Loading...
HomeMy WebLinkAboutContract 52483-A4CSC No. 52483-A4 AMENDMENT No.4 TO CITY SECRETARY CONTRACT No. 52483 WHEREAS, the City of Fort Worth (CITY) and Halff Associates, Inc.,(ENGINEER), made and entered into City Secretary Contract No. 52483, (the CONTRACT), which was authorized by M&C No. C-29147 on the 11 day of June, 2019 in the amount of $ 930,000.00 (Nine hundred and Thirty Thousand Dollars); and WHEREAS, the CONTRACT involves engineering services for the following project: CentrePort Trail Phase I and Phase II Project; and WHEREAS, to date, three amendments have been necessary: Amendment No. 1 in the amount of $27,000.00 for additional for archeological survey and geotechnical stability analysis, Amendment No. 2 in the amount of $37,000.00 for additional hydrology and hydraulic studies and Amendment No. 3 in the amount of $35,945.00 for additional geotechnical test boring for retaining wall piers; and WHEREAS, it has become necessary to execute Amendment No. 4 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in a scope of services proposal, a copy of which is attached hereto and incorporated herein (Attachment A) . The cost to City for the additional design services to be performed by Engineer totals $36,700.00(see attached Funding Breakdown Sheet, page 4). 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $1,066,645.00. City or Fort Worth Professional Services Agreement Amendment Template CFW Official Release 9/19/2017 Page 1 or 4 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date subscribed by the City's designated Assistant City Manager. APPROVED: City of Fort Worth Valerie Washington Assistant City Manager DATE= Apr 14, 2021 APPROVAL RECOMMENDED: Richard Zavala (Apr 9, 202117:20 CDT) Richard Zavala Director, Park & Recreation Department DATE: Apr 9, 2021 Contract Compliance Manager: ENGINEER Half£ Associates, Inc. irector of Landscape Architecture DATE: o1/flll1,tnl By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Jing Yang Project Manager City of Fort Worth Professional Services Agreement Amendment Template CFW Official Release 9/19/2017 Page 2 of 4 APPROVED AS TO FORM AND LEGALITY: DBlack (Apr 13, 202118:01 CDT) Douglas W. Black Assistant City Attorney ATTEST: Mary J. Kayser City Secretary City of Fort Worth Professional Services Agreement Amendment Template CFW Official Release 9/19/2017 Page 3 of 4 M&C: 21-0219 M&C Date: 03.23.2021 Date: Apr 1 3, 2021 Date: Apr 14, 2021 FUNDING BREAKDOWN SHEET AN�NDMENT No . 4 TO CITY SECRETARY CONTRACT No. 52483 DEPARTMENT FUND-ACCOUNT-CENTER AMOUNT PARD 31001-5330500-0800450-100082-5030 $36,700.00 City of Fort Worth Professional Services Agreement Amendment Template CFW Official Release 9/19/2017 Page 4 of 4 ATTACHMENT A ■■■ HALFF [ 1201 North BowserRoad ��� Richardson, Texas 75081 ��� (214)346-6200 Fax(214)739-0095 ADDITIONAL SERVICES CONFIRMATION To: Jing Yang Date: December 17, 2020 From: Jeff Roberts Email: jfroberts@halff.com VIA: email AVO: 34838.001 Project: CentrePort Trail - Phase I The scope of services provided below are a continuation of the scope of services stated in the Standard Form of Agreement dated July 2, 2019 between The City of Fort Worth (CLIENT) and HalffAssociates (CONSULTANT) for CentrePort Trail — Phase I. The specific geotechnical services provided as part of this amendment are as follows: Additional Services PROJECT DESCRIPTION AGG previously perFormed a geotechnical investigation (AGG Report No. DE19-282) for the CentrePort Trail Phase I alignment. It is understood that the City of Fort Worth would like to preserve the existing trees without flattening the existing steep slopes. It is further understood that additional test borings have been requested in order to provide recommendations for soil nail reinforced and/or drilled shafts for retaining walls F and G. AGG SCOPE OF WORK See the attached Proposal for Supplementary Geotechnical Investigation from Alliance Geotechnical Group, dated December 3, 2020 for Global Stability and Engineering Analysis. To perform these additional services, Halff is requesting a fee that will not exceed of $15,000.00 for the geotechnical analysis by AGG and coordination and oversight by Halff. HALFF SCOPE OF WORK Halff will provide coordination, oversight, and administration for the additional work for AGG, in addition to review and comment on the additional analysis. To perform these additional services, Halff is requesting a fee that will not exceed of $7,500.00. Additional Services total: $22,500.00 We request your signature below to confirm the scope and fee. If the scope and/or fee is not acceptable, please notify us immediately. CITY OF FORT WORTH By: (Print name) Title: Signature; Date: HALFF ASSOCIATES INC. By: Title: Signature: Date: �u�ri� � ���� �� December 3, 2020 Ms. Laura Johnson Senior Project Manager Half Associates, Inc. 1201 N. Bowser Road Richardsan, Texas 75081 Phone: (214) 346-6311 Email: Ijohnsan a�halff.com GEOTECHNICAL ENGINEERING ENVIRONMENTAL CONSULTINQ CONSTRUCTION MATERIALS ENGINEERING AND TESTING • CONSTRUCTION INSPECTION Re: Proposal for Suppl�mentary Geotechnical Investigation CentrePort Trail — Retaining Walls F& G Fort Worth/Grand Prairie, Texas AGG Proposal No. P20-11 U5E-R2 Dear Ms. Johnson, Alliance Geotechnical Group (AGG) understands that we have been selected to provide geotechnical engi�eering and testing servi�es at the above noted project. We �nderstand that AGG has ueen selected based on qualifications in accordance with the Professional Services Procurement Act for providing geotechnical services. A detailed scope and project pricing are provide� below. PROJECT DESCRIPTION AGG has previously perFormed a geotechnical investi�ation (AGG Report No. DE19-282) for the CentrePArt Trail Fhase I alignment. It is understood that the City of Fort Worth would like to preserve th� existing trees �Nithout flattening the existing steep slopes. It is further understood that additional test borings have been requested in order to provide recommendations for soil nail reinforced and/or urilled shafts for retaining wails F and G. SCOPE OF WORK The gectec:,hniaal irivestigatinn performed for the referenced project will consist of field and iaboratory investigations, engineering analysis, and a report preparsd by a Registered Professional Engineer. Field and Lab investi�ations The field and lab ir�vestigations will be performed under a separate contract. Gfabal Stabifity Testing for glob�l stability will include atterberg limits (PI's), moisture content, sieve analyses and unconfined carrfpression strength #esting .Jue to the variable Woodbine formatian and the length of time required for triaxial testing and direct shear testing, these tests have not been inc�uded in Dallas • Ft. Worth • Frisco • Dayton • Longview • Htintsville 3228 Halifax Street • Dallas, Texas 75247 ��� TeL• 972•444-8889 • Fax: 972-444-8893 • www.aggengr.com ''��o' ,�± -� ��f�ri� ��G �orECHnic,� � _ C�OUP _ _ � Proposal for S�pplementary Geotechnical Investigation CentrePort Trail — Retaining Walls F& G Fort Worth/Grand Prairie, Texas AGG Proposal No. P20-1105E-R2 Page 2 this proposal. Global Stability studies will be based on TxDOT slope criteria based on PI. We have included global stability studies that will be based on typical strength parameters on similar soil in the event a highly variable layered stratigraphy is encountered as anticipated. Alternative recommendations will be provided based on current global stability conditions in tree covered areas and in areas where tree cover is sparse. Ens�ineerin� Analvses Results of field and laboratory work will be presented in an engineering report that is signed and sealed by Registered Professional Engineer of Texas. The report will include our recommendations to guide design and construction of retaining wall F and G. The r�eport will include the following: 1. Plan of borings, boring logs, water level observations, and laboratory test results. 2. Foundation recommendations for short retaining walls. 3. Global stability analyses for retaining wall F and G. 4. Recommendations for drilled shaft walls. 5, Recommendations for site grading and compaction of earthwork will be presented. GEOTECHNICAL FEES Based on the proposed scope of work, the fee for the analyses and report will not exceed $15,000.00. This includes time to review the revised construction documents and a contingency for additional analyses and recommendations that are not indicated above. This is to assure that you do not lack recommendations for unexpected items that come up during your final design. TERMS AND CONDITIONS If this proposal meets with yaur approval, please sign below to authorize Alliance Geotechnical Group to perform the work. Pleasc: contact us after reviewing our proposal if you have any questions. We look forward to working with you on this project. Sincerely, ALLIANCE GEOTECHNICAL GROUp C� �� G„� �v c Logar�l'ucker, �I.T. Staff Engineer t...�- Mark J. a ow, P.E Senior Vice President �GG 1. Al...LIflhCE GEaTECHMICAL Proposal for Supplementary Geotechnical Investigation � CentrePort Trail — Retaining Walls F& G Fort Worth/Grand Prairie, Texas AGG Proposal No. P20-1105E-R2 Page 3 GROUP ACCEPTED BY: Name/Title Date �%� HALFF ��� 1201 North Bowser Road Richardson, Texas 75061 (214)346-6200 Fax(214)739-0095 ADDITIONAL SERVICES CONFIRMATION To: Jing Yang From: Laura Johnson Email: LJohnson@halff.com VIA: E-mail Date: November 3, 2020 AVO: 34838.001 Project: CentrePort Phase I The City of Fort Worth (CLIENT) has asked Halff Associates, Inc. (Halff) (CONSULTANT) to complete environmental services for CentrePort Trail Phase I beyond the services provided in the agreement dated July 2, 2019 and as directed by the City of Fort Worth. The scope of services provided below are a continuation of the scope of services stated in the Standard Form of Agreement dated July 2, 2019. The specific services provided as part of this amendment are as follows: Additional Services CentrePort Phase I Environmenkai Technical Re�ort Re�isions The following scope of services and associates fees are the result of project design refinements (made in September 2020) and the need for new permanent easements that necessitated revisions and additional reviews of environmental technical reports previously submitted to the Texas Department of Transportation Fort Worth District (TxDOT), updates to draft environmental technical reports, and subsequent coordination with TxDOT. Historical Studies Project Coordination Request (PCR) and Hazardous Materials Initial Site Assessment (ISA) — For environmental technical reports that were submitted to TxDOT for review prior to the September 2020 project design refinements, Halff will prepare a GIS shapefile and Project Environmental Footprint Comparison Mapbook containing/showing areas within the latest project footprint that were not evaluated previously. Halff will coordinate with TxDOT to evaluate the need to revise the Historical Studies PCR and Hazardous Materials ISA. Pending TxDOT review and comments, Halff will revise the environmental technical reports as needed. Biological Investigations — Halff will revise and submit the in-progress draft Species Analysis Form, Species Analysis Spreadsheet, Tier I Site Assessment, and supporting documentation to TxDOT once the project design refinements are completed. Halff will also update the Tier I Site Assessment and Species Analysis Spreadsheet based on TxDOT's latest updates to these forms and Texas Parks and Wildlife Department's updates to county species lists that occurred in August 2020. Halff will request new Texas Natural Diversity Database data, which expired in August 2020, and update the Species Analysis Form, all exhibits, and vegetation impact calculations based on the revised project area and easement needs. Pending TxDOT review and comments, Halff will revise the environmental technical reports as needed. Water Resources Investigations — Halff will revise and submit the draft Surface Water Analysis Form, Waters of the U.S. Delineation Report, Section 404/10 Impacts Table and supporting documentation to TxDOT once the project design refinements are completed. Halff will update the Surface Water Analysis Form based on TxDOT's latest update to this form in August 2020 and update the Waters of the U.S. Delineation Report, Section 404/10 Impacts Table, and all exhibits based on the revised project area and easement needs. Pending TxDOT review and comments, Halff will revise the environmental technical reports as needed. %�� HALFF ��� 1201 North Bowser Road Richardson, Texas 75081 (214)346-6200 Fax(214)739-0095 Archeological Survey Report — Halff will revise and submit the draft Archeological Survey Report and supporting documentation to TxDOT based on the revised project area and easement needs. Pending TxDOT review and comments, Halff will revise the environmental technical report as needed. Additional Fees To complete these additional services, Halff is requesting a lump sum fee of $14,200.00 for the CentrePort Phase I environmental technical report revisions. Total: $14,200.00 We request your signature below to confirm the scope and fee. If the scope and/or fee is not acceptable, please notify us in writing, CITY OF FORT WORTH By: (Print name) Title: Signature: Date: HALFF ASSOCIATES INC. By: Title: Signature: Date: 3/23/2021 CITY COUNCIL AGENDA DATE: 3/23/2021 REFERENCE "'`M&C 21- LOG NO.: 0219 NAME: M&C Review FORT �VpRTI I -��- 80CENTREPORT TRAIL PHASE I AND PHASE II PROJECT ENGINEERING CO CODE: C TYPE: CONSENT PUBLIC NO HEARING: SUBJECT: (CD 5) Authorize Execution of Amendment No. 4 to the Engineering Agreement with Halff Associates, Inc. to Provide Additional Engineering Design Services for CentrePort Trail Phase I and Phase II in an Amount Not to Exceed $36,700.00, for a Total Contract Value of $1,066,645.00 RECOMMENDATION: It is recommended that the City Council authorize the execution of Amendment No. 4 to City Secretary Contract No. 52483, an engineering agreement with Halff Associates, Inc. to provide additional engineering design services for CentrePort Trail Phase I and Phase II, in an amount not to exceed $36,700.00, for a total contract value of $1,066,645.00 (City Project No. 100082). DISCUSSION: The purpose of this Mayor and Council Communication (M&C) is to authorize the execution of Amendment No. 4 with Halff Associates, Inc. (Halff) to provide additional engineering design services for CentrePort Trail Phase I and Phase II (City Secretary Contract No. 52483), in an amount not to exceed $36,700.00, for a total contract value of $1,066,645.00 (City Project No. 100082). This project includes two phases. Phase I will start at the new American Airlines Campus in the east Fort Worth CentrePort area, connect to Arlington River Legacy Trails, and terminate at the Trinity Railway Express (TRE) CentrePort Station (approximately 1.6 miles total). Phase II will start at the TRE CentrePort Station and extend east along the TRE railroad until meeting Trinity Boulevard, and then continue heading south to Mike Lewis Park in Grand Prairie (approximately 3.5 miles total). A map showing these routes is attached. Anticipated improvements include a 12-foot wide concrete paved trail, 2-foot wide shoulder on both sides of the trail and other trail structures. The City Council authorized an Advanced Funding Agreement (AFA) with Texas Department of Transportation (TxDOT) in the amount of $2,757,588.00 on June 20, 2017 (M&C G-18975 and rescinded M&C G-19040) (City Secretary Contract No. 49494 and TxDOT Control Section Job No. 0902-90-050), for the engineering and construction of Phase I. Subsequently on September 25, 2018 (M&C G-19383), the City Council authorized the execution of an amendment to the AFA which added $926,862.00 for the preparation of 90\% design only for Phase II, bringing the total AFA amount to $3,684,450.00. Halff has been under contract (M&C C-29147 and City Secretary Contract No. 52483) since June 11, 2019, providing engineering design services for Phase I and Phase II projects. The amount in the original engineering contract is $930,000.00. To date, three amendments have been administratively approved. Amendment No. 1 in the amount of $27,000.00 was for increased scope for archeological survey and geotechnical stability analysis. Amendment No. 2 in the amount of $37,000.00 was for additional hydrology and hydraulic studies. Amendment No. 3 in the amount of $35,945.00 was for the additional geotechnical test boring for retaining wall piers. Design Contract 8� Amendment No Design Contract No. 52483 Amendment No. 1 �IAmendment No. 2 -- - -- - ----- - - Amendment No. 3 Amendment No. 4 Amount $930,000.00 $27,000.00 $37,000.00 $35,945.00 $36,700.00 apps.cfwnet.org/council_packeUmc_review.asp?ID=28769&councildate=3/23/2021 1/2 3/23/2021 M&C Review I Total � $1,066,645.00 CentrePort Trail Phase I and Phase II is located in COUNCIL DISTRICT 5. FISCAL INFORMATIONICERTIFICATION: The Director of Finance certifies that funds are available in the current capital budget, as previously appropriated, in the Grants Cap Projects Federal Fund for the Centreport Trail project to support the approval of the above recommendation and execution of the contract. Prior to any expenditure being incurred, the Park & Recreation Department has the responsibility to validate the availability of funds. TQ � Fund Department Account Project Program Activity Budget Reference #, Amount � ID ID Year �(Chartfield 2) FROM Fund Department Account Project Program Activity Budget Reference # Amount ID ID Year �(Chartfield 2) Submitted #or City Manager's �ffice by_ Valerie Washington (6192) Originating Department Head: Additional ln€ormation Contact: ATTACHMENTS Locatian Map.pdf Richard Zavala (5704) David Creek (5744) apps.cfwnet.org/council_packeUmc_review.asp?ID=287698�councildate=3/23/2021 2/2