Loading...
HomeMy WebLinkAboutContract 35782 CITY SECRETARY CONTRACT 10. AMENDMENT NO. 6 TO AGREEMENT FOR ARCHITECTURAL DESIGN SERVICES NEW CONVENTION CENTER PARKING STRUCTURE STATE OF TEXAS COUNTY F TAI RANT WHEREAS, The City of Fort Worth and ,Jacobs Facilities, Inc. (Architect) made and entered into City Secretary Contract No. 33230 (The Contract)which was authorized by the City Council by M C C-21271, the 24th day of January, 2006; and WHEREAS,, farther amendment is necessary to reimburse the Architect for additional design services to incorporate the art-rel ated infrastructure into the Jacobs'construction documents; and NOW THEREFORE,RE, City and Architect, acting herein by and through their duly authorized representatives, eater into the following agreement which amends the Contract: "1. Article 1.1, SECTION 1—SERVICES OF THE ARCHITECT, a paragraph is added to read as follows- "Provide additional design services for the tower crane foundation. The cost of this additional service is $2,000.00. The scope of services is described more fully in the Jacobs letter dated July 23, 2007, subject: City of Fort Worth Convention Center Parking Garage, Proposal for Foundation Design of Tower Crane, Project No. I~ W71 oo, which is attached hereto as Attachment"A"and made a part of this Agreement." 2. Paragraph 1 of SECTION 1 -COMPENSATION TO ARCHITECT, i s amended as follows: "The total compensation for all of the assignments to be performed by Architect as described in CHARACTER AND EXTENT of ARCHITECT'S SERVICES hereof shall be a fixed fee of $1,277,658.00, hereinafter referred to as the "total fee," plus up to $30,000 In reimbursable expenses." 3. All other provisions of this Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED this the day o ,2007, in Fort Worth, Tarrant County, Texas. JAC BS F C ITi N INC. APPR V By: By: David J. Whig 111, PE Marc Ott Manager of Operations Assistant City Manager APPROVAL RECOMMENDED:MMENDED: F EC ED: 4 B . By. 6i4e Robert Goode, PE Marty Hendry Director, Transportation& Public Works Dept. City Secretary APPROVE AS OF GALITY: M&C Not Required Contract Authorization Bar: Amy J. R y Date: As istan C' Attorney 5. F+ R I * 4 OhIGINAL k 5 EI*JACOBS __- 1111111 - - 6688 North Central Expressway Suite 400,MB 1 Dallas, Texas 75206 U.S.A. 1.214-424.7500 Fax 1.214.696.3499 July 23,2007 Jack Durham Senior Construction Manager Facilities Management Division City of Fort worth 319 West 10th Fort Worth,Texas 76102 FEE; City of Fort forth Project No. 175W71600 Conventkn Center Parking Garage lropma)for Foundation Design of Tower Crane Dear Jack: At the request of Thomas S. Bruno(TSB), we are pleased to submit our proposal to the City of fort Worih to provkie additional professional services for the Convention Center Parking Garage project, Following you will find an itemized discussion of our understanding of the scope, schedule,and fee requirements. SCOPE of SERVICES Our services will include the design of the tourer crane foundation and preparation of drawings to be issued to the contractor for construction of the foundation. This proposal is based on the fbilowing assumptions: 0 The required opening size for the floor openings will be provided by TSB. Crane tower anchorage details will be provided by TSB. We believe these are services that should be included in TSB's scope, and as such, this design fee should be deducted from TSB's construction amount. SCHEDULE The design can be complete and drawings Issued wlthl*n two weeks after receiving Notice-To- Proceed from the City. FEE We propose to provide the above described services for a Lump sum Fee of$2,000, including all direct costs. jacobs y ri Inc. r JACOBS City of Fort Worth Convention Center Parking Garage Proposal for Foundation Design of Tower Crane July 2 ,2007 Pace 2 of 2 We loom f rwaM to working with The City on these additional services. If we can provide you with any additional information or if you have any quesbons,please do not hesitate to call. As always, it is a pleasure to provide The City of Fort Worth with our services. Sincerely, i Bs David Ill hate 11% PE Manager of Operations c : C R F II'If 1 00.202 mod