thereof, the Engineer will initiate the processing of the final estimate and recommend final acceptance of the project and final payment therefor as outlined in CB-8.8 below. ce-8.8 FINAL PAYMENT: Whenever all the improvements provided for by the Contract Documents and all approved modifications thereof shall have been completed and all requirements of the Contract Documents have been fulfilled on the part of the Contractor, a final estimate showing the value of the work will be prepared by the Engineer as aoon as the necessary measurements, computations, and checks can be made. All prior estimates upon which payment has been made are subject to necessary corrections or revisions in the final payment. cs-s (3) The amount of the final estimate, less previous payments and any sum that have been deducted or retained under the provisions of the Contract Documents, will be paid to the Contractor within 60 days after final accep~ance by the Owner on a proper resolution of the City Council, provided the Contractor has furnished to the owner satisfactory evidence of payment as follows: Prior to submission of the final estimate for ·payment, the Contractor shall execute an affidavit, as furnished by , the City, certifying that all persons, firms, associations, corporations, or other organizations furnishing labor and/or materials have been paid in full, that the wage scale established by the City Council in the City of Fort Worth has been paid, and that there are no claims pending for personal injury and/or property damages. The acceptance by the Contractor of the last or final payment as aforesaid shall operate as and shall release the Owner from all claims or liabilities under the Contract for anything done or furnished or relating to the work under Contract Documents or any act or neglect of said City relating to or connected with the Contract. , The making of the final payment by the Owner shall not relieve ·~e Contractor of any guarantees or other requirement• of the ~ntract Documents which specifically continue thereafter. C8-8.9 ADEQUACY OF DESIGN: It ia understood that the OWner believes it bas employed competent Engineers and designers to prepare the Contract Documents and all modifications of the approved Contract Documents. It is, therefore, agreed that the Owner shall be responsible for the adequacy of its own design features, sufficiency of the Contract Document•, the safety of the structure, and the practicability of the operations of the completed project, provided the Contractor has complied with the requirements of the said Contract Documents, all approved modifications thereof, and additions and alterations thereto approved in writing by the OWner. The burden of proof of such compliance shall be upon the Contractor to show that he baa complied with the said requirements of the Contract Documents, approved modifications thereof, and all approved additions and alteration• thereto. CS-8.10 GENERAL GUARANTY: Neither the final certificate of payment nor any provision in the Contract Documents nor partial or entire occupancy or use of the premises by the owner shall constitute an acceptance of work not done in accordance with the Contract Documents or relieve the contractor of liability in respect to any express warranties or responsibility for faulty materials or workmanship. The contractor shall remedy any defects or damages in the work and C8-8 (4) • .. > - ,_ - - - - - ..... -. pay for any damage to other work resulting therefrom which s~all appear within a period of one year from the date of f1nal acceptance of the work unless a longer period is specified andshall furnish a good and sufficient maintenance bond in the amount of 100 percent of the amount of the contract which shall assure the performance of the general guaranty as above outline. The Owner will give notice of observed defects with reasonable promptness. CB-8.11 SUBSIDIARY WORR: Any and all work specifically governed by documentary requirements for the project, such as conditions imposed by the Plans, the General Contract Documents or these Special Contract Documents, in which no specific item for bid has been provided for in the Proposal, shall be considered as a subsidiary item of work, the cost of which shall be included in the price bid in the Proposal, for each bid item. Surface restoration, rock excavation and cleanup are general items of work which fall in the category of subsidiary work. ce-e .12 MISCELLANEOUS PLACEMENT OF MATERIAL: Material may be allocated under various bid items in the Proposal to establish unit prices for miscellaneous placement· of material. These materials shall be µsed only when directed by the Engineer, depending on field conditions. Payment for miscellaneous placement of material will be made for only that amount of material used, measured to the nearest one-tenth unit. Payment for miscellaneous placement of material shall be in accordance with the General Contract Documents regardless of the actual amount used for the project. CB-8.13 RECORD DOCUMENTS: Contractor shall keep on record a copy of all specifications, plans, addenda, modifications, shop drawings and samples at the site, in good order and annotated to show all change& made during the construction process. These shall be delivered to Engineer upon completion · of the work. CB-8 CS) - - - - - - - - - - - - - - - - - - A. B. C. D. SECTION Cl: SUPPLEMENTARY CONDITIONS TOP ART C -GENERAL CONDITIONS General These Supplementary Conditions amend or supplement the General Conditions of the Contract and other provisions of the Contract Documents as indicated below. Provisions which are not so amended or supplemented remain in full force and affect. C8-8.5 PARTIAL ESTIMATES AND RETAINAGE : Page C8-8 (2), should be deleted in its entirety and replac.ed with the following: Partial pay estimates shall be submitted by the Contractor or prepared by the City on the 5th day and 20th day of each month that the work is in progress. The estimate shall be proceeded by the City on the 10th day and 25th day respectively. Estimates will be paid within 25 days following the end of the estimate period, less the appropriate retainage as set out below. Partial pay estimates may include acceptable nonperishable materials delivered to the work place which are to be incorporated into the work as a permanent part thereof, but which at the time of the pay estimate have not been so installed. If such materials are included within a pay estimate, payment shall be based upon 85% of the net voice value thereof. The Contractor will furnish the Engineer such information as may be reasonably requested to aid in the verification or the preparation of the pay estimate . For contracts of less than $400,000 at the time of execution, retainage shall be ten per cent (10%). For contracts of $400,000 or more at the time of execution, retainage shall be five percent (5%). Contractor shall pay subcontractors in accord with the subcontract agreement within five (5) business days after receipt by Contractor of the payment by City. Contractor's failure to make the required payments to subcontractors will authorize the City to withhold future payments from the Contractor until compliance with this paragraph is accomplished . It is understood that the partial pay estimates will be approximate only, and all partial pay estimates and payment of same will be subject to correction in the estimate rendered following the discovery of the mistake in any previous estimate. Partial payment by Owner for the amount of work done or of its quality or sufficiency or acceptance of the work done; shall not release the Contractor of any of its responsibilities under the Contract Documents. The City reserves the right to withhold the payment of any partial estimate if the Contractor fails to perform the work in strict accordance with the specifications or other provisions of this contract. Part C -General Conditions: Paragraph C3-3.l 1 of the General Conditions is deleted and replaced with D-3 of Part D -Special Conditions. C3-3.11 INSURANCE: Page C3-3 (6): Delete subparagraph "g. LOCAL AGENT FOR INSURANCE AND BONDING" Revised 09/30/02 Pg. 1 E. C6-6.12 CONTRACTOR'S RESPONSIBLITY FOR DAMAGE CLAIMS: Page C6-6 (8), is deleted in its entirety and replaced with the following: Contractor covenants and agrees to indemnify City's engineer and architect, and their personnel at the project site for Contractor's sole negligence. In addition, Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the Owner, its officers, servants and employees, from and against any and all claims or suits for property loss, property damage, personal injury, including death, arising out of, or alleged to arise out of, the work and services to be performed hereunder by Contractor, its officers, agents, employees, subcontractors, licensees or invitees, whether or not any such injury. damage or death is caused. in whole or in part. by the negligence or alleged negligence of Owner. its officers. servants. or employees. Contractor likewise covenants and agrees to indemnify and hold harmless the Owner from and against any and all injuries to Owner's officers, servants and employees and any damage, loss or destruction to property of the Owner arising from the performance of any of the terms and conditions of this Contract, whether or not any such injury or damage is caused in whole or in part by the negligence or alleged negligence of Owner. its officers. servants or employees. In the event Owner receives a written claim for damages against the Contractor or its subcontractors prior to final payment, final payment shall not be made until Contractor either (a) submits to Owner satisfactory evidence that the claim has been settled and/or a release from the claimant involved, or (b) provides Owner with a letter from Contractor's liability insurance carrier that the claim has been referred to the insurance carrier. The Director may, if he deems it appropriate, refuse to accept bids on other City of Fort Worth public work from a Contractor against whom a claim for damages is outstanding as a result of work performed under a City Contract. F. INCREASED OR DECREASED QUANTITIES: Part C -General Conditions, Section C4-4 SCOPE OF WORK, Page C 4-4 (1), revise paragraph C4-4.3 INCREASED OR DECREASED QUANTITIES to read as follows: The Owner reserves the right to alter the quantities of the work to be performed or to extend or shorten the improvements at any time when and as found to be necessary, and the Contractor shall perform the work as altered, increased or decreased at the unit prices as established in the contract documents. No allowance will be made for any changes in lost or anticipated profits nor shall such changes be considered as waiving or invalidating any conditions or provisions of the Contract Documents. Variations in quantities of sanitary sewer pipes in depth categories shall be interpreted herein as applying to the overall quantities of sanitary sewer pipe in each pipe size but not to the various depth categories. Revised 09/30/02 Pg.2 - - - - - - - - - - - - G. C3-3.11 INSURANCE: Page C3-3 (7): Add subparagraph "h. ADDITIONAL INSURANCE REQUIREMENTS" a. The City, its officers, employees and servants shall be endorsed as an additional insured on Contractor's insurance policies excepting employer's liability insurance coverage under Contractor's workers' compensation insurance policy. b. Certificates of insurance shall be delivered to the City of Fort Worth, contract administrator in the respective department as specified in the bid documents, I 000 Throckmorton Street, Fort Worth, TX 76102, prior to commencement of work on the contracted project. c. Any failure on part of the City to request required insurance documentation shall not constitute a waiver of the insurance requirements specified herein. d. Each insurance policy shall be endorsed to provide the City a minimum thirty days notice of cancellation, non-renewal, and/or material change in policy terms or coverage . A ten days notice shall be acceptable in the event of non-payment of premium. e. Insurers must be authorized to do business in the State of Texas and have a current A.M. Best rating of A: VII or equivalent measure of financial strength and solvency. f. Deductible limits, or self-funded retention limits, on each policy must not exceed $10,000.00 per occurrence unless otherwise approved by the City. g. Other than worker's compensation insurance, in lieu of traditional insurance, City may consider alternative coverage or risk treatment measures through insurance pools or risk retention groups. The City must approve in writing any alternative coverage. h. Workers' compensation insurance policy(s) covering employees employed on the project shall be endorsed with a waiver of subrogation providing rights of recovery in favor of the City. i. City shall not be responsible for the direct payment of insurance premium costs for contractor's insurance . j. Contractor's insurance policies shall each be endorsed to provide that such insurance is primary protection and any self-funded or commercial coverage maintained by City shall not be called upon to contribute to loss recovery. k. In the course of the project, Contractor shall report, in a timely manner, to City's officially designated contract administrator any known loss occurrence which could give rise to a liability claim or l3;wsuit or which could result in a property loss. Revised 09/30/02 Pg. 3 1. Contractor's liability shall not be limited to the specified amounts of insurance required herein . m. Upon the request of City, Contractor shall provide complete copies of all insurance policies required by these contract documents . H. C8-8.4 SCOPE OF PAYMENT: Delete C8-8.4, Scope of Payment at page C8-8(1) is deleted in its entirety and replaced with the following: I. The Contractor shall receive and accept the compensation as herein provided, in full payment for furnishing all labor, tools, materials , and incidentals for performing all work contemplated and embraced under these Contract Documents, for all loss and damage arising out of the nature of the work or from the action of the elements, for any unforeseen defects or obstructions which may arise or be encountered during the prosecution which may arise or be encountered during the prosecution of the work at any time before its final acceptance by the Owner, (except as provided in paragraph CS-5.14) for all risks of whatever description connected with the prosecution of the work, for all expenses incurred by or in consequence of the suspension or discontinuance of such prosecution of the working operations as herein specified, or any and all infringements of patents, trademarks, copyrights, or other legal reservations, and for completing the work in an acceptable manner according to the terms of the Contract Documents. The payment of any current or partial estimate prior to the final acceptance of the work by the Owner shall in no way constitute an acknowledgment of the acceptance of the work, materials, or equipment, nor in any way prejudice or affect the obligations of the Contractor to repair, correct, renew, or replace at his own and proper expense any defects or imperfections in the construction or in the strength or quality of the material used or equipment or machinery furnished in or about the construction of the work under contract and its appurtenances, or any damage due or attributed to such defects, which defects, imperfections, or damage shall have been discovered on or before the final inspection and acceptance of the work or during the two (2) year guaranty period after the final acceptance. The Owner shall be the sole judge of such defects, imperfections, or damage, and the Contractor shall be liable to the Owner for failure to correct the same as provided herein. CS-8.10 GENERAL GUARANTY: Delete CS-8.10, General Guaranty at page CS-8(4) is deleted in its entirety and replaced with the following: Neither the final certificate of payment nor any provision in the Contract Documents, nor partial or entire occupancy or use of the premises by the Owner shall constitute an acceptance of work not done in accordance with the Contract Documents or relieve the Contractor of liability in respect to any express warranties or responsibility for faulty materials or workmanship. The Contractor shall remedy any defects or damages in the work and pay for any damage to other work or property resulting therefrom which shall appear within a period of two (2) years from the date of final acceptance of the work unless a longer period is specified and shall furnish a good and sufficient maintenance bond in the amount of 100 percent of the amount of the contract Revised 09/30/02 Pg.4 - - ' - - - - - - - - - - - - - - J. K. which shall assure the performance of the general guaranty as above outlined. The Owner will give notice of observed defects with reasonable promptness . Any reference to any shorter period of time of warranty contained elsewhere within the specifications shall be resolved in favor of this specifications, it being the City's intent that the Contractor guarantee its work for a period of two (2) years following the date of acceptance of the project. In the Special Instructions to Bidders, TPW contracts place the following in lieu of the existing paragraph 2 . Part C -General Conditions, Section C2-2 INTERPRETATION AND PREPARATION OF PROPOSAL, Page C2-2 (4) exchange paragraphs C2-2.7, C2-2.8 and C2-2.9 with the following: C2-2.7 DELIVERY OF PROPOSAL: No proposal will be considered unless it is delivered, accompanied by its proper Bid Security, to the Purchasing Manager or his representative at the official location and stated time set forth in the "Notice to Bidders." It is the Bidder's sole responsibility to deliver the proposal at the proper time to the proper place. The mere fact that a proposal was dispatched will not be considered. The Bidders must have the proposal actually delivered. Each proposal shall be in a sealed envelope plainly marked with the word "PROPOSAL," and the name or description of the project as designated in the "Notice to Bidders." The envelope shall be addressed to the Purchasing Manager, City of Fort Worth Purchasing Division, P.O. Box 17027, Fort Worth, Texas 76102. C2-2.8 WITHDRAWING PROPOSALS: Proposals actually filed with the Purchasing Manager cannot be withdrawn prior to the time set for opening proposals. A request for non-consideration of a proposal must be made in writing, addressed to the City Manager, and filed with him prior to the time set for the opening of proposals. After all proposals not requested for non-consideration are opened and publicly read aloud, the proposals for which non-consideration requests have been properly filed may, at the option of the Owner, be returned unopened. C2-2.9 TELEGRAPHIC MODIFICATION OF PROPOSALS: Any bidder may modify his proposal by telegraphic communication at any time prior to the time set for opening proposals, provided such telegraphic communication is received by the Purchasing Manager prior to the said proposal opening time, and provided further, that the City Manager is satisfied that a written and duly authenticated confirmation of such telegraphic communication over the signature of the bidder was mailed prior to the proposal opening time. If such confirmation is not received within forty-eight (48) hours after the proposal opening time, no further consideration will be given to the proposal C3-3.7 BONDS (CITY LET PROJECTS): Reference Part C, General Conditions, dated November 1, 1987; (City let projects) make the following revisions: Revised 09/30/02 Pg. 5 L. 1. Page C3-3(3); the paragraph after paragraph C3-3.7d Other Bonds should be revised to read: In order for a surety to be acceptable to the City, the surety must (1) hold a certificate of authority from the United States secretary of the treasury to qualify as a surety on obligations permitted or required under federal law; or (2) have obtained reinsurance for any liability in excess of $100,000 from a reinsurer that is authorized and admitted as a reinsurer in the state of Texas and is the holder of a certificate of authority from the Untied States secretary of the treasury to qualify as a surety on obligations permitted or required under federal law. Satisfactory proof of any such reinsurance shall be provided to the City upon request. The City, in its sole discretion, will determine the adequacy of the proof required herein. 2. Pg . C3-3(5) Paragraph C3-3. l 1 INSURANCE delete subparagraph "a. COMPENSATION INSURANCE". 3 . Pg. C3-3(6), Paragraph C3-3. l 1 INSURANCE delete subparagraph "g. LOCAL AGENT FOR INSURANCE AND BONDING". RIGHT TO AUDIT: Part C -General Conditions, Section C8-8 MEASUREMENT AND PAYMENT, P~ge C8-8 (5), add the following: C8-8.14 RIGHT TO AUDIT: (a) Contractor agrees that the City shall, until the expiration of three (3) years after final payment under this contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers and records of the Contractor involving transactions relating to this contract. Contractor agrees that the City shall have access during normal working hours to all necessary Contractor facilities and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this section. The City shall give contractor reasonable advance notice of intended audits. (b) Contractor further agrees to include in all its subcontracts hereunder a provision to the effect that the subcontractor agrees that the City shall, until the expiration of three (3) years after final payment under the subcontract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers and records of such subcontractor, involving transactions to the subcontract, and further, that City shall have access during normal working hours to all subcontractor facilities , and shall be provided adequate and appropriate work space, in order to conduct audits in compliance with the provisions of this article. City shall give subcontractor reasonable advance notice of intended audits. ( c) Contractor and subcontractor agree to photocopy such docume~ts as may be requested by the City. The City agrees to reimburse the Contractor for the cost of copies as follows: Revised 09/30/02 Pg.6 - - - - - - - - - - - - - - - - - 1. 50 copies and under -10 cents per page 2, More than 50 copies -85 cents for the first page plus fifteen cents for each page thereafter M. SITE PREPARATION: The Contractor shall clear rights-of-way or easements of obstruction which must be removed to make possible proper prosecution of the work as a part of this project construction operations . The contractor's attention is directed to paragraph C6-6. l O work within easements, page C6-6(4), part C -General Conditions of the Water Department General Contract Document and General Specifications. Clearing and restoration shall be considered as incidental to construction and all costs incurred will be considered to be included in the Linear Foot price of the pipe. N. . Reference Part C -General Conditions, Section C6-6.8 BARRICADES, WARNINGS AND WATCHMEN: 0 . 1. Wherever the word Watchmen appears in this paragraph, it shall be changed to the word flagmen. 2. In the first paragraph, lines five (5) and six (6), change the phrase take all such other precautionary measures to take all reasonable necessary measures. MINORITY /WOMEN BUSINESS ENTERPRISE COMPLIANCE: Reference Part C (General Conditions), Section C3-3.2 Entitled "MINORITY BUSINESS ENTERPRISE/WOMEN-OWNED BUSINESS ENTERPRISE COMPLIANCE" shall be deleted in its entirety and replaced with the following: Upon request, Contractor agrees to provide to Owner complete and accurate information regarding actual work performed by a Minority Business Enterprise (MBE) and/or a Woman Business Enterprise (WBE) on the contract and payment therefore. Contractor · further agrees to permit an audit and/or examination of any books, records or files in its possession that will substantiate the actual work performed by an MBE and/or WBE. The misrepresentation of facts ( other than a negligent misrepresentation) and/or the commission of fraud by the Contractor will be grounds for termination of the contract and/or initiating action under appropriate federal, state or local laws or ordinances relating to false statements; further, any such misrepresentation ( other than negligent misrepresentation) and/or commission of fraud will result in the Contractor being determined to be irresponsible and barred from participating in City work for a period of time of not less than thee (3) years. Revised 09/30/02 .Pg. 7 • P. WAGE RATES: Section C3-3.13 of the General Conditions is deleted and replaced with the following: (a) The contractor shall comply with all requirements of Chapter 2258, Texas Government Code, including the payment of not less than the rates determined by the City Council of the City of Fort Worth to be the prevailing wage rates in accordance with Chapter 2258, Texas Government Code. Such prevailing wage rates are included in these contract documents. (b) The contractor shall, for a period of three (3) years following the date of acceptance of the work, maintain records that show (i) the name and occupation of each worker employed by the contractor in the construction of the work provided for in this contract; and (ii) the actual per diem wages paid to each worker. These records shall be open at all reasonable hours for inspection by the City. The provisions of Section C-1, L. Right to Audit (Rev. 9/30/02) pertain to this inspection. ( c) The contractor shall include in its subcontracts and/or shall otherwise require all of its subcontractors to comply with paragraphs (a) and (b) above. (d) With each partial payment estimate or payroll period, whichever is less, an affidavit stating that the contractor has complied with the requirements of Chapter 2258, Texas Government Code. The contractor shall post the prevailing wage rates in a conspicuous place at the site of the project at all times. Revised 09/30/02 Pg. 8 PART D -SPECIAL CONDITIONS GENERAL ..................................................................................................................... 3 COORDINATION MEETING .......................................................................................... 4 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW ................ 5 COORDINATION WITH FORT WORTH WATER DEPARTMENT ................................ 7 CROSSING OF EXISTING UTILITIES .......................................................................... 7 EXISTING UTILITIES AND IMPROVEMENTS .............................................................. 7 CONSTRUCTION TRAFFIC OVER PIPELINES ............................................................ 8 TRAFFIC CONTROL ..................................................................................................... 8 DETOURS ..................................................................................................................... 9 EXAMINATION OF SITE ................................................................................................ 9 ZONING COMPLIANCE ................................................................................................. 9 WATER FOR CONSTRUCTION .................................................................................. 10 WASTE MATERIAL ..................................................................................................... 10 PROJECT CLEANUP AND FINAL ACCEPTANCE ...................................................... 10 CONSTRUCTION SCHEDULE AND SEQUENCING OF WORK ................................. 10 SAFETY RESTRICTIONS -WORK NEAR HIGH VOLTAGE LINES ............................ 10 BID QUANTITIES ......................................................................................................... 11 CUTTING OF CONCRETE .......................................................................................... 11 PROJECT DESIGNATION SIGN ................................................................................. 11 CONCRETE SIDEWALK AND DRIVEWAY REPLACEMENT ...................................... 12 MISCELLANEOUS PLACEMENT OF MATERIAL. ....................................................... 12 CRUSHED LIMESTONE BACKFIL L ............................................................................ 12 2:27 CONCRETE ......................................................................................................... 12 TRENCH EXCAVATION , BACKFILL , AND COMPACTION ......................................... 12 PAVEMENT REPAIR (E2 -19) ...................................................................................... 14 SITE SPECIFIC TRENCH SAFETY SYSTEM (COVERS ALL PROJECTS) ................ 15 SANITARY SEWER MANHOLES ................................................................................ 15 SANITARY SEWER SERVICES .................................................................................. 18 REMOVAL, SALVAGE , AND ABANDONMENT OF EX ISTING FACILITIES ................ 20 DETECTABLE WARNING TAPES ............................................................................... 22 PIPE CLEANING .......................................................................................................... 22 DISPOSAL OF SPOIL/FILL MATERIAL ....................................................................... 22 MECHANICS AND MATERIALMEN 'S LIEN ................................................................. 23 SUBSTITUTIONS ........................................................................................................ 23 PRE-CONSTRUCTION TELEVISION INSPECTION OF SANITARY SEWER. ............ 23 VACUUM TESTING OF SANITARY SEWER MANHOLES .......................................... 26 BYPASS PUMPING ..................................................................................................... 27 POST-CONSTRUCTION TELEVISION INSPECTION OF SANITARY SEWER .......... 27 SAMPLES AND QUALITY CONTROL TESTING ......................................................... 29 TEMPORARY EROSION, SEDIMENT, AND WATER POLLUTION CONTROL .......... 30 INGRESS AND EGRESS/OBSTRUCTION OF ACCESS TO DRIVES ........................ 31 PROTECTION OF TREES, PLANTS AND SOIL.. ........................................................ 31 SITE RESTORATION .................................................................................................. 31 CITY OF FORT WORTH STANDARD PRODUCT LIST .............................................. 31 TOPSOIL, SODDING, SEEDING & HYDROMULCHING ............................................. 32 CONFINED SPACE ENTRY PROGRAM ..................................................................... 37 SUBSTANTIAL COMPLETION INSPECTION/FINAL INSPECTION ............................ 37 EXCAVATION NEAR TREES ...................................................................................... 37 CONCRETE ENCASEMENT OF SEWER PIPE .......................................................... 38 CLAY DAM ................................................................................................................... 38 EXPLORATORY EXCAVATION (D-HOLE) .................................................................. 38 INSTALLATION OF WATER FACILITIES .................................................................... 39 09/01 /04 SC-1 PART D -SPECIAL CONDITIONS 52 .1 Polyvinyl Chloride (PVC) Wate r Pipe ............................................................................ 39 52 .2 Blocking ....................................................................................................................... 39 52 .3 Type of Casing Pipe ..................................................................................................... 39 52.4 Tie-Ins ......................................................................................................................... .40 52 .5 Connection of Existing Ma ins ...................................................................................... .40 52 .6 Valve Cut-Ins .............................................................................................................. .40 52 .7 Water Serv ices ............................................................................................................ .40 52 .8 2-lnch Temporary Service Line ................................................................................... .42 52 .9 Purging and Steril ization of Water Lines ..................................................................... .43 52 .10 Work Near Pressure Plane Boundaries ....................................................................... .44 52 .11 Water Sample Station .................................................................................................. 44 52 .12 Ductile Iron and Gray I ran Fittings ................................................................................ 44 0-53 SPRINKLING FOR DUST CONTROL ......................................................................... .45 0-54 DEWATERING ............................................................................................................ .45 0-55 TRENCH EXCAVATION ON DEEP TRENCHES ........................................................ .45 0-56 TREE PRUNING ......................................................................................................... .45 0-57 TREE REMOVAL ........................................................................................................ .46 0-58 TEST HOLES ............................................................................................................... 46 0-59 PUBLIC NOTIFICATION PRIOR TO BEGINNING CONSTRUCTION AND NOTIFICATION OF TEMPORARY WATER SERVICE INTERRUPTION DURING CONSTRUCTION ....................................................................................................... .47 TRAFFIC BUTTONS .................................................................................................... 47 SANITARY SEWER SERVICE CLEANOUTS ............................................................. .48 TEMPORARY PAVEMENT REPAIR ........................................................................... .48 CONSTRUCTION STAKES ... : ..................................................................................... 48 EASEMENTS AND PERMITS ..................................................................................... .48 PRE-CONSTRUCTION NEIGHBORHOOD MEETING ............................................... .49 WAGE RA TES ............................................................................................................ .49 REMOVAL AND DISPOSAL OF ASBESTOS CEMENT PIPE ..................................... .49 STORM WATER POLLUTION PREVENTION ............................................................ 50 COORDINATION WITH THE CITY 'S REPRESENTATIVE FOR OPERATIONS OF EXISTING WATER SYSTEMS .................................................................................... 52 ADDITIONAL SUBMITTAL$ FOR CONTRACT AWARD ............................................ 52 EARLY WARNING SYSTEM FOR CONSTRUCTION ................................................. 52 AIR POLLUTION WATCH DAYS ................................................................................. 53 FEE FOR STREET USE PERMITS AND RE-INSPECTIONS ...................................... 54 GREEN CEMENT POLICY ............................................................................ 54 09/01 /04 SC-2 PART D -SPECIAL CONDITIONS D, Part D shall This Part D -Special Conditions is complimentary to Part C -General Conditions and Part C 1 -Supplementary Conditions to Part C of the Contract. Anything contained in this Part D that is additive to any provision in Part C -General Conditions and part C1 - Supplementary Conditions to Part C of the Contract are to be read together. Any conflict between Part C -General Conditions and Part C1 -Supplementary Conditions of the Contract and this Part D, Part D shall control. FOR: WATER MAIN REPLACEMENTS CONTRACT 2007 A FORT WORTH , TEXAS DOE PROJECT NO . 5965 WATER DEPARTMENT PROJECTS NO. P253-6011700972 CITY PROJECT NO . 972 D-1 GENERAL The order or precedence in case of conflicts or discrepancies between various parts of the Contract Documents subject to the ruling of the Engineer shall generally , but not necessarily, follow the guidel ines listed below : 1. Plans 2. Contract Documents 3. SpecialCond~ons The following Special Condit ions shall be applicable to this project under the provisions stated above . The Contractor shall be responsible for defects in this project due to faulty materials and workmanship , or both , for a period of two (2) years from date of final acceptance of this project by the City of Fort Worth and will be required to replace at his expense any part or all of this project -which becomes defective due to these causes . Subject to modifications as herein contained , the Fort Worth Water Department 's General Contract Documents and General Specifications , with latest revisions , are made a part of the General Contract Documents for this project. The Plans , these Special Contract Documents and the rules , regulations , requirements , instructions , drawings or details referred to by manufacturers name , or identification include therein as specifying , refe rr ing or implying product control , performance , quality , or other shall be binding upon the contractor. The specifications and drawings shall be considered cooperative ; therefore , work or material called for by one and not shown or mentioned in the other shall be accomplished or furnished in a faithful manner as though required by al l. Any Contractor performing any work on Fort Worth water or sanitary sewer facilities must be pre- qualified with the Water Department to perform such work in accordance with procedures described in the current Fort Worth Water Department General Specifications , which general specifications shall govern performance of all such work. This contract and project , where applicable , may also be governed by the two following published specifications , except as modified by these Special Provisions: 1. STANDARD SPECIFICATIONS FOR STREET AND STORM DRAIN CONSTRUCTION - CITY OF FORT WORTH 09/01 /04 SC-3 PART D -SPECIAL CONDITIONS 2. STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION -NORTH CENTRAL TEXAS Any conflict between these contract documents and the above 2 publ ications shall be resolved in favor of these contract documents. A copy of either of these specifications may be purchased at the office of the Transportation and Publ ic Works Director, 1000 Throckmorton Street, 2nd Floor, Municipal Building , Fort Worth , Texas 76102 . The specifications applicable to each pay item are indicated by the call -out for the pay item by the designer. If not shown , then applicable publ ished specifications in either of these documents may be followed at the discretion of the Contractor. General Provisions shall be those of the Fort Worth document rather than Division 1 of the North Central Texas document. Bidders shall not separate, detach or remove any portion, segment or sheets from the contract document at any time. Failure to bid or fully execute contract without retaining contract documents intact may be grounds for designating bids as "non-responsive" and rejecting bids or voiding contract as appropriate as determined by the City Engineer. INTERPRETATION AND PREPARATION OF PROPOSAL: A DELIVERY OF PROPOSAL: No proposal will be considered unless it is delivered , accompanied by its proper Bid Security , to the Purchasing Manager or his representative at the official location and stated time set forth in the "Notice to Bidders". It is the Bidder's sole respons ibility to deliver the proposal at the proper time to the proper place . The mere fact that a proposal was dispatched will not be conside red . The Bidders must have the proposal actually delivered . Each proposal shall be in a sealed envelope plainly marked with the word "PROPOSAL", and the name or descri ption of the project as designated in the "Notice to Bidders". The envelope shal l be addressed to the Purchasing Manager, City of Fort Worth Purchasing Division , PO Box 17027 , Fort Worth , Texas 76102 . B. WITHDRAWING PROPOSALS : Proposals actually filed with the Purchasing Manager cannot be withdrawn prior to the t ime set for opening proposals . A request for non -consideration of a proposal must be made in writ ing , addressed to the City Manager, and filed with him prior to the time set for the opening of proposals . After all proposals not requested for non- consideration are opened and publicly read aloud , the proposals for which non-consideration requests have been properly filed may , at the option of the Owner , be returned unopened . C . TELEGRAPHIC MODIFICATION OF PROPOSALS : Any bidder may modify his proposal by telegraphic communication at any time prior to the time set for opening proposals , provided such telegraphic communication is received by the Purchasing Manager prior to the said proposal opening time , and provided further, that the City Manager is satisfied that a written and duly authenticated confirmation of such telegraphic communication over the s ignature of the bidder was mailed prior to the proposal opening time . If such confirmation is not received within forty-eight (48) hours after the proposal opening time , no further consideration will be given to the proposal. 0-2 COORDINATION MEETING For coordination purposes , weekly meetings at the job s ite may be required to maintain the project on the desired schedule . The contractor shall be present at all meet ings . 09/0110 4 SC-4 PART D -SPECIAL CONDITIONS 0-3 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW A. Definitions : 1. Certification of coverage ("certificate"). A copy of a certificate of insurance , a certificate of authority to self-insure issued by the commission , or a coverage agreement (TWCC-81 , TWCC-82 , TWCC-83 , or TWCC-84), showing statutory workers' compensation insurance coverage for the person's or entity's employees providing services on a project , for the duration of the project. 2 . Duration of the project -includes the time from the beginning of the work on the project until the contractor's/person's work on the project has been completed and accepted by the governmental entity. 3. Persons providing services on the project ("subcontractor" in §406 .096)-includes all persons or entities performing all or part of the services the contractor has undertaken to perform on the project, regardless of whether that person contracted directly with the contractor and regardless of whether that person has employees . This includes , without limitation , independent contractors , subcontractors , leasing companies , motor carriers , owner operators , employees of any such entity , or employees of any entity which furnishes persons to provide services on the project. "Services" include , w ithout limitation , providing , hauling , or delivering equipment or materials , or providing labor, transportation, or other services related to a project. "Services" does not include activities unrelated to the project , such as food/beverage vendors , office supply deliveries , and delivery of portable toilets . B. The Contractor shall provide coverage , based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements , which meets the statutory requirements of Texas Labor Code , Section 401 .011 (44) or all employees of the Contractor provid ing services on the project , for the duration of the project. C. The Contractor must provide a certificate of coverage to the governmental entity prior to being awarded the contract. D. If the coverage period shown on the contractor's current certificate of coverage ends during the duration of the project , the contractor must, prior to the end of the coverage period, file a new certificate of coverage with the governmental entity showing that coverage has been extended . E. The Contractor shall obtain from each person providing services on a project , and provide the governmental entity: 1. A certificate of coverage, prior to that person beginning work on the project , so the governmental entity will have on file certificates of coverage showing coverage for al l persons providing services on the project; and 2 . No later than seven days after receipt by the contractor, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project. F. The contractor shall retain all required certificates of coverage for the duration of the project and for one year thereafter. 09/01 /04 SC-5 PART D -SPECIAL CONDITIONS G . The contractor shall notify the governmental entity in writing by certified mail or personal delivery, within ten (10) days after the contractor knew or should have known ,, of any change that materially affects the provision of coverage of any person provid ing services on the project. H. The contractor shall post on each project s ite a notice , in the text, form and manner prescribed by the Texas Worker's Compensation Commission , informing all persons providing services on the project that they are required to be covered , and stating how a person may ver ify coverage and report lack of coverage . I. The contractor shall contractually require each person with whom it contracts to provide services on a project , to : 1. Provide coverage , based on proper reporting on classification codes and payroll amounts and filing of any coverage agreements , which meets the statutory requirements of Texas Labor Code, Section 401 .011 (44) for all of its employees providing services on the project , for the duration of the project ; 2 . Provide to the Contractor, prior to that person beginning work on the project, a certificate of coverage showing that coverage is being provided for all employees of the person providing services on the project , for the duration of the project ; 3. Provide the Contractor, prior to the end of the coverage period , a new cert ificate of coverage showing extension of coverage , if the coverage period shown on the current certificate of coverage ends during the duration of the project ; 4 . Obta in from each other person with whom it contracts , and provide to the Contractor: a.) A certificate of coverage , prior to the other person beginning work on the project ; and b .) A new certificate of coverage showing extension of coverage , prior to the end of the coverage period , if the coverage period shown on the current certificate of coverage ends during the duration of the project. 5. Retain all required certificates of coverage on file for the duration of the project and for one year thereafter. 6. Notify the governmental entity in writing by certified mail or personal delivery , within ten (10) days after the person knew or should have known , of any change that materially affects the provision of coverage of any person providing services on the project; and 7. Contractually require each person with whom it contracts , to perform as required by paragraphs (1 )-(7), with the certificates of coverage to be provided to the person for whom they are providing services . 8. By signing this contract or providing or causing to be provided a certificate of coverage , the contractor is representing to the governmental entity that all employees of the contractor who will provide services on the project will be covered by worker's compensation coverage for the duration of the project , that the coverage will be based on proper reporting of class ification codes and payroll amounts , and that all coverage agreements will be filed with the appropriate insurance carrier or, in the case of a self- 09/01 /04 SC-6 PART D -SPECIAL CONDITIONS insured , with the commission's Division of Self-Insurance Regulation . Providing false or misleading information may subject the contractor to administrative , criminal , civil penalties or other civil actions . 9. The contractor's failure to comply with any of these provisions is a breach of contract by the contractor which entitles the governmental entity to declare the contract void if the contractor does not remedy the breach within ten days after receipt of notice of breach from the governmental entity. J . The contractor shall post a notice on each project site informing all persons providing services on the project that they are required to be covered , and stating how a person may verify current coverage and report failure to provide coverage. This notice does not satisfy other posting requirements imposed by the Texas Worker's Compensation Act or other Texas Worker's Compensation Commission rules . This notice must be printed with a title in at least 30 point bold type and text in at least 19 point normal type , and shall be in both Eng lish and Spanish and any othe r language common to the worker population . The text for the notices shall be the following text , without any additional words or changes : "REQUIRED WORKER'S COMPENSATION COVERAGE The law requires that each person working on this site or providing services related to this construction project must be covered by workers' compensation insurance . This includes persons providing , hauling , or delivering equipment or materials , or providing labor or transportation or other service related to the project , regardless of the identity of their employer or status as an employee ." Call the Texas Worker's Compensation Commission at (512)440-3789 to receive information on the legal requirement for coverage , to verify whether your employer has p rovided the required coverage , or to report an employer's failure to provide coverage". D-4 COORDINATION WITH FORT WORTH WATER DEPARTMENT During the construction of this project , it will be necessary to deactivate , for a period of time , existing lines . The Contractor shall be required to coordinate with the Water Department to determine the best times for deactivating and activating those lines . D-5 CROSSING OF EXISTING UTILITIES Where a proposed water line crosses over a sanitary sewer or sanitary sewer service line and/or proposed sewer line crosses over a water line and the clear vertical distance is less than 9 feet barrel to barrel , the sanitary sewer or sanitary sewer service line shall be made watertight or be constructed of ductile iron pipe. The Engineer shall determine the required length of replacement. The material for sanitary sewer mains and sanitary sewer laterals shall be Class 51 Ductile Iron Pipe with polyethylene wrapping . The material for sanitary sewer service lines shall be extra strength cast iron soil pipe with polyethylene wrapping . Adapter fittings shall be a urethane or neoprene coupling ASTM C-425 with series 300 stainless steel compression straps . Backfill , fittings , tie-ins and all other associated appurtenances required are deemed subs idiary work , the cost of which shall be included in the price bid in the Proposa l for each bid item . D-6 EXISTING UTILITIES AND IMPROVEMENTS The plans show the locations of all known surface and subsurface structures. However, the Owner assumes no responsib ility for failure to show any or all of these structures on the Plans , or to show them in their exact location . It is mutually agreed that such failure shall not be 09101104 SC-7 PART D -SPECIAL CONDITIONS considered sufficient basis for claims for additional compensation for extra work or for increasing the pay quantit ies in any manner whatsoever . The Contractor shall be responsible for verifying the locations of and protecting all existing utilities , service lines , or other property exposed by his construction operations . Contractor shall make all necessary provisions for the support , protection or relocation , and/or temporary relocation of all utility poles , gas lines , telephone cables , utility services , water mains , sanitary sewer lines , electrical cables , drainage pipes , and all other utilities and structures both above and below ground during construction . The Contractor is liable for all damages done to such existing facilities as a result of his operations and any and all cost incurred for the protection and/or temporary relocation of such facilities are deemed subsidiary work and the cost of same and shall be included in the cost bid per linear foot of pipe installed . NO ADDITIONAL COMPENSATION WILL BE ALLOWED . Where existing utilities or service lines are cut, broken or damaged the Contractor shall replace or repair the utilities or service lines with the same type of original material and construction , or better, unless otherwise shown or noted on the plans , at his own cost and expense . The Contractor shall immediately notify the Owner of the damaged utility or service line . He shall cooperate with the Owners of all utilities to locate existing underground facilities and notify the Engineer of any conflicts in grades and alignment. In case it is necessary to change or move the property of any owner of a public utility , such property shall not be moved or interfered with until ordered to do so by the Engineer. The right is reserved to the owner of public utilities to enter upon the limits of the project for the purpose of making such changes or repairs of their property that may be made necessary by performance of this contract. The utility lines and conduits shown on the plans are for information only and are not guaranteed by the City of the Engineer to be accurate as to extent , location , and depth ; they are shown on the plans as the best information available at the time of design , from the owners of the utilities involved and from evidences found on the ground . 0-7 CONSTRUCTION TRAFFIC OVER PIPELINES It is apparent that certain construction vehicles could exceed the load bearing capacity of the pipe under shallow bury conditions. It will be the responsibility of the Contractor to protect both the new line and the existing lines from these possibly excessive loads . The Contractor shall not, at any time, cross the existing or new pipe with a truck delivering new pipe to the site . Any damage to the existing or new pipe will be repaired or replaced by the Contractor, at the Contractor's expense, to the satisfaction of the City . In locations where it is not permissible to cross the existing or proposed pipes without additional protection the Contractor may elect to provide additional protection of the pipes so that more frequent crossings of the pipes are allowed. It still is , however, the responsibility of the Contractor to repair any damage to the existing or proposed lines , if the damage results from any phase of his construction operation . 0-8 TRAFFIC CONTROL The contractor will be required to obtain a "Street Use Permit" prior to starting work . As part of the "Street Use Permit" a traffic control plan is required . The Contractor shall be responsible for providing traffic control during the construction of this project consistent with the provisions set forth in the "Latest Edition Texas Manual on Uniform Traffic Control Devices for Streets and 09/01/04 SC-8 r- PART D -SPECIAL CONDITIONS Highways" issued under the authority of the "State of Texas Uniform Act Regulating Traffic on Highways ," codified as Article 6701 d Vernon 's Civil Statutes , pertinent sections being Section Nos . 27 , 29 , 30 and 31 . Unless otherwise included as part of the Construction documents , the Contractor shall submit a traffic control plan (duly sealed , signed and dated by a Registered Professional Engineer in the State of Texas), to the City Traffic Engineer [Tel (817)392-8770] at or before the preconstruction conference . Although work will not begin until the traffic control plan has been reviewed and approved ; the Contractor's time w ill begin in accordance with the time frame mutually established in the Notice to the Contractor. The Contractor will not remove any regulatory sign , instructional sign , street name sign or other sign , which has been erected by the City . If it is determined that a sign must be removed to permit required construction , the Contractor shall contact the Transportation and Public Works Department , Signs and Markings Division , (Phone Number 871-7738) to remove the sign . In the case of regulatory signs , the Contractor must replace the permanent sign with a temporary sign . meeting the requirements of the above-referenced manual and such temporary sign must be installed prior to the removal of the permanent sign. If the temporary sign is not installed correctly or if it does not meet the required specifications , the permanent sign shall be left in place until the temporary sign requirements are met. When construction work is completed to the extent that the permanent sign can be reinstalled , the Contractor shall again contact the Signs and Markings Division to reinstall the permanent sign and shall leave his temporary sign in place until such re installation is completed . Work shall not be performed on certain locations/streets during "peak traffic periods " as determination by the City Traffic Engineer and in accordance with the applicable provision of the "City of Fort Worth Traffic Control Handbook for Construction and Maintenance Work Areas ." The per each pay item for traffic control plan shall cover design and/or installation and maintenance of the traffic control plan . 0-9 DETOURS The contractor shall prosecute his work in such a manner as to create a minimum of interruption to traffic and pedestrian facilities and to the flow of vehicular and pedestrian traffic within the project area . 0-10 EXAMINATION OF SITE It shall be the responsibility of the prospective bidder to visit the project site and make such examinations and explorations as may be necessary to determine all conditions , which may affect construction of this project. Particular attention should be given to methods of providing ingress and egress to adjacent private and public properties , procedures for protecting existing improvements and disposition of all materials to be removed. Proper consideration should be given to these details during the preparation of the Proposal and all unusual conditions , which may give , rise to later contingencies should be brought to the attention of the Owner prior to the submission of the Proposal. 0-11 ZONING COMPLIANCE During the construction of this project , the Contractor shall comply with present zoning requirements of the City of Fort Worth in the use of vacant property for storage purposes . 09101/04 SC-9 PART D -SPECIAL CONDITIONS 0-12 WATER FOR CONSTRUCTION The Contractor at his own expense will furnish water for construction . 0-13 WASTE MATERIAL All waste material shall become the property of the Contractor and shall be disposed of by the Contractor at locations approved by the Engineer. All material shall be disposed of in such a manner as to present a neat appearance and to not obstruct proper drainage or to cause injury to street improvements or to abutting property. 0-14 PROJECT CLEANUP AND FINAL ACCEPTANCE The Contractor shall be aware that keeping the project site in a neat and orderly condition is considered an integral part of the contracted work and as such shall be considered subsidiary to the appropriate bid items. Clean up work shall be done as directed by the Engineer as the work progresses or as needed. If, in the opinion of the Engineer it is necessary , clean-up shall be done on a daily basis. Clean up work shall include , but not be limited to: • Sweeping the street clean of dirt or debris • Storing excess material in appropriate and organized manner • Keeping trash of any kind off of residents ' property If the Engineer does not feel that the jobsite has been kept in an orderly condition, on the next estimate payment (and all subsequent payments until completed) of the appropriate bid item(s) will be reduced by 25%. Final cleanup work shall be done for this project as soon as all construction has been completed . No more than seven days shall elapse after completion of construction before the roadway, right- of-way , or easement is cleaned up to the satisfaction of the Engineer. The Contractor shall make a final cleanup of all parts of the work before acceptance by the City of Fort Worth or its representative . This cleanup shall include removal of all objectionable rocks, pieces of asphalt or concrete and other construction materials , and in general preparing the site of the work in an orderly manner and appearance. The City of Fort Worth Department of Engineering shall give final acceptance of the completed project work . 0-15 CONSTRUCTION SCHEDULE AND SEQUENCING OF WORK Prior to executing the Contract, it shall be the responsibility of the Contractor to furnish a schedule outlining the anticipated time for each phase of construction with starting and completion dates, including sufficient time being allowed for cleanup . The Contractor shall not commence with water and/or sanitary sewer installation until such time that the survey cut-sheets have been received from the City inspector. 0-16 SAFETY RESTRICTIONS -WORK NEAR HIGH VOLTAGE LINES The following procedures will be followed regarding the subject item on this contract: 1. A warning sign not less than five inches by seven inches , painted yellow with black letters that are legible at twelve feet shall be placed inside and outside vehicles such as cranes, derricks , power shovels , drilling rigs, pile drivers, hoisting equipment or similar apparatus. 09101104 SC-10 PART D -SPECIAL CONDITIONS The warning sign shall read as follows: "WARNING -UNLAWFUL TO OPERATE THIS EQUIPMENT WITHIN SIX FEET OF HIGH VOLTAGE LINES ." 2. Equipment that may be operated within ten feet of high voltage lines shall have insulating cage-type of guard about the boom or arm , except back hoes or dippers , and insulator links on the lift hook connections . 3. When necessary to work within six feet of high voltage electric lines , notification shall be given the power company (ONCORE) who will erect temporary mechanical barriers , de- energize the lines , or raise or lower the lines . The work done by the power company shall not be at the expense of the City of Fort Worth . The notifying department shall maintain an accurate log of all such calls to ONCORE , and shall record action taken in each case . 4. The Contractor is required to make arrangements with the ONCORE company for the temporary relocation or raising of high voltage lines at the Contractor's sole cost and expense . 5. No person shall work within six feet of a high voltage line without protection having been taken as outlined in Paragraph (3). 0-17 BID QUANTITIES Bid quantities of the various items in the proposal are for comparison only and may not reflect the actual quantities . There is no limit to which a bid item can be increased or decreased. Contractor shall not be entitled to renegotiation of unit prices regardless of the final measured quantities . To the extent that C4-4.3 conflicts with this provision , this provision controls . No claim will be considered for lost or anticipated profits based upon differences in estimated quantities versus actual quantities . 0-18 CUTTING OF CONCRETE When existing concrete is cut , such cuts shall be made with a concrete saw. All sawing shall be subsidiary to the unit cost of the respective item. 0-19 PROJECT DESIGNATION SIGN Project signs are required at all locations . It shall be in accordance with the attached Figure 30 (dated 9-18-96). The signs may be mounted on skids or posts . The Engineer shall approve the exact locations and methods of mounting. In addition to the 4 ' x 8 ' project signs , project signs shall be attached to barricades used where manhole rehabilitation or replacement is being conducted. Signs suspended from barricading shall be placed in such a way that signs do not interfere with reflective paint or coloring on the barricades. Barricade signs shall be in accordance with Figure 30, except that they shall be 1 '-0 " by 2'-0" in size. The information box shall have the following information : For Questions on this Project Call : (817) 871-8306 M-F 7 :30 am to 4 :30 p.m . or (817)871-8300 Nights and Weekends Any and all cost for the required materials , labor, and equipment necessary for the furnishing of Project Signs shall be considered as a subsidiary cost of the project and no additional compensation will be allowed . 09/01104 SC-11 PART D -SPECIAL CONDITIONS 0-20 CONCRETE SIDEWALK AND DRIVEWAY REPLACEMENT At locations in the project where mains are required to be placed under existing sidewalks and/or driveways , such sidewalks and/or driveways shall be completely replaced for the full existing width , between existing construction or expansion joints with 3000 psi concrete with reinforcing steel on a sand cushion in accordance with City of Fort Worth Transportation/Public Works Department Standard Specifications for Construction , Item 504 . At locations where mains are requ ired to be placed under existing curb and gutter, such curb and gutter shall be replaced to match type and geometry of the removed curb and gutter shall be installed in accordance with City of Fort Worth Public Works Department Standard Specification for Construction , Item 502 . Payment for cutting , backfill , concrete , forming materials and all other associated appurtenances required , shall be included in the square yard price of the bid item for concrete sidewalk or driveway repair. 0-21 MISCELLANEOUS PLACEMENT OF MATERIAL Material has been allocated under various bid items in the Proposal to establ ish unit prices for miscellaneous placement of material. These materials shall be used only when directed by the Engineer, depending on field conditions . Payment for miscellaneous placement of material will be made for only that amount of material used , measured to the nearest one-tenth unit. Payment for miscellaneous placement of mate rial shall be in accordance with the General Contract Documents regardless of the actual amount used for the project. 0-22 CRUSHED LIMESTONE BACKFILL Where specified on the plans or directed by the Engineer, Crushed Limestone shall be used for trench backfill on this project. The material shall conform to Public Works Standard Specifications for Street and Storm Drain Construction Division 2 Item 208 .2 -Materials and Division 2 Item 208.3 -Materials Sources. Trench backfill and compaction shall meet the requirements of E2-2 Excavation and Backfill , Construction Specifications, General Contract Documents . Payment for crushed limestone backfill in place shall be made at the unit price bid in the Proposal multiplied by the quantity of material used measured in accordance with E2-2 .16 Measurement of Backfill Materials , Construction Specifications , and General Contract Documents. 0-23 2:27 CONCRETE Transportation and Public Works Department typical sections for Pavement and Trench Repair for Utility Cuts Figures 1 through 5 refer to using 2:27 Concrete as base repair. Since this call- out includes the word "concrete", the consistent interpretation of the Transportation and Public Works Department is that this ratio specifies two (2) sacks of cement per cubic yard of concrete . 0-24 TRENCH EXCAVATION, BACKFILL, AND COMPACTION Trench excavation and backfill under parking lots, driveways , gravel surfaced roads , within easements , and within existing or future R.O .W. shall be in accordance with Sections E1-2 Backfill and E2-2 Excavation and Backfill of the General Contract Documents and Specifications except as specified herein . 09101/04 SC-12 - PART D -SPECIAL CONDITIONS 1. TRENCH EXCAVATION : In accordance with Section E2-2 Excavation and Backfill , if the stated maximum trench widths are exceeded , either through accident or otherwise , and if the Engineer determines that the design loadings of the pipe will be exceeded , the Contractor will be required to support the pipe with an improved trench bottom . The expense of such remedial measures shall be entirely the Contractor's own. All trenching operations shall be confined to the width of permanent rights-of-way, permanent easements , and any temporary construction easements . All excavation shall be in strict compliance with the Trench Safety Systems Special Condition of this document. 2 . TRENCH BACKFILL: Trenches which lie outside of existing or future pavement shall be backfilled above the top of the embedment material with Type "C" backfill material. Excavated material used for Type "C" backfill must be mechanically compacted unless the Contractor can furnish the Engineer with satisfactory evidence that the P .I. of the excavated material is less than 8 . Such evidence shall be a test report from an independent testing laboratory and must include representative samples of soils in all involved areas , with a map showing the location and depth of the various test holes. If excavated material is obviously granular in nature , containing little or no plastic material , the Engineer may waive the test report requirement. See E 1-2.3 , Type "C" or "D" Backfill, and E2-2.11 Trench Backfill for additional requirements . When Type "C" back-fill material is not suitable , at the direction of the Engineer, Type "8" backfill material shall be used. In general , all backfill material for trenches in existing paved streets shall be in accordance with Figure A. Sand material specified in Figure A shall be obtained from an approved source and shall consist of durable particles free of thin or elongated pieces , lumps of clay , soil , loam or vegetable matter and shall meet the following gradation : • Less than 10% passing the #200 sieve • P .I. = 10 or less Additionally, the crushed limestone embedment gradation specified in Section E 1-3 Crushed Limestone for Embedment of the General Contract Documents and Specifications shall be replaced with the following : Sieve Size % Retained 1" 0-10 1/2" 40-75 3/8" 55-90 #4 90-100 #8 95-100 All other provisions of this section shall remain the same . 3. TRENCH COMPACTION: All trench backfill shall be placed in lifts per E2-2 .9 Backfill. Trenches which lie outside existing or future pavements shall be compacted to a minimum of 90% Standard Proctor Density (A.S .T.M. 0698) by mechanical devices specifically designed for compaction or a combination of methods subject to approval by the Engineer. Trenches which lie under existing or future pavement shall be backfilled per Figure A with 95% Standard Proctor Density by mechanical devices specifically designed for compaction or a combination of methods subject to approval by the Engineer. Backfill material to be compacted as described above must be within +-4% of its optimum moisture content. The top two (2) feet of sewer line trenches and the top eighteen (18) inches of water line may be rolled in with heavy 09101/04 SC-13 PART D -SPECIAL CONDITIONS equipment tires, provided it is placed in lifts appropriate to the material being used and the operation can be performed without damage to the installed pipe . The City , at its own expense , will perform trench compaction tests pe r A.S.T.M . standards on all trench backfil l. Any retesting required as a result of failure to compact the backfill material to meet the standards will be at the expense of the Contractor and will be billed at the commercial rates as determined by the City . These soil density tests shall be performed at two (2) foot vertical intervals beginning at a level two (2) feet above the top of the installed pipe and continuing to the top of the completed backfill at intervals along the trench not to exceed 300 linear feet. The Contractor will be responsible for providing access and trench safety system to the level of trench backfill to be tested. No extra compensation will be allowed for exposing the backfill layer to be tested or provid ing trench safety system for tests conducted by the City . 4 . MEASUREMENT AND PAYMENT: All material , including any and all Type "B" backfill , and labor costs of excavation and backfill will be included in the contract documents as a pre-bid pay item in cubic yards . 0-25 PAVEMENT REPAIR (E2-19) The unit price bid under the appropriate bid item of the proposal shall cover all cost for providing pavement repair equal to or superior in composition , thickness , etc., to existing pavement as detailed in the Public Works Department typical sections for Pavement and Trench Repair for Utility Cuts , Figures 2000-1 through 2000-3 . The results of the street cores that were conducted on the project streets , to determ ine HMAC depths on existing streets , are prov ided in these specifications and contract documents . All required paving cuts shall be made with a concrete saw in a true and straight line on both sides of the trench , a minimum of twelve (12) inches outside the trench walls . The trench shall be backfilled and the top nine (9) inches shall be filled with required materials as shown on paving details , compacted and level with the finished street surface . This finished grade shall be . maintained in a serviceable condition until the pav ing has been replaced . All residential driveways shall be accessible at night and over weekends . It has been determined by the Transportat ion and Public Works Department that the strip of existing HMAC pavement between the existing gutter and the edge of the trench pavement repair will not hold up if such strip of existing pavement is two (2) feet or less in width . Therefore, at the locations in the project where the trench wall is three (3) feet or less from the lip of the existing gutter, the Contractor shall be required to remove the existing paving to such gutter. The pavement repair shall then be made from a minimum distance of twelve (12) inches outside the trench wall nearest the center of the street to the gutter line . The pavement shall be replaced within a maximum of five (5) working days , providing job placement conditions will permit repaving . If paving conditions are not suitable for repaving , in the opinion of the Owner, the repaving shall be done at the earliest possible date . A permit must be obtained from the Department of Engineering Construction Services Section by the Contractor in conformance with Ordinance No . 3449 and/or Ordinance No . 792 to make utility cuts in the street. The Department of Engineering will inspect the paving repair after construction. This permit requirement may be waived if work is being done under a Performance Bond and inspected by the Department of Engineering . 09/01104 SC-14 PART D -SPECIAL CONDITIONS D-26 SITE SPECIFIC TRENCH SAFETY SYSTEM (COVERS ALL PROJECTS) A. GENERAL: This specification covers the trench safety requirements for all trench excavations exceed ing depth of five (5) feet in order to protect workers from cave-ins . The requirements of this item govern all trenches for mains , manholes , vaults , service lines , and all other appurtenances . The design for the trench safety shall be signed and sea led by a Registered Professional Engineer licensed in Texas. The trench safety plan shall be specific for each water and/or sanitary sewer line included in the project. 8 . STANDARDS : The latest version of the U.S. Department of Labor, Occupational Safety and Health Administration Standards , 29 CFR Part 1926 , Sub-Part P -Excavations , are hereby made a part of this specification and shall be the minimum governing requirements for trench safety. C . DEFINITIONS : 1: TRENCHES -A trench is referred to as a narrow excavation made below the surface of the ground in which the depth is greater than the width, where the width measured at the bottom is not greater than fifteen (15) feet. 2. BENCHING SYSTEM -Benching means excavating the sides of a trench to form one or a series of horizontal level or steps , usually with vertical or near-vertical surfaces between levels . 3. SLOPING SYSTEM -Sloping means excavating to form sides of a trench that are inclined . away from the excavation . 4 . SHIELD SYSTEM -Shields used in trenches are generally referred to as "trench boxes " or ,;trench shields ". Shield means a structure that is able to withstand the forces imposed on it by a cave -in and protect workers within the structure . Shields can be permanent structures or can be des igned to be portable and move along as the work progresses . Shields can be either pre-manufactured or job-built in accordance with OSHA standards . 5. SHORING SYSTEM -Shoring means a structure such as a metal hydraulic , mechanical or timber system that supports the sides of a trench and which is designed to prevent cave-ins . Shoring systems are generally comprised of cross-braces , vertical rails , (uprights), horizontal rails (wales) and/or sheeting . D. MEASUREMENT -Trench depth is the vertical measurement from the top of the existing ground to the bottom of embedment or bottom of excavation . The quantity of trench safety systems shall be based on the linear foot amount of trench depth greater than five (5) feet. E. PAYMENT -Payment shall be full compensation for safety system design , labor, tools , materials , equipment and incidentals necessary for the installation and removal of trench safety systems . D-27 SANITARY SEWER MANHOLES A. GENERAL: The installation , replacement , and/or rehabilitation of sanitary sewer manholes will be required as shown on the plans , and/or as described in these Special Contract Documents in addition to those located in the field and identified by the Engineer. All manholes shall be in accordance with sections E1-14 Materials for Sanitary Sewer Manholes , Valve Vaults , Etc ., and E2-14 Vault and Manhole Construction of the General Contract 09/01/04 SC-15 PART D -SPECIAL CONDITIONS Documents and Specifications , unless amended or superseded by requirements of this Special Cond ition . For new sewer line installations , the Contractor shall temporarily plug all lines at every open manhole under construction in order to keep debris out of the dry sewer lines . The plugs shall not be removed until the applicable manhole complete with cone section has been constructed and the lid installed to keep out debris as a result of additional construction . 1. CONCRETE COLLARS : Concrete collars will be requ ired on all manholes specified as per Figure 121. 2 . WATERTIGHT MANHOLE INSERTS : Watertight gasket manhole inserts shall be installed in all sanitary sewer manholes. Inserts shall be constructed in accordance with Fort Worth Water Department Standard E100-4 and shall be fitted and installed according to the manufacturer's recommendations . Stainless Steel manhole inserts shall be required for all pipe diameters 18 " and greater. 3 . LIFT HOLES : All lift holes shall be plugged with a pre-cast concrete plug. The lift hole shall be sealed on the outside of the manhole with Ram-Nek or an approved equal sealant. The lift hole shall be sealed on the inside of the manhole with quick setting cement grout. 4 . FINAL RIM ELEVATIONS : Manhole rims in parkways , lawns and other improved lands shall be at an elevation not more than one (1) nor less than one-half (1/2) inch above the surrounding ground . Backfill shall provide a uniform slope from the top of manhole casting for not less than three (3) feet each direction to ex isting finish grade of the ground . The grade of all surfaces shall be checked for proper slope and grade by string lining the entire area regarded near the manhole . Manholes in open fields, unimproved land , or drainage courses shall be at an elevation shown on the drawings or minimum of 6 inches above grade . 5. MANHOLE COVERS : All lids shall have pick slots in lieu of pick holes. Manhole frames and covers shall be McKinley , Type N, with indented top design , or equal , with pick slots. Covers shall set flush with the rim of the frame and shall have no larger than 1 /8-inch gap between the frame and cover. Bearing surfaces shall be machine finished . Locking manhole lids and frames will be restricted to locations within the 100-year floodplain and areas specifically designated on the plans . Certain teed Ductile Iron Manhole Lids and Frames are acceptable for use where locking lids are specified . 6 . SHALLOW CONE MANHOLES : Shallow manhole construction will be used when manhole depth is four (4) feet or less . All shallow cone manholes shall be built in accordance with Figure 105 . All shallow cone manholes shall have a cast iron lid and frame with pick slots . NOTE : MANHOLES PER FIGURE 106 WILL NOT BE ALLOWED. 7. MANHOLE STEPS : No manhole steps are to be installed on any sanitary sewer manhole. 8 . EXTERIOR SURFACE COATING : Exterior surfaces of all manholes shall be coated with two mop coats of coal tar epoxy , Koppers "Bitumastic Super Service Black" Tnemec "46- 450 Heavy Tnemecol ," or equal to , a minimum or 14 mils dry film thickness . 9 . MANHOLE JOINT SEALING : All interior and/or exterior joints on concrete manhole sections constructed for the City of Fort Worth Water Department , excluding only the 09101/04 SC-16 PART D -SPECIAL CONDITIONS joints using a trapped type performed 0-ring rubber gasket shall require Bitumastic joint sealants as per Figure M. This sealant shall be pre-formed and trowelable Bitumastic as manufactured by Kent- Seal , Ram-Nek , E-Z Stick , or equal. The joint sealer shall be supplied in either extruded pipe form or suitable cross-sectional area or flat-tape and shall be sized as recommended by the manufacturer and approved by the Engineer. The joint sealer shall be protected by a suitable removable wrapper and shall not in any way depend on oxidation , evaporation , or any other chemical action for either its adhesive properties or cohesive strength . The Joint sealer shall remain totally flexible without shrinking, hardening , or oxidizing regardless of the length of time it is exposed to the elements . The manufacturer shall furnish an affidavit attesting to the successful use of the product as a pre-formed flexible joint sealant on concrete pipe and manhole sections for a period of at least five years . B. EXECUTION : 1. INSTALLATION OF JOINT SEALANT: Each grade adjustment ring and manhole frame shall be sealed with the above-specified materials . All surfaces to be in contact with the joint sealant shall be thoroughly cleaned of dirt , sand , mud, or other foreign matter. The manufacturer shall apply a primer to all surfaces prior to installing the joint sealant in accordance with the recommendations . The protective wrapper shall remain on the joint sealant until immediately prior to the placement of the pipe in the trench . After removal of the protective wrapper , the joint sealant shall be kept clean . Install frames and cover over manhole opening with the bottom of the rings resting on Bitumastic joint sealer. Frames and grade rings shall rest on two (2) rows (inside and outside) of Bitumastic joint sealer. 2 . SEALING AND/OR ADJUSTING EXISTING MANHOLES: Excavate (rectangular full depth saw cut if in pavement) adjacent to the manhole to expose the entire manhole frame and a minimum of 6 inches of the manhole wall keeping the sides of the trench nearly vertical. 09/01104 Remove manhole frame from the manhole structure and observe the condition of the frame and grade rings . Any frame or grade ring that is not suitable for use as determined by the Engineer shall be replaced. Grade rings that are constructed of brick , block materials other than pre-cast concrete rings, or where necessary and approved by the Engineer, shall be replaced with a pre-cast flattop section . Pre-cast concrete rings , or a pre-cast concrete flattop section will be the only adjustments allowed . In brick or block manholes, replace the upper portion of the manhole to a point 24 inches below the frame . If the walls or cone section below this level are structurally unsound , notify the Engineer prior to replacement of the grade rings and manhole frame . Existing brickwork , if damaged by the Contractor, shall be replaced at the Contractor's expense . Wire brush manhole frame and exposed manhole surfaces to remove dirt and loose debris . Coat exposed manhole surfaces with an approved bonding agent followed by an application of quick setting hydraulic cement to provide a smooth working surface . If the inside diameter of the manhole is too large to safely support new adjustment rings or frames, a flat top section shall be installed . Joint surfaces between the frames , adjustment rings, and cone section shall be free of dirt , stones , debris and voids to ensure a watertight seal. Place flexible gasket joint SC-17 PART D -SPECIAL CONDITIONS material along the ins ide and outside edge of each joint , or use trowelable material in lieu of pre-formed gasket material. Position the butt joint of each length of joint material on opposite sides of the manhole. No steel shims , wood , stones , or any material not specifically accepted by the Engineer may be used to obtain final surface elevation of the manhole frame . In paved areas or future paved areas , castings shall be installed by using a straight edge not less than ten (10) feet long so that the top of the casting will conform to the slope and finish elevation of the paved surface . The top of the casting shall be 1 /8 inch below the finished elevation . Allowances for the compression of the joint material shall be made to assure a proper final grade elevation. 3. EXPOSED EXTERIOR SURFACES : All exposed exterior surfaces shall be coated with two mop coats of coal tar epoxy . Kopper "Bitumastic Super Service Black "; Tnemec "46- 450 Heavy Tnemecol ", or equal , to a minimum of 14 mils dry film thickness . 4 . The exterior surface of all pre -cast section joints shall be thoroughly cleaned with a wire brush and then waterproofed with a 1 /2-inch thick coat of trowelable bitumastic joint sealant from 6-inches below to 6-inches above the joint. The coated joint shall then be wrapped with 6 mil plastic to protect the sealant from damage during backfilling. C . MEASUREMENT AND PAYMENT: The price bid for new manhole installations shall include all labor, equipment, and materials necessary for construction of the manhole including , but not limited to , joint sealing , lift hole sealing and exterior surface coating . Payment shall not include pavement replacement , which if required , shall be paid separately . The price bid for reconstruction of existing manholes shall include all labor equipment and materials necessary for construction of new manhole , including , but not limited to , excavation , backfill , disposal of materials , joint sealing , lift hole sealing and exterior surface coating . Payment shall not include pavement replacement , wh ich if required , shall be paid separately . The price bid for adjusting and/or sealing of existing manholes shall include all labor, equipment and materials necessary for adjusting and/or sealing the manhole , including but not limited to , joint sealing , lift hole sealing , and exterior surface coating . Payment for concrete collars will be made per each. Payment for manhole inserts will be made per each . D-28 SANITARY SEWER SERVICES Any reconnection , relocation , re-routes , replacement , or new sanitary sewer service shall be required as shown on the plans , and/or as described in these Special Contact Documents in addition to those located in the field and identified by the Engineer as active sewer taps . The service connections shall be constructed by the Contractor utilizing standard factory manufactured tees . City approved factory manufactured saddle taps may be used , but only as directed by the Eng ineer. The decision to use saddle taps as opposed to tees shall be made on a case-by-case basis . The Contractor shall be responsible for coordinating the scheduling of tapping crews with building owners and the Engineer in order that the work be performed in an expeditious manner. A minimum of 24 hours advance notice shall be given when taps will be required. Severed service connections shall be maintained as specified in section C6-6 .15. A. SEWER SERVICE RECONNECTION : When sewer service reconnection is called for the Contractor shall vertically adjust the existing sewer service line as required for 09101/04 SC-18 PART D -SPECIAL CONDITIONS reconnection and furnish a new tap . The fittings used for vertical adjustment shall consist of a maximum bend of 45 degrees . The tap shall be located so as to line up with the service line and avoid any horizontal adjustment. For open cut applications , all sanitary sewer service lines shall be replaced to the property or easement line , or as directed by the Engineer. Sanitary sewer services on sewers being rehabilitated using pipe enlargement methods shall be replaced to the property or easement line or as directed by the Engineer. Procedures listed below for Sewer Service Replacement shall be adhered to for the installation of any sewer service line including the incidental four (4) feet of service line which is included in the price bid for Sanitary Sewer Taps . Payment for work such as backfill , saddles , tees , fittings incidental four (4) feet of service line and all other associated appurtenances required shall be included in the price bid for Sanitary Sewer Taps . B. SEWER SERVICE REPLACEMENT: All building sewer services encounte1red during construction shall be adjusted and/or replaced by the Contractor as directed by the Engineer as required for the connection of the sewer service line. If the sewer service line is in such condition or adjustment necessitates the replacement of the sewer service line , all work shall be performed by a licensed plumber. The Engineer shall determine the length of the replacement. All sewer services shall be installed at a min imum of two (2) percent slope or as approved by the Engineer. For s ituations involving sewer service re- routing , whether on public or private property , the City shall provide line and grade for the sewer service lines as shown on the project plans . Prior to installing the applicable sewer main or lateral and the necessary service lines , the Contractor shall verify (by de-holing at the building clean-out) the elevations (shown on the plans) at the building clean-out and compare the data with the elevation at the proposed connection point on the sewer main , in order to ensure that the two (2) percent minimum slope (or as specified by the Engineer) requirement is satisfied . Elevations shall also be verified at all bend locations on the service re-route . All applicable sewer mains , laterals and affected service lines that are installed without pre-construction de-holing at the affected residences (to verify design elevations) shall be removed and replaced as necessary at the Contractor's expense in the event grade conflicts are brought to light after de-holing is conducted . All elevation information obtained by the Contractor shall be submitted to the Inspector. The Engineer shall be immediately notified in the event that the two (2) percent minimum slope is not satisfied. If the Contractor determines that a different alignment for the re-route is more beneficial than shown on the plans , the Contractor shall obtain and submit all relevant elevation information for the new alignment to the Inspector and shall be responsible for ensuring that the two (2) percent minimum grade (or as approved by the Engineer) is satisfied . Prior to backfilling , the Contractor shall double check the grade of the installed service line and submit signed documentation verifying that the line has been installed as designed to the Engineer. The Contractor, at its sole expense , shall be required to uncover any sewer service for which no grade verification has been submitted . All re- routes that are not installed as designed or fail to meet the City code shall be reinstalled at the Contractor's expense . The Contractor shall ensure that the service line is backfilled and compacted in accordance with the City Plumbing Code. Connection to the existing sewer service line shall be made with appropriate adapter fittings. The fitting shall be a urethane or neoprene coupling A.S.T.M . C-425 with series 300 stainless steel compression straps. The Contractor shall remove the existing clean-out and plug the abandoned sewer service line . The contractor shall utilize schedule 40 PVC for all sanitary sewer service re-routes or relocations located on private property . Furthermore , the contractor shall utilize the services of a licensed plumber for all service line work on private property . Permit(s) must be obtained 09/01 /0 4 SC-19 PART D -SPECIAL CONDITIONS from the City of Fort Worth Development Department for all service line work on private property and all work related to the service line must be approved by a City of Fort Worth Plumbing Inspector. A copy of the plumbing permit shall be provided to the Engineer prior to beginning work on the sanitary sewer service re-route and proof of final acceptance by the Plumbing Inspector shall be provided to the Engineer upon completion of the sanitary sewer re-route. Payment for work and materials such as backfill , removal of existing clean-outs , plugging the abandoned sewer service line , double checking the grade of the installed service line , pipe fittings , surface restoration on private property (to match existing), and all other associated work for service replacements in excess of four (4) linear feet shall be included in the linear foot price bid for sanitary sewer service line replacement on private property or public right of way. Payment for all work and material involving the "tap " shall be included in the price bid for sanitary sewer service taps . D-29 REMOVAL, SALVAGE, AND ABANDONMENT OF EXISTING FACILITIES Any removal , salvaging and/or abandonment of existing facilities will necessarily be required as shown on the plans, and/or described in these Special Contract Documents in addition to those located in the field and identified by the Engineer. This work shall be done in accordance with Section E2-1 .5 Salvaging of Material and E2-2. 7 Removing Pipe , of the General Contract Documents and Specifications , unless amended or superseded by requirements of this Special Condition . A. SALVAGE OF EXISTING WATER METER AND METER BOX: Existing water meter and meter box shall be removed and returned to the Water Department warehouse by the Contractor in accordance with Section E2-1.5 Salvaging of Materials. B. SALVAGE OF EXISTING WATER METER AND CONCRETE VAULT LID : Existing water meter and concrete vault lid shall be removed and returned to the Water Department warehouse by the Contractor in accordance with Section E2-1 .5 Salvaging of Materials . The concrete vault shall be demolished in place to a point not less than 18 inches below final grade . The concrete vault shall then be backfilled and compacted in accordance with backfill method as specified in Section E2-2.9 Backfill. Backfill material shall be suitable excavated material approved by the Engineer. Surface restoration shall be compatible with existing surrounding surface and grade. C. SAJ._VAGE OF EXISTING FIRE HYDRANTS : Existing fire hydrants shall be removed and returned to the Water Department warehouse by the Contractor in accordance with Section E2-1.5 Salvaging of Materials . The void shall be backfilled and compacted in accordance with backfill method as specified in Section E2-2 .9 Backfill. Backfill material shall be suitable excavated material approved by the Engineer. Surface restoration shall be compatible with existing surrounding surface and grade . D. SALVAGE OF EXISTING GATE VALVE : Existing gate valve and valve box and lid shall be removed and returned to the Water Department warehouse by the Contractor in accordance with Section E2-1 .5 Salvaging of Materials. The void area caused by the valve removal shall be backfilled and compacted in accordance with backfill method as specified in Section E2-2.9 Backfill. Backfill material shall be suitable excavated material approved by the Engineer. Surface restoration shall be compatible with existing surrounding surface and grade . If the valve is in a concrete vault , the vault shall be demolished in place to a point no less than 18" below final grade . 09/01104 SC-20 PART D -SPECIAL CONDITIONS E. ABANDONMENT OF EXISTING GATE VALVE: Existing gate valve and box lid shall be abandoned by first closing the valve to the fully closed position and demolishing the valve box in place to a point not less than 18 inches below final grade . Concrete shall then be used as backfill material to match existing grade . F . ABANDONMENT OF EXISTING VAULTS : Vaults to be demolished in place shall have top slab and lid removed and vault walls demolished to a point not less than 18" below final grade. The void area caused shall then be backfilled and compacted in accordance with backfill method as specified in Section E2-2 .9 Backfill. Backfill material shall be suitable excavated material approved by the Engineer. Surface restoration shall be compatible with the existing surrounding grade. G . ABANDONMENT OF MANHOLES: Manholes to be abandoned in place shall have all pipes entering or exiting the structure plugged with lean concrete. Manhole top or cone section shall be removed to the top of the full barrel diameter section , or to point not less than 18 inches below final grade . The structure shall then be backfilled and compacted in accordance with backfill method as specified in Section E2-2 .9 Backfill. Backfill material may be either clean washed sand of clean , suitable excavated material approved by the Engineer. Surface restoration shall be compatible with surrounding service surface . Payment for work involved in backfilling , plugging of pipe(s) and all other appurtenances requ i red , shall be included in the appropriate bid item -Abandon Existing Sewer Manhole. H. REMOVAL OF MANHOLES : Manholes to be removed shall have all pipes entering or exiting the structure disconnected . The complete manhole, including top or cone section , all full barrel diameter section , and base section shall be removed . The excavation shall then be backfilled and compacted in accordance with backfill method as specified in Section E2-2 .9 Backfill. Backfill material may be with Type C Backfill or Type B Backfill , as approved by the Engineer. Surface restoration shall be compatible with surrounding surface . I. CUTTING AND PLUGGING EXISTING MAINS: At various locations on this project, it may be required to cut , plug , and block existing water mains/services or sanitary sewer ma ins/services in order to abandon these lines . Cutting and plugging existing mains and/or services shall be considered as incidental and all costs incurr~d will be considered to be included in the linear foot bid price of the pipe , unless separate trenching is required. J. REMOVAL OF EXISTING PIPE: Where removal of the existing p ipe is required , it shall be the Contractor's responsibility to properly dispose of all removed pipe. All removed valves , fire hydrants and meter boxes shall be delivered to Water Department Field Operation , Storage Yard . K . PAYMENT: Payment for all work and material involved in salvaging , abandoning and/or removing existing facilities shall be included in the linear foot bid price of the pipe , except as follows : separate payment will be made for removal of all fire hydrants, gate valves , 16 inch and larger, and san itary sewer manholes, regardless of location . Payment will be made for salvaging , abandoning and/or removing all other existing facilities when said facil ity is not being replaced in the same trench (i.e ., when removal requires a separate trench). L. ABANDONMENT OF EXISTING SEWER LINES : Where plans call for abandonment of existing sewer mains after the construction of a new sewer main , the Contractor shall be 09/01/04 SC-21 PART D -SPECIAL CONDITIONS responsible for TV inspection of 100% of the existing sewer main to be abandoned to make a final determination that all existing service connections have been relocated to the new main . Once this determination has been made , the existing main will be abandoned as indicated above in Item I. 0-30 DETECTABLE WARNING TAPES Detectable underground utility warning tapes which can be located from the surface by a pipe detector shall be installed directly above non-metallic water and sanitary sewer pipe . The detectable tape shall be "Detect Tape" manufactured by Allen Systems , Inc . or approved equal , and shall consist of a minimum thickness 0 .35 mils solid aluminum foil encased in a protective inert plastic jacket that is impervious to all known alkalis , acids , chemical reagents and solvents found in the soil. The minimum overall thickness of the tape shall be 5 .5 mils , and the width shall not be less than two inches with a minimum unit weight of 2'!/i pounds/1 inch/100'. The tape shall be color coded and imprinted with the message as follows : Type of Utility Color Code Water Safety Blue Sewer Safety Green Legends Caution! Buried Water Line Below Caution! Buried Sewer Line Below Installation of detectable tapes shall be per manufacturer's recommendations and shall be as close to the grade as is practical for optimum protection and detectability . Allow a minimum of 18 inches between the tape and the pipe. Payment for work such as backfill, bedding , blocking, detectable tapes, and all other associated appurtenances required shall be included in the unit price bid for the appropriate bid item(s). 0-31 PIPE CLEANING Joints shall be wiped and then inspected for proper installation by the inspectors . Each joint shall be swept daily and kept clean during installation. A temporary night plug shall be installed on all exposed pipe ends during any period of work stoppage . 0-32 DISPOSAL OF SPOIUFILL MATERIAL Prior to the disposing of any spoil/fill material , the Contractor shall advise the Director of Engineering Department, acting as the City of Fort Worth's Flood Plain Administrator ("Administrator"), of the location of all sites where the Contractor intends to dispose of such material. Contractor shall not dispose of such material until the proposed sites have been determined by the Administrator to meet the requirements of the Flood Plain Ordinances of the City of Fort Worth (Ordinance No . 10056). All disposal sites must be approved by the Administrator to ensure that filling is not occurring within a floodplain without a permit. A floodplain permit can be issued upon approval of necessary Engineering studies . No fill permit is required if disposal sites are not in a floodplain . Approval of the Contractor's disposal sites shall be evidenced by a letter signed by the Administrator stating that the site is not in a known flood plain or by a Flood Plain Fill Permit authorizing fill within the flood plain . Any expenses associated with obtaining the fill permit, including any necessary Engineering studies, shall be at the Contractor's expense . In the event that the Contractor disposes of spoil/fill material at a site without a fill permit or a letter from the administrator approving the disposal site, upon notification by the Director of Engineering Department, Contractor shall remove the spoil/fill material at its expense and dispose of such materials in accordance with the Ordinances of the City and this section . 09/01/04 SC-22 PART D -SPECIAL CONDITIONS D-33 MECHANICS AND MATERIALMEN'S LIEN The Contractor shall be required to execute a release of mechanics and material men 's l_iens upon receipt of payment. D-34 SUBSTITUTIONS The specifications for materials set out the minimum standard of quality , which the City bel ieves necessary to procure a satisfactory project. No substitutions will be permitted until the Contractor has received wr itten perm ission of the Engineer to make a substitution for the material , which has been specified . Where the term "or equal ", or "or approved equal " is used , it is understood that if a material , product , or piece of equipment bearing the name so used is furnished , it will be approvable , as the particular trade name was used for the purpose of establishing a standard of quality acceptable to the City. If a product of any other name is proposed for use , the Engineer's approval thereof must be obtained before the Contractor procures the proposed substitute. Where the term "or equal ", or "or approved equal " is not used in the specifications , this does not necessarily exclude alternative items or material or equipment which may accomplish the intended purpose . However, the Contractor shall have the full responsib ility of proving that the proposed substitution is , in fact , equal , and the Engineer, as the representative of the City, shall be the sole judge of the acceptability of substitutions . The provisions of this sub-section as related to "substitutions " shall be appl icable to all sections of these specifications . D-35 PRE-CONSTRUCTION TELEVISION INSPECTION OF SANITARY SEWER A. GENERAL: Prior to the reconstruction , ALL sections of existing sanitary sewer lines to be abandoned , removed (except where being replaced in the same location), or rehabilitated (pipe enlargement , cured-in-place pipe , fold and form p ipe, slip-line , etc.), shall be cleaned , and a telev ision inspection performed to identify any active sewer service taps , other sewer laterals and their location . Work shall consist of furnishing all labor, material , and equipment necessary for the cleaning and inspection of the sewer lines by means of closed circuit television . Satisfactory precautions . shall be taken to protect the sewer lines from damage that might be inflicted by the improper use of cleaning equipment. 1. HIGH VELOCITY JET (HYDROCLEANING) EQUIPMENT: The high-velocity sewer line cleaning equipment shall be constructed for easy and safe operation . The equipment shall also have a selection of two or more high-velocity nozzles. The nozzles shall be capable of producing a scouring action from 15 to 45 degrees in all size lines designated to be cleaned . Equipment shall also include a high-velocity gun fo r washing and scouring manhole walls and floor. The gun shall be capable of producing flows from a fine spray to a solid stream . The equipment shall carry its own water tank , auxiliary engines , pumps , and hydraulically driven hose reel. Hydraulically Propelled Equipment shall be of a movable dam type and be constructed in such a way that a portion of the dam may be collapsed at any time during the cleaning operation to protect against flooding of the sewer. The movable dam shall be equal in diameter around the outer periphery to ensure removal of grease . If sewer cleaning balls or other equipment , which cannot be collapsed , is used , special precautions to prevent flooding of the sewers and public or private property shall be taken. The flow of sewage present in the sewer lines shall be utilized to provide necessary fluid for hydraulic cleaning devices whenever possible . 2 . CLEANING PROCEDURES : The designated sewer manholes shall be cleaned using high-velocity jet equipment. The equipment shall be capable of removing dirt , grease , rocks , sand , and other materials and obstructions from the sewer lines and manholes . If 09101104 SC-23 PART D -SPECIAL CONDITIONS cleaning of an entire section cannot be successfully performed from one manhole , the equipment shall be set up on the other manhole and cleaning again attempted . If, again , successful cleaning cannot be performed or equipment fails to traverse the entire manhole section , it will be assumed that a major blockage exists , and the cleaning effort shall be abandoned . When additional quantities of water from fire hydrants are necessary to avoid delay in normal working procedures , the water shall be conserved and not used unnecessarily. No fire hydrant shall be obstructed in case of a fire in the area served by the hydrant. Before using any water from the City Water Distribution System , the Contractor shall apply for and receive permission from the Water Department. The Contractor shall be responsible for the water meter and related charges for the setup , including the water usage bill. All expenses shall be considered incidental to cleaning. 3. DEBRIS REMOVAL AND DISPOSAL: All sludge, dirt, sand , rock , grease , and other solid or sem isolid material resulting from the cleaning operation shall be removed at the downstream manhole of the section being cleaned . Passing material from manhole section to manhole section , which could cause line stoppages , accumulations of sand in wet wells , or damage pump ing equipment , shall not be permitted. 4 . All solids or semisolid resulting from the cleaning operations shall be removed from the site and disposed of at a site designated by the Eng ineer. All materials shall be removed from the site no less often than at the end of each workday and disposed of at no additional cost to the City . 5. UNDER NO CIRCUMSTANCE SHALL SEWAGE OR SOLIDS REMOVED THEREFROM BE DUMPED ONTO STREETS OR INTO DITCHES , CATCH BASINS , STORM DRAINS OR SANITARY SEWER MANHOLES . 6 . TELEVISION INSPECTION EQUIPMENT: The television camera used for the inspection shall be one specifically designed and constructed for such inspection . Lighting for the camera shall be suitable to allow a clear picture of the entire periphery of the pipe . The camera shall be operative in 100% humidity conditions . The camera , television monitor, and other components of the video system shall be capable of producing picture quality to the satisfaction of the Engineer; and if unsatisfactory , equ ipment shall be removed and no payment will be made for an unsatisfactory inspection . B. EXECUTION : 1. TELEVISION INSPECTION : The camera shall be moved through the line in either direction at a moderate rate , stopping when necessary to permit proper documentation of any sewer service taps . In no case will the television camera be pulled at a speed greater than 30 feet per minute . Manual winches , power winches , TV cable , and powered rewinds or other devices that do not obstruct the camera view or interfere with proper documentation shall be used to move the camera through the sewer line . 09101/04 When manually operated winches are used to pull the television camera through the line , telephones or other suitable means of communications shall be set up between the two manholes of the section being inspected to ensure good communications between members of the crew . The importance of accurate distance measurements is emphasized . All television inspection videotapes shall have a footage counter. Measurement for location of sewer service taps shall be above ground by means of meter device . Marking on the cable , or SC-24 PART D -SPECIAL CONDITIONS the like , which would require interpolation for depth of manhole , will not be allowed . Accuracy of the distance meter shall be checked by use of a walk ing meter, roll-a-tape , or other suitable device , and the accuracy shall be sat isfactory to the Engineer. The City makes no guarantee that all of the sanitary sewers to be entered are clear for the passage of a camera . The methods used for securing passage of the camera are to be at the option of the Contractor. The cost of retrieving the Television camera , under all circumstances , when it becomes lodged during inspection , shall be incidental to Television inspection . 2. DOCUMENTATION : Television Inspection Logs : Printed location records shall be kept by the Contractor and will clearly show the location in relation to an adjacent manhole of each sewer service taps observed during inspection . In addition , other points of significance such as locations of unusual conditions , roots , storm sewer connections, broken pipe , presence of scale and corrosion , and other discernible features will be recorded , and a copy of such records will be supplied to the City . 3. PHOTOGRAPHS : Instant developing , 35 mm, or other standard-size photographs of the television picture of problems shall be taken by the Contractor upon request of the Engineer, as long as such photographing does not interfere with the Contractor's operations . 4 . VIDEOTAPE RECORDINGS: The purpose of tape recording shall be to supply a visual and audio record of problem areas of the lines that may be replayed . Video tape record ing playback shall be at the same speed that it was recorded . The te levision tapes shall be furnished to the City for review immediately upon completion of the television inspection and may be retained a maximum of 30 calendar days . Equipment shall be provided to the City by the Contractor for review of the tapes . The Eng ineer will return tapes to the Contractor upon completion of review. Tapes shall not be erased without the permission of the Engineer. If the tapes are of such poor quality that the Engineer is unable to evaluate the condition of the sewer line or to locate service connections , the Contractor shall be required to re -televise and provide a good tape of the line at no additional cost to the City . If a good tape cannot be provided of such quality that can be reviewed by the Engineer, no payment for televising this portion shall be made . Also , no payment shall be made for portions of lines not televised or portions where manholes cannot be negotiated with the television camera . THE TAPES SHALL BE SUBMITTED TO THE ENGINEER PRIOR TO CONSTRUCTION FOR REVIEW AND DETERMINATION OF SAGS . Upon completion of review of the tapes by the Engineer, the Contractor will be notified as to which sections of the sanitary sewer are to be corrected . The Engineer will return tapes to the Contractor upon completion of review. All costs associated with this work shall be incidental to unit prices bid for items under Television Inspection of the Proposal. C. PAYMENT OF CLEANING AND PRE-CONSTRUCTION TELEVISION INSPECTION OF SANITARY SEWERS : The cost for Pre-Construction Cleaning and Television Inspection of sanitary sewers shall be per linear foot of sewer actually televised . The Contractor shall provide the Engineer with tapes of a quality that the particular piece of sewer can be readily evaluated as to existing sewer conditions and for providing appropriate means for review of 09/01 /04 SC-25 PART D -SPECIAL CONDITIONS the tapes by the Engineer including collection and removal , transportation and d isposal of sand and debris from the sewers to a legal dump site . Television inspection shall include necessary cleaning (hydraulic jet or mechan ical cleaner) to provide video image required for line analysis . The primary purpose of cleaning is for television inspection and rehabilitation ; when a portion of a line is not or cannot be televised or rehabilitated , the cleaning of that portion of line shall be incidental and no payment shall be made . The City makes no guarantee that all of the sanitary sewers to be entered are clear for the passage of a camera . The methods used for securing passage of the camera are to be at the opt ion of the Contractor, and the costs must be included in the bid price for TV Inspections. The cost of retrieving the TV Camera , under all circumstances , when it becomes lodged during inspection , shall be incidental to TV Inspection . The item shall also include all costs of installing and maintaining any bypass pumping required to provide reliable , regular sewer service to the area residents . All bypass pumping shall be incidental to the project. 0-36 VACUUM TESTING OF SANITARY SEWER MANHOLES D. GENERAL: This item shall govern the vacuum testing of all newly constructed sanitary sewer manholes . B. EXECUTION : 1. TEST PROCEDURE: Manholes shall be vacuum tested prior to any interior grouting with all connections in place . Lift holes shall be plugged , and all drop-connections and gas sealing connections shall be installed prior to testing . 09/01104 The sewer lines entering the manhole shall be plugged and braced to prevent the plugs from being drawn into the manhole . The plugs shall be installed in the lines beyond the drop-connections , gas sea ling connections , etc . The test head shall be placed inside the frame at the top of the manhole and inflated in accordance with the manufacturer's recommendations . A vacuum of ten inches of mercury (1 O"Hg) shall be drawn and the vacuum pump will be turned off. With the valve closed, the level of vacuum shall be read after the required test time . The required test time shall be determined from the Table I below in accordance with ASTM C1244-93 : Table I MINIMUM TIME REQUIRED FOR VACUUM DROP OF 1" Hg (10"Hg -9"Hg) (SEC) Depth of MH . 48-lnch Dia. 60-lnch Dia . (FT.) Manhole Manhole 0 to 16 ' 40 sec . 52 sec. 18 ' 45 sec. 59 sec. 20' 50 sec. 65 sec . 22' 55 sec . 72 sec. 24' 59 sec . 78 sec. SC-26 - PART D -SPECIAL CONDITIONS 26' 64 sec. 85 sec . 28 ' 69 sec. 9 1 sec . 30 ' 74 sec. 98 sec. For Each 5 sec . 6 sec. Additional 2' 2 . ACCEPTANCE: The manhole shall be considered acceptable , if the drop in the level of vacuum is less than one-inch of mercury (1" Hg) after the required test t ime . Any manhole , which fails to pass the initial test , must be repaired by either pressure grouting through the manhole wall or d igging to expose the exterior wall of the manhole in order to locate the leak and seal it with an epoxy sealant. The manhole shall be retested as described above until it has successfully passed the test. Following completion of a successful test , the manhole shall be restored to its normal condition , all temporary plugs shall be removed , all braces , equipment , and debris shall be removed and disposed of in a manner satisfactory to the Engineer. C. PAYMENT: Payment for vacuum testing of sanitary sewer manholes shall be paid at the contract price per each vacuum test. This price shall include all material , labor, equipment , and all incidentals , including all bypass pumping , required to complete the test as specified herein . 0-37 BYPASS PUMPING The Contractor shall bypass the sewage around the section or sections of sewer to be rehabilitated and/or replaced . The bypass shall be made by plugging existing upstream manhole and pumping the sewage into a downstream manhole or adjacent system or other method as may be approved by the Engineer. The pump and bypass lines shall be of adequate capacity and size to handle the flow without sewage backup occurring to facilities connected to the sewer. Provisions shall be made at driveways and street crossings to permit safe vehicular travel without interrupting flow in the bypass system . Under no circumstances will the Contractor be permitted to discharge sewage into the trenches . Payment shall be incidental to rehabilitation or replacement of the sewer line . 0-38 POST-CONSTRUCTION TELEVISION INSPECTION OF SANITARY SEWER A. GENERAL: After construction , ALL sections of sanitary sewer lines shall have a telev ision inspection performed by an independent sub-Contractor hired by the prime Contractor. Work shall consist of furnishing all labor, material , and equipment necessary for inspection of the sewer lines by means of closed circuit television . Satisfactory precautions shall be taken to protect the sewer lines from damage that might be inflicted by the improper use of cleaning equipment. B . TELEVISION INSPECTION EQUIPMENT: The television camera used for the inspection shall be one specifically des igned and constructed for such inspection . Lighting for the camera shall be operative in 100% humidity conditions . The camera , television monitor, and other components of the video system shall be capable of producing picture quality to the satisfaction of the Engineer; and if unsatisfactory , equipment shall be removed and no payment will be made for an unsatisfactory inspection . 09101/0 4 SC-27 PART D -SPECIAL CONDITIONS C . EXECUTION: 1. TELEVISION INSPECTION : The camera shall be moved through the line in either direction at a moderate rate , stopping when necessary to permit proper documentation of any sewer service taps. In no case will the television camera be pulled at a speed greater than 30 feet per minute . Manual winches, power winches , TV cable , and powered rewinds or other devices that do not obstruct the camera view or interfere with proper documentation shall be used to move the camera through the sewer line . No more than 2000 linear feet of pipe will be televised at one time for review by the Engineer. When manually operated Winches are used to pull the television camera through the line , telephones or other suitable means of communications shall be set up between the two manholes of the section being inspected to ensure good communications between members of the crew. The importance of accurate distance measurements is emphasized . All television inspection video tapes shall have a footage counter . Measurement for location of sewer service taps shall be above ground by means of meter device . Marking on the cable , or the like , which would require interpolation for depth of manhole , will not be allowed . Accuracy of the distance meter shall be checked by use of a walking meter, roll-a-tape , or other suitable device , and the accuracy shall be satisfactory to the Enginee r. The City makes no guarantee that all of the sanitary sewers to be entered are clear for the passage of a camera . The methods used for securing passage of the camera are to be at the option of the Contractor. The cost or retrieving the Television camera , under all circumstances , when it becomes lodged during inspection , shall be incidental to Television inspection . Sanitary sewer mains must be laced with enough water to fill all low pints . The television inspection must be done immediately following the lacing of the main with no water flow .. If sewer is active , flow must be restricted to provide a clear image of sewer being inspected . 2. DOCUMENTATION : Television Inspection Logs : P r inted location records shall be kept by the Contractor and will clearly show the location in relation to an adjacent manhole of each sewer service tap observed during inspection . All television logs shall be referenced to stationing as shown on the plans . A copy of these television logs will be supplied to the City . 3. PHOTOGRAPHS: Instant developing , 35 mm , or other standard-size photographs of the televis ion picture of problems shall be taken by the Contractor upon request of the Engineer, as long as such photographing does not interfere with the Contractor's operations . 4 . VIDEOTAPE RECORDINGS : The purpose of tape recording shall be to supply a visual and audio record of problem areas of the lines that may be replayed. Video tape recording playback shall be at the same speed that it was recorded . The television tapes shall be furnished to the City for review immediate ly upon completion of the television inspection and may be retained a maximum of 30 calendar days. Equipment shall be provided to the City by the Contractor for review of the tapes . Tapes w ill be returned to the Contractor upon completion of review by the Engineer. Tapes shall not be erased without the permission of the Engineer. 09101/04 SC-28 - PART D -SPECIAL CONDITIONS If the tapes are of such poor qual ity that the Engineer is unable to evaluate the condition of the sewer line or to locate service connections, the Contractor shall be required to re- televise and provide a good tape of the line at no additional cost to the Citv . If a good tape cannot be provided of such quality that can be reviewed by the Engineer, no payment for televising this portion shall be made . Also , no payment shall be made for portions of lines not televised or portions where manholes cannot be negotiated with the television camera . D. PAYMENT OF POST-CONSTRUCTION TELEVISION INSPECTION OF SANITARY SEWERS : The cost for post-construction Television Inspection of sanitary sewers shall be per linear foot of sewer televised . The Contractor shall provide the Engineer w ith tapes of a quality that the particular p iece of sewer can be readily evaluated as to sewer conditions and for providing appropriate means for review of the tapes by the Engineer. Television inspection shall include necessary cleaning (hydraulic jet or mechanical cleaner) to provide video image required for line analysis . The quantity of TV inspection shall be measured as the total length of new pipe installed . All costs associated with this work shall be included in the appropriate bid item -Post-Construction Television Inspection . The item shall also include all costs of installing and maintaining any bypass pumping required to provide rel iable , regular sewer service to the area residents . All bypass pumping shall be incidental to the project. D-39 SAMPLES AND QUALITY CONTROL TESTING A The Contractor shall furnish , at its own expense , certifications by a private laboratory for all materials proposed to be used on the project , including a mix design fo r any asphaltic and/or Portland cement concrete to be used , and gradation analysis for sand and crushed stone to be used along with the name of the pit from which the material was taken . The contractor shall provide manufacturer's certifications for all manufactured items to be used in the project and will bear any expense related thereto . A Tests of the design concrete mix shall be made by the contractor's laboratory at least nine days prior to the placing of concrete using the same aggregate , cement , and mortar which are to be used later in the concrete . The Contractor shall provide a certified copy of the test results to the City . C. Quality control testing of in-place material on this project will be performed by the city at its own expense . Any retesting required as a result of failure of the material to meet project specifications will be at the expense of the contractor and will be billed at commercial rates as determined by the City . The failure of the City to make any tests of materials shall in no way relieve the contractor of its responsibility to furnish materials and equipment conforming to the requirements of the contract. D. Not less than 24 hours notice shall be provided to the City by the Contractor for operations requiring testing . The Contracto r shall provide access and trench safety system (if required) for the site to be tested , and any work effort involved is deemed to be included in the unit price for the item being tested . E. The Contractor shall provide a copy of the trip ticket for each load of fill material del ivered to the job site . The ticket shall specify the name of the pit supplying the fill material. 09101/04 SC-29 PART D -SPECIAL CONDITIONS D-40 TEMPORARY EROSION, SEDIMENT, AND WATER POLLUTION CONTROL A. DESCRIPTION : This item shall consist of temporary soil erosion sediment and water pollution control measures deemed necessary by the Engineer for the duration of the contract. These control measures shall at no time be used as a substitute for the permanent control measures unless otherwise directed by the Engineer and they shall not include measures taken by the CONTRACTOR to control conditions created by his construction operations . The temporary measures shall include dikes , dams , berms , sediment basins , fiber mats, jute netting , temporary seeding , straw mulch , asphalt mulch , plastic liners , rubble liners, baled-hay retards , dikes , slope drains and other devices. B . CONSTRUCTION REQUIREMENTS : The Engineer has the authority to define erodible earth and the authority to limit the surface area of erodible-earth material exposed by preparing right-of-way , clearing and grubbing , the surface area of erodible-earth material exposed by excavation , borrow and to direct the CONTRACTOR to provide temporary pollution-control measures to prevent contamination of adjacent streams , other water courses , lakes , ponds or other areas of water impoundment. Such work may involve the construction of temporary berms, dikes , dams, sed iment basins , slope drains and use of temporary mulches , mats , seeding , or other control devices or methods directed by the Engineer as necessary to control soil erosion . Temporary pollution-control measures shall be used to prevent or correct erosion that may develop during construction prior to installation of permanent pollution control features , but are not associated with permanent control features on the project. The Engineer will limit the area of preparing right-of-way , clearing and grubbing , excavation and - borrow to be proportional to the CONTRACTOR'S capability and progress in keeping the finish grading , mulching , seeding , and other such permanent pollution-control measures current in accordance with the accepted schedule . Should seasonal conditions make such li mitations unrealistic, temporary soil-erosion-control measures shall be performed as directed by the Engineer. 1. Waste or disposal areas and construction roads shall be located and constructed in a manner that will minimize the amount of sediment enteri ng streams . 2 . Frequent fordings of live streams will not be permitted ; therefore , temporary bridges or other structures shall be used wherever an appreciable number of stream crossings a re necessary. Unless otherwise approved in writing by the Engineer, mechanized equipment shall not be operated in live streams . 3 . When work areas or material sources are located in or adjacent to live streams , such areas shall be separated from the stream by a dike or other barrier to keep sediment from entering a flowing stream . Care shall be taken during the construction and removal of such barriers to minimize the muddying of a stream . 4 . All waterways shall be cleared as soon as practicable of false work, piling , debris or other obstructions placed during construction operations that are not a part of the finished work. 5. The Contractor shall take sufficient precautions to prevent pollution of streams , lakes and reservoirs with fuels , oils , bitumen , calcium chloride or other harmful materials . He shall conduct and schedule his operations so as to avoid or minimize siltation of streams , lakes and reservoirs and to avoid interference with movement of migratory fish . C . MEASUREMENT AND PAYMENT: All work , mate r ials and equipment necessary to provide temporary erosion control shall be considered subsidiary to the contract and no extra pay will be given for this work. 09101/04 SC-30 - PART D -SPECIAL CONDITIONS 0-41 INGRESS AND EGRESS/OBSTRUCTION OF ACCESS TO DRIVES The Contractor shall provide ingress and egress to the property being crossed by th is construction and adjacent property when construction is not in progress and at night. Drives shall be left accessible at night , on weekends , and during holidays . The Contractor shall conduct his activities to minimize obstruction of access to drives and property during the progress of construction . Notification shall be made to an owner prior to his driveway being removed and/or rebu ilt. 0-42 PROTECTION OF TREES, PLANTS AND SOIL All property along and adjacent to the Contractors' operations including lawns , yards , shrubs , trees , etc., shall be preserved or restored after completion of the work , to a condition equal to or better than existed prior to start of wo rk. Any trees or other landscape features scarred or damaged by the Contractor's operations shall be restored or replaced at the Contractor's expense. Trimming or pruning to facilitate the work will be permitted only by experienced workmen in an approved manner (No trimming or pruning without the property owners ' consent). Pruned limbs of 1" diameter or larger shall be thoroughly treated as soon as possible with a tree wound dressing . By ordinance , the Contractor must obtain a permit from the City Forester before any work (trimming , removal , or root pruning) can be done on trees or shrubs growing on public property including street Rights-of-Ways and designated alleys . This permit can be obtained by calling the Forestry Office at 871-5738 . All tree work shall be in compliance with pruning standards for Class II Pruning as described by the National Arborist Association . A copy of these standards can be provided by calling the above number. Any damage to public trees due to negligence by the Contractor shall be assessed using the current formula for Shade Tree Evaluation as defined by the International Society of Arboriculture . Payment for negligent damage to public trees shall be made to the City of Fort Worth and may be withheld from funds due the Contractor by the City . To prevent the spread of the Oak Wilt fungus , all wounds on Live Oak and Red Oak trees shall be immediately sealed using a commercial pruning paint. No separate payment will be made for any of the work involved for this item and all costs incurred will be considered a subsidiary cost of the project. D-43 SITE RESTORATION The contractor shall be responsible for restoring the site to original grade and condition after completion of his operations subject to approval of the Engineer. The basis for approval by the Engineer will be grade restoration to plus minus one-tenth (0.1) of a foot. D-44 CITY OF FORT WORTH STANDARD PRODUCT LIST Proposed products submitted in the bid documents must appear in the latest "City of Fort Worth Standard Product List , for the bid to be considered responsive . Products and processes listed in the "City of Fort Worth Standard Product List shall be considered to meet City of Fort Worth minimum technical requirements . 09101/04 SC-31 PART D -SPECIAL CONDITIONS 0-45 TOPSOIL, SODDING, SEEDING & HYDROMULCHING This item shall be performed in accordance with the City of Fort Worth Parks and Community Services Department Specifications for Topsoil , Sodding and Seeding . 1. TOPSOIL DESCRIPTION : This item will consist of furnishing and placing a minimum of six (6) inches of topsoil , free from rock and foreign material , in all parkways and medians to the lines and grades as established by the Engineer. CONSTRUCTION METHODS : Topsoil will be secured from borrow sources as required to supplement material secured from street excavation . All excavated materials from streets which is suitable for topsoil will be used in the parkways and medians before any topsoil is obtained from a borrow source . Topsoil material secured from str~et excavation shall be stockpiled at locations approved by the Engineer, and at completion of grad ing and paving operations , topsoil shall be placed on parkway areas so as to provide a minimum six (6) inches of compacted depth of topso il parkways . 2 . SODDING DESCRIPTION : Sodding will consist of furnishing and planting Bermuda , Buffalo or St. Augustine grass in the areas between the curbs and walks , on terraces , in median strips , on embankments or cut slopes , or in such areas as designated on the Drawings and in accordance with the requirements of this Specification . Recommended Buffalo grass varieties for sodding are Prairie and 609 . MATERIALS : Sod shall consist of live and growing Bermuda , Buffalo or St. Augustine grass secured from sources where the soil is fertile . Sod to be placed during the dormant state of these grasses shall be alive and acceptable . Bermuda and Buffalo grass sod shall have a healthy, virile root system of dense , thickly matted roots throughout a two (2) inch minimum thickness of native soil attached to the roots . St. Augustine grass sod shall have a healthy , virile root system of dense , thickly matted roots throughout a one (1) inch minimum thickness of native soil attached to the roots . The sod shall be free from obnoxious weeds or other grasses and shall not contain any matter deleterious to its growth or which might affect its subsistence or hardiness when transplanted . Sod to be placed between curb and walk and on terraces shall be the same type grass as adjacent grass or existing lawn. Care shall be taken at all times to retain native soil on the roots of the sod during the process of excavating , hauling , and planting. Sod material shall be kept moist from the time it is dug until planted. When so directed by the Eng ineer, the sod existing at the source shall be watered to the extent required prior to excavating . Sod material shall be planted within three days after it is excavated. CONSTRUCTION METHODS : After the designated areas have been completed to the lines , grades , and cross-sections shown on the Drawings and as provided for in other items of the contract, sodding of the type specified shall be performed in accordance with the requirements hereinafter described. Sodding shall be either "spot" or "block"; either Bermuda , Buffalo or St. Augustine grass . 09101/04 SC-32 PART D -SPECIAL CONDITIONS a. Spot Sodding Furrows parallel to the curb line or sidewalk lines , twelve (12) inches on centers or to the dimensions shown on the Drawings , shall be opened on areas to be sodded . In all furrows , sod approximately three (3) inches square shall be placed on twelve ( 12) inch centers at proper depth so that the top of the sod shall not be more than one-half (1/2) inch below the finished grade . Holes of equivalent depth and spacing may be used instead of furrows. The soil shall be firm around each block and then the entire sodded area shall be carefully rolled with a heavy , hand roller developing fifteen (15) to twenty-five (25) pounds per square inch compression . Hand tamping may be required on terraces . b . Block Sodding . At locations on the Drawings or where directed , sod blocks shall be carefully placed on the prepared areas . The sod shall be so placed that the entire designated area shall be covered , and any voids left in the block sodding shall be filled with additional sod and tamped . The entire sodded area shall be rolled and tamped to form a thoroughly compact solid mass . Surfaces of block sod , which , in the opinion of the Eng ineer, may slide due to the height or slope of the surface or nature of the soil , shall ,. upon direction of the Engineer, be pegged with wooden pegs driven through the sod block to the firm earth , sufficiently close to hold the block sod firmly in place . When necessary , the sodded areas shall be smoothed after planting has been completed and shaped to conform to the cross-section previous ly provided and existing at the time sodding operations were begun. Any excess dirt from planting operations shall be spread uniformly over the adjacent areas or disposed of as directed by the Engineer so that the completed surface will present a sightly appearance . The sodded areas shall be thoroughly watered immediately after they are planted and shall be subsequently watered at such times and in a manner and quantity directed by the Engineer until completion and final acceptance of the project by the City of Fort Worth . 3. SEEDING DESCRIPTION : "Seeding" will consist of preparing ground , providing and planting seed or a mixture of seed of the kind specified along and across such areas as may be designated on the Drawings and in accordance with these Specifications . MATERIALS: a . General. All seed used must carry a Texas Testing Seed label showing purity and germination , name , type of seed , and that the seed meets all requirements of the Texas Seed Law . Seed furnished shall be of the previous season's crop and the date of analysis shown on each tag shall be within nine (9) months of time of delivery to the project. Each variety of seed shall be furnished and delivered in separate bags or containers. A sample of each variety of seed shall be furnished for analysis and testing when directed by the Engineer. 09/01 /04 The specified seed shall equal or exceed the following percentages of Purity and germination : SC-33 PART D -SPECIAL CONDITIONS Common Name Common Bermuda Grass Annual Rye Grass Tall Fescue Western Wheatgrass Buffalo Grass Varieties Top Gun Cody Purity 95% 95% 95% 95% 95% 95% Table 120.2.(2)a. Germination 90% 95% 90% 90% 90% 90% URBAN AREA WARM-SEASON SEEDING RATE (lbs.); Pure Live Seed (PLS) Dates Feb 1 to May 1 Mixture for Clay or Tight Soils (Eastern Sections) Bermudagrass 40 . Buffalograss 60 (Western Sections) Buffalograss 80 Bermudagrass 20 Total: 100 Total : 100 Table, 120.2.(2)b Mixture for Sandy Soils (All Sections) Bermudagrass 60 Buffalograss 40 Total : 100 TEMPORARY COOL-SEASON SEEDING RATE; (lb.) Pure Live Seed (PLS) Dates (All Sections) Aug 15 Tall Fescue 50 to Western Wheatgrass 50 May 1 Annual Rye 50 Total : 100 CONSTRUCTION METHODS : After the designated areas have been completed to the lines , grades , and cross-sections shown on the Draw ings and as provided for in other items of this Contract , seeding of the type specified shall be performed in accordance with the requirements hereinafter described . a. Watering . Seeded areas shall be watered as directed by the Engineer so as to prevent washing of the slopes or dislodgment of the seed . b . Finishing . Where applicable , the shoulders , slopes , and ditches shall be smoothed after seed bed preparation has been completed and shaped to conform to the cross-section previously provided and existing at the time planting operations were begun . BROADCAST SEEDING : The seed or seed mixture in the quantity specified shall be uniformly distributed over the areas shown on the Drawings and where directed . If the sowing of seed is by hand , rather than by mechanical methods , the seed shall be sown in two directions at right angles to each other. Seed and fertilizer shall be distributed at the same time provided the specified uniform rate of application for both is obtained . "Finishing" as specified in Section 0-45, Construction Methods , is not applicable since no seed bed preparation is required. DISCED SEEDING : Soil over the area shown on the Drawings as directed to be seeded shall be loosened to a minimum depth of three (3) inches and all particles in the seed bed shall be reduced to less than one (1) inch in diameter or they shall be removed . The area shall then 0910 1104 SC-34 .. - PART D -SPECIAL CONDITIONS be finished to line and grade as specified under "Finishing" in Section 0-45 , Construction Methods. The seed , or seed mixture , specified shall then be planted at the rate required and the application shall be made uniformly . If the sowing of seed is by hand rather than by mechanical methods , seed shall be raked or harrowed into the soil to a depth of approximately one-eight (1/8) inch . The planted area shall be rolled with a corrugated roller of the "Cultipacker" type . All rolling of the slope areas shall be on the contour. ASPHALT MULCH SEEDING : The soil over the area shown on the Drawings , or as directed to be seeded , shall be loosened to the minimum depth of three (3) inches and all particles in the seed bed shall be reduced to less than one (1) inch in diameter, or they shall be removed . The area shall then be finished to line and grade as specified under "Finishing" in Section D- 45, Construction Methods . Water shall then be applied to the cultivated area of the seed bed until a minimum depth of six (6) inches is thoroughly moistened . After the watering , when the ground has become sufficiently dry to be loose and pliable , the seed , or seed mixture specified , shall then be planted at the rate required and the application shall be made uniformly . If the sowing of seed is by hand , rather than mechanical methods , the seed shall be sown in two directions at right angles to each other. Seed and fertilizer may be distributed at the same time , provided the specified uniform rate of application for both is obtained. After planting, the seed shall be raked or harrowed into the soil to a depth of approximately one-quarter (1/4) inch. The planted surface area and giving a smooth surface without ruts or tracks. In between the time compacting is completed and the asphalt is applied , the planted area shall be watered sufficiently to assure uniform moisture from the surface to a minimum of six (6) inches in depth . · The application of asphalt shall follow the last watering as rapidly as possible. Asphalt shall be of the type and grade as shown on the Drawings and shall conform to the requirements of the item 300 , "Asphalts , Oils and Emulsions". If the type of asphalt to be used is not shown on the Drawings , or if Drawings are not included , then MS-2 shall be used . Applications of the asphalt shall be at a rate of three-tenths (0 .3) gallons per square yard . It shall be applied to the area in such a manner so that a complete film is obtained and the finished surface shall be comparatively smooth. RE-SEEDING OF AREAS PLANTED WITH COOL SEASONS SPECIES : Areas where temporary cool season species have been planted may be replanted beginning February 1 with warm season species as listed in Table 120.2(2)a. The re-seeding will be achieved in the following manner. The cool season species shall be mowed down to a height of one (1) inch to insure that slit-seeding equipment will be able to cut through the turf and achieve adequate soil penetration . * Slit-seeding , is achieved through the use of an implement which cuts a furrow (slit) in the soil and places the seed in the slit which is then pressed close with a cult packer wheel. 4 . HYDROMULCH SEEDING : If hydro mulch seeding is provided , seed mix shall have 95% purity of Bermuda grass and have a germination rate of 90%. Contractor shall ensure that the grass establishes . 09/01/04 SC-35 PART D -SPECIAL CONDITIONS 5. CONSTRUCTION WITHIN PARK AREAS TURF RESTORATION OF PARK AREAS : FERTILIZER DESCRIPTION : "Fertilizer" will consist of providing and distributing fertilizer over such areas as are designated on the Drawings and in accordance with these Specifications . MATERIALS : All fertilizer used shall be delivered in bags or containers clearly labeled showing the analysis . The fertilizer is subject to testing by the City of Fort Worth in accordance with the Texas Fertilizer Law . A pelleted or granulated fertilizer shall be used with an analysis of 16-20-0 or 16-5-8 or having the analysis shown on the Drawings. The figures in the analysis represent the percent of nitrogen , phosphoric acid , and potash nutrients respectively as determined by the methods of the Association of Official Agricultural Chemists . In the. event it is necessary to substitute a fertilizer of a different analysis, it shall be a pelleted or granulated fertilizer with a lower concentration . Total amount of nutrients furnished and applied per acre shall equal or exceed that specified for each nutrient. CONSTRUCTION METHODS: When an item for fertilizer is included in the Drawings and proposal , pelleted or granulated fertilizer shall be applied uniformly over the area specified to be fertilized and in the manner directed for the particular item of work . Fertilizer shall be dry and in good physical condition. Fertilizer that is powdered to caked will be rejected. Distribution of fertilizer as a particular item of work shall meet the approval of the Engineer. Unless otherwise indicated on the Drawings , fertilizer shall be applied uniformly at the average rate of three hundred (300) pounds per acre for all types of "Sodding" and four hundred (400) pounds per acre for all types of "Seeding". MEASUREMENT : Topsoil secured from borrow sources will be measured by the square yard in place on the project site . Measurement will be made only on topsoils secured from borrow sources . Acceptable material for "Seeding" will be measured by the linear foot , complete in place . Acceptable material for "Sodding" will be measured by the linear foot , complete in place . Acceptable material for "Fertilizer" shall be subsidiary to the price of sodding or seeiding. PAYMENT : All work performed as ordered and measured shall be subsidiary to the contract unless and otherwise noted in the plans and bid documents to be paid for at the unit price bid for each item of work. Its price shall be full compensation for excavating (except as noted below), loading , hauling , placing and furnishing all labor, equipment, tools , supplies , and incidentals necessary to complete work . All labor, equipment, tools and incidentals necessary to supply, transport, stockpile and place topsoil or salvage topsoil as specified shall be included in "Seeding" or "Sodding " bid items and will not be paid for directly . "Spot sodding" or "block sodding" as the case may be , will be paid for at the contract unit price per square yard , complete in place , as provided in the proposal and contract. The contract unit price shall be the total compensation for furnishing and placing all sod ; for all 09101/04 SC-36 PART D -SPECIAL CONDITIONS rolling and tamping ; fo r all watering ; for disposal of all surplus materials ; and for all materials , labor, equipment , tools and incidentals necessary to complete the work, all in acco rdance with the Drawings and these Specifications . The work performed and materials furnished and measured as provided under "Measurement" shall be paid for at the unit price for "Seed ing ", or "Sodd ing", of the type specified , as the case may be , which price shall each be full compensation for furnishing all materials and for performing all operations necessary to complete the work accepted as follows : Fertilizer material and application will not be measured or paid for directly , but is considered subsidiary to Sodding and Seeding . 0-46 CONFINED SPACE ENTRY PROGRAM It shall be the responsibility of the contractor to implement and maintain a variable "CONFINED SPACE ENTRY PROGRAM " which must meet OSHA · requirements for all its employees and subcontractors at all times during construction . All active sewer manholes , regardless of depth , are defined by OSHA , as "permit required confined spaces ". Contractors shall submit an acceptable "CONFINED SPACE ENTRY PROGRAM " for all applicable manholes and maintain an active file for these manholes . The cost of comply ing with this program shall be subsidiary to the pay items involving work in confined spaces . 0-47 SUBSTANTIAL COMPLETION INSPECTION/FINAL INSPECTION !!!! 1. Prior to the final inspection being conducted for the project, the contractor shall contact .. - the city inspector in writ ing when the entire project or a designated portion of the project is substantially complete. 2. The inspector along with appropriate City staff and the City's consultant shall make an inspection of the substantially completed work and prepare and submit to the contractor a list of items needing to be completed or corrected . 3 . The contractor shall take immediate steps to rectify the listed deficiencies and notify the owner in writing when all the items have been completed or corrected. 4. Payment for substantial completion inspection as well as final inspection shall be subsidiary to the project price . Contractor shall still be required to address all other deficiencies , which are discovered at the time of final inspection . 5 . 0-48 1. Final inspection shall be in conformance with general condition item "C5-5.18 Final Inspection" of PART C -GENERAL CONDITIONS . EXCAVATION NEAR TREES The Contractor shall be responsible for taking measures to minimize damage to tree limbs , tree trunks, and tree roots at each work site . All such measures shall be considered as incidental work included in the Contract Unit Price bid for applicable pipe or structu re installation except for short tunneling/tree augering . 2. Any and all trees located within the equipment operating area at each work site shall , at the direction of the Engineer, be protected by erecting a "snow fence" along the drip line or edge of the tree root system between tree and the construction area. 09101 /04 SC-37 PART D -SPECIAL CONDITIONS 3. Contractor shall inspect each work site in advance and arrange to have any tree limbs pruned that might be damaged by equipment operations . The Engineer shall be notified at least 24 hours prior to any tree trimming work. No trimming work will be permitted within private property without written permission of the Owner. 4 . Nothing shall be stored over the tree root system within the drip line area of any tree . 5. Before excavation (off the roadway) within the drip line area of any tree , the earth shall be sawcut for a minimum depth of 2 feet. 6 . At designated locations shown on the drawings , the "short tunnel" method using Class 51 0 .1. pipe shall be utilized. 7 . Except in areas where clearing is allowed , all trees up to 8" in diameter damaged during construction shall be removed and replaced with the same type and diameter tree at the contractor's expense . 8 . Contractor shall employ a qualified landscaper for all the work required for tree care to ensure utilization of the best agricultural practices and procedures . 9 . Short tunneling shall consist of power augering or hand excavation . The tunnel diameter shall not be larger than 1-1 /2 times the outside pipe diameter. Voids remaining after pipe installation shall be pressure grouted . 0-49 CONCRETE ENCASEMENT OF SEWER PIPE Concrete encasement of sewers shall be paid for at the Contract Unit Price per linear foot of concrete encasement as measured in place along the centerline of the pipe for each pipe diameter indicated . The Contract Unit Price shall include all costs associated with installation and reinforcement of the concrete encasement. 0-50 CLAY DAM Clay dam construction shall be performed in accordance with the Wastewater Clay Dam Construction , figure in the Drawings in these Specifications, at locations indicated on the Drawings or as directed by the City. Clay dams shall be keyed into undisturbed soil to make an impervious barrier to reduce groundwater percolation through the pipeline trench . Construction material shall consist of compacted bentonite clay or 2:27 concrete . Payment for work such as forming , placing and finishing shall be subsidiary to the price bid for pipe installation . 0-51 EXPLORATORY EXCAVATION (0-HOLE) The Contractor shall be responsible for verifying the locations of all existing utilities prior to construction , in accordance with item D-6 . At locations identified on the drawings, contractor shall conduct an exploratory excavation (D-Hole), to locate and verify the location and elevation of the existing underground utility where it may be in potential conflict with a proposed facility alignment. The exploratory excavation shall be conducted prior to construction of the entire project only at locations denoted on the plans or as directed by the engineer. Contractor shall submit a report of findings (including surveyed elevations of existing conflicting utilities) to the City prior to the start of construction of the entire project. If the contractor determines an existing utility is in conflict with the proposed facility, the contractor shall contact the engineer immediately for appropriate design modifications . 09101/04 SC-38 - PART D -SPECIAL CONDITIONS The contractor shall make the necessary repairs at the exploratory excavation (D -Hole) to obtain a safe and proper driving surface to ensure the safety of the general public and to meet the approval of the City inspector. The contractor shall be liable for any and all damages incurred due to the exploratory excavation (D-Hole). Payment shall not be made for verification of existing utilities per item D-6 . Payment for exploratory excavation (D-Hole}, at locations identified on the plans or as directed by the Engineer, shall include full compensation for all materials , excavation , surface restoration , field surveys , and all incidentals necessary to complete the work , shall be the unit price bid . No payment shall be made for exploratory excavation(s) conducted after construction has begun . D-52 INSTALLATION OF WATER FACILITIES 09/01/04 52.1 Polyvinyl Chloride (PVC) Water Pipe POLYVINYL Chloride Plastic Water Pipe and fittings on this Project shall be in accordance with the material standard contained in the General Contract Documents. Payment for work such as backfill , bedding, blocking , detectable tapes and all other associated appurtenant required, shall be included in the linear foot price bid of the appropriate BID ITEM(S). 52.2 Blocking Concrete blocking on this Project will necessarily be required as shown on the Plans and shall be installed in accordance with the General Contract Documents . All valves shall have concrete blocking provided for supporting . No separate payment will be made for any of the work involved for the item and all costs incurred will be considered to be included in the linear foot bid price of the pipe or the bid price of the valve . 52.3 Type of Casing Pipe 1. WATER: The casing pipe for open cut and bored or tunneled section shall be AWWA C-200 Fabricated Electrically Welded Steel Water Pipe , and shall conform to the provisions of E 1-15 , E 1-5 and E 1-9 in Material Specifications of General Contract Documents and Specifications for Water Department Projects . The steel casing pipe shall be supplied as follows : For the inside and outside of casing pipe , coal-tar protective coating in accordance with the requirements of Sec. 2.2 and related sections in AWWA C-203 . Touch-up after field welds shall provide coating equal to those specified above . C. Minimum thickness for casing pipe used shall be 0.375 inch. Stainless Steel Casing Spacers (centering style) such as manufactured by Cascade Waterworks Manufacturing Company or an approved equal shall be used on all non- concrete pipes when installed in casing . Installation shall be as recommended by the Manufacturer. 2 . SEWER: Boring used on this project shall be in accordance with the material standard E 1-15 and Construction standard E2-15 as per Fig . 110 of the General Contract Documents . 3. PAYMENT: Payment for all materials , labor, equipment , excavation , concrete grout , backfill , and incidental work shall be included in the unit price bid per foot. SC -39 09/01/04 PART D -SPECIAL CONDITIONS 52.4 Tie-Ins The Contractor shall be respons ible for making tie-ins to the existing water mains. It shall be the responsibility of the Contractor to verify the exact location and elevation of the existing line tie-ins. And any differences in locations and elevation of existing line tie-ins between the contract drawings and what may be encountered in the field shall be considered as incidental to construction. The cost of making tie-ins to existing water or sanitary sewer mains shall be included in the linear foot b id price of the pipe . 52.5 Connection of Existing Mains The Contractor shall determine the exact location , elevation , configurat ion and angulation of existing water or sanitary sewer lines prior to manufacturing of the connect ing piece . Any differences in locations , elevation , configuration , and or angulation of existing lines between the contract drawings and what may be encountered in the said work shall be considered as incidental to construction . Where it is required to shut down existing mains in order to make proposed connections , such down time shall be coordinated with the Engineer, and all efforts shall be made to keep this down time to a minimum . In case of shutting down an existing main , the Contractor shall notify the Manager, Construction Services , Phone 871-7813 , at least 48-hours prior to the required shut down time . The Contractor's attention is directed to Paragraph C5-5 .15 INTERRUPTION OF SERVICE , Page C5-5(5), PART C -GENERAL CONDITIONS OF THE WATER DEPARTMENT GENERAL CONTRACT DOCUMENTS AND GENERAL SPECIFICATIONS . The Contractor shall notify the customer both personally and in writing as to the location , time , and schedule of the service interruption . The cost of removing any existing concrete blocking shall be included in the cost of connection . Unless bid separately all cost incurred shall be included in the linear foot price bid for the appropriate pipe size . 52 .6 Valve Cut-Ins It may be necessary to cut-in gate valves to isolate the water main from which the extension and/or replacement is to be connected . This may require closing valves in other lines and putting consumers out of service for that period of time necessary to cut in the new valve ; the work must be expedited to the utmost and all such cut-ins must be coordinated with the engineer in charge of inspection . All consumers shall be individually advised prior to the shut out and advised of the approximate length of time they may be without service . Payment for work such as backfill , bedding , fittings , blocking and all other associated appurtenants required , shall be included in the price of the appropriate bid items. 52. 7 Water Services The relocation , replacement , or reconnection of water services will be required as shown on the plans , and/or as described in these Special Contract Documents in addition to those located in the field and identified by the Engineer. All service's shall be constructed by the contractor utilizing approved factory manufactured tap saddles (when required) and corporation stops , type K copper water tubing , curb stops with lock wings , meter boxes , and if required approved manufactured service branches . All materials used shall be as specified in the Material Standards (E 1- 17 & E 1-18) contained in the General Contract Documents . SC-40 r 09/01 /04 PART D -SPECIAL CONDITIONS All water services to be replaced shall be installed at a minimum depth of 36 inches below final grade . All existing 3/4-inch water service lines wh ich are to be replaced shall be replaced with 1- inch Type K copper, 1-inch d iameter tap saddle when required , and 1-inch corporation from the main line to the meter box . All services which are to be replaced or relocated shall be installed with the service ma in tap and service line being in line with the service meter unless otherwise directed by the Engineer. A minimum of 24 hours advance notice shall be given when service interruption will be required as specified in Section C5-5 .15 INTERRUPTION OF SERVICE . All water service meters shall be removed , tagged , and collected by the contractor for pickup by the Water Department for reconditioning or replacement. After installation of the water service in the proposed location and receipt of a meter from the project inspector the contractor shall install the meter. The meter box shall be reset as necessary to be flush with existing ground or as otherwise directed by the Engineer. All such work on the outlet side of the serv ice meter shall be performed by a licensed plumber. 1. WATER SERVICE REPLACEMENTS : Water service replacement or relocation is required when the existing service is lead or is too shallow to avoid breakage during street reconstruction . The contractor shall replace the existing service line with Type K copper from the main to the meter, curb stop with lock wings , and corporation stop . Payment for all work and materials such as backfill , fittings , type K copper tubing , curb stop with lock wings , service line adjustment , and any relocation of up to 12-inches from center line existing meter location to center line proposed meter location shall be included in the Linear Foot price bid for Copper Service Line from Main to five (5) feet behind Meter. Any vert ical adjustment of customer service line within the 5 foot area shall be subsidiary to the service installation. Payment for all work and materials such as tap saddle (if requ ired), corporation stops , and fittings shall be included in the price bid for Service Taps to Main . 2. WATER SERVICE RECONNECTION : Water service reconnect ion is required when the existing service is copper and at adequate depth to avoid breakage during street reconstruction . The contractor shall adjust the existing water service line as required for reconnection and furnish a new tap with corporation stop . The contractor will be paid for one (1) Service Tap to Main for each service reconnected plus for any copper service line used in excess of five (5) feet from Main to five (5) feet behind the Meter. 3 . WATER SERVICE METER AND METER BOX RELOCATIONS : When the replacement and relocation of a water service and meter box is required and the location of the meter and meter box is moved more than twelve (12) inches , as measured from the center line of the existing meter to location to the center line of the proposed meter location , separate payment will be allowed for the relocation of service meter and meter box. Centerline is defined by a line extended from the service tap through the meter. Only relocations made perpendicular to this centerline will be paid for separately . Relocations made along the centerline will be paid of in feet of copper service line . SC-41 PART D -SPECIAL CONDITIONS When relocation of service meter and meter box is required , payment for all work and materials such as backfill , fittings , five (5) feet of type K copper service and all materials , labor , and equipment used by and for the licensed plumber shall be included in the price bid for the service meter relocation. All other costs will be included in other appropriate bid item(s). This item will also be used to pay for all service meter and meter box relocations as /. required by the Engineer when the service line is not being replaced . Adjustment of only the meter box and customer service line within 5 feet distance behind the meter will not justify separate payment at any time . Locations with multiple service branches will be paid for as one service meter and meter box relocation. 4 . NEW SERVICE: When new services are required the contractor shall install tap saddle (when required), corporation stop , type K copper service line , curb stop with lock wings , and meter box. Reinforced plastic meter boxes with cast iron lid shall be provided for all 2 inch water meters or smaller. The reinforced plastic water meter boxes shall comply with section E 1-18A -Reinforced Plastic Water Meter Boxes Payment for all work and materials such as backfill, fittings , type K copper tubing , and curb stop with lock wings shall be included in the Linear Foot price bid for Service Line from Main to Meter five (5) feet behind the meter. Payment for all work and materials such as tap saddle , corporation stops, and fittings shall be included in the price bid for Service Taps to Mains . Payment for all work and materials such as furnishing and setting new meter box shall be included in the price bid for furnish and set meter box . 5. MULTIPLE SERVICE BRANCHES : When multiple service branches are required the contractor shall furnish approved factory manufactured branches . Payment for multiple service branches will include furnishing and installing the multiple service branch only and all other cost will be included in other appropriate bid item(s). 6 . MULTIPLE STREET SERVICE LINES TO SINGLE SERVICE METER: Any multiple service lines with taps servicing a single service meter encountered during construction shall be replaced with one service line that is applicable for the size of the existing service meter and approved by the Engineer. Payment shall be made at the unit bid price in the appropriate bid item(s). 52.8 2-lnch Temporary Service Line A. The 2-inch temporary service main and 3/4-inch service lines shall be installed to provide temporary water service to all buildings that will necessarily be required to have severed water service during said work. The contractor shall be responsible for coordinating the schedule of the temporary service connections and permanent service reconnections with the building owners and the Engineer in order that the work be performed in an expeditious manner. Severed water service must be reconnected within 2 hours of discontinuance of service . A 2-inch tapping saddle and 2-inch corporation stop or 2-inch gate valve with an appropriate fire hydrant adapter fitting shall be required at the temporary service point of 09101104 SC-42 PART D -SPECIAL CONDITIONS connection to the City water supply . The 2-inch temporary service main and 3/4-inch service lines shall be installed in accordance to the attached figures 1, 2 and 3. 2" temporary service line shall be cleaned and sterilized by using chlorine gas or chlorinated lime (HTH) prior to installation . The out-of-service meters shall be removed , tagged and collected by the Contractor for delivery to the Wate r Department Meter Shop for recond itioning or replacement. Upon resto ring permanent service , the Contractor shall re-install the meters at the correct location. The meter box shall be reset as necessary to be flush with the existing ground or as otherwise directed by the Engineer. The temporary service layout shall have a minimum available flow rate of 5 GPM at a dynamic pressure of 35 PSI per service tap . This criteria shall be used by the Contractor to determine the length of temporary service allowed , number of service taps and number of feed points . When the temporary service is required for more than one location the 2-inch temporary service pipes , 3/4-inch service fines and the 2-inch meter shall be moved to the next successive project location. Payment for work such as fittings , 3/4-inch service li nes , asphalt , barricades , all service connections , removal of temporary services and all other associated appurtenants required , shall be included in the appropriate bid item . B . In order to accurately measure the amount ·of water used duri ng construction , the Contractor will install a fire hydrant meter for all temporary service lines. Water used during construction for flushing new mains that cannot be metered from a hydrant will be estimated as accurately as possible. At the pre-construction conference the contractor will advise the inspector of the number of meters that will be needed along with the locations where they will be used . The inspector will deliver the hydrant meters to the locations . After installation , the contractor will take full responsibility for the meters until such time as the contractor returns those meters to the inspector. Any damage to the meters will be the sole responsibility of the contractor. The Water Department Meter Shop will evaluate the condition of the meters upon return and if repairs are needed the contractor will receive an invoice for those repa irs. The issued meter is for this specific project and location only. Any water that the contractor may need for personal use will require a separate hydrant meter obtained by the Contractor, at its cost , from the Water Department. 09101 /04 52.9 Purging and Sterilization of Water Lines Before being placed into service all newly constructed water lines shall be purged and sterilized in accordance with E2-24 of the General Contract Documents and Specifications except as modified herein . The Contractor will furnish all water for INITIAL cleaning and sterilization of water lines. All materials for construction of the project , including appropriately sized "pipe cleaning pigs ", chlorine gas or chlorinated lime (HTH) shall be furnished by the Contractor. Chlorinated lime (HTH) shall be used in sufficient quantities to provide a chlorine residual of fifty (50) PPM. The residual of free chlorine shall be measured after 24 hours and shall not be less than 10 parts per million of free chlorine . Chlorinated water shall be disposed of in the sanitary sewer system. Should a sanitary sewer not be available , chlorinated water shall be "de-chlorinated " prior to disposal. The line may not be placed in service until two successive sets of samples , taken 24 hours apart , have met the established standards of purity . SC-43 09/01 /04 PART D -SPECIAL CONDITIONS Purg ing and sterilization of the water lines shall be considered as incidental to the project and all costs incurred will be considered to be included in the linear foot bid price of the pipe . 52.10 Work Near Pressure Plane Boundaries Contractor shall take note that the water line to be replaced under this contract may cross or may be in close proximity to an existing pressure plane boundary . Care shall be taken to ensure all "pressure plane" valves installed are installed closed and no cross connections are made between pressure planes 52.11 Water Sample Station GENERAL: All water sampling station installations will be per attached Figure 34 or as required in large water meter vaults as per Figure 33 unless otherwise directed by the Engineer. The appropriate water sampling station will be furnished to the Contractor free of charge ; however, the Contractor will be required to pick up this item at the Field Operations Warehouse . PAYMENT FOR FIGURE 34 INSTALLATIONS : Payment for all work and materials necessary for the installation of the 3/4-inch type K copper service line will be shall be included in the price bid for copper Service Line from Main to Meter. Payment for all work and materials necessary for the installation tap saddle (if required), corporation stops , and fittings shall be included in the price bid for Service Taps to Main . Payment for all work and materials necessary for the installation of the sampl ing station , concrete support block, curb stop , fittings , and an incidental 5-feet of type K copper service line which are required to provide a complete and functional water sampling station shall be included in the price bid for Water Sample Stations . PAYMENT FOR FIGURE 33 INSTALLATIONS : Payment for all work and materials necessary for the installation tap saddle , gate valve , and fittings shall be included in the price bid for Service Taps to Main . Payment for all work and materials necessary for the installation of the sampling station , modification to the vault , fittings , and all type K copper service line which are required to provide a complete and functional water sampling station shall be included in the price bid for Water Sample Stations . 52.12 Ductile Iron and Gray Iron Fittings Reference Part E2 Construction Specifications , Section E2-7 Installing Cast Iron Pipe , fittings , and Specials , Sub section E2-7 .11 Cast Iron Fittings : E2-7 .11 DUCTILE-IRON AND GRAY-IRON FITTINGS : All ductile-iron and gray-iron fittings shall be furnished with cement mortar lining as stated in Section E 1-7. The price bid per ton of fittings shall be payment in full for all fittings , joint accessories , polyethylene wrapping , horizontal concrete blocking , vertical tie-down concrete blocking , and concrete cradle necessary for construction as designed . · SC-44 --· PART D -SPECIAL CONDITIONS All ductile-iron and gray-iron fittings , valves and specials shall be wrapped with polyethylene wrapping conforming to Material Specification E 1-13 and Construction Specification E2-13. Wrapping shall precede horizontal concrete blocking , vertical tie- down concrete blocking, and concrete cradle . Payment for the polyethylene wrapping , horizontal concrete blocking , vertical tie-down concrete blocking , and concrete cradle shall be included in bid items for vales and fittings and no other payments will be allowed . D-53 SPRINKLING FOR DUST CONTROL All applicable prov isions of Standard Specifications Item 200 , "Sprinkling for Dust Control " shall apply . However, no direct payment will be made for this item and it shall be considered to this contract. D-54 DEWATERING The Contractor shall be responsible for determining the method of dewatering operation for the water or sewage flows from the existing mains and ground water. The Contractor shall be responsible for damage of any nature resulting from the dewatering operations . The DISCHARGE from any dewatering operation shall be conducted as approved by the Engineer. Ground water shall not be discharged into sanitary sewers . Dewatering shall be considered as incidental to a construction and all costs incurred will be considered to be included in the project price . D-55 TRENCH EXCAVATION ON DEEP TRENCHES Contractor to prevent any water flowing into open trench during construction . Contractor shall not leave excavated trench open overnight. Contractor shall fill any trench the same day of excavation . No extra payment shall be allowed for this special condition . D-56 TREE PRUNING A. REFERENCES: National Arborist Association 's "Pruning Standards for Shade Trees ". B. ROOT PRUNING EQUIPMENT C . 09/01/04 1. Vibratory Knife 2 . Vermeer V-1550RC Root Pruner NATURAL RESOURCES PROTECTION FENCE 1. Steel "T" = Bar stakes , 6 feet long . 2 . Smooth Horse-Wire: 14-1/2 gauge (medium gauge) or 12 gauge (heavy gauge). 3 . Surveyor's Plastic Flagging : "Tundra" weight , International fluorescent orange or red color. 4 . Combination Fence : Commercially manufactured combination soil separator fabric on wire mesh backing as shown on the Drawings . SC-45 PART D -SPECIAL CONDITIONS D. ROOT PRUNING 1. Survey and stake location of root pruning trenches as shown on drawings . 2. Us ing the approved specified equipment , make a cut a m in i mum of 36 inches deep in order to minimize damage to the undisturbed root zone . 3. Backfill and compact the trench immediately after trenching . 4 . Place a 3-foot wide by 4-inch deep cover of mulch over the trench as required by the Engineer. 5. Within 24 hours, prune flush with ground and backfill any exposed roots due to construction activity . Cover with wood chips of mulch in order to equalize soil temperature and minimize water loss due to evaporation . 6. Limit any grading work within conservati9n areas to 3-inch maximum cut or fill , with no roots over 1-inch diameter being cut unless cut by hand or cut by specified methods , equipment and protection. E. MULCHING: Apply 2-inches to 4-inches of wood ch ips from trimming or clearing operation on areas designated by the Engineer. F. Tree Pruning shall be considered subsidiary to the project contract price . 0-57 TREE REMOVAL Trees to be removed shall be removed using applicable methods , including stump and root ball removal , load ing , hauling and dumping. Extra caution shall be taken to not disrupt existing utilities both overhead and buried. The Contractor shall immediately repair or replace any damage to utilities and private property including , but not limited to , water and sewer services , pavement , fences , walls , sprinkler system piping , etc., at no cost to the Owner. All costs for tree removal , including temporary service costs , shall be considered subsidiary to the project contract price and no additional payment will be allowed . 0-58 TEST HOLES The matter of subsurface exploration to ascertain the nature of the soils , including the amount of rock, if any , through which this pipeline installation is to be made is the responsibility of any and all prospective bidders, and any bidder on this project shall submit his bid under this condition . Whether prospective bidders perform this subsurface exploration jointly or independently , and whether they make such determination by the use of test holes or other means , shall be left to the discretion of such prospective bidders . If test borings have been made and are provided for bidder's information , at the locations shown on the logs of borings in the appendix of this specification , it is expressly declared that neither the City nor the Engineer guarantees the accuracy for the information or that the material encountered in excavations is the same , either in character, location , or elevation , as shown on the boring logs. It shall be the responsibil ity of the bidder to make such subsurface investigations , as he deems necessary to determine the nature of the material to be excavated . The Contractor assumes all responsibility for interpretation of these records and for making and maintaining the required excavation and of doing other work affected by the geology of the site. 09/01104 SC-46 - - PART D -SPECIAL CONDITIONS The cost of all rock removal and other associated appurtenances , if required , shall be included in the linear foot bid price of the pipe. 0-59 PUBLIC NOTIFICATION PRIOR TO BEGINNING CONSTRUCTION AND NOTIFICATION OF TEMPORARY WATER SERVICE INTERRUPTION DURING CONSTRUCTION Prior to beginning construction on any block in the project , the contractor shall , on a block by block basis, prepare and deliver a notice or flyer of the pending construction to the front door of each residence or business that will be impacted by construction. The notice shall be prepared as follows : The notification notice or flyer shall be posted seven (7) days prior to beginning any construction activity on each block in the project area . The flyer shall be prepared on the Contractor's letterhead and shall include the following information : Name of Project , DOE No., Scope of Project (i.e. type of construction activity), actual construction duration within the block , the name of the contractor's foreman and his phone number, the name of the City 's inspector and his· phone number and the City 's after-hours phone number. A sample of the 'pre -construction notification' flyer is attached. The contractor shall submit a schedule showing the construction start and fin ish time for each block of the project to the inspector. In addit ion , a copy of the flyer shall be delivered to the City Inspector for his review prior to being distributed. The contractor will not be allowed to begin construction on any block until the flyer is delivered to all residents of the block. In the event it b_ecomes necessary to temporarily shut down water service to residents or businesses during construct ion , the contractor shall prepare and deliver a notice or flyer of the pending interruption to the front door of each affected residen t The notice shall be prepared as follows: The notification or flyer shall be posted twenty-four (24) prior to the temporary interruption . The flyer shall be prepared on the contractor 's letterhead and shall include the following information: Name of the project , DOE number, the date of the interruption of service , the period the interruption will take place , the name of the contractor's foreman and his phone number and the name of the City 's inspector and his phone number. A sample of the temporary water service interruption notification is attached. A copy of the temporary interruption notification shall be delivered to the inspector for his review prior to being distributed . The contractor shall not be permitted to proceed with interruption of water service until the flyer has been delivered to all affected residents. and businesses. Electronic versions of the sample flyers can be obtained from the Construction office at (817) 871-8306 . All work involved with the notification flyers shall be considered subsidiary to the contract price and no additional compensation shall be made. 0-60 TRAFFIC BUTTONS The removal and replacement of traffic buttons is the responsibility of the contractor and shall be considered a subsidiary item. In the event that the contractor prefers for the Signals , Signs and Markings Division (SSMD) of the Transportation/Public Works Department to install the markings, the contractor shall contact SSMD at (817) 871-8770 and shall reimburse SSMD for all costs 09/01 /04 SC-47 PART D -SPECIAL CONDITIONS incurred , both labor and material. No additional compensation shall be made to the contractor for this reimbursement. D-61 SANITARY SEWER SERVICE CLEANOUTS Whenever a sanitary sewer service line is installed or replaced , the Contractor shall install a two- way service cleanout as shown in the attached detail. Cleanouts are to be installed out of high traffic areas such as driveways , streets , sidewalks , etc . whenever possible . When it is not possible , the cleanout stack and cap shall be cast iron . Payment for all work and materials necessary for the installation of the two-way service cleanout which are required to provide a complete and functional sanitary sewer cleanout shall be included in the price bid for San itary Sewer Service Cleanouts . D-62 TEMPORARY PAVEMENT REPAIR The Contractor shall .provide a temporary pavement repair immediately after trench backfill and compaction using a minimum of 2-inches of hot mix asphalt over a minimum of 6-inches of compacted flex base . The existing asphalt shall be saw cut to provide a uniform edge and the entire width and length of the temporary repair shall be rolled with a steel asphalt roller to provide smooth rideability on the street as well as provide a smooth transition between the existing pavement and the temporary repair . Cost of saw cutting shall be subsidiary to the temporary pavement repair pay item . The contractor shall be responsible for maintain ing the temporary pavement until the paving contractor has mobil ized . The paving contractor shall assume maintenance responsibility upon such mobilization. No additional compensation shall be made for maintaining the temporary pavement. D-63 CONSTRUCTION STAKES The City , through its Surveyor or agent, will provide to the Contractor construction stakes or other customary method of markings as may be found consistent with professional practice, establishing line and grades for roadway and utility construction , and centerlines and benchmarks for bridgework. These stakes shall be set sufficient ly in advance to avoid delay whenever practical. One set of stakes shall be set for all utility construction (water , sanitary sewer, drainage etc .), and one set of excavation/or stabilization stakes , and one set of stakes for curb and gutter/or paving . It shall be the sole responsibility of the Contractor to preserve , maintain , transfer, etc., all stakes furnished until completion of the construction phase of the project for which they were furnished . If the City or its agent determines that a sufficient number of stakes or markings provided by the City , have been lost , destroyed , or disturbed , to prevent the proper prosecution and control of the work contracted for in the Contract Documents , it shall be the Contractor's responsibility , at the Contractor's sole expense , to have such stakes replaced by an individual registered by the Texas Board of Professional Land Surveyor as a Registered Land Surveyor. No claims for delay due to lack of replacement of construction stakes will be accepted , and time will continue to be charged in accordance with the Contract Documents. D-64 EASEMENTS AND PERMITS The performance of this contract requires certa in temporary construction , right-of-entry agreements , and/or permits to perform work on private property . 09/01104 SC-48 - - - PART D -SPECIAL CONDITIONS The City has attempted to obtain the temporary construction and/or right-of-entry agreements for properties where construction activity is necessary on City owned facilities, such as sewer lines or manholes . For locations where the City was unable to obtain the easement or right-of-entry , it shall be the Contractor's responsibility to obtain the agreement prior to beginning work on subject property . This shall be subsidiary to the contract. The agreements , which the City has obtained , are available to the Contractor for review by contacting the plans desk at the Department of Engineering , City of Fort Worth . Also , it shall be the responsibility of the Contractor to obtain written permission from property owners to perform such work as c leanout repair and sewer service replacement on private property . Contractor shall adhere to all requirements of Paragraph C6-6.10 of the General Contract Documents . The Contractor's attention is directed to the agreement terms along with any special conditions that may have been imposed on these agreements , by the property owners . The easements and/or private property shall be cleaned up after use and restored to its original condition or better. In event additional work room is required by the Contractor, it shall be the Contractor's responsibil ity to obtain written permission from the property owners involved for the use of additional property required . No additional payment will be allowed for this item . The City has obtained the necessary documentation for railroad and/or highway permits required for construction of this project. The Contractor shall be responsible for complying with all provisions of such permits , including obtaining the requisite insurance , and shall pay any and all costs associated with or required by the permit(s). It is the Contractor's responsibil ity to provide the required flagmen and/or provide payment to the appropriate railroad/agency for all flagmen during construction in railroad/agency right-of-way . Any and all costs associated with compliance with permits(s) including payment for flagmen shall be subsidiary to the project price . No add itional payment will be allowed for this item. D-65 PRE-CONSTRUCTION NEIGHBORHOOD MEETING After the pre-construction conference has been held but before construction is allowed to begin on this project a publ ic meeting will be held at a location to be determined by the Engineer. The contractor , inspector, and project manager shall meet with all affected residents and present the projected schedule , including construct ion start date , and answer any construction related questions . Every effort will be made to schedule the neighborhood meeting within the two weeks following the pre-construction conference but in no case will construction be allowed to begin until this meeting is held. D-66 WAGE RATES The labor classifications and minimum wage rates set forth herein have been predetermined by the City Council of the City of Fort Worth , Texas , in accordance with statutory requirements , as being the prevailing classifications and rates that shall govern on all work performed by the Contractor or any Subcontractor on the site of the project covered by these Contract Documents . In no event shall less than the following rates of wages be paid . (Attached) D-67 REMOVAL AND DISPOSAL OF ASBESTOS CEMENT PIPE A. It is the intent of the City of Fort Worth to comply with the requirements of the Asbestos NESHAP found at 40 CFR Part 61 , Subpart M. This specification will establish procedures to be used by all Excavators in the removal and disposal of ACP in compliance with NESHAP . Nothing in this specification shall be construed to void any provision of a 09101104 SC-49 PART D -SPECIAL CONDITIONS contract or other law, ordinance , regulation or policy whose requirements are more stringent. B . ACP is defined under NESHAP as a Category 11 , non-friable material in its intact state but wh ich may become friable upon removal , demolition and/or disposal. Consequently , if the removal/ disposal process renders the ACP friable , it is regulated under the disposal requirements of 40 CFR 61 .150. A NESHAP notification must be filed with the Texas Department of Health . The notification must be filed at least ten days prior to removal of the material. If it remains in its non -friable state , as defined by the NESHAP, it can be disposed as a conventional construction waste . EPA defines friable as material , when dry, wh ich may be crumbled , pulverized or reduced to powder by hand pressures . C . D . The Generator of the hazardous material is responsible for the identification and proper handling , transportation , and disposal of the material. Therefore , it is the policy of the City of Fort Worth that the Excavator is the Generator regardless of whether the pipe is friable or not. It is the intent of the City of Fort Worth that all ACP shall be removed in such careful and prudent manner that it remains intact and does not become friable . The Excavator is responsible to employ those means, methods, techniques and sequences to ensure this result. E. Compliance with all aspects of worker safety and health regulations including but not limited to the OSHA Asbestos Standard is the responsibility of the Excavator. The City of Fort Worth assumes no responsibility for compliance programs , which are the responsibility of the Excavator. (Copy of forms attached) 0-68 STORM WATER POLLUTION PREVENTION PERMIT: As defined by Texas Commission on Environmental Quality (TCEQ) regulations , a Texas Pollutant Discharge Elimination System (TPDES) General Construction Permit is required for all construction activities that result in the disturbance of one to five acres (Small Construction Activity) or five or more acres of total land (Large Construct ion Activity). The contractor is defined as an "operator" by state regulations and is requ ired to obtain a permit. Information concerning the permit can be obtained through the Internet at http ://www.tnrcc.state.tx.us/permitting/water perm/wwperm/construct.html. Soil stabilization and structural practices have been selected and designed in accordance with North Central Texas Council of Governments Best Management Practices and Erosion Control Manual for Construction Activities (BMP Manual). This manual can be obtained through the Internet at www.dfwstormwater.com/runoff.html. Not all of the structural controls discussed in the BMP Manual will necessarily apply to this project. Best Management Pract ices are construction management techniques that, if properly utilized , can minimize the need for physical controls and possible reduce costs . The methods of control shall result in minimum sediment retention of not less than 70%. NOTICE OF INTENT (NOi): If the project will result in a total land disturbance equal to or greater than 5 acres, the contractor shall s ign at the pre-construction meeting a TCEQ Notice of Intent (NOi) form prepared by the engineer. It serves as a notification to the TCEQ of construction activity as well as a commitment that the contractor understands the requirements of the permit for storm water discharges from construction activities and that measures will be taken to implement and maintain storm water pollution prevention at the site . The NOi shall be submitted 09101 /04 SC-50 - - PART D -SPECIAL CONDITIONS to the TCEQ at least 48 hours prior to the contractor moving on site and shall include the required $100 application fee . The NOi shall be mailed to: Texas Commission on Environmental Quality Storm Water & General Permits Team ; MC-228 P .O . Box 13087 Austin , TX 78711-3087 A copy of the NOi shall be sent to : City of Fort Worth Department of Environmental Management 5000 MLK Freeway Fort Worth , TX 76119 NOTICE OF TERMINATION (NOT): For all sites that qualify as Large Construction Activity , the contractor shall sign, prior to final payment, a TCEQ Notice of Termination (NOT) form prepared by the engineer. It serves as a notice that the site is no longer subject to the requirement of the permit. The NOT should be mailed to : Texas Commission on Environmental Quality Storm Water & General Permits Team ; MC-228 P .O . Box 13087 Austin, TX 78711-3087 STORM WATER POLLUTION PREVENTION PLAN (SWPPP): A document consisting of an erosion control and toxic waste management plan and a narrative defining site parameters and techniques to be employed to reduce the release of sediment and pollution from the construction site . Five of the project SWPPP's are available for viewing at the plans desk of the Department of Engineering. The selected Contractor shall be provided with three copies of the SWPPP after award of contract , along with unbounded copies of all forms to be submitted to the Texas Commission on Environmental Quality. LARGE CONSTRUCTION ACTIVITY -DISTURBED AREA EQUAL TO OR GREATER THAN 5 ACRES : A Notice of Intent (NOi) form shall be completed and submitted to the TCEQ including payment of the TCEQ required fee. A SWPPP that meets all TCEQ requirements prepared by the Engineer shall be prepared and implemented at least 48 hours before the commencement of construction activities . The SWPPP shall be incorporated into in the contract documents. The contractor shall submit a schedule for implementation of the SWPPP. Deviations from the plan must be submitted to the engineer for approval. The SWPPP is not warranted to meet all the conditions of the permit since the actual construction activities may vary from those anticipated during the preparation of the SWPPP. Modifications may be required to fully conform to the requirements of the Permit. The contractor must keep a copy of the most current SWPPP at the construction site. Any alterations to the SWPPP proposed by the contractor must be prepared and submitted by the contractor to the engineer for review and approval. A Notice of Termination (NOT) form shall be submitted within 30 days after final stabilization has been achieved on all portions of the site that is the responsibility of the permittee , or, when another permitted operator assumes control over all areas of the site that have not been finally stabilized . SMALL CONSTRUCTION ACTIVITY -DISTURBED AREA EQUAL TO OR GREATER THAN ONE ACRE BUT LESS THAN FIVE ACRES : Submission of a NOi form is not required . However, 09/01/04 SC-51 PART D -SPECIAL CONDITIONS a TCEQ Site Notice form must be completed and posted at the site . A copy of the completed Site Notice must be sent to the City of Fort Worth Department of Environmental Management at the address listed above. A SWPPP , prepared as described above, shall be implemented at least 48 hours before the commencement of construction act ivities. The SWPPP must include descriptions of control measures necessary to prevent and control soil erosion , sedimentation and water pollution and will be included in the contract documents . The control measures shall be installed and maintained throughout the construction to assure effective and continuous water pollution control. The controls may include , but not be limited to , s ilt fences , straw bale dikes , rock berms , diversion dikes , interceptor swales , sediment traps and basins , pipe slope drain , inlet protection , stabilized construction entrances , seeding , sodding , mulching , soil retention blankets, or other structural or non-structu ral storm water pollution controls . The method of control shall result in a minimum sediment retention of 70% as defined by the NCTCOG "BMP Manual." Deviations from the proposed control measures must be submitted to the engineer for approval. PAYMENT FOR SWPPP IMPLEMENTATION : Payment shall be made per lump sum as shown on the proposal as full compensation for all items contained in the project SWPPP . FOR DISTURBED AREAS LESS THAN 1 ACRE, SPECIAL CONDITION D -40 SHALL BE APPLICABLE. D-69 COORDINATION WITH THE CITY'S REPRESENTATIVE FOR OPERATIONS OF EXISTING WATER SYSTEMS It is the Contractor's responsibility to coordinate any event that will require connecting to or the operation of an existing City water line system with the City 's representative . The Contractor may obtain a hydrant water meter from the Water Department for use during the life of named project. In the event the Contractor requ ires that a water valve on an existing live system be turned off and on to accommodate the construction of the project , the Contractor must coordinate th is activity through the appropriate City representative . The Contractor shall not operate water line valves of existing water system . Failure to comply will render the Contractor in violation of Texas Penal Code Title 7, Chapter 28 .03 (Criminal Mischief) and the Contractor will be prosecuted to the full extent of the law. In addition , the Contractor will assume all liabilities and responsibilities as a result of these actions . D-70 ADDITIONAL SUBMITTAL$ FOR CONTRACT AWARD The City reserves the right to require any pre-qualified contractor who is the apparent low bidder(s) for a project to submit such additional information as the City , in sole discretion may require, including but not limited to manpower and equipment records , information about key personnel to be assigned to the project, and construction schedule , to assist the City in evaluating and assessing the ability of the apparent low bidder(s) to deliver a quality product and successfully complete projects for the amount bid within the stipulated time frame . Based upon the City 's assessment of the submitted information , a recommendation regarding the award of a contract will be made to the City Council. Failure to submit the additional information if requested may be grounds for rejecting the apparent low bidder as non-responsive . Affected contractors will be notified in writing of a recommendation to the City Council. D-71 EARLY WARNING SYSTEM FOR CONSTRUCTION Time is of the essence in the completion of this contract. In orde r to insure that the contractor is responsive when notified of unsatisfactory performance and/or of failure to maintain the contract schedule , the following process shall be applicable : 09101/04 SC-52 - - - - - PART D -SPECIAL CONDITIONS The work progress on all construction projects will be closely mon itored. On a bi -monthly basis the percentage of work completed will be compared to the percentage of time charged to the contract. If the amount of work performed by the contractor is less than the percentage of time allowed by 20% or more ( example : 10% of the work completed in 30% of the stated contract time as may be amended by change order), the following proactive measures will be taken: 1. A letter will be mailed to the contractor by certified mail , return receipt requested demanding that , with in 10 days from the date that the letter is received , it provide sufficient equ ipment , materials and labor to ensure completion of the work with in the contract time. In the event the contractor receives such a letter, the contractor shall provide to the City an updated schedule showing how the project will be completed within the contract time . 2 . The Project Manager and the Directors of the Department of Engineering , Water Department , and Department of Transportation and Public Works will be made aware of the situation . If necessary , the City Manager's Office and the appropriate city council members may also be informed . 3 . Any notice that may , in the City's sole discretion , be required to be provided to interested individua ls will distributed by the Engineering Department's Public Information Officer. 4 . Upon receipt of the contractor's response , the appropriate City departments and directors will be notified. The Engineering Department's Public Information Officer will , if necessary , then forward updated notices to the interested individuals. 5 . If the contractor fails to provide an acceptable schedule or fails to perform satisfactorily a second time prior to the completion of the contract , the bonding company will be notified appropriately . D-72 AIR POLLUTION WATCH DAYS The Contractor shall be required to observe the following guidelines relating to working on City construction sites on days designated as "AIR POLLUTION WATCH DAYS ". Typically , the OZONE SEASON, within the Metroplex area , runs from May 1, through OCTOBER 31, with 6 :00 a .m . -10 :00 a.m . being critical BECAUSE EMISSIONS FROM THIS TIME PERIOD HAVE ENOUGH TIME TO BAKE IN THE HOT ATMOSPHERE THAT LEADS TO EARLY AFTERNOON OZONE FORMATION .. The Texas Commission on Environmental Quality (TCEQ), in coordination with the National Weather Service , will issue the Air Pollution Watch by 3:00 p .m. on the afternoon prior to the WATCH day . On designated Air Pollut ion Watch Days, the Contractor shall bear the responsibility of being aware that such days have been designated Air Pollution Watch Days and as such shall not begin work until 10 :00 a.m. whenever construction phasing requires the use of motorized equipment for periods in excess of 1 hour. However, the Contractor may begin work prior to 10 :00 a.m . if use of motorized equipment is less than 1 hour, or if equipment is new and certified by EPA as "Low Emitting ", or equipment burns Ultra Low Sulfur Diesel (ULSD), diesel emulsions, or alternative fuels such as CNG . If the Contracto r is unable to perform continuous work for a period of at least seven hours -between the hours of 7:00 a.m. -6 :00 p.m., on a designated Air Pollution Watch Day , that day will be considered as a weather day and added onto the allowable weather days of a given month . 09/01/04 SC-53 - PART D -SPECIAL CONDITIONS 0-73 FEE FOR STREET USE PERMITS AND RE-INSPECTIONS A fee for street use permits is in effect. In addition , a separate fee for re-inspections for parkway construction , such as driveways , sidewalks , etc., will be required. The fees are as follows : 1. The street permit fee is $30 .00 per permit with payment due at the time of permit application. 2 . A re-inspection fee of $25 .00 will be assessed when work for which an inspection called for is incomplete. Payment is due prior to the City performing re-inspection. Payment by the contractor for all street use permits and re-inspections shall be considered subsidiary to the contract cost and no additional compensation shall be made . 0-74 "GREEN" CEMENT POLICY As mandated by Fort Worth City Council Resolution 3536 , all cement utilized for this project shall be procured from a kiln utilizing a dry kiln process or from any kiln that does not produce an excess of 1.71b of NOx emissions per ton of clinker produced . All related costs for complying with the 'Green ' Cement Policy shall be considered subsidiary to the applicable project pay items . This policy shall also apply to all cement products including concrete , and concrete products . The contractor shall complete and submit the 'Green ' Cement Policy Compliance Statement (included in the contract documents) at the time of bid opening of the project. Failure to comply with the 'Green ' Cement policy shall be grounds for rejecting the bid as non-responsive. During the term of the contract if cement meeting the above requirement is not available , and where cement from a non-compliant source must be utilized , the contractor shall furnish good faith effort documentation in form of letters from two North Texas cement manufacturers of 'Green ' Cement stating that no stock of 'green ' cement is available for the contractor at that time. These letters shall be considered valid for a maximum of one week after which new letters must be submitted to the Project Inspector if 'green ' cement continues to remain unavailable . 09/01/04 SC-54 - - . .' Date: .... -· -7 , (To be printed on Contractor's Letterhead) -----DOE No: 3176 PROJECT NAME:Main C1C4B Sanitary Sewer Drainage Area Part 15 MAPSCO LOCATION: 76L LIMITS OF CONST.: West of9111 Avenue along FWWR between Rosedale and Oleander Estimated Duration of Construction on your Street : <XX> days THIS IS TO INFORM YOU THAT UNDER .A CONTRACT WITH THE CITY OF FORT WORTH, OUR COMPANY WILL REHABILITATE SEWER LINES ON OR AROUND YOUR PROPERTY. CONSTRUCTION WILL BEGIN APPROXIMATELY .SEVEN DAYS FROM THE DATE OF THIS NOTICE . IF YOU HA VE QUESTIONS ABOUT ACCESS, SECURITY, SAFETY OR ANY OTHER ISSUE, PLEASE CALL: Mr. <CONTRACTOR'S SUPERINTENDENT> AT <TELEPHONE NO.> OR Mr. <CITY INSPECTOR> AT <TELEPHONE NO.> AFTER 4:30 PM OR ON WEEKENDS, PLEASE CALL 871-7970 PLEASE KEEP THIS FLYER HANDY WHEN YOU CALL. PART D -SPECIAL CONDITIONS CITY OF FORT WORTH HIGHWAY CONSTRUCTION PREVAILING WAGE RATE FOR 2000 CLASSIFICATION Asphalt Raker Asphalt Shoveler Batching Plant Weigher Carpenter (Rough) Concrete Finisher-Paving Concrete Finisher Helper (Paving) Concrete Finisher-Structures Flagger Form Builder-Structures Form Setter-Paving & Curbs Form Setter-Structures Laborer-Common Laborer-Utility Mechanic Servicer Pipe Layer Pipe Layer Helper Asphalt Distributor Operator Asphalt Paving Machine Operator Concrete Paving Saw Crane , Clamshell , Backhoe, Derrick , Dragline , Shovel(< 1 1/2 CY) Crane , Clamshell , Backhoe , Derrick , Dragl ine , Shovel (> 1 1/2 CY) Front End Loader (2 1/2 CY & less) Front End Loader (over 2 1/2 CY) Milling Machine Operator Mixer Motor Grader Operator (Fine Grade) Motor Grader Operator Pavement Marking Machine Roller, Steel Wheel Plant-Mix Pavements Roller, Steel Wheel Other Flatwheel or Tamping Roller, Pneumatic, Self-Propelled Scraper Traveling Mixer Reinforcing Steel Setter (Paving) Truck Driver-Single Axle (Light) Truck Driver-Tandem Axle Semi-Trailer Truck Driver-Lowboy/Float Truck Driver-Transit Mix Truck Driver-Winch 09/01 /04 SC-56 HOURLY RATE $10 .32 $9 .75 $9 .65 $13.64 $10 .16 $9.70 $13.44 $7 .00 $13.44 $10 .25 $9 .75 $7 .64 $8 .64 $13 .25 $10 .13 $7.35 $6 .75 $11.45 $11 .09 $10.53 $10 .00 $11.52 $9 .94 $9 .32 $8 .00 $11.00 $12.31 $13 .75 $11 .00 $9 .88 $12 .12 $8.02 $10 .00 $9 .75 $8.00 $10 .22 $10 .54 $10 .63 $9 .80 - - liiiil DOE NO. XXXX Project Name: NOTICE OF TEMPORARY WATER SERVICE INTERRUPTION DUE TO UTILITY IMPROVEMENTS IN YOUR NEIGHBORHOOD, YOUR WATER SERVICE WILL BE INTERRUPTED ON --------- BETWEENTHEHOURSOF _______ AND _____ ~ IF YOU HAVE QUESTIONS ABOUT THIS SHUT-OUT, PLEASE CALL: MR. AT __________ _ (CONTRACTORS SUPERINTENDENT) (TELEPHONE NUMBER) OR MR. ____________ AT __________ _ (CITY INSPECTOR) (TELEPHONE NUMBER) THIS INCONVENIENCE WILL BE AS SHORT AS POSSIBLE. THANK YOU, ___________ _, CONTRACTOR 09101/04 F 0 r 0 ff i e e u s a · 0 n I y u T A H p A 0 N E s H A p C T [I H 0 L V I 0 I a ti Q n ? PART D -SPECIAL CONDITIONS ~·:J..:-.l . DEMOLITION J RENOVATION .,., NOTIFICATION FORM T T) H NOTIFICATION# ________ _ TEXAS DEPARTMENT OF HEALTH NOTE: CIRCLE ITEMS THAT ARE AMENDED 1) Aba,emem Contractor; ______ -____________ TDH Licen!a>e Number:. _______ _ AdC'res$ : Citv: State : . Zip : ___ _ Office Phone Numb-er : ,__.__ _________ Joo Site Phone Numbet:. _____________ _ Site S~~rvis<lr: TOH License Number:-------------- Site StipcrviSOr : TOH Li~nse Number:. ______________ ___. .. Trained On-Site NESHAP lndh,i dual ; _______________ Certiflcation Dale :. _______ _ Demolition Contractor: ___________ -:-__ Ottice PhoM Number...__.__ _________ _ Adc!ress: _______ ~ ________ Ci1:t __________ Sta1e : Zip ; ____ ..,_ ... 2) Projed Consultant or Operalor: __________ ~ _____ TDH License Number:. _____ _ Mii11in9 Address;_~----------------------------------Clty: state: ____ Zip: ____ Office Phone Number:,..__.__ _____ _ 3) FacllityO·J,ne r:. __________________________ ~------ AUonliM: _________________ ~-------------------- Mailing Addrnss: ____ ~------------------,------------------ City: Slate : Zip: Owner Phone Number~-~-~---- .. Noto: Tho lnvoi~g for the notification foe wi ll be sent to the ownerotthe building and the billing ocf(jl'C$$ forth41 lnvolce will b& obtained from the lnfotm:ition th.it ls provided In thh. section. 4) Description or Facil ity Name=----------:::--~------~---------:::,------ Physical Adcress : _ ____,--,-----------Caunty: Cit)·: _______ .Zip ; ___ _ Facility PhOfle Number Facil ity Contact Pe~on ; _____ ~~------- Oescrip!ion of Area!Room Numbe-r=---------~---------------------Prior Uije : _______________ Future Use: ________________ ~- Age oi Biiilding,i Facility : Size: Number of Floors : _____ Sci"iool (K · 12): C YES C NC- 5) Type of Work.: ,-: Demolition :i Renovation {Abatement) .J Annual Consolidated Work wil l be during: ,_; D.i y o faening u Night -Ptiased Projeci Oescrlption of work sctiedulc: ___________________________ ~ __ __,_ 6} Is 1his a Public Buitcli ng? :-: YES NESHAP-Only Facility? 0 YES 11 NO Federal Facility?: YES : NO fnduslrial Site? Cl YES n NO n NO IS Building/Facil ity Oc:cupiec!? :1 YES : I NO 7) Notifie3tion Type CHECK ONLY ONE J Original (10 Working Days} :--Cancellation i · Amendment n Emergency/Ordered If 1his is a n <'.lmendmen t, which amendmen1 number is this?_ (Enclose eopy of original .1nd/or la.st amendment) If an emergency, v..ho did you talk with ~l TOH? Emergency#: _____ _ Date and Hou, of Emergency {HH/MMJ'DD/YY}:. _______ ~ Description of the sudden , unexpecteo event encl explan~tiOn o f 110w the event caused unsafe conditions ar Woul d ceu f- equ ipment dam~e {compute.rs. machinery. etc. ________________________ _ O 8) Description of procedu.res to be followed in 1he event that unexpected asbestos is found or previously non-friable Y asbestos rne1erial becomes aumblfld. pul ... erized. or r educed to powder ;-----------------,- E s 9) Was en Asbes1os $\J rYey performed? J YES C NO Date: I f TOH lnspec!or Lioense No ; ____ _ G Analytical Method: 0 PLM D TEM O Assumed TOH Uibcratory License No: --,----- N {For TAHPA (public building) projecis : an assumption mus! be made by a TDH Licensed Inspector) tO) Descripti.o n of planned e1emolili0n or renovation work. type of material, end method(s) to be used,_:------- 11} Description of work pra ct ices and engi neering controls to oe used to prcvont emissions of asbeslos at the demolitio.'llrenova1ion : _______________________________ _ SC-58 - 09101/04 PART D -SPECIAL CONDITIONS 12} ALL applicab !e items iri 1hB foilcwing table must be completed: IF NO ASBESTOS PRESENT CHECK HSRE : Approximate amc,11t.uit of Check onlt of measurement Asbestos-Containing Building Material Asbestos Type 1------,,------1 --",--,--,----,,---,-----I Pipes Surface Area RACM to be removed RACM NOT remo\'ed lntenor Cate on I non-friab{e ramO\•ed EX:Etrior Cate or I non-friabl e removed C~teco I non•friable NOT remo\'ed Interior Cat o • i i non-friable remo\·ed Exterior Cate o JI non-triable remo~·ed Cat 11 non-frla!lle NOT remo ... e<1 RACM Off-Facil ity Component 13) \.Vaste Transpor1e r Name : _________________ TOH License Number.------ A.dd,oss : ____________ City: _________ ~State: ___ Zip :=· ___ _ Ccntad Person : Pt1011e Number: ,._/ -L--------- 14) waste Dispos.31 Site Name=·---------=--------------------------Address: __ --, ___________ .....:Cily : __________ Staie: ___ Zip : ___ _ Te:ephone : ' TNRCC Permit N umber.-------- 15) For stl\Jc:turally unsound facilities. attach a cop,• of demolition order and rden1ify Governmental OtticieJ oelow: Ni'.:.n'l(t : Registrat ion No : --------------Til le: _______________ _ Date of order (M M.!'DDJYY) J . Dale order to begin {MM i DD/YY) _ __:_ _ _,_J __ 16) Scheduled Dates of Asbestos Al>ateme111 (MM/DD/YY} Start: __ .....:.. _ ___,/ __ Ccmple1e : -~l-~'- 17) Scheduled Dates Demolilion.rRenovetion {MM/ODNY) S1art: Complete : __ /~~'---- .. Note: tf the start date on this notification c~o not bo met, 11111 lOH Regional e>r Local Program office Musr be conlacted by phomt prior to the tSlart data . Failure lo do so is a viol.3tlon In accor'"ncc co TAHPA. ~Ion 295.61. l hereb;• cerlify Hiat all information I twve provided is correct. complete. and 1rue to t'le best of my knowledge . I acknD'.,.'ledge that I am respons rllle tor all aspects of the notifica1ion form, includi ng, but no1 limiting . co:1te11t and submission dates. TM maximum penally is $10,000 pe r day per vi olation . (Signe1ure of Building o ... •ner/ Operator or Delegated Consullan.L"Contracior) MA IL TO: •Faxes aro not accoptod" (Printed Nam~) {Dale} ASBESTOS NOTIFICATION SECTION TOXIC SUBSTANCES CONTROL DNISION TEXAS DEPARTMENr OF HEAL m PO BOX 143538 AUSTIN, TX 78714-3538 Pli:. 512-834-6600. 1-800-572-5548 (Telephooe) (Fax Numlx':r) ·F:J><.cs tire not accepted" Form APB#5, dater:! 07129/02. Replaces TOH form dato<f 07113/01. For a.ssistanc;e in c;ompleting farm, call 1-B00-572-5548 SC-59 DA-1 DA-2 DA-3 DA-4 DA-5 DA-6 DA-7 DA-8 DA-9 DA-10 DA-11 DA-12 DA-13 DA-14 DA-15 DA-16 DA-17 DA-18 DA-19 DA-20 DA-21 DA-22 DA-23 DA-24 DA-25 DA-26 DA-27 DA-28 DA-29 DA-30 DA-31 DA-32 DA-33 DA-34 DA-35 DA-36 DA-37 DA-38 DA-39 DA-40 DA-41 DA-42 DA-43 DA-44 DA-45 DA-46 PART DA -ADDITIONAL SPECIAL CONDITIONS AW ARD OF CONTRACT FOR PROJECTS WITH MULTIPLE UNITS ..................... 4 PIPELINE REHABILITATION CURED-IN-PLACE PIPE. ............................................ 4 PIPE ENLARGEMENT SYSTEM ....................................................................................... 4 FOLD AND FORM PIPE ...................................................................................................... 4 SLIPLINING ........................................................................................................................... 4 PIPE INST AL LED BY OTHER THAN OPEN CUT ......................................................... 4 TYPE OF CASING PIPE ...................................................................................................... 7 SERVICE LINE POINT REPAIR/ CLEANOUT REPAIR .............................................. 7 PROTECTIVE MANHOLE COATING FOR CORROSION PROTECTION ............... 7 MANHOLE REHABILITATION ........................................................................................ 7 SURFACE PREPARATION FOR MANHOLE REHABILITATION ............................. 8 INTERIOR MANHOLE COATING -MICROSILICATE MORTAR SYSTEM ........... 8 INTERIOR MANHOLE COATING -QUADEX SYSTEM .............................................. 8 INTERIOR MANHOLE COATING -SPRAY WALL SYSTEM ..... : ............................... 8 INTERIOR MANHOLE COATING -RA VEN LINING SYSTEM ................................. 8 INTERIOR MANHOLE COATING: PERMACAST SYSTEM WITH EPOXY LINER ......... 8 INTERIOR MANHOLE COATING-STRONG-SEAL-SYSTEM .................................... 8 RIGID FIBERGLASS MANHOLE LINERS ...................................................................... 8 PVC LINED CONCRETE WALL RECONSTRUCTION ................................................ 8 PRESSURE GROUTING ...................................................................................................... 8 VACUUM TESTING OF REHABILITATED MANHOLES .......................................... 11 FIBERGLASS MANHOLES ............................................................................................... 11 LOCATION AND EXPOSURE OF MANHOLES AND WATER VALVES ................ 11 REPLACEMENT OF CONCRETE CURB AND GUTTER ........................................... 12 REPLACEMENT OF 6" CONCRETE DRIVEWAYS .................................................... 12 REPLACEMENT OF H.M.A.C. PAVEMENT AND BASE ............................................ 12 GRADED CRUSHED STONES .......................................................................................... 13 WEDGE MILLING 2" TO 0" DEPTH 5.0' WIDE. .......................................................... 13 BUTT JOINTS -MILLED .................................................................................................. 13 2" H.M.A.C. SURFACE COURSE (TYPE "D" MIX) ..................................................... 13 REPLACEMENT OF 7" CONCRETE VALLEY GUTTER .......................................... 13 NEW 7" CONCRETE VALLEY GUTTER ...................................................................... 14 NEW 4" STANDARD WHEELCHAIR RAMP ................................................................ 14 8" PAVEMENT PULVERIZATION ................................................................................. 14 REINFORCED CONCRETE PAVEMENT OR BASE (UTILITY CUT) ..................... 14 RAISED PAVEMENT MARKERS .................................................................................... 15 POTENTIALLY PETROLEUM CONTAMINATED MATERIAL HANDLING ........ 15 LOADING, TRANSPORTATION, AND DISPOSAL OF CONTAMINATED SOIL .. 15 ROCK RIPRAP-GROUT-FILTER FABRIC ................................................................ 15 CONCRETE RIPRAP .......................................................................................................... 15 CONCRETE CYLINDER PIPE AND FITTINGS ........................................................... 16 CONCRETE PIPE FITTINGS AND SPECIALS ............................................................. 16 UNCLASSIFIED STREET EXCAVATION ..................................................................... 16 6" PERFORATED PIPE SUBDRAIN ................................................................................ 17 REPLACEMENT OF 4" CONCRETE SIDEWALKS ..................................................... 17 RECOMMENDED SEQUENCE OF CONSTRUCTION ................................................ 17 ASC-1 PART DA -ADDITIONAL SPECIAL CONDITIONS DA-47 PAVEMENT REPAIR IN PARKING A REA ................................................................... 17 DA-48 EASEMENTS AND PERMITS ........................................................................................... 17 DA-49 HIGHWAY REQUIREMENTS .......................................................................................... 17 DA-SO CONCRETE ENCASEMENT ............................................................................................ 17 DA-51 CONNECTION TO EXISTING STRUCTURES .............................................................. 18 DA-52 TURBO METER WITH VAULT AND BYPASS INSTALLATION ............................. 18 DA-53 OPEN FIRE LINE INSTALLATIONS .............................................................................. 18 DA-54 WATER SAMPLE STATION ............................................................................................. 18 DA-55 CURB ON CONCRETE PAVEMENT .............................................................................. 18 DA-56 SHOP DRAWINGS .............................................................................................................. 19 DA-57 COST BREAKDOWN ......................................................................................................... 19 DA-58 STANDARD STREET SPECIFICATIONS H.M.A.C. OVERLAY ................................ 19 DA-59 H.M.A.C. MORE THAN 9 INCHES DEEP ....................................................................... 20 DA-60 ASPHALT DRIVEWAY REP AIR ..................................................................................... 20 DA-61 TOP SOIL .............................................................................................................................. 20 DA-62 WATER METER AND METER BOX RELOCATION AND ADJUSTMENT ............ 20 DA-63 BID QUANTITIES ............................................................................................................... 20 DA-64 WORK IN HIGHWAY RIGHT OF WAY ........................................................................ 20 DA-65 CRUSHED LIMESTONE (FLEX-BASE) ......................................................................... 20 DA-66 OPTION TO RENEW .......................................................................................................... 20 DA-67 NON-EXCLUSIVE CONTRACT ....................................................................................... 20 DA-68 CONCRETE VALLEY GUTTER ................................................................................. : .... 20 DA-69 TRAFFIC BUTTONS .......................................................................................................... 21 DA-70 PAVEMENT STRIPING ..................................................................................................... 21 DA-71 H.M.A.C. TESTING PROCEDURES ................................................................................ 21 DA-72 SPECIFICATION REFERENCES ............................................................... 21 DA-73 RELOCATION OF SPRINKLER SYSTEM BACK-FLOW PREVENTOR/CONTROL VALVE AND BOX ............................................... 21 DA-74 RESILIENT-SEATED GATE VALVES ......................................................... 22 DA-75 EMERGENCY SITUATION, JOB MOVE IN .................................................. 22 DA-76 1 1/2" & 2" COPPER SERVICES .................................................................. 22 DA-77 SCOPE OF WORK (UTIL. CUT) ...................................................................................... 22 DA-78 CONTRACTOR'S RESPONSIBIL TY (UTIL. CUT) ....................................................... 22 DA-79 CONTRACT TIME (UTIL. CUT) ...................................................................................... 22 DA-80 REQUIRED CREW PERSONNEL & EQUIPMENT (UTIL. CUT) .............................. 22 DA-81 TIME ALLOWED FOR UTILITY CUTS (UTIL. CUT) ................................................. 23 DA-82 LIQUIDATED DAMAGES (UTIL. CUT) ......................................................................... 23 DA-83 PAVING REPAIR EDGES (UTIL. CUT) .......................................................................... 23 DA-84 TRENCH BACKFILL (UTIL. CUT) ................................................................................. 23 DA-85 CLEAN-UP (UTIL. CUT) .................................................................................................... 23 DA-86 PROPERTY ACCESS (UTIL. CUT) .................................................................................. 23 DA-87 SUBMISSION OF BIDS (UTIL. CUT) .............................................................................. 23 DA-88 STANDARD BASE REPAIR FOR UNIT I (UTIL. CUT) ............................................... 23 DA-89 CONCRETE BASE REPAIR FOR UNIT II & UNIT III (UTIL. CUT) ........................ 23 DA-90 2 TO 9 H.M.A.C. PAVEMENT (UTIL. CUT) ................................................................... 23 DA-91 ADJUST WATER VALVE BOXES, MANHOLES, AND VAULTS (UTIL. CUT) ...... 23 ASC -2 PART DA -ADDITIONAL SPECIAL CONDITIONS DA-92 MAINTENANCE BOND (UTIL. CUT) ............................................................................. 23 DA-93 BRICK PAVEMENT (UTIL. CUT) ................................................................................... 23 DA-94 LIME STABILIZED SUBGRADE (UTIL. CUT) ............................................................. 23 DA-95 CEMENT STABILIZED SUBGRADE (UTIL. CUT) ...................................................... 24 DA-96 REPAIR OF STORM DRAIN\ STRUCTURES (UTIL. CUT) ........................................ 24 DA-97 "QUICK-SET" CONCRETE (UTIL. CUT) ...................................................................... 24 DA-98 UTILITY ADJUSTMENT (UTIL. CUT) ........................................................................... 24 DA-99 STANDARD CONCRETE SIDEWALK AND WHEELCHAIR RAMPS .................... 24 DA-100 LIMITS OF CONCRETE PAVEMENT REPAIR (UTIL. CUT) ................................... 24 DA-101 CONCRETE CURB AND GUTTER (UTIL. CUT) .......................................................... 24 DA-102 PAYMENT (MISC. REPL.) ................................................................................................ 24 DA-103 DEHOLES (MISC. REPL.) ................................................................................................. 25 DA-104 CONSTRUCTION LIMITATIONS (MISC. EXT.) .......................................................... 25 DA-105 PRESSURE CLEANING AND TESTING (MISC. REPL.) ............................................. 25 DA-106 BID QUANTITIES (MISC. REPL.) ................................................................................... 25 DA-107 LIFE OF CONTRACT (MISC. REPL.) ............................................................................ 25 DA-108 DETERMINATION AND INITIATION OF WORK (MISC. REPL.) ........................... 26 DA-109 WORK ORDER COMPLETION TIME (MISC. REPL.) ............................................... 26 DA-110 MOVE IN CHARGES (MISC. REPL.) .............................................................................. 26 DA-111 PROJECT SIGNS (MISC. REPL.) ..................................................................................... 26 DA-112 LIQUIDATED DAMAGES (MISC. REPL.) ..................................................................... 26 DA-113 TRENCH SAFETY SYSTEM DESIGN (MISC. REPL.) ................................................. 27 DA-114 FIELD OFFICE .................................................................................................................... 27 DA-115 BRICK PAVEMENT REPAIR (MISC. REPL.) ............................................................... 27 DA-116 FLOW ABLE FILL (MISC. REPL.) ................................................................................... 27 DA-117 TRAFFIC CONTROL PLAN ............................................................................................. 28 DA-118 COORDINATION OF WORK WITH CONTRACTOR FOR OTHER UNITS ........... 28 DA-119 CONTRACT AWARD ................................................................................ 28 ASC-3 PART DA -ADDITIONAL SPECIAL CONDITIONS DA-1 AWARD OF CONTRACT FOR PROJECTS WITH MULTIPLE UNITS The City reserves the right to abandon without obligation to the contractor, any part of the project, or the entire project, at any time before the contractor begins any construction work authorized by the City. Award , if made, shall be to the lowest responsible bidder. The following shall apply for contract documents with multiple units of work . Each unit represents a separate project , each with an individual M/WBE specification and proposal section . The proposal sections are arranged to allow prospective bidders to submit bids on one unit, some of the units , or all of the units. Award of contract(s), if made, shall be to the lowest responsible bidder for each individual unit. If a contractor is the low bidder on two units or more, a single set of contract documents consisting of all applicable units will be created and one single award of contract shall be made . The Contractor shall comply with the City's M/WBE Ordinance on each unit. Bidders shall submit individual and separate monthly M/WBE reports for each Unit included in the Contract. Construction time on all units will run concurrently . For situations involving approved contracts with multiple units, the total allowable construction completion time period for all the units shall be the same as the unit with the longest construction ·time period . DA-2 PIPELINE REHABILITATION CURED-IN-PLACE PIPE Not Used . DA-3 PIPE ENLARGEMENT SYSTEM Not Used . DA-4 FOLD AND FORM PIPE Not Used. DA-5 SLIPLINING Not Used . DA-6 PIPE INSTALLED BY OTHER THAN OPEN CUT A. GENERAL: 1 . Furnish materials and necessary accessories, with strengths, thickness , coatings, and fittings indicated, specified and/or necessary to complete the work . 2. All excavation shall provide an open area conforming to the outside diameter of the casing and/or carrier conduit. The excavation shall be to an alignment and grade which will allow the carrier conduit to be installed to proper line and grade as shown on the Plans and as established in the Specifications. 3 . Work shall be performed in accordance with the requirements of the City of Fort Worth Water Department, the Texas Department of Transportation, or railroad company, as applicable. 8 . MATERIALS : 1 . Casing Pipe : Casing pipe shall be steel conforming to ANSI 836.10 and the following : a . Field Strength : 35,000 psi minimum. ASC-4 PART DA -ADDITIONAL SPECIAL CONDITIONS b. Wall thickness : 0.312 in. minimum (0.5 for railroad crossings). c . Diameter: As shown on the drawings (minimum size requirements). d . Joints : Continuous circumferential weld in accordance with AWS 01 .1 . 2 . Carrier Pipe in Casing: Carrier pipe shall be as shown on drawings and as specified in the General Contract Documents . 3 . Sewer Pipe without Casing Pipe : Shall be minimum Class 51 ductile iron pipe , or as designated on the plans . 4. Grout: Grout shall be Portland Cement grout of min . 2000 psi compressive strength at 28 days. Proportioned not less than 1 cu . ft . of cement to 3 cu . ft . of fine sand with sufficient water added to provide a free flowing thick slurry . C. EXECUTION 1. Where sewer pipe is required to be installed under railroad embankments or under highways , streets or other facilities in other than open cut, construction shall be performed in such a manner so as to not interfere with the operation of the railroad , street , highway, or other facility , and so as not to weaken or damage any embankment or structure . During construction operations , barricades and lights to safeguard traffic and pedestrians shall be furnished and maintained , until such time as the backfill has been completed and then shall be removed from the site . 2. Pits and Trenches : a. If the grade of the pipe at the end is below the ground surface, suitable pits or trenches shall be excavated for the purpose of conducting the jacking or tunneling operations and for placing end joints of the pipe . Wherever end trenches are cut in the sides of the embankment or beyond it, such work shall be sheeted securely and braced in a manner to prevent earth from caving in. b. The location of the pit shall meet the approval of the Engineer. c . The pits of trenches excavated to facilitate these operations shall be backfilled immediately after the casing and carrier pipe installation has been completed . 3. Boring and Jacking Steel Casing Pipe : Steel casing pipe shall be installed by boring hole with the earth auger and simultaneously jacking pipe into place . a . The boring shall proceed from a pit provided for the boring equipment and workmen . The holes are to be bored mechanically . The boring shall be done using a pilot hole . By this method an approximate 2-inch hole shall be bored the entire length of the crossing and shall be checked for line and grade on the opposite end of the bore from the work pit. This pilot hole shall serve as the centerline of the larger diameter hole to be bored . Other methods of maintaining line and grade on the casing may be approved if acceptable to the Engineer. Excavated material shall be placed near the top of the working pit and disposed of as required . The use of water or other fluids in connection with the boring operation will be permitted only to the extent required to lubricate cuttings . Jetting or sluicing will not be permitted . b . In unconsolidated soil formations , a gel-forming colloidal drilling fluid consisting of at least 10 percent of high grade carefully processed bentonite may be used to consolidate ASC-5 PART DA -ADDITIONAL SPECIAL CONDITIONS cutt ings of the bit , seal the walls of the hole , and furnish lubrication for subsequent removal of cutt ings and installation of the pipe immediately thereafter. c . Allowable variation from the line and grade shall be as specified under paragraph A.2 . All vo ids between bore and outs ide of cas ing shall be pressure grouted . 4 . Installation of Carrier Pipe in Casing : a. Sanitary sewer pipe located w ithin the encasement pipe shall be supported by "skids" or "bands " to prevent the pipe and bells from snagging on the inside of the casing , and to keep the installed line from resting on the bells . b . All skids shall be treated with a wood preservative . Skids should extend for the full length of the pipe w ith the exception of the bell area and spigot area necessary for assembly unless otherwise specified . c . The Contractor shall prevent over-belling the pipe while installing it through the casing . A method of restricting the movement between the assembled bell and spigot where applicable shall be provided. d . At all bored , jacked , or tunneled insta ll ations , the annular space between the carrier pipe and casing shall be filled with grout. Care must be taken that not too much water is forced into the casing so as not to float the pipe . The backfill material will not be required unless specified on the plans and specified by the Engineer. e . Closure of the casing after the pipe has been installed shall be plugged at the ends of the casing as shown on the drawings or as required by the Engineer. 5. Boring and Jacking Ductile Iron Pipe without Casing Pipe : a . As indicated on drawings and as required and directed by the Engineer sewer shall be constructed of bore and jacked ductile iron pipe . b. When a casing pipe is not designated on the drawings , the contractor shall prov ide a casing pipe if necessary to achieve line and grade . Casing pipe shall be provided at no add itional cost and shall be subs idiary to the cost bid for installation By Other than Open Cu t. c . Bore and jack in accordance with paragraph C.3. above . d . Short length of sewer consisting of a single pipe section may be installed by jacking without a bore hole if permitted by the Engineer and in soft soil layer. All voids outside of installed pipe shall be pressure grouted . 6 . Tunneling : Where the characteristics of the so il, the size of the proposed pipe , or the use of monolithic sewer would make the use of tunneling more satisfactory than jacking or boring , or when shown on the plans , a tunnel ing method may be used , with the approval of the Engineer or railroad/highway offic ials. a . When tunneling is permitted , the lin ing of the tunnel shall be of sufficient strength of support the overburden . The Contractor shall submit the proposed liner method to the Engineer for approval. The tunnel liner design shall bear the seal of a licensed professional engineer in the State of Texas. Approval by the Engineer shall not relieve the Contractor of the responsibility for the adequacy of the liner method . ASC-6 PART DA -ADDITIONAL SPECIAL CONDITIONS b. The space between the tunnel liner and the limits of excavation shall be pressure grouted or mud-jacked . c. Access holes for placing concrete shall be space at maximum intervals of 10 feet. D. MEASUREMENT AND PAYMENT : Installation of pipe by other than open cut will be measured by the linear foot of pipe, complete in place . Such measurement will be made between the ends of the pipe along the central axis as installed . The work performed and materials furnished as prescribed by this item will be paid for at the Contract Unit Price bid per linear foot for Pipe Installed by Other Than Open Cut of the type , size , and class of pipe specified as shown on plans . The furnishing of all materials , pipe , liner materials required for installation, for all preparation , hauling and installing of same , and for all labor, tools , equipment and incidentals necessary to complete the work , including excavation , backfilling and disposal of surplus material shall be included in the Contract Unit Price as shown in the Bid Proposal. Payment shall not include pavement replacement, which if requ ired , shall be paid separately . DA-7 TYPE OF CASING PIPE 1. WATER: The casing pipe for open cut and bored or tunneled section shall be AWWA C-200 Fabricated Electrically Welded Steel Water Pipe , and shall conform to the provisions of E1-15 , E1-5 and E1-9 in Material · Specifications of General Contract Documents and Specifications for Water Department Projects . The steel cas ing pipe shall be suppl ied as follows : · A. For the inside and outside of cas ing pipe , coal-tar protective coating in accordance with the requirements of Sec . 2.2 and related sections in AWWA C-203 . B . Touch-up after field welds shall provide coating equal to those specified above . C. Minimum thickness for casing pipe used shall be 0.375 inch Casing Spacers (centering style) such as manufactured by Cascade Waterworks Manufacturing Company, Advanced Products and Systems, Inc ., or an approved equal shall be used on all non-concrete pipes when installed in casing . Installation shall be as recommended by the manufacturer. 2. SEWER: Boring used on this project shall be in accordance with the material standard E1-15 and Construction standard E2-15 as per Fig . 110 of the General Contract Documents . 3 . PAYMENT: Payment for all materials, labor, equipment, excavation , concrete grout, backfill , and incidental work shall be included in the unit price bid per foot. DA-8 SERVICE LINE POINT REPAIR/ CLEANOUT REPAIR Not Used . DA-9 PROTECTIVE MANHOLE COATING FOR CORROSION PROTECTION Not Used . DA-1() MANHOLE REHABILITATION ASC-7 PART DA -ADDITIONAL SPECIAL CONDITIONS Not Used . DA-11 SURFACE PREPARATION FOR MANHOLE REHABILITATION Not Used . DA-12 INTERIOR MANHOLE COATING -MICROSILICATE MORTAR SYSTEM Not Used . DA-13 INTERIOR MANHOLE COATING -QUADEX SYSTEM Not Used . DA-14 INTERIOR MANHOLE COATING -SPRAY WALL SYSTEM Not Used . DA-15 INTERIOR MANHOLE COATING -RAVEN LINING SYSTEM Not Used . DA-16 INTERIOR MANHOLE COATING: PERMACAST SYSTEM WITH EPOXY LINER Not Used . DA-17 INTERIOR MANHOLE COATING-STRONG-SEAL-SYSTEM Not Used . DA-18 RIGID FIBERGLASS MANHOLE LINERS -Not Used . DA-19 PVC LINED CONCRETE WALL RECONSTRUCTION Not Used . DA-20 PRESSURE GROUTING A. GENERAL 1. Scope. This Section governs all work, materials and testing required for the pressure grouting of manhole defects. Manholes or sections of manholes with active leaks shall be repaired as indicated in the Manhole Rehabilitation Schedule. 2. Description. The Contractor shall be responsible for the furnishing of all labor, supervision , materials, equipment, and testing required for the completion of pressure grouting of manhole defects in accordance with the Contract Documents. 3. Manufacturer's Recommendations. Materials, additives, mixture ratios , and procedures utilized for the grouting process shall be in accordance with manufacturer's recommendations . 4 . Manholes . Manholes to be grouted are of brick, concrete , or fiberglass construction. ASC-8 PART DA -ADDITIONAL SPECIAL CONDITIONS A MA TE RIALS 1. Grouting Materials : a. Urethane Ge l Grout: Urethane gel grout , such as Scotch -Seal 5610 gel or equal shall be a hydrophilic polymer. The chemical shall be m ixed within the range of from 8 to 10 parts of water and shall contain a reinforcing agent supplied by the same manufacturer. The material shall gel and cu re to a tough flexible elastomeric condition . When wet , the gel shall exhibit strength properties of at least 25 ps i tensile at 150 percent elongation . The material shall not change in linear dimension more than eight percent when subjected to wet and dry cycles . b. The chemical grout shall be applied so as to have the grout material flow freely into the defects . To avoid any wastage of the material flowing through the defects, a gel control agent may be added . The following properties shall be exhibited by the grout: 1) Documented service of satisfactory performance in similar usage . 2) Controllable reaction times and shrinkage through the use of chemicals supplied by the same manufactu rer. The minimum gel set time shall be established so that adequate grout travel is achieved. 3) Resistance to chemicals ; resistant to most organic solvents , mild ac ids and alkali. 4) Compressive recovery return to original shape after repeated deformation . 5) The chemical shall be essentially non-toxic in a cured form . 6) Sealing material shall not be rigid or brittle when subjected to dry atmosphere . The material shall be able to withstand freeze/thaw and moving load condit ions . 7) Sealing material shall be noncorrosive . c. A reinforcing agent such as Scotch-Seal Brand 5612 re inforcing agent or equivalent shall be util ized in accordance with manufacturer's recommendations . Any 5612 reinforcing agent which contains lumps must be discarded . Care must be taken to be sure that the pH of the water in the tank is from 5 to 9. As a precaution against the possibility of the pH being outside this range , take a small amount of water from the tank to which Gel Reinforcing Agent 5612 is to be added . Add a few drops of 5612 to this test sample . Scotch-Seal Brand Gel Reinforcing Agent 5612 should disperse readily . If precipitation occurs , drain the tank and retest. Repeat as necessary until dispersion occurs . If dispers ion does not occur, do not use the water source . d. A filler material such as Celite 292 (diatomaceous earth) from Johns Mansville or equivalent shall be utilized . The addition of the filler material shall not exceed the quantity specified by the manufacturer, and continuous agitation of the water side of the mixture is required . The filler material may also be utilized as a reinforc ing agent in accordance with the urethane gel grout manufacturer's recommendations .................................................................................................... . 1. Add itives : Grout add itions may be utilized for catalyzing the gel reaction , inhibiting the gel reaction , buffering the solution , lowering the freez ing temperature of the solution , acting as a filler, providing strength or for inhibition of root growth . 2. Root Control : A root inhibiting chemical such as dichlobenil shall be added to the chemical grout mixture at a safe level of concentration and shall have the ability to remain active within the grout for a minimum of 12 months . 3. Material Identification : Contractor shall completely identify the types of grout , mortar, sealant , and/or root control chemicals used and provide case histories of successful use or defend the choice of ASC-9 PART DA -ADDITIONAL SPECIAL CONDITIONS grouting materials based on chem ical and physical properties , ease of application , and expected performance , to the satisfaction of the Engineer. 4 . Mixing and Handling : Mix ing and handl ing of chem ical grout and form ing const ituents , which may be toxic under certa in conditions shall be in accordance w ith the recommendations of the manufacturer and in such a manne r as to minimize hazard to personnel. It is the responsibility of the Contractor to provide appropriate protective measures to ensure that chem icals or gels produced by the chemicals are under control at all times and are not ava ilable to unauthorized personnel or animals. All equipment shall be subject to the approval of the Engineer. Only personnel thoroughly familiar with the handling of the grou t material and additives shall perform the grout ing operations . C. EXECUTION 1. General. Manhole grouting shall not be performed until sealing of manhole frame and grade adjustments , partial manhole replacement, or manhole repairs are complete . 2. Preliminary Repairs : a . Seal all unsealed lifting holes , unsealed step holes , vo ids larger than approximately one- half (1/2) inch in th ickness. All cracked or deteriorated material shall be removed from the area to be patched and replaced with Octocrete , as manufactured by IPS Systems , Inc . or equal , in acco rdance with manufacturer's specifications . b. Cut and trim all roots within the manho le. 3 . Temperature . Normal grouting operations including appl ication of interior coating shall be performed in accordance with manufacturer's recommendations . 4 . Grouting Material Usage . Grouting of the manhole may include corbel , wall , pipe seals , manhole joints , wall to flattop joint, and/or bench/trough . Areas of the manhole designated to be grouted will be directed by the Engineer. If entire manhole is scheduled for grouting , grouting shall include the entire manhole including corbel , wall , pipe seals and bench/trough . Pipe seal grouting shall include all pipe seals in the spec ified manhole and grouting of the specified manhole includ ing the bench/trough to the maximum he ight of 18 inches from the crown . 5 . Drilling and Injection : a. Injection holes shall be drilled through the manhole wall at locations indicated in the appropriate detail(s). b. Grout shall be injected through the holes under pressure w ith a suitable probe . Injection pressure shall not cause damage to the manhole structure or surrounding surface features . Grout shall be injected through the lowest holes first. The procedure shall be repeated until the manhole is externally sealed w ith grout. c . Grouting from the ground surface shall not be allowed . d. Grout travel shall be verified by observation of grout to defects or adjacent injection holes . Provide additional injection holes, if necessary , to ensure grout travel. e. Injection holes shall be cleaned with a drill and patched with a waterproof quick setting mortar for brick and concrete manholes . ASC-10 PART DA -ADDITIONAL SPECIAL CONDITIONS 6. Testing of Rehabilitated Manholes . Testing of rehab ilitated manholes for water tightness shall be performed by the Contractor in the presence of the Engineer in accordance with the requirement of Section DA-21 , VACUUM TESTING OF REHABILITATED MANHOLES of these specifications . D. MEASUREMENT AND PAYMENT If the entire manhole is grouted , the Contract Unit Price shall be per vertical foot grouted as indicated on the Manhole Rehabilitation Schedule included in these specificat ions or as required by the Engineer. Payment for grouting pipe seals , bench and trough , and 18 inches above crown of pipe , and grouting flattop to wall joint, shall be based on the Contract Unit Price per each manhole rehab ilitated as indicated on the Manhole Rehabilitation Schedule . The Contract Unit Price shall be payment in full for performing the work and for furnishing all labor, supervision, materials, equipment, preliminary repairs and testing necessary to complete the work including grouting with urethane grout. DA-21 VACUUM TESTING OF REHABILITATED MANHOLES Not Used . DA-22 FIBERGLASS MANHOLES Not Used . DA-23 LOCATION AND EXPOSURE OF MANHOLES AND WATER VALVES The contractor shall be responsible for locating and marking all previously exposed manholes and water valves in each street of this contract before the resurfac ing process commences for a particular street. The contractor shall attempt to include the Construction Engineer (if he is available) in the observation and marking activ ity . In any event a street shall be completely marked a minimum of two (2) working days before resurfacing begins on any street. Marking the curbs with paint is a recommended procedure . It shall be the contractors responsibility to notify the utility companies that he has commenced work on the project. As the resurfacing is completed (within same day) the contractor shall locate the covered manholes and valves and expose them for later adjustment. Upon completion of a street the contractor shall notify the utilities of this completion and indicate the start of the next one in order for the utilities to adjust facilities accordingly . The following are utility contact persons : Company Southwestern Bell Telephone Texas Utilities Lone Star City of Fort Worth , Street Light and Signal Telephone Number 338-6275 336-9411 Ext. 2121 336-8381 Ext. 6982 871-8100 Contact Person "Hot Line " Mr. Roy Kruger Mr. Jim Bennett Mr. Jim Bob Wakefield Of course , under the terms of this contract , the contractor shall complete adjustment of the storm dra in and Water Department facilities , one traffic lane at a time within five (5) working days after completing the laying of proposed H.M.A.C . overlay adjacent to said facilities . Any deviation from the above procedure and allotted working days may result in the shut down of the resurfacing operation by the Construction Engineer. ASC-11 PART DA -ADDITIONAL SPECIAL CONDITIONS The contractor shall be responsible for all materials , equipment and labor to perform a most accurate job and all costs to the contractor shall be figured subsidiary to this contract. DA-24 REPLACEMENT OF CONCRETE CURB AND GUTTER These provisions require the contractor to remove all failed existing curb and gutter, as designated by the Construction Engineer, and replace with standard concrete curb and gutter , laydown curb and gutter, or in like kind, as governed by the standard City Specifications, Item No . 104 "Removing Old Concrete", Item No . 502 "Concrete Curb and Gutter", and Drawing Nos . S-S2 through S-S4 . Pay limits for laydown curb and gutter are shown in Drawing No . S-S5 of the Standard Specifications . Contractor shall saw cut the curb and gutter and pavement prior to removal. Included , and figured subsidiary to this unit price , will be the required sawcut excavation, as per specification Item No . 106 "Unclassified Street Excavation ", into the street to aid in the construction of the curb and gutter. The pay limit will be 9" out from the gutter lip, with same day haul-off of the removed material to a suitable dump site . The street void shall be filled with H.M.A.C . "Type D" mix as per specification No. 300 "Asphalts , Oils and Emulsions ", Item No. 304 "Prime Coat" and Item No . ;312 "Hot Mix Asphaltic Concrete" and compacted to standard City densities and top soil as per specification item No. 116 "Top Soil", if needed , shall be added and leveled to grade behind the curb . Existing improvements within the parkway such as water meters , sprinkler system, etc. damaged during construction shall be replaced with same or better at no cost to the City. Backfill for curb and gutter shall be completed within fourteen (14) calendar days from the day of demolition to date of completion . If the contractor fails to complete the work within fourteen ( 14) calendar days , a $100 dollar liquidated damage will be assessed per block per day . The unit price bid per linear foot shall be full compensation for all materials, labor, equipment and incidentals necessary to complete the work . DA-25 REPLACEMENT OF 6" CONCRETE DRIVEWAYS This item shall include the removal and replacement of existing concrete driveways , due to deterioration or in situations where curb and gutter is replaced to adjust grades to eliminate ponding water with same day haul-off of the removed material to a suitable dump site . For specifications governing this item see Item No . 104 "Removing Old Concrete", Item No . 504" Concrete Sidewalk and Driveways". Pay limits for concrete driveway are as shown in Drawing No . S-S5 of the Standard Specifications. The unit price bid per square yard shall be full compensation for all labor, material, equipment, supplies , and incidentals necessary to complete the work . DA-26 REPLACEMENT OF H.M.A.C. PAVEMENT AND BASE The contractor shall remove all existing deformed H.M.A.C . pavement and/or bad base material that shows surface deterioration and/or complete failure . The Engineer will identify these areas upon which time the contractor will begin work . The failed area shall be saw cut, or other similar means, out of the existing pavement in square or rectangular fashion . The side faces shall be cut vertically and all failed and loose material excavated . As a part of the excavation process , all unsatisfactory base material shall be removed, if required , to a depth sufficient to obtain stable sub-base. The total depth of excavation could range from a couple of inches to include the surface-base-some sub-base removal for which the Engineer will select the necessary depth . The remaining good material shall be leveled and uniformly made ready to accept the fill material. All excavated material shall be hauled off site , the same day as excavated , to a suitable dump site. After satisfactory completion of removal as outlined above, the contractor shall place the permanent pavement patch , with "Type D" surface mix. This item will always be used even if no base improvements are required . The proposed H.M.A.C . repair shall match the existing pavement section or the depth of the failed material , whichever is greater. However, the patch thickness shall be a minimum of 2 inches . Generally the existing H.M.A.C . ASC-12 PART DA -ADDITIONAL SPECIAL CONDITIONS pavement thickness will not exceed 6". Before the patch layers are applied , any loose material , mud and/or water shall be removed . A liquid asphalt tack coat shall be applied to all exposed surfaces . Placement of the surface mix lifts shall not exceed 3 inches with vibrator compactions to follow each lift. Compactions of the mix shall be to standard densities of the City of Fort Worth , made in preparation to accept the recycling process . All applicable provisions of Standard Specification Item Nos. 300 "Asphalts , Oils, and Emu lsions", 304 "Prime Coat", and 312 "Hot-Mix Asphaltic Concrete" shall govern work . The unit price bid per cubic yard shall be full compensation for all materials, labor, equipment and incidentals necessary to complete the work . DA-27 GRADED CRUSHED STONES This item shall be used to repair the failed base material in areas exceed 8" deep as directed by the Engineer. The material shall be graded crushed stones . For specifications governing this item see Item No. 208 "Flexible Base". The unit price bid per cubic yard shall be full compensation for all materials , labor, equipment and incidentals necessary to complete the work . DA-28 WEDGE MILLING 2" TO O" DEPTH 5.0' WIDE Not Used . DA-29 BUTT JOINTS -MILLED Not Used . DA-30 2" H.M.A.C . SURFACE COURSE (TYPE "D" MIX) All applicable provisions of Standard Specifications, Item Nos. 312 "Hot-Mix Asphaltic Concrete", 300 "Asphalts , Oils and Emulsions ", 304 "Prime Coat", and 313 "Central Plant Recycling-Asphalt Concrete" shall apply to the construction methods for this portion of the project. Standard Specification 312 .5 (1) shall be revised as follows : The prime coat , tack coat, or the asphaltic mixture shall not be placed unless the air temperature is fifty (50) degrees Fahrenheit and rising , the temperature being taken in the shade and away from artificial heat. Asphaltic material shall also not be placed when the wind cond itions are unsuitable in the opinion of the Engineer. The contractor shall furnish batch design of the proposed hot mix asphaltic concrete for City approval 48 hours prior to placing the H.M.A.C . overlay. The City will provide laboratory control as necessary . The unit price bid per square yard of H.M.A.C . complete and in place , shall be full compensation for all labor, materials, equipment, tools , and incidenta ls necessary to complete the work . DA-31 REPLACEMENT OF 7" CONCRETE VALLEY GUTTER This item shall include the removal and reconstruction of existing concrete valley gutters at locations to be determined in field: Removal of existing concrete valley, asphalt pavement , concrete base, curb and gutter, and necessary excavation to install the concrete valley gutters all shall be subsidiary to this pay item . Furnishing and placing of 2:27 concrete base and crushed limestone to a depth as directed by the Engineer and necessary asphalt transitions as shown in the concrete valley gutter details, shall be subsidiary to this Pay Item . ASC-13 - PART DA -ADDITIONAL SPECIAL CONDITIONS See standard specification Item No. 314, "Concrete Pavement", Item 312 "Hot-Mix Asphaltic Concrete", Item No . 104 , "Removing Old Concrete", Item No . 106 , "Unclassified Street Excavation " Item No . 208 "Flexible Base ." Measurement for final quantities of valley gutter will be by the square yard of concrete pavement and the curb and gutter section will be included . Contractor may substitute 5" non-reinforced (2 :27) Concrete Base in lieu of Crushed Stone at no additional cost. See Item 314 " Concrete Pavement". Asphalt base material may be required at times as directed by the Engineer to expedite the work at locations identified in the field . The concrete shall be designed to achieve a minimum compressive strength of 3000 pounds per square inch . Contractor shall work on one-half of Valley Gutter at a time , and the other half shall be open to traffic . Work shall be completed on each half with in seven (7) calendar days. If the contractor fails to complete the work on each half within seven (7) calendar days , a $100 dollars liquidated damage will be assessed per each half of valley gutter per day. The unit price bid per square yard for Concrete Valley as shown on the proposal will be full compensation for materials , labor , equipment, tools and incidentals necessary to comp lete the work . DA-32 NEW 7" CONCRETE VALLEY GUTTER Not Used . DA-33 NEW 4" STANDARD WHEELCHAIR RAMP Not Used . DA-34 8" PAVEMENT PULVERIZATION Not Used . DA-35 REINFORCED CONCRETE PAVEMENT OR BASE (UTILITY CUT) The following specifications are for the furnishing and placing of re info rced concrete pavement or base as shown on detail and as directed by the Engineer. A. GENERAL: Reinforced concrete pavement or base shall conform to Specification Item No . 314 herein except for finishing and curing . B. FINISHING : The reinforced concrete shall be brought to a uniform surface by working w ith a wooden float. The surface shall be flush w ith the adjacent pavement and shall have a finish similar to the surrounding pavement. The surface shall be even and shall provide a smooth ride . C. CURING : ASC-14 PART DA -ADDITIONAL SPECIAL CONDITIONS The reinforced concrete pavement surfaces shall be sp rayed un iformly with a membrane curing compound conforming to the requ irements of ASTM C-309 , Type 2, white-pigmented compound , which shall not produce permanent discoloration of the concrete. Conc rete shall be allowed to cure for seven days or test cylinders reach 3000 psi before removal of barricades . D. EXECUTION : Included in th is item will be the removal of the existing reinfo rced concrete pavement. The existing pavement shall be sawed so as to ma intain an even , straight pavement cut. The existing reinforcing steel at sawed line and construction joints shall be lapped 18 inches w ith the new reinforced concrete pavement. The existing stee l shall be thoroughly cleaned before lapping . The following work method will be performed on each util ity cut: 1. Place safety signs , barricades and/or other warn ing devices where necessary and as required . 2 . Replace pavement to nearest joint. 3 . Mark out the damaged area with keel , chalk line or paint being sure to include all areas requiring repair. 4 . Saw cut along marked lines a minimum of two (2) inches deep . 5. Remove existing concrete . 6 . Form joints and place reinforcing steel and Dowe l Bars (as required) according to standard spec ifications . 7 . Place and finish concrete . 8 . Clean up job site , remov ing all debris . 9 . Maintain traffic control devices to protect the area until the concrete has cured seven days or concrete reaches 3000 psi compressive strength . E. PAYMENT: Payment shall be made at the unit price per linear foot as shown on the proposal and shall be full compensation for furnishing all labor, materials , equipment tools and incidentals necessary to complete the work . DA-36 RAISED PAVEMENT MARKERS Not Used . DA-37 POTENTIALLY PETROLEUM CONTAMINATED MATERIAL HANDLING Not Used . DA-38 LOADING, TRANSPORTATION, AND DISPOSAL OF CONTAMINATED SOIL Not Used . DA-39 ROCK RIPRAP -GROUT -FILTER FABRIC Not Used . DA-40 CONCRETE RIPRAP ASC-15 PART DA -ADDITIONAL SPECIAL CONDITIONS 1 GENERAL: The following shall govern the furnishing and placing of concrete riprap as shown on the plans or as directed by the Eng ineer. 2 MATERIALS : Concrete for riprap shall be placed in accordance w ith the details and to the dimensions shown on the plans or as established by the Engineer. Unless otherwise shown on the plans , concrete riprap shall be reinforced using wire or bar reinforcement. · The concrete shall be 3000 PSI at 28 days, Class A Wire reinforcement shall be six (6) by six (6) inch No . 6 plain electric welded reinforcing fabric or its equal. A minimum lap of six (6) inches shall be used at all splices . At the edge of the riprap , the wire fabric shall not be less than one (1) inch , no more than three (3) inches from the edge of the concrete and shall have no wire projecting beyond the last member parallel to the edge of the concrete . Reinforcement shall be supported properly throughout the placement to maintain its position equidistance from the top and bottom surface of t~e slab . If the slopes and bottom of the trench for toe walls are dry and not consolidated properly , the Engineer may require the entire area to be sprinkled , or sprinkled and consolidated before the concrete is placed. All surfaces shall be moist when concrete is placed . After the concrete has been placed, compacted, and shaped to conform to the dimensions shown on the plans , and after it has set sufficiently to avoid slumping , the surface shall be finished with a wooden float to secure a reasonably smooth surface . 3. PAYMENT: Payment for concrete riprap in place shall be made at the unit price bid in the Proposal multiplied by the quantity of material used. Bid price will be full compensation for placing all materials , and for all labor, tools , equipment , and incidentals necessary to complete the work . Payment for all necessary excavation below natural ground , and bottom or slope of the excavated channel will be included in the bid price . DA-41 CONCRETE CYLINDER PIPE AND FITTINGS Concrete cylinder pipe on this project shall be Class 150 AW.WA C-303 pretensioned concrete cylinder pipe or Class 150 AWWA C-301 prestressed concrete cylinder pipe as specified on the plans and manufactured in accordance with Material Standard E1-4 contained in the General Contract documents. Payment for work such as backfill , bedding , blocking, excavation and all other associated appurtenances ; required , shall be included in the Linear Foot price of the pipe and lump sum for the pipe fittings in the appropriate BID ITEM(S). DA-42 CONCRETE PIPE FITTINGS AND SPECIALS Bidders shall submit the following for C-303 pre-tensioned concrete cylinder pipe to be installed on this project: 1. A complete list of fittings and specials upon which the lump sum is bid . 2. Provide a unit price indicating the cost for furnishing and installing each of the various items of fittings and specials . The lump sum as bid in the Proposal shall be payment in full for all fittings and specials necessary for the construction of the project as designed . Payment for the installation of the pipe fittings , specials , and random lengths shall be included . Should the Engineer approve any changes to the fittings, specials or random pipe lengths listed as justifying the amount bid in the Proposal, the price submitted with the Proposal shall be used to determine the increase or decrease in the value of the lump sum of the Proposal , and the Contractor shall be paid on the basis of this adjusted value under that bid item . DA-43 UNCLASSIFIED STREET EXCAVATION ASC-16 PART DA -ADDITIONAL SPECIAL CONDITIONS Not Used . DA-44 6" PERFORATED PIPE SUBDRAIN Not Used . DA-45 REPLACEMENT OF 4" CONCRETE SIDEWALKS This item shall include the removal and replacement of existing concrete sidewalk due to failure or in situation where curb and gutter is replaced to adjust grades to eliminate ponding water with same day haul-off of the removed material to a suitable dumpsite. For specifications governing this item see Item No . 104 "Removing Old Concrete ", and Item No. 504 "Concrete Sidewalk and Driveways ". The unit price bid per square yard shall be full compensation for all labor, material , equipment, supplies, and incidentals necessary to complete the removal and replacement work . DA-46 RECOMMENDED SEQUENCE OF CONSTRUCTION Not Used . DA-47 PAVEMENT REPAIR IN PARKING AREA The unit price bid under appropriate BID ITEM(S) of the Proposal shall cover all cost for providing pavement repair equal to or superior in composition, thickness , etc ., to existing pavement. All required paving cuts shall be made with a concrete saw in a true and straight line on both sides of the trench , a minimum of twelve (12) inches outside the trench walls. The trench shall be backfilled and the top nine (9) inches shall be filled with crushed limestone base material , compacted and level with the finished adjacent surface. This finished grade shall be maintained in a serviceable condition until the paving has been replaced . DA-48 EASEMENTS AND PERMITS Easements and permits , both temporary and permanent, have been secured for this project at this time and made a part thereto . Any easements and/or permits , both temporary and permanent , that have not been obtained by the time of publication shall be secured before construction starts . No work is to be done in areas requiring easements and/or permits until the necessary easements are obtained . The Contractor's attention is directed to the easement description and permit requirements , as contained herein, along with any special conditions that may have been imposed on these easements and permits. Where the pipeline crosses privately owned property, the easements and construction areas are shown on the plans . The easements shall be cleaned up after use and restored to their original conditions or better. In the event additional work room or access is required by the Contractor, it shall be the Contractor's responsibility to obtain written permission from the property owners involved for the use of additional property required. No additional payment will be allowed for this item. DA-49 HIGHWAY REQUIREMENTS Not Used. DA-50 CONCRETE ENCASEMENT Concrete encasement shall be Class E (1500 psi) concrete and for sewer line encasements shall conform to Fig. 113; for water line encasements it shall conform to Fig . 20 of the General Contract Documents. Requirements for such encasement are specified in Sections E1-20 and E2-20 of the General Contract Documents. ASC-17 PART DA -ADDITIONAL SPECIAL CONDITIONS Payment for work such as forming , placing, and finishing including all labor, tools , equipment and material necessary to complete the work shall be included in the linear foot price bid for Concrete Encasement. DA-51 CONNECTION TO EXISTING STRUCTURES All connections between proposed and existing facilities , shall consist of a watertight seal. Concrete used in the connection shall be Class A (3000 psi) concrete and meet the requirements of Section E1-20 and E2-20 of the -General Contract Documents. Prior to concrete placement, a gasket, RAM-Nek or approved equal shall be installed around penetrating pipe. Payment for such work as connecting to existing facilities including all labor, tools , equipment, and material necessary to complete the work shall be included in the linear foot price of the appropriate pipe BID ITEM . DA-52 TURBO METER WITH VAULT AND BYPASS INSTALLATION Not Used . DA-53 OPEN FIRE LINE INSTALLATIONS Not Used . DA-54 WATER SAMPLE STATION GENERAL: All water sampling station installations will be per attached F igure 34 or as required in large water ·meter vaults as per Figure 33 unless otherwise directed by the Engineer. The appropriate water sampling station will be furnished to the Contractor free of charge ; however, the Contractor will be required to pick up this item at the Field Operations Warehouse . PAYMENT FOR FIGURE 34 INSTALLATIONS : Payment for all work and materials necessary for the installation of the 3/4-inch type K copper service line will be shall be included in the price bid for copper Service Line from Main to Meter. Payment for all work and materials necessary for the installation tap saddle. (if required), corporation stops, and fittings shall be included in the price bid for Service Taps to Main . Payment for all work and materials necessary for the installation of the sampling station , concrete support block , curb stop , fittings , and an incidental 5-feet of type K copper service line which are required to provide a complete and functional water sampling station shall be included in the price bid for the water main . PAYMENT FOR FIGURE 33 INSTALLATIONS: Payment for all work and materials necessary for the installation tap saddle , gate valve , and fittings shall be included in the price bid for Service Taps to Main . Payment for all work and materials necessary for the installation of the sampling station , modification to the vault, fittings, and all type K copper service line which are required to provide a complete and functional water sampling station shall be included in the price bid for Water Sample Stations . DA-55 CURB ON CONCRETE PAVEMENT Standard Specification Item 502 shall apply except as herein modified . ASC-18 PART DA -ADDITIONAL SPECIAL CONDITIONS INTEGRAL CURB: Integral curb shall be constructed along the edge of the pavement as an integral part of the slab and of the same concrete as the slab . The concrete for the curb shall be deposited not more than thirty (30) minutes after the concrete in the slab . SUPERIMPOSED CURB : Concrete shall have a minimum compressive strength of three thousand (3,000) pounds per square inch at twenty-eight (28) days. The quantity of mixing water shall not exceed seven (7) U .S. gallons per sack (94 lbs .) of Portland Cement. The slump of the concrete shall not exceed three (3) inches. A minimum cement content of five (5) sacks of cement per cubic yard of concrete is required. PAYMENT: Payment shall be made for cutting and replacing curbs and gutters required in this Project under the appropriate bid item and shall be in compliance with Public Works Department standard requirement Item 502 . DA-56 SHOP DRAWINGS 1. Submit seven (7) copies of shop drawings, layouts, manufacturer's data and material schedules as may be required by the Engineer for his review . Submittals may be checked by and stamped with the approval of the Contractor and identified as the Engineer may require . Such review by the Engineer shall include checking for general conformance with the design concept of the project and general compliance with information given in the General Contract Documents . Indicated actions by the Engineer, which may result from his review , shall not constitute concurrence with any deviation from the plans and spec ifications unless such deviations are specifically identified by the method described below, and further shall not relieve the Contractor of responsibility for errors or omissions in the submitted data. Processed shop drawing submittals are not change orders . The purpose of submittals by the Contractor is to demonstrate that the Contractor understands the design concept, and that he demonstrates his understanding by indicating which equipment and materials he intends to furnish and install, and by detailing the fabrication and installation methods he intends to use . If deviations, discrepancies or conflicts between submittals and the design drawings and/or specifications are discovered, either prior to or after submittals are processed , the design drawings and specifications shall govern . The Contractor shall be responsible for dimensions which are to be confirmed and correlated at the job site, fabrication processes and techniques of constriction , coordination of his work with that of other trades and satisfactory performance his work. The Contractor shall check and verify all measurements and review submittals prior to being submitted , and sign or initial a statement included with the submittal , which signifies compliance with plans and specifications and dimensions suitable for the application . Any deviation from the specified criteria shall be expressly stated in writing in the submittal. Three (3) copies of the approved submittals shall be retained by the Contractor until completion of the project and presented to the City in bound form. 2. Shop drawings shall be ·submitted for the following items prior to installation : List the required submittals here Additional shop drawing requirements are described in some of the material specifications . 3. Address for Submittals -The submittals shall be addressed to the Project Manager: (Project Manager) City of Fort Worth 1000 Throckmorton Fort Worth, TX 76102 DA-57 COST BREAKDOWN Not Used . DA-58 STANDARD STREET SPECIFICATIONS H.M.A.C. OVERLAY ASC-19 PART DA -ADDITIONAL SPECIAL CONDITIONS Not Used . DA-59 H.M.A.C. MORE THAN 9 INCHES DEEP Not Used . DA-60 ASPHALT DRIVEWAY REPAIR Not Used . DA-61 TOP SOIL Not Used . DA-62 WATER METER AND METER BOX RELOCATION AND ADJUSTMENT This item shall include raising or lowering an existing meter box to the parkway grade specified No payment will be made for adjusting existing boxes which are within 0.001 feet of specified parkway grade. The unit price bid shall be full and sufficient payment for all labor, equipment and materials used in the adjustment of the meter box. DA-63 BID QUANTITIES Not Used . DA-64 WORK IN HIGHWAY RIGHT OF WAY When the Engineer directs the Contractor to perform work in the right-of-way which is under the jurisdiction of the Texas Department of Transportation (Tex-Dot), the Contractor shall obtain approval from the Texas Department of Transportation prior to commencing any work therein . All work performed in the Tex-Dot right-of- way shall be performed in compliance with and subject to approval from the Texas Department of Transportation and Item E2-29.1 "Construction W ithin Highway Right-of-Way" of the General Contract Documents and Specifications , effective July 1, 1978, as amended . DA-65 CRUSHED LIMESTONE (FLEX-BASE) Crushed limestone required for use as a flexible base material shall conform to Specification Item No. 208 of the Standard Specifications for Street and Storm Drain Construction for the City of Fort Worth Transportation and Public Works Department. DA-66 OPTION TO RENEW Not Used . DA-67 NON-EXCLUSIVE CONTRACT This contract is non-exclusive . During the term of this contract or any renewal hereof, the City reserves the right · to advertise and award another contract for like or similar work . If a second contract is awarded , the City further reserves the right to issue work orders under either contract as it deems in its best interest, without recourse . DA-68 CONCRETE VALLEY GUTTER ASC-20 PART DA -ADDITIONAL SPECIAL CONDITIONS This item shall include the repair/replacement of existing concrete valley gutters as directed by the Engineer. The proposed valley gutters will be constructed according to the detail included in these documents as well as conforming to Specification Item No. 314 of the Standard Specifications for Street and Storm Drain Construction for the City of Fort Worth Transportation and Public Works Department. The unit price bid for this item shall be full compensation for all materials (including applicable sub-base), labor, equipment and incidentals necessary to complete the work . DA-69 TRAFFIC BUTTONS Not Used . DA-70 PAVEMENT STRIPING Not Used . DA-71 H.M.A.C. TESTING PROCEDURES The contractor is required to submit a Mix Design for both Type "B" and "D" asphalt that will be used for each project. This should be submitted at the Pre-Construction Conference. This design shall not be more than two (2) years old . Upon submittal of the design mix a Marshal (Proctor) will be calculated, if one has not been previously calculated , for the use during density testing . For type "B" asphalt a maximum of 20% rap may be used . No Rap may be used in type "D" Upon approval of an asphalt mix design and the calculation of the Marshal (proctor) the contractor is approved for placement of the asphalt. The contractor shall contact the City Laboratory , through the inspector, at least 24 hours in advance of the asphalt placement to schedule a technician to assist in the monitoring of the number of passes by a roller to establish a rolling pattern that will provide the requ ired densities. The required Density for Type "B" and for Type "D" asphalt will be 91 % of the calculated Marshal (proctor). A Troxler Thin Layer Gauge will be used for all asphalt testing . After a rolling pattern is established , densities should be taken at locations not more than 300 feet apart . The above requirement applies to both Type "B" and "D" asphalt. Densities on type "B" must be done before Type "D" asphalt is applied . Cores to determine thickness of Type "B" asphalt must be taken before Type "D" asphalt is applied . Upon completion of the application of Type "D" asphalt additional cores must be taken to determine the applied thickness . DA-72 SPECIFICATION REFERENCES When reference is made in these specifications to a particular ASTM , AWWA, ANSI or other specification , it shall be understood that the latest revis ion of such specification , prior to the date of these general specifications or revisions thereof, shall apply . DA-73 RELOCATION OF SPRINKLER SYSTEM BACK-FLOW PREVENTOR/CONTROL VALVE AND BOX The relocation and reconnection of sprinkler system control valve and box will be required as shown on the plans , and/or as described in these Special Contract Documents in addition to those located in the field and identified by the Engineer. A minimum of twenty-four (24) hours advance notice shall be given when service interruption will be required . When the relocation is required , separate payment will be allowed for the relocation of sprinkler back-flow . preventer or control valve and box . Payment for all work and material such as back-fill, fittings, five (5) feet of PVC Schedule 40 and all material labor, and equipment used by and for the licensed plumber shall be included ASC-21 - PART DA -ADDITIONAL SPECIAL CONDITIONS in the price bid for the relocation of sprinkler back-flow preventer or control valve and box. All other costs will be included in other appropriate bid item(s). DA-74 RESILIENT-SEATED GATE VALVES Any resilient-seated gate valves supplied for this contract shall conform to Material Standard E1-26, STANDARD SPECIFICATIONS FOR RESILIENT-SEATED GATE VALVES , with the exception of size requirements in sections E-26 .1. All resilient-seated gate valves shall be mechanical joints and be approved on the City of Fort Worth Standard Product List. DA-75 EMERGENCY SITUATION, JOB MOVE-IN The Owner or Engineer shall determine when an emergency situation shall exist. When water emergency work is required , the Contractor shall mobilize to the said location within twenty-four (24) hours after given notification from the Inspector and/or Project Manager. The Contractor shall make all necessary arrangements for bypass pumping , setting up barricades, notifying citizens, etc ., while waiting for other utilities to be located as directed by the Engineer. The Contractor shall work continuously until the emergency work order has been completed at a time agreed to by the Project Manager, Inspector, and Contractor. After the emergency work order has been completed, there will be no additional "Job Move-In" charges paid to remobilize back to the previous project location site . DA-76 1 %" & 2" COPPER SERVICES The following is an addendum to E1-17, Copper Water Service Lines and Copper Alloy Couplings : All fittings used for 1 Y:z'' and 2" water services lines shall be compression fittings of the type produced with an internal "gripper ring" as manufactured by the Ford Meter Box Co ., Inc ., Mueller Company , or approved equal. Approved equal products shall submit shop drawings and manufacturer's catalog information for approval. Contractor shall make all cuts to the copper tubing with a copper tubing cutter tool specifically designed for this purpose in order to provide a clean , square cut. The use of hacksaws or any other type of cutter will not be allowed . Prior to installing the compression fittings , the copper tubing will be made round by the use of a "rounding tube " specifically made for that purpose. Payment for all work and materials associated with 1 % " and 2" copper services shall be included in the price of the appropriate bid item . DA-77 SCOPE OF WORK (UTIL. CUT) Not Used . DA-78 CONTRACTOR'S RESPONSIBIL TY (UTIL. CUT) Not Used . DA-79 CONTRACT TIME (UTIL. CUT) Not Used . DA-80 REQUIRED CREW PERSONNEL & EQUIPMENT (UTIL. CUT) Not Used. ASC-22 PART DA -ADDITIONAL SPECIAL CONDITIONS DA-81 TIME ALLOWED FOR UTILITY CUTS (UTIL. CUT) Not Used . DA-82 LIQUIDATED DAMAGES (UTIL. CUT) Not Used . DA-83 PAVING REPAIR EDGES (UTIL. CUT) Not Used. DA-84 TRENCH BACKFILL (UTIL. CUT) Not Used . DA-85 CLEAN-UP (UTIL. CUT) Not Used . DA-86 PROPERTY ACCESS (UTIL. CUT) Not Used . DA-87 SUBMISSION OF BIDS (UTIL. CUT) Not Used . DA-88 STANDARD BASE REPAIR FOR UNIT I (UTIL. CUT) Not Used . DA-89 CONCRETE BASE REPAIR FOR UNIT II & UNIT Ill (UTIL. CUT) Not Used . DA-90 2 TO 9 H.M.A.C. PAVEMENT (UTIL. CUT) Not Used . DA-91 ADJUST WATER VALVE BOXES , MANHOLES, AND VAULTS (UTIL. CUT) Not Used . DA-92 MAINTENANCE BOND (UTIL. CUT) Not Used . DA-93 BRICK PAVEMENT (UTIL. CUT) Not Used. DA-94 LIME STABILIZED SUBGRADE (UTIL. CUT) Not Used . ASC-23 PART DA -ADDITIONAL SPECIAL CONDITIONS DA-95 CEMENT STABILIZED SUBGRADE (UTIL. CUT) Not Used . DA-96 REPAIR OF STORM DRAIN\ STRUCTURES (UTIL. CUT) Not Used . DA-97 "QUICK-SET" CONCRETE (UTIL. CUT) Not Used . DA-98 UTILITY ADJUSTMENT (UTIL. CUT) Not Used. DA-99 STANDARD CONCRETE SIDEWALK AND WHEELCHAIR RAMPS (UTIL. CUT) Not Used. DA-100 Not Used . DA-101 Not Used . DA-102 LIMITS OF CONCRETE PAVEMENT REPAIR (UTIL. CUT) CONCRETE CURB AND GUTTER (UTIL. CUT) PAYMENT (MISC. REPL.) Because of the unique nature of th is contract, C8-8 .5 PARTIAL ESTIMATES AND RETAINAGE of the General Cond itions shall not apply and shall be superseded by the following : (Please initial below) Whenever the improvements prescribed by an individual Work Order have been completed , the Contractor shall notify the Engineer. The Engineer or other appropriate official of the Owner will, within a reasonable time , perfo rm the inspections . If such inspection reveals that the improvements are in an acceptable condition and have been completed in accordance with the terms of the Contract Documents and all approved modifications thereof, the Engineer will recommend acceptance of the work under that particular Work Order and recommend payment therefore . If the Engineer finds that the work has not been completed as required , he shall so advise the Contractor in writing , furnishing him an itemized list of all known items which have not been completed or which are not in an acceptable condition . When the Contractor has corrected all such items , he shall again notify the Engineer that the improvements are ready for inspection , and the Engineer shall proceed as outl ined above . Whenever the improvements presc ribed by the individual Work Order · have been completed and all requirements of the Contract Documents have been fulfilled on the part of the Contractor, an estimate showing the value of the work will be prepared by the Engineer as soon as the necessary measurements, computations , and checks can be made . The amount of the estimate will be paid to the Contractor after acceptance by the Water Department Director, provided the Contractor has furn ished to the Owner satisfactory evidence of payment as follows : Prior to submission of the estimate for payment, the Contractor shall execute an affidavit, as furnished by the City , certifying that all persons , firms , associations, corporations , or other organizations furnishing labor and/or materials under that Work Order have been paid in full , that the wage scale established by the City Council in ASC-24 PART DA -ADDITIONAL SPECIAL CONDITIONS the City of Fort Worth has been paid, and that there are no claims pending for personal injury and/or property damages. The acceptance by the Contractor of the individual payment as aforesaid shall operate as and shall release the Owner from all claims or liabilities under the Contract for anything done or furnished or relating to the work under that Work Order or any act or neglect of said City relating to or connected with the Contract. The making of the payment by the Owner shall not relieve the Contractor of any guarantees or other requirements of the Contract Documents which specifically continue thereafter . Bidder's Initials ________ _ DA-103 DEHOLES (MISC. REPL.) The Contractor excavates for existing water and/or sanitary sewer main as detailed by work order together with a sketch . The location and dimensions shown on the plans relative to other existing utilities are based on the best information available . Omission from , or the inclusion of utility locations on the Plans is not to be considered as the nonexistence of, or a definite location of, existing underground utilities. It shall be the Contractor's responsibility to verify locations of adjacent and/or conflicting utilities sufficiently in advance of construction in order that he may negotiate such local adjustments as necessary in the dehole process to provide adequate clearances . The Contractor shall take all necessary precautions in order to protect all services encountered . Any damage to utilities resulting from the Contractor's operations , shall be restored at his expense . Payment for work such as backfill and all other associated appurtenants required, shall be included in the price of the appropriate bid item . DA-104 Not Used . DA-105 CONSTRUCTION LIMITATIONS (MISC. EXT.) PRESSURE CLEANING AND TESTING (MISC. REPL.) Care shall be taken to keep all water extensions clean and free from foreign objects . Chlorinated lime shall be placed in the first joint of pipe of the extension and upon completion of the pipe laying , water shall be introduced slowly for sterilization , after which the extension shall be thorough ly flushed with clean water. Risers shall be installed , as directed by the Engineer, for flushing and for providing sample points for bacteria tests . The water main extensions of the project shall be tested under normal line pressure and any leaks observed shall be immediately repaired . DA-106 BID QUANTITIES (MISC. REPL.) Bid quantities of the various items in the proposal are for comparison only and may not reflect the actual quantities. There is no limit to which a bid item can be increased or decreased . Contractor shall not be entitled to renegotiation of unit prices regardless of the final measured quantities . To the extent that C4-4 .3 conflicts with this provision , this provision controls. No claim will be considered for lost or anticipated profits based upon differences in estimated quantities versus actual quantities. DA-107 LIFE OF CONTRACT (MISC. REPL.) It is contemplated that Work Orders will be issued to the Contractor for work to be performed under this Contract for not to exceed 365calendar days following the date of the Contract nor to exceed the limit of the bid price , whichever should occur first. The Contractor shall be required to complete any work covered by a Work Order ASC-25 PART DA -ADDITIONAL SPECIAL CONDITIONS issued prior to that date of termination but will not be required to accept any work order for execution dated after that date of termination . If the cost of the work performed under this Contract is less than the limit of the bid price at the end of the 365 calendar day period , at the C ity's option and the Contractor's concurrence , the Project may be extended to the limit of the bid price. DA-108 DETERMINATION AND INITIATION OF WORK (MISC. REPL.) The Engineer shall determine and designate to the Contractor the location of the service main requinng replacement by a Work Order together with a sketch for each such replacement , giving the limits, size and nature of work required . The Engineer will notify the Contractor that a Work Order is ready and fax the Contractor a copy of the Work Order notification . The Contractor is to provide his fax number to the Engineer at the pre-construction conference . Single or several Work Orders may be issued at one time . The Contractor shall in itiate work on a replacement within seven (7) working days of the date the Work Order is faxed to the Contractor, and continue work on the Work Order until it has been completed , not including paving . The Contractor shall furnish and supply sufficient equipment and personnel to complete the Work Order in the amount of time provided for in the Work Order. Should the Contractor fail to s.tart any Work Order within the time specified , he shall add the necessary work crews and equipment to prosecute the work to complete the Work Order or Work Orders in the time provided therefore. DA-109 WORK ORDER COMPLETION TIME (MISC. REPL.) Should the contractor fail to complete an individual work order in the given amount of calendar days as specified on each individual work order, liquidated damage charges as prescribed in Part C -General Conditions C?-7.10 Time of Completion will be subtracted from the final pay estimate of that particular work order. The estimated amount for each particular work order will be used for determining the amount of damages charged per calendar day of time exceeding the specified amount. The first two paragraphs of Part C -General Conditions C?-7 .10 Time Of Completion shall be replaced with the following : The time of completion of each individual work order in an essential element of this contract. Each work order issued will have the maximum allowed number of calendar days allowed for the completion of that specific work . DA-110 MOVE IN CHARGES (MISC. REPL.) A Work Order may contain one or more locations . One move-in fee will paid to the contractor per Work Order issued . Locations for multiple sites per Work Order will be in the same general vicinity , if possible , and if so, only one mobilization charge will be paid . When water and sewer work are required only the water move in fee will be paid . At no time will both fees be paid for one specific location . DA-111 PROJECT SIGNS (MISC. REPL.) Project Signs are required at all locations which will be under construction for more than thirty (30) calendar days as indicated in Part B Proposal. Project Signs shall be in accordance with Figure 30 (dated 9-18-96) of the General Contract Documents . The signs may be mounted on skids or on posts. The exact locations and methods of mounting shall be approved by the engineer. Any and all costs for the required materials , labor, and equipment necessary for the furnishing of Project Signs shall be considered as a subsidiary cost of the project and no additional compensation will be allowed . DA-112 LIQUIDATED DAMAGES (MISC. REPL.) ASC-26 PART DA -ADDITIONAL SPECIAL CONDITIONS The Contractor shall pay liquidated damages of one hundred dollars ($100.00) per day per Work Order, for failure to begin a Work Order within the seven (7) work ing days of the date the Work Order is faxed to the Contractor. Failure to complete project within the stipulated construction time on the Work Order, the Contractor will pay liquidated damages in the amount stipulated in these contract documents . DA-113 TRENCH SAFETY SYSTEM DESIGN (MISC. REPL.) Because of the unique nature of this contract , the number of trench safety system designs required is not known at the time bids are received. While the contractor is still bound by the latest version of the U.S . Department of Labor, Occupational Safety and Health Administration Standards , 29 CFR Part 1926 , Subpart P-Excavations as detailed in D-26 Trench Safety System, it is the City 's intention that all costs incurred by the Contractor in acquiring trench safety designs be included in the unit price bid for Job Move in . DA-114 FIELD OFFICE Not Used . DA-115 BRICK PAVEMENT REPAIR (MISC. REPL.) Contractor shall take all precautions to carefully remove all existing brick pavers . The brick pavers shall be handled with extreme care to avoid chipping and/or breaking of pavers . Until installed , they shall be cleaned and neatly stacked on pallets (not to exceed 3 feet in height). If necessary , all new brick pavers used on this project shall meet the specifications for ASTM C1272 . The brick shall be a Type F heavy vehicular paving brick a minimum 2 5/8 " thick, with spacer nibs or lugs , and match the existing brick in size, shape , and color. The brick pavers will be set on a :X-inch sand/cement bedding mixture . The sand used shall conform to ASTM C33 excluding all stone screenings that may pass the C33 sieve analysis . The cement sand ratio shall be 1 sack of cement per 1 CY of sand or as directed by the Engineer. Filter fabric 12-inches wide will be installed over every construction , and/or expansion joint as well as all vertical surfaces . Once the brick pavers have been installed they will be vibrated into the sand bed . Sand conforming to C33 will then be swept into joints and vibrated again . All brick shall be installed per the manufacturer's recommendations . The resulting repair shall provide a smooth driving surface and match all applicable street grades , cross slopes , and crowns . The price bid per linear foot for "BRICK PAVEMENT REPAIR " as shown in the Proposal will be full payment for materials including all labor, equipment, tools and incidentals necessary to complete the work . DA-116 FLOWABLE FILL (MISC. REPL.) 1. Description: The flowable fill material shall be mixed on site , free flowing and self-leveling and shall have a consistency enabling it to fill all voids without tamping , vibrating or compacting . Material shall be capable of supporting foot traffic in less than twenty (20) minutes after the pour reaches finished grade and shall be ready to receive a concrete cap in less than eighty (80) minutes, regardless of site and weather conditions . The flowable fill material shall have an in place density of not less than 95 and not more than 115 lbs./cu . ft ., with a maximum twenty-eight (28) day compression strength of not less than 60 and not more than 85 PSI allowing the material to be removed with hand tools such as picks and shovels . The height of free fall of the flowable fill shall not exceed four (4) feet. 2. Material Specifications: Flowable fill shall consist of: ASC-27 - PART DA -ADDITIONAL SPECIAL CONDITIONS A An appropriate amount of Portland Cement meeting ASTM C-150 (with other additives as necessary). B. Aggregates meeting ASTM C-33 C. Sand or fine aggregates as per City of Ft. Worth Standard Specifications for Street and Storm Drain Construction Item 406 D. Flyash , Class C or F, meeting ASTM C-618 E. Admixtures 1) Mineral admixtures will be pozzolanic 2) Chemical admixtures shall be in liquid or powder form used in standard ready-mix concrete products unless specifically designed for flowable fill . Permiss ible types of admixtures are : a. High air generators, as manufactured by Grace Construction Products or approved equal , which are specifically designed for flowable fill to lower unit weights , reduce shrinkage and subsidence, and control compressive strength . b. Air entraining admixtures conforming to ASTM C-260 . c . High range water reducers conforming to ASTM C-494 Type For G. d. Accelerating admixtures conforming to ASTM C-494, Type C . DA-117 TRAFFIC CONTROL PLAN Not Used. 1. Non -chloride, non-corrosive accelerators used where metals are present in concrete or embedded members . 2 . Calcium chloride. DA-118 COORDINATION OF WORK WITH CONTRACTOR FOR OTHER UNITS Not Used . DA-119 CONTRACT AWARD Bid quantities of the various items in the proposal are for comparison only and may not reflect the actual quantities . There is no limit to which a bid item can be increased or decreased . Contractor shall not be entitled to renegotiation of unit prices regardless of the final measured quantities. To the extent that C4-4 .3 conflicts with this provision , this provision controls . No claim will be considered for lost or anticipated profits based upon differences in estimated quantities versus actual quantities . Total quantities given in the bid proposal may not reflect actual quantities ; however, they are given for the purpose of bidding and awarding the contract. A contract in the amount of $1 ,200 ,000 .shall be awarded with final payment based on actual measured quantities and the unit price bid in this proposal. Moreover, there is to be no limit on the variation between the estimated quantities shown and actual quantities performed . It is understood and agreed that the scope of work contemplated in this contract is that which is designated by the City but will in no case exceed $1,200,000 . ASC-28 GENERAL CONSTRUCTION NOTES 1. Applicable design and details shall conform to "General Contract Documents and Specifications for Water Department Projects" (GCD) effective July 1, 1978 , with the latest revisions . 2. All horizontal blocking , cradle blocking, and vertical tie-down blocking to be in accordance with Fig.(s) 9 , 10, and l lof the GCD. 3 . Fire hydrants shall be located a minimum of 3 '-0" behind the face of curb per Fig. 5 GCD. 4 . All gate valve installations for sizes up to 12" are to be per Fig. 3 GCD and sizes 16" and larger Fig. 4 GCD . 5. The proposed water and/or sewer mains at times will be laid close to other existing utilities and structures both above and below the ground. The contractor shall make necessary provisions for the support and protection of all utility poles , fences, trees, shrubs, gas mains , telephone cables, TU cables , drainage pipes , utility services, and all other utilities and structures both above and below the ground during construction. It is the contractor's responsibility to notify all utility owners prior to any construction in the area and verify the actual location of all buried utilities that may or may not be shown on the plans. The contractor shall preserve and protect all underground and overhead facilities and be responsible for any damage he may cause to them. The Contractor shall contact the following @ least 48 hours prior to excavating at each location: Fort Worth Water Department Field Operations Kristian Sugrim Scott Neystel Fort Worth Transportation & Public Works Light and Signal Division Dwayne Cox Roger Martin Fort Worth Transportation & Public Works (Storm Drain locates) 817-212-2649 or 817-925-2271 817-212-2642 or 817-994-8663 817-871-8100 817-871-8100 Lone Star Gas Company Gordon Couch 817-871.:.8100 Metro(214) 263-3444 336-2328 Texas Utility Service Company Southwestern Bell Telephone Company Texas One Call-Fiber Optics Location (MCI, AT&T, Sprint, etc .) Marcus Cable T.V . Enterprise 9800 1-800-245-4545 737-4731 6 . Contractor shall verify the elevation, configuration, and angulation of existing line prior to construction of tie-in materials. Such verification shall be considered as subsidiary cost of project and no additional compensation will be allowed. Elevation adjustments at connections may be made with bends, offsets, or joint deflections. All nonstandard bends shall be made using the closest standard M.J . fittings with the required joint deflections.( deflections not to exceed manufacturer's deflection per joint) 7. Contractor shall keep at least one lane of traffic open at all times during construction and access to all places of business and residence at all times.(reference C6-6.5 GCD) 8. No excavated materials, backfill materials, equipment, or supplies shall be stored within floodways or drainage easements.(reference C6-6 .6 GCD) 9. Trenches which lay outside existing or future pavements shall be backfilled above the top of the embedment with Type "C" backfill material. When Type "C" backfill material is not suitable, at the direction of the Engineer, Type "B" material shall be used. All backfill material shall be cqmpacted to a minimum of 90% proctor density by means of tamping only. Trenches which cross under existing or future pavement shall be backfilled per Fig. "A" with 95% proctor density by jetting, tamping , or a combination of such methods. 10.Rim elevations of the proposed sanitary sewer manholes in repaved streets are shown as final finished grades in these plans. They shall be constructed to 15" below final finished grade by utility contractor and adjusted by paving contractor in accordance with Fig. M of the special contract documents. Concrete collars shall be installed where indicated on the plans per Fig. 121 of the special contract documents. Manhole inserts shall be installed in all standard four foot and standard four foot drop access manholes per E-100-4 of the special contract documents. Standard four foot diameter manholes shall be in accordance with section E2A, Fig. 103 and Fig. 104 GCD, standard four foot drop access manholes per Fig. 107 GCD, and shallow manholes per Fig. 106 GCD. 11.The top of the water lines shall be a minimum of 3'-6" below the top of the curb for 12" and smaller mains except where otherwise shown on these plans. 12.All water meters shall be placed or relocated 3'-0" behind the face of the proposed curb or as directed by the Engineer. 13 .All existing water services shall be replaced with 1" minimum copper tubing unless a larger size is indicated on the plans. Corporation stops shall be fully opened prior to trench backfill. Curb stops with lock wings shall be tested for full flow when the system is pressure tested. Extend l" water services to those lots where no water services have been extended to . Locate these services at normal locations or as directed by the Engineer. a. The normal location of water service lines shall be 5' east or north of the center of the property frontage. b.For 40' or less lot frontage, all water services shall be placed 18" from the east or south property line. 14.All sanitary sewer services encountered shall be replaced to the property line as directed by the Engineer. -- HEAVY & HIGHWAY CONSTRUCTION PREY AILING WAGE RA TES 2008 Air Tool Operator Asphalt Distributor Ooerator Asphalt Paving Machine Operator Asphalt Raker Asphalt Shoveler Batching Plant Weigher Broom or Sweeper Operator Bu11dozer Operator Caroenter Concrete Finisher, Paving Concrete Finisher, Structures Concrete Paving Curbing Machine Operator Concrete Paving Finishing Machine Operator Concrete Paving Joint Sealer Operator Concrete paving Saw Operator Concrete Paving Spreader Operator Concrete Rubber Crane, Clamshell, Backhoe, Derrick, Drag]ine, Shovel Operator Electrician Flagger Fonn Builder/Setter, Structures Form Setter, Paving & Curb Foundation Drill Operator, Crawler Mounted Foundation Drill Operator, Truck Mounted Front End Loader Ooerator Laborer, Common Laborer, Utility Mechanic Milling Machine Operator, Fine Grade Mixer Operator Motor Grader Operator, Fine Grade Motor Grader Operator, Rough Oiler Painter, Structures Pavement Marking Machine Operator Pipelayer Reinforcine: Steel Setter, Paving Reinforcing Steel Setter, Structure Roller Operator, Pneumatic, Self-Propelled Roller Operator, Steel Wheel Flat Wheel/Tamping Roller Operator, Steel Wheel, Plant Mix Pavement Scraoer Operator Servicer Slip Form Machine Operator Spreader Box Operator Tractor Operator, Crawler Type Tractor Operator, Pneumatic Traveling Mixer Operator Truck Driver, Lowboy-Float Truck Driver, Single Axle, Heavy Truck Driver, Single Axle, Light Truck Driver, Tandem Axle, Semi-Trailer Truck Driver, Transit-Mix Wagon Drill, Boring Machine, Post Hole Driller Operator Welder Work Zone Barricade Servicer ,,,. $10.06 $13.99 $12.78 $11.01 $ 8.80 $14.15 $ 9 .88 $13.22 $12.80 $12.85 $13.27 $12.00 $13.63 $12.50 $13.56 $14.50 $10.61 $14.12 $18.12 $ 8.43 $11.63 $11.83 $13 .67 $16.30 $12.62 $ 9.18 $10.65 $16.97 $11.83 $11.58 $15.20 $14.50 $14.98 $13.17 $10.04 $11.04 $14 .86 $16.29 $11.07 $10.92 $11.28 $11.42 $12.32 $12.33 $10.92 $12.60 $12.91 $12.03 $14.93 $11.47 $10.91 $11. 75 $12 .08 $14.00 $13.57 $10.09 ( id:)~ 1t 'Cnt~on AC Mechanic AC Mechanic Helper Acoustical Ceilim! Mechanic Bricklaver/Stone Mason Briddaver/Stone Mason Helper Carpenter Carpenter Helper Concrete Finisher Concrete Form Builder Drywall Mechanic Drywall Helper Drywall Taper Drywall Taper Heloer Electrician (Journeyman} Electrician Heloer Electron ic Technician Electronic Technician Helper Floor Layer (Resilient) Floor Layer Helper Glazier Gla zier He lper Insulator Insulator Helper Laborer Common Laborer Skilled Lather Painter Painter He l per Pipefitter Pipefitter Helper Plas terer Plasterer Helper -. '2008 PREVAILING WAGE RATES CONSTRUCTION INDUSTRY :1:--:,. ;:;,a~,:· C'as.s1fication $21.69 Plumber $12.00 Plumber Helper $15.24 Re inforcing Steel Setter $19.12 Roofer $10.10 Roofer Heloer $16.23 Sheet Metal Worker $11 .91 Sheet Metal Wo rker Helper $13 .49 Sorinkler System Installer $13.12 Sprinkler System Installer He lper $14.62 Steel Wori<er Structural $10.91 Concrete Pump Crane, Clamsheel, Backhoe, Derrick, D"Line $13.00 Shovel S9 .00 Forklift $20 .20 Fro nt End Loade r Sl4.43 Truck Driver $19.86 Welder $12 .00 Welder Helper $20.00 $13.00 $18 .0D $13.00 $14.78 $11.25 $1D.27 S13 .18 $16 .10 $1 4 .83 $8 .00 $18.85 $1 2 .83 S17 .2s I $12 .25 1 Hrl;• Ra!e $20.43 $14.90 $10 .00 $14 .00 $10.00 I $16.96 $12.31 $18.00 $9 .00 S17.43 $20 .50 $17 .76 $12.63 $10.50 $14 . 91 $16.06 $9.75 Classifications Hrly Rts Classifications Hrly Rts Air Tool Operator $10.06 Scraper Operator $11.42 Asphalt Raker $11 .01 Servicer $12.32 Asphalt Shoveler $8.80 Slip Form Machine Operator $12.33 Asphalt Distributor Operator $13 .99 Spreader Box Operator $10 .92 Asphalt Paving Machine Operator $12.78 Tractor operator, Crawler Type $12.60 Batching Plant Weigher $14 .15 Tractor operator, Pneumatic $12 .91 Broom or Sweeper Operator $9 .88 Traveling Mixer Operator $12 .03 Bulldozer operator $13 .22 Truck Driver-Single Axle (Light) $10.91 Carpenter (Rough) $12 .80 Truck Driver-Single Axle (Heavy) $11.47 Concrete Finisher-Paving $12 .85 Truck Driver-Tandem Axle Semi-Trailer $11 .75 Concrete Finisher -Structures $13 .27 Truck Driver-Lowboy/Float $14 .93 Concrete Paving Curbing Mach. Oper. $12 .00 Truck Driver-Transit Mix $12.08 Concrete Paving Finishing Mach. Oper. $13 .63 Wagon Drill , Boring Machine , Post Hole Driller $14 .00 Concrete Paving Joint Sealer Oper. $12 .50 Welder $13 .57 Concrete Paving Saw Oper. $13 .56 Work Zone Barricade Servicer $10.09 Concrete Paving Spreader Oper. $14 .50 Concrete Rubber $10.61 Crane, Clamshell , Backhoe , Derrick, Dragline , Shovel $14 .12 Electrician $18 .12 Flagger $8 .43 Form Builder-Structures $11 .63 Form Setter-Paving & Curbs $11 .83 Foundation Drill Operator, Crawler Mounted $13 .67 Foundation Drill Operator, Truck Mounted $16 .30 Front End Loader $12.62 Laborer-Common $9 .18 Laborer-Utility $10 .65 Mechanic $16 .97 Milling Machine Operator, Fine Grade $11 .83 Mixer Operator $11.58 Motor Grader Operator (Fine Grade) $15.20 Motor Grader Operator, Rough Oiler $14 .50 Painter, Structures $13 .17 Pavement Marking Machine Oper. $10 .04 Pipe Layer $11 .04 Roller, Steel Wheel Plant-Mix Pavements $11 .28 Roller, Steel Wheel Other Flatwheel or Tamping $10 .92 Roller, Pneumatic, Self-Propelled Scraper $11 .07 Reinforcing Steel Setter (Paving) $14 .86 Reinforcing Steel Setter (Structure) $16 .29 ··.,· .. :··. >f .. ··. ·- SECTION E SPECIFICATIONS JANUARY l , 1978 All materials , construction methods and procedures used in this project shall conform to Sections El , E2 , and E2A of the Fort Worth Water Department General Contract Documents and General Specifications, together with any additional material specification(s), construction(s) or later revision(s). (See revisions listed on this sheet). Sections El , E2 and E2A of the Fort Worth Water Department General Contract Documents and General Specifications are hereby made a part of this contract document by reference for all purposes , the same as if copies verbatim herein , and such Sections are filed and kept in the office of the City Secretary of the City o f Fort Worth as an official record of the City of Fort Worth. INDEX El MATERIAL SPECIFICATIONS E2 CONSTRUCTION SPECIFICATIONS E2A GENERAL DESIGN DE TAILS Revisions as of April 20 , 1981 , follow: El-2.4 Backfill : (Correct minimum compaction requirement to 95% Procter density and correct P .I. values as follows:) c. Additional backfill requirements when approved for use in streets: 1. Type B Backfill ( c) Maximum plastic index (Pl) shall be 8 2. Type C Backfill (a) Material meeting requirements and having a PI of 8 or less shall be considered as suitable for compaction by wetting (b) Material , meeting requirement and having a PI of 9 or more shall be considered for use only with mechanical compaction E2-2. l l Trench Backfill : (Correct minimum compaction requirement wherever it appears , in thi s section to 95% Procter density except for paragraph a.I. where the "95% modified Procter density" shall remain unchanged). EI00-4 WATERTIGHT MANHOLE INSERTS . SECTION El 00 -MATERIAL SPECIFICATIONS MATERIAL STANDARD EI00-4 JANUARY 1, 1978 (ADDED 5/13/90) E 100-4.1 GENERAL: This standard covers the furnishing and installation of watertight gasketed manhole inserts in the. Fort Worth sanitary sewer collection system. EI00-4 .2 MATERIALS AND DESIGN: a. The manhole insert shall be of corrosion-proof high density polyethelene that meets or exceeds the requirements of ASTM D1248 , Category 5, Type III. b. The minimum thickness of the manhole insert shall be 1/8". c. The manhole insert shall have a gasket that provides positive seal in wet or dry conditions. The gasket sha II be made of closed ce II neoprene rubber and meet the requirement of ASTM D 1056, or equal. d. The manhole insert shall have a strap for removing the insert. The strap shall be made of minimum 1 wide woven polypropalene or nylon webbing, with the ends treated to prevent . unravelling . Stainless steel hardware shall be used to securely attach strap to the insert. e. The manhole insert shall have one or more vent holes or valves to release gasses and allow water inflow at a rate no greater than l O gallons per 24 hours. EI00-4.3 INSTALLATION: a. The manhole frame shall be cleaned of all dirt and debris before placing the manhole insert on the rim. b. The manhole insert shall be fully seated around the manhole frame rim to retard water from seeping between the cover and the manhole frame rim. ElOO (1) SECTION E1-18A-RBNFORCED PLASTIC WATER METER BOXES E1 .18A.1 SCOPE: This specification covers three types of water meter boxes, Type A and B·, and Type C, E1 .1 BA.1 .1 Class A Standard Meter Box: Intended for use with services utilizing 5/8" X %",%"and 1" meters. E1 .18A.1.2 Class B Standard Meter Box: Intended for use w ith services utilizing 1-: 1 /2" and z· meters . E1 .18A.1 .3 Class C Standard Meter Box: Intended for use with services utilizing two 5/8" X %" or %" meters. E1 .18A.2 CONSTRUCTION:· Reinforced plastic water meter boxes and iron cover lids under this specification will include three specific sizes of a rectangula_r shape. Those three sizes will be referred to us: · CLASS . 'A', 11" x 18 "B.ox; 12" high CLASS 'B', 15.25" x 27" Box, 12" high CLASS 'C', 18" x 16' Box, 12" high E1 .18A.3. REINFORCED PLASTIC METER BOX SPECIFICATION The· meter box shall be con·structed of Linear Medium Density Polyethylene (LMDPE) as defined in ASTM D-883-95Aand have a minimum wall thickness of .500". The exterior shall be black to provide UV protection. Boxes shall be able to . withstand a minimum 15,000 pounds vertical load and shall withstand a minimum 400 pounds sidewall load. The meter box exterior shall be free from seams or . parting lines and all edges · and corners are to be smooth and free from sharp edges ·so the _unit can be handled safely without gloves. E1 .18A.4. IRON METER BOX LID SPECIFICATION The meter box lids are to be made of cast iron according to ASTM A48-84, Class 308 or ductile iron according to · ASTM A-536. The lids shall withstand a minimum vertical load of 15,000 pounds. Castings are coated with a . bituminous emulsified asphalt unless otherwise specified, ground smooth, and cleaned with shot blasting, to get a uniform quaHty free from strength defects and distortions. · Dimensions shall be . within ind _ustry standards of plus or minus ( +!-) one-sbcteenth of an inch per foot. All castings will bear the Manufacturer's IS (name or logo) and Country of Origin. Casting weights .may vary plus or minus (+/-) five percent from drawing weight per' industry standards . EXIS TING CURB .&· GUTIER EXISTING HMAC PAVEMENT TRENCH REPAIR LIMITS EXISTING HMAC PAVEMENT EXISTI NG BASE (IF ANY) BACKFILL MATERIAL (SEE NOTE #4) TRENCH REPAIR W/PERMANENT HMAC PAVEMENT AND NON-REIN FORC ED CONCRE TE BASE NOTES: TYPICA~ SEC TIO N 1. PLACE A MIN . OF 2" HMAC SURFAC[ COURSE (TYPE ·''o_;, MI X) TO MATCH EXISTING HMAC PAVEMENT GRADE AS SHOWN. 2. PLACE A MIN. OF 8" . 2 : 27 CONCRETE AS SHOWN. · 3. FLOWABLE FILL IS REQUIRED TO BACK FI LL ALL TRENCHES IN EXISTING CURB & GUTIER . DOWNTOW N STREETS, ANO IS OPTIONAL IN OTHER AREAS. FOR STORM DRA IN INSTALLATION, BACK FILL SHALL MEET SPECIFIED ITEM 402 OF THE STANDARD SPECIFICATIONS FOR STR EET AND .STORM DRAIN CONSTRUCTION, CITY OF FORT WORTH ALL CONSTRUCTION MUST BE IN ACCOR DAN CE WITH THE CITY OF FORT WOR TH STANDARD FOR WATER OR SANITARY SEWER INS TALLATION, BACKFILL SH ALL BE PER FIGURE A. . SPECIF ICATIONS FOR STREET AND STOR M DRAIN CONSTRUCTION. CITY OF FORT WORTH, TEXAS PERMANENT ASPHALT PAVEMENT REPAIR WITH NON-REINFORCED CONCRETE BASE .• DATE : 09/2005 2000-1A , •. /. .. ·: ~ . ;;-_·:, EXISTING : . 1 ·. HMAC PAVEMENT ... N·0 .3 · BARS , ON 24'~. CENTERS i3oik WAYS WITH MiN . 2 . · · BARS LONGI.TUDINAL IN DITCH • TRENCH . R~PAIR .. LIMITS . TYPICAL SECTION l .~ ', REJNFORCEb CONCRETE PAVEMENT SHALL BE REPLACED TO OR IGINA L . '}HICKNESS 0~ to .A MINIMUM THICKNESS OF 5" WHICHEVER IS GREATER ·. . : •, ,· ... -,•; 2 .. IF .i S1EEL EXISTS IN . CONCRETt PAVEMENT TO BE CUT, THE STEEL SHALL BE CUT AND ; SALVAGCAS JPOSSI BLE . A MINi'MUM LAP SPLICE DISTANCE OF 12" SHALL BE PROVIDED . 3: .' RtlNFQ!Rcto' 66~C R.~tf ~;vi~kN+· i1~L .· B~-:~;~PCACED ,OVER TRENCH,. AS . SH~WN. ;N THE · . EVENT NON_:R EI NFORCED CONCRETCPAVEMENt· JS REMOVED .' .· ... ·. · •· . . ·. ·,: · . j . . . ' . ·.•· ' : .. • • • •; : ... • . . ~ . : ' . ~· . •·. :· . ,.•. ; ' ; . ' . . . ·, ' . . . . 4. · .ALL · EX1}3 TING ASPHALT COURS[ SHAL L BE REPLACED TO THE ' OR IGI NAL . DEPTH , MIN IMUM PAVE'.MENT <QN ALL ASPHALT STR EE TS SHAL L BE 2" OF FiNE GRADED SURFACE COURSE. 5. BEDDING OF PIPE TO MATCH ADJACENT SECTIONS . 6 . 2:.27 CONCRETE MAY BE. DELETED IF HALF THE SPECIFIED THICKNESS OF 2: 27 IS ADDED TO THt CLASS "A" CONCRETE . EXISTING . HMAC PAVEMENT BACKFILL MATERIAL (SEE NOTE #7) ... EXISTING CURB & GUTIER EXIST CONC . SASE 7. FLOWABLE .FIL L JS REQUIRED TO BACKFILL ALL TRENCHES IN DOWNTOWN STREETS, AND IS OPTIONAL IN OTHER AREAS . FOR STORM DRAIN INSTALLATION, BACKFILL SHA LL MEET SPtCIFIED ITEM .4 02 OF THE STANDARD SPECIFIC ATION S' FOR STREET AND STORM DRAIN CONSTR UCTION , CIT Y OF 'FORT WORTH FOR :, WATER OR SAN IT ARY SEWER INSTALLATION, . B.i:\CKF ILL SHA LL BE PER FIG URE A. ALL CONS TRUCTION .MUST Bl: IN ACCORDANCE WITH THE CIT Y OF FORT WORTH STANDARD SP ECIFICATIONS FOR STREET AND STORM DRAIN CONSTRUCTION. fORT,IITg CITY OF FORT WORTH, i'E)<AS DATE: 09/2005 PERMANENT 'ASPHALT PAVEMENT REPAIR WITH REINFORCED CONCRETE BASE . 2000-18 EX IST ING CURB & GUTIER EXISTi NG HMAC · PAVEMENT TRE NCH REPAIR LIMITS i ' HOT . MIX ASPHALT EX ISTING HMAC PAVEMENT --BAC KFILL MATE RIAL (SEE NOT E #3) EX ISTI NG CURB & GUTIER TRENCH · REPAiR W/T~MPORARY HMAC PAVEMENT . TYPICAL SECTION NOTES ; ·· 1. PLACE A MIN. OF 2" HMAC SURFACE SOURSE (TYPE "D" MIX) TO MATCH EXIS TING HMAC PAVEMENT GRADE AS SHOWN . . 2. PLACE COMPACTED FLE X BASE MATERIAL AS SHOWN . 3. FLOWA BLE FILL IS REQUIRED TO BACKFILL ALL · TRENCHES IN DOWNTOWN STREETS, AND IS OPTIONAL IN OTHER AREAS. FOR STORM DRAIN INSTALLATION, BACKF ILL SHALL MEET SPECIFIED ITEM 402 OF THE STANDARD SPECIFICATIONS FOR STREET AND STO RM DRAIN CONSTRUCTION, CITY OF FORT WORTH FOR WATER OR SANITARY SEWER INSTALLATION, . BACKF ILL SHALL BE PER FIGURE A. ALL CONSTRUCTION MUST BE IN ACCORDANCE WITH THE CITY OF FORT WOR TH STANDARD SPECIFICATIONS FOR STREET AN D STORM DRAIN CONSTRUCT ION . CITY OF FORT WORTH,· TEXAS DA TE: 09 /2005 TEMPORARY ASPHALT PAVEMENT REPAIR 2000-1C · ALL '·,CONSTRUCTfON ':}v1UST BE ,\IN \.ACCORD AN .CE WITH · THE . CITY , OF FORT WORTH , STANDARD SPECIFICATIONS ·.FOR ·STREET .. ANO '.'·'.STORM · · DRAIN . CONSTRUCTION -'rot ' . ' . . ' •• • ,. ~· l • -_, •. . -.. ,. ' ... ·:. <;':;·,. 51 M'ii{ .. ·., . , ·_.: ·r~~·-71 : . DOWEL . CLASS ''A" Rt:INFORCED CONCRETE PAVEMENT 'REPLACEMENT TO THE , . NEAREST JOINT OR CURB. DOWEL EXISTING . CURB ·& GUTTER EXISTING CONCRETE PAVEMENT . : I I ! 1 . i i ~ ,· ··~~1s:~~t ·. :BASE .. , GEORGE A.BtHMANtSH, ASSIST ANT DiRECTOR . TPW . Re.v. · 12' ··~ ': EXISTING CONCRETE JOINT NOTES . .. . . ..• . . .· '. 1. FLOWABLE FILL IS REQUIRED TO BACKFILL ALL iRENCHES IN . DOWNiOWN STREETS, AND OPTIONAL IN OTHER AREAS . BACKFILL SHALL MEEi . SPECIFIED ITEM 402 OF THE ST AND ARD SPECIFICATIONS . . F"OR STREET . AND STORM ORAi~ CONSTRUCTION;.:.·. CITY . OF f ORT · WORTH ~ . -,, '·.-/ '_\ '.TYPIGAL :SECT:ION-)_,:,:f REN .CH ·· REPAIR.,·' ·, . · ·. ·:REINFORGE:D : CONCRETE:i'PAVEMENT ·.,. : !' ! :-·' 1 '. . ·, .. ·. -:;:: •. ':~ I ··:;.' • 2. REINFORCED CONCRETE PAVEMENT SHALL BE REPLACED TO ORIGINAL DEPTH OR T,O A MINIMUM DEPTH OF 5" WHICHEVER IS GREATER. 3 i PLACE 6" OF 2:27 CONCRETE AS SHOWN. 1" OF REINFORCED CONCRETE MAY BE SUBSTITUTED FOR EVERY . 2" OF 2;27 CONCRETE .4.RE~FORCEMENT OF CONCRETE MUST .. MEET CIT'( STANDARD OR MATCH EXISTING, .. .WHICHEVER IS GREAiER. ,\. • I , ·I I APPROVED BY: -------DAT.,,._E: __ _ CITY OF FORT WORTH, TEXAS TRANSPORTATiON/PUBLIC .WORKS ENGINEERING DIVISION ./ HUGO MALANGA DIR C OR TPW FIG 2000·2 ',,•, . I i ALL Co'NSTRUCTION MUST BE IN ACCORDANCE , · WITH · THE .·CITY OF FORT WORTH STANDARD 1 · 5~~~~~6'~k°risutr9~N STREET AND STORM ': I EXISTING CURB · . 8c GUTTER EXISTING BRICK PAVEMENT DOWEL NOTES:· EXISTING BASE CIF ANY) 1. REINFORCED CONCRETE BASE · i,1 SHALL BE REPLACED 'TQ :oRIGINAL DEPTH , OR TO A MINIMUM ' DEPTH OF 5" .1 . WHICHEVER IS , GREATER.'CCNCRETE . ). SHALL ,BE CLASS "A'' · PER CITY OF FORT .WORTH STANDARD. . . DITCH WALL 2. REINFORCEMENT OF CONCRETE Musr MEET .CITY STANDARD OR MATCH EXISTING, WHICHEVER IS GREATER. 3. PLACE 6'' OF' 2:27 CONCRETE AS SHOWN. , 1" OF . REINFORCED CONCRETE MAY BE . SUBSTITUrEo FOR EVERY 2" OF 2:27 CONCRETE. ' . PIPE ,. I DOWEL MORTAR BED SEE SPEC. 4. FLOWABLE FILL IS REQUIRED TO BACKFILL ALL TRENCHES IN DOWNTOWN STREETS, AND OPTIONAL IN OTHER AREAS BACKFILL SHALL MEET .•. · SPECIFIED · ITEM 402 OF THE ST AND ARD , SPECIFICATIONS FOR STREET AND STORM DRNN CONSTRUCTION, , CITY OF FORT WORTH . ' EXISTING CURB 8c GUTTER 5. EXISTING BRICK SHALL BE REMOVED ·CAREFULLY TO AVOIO DAMAGE. DAMAGED BRICK' IS TO BE REPLACE:D WITH UNDAMAGED BRICK TO MATCH ADJAGENT BRICK TYPICAL SECTION -TRENCH REP AIR TYPICAL BRICK SURFACE 8( REINFORCED CONCRETE BASE I . RECOMMtND ~D, BY:~.~ DATE:Z[IS\o\ FORT WORTH APPROVED BY: -------DATE:----: , . GEORGE ·A BEHMANESH; , ASSISTANT DIRECTOR, "TPW Rev. ~ CITY OF FORT WORTH, TEXAS TRANSPORTATION/PUBLIC WORKS ENGINEERING DIVISION HUGO MALANGA DIRECTOR, TPW -,1.·c.J\1.:> r.n~v .\,;UN\,;Kt;. It;.. ::iHAI.L · . < BE>,SAW " :Cui tULL DtPTH : . .'; .. ··:;.:·. ,_: '.: . :fr'DRILL 'ifi°D c:GROUT (NC>.5 x' t'4 ii TIE .. ·. ;';/!,BARSJ t.t ·24::.c ;.c ,,,PENATRATE : .MIN. 6'.' : ·>:, INTO EXISTING PAVEMENT . :: ..... _3,:S~L lCE ·:~~:1 (~'AR s.i:+o ,'.,.Ttit '.N0 ;5 . r1t ·:e'AA : •.. · ' WITH •; A MINIMUM 12'' \OVERLAP ,; ' . . .,, ,. ' . . · .. . ' . ·:l i,-Ai}:~PA~;iO ~ ;'Joi'~r :-~s~-R 0ED W;oo . . .. EXPANSION JOINT FILLER AND N0 .6 x 24" SMOOTH . DOWEL . AT 24" c-c · · . · .· . . . . .· . ' ' . . . ,: ' ~ · EXIST . STEEL . ·CURB 6" · 18'1 NO. 3 BARS ~ 24" C-C BOTH WAYS SAW CUT 18 11 EXISTING STEEL IN PAVEMENT SHALL BE CUT . . . . ·• r .. ;i<'-··· ·--··-. .-:.--.. --SAWED .OR CONSTRUCTED JOITT ...,,.... ......... ..._t--~= ,:t-------ct . JO INT JOINT DEPTH ·f . : ,, ·. CURB .-' ' . . , • • , ~·-.. ~· , • I •• ~ ._.,,. ~. /· ;,.' . ;· . . GEORG~:.Ai i3EHMANESH, .; ASSIST AN r '.0 p1RECJOlt TPW ,·' .. ,.,., .I .• 1 ., . i ··.· ·'·\ "··1 \ z . . TYPICAL PARTIAL PANEL REPLACEMENT REINFORCED CONCRETE PAVEMENT PAVEMENT THICKNESS T• 5" T• 611 T•7" T• 8 11 .JOINT DEPTH 1-1/+" · 1-1/2 il 1-3/4,11 211 FORT WORTH APPROVED BY: _. ------DATE : __ _ ~· CITY . OF FORT WORTH, TEXAS TRANSPORTATION/PUBLIC ··woRKS . ENGINEERING DIVISION HUGO MALANGA DIRECTOR, TPW FIG. 2000·4A . NOTES ; . • .. · :1.THE FOUR SIDES OF THE CUT SHALL · BE NEATLY SAWED WITHOUT ROUGH CURB 8i GUTTER ·ASPHALT PAVEMENT SPOT REPAIR ·,. 5'MIN. . ' l:DGES .. : . · ====mmmmr============r=:==;,;;;;;;;;;:r=~=::::==::::,mmmmmr~r-··--··· ---- 2. ANY REMAINING PAVEMl:NT BETWEEN . SPOT REPAIRS MUST BE: A MINIMUM . · OF 5' IN ALL DIRECTIONS. ' I . 5'MIN. UN LE I I I I I I I I I 5'.MIN. I I : 25' ey----------------------i...' -----ASPHALT 28'. 1 - 1 I I UN4c I . I 5'MIN. CURB 8i GUTTER iJ"YPICAL 28' WIDE PAVEMENT , REc.oMMENDED 'sy~·t\ B~ · DATt: Z{ is Io\ GEORGE · A: 8EHMANESH, ASSIS'(ANT DlRECTOR, TPW ·. Rev. CITY OF FORT WORTH, TE XAS TRANSPORTATION/PUBLIC WORKS J'."N r.1 N f:TRl 1'1 r. nl\/l C::l n ~, ----1 I I I I I .1 APPROVED BY : ------- HUGO MALANGA DIRECTOR, TPW DATE : --- ' I NOTES ·. , · .'· . · . ,: ; .J.TH~fOYR SIDES ,OF .tHE CUTSHALL ,,_ , BE NEATLY SAWED WITHOUT ROUGH ';/ , • ', ... •' •, •. •H.<' •); • H; .. • ' • ."',,EDGES ·.····· ,··.··1 · . --- .. · ·. 2:_ A.NY.'ReMA.tNi~t;; r A. veMeNr _BETWEEN . ·, ' SPOT.R~PAiRs ·Mus:t. BE A MINIMUM ' . · · .·;-, 01£5•. rN ANY. DIRECTION; · · '. : ' · : . · · · · · · · ·. · Long ·serv i c~s ;~ 1. . ' .... · . \ .. Short . For area < 5': . go to curb & square off. · ·L . QJ QJ +-C 0•- 3' -- .Asphalt Concre t e Long Services . ,·. . . Short Services Replace to . edge .·.· 0 f panel where · . the distance ;-.· · ' between cut <'\·. . ". . . and edge of .. panel is < 5'. · ' for .area < 5': g( to _curb Ill. _sqi.Ja t e . brr . 0 Emergency repa Ir . . . L QJ Q) +-C .. 0·- 3' - . L Ql +-C :,i: :-:- Asphalt Concrete Replace entire panel from center I i ne to curb, j PAVEMENT > 10 YEARS /':'..:.PAVEMENT '·< 10 YEARS · FoRJWortTii · FRANK ' CRUMB, . ASSIST ANT ·DIRECTOR, WA!~R DEPT . WATER. DEPAR.T_MEN.T Rev;'. .·, CiT'l' OF · FORT · 'WORTH, TEXAS ~ ; .. : .,. ', APPROVED · 9Y ,: .~_;..~~.:....::::. DALE FISSELER, . DIRECTOR, WATER ·01;:PT : ATE: Z /4 0\ FIG 2000·4-W ... ; .. • . :· ~. -·.'.; .: .' . Noi~:s·: . .. . ,, , . . J .. P.ROVIOE ADEQUAtE .oVERLAP ;OF PLATE: ON . ASPHALT TO ·ASSURE NO "SLIPPAGE .· OF . i · .. · .. · PL.ATE .ANO NO '.COLLAPSING OF . TRENCH '-·< . ·. 2.i\~E~CH LENOlH \ih~~ss ·r"Hm s-dtT ., · ANO STEEL 'PLATES '.:WILL': BE . IN PLACE LESS -<::\i . : ,THAN :4B HOURS;STEEVPLATES ·MAY ·.BE '· '•:.',< PLACED DIRECTLY -ON EXISTING ~ASPHALT WITHOUT . ' MILLING. PROVIOE .·.TEMPOR.ARY -· A:,PHALT , ,, ; ,·. TRANSITIONS El<f.ENDING · 3·F,EET · BEYOND EDGE . ' OF, STEEL PLATES.•, , , · · · · · ,. ,:~'.-'..)-.~; .' :.~~I •.. ~'.-•.\;•,!;. •1 ·'·. •,·,·; \ '.. . .. :: . ~ .. '-;, . : . -~ECO ~~ENoti{i k~-~~ilGLDATE: i;l 1slo:\. cEoRct . A, sEHMANtsi:i : •·· · • ._.· ASSIST ANt DIREGtOFt 'TPW. Rev. ,.' TYPE "A'' MUST HAVE PRIOR APPROVAL OF CITY ·TRENCH . STEEL ··• PLATE ··' , .. . ' MILL 1" FOR STEEL PLATE . PACK JOINT WITH COLD MIX TRENCHING . TYPE 119ti PLATING FORiWoRTH : . -~))~·-·_.··.·.·· .;' '· . ;_-.· ,· ::· ... . CITY OF f"ORT WORTH, TEXAS ' iR.ANSPORi ATION/PUBLIC -WORKS ENGINEERING b_lVISION . ·.~ : .· .. • .• .APPROVED BY: _. ~-)_· _______ DATE:---- HUGO MALANGA' '.DIRECTOR, TPW , FIG 2000·5 I I ~I ::J I /'.'.: ts I 0.. SIDEWALK ~o.. 20" 2'-6" • 1 CURB WATER MAIN BEHIND CURB E1-17 MATERIAL E2-17 CONSTRUCTION PAVEMENT MATERIAL LIST 1" OR AS APPLICABLE WATER MAIN IN STREET @ STANDARD CORPORATION ® BLUE VIN YL TAPE , 3" WIDE , 6" ABOVE GROUND © STANDARD CURB STOP & 90' ELBOW @ AREA TO BE BACKFILLED WITH SAND CITY OF FORT WORTH , TEXAS WATER SERVICE DETAIL DATE : 08 -2 007 WTR-001 NOTE : PAVEMENT OR OTHER SURFACE MATERIAL DETAIL PERTAINS TO ALL GATE VAL VE SIZES 4" THRU 12" WATER MAIN E1-10 MATERIAL E2-10 CONSTRUCTION r=, I I >--~ '--.,-~ I I I I I I I I I CONCRETE COLLAR PER DETAIL WTR-004 --1------IF VALVE OPERATING NUT IS MORE THAN 3 ' BELOW PAVEMENT SURF ACE, PROVIDE EXTENSION STEM TO 1' BELOW PAVEMENT SURFACE. (SEE DETAIL WTR-003) n---MCKINLEY IRON AND STEEL CO ., NO . YB5 THREE PIECE VALVE BOX OR EQUAL i-----GATE VALVE TORQUE SOL TS PRIOR TO BACKFILL CITY OF FORT WORTH , TEXAS GATE VALVE AND BOX DATE: 08-2007 WTR-002 2" 0 SQUARE STOCK W/ 1" DIA. HOLE DR ILLED THROUGH. 1 "¢ ROUND STOCK 2" 0 SQUARE STOCK W / DIA. HOLE DRILLED THROUGH . 2~"¢ TUBING W/ ~ .. THICK WALL Ya"x45. CHAMFER t VARIES 4"~ ·~_J NOTES : 1 . 1" ROUND BAR & 2" SQUARE PER ATSM A-1 08-81, SAE 1020, COLD DRAWN OR BETTER . 2 . 2->2" TUBING PER ATSM A-512-79, SAE 1020, COLD DRAWN OR BETTER . 3. ALL WELDS SHALL COMPLY WITH A.W.S. CODE FOR PROCEDURE, APPEARANCE, AND QUALITY OF WELDS. . CITY OF FORT WORTH , TEXAS VALVE STEM EXTENSION DATE : 08-2007 WTR-003 COLLAR CONFIGURATION FOR PAVED AREA A L CLASS 'A ' ---1 (3000 PSI) CONCRETE 8-#4 REBARS TYP . CASE 1 CASE 2 CASE 1 COLLAR SHALL EXTEND TO TOP OF 2 :27 CONCRETE (REBAR REQUIRED) CASE 2 COLLAR SHALL BE 8 " THICK (REBAR REQUIRED) E1-20, E1-21 MATERIAL E2:-20,. E2-21 . CONS .TRUCTION .. 2'-0" r , 4~=!=?· I I I I I I I I I I I: I ... SECTION A-A COLLAR CONFIGURATION FOR UNPAVED AREA G) A J 3" TYP . 0 I °N 14" CHAMFER (TYP .) en en---:-w z z-~~ u. :i:i:o I-.._,, a::: (/) <{ ~ _J a::: _J <{ 0> u REBAR SHALL BE PLACED 3" MIN . FROM TOP AND BOTTOM OF CONCRETE COLLAR. CITY OF FORT WORTH : TEXAS DATE: 08-2007 GATE VALVE CONCRETE COLLAR WTR-004 ..-,. w a.. ci: u... 0 a.. 8 ......, A I . . . . . . E1-14 MATE RIAL E2-14 CONSTRUCTION SEC TI ON A-A GATE DIMENSION TABLE VALVE SIZE A B C D E F G H J K L M 16" 20· 20· 12· 12· 4~· 1· 48" 12· 10· 24" 12· 16" 16" 20· 20· 12· 12· 51%" 2· 46" 12· 12· 24" 12" 16" 20· 20· 16" 12· 12· 55%· 1· 54• 12" 12· 24" 16" 20· 24" 22· 14" 12· 12· 64~" 1· 60" 16" 14" 30" 16" 24" 30• 28" 12· 12" 12· so%· 3• 66" 1a· 1a· 30• 20· 30• 36" 32" a· 12· 12· 9di.· 4• 72" 18" 18" 36" 24" 36" 42" 34• 6" 15" g• 101¥.· s· 78" 24" 20· 36" 30" 42" 48" 36" 4• 14" 10· 121%" 4• 90" 24" 26" 42" 36" 48" 54• 36" 4• 9• 15" 14:#.z" 3• 102· 24" 32" 46" 40• 54" DIMENSIONS ARE BASED ON AMERIC AN DARLING VALVE AND MFG. CO. DRAV..NG NO . 6397, DATED 3-2-59 REVISED 5-11-70. 16" GATE VALi,£ DIMENSIONS ARE 0 BASED ON CATALOG NO . 10, PAGES 20 AND 22. 54" GATE VALVE DIMENSIONS ARE BASED ON DRAWING NO. 92-12158. DATED 12-13-70. CONCRETE TOP VIEW, LESS MANHOLE COVER AND RIM INSTALLATION NO. 6 BARS, 6" C-C (TYP) NOTES : NO . 5 BARS, 1. 24"x40" FORT WORTH STANDARD 336 LB . MANHOLE COVER WITH THE WORD "WATER" CAST IN 2-INCH LETTERS . USE BILCO 30"x 30" TYPE HLC ACCESS HATCH IN HIGH TRAFFIC AREAS . 12" C-C (TYP) MIN . (TYP) GRANULAR EMBEDMENT (TO TOP OF PIPE) NO . 4 BARS, 12" C-C BOTH WAYS IN 2500# CONCRETE * 2" COVER (TYP.) 12" c-c C ITY OF FORT WORTH, T EXAS VAULT DETAIL E 2. VALVE VAULT SIDE WALLS SHALL BE PRECAS T REINFORCED CONCRETE PIPE OF THE TONGUE AND GROOVE DESIGN, MEETING THE REQUIREMENTS OF A.S .T.M. C-76, CLASS Ill, OR EQUAL, USING RAM-NEK PLASTIC SE AL, OR POURED-IN-PLACE 2500# REINFORCED CONCRETE WITH 8" WALLS. CONCRETE WALLS SHALL BE REINFORCED WITH #4 CIRCULAR BARS, SPACED 6" C-C HORIZONTALLY AND 6 " C-C VERTICALLY. POURED-IN-PLACE CONCRETE MUST HAVE "FIRS T SURFACE RUBBING" AS SPECIFIED IN E2-14.15b (1) OF THE GENERAL CONTRACT DOCUMENTS AND SPEC IFIC ATI ONS. 3. PROVIDE CORPORATION AND CUR B STOPS A MAXIMUM OF 12" FROM EACH END OF GATE VALVE , AS SHOWN . CORPORATION AND CURB STOP SIZES SHALL BE 1" FOR 16", 20", AND 24" PIPE NOMINAL DIAMETERS; 2" FOR 30" AND LARGER DIAMETERS . 2" TAPS SHALL BE MADE AS A 2" FLANGED OUTLET, WITH INSULATED ADAPTOR KIT. COPPER RISERS SHALL BE PROVI DED BETWEEN THE CORPOR A TION AND CURB STOPS . CURB STO P S SHALL BE INSTALLED AT AN ELEVATION 12" ABOVE THE TOP SURF ACE OF VAULT BOTTOM SLAB . 4 . GROUT WITH MORTAR . 5 . BY-PASS VALVE NOT REQUIRED FOR RESILIENT WEDGE GA TE VALVE. DAT E : 08-2 007 FOR 16" AND LARGER GATE VALVES WTR-005 CONCRETE-+---. BLOCKING .,.__,,.,,..__ M.J. ANCHOR TEE-tr~~==,,\ EXISTING OR PROPOSED CURB PAVEMENT OR OTHER SURFACE M.J . ANCHORING COUPLING E1-12 MATERIAL E2-12 CONSTRUCTION 6" LEAD FROM MAINS EX ISTING OR PROPOSED CURB CONCRETE BLOCKING EXERCISE CARE TO AVOID PLUGGING DRAIN HOLE WITH CONCRETE 18" MINIMUM FROM GROUND, PER FIRE DEPT. FIRE HYDRANT TO BE SET PLUMB PARKWAY i--t~r-----EXTENSION BARREL AND STEM FOR EXTRA BURY DEPTH IF NECESSARY 6" FIRE HYDRANT <f LEAD LINE ;,, }4...++4--MINIMUM 7 C.F . GRAVEL PROPORTIONALLY AROUND BASE ------_l:i,;~,±-CONCRETE BLOCKING 12"x12"x6" CITY OF FORT WORTH, TEXAS STANDARD FIRE HYDRANT DATE: 08-2007 WTR-006 go· BENO, ROTATE DOWN OR UP AS NECESSARY NOTE: PROVIDE VERTICAL TIE DOWN BLOCK AS NECESSARY TEE go· BENO, ROTATE AS NECESSARY E2-25 CONSTRUCTION WATER MAIN -----+--- TEE WITH BRANCH ON 0% GRADE SLEEVE SAME SIZE AS SMALLER MAIN PLAN WATER MAIN RING CONNECTION ELEVATION CITY OF FORT WORTH, TEXAS TYPICAL RING CONNECTION NOTE : WATER MAIN OVER OR UNDER AS THE CASE MAY BE TEE, ROTA TE UP OR DOWN AS NECESSARY TEE, ROTATE AS NECESSARY PROVIDE VERTICAL & HORIZONTAL BLOCKING AS NECESSARY OR REQUIRED DATE : 08-2007 WTR-007 I-"E" NOTE : BEARING AREAS SHOWN ARE BASED ON 150 P .S.I.G TEST PRESSURE AND 3000 P .S.F. SOIL BEARING VALUE. 3000 PSI CONCRETE (TYP .) * DIMENSION "X" MAY VARY IF NECESSARY TO PROVIDE BEARING AGAINST UNDISTURBED TRENCH WALL HORIZONTAL BLOCKING TABLE "X" 11.25· 22.5" 45· 90· PIPE MAX MIN . MIN . MAX SIZE (FT.) "A " MIN . "B" MAX "C" non MIN . AREA VOL AREA VOL AREA VOL AREA 4 " 1.0 0 .90 0 .80 0 .05 0 .95 0.90 0 .05 0 .95 0 .90 0 .05 0 .91 0 .82 6 " 1.5 0.90 0 .80 0.05 0 .95 0 .90 0 .05 1.05 1.10 0 .05 1.73 1.99 8 " 1.5 0 .90 0 .80 0.05 0 .95 0 .90 0 .05 1.41 2 .00 0 .05 1.86 3.47 10· 1.5 0 .90 0 .80 0 .05 1.26 1.60 0 .05 1.79 3 .20 0 .10 2 .18 5 .62 12" 1.5 1.10 1.20 0.05 1.48 2 .30 0 .10 2 .14 4 .50 0 .20 2.83 8 .00 15• 2 .0 1.41 2 .00 0.10 2.00 4.00 0 .10 2 .83 8 .00 0.40 3.75 14.10 20· 2 .0 1.77 3 .10 0 .20 2 .54 6 .20 0 .30 3.52 12.40 0.60 4 .70 22.00 24" 2 .0 2 .14 4 .50 0 .25 3.00 9.00 0 .50 4.25 18.10 0 .95 5.65 32.00 30" 2.5 2.66 7.10 0 .55 3 .78 14.20 1.00 5 .30 28.20 1.75 7 .05 49.80 36" 2 .5 3 .33 10.00 0 .75 4 .50 20.40 1.40 6 .36 40.80 2 .65 8.50 72.00 42" 3 .0 3 .72 13.80 1.20 5 .25 27.60 2 .20 7 .41 55.30 4 .10 9 .90 97.50 48" 3 .0 4 .38 18.30 1.60 6 .00 36.00 2.90 8.48 72.00 5.40 11.14 126.50 54" 4 .0 4 .0 22.50 4 .0 6 .70 45.00 7 .00 9.40 88.00 10.00 13.00 162.00 NOTES: MAX VOL 0.05 0 .05 0 .10 0.20 0 .30 0 .65 1.15 1.85 3.40 5 .10 7.90 10.40 16 .00 MINIMUM AREAS SHOWN ARE IN SQUARE FEET. VOLUMES SHOWN ARE IN CUBIC YARDS . VERTICAL DIMENSIONS OF ALL BLOCK BEARING AREAS SHALL BE IDENTICAL TO THE HORIZONTAL DIMENSION SHOWN . E1 -20 MA TERI AL E2-20 CONSTRUCTION CITY OF FORT WORTH, TEXAS HORIZONTAL BLOCKING TEE & PLUG "E" MIN . MAX AREA VOL 1.16 0.58 0.05 1.19 1.41 0.05 1.57 2.46 0 .10 1.99 3.98 0.15 2 .38 5 .56 0.20 3 .16 10.00 0 .50 3 .94 15.55 0 .75 4 .76 22.60 1.05 5 .91 35.33 2 .10 7 .20 51 .00 2 .95 8.30 69 .00 4.75 9.50 90.03 6.15 10.70 115.00 12.00 DATE: 08-2007 WTR-008 3000 PSI CONCRETE BELL-BELL BEND TRENCH WIDTH : 1. PIPE 24" I.D . AND SMALLER = 24" OR O.D. + 12" WHICHEVER IS GREATER. 2 . PIPE LARGER THAN 24" = O.D. OF PIPE + 18". 3 . CRADLE SHALL EXTEND A MIN . OF 6" BEYOND EACH SIDE OF PIPE . ---ct--J_ 11 ·-0·1 ---lTYP .I RUBBER GASKET JOINT BELL -BELL BEND 3000 PSI CONCRETE KEEP A MIN. OF 1 '-0" CLEARANCE BETWEEN CONCRETE AND JOINTS OR BOLTS ON C.I. PIPE, OR IN EXCESS OF 1 '-0" AS DETAILED. E1-20 MATERIAL E2-20 CONSTRUCTION _ 11·-o"I ----i TYP . t- MECHANICAL JOINT MAIN --------ct-- ~ TYP. BELL AND SPIGOT JOINT CITY OF FORT WORTH . TEXAS CONCRETE CRADLE NOTE: WHEN CRADLE IS SHOWN OR SPECIFIED FOR INSTALLATION ON CONCRETE PIPE, THE FULL JOINT LENGTH OF THE PIPE OR FITTING SHALL BE CRADLED . DATE: 08-2007 WTR-009 CLASS "B" (2500 PSI) CONCRETE #4 STEEL BAR NOTE : Q) KEEP CONCRETE CLEAR OF PIPE JOINTS ANO BOLTS WRAP PIPE WITH 15# ROOFING FELT FORM AS NECESSARY 6 ,-.... z .._, a::: w r-8 w :!!: <( 0 _J <( z ~ 10 0 z w a_ 0::: 12 go· *VOL. REQ'D . (C .F.) 39.99 A (FT.) 2.50 B (FT.) 4 .00 C (FT .) 4 .00 *VOL. REQ 'O. (C .F.) 71 .09 A (FT.) 2 .83 B (FT.) 5.00 C (FT.) 5 .00 *VOL. REQ'D . (C .F.) 111 .07 A (FT.) 3.25 B (FT .) 5.90 C (FT.) 5 .90 *VOL. REQ'O . (C .F.) 159 .94 A (FT.) 4.17 B (FT.) 6.20 C (FT.) 6 .20 BENDS 45· 22.5" 21.64 11.03 1.42 1.00 3 .88 3 .36 3 .88 3 .36 38.47 19 .61 1.67 1.50 4.80 3.66 4 .80 3.66 60.11 30.65 1.92 1.75 5 .60 4.25 5 .60 4.25 86 .56 44.13 2.42 1.42 6.00 5.54 6.00 5 .54 *VOLUME CALCULATED ON THE BASIS OF CONCRETE REACTING 11 .25· 5 .54 0 .75 2.75 2.75 9 .85 1.00 3 .20 3.20 15.40 1.50 3 .25 3 .25 22.17 1.25 4.20 4 .20 THRUST ON THE RESPECTIVE BENDS UNDER AN INTERNAL PRESSURE E1 -20 MATERIAL E2-20 CONSTRUCTION OF 150 PSIG AT THE RA TE OF 150 LB . WT . PER CUBIC FEET OF CONCRETE . CITY OF FORT WORTH , TEXAS EXAMPLE A VERTICAL TIE-DOWN BLOCK DATE : 08-2007 WTR-010 ~ \ NOTE : KEEP CONCR ETE CL EAR OF PIP E JOIN TS AN D BOLTS. E1 -20 MATERIAL E2 -2 0 CONSTRU CTION NOTE : QU A NTITIES WIL L B E SPECIFIED ON PLANS OR DIRECTED B Y ENGINEER . CITY OF FORT WORTH , TEXAS EXAMPLE 8 VERTICAL TIE-DOWN BLOCK #4 BAR STEEL STRAPS IN VARI A BLE QU A NTITY DEPENDING ON THRUST FORM AS NECESSARY 2500 PSI CONCRETE DATE : 08-2007 WTR-011 NOTE: KEEP CONCRETE CLEAR OF PIPE JOINTS AND BOLTS . E1-20 MATERIAL E2-20 CONSTRUCTION (.) w #4 BAR STEEL STRAPS IN VARIABLE QUANTITY DEPENDING ON THRUST FORM AS NECESSARY 2500# CONCRETE :.,. _~....,.--4;::;;:;;---#4 BARS BOTH WAYS 6" C-C NOTE: QUANTITIES WILL BE SPECIFIED ON PLANS OR DIRECTED BY ENGINEER . CITY OF FORT WORTH, TEXAS EXAMPLE C VERTICAL TIE-DOWN BLOCK DATE : 08-2007 WTR-012 -r ___ 2_·_-_o·_· ---114_· -_o ___ .. _2_· -_o_·_· ---"l- 0 I ":st- CX) t MANHOLE COVER LETTERING ("WATER") TO BE 2-INCH 24" MANHOLE RING AND COVER MCKINLE Y IRON & STEEL CO . NO . A24AM WITH "WATER" CAST IN LID, OR EQUAL PRECAST CONCRETE GRADE RINGS PLAN 2" J.P . PLUG ON ~ OF CARRIER PIPE 24" BLIND FLANGE A.S.A . CLASS 125# CONCRETE COLLAR ----fA':'7~~~~q['T::-) J_ PER DETAIL SAN-009 Ill--~~ 2500 PSI CONCRETE, 4' ---tu,.:....::~i-f M.H. BARS "T" 9" C-C ,......; ...... ...._ ___ ......_....., ...... RAMNEK (TYP .) BARS #4 @ 12" C-C BARS #4 @ 9" C-C BARS #4 @ 18" C-C WRAP PIPE WITH FORM AND FILL VOID WITH 2500 PSI CONCRETE CASI NG PIPE CARRIER P IPE (24" MIN .) STEEL BOLT GAS K ET BRONZE NUT NECESSARY LENGTHS OF 48" REINFORCED CONCRETE PIPE A .S. T.M. C 76, CLASS Ill OR EQUAL TO BE SET ON VAULT WALLS . SEAL JOINTS WITH CONCRETE. CASING PIPE PREMOLD MA TERI AL ====:!!t:!!:::i!o::t======!:!::::::==l=====!:!::::::==l====t====='4===!i=. WRAP PIPE WITH PREM OLD MA TERI AL CARRIER PIPE #4 BARS DOWELS @ 18" C-C ALL AROUND EXCEPT IN WAY OF PIPE 3000 PSI CONCRETE E1 -20 MA TERI AL E2-20 CONSTRUCTION SECTION CITY OF FORT WORTH, TEXAS ACCESS MANHOLE 8" THICK FLOOR SLAB BOTH WAYS DATE : 08-2007 WTR-013 E1-11 MATER IAL E2-11 CONSTRUCTION CONCRETE COLLAR PER DETAIL SAN-009 (D 1" AIR RELEASE VALVE , 2 EA . CLOSE NIPPLES, 2 EA . 12" LENGTH COPPER OR BRASS RISERS, 2 EA. GATE VALVES , AND 1 EA . TEE. ® L 1\" x 1\" x \" x 46" WITH 1 EA . 18 " DIA. U-CLAMP . EACH END OF ANGLE TO BE BOLTED TO FLOOR SLAB WITH W LAG BOLTS. ANGLE TO BE TREATED WITH 2 COATS OF PRIMER PRIOR TO INSTALLATION . @ WATER MAIN WITH THREADED INSULATOR TAP. NOTE : REFER TO DETAIL WTR-015 AND WTR-016 FOR VAULT MATERIALS AND DIMENSIONS . CITY OF FORT WORTH, TEXAS 1" AIR RELEASE VALVE DATE: 08-2007 WTR-014 N = :i. N-~:::E NOTE : UNDISTURBED TRENCH WALL 24"x40" SHALLOW MANHOLE TYPE TO BE USED IF TOTAL DEPTH LESS THAN 4 FEET, McKINLEY IRON WORKS NO . PM 24x40 OR EQUAL. MATERIALS t CX) l B NOTE : SEE DETAIL WTR-016 FOR DIMENSIONS (D 24" STD . MANHOLE COVER EQUAL TO McKINLEY I.W . NO. A24AM WITH "WATER" CAST IN LID (2-INCH LETTERING). (J) CONCRETE COLLAR PER DETAIL SAN-009 . @ © @ ® (J) GRADE ADJUSTMENT GRADE RINGS, 8" IN STREET R.O .W. OR UNDER PAVEMENT . TOP & BOTTOM SLABS , CLASS 'F' (4000 PSI) CONCRETE W/ #6 BARS SPACED 6" c/c EACH WAY . STEEL BAR COVER ~" ± ~" FROM BOTTOM OF EACH SLAB . POLYURETHANE CUSHION PAD-5'x7' MIN. WATER MAIN WITH FLANGE ACCESS AS APPLICABLE . COMBINATION AIR & VACUUM RELEASE VALVE, CLOSE NIPPLES, TEE, 2 EA . GATE VALVES . NIPPLES TO CONFORM TO E 1 -9.4 E1 -11 MA TERI AL E2-11 CONSTRUCTION CITY OF FORT WORTH , TEXAS 2" & 3" COMBINATION AIR AND VACUUM RELEASE VALVE DATE : 08-2007 WTR-015 A L : a.: N>-~1- ( 48" RCCP RISERS) REF : E1-12 A J (CONTINUED FROM WTR-015) NO. 6 BARS 6" C/C © SECTION 8-8 DIMENSIONS WHEN EXHAUST PIPING IS REQUIRED, MINIMUM DIMENSION SHALL BE LENGTH OF VAULT RISER TONGUE PLUS 1 ". WHEN EXHAUST PIPING IS NOT REQUIRED , MINIMUM DIMENSION SHALL BE LENGTH OF VAULT RISER TONGUE PLUS 1 ", (APPROX . 5") 2" FITIINGS, USING CLOSE NIPPLES, MINIMUM DIMENSION SHALL BE 1 '-81fs"; 3 " FITIINGS, USING CLOSE NIPPLES, MINIMUM DIMENSION SHALL BE 2' -'%". MINIMUM DIMENSIONS NOM INAL IN ST ALLA TION ON INSTALLATION ON C/L PIPE TO SIZE BLIND FLANGE SURF ACE OF PIPE COLLAR 2" * )2,, ** 1Xs" 3 " * %" ** 7%" * MINIMUM DIMENSION BASED ON RECOMMENDED INSTALLATION OF CLOSE NIPPLE . ** MINIMUM DIMENSION BASED ON RECOMMENDED INSTALLATION OF CLOSE NIPPLE ON FLANGED OUTLET WITH INSULATED FLANGE TO THREAD KIT. ® OFF-SET TO BE 6" FROM C/L WHEN INSTALLATION IS REQUIRED ON BLIND FLANGE OF ACCESS OUTLET . OTHER INSTALLATIONS SHALL BE ON TOP C/L OF MAIN . El-11 MATERIAL E2-11 CONSTRUCTION CITY OF FORT WORTH, TEXAS 2" & 3" COMBINATION AIR AND VACUUM RELEASE VALVE DATE : 08-2007 WTR-016 / PROVIDE M.J. TEE FOR D.I. PIPE OR M.J. BELL OUTLET FOR CONCRETE PIPE WITH ANCHOR COUPLING IN EACH CASE SEE DETAIL WTR-002 M.J. GATE VALVE 2500 PSI CONCRETE SUPPORT 16" DIA . 6" MIN. SEAL PIPE TO WALL HOLE CUT-OUT WITH NON-SHRINK MORTAR EQUAL TO 1 PART ALCRETE, 1 PART CEMENT, 6 PARTS SAND . E1-20 MATERIAL E2-20 CONSTRUCTION DETAILS OF CONSTRUCTION SHALL CONFORM TO FIGURE SAN-003 . CLASS 'F' ( 4000 PSI) CONCRETE WITH NO . 6 STEEL BARS SPACED 6" C/C EACH WAY . STEEL BAR COVER TO BE 2" MIN ., 3" MAX . FROM BOTIOM OF TOP SLAB AND FROM TOP OF FLOOR SLAB . CITY OF FORT WORTH, TEXAS STANDARD BLOW-OFF INTO 4' DIAMETER SUMP MANHOLE DATE : 08-2007 WTR-017 EXISTING SURF ACE E1-7 MA TERI AL E2-7 CONSTRUCTION G) @ BACKFILL AS APPROPRIATE 6" MIN. DIMENSION . 6" MAX. FOR PAY PURPOSES WHEN BID PER CUBIC YARD . G) 6" MIN. DIMENSION. MAX . FOR PAY PURPOSES SHALL BE 6" ON MAINS 24" AND SMALLER, 9" ON MAINS 30" AND LARGER WHEN BID PER CUBIC YARD . 4" MIN . DIMENSION . 4" MAX. FOR PAY PURPOSES WHEN BID PER CUBIC YARD. CLASS 'E' (1500 PSI) CONCRETE. CONCRETE ENCASEMENT SHALL STOP 1' EITHER SIDE OF JOINT, AND WHEN ENCASING CONCRETE PRESSURE PIPE, FULL LENGTHS OF PIPE SHALL BE ENCASED, JOINTS EXCLUDED. CITY OF FORT WORTH, TEXAS CONCRETE ENCASEMENT DATE : 08-2007 WTR-018 / NOTE: ALL PIPE SHALL BE LAID TO GRADE AS SHOWN ON THE PLANS. CARRIER PIPE VARIOUS TYPES OF CASING PIPE MAY BE USED, CONCRETE, STEEL OR CORRUGATED METAL AS PERMITTED BY THE PLANS AND SPECIFICATIONS. NOTE: ALL PIPE SHALL BE LAID TO GRADE AS SHOWN ON THE PLANS. CARRIER PIPE VARIOUS TYPES OF CASING PIPE MAY BE USED, CONCRETE, STEEL OR CORRUGATED METAL AS PERMITTED BY THE PLANS AND SPECIFICATIONS. E1-15 MATERIAL E2-15 ~ONSTRIJCTION TUNNELED SECTION OPEN CUT OR BORED SECTION CITY OF FORT WORTH, TEXAS CASING DETAILS PRESSURE GROUT BETWEEN CASING AND SURROUNDING EARTH TUNNEL LINER OR CASING PIPE AS REQUIRED. WATER LINES SHALL BE SECURED BY CASING SPACERS AS MANUFACTURED BY CASCADE WATERWORKS MANUFACTURING CO ., ADVANCE PRODUCTS & SYSTEMS, OR APPROVED EQUAL. NOTE : ADEQUATE SKIDS SHALL BE FURNISHED AND INSTALLED BY THE CONTRACTOR AS NECESSARY TO FACILITATE INSTALLATION OF CARRIER PIPE . CASING PIPE WATER LINES SHALL BE SECURED BY CASING SPACERS AS MANUFACTURED BY CASCADE WATERWORKS MANUFACTURING CO., ADVANCE PRODUCTS & SYSTEMS, OR APPROVED EQUAL. NOTE: ADEQUATE SKIDS SHALL BE FURNISHED AND INSTALLED BY THE CONTRACTOR AS NECESSARY TO FACILITATE INSTALLATION OF CARRIER PIPE. DATE: 08-2007 WTR-019 ' . . ,, . , . ,' .... 111e---,,--:;:,,..,,.,,----PIERS SHALL BE ALIGNED TO CENTER LINE OF DRAINAGE CHANNEL AT POINT OF CROSSING, WITH PIER PLACEMENT 3 ' MAX . EITHER SIDE OF PIPE JOINT. REFER TO . DETAIL SAN-018 FOR CONCRETE PIER DETAILS , AND SPECIFIC PROJECT PLA NS FOR NUMBER OF PIER S ANO HEIGHT DIMENSIONS . CITY OF FORT WORTH , TEXAS TYPICAL ELEVATED CROSSING DATE : 08-2007 WTR-020 L EXISTING SEWER LINE . -==i==] PROPOSED WATER MAIN G) VARIABLE TRENCH WIDTH. PIPE LENGTH SHALL BE MEASURED AS STANDARD TRENCH WIDTH, (REF . E2-2.16), PLUS FOUR FEET (4'). NO JOINTS WILL BE ALLOWED WITHIN THIS DIMENSION . A MINIMUM BEARING OF 24" SHALL BE REQUIRED ON EACH SIDE OF THE TRENCH. @ SEWER LINES LESS THAN TWELVE INCHES ( 12") IN DIAMETER SHALL BE REPLACED WITH CLASS 150 CAST IRON PIPE . SEWER SERVICE LINES SHALL BE REPLACED WITH EXTRA STRENGTH CAST IRON SOIL PIPE. THE JOINING OF DUCTILE IRON PIPE, CONCRETE PIPE, OR SDR-26 , AS DIRECTED BY THE ENGINEER, SHALL BE MADE WITH URETHANE OR NEOPRENE COUPLING ATSM C-425 SERIES 300 STAINLESS STEEL COMPRESSION STRAPS OR WITH APPROVED ADAPTORS. THE MINIMUM CLEARANCE OF SEWER TO WATER LINES SHALL BE EIGHTEEN INCHES (18"). E1-7 MATERIAL E2-2 CONSTRUCTION CITY OF FORT WORTH, TEXAS SANITARY SEWER PIPE REPLACEMENT DATE: 08-2007 WTR-021 G) EXISTING SURFACE 1~" TYP. EXISTING SEWER LINE li3 " TYP . t 3" TYP . 1)1z" TYP . 12" C/C TYP . PROPOSED WATER MAIN : c.o ''"-'-#6 GAUGE WELDED WIRE MESH , LENGTH OF ENCASEMENT MINUS 3 " OUTSIDE DIAMETER OF BEL L 3" TYP. 6" C/C TYP. SECTION A-A VARIABLE TRENCH WIDTH . CLASS 'B ' (2500 PSI) REINFORCED CONCRETE SUPPORT BEAM AND ENCASEMENT LENGTH SHALL BE MEASURED AS THE STANDARD TRENCH WIDTH, (REF. E2-2 .1 6), PLUS FOUR FEET (4 '). A MINIMUM BEARING OF 24 " ON UNDISTURBED EARTH SHALL BE REQUIRED ON EACH SIDE OF THE TRENCH. @ CLASS 'B' (2500 PSI) REINFORCED CONCRETE SHALL BE USED IN CONSTRUCTION OF A SUPPORT BEAM AND ENCASEMEN T FOR SEWER LINES TWELVE INCHES (12") DIAMETER AND LARGER . SEWER LINES LESS THAN TWELVE INCHES (12 ") DIAMETER , WITH EXCEPTION OF SEWER SERVICE LINES, SHALL BE REPLACED BY DUCTILE IRON PIPE OR SOR 26 OR SUPPORTED BY AFOREMENTIONED CONCRETE ENCASEME NT, PER NOTE 2 , DETAIL WTR-021 . CITY OF FORT WORTH, TEXAS SANITARY SEWER PIPE TRENCH CROSSING DATE : 08-2007 WTR-022 NOTE : IN LIEU OF PRE-CAST CONCRETE MANHOLE PIPE POURED IN PLACE 2500 PSI CONCRETE MANHOLES WITH 8" WALLS, AND #4 BARS 6" C-C EACH WAY MAY BE USED . (/J w ~ <i > 24"x 40" FORT WORTH STD . MANHOLE COVER WITH WORD "WATER" (2" LETTERING) CAST IN IT. MIN . WEIGHT 336 LBS. (McKINLEY 1.W. NO . PM 24x40 OR EQUAL) CONCRETE GRADE RINGS CON CRETE COLLAR PER DETAIL SAN-009 2500 PSI CONC . 1" COMBINATION AIR RELEASE VALVE .· ,.: ·2-#4 · . : . ·.qRCU..LAR : · . :·:· (; ·, ... ·. BARS . ,. _. -··. ,...,_,,_ · .. : . :-_ .. . . . : . . ~ . , .. · .. · -:-t": COR'f:>ORATION COCK · FOR ·. .. PiTQT_· (Ut>iDER. OPEN .IN.G) .. · . --·"--. -... :· . 48" .REINFORCED .... · . ····C.ON'CR.EIT -.i,,/ ·.··. ·. · · .MANHOLE PIPE TEE If \'.}'.'Jl'JJ{ . ., .. :mA· · .. · . ;. ·· .... ·.:#4:BARS@ 6" . : > .· NIPPLt _.·. ' ·· · · .<>::_c . ·so TH WAYS -~~-W_ATER M-'-'-'A-"1.:...:.N~~- . : ... .. . .. ..--: ••• i. __ ··.·-:-·· •• : ... ~ ·. . . .. . . . . . NOTE : FOR 2" OR 3" AIR RELEASE VALVE PROVIDE REDUCER TO RECEIVE A 1" CORPORATION COCK . NOTE: SEE ALSO DETAIL WTR-014 E1-11 MATERIAL E2-11 CONSTRUCTION CITY OF FORT WORTH, TEXAS COMBINATION 1" AIR RELEASE VALVE AND 1" PITOT CONNECTION DATE : 08-2007 WTR-023 2 " CORP . STOP E1-10 MATERIAL E2-10 CONSTRUCTION :i •·.,· .. ,. -~.) .ii.::, CORP . RISER PER WTR-005 I-24" --1 ,·. ~ '·:· ' .. • .. . •, :·'!'~· ....... . ~. : ,•, ~ ·-.·~-~· ~· ,:. ·,,-t :· .. ~ :.•. ,, '·' --: .. · 54" C 76 TYPE Ill CONCRETE PIPE ' . ,· ·~ •:.•· ' ~-.. 1 o" ··,::, 2" CORP . STOP CITY OF FORT WORTH, TEXAS INSTALLATION OF 16" GATE VALVE WITH 2" BYPASS NO . 4 BARS @ 6" C-C BOTH WAYS NO . 4 BARS @ 12" C-C BOTH WAYS DATE : 08-2007 WTR-024 2"x*" BUSHING & W' SAMPLING TAP E2-24 CONSTRUCTION ·x ~ <( ~~ ob I I Nin WA TER LINE NOTE : ~2" GATE VALVE 2" SHORT NIPPLE 2 " TEE i------r---AFTER STERILIZATION REMOVE PIP ING AND INSTA LL PLUG Il l Ill Il l II ' ', , , ' ' 'I I JU, I ,ill~ II II 111 2" COUPLIN G TO BE j j== PLUGGED W/ 2 " C.I. = P LUG AFTER SAMPLING CON CRETE BLO CKING PER DETA IL WTR-008 CHLORINATION BLOWOFF AND SAMPLE POINT FOR DEADEND WATER PIPING . CONTRACTOR IS TO FURNISH ALL LABOR AND MATERIALS. MATERIAL WILL BE REMOVED AND RETAINED BY THE CONTRA CTOR AFTER SATISFACTORY SAMPLES HAVE BEEN OBTAINED . CITY OF FORT WO RTH, TEXAS DATE : 08-2007 END PLUG CHLORINATION BLOWOFF AND SAMPLING PO INT WTR-025 CD @ ® ® (j) NOTES: 6" BLIND FLANGE TAPPED 2" WITH 2" BRASS PLUG 125# PATTERN BLIND FLANGE DRILLED AND TAPPED FOR 6" BLIND FLANGE. 6" BLIND FLANGE ATTACHED WITH BRONZE BOLTS . GASKETS SHALL BE FULL FACED AS OTHERWISE REQUIRED IN E 2-4. LIFTING LUGS SHALL BE PROVIDED IN QUANTITIES SUFFICIEN T TO LOFT AND HANDLE THE FLANGE AS A BALANCED LOAD . ATTACH THE 125# PATTERN BLIND FLANGE WITH STEEL BOLTS AND BRONZE NUTS THEN COVER WITH CEMENT GROUT AFTER INSTALLATION . 125# PATTERN FLANGE , UNLESS REQUIRED OTHERWISE . FLANGES AND BLIND FLANGES TO BE DESIGNED TO WITHSTAND PRESSURE RA TING OF PIPE . WYE BRANCH TO BE ONE SIZE LARGER THAN , BUT TAPERED TO STANDARD RUN NORMAL DIAMETER UNLESS OTHERWISE SPECIFIED. STANDARD RUN DIAMETER E1-4 MATERIAL E2-4 CONSTRUCTION CITY OF FORT WORTH , TEXAS STANDARD CLEANING WYE DATE: 08-2007 WTR-026 NOTE : WHEN A FIRE HYDRANT IS LOCATED AT END OF MAINS 6" AND 8" IN DIAMETER, WYE MAY BE OMITTED . CONTRACTOR WILL MAKE A REASONABLE EFFORT TO PREVENT BACK-FLOW OF PURGED WATER (SEE E2-24) FLOW E1-7 MATERIAL E2-7. CONSTRUCTION 1. INSTALL M.J. WYE AT TERMINAL END OF MAIN. 2. PLUG THE STRAIGHT RUN OF THE WYE AS SHOWN . 3 . AFTER CLEANING WITH POLY-PIG, INSTALL BRANCH END PLUG . CITY OF FORT WORTH, TEXAS CLEANING WYE DETAIL FOR NON-LOOPED SYSTEM 12" AND UNDER DATE: 08-2007 WTR-027 2'-6 " 2'-6" J · · J · .. I -$--+--~ I I -t--- _ffi_ 'i7' -t--$- PLAN VIEW 4-6 " DIA . STEEL GUARD POST FILLED WITH CONCRETE E1-12 MATERIAL E2-12 CONSTRUCTION c.D I N c.D I CONCRETE SET POST IN CONCRETE I· c.D I N c.D I N 2 '-6 " CITY OF FORT WORTH , TEXAS FIRE HYDRANT BARRICADE 2'-6" .. I w z :J >-1- Cl'.'. w Q_ 0 Cl'.'. Q_ J--6" MIN . DATE: 08-2007 WTR-028 3000 P .S.I. @ 28 DAY CONCRETE WITH A.S.T.M. #5 @ 12" CTR. GRADE 60 K.S.I. REINFORCEMENT PAVEMENT V VALVE BOX OPENING REQUIRED FOR VALVES 3 " AND LARGER INSIDE VAULT Q'-9" #5 X ~ ~" CTR . -1----=t~;.JI 2'-6" "° (FOR ACCESS .,J, OPENING) 1'-6" [k1'1;.;H,---#~~@ 12" CTR. 2'-6" KEYED JOINT THRUST BLOCK SYMBQLS · 8" 8" @ -FITTINGS AND MATERIALS 6'-4" LIST ITEMS, (SEE SHEET N0.2) SEQIIQN B-B TURBINE METER BY-PASS METER PIPE PIPE SIZE DIA . DIA . A B C 3" 4" 2 " 13'-0" 2'-7" 2 '-7" 4 " 4" 2· 13'-7~" 3'-2~" 6" 6" 4• 15'-5" 4 '-1~" 8" 8 " 6" 16'-4" 4 '-3" 10" 10" 6" 18'-10" 6'-3" NOTES : 1. ALL THRUST BLOCKING SHALL BE IN ACCORDANCE WITH FIGURE (9) OF THE GENERAL CONTRACT DOCUMENTS . 2 '-7" 3 '-~" 4'-3" 4'-9" 2 . IF VALVE OPERATING NUT IS MORE THAN (3) FEET BELOW GROUND OR PAVING SURFACE, PROVIDE EXTENSION STEM TO ONE-FOOT BELOW GROUND OR PAVING SURFACE . 3 . ACCESS OPENING CENTERED OVER METER . A.) H-20 LOADING-24"x40" C.I. FRAME AND COVER MARKED "WATER", McKINLE Y (KM . 24"x40") OR EQUAL. PIPING DIMENSIONS D E F G H J 2'-8" 8" 2'-6" 1'-0" 1'-6" 1'-6" 2'-8" 8" 2'-5" 1'-2" 1'-6" 1'-5" 2'-8" 1'-4" 1·-2~· 2 '-3J&" 1'-6" 1'-6" 2'-8" 2 '-0" 111&· 2'-6%" 1'-6" 1'-6" 2'-8" 3'-0" 6" 3 '-5" 1'-8" 11.la" 4 . WRAP ALL PIPING PENETRATIONS THROUGH WALL WITH 8 MIL POLYETHYLENE . 5 . 6-INCH TURBINE METER IS THE MINIMUM METER SIZE WITH 6-INCH DIA . BY-PASS FOR FIRE PROTECTION . 6 . ALL METERS INSTALLED TO BE COMBINATION TYPE . 7 . WATER SAMPLING POINT FOR 4 -INCH OR LARGER METERS . B I : 6'-6" I --8"• A YAULI -PLAN A ·18" CON C. PIPE FOR SUMP SECTION A-A B.) NON H-20 LOADING 30"x36 " STEEL SINGLE LEAF DOOR , BILCO TYPE J MODEL OR EQUAL. 4. CONCRETE FINISHES SHALL BE IN ACCORDANCE WITH SECTION E2-20 OF THE GENERAL CONTRACT DOCUMENTS. CITY OF FORT WORTH , TEXAS COMBINATION TURBINE MET ER VAULT I NSTA L LAT ION W IT H BY PA SS C A DIRECTION OF FLOW OR UNDIS TURBED EARTH DATE : 08-2007 W T R-02 9 SHEET 1 OF 2 3• MEIEB YdJH 2• BYPASS CD 4-INCH X 2-INCH BRONZE TAP SADDLE (DOUBLE STRAP) W/ CORPORATION STOP (FLARED) 0 4-INCH 0 .1. PIPE (CLASS 51) 0 4-INCH GATE VALVE (MECHANICAL JOINT /RETAINER GLAND) 0 4-INCH X 3-INCH REDUCER (MECHANICAL JOINT/P.E.) W/ 3-INCH 0 .1. FLANGED ADAPTER ® © 0 ® ® @ @ @ 3-INCH TURBO-METER, FLANGE (PURCHASED BY CONTRACTOR FROM WATER DEPT .) 4-INCH X 3-INCH REDUCER (FLANGE) 4-INCH FLANGE COUPLING ADAPTER 4-INCH BRONZE TAP SADDLE (2-INCH TAP SIZE), 2-INCH DIA . BRASS NIPPLE (THREADED), 2-INCH BRASS GATE VALVE (THREADED) AND 2-INCH BRASS PLUG (THREADED) 2 -IN CH COPPER TUBING (TYPE "K") 2-INCH 90' ELBOW (FLARED) 2-INCH BRASS GATE VALVE W/ (2) 2-INCH BRASS MALE FITTING ADAPTER (FLARED TO THREAD) ~-INCH C.I. VALVE BOX AND COVER (MARKED "WATER") 4-INCH BRONZE TAP SADDLE (3/4-INCH TAPSIZE); 3/4-INCH DIA. BRASS NIPPLE (THREAD); 3/4-INCH BRASS GATE VALVE (THREAD) AND 3/4-INCH BRASS PLUG (THREAD). (THIS OUTLET IS FOR WATER SAMPLE STATION ATTACHMENT WHEN REQUIRED) FITTINGS AND MATERIALS LIST CD 4-INCH X 2-INCH BRONZE TAP CD 6-INCH X 6-INCH X 4-INCH SADDLE (DOUBLE STRAP) W/ 0 .1. TEE (MECHANICAL CORPORATION STOP (FLARED) JOINT/RETAINER GLAND) 0 4-INCH 0.1. PIPE (CLASS 51) 0 4-INCH GATE VALVE (MECHANICAL JOINT /RETAINER GLAND) 0 4-INCH 0 .1. FLANGE ADAPTER ® 4-INCH TURBO-METER, FLANGE (PURCHASED BY CONTRACTOR FROM WATER DEPT .) © 4-INCH FLANGE COUPLING ADAPTER 0 4-INCH BRONZE TAP SADDLE (2-INCH TAP SIZE), 2-INCH DIA . BRASS NIPPLE (THREADED), 2-INCH BRASS GATE VALVE (THREADED) AND 2-INCH BRASS PLUG (THRE ADED) ® 2-INCH COPPER TUBING (TYPE "K") ® 2-INCH 90' ELBOW (FLARED) @ 2-INCH BRASS GATE VALVE W/ (2) 2-INCH BRASS MALE FITTING ADAPTER (FLARED TO THREAD) @ ~-INCH C.I. VALVE BOX AND COVER (MARKED "WATER") @ 4-INCH BRONZE TAP SADDLE (3/4-INCH TAPSIZE); 3/4-INCH DIA . BRASS NIPPLE (THREAD); 3/4-INCH BRASS GATE VALVE (THREAD) AND 3/4-INCH BRASS PLUG (THREAD). (THIS OUTLET IS FOR WATER SAMPLE STATION ATTACHMENT WHEN REQUIRED) 0 6-INCH 0 .1. PIPE (CLASS 51) 0 6-INCH GATE VALVE (MECHANICAL JOINT /RETAINER GLAND) 0 6-INCH 0 .1. FLANGE ADAPTER ® 6-INCH TURB O-METER W/ STRAINER (PURCHASED BY CONTRACTOR FROM WATER DEPT.) © 0 6-INCH FLANGE COUPLING ADAPTER 6-INCH BRONZE TAP SADDLE (2-INCH TAP SIZE), 2-INCH DIA . BRASS NIPPLE (THREADED), 2-INCH BRASS GATE VALVE (THREADED) AND 2-INCH BRASS PLUG (THREADED) ® 4-INCH 0 .1. PIPE (CLASS 51) ® 4-INCH 90' BEND (MECHANICAL JOINT /RETAINER GLAND) @ 4-INCH GATE VALVE (MECHANICAL JOINT/RETAINER GLAND) @ ~-INCH C.I. VALVE BO X AND COVER (MARKED "WATER ") @ 6-INCH BRONZE TAP SADDLE (3/4-INCH TAPSIZE); 3/4-INCH DIA. BRASS NIPPLE (THREAD); 3/4-INCH BRASS GATE VALVE (THREAD) AND 3 /4-INCH BRASS PLUG (THREAD). (THIS OUTLET IS FOR WATER SAMPLE STATION ATTACHMENT WHEN REQUIRED) s· MEIEB W!JH s· BYPASS CD 8-INCH X 8-INCH x 6-INCH 0 .1. TEE (MECHANICAL JOINT /RETAINER GLAND) 0 8-INCH 0 .1. PIPE (CLASS 51) 0 8-INCH GATE VALVE (MECHANICAL JOINT /RETAINER GLAND) 0 8-INCH 0 .1. FLANGE ADAPTER ® 8-INCH TURBO-METER W/ STRAINER (PURCHASED BY CONTRACTOR FROM WATER DEPT.) ® 0 8-INCH FLANGE COUPLING ADAPTER 8-INCH BRONZE TAP SADDLE (2-INCH TAP SIZE), 2-INCH DIA . BRASS NIPPLE (THREADED), 2-INCH BRASS GATE VALVE (THREADED) AND 2-INCH BRASS PLUG (THREADED) ® 6-INCH 0 .1. PIPE (CLASS 51) ® 6-INCH 90' BEND (MECHANICAL JOINT/RETAINER GLAND) @ 6-INCH GATE VALVE (MECHANICAL JOINT /RETAINER GLAND) @ ~-INCH C.I. VALVE BO X AND COVER (MARKED "WATER") @ 8-INCH BRONZE TAP SADDLE (3/4-INCH TAPSIZE); 3/4-INCH DIA . BRASS NIPPLE (THREA D); 3/4-INCH BRASS GATE VALVE (THREAD) AND 3/4-INCH BRASS PLUG (THREAD). (THIS OUTLET IS FOR WATER SAMPLE STATION ATTACHMENT WHEN REQUIRED) 10• MEIEB WTIH s• BYPASS CD 10-INCH X 10-INCH x 6-INCH 0.1. TEE (MECHANICAL JOINT /RETAINER GLAND) 0 10-INCH 0 .1. PIPE (CLASS 51) 0 10-INCH GATE VALVE (MECHANICAL JOI NT /RETA IN ER GLAND) 0 10-INCH 0.1 . FLANGE ADAPTER ® 10-INCH TURBO-METER W/ STRAINER (PURCHASED BY CONTRACTOR FROM WATER DEPT .) © 0 10-INCH FLANGE COUPLING ADAPTER 10-INCH BRONZE TAP SADDLE (2-INCH TAP SIZE), 2-INCH DIA. BRASS NIPPLE (THREADED), 2-INCH BRASS GATE VALVE (THREADED) AND 2-INCH BRASS PLUG (THREADED) ® 6-INCH 0 .1 . PIPE (CLASS 51) ® 6-INCH 90' BEND (MECHANICAL JOINT /R ETAINER GLAND) @ 6-INCH GATE VALVE (MECHANICAL JOINT /RETAINER GLAND) @ ~-INCH C.I. VALVE BO X ANO COVER (MARKED "WATER") @ 10-IN CH BRONZE TAP SADDLE (3/4-INCH TAPSIZE); 3/4-INCH DIA . BRASS NIPPLE (THREAD); 3/4-INCH BRASS GATE VALVE (THREAD) AND 3/4-INCH BRASS PLUG (THREAD). (THIS OUTLET IS FOR WATER SAMPLE STATION ATTACHMENT WHEN REQUIRED) NOTE: ALL THREADED JOINT SHALL CONFORM TO THE AMERICAN NATIONAL TAPER PIPE THREAD , ASA 82.1 OR FG GGG-P-351 A . F01trWoim1 CITY OF FORT WORTH , TEXAS COMBINATION TURBINE METER VAULT INSTALLATION WITH BYPASS DATE : 08-2007 WTR-029 SHEET 2 OF 2 @ ® © @ ® MATERIALS STANDARD ~:' CORPORA TION (W/ TAP SADDLE WHEN REQUIRED ) STANDARD W' CURB STOP & 90 ELBOW *" TYPE K COPPER SERVICE LINE ~-@ Eclipse™ No . 88 SAMPLING STATION WITH 12" DEPTH OF BURY 2'x2' CONCRE TE PAD, CLASS 'B ' CONCRETE (25 00 PSI) W/ #4 REBAR @ 12" C-C EACH WAY; 3" MIN . CLEAR COVER 30" MIN . WATER MAIN . ·:· ·~-·~·:·~ fJ:Ni1'.Jtl1~l NOTES . <.O I n <.O ® 1. BACKFILL TRENCH AREA WITH SAND . 2. PLACE SAM PLING ST A TION NEXT TO POWER POLE, ELEV ATED TANK, STREET SIGN, TREE , OR FIRE HY DRANT . 3 . PLACE SAMPLING STATION WITH DOOR FAC ING STREET . 4 . INSTALL SA MPLIN G STAT IO N ON "SHOR T SIDE" OF STREET. °N J_ 5 . WHEN PLACING STATION NEXT TO FIRE HYDR ANT, DO NOT TAP FIRE HYDRANT LEAD & MAINTAIN DISTANC E OF 4' FOR PROPER OPERATION OF FIRE HYDRANT. 6. IN LIEU OF TAPPING MA IN, CONNECT TO EXISTING LARGE VALVE COPPER RISERS WHEN POSSIBLE . CITY OF FORT WORTH , TEXAS WATER SAMPLING STATION DATE : 08-2007 WTR-030 11 .la" I •[283mm( I rf-11131 COYER SECTION 12 %" [327mm] *" LETTERING (RECESSED FLUSH) 11 %" 1 %" 1•[289mrn(1 SJ I 9 %" I ~ 12" [251mmj [305mm] I::::=::~ _j_ [ 476mm] BOX SECTION 1 ~"R [R38mm] %" [16mm] 18 " [ 457mm] 1 *" l--2 Jf [ 44rnrnJL I [54mm] ~ T: ~,'. [Bm~] ? 'X," [8mm] COVER SECTION I· 1· 1- 20" [508mm] 18 \" [ 464mm] 16 *" [ 425mm] 21" [533mm] 24" [610mm] · I -1 ·I BOX SECTION NOTE: FORT WORTH LOGO IS OPTIONAL. CITY OF FORT WORTH , TEXAS DATE : 08-2007 CLASS 'A' STANDARD PLASTIC METER BOX W/ CAST IRON LID FOR %11 & 1" METERS WTR-031 /1 J J J J \ J ~ \ JI 1\ l[ ][][ ][ ?r:lrltU l[ l[ l[ Jl]l l(Jl l[ l[l[ l[ l[ffff ff llll JI X J ~ I ~ I l ~ ; "" -& ) 3 ~ i!I. ~ a ~ !l ~ w X X 15 715 " [386mm ] ." l[ X • .. X • ll J ,r " " ••X l[ "" ][ l[ l[l[ l[ PLAN VI EW 26 w· [679mm] 13 Xi" 11 13 Xi " X " X I/ ,i. 1 ~"R [R38mm] [337mm] II [337mm] Ir 1 %" 11 _1_[ 44mm] ij r:-:,rn te:::Jl w COYER SECTION II J --j ~6 .. [8mm] 30" [762mm] 27" [686 m m] L ~::::;=;:====;:::::=;===;:~~ 1 1 %" [ 44mm] 1 2" [305mm] ~===============~ _l I . 25" [635mm] BOX SECTION . , n= 18" 15 ~s" [ 457mm] [392mm] LL ----7-,, ,, I \ ' ' -~- _J_ 3" [76mm] t -----4" [102mm ] BOX SECTION NOT E: FORT WORTH LOGO IS OPTIONAL. ! 14" [356mm] j CITY OF FORT WORTH , TEXAS DATE : 08 -2007 CLASS 'B' STANDARD PLASTIC METER BOX W/ CAST IRON LID FOR 11'2" & 2" METERS WTR-032 t ._J %' [16m m] rrr r. ... ~ A"I~ J Ill II Ill I J ~ II Ill I JI J J '1M ~ a; ~ ~ 0::0:: ~ ~ ~ WW ~';l ~ ~t;j ~ ss m ~ 31:~ ~ ~ ~ ... n"il J J -J J II J I llJ J J J J • . .,:..,.11.,,, .. :II. _,) I 14 12" [368mm] L l 17" 18 %" [ 432mm] [ 467mm] L~-J 2"R [R51 MM] PLAN VIEW COVER SECTION I 11 *" I • [298mm] • 16 ~ .. [419mm] 2){(--~ [54mm] %" Ir 1 ~ .. f&.§,;4 ,c Om:] l.j __r38mm] ~ "-:-II--E~6:-r [8~m] [8mm ] COVER SECTION 18 ~ .. ~I • __ [ 47-9m_mJ ___ • I _J_ I I· 20 ~ .. [514mm] BOX SECTION L1 w [38mm] • I BOX SECTION NOTE : FORT WORTH LOGO IS OPTIONAL. CITY OF FORT WORTH , TEXAS DATE : 08-2007 CLASS "C" STANDARD PLASTIC METER BOX W/ CAST IRON LID FOR 2 -%" METERS WTR-033 ( -- -----+1+--,-+---TYPE "c" BAC K FILL MINIMUM 6" INITIAL-----;-±c!±;--;t'"":":c-:-~ SEE SPE C. E1 -2 .4 G.C.D. BACKFILL COVER -~..u.,c....-SAND MATERIAL EMBEDMENT & INITIAL BACKFILL SEE SPEC . E1 -2 .3 G.C .D. MINIMUM 6" ---.-~=-.;.;..'f. EMBEDMENT WATER: SIZES UP TO AND INCLUDING 12" __ ...........,..,....,..___ TYPE "C" BACKFILL MINIMUM 6" INITIAL---=-~~. SEE SPEC . E1 -2.4 G.C.D. BACKFILL COVER : WATER -6" SEWER -12 " STORM DRAIN -12" ~~.-.1.r--CRUSHED STONE OR SAND MATERIAL INITIAL BACKFILL SEE SPEC . E1 -2.4(b) OR E l -2.3 G.C.D. ::t::.,,~A3:~'k~tt=t--CRUSHED STONE MINIMUM 6" ----+==J..JJi~~~~~t"'F SEE SPEC . E1 -2.3 EMBEDMENT G.C.D. SAND GRADATION • LESS THAN 10% PASSING #200 SIEVE • P.I. = 10 OR LESS CRUSHED STONE GRADATION SIEVE SIZE RETAINED 1" 0-10 Yz" 40-75 %" 55-90 #4 90-100 #8 95-100 WATER: SIZES 16" AND LARGER SEWER: ALL SIZES STORM DRAIN: ALL SIZES MA TERI AL SPECIFICATIONS THE EMBEDMENT AND BACKFILL DETAILS PROVIDED ON THIS SHEET SHALL REPLACE APPROPRIATE PROVISIONS OF BOTH THE E1-2.4(b) AND E1-2.3 OF THE G.C .D. AND STD. SPEC. ITEM 402 OF THE TPW STANDARD SPECIFICATIONS FOR STREET & STORM DRAIN CONSTRUCTION . ALL OTHER PROVISIONS OF THESE ITEMS SH ALL APPLY. ' CITY OF FORT WORTH , TEXAS DA TE: 08-2007 WATER, SEWER, & STORM DRAIN EMBEDMENT AND BACKFILL DETAILS WTR-034 EXISTING CURB TEMP . SERVICE---- 2" GALV. PIPE TO F.H . OUTLET FOR TEMP ---WATER SUPPLY. TEMP . SERVICE 2" GAL V. PIPE 11 .. =1-..i--EXIS TING METER VAULT . SEE DETAIL WTR-036 FOR TEMP . SERVICE CONNECTION . ---+---TEMP. SERVICE 2" GALV. PIPE SEE DETAIL WTR-037 FOR INTERSECTION CROSSING EXISTING CURB CITY OF FORT WORTH, TEXAS DATE : 08-2007 TYPICAL MAIN BY-PASS LAYOUT WTR-035 ~" TUBING 2" GAL V. PIPE NOTE : CONTRACTOR SHALL BE REQUIRED TO COVER METER VAULT WITH PROTECTIVE GUARD . NOTE : ADAPT AS REQUIRED EXISTING PRIVATE SERVICE TO HOUSE OR BUILDING . METER SHALL BE REMOVED BY THE CONTRACTOR. CONNECTION FROM BY-PASS TO PRIVATE SERVICE SHALL BE MADE BY CONTRACTOR. EXISTING COPPER SERVICE LINE CITY OF FORT WORTH, TEXAS TEMPORARY SERVICE CONNECTION DATE: 08-2007 WTR-036 EXISTING PAVING 36" MAX . ASPHALT COVER 15# ROOFING FELT, 36 " WIDE 2" GALV . PIPE 2-STANDARD FINISHED 2"x6" WOODEN PLANKS / CITY OF FORT WORTH, TEXAS DATE : 08-2007 INTERSECTION & DRIVEWAY APPROACH CROSSING FOR TEMPORARY WATER SERVICE WTR-037 NOTE : IF VALVE OPERATING NUT IS MORE THAN 3' FEET BELOW FINISHED GRADE , PROVIDE STEM EXTENSION TO 1' BELOW FINISHED GRADE . YAUL T WIDTH VARIES TO ACCOMMODATE OPERATOR BUTTERFLY VALVE & UNDERGROUND OPERATOR I • GRADE FLOOR TO DRAIN TOWARD ----' SUMP (12" PIPE, P.Y.C. OR 12" SQ. BLOCK OUT) IN STREET 2" CORP. STOP PREMOLD AROUND PIPE @ WALLS (TYP .) #5 @ 12" C-C EACH WAY VARIES PLAN SECTION • I (/) w ii:: :::: 24"x40" MANHOLE FRAME & COYER CAST FRAME INTO TOP SLAB FILL WITH TOPSO IL TO DRAIN AWAY FROM YAUL T 18" BLIND FLANGE NOTE : VALVE POSITlON INDICATOR REQUIRED . CITY OF FORT WORTH , TEXAS BUTTERFLY VALVE DATE : 08-2007 WTR-038 2 .25" ;..-, I 2 .25" 2'-7" 8'-0" 2'-7" FORT WORTH --+---+----::----------------------------- PROJECT NAME 2.5" '? -------------"<¢ PROGRAM NAME/FUNDING SOURCE N I N This project is managed by the Department Of Engineering Questions on this project, call 000-0000 (Weekdays 7:30a.m.-4:30p.m.) Questions on this project after hours, call 000-0000 After hours watrr and sewer emergencies, call 000-0000 2 .5" 3 " FONTS : FORT WORTH LOGO -CHELTENHAM BOLD ALL OTHER TEXT -ARIAL LOGO COLORS: FORT WORTH -PMS 288 (BLUE) LONGHORN LOGO -PMS 725 (BROWN) \ \ \ \ 7'-6" \ LLwHITE \ \ \ 3"R (TYP .) L PMS 288 (BLUE) CITY OF FORT WORTH , TEXAS PROJECT SIGN -4'x8' 3 " <..'.) z ~ w ~ w _J N DATE : 08-2007 WTR-039 t ACORD CERTIFICATE OF LIABILITY INSURANCE I DATE (MMIDD/YYYY) TM 07/21/2008 PRODUCER (817)457-6700 FAX (817)457-7246 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION THE SWEENEY COMPANY ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE 1121 E. Loop 820 South HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. P O Box 8720 Fort Worth, TX 76124-0720 INSURERS AFFORDING COVERAGE NAIC# INSURED Conatser Construction TX, LP INSURER A: Bituminous Casualty Corp ,+ IX P.0.Box 15448 INSURER S: Bituminous Fire & Marine Ins Co A+ IX Fort Worth, TX 76119 INSURERC: INSURERD: IN SURERE: COVERAGE~ THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERJOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT , TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF S UCH POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS . 1r1: ~'?:! TYPE OF INSURANCE POLICY NUMBER POLICY EFFECTIVE POLICY EXPIRATION LIMITS ~·= . nATI' GENERAL LIABILITY CLP 3 255 208 08/01/2008 08/01/2009 EACH OCCURRENCE $ 1,000,000 -DAMAGE TO RENTED X COMMERCIAL GENERAL LIABILITY OOC:1...11<'.'CC' I C----•·----$ 100,000 -0 CLAIMS MADE 0 OCCUR MED EXP (Any one person ) $ 5,000 ,-- A X CONTRACTUAL, XCU PERSONAL & ADV INJURY $ 1,000,000 X INDEP CONTRACTORS GENERAL AGGREGATE $ 2,000,000 ~ GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS -COMP/OP AGG -i POLICY m ~r& n LOC $ 2 000,000 AUTOMOBILE LIABILITY CAP 3 523 271 08/01/2008 08/01/2009 COMBINED SINGLE LIMIT -(Ea accident) $ X ANY AUTO 1,000,000 -X ALL OWNED AUTOS BOD ILY INJURY X (Per person) $ SCHEDULED AUTOS B - X HIRED AUTOS BODILY INJURY -(Per accident) $ X NON-OWNED AUTOS - -PROPERTY DAMAGE $ (Per accident) GARAGE LIABILITY AUTO ONLY -EA ACCIDENT $ ~ ANY AUTO OTH ER THAN EAACC s AUTO ONLY: AGG $ EXCESS/UMBRELLA LIABILITY CUP 2 583 186 08/01/2008 08/01/2009 EACH OCCURRENCE s 5,000,000 ~ OCCUR D CLAIMS MADE UMBRELLA AGGREGATE $ 5,000,000 A $ Fxi DEDUCTIBLE $ RETENTION $ 10,00C $ WORKERS COMPENSATION AND WC 3 523 272 08/01/2008 08/01/2009 X I l/,~JT~JN::: I 10.w - EMPLOYERS' LIABILITY E.L. EACH ACC IDENT $ 1,000,000 B ANY PROPRIETOR/PARTNER/EXECUTIVE OFFICER/MEMBER EXCLUDED? E.L. DISEASE -EA EMPLO YEE $ 1,000.000 If yes, describe under SPECIAL PROVISIONS below E.L. DISEASE -POLICY LIMIT $ 1,000.000 OTHER DESCRIPTION OF OPERATIONS ./ LOCATIONS/ VEHICLES/ EXCLUSIONS ADDED SY ENDORSEMENT/ SPECIAL PROVISIONS WATER MAIN REPLACEMENTS PROJ NO. 972, P253-6011700972, DOE. 5965 IN THE CITY OF FORT WORTH. CERT HOLDER NAMED ADLN INSURED EXCEPT ON WORKERS COMP WITH GENL LIAB PRIMARY & NON -CONTRIBUTORY, WITH WAIVER OF SUBROGATION ALL POLICIES AS REQUIRED BYWRITTEN CONTRACT. 30 DAY CANC NOTICE AMENDED TO 10 DAY FOR NON-PAY OF PREMIUM. C CITY OF FORT WORTH 1000 THROCKMORTON FT WORTH, TX 76102 ACORD 25 (2001/08) N SHOULD ANY OF THE ABOVE DESCRIBED POLICIES SE CANCELLED BEFORE THE EXPIRATION DATE THEREOF , THE ISSUING INSURER WILL ENDEAVOR TO MAIL _1Q_ DAYS WRITIEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, BUT FAILURE TO MAIL SUCH NOTICE SHALL IMPOSE NO OBLIGATION OR LIABILITY AUTHORIZED REPRESENTATIVE CERTIFICATE OF INSURANCE TO: CITY OF FORT WORTI-I Date~ NAME OF PROJECT: Water Main Replacements Contract 2007A {DOE# 5965) at Various Locations Throughout the City of Fort Worth PROJECT NUMBER: P253-6011700972 IS TO CERTIFY TI-IAT : Conatser Construction TX, LP is , at the date of this certificate, Insured by this Company with respect to the business operations hereinafter described, for the type of insurance and accordance with provisions of the standard policies used by this Company, and further hereinafter described. Exceptions to standard policy noted on reverse side hereof. TYPE OF INSURANCE Policy Effective Expires Limits of Liability Worker's Compensation Comprehensive General Bodily Injury: Liability Insurance (Public Ea. Occurrence: $ Liability) Property Damage: Ea. Occurrence: $ Blasting Ea . Occurrence: $ Collapse of Building or struct:w-es adjacent to Ea. Occurrence: $ __ excavations Damage to Underground Utilities Ea . Occurrence: $ Builder's Risk Comprehensive Bodily Injury: Automobile Liability Ea. Person: $ Ea . Occurrence: $ Property Damage: Ea.Occurrence:$ Bodily Injury: Contractual Liability Ea . Occurrence: $ Property Damage: Ea. Occurrence: $ Other Locations covered:--------------------------------- Description of operations covered:---------------------------- The above policies either in the body thereof or by appropriate endorsement provided that they may not be changed or canceled by the insurer in less than five (5) days after the insured bas received written notice of such change/or cancellation. Where applicable local laws or regulations require more than five (5) days actual notice of change or cancellation to be assured, the above policies contain such special requirements, either in the body thereof or by appropriate endorsement thereto attached. The City, its officers, employees and servants shall be endorsed as an additional insured on Contractor's insurance policies excepting employer's liability insurance coverage under Contractor's workers ' compensation insurance policy. Agency Insurance Company: __________ _ F=o~rt~W_o~rth~A~gen~t _____________ By _________________ _ Address _______________ _ Title _______________ _ CONTRACTOR COMPLIANCE WITH WORKERS' COMPENSATION LAW Pursuant to V.T.C.A. Labor Code §406 .96 (2000), as amended , Contractor certifies that it provides workers ' compensation insurance coverage for all of its employees employed on City of Fort Worth Department of Engineering No .5965 and City of Fort Worth Project No. P253- 6011700972. STA TE OF TEXAS COUNTY OF TARRANT § § § Title : Mark Pappas , Vice -President of -Conatser Manag em ent Gro up , In c, G.P. ----------- Date: d& 2i 2§().f> /~ v1!1 B~fqr;e me, the undersigned authority, on th is day personally appeared ma cl:< /..lei Oj2a.S , known to me to be the person whose name is subscribed to the foregoing instrument, and acknowledged to me that he executed the same as the act and deed of Conatser Construction TX, LP for the purposes and consideration therein expressed and in the capacity therein stated . 5,T Given Under My Hand and Seal of Office this 2!_ day of sL 11 , 20 og SYDNEY JONES Notary Public, State of Texas My Commission Expires May 09, 2010 Bond No: 022023664 PERFORMANCE BOND THE STATE OF TEXAS § KNOW ALL BY THESE PRESENTS : COUNTY OFT ARRANT § . . . . Liberty Mutual Insurance That we (1) Conatser Constroctlon TX, LP as Pnnc1pal herelll, and (2) Canparw , a corporation organized under the laws of the State of (3) MA , and who is authorized to issue surety bonds in the State of Texas, Surety herein, are held and firmly bound unto the City of Fort Worth, a municipal corporation located in Tarrant and Denton Counties, Texas, Obligee herein, in the sum of: One Million Two Hundred Thousand and no/100 ..................................................................................................... . ($1,200,000.00) Dollars for the payment of which sum we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. AUG O 5 2008 WHEREAS, Principal has entered into a certain contract with the Obligee dated the __ of __ ___._, =-20 ....... 0 ____ 8 a copy of which is attached hereto and made a part hereof: for the construction of: Water Main Replacements Contract 2007 A {DOE# 5965) at Various Locations Throughout the City of Fort Worth NOW THEREFORE, the condition of this obligation is such, if the said Principle shall faithfully perform the work in accordance with the plans, specifications, and contract documents and shall fully indemnify and hold harmless the Obligee from all costs and damages which Obligee may suffer by reason of Principal's default, and reimburse and repay Obligee for all outlay and expense that Obligee may incur in making good such default, then this obligation shall be void; otherwise, to remain in full force and effect. PROVIDED, HOWEVER, that this bond is executed pursuant to Chapter 2253 of the Texas Government Code, as amended, and all liabilities on this bond shall be determined in accordance with the provisions of such statute, to the same extent as if it were copied at length herein. IN WITNESS WHEREOF, the duly authorized representatives of the Principal and the Surety have executed this instrument. AUG Q 5 2008 SIGNED and SEALED this __ of __ --'-', 2=00=8. ATTEST: (Principal) Secretary (SEAL) ATTEST: (Surety) Secretary (SEAL) PO Box 15448 Fort Worth, TX 76119 (Address) 17 5 Berkeley Street oo s r an, MA Q2 I 17 (Address) NOTE: Date of Bond must not be prior to date of Contract (1) Correct Name of Contractor (2) Correct name of Surety (3) State of incorporation of Surety Telephone number of surety must be stated. In addition, an original copy of Power of Attorney shall be attached to Bond by Attorney-in-Fact. The date of bond shall not be prior to date of Contract. Bond No: 022023664 PAYMENT BOND THE STATE OF TEXAS § § § KNOW ALL BY THESE PRESENTS : COUNTY OFT ARRANT That we, (1) Conatser Construction TX, LP, as Principal herein, and (2 ) Liberty Mutual Insurance Canpany • a corporation organized and existing under the laws of the State of (3) __ MA ___ ~ as surety, are held and firmly bound unto the City of Fort Worth, a municipal corporation located in Tarrant and Denton Counties, Texas, Obligee herein, in the amount of One Million Two Hundred Thousand and no/100 .................... Dollars ($1,200,000.00) for the payment whereof, the said Principal and Surety bind themselves and their heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents: AUG Q 5 2008 WHEREAS, the Principal has entered into a certain written contract with the Obligee dated the __ day of --~ Conatser Construction TX, LP, which contract is hereby referred to and made a part hereof as if full y and to the same extent as if copied at length, for the following project: Water Main Replacements Contract 2007A (DOE# 5965) at Various Locations Throughout the City of Fort Worth NOW, THEREFORE, THE CONDITION OF TIIlS OBLIGATION IS SUCH, that if the said Principal shall faithfully make payment to each and every claimant (as defined in Chapter 2253 , Texas Government Code, as amended) supplying labor or materials in the prosecution of the work under the contract, then this obligation shall be void; otherwise, to remain in full force and effect. PROVIDED, HOWEVER, that this bond is executed pursuant to Chapter 2253 of the Texas Government Code, as amended, and all liabilities on this bond shall be determined in accordance with the provisions of said statute, to the same extent as if it were copied at length herein IN WITNESS WHEREOF, the duly authorized representatives of the Principal and the Surety have executed this instrument. SIGNED and SEALED this ---Atffl' @:5 2008 Conatser Constmction TX, LP. ATTEST: Name: Mark Pappas (Principal) Secretary ATTEST: Secretary (SE AL) Carolyn Maples NOTE: (1) (2) (3) Title : Vice President of the GP Address: PO Box 15448 Fort Worth, TX 76119 Liberty Mutual Insurance Ccxnpany SURETY ~~ B~ ~ Name: Glenna S. Davis Attorney in Fact Address: ----------175 Berkeley Street Boston. MA 02117 Telephone Number: 972-233-9588 Correct name of Principal (Contractor). Correct name of Surety. State of incorporation of Surety Telephone number of surety must be stated. In addition , an original copy of Power of Attorney shall be attached to Bond by the Attorney-in-Fact. The date of bond shall not be prior to date of Contract. &>nd No: 022023664 MAINIBNANCE BOND THE STATE OF TEXAS § COUNTY OF TARRANT § That Conatser Construction TX, LP ("Contractor"), as principal, and Liberty Mutual Insurance Ccxnpany a corporation organized under the laws of the State of MA , ("Surety"), do hereby acknowledge themselves to be held and bound to pay unto the City of Fort Worth, a Municipal Corporation chartered by virtue of Constitution and laws of the State of Texas, ("City") in Tarrant County, Texas, the sum of One Million Two Hundred Thousand and no/100 .................... Dollars ($1,200,000.00), lawful money of the United States, for payment of which sum well and truly be made unto said City and its successors, said Contractor and Surety do hereby bind themselves, their heirs, executors, administrators, assigns and successors, jointly and severally. This obligation is conditioned, however, that: WHEREAS, said Contractor has this day entered into a written Contract with the City of Fort Worth, dated the ~ 5 2008 , Conatser Construction TX, LP, a copy of which is hereto attached and made a part hereof, for the performance of the following described public improvements: Water Main Replacements Contract 2007 A (DOE # 5965) at Various Locations Throughout the City of Fort Worth the same being referred to herein and in said contract as the Work and being designated as project number(s) P253~011700972 and said contract, including all of the specifications , conditions, addenda , change orders and written instruments referred to therein as Contract Documents being incorporated herein and being made a part hereof; and , WHEREAS, in said Contract, Contractor binds itself to use such materials and to so construct the work that it will remain in good repair and condition for and during a period of after the date of the final acceptance of the work by the City; and WHEREAS, said Contractor binds itself to maintain said work in good repair and condition for said term of Two (2) years ; and WHEREAS, said Contractor binds itself to repair or reconstruct the Work in whole or in part at any time within said period, .if in the opinion of the Director of the City of Fort Worth Department of Engineering, it be necessary; and, WHEREAS, said Contractor binds itself, upon rece iving notice of the need therefore to repair or reconstruct said Work. as herein provided . NOW THEREFORE, if said Contractor shall keep and perform its said agreement to maintain, repa ir or reconstruct said Work. in accordance with all the terms and conditions of said Contract, these presents shall be null and void, and have no force or effect. Otherwise, this Bond shall be and remain in full force and effect, and the C ity shall have and recover from Contractor and Surety damages in the premises as prescribed by said Contract. This obligation shall be a continuing one and successive recoveries may be had hereon for successive breaches until the full amount hereof is exhausted . IN WITNESS WHEREOF, this instrument is executed in! counterparts , each of which shall be deemed an original , this_ day of , A.O. Conatser Construction TX, LP . AUG O 5 2008 ATTEST: Conatser Construction TX, LP Conatser Mana Grou (S E A L) Contractor Secretary ATTEST: (SE AL) Secretary By:-r---::,-,,._,_---J.~rn,,c;------- Na Title: Vice President of the General Partner Liberty Mutual Insurance Ccxnpany Surety B~~~ Na~~Davis Title: Attorney-in-Fact )75 Berkeley Street Boston, MA 02117 Address Tel No: 972-233-9588 2346086 THIS POWER OF ATTORNEY IS NOT VALID UNLESS IT IS PRINTED ON RED BACKGROUND. This Power of Attorney limits the acts of those named herein, and they have no authority to bind the Company except in the manner and to the extent herein stated. LIBERTY MUTUAL INSURANCE COMPANY BOSTON,MASSACHUSETTS POWER OF ATTORNEY KNOW ALL PERSONS BY THESE PRESENTS : That Liberty Mutual Insurance Company (the "Company "), a Massachusetts stock insurance company, pursuant to and by authority of the By-law and Authorization hereinafter set forth, does hereby name, constitute and appoint GREG A. WILKERSON, GLENNA S. DAVIS, CATHY VINSON, CAROLYN MAPLES, JOHN R. WILSON, ALL OF THE CITY OF FORT WORTH, STATE OF TEXAS ....................................................................................................................................... . , each individually if there be more than one named, its true and lawful attorney-in-fact to make , execute , seal, acknowledge and deliver, for and on its behalf as surety and as its act and deed, anv and all undertakings, bonds, recognizances and other surety obligations in the penal sum not exceeding TWENTY FIVE MILLION AND 00/100**1***************** DOLLARS ($ 25,000,000.00***** ) each , and the execution of such undertakings, bonds, recognizances and other surety obligations , in pursuance of these presents, shall be as binding upon the Company as if they had been duly signed by the president and attested by the secretary of the Company in their own proper persons . That this power is made and executed pursuant to and by authority of the following By-law and Authorization : ARTICLE XIII -Execution of Contracts : Section 5 . Surety Bonds and Undertakings . Any officer of the Company authorized for that purpose in writing by the chairman or the president, and subject to such limitations as the chairman or the president may prescribe, shall appoint such attorneys-in-fact, as may be necessary to act in behalf of the Company to make, execute , seal , acknowledge and deliver as surety any and all undertakings , bonds, recognizances and other surety obligations . Such attorneys-in-fact , subject to the limitations set forth in their respective powers of attorney , shall have full power to bind the Company by their signature and execution of any such instruments and to attach thereto the seal of the Company . When so executed such instruments shall be as binding as if signed by the president and attested by the secretary . By the following instrument the chairman or the president has authorized the officer or other official named therein to appoint attorneys-in-fact: Pursuant to Article XIII , Section 5 of the By -Laws, Garnet W . Elliott, Assistant Secretary of Liberty Mutual Insurance Company, is hereby authorized to appoint such attorneys-in-fact as may be necessary to act in behalf of the Company to make, execute , seal, acknowledge and deliver as surety any and all undertakings, bonds , recognizances and other surety obligations . That the By-law and the Authorization set forth above are true copies thereof and are now in full force and effect. ::,:. ca "C 1/) 1/) Cl) C: 'in :::, .a >, C: ca =5 ~ .... »en G>W EE IN WITNESS WHEREOF , this Power of Attorney has been subscribed by an authorized officer or official of the Company and the corporate seal of O a. Liberty Mutual Insurance Company has been affixed thereto in Plymouth Meeting , Pennsylvania this 29th day of May , := 0 2008 <t M 0~ COMMONWEALTH OF PENNSYLVANIA COUNTY OF MONTGOMERY ss LIBERTY MUTUAL INSURANCE COMPANY By6=~ M-£Z('-5tA;:· Garnet W. Elliott, Assistant Secretary On this~ day of May , 2008 , before me, a Notary Public, personally came Garnet W . Elliott. to me known, and acknowledged that he is an Assistant Secretary of Liberty Mutual Insurance Company; that he knows the seal of said corporation ; and that he executed the above Power of Attorney and affixed the corporate seal of Liberty Mutual Insurance Company thereto with the authority and at the direction of said corporation . first above written . CERTIFICATE COMMONWEAL TH OF PENNSYLVANIA No!arilll Seal TerasaPastella, ~ Nlllc ~Twp.,~Cou,ty My Ctmni9sion Elq)ir8s Mar. ~ 2<m By~ Ter6sa Pastella , Notary Public I, the undersigned, Assistan ecretary of Liberty Mutual Insurance Company, do hereby certify that the original power of attorney of which the foregoing is a full, true and correct copy , is in full force and effect on the date of this certificate; and I do further certify that the officer or official who executed the said power of attorney is an Assistant Secretary specially authorized by the chairman or the president to appoint attorneys-in-fact as provided in Article XIII, Section 5 of the By-laws of Liberty Mutual Insurance Company. This certificate and the above power of attorney may be signed by facsimile or mechanically reproduced signatures under and by authority of the following vote of the board of directors of Liberty Mutual Insurance Company at a meeting duly called and held on the 12th day of Ma.rch , 1980 . VOTED that the facsimile or mechanically reproduced signature of any assistant secretary of the company, wherever appearing upon a certified copy of any power of attorney issued by the company in connection with surety bonds, shall be valid and binding upon the company with the same force and effect as though manually affixed . IN TESTIMONY WHEREOF, I have hereunto subscribed my name and affixed the corporate seal of the said company, this Al JG Q 5 ?008 day of ... "C Cl) C: 3: ca ll.o E ca .!!?o ..C:0 -" _a, 0 C: >,Cl> :!:: Cl) :-2 .! -Cl) ~.a Cl)O =~ E~ .!::~ 'E~ Oo u.-o<D I-,!. ~LibeM:J. ~ M11tual. Important Notice TO OBTAIN INFORMATION ABOUT THIS BOND OR TO MAKE A COMPLAINT: You may contact the Texas Department of Insurance to obtain information on companies, coverages, rights or complaints at: 800-252-3439 You may write the Texas Department of Insurance at: P. 0. Box 149104 Austin, TX 78714-9104 Your notice of claim against the attached bond may be given to the Surety Company that issued the bond by sending it to the following address: Liberty Mutual Surety Interchange Corporate Center 450 Plymouth Road, Suite 400 Plymouth Meeting, PA 19462-8284 You may contact the claim office by telephone at: 610-832-8240 Premium or Claim Disputes If you have a dispute concerning a premium, you should contact the agent first. If you have a dispute concerning a claim, you should contact the company first. If the dispute is not resolved, you may contact the Texas Department of Insurance. This notice is for information purposes only and does not become a part of or a condition of the attached document. It is given to comply with Section 2253. 048, Government Code, and Section 53. 202, Property Code, Effective September 1, 2001 THE STATE OF TEXAS CITY OF FORT WORTH, TEXAS CONTRACT KNOW ALL BY THESE PRESENTS COUNTY OFT ARRANT AUG p 5 2008 1bis agreement made and entered into this the __ day o A.D ., 20~ by and between the CI1Y OF FORT WORTH, a municipal corporation of Tarrant County, Texas, organized and existing under and by virtue of a special charter adopted by the qualified voters within said City on the 11th day of December, A.D. 1924 , under the authority (vested in said voters by the "Home Rule" provision) of the Constitution of Texas, and in accordance with a resolution duly passed at a regular meeting of the City Council of said city , and the City of Fort Worth being hereinafter termed Owner, Conatser Construction TX, LP, HEREINAFfER CALLED Contractor. WITNESSETH: That said parties have agreed as follows : 1. That for and in consideration of the payments and agreements hereinafter mentioned to be made and performed by the Owner, and under the conditions expressed in the bond bearing even date herewith, the said Contractor hereby agrees with the said Owner to commence and complete the construction of certain improvements described as follows : Water Main Replacements Contract 2007A (DOE# 5965) at Various Locations Throughout the City of Fort Worth 2 . That the work herein contemplated shall consist of furnishing as an independent contractor all labor, tools, appliances and materials necessary for the construction and completion of said project in accordance with the Plans and Specifications and Contract Documents prepared by the Department of Engineering for the Transportation and Public Works Department of the City of Fort Worth adopted by the City Council of the City of Fort Worth, which Plans and Specifications and Contract Documents are hereto attached and made a part of this contract the same as if written herein . 3 . The Contractor hereby agrees and binds himself to commence the construction of said work within ten ( 10) days after being notified in writing to do so by the Department of Engineering of the City of Fort Worth . 4 . OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX The Contractor hereby agrees to prosecute said w ork with reasonable diligence after the commencement thereof and to fully complete and finish the same ready for the inspection and approval of the Department of Engineering of the City of Fort Worth and the City Council of the City of Fort Worth within a period of 365 Calendar days . If the Contractor should fu.il to complete the work as set forth in the Plans and Specifications and Contract Documents within the time so stipulated, plus any additional time allowed as provided in the General Conditions, there shall be deducted from any monies due or which may thereafter become due him, the sum of $420 Per working day, not as a penalty but as liquidated damages, the Contractor and his Surety shall be liable to the Owner for such deficiency. 5 . Should the Contractor fu.il to begin the work herein provided for within the time herein fixed or to carry on and complete the same according to the true meaning of the intent and terms of said Plans, Specifications and Contract Documents, then the Owner shall have the right to either demand the surety to take over the work and complete same in accordance with the Contract Documents or to take charge of and complete the work in such a manner as it may deem proper, and if in the completion thereof, the cost to the said City shall exceed the contract price or prices set forth in the said plans and specifications made a part hereof, the Contractor and/or its Surety shall pay said City on demand in writing, setting forth and specifying an itemized statement of the total cost thereof, said excess cost. 6 Contractor covenants and agrees to indemnify City's engineer and architect, and their personnel at the project site for Contractor's sole negligence. In addition, Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the Owner, its officers, servants and employees, from and against any and all claims or suits for property loss, property damage, personal injury, including death, arising out of, or alleged to arise out of, the work and services to be performed hereunder by Contractor, its officers, agents , employees, subcontractors, licensees or invitees, whether or not any such iniurv, damage or death is caused, in whole or in part, by .the negligence or alleged negligence of Owner, its officers, servants, or employees. Contractor likewise covenants and agrees to indemnify and hold harmless the Owner from and against any and all injuries to Owner's officers, servants and employees and any damage, loss or destruction to property of the Owner arising from the performance of any of the terms and conditions of this Contract, whether or not any such iniurv or damage is caused in whole or in part by the negligence or alleged negligence of Owner, its officers, servants or employees .. In the event Owner receives a written claim for damages against the Contractor or its subcontractors prior to final payment, final payment shall not be made until Contractor either (a) submits to Owner satisfactory evidence that the claim has been settled and/or a release from the claimant involved, or (b) provides Owner with a letter from Contractor's liability insurance carrier that the claim has been referred to the insurance carrier. The Director may, if he deems it appropriate, refuse to accept bids on other City of Fort Worth public work from a Contractor against whom a claim for damages is outstanding as a result of work performed under a City Contract. 7 . OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX The Contractor agrees, on the execution of this Contract, and before beginning work, to make, execute and deliver to said City of Fort Worth good and sufficient surety bonds for the faithful performance of the terms and stipulations of the Contract and for the payment to all claimants for labor and/or materials furnished in the prosecution of the work, such bonds being as provided and required in Article 5160 of the Revised Civil Statutes of Texas, as amended, in the form included in the Contract Documents, and such bonds shall be for 100 percent of the total contract price, and said surety shall be a surety company duly and legally authorized to do business in the State of Texas, and acceptable to the City Council of the City of Fort Worth. 8 . Said City agrees and binds itself to pay, and the said Contractor agrees to receive, for all of the aforesaid work, and for all additions thereto or deductions therefrom, the price shown on the Proposal submitted by the successful bidder hereto attached and made a part hereof. Payment will be made in monthly installments upon actual work completed by contractor and accepted by the Owner and receipt of invoice from the Contractor. The agreed upon total contract amount (including/excluding) alternates n/a, shall be One Million Two Hundred Thousand and no/100 ................................ Dollars, ($1,200,000.00). 9 . It is further agreed that the performance of this Contract, either in whole or in part, shall not be sublet or assigned to anyone else by said Contractor without the written consent of the Director of the Department of Engineering. 10 . The Contractor agrees to pay at least the minimum wage per hour for all labor as the same is classified, promulgated and set out by the City of Fort Worth, Texas, a copy of which is attached hereto and made a part hereof the same as if it were copied verbatim herein. 11. It is mutually agreed and understood that this agreement is made and entered into by the parties hereto with references to the existing Charter and Ordinances of the City of Fort Worth and the laws of the State of Texas with references to and governing all matters affecting this Contract, and the Contractor agrees to fully comply with all the provisions of the same. IN WITNESS TIIEREOF, the City of Fort Worth has caused this instrument to be signed in ~ counterparts in its name and on its behalf by the City Manager and attested by its Secretary, with the corporate seal of the City of Fort Worth attached. The Contractor has executed this instrument through its duly authorized officers in ~ counterparts with its corporate seal attached . AUG O 5 2008 Done in Fort Worth, Texas, this the __ day of ___ .._AD ., 2008. OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX RECOMMENDED: BY: ~/,,1J11k-----: DIRECTOR, DEPARTMENT OF ENGINEERING Conatser Construction TX, LP Conatser Management Group, Inc. PO Box 15448 Fort Worth, TX 76119 CONTRACTOR TITLE November 1960 Revised May 1986 Revised September 1992 CITY OF FORT WORTH ATTEST: CITY SECREf ARY (SE AL) Co ntrac t Authorizatioa Date R/~/D8 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Page 1 of 3 .. City of Fort Worth, Texas Mayor and Council Communication COUNCIL ACTION: Approved on 8/5/2008 -Ord. No. 18216-08-2008 DATE: Tuesday, August 05 , 2008 LOG NAME: 30MRW2007A REFERENCE NO.: C-22968 SUBJECT: Authorize Execution of a Contract in the Amount of $1 ,200,000.00 with Conatser Construction TX, LP, for Water Main Replacements Contract 2007 A at Various Locations Throughout the City of Fort Worth (DOE No. 5965), and Adopt Appropriation Ordinance RECOMMENDATION: It is recommended that the City Council authorize the City Manager to: 1. Execute a contract with Conatser Construction TX, LP, in the amount of $1 ,200,000 .00 for Water Main Replacements Contract 2007 A; 2 . Authorize the transfer of $1 ,513,800.00 from the Water and Sewer Fund to the Water Capital Projects Fund;and 3. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Water Capital Projects Fund in the amount of $1,513 ,800 .00 from available funds . DISCUSSION: The work to be performed under this contract consists of extending , replacing and/or relocating water mains, services, and other pertinent construction required to provide water service to individual customers or developers throughout the City . The bid documents included a stipulation that the total quantities listed may not reflect actual quantities and are based on the budgeted amount of $1,200 ,000.00 . It was also stipulated that regardless of the dollar amount bid , the contract would be awarded in the amount of $1 ,200,000.00 . Final payments will be made based on actual measured quantities. The project was advertised on May 1 and May 8 , 2008 , in the Fort Worth Star-Telegram. On May 29 , 2008, the following bids were received : Bidders Conatser Construction TX, LP Laughley Bridge and Construction Cleburne Utility Construction , Inc. William J. Schultz, Inc., d/b/a Circle 'C ' Construction Company Ed A. Wilson , Inc . The Engineer's estimate for this project was $1 ,390 ,905.50 . Bid Amount $1,335,695.00 $1 ,351 ,340.00 $1 ,680,911 .50 $1,914 ,940.00 $2,232 ,535 .00 Time of Contract 365 Calendar Days Conatser Construction TX, LP , is in compliance with the City 's M/WBE Ordinance by committing to 13 percent M/WBE participation and documenting good faith effort. Conatser Construction TX, LP, identified http:// apps . cfwnet. org/council _packet/Reports/me _print.asp 8/6/2008 rage L. ur ., .. several subcontracting opportunities. However, the M/WBEs contacted in the areas identified did not respond or did not submit the lowest bids . The City's goal on this project is 16 percent. In addition to construction cost , $36 ,000 .00 contingency is required for possible change orders , and $277 ,800 .00 is required for design, inspection and survey services. This project is located in ALL COUNCIL DISTRICTS . FISCAL INFORMATION/CERTIFICATION : The Finance Director certifies that upon approval and completion of recommendation No. 1 and the adoption of the attached appropriation ordinance, funds will be available in the current capital budget, as appropriated of the Water Capital Projects Fund . TO Fund/Account/Centers FROM Fund/Account/Centers 1 PE45 538070 609020 $1,513,800.00 fil P253 541200 601170097283 $1 •2 00 ,000.00 1&2) $1,513,800.00 P253 472045 601170097200 g). $20,000.00 P253 531350 60117009723 1 g). $30 ,000 .00 P253 531350 601170097232 ~ $50 ,000 .00 P253 531350 601170097233 ~ $1,000 .00 P253 541100 601170097241 ~ $5 ,000 .00 P253 531350 601170097242 ~ $10,000 .00 P253 531200 601170097251 ~ $3 ,000.00 P253 531350 601170097251 ~ $10 ,000 .00 P253 531200 601170097252 ~ $20 ,000.00 P253 531350 601170097252 ~ $5 ,000 .00 P253 531350 601170097253 ~ $1,000 .00 P253 531350 601170097260 ~ $20,000 .00 P253 531350 601170097280 ~ $300.00 P253 533010 601170097281 ~ $1,000 .00 P253 533030 601170097281 ~ $500 .00 P253 533040 601170097281 ~ $2 ,000 .00 P253 531350 601170097282 ~ $1,236,000.00 P253 541200 601170097283 http:// apps . cfwnet. org/ council _packet/Reports/me _print. asp 8/6/2008 21 P253 531200 601170097284 21 P253 531350 601170097284 21 P253 531350 601170097285 21 P253 531350 601170097291 21 P253 531350 601170097292 $15 ,000.00 $5 ,000.00 $75,000.00 $1,000.00 $3,000.00 Submitted for City Manager's Office by: Originating Department Head: Additional Information Contact: http://apps .cfwnet.org/ council _packet/Reports/me _print.asp Fernando Costa (8476) A. Douglas Rademaker (6157) Danika Chevalier (2877) Adolpho Lopez (7829) Page 3 of 3 8/6/2008