HomeMy WebLinkAboutContract 51240-AD2PROFESSIONAL SERVICES AGREEMENT CSC 51240 AD2
BETWEEN NU, INC., D/B/A NU-DESIGN AND THE CITY OF FORT WORTH
Information Technology Delivery Order
This Multi-Year Information Technology Delivery Order form shall be governed by all the term s and
conditions of the agreement referenced below.
Sponsoring (Client) Department:
City Secretary Contract Number:
Delivery Order Number:
Project Name:
Professional Services Firm:
Date of Contract:
Delivery Order Date:
City 's Contract Manager:
Planning & Data Analytics Department
City Secretary Contract Number 51240
Delivery Order (Addenda 2)
FWPA CM -Nu Des ign
Nu, Inc ., d/b/a Nu-Design
September 10, 2018
April 8, 2021
Arts Council of Fort Worth and Tarrant County, Inc .
Summary and Description of Statement of Work attached hereto:
Scope of Work and fee propo sal per Nu, Inc ., letter dated September 29 , 2020,
subject: Lancaster Ave . -Plan to Prepare Sculpture #4 Interior for Lighting Demo (attached).
Fund/Account/Center No .:
Notice to Proceed Date for this Delivery Order:
Completion Date for this Delivery Order:
CITY OF FORT WORTH:
Fernando Costa
Assistant City Manager
Date: _ _,4+-/-=--.J,f-'/z,=-o~2,c._l ___ _
APPROVED AS TO FORM AND LEGALITY:
~;,;;?
3 9007-020£4 3 1-5740010--100246-CAPEX -
April 8, 2021
April 20, 2021
NU, INC., D/B/A NU DESIGN:
By: ~~dad-
Kelly Hart
Vice President
Date: 4 /8 /2021 ~· .. .... ·r··
/.. I ·••••.• -_.
. . . ·,, .....
'· I •.•• •·
•"
OFFICIAL RE ORD
CITY SECRE RY
FT. WORTH T'f
Seplember29,2020
~-G _" ------------
P.O. BOX 14116, ARLINGTON, TX 760941 WWW.NU -DESIGN .COM I 817--874-6486
Lancaster Ave -Plan to Prepare Sculpture #4 Interior for New Lighting Demo
Note: This is not an estimate
Structure -Referring to figures 1 -2
A . Radio receiver
B. (front) Transformer for external lights
C. (front) OMX splitter/isolator/amplifier
D. (rear) Transformer for tower lights/previous ground tights
E. (rear) Transformer for tower lights/previous ground lights. 1 gang all weather electrical ouUet
attached to fronl
F. Electrical junction box with conduit bringing power in and out
Work -Referring to figures 1 -2
D Tum off power iii street box
D Test power to make sure it is off at sculpture
A . Disconnect radio power and dmx cable. Remove box and upper L-Brackel that is holding ii in
place.
B. Disconnect transformer power inputs and outputs_ Remove box.
C . Disconnect dmx and power cables, remove ends so wires can be removed through box ports,
and remOYe box.
D. Disconnect transformer power inputs and outputs_ Remove box_
E. Disconnect transformer power inputs and outputs_ Remove electrical ouUet_ Remove box _
F . Leave box and conduit in place.
D Reconnect electrical outlet and secure for temporary power access.
□ Temporarily terminate exposed wires and wrap and coil.
□ Restore power and test ouUet
Approximate Resources
□ 2staff@ 103/hour nonprofit rilte x 6 hours = 1236
□ Hardware(ifneeded)=30
□ If removal r:I coverings reveals any major electrical issues, we may need to call in an
electrician from Nema3.
2
Figure 1: Interior Sculpture #4
Left Inside Wall Rear Wall Right Inside Wall
Figure 2: Exploded View of figure 1
-2 -
3
CONTRACT COMPLIANCE MANAGER
By signing, I acknowl that I am the person responsible
for the monitorin d administration of this contract, including
fo1mance and reporting requirements.
ublic Art Collection Manager
Fort Worth
OFFICIAL REC1t>RD
CITY SECRET, ,RY
FT. WORTH, ITX