HomeMy WebLinkAboutContract 54916-CO2CSC No. 54916-0O2 DEVELOPER-AWARDED-PROJECT CHANGE ORDER PROJECT NAME: IH35W Global Logistics CHANGE CONTRACT: Water Im rovements to Serve IH35W Global Lo istics ORDER No: CFA # CFA20-0107 CITY PARTICIPATION: YES CITY PROJECT # 102818 CITY SECRETARY CONTRACT # 54916 2 FID # 30114-0200431-10281S-E07685 SEWER PROJECT # N/A FILE # X-26579 INSPECTOR: Wallace Rodrick Phone No: (817) 350-3321 PROJECT MANAGER: Kiran Konduru Phone No: (817) 392-2237 CONTRACT UNIT WATER SEWER DRAINAGE PAVING STREET LIGHTS CONTRACT Developer Developer Developer Developer Developer DAYS Cost City Cost Cost City Cost Cost City Cost Cost City Cost Cost City Cost ORIGINAL CONTRACT $457,749.39 $91,604.61 $0.00 $0.00 $0.00 $0.00 $0.00 240 EXTRAS TO DATE $14,335.75 $38,962.00 CREDITS TO DATE CONTRACT TO DATE $472,085.14 $91,604.61 $38,962.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 240 AMOUNT OF PROP. CHANGE ORDER $10,043.50 ($5,928.00) REVISED CONTRACT AMOUNT $482,128.64 $91,604.61 $33,034.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 240 TOTAL REVISED CONTRACT AMOUNT PER UNIT $573,733.25 $33,034.00 $0.00 $0.00 $0.00 REVISED COST SHARE Dev. Cost: $515,762.64 City Cost: $97,604.67 TOTAL REVISED CONTRACT $606,767.25 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Revised: 12-17-2018 Page 1 You are directed to make the follow n chan es in the contract documents: CITY BID ITEM PAY ITEM # # QUANTITY UNIT ITEM DESCRIPTION UNIT PRICE TOTAL Unit II: Water 22 3305.0116 -2.5 CY Concrete Encasement for Utility Pipes $125.00 -$312.50 '26 9999.0003 1 EA 16" Water Line Lowering $10,356.00 $10,356.00 TOTAL $10,043.50 Unit III: Sewer 5 3305.1004 -39 LF 20" Casing By Open Cut $152.00 -$5,928.00 TOTAL -$5,928.00 GRAND TOTAL $4,115.50 ASt21'ISK (") II1dIC8t2S N@W F'8y It@Ill REASONS FOR CHANGE ORDER Conflict with existing sanitary sewer determined in the field requires lowering of the water line The Change Order does not effect the City Cost Participation and all changes are at Developers Cost Revised: 12-17-2018 Page 2 RECOMMENDED: APPROVED: APPROVED: L70,IG�l��t �GtG�IGtl7Gtl1 J....�h.iirha -ni�pit4,�0�1t5_45CDT� Y' ste✓en D. S✓d�lforA By scPveno � it,rd;n�na,�miio_ncot; ��r� Ca��7e� By. Ji C iP.s;Apr15.�OJ110�.1GC�T'� Name: Joseph Buchanan, P.E. Name: Steven Bradford Name: Jimmy Cordes Title: Civil Engineer Title: Manager Title: Vice President APPROVALRECOMMENDED APPROVED: APPROVED AS TO FORM AND LEGALITY: CFW - Sponsoring Department c �00l1 WOl� gy: P Name: Soon Wong Name: Dana Burghdoff Name: Richard McCracken Title: Engineering Manager Title: Assistant City Manaqer Title: Senior Assistant City Attorney CFW - Assistant City Manager b� B�a�f y gy.� ��R_,�, CFW - Assistant City Attorney �.-_..,. By: � RECOMMENDED: CFW - 'Contract Compliance Manager �� �er.�u, �� B�/� K � K rd�ru.l'E Ap � i_�_ '�CJ�; � Name: Kiran Konduru ATTEST ������ Mary J. Kayser City Secretary * Contract Compliance Manager (Project Manager): By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, include ensuring all performance and reporting requirements. Title: Senior Professional Enqineer M&C Number: N/A M&C Date Approved: N/A Revised: 12-17-2018 �pFoF�Rr��d >�.o° � o0�i F.� o�l ° �2 C� � o 0 0 0 ���o o �F �oa � � ��00000�_ d ❑There are NO City Funds associated with this Contract �There are City Funds associated with this Contract OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Page 3