Change Order Request
Project Name! Alliance Pavement Rehab Phase 7
CITY SECRETARY
comRAcr No. ~"l 1f er-co 1.
City Sec# 42765
Client Project #(s) 1588 :=:==================================================::::
Project Description Rehabilitation of Runway , Taxiway , and Precision Approach Path Indicator (PAPI) on runway 16/34L
Contractor! EAS Contracting, LP
City Project Mgr.! Ruseena Johnson
Original Contract Amount
Extras to Date
Credits to Date
Dept.
Pending Change Orders (in M&C Process)
Contract Cost to Date
Revised Contract Amount
Original Funds Available for Change Orders
Remaining Funds Available for this CO
Additional Funding (if necessary)
Change Order #
City Inspector
Aviation
$699,657.25
$0 .00
$0 .00
Chris Ash
Date
Totals
$699,657 .25
$699,657 .25
$25,415.58
$725,072.83
$0.00
4/11/2012
Contract Time
CD
120
120
8
128
Change Order #1 is required to address field conditions found . Record drawings indicated that the ARFF pavement thickness was 6-inches in
depth but actual field conditions found were existing pavement thickness ranging from 8-inches to 12-inches thus requiring a redesign of the
ARFF apron . Change Order #1 also includes 65 linear foot of directional boring . The new 65 linear foot of directional boring is required due an
omission on the contract drawings where the relocated new PAPl-4 power duct bank goes under an existing serivce road .The contractor has
requested a 8 calendar day extens ion to the contract amount of 120 days due to the redesign of the ARFF station pavement. The calendar day
extension would be granted at NO additional cost to th l1F.i\M11Wnrth
OFFICIAL RECOR
CITY SECRETAR
· FT. WORTH, TX
Project Name Alliance Pavement Rehab Phase 7
City of Fort Worth
Change Order Additions
City Sec# 42765
Client Project # 1588 -----------------------------------
Project Description Rehabilitation of Runway, Taxiway , and Precision Approach Path Indicator (PAPI) on runway 16/34L
Contractor EAS Contracting, LP Change Order# I 1 Date 4/11/2012
City Project Mgr. Ruseena Johnson City Inspector!._ -Ch_n=·s""'"Ash""'"""'" ________ _.
ADDITIONS
11t.M ----·'" IIUN Ul:.t' I l..lC'f Uni( umt~I IO!al
1 l"'avement Kemovai, 14-mcn r-1.,1,,, ma . nau11ng (Alrcran: l"'avementJ Aviaoon tUi/ .:>T f"1:II,-', ~ll:l:>.1U
2 Pavement Kemovai, 5-lncn l"'lili , 1ne1. Halling (ARFF Pavement) AVl8uon JOU.IAJ ~T $16 .o.: ~ts.,uo .~
3 Removal, l:XISOng liement Treatea .i;:,,.._,~,..,.,,e Aviaoon Jt>ti .t>/ ~y $8.IAJ $2,933.3ti
4 Pavement -1..iOOaete Replacemetn , on t.X1St i,ase (14" Reinrorcea l"vliJ Aviaoon Jt>tj,b/ ~T ~:>.f\J $3:>,Ul:IU.J:.!
:, 1u1recoona1 t100ng, 4· nut'c t:IOre , t"At"I Power teea Aviaoon 65 .UU u-~.w ~i.~.uu
<
Change Order Additions Page 1 of 2
...
... ,
)
'
Aviation $47,915.58
:SUD I Otal AOOIUOOS ~f,915.58
Change Order Additions Page 2 of 2
FORT WORTH 9
Project Name Alliance Pavement Rehab Phase 7
City of Fort Worth
Change Order Deletions
City Sec# 42765
Client Project# 1588 ;::===========================
Project Desaiption Rehabilitation of Runway, Taxiway, and Precision Approach Path Indicator (PAPI) on runway 16134L
Contractor EA.5 Contracting, LP Change Order# I 1 Date 4/11/2012
City Project Mgr. Ruseena Johnson City Inspector ... I _Ch_ns_· _Ash ________ _
DELETIONS
11t:M ----· "' I IUN Uc/"I r..zr.y Unit UntlU>SI IOtal
1 ~avement -·-·-· o-1nat l"vv, mci. Hauung (AKl"r-AprOOJ Aviaoon .x,u.uu .:IT ~1:.1!.::x. ~.OUU.UlJ
'/. ~avement -v00crete Replacement, 8-lncn tu11nrorcea n.;1,; 1Aviaoon .lOU.UU .:>T ~.UI. ~lH,uuu .w
Change Order Deletions Page 1 of 2
Aviation $22 ,500.00
:sue Total ueteuons ,a,ouu .oo
Change Order Deletions Page 2 of 2