HomeMy WebLinkAboutContract 53962-CO2CSC No. 53962-0O2
FO RT WO RT H City of Fort Worth
Change Order Request
Project Name: 90-Inch (M-280) Sanitary Sewer Rehabilitalion Pro�ecl Cily Sec No.: 539 Q
PfOjeCl N0.(S): 56002•0700430-4956001-001286 DOE No. N/A City Proj. No.: 01286�
Project Descriplion: Sanitary Sewer Rehabilatallon M-2806 Located in Galeway Park
Contraclor. S. J, Louis Conslruclion Of Texas, Ltd. Change Order #�2 Dale: 311612021
City Projecl Mgr. Walter Norwood City Inspector: Carmen Drake
Phone Number: (817) 392•5026 Phone Number: (817) 392-8347
Dept. � Water � Sewer
Original Contract Amount $5,591,888.00
Exiras to Date $0.00
Credits to Date
Pending Change Orders(in MB�C Process)
Contract Cost to Date $5,591,888.00
Amount of Proposed Change Order $6;683.04 1
Revised Contracl Amount $5,598,571.04
Original Funds Available for Change Orders $167,757.00
Remaining Funds Available forthis CO ' �
Additional Funding (ii necessary) $6,683.04
CHANGE ORDERS to DATE (INCLUDING TNIS ONE) AS % OF ORIGINAL CONTRACT
MAX ALLOWABLE CONTRACTAMOUNT (ORIGINAL CONTRACT COST+ 25%)
JUSTIFICATIONIIREASONSI1FORiCFIANGE ORDER
Change Order No. 2 provides for the following:
Totals �ontract Time
(Calender days)
$5,591,888.00 456
0
$5,591,888.00 456
�6 683.04 0
$5,598,571.04 456
$167,757;00
$6,683.04
0.12%
$6,989,860.00
• Stop logs with dual seals in existing sewerjunction structure.
• Removal of concrete over trench on 90 inch diameter gravity sewer.
• Removal of unsuitable back fill material found onslte and additional imported select backfill over portions of
the trench for the 90 inch diameter gravity sewer.
• The deletlon of pay item quantities that are no longer needed on the proJect.
Coniractor's Com any Name Contractor Name
S. J. Louis Construclion O( Texas, Ltd. Adam Lundsford
Director
Assistant
�
M&C Number
Date
S�- �D�
� Date
r ApY �, Zo2�
Date
pr7,2021
Councll Ac
N1A
Constructlon
Asslstant Clty Ma
MB�C Dale Approved
Date
Date
pr 7, 2021
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
F�, �z wo RT H City of Fort Worth
Change Order Additions
ProJect Name 90-Inch (M-280) Sanitary Sewer Rehabilatation Project City Sec No.: 53962
Project No.(s): 56002-0700430-4956001-001286 DOE No. N/A City Proj. No.: 01286
Project
Description
Sanitary Sewer Rehabilatatfon M-280B Located in Gateway Park
Contractor S. J. Louis Construclion Of Texas, Ltd. Change Order:�2 Date: 3116/2021
City Project Mgr. Walter Norwood City Inspector Carmen Drake
ADDITIONS
DEPT Qt Unit Unit Cost Total
31 Select Backfill in Trench for 90 Inch Dia. Gravity Sewer Sewer 4,700.00 CY $25.00 �117,500.00
49 86" Series 95 Stop Log and Guide Frame with Dual Seal Sewer 2.00 EA �39,003.00 $78,006.00
50 106" Series 95 Stop Log and Guide Frame with Dual Seal Sewer 1.00 EA $55,003.00 $55,003.00
51 Removal of Concreie Trench Cap over 90" Gravity Sewer Sewer 388,00 LF �479.83 $186,174,04
Water
Sewer $436,683.04
r<ige i oi i Additions Sub Total $436,683.04
�'O RT WO RT H City of Fort Worth
Change Order Deletions
Project Name 90-Inch (M-280) Sanilary Sewer Rehabilatation ProJect Cily Sec No.: 53962
Project No.(s): 56002-0700430-4956001-001286 DOE No. N/A City ProJ. No.: 01286
Projecl Descriplion
Saniiary Sewer Rehabilatation M-280B Located in Gateway Park
Contractor S. J. Louis Conslrucfion Of Texas, Lld. Change Order: �2 Date 3116/2021
City Project Mgr. Walter Nonrrood City Inspector: Carmen Drake
DELETIONS
Page 1 of 1
MIWBE BreakdQwn for this Change Order
Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
Signature
Name of Employee
Title
Mary J. Kayser
City Secretary