Loading...
HomeMy WebLinkAboutContract 42749-CO3 (2)FORT WORTH . City of Fort Worth Change Order Request CITY SECRETAR CONTRACT NO. Li 2-, Liq-co 3 .~ Project Name! Academy Blvd Grassland Court Extended Drainage Design City Sec# 42749 Client Project #(s)! 00476/ TPW P227-207280047983 / Water P253-607170147983 DOE 5419 Project Description! Storm Drain Improvement Contractor! Tri -Tech Construction Change Order# 3 Date City Project Mgr.I Felipe Pulido City Inspector Jerry Taliaferro Dept. TPW Water Sewer Original Contract Amount $2 ,071,874 .60 $158 ,661 .20 Extras to Date $45 ,000 .00 Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date $2,116 ,874.60 $158 ,661 .20 IAmount of Proposed Change Order $167 I 103.30 $0.00 $0.00 Revised Contract Amount $2,283 ,977.90 $158 ,661 .20 Original Funds Available for Change Orders $66 ,920 .00 Remaining Funds Available for this CO $21 ,920 .00 $0.00 Additional Funding (if necessary) $145 ,183.30 CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) JUSTIFICATION (REASONS) FOR CHANGE ORDER This is the final reconcilatory Change Order. This change order includes adding the following items : 63 Pavement-2" Min HMAC on 2/27 , 95 Hand Rail , 96 Concrete Valley Gutter 97 Sprinkler System for Greenbelt , 98 2" inch Temp Asphalt on 6"inch base 99 Sidewalk , 100 Manhole Collars , 101 Utility Ajustments , 102 Water Valve Collar 56 Driveway Remove , 57 Driveway Install 59 Remove Existing HMAC on 2:27 , 60 Curb & Gutter Remove 61 Curb & Gutter Install , 67 Grass Seeding 68 Grass sod -Item 94 -Credit for additional acceptable backfill material unused from CO No . 1 Totals $2,230 ,535 .80 $45 ,000 .00 $2,275 ,535.80 $167,103.30 $2 ,442 ,639.10 $66 ,920.00 $21 ,920.00 $145 ,183.30 9.51% $2,788 ,169.75 10/17/2012 Select Day Type 280 30 310 310 ~~:=c!L_~~~~~~~L---4~~,l ,vv-- M&C Number I c.. ... 1-6o8j> I te Approved ! 1.. • S"'. IJ FT. WORTH, TXl 2 11 -1 3 /1 1 1 : 5 2 1 N •· ' . · }9lr.;.ol{TH . City of Fort Worth Change Order Request Project Name! Academy Blvd Grassland Court Extended Drainage Design Client Project #(s)! 00476/ TPW P227-207280047983 / Water P253-607170147983 Project Description! Storm Drain Improvement Contractor! Tri -Tech Construction Change Order # City Project Mgr.! Felipe Pulido City Inspector , City Sec# 42749 DOE 5419 3 Date 10/17/2012 Jerry Taliaferro Dept. TPW Water Sewer Totals Select Day Type Original Contract Amount $2 ,071 ,874.60 $158 ,661 .20 Extras to Date $45 ,000 .00 Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date $2 ,116 ,874 .60 $158 ,661 .20 !Amount of Proposed Change Order $167,103.30 $0.00 $0 .00 Revised Contract Amount $2 ,283 ,977.90 $158 ,661 .20 Original Funds Available for Change Orders $66 ,920 .00 Remaining Funds Available for this CO $21,920 .00 $0 .00 Additional Funding (if necessary) $145 ,183.30 CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS% OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) JUSTIFICATION (REASONS) FOR CHANGE ORDER This is the final reconcilatory Change Order. $2 ,230 ,535.80 $45 ,000.00 $2,275 ,535 .80 $167,103.30 $2 ,442 ,639.10 $66 ,920 .00 $21 ,920 .00 $145 ,183 .30 9.51% $2 ,788 ,169.75 This change order includes adding the following items : 1 63 Pavement-2 " Min HMAC on 2/27 , 95 Hand Rail , 96 Concrete Valley Gutter I ":) G 97 Sprinkler System for Greenbelt, 98 2" inch Temp Asphalt on 6"inch base // L_. 99 Sidewalk , 100 Manhole Collars , 101 Utility Ajustments , 102 Water Valve Collar n,,d-J... -m 1--- 56 Driveway Remove , 57 Driveway Install ..} 59 Remove Existing HMAC on 2:27 , 60 Curb & Gutter Remove 61 Curb & Gutter Install , 67 Grass Seeding 68 Grass sod -Item 94 -Credit for additional acceptable backfill material unused from CO No . 1 M&C Number !C -l6:>K 5' I !1 S:: I J \ 280 30 310 310 . ' ' FORT WORTH. City of Fort Worth Change Order Request LI z ,, I 1-co3 ~ Project Name! Academy Blvd Grassland Court Extended Drainage Des ign City Sec# 42749 Client Project #(s)j 00476/ TPW P227-207280047983 / Water P253 -607170147983 DOE 5419 Project Description! Storm Drain Improvement Contracted Tri -Tech Construction Change Order# 3 Date City Project Mgr.! Felipe Pulido City Inspector Jerry Taliaferro -Dept. TPW Water Sewer Orig inal Contract Amount $2 ,071 ,874 .60 $158 ,661.20 Extras to Date $45 ,000.00 Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date $2 ,116 ,874 .60 $158 ,661 .20 !Amount of Proposed Change Order $167,103.30 $0.00 $0.00 Revised Contract Amount $2 ,283 ,977.90 $158 ,661.20 Original Funds Available for Change Orders $66 ,920 .00 Remain ing Funds Available for this CO $21 ,920 .00 $0.00 Additional Funding (if necessary) $145 ,183 .30 CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS% OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) JUSTIFICATION (REASONS) FOR CHANGE ORDER This is the final reconcilatory Change Order. This change order includes adding the following items : Totals $2 ,230 ,535 .80 $45 ,000 .00 $2 ,275 ,535 .80 $167,103.30 $2,442 ,639 .10 $66,920 .00 $21 ,920 .00 $145 ,183.30 9.51% $2,788 ,169.75 63 Pavement-2" Min HMAC on 2/27 , 95 Hand Rail , 96 Concrete Valley Gutter 97 Sprinkler System for Greenbelt, 98 2" inch Temp Asphalt on 6"inch base / / -; / / n ,..1; l' / ·n) ·/.. L 99 Sidewalk , 100 Manhole Collars, 101 Utility Ajustments , 102 Water Valve Collar 56 Driveway Remove , 57 Driveway Install 59 Remove Ex isting HMAC on 2:27 , 60 Curb & Gutter Remove 61 Curb & Gutter Install , 67 Grass Seeding 68 Grass sod -Item 94 -Credit for additional acceptable backfill material unused from CO No . 1 2..12 13 M&C Number !G -t... 1;:,.:>S 5' .. I I 11 . S" .13 10/17/20 12 Select Day Type 280 30 310 310 Date O't 01[13 Date ·1 / City of Fort Worth Change Order Request i Project Name! Academy Blvd Grassland Court Extended Drainage Design City Sec # 42749 Client Project #(s)j 00476/ TPW P227 -207280047983 / Water P253-607170147983 DOE 5419 Project Description! Storm Drain Improvement Contractor! Tri -Tech Construction Change Order# 3 Date City Project Mgr .! Felipe Pulido City Inspector Jerry Taliaferro Dept. TPW Water Sewer Orig inal Contract Amount $2 ,071 ,874.60 $158,661 .20 Extras to Date $45 ,000 .00 Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date $2,116,874 .60 $158,661.20 !Amount of Proposed Change Order $167,103.30 $0.00 $0.00 Revised Contract Amount $2 ,283 ,977.90 $158 ,661 .20 Original Funds Available for Change Orders $66 ,920 .00 Remain ing Funds Available for this CO $2 1,920 .00 $0 .00 Additional Funding (if necessary) $145 ,183.30 CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS% OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) JUSTIFICATION (REASONS) FOR CHANGE ORDER This is the final reconcilatory Change Order. This change order inc ludes adding the following items : 63 Pavement-2" Min HMAC on 2/27 , 95 Hand Rail , 96 Concrete Valley Gutter 97 Sprinkler System for Greenbelt , 98 2" inch Temp Asphalt on 6"inch base 99 Sidewalk , 100 Manhole Collars , 101 Utility Ajustments , 102 Water Valve Collar 56 Driveway Remove , 57 Driveway Install 59 Remove Existing HMAC on 2:27 , 60 Curb & Gutter Remove 61 Curb & Gutter Install , 67 Grass Seeding 68 Grass sod -Item 94 -Credit for additional acceptable backfill material unused from CO No . 1 Totals $2 ,230 ,535 .80 $45 ,000 .00 $2 ,275,535 .80 $167,103.30 $2 ,442 ,639 .10 $66 ,920.00 $21 ,920 .00 $145 ,183.30 9.51% $2,788 ,169 .75 I, I I 10/17/2012 Select Day Type 280 30 310 310 It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of , or incidental to , the above Change Order. Contractor's Compan Name Contractor Name Contract Si nature Tri -Tech Construction .. Inspector/Inspection Supervisor Date Project Manager/Program Manager Date I ' 01.,/0,l,3 A ~ " \ , I ... . Assistant Director (Dept) Date Director, Contractinq Department (Dept) Date Assistant City Attorney ,t· Date c Asstsranl City Manaqer , Date , !_ ~ !'~!~ ..,I, ' --~I /1~ --- Council Action if required) M&C Number I I M&C Date Approved I I L_----------------------------------'-------~----~ FORT WORTH -----..,---City of Fort Worth Change Order Additions Project Name Grassland Court Extended Drainage Design Client Project# 00476/ TPW P227-207280047983 / Water P253-607170147983 DOE 5419 Project Description Storm Drain Improvement Contractor Tri -Tech Construction Change Order# 3 City Project Mgr . Felipe Pulido .____._ _____________ ___, City Inspector Jerry Taliaferro ADDITIONS lltM !.'=::::_-;::--I IUN Utt-'I Qty Unit tiJ Pavement-2" Mm HMAC on L.JLt IPW ~.ooo.uu Sf !:15 Hand Rall IPW bb .UU Lf !:16 concrete Valley Gutter IPW ~J.UU Sy !:11 spnn1<1er system tor Greenbelt IPW 1.UU Ls !:ltl L .. 1ncn 1 emp Aspna1t on tnncn base IPW 2,L/U .UU ::ii" !:l!:I ::;1oewa11< IPW 1UJ.00 St lUU Manno1e Collars IPW LJ .00 Ea 101 Utility AJustments IPW 1.UO Ls 06 unveway Remove ll"'W 1,t5LU .00 ::iU bl Driveway Install IPW J, 117.40 ::;q b!:I I Remove t:x1stmg HMAC on 2:Lt IPW 1.w~.00 sq tiU (.;Urb & Gutter Remove IPW L~J.00 Lf ti1 curb & Gutter Install IPW L~J.UU Lf ti/ !Grass ::;eed1ng IPW J~4 .00 Sq titl l.:irass soa IPW 1,740.00 Sq 1UL water valve collar ll"'W 15.00 Ea Change Order Additions Page 1 of 2 City Sec# 42749 Date 10/17/2012 Unit l,;OSt IOtal :i;o .uu :i;:,~,Jlt5 .UU :i;~u .uu :!i4,!:lbU .UU :i;ou .uu :!i4,!:l~U.UL !li14,UUU.UU :!i14,UUU .Ut; !li3 .UU :!it5 ,~1U .UL !li5 .0l :i;ooo .bL !li450 .UL :jilU,JOU .UU !li17,JUJ .UL :!ilf ,JUJ.UU !ji1 .UL :jil ,OLU.UU !li7 .UL :j;Ll ,OL .OU !li2 .UL ~L, 1!:lt5 .UIJ !ji6 .UL :!il ,0::10.UU :j;Lt5 .UL :ji/,JOO .UU !li1 .UL ~J::14 .UU !li11 .UL :!il!:l ,14U.uu !li225 .UL ~J,J/b.UU TPW $175 ,878 .30 Water $0.00 Sewer $0.00 suo I otal Aam!ions ~175,tHtl.JU Change Order Additions Page 2 of 2 FORT WORTH ----.--City of Fort Worth Change Order Deletions Grassland Court Extended Drainage Design Project Name Client Project # 004 76/ TPW P227-20728004 7983 / Water P253-60717014 7983 DOE 5419 Project Description Storm Drain Improvement Contractor Tri -Tech Construction Change Order # 3 City Project Mgr. Felipe Pulido -----------------City Inspector Jerry Taliaferro DELETIONS lltM Ut:~vKlt"' I IUN Ut:t"' I 1.J.cy Unit ~ Acceptao1e l::lacKrn I t"'VV 000.Uli l, y Change Order Deletions Page 1 of 2 City Sec# 42749 Date 10/17/2012 Unit vOSt IOtal :!il:J .UL :jits ,ff:J .UU TPW $8,775 .00 Water $0 .00 Sewer $0 .00 Sub 1 otal Deletions $8,/ /b.UU Change Order Deletions Page 2 of 2 M/WBE Breakdown for this Change Order MWBE Sub Type of Service Amount for this CO COWTOWN REDI MIX Concrete $6,250 .00 C. GREEN SCAPING Landscaping $13 ,000 .00 Total $19,250.00 Previous Change Orders CO# DATE AMOUNT 1 6/22/2012 $45 ,000 .00 2 6/26/2012 $0 .00 \ Total $45,000.00 PROJECT NAME: BuySpeed No (T/PW): BuySpeed No (Water): City Project No : Contract No : D.O .E. No: Attachment to Change Order No: Today's Date : Origina l Contract Amount: Extras to Date : Credits to Date : Contract Amount to Date : PROJECT SUMMARY SHEET (Change Order Attachment) Academy Blvd -Grassland Ct P0-12-00070744 P0-12-00072460 00479 CS42749 I 5419 I 3 11/26/12 TOTAL $ 2,230,535.80 $ 2 ,071 ,874.60 $ 45,000.00 $ 45 ,000 .00 $ - $ 2,275,535.80 $ 2,116 ,874 .60 Amount of Proposed Change Order: $ 167,103.30 $ 167 ,103.30 Revised Contract Amount: $ 2,442,639.10 $ 2 ,283 ,977.90 Contingency Funds Ava il. for Admin. Change Orders : $ 66,920.00 $ 66,920 .00 Remaining Funds Available for Change Orders : $ 21,920.00 $ 21 ,920 .00 Additional Funding (if necessary): $ (145,183.30) $ (145 ,183.30) Prepared By: Christy Ezernack T/PW Construction Services l $ 158 ,661.20 $ -$ - $ -$ - $ 158 ,661 .20 $ - $ 158 ,661 .20 $ - $ -$ - $ -$ - $ -$ - M&CReview Page 1 of 2 Official site of the City of Fort Worth, Texas • fORTWORTH CITY COUNCIL AGENDA ~ DATE: CODE: 21512013 REFERENCE NO.: C TYPE: 20SW 00479 GRASSLAND **C-26085 LOG NAME: COURT DRAINAGE IMPROVEMENTS PUBLIC CONSENT HEARING: NO SUBJECT: Authorize Execution of Change Order No. 3 to City Secretary Contract No . 427 49 with Tri-Tech Construction, Inc., in the Amount of $167 ,103.30 for the Grassland Court Extended Drainage Improvements for a Total Contract in the Amount of $2,442,639.10 (COUNCIL DISTRICT 7) RECOMMENDATION: It is recommended that the City Council authorize the execution of Change Order No. 3 to City Secretary Contract No. 42749 with Tri-Tech Construction, Inc ., in the amount of $167,103.30 for the Grassland Court Extended Drainage Improvements, thereby revising the total contract in the amount of $2,442,639.10. DISCUSSION: On December 6, 2011, (M&C C-25335) the City Council authorized the award of a contract to Tri- Tech Construction, Inc., (Tri-Tech) in the amount of $2,230,535.80 for the Grassland Court Extended Drainage Improvements project. This project is needed to reduce the flood risk to residential properties. On June 22, 2012, Change Order No . 1 was administratively executed in the amount of $45,000 .00 to provide more backfill material than was called for in the bid documents. On June 26, 2012 a no cost change order (Change Order No. 2) was administratively executed to make some revisions in the size and number of manholes in the project. The change order recommended by this Mayor and Council Communication includes the final reconciliation of material quantities ultimately required for the contract work (e.g. fill, paving , sprinkler system repair and installation, and grass seeding and sodding). The net effect of the proposed Change Order is as follows: Original Contract Amount Change Order No. 1 Change Order No. 2 Proposed Change Order No. 3 Revised Contract Amount Amount $ 2,230,535.80 $ 45,000.00 $ 0.00 $ 167,103.00 $ 2,442,639.10 Costs for the implementation of Change Order No. 3 will be funded by the Stormwater Capital Projects Bond Fund. Tri-Tech Construction, Inc ., is in compliance with the City's M/WBE Ordinance by committing to an additional 12 percent M/WBE participation on this Change Order No . 3 . This project is located in COUNCIL DISTRICT 7, Mapsco 31 Mand 32J. FISCAL INFORMATION/CERTIFICATION: The Financial Management Services Director certifies that funds are available in the current capital http ://www.fortworthgov .org/council_packet/mc_review .asp?ID=17862&councildate=2/5 /2013 2/5/2013 M&CReview Page 2 of2 buqget, as appropriated, of the Stormwater Capital Projects Bond Fund . TO Fund/Account/Centers FROM Fund/Account/Centers P227 541200 207280047983 $167,103.30 Submitted for City Manager's Office by: Originating Department Head: Additional Information Contact: ATTACHMENTS Grassland Court Map.PDF Fernando Costa (6122) Douglas W . Wiersig (7801) Felipe Pulido (900-8345) http://www.fortworthgov.org/council_packet/mc_review .asp?ID=l 7862&councildate=2/5/2013 2/5/2013