HomeMy WebLinkAboutContract 42708-CO1 (2).. CITY SECRETARY
CONTRACT NO. Y cl 7o~ -C D l
Change Order No . Date
1 (One) 3/20/2012
City of Fort Worth
Change Order Request
TPW Project No . Fund ing (FAC )
G R76-541200-
017452046800
Facility and Project Description City Secretary Contract No .
Guinn School Elementary Phase 2 42708
ORIGINAL CONTRACT AMOUNT ................................................................ $709 ,000 .00
EXTRAS TO DATE .................................................................... .
CREDITS TO DATE ................................................................... .
$
$
0
0
CONTRACT COST TO DATE ................................................................................................. .
AMOUNT OF PROPOSED CHANGE ORDER ........................................................................... .
REVISED CONTRACT AMOUNT ............................................................................................ .
ORIGINAL FUNDS AVAILABLE FOR CHANGE ORDERS .......................................................... ..
REMAINING FUNDS AVAILABLE FOR CHANGE ORDERS ........................................................ .
ADDITIONAL FUNDING (IF NECESSARY) ............................................................ , .................. .
IN ACCORDANCE WITH THIS CHANGE ORDER, THE CONTRACTOR SHALL:
PCR # 1: Change out the 6" studs @ second floor corridor to 8 " as per attached ; Add
Total Add
$710,751
$ 1,751
$ 710 ,751
$ 184,000
$ 182,249
0
$ 1,751
$ 1 ,751
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time
and money) fo r all costs arising out of, or inci d ental to , the above Change Ord er
Contracto r's Name
Prime Construction
Orig inal Contract Time Additional Approved Time To Da te Approved Contra ct Time To Da te Additional Time Fo r Th is Change Order
200 cd O 200 cd O
Contractor· Prime Construction Date
anager
Council Action (I f Required)
D Approved D Disapproved
D Other
~;~
Date
J/1.2-/Jz_
Date
3 .tc(, CI
Date
o,,1c1Atrrt1toRD
CITY SECRETARY
FT, WORTH , TX
(s~
TO:
PRIME CONSTRUCTION COMPANY
8101 VALCASI DRIVE , SUITE 101
ARLINGTON, TEXAS 76001
817-572-5550 (0) 817-572-6354 (F)
REQUEST FOR PROPOSAL ESTIMATE SUMMARY
Komatsu Arch itecture PROPOSAL : PCR04
3880 Hulen Street, Suite 300 DATE : March 16, 2012
Fort Worth, Texas 76107 PROJECT : Guinn School
Attention : NUMBER: 2004.143 .A
Mr. Gordon Marchant
DESCRIPTION OF PROPOSAL
Furnish and install 8" studs in lieu of 6" studs shown on plan at south wall of 2nd Floor corridor
8" studs are only available in a mill thickness that cannot be cut w ith standard tin snips and must be cut
with a chop saw. This is more labor intensive and that is why you see the added labor.
PCC MATERIALS $0 .00
PCC EQUIPMENT $0 .00
PCC LABOR $0.00
PCC LABOR BURDEN 42% $0.00
PCC MARKUP 15.0% $0.00
PCC SUBTOTAL $0.00
SUBCONTRACTOR COST $1 ,561.14
PCC MARKUP ON SUB 10% $156.11
SUBCONTRACTOR TOTAL $1,717.00
$34.00
BOND 2%
TOT AL THIS PROPOSAL $1 ,751.00
ADDITIONAL TIME (DAYS REQUIRED 1
TO:
Koma t su Architecture
3880 Hulen Street, Suite 300
Fort Worth , Texas 76107
Attention :
Mr. Gordon Marchant
DESCRIPTION
Barber Specialties
TOTAL COST
PRIME CONSTRUCTION COMPANY
8101 VALCASI DRIVE, SUITE 101
ARLINGTON, TEXAS 76001
817-572-5550 (0) 817-572-6354 (F)
REQUEST FOR PROPOSAL COST DETAIL
PROPOSAL:
DATE: ..c.P_C.:...:R.c:.0...:...4 ________ _
PROJECT: March 16, 2012
NUMBER: Guinn School
2004.143.A
QUANTITY UNIT PCC PCC PCC TOTAL SUB COST LABOR MATERIAL EQUIPMENT
1 $1,561.14
>< IX >< >< >< $1,561.14
TOTAL PCC COST
;;
BARBER SPECIAL TIES, INC.
2412 Elizabeth Ct Seagoville, Texas 75159
Project Name: Guinn School Phase II
1. PCO Title: Install 8" studs in lieu of 6" studs at south corridor wall
3 . Change Order Requested By: Mr .John Hryorchuk
2. Number 1.0
4 . Date 03.07 .2012
5 . Owner and/or Architect-Engineer Change Order Request Number
6 . Material
7 . Equipment
8 . Material and Equipment Sub-Total
9 . Sales Tax@ 0 .00%
10 . Labor 8.00 Man-hours@ $19 .00 I Hour
11 . Labor Insurance & Taxes 35 .00%
12 . Estimation/Planning 4 Man-hours@ $ 30.00 I Hour
13. Safety 5 .00% of Labor
14. Tool Replacement 5 .00% of Labor
15 . Overtime Inefficiency 0 .00% of Labor
15 . Labor Sub-Total
16 . Equipment Rental & Miscellaneous expenses
Scissor Lift 0 .00 Hours @ / Hour
Material delivery 0.00 Hours @ / Hour
Trash 0 .00 Hours@ 10.00 / Hour
Hoisting 0 .00 Hours @ / Hour
17. Equipment Rental Sub-Total
18 . CHANGE ORDER SUB-TOTAL COSTS
19 . Overhead
22 . Margin
24 . (Credits)
30. This Proposal May Be Withdrawn By us 26 . Special Insurance
$ 949 .80
$
$ 152.00
$ 53.20
$ 120.00
$ 7 .60
$ 7.60
$
$
$
$
$
10.00%
21 . Sub-Total
10 .00%
23. Sub-Total
25 . Sub-Total
If Not Accepted Within 30 Days 27 . Bond Premium 0 .0%
28. TOT AL PRICE OF CHANGE
31. Time Extension Required of __ o __ Days
$
$
$
$
$
$
$
$
$
$
$
$
$
29 . Cost if this change Order is not accepted
$
32. Submitted By Chris Cadenhead
33 . Approved By
Na rra tiv e :
Furnish and install 8" studs in lieu of 6" studs shown on plan at south wall of 2nd Floor corridor
949.80
340.40
1,290.20
129.02
1,419.22
141 .92
1,561.14
1,561.14
1,561 .14
8" studs are only available in a mill thickness that cannot be cut with standard tin snips and must be cut
with a chop saw. This is more labor intensive and that is why you see the added labor.
Acoustical Ceilings · Drywall · Metal Stud Framing · Fire Rated Ceiling Systems ·
Integrated Ceiling systems ·
Metal Lat h · Plaster & Stucco · Insulation Work · Structu ral Metal Framing
BARBER SPECIAL TIES , I N(ko 1 Use 8 in ch studs in lieu of 6 inch studs at south wall of second floor corridor.
Backup
Project Name: Guinn School Phase II
C
0
d Unit of Material Material Labor
Description e Quantity measure Unit Cost Costs Total Hrs
-$ --
6" x 20 studs (1,120 .00 ) LF $ 0.51 $ (57 1.20 )
6" x 20 Gauge Track (100 .00) LF $ 0.46 $ (4 6 .00 ) -
6" x 20 Gauge DL Trac k (100.00 ) LF $ 0.580 $ (58.00 ) -
8" x 20 STR T rack 100 .00 LF $ 1.050 $ 105 .00 -
8" x 20 STR DL Track 100.00 LF $ 1.200 120 .00 -
8" x 20 STR Studs 1,120.00 LF $ 1.250 1,400.00 -
---
Man-Hours 8.00 -8
--
--
--
---
---
---
---
--
---
TOTALS $ 949 .80 8 .00
BARBER SPECIAL TIES , INC . PCO 1 Use 8 inch st ud s in lieu of 6 inch studs at south wall of sec ond floor corri dor. Pa ge 2 of 2
\ ·. ~ --r-----~r -([!]-- -------) , ..
, l "·" I ,,, " ,, ......
' '
20·-10·
6"
3'-4" '\
VI
2 Al .03 1 9
STAIR,;,
CE]~
'T
1::,
10'-3"
OFFICE
! 204 ! 6"
"'
CORRIDOR
[]QI]
B'-B"
3'-4"
t" C.; .,,,.
I_ \·-3~
.............
7/A5.04
r····-··--·-· -· ·--·r ·· ·-· -···-··-···-!
I I
I
L -..... - - -.. l
2 TYP .
* DIMENSION IS TO BE VERIFIED WITH
EXISTING STRUC TU RAL STEEL LOCATION
it OFFICES " ! 206 ! I
~ --, r
I I
:~:ii: I 1'-.\
I · .... I -9 -
1 ·. I'
: : •, . ~-i
I ,
,(
,I
0 0 :-··r,
I t.'
~ WORK AREAS
1::1 ! 205 !
.
0
I
b
I
~
OFFICE
1208 I
9'-10·
18
OFFICE
12011
.
<O
I
"
9 w u:
'b
I
b
N
I a,
'b
'T
"'
14.
15.
16 .
17.
18.
19.
20.
21.
22.
23.
1.
2.
3.
4.
5.
6 .
7 .
8.
9.
PROJECT SUMMARY SHEET
(Change Order Attachment)
PROJECT NAME: Guinn School Elementary Ph 2
BuySpeed No :
Contract No: CS42708
D.O .E. No:
Attachment to Change Order No : 1 ------Today's Date : 3/22/12 ------
Original Contract Amount:
Extras to Date:
Credits to Date:
Contract Amount to Date:
Amount of Proposed Change Order:
Revised Contract Amount:
Contingency Funds Avail. for Admin. Change Orders :
Remaining Funds Available for Change Orders:
Additional Funding (if necessary):
TOTAL
$ 709,000.00
$
$
$ 709,000.00
$ 1,751.00
$ 710,751.00
$ 184,000.00
$ 182,249.00
$
Prepared By : Christy Ezernack T/PW Mgmt Svs.