Loading...
HomeMy WebLinkAboutContract 50217-A1AMENDMENT No .1 CSC No. 50217-A1 TO CITY SECRETARY CONTRACT wHEREAS, the City of Fort Worth (CITY) and Kimley-Horn and Associates, Inc., (ENGINEER) made and entered into City Secretary Contract No. 50217, (the CONTRACT) which was authorized by M&C C-28545 on the 23rd day of January, 2018 in the amount of $1,795,070.00; and WHERFAS, the CONTRACT involves engineering services for the following project: Clear Fork Lift Station and Force Main; and WHERP�,S, it has become necessary to execute Amendment No . 1 to the CONTRACT to include an increased scope of work and revised fee. NOWTHEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in the proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $48,720.00. 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $1,843,790.00. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. OFFICIAL RECORD CITY SECRETARY Page -1- FT. WORTH, TX EXECUTED and EFFECTIVE as of �he date ].ast wri.tten hy a signatory, below. APPROVED: City oi Fart Worth ��a �����o� Dana Burghdoff (Apr6, 2021 3:38 CDT) nana Barghdo�'f Assistan� City Manager ENGINEER Kimley-Hoa�z� and Associates, Tnc. � �.. �. Glenn Gary, P.E. Senior Vice-President DATE : Apr 6, 2021 APPROVAL RECOM@�NDED: ( �iZ'2Gd�i.G�i��iL �G'v2,� Christophcr Hard (AprS, 202114:45 CDT) Chris Harder, �.E. Direptar, Water Depa�tment Can�ract Camp�.iance Manager: DATE : "� �°°� � By signing, I aakrFawledge th�.'� I am the person responsible for the inonitaring and adms.nistra�ion of th�,s corxt�aa�, includ.ing ensuring ali perfo�nar�ce and reporting requiremen�s . Name af Emplayee � G�,9�, � Leon W%lson, P.E., Project Manager APPROVED AS TO FORM AND L�GAL�TY: �I DBlack (Apr6, 2021 10:07 CDT) Douglas W . H�.ack Senior Assistant Ci.ty A�to�ney M&C: N/A Date: N/A Form 129�: N/A �,04������ A�TEST: �� �oF�RT�Od� a � ������� a�o �_� ��.�d� ��o �=d a o� Ma�y J. Kayser ���'f �oo o� �`d� City Secxetary �n� nEXA`'��,aA'b Page -Z-- OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Kimley>>> Horr� March 23, 2021 Mr. Leon Wilson, Jr., P.E. Project Manager City of Fort Worth Water Department 200 Texas Street Fort Worth, TX 76102 Re: Clear Fork Lift Station and Force Main Amendment No. 1— Permitting Services KHA No. 061018214 City Project No. 100996 Dear Leon: This letter is in reference to a contract between Kimley-Horn and Associates, Inc. ("Engineer" or "Kimley-Horn") and the City of Fort Worth (the City) dated 01-31-2018 referred herein as the "Contract". During a meeting between the City, Kimley-Horn, and Tarrant Regional Water District (TRWD) representatives on 03-05-2021, TRWD indicated that a Section 408 United States Army Corps of Engineers (USACE) permit would be required to be obtained prior to beginning construction on the proposed Clear Fork Force Main within the existing Federal Floodway of the Clear Fork Trinity River. The scope of services in the Contract does not include preparation of the Section 408 permit submittal. The City has requested that Kimley-Horn perform additional services under Amendment Number 1 for the Clear Fork Lift Station and Force Main project. These services include additional permitting tasks related to preparing a Section 408 USACE permit submittal. Service details are further described as follows: CONTRACT TASK 1'� — PERMITTING SERVICES: (Water$0, Sewer$48,720) $ 28,520 Kimley-Horn 20 200 Archeologist Sub $ 48,720 Total ENGINEER will complete the following additional tasks in accordance with the Original Contract: • Prepare 408 permit submittal cover letter • PerForm of an archaeological survey in accordance with USACE and Texas Historical � Commission (THC) requirements of proposed open cut areas along the pipeline alignment • Prepare a Waters of the United States (WOTUS) report and up to four (4) aerial exhibits dictating federal floodway boundary, proposed improvements, and WOTUS boundaries • Preparation of up to six (6) aerial exhibits in addition to those required under Task 12 • Review, respond and address up to two (2) rounds of USACE/TRWD comments • Compile correspondence with USACE on hydrologic and hydraulic analysis study for proposed lift station site kimley-horn.com . Kimley>>> Horn Page 2 • Compile official species list from U.S. Fish and Wildlife Service • Prepare for and attend up to four (4) meetings with TRWD and USACE We recommend that the City increase the budget by $48,720 for these additional services. The following tables summarize our recommended budget revisions, water and sanitary sewer design fees, and revised contract amount: Description Water Sewer Total Task 1 — Project Management $0 $0 $0 Task 2— Lift Station Site Feasibility and Due Diligence $0 $0 $0 Task 3— Lift Station Property Acquisition $0 $0 $0 Task 4— Lift Station Preliminary Design $0 $0 $0 Task 5— Lift Station Final Design $0 $0 $0 Task 6— Lift Station Construction Contract Document Preparation $0 $0 $0 Task 7— Lift Station Bid Phase Services $0 $0 $0 Task 8— Lift Station Construction Phase Services $0 $0 $0 Task 9— Lift Station Record Drawings $0 $0 $0 Task 10 — Force Main Alignment Study $0 $0 $0 Task 11 — Force Main Preliminary Design $0 $0 $0 Task 12 — Force Main Final Design $0 $0 $0 Task 13 — Force Main Construction Contract Document Preparation $0 $0 $0 Task 14 — Force Main Bid Phase Services $0 $0 $0 Task 15 — Force Main Construction Phase Services $0 $0 $0 Task 16 — Force Main Record Drawings $0 $0 $0 Task 17 — Permitting Services $0 $48,720 $48,720 Task 18 — ROW/Easement Services $0 $0 $0 Task 19 — Survey and SUE $0 $0 $0 Task 20 — Additional Services $0 $0 $0 Total $0 $48,720 $48,720 The following table summarizes the Fee per Work Phase breakdown: Work Phase Water Sewer Total 31 $0.00 $14,616.00 $14,616.00 32 $0.00 $29,232.00 $29,232.00 33 $0.00 $4,872.00 $4,872.00 51 $0.00 $0.00 $0.00 Kirnley�>>Horn Page 3 The following table summarizes our recommended budget revisions and shows the revised contract amount: Original Contract Amendment No. 1 Revised Contract Task 1 $33,000 $33,000 Task 2 $83,330 $83,330 Task 3 $39,700 $39,700 Task 4 $265,230 $265,230 Task 5 $357,710 $357,710 Tas k 6 $40, 060 $40, 060 Task 7 $43,910 $43,910 Task 8 $173,050 $173,050 Task 9 $8,900 $8,900 Task 10 $64,900 $64,900 Task 11 $178,460 $178,460 Task 12 $111,730 $111,730 Task 13 $14,500 $14,500 Task 14 $23,520 $23,520 Task15 $91,760 $91,760 Task 16 $13,100 $13,100 Task 17 $21,700 $48,720 $70,420 Task 18 $42,570 $42,570 Task 19 $137,940 $137,940 Task 20 $50,000 $50,000 Total Project $1,795,070 $48,720 $1,843,790 The following breakdown for water and sewer services is recommended: Water Fee Sewer Fee S Feeey Total Original Contract $0 $1,657,130 $137,940 $1,795,070 Amendment No. 1 $0 $48,720 $0 $48,720 Total $0 $1,705,850 $137,940 $1,843,790 Kimley�>>Horn Page 4 We appreciate the opportunity to be of continued service to the City. Please contact us if we need to provide any further information. Very truly yours, KIMLEY-HORN AND ASSOCIATES �. d � �• John R. Atkins, P.E. Vice President JCK/jra Copy to: Tony Sholola, P.E., City of Fort Worth Attachments - Level of Effort Spreadsheet \\kimley-hom\TX_FTVNFTW Ulilities1061018214-Clear-Fork-LS&FM\PPP\POST_NTPWmendment-No-lWmendment-No-1_Clear-Fork-LS&FM.doc kimley-horn.com �'` � c� �.d�' �° �� A 3 � O d � � �m^m� � � o 7Ja�° � � � m -i N � o � m � m w O � a � v � .. d � W � c o�� � IV j � O � N ,_�, C�wD 1 � � � m m � T � � � � o � N � c 0 0 � � o O � � C� N N N " N N N � N � N T � � �A A J ^ � � � N � �I O J � p N N p p O O 00 c� Z � C/� (n � m m � �mm o m��� m��d-a�,�» ? o 0 0 0 n � � X � � C �l = = (D N p 3 N N � U C '3 � .�i .�-r N � N d � Efl ffl ffl N N � N N � � O N (T � o N fA N O m o O O O O W � � � m � m r r > > m m T T O o N N N N A A 0 0 0 0 0 0 0 0 0 0 � W N � A � V N O O O � -i r -� D '� � < v � N v�i 2 .��, T � C � O � � � r � � � �'(D D� v�N �w d o v�- �*�o� 3 �� � Z rt 7 C.