Loading...
HomeMy WebLinkAboutContract 42789-CO3 (2)·, Change Orde r No. Da te 3 (three) 6/7/20 ' / ;!. Facility and Proj ect Des cription Auto Pound Renovation City of Fort Worth Change Order Request TPW Project No . CITY SECRETARYYZ:169-PD3 CONTRACT NO . . Fundin g (FA C) R 107 541200 0357000 City Se cretary Contract No . 42789 --8RIG INA~C8NT RA&T A MOUNT • .:::~ ......................................................... --$1-79 ,950--------------------- ) . EXTRAS TO DATE..................................................................... $ 2 2 ,9 44 CREDITS TO DATE .............................................. : .................... . $ 0 CONTRACT COST TO DATE .......................................................... ." ....................................... . $ 202 ,894 AMOUNT OF PROPOSED CHANGE ORDER ........................................................................... . $ 810 REVISED CONTRACT AMOUNT ............................................................................................ . $ 203 ,704 ORIGINAL FUNDS AVAILABLE FOR CHANGE ORDERS ........................................................... . $ 25 ,000 REMAINING FUNDS AVAILABLE FOR CHANGE ORDERS ......................................................... --,. $ 1 ,2 4 6 ADDITIONAL FUNDING (IF NECESSARY) ............................. _. .................................... ·: ............ . 0 IN ACCORDANCE WITH THIS CHANGE ORDER, THE CONTRACTOR SHALL: Provide all labor and mat erials as per attached : PCR-16 , Mod ify st ructu ral fra m ing at NE corner of the awn ing . -------------------------------------------------------------' --------------. -------------------------------------------------------------------- T OTAL A DD $ 8 10 It is :understoo d and agreed that the acc eptance of this Change Order by the co ntracto r constitutes an accord and satisfa ction and represents payment in full (both time and mon ey ) fo r all costs arising out of , or incidental t o, the ab ove Change Order Cont ra cto r's Name Tegrity Conbtractors Orig inal Contract Time Ad ditional Approve d Time To Date Approved Contra ct Time To Date Additio na l Ti me Fo r This Cha nge Order 90 cd O cd Contractor-T egrity Contracto rs , Inc 90 cd 0 cd Df te "'1sl,1. Date t/11/1r- Date "(12/"/,D/t, Date Dat e Coun ci l Actio n (If Requ ired) L~ J.',4._ / D Approved D Disapproved 'VI f), f J · ( l-.D Other Da t e TPW Facili ties Management Divisio n Change Order Form (2/2 8/12) OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX 06 -13 -1 2 P03:21 IN -. Change Request: 16 Date: 5/4/2012 To: City of Fort Worth From: 401 West 13th Fort Worth , Texas 76102 Attn : Alan Bagamery Re: Police Auto Pound Facility Materials and Labor for additional steel for NW corner of canopy as per Engineer's s ite v isit and instructions See attached Subtotal $ 715 .00 Tegrity Profit & Overhead $ 71.50 Bond Fee $ 23.60 Total · $ BHUQ $ 810 .00 The Contract Time will be changed by ( 0 ) days. Eddie Wh itworth Tegrity Contractors, Inc 106 East University Dr. #100 McKinney, Texas 75069 $ 715.00 i> +. ,. .... , ... . > "\. <•; ii ·•··· . < .. > < •·• ...... · .. .. 5 3/2/2012 Replace Thermostats 6 3/6/2012 Restroom Exit Lights ••••• Tegrity Contractors Inc . Change Order Request Log Fort Worth Auto Pound Facility > /···.· Amount Ch~nge Orde(#1 phange Otfter #2 $ 850 .00 $ 395.00 ) $ $ •· 850 .00 395.00 7 3/8/2012 Chani:ie 2x4 fixtures to hard ceilini:i frames $ 283 .00 $ 283.00 8 3/8/2012 Tape, bed, paint column fu rr-out , $ 319 .00 $ 319.00 9 3/8/2012 Additional Paintini:i $ 202.00 $ 202.00 10 4/10/2012 Electrical Switch chani:ies $ 878 .00 $ 878 .00 11 4/10/2012 Saw-cut and repour sidewalks west side $ 1,391.00 $ 1,391 .00 12 4/10/2012 New Breakroom Lights $ 567.00 $ 567.00 13 4/12/2012 Exterior Wall Packs $ 408 .00 $ 408.00 14 4/12/2012 Asphalt concrete removal/cable relocate $ 1,728.00 $ 1,728.00 15 4/25/2012 Pier Casinq $ 12,413.00 $ 12,413.00 .. ·.···/??> -~: ........ ·····•c.•••······ .,.··.·.\:i :·:::<::·:<:::-::<<: >:}::::-:-~hange·•·orc1ei,·#2·· ··:')' .\? ······ ..... / ........... ·:----. ........... ,/ < >ra,tal Approved ·•·.··.·.· .. ·.;.·.·-:·· -,:;.· -}:: ?i>>> \/\< ?\/::: .·. 16 5/4/2012 !Additional Canopy Steel 810 .00 I Totals $ 23,754.00 $ 22 ,944 .00 $ Possible Future CR's ·.•·. ou JC, 4=:>Lt - T:\Job Folders -Current\Jobs 2011 \11-36 Vehicle Impound Facility\Change Orders\11-36 COR Log .x is 5/5/2012 · •' . } .. / ····· $ 850.00 $ 1,245.00 $ 1,528.00 $ 1,847.00 $ 2,049 .00 $ 2,927 .00 $ 4 ,318 .00 $ 4 ,885.00 $ 5,293 .00 $ 7 ,021 .00 $ 19,434.00 $ 22,944.00 I -, Tegrity Contractors Attn: Eddie Whitworth Change Order #3 Change Order Creek Field Services, LLC 2141 Collins Road Suite #502 Denton, TX 76208 (940) 387-9711 Office (940) 387-9723 Fax March 28, 2012 Phone: 972-562-6060 Fax: 972-562-6064 Ft. Worth Impoun d Page 1 of 1 This change order covers the cost of additional labor and materials required to install the additional structural steel, C-Perlin, and clips perrevision 1 dated 5/3/2012 . This cost is incurred due to a design change by the structural engineer. Labor to fabricate and install: 8 MH @ $40.00 = $320 .00 Material and Sundries: $323.00 10%P&O $643.00 $72 .00 $715.00 We have furnished material and labor for the completion of the above change order. All material is guaranteed to be as specified. All work has been completed in a workmanlike manner according to standard practices . Any alteration or deviation from above specifications involving extra costs will be executed only upon written orders , and will become an extra charge over and above the estimate . All agreements contingent upon strikes , accidents or delays beyond our control. Owner to carry fire, tornado and other necessary insurance . Our workers are fully covered by Workman's Compensation Insurance. Acceptance of Change Order -The above prices, specifications and conditions are satisfactory and are hereby accepted. Date of Acceptance: Authorized Signature: Signature: -------------- Signature: -------------- I"") . ,2' 2 1/2" ...111111{~ ""1111111111 "SI" vi L. 109'-11 1/2'' I 0 PLAN I L __ I I I OFF!CF Off/CE OFFICE OFF ICE -_---- !FIN . FLR .=DATUM EL. 100' ~"I f-- >-- J [-~------·- I ,--, __________________ L=~ _J __ · BREfa,K f<.OOH . I / -----------------IL------------~-------·-- MEN: LOC.Kt