HomeMy WebLinkAboutContract 50217-A1AMENDMENT No .1 CSC No. 50217-A1
TO CITY SECRETARY CONTRACT
wHEREAS, the City of Fort Worth (CITY) and Kimley-Horn and
Associates, Inc., (ENGINEER) made and entered into City Secretary
Contract No. 50217, (the CONTRACT) which was authorized by M&C C-28545
on the 23rd day of January, 2018 in the amount of $1,795,070.00; and
WHERFAS, the CONTRACT involves engineering services for the
following project:
Clear Fork Lift Station and Force Main; and
WHERP�,S, it has become necessary to execute Amendment No . 1 to
the CONTRACT to include an increased scope of work and revised fee.
NOWTHEREFORE, CITY and ENGINEER, acting herein by and through
their duly authorized representatives, enter into the following
agreement, which amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the additional
engineering services specified in the proposal attached hereto and
incorporated herein. The cost to City for the additional design services
to be performed by Engineer totals $48,720.00.
2.
Article II of the CONTRACT is amended to provide for an increase
in the fee to be paid to Engineer for all work and services performed
under the Contract, as amended, so that the total fee paid by the City
for all work and services shall be an amount of $1,843,790.00.
3.
All other provisions of the Contract, which are not expressly
amended herein, shall remain in full force and effect.
OFFICIAL RECORD
CITY SECRETARY
Page -1- FT. WORTH, TX
EXECUTED and EFFECTIVE as of �he date ].ast wri.tten hy a signatory,
below.
APPROVED:
City oi Fart Worth
��a �����o�
Dana Burghdoff (Apr6, 2021 3:38 CDT)
nana Barghdo�'f
Assistan� City Manager
ENGINEER
Kimley-Hoa�z� and Associates, Tnc.
� �..
�.
Glenn Gary, P.E.
Senior Vice-President
DATE : Apr 6, 2021
APPROVAL RECOM@�NDED:
( �iZ'2Gd�i.G�i��iL �G'v2,�
Christophcr Hard (AprS, 202114:45 CDT)
Chris Harder, �.E.
Direptar, Water Depa�tment
Can�ract Camp�.iance Manager:
DATE : "� �°°� �
By signing, I aakrFawledge th�.'� I am the person responsible for the
inonitaring and adms.nistra�ion of th�,s corxt�aa�, includ.ing ensuring
ali perfo�nar�ce and reporting requiremen�s .
Name af Emplayee
� G�,9�, �
Leon W%lson, P.E., Project Manager
APPROVED AS TO FORM AND L�GAL�TY:
�I
DBlack (Apr6, 2021 10:07 CDT)
Douglas W . H�.ack
Senior Assistant Ci.ty A�to�ney
M&C: N/A
Date: N/A
Form 129�: N/A
�,04������
A�TEST: �� �oF�RT�Od�
a �
������� a�o
�_� ��.�d�
��o �=d
a o�
Ma�y J. Kayser ���'f �oo o� �`d�
City Secxetary �n� nEXA`'��,aA'b
Page -Z--
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Kimley>>> Horr�
March 23, 2021
Mr. Leon Wilson, Jr., P.E.
Project Manager
City of Fort Worth Water Department
200 Texas Street
Fort Worth, TX 76102
Re: Clear Fork Lift Station and Force Main
Amendment No. 1— Permitting Services
KHA No. 061018214
City Project No. 100996
Dear Leon:
This letter is in reference to a contract between Kimley-Horn and Associates, Inc. ("Engineer" or
"Kimley-Horn") and the City of Fort Worth (the City) dated 01-31-2018 referred herein as the
"Contract".
During a meeting between the City, Kimley-Horn, and Tarrant Regional Water District (TRWD)
representatives on 03-05-2021, TRWD indicated that a Section 408 United States Army Corps of
Engineers (USACE) permit would be required to be obtained prior to beginning construction on the
proposed Clear Fork Force Main within the existing Federal Floodway of the Clear Fork Trinity River.
The scope of services in the Contract does not include preparation of the Section 408 permit submittal.
The City has requested that Kimley-Horn perform additional services under Amendment Number 1 for
the Clear Fork Lift Station and Force Main project. These services include additional permitting tasks
related to preparing a Section 408 USACE permit submittal. Service details are further described as
follows:
CONTRACT TASK 1'� — PERMITTING SERVICES: (Water$0, Sewer$48,720)
$ 28,520 Kimley-Horn
20 200 Archeologist Sub
$ 48,720 Total
ENGINEER will complete the following additional tasks in accordance with the Original Contract:
• Prepare 408 permit submittal cover letter
• PerForm of an archaeological survey in accordance with USACE and Texas Historical �
Commission (THC) requirements of proposed open cut areas along the pipeline alignment
• Prepare a Waters of the United States (WOTUS) report and up to four (4) aerial exhibits
dictating federal floodway boundary, proposed improvements, and WOTUS boundaries
• Preparation of up to six (6) aerial exhibits in addition to those required under Task 12
• Review, respond and address up to two (2) rounds of USACE/TRWD comments
• Compile correspondence with USACE on hydrologic and hydraulic analysis study for
proposed lift station site
kimley-horn.com
.
Kimley>>> Horn Page 2
• Compile official species list from U.S. Fish and Wildlife Service
• Prepare for and attend up to four (4) meetings with TRWD and USACE
We recommend that the City increase the budget by $48,720 for these additional services. The
following tables summarize our recommended budget revisions, water and sanitary sewer design fees,
and revised contract amount:
Description Water Sewer Total
Task 1 — Project Management $0 $0 $0
Task 2— Lift Station Site Feasibility and Due Diligence $0 $0 $0
Task 3— Lift Station Property Acquisition $0 $0 $0
Task 4— Lift Station Preliminary Design $0 $0 $0
Task 5— Lift Station Final Design $0 $0 $0
Task 6— Lift Station Construction Contract Document Preparation $0 $0 $0
Task 7— Lift Station Bid Phase Services $0 $0 $0
Task 8— Lift Station Construction Phase Services $0 $0 $0
Task 9— Lift Station Record Drawings $0 $0 $0
Task 10 — Force Main Alignment Study $0 $0 $0
Task 11 — Force Main Preliminary Design $0 $0 $0
Task 12 — Force Main Final Design $0 $0 $0
Task 13 — Force Main Construction Contract Document Preparation $0 $0 $0
Task 14 — Force Main Bid Phase Services $0 $0 $0
Task 15 — Force Main Construction Phase Services $0 $0 $0
Task 16 — Force Main Record Drawings $0 $0 $0
Task 17 — Permitting Services $0 $48,720 $48,720
Task 18 — ROW/Easement Services $0 $0 $0
Task 19 — Survey and SUE $0 $0 $0
Task 20 — Additional Services $0 $0 $0
Total $0 $48,720 $48,720
The following table summarizes the Fee per Work Phase breakdown:
Work Phase Water Sewer Total
31 $0.00 $14,616.00 $14,616.00
32 $0.00 $29,232.00 $29,232.00
33 $0.00 $4,872.00 $4,872.00
51 $0.00 $0.00 $0.00
Kirnley�>>Horn
Page 3
The following table summarizes our recommended budget revisions and shows the revised contract
amount:
Original Contract Amendment No. 1 Revised Contract
Task 1 $33,000 $33,000
Task 2 $83,330 $83,330
Task 3 $39,700 $39,700
Task 4 $265,230 $265,230
Task 5 $357,710 $357,710
Tas k 6 $40, 060 $40, 060
Task 7 $43,910 $43,910
Task 8 $173,050 $173,050
Task 9 $8,900 $8,900
Task 10 $64,900 $64,900
Task 11 $178,460 $178,460
Task 12 $111,730 $111,730
Task 13 $14,500 $14,500
Task 14 $23,520 $23,520
Task15 $91,760 $91,760
Task 16 $13,100 $13,100
Task 17 $21,700 $48,720 $70,420
Task 18 $42,570 $42,570
Task 19 $137,940 $137,940
Task 20 $50,000 $50,000
Total Project $1,795,070 $48,720 $1,843,790
The following breakdown for water and sewer services is recommended:
Water Fee Sewer Fee S Feeey Total
Original Contract $0 $1,657,130 $137,940 $1,795,070
Amendment No. 1 $0 $48,720 $0 $48,720
Total $0 $1,705,850 $137,940 $1,843,790
Kimley�>>Horn
Page 4
We appreciate the opportunity to be of continued service to the City. Please contact us if we need to
provide any further information.
Very truly yours,
KIMLEY-HORN AND ASSOCIATES
�. d � �•
John R. Atkins, P.E.
Vice President
JCK/jra
Copy to: Tony Sholola, P.E., City of Fort Worth
Attachments - Level of Effort Spreadsheet
\\kimley-hom\TX_FTVNFTW Ulilities1061018214-Clear-Fork-LS&FM\PPP\POST_NTPWmendment-No-lWmendment-No-1_Clear-Fork-LS&FM.doc
kimley-horn.com
�'` � c�
�.d�'
�° ��
A 3 �
O d � �
�m^m�
� � o
7Ja�° �
� � m -i
N � o �
m � m w
O � a
� v �
.. d �
W � c
o��
�
IV j �
O �
N ,_�,
C�wD
1
� �
� m
m �
T �
� � �
o � N �
c
0 0 � � o
O � �
C� N N N
" N N N
�
N
�
N
T
� � �A A
J ^ � � �
N � �I O J
� p N N
p p O O
00
c�
Z
�
C/� (n
� m m �
�mm o
m���
m��d-a�,�»
? o 0 0 0
n � � X � � C
�l = = (D N p 3
N N � U C '3
� .�i .�-r N � N d
�
Efl ffl
ffl N N
� N N �
� O N (T �
o N fA N O m
o O O O O W
� �
� m
� m
r r
> >
m m
T T
O o
N N
N N
A A
0 0
0 0
0 0 0
0 0 0
�
W
N
�
A
�
V
N
O
O
O
� -i r
-� D '�
� <
v
�
N v�i 2 .��,
T � C �
O � � �
r � � �
�'(D D�
v�N �w
d o v�-
�*�o�
3 ��
� Z rt
7
C.