HomeMy WebLinkAboutContract 46606-CO6CSC No. 46606-006 FORT WORTH City of Fort Worth Change Order Request Project Name: Northside II 48-inch Water Main Phase I, Part 2 City Sec No.: 46606 Project No.(s): 59601-0600430-0O2082-001483 DOE No. 7068 City Proj. No.: 02082 Project Description: Northside II 48-inch Water Main, Phase I, Part 2 from Old Denton Road to Heritage Trace Parkway Contractor: Oscar Renda Contracting, Inc. Change Order #�6 Date 3/8/2021 City Project Mgr. John Kasavich City Inspector: David Johnson Phone Number: 817-392-8480 Phone Number: 817-392-8371 Dept. Original Contract Amount Extras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date Amount of Change Order Revised Contract Amount Original Funtls Available for Change Orders Remaining Funtls Available for this CO Additional Funtling (if necessary) Water � 10,109, 900.00 $611,092.63 $10,720,992.63 $0.00 $10,720,992.63 $303,300.00 Sewer Paving Totals Contract Time (Calender days) $336,310.( 336,310.00 $0.00 336,310.00 $16,820.00 $16, 820.00 CHANGE ORDERS fo DATE (INCLUDING THIS ONEJ AS % OF ORIGINAL CONTR,4CT MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) JUSTIFICATION Change Order No. 6 provides additional time for the following: FOR CHANGE ORDER �,446,210.00 150 611,092.63 0120 1,057,302.63 270 $0.00 1850 �320,120.00 $16,820.00 5.85% $13,057,762.50 • Easement acquisition which took over a year and a half to complete after the project was advertised for bid. TPW attempts to acquire the ROW at the Golden Triangle/Riverside Drive intersection were unsuccessful prior to advertising the project for bid. Therefore the Water Department had to acquire easement for the water main. • Conflict with existing utilities along the alignment of the water main which took several months to resolve. • Defects on a butterfly valve that was installed on the project necessitated replacement which delayed the project for several months until a new valve was delivered. • Erosion at a creek bottom resulted in having to install a segment of the water main at a deeper elevation than originally designed. • Pavement overlay of Tarrant County roadways by Tarrant County paving crews resulted in all water valve boxes being paved over which required remobilizing by the water contractor remobilizing to adjust all of the water valves. • Delay resulting from conflict with a developer project near the Golden Triangle and Riverside Drive intersection. • Delay resulting from having to wait for the completion of another Phase of the Northside II water main project in order to conduct testing. It is untlerstood and agreetl that the acceptance of this Change Ortler by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. Contractor's Company Name Contractor Name Contractor Signature Date Oscar Renda Contracting, Inc. Rudy V. Rentla Rudolph V. Renda Date[a202103.09 �408:59 pbppenda 3/08/2021 Assistant Director is+ophev �frardev Assistant M&C Number N/A Date Project Manager 3 -�- ��,� � rs�,,��, Date C nstruction Supervisor (Water De{ Apr 29, 2021 Date Assistant City Manager Apr 29, zo2i �� a � Council Action (If Required) M&C Date Approvetl � Date 3__ �.. Date '-�'�a'� Date May 6, 2021 OFFIGIAL RECORD CITY SECRETARY FT. WORTH, TX FORT WORTH City of Fort Worth Change Order Additions Project Name Northside II 48-inch Water Main Phase I, Part 2 City Sec No.: 46606 Project No.(s): 59601-0600430-0O2082-001483 DOE No. 7068 City Proj. No.: 02082 Project Description Northside II 48-inch Water Main, Phase I, Part 2 from Old Denton Road to Heritage Trace Parkway Contractor Oscar Renda Contracting, Inc. Change Order:�6 Date: 3l8/2021 City Project Mgr. John Kasavich City Inspector David Johnson ADDITIONS Totai rage 1 oi i Sewer Paving Additions Sub Total F�R�1' VVORTH City of Fort Worth Change Order Deletions Project Name Northside II 48-inch Water Main Phase I, Part 2 City Sec No.: 46606 Project No.(s): 59601-0600430-0O2082-001483 DOE No. 7068 City Proj. No.: 02082 Project Description Northside II 48-inch Water Main, Phase I, Part 2 from Old Denton Road to Heritage Trace Parkway Contractor Oscar Renda Contracting, Inc. Change Order: �6 Date 3/8/2021 City Project Mgr. John Kasavich City Inspector: David Johnson DELETIONS ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total Sewer Paving Pag� 1 c�f 1 Deletions Sub Total Page 1 of 1 MIWBE Breakdown for this Change Order Coniract Compliance Mana�er ' By signing I acicnowledge ihat I am the person responsible for the monitoring and administration of ihis coniract, including ensuring all performance and reporting requirements. c��.. �.� � Signature �; - r.l�J�y,., � . l�<�Ew� G� Name of Lrrt�loyee ��iit ��'%rui i"' `�'`�-�` � Title ATTEST: � :�.... ��...4 Mary J. Kayser City Secretary �4���� a �� ��► �o�OR������ o° 0 p�o o � ��a oi� 0 0 00 �a °o o �`� ��a� o °O�00000� ,o� �� �EX A`'�aa�O'a OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX