HomeMy WebLinkAboutContract 42789-CO2 (2)ji
•
Change Order No . Date
City of Fort Worth
Change Order Request
TPW Project No . Fund ing (FAC )
2 (two) 3/30/2012 R 107 541200 0357000
Facility and Project Description City Secretary Contract No .
Auto Pound Renovation 42789
ORIGINAL CONTRACT AMOUNT................................................................ $179,950
EXTRAS TO DATE .................................................................... . $ 3,510
CREDITS TO DATE ................................................................... . $ 0
CONTRACT COST TO DATE ................................................................................................. .
AMOUNT OF PROPOSED CHANGE ORDER. .......................................................................... .
REVISED CONTRACT AMOUNT ............................................................................................ .
ORIGINAL FUNDS AVAILABLE FOR CHANGE ORDERS ........................................................... .
REMAINING FUNDS AVAILABLE FOR CHANGE ORDERS ........................................................ .
ADDITIONAL FUNDING (IF NECESSARY) ............................................................................... .
IN ACCORDANCE WITH THIS CHANGE ORDER, THE CONTRACTOR SHALL:
Provide all labor and materials as per attached :
PCR-5 , PCR-6, PCR-7 , PCR-8 , PC-9 , PCR-10 , PCR-11 , PCR-12 , PCR-13 , PCR-14 , PCR-15
TOTAL ADD
$
$
$
$
$
0
183,460
19,434
202,894
25 ,000
2,056
$19,434
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in fu ll (both t ime
and m oney) for all costs ari s in g out of, or in c id enta l to, the ab ove C hange O rd er
Contractor's Name
Imperial Construction , Inc .
Origi nal Co ntract Time Additiona l Approved Tim e To Date Approved Contract Ti me To Date Additiona l Time For Th is Change Order
90 cd O cd 90 cd O cd
Contractor-Tegrity Contractors , Inc
lu~w
05-11-12 Al0:22 IN
Date
"'> f f>2_ / 12..
Date
Date
Date Council Action (If Requ ired )
D Approved D Disapproved S, ( D · (2,.. D Other
TPW Facilities Management Divis ion
Change Order Form (2 /28 /12)
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
D~tz ,/
S'f•YIZ
Date s/J?,l-
Date
s)o/2
Date
;
::
Change Order # 2 Auto Pound Renovation
PCR 5-replace thermostats per owners request ADD $ 850
PCR 6-add 3 exit lights as per code requirements ADD $ 395
PCR 7-change 2x4 lay in lights to a hard ceiling light fixture ADD$ 283
PCR 8-labor and material to paint the small sheetrock
fur out in the break room ADD$ 319
PCR 9-paint 2 doors ADD $ 202
PCR 10-relocate remote switches for the canopy and the awning to
central area inside the office. ADD$ 878
PCR 11-material and labor to saw cut , demo and replace
sidewalk for piers. ADD $1 ,391
PCR 12 -install 4 new 2x4 lights in the break room ADD $ 567
PCR 13-demo outside lights on metal building not picked up on the
original demo ADD $ 408
PCR 14-dig out concrete on 2--18 " piers and dig out along building
to move cable to install the pier at the building. ADD $ 1,728
PCR 15-material and labor for casing 11-24 inch piers ADD $12,413
Total This Change ADD $19 ,434
;::
'L
?fa~~s I
Change Request: 5
Date: 3/2/2012
To: City of Fort Worth
401 West 13th
Fort Worth , Texas 76102
Attn : Alan Bagamery
Re: Police Auto Pound Facility
From:
Materials and Labor to replace (3) thermostats as per owner's request
Materials and Labor to replace thermostats
See attached
Subtotal $ 750 .00
T egrity Profit & Overhead $ 75 .00
Bond Fee $ 24.75
Total $ 849.7§
$ 850 .00
The Contract Time will be changed by ( 0 ) days.
Eddie Whitworth
Tegrity Contractors , Inc
106 East University Dr. #100
McKinney, Texas 75069
$ 750 .00
CR# Date
1 2/23/2012
2 2/23/2012
3 2/23/2012
4 2/23/2012
5 3/2/2012
Tegrity Contractors Inc. Change Order Reque st Log
Fort Worth Auto Pound Facility
Subject Amount Approved
Gyp . Board Ceilings Rm#101 , 102 and 103 $ 1,965.76 $ 1,965.76
Breakroom Column and CeilinQ $ 317.24 $ 317.24
Credit for Eooxv Floor Paint in Rm #104 $ (362 .56) $ (362.56)
Replace Door #101 $ 1,589.60 $ 1,589 .60
Reolace Thermostats $ 850 .00
Totals $ 4 ,360 .04 $ 3 ,510 .04
Disapproved
$ -
Possible Future COR's
Additional studs at walls
T :\Job Folders -Current\Jobs 2011\11-36 Vehicle Impound Facility\Change Orders\11-36 COR Log .x is
3/2/2012
..
Total Approved
$ -
$ 3 ,510 .04
License No:TACLA 012544E
Expires : 02-05-2012
PROPOSAL SUBM[TIED TO
Tearitv
PHONE NUMBER
a J21:!Q rou p
18111 Preston Road Suite 620
Dallas , TX 75252
972-234-4822 Office 972-234-4824 Fax
CHANGE ORDER
TODAY 'S DATE
3-2 -12
JOB NAME
Page No. __ 1 __ of __ 1 __
I DATE OF PLANS/PAGE #'S
N/A
972-562-6060
I FAX NUMBER
972 -562 -6064 City of Ft Worth Vehicle Impound Facility Packaae #3
ADDRESS, cm, STATE , ZIP JOB LOCATION
106 E. University Drive McKinney TX 75069 2500 Brennan Ave. Ft Worth TX 76106
We propose hereby to furnish material and labor necessary for the completion of:
Change Order #1
Provide and in stall three Honeywell 7 day, touch screen thermostats.
Change Orde r #1
Previous Contract
Revised Contract
$ 750.00
$4,3 66 .0 0
$5 ,116.00
Bid excludes tax, electrical, repairs to existing equipment.
Project type: Remodel
Completed by : JWS
We propose hereby to furnish material and labor -complete in accordance with above specifications for the sum of:
_______________________________ dollars ( $ _________ _
Payment as follows:
All material is guaranteed to be as specified. All work to be completed in a substantial workmanlike manner according to specifications submitted, pe r standard
practices. Any alteration or deviation from above specifications involving extra costs will be executed only upon written orders , and will become an extra
charge over and above the estimate . All agreements contingent upon strikes , accidents or delays beyond our control. Owner to carry fire , tornado and other
necessary insurance. Our workers are fully covered by Workmen 's Compensation Insurance. Accounts overdue beyond 30 days of billing will be charged at an
interest rate of .LS. per annum . Customer is also liable for an additional 1Q.ll of unpaid balance plus incidental collections costs , including attorney fees . If
either _party commences legal action to enforce its rights pursuant to this agreement, the prevailing party in said legal action shall be entitled to recover its
reasonable attorney's fees and costs of litigation relating to said legal action , as determined by a court of competent jurisdiction.
Note: this proposal may be withdrawn by us Authorized
Signature _______________________ if not accepted within 30 days .
ACCEPTANCE OF PROPOSAL The above prices, specifications and
conditions are satisfactory and are hereby accepted. You are authorized
to do the work as specified . Payment will be made as outlined above.
Signature
Signature
Date of Acceptance -------------------
Regulated by the Texas Department of Licensing and Regulations , P.O. Box 12157, Austin , TX 78111 (512 ) 463-6599 1-800-803-9202
=
:
Change Request: 6 J
Date: 3/7/2012
To: C ity of Fort Worth From: Edd ie Wh itworth
401 West 13th Tegrity Contractors , Inc
Fort Worth , Texas 76102 106 East Un ivers ity Dr. #100
Attn : Alan Bagamery McKinney, Texas 75069
Re: Police Auto Pound Facility
Materials and Labor to provide (3) exit lights as per city inspector ,,
Materials and Labor to replace thermostats $ 349 .00
See attached
Subtotal $ 349.00
Tegrity Profit & Overhead $ 34.90
Bond Fee $ 11 .52
Total $ J9a .4~
$ 395 .00
The Contract Time will be changed by ( 0 } days.
CR# Date
1 2/23/2012
2 2/23/2012
3 2/23/2012
4 2/23/2012
5 3/2/2012
6 3/6/2012
Te grity Contractors Inc. Chan ge Ord er Re quest Lo g
Fort Worth Auto Pound Facility
Subject Amount Approved
Gyp . Board Ceilings Rm#101 , 102 and 103 $ 1,965.76 $ 1,965.76
Breakroom Column and Ceilinq $ 317 .24 $ 317 .24
Credit for Epoxy Floor Paint in Rm #104 $ (362 .56) $ (362.56)
Replace Door #101 $ 1,589.60 $ 1,589 .60
Replace Thermostats $ 850 .00
Restroom Exit Liqhts $ 395 .00
Totals $ 4 ,755 .04 $ 3 ,510 .04
Disapproved
$ -
Possible Future COR's
Additional studs at walls
change 2x4 fixtures to hard ceiling frames
T:\Job Folders -Current\Jobs 2011\11 -36 Vehicle Impound Facility\Change Orders\11 -36 COR Log.xis
. .
" 3/7/2012
..,
Total Approved
$ -
$ 3 ,510 .04
Page 1 of 1
February 28, 2012
Attn:
Reference Project:
GISSINER ELECTRIC
commercial • residential
P .O . Box 187, Alvarado, TX 76009
972-342-965 1/81 7-932-5202
HUB #1263059101900
WBE #WFWB49775N0712
Eddie Whitworth
Fort Worth Auto Pound Change Order #2
We are pleased to offer our proposal for performing the electrical work associated with the above
referenced project.
CHANGE ORDER: $349.00, Three Hundred Forty-nine Dollars and No Cents
SCOPE: Adding (3) Exit Lights , including all material and labor
We appreciate this opportunity to be of service and look forward to a mutually profitable
relationship.
Gissiner Electric
JD Barker
Regulated by the Texas Department of Licensing and Regulation
PO Box 12157. Texas 787 11
1800-803 -9202 5 12-463 -6599
www .li cense .state.tx .us/comp laint
Accepted by date
Change Request: 7 J
Date: 3/8/2012
To: City of Fort Worth From:
401 West 13th
Fort Worth , Texas 76102
Attn: Alan Bagamery
Re: Police Auto Pound Facility
Material cost to change 2x4 fixtures from lay-in grid mounted to hard
ceiling mounted
Materials costs
See attached
Subtotal $ 250 .00
Tegrity Profit & Overhead $ 25 .00
Bond Fee $ 8 .25
Total $ ~s~.~a
$ 283.00
The Contract Time will be changed by ( 0 ) days.
Eddie Wh itworth
Tegrity Contractors , Inc
106 East University Dr. #100
McKinney, Texas 75069
$ 250 .00
CR# Date
1 2/23/2012
2 2/23/2012
3 2/23/2012
4 2/23/2012
5 3/2/2012
6 3/6/2012
7 3/8/2012
Te grity Contractors In c. Chang e Order Requ est Log
Fort Worth Auto Pound Facility
Subject Amount Approved
Gyp . Board Ceilings Rm#101 , 102 and 103 $ 1,965.76 $ 1,965 .76
Breakroom Column and Ceilino $ 317 .24 $ 317.24
Credit for Epoxy Floor Paint in Rm #104 $ (362 .56) $ (362 .56)
Replace Door #101 $ 1,589 .60 $ 1,589 .60
Replace Thermostats $ 850.00
Restroom Ex it Lights $ 395.00
Chanoe 2x4 fixtures to hard ceilino frames $ 283 .00
Totals $ 5 ,038 .04 $ 3 ,510 .04
Disapproved
$ -
Possible Future COR's
Additional studs at walls
T :\Job Folders -Current\Jobs 2011\11-36 Vehicle Impound Facility\Change Orders\11-36 COR Log.xi s
..
3/8/2012
Total Approved
$ -
$ 3 ,510 .04
March I , 2012
Attn:
Reference Project:
GISSINER ELECTRIC
commercial • residential
P .O. Box 187 , Alvarado, TX 76009
972-342-9651 /817-932-5202
HUB #1263059101900
WBE #WFWB49775N0712
Eddie Whitworth
Fort Worth Auto Pound Change Order # I
Page 1 of 1
We are pleased to offer our proposal for performing the electrical work associated with the above
referenced project.
CHANGE ORDER: $250 .00 , Two Hundred Fifty Dollars and No Cents
SCOPE : This change order is based on the changes made to the lighting submittal
package. There is a needed flange for the Type A fixtures that will now be attached to a
hard ceiling.
We apprec iate this opportunity to be of service and look forward to a mutually profitable
relationship.
Gissiner Electric
Amber Gissiner
Regulated by the Texas Dcpartrncnl of Licensing and Regulation
PO Box 12 157. Texas 787 11
1800-803 -9202 512-463-6599
www.license.statc .u .usfcomplainl
Accepted by date
Change Request: 8
Date: 3/8/2012
To: City of Fort Worth
401 West 13th
Fort Worth , Texas 76102
Attn : Alan Bagamery
Je: Police Auto Pound Facility
Breakroom column furr-out
Material and labor to tape , bed and paint new sheetrock furr-out
around the column discovered during demo
See attached
Subtotal $ 281.75
Tegrity Profit & Overhead $ 28.18
Bond Fee $ 9 .30
Total $ d~ Q.~~
$ 319 .00
The Contract Time will be changed by ( 0 ) days.
From: Eddie Whitworth
Tegrity Contractors , Inc
106 East University Dr. #100
McKinney, Texas 75069
$ 281.75
Catapult Painting, LLC
4 105 W Sp ri ng Creek Pkwy, Ste 604
Pl ano, TX 75 024
PH ONE: 972 -596 -4 11 8 FAX: 972-767-4557
E-MAIL: info@sambecca.com
REQUESTE D BY:
Tegrity Co ntractors, Inc.
106 E. Unive rs ity , Ste 100
McKinney , TX 7507 1
EXTRA
Description
REPAIR PATCH & COLUMN IN BREAK ROOM
LABOR: 6 HOUR S @ $35 .00 PER HOUR
Estimate
Date Estimate#
3/9 /20 12 19446
PRICING VALID FOR 60 DAYS
PROJECT NAME
Vehic le Impo und Facility A lteratio ns
2500 Brennan Avenue
Ft Worth , TX 76106
PO 11 -36-09 -7000
Total
2 10.00
MATERIALS : 1 BOX MUD , 1 GALLON PRJMER, 1 GALLON PAINT 35 .00
PROFIT @ 15%: 36 .75
PLEASE SIGN , DATE & RETURN FOR ACCEPTANCE:
PLEASE OBTAIN A CHA NGE ORDER FOR THIS IT EM . I Total I $281 .75
CR# Date
1 2/23/2012
2 2/23/2012
3 2/23/2012
4 2/23/2012
5 3/2/2012
6 3/6/2012
7 3/8/2012
8 3/8/2012
Tegrity Contractors Inc . Change Order Reque st Log
Fort Worth Auto Pound Facility
Subject Amount Approved
Gyp. Board Ceilings Rm#101 , 102 and 103 $ 1,965.76 $ 1,965.76
Breakroom Column and Ceilinq $ 317.24 $ 317.24
Credit for Epoxy Floor Paint in Rm #104 $ (362.56) $ (362 .56)
Replace Door #101 $ 1,5 89 .60 $ 1,589.60
Replace Thermostats $ 850.00
Restroom Exit Liqhts $ 395 .00
Chanqe 2x4 fixtures to hard ceilinq frames $ 283.00
Tape, bed , paint column furr-out $ 319.00
Totals $ 5 ,357 .04 $ 3 ,510 .04
Disapproved
$ -
Possible Future COR's
Additional studs at walls
T :\Job Folders -Current\Jobs 2011\11-36 Vehicle Impound Facility\Change Orders\11-36 COR Log .xis
3/8/2012
Total Approved
$ -
$ 3 ,510 .04
Change Request: 9
Date: 3/8/2012
To: City of Fort Worth From:
401 West 13th
Fort Worth , Texas 76102
Attn : Alan Bagamery
Re: Police Auto Pound Facility G Misc Additional Paint
Materials and Labor to paint (2) existing doors in Room #103
as per city request
Materials and Labor to paint new CMU wall patch at New Door #101
(Garage Side)
See attached
Subtotal $ 178 .25
Tegrity Profit & Overhead $ 17.83
Bond Fee $ 5 .88
Total $ ~g1 .9e
$ 202 .00
The Contract Time will be changed by ( 0 ) days.
Eddie Whitworth
Tegrity Contractors, Inc
106 East University Dr. #100
McKinney, Texas 75069
$ 109 .25
$ 69 .00
Catapult Painting, LLC
4105 W S pring Creek Pkwy, Ste 604
Plano, TX 75 024
PHONE: 972-596-4118 FAX: 972-767-4557
E-MAIL: info @sambecca.com
REQUESTED BY:
Tegrity Contractors , Inc.
106 E. University , Ste 100
McKinney, TX 75 071
EXTRA
PAINT EXISTING HM DOORS IN ROOM 103
LABOR : 2 HOURS @ $35.00 PER HOUR
MATERIALS : I GALLON PAINT
PROFIT @ 15%:
Description
PLEASE S IGN, DATE & RETURN FOR ACCEPTANCE:
PLEASE OBTAIN A CHANGE ORDER FOR THIS ITEM.
Estimate
Date Est imate#
3/6/2012 19444
PRICING VALID FOR 60 DAYS
PROJECT NAME
Ve hicl e Impound Facility Alterations
2500 Brennan Avenue
Ft Worth , TX 76106
PO 11-36-09 -7000
Total
70.00
25.00
14.25
I Total I $109.25
.•
Catapult Painting, LLC
4105 W. Spring Cree k Pkwy, Ste 604
Plano, TX 75024
PHONE: 972 -596-4118 FAX: 972-767-4557
E-MAIL: injo@sambecca.com
REQUESTED BY:
Tegrity Contractors, Inc .
I 06 E. Un iversity , Ste I 00
McKinney , TX 75071
EXTRA
Description
TOUCH UP CMU WALL AT EXTE RJOR O F MEN'S RR
(NOT A REPAINT)
LABOR: 1 HOUR @ $35.00 PER HO UR
MATERJALS: I GALLON BLOCKFILLER, 1 GALLON PAINT
PROFIT @ 15 %:
PLEASE SIGN , DATE & RETURN FOR ACCEPTANCE:
PLEASE OBTAIN A CHANGE ORDER FOR THIS ITEM .
Estimate
Date Estimate#
3/9/20 12 19445
PRICING VALID FOR 60 DAYS
PROJECT NAME
Vehicle Impound Facility A lt erations
2500 Brennan Avenue
Ft Worth , TX 76106
PO 11-36-09 -7000
Total
35.00
25.00
9 .00
I Total I $69.00
CR# Date
1 2/23/2012
2 2/23/2012
3 2/23/2012
4 2/23/2012
5 3/2/2012
6 3/6/2012
7 3/8/2012
8 3/8/2012
9 3/8/2012
Tegrity Contractors In c. Chan ge Ord er Request Log
Fort Worth Auto Pound Facility
Subject Amount Approved
Gyp. Board Ceilings Rm#101 , 102 and 103 $ 1,965 .76 $ 1,965 .76
Breakroom Column and Ceilinq $ 317.24 $ 317.24
Credit for Epoxy Floor Paint in Rm #104 $ (362.56) $ (362.56)
Replace Door #101 $ 1,589.60 $ 1,589.60
Replace Thermostats $ 850 .00
Restroom Exit Liqhts $ 395 .00
Chanqe 2x4 fixtures to hard ceilinq frames $ 283 .00
Tape , bed, paint column furr-out $ 319 .00
Additional Paintinq $ 202 .00
Totals $ 5,559 .04 $ 3 ,510.04
Disapproved
$ -
Possible Future COR's
Additional studs at walls
T :\Job Folders -Current\Jobs 2011\11-36 Vehicle Impound Facility\Change Orders\11-36 COR Log .xis
• • • s •• . .
3/8/2012
-.
Total Approved
$ -
$ 3,510.04
..
Change Request: 10
Date: 4/10/2012
To: City of Fort Worth
401 West 13th
Fort Worth , Texas 76102
Attn : Alan Bagamery
Re: Police Auto Pound Facility
Breakroom/Canopy Light Switches
From:
Material and Labor to adding additional light switches in break room
as per city request
Materials and Labor to relocate canopy light switches from front lobby to the
main operating office on the West side of the building as per city request
Pricing includes credit for exterior switches
See attached
Subtotal $ 775 .00
Tegrity Profit & Overhead $ 77.50
Bond Fee $ 25 .58
Total $ 878 .QS
$ 878 .00
The Contract Time will be changed by ( 0 ) days.
Eddie Whitworth
Tegrity Contractors , Inc
106 East University Dr. #100
McKinney, Texas 75069
$ 375 .00
$ 400 .00
March 1, 2012
Attn:
Reference Project:
GISSINER ELECTRIC
commercial • residentia l
P .O . Box 187 , Alvarado, TX 76009
972-342-9651/817-932-5202
HUB #1263059101900
WBE #WFWB49775N0712
Eddie Whitworth
Fort Worth Auto Pound Change Order #3
Page 1 of 1
We are pleased to offer our proposal for performing the electrical work associated with the above
referenced project.
CHANGE ORDER: $375 .00, Three Hundred Seventy-five Dollars and No Cents
SCOPE: This change order is for separate switching for break room and computer room
and adding (2) three way switches in computer room.
We appreciate this opportunity to be of service and look forward to a mutually profitable
relationship.
Gissiner Electric
Amber Gissiner
Regulated by the Texas Depart ment of licensing and Regulation
PO Box 12157, Texas 7871 1
1800-803 -9202 5 12-463 -6599
www.license.state.tx.us/complai nt
Accepted by date
. .
April 4, 2012
Attn :
Reference Project:
GISSINER ELECTRIC
commercial • residential
P .O . Box 187 , Alvarado, TX 76009
972-342-9651/817-932-5202
HUB #1263059101900
WBE #WFWB49775N0712
Eddie Whitworth
Fort Worth Auto Pound Change Order #4
Page 1 of 1
We are pleased to offer our proposal for performing the electrical work associated with the above
referenced project.
CHANGE ORDER: $400 .00, Four Hundred Dollars and No Cents
SCOPE: This change order is for relocating switches from front entry and outside
locations to one central location in the office. Original quote for changes was $575.00.
This change reflects a credit of $175.00 for outside receptacles.
We appreciate this opportunity to be of service and look forward to a mutually profitable
relationship.
Gissiner Electric
Amber Gissiner
Regu lated by the Texas Department of Li cens ing and Reg ul at ion
PO Box 12 157, Texas 787 11
1800-803-9202 5 12-46 3-6599
www .license.st ate.tx .us/complai nt
Accepted by date
CR# Date
1 2/23/2012
2 2/23/2012
3 2/23/2012
4 2/23/2012
5 3/2/2012
6 3/6/2012
7 3/8/2012
8 3/8/2012
9 3/8/2012
10 4/2/2012
Teg rity Contractors In c. Ch ange Order Reques t Lo g
Fort Worth Auto Pound Facility
Subject Amount Approved
Gyp. Board Ceilings Rm#101 , 102 and 103 $ 1,966.00 $ 1,966 .00
Breakroom Column and Ceiling $ 317 .00 $ 317 .00
Credit for Epoxv Floor Paint in Rm #104 $ (363 .00) $ (363 .00)
Replace Door #101 $ 1,590 .00 $ 1,590 .00
Replace Thermostats $ 850.00
Restroom Exit Lights $ 395 .00
Change 2x4 fixtures to hard ceiling frames $ 283.00
Tape , bed, paint column furr-out $ 319 .00
Additional Painting $ 202.00
Electrical Switch changes $ 878 .00
Totals $ 6 ,437 .00 $ 3 ,510 .00
Disapproved
$ -
Possible Future COR's
T :\Job Folders -Current\Jobs 2011\11-36 Vehicle Impo und Fa cility\Change Orders\11 -36 COR Log .xis
4/10/2012
., ' .,
~1
Total Approved
$ -
$ 3,510 .00
Change Request: 11
Date: 4/10/2012
To: City of Fort Worth From:
401 West 13th
Fort Worth, Texas 76102
Attn : Alan Bagamery
Re: Police Auto Pound Facility
Sidewalks west side of building
Material and Labor to saw-cut, demo and re-pour sidewalks on west
side of building at pier locations that hit existing sidewalks
See attached
Subtotal $ 1,228 .00
Tegrity Profit & Overhead $ 122.80
Bond Fee $ 40 .52
Total $ ~ ,d9~ .d~
$ 1,391.00
The Contract Time will be changed by ( 4 ) days.
Eddie Whitworth
Tegrity Contractors, Inc
106 East University Dr. #100
McKinney, Texas 75069
$ 1,228 .00
HBA Incorporated
P.O. Box 25861
Anaheim, C4 92825
8300 Hwy380
Crossroads, TX 76227
Phone/Fax (940) 365-9993
Request for Change Order #01
March 14, 2012
Tegrity Contractors
Attn:Eddie
Job#:
Vehicle Impound
2500 Brennan Avenue
Fort Worth, TX 76106
This is for saw cutting of concrete sidewalks, Demo, haul off concrete and pour back concrete
sidewalks only.
72SF of concrete sidewalks on the west face to be
demo and pour back 3500PSI concrete w / #3
l 8"0/c
Submitted:
Accepted by: Title:
John Blatnik
~-
/
$1,228 .00
Contractor:
Dated:
CR# Date
1 2/23/2012
2 2/23/2012
3 2/23/2012
4 2/23/2012
5 3/2/2012
6 3/6/2012
7 3/8/2012
8 3/8/2012
9 3/8/2012
10 4/10/2012
11 4/10/2012
Tegrity Contractors Inc . Change Order Reque st Log
Fort Worth Auto Pound Facility
Subject Amount Aooroved
Gyp . Board Ceilings Rm#101, 102 and 103 $ 1,966 .00 $ 1,966 .00
Breakroom Column and Ceiling $ 317 .00 $ 317 .00
Credit for Epoxy Floor Paint in Rm #104 $ (363.00) $ (363 .00)
Replace Door #101 $ 1,590.00 $ 1,590.00
Replace Thermostats $ 850 .00
Restroom Exit Liahts $ 395 .00
Change 2x4 fixtures to hard ceilina frames $ 283 .00
Tape , bed, paint column furr-out $ 319 .00
Additional Paintina $ 202 .00
Electrical Switch chanaes $ 878 .00
Saw-cut and reoour sidewalks west side $ 1 ,391 .00
Totals $ 7 ,828 .00 $ 3 ,510 .00
Disapproved
$ -
Possible Future COR's
Pier casinq
New liaht fixtures breakroom
remove liahts buildina exterior
T:\Job Folders -Current\Jobs 2011\11 -36 Vehicle Impound Facility\Change Orders\11 -36 COR Log .x is
4/10/2012
Total Approved
$ -
$ 3 ,510.00
Change Request: 12
Date: 4/10/2012
To: City of Fort Worth
401 West 13th
Fort Worth, Texas 76102
Attn : Alan Bagamery
Re: Police Auto Pound Facility
New Breakroom Lights
From:
Material and Labor to provide and install (4) new 2x4 fixtures in existing
breakroom as per request
See attached
Subtotal $ 500.00
Tegrity Profit & Overhead $ 50.00
Bond Fee $ 16 .50
Total $ aee .aG
$ 567 .00
The Contract Time will be changed by ( 0 ) days.
Eddie Whitworth
Tegrity Contractors, Inc
106 East University Dr. #100
McKinney, Texas 75069
$ 500 .00
-.
April 10 , 2012
Attn:
Reference Project:
GISSINER ELECTR IC
commercial • residential
P .O. Box 187, Alvarado , TX 76009
972-342-9651/817-932-5202
HUB #1263059101900
WBE #WFWB49775N0712
Eddie Whitworth
Fort Worth Auto Pound Change Order #5
·page 1 ofl
We are pleased to offer our proposal for performing the electrical work associated with the abo ve
referenced project.
CHANGE ORDER OPTION 1: $500 .00, Five Hundred Dollars and No Cents
SCOPE: This change order is for demo of (4) existing T -12 fixtures and replacing with
( 4) new T-8 fixtures while reusing existing conduit and wire. Pricing includes labor and
material.
CHANGE O 50.00, Two Hu ars and No Cents
ange order is for adding (2) new T-8 fixtures while reus
conduit and wire. The location is to be determined . Pricing includes labor and material.
We appreciate this opportunity to be of service and look forward to a mutually profitable
relationship .
Gissiner Electric
Amber Gissiner
Regu lated by the Texas Department of Licensi ng and Regulation
PO Box 12157, Texas 787 11
1800-803-9202 5 12-463 -6599
www .Jicense .state.tx .us.lcomplai nt
Accepted by date
CR# Date
1 2/23/2012
2 2/23/2012
3 2/23/2012
4 2/23/2012
5 3/2/2012
6 3/6/2012
7 3/8/2012
8 3/8/2012
9 3/8/2012
10 4/10/2012
11 4/10/2012
12 4/10/2012
Te gr ity Contractors In c. Change Order Requ est Lo g
Fort Worth Auto Pound Facility
Subject Amount Approved
Gyp . Board Ceilings Rm#101 , 102 and 103 $ 1,966 .00 $ 1,966.00
Breakroom Column and Ceilinq $ 317.00 $ 317.00
Credit for EPOXY Floor Paint in Rm #104 $ (363.00) $ (363.00)
Replace Door #101 $ 1,590.00 $ 1,590 .00
Replace Thermostats $ 850.00
Restroom Exit Liqhts $ 395 .00
Chanqe 2x4 fixtures to hard ceilinq frames $ 283 .00
Tape, bed, paint column furr-out $ 319 .00
Additional Painting $ 202.00
Electrical Switch changes $ 878 .00
Saw-cut and repour sidewalks west side $ 1,391 .00
New Breakroom Licihts $ 567 .00
Totals $ 8 ,395.00 $ 3 ,510 .00
Disapproved
$ -
Possible Future COR's
Pier casing
New light fixtures breakroom
remove liqhts buildinq exterior
T :\Job Folders -Current\Jobs 2011 \11-36 Vehicle Impound Facility\Change Orders\11-36 COR Log .x is
4/10/2012 -··
•I
Total Approved
$ -
$ 3 ,510 .00
Change Request: 13
Date: 4/12/2012
To: City of Fort Worth
401 West 13th
Fort Worth, Texas 76102
Attn: Alan Bagamery
Re: Police Auto Pound Facility
Existing Wall Packs
From:
Material and Labor to demo wall packs on face of existing building
includes tying in reamining fixtures into a photo cell
See attached
Subtotal $ 360.00
Tegrity Profit & Overhead $ 36 .00
Bond Fee $ 11.88
Total $ 4g7 _gg
$ 408 .00
The Contract Time will be changed by ( 0 ) days.
Eddie Whitworth
Tegrity Contractors, Inc
106 East University Dr. #100
McKinney, Texas 75069
$ 360.00
.' 1
-. 't
April 12 , 2012
Attn :
Reference Project:
GISSINER ELECTRIC
comme rcial • res i dential
P.O. Box 187 , Alvarado , TX 76009
972-342 -9651/817-932 -5202
HUB #1263059101900
WBE #WFWB49775N0712
Eddie Whitworth
Fort Worth Auto Pound Change Order #6
Page 1 of 1
We are pleased to offer our proposal for performing the electrical work associated with the above
referenced project.
CHANGE ORDER: $360.00 , Three Hundred Sixty Dollars and No Cents
SCOPE : This change order is for demo of existing wall packs that are interfering with the
installation of the new awning . The remaining wall packs are to be tied into closest circuit
and operate with a photo cell(s). Pricing includes labor and material.
We appreciate this opportunity to be of service and look forward to a mutually profitable
relationship .
Gissiner Electric
Amber Gissiner
Regulated by the Texas Depart men t of Licens ing and Regulatio n
PO Box 12 157, Texas 7871 1
1800-803 -9202 512-463 -6599
y,rv.rw. license. state. tx. us/ co mp la int
Accepted by date
CR# Date
1 2/23/2012
2 2/23/2012
3 2/23/2012
4 2/23/2012
5 3/2/2012
6 3/6/2012
7 3/8/2012
8 3/8/2012
9 3/8/2012
10 4/10/2012
11 4/10/2012
12 4/10/2012
13 4/12/2012
Teg rity Contractors In c. Ch ange Ord er Requ es t Log
Fort Worth Auto Pound Facility
Subject Amount Approved
Gyp . Board Ceilings Rm#101, 102 and 103 $ 1,966.00 $ 1,966 .00
Breakroom Column and Ceiling $ 317 .00 $ 317.00
Credit for Epoxv Floor Paint in Rm #104 $ (363.00) $ (363 .00)
Replace Door #101 $ 1 ,590 .00 $ 1,590 .00
Replace Thermostats $ 850 .00
Restroom Exit Liqhts $ 395.00
Chanqe 2x4 fixtures to hard ceilinq frames $ 283 .00
Tape , bed , paint column furr-out $ 319 .00
Additional Paintinq $ 202 .00
Electrical Switch chanqes $ 878 .00
Saw-cut and repour sidewalks west side $ 1,391 .00
New Breakroom Liahts $ 567 .00
Exterior Wall Packs $ 408 .00
Totals $ 8 ,803 .00 $ 3 ,510 .00
Disapproved
$ -
Possible Future COR's
Pier casinq
concrete removal under asphalt
hand diq cable in pier location
T :\Job Folders -Current\Jobs 2011\11 -36 Vehicle Impo und Fac ility\Change Orders\11-36 COR Log .x is
4/12/201 2
Total Approved
$ -
$ 3 ,510 .00
, .. ,._ .,..
Change Request: 14
Date: 4/12/2012
To: C ity of Fort Worth
401 West 13th
Fort Worth, Texas 76102
Attn : Alan Bagamery
Re: Police Auto Pound Facility
From:
Materials and labor to demo concrete d iscovered under asphalt at
pier locations
Materials and labor to hand dig communications line from pier location
See attached
Subtotal $ 1,525.00
Tegrity Profit & Overhead $ 152.50
Bond Fee $ 50.33
Total $ ~.n7 .g~
$ 1,728 .00
The Contract Time will be changed by ( 2 ) days.
Eddie Whitworth
Tegrity Contractors , Inc
106 East Un ivers ity Dr . #100
McKinney, Texas 75069
$ 850.00
$ 675 .00
,.., •
STRAND CONCRETE, LLC
1154 Old Millwood, ROCKWALL, TX.
Phone: 972-772-0275 Fax: 972-772-8033
Carlton Bier, Estimator M # 214-708-6541
Change Order Request
Date: 4/12/12
To: Eddie Whitworth
Fax: Emailed
# of Pages: 1
Project: Fort Worth Auto Pound
From: Carlton Bier
The following is pricing to add the following revisions: Add: $1,525.00
Additional Charge to hand excavate for Fiber optic Line: $675.00
Labor: $600(4 guys -5hrs each -$30/hr)
P /0: $75
Additional Charge to jackhammer/demolition concrete: $850.00
Labor: $500( 4guys -4.25 hrs each -$30/hr)
Equip: $250
P /0 : $100
Please sign and return, feel free to call if you have any questions.
Thanks
Carlton Bier
M# 214-708-6541
Strand Concrete, LLC.
carlton@ strandconcrete.com
Agreed and Accepted: ___________ _
Name Date
Page 1 of 1
CR# Date
1 2/23/2012
2 2/23/2012
3 2/23/2012
4 2/23/2012
5 3/2/2012
6 3/6/2012
7 3/8/2012
8 3/8/2012
9 3/8/2012
10 4/10/2012
11 4/10/2012
12 4/1.0/2012
13 4/12/2012
14 4/12/2012
Possible Future CR's
..
'•
Tegrity Con t ractors In c. Chang e Ord er Requ est Log
Fort Worth Auto Pound Facility
Subject Amount Approved
Change Order #1
Gyp . Board Ceilings Rm#101 , 102 and 103 $ 1,966.00 $ 1,966.00
Breakroom Column and Ceiling $ 317.00 $ 317.00
Credit for Epoxy Floor Paint in Rm #104 $ (363 .00) $ (363 .00)
Replace Door #101 $ 1 ,590 .00 $ 1,590 .00
Change Order #1 Total Approved
Replace Thermostats $ 850 .00
Restroom Exit Liqhts $ 395.00
Change 2x4 fixtures to hard ceiling frames $ 283 .00
Tape, bed , paint column furr-out $ 319.00
Additional Paintinq $ 202 .00
Electrical Switch chanqes $ 878 .00
Saw-cut and reoour sidewalks west side $ 1,391.00
New Breakroom Lights $ 567.00
Exterior Wall Packs $ 408 .00
Asphalt concrete removal/cable relocate $ 1,728.00
Totals $ 10,531 .00 $ 3 ,510.00
Pier casing
Disapproved
$ 3,510.00
$ -
T :\Job Folders -Current\Jobs 2011\11-36 Vehicle Impound Facility\Change Orders\11-36 COR Log .x is
4/12/2012
Total Approved
$ 1,966.00
$ 2 ,283.00
$ 1,920 .00
$ 3 ,510 .00
$ 3 ,510 .00
• < .J
Change Request: 15
Date: 4/25/2012
To: City of Fort Worth
401 West 13th
Fort Worth, Te xas 76102
Attn: Alan Bagamery
Re: Police Auto Pound Facility
Materials and labor case 24" piers as per testing lab
See attached
Subtotal $ 10 ,956.00
Tegrity Profit & Overhead $ 1,095.60
Bond Fee $ 361 .55
Total $ 1~.41J .Hi
$ 12,413.00
The Contract Time will be changed by ( 3 ) days.
From: Eddie Whitworth
Tegrity Contractors , Inc
106 East Un iversity Dr. #100
McKinney, Texas 75069
$ 10 ,956 .00
STRAND CONCRET_E, LLC
1154 Old l\1illwood, ROCKWALL, TX.
Phone : 972-772-0275 Fax : 972-772-8033
Carlton Bier, Estimator M. # 214-708-6541
Change Order Request
Date: 4/9/12
To: Eddie Whitworth
Fax: Emailed
# of Pages: l
Pro.iect : Fort Worth Auto Pound
From: Carlton Bier
The following is pricing t.o add the following revisions: Add:$17~
7
Additional Charge to case piers per unit price quoted in proposal and agreed to at contract.
Please see attached drilling log for footage
Please sign and return, feel free to call if you have any question ..
Thanks
Carlton Bier
M# 214-708-6541
Strand Concrete, LLC.
cruJton@strandconcrete.com
Agreed and Accepted:_ _ ___ _
Name
Page 1 of 1
·--------------
Date
CR# Date
1 2/23/2012
2 2/23/2012
3 2/23/2012
4 2/23/2012
5 3/2/2012
6 3/6/2012
7 3/8/2012
8 3/8/2012
9 3/8/2012
10 4/10/2012
11 4/10/2012
12 4/10/2012
13 4/12/2012
14 4/12/2012
15 4/25/2012
Possible Future CR's
Tegrity Contractors Inc . Change Order Reque st Lo g
Fort Worth Auto Pound Facility
Subject Amount Approved
Change Order #1
Gyp. Board Ceilings Rm#101, 102 and 103 $ 1,966 .00 $ 1,966.00
Breakroom Column and Ceilinq $ 317 .00 $ 317.00
Credit for Epoxy Floor Paint in Rm #104 $ (363 .00) $ (363.00)
Replace Door #101 $ 1,590.00 $ 1,590 .00
Change Order #1 Total Approved
Replace Thermostats $ 850 .00
Restroom Exit Lights $ 395.00
Chanqe 2x4 fixtures to hard ceil inq frames $ 283 .00
Tape , bed , paint column furr-out $ 319 .00
Additional Paintinq $ 202 .00
Electrical Switch chanqes $ 878.00
Saw-cut and repour sidewalks west side $ 1,391 .00
New Breakroom Liqhts $ 567.00
Exterior Wall Packs $ 408 .00
Asphalt concrete removal/cable relocate $ 1,728.00
Pier Casing $ 12,413 .00
Totals $ 22 ,944.00 $ 3,510.00
Pier casing
Disapproved
$ 3,510.00
$ -
T:\Job Folders -Current\Jobs 2011\11-36 Vehicle Impound Facility\Change Orders\11-36 COR Log .xis
4/25/2012
Total Approved
$ 1,966.00 '/
$ 2 ,283.00
$ 1,920.00
$ 3 ,510.00
$ 3,510 .00
. ;
-1
"'" ·-~~
f . -..
MAS-TEK ENGINEERING &ASSOCIATES, INC.
BELL DRILLED PIER INSPECTION REPORT
CLIENT:
PROJECT:
CONTRACTOR:
DRILLING COMPANY:
Pier Location (Grid Lines)
Pier Mark
Design Shaft Diameter (inches)
Requi red Pen . (ft)
Depth to Bearing Strata (ft)
Total Depth (ft)
Actua l Pen . (ft)
Cas ing Diameter
Casing Lengt h
City of Fort Worth Public
Works & Trans .
Vehicle Impound Facility
Integrity Contractors
Big Dog Drilling
4
· B-1
26
14 .0
22
36
14 .0
24
23
, .... .--.'I: .. ~--·-v ,..,~-~ ........... -.. .·--.. ~ ·-·· -.. ··-.. .......... ~-. ' ~ ,.
Top of Casing to Ground : 18" Above
Variation of Shaft from Plumb (in) NIA
Variation Pump within Tolerance Yor N Yes
Bottom of Hole Condition Dry
Time Drilling Complete 2:35 PM
Vertical Bars (No . & Size!) 6#6
Length of Bars 40 .5
Horizontal Ties (Size & Spacing) #3@), 12
Concrete Length (fl) 37 .0
Time Concrete Comp lete 4:58PM ..
RE MARKS:
REPORT NO.:
TECHNICIAN:
DATE OBSERVED:
REPORT DATE:
1
A-2
26
14.0
23
37.5
14 .5
24
:G
23 .... ---
1 3/4
N /A
Yes
Dry
11:58AM
6 #6
40.0
#3 (iiJ 12
37 .1 1
12 :42PM
MAS-TEK EN GI N EE RING & ASSOC.
Page I of I
--
-~"
19-035-004
. Bob Robinson
4/5/2012
4/10/2012
..
,,
L\ !.,
)
..
'
..
•
MAS-TEK ENGINEERING & ASSOCIATES, INC.
BELL DRILLED PIER INSPECTION REPORT
CLIENT:
PROJECT:
CONTRACTOR:
DRILLING COMPANY:
Pier Location {Grid Lines)
Pier Mark
.· Design Shaft Diameter (inches)
Required Pen . (ft)
Depth to Bearing Strata (ft)
Total Depth (ft)
Actual Pen. (ft)
Casing Diameter
City of Fort Worth Public
Works & Trans.
Vehicle Impound Facility
Integrity Contractors
Big Dog Drilling
2
A-3
26
14.0 .
22.0
36.4
·-
14.4
23
J.)
20.0 Casing Length -· .. -. --.. -·
Top of Casing to Ground : 2
Variat ion of Shaft from Plumb (in) NIA
Variation Pump within Tolerance Y or N Yes
Bottom of Hole Condition Dry
Time Drilling Complete 5:02PM
Vertical Bars (No . & Size) 6#6
1
Length of Bars 40.2
Horizontal Ties (S ize & Spacing) #3@)2
Concrete Length (ft) 34.7
Time Concrete Complete 5:55 PM
REMARKS: -·-·····-
REPORT NO.:
TECHNICIAN:
DATE OBSERVED:
REPORT DATE:
3
A-4
26
14.0
21.5
35.7
14.2
23
.-..• ~:
18.0
. .
2
N/A
Yes
Dry
3:46PM
6#6
39.11
#3@12
·-·
34.7
5:10PM
MAS-TEK ENGINEERING & ASSOC.
Page I of I
19-035-002 .
Bob Robinson
4/4/2012
4/10/2012
!J r : .....
-
'
.....
•
"
-
.-..
MAS.TEK ENGINEERING & ASSOCIATES, INC ..
BELL DRILLED PIER INSPECTION REPORT
CLIENT:
PROJECT:
CONTRACTOR:
DRILLING COMPANY:
Pier Location (Grid Lines)
Pier Mark
Design Shaft Diameter (inches)
Required Pen . (ft)
Depth to Bearing Strata (ft)
Total Depth (ft)
Actual Pen . (ft)
Casing Diameter
Casing Length -
Top of Casing to Ground:
City of Fort Worth Public
Works & Trans .
Vehicle Impound Facility
Integrity Contractors
Big Dog Drilling
6
B-3
24
14.0
21
35.3
14.3
25
•••• I
23
1.3
Variation of Shaft from Plumb (in) NIA
Variation Pump within Tolerance Y or N Yes
Bottom of Hole Condition Dry
Time Drilling Complete 10:40 AM
Vertical Bars (No . & Size) 6#6
Length of Bars 36.7
Horizontal Ties (Size & Spacing) #3@12
Concrete length (ft) 35.11
Time Concrete Complete 12:55 PM
REMARKS:
REPORT NO.:
TECHNICIAN:
DATE OBSERVED:
REPORT DATE:
5 9
B-2 C-2
24 24
14 .0 14
20 23.6
34.2 27.6
19.2 14
26 26
·-, I
23 18
2.2 -3.0
NIA NIA
Yes Yes
Drv Dry
ll:15AM 11:59AM
6#6 6 #6
41.3 40.6
#3 (a} 12 #3@ 12
34.8 40.
1:14PM 2:47PM
Page I of2
19-035-006
Bob Robinson
4/6/2012
4/11/2012
8 7
C-1 C-3
24 24
14 14
21 19
35 33.l
14 14.l
24 26
.. .,
20 23
-1.0 2.5
NIA NIA
Yes Yes
Dry Dry
3:55 PM 2:40PM
6#6 6#6
41.6 40.7
#3@)2 #3@12
34.0 34.4
5:47 PM 2:59 PM
1 ... • . ,
...
.-..
MAS-TEK ENGINEERING & ASSOCIATES, INC .
BELL DRILLED PIER INSPECTION REPORT
CLIENT:
PROJECT:
CONTRACTOR:
DRILLING COMPANY:
Pier Location (Grid Lines)
Pier Mark
Design Shaft Diameter (inches)
Required Pen. (ft)
Depth to Bearing Strata (ft)
Total Depth (ft)
Actual Pen . (ft)
Casing Diameter
Casing Length
...... . -~· ~ ..
Top of Casing to Ground :
City of Fort Worth Public
Works & Trans.
Veh icle Impound Facility
· Integrity Contractors
Big Dog Drilling
10
1 C-3
24
14
19
33.1
14.1
26
ii,\,
23
-
2.7
. Va_riation of $haft from Plumb (in) N(A
Variation Pump within Tolerance Y or N Yes
Bottom of Hole Condition Dry
Time Drilling Complete 5:05 PM
Vertical Bars (No . & Size) 6#6
Length of Bars 40
Horizontal Ties (Size & Spacing) #3@ 12
Concrete Length (ft) 32
Time Concrete Comp lete 6 :05 PM
REMARKS:
REPORT NO.:
TECHNICIAN:
DATE OBSERVED:
REPORT DATE:
I I
C-4
24
14
21
35
14 ·'.
26
..
23
2.6
N IA
Yes
Dry _
5 :29PM
6 #6
39.IO
#3@12
35.
6 :20PM
MAS -( EK ENGINE ERING & ASSOC .
Page 2 of2
...
19-035-006
Bob Robinson
4/6/2012 ---------1
4/11/2012
.-..
51 (.,.,