Loading...
HomeMy WebLinkAboutContract 42765-CO2 (2)fORTWORTH .. ~ City of Fort Worth Change Order Request g~:::1:.V 4211Pr-cQL Project Name! Alliance Pavement Rehab Phase 7 Client Project #(s) I City Sec# j 42765 I ,...._ _________________________________ __, Project Description Rehabilitation of Runway , Taxiway , and Precision Approach Path Indicator (PAPI) on runway 16/34L Contractor! EAS Contracting , LP City Project Mgr.j Ruseena Johnson Dept. Original Contract Amount Extras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date !Amount of Proposed Change Order Revised Contract Amount Original Funds Available for Change Orders Remaining Funds Available for this CO Additional Funding (if necessary) Aviation $699 ,657 .25 $25 ,415.58 $0.00 $0.00 $725,072.83 '11Uf4,A i - $843,~l.51 ' $0.00 $118,874.68 Change Order# 2 Date 8/8/2012 ., City Inspector Chris Ash ,;e,. .. '----------------' ' Totals Select Day Type $699 ,657.25 $25,415 .58 $725 ,072.83 $118,874.68 $843 ,947 .51 $0 .00 $118 ,874 .68 20.62% $874,571.56 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Will require an additional 150 Calendar Days added to Contract for materials lead time and installation by Contractor. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of , or incidental to , the above Change Order . 1 "\_ . -1 0 ') • Iv • I I July 5, 2012 Larry L. Gaines Project Manager AECOM 1200 Summit Ave., Suite 600 Fort Worth, Texas 76102-4409 Ref: "Alliance Airport Runway and Taxiway Rehab Phase 7" Requested Proposal for Runway 16R/34L Lighting Modification EAS -----------CONTRACTING, LP EAS proposes to complete the requested Electrical work, represented by pdf drawings transmitted to EAS on 6/14/2012, for a Lump Sum amount of $121,869.00 . Scope of work Items are attached with estimated units and pricing. Scope of work is represented as follows : 1. Proposal pricing is based on furnishing new fixtures with isolation transfonners at all locations Denoting configuration change/and or new fixtures . 2. Cost of Survey and Traffic Control is included. 3. Other than End of Runway New Base and Fixtures, re-circuiting of fixtures will be accomplished utilizing existing underground duct bank system. Replacing existing conduit, other than a single 2" at Runway Ends, is not included. EAS assumes the ability to use existing power duct. 4. This proposal excludes vegetative restoration; EAS does not anticipate a need for this Item. 5. Vault Lock-outs are included. 6. All work will be daylight work shifts 0700 and 1730 Hours. 7. Temporary by-pass circuits will be installed to maintain existing Lighting for re-opening at night, other than a short period for final circuit and fixture cut-over . 8. This proposal includes no DBE participation . 9. This proposal includes no asphalt restoration . Removed asphalt will be replaced with concrete matching existing grades . 10. BAS Contracting, LP is regulated by the Texas Department of Licensing and Regulations; TDLR # 17419. ~ Bobby . cClelland EAS 'ONTRACTING, LP 817-233-7511 2941 Trade Center Drive -Suite 200 -Carrollton, TX 75007 972-590-5576 Phone• 972-590-5571 Fax• www .easlp .com • info@easlp .com BID FORM Bidder: Airport Name : Project Description : Item No. Spec l 2 3 4 5 6 7 8 9 IO 11 12 EAS Contracting, LP Fort Worth Alliance Airport Phase 7 Runway Design and Ta:riway Rehabilitation Runway 16R/34L Lighting Modification Item Description Extended Overhead/On-site Office And Project Management Traffic And Barricades Temporary Electrical By-Pass Remove and Store Elevated Fixtures And Transformers Remove and Store In-pavement Fixtures and Transformers Furnish and Install End Of Pavement Runway Lights and Transformers in new Base Cans with New Conduit Circuit Feed Furnish and Install Runway Edge Lights and Transformers Furnish and Install Runway In-pavement Edge Lights and Transformers Furnish and Install In-pavement Runway Threshold Lights and Transformers Furnish and Install Runway In-pavement Blank Plates in place of fixtures Install New Cable In New and Existing Conduit Bonds and Insurance TOTAL PROPOSAL Unit Approximate Ouantitv LS 1 LS I LS I EA. 23 EA 21 EA 16 EA 7 EA 5 EA 4 EA 12 LF. 6400 LS I Date : 6-Jul-12 ------- Unit Price Total Amount $ 17,367.00 $ 17,367.00 $ 10,444.00 $ 10,444.00 $ 9,500.00 $ 9,500 .00 $ 125.00 $ 2,875.00 $ 150 .. 00 $ 3,150.00 $ 2,500.00 $ 40,000 .00 $ 600.00 $ 4,200.00 $ 1,600.00 $ 8,000.00 $ 1,800 .00 $ 7,200.00 $ 350.00 $ 4,200.00 $ 2 .00 $ 12,800.00 $ 2,133.00 $ 2,133.00 $ 121,869.00 Page 1 Alliance A irport Proposed lighting Modification Runway 16R34L 6-25-20 12 Extended Overhead On-Site Office And Project Manager 1 .00 1ota1 Laoorunn Material Equip. Labor Cost/ .35 System Sys Total Sys Total OH & Margin Actual BID I Actual Item I Item# Description Labor Unit Cost Unit Cost HR. B-HR. Total Labor Mat. Equip. 18%/10% Sys BID Unit UNIT Value 1 1 EAS Office And Con-X 2 0 .000 375 .00 0.000 0 27 .00 $0 .00 $750 .00 $0 .00 $223 .50 973 .50 2 Utilities 2 0.0000 500 .00 0.00 0 24 .00 $0 .00 $1,000.00 $0 .00 $298 .00 1298.00 3 Project Manaaer 200 200 .0000 0.00 7.00 200 46 .73 $9,346 .00 $0.00 $1 ,400 .00 $3 ,202.31 13948 .31 4 Broom 200 200 .0000 0.00 12 .00 0 0.00 $0 .00 $0.00 $2 ,400 .00 $715 .20 3115.20 Subtotal 200 $9,346 .00 $1,750.00 $3 800.00 4439.01 $19,500.00 $19 ,500.00 Traffic And Barricades 1.00 Total Labor Unit Material Equip. Labor Cost/ .35 System Sys Total Sys Total OH & Margin Item# Description Labor Unit Cost Unit Cost HR. B-HR. Total Labor Mat. Equip. 18%/10% Sys Unit Cost 1 1 liahted X's 2 0 .000 0.00 1500.000 0 27 .00 $0.00 $0.00 $3 ,000 .00 $894 .00 3894 .00 2 liahted Cones 100 0.0000 0.00 10.00 0 24 .00 $0.00 $0.00 $1,000 .00 $298 .00 1298.00 3 Vehicles (3) 3 0.0000 0.00 600.00 0 24 .00 $0.00 $0.00 $1 ,800 .00 $536 .40 2336.40 4 Fuel 640 0.0000 3.40 10.00 0 24.00 $0.00 $2,176.00 $6 ,400 .00 $2,555 .65 11131 .65 5 Traffic Labor 64 64 .0000 0.00 0.00 64 24 .00 $1 ,536 .00 $0.00 $0 .00 $457 .73 1993.73 Subtotal 64 $1 ,536.00 $2,176.00 $12,200 .00 4741 .78 $10,444.00 $10 ,444 .00 159;12.00! Temporary Electrical By-pass 1.00 1ora1 Laoor unn Material Equip. Labor Cost/ .35 System Sys Total Sys Total OH & Margin Item# Description Labor Unit Cost Unit Cost HR. B-HR. Total Labor Mat. Equip. 18%/10% Sys Unit Cost 1 1 Riaid Conduit 2" 500 0.100 8.25 0.350 50 27 .00 $1,350 .00 $4 ,125.00 $175 .00 $1,683 .70 7333 .70 2 L-824C Cable 2000 0.0100 0.60 0.02 20 27 .00 $540 .00 $1 ,200.00 $40 .00 $530 .44 2310.44 Subtotal 70 $1,890.00 $5 325.00 $215 .00 2214.14 $9,500.00 $9 ,500.00 cost· Page 1 of 5 Page 2 Alliance Airport Proposed Lighting Mod ification Runway 16R34L 6-25-2012 Remove and Store Elevated FixturesAnd Transformers 23 .00 lotal Labor Unit Material Equip. Labor Cost/ .35 System Sys Total Sys Total OH & Margin Item# Description Labor Unit Cost Unit Cost HR. B-HR. Total Labor Mat. Equip. 18%/10% Sys Unit Cost 23 Remove Elevated Fixtures & 1 Transformers 23 23.000 0 .00 7.000 23 27.00 $621 .00 $0.00 $161 .00 $233 .04 44.13 2 Remove Cable 4400 0 .0050 0 .00 0 .08 22 24 .00 $528 .00 $0.00 $352.00 $262 .24 49.66 3 Remove Base Can & Structures 8 2 .0000 5 .00 64 .00 16 24 .00 $384 .00 $40 .00 $512.00 $278 .93 52 .82 Subtotal 61 $1,533.00 $40.00 $1,025 .00 774.20 $125.00 $2,875 .00 Remove and Store In -pavement Fixtures And Transformers 21 .00 lotal I Labor Unit Material Equip. Labor Cost/ .35 System Sys Total Sys Total OH & Margin Item# Description Labor Unit Cost Unit Cost HR. B-HR. Total Labor Mat. Equip. 18%/10% Sys Unit Cost 21 Remove Runway ln-pav. Fixtures 1 And Transformers 21 17.000 0.00 7 .000 17 27.00 $459.00 $0.00 $147 .00 $180 .59 37.46 2 Remove Cable 2000 0 .0050 0 .00 0.08 10 24 .00 $240.00 $0.00 $160.00 $119.20 24.72 Subtotal 27 $699 .00 $0.00 $307.00 299.79 $150.00 $3 ,150.00 Place End Of Pavement Runway Lights 16.00 Total Labor Unit Material Equip. Labor Cost/ .35 System Sys Total Sys Total OH & Margin Item# Description Labor Unit Cost Unit Cost HR. B-HR. Total Labor Mat. Equip . 18%/10% Sys Unit Cost 16 1 Survey 16 0 .500 0.00 30 .000 8 27 .00 $216.00 $0.00 $480 .00 $207.41 56.46 2 3000 PSI concrete 22 1.50 82 .00 35 .00 33 .00 24.00 $792.00 $1 ,804.00 $770.00 $1,003.07 273 .07 3 2" spacers 88 0.15 0 .75 0.00 13.20 24.00 $316 .80 $66.00 $0 .00 $114 .07 31 .05 4 2" PVC Sch-40 440 0 .05 0.40 0.00 22.00 24 .00 $528 .00 $176.00 $0.00 $209 .79 57 .11 5 2" PVC Fittings 24 0.03 2.00 0.00 0.72 24 .00 $17 .28 $48 .00 $0 .00 $19.45 5 .30 6 #4 x24" rebar 88 0 .15 0 .62 0 .00 13.20 24.00 $316.80 $54 .56 $0 .00 $110 .67 30 .13 7 Warning Tape 440 0.01 0 .15 0 .00 2.20 24.00 $52 .80 $66.00 $0.00 $35.40 9 .64 8 GLUE 440 0 .005 0.03 0.00 2.20 24.00 $52 .80 $13.20 $0 .00 $19 .67 5.35 9 Base Cans 16 6.00 175 .00 100.00 96 .00 24.00 $2,304.00 $2,800.00 $1 ,600 .00 $1 ,997 .79 543 .86 10 Ground Rods 16 1.00 19.00 0 .00 16.00 27.00 $432 .00 $304.00 $0 .00 $219 .33 59.71 11 Rwy.End Lights With Transformer. 16 1.50 366 .00 25 .00 24.00 24 .00 $576.00 $5,856.00 $400 .00 $2,035 .94 554 .25 Page 2 of 5 Page 3 Alliance Airport Proposed Lighting Modification Runway 16R34L 6-25-2012 12 Saw And Remove Asphalt 440 0.10 0.00 1.50 44 .00 24.00 $1 ,056 .00 $0.00 $660 .00 $511 .37 139.21 13 Core Asphalt For Base Cans 16 1.00 0.00 50 .00 16 .00 27 .00 $432 .00 $0.00 $800 .00 $367 .14 99.95 14 Trench 440 0.06 0.00 2.50 26.40 24 .00 $633 .60 $0.00 $1 ,100.00 $516 .61 140.64 15 Concrete Duct Marker 2 2.00 50 .00 25 .00 4.00 24.00 $96 .00 $100.00 $50.00 $73 .31 19.96 16 Clean UP 440 0.05 0.00 0.00 22 .00 24.00 $528 .00 $0.00 $0 .00 $157 .34 42 .83 17 Pickup 80 7.00 0 24.00 $0 .00 $0.00 $560.00 $166 .88 45.43 18 Service Truck 40 12 .00 0 24.00 $0 .00 $0.00 $480.00 $143 .04 38 .94 19 Trencher 16 18 .00 0 24.00 $0 .00 $0.00 $288 .00 $85 .82 23.36 20 Rubber Tire Backhoe 32 35 .00 0 24.00 $0 .00 $0 .00 $1,120 .00 $333 .76 90 .86 - 342.92 8350.08 11287.76 8308.00 8327 .86 $2,500.00 $40 ,000 .00 1746.621 Page 3 of 5 Page4 Alliance A irport Prcposed Lighting Mod ification Runway 16R34L 6-25-2012 Place Elevated Rwy. Edge Lights And Transformers 7 .00 0 Material Equip. Labor System Sys Total Sys Total OH&Margin Item# Description Labor Unit Cost Unit Cost HR. Total Labo Mat. Equip . 18%/10% Sys Unit Cost Rwy.Elevated Edge Lights With 1 Transformers 7 2.33 260.00 25 .00 16.31 24 .00 $391.44 $1,820.00 $1 75.00 $7 11 .16 442.51 2 C lean u 7 1.25 0.00 50 .00 8.75 24 .00 $210 .00 $0.00 $350 .00 $166.88 103.84 3 Picku 10 7 .00 0 24 .00 $0.00 $0.00 $70 .00 $20 .86 12.98 25.06 601 .44 1820.00 595.00 898 .90 $600 .00 $4 ,2 00 .00 ·• !k;ttl 430~92! Place In-Pavement Rwy. Edge Lights And Transformers 5.00 Material Equip. System Sys Total Sys Total OH & Margin Item# Description Labor Unit Cost Unit Cost Total Labo Mat. Equip. 18%/10% Sys Un it Cost Rwy.In-Pavement Edge Lights 1 With Transformers 5 3.50 630 .00 25.00 17.50 24.00 $420 .00 $3,150.00 $125 .00 $1 ,101 .11 959 .22 2 Clean u 5 1.25 0.00 50 .00 6.25 24 .00 $150.00 $0.00 $250 .00 $1 19.20 103.84 3 Picku 10 7.00 0 24.00 $0.00 $0.00 $70 .00 $20 .86 18.17 23.75 570 .00 $1,600 .00 $8 ,000.00 Place In-Pavement Rwy. Threshold Lights And Transformers 4.00 Material Equip. System Sys Total Sys Total OH & Margin Item# Description Labor Unit Cost Unit Cost Total Labo Mat. Equip. 18%/10% Sys Unit Cost 4 Rwy.In-Pavement Thresho ld 1 Lights W ith Transformers 4 3.50 630 .00 25.00 14.00 24 .00 $336 .00 $2,520 .00 $100 .00 $880 .89 959 .22 2 Clean u 4 1.25 0.00 50 .00 5.00 24 .00 $120.00 $0.00 $200 .00 $95 .36 103.84 3 Picku 10 7.00 0 24 .00 $0.00 $0.00 $70 .00 $20 .86 22 .72 19.00 456.00 2520.00 370.00 997.11 $1 ,800.00 $7 ,200 .00 ' 1836.51>! Page 4 of 5 Place In-Pavement Rwy. End Light Plates Item# Description Rwy.In -Pavement End Light Blank 1 Plates And Spacers 2 Clean uo 3 Picku o ~ Install New Cable In Existing Conduit Item# 1 2 3 4 - Description Power Cable Clean uo Pickup Pickuo TOTAL COST TOTAL FEE TOT AL BID AMOUNT Labor Unit 12 12 2.75 12 1.25 10 Labor Unit 6400 6400 0.03 6400 0 .01 10 10 IOtal Material Equip. Labor Cost Unit Cost HR. 132.00 25 .00 33 .00 0.00 50 .00 15.00 7 .00 0 48.00 101a1 Material Equip. Labor Cost Unit Cost HR. 0.60 0 .15 160.00 0.00 0 .05 32 .00 7 .00 0 7 .00 0 192.00 Page 5 Alliance Airport Proposed Lighting Modification Runway 16R34L 6-25-2012 12.00 Laoor unn Cost/.35 System Sys Total Sys Total OH & Margin B-HR. Total Labor Mat. Equip. 18%/10% Sys Unit Cost 24 .00 $792 .00 $1 ,584.00 $300 .00 $797.45 289.45 24 .00 $360.00 $0.00 $600 .00 $286 .08 103 .84 24 .00 $0 .00 $0.00 $70 .00 $20.86 7 .57 1152.00 1584.00 970 .00 1104.39 $350 .00 $4 ,200.00 C 308.83 6400.00 !Laoorunn Cost/ .35 System Sys Total Sys Total OH & Margin B-HR. Total Labor Mat. Equip. 18%/10% Sys Unit Cost 24 .00 $3,840.00 $3,840.00 $960 .00 $2,574.72 1.75 24 .00 $768.00 $0.00 $320 .00 $324 .22 0.22 24 .00 $0.00 $0.00 $70 .00 $20.86 0.01 24 .00 $0.00 $0.00 $70 .00 $20 .86 0.01 4608.00 3840.00 1420.00 2940 .66 $2 .00 $12,800.00 $93,889.28 $27,979.01 $121,868.29 $121,869.00 Page 5 of 5 City of Fort Worth, Texas Mayor and Council Communication COUNCIL ACTION: A~c ..... ~ ...... o_'v ..... ed __ -___ on ___ 9/._1 ...... 1/_20 ___ -1_2 _______ __ DATE: Tuesday, September 11, 2012 REFERENCE NO.: **C-25810 LOG NAME: 55AFW-01588 PHASE 7 PAVEMENT REHAB -CO2 SUBJECT: Authorize Execution of Change Order No. 2 to City Secretary Contract No . 42765 with EAS Contracting, LP, in the Amount of $118,874.68 for Additional Improvements on the Phase 7 Pavement Rehabilitation Project at Alliance Airport (COUNCIL DISTRICT 2) RECOMMENDATION: It is recommended that City Council authorize the execution of Change Order No. 2 to City Secretary Contract No. 42765 with EAS Contracting, LP, in the amount of $118 ,874.68 for additional improvements on the Alliance Runway Extension-Earthworks Package 3 Project at Alliance Airport; thereby, increasing the contract amount to $843,947.51. DISCUSSION: On December 13, 2011, (M&C C-23555) the City Council authorized the award of contract to EAS Contracting, LP, for the subject project. The work included: airfield pavement rehabilitation and improvements, runway guard light rehabilitation and precision approach path indicator rehabilitation at Fort Worth Alliance Airport. On April 11, 2012, Change Order No. 1 was executed administratively in the amount of $25,415 .58 to address field conditions that were found to be variant to the record drawings that resulted in redesigns and an eight day increase in contract time. This Change Order No. 2 is related to additional improvements noted during construction. Those improvements include : 1. Remove and store elevated fixtures and transformers ; 2. Furnish and install end of pavement runway lights and transformers in new base cans with new conduit circuit feed; 3. Furnish and install runway edge lights and transformers; 4. Furnish and install runway in-pavement edge lights and transformers; 5. Furnish and install in-pavement runway threshold lights and transformers; 6. Furnish and install runway in-pavement blank plates in place of fixtures; and 7. Install new cable in new and existing conduit. An additional 150 days will be added to the contract time. The net effect of the proposed Change Order No. 2 is as follows: !Contract ---------c-----1 Logname: 55AFW -01588 PHASE 7 PAVEMENT REHAB -CO2 Page 1 of 2 ,IC,r,igir,alContract ArT1our1t 1$699,657 .25 -IC~ha-n~g~e ~O~rd-e~r~N~o~. 1-"'-~~~~~-1$ 25,4! ~.58 •[g-=~a=_!1~.9~.e ~O~_rd~-e~_r_=·t-J=_C?_=··2=-···-~·=-·-=-=··=··-=-=-~~-~118,874.68 [!OTAL . !$843,_947.51 EAS Contracting, LP, agrees to maintain its initial M/WBE commitment of 20 percent that it made on the original contract and extend and maintain that same M/WBE commitment of 20 percent to all prior change orders up to and inclus ive of this Change Order No. 2. Therefore , EAS Contracting , LP, remains in compliance w ith the City's M/WBE Ordinance and attests to its commitment by its signature on the Acceptance of Previous M/WBE commitment form executed by an authorized representative of its company. This project is located in COUNCIL DISTRICT 2. FISCAL INFORMATION/ CERTIFICATION: The Financial Management Services Director certifies that funds are available in the current capital budget, as appropriated, of the Airport Grants Fund. FUND CENTERS: TO Fund/Account/Centers CERTIFICATIONS: Submitted for City Manager's Office by: Originating Department Head: Additional Information Contact: ATTACHMENTS 1. 1588 FAR C02.pd f (CFW Internal) FROM Fund/Account/Centers GR14 539120 055218517810 Fernando Costa (6122) Bill Welsted (5402) Ruseena Johnson (5407) 2. 1588 -EAS CO2 MWB E APCF.pdf (CFW Internal) $118,874.68 3. Fund Avai labi ltiy -M&C 55AFW 01588 PHAS E 7 PAVEMENT REHAB -C02 .pdf (CFW Internal) Logname: 55AFW -015 88 PH A SE 7 PAVEMENT REHAB -CO2 Page 2 of 2