HomeMy WebLinkAboutContract 54517-CO1CSC No. 54517-CO1 �i�c_3�T �Vc �:tw���i � City o�f �ort Woi�fih J "T��� s - — �;hange (�rder Reques4 Project Name: Contract 2019 WSM-C City Sec No.: 54517 Project No.(s): 59601-060o4:i0-0ot78o, 59&07-0700430-001780 DOE No. N/A City Proj. No.: 102170 WatedSew�,r replacements and pavement rehabililation on NV�! 271h St., Azie Ave., Columbus Ave., Westwood Ave., Project Descriplion: Sunset Ln., and Loving Ave. Coniractor: Jackson Construction, Ltd. Change Order #� Date: 4/1512021 City Project Mgr. Leon Wilso � City Inspector. Jesse Reed � Phone Number: 817-392-2387 Phone Number: 817-392-8362 � Dept. Original Contracl Amount Extras to Date Credits to Dale Pending Change Orders (in M&C I�rocess) Conlract Cosl fo Date Amount of Proposed Change Order Revised Contract Amount � Original Funds Available for Chanqe Orders Remaining Funds Available for thi:; CO Additional Funding (if necessary) Water 241.50 11 $130,987.50 $130,987.50 Sewer � Paving $0.00 144,414.50 $14,441.00 $14,441.00 Totals Contract Time (Calender days) 64,510,656.00 500 i4,510,656.00 500 $6.11 025 510,662.11 525 $145,428.50 $145,428.50 CNANGE ORDERS fo DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTR,QCT 0.00% MAXALLOVVABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) $5,638,320.00 JUSTIFICATION (REASONS) FOR CHANGE ORDER Change Order No. 1 will provide for the following items that are necessary on the project: • Restrained joint connections on lhe 24-inch ductile iron water main af the intersections of NW 27th Street/Robinson Street and hJW 27th StreeWV, Long Avenue instead of the proposed unrestrained connections. � The placement of high early :;irength concrete for concrete blocking fo minimize lhe closure lime of the slreet. � Additional temporary water to mainlain temporary water service lo the affected customers. � The deletion of pay item quantilies ihat are no longer needed on the project Staff concurs with the contraclor's request for 25 addilional days on this change order. It is understood and agreed that the acceptance of this Change Order by the conlractor conslitutes an accord and satisfaclion and represents payment in full (both time and money) for all costs arising out of, or incidental to, lhe above Change Order. Contractor's Company Name Contractor Name Contractor Signature Date Jackson Conslrucfion, Lld. Troy Jackson "`� i:�- ��.r-'G �-CC�7 `� ,l� '��"vSs�i �LI',"v7,/J Director Water De Assistant City Alfon M&C Number ` �; [ N!A Date �t'-3v-� Date May 3, 2021 Date M ay 4, 2021 Council Action (If Assisfant M&C Date Approved Date 5��-Z� Date iE— 3''—� Date M ay 4, 2021 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX �'��RT �Olz'�'I-� City of Fort Worth - Change Order Addition� Project Name Contracl 201� WSM-C City Sec No.: 54517 Project No.(s): 59601-0600430-001780 59607-0700430-001780 DOE No. N/A City Proj. No.: 102170 Projeci WaterlSe�ver eplacements and pavement rehabilitation on NW 27th St., Azle Ave., Columbus Ave., Westwood Ave., Description Sunsel Ln., and Loving Ave. Contractor Jackson Con�truction, Lfd. Cnange Order: � Dafe: 4115/2021 Cily Project Mgr. Leun Wilson Cify Inspector Jesse Reed ADDITIONS . - ' >DEPT Qty _ Unit = Unit Cost Total 1A 24" Water Pipe-D.I. Pipe (Re��rained Joint) Water 308.00 LF $280.24 $86,313.92 2A 24" Pipe-D.I. Pipe, CSS(Reslrained Joint) Water 153.00 LF $653.23 $99,944.19 79 24" Water Pipe-D.I.Pipe (Re�trained Joint)-Lowering NW 27fh/Loving Water 95.00 LF $403.00 $38,285.00 80 Cuslom Blocking for 24" D.I.-High Eariy Slrength Water 2.00 EA $19,832.00 $39,664.00 81 Adtlitional Temporary Water (NW 27th/Loving) Water 1.00 LS $9,050.00 $9,050.00 � Water $273,257.11 Sewer Paving Page 2 of 4 Addilions Sub Tofal $273,257.11 �.�K �. .�vl-� � City of F'orf VUorth Change Order Deletions Project Name Conlracl 20�9 WSM-C Projecl �Jo.(s): 59601-0600430-001780, 59607-0700430-001780 DOE No. N/A Water/Sewer replacements and pavement rehabilitafion on NW 271h St., Azie Ave., Columbus Ave., Projecl Description qve . Sunset Ln.. and Lovinq Ave. ConUaclor Ciiy Project Mgr Jackson Co.�struction, Ltd. Leon Wi�sor� Change Order: � Date 4115/2021 Cily Inspeclor: Jesse Reed nFl FTInNS City Sec No.: 54517 City Proj. No.: 102170 Page 4 of 4 MIWBE Breakdown for this Change Order Previous Change Orders Contract Compliance Manager By signing I aclmowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all pe1fmmance and reporting requirements. Signature Name ofEmployee Title ATTEST: �g� Mary J. Kayser City Secretary