HomeMy WebLinkAboutContract 53101-A2AMENDMENT No . 2
TO CITY SECRETARY CONTRACT
WHEREAS, the City of Fort
Nichols, Inc., (ENGINEER) made an
Contract No. 53101, (the CONTRACT
authorized on the 19th day of Nov
$258,140.00; and
CSC No. 53101-A2
and Freese and
City Secretary
administratively
n the amount of
WHEREAS, the CONTRACT was subsequently revised by Amendment
No. 1 in the amount of $163,243.00 which was authorized by M&C 20-
0161 on April 17, 2020; and
WHEREAS, the CONTRACT involves engineering services for the
following project:
Additional Emergency Streambank Stabilization for Two 90-inch
Sanitary Sewer Mains; and
WHEREAS, it has become necessary to execute Amendment No. 2
to the CONTRACT to include an increased scope of work and revised
fee .
NOW THEREFORE, CITY and ENGINEER, acting herein by and
through their duly authorized representatives, enter into the
following agreement, which amends the CONTRACT:
1.
Article I of the CONTRACT is amended
additional engineering services specified in a
attached hereto and incorporated herein. The cost
additional design services to be performed by
$57,791.00.
F�
Article II of the CONTRACT is
increase in the fee to be paid to
services performed under the Contrac
total fee paid by the City for all wo
amount of $481,174.00.
3.
:o include the
proposal letter
to City for the
Engineer totals
to provide for
for all work
amended, so that
ervices shall be
an
and
the
an
All other provisions of the Contract, which are not expressly
amended herein, shall remain in full force and effect. OFFICIAL RECORD
CITY SECRETARY
Page -1-
FT. WORTH, TX
Worth (CITY)
d entered into
) which was
ember, 2019 i
amended
Engineer
t, as
rk and s
EXECUTED and EFFECTIVE as of the date last written by a
signatory, below.
APPROVED:
City of Fort Worth
�G�Zc''v �GG2.�%>��i�i
Dana Burghdoff (Apr 17, 20 2:06 CDT
Dana Burghdoff
Assistant City Manager
DATE : Apr 17, 2021
APPROVAL RECOMNIENDED:
CGi!'lSf"OpGiB!' KA!'G�B�'
Ch rist� ardcr (Apr 14, 2021 15:50 CDT)
Chris Harder, P.E.
Director, Water Department
Contract Compliance Manager:
ENGINEER
Freese and Nichols, Inc.
�Q1�� ��w./�1'�.�t.,
Nicholas Lester, P.E.
Vice-President
DATE : � I��j_��)
By signing, I acknowledge that I am the person responsible for the
monitoring and administration of this contract, including ensuring
all performance and reporting requirements.
. � � �� 1 � � . E
G� 1'� � i �. �'t
Tony holola, P.E.
Assistant Director
APPROVED AS TO FORM AND LEGALITY:
f�-�l
DBlack (Apr 16, 202116:47 CDT)
Douglas W. Black
Senior Assistant City Attorney
ATTEST:
I����-��,
Mary J. Kayser
City Secretary
,d4��nn
a ��
��► ���oR����a�
o �
p�o
o �
(%�o �_�
����oo �o���
� °°00000a ,�
�� nEXASb�'a
M&C: 21-0284 (Funding M&C)
Date: April 13, 2021
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Page -2-
February 8, 2021
Mr. Tony Sholola, P.E.
Assistant Director
City of Fort Worth Water Department
311 West 10`h Street
Fort Worth, TX 76102
Re: Amendment No. 2 for the Twin 90" Sewer Pipes Emergency Bank Repairs at Sanders Street
(City Project No. 53101)
Dear Mr. Sholola:
Freese and Nichols, Inc. (FNI) is providing this proposal to amend the Engineering Design Services for the
Twin 90" Sewer Pipes Emergency Banl< Repairs at Sanders Street (City Project Number 53101). The
following fee includes the costs for additional Resident Project Representation (RPR) and additional
Construction Phase Services. FNI records show that this proposal would serve as Contract Amendment
No. 3.
A summary of the additional costs is shown below:
Item Fee
Additional Resident Project Representation $ 40,806
Additional Construction Phase Services $ 18,985
Total $ 59,791
[FTW19581] T:\1.01 Contracts\Amendment No.1\Amendment 1 Letter
4055 International Plaza, Suite 200 • Fort Worth, Texas 76109 • 817-735-7300 • fax 817-735-7492 www.freese.com
CPN 53101 Amendment No. 2
Twin 90" Sewer Pipes Emergency Banl< Repairs at Sanders Street
February 8, 2021
Page 2 of 2
� (.�. ��-�����w
. . I i I ' � �'''� '•i. �-.i i :1._f-.v �_I
I
Freese and Nichols, Inc. appreciates this opportunity, and we would like to meet with you to discuss
these additional services at your convenience.
Original Contract Amount
Amendment No. 1
Amendment No. 2
Contract Amount to Date
Sincerely,
� .Lz�� c���--
Nick Lester, P.E.
Vice President
Attachments
Level of Effort Spreadsheet
Attachment A - Scope
258,140
163, 243
59,791
481,174
[FTW18195] T:\1.02 PM\Amendments\Amendment 1- Pier Design\Amendment 1 Letter
ATTACHMENT A
• DESIGN SERVICES FOR
TWIN 90•INCH EMERGENCY BANK STABILIZATION
ATTACHMENT A
Scope for Enqineerinq Desiqn Related Services for Water and/or Sanitary Sewer
Improvements
DESIGN SERVICES FOR
TWIN 90-INCH EMERGENCY BANK STABILIZATION (JULY 2020)
The scope set forth herein defines the work to be performed by the ENGINEER in
completing the project. Both the CITY and ENGINEER have attempted to clearly define the
work to be performed and address the needs of the Project.
WORK TO BE PERFORMED
Task 9. Additional Resident Project Representatives (RPR)
Task 10. Additional Construction Phase Services
TASK 9. ADDITIONAL RESIDENT PROJECT REPRESENTATIVES (RPR).
ENGINEER will support the construction phase of the project as follows:
■ Attend construction meetings.
■ Serve as Engineer's and Client's liaison with Contractor.
■ Conduct on-site observations of the Work in progress to determine if the Work is in
general compliance with the Contract Documents .
■ Report to Engineer whenever RPR believes that any Work will not produce a
completed Project that conforms generally to the Contract.
■ Accompany visiting inspectors representing public or other agencies having
jurisdiction over the Project, record the results of these inspections and report to
Engineer.
• Interpret Contract Documents when clarifications and interpretations of the Contract
Documents are needed.
■ Review Applications for Payment with Contractor for compliance with the schedule of
values, Work completed and materials and equipment at the Site but not
incorporated in the Work.
• Submit to Contractor a list of observed items requiring completion or correction and
determine if all items on final list have been completed or corrected.
DELIVERABLES
A. Daily inspection reports.
City of Fort Worth, Texas
Attachment A
PMO Release Date: 07.23.2012
Page 1 of 3
ATfACHMENTA
DESIGN SERVICES FOR
TWIN 90�INCH EMERGENCY BANK STABILIZATION
TASK 10. ADDITIONAL CONSTRUCTION PHASE SERVICES.
ENGINEER will support the construction phase of the project as follows.
• The ENGINEER shall visit the project site b-weekly or at requested intervals as
construction proceeds to observe and report on progress.
• As requested by the CITY, the ENGINEER shall provide necessary
interpretations and clarifications of contract documents, review submittals and
make recommendations as to the acceptability of the work.
• Assist contractor in coordinating with survey.
• Prepare record drawings.
DELIVERABLES
A. Submit Record Drawings
City of Fort Worth, Texas
Attachment A
PMO Release Date: 08.1.2014
Page 2 of 3
ATTACHMENT A
DESIGN SERVICES FOR
TWIN 90�INCH EMERGENCY BANK STABILIZATION
ADDITIONAL SERVICES NOT INCLUDED IN THE EXISTING SCOPE OF SERVICES
Additional Services not included in the existinq Scope of Services — CITY and
ENGINEER agree that the following services are beyond the Scope of Services described in
the tasks above. However, ENGINEER can provide these services, if needed, upon the
CITY's written request. Any additional amounts paid to the ENGINEER as a result of any
material change to the Scope of the Project shall be agreed upon in writing by both parties
before the services are performed. These additional services include the following:
• Negotiation of easements or property acquisition including temporary right-of-
entries
• Services related to development of the CITY's project financing and/or budget
• Services related to pre-qualification, advertising, bid openings and protests, bid
rejection and re-bidding of the contract for construction, or any disputes thereof
• Construction management and inspection services
• Design phase public meetings
• Performance of materials testing or specialty testing services
• Services necessary due to the default of the Contractor
• Services related to damages caused by fire, flood, earthquake or other acts of God
• Services related to warranty claims, enforcement and inspection after final
completion
• Services related to submitting for permits (i.e. TxDOT, railroad, etc.)
• Services related to Subsurface Utility Engineering Levels A, B, C or D
• Services related to Survey Construction Staking
• Services related to acquiring real property including but not limited to easements,
right-of-way, and/or temporary right-of-entries
• Services to support, prepare, document, bring, defend, or assist in litigation
undertaken or defended by the CITY
• Preparation of Environmental Permitting
• Review of additional shop drawings and preparation of additional change orders
Performance of miscellaneous and supplemental services related to the project as
requested by the City
City of Fort Worth, Texas
Attachment A
PMO Release Date: 08.1.2014
Page 3 of 3
EXHIBIT B-2
Level of Effort Spreadsheet
TASK/HOUR BREAKDOWN
Design Services for
Twin 90-Inch Emergency Bank Stabilization -Amendment No.2
City of Fort Worth, Texas
Attachment B- Level of Effort Supplement
Typical Waler and Sewer Replacemenl
FVJVJiR Official Release Date: 8.092012
Water Line Fao[age 0% Project Summary
Sev:er Line Footage 100% To[al Hours 400
0 100% Total Labor 558,854
Total EXpense 5937
(A) TotalFee 559,791 MBE/SBESubconsultant SO
(B) Survey Fee 50 Norvh10E/SBE Subconsultant 50
(C TotalFee - s�rve Fee 559791 t0! SubMarku 50
Water Fee (0% o( C) Sevrer Fee (100! of C) PA9Fl58E Particlpalion 0.0°h
50.0� 559,791.00 To�al Projecl Cost 559,791.00
City of Fort Worth, Texas
Mayor and Council Communication
DATE: Tuesday, April 13, 2021 REFERENCE NO.: **M&C 21-0284
LOG NAME: 6051521&53101ADDFUNDING
SUBJECT:
(CD 4) Adopt the Attached Appropriation Ordinance in the Amount of $1,127,093.00 for Increased Project
Costs for the Emergency Sewer Work and Engineering Design for Trinity River Bank Erosion Affecting M-
280-B and M-338-B
RECOMMENDATION:
It is recommended that the City Council adopt the attached appropriation ordinance adjusting receipts and
appropriations in the Sewer Capital Legacy Fund by increasing receipts and appropriations in the
Emergency Sewer Erosion project (City Project No. 102346) in the amount of $1,127,093.00, and by
decreasing receipts and appropriations in the Unspecified project (City Project No. UNSPEC) by the same
amount.
DISCUSSION:
The purpose of this Mayor & Council Communication (M&C) is to provide necessary additional funding for
increased project costs for the Trinity River Bank Slope Stabilization project to protect the two 90-inch
diameter West Fork trunk sewer mains, identified as mains M-280-B and M-338-B.
In the spring of 2016 significant erosion of the Trinity River streambank occurred due to heavy rains and
upstream reservoir releases. The streambank erosion jeopardized the stability of the two 90-inch diameter
West Fork collector sewer lines, which convey a significant portion of Fort Worth's wastewater to the
downstream Village Creek Water Reclamation Facility. An emergency memo was routed on June 7, 2016,
for preliminary bank stabilization while emergency engineering design by DeOtte Engineering
commenced. On September 26, 2017 (M&C C-28407), City Council authorized the execution of a contract
(City Secretary Contract No. 49826) with Humphrey & Morton Construction Company, Inc. (HMCCI), in the
amount of $1,867,535.00, for construction of a reinforced concrete wall with rock gabion baskets to
stabilize the streambank and protect the West Fork collector sewer lines based on the emergency design.
However, additional heavy rains which occurred in the fall of 2018 and spring of 2019 resulted in
additional erosion of the streambank necessitating additional emergency work which both Circle C
Construction Company (City Secretary Contract No. 51472) and HMCCI (City Secretary Contract No.
51521) (10/17/18 emergency memo) were engaged to conduct improvements, consisting of additional
steel sheet pile cutoff wall with anchored tiebacks to reinforce the streambank and provide temporary
support for the collector sewer lines.
The erosion that occurred in 2018 and again in 2019 resulted in substantially changed conditions,
rendering the original DeOtte Engineering design no longer workable, leading to the mutual decision to
terminate City Secretary Contract No. 49826. On April 7, 2020, (M&C 20-0161) the City Council
authorized the termination of City Secretary Contract No. 48926 with Humphrey and Morton Construction
Company, Inc. for slope stabilization of sanitary sewer mains M-280-B and M-338-B. The changed
conditions required additional engineering and design, this time provided by Freese and Nichols, Inc. (City
Secretary Contract No. 53101), including flow deflection structures along the lower portion of the stream
bank to prevent the river from moving towards the twin 90-inch pipes. The upper portion of the stream
bank will be protected with large rock riprap and feature a cast-in-place concrete wall to restore the cover
around the pipes to original design conditions. Staff engaged HMCCI to construct the revised repairs
under the existing emergency contract (City Secretary Contract No. 51521).
Subsequent rainfall events have resulted in additional erosion necessitating increased quantities of rock,
flowable fill, and embankment material. In addition, it was necessary to drill down an average of 7 more
feet than anticipated at each of the 72 pier locations which support the pier cap and wall. Additional
construction assistance is also necessary on the project.
Appropriations for slope stabilization of sanitary sewer mains M-280-B and M-338-B are as depicted
below:
Fund Existing Additional Project Total*
Appropriations Appropriations
W&S Capital
Projects - Fund $2,315,031.00 $0.00 $2,315,031.00
56002
Sewer Capital
Fund - Legacy $17,207.00 $1,127,093.00 $1,144,300.00
59607
Water & Sewer
Bond 2017A- $1,695,823.00 $0.00 $1,695,823.00
Fund 56011
ProjectTotal $4,028,061.00 $1,127,093.00 $5,155,154.00
*Numbers rounded for presentation purposes.
This action will have no effect on the Water Department's operating budget when complete.
The project is located in COUNCIL DISTRICT 4
FISCAL INFORMATION / CERTIFICATION:
The Director of Finance certifies that funds are currently available in the Unspec Project within the Sewer
Capital Legacy Fund and upon approval of the above recommendation and adoption of the attached
appropriation ordinance, funds will be available in the Sewer Capital Legacy Fund for the HM Twin 90inch
M-280B & M-3386 project. Prior to an expenditure being incurred, the Water Department has the
responsibility of verifying the availability of funds.
FUND IDENTIFIERS (FIDs):
TO
�Fund Department Accoun Project Program ctivity Budget Reference # moun
� ID ID Year (Chartfield 2)
Fund Department
ID
CERTIFICATIONS:
oun Project ProgramActivity Budget Reference # moun
ID Year (Chartfield 2)
Submitted for Citv Manaqer's Office bv: Dana Burghdoff (8018)
Originating Department Head: Chris Harder (5020)
Additional Information Contact: Tony Sholola (6054)
ATTACHMENTS
1. 6051521&53101ADDFUNDING FID Table (WCF 03.10.21).xlsx (CFW Internal)
2. 6051521&53101ADDFUNDING FID Table-Revised.xlsx (CFW Internal)
3. 6051521&53101ADDFUNDING Funds Available.docx (CFW Internal)
4. 6051521&53101ADDFUNDING 59607 A021(r1)r.docx (Public)
5. M& C Map - 6051521 &53101 FUNDING.pdf (Public)
� 1''�� � 1'���1�� �
a 111�� n ,1���'�� Q-
v
m
v
rt
�
v
�
�a
�
�
v
m
�
�
�
a
�
�
0
c
�
rr
'O
�
O
fD
n
M
v
���
� � rn
w x
�
m
Z
��
�+ m
N �
�Z
-, o
o�o �
a �
3 �
�
�
r
rn
D rt
3 �
o �p
c y
3
r► �
�
�
a
c�
a
'O
�
O
fD
n
M
v
a
�
�
�
�
�
� �
�+ a
� �
fD
�
�
�
��
„ �►
N �
��
o �
o� 0�
d
3
D
3 •
0
c
3
rF
�
�
O
fD
n
.�r
G
a
�
�
'<'
�
�
o�
�
o.
ao
�
�
�
v
�N
N W
i
�a
a°o
d rt
3
D
3
0
c
3
'f
� � �
� � �
� � �� �