Change Order Request
Project Name:! Village Creek Drainage Basin Sanitary Sewer System Rehabilitation , Part 3 I Ci ty Sec No .: I 42714 :=:==========:::::
j City Proj. No .:._! -'0-'-04-'3-'-8----~ Project No .(s) I P254-705170043883 and P258-705170043883 DOE No . I 6013
Project
Description : Sanitary Sewer Rehabilitation on Lloyd Avenue , Edgewood Jerrace and Avenue G, H, I, J and M.
'--------------------------------------------'
Contractor :! Jackson Construction , Ltd .
City Project Mgr. ._I _L_ia_m_C_o_nl_on ____ _.
Phone Number : I 817-392-6824
Dept. TPW Water
Original Contract Amount
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
!Amount of Proposed Change Order
Revised Contra ct Amount
Original Funds Available for Change Orders
Remaining Funds Available for this CO
Add itional Funding (if necessary)
Change Order# I Date :
City Inspector : I Adilda Cazorla
Phone Number : I 817 -223-2282
Sewer Totals
$800 ,000 .00 $800,000.00
$800 ,000.00 $800,000.00
$155,449.84 $155,449.84
$955 ,449.84 $955,449.84
$25 ,000 .00 $25 ,000.00
$155 ,449 .84 $155 ,449.84
5/22 /2013
Contract Time
(Calendar days)
250
250
098
348
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) -
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
,; FORT WORTH ...... ,
City of Fort Worth
Change Order Additions
Project Name Village Creek Drainage Basin Sanitary Sewer System Rehabilitation , Part 3
Project No.(s): P254-705170043883 and P258-705170043883 poE No .! 6013
Project
Description Sanitary Sewer Rehabilitation on Lloyd Avenue , Edgewood Terrace and Avenue G, H, I, J and M.
City Sec No .: 42714
City Proj . No.: I 00438
Contractor Jackson Construction , Ltd . ~hane Order-I -~ Date : I 5/22/2013
City Project Mgr. Liam Conlon ,...._ ________________ __, City Inspecto r Ad ilda Cazorla
ADDITIONS
111:M ..;::::..o"\lr I IUN DEPT Qty Unit Unit Cost Total
2 Pipe sewer 8" PVC all depths Sewer 154 .00 LF $30.00 $4 ,620 .00
8 Pipe sewer 12 " SOR 26 (all depths) Sewer 1,126.00 EA $60.00 $67 ,560 .00
9 Sewer service 4"/ 2 way clean out Sewer 43.00 EA $175.00 $7 ,525 .00
10 Plumbing service 4" schedule 40 Sewer 3,389 .00 LF $45 .00 $152 ,505 .00
11 Sewer service 4" SDR26 install Sewer 742 .00 LF $25 .00 $18 ,550.00
14 Sewer serv ice tap 4" Sewer 97 .00 EA $500 .00 $48 ,500 .00
22 Remove manhole Sewer 4.00 EA $500.00 $2 ,000 .00
28 Install concrete driveway Sewer 700.00 SF $8.00 $5 ,600 .00
32 Inspection post construction Sewer 378 .00 LF $1 .50 $567 .00
42 Temporary repair 2" HMAC on flex base Sewer 10,850 .00 LF $15 .00 $162,750 .00
43 Concrete channel rip-rap repair Sewer 1.00 LS $6 ,141 .84 $6 ,141 .84
44 Concrete encasement for water line Sewer 20 .00 LF $42 .00 $840.00
TPW
Water
Sewe r $477 ,158.84
Page 2 of 4
FORTVVORTH
,. • City of Fort Worth
Change Order Deletions
Project Name! .... -V-ill-ag_e_C-re_e_k _D-ra-in-ag_e_B-as-in_S_a_ni_·ta_ry_S_e_we_r_S-ys-te_m_R_e_h-ab-ili-ta-tio_n_, P_a_rt_3 __ _
Project No.(s): j P254-705170043883 and P258-705170043883 !DOE No . j 6013
City Sec No .:
City Proj. No .:
Project Description Sanitary Sewer Rehabilitation on Lloyd Avenue , Edgewood Terrace and Avenue G, H, I, J and M.
42714
00438
Contractor Jackson Construction , Ltd . ~hane Order [TI Date I
City Inspector I Adilda Cazorla
5/22/2013
City Project Mgr . Liam Conlon .__ ___________ ____.
DELETIONS
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total
1 Pipe pressure 8" C-900 (DR14) Sewer 66.00 LF $35 .00
3 Pipe sewer 8" other than open cut Sewer 39 .00 LF $100 .00
4 Pipe sewer 12" bore and jack Sewer 53.00 LF $175 .00
5 Pipe pressure 12" class 350 DIP w/protector 401 lin ing (all depths) Sewer 106 .00 LF $105.00
6 Pipe pressure 12" C-900 DR 18 Sewer 1,139 .00 LF $65.00
7 Pipe sewer 12" PVC SDR35 (All depths) Sewer 299 .00 LF $50 .00
12 Sewer service 4" install SDR 26 w/CTS Sewer 511 .00 LF $30 .00
16 MH STD 4 ft Diam added depth to 6' depth Sewer 1.00 VF $275 .00
18 Manhole drop std 4ft diam added depth Sewer 2.00 VF $300.00
19 Collar MH 32" frame and cover Sewer 1.00 EA $400 .00
20 MH vacuum test services Sewer 1.00 EA $150.00
23 Trench safety Sewer 472.00 LF $1.00
24 Pavement 2" Min HMAC on 2:27 Sewer 9,364 .00 LF $15 .00
25 Paving concrete replacement on Sewer 234.00 SY $100.00
26 Curb and Gutter install Sewer 246 .00 LF $25 .00
27 Install concrete walk Sewer 14 .00 SF $8 .00
33 Pre-construction inspection and cleaning Sewer 800.00 LF $2 .00
34 Dehole exploration excavation Sewer 5.00 EA $1 ,500.00
35 Fill material ftowable fill (cement) Sewer 24.00 CY $90 .00
41 Pavement additional HMAC Sewer 500 .00 SY $15.00
TPW
Water
Sewer
Deletions Sub Total
Page 3 of 4
$2 ,310.00
$3 ,900 .00
$9 ,275.00
$11 ,130 .00
$74 ,035 .00
$14 ,950 .00
$15 ,330.00
$275.00
$600 .00
$400 .00
$150.00
$472.00
$140,460 .00
$23,400 .00
$6 ,150 .00
$112 .00
$1 ,600 .00
$7 ,500 .00
$2 ,160.00
$7 ,500.00
$321 ,709.00
$321,709 .00
....
,
M/WBE Breakdown for this Change Order
MWBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
CO# DATE AMOUNT
Total $0.00
Page 4 of 4
. -
·M&C Review Page 1 of 2
,..J •
CITY COUNCIL AGENDA
Offic ial site of the City of Fort Worth, Texas
FORT WORTH --...,..,-
DATE:
CODE:
COUNCIL ACTION: Approved on 5/7/2013
5/7/20 13 REFERENCE NO.: **C-26232
C TYPE: CONSENT
LOG NAME:
PUBLIC
HEARING:
60VCSSP3C01-
JACKSON
NO
SUBJECT: Authorize Execution of Change Order No. 1 to C ity Secretary Contract No . 42714 with
Jackson Construction , Ltd, in the Amount of $155,449 .84 for Village Creek Drainage
Basin Sanitary Sewer System Rehabilitation and Improvements, Part 3, for a Revised
Total Contract in the Amount of $955,449.84 (COUNCIL DISTRICT 5)
RECOMMENDATION:
It is recommended that the City Council authorize the execution of Change Order No . 1 to City
Secretary Contract No . 42714 with Jackson Construction, Ltd, in the amount of $155,449 .84 for
Village Creek Dra inage Bas in Sani t ary Sewer System Rehabilitation and Improvements, Part 3, for a
revised total contract in the amount of $955,449.84 .
DISCUSSION:
On August 23 , 2011 , (M&C C-25119) the City Counci l authorized a contract with Jackson
Construction , Ltd , in the amount of $800 ,000.00 for V ill age Creek Drainage Basin Sanitary Sewer
System Rehabil itati on and Improvements, Part 3.
The change order will provide for increased pay item quantities of 12-inch sewer pipe , sewer service
lines and sewer clean outs th at were necessary for the project due to actual field conditions that were
encountered during construction of the project. Staff has reviewed th e unit prices and determined
them to be in line w ith bid prices .
M/WBE Office : Jackson Construction , Ltd, is in compliance with the City's M/WBE Ordinance by
committ ing to an additiona l 38 percent M/WBE participation on this Change Order No. 1.
This project is located in COUNC IL DISTRICT 5 .
FISCAL INFORMATION/CERTIFICATION:
The Financia l Management Services Director cert ifi es that funds are available in the current capital
budget, as appropriated , of the Sewer Capita l Projects Fund .
TO Fund/Account/Centers
Submitted for C ity Manager's Office by:
Originating Department Head:
Additional Information Contact :
FROM Fund/Account/Centers
P258 541200 705170043883 $155,449.84
Fernando Costa (6122)
S. Frank C rumb (8207)
Li am Conlon (6824)
http://apps.cfwnet.org/coun ci l_pack et/mc _review.asp?ID= 18251 &councildat... 5/8/2013
. -
;
· , M&C Review
. ,, .
ATTACHMENTS
60VCSSP3C01-JACKS0N MAP .pdf
Page 2 of2
http://apps.cfwnet.org/council _packet/me _review.asp?ID= 18251 &councildat... 5/8/2013