Loading...
HomeMy WebLinkAboutContract 51240-AD2PROFESSIONAL SERVICES AGREEMENT CSC 51240 AD2 BETWEEN NU, INC., D/B/A NU-DESIGN AND THE CITY OF FORT WORTH Information Technology Delivery Order This Multi-Year Information Technology Delivery Order form shall be governed by all the term s and conditions of the agreement referenced below. Sponsoring (Client) Department: City Secretary Contract Number: Delivery Order Number: Project Name: Professional Services Firm: Date of Contract: Delivery Order Date: City 's Contract Manager: Planning & Data Analytics Department City Secretary Contract Number 51240 Delivery Order (Addenda 2) FWPA CM -Nu Des ign Nu, Inc ., d/b/a Nu-Design September 10, 2018 April 8, 2021 Arts Council of Fort Worth and Tarrant County, Inc . Summary and Description of Statement of Work attached hereto: Scope of Work and fee propo sal per Nu, Inc ., letter dated September 29 , 2020, subject: Lancaster Ave . -Plan to Prepare Sculpture #4 Interior for Lighting Demo (attached). Fund/Account/Center No .: Notice to Proceed Date for this Delivery Order: Completion Date for this Delivery Order: CITY OF FORT WORTH: Fernando Costa Assistant City Manager Date: _ _,4+-/-=--.J,f-'/z,=-o~2,c._l ___ _ APPROVED AS TO FORM AND LEGALITY: ~;,;;? 3 9007-020£4 3 1-5740010--100246-CAPEX - April 8, 2021 April 20, 2021 NU, INC., D/B/A NU DESIGN: By: ~~dad- Kelly Hart Vice President Date: 4 /8 /2021 ~· .. .... ·r·· /.. I ·••••.• -_. . . . ·,, ..... '· I •.•• •· •" OFFICIAL RE ORD CITY SECRE RY FT. WORTH T'f Seplember29,2020 ~-G _" ------------ P.O. BOX 14116, ARLINGTON, TX 760941 WWW.NU -DESIGN .COM I 817--874-6486 Lancaster Ave -Plan to Prepare Sculpture #4 Interior for New Lighting Demo Note: This is not an estimate Structure -Referring to figures 1 -2 A . Radio receiver B. (front) Transformer for external lights C. (front) OMX splitter/isolator/amplifier D. (rear) Transformer for tower lights/previous ground tights E. (rear) Transformer for tower lights/previous ground lights. 1 gang all weather electrical ouUet attached to fronl F. Electrical junction box with conduit bringing power in and out Work -Referring to figures 1 -2 D Tum off power iii street box D Test power to make sure it is off at sculpture A . Disconnect radio power and dmx cable. Remove box and upper L-Brackel that is holding ii in place. B. Disconnect transformer power inputs and outputs_ Remove box. C . Disconnect dmx and power cables, remove ends so wires can be removed through box ports, and remOYe box. D. Disconnect transformer power inputs and outputs_ Remove box_ E. Disconnect transformer power inputs and outputs_ Remove electrical ouUet_ Remove box _ F . Leave box and conduit in place. D Reconnect electrical outlet and secure for temporary power access. □ Temporarily terminate exposed wires and wrap and coil. □ Restore power and test ouUet Approximate Resources □ 2staff@ 103/hour nonprofit rilte x 6 hours = 1236 □ Hardware(ifneeded)=30 □ If removal r:I coverings reveals any major electrical issues, we may need to call in an electrician from Nema3. 2 Figure 1: Interior Sculpture #4 Left Inside Wall Rear Wall Right Inside Wall Figure 2: Exploded View of figure 1 -2 - 3 CONTRACT COMPLIANCE MANAGER By signing, I acknowl that I am the person responsible for the monitorin d administration of this contract, including fo1mance and reporting requirements. ublic Art Collection Manager Fort Worth OFFICIAL REC1t>RD CITY SECRET, ,RY FT. WORTH, ITX