HomeMy WebLinkAboutContract 54916-CO2CSC No. 54916-0O2
DEVELOPER-AWARDED-PROJECT CHANGE ORDER
PROJECT NAME: IH35W Global Logistics CHANGE
CONTRACT: Water Im rovements to Serve IH35W Global Lo istics ORDER No:
CFA # CFA20-0107 CITY PARTICIPATION: YES
CITY PROJECT # 102818
CITY SECRETARY CONTRACT # 54916 2
FID # 30114-0200431-10281S-E07685
SEWER PROJECT # N/A
FILE # X-26579
INSPECTOR: Wallace Rodrick Phone No: (817) 350-3321
PROJECT MANAGER: Kiran Konduru Phone No: (817) 392-2237
CONTRACT UNIT
WATER SEWER DRAINAGE PAVING STREET LIGHTS CONTRACT
Developer Developer Developer Developer Developer DAYS
Cost City Cost Cost City Cost Cost City Cost Cost City Cost Cost City Cost
ORIGINAL CONTRACT $457,749.39 $91,604.61 $0.00 $0.00 $0.00 $0.00 $0.00 240
EXTRAS TO DATE $14,335.75 $38,962.00
CREDITS TO DATE
CONTRACT TO DATE $472,085.14 $91,604.61 $38,962.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 240
AMOUNT OF PROP. CHANGE ORDER $10,043.50 ($5,928.00)
REVISED CONTRACT AMOUNT $482,128.64 $91,604.61 $33,034.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 240
TOTAL REVISED CONTRACT AMOUNT
PER UNIT $573,733.25 $33,034.00 $0.00 $0.00 $0.00
REVISED COST SHARE Dev. Cost: $515,762.64 City Cost: $97,604.67
TOTAL REVISED CONTRACT $606,767.25
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Revised: 12-17-2018 Page 1
You are directed to make the follow n chan es in the contract documents:
CITY BID ITEM
PAY ITEM # # QUANTITY UNIT ITEM DESCRIPTION UNIT PRICE TOTAL
Unit II: Water
22 3305.0116 -2.5 CY Concrete Encasement for Utility Pipes $125.00 -$312.50
'26 9999.0003 1 EA 16" Water Line Lowering $10,356.00 $10,356.00
TOTAL $10,043.50
Unit III: Sewer
5 3305.1004 -39 LF 20" Casing By Open Cut $152.00 -$5,928.00
TOTAL -$5,928.00
GRAND TOTAL $4,115.50
ASt21'ISK (") II1dIC8t2S N@W F'8y It@Ill
REASONS FOR CHANGE ORDER
Conflict with existing sanitary sewer determined in the field requires lowering of the water line
The Change Order does not effect the City Cost Participation and all changes are at Developers Cost
Revised: 12-17-2018 Page 2
RECOMMENDED: APPROVED: APPROVED:
L70,IG�l��t �GtG�IGtl7Gtl1
J....�h.iirha -ni�pit4,�0�1t5_45CDT�
Y'
ste✓en D. S✓d�lforA
By scPveno � it,rd;n�na,�miio_ncot;
��r� Ca��7e�
By.
Ji C iP.s;Apr15.�OJ110�.1GC�T'�
Name: Joseph Buchanan, P.E. Name: Steven Bradford Name: Jimmy Cordes
Title: Civil Engineer Title: Manager Title: Vice President
APPROVALRECOMMENDED
APPROVED:
APPROVED AS TO FORM AND LEGALITY:
CFW - Sponsoring Department
c �00l1 WOl�
gy: P
Name: Soon Wong Name: Dana Burghdoff Name: Richard McCracken
Title: Engineering Manager Title: Assistant City Manaqer Title: Senior Assistant City Attorney
CFW - Assistant City Manager
b� B�a�f y
gy.� ��R_,�,
CFW - Assistant City Attorney
�.-_..,.
By: �
RECOMMENDED:
CFW - 'Contract Compliance Manager
�� �er.�u, ��
B�/� K � K rd�ru.l'E Ap � i_�_ '�CJ�;
�
Name: Kiran Konduru
ATTEST
������
Mary J. Kayser
City Secretary
* Contract Compliance Manager (Project Manager):
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, include
ensuring all performance and reporting requirements.
Title: Senior Professional Enqineer
M&C Number: N/A
M&C Date Approved: N/A
Revised: 12-17-2018
�pFoF�Rr��d
>�.o° � o0�i
F.� o�l
° �2
C� � o
0 0
0
���o o �F
�oa �
� ��00000�_ d
❑There are NO City Funds associated with this Contract
�There are City Funds associated with this Contract
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Page 3