Loading...
HomeMy WebLinkAboutResolution 4092-06-2012A Resolution NO. 4092 -06 -2012 SUPPORTING THE ENVIRONMENTAL CLEARANCE AND COMMENCEMENT OF IMPROVEMENTS TO THE IH -35W CORRIDOR WHEREAS, the Texas Department of Transportation ( "TxDOT ") is seeking support and comments from the City for the proposed improvements to Interstate Highway 35W ( "IH -35W ") in Fort Worth; and WHEREAS, IH -35W a/k/a the "NAFTA Superhighway," is an important international trade and commerce route and has been designated by the U.S. Congress as a National High Priority Corridor; and WHEREAS, IH -35W through Tarrant and Denton Counties has become significantly congested, resulting in increased transportation time and costs jeopardizing the region's ability to expand existing economic development programs and compete nationally and globally for new businesses and jobs; and WHEREAS, Denton County is advancing schematic designs for improvements to IH -35W from the Denton Central Business District south to the Denton/Tarrant County Line; and WHEREAS, TxDOT is advancing schematic designs for improvements to IH -35W from United States Highway 287 ( "US 287 ") north to the Denton/Tarrant County Line, the "IH -35W 3C Project "; and WHEREAS, the City of Fort Worth supported the creation of the I -35 Coalition, a broad based community and business organization created to advance transportation and mobility improvements to the IH -35W corridor; and WHEREAS, the City of Fort Worth has adopted aesthetic corridor and land use guidelines to steer future development along the project; and WHEREAS, the City of Fort Worth supports TxDOT's efforts to identify funding to advance the construction of IH -35W from the Interstate Highway 820 /IH -35W Interchange ( "IH -820 Interchange ") to US 287, the "IH -35W 3B Project "; and WHEREAS, the City of Fort Worth supports TxDOT's efforts to secure Transportation Infrastructure Finance and Innovation Act ( "TIFIA ") funding for the IH -35W improvements from Fort Worth's Central Business District to, and including, the IH -820 Interchange, the "IH -35W 3A Project "; and F2 WHEREAS, the City of Fort Worth understands the vital need to protect adjacent communities and cultural assets from the impacts of the proposed improvements along the IH -35W corridor; and WHEREAS, the City of Fort Worth understands that the IH -35W 3A Project's schematic design details the ultimate improvements to be made in the corridor; and WHEREAS, the City of Fort Worth understands that funding for the ultimate improvements is not currently available and the project will be constructed in phases; and WHEREAS, the City of Fort Worth understands that TxDOT has entered into a long term Comprehensive Development Agreement with a private entity, NTE Mobility Partners, LLC ( "NTEMP "), for the construction, funding, and maintenance of the project; and WHEREAS, TxDOT and NTEMP will agree on the scope of the first phase of construction known as the Mandatory Scope of Work for the IH -35W 3A Project. NOW, THEREFORE BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS THAT: The City of Fort Worth supports the environmental clearance and the commencement of construction of the IH -35W 3A and 3B projects as soon as possible with the following provisions: • TxDOT continues the prompt advancement of the design of the IH -35W 3C Project and identification of funding support; • TxDOT continues to plan appropriate and prudent mitigations to the historical and noise issues raised by the Oakhurst Neighborhood Association on the IH -35W 3A Project; • TxDOT continues to plan appropriate and prudent mitigations of the IH -35W 3A Project's increased footprint across the Trinity Trail at the Trinity River Crossings to include limited construction related trail closures, installation of under bridge lighting, and clear spans of the Trinity River as practical; • TxDOT continues its appropriate and meaningful engagement of City staff in the development and implementation of the local access elements based on the Mandatory Scope of Work including aesthetic treatments in the entire corridor; • TxDOT maintains its appropriate and meaningful engagement with the City and NTEMP, through design and construction, of the IH -35W 3A Project to ensure the least disruption to the community, the City's arterial network, and the City's Water, Sewer and Storm Water utilities. Resolution No. 4092 -06 -2012 Adopted this 5`h day of June, 2012. ATTEST: By: Mary J. IKays r, City Secretary .Attachments IH -35 Location Map Segments 3A, 3B, & 3C ' COPPELL 70 1 SOUTHLAKE 1 1 4 !f^ ,.' KELLER GRAPEVINE 26 f m 14` 377.. (' COLLEYVILLE 121 NORTH 3029 1 360, RICHLAND HILLS DFW 1.61 inn. EULESS 1938 BEDFORD HURST j (360 183 121, 157' 35W --_ — – '30 GRAND 30 20 ARLINGTON PRAIRIE FORT WORTH I Master Development Plan (Segments 2 -4) Concession CDA MOMMS Segment 2E Segment 4 Segments 1 & 2W Segment 3A 1 -35W/1 -820 B interchange Segment 3 reconstruction �111111 Segment 3C