HomeMy WebLinkAboutContract 54012-FP1City Secretary 54012 -FP1 Contract No. FORTWORTHo Date Received Apr 28, 2021 NOTICE OF PROJECT COMPLETION (Developer Projects) The Transportation and Public Works Department upon the recommendation of the Project Manager has accepted the following project as complete: Project Name: Chapel Creek Phase 6 City Project No.: 102241 Improvement Type(s): Water 0 Original Contract Price: Amount of Approved Change Order(s): Revised Contract Amount: Total Cost of Work Complete: Sewer 0 �,�� Jac atee , pr23,202115.14CDT) Contractor Project Management Title Conatser Construction TX, L.P. Company Name u�kn� Habte Taezaz (Apr 23, 202115:44 C Project Inspector Debbie T. willhelvn ❑gbbie n��ii elm(Apr2fi,�mi�n�aarnr: Project Manager � cti2��- ���c� J ieScarlettMorales(Apr26,20211228CDT) CFA Manager �GZ�Gt t�GI�GI�IG�D��F ��naBurgl�doff(A�26,Z�z1� :�6b CDT) Asst. City Manager Apr 23, 2021 Date Apr 23, 2021 Date Apr 26, 2021 Date Apr 26, 2021 Date Apr 26, 2021 Date $626,836.50 $1,250,00 $628,086,50 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Page 1 of 2 Notice of Project Completion Project Name: Chapel Creek Phase 6 City Project No.: 102241 City's Attachments Final Pay Estimate 0 Change Order(s): 0 Yes ❑ N/A Pipe Report: ❑x Yes ❑ N/A Contractor's Attachments Affidavit of Bills Paid Consent of Surety Statement of Contract Time Contract Time: 210 WD Days Charged: 148 Work Start Date: 7/20/2020 Work Complete Date: 4/12/2021 Completed number of Soil Lab Test: 526 Completed number of Water Test: 27 Page 2 of 2 FORT VVORTH CITY OF FORT WORTH F1NAL PAYMENT REQUEST Contract Name CHAPEL CREEK PHASE 6 Contr•act Limits Project Type WATER & SEWER City Project Numbers ]02241 DOE Number 2241 Estimate Number 1 Payment Number 1 For Period Ending 4/15/2021 W City Secretary Contract Number Contract Time z 1�' Contract Date 5/27/2020 Days Cl�arged to Date 145 Project Manager NA Contract is 100.00 Complete Contractor CONATSER CONSTRUCTION TxL,P 5327 WICHITA ST FORT WORTH , TX 76119 Inspectors MILLER, W / TAEZAZ � Thursday, April 22, 2021 Page 1 of 4 City Project Numbers 102241 Contract Name CHAPEL CREEK PHA3E 6 Contract Limits Project Type WATER & SEWER Project Funding UNTT I: WAT�R IMPROVEMENTS DO� Number 2241 Estimate Number 1 Payment Number 1 For Period Ending 4/IS/2021 Item Description of Items Estimated Unit Unit Cost �stimated Completed Completed No. Quanity Total Quanity Total — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — - 1 TRENCHSAFETY 4601 LF $1.00 $4,601.00 4601 $4,601.00 Z DUCTILE IRON WATER FITTINGS W/ 0.4 TN $5,000.00 $2,000.00 0.4 $2,000.00 RESTRAINT 3 8" PVC WATERPIPE 4601 LF $34.00 $156,434.00 4601 $156,434.00 4 FIRE HYDRANT 7 EA $4,500.00 $31,500.00 7 $31,500.00 5 CONNECTION TO EXISTING 4"-12" WATER 2 EA $1,000.00 $2,000.00 2 $2,000.00 MAIN 6 1" WATER SERVICE 123 EA $950.00 $116,850.00 123 $116,850.00 7 8" GATE VALVE (CO #1) 9 EA $1,250.00 $11,250.00 9 $11,250.00 8 1" IRRIGATION SERVICE 2 EA $1,000.00 $2,000.00 2 $2,000.00 Sub-Total of Previous Unit $326,635.00 $326,635.00 UNIT II: SANTTARY S�WER IMPROVENI�NTS Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total 1 POST-CCTV INSPECTION 3350 LF $4.00 $13,400.00 3350 $13,400.00 2 MANHOLEVACIIUMTESTING ll EA $150.00 $1,650.00 11 $1,650.00 3 TRENCH SAFETY 3350 LF $2.00 $6,700.00 3350 $6,700.00 4 4" SEWER SERVICE 120 EA $650.00 $78,000.00 120 $78,000.00 5 8"SEWERPII'E 3350 LF $38.00 $127,300.00 3350 $127,300.00 6 8" SEWERPIPE, CSS BACKFILL 230 LF $48.00 $11,040.00 230 $11,040.00 7 EPDXY MANHOLE LLINER 22.9 VF $385.00 $8,816.50 22.9 $8,816.50 8 4' MANHOLE 11 EA $4,370.00 $48,070.00 11 $48,070.00 9 EXTRA DEPTH MANHOLE (>6.0) 35 VF $185.00 $6,475.00 35 $6,475.00 Sub-Total of Previous Unit $301,451.50 $301,451.50 Thursday, Aprii 22, 2021 Page 2 of 4 City Project Numbers 102241 Contract Name CHAPEL CREEK PHASE 6 Contract Limits Project Type WATER & SEWER Project Funding Contract Information Summary Original Cantract Amount Change Orders CUange Order Number lA Total Contract Price DOE Number 2241 �stimate Number I Payment Number 1 For Period Ending 4/15/2021 $626,836.50 $1,250.00 $628,086.50 Total Cost of Worlc Completed $628,086.50 Less % Retained $0.00 Net Earned $628,086.50 Earned This Period $628,086.50 Retainage This Period $0.00 Less Liquidated Damages Days @ / Day LessPavement Deficiency Less Penalty Less Previous Payment Plus Material on Hand Less 15% Balance Due This Payment $0.00 $0.00 $0.00 $0.00 $0.00 $628,086.50 Thursday, April 22, 2021 Page 3 of4 City Project Numbers 102241 Contract Name CHAPEL CREEK PHASE 6 Contract Limits Projeet Type WATER & SEWER DOE Number 2241 Estimate Number 1 Payment Number 1 For Period Ending 4/15/2021 Project Funding Project Manager NA Inspectors MILLER, W / TAEZAZ Contractor CONATSER CONSTRUCTION TxLP 5327 WICHITA ST FORT WORTH , TX 76119 City Secretary Contract Number Contract Date 5/27/2020 Contract Time 21� W Days Charged to Date 145 W Contract is 000000 Complete CITY OF FORT WORTH SUMMARY OF CIIARGES Line Fund Account Center Amount Gross Retainage Funded Total Cost of �Vorlc Completed Less % Retained Net Earned Earned This Period $628,086.50 Retainage This Period $0.00 Less Liquidated Damages � Days @ $0.00 / Day LessPavement Deficiency Less Penalty Less Previous Payment Plus DZatei•ial on Hand Less 15% Balance Due This Payment Net $628,086.50 $0.00 $628,086.50 $0.00 $0.00 $0.00 $0.00 $0.00 $628,086.50 Thursday, April 22, 2021 Page 4 of 4 PROJECT 1�1AM�: PROJECT NUMB�R: DO� NUMB�R: PIP� LAID FIRE HYDRANTS: 7 PIP� ABANDONED DENSITI�S: NEW SERVICES: PIPE LAID PIP� ABANDONED D�NSITIES: N�W SERVIC�S: FORTWORTH � �� TRANSPORTATION AND PUBLIC WORKS PIPE REPORT FOR: Chapel Creek Phase 6 102241 N/A WAT�R SIZ� TYP� OF PIP� 8" PVC VALVES (16" OR LARGER) SIZ� TYPE OF PIP� 125 (1") COPPER S�W�R SIZ� TYPE OF PIPE � 8" PVC SIZE TYPE OF PIP� 120 (4") PVC TRr1NSPORTATION t�ND PUBLIC �ORKS ��;' The Cit�� of Fort Worth • 1000 Thioclunoiton Street • Fort Woidi, TX 7G012-G311 (817) 392 - 7941 • Fax: (817) 392 - 7845 LF 4601 N/A LF LF 3580 LF �� M�p OD �l1 N M N N` M Q � N a0 0 0 Z Z O O aa N � NN y W '� i" s� N W a :o N � zo � W � � U � � a UQ �] [J a } 5 � $ Z0 0 0� o Q N N N U N (�j O O �. 4� N V�i � U � � h �� � � � Fi � n � �a � � � � U � o 0 i' r a�. g � U � Z � o d0 o g � � � ' � � �� � � � � o 0 0 Z �' YOI N h 00 � � U �. o f„ = N Qj � S � a 0. (� r n n � N Z � �n ui �n A Q o s o � U � g' g' � � � �, 0 � 0 0 � � r � � U N p � � v N N � � � � � � �i "� � o w 0 � 'v� `u� "�i O 0 0 0 V o 0 � w � o � U e F � '� c �o o � "p' t� vi Vi N ��� ��� d � � o� o z � , 0 a ¢ W � W �� � �o � Z ����_� � ¢� �' a a �w a N � o � a 0 o a Z V((�/��� � � V � � V O U� � Fa- �N� �Ns � � W�og O� U U d� t' N Oq N a 0 c m � s a e 0 a m t U c q M O � t V � m d 0 N L i 'ni E m m c a m � O c m � e a c a o c ❑ o o � L O N mC u° � u U $ O � ri' m o u 0 L �� .o c 0 9 C m o C q a °� m� t o � � � � m o a — � 9 o a o a � � o $ A y 9 m � � m m rU w 0 a 0 w c9 Z Q V K O i 0 o� ¢ w ¢ O 2 G Z Q Fy� U W O O � _ .T. U � O ;E 0 0 O LL W J m 2 w a0 W Lll w O W W a� 0 �. � � 0 = U N �W m Z -� U � �� Z w W � J O O � > LL 2 {_ y Z � W Z W �� � � V � o'w z� \ \ � N .� C 2 � m E Z c 9 .� p. � m m � N J ii f= u w � a 3 S m � 0 E � Z m a u m q z N d � .� a s° FCIRTW�RTH� TRANSPORTATION AND PUBLIC WORKS April 12, 2021 Conatser Construction Tx, LP, 5327 Wichita St. Fort Worth, Texas 76119 RE: Acceptance Letter Project Name: Chapel Creek Phase 6 Project Type: 01, 02, 03, 04 City Project No.: CPN: 102241 To Whom It May Concern: On April 9, 2021 a final inspection was made on the subject project. There were punch list items identified at that time. The punch list items were completed on April 12, 2021. The final inspection and the corrected punch list items indicate that the work meets the City of Fort Worth specifications and is therefore accepted by the City. The warranty period will start on April 12, 2021, which is the date of the punch list completion and will extend of two (2) years in accordance with the Contract Documents. If you have any questions concerning this letter of acceptance, please feel free to contact me at 817- 392-7949. Sincerely, Debbie T. willHelvn- Debbie J. Wlllhelm (Apr26, 202110:38 CDT) Debbie J, Willhem, Project Manager Cc: Habte Taezaz, Inspector Wade Miller, Inspection Supervisor Ariel Duarte, Senior Inspector Victor Tornero, Program Manager Shield Engineering Group, Consultant Conatser Construction TX, LP, Contractor D.R Horton, Developer File E-Mail: Douglas W. Wiersig, P.E., PhD., Director, TPW Wendy Chi-Babulal, P.E., Water Richard Martinez, Assistant Director, TPW Tony Sholola, P.E., Water Marisa Conlin, Traffic Engineering Richard Zavala, Director, PARD Allen Hall, Superintendent, TPW David Creel<, Assistant Director, PARD John Robert Carman, P.E., Director, Water Chris Harder, P.E., Assistant Director, Water Rev. 9/15/16 AFFIDAVIT STATE OF TEXAS COUNTY OF TARRANT Before me, the undersigned authority, a Notary Public in the state and county aforesaid, on this day personally appeared Brock Huggins, President of Conatser Management Group, Inc., general partner of Conatser Construction TX. LP, known to me to be a credible person, who being by me duly sworn, upon his oath deposed and said: That all persons, firms, associations, corporations or other organizations furnishing labor and/or materials have been paid in full; That the wage scale established by the City Cauncil in the City of Fort Worth, has been paid in full; and That there are no claims pending for personal injury and/or property damages; On Contract described as: CHAPEL CREEK PH 6 WATER, SANITARY SEWER, DR.AINAGE, PAVING, STREET LIGHT IMPROVEMENTS DOE#: N/A CFA PRJ #: 2019-0120 CITY PROJCT #: N/A CITY OF FORT WORTH STATE OF TEXAS CONATSER CONSTRUCTION TX, LP . Brock Huggins Subscribed and sworn to befare me this 15th day of March�� �-_ _ :�=.,`-�-.�..a. �- -- ,�P.PY PUg� BERTHA GIA!_N��-�S�� . _ �_ � r°� � ° Public, State of Texas � — �"°�" � Notary Public in Tarrant County, Texas �*�; � �res0911812023 � : ,�•'� *z Comm. �P `�''• � Notary �� 1026977-3 ��a . �«r�i4 0 �ONSENT OF SURETY COMPANY TO FINAL PAYMENT Conforms with the American Institute of Architects, AIA Rocument G707 OWNER ❑ ARCHITECT ❑ CONTRACTOR ❑ SURETY ❑ OTHER Bond No 0230496 PR�JECT: (name, aCICif655)Chapel Creek Phase 6 Fort wonh, Tx TO (Clwner) C1N OF FORT WORTH & D. R. HORTON-TEXAS, � ARCHITECT'S PROJECT NQ: CFA No.2019-0120 �ro. CONTRACT FOR: 6751 North Freeway Water, Sanitary Sewer, Drainage, and Paving Improvements for Chapei Creek Phase 6 Fort Worth TX 76131 � CONTRACT DATE: CONTRACTOR: GONATSER CONSTRUCTtON TX, L.P. In accordance with the provisions of the Contract between the Owner and the Contractor as inc�icated above, the (here insert name end eddress of Surety Company} BERKLEY INSURANCE COMPANY 475 Steamboat Road Greenwich CT o6830 , SURETY COMPANY on bond of Ihere insert name and address ot CoMractor? CONATSER CONSTRUCTION TX, L.P. 5327 Wichita St. For# Worth TX 76919-6035 , CONTRACTOR, hereby approves of the final gayment to the Contractor, and agrees that final payment to the Contractor shall not relieve the Surery Company of any of its obligations to (here insert name and address of Owner) CITY OF FORT WORTH & D. R. HORTON-TEXAS, LTD. 6751 North Freeway Fort Worth TX 76131 , OWNER, as set forth in the said Surety Company's bond. IN WITNESS, WHEREOF, the Surety Company has hereunto set its hand this 4th day of March, 2021 BERKLEY INSURANCE COMPANY Surety Company Attest: ���t/G,�%�����-�.r�---- :. � ��c��12�.rfC�� {Seal}: Signature of Authorized Representative Robbi Morales Attorney-in-Fact Title NOTE; This form is to be used as a companion document to AIA DOCUMENT G706, CONTRACTOR'S AFFIDAVIT QF PAYMENT OF DEBTS AND CLAIMS, Current Edition QNE PAGE POWER OF ATTORNEY BERKI.,EY INSURANCE COMPANY WILMINGTON, DELAWARE No. BI-7280j-el NOTICE: The warning found elsewhere in this Power of Attorney affects the validity thereof. Please review carefully. KNOW ALL MEN BY THESE PRESENTS, that BERKLEY INSURANCE COMPANY (the "Company"), a corporation duly organized and existing under the laws of the State of Delaware, having its principal office in Greenwich, CT, has made, constituted and appointed, and does by these presents make, constitute and appoint: Ricardo J. Reyna; Don E. Cornell; Sophinie Hunter; Robbi Morales; Kelly A. Westbrook; Tina McEwan; Joshua A. Saunders; or Tonie Petranek of Aon Risk Services Southwest, Inc. of Dallas, TX its true and lawful Attorney-in-Fact, to sign its name as surety only as delineated below and to execute, seal, acknowledge and deliver any and all bonds and undertakings, with the exception of Financial Guaranty Insurance, providing that no single obligation shall exceed Fifty Million and 00/100 U.S. Dollars (U.S.$50,000,000.00), to the same extent as if such bonds had been duly executed and acknowledged by the regularly elected officers of the Company at its principal office in their own proper persons. This Power of Attorney shall be construed and enforced in accordance with, and governed by, the laws of the State of Delaware, without giving effect to the principles of conflicts of laws thereof. This Power of Attorney is granted pursuant to the following resolutions which were duly and validly adopted at a meeting of the Board of Directors of the Company held on January 25, 2010: RESOLVED, that, with respect to the Surety business written by Berkley Surety, the Chairman of the Board, Chief Executive Officer, President or any Vice President of the Company, in conjunction with the Secretary or any Assistant Secretary are hereby authorized to execute powers of attorney authorizing and qualifying the attorney-in-fact named therein to execute bonds, undertakings, recognizances, or other suretyship obligations on behalf of the Company, and to affix the corporate seal of the Company to powers of attorney executed pursuant hereto; and said officers may remove any such attorney-in-fact and revoke any power of attorney previously granted; and further RESOLVED, that such power of attorney limits the acts of those named therein to the bonds, undertakings, recognizances, or other suretyship obligations specifically named therein, and they have no authority to bind the Company except in the manner and to the extent therein stated; and further RESOLVED, that such power of attorney revokes all previous powers issued on behalf of the attorney-in-fact named; and further RESOLVED, that the signature of any authorized officer and the seal of the Company may be affixed by facsimile to any power of attorney or certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or other suretyship obligation of the Company; and such signature and seal when so used shall have the same force and effect as though manually affixed. The Company may continue to use for the purposes herein stated the facsimile signature of any person or persons who shall have been such officer or officers of the Company, notwithstanding the fact that they may have ceased to be such at the time when such instruments shall be issued. LN �VITN�SS V�'fiEItEC1F, ihe Company has causcd thcse presents t�_ bc si�►cd aad atte.�te3 by its appropriate oL`�ic�rs and its corporate seal h�re�nto affixed tl�is 2nd da.y nf ,lune �zozo . � -,�RAN� Attest ! Berk1F � Insurance Compauy , �a5 �F'f . f/ W�' G�pPqRq��,�'l�'`, � " r L $ ` • ' ,�,..� +�,�.."� � m �t�"�I �i ? 1 L • . aderman y Je �� a$er ' ' 1975 Yr �ikWp� , Executive Vice President R� Secretary ° S '� i e resident � .._ � � S"�'AT� OF Cn'V1�tECTiCUT } ) ss: CAUTvT`� Ok FAYR�'iELD ) Swom to before me, � Notary Public in the Sfiate of Connecticv� this 2nd day of .lune ,_ 2020 ._ , by Tra S. Le3erc�an and 7affrey M. Iiafcer who are sworn to me ta be fihe Executive Vice Prasiden� Sec�retar;, and t' � Senior Vice President, resgr.ctively, of Berkley Insurance Company. �^Au aav a�A� �c� � �� COh'NEC7ICUT � Mr �hf'H1�30. 20�24�I�g < Ota2}' T�t1bF1C, State of Co�ecticut CERTffICATE I, the undersigmed, A.ssistant �ecretary af BERKLEY INSUR.A�.'`zCE COMPANY, DO HEREB�' CERTIFY ihat tF►e fare�oing is �. true, conrect aad eoffiplete capy of the ori�nat Power of Attomey; that said Pawer of Attorney has not been revoked or rescind�d an�..�hat-tk,� authori.ty of the Attomey-in-Fact set forYh therein, wha sxecuted the bond nr uxsdertaking to whieh this X'ower of �it�,'��AN$S a��c�ed, is i.n iull force and effect as ofthis date. j;,�� '�'"��t'� ��t�der my hand and seal of the Gompany, this � day of /� ,��(. � �ta�Lt,, 2� m ` ]975 % � ��°x�n�vaa� ' Vutcent P. ForEe -