HomeMy WebLinkAboutContract 54184-CO2FORT WORTH City of Fort Worth CSC No.54184-0O2 Change Order Request PfojeCt Name: Emergency Response - Trinity River Bank Erosion Affecting M-280-B and M-338-B City Sec No.: 54184 Project No.(s): 59607-0700430-102939-001780 DOE No. N/A City Proj. No.: 10239 Project Description:� Emergency Repair of 90-inch sewer main, by-pass pumping and site restoration ContfaCtor: William J. Schul�, Inc. dba Cirde C Construction Co. Change Oftlef #� Date: 5/3/2021 Ciry Project Mgr. Tony Sholola City Inspector: David Johnson Phone Number: 817-392-6054 Phone Number: 817-392-8455 Dept. Original Contract Amount Extras to Date Credits to Date Pending Change Ortlers (in M&C Process) Contract Cost to Date Amount of Proposed Change Order Revised Contract Amount Original Funds Available for Change Orders Remaining Funtls Available for this CO Additional Funding (if necessary) Sewer Unit 1 00 $3,230,000.00 $96,528.00 Sewer Unit 2 I Sewer Unit 3 CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTR,4CT MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%J Totals Contract Time (Calender days) $1,600,000.00 $1,630,000.00 $3,230,000.00 $96,528.00 $3,326,528.00 107.91 % $2,000,000.00 JUSTIFICATION (REASONS) FOR CHANGE ORDER This Change Order provides compensation for the additional pipe footage that was installed during repair of the 90-inch sewer main closest to the river at the Trinity River bank erosion protection project. The longer duration of pipe replacement also necessitated additional by-pass pumping. The change order will also allow for the relocation of the by-pass pumping HOPE pipes from the job site to the Village Creek Treatmement Plant. It is understootl antl agreed that the acceptance of this Change Order by the contractor constitutes an accord antl satisfaction and represents payment in full (both time antl money) for all costs arising out of, or incidental to, the above Change Order. Contractor's Company Name Contractor Name Contractor Signature Date �T >��7 > William J. Schultr, Inc. dba Circle C Construc�on Co. T2fl Sk211y /ois D�/.', �� f llval�vii 05%03'2021 Ins ector . Director Water De� �if o� e� � e� Assistant City Attor eeen M&C Number Funding M&C 21-0289 Date Pro'ect Mana er 5-3-�-! l Date Con,�tr tion Sups May 3, 2021 � � ---_— —_- �� Date Assistant Ci Mar Aay4,2021 b�+-8�+"9��ff Council Action M&C Date Approved Date ���a� Date OFFICIAL RECORD ���-E.-�x�:��r_�:�-i FT. WORTH, TX Fo��r woR�rH City of Fort Worth Change Order Additions Project Name Emergency Response - Trinity River Bank Erosion Affecting M-280-B and M-338-B City Sec No.: 54184 Project No.(s): 59607-0700430-102939-001780 DOE No. N/A City Proj. No.: 10239 Project Description Emergency Repair of 90-inch sewer main, by-pass pumping and site restoration Contractor William J. Schultz, Inc. dba Circle C Construction Co. Change Order:� Date: 5l3/2021 City Project Mgr. Tony Sholola City Inspector David Johnson ADDITIONS EPT Page 2 of 4 Unit IUnitCost Unit 2 Unit 3 ns Sub Total 528.00 528.00 �� �� �VO RT H City of Fort Worth Change Order Deletions Project Name Emergency Response - Tnnity River Bank Erosion Affecfing M-280-B and M-33&B City Sec No.: 54184 Project No.(s): 59607-0700430-102939-001780 DOE No. N/A City Proj. No.: 10239 Project Description Emergency Repair of 90-inch sewer main, by-pass pumping antl site restoration Contractor William J. Schul�, inc. dba circ�e c constr�ot�on co. Change Ortler: � Date 513/2021 City Project Mgr. Tony Sholola City Inspector: David Johnson DELETIONS MIWBE Breakdown for this Chanae Order MWBE Sub � Type of Service � Amount for this CO Total � $0.00 Page 4 of 4 Previous Change Orders Contract Compliance Manager By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including � all pSI�l treportingreqlliremenIB. Signature Tony Sholola Name of Employee Assistant Water Director Title ATTEST: Mary J. Kayser City Secretary C.ircle C� on s tructio n 12-Mar-21 Mr. Tony Sholola city of Fort Worth 1000 Throckmorton Street Fort Worth, Texas 76102 RE: Emergency Agreement - Emergency Response for Trinity River Streambank Erosion Affecting Two 90" Sanitary Sewer Lines Estimate Number 6 CSC Number 54184 Xylem Profit and Overhead Repair of Existing 90" Pipes 1 LS $ 64,928,35 $ 64,928.35 15% $ 9,739.25 3 DY $ 4,fi20.00 $ 13,860.Q0 Total Estimate Six Sincerely, �,�,��t,Go� �c.�+ Teri Skelly $ 88,527.60 500 W 71tt1MIv�.T AVE FORT �Q/ORTH, T'FXAS 76140 "T 817-293-1863 Circle C Construction 11-Mar-21 Mr Tony 5holola, PE city of Fort worth 1000 Throckmorton Street Fort Worth, Texas 76102 RE: Emergency Response For Trinity River Streambank Affecting Two 90" Sanitary Sewer Lines CSC Number 54184 Delivery of HDPE Pipe from Site to Village Creek 1 LS $ 8,000.00 $ 8,000.00 Approx 16 Loads Tota I Sincerely, �.�- �^� Teri Skelly v President Circle C Construction $ 8,000.00 500 W 1�iAMl�L AVE FORT WORTH, TEXAS 7G140 T 817-293-18G3