HomeMy WebLinkAboutContract 42708-CO2 (2)City of Fort Worth g~:;~~~7;10Q{tlL
Change Order Request
Change Order No. Date TPW Project No. Fund ing (FAC)
2 ( TWO) 5/15/2012 GR76-541200-
017452046800
Facility and Project De scriptio n City Secretary Contract No .
Guinn School Elementary Phase 2 42708
ORIGINAL CONTRACT AMOUNT ................................................................ $ 709,000.00
EXTRAS TO DATE .................................................................... . $ 1.751.00
CREDITS TO DATE ................................................................... . $ 0
CONTRACT COST TO DATE ................................................................................................. .
· AMOUNT OF PROPOSED CHANGE ORDER ........................................................................... .
REVISED CONTRACT AMOUNT ............................................................................................ .
ORIGINAL FUNDS AVAILABLE FOR CHANGE ORDERS ........................................................... .
REMAINING FUNDS AVAILABLE FOR CHANGE ORDERS ........................................................ .
ADDITIONAL FUNDING (IF NECESSARY) ............................................................................... .
IN ACCORDANCE WITH THIS CHANGE ORDER, THE CONTRACTOR SHALL :
Furnish all labor and material as per the attached Propose Change requests:
PCR # 3, PCR # 5, PCR # 6 and PCR # 8 Total Add
Total Add
$710,751
$
$
$
$
0
$
$
15,991
726 ,742
184,000
166,258
15 ,991
15,991
It is unders too d and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (b oth time
and money) fo r a ll costs arising out of, or incidental to, the above Change Order
Contractor's Name
Prime Construction
Original Contract Time Add itional Approve d Time To Date Approved Contra ct Time To Date Additional Time For Th is Change Order
200 cd O 200 cd O
Contractor-Prime Construction
Distribution :
Fi le
Construction Manager
P roject Manager
Contractor
__ 1 2 p c)3 :"\'Z l 'N Qf:)-24 I
Da te
TPW Facil ities Management Divi sion
Change Order Form (12 /1 9/01)
? :2.~.1 ·2..-
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
4
r\c
TO:
PRIME CONSTRUCTION COMPANY
8101 VALCASI DRIVE, SUITE 101
ARLINGTON, TEXAS 76001
817-572-5550 (0) 817-572-6354 (F)
REQUEST FOR PROPOSAL ESTIMATE SUMMARY
Komatsu Architecture
3880 Hulen Street Suite 300
Fort Worth, Texas 76107
Attention:
Mr. Gordon Marchant, AIA
PROPOSAL:
DATE:
PROJECT:
NUMBER:
DESCRIPTION OF PROPOSAL
PCR 03
March 14, 2012
Guinn School
2004.149A
Refinish all Exterior Wood Windows.
PCC MATERIALS $0.00
PCC EQUIPMENT $0.00
PCC LABOR $100.00
PCC LABOR BURDEN 42% $42.00
PCC MARKUP 15.0% $21.00
PCC SUBTOTAL
SUBCONTRACTOR COST $9 ,550.00
PCC MARKUP ON SUB 10% $955.00
SUBCONTRACTOR TOTAL
BOND 2% $213 .00
TOT AL THIS PROPOSAL
ADDITIONAL TIME (DAYS) REQUIRED
$163.00
$10,505.00
$10,881.00
14
TO: Komatsu Architecture
3880 Hulen Street Suite 300
Fort Worth, Texas 761 ,07
Attenti on: ---------Mr. Gordon Marchant, AIA
DESCRIPTION
Cainco
Pri me (clean-up)
TOTAL COST
PRIME CONSTRUCTION COMPANY
8101 VALCASI DRIVE, SUITE 101
ARLINGTON, TEXAS 76001
817-572-5550 (0) 817-572-6354 (F)
REQUEST FOR PROPOSAL COST DETAIL
PROPOSAL: PCR 03 -----------DATE: March 14, 2012
PROJECT: Guinn School
NUMBER: 2004.149A -----------
QUANTITY UNIT PCC PCC PCC TOTAL SUB COST LABOR MATERIAL EQUIPMENT
1 $9,550.00
4 $100.00
><: IX >< >< >< $9,550.00
f' . -.. -,·
TOTAL PCC COST
$100.00
$100.00
<
Cainco
2229 MONEbA
FORT WORll-1, TX. 76117
TO : Prime Construction
attn: John
JOB : Quinn School Renovation
· 1120 South Fiv.1y.
Ft. Worth Tx.
COMMERCIAL INDUSTRIAL PAINT
AND DRY WALL FINISHES
OFFICE: (817) 834--0921
FA:X:{817) 834-4823
8178346789
E-MAIL: CAINC076117@YAHOO.COM
DATE . 3-14-2012
Refinish the exterior of all existing wood windows.
p.1
JAMES CAIN
DAVID CAIN .
Remove all loose window glazing as needed. Clean all wood surfaces & prep. for new finish.
Repiace all removed glazing & prime with exterior oil primer.
Finish \lv'itb. two coats satin exterior latex paint.
AU second floor ,,.,·indO\,VS will be finished using 3 stage scaffold tied off to building.
Cainco to rent & set up scaffold. All labor & material furnished by Cameo.
Labor & material cost. $8,250.00
Rental on scaffold $1,300.00
Total cost $9,550.00
Thank you
'.
TO:
PRIME CONSTRUCTION COMPANY
8101 VALCASI DRIVE, SUITE 101
ARLINGTON, TEXAS 76001
817-572-5550 (0) 817-572-6354 (F)
REQUEST FOR PROPOSAL ESTIMATE SUMMARY
Komatsu Architecture PROPOSAL: PCR 05
3880 Hulen Street, Suite 300 DATE : April 2, 2012
Fort Worth , Texas 76107 PROJECT: Guinn School
Attention: NUMBER : 2004.143.A
Mr. Gordon Marchant
DESCRIPTION OF PROPOSAL
Furnish and install U shaped fur downs to conceal structural supports at folding partitions.
PCC MATERIALS $0.00
PCC EQUIPMENT $0.00
PCC LABOR $0.00
PCC LABOR BURDEN 42% $0.00
PCC MARKUP 15.0% $0.00
PCC SUBTOTAL $0.00
SUBCONTRACTOR COST $1 ,275 .00
PCC MARKUP ON SUB 10% $127 .50
SUBCONTRACTOR TOTAL $1,402.50
BOND 2% $28.05
TOT AL THIS PROPOSAL $1 ,430.55
ADDITIONAL TIME (DAYS) REQUIRED 1
TO:
Komatsu Architecture
3880 Hulen Street, Suite 300
Fort Worth , Texas 76107
Attention :
Mr. Gordon Marchant
DESCRIPTION
Barber Specialties
TOTAL COST
PRIME CONSTRUCTION COMPANY
8101 VALCASI DRIVE, SUITE 101
ARLINGTON, TEXAS 76001
817-572-5550 (0) 817-572-6354 (F)
REQUEST FOR PROPOSAL COST DETAIL
PROPOSAL:
DATE: PCR05 ------------PROJECT: _A..,_p_ril_2-'-, _20_1_2 _______ _
NUMBER: Guinn School ------------2004.143 . A
QUANTITY UNIT PCC PCC PCC TOTAL SUB COST LABOR MATERIAL EQUIPMENT
1 $1,2.75.58
>< IX >< >< >< $1 ,275.58
TOT AL PCC COST
BARBER SPECIAL TIES, INC.
2412 Elizabeth Ct Seagov i lle , Texas 75159
Project Name: Guinn School Phase II
1. PCO T itle: RFI 05 2. Number 3.0
3. Change Order Requested By : Mr.John Hryorchuk 4 . Date 03.30.2012
5. Owner and/or Architect-Engineer Change Order Request Number
6 . Material $ 303 .00
7. Equipment $
8 . Material and Equipment Sub-Total
9 . Sales Tax@ 0 .00 %
10 . Labor 24 .00 Man-hours@ $19.00 / Hour $ 456.00
11. Labor Insurance & Taxes 35 .00% $ 159.60
12 . Estimation/Planning 3 Man-hours@ $ 30 .00 I Hour $ 90.00
13 . Safety 5 .00% of Labor $ 22 .80
14. Tool Replacement 5.00% of Labor $ 22.80
15. Overtime Inefficiency 0 .00% of Labor $
15 . Labor Sub-Total
16 . Equipment Rental & Miscellaneous expenses
Scissor Lift 0.00 Hours@ / Hour $
Material delivery 0 .00 Hours@ / Hour $
Trash 0 .00 Hours@ 10 .00 / Hour $
Hoisting 0 .00 Hours@ / Hour $
17 . Equipment Rental Sub-Total
18 . CHANGE ORDER SUB-TOTAL COSTS
19. Overhead 10.00%
2 1. Sub-Total
22 . Margin 10 .00%
23 . Sub-Total
24 . (Credits)
25 . Sub-Total
30. Th is Proposal May Be Withdrawn By us 26 . Special Insurance
If Not Accepted Within 30 Days 27. Bond Premium 0 .0%
28. TOT AL PRICE OF CHANGE
31 . Time Extension Required of 0 Days
$
$
$
$
$
$
$
$
$
$
$
$
$
29 . Cost if this change Order is not accepted
$
32 . Submitted By Chris Cadenhead
33. Approved By
Narrative:
Furnish and install U shaped fur downs t o conceal structural supports at folding partition
~
tEllll~SI IIHRllfl SYSIEMS
CDIIIT IIACIDRS I.SsotlATIOK
BARBER SPECIAL TIES , INC.
Acoust ical Ceilings · Drywall · Metal Stud Framing · Fire Rated Ce iling Systems ·
In tegrated Ce iling systems ·
Metal Lath · Plaster & Stucco · Insulation Work · Structural Metal Framing
PCO 3.0 Per RFI 05
303.00
751.20
1,0 54.20
105.42
1,159.62
115.96
1,275 .58
1,275.58
1 ,275.58
.,
'
Description
1X4X10'
2x12x10'
Drywall
Sound Cau l k
3 5/8" x 20 Studs
3 5/8" x 20 gauge track
Man-Hours
TOTALS
BARBER SPECIAL TIES , INC.
Backup
Project Name: Guinn School Phase II
C
0
d Unit of Material
e Quantity measure Unit Cost
-
40 .00 LF $ 0.60
20 .00 LF $ 1.75
120 .00 SF $ 0.250
2 .00 Tubes $ 15 .000
240 .00 LF $ 0.550
100 .00 LF $ 0.520
-
24 .00
-
-
-
-
-
PCO 3.0 Per RF! 05
Material Labor
Costs Total Hrs
$ --
$ 24 .00
$ 35.00 -
$ 30 .00 -
$ 30 .00 -
132.00 -
52.00 -
--
-24
--
--
--
--
--
--
--
--
--
$ 303 .00 24 .00
Page 2 of 2
..
r
1
TO:
PRIME CONSTRUCTION COMPANY
8101 VALCASI DRIVE, SUITE 101
ARLINGTON, TEXAS 76001
817-572-5550 (0) 817-572-6354 (F)
REQUEST FOR PROPOSAL ESTIMATE SUMMARY
Komatsu Architecture PROPOSAL: PCR 06
3880 Hulen Street, Suite 300 DATE: April 2, 2012
Fort Worth, Texas 76107 PROJECT: Guinn School
Attention : NUMBER: 2004.143.A
Mr. Gordon Marchant
DESCRIPTION OF PROPOSAL
Perimeter releif per RFI 06.
PCC MATERIALS $0.00
PCC EQUIPMENT $0.00
PCC LABOR $0.00
PCC LABOR BURDEN 42% $0 .00
PCC MARKUP 15.0% $0.00
PCC SUBTOTAL
SUBCONTRACTOR COST $1,162 .81
PCC MARKUP ON SUB 10% $116.28
SUBCONTRACTOR TOTAL
BOND 2% $25.58
TOT AL THIS PROPOSAL
ADDITIONAL TIME (DAYS) REQUIRED
$0.00
$1 ,279.09
$1,304.67
1
TO:
Komatsu Architecture
3880 Hulen Street, Suite 300
Fort Worth , Texas 76107
Attentio n :
Mr. Gordon Marchant
DESCRIPTION
Barber Specialties
TOTAL COST
PRIME CONSTRUCTION COMPANY
8101 VALCASI DRIVE, SUITE 101
ARLINGTON, TEXAS 76001
817-572-5550 (0) 817-572-6354 (F)
REQUEST FOR PROPOSAL COST DETAIL
PROPOSAL:
DATE:
PROJECT:
NUMBER:
QUANTITY UNIT PCC PCC
LABOR MATERIAL
1
t>< IX >< ><
....
PCR 06
April 2 , 2012
Guinn School
2004.143.A
PCC TOTAL SUB COST TOTAL PCC COST EQUIPMENT
$1 ,162.81
>< $1,162.81
,•
BARBER SPECIAL TIES, INC.
2412 Elizabeth Ct Seagov i lle, Texas 75159
Project Name: Guinn School Phase II
1. PCO Title : RFI 06 2 . Number 4 .0
3 . Change Order Requested By : Mr.John Hry orchuk 4 . Date 03 .30 .2012
5. Owner and /or Architect-Engineer Change Order Request Number
6 . Material $ 350.00
7 . Equipment $
8 . Material and Equipment Sub-Total
9 . Sales Tax@ 0 .00 %
10. Labor 20 .00 Man-hours@ $19 .00 /Hour $ 380.00
11 . Labor Insurance & Taxes 35.00 % $ 133.00
12. Estimation /Plann ing 2 Man-hours@ $ 30 .00 I Hour $ 60 .00
13 . Safety 5.00% of Labor $ 19 .00
14. Tool Replacement 5 .00% of Labor $ 19.00
15 . Overtime Inefficiency 0 .00% of Labor $
15. Labor Sub-Total
16 . Equipment Rental & Miscellaneous expenses
Scissor Lift 0 .00 Hours@ / Hour $
Material delivery 0 .00 Hours@ / Hour $
Trash 0.00 Hours@ 10.00 / Hour $
Hoisting 0 .00 Hours@ / Hour $
17. Equipment Rental Sub-Total
18. CHANGE ORDER SUB-TOTAL COSTS
19. Overhead 10 .00%
21. Sub-Total
22. Margin . 10 .00%
23. Sub-Total
24 . (Credits)
25. Sub-Tota l
30 . Th is Proposal May Be Withdrawn By us 26 . Special Insurance
If Not Accepted Within 30 Days 27 . Bond Premium 0 .0%
28. TOT AL PRICE OF CHANGE
31. Time Extension Required of 0 Days
$
$
$
$
$
$
$
$
$
$
$
$
$
29. Cost if this change Order is not accepted
$
32 . Submitted By Chris Cadenhead
33. Approved By
Narrative:
Furnish and install perimeter relief per RFI 06 and detail provided on page 3 .
~
t£HCSllll!IICIISYS1£MS
COrrA.&CtDRS ASSDCIAIKlN
BARBER SPECIALTIES, INC .
Acoust ica l Ceilings · Drywall · Metal Stud Framing · Fire Rated Ceiling Systems ·
Integrated Ceiling sys tems ·
Meta l Lath · Plaster & Stucco· Insulation Work · Structural Metal Framing
PCO 4.0 Per RFI 06
350 .00
611 .00
961 .00
96 .10
1,057 .10
105.71
1,162.81
1,162.81
1 ,162.81
Backup
! Project Name: Guinn School Phase II
C
0
d Unit of Material Material Labor
Description e Quantity measure Unit Cost Costs Total Hrs
-$ --
L-Bead 1 ,000 .00 LF $ 0 .30 $ 300 .00
Misc Fasteners 1.00 Each $ 50 .00 $ 50 .00 -
$ --
$ --
--
--
---
Man-Hou rs 24 .00 -24
--
--
--
---
---
---
---
--
---
TOTALS $ 350 .00 24.00
BARBER SPECIAL T IES , INC . PC O 4.0 Per RFI 06 Page 2 of 2
....
r
l
I
Existing Plaste r Wall
..
i
j
l
I ' .
t l l t
CAU?,'L,/N({ /.:!y
OrH?~s.
=t•dwlth~
nritroPoF · professional
r:fownfoad the< free trial online at •n!wpdf.r.om/pro~seiorta i
,a
Crooted with
nitroPDF"professional
••
TO:
PRIME CONSTRUCTION COMPANY
8101 VALCASI DRIVE, SUITE 101
ARLINGTON, TEXAS 76001
817-572-5550 (0) 817 -572-6354 (F)
REQUEST FOR PROPOSAL ESTIMATE SUMMARY
Komatsu Architecture PROPOSAL : PCR#08
3880 Hulen Street, Su ite 300 DATE: April 26, 2012
Fort Worth , Texas 76107 PROJECT : Guinn Schoor
Attention: NUMBER: 2004.143.A
Mr. Gordon Marchant
DESCRIPTION OF PROPOSAL
NOT TO EXCEED AMOUNT FOR LEAK TESTING BUILDING AT VARIOUS LOCATIONS.
NOTED AREAS IN EFFORT TO IDENTIFY LEAKS.
PCC MATERIALS
PCC EQUIPMENT
PCC LABOR
PCC LABOR BURDEN
PCC MARKUP
PCC SUBTOTAL
SUBCONTRACTOR COST
PCC MARKUP ON SUB
SUBCONTRACTOR TOTAL
BOND 2%
TOT AL THIS PROPOSAL
42%
15.0%
10%
ADDITIONAL TIME (DAYS) REQUIRED
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
I
SOAK
$2,500.00
·$0.00
$2,500.00
TBD
TO:
Komatsu Architecture
3880 Hulen Street, Suite 300 .
Fort Worth, Texas 76107
Attention :
Mr. Gordon Marchant
PRIME CONSTRUCTION COMPANY
8101 VALCASI DRIVE, SUITE 101
ARLINGTON, TEXAS 76001
817-572-5550 (0) 817-572-6354 (F)
REQUEST FOR PROPOSAL COST DETAIL
PROPOSAL:
DATE: PCR8 ------------PROJECT: _A_,__p_ril_3'-0,'-2_0_12 ________ _
NUMBER: Guinn School ------------
2004.143 .A
NOT TO EXCEED AMOUNT FOR LEAK TESTING BUILDING AT VARIOUS LOCATIONS.
AREAS IN EF FORT TO IDENTIFY LEAKS.
DESCRIPTION QUANTITY UNIT PCC PCC PCC TOTAL SUB COST LABOR MATERIAL EQUIPMENT
LABOR (2 MEN AT $60.00/HR) 32 HRS $60.00
MISC MATERIALS 1 LS $290.00
EQUIPMENT 1 LS $290.00
TOTAL COST I><: IX >< >< ><
SOAK NOTED
TOTAL PCC COST
$1,920.00
$290.00
$290.00
$2 ,500.00
PROJECT SUMMARY SHEET
(Change Order Attachment)
PROJECT NAME: Guinn School Elementary Ph 2
Contract No: CS42708
Attachment to Change .Order No: 2 ------Today's Date: 5121/12 ------
Original Contract Amount:
Extras to Date:
Credits to Date:
Contract Amount to Date:
Amount of Proposed Change Order:
Revised Contract Amount:
Contingency Funds Avail . for Admin. Change Orders:
Remaining Funds Available for Change Orders:
Additional Funding (if necessary):
TOTAL
$ 709,000.00
$ 1,751.00
$
$ 710,751.00
$ 15,991.00
$ 726,742.00
$ 184,000.00
$ 166,258.00
$
Prepared By: Karen Striker T/PW Business Support