HomeMy WebLinkAboutContract 46606-CO6CSC No. 46606-006
FORT WORTH City of Fort Worth
Change Order Request
Project Name: Northside II 48-inch Water Main Phase I, Part 2 City Sec No.: 46606
Project No.(s): 59601-0600430-0O2082-001483 DOE No. 7068 City Proj. No.: 02082
Project Description:
Northside II 48-inch Water Main, Phase I, Part 2 from Old Denton Road to Heritage Trace Parkway
Contractor: Oscar Renda Contracting, Inc. Change Order #�6 Date 3/8/2021
City Project Mgr. John Kasavich City Inspector: David Johnson
Phone Number: 817-392-8480 Phone Number: 817-392-8371
Dept.
Original Contract Amount
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
Amount of Change Order
Revised Contract Amount
Original Funtls Available for Change Orders
Remaining Funtls Available for this CO
Additional Funtling (if necessary)
Water
� 10,109, 900.00
$611,092.63
$10,720,992.63
$0.00
$10,720,992.63
$303,300.00
Sewer Paving Totals Contract Time
(Calender days)
$336,310.(
336,310.00
$0.00
336,310.00
$16,820.00
$16, 820.00
CHANGE ORDERS fo DATE (INCLUDING THIS ONEJ AS % OF ORIGINAL CONTR,4CT
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%)
JUSTIFICATION
Change Order No. 6 provides additional time for the following:
FOR CHANGE ORDER
�,446,210.00 150
611,092.63 0120
1,057,302.63 270
$0.00 1850
�320,120.00
$16,820.00
5.85%
$13,057,762.50
• Easement acquisition which took over a year and a half to complete after the project was advertised for bid. TPW
attempts to acquire the ROW at the Golden Triangle/Riverside Drive intersection were unsuccessful prior to advertising
the project for bid. Therefore the Water Department had to acquire easement for the water main.
• Conflict with existing utilities along the alignment of the water main which took several months to resolve.
• Defects on a butterfly valve that was installed on the project necessitated replacement which delayed the project for
several months until a new valve was delivered.
• Erosion at a creek bottom resulted in having to install a segment of the water main at a deeper elevation than originally
designed.
• Pavement overlay of Tarrant County roadways by Tarrant County paving crews resulted in all water valve boxes being
paved over which required remobilizing by the water contractor remobilizing to adjust all of the water valves.
• Delay resulting from conflict with a developer project near the Golden Triangle and Riverside Drive intersection.
• Delay resulting from having to wait for the completion of another Phase of the Northside II water main project in order
to conduct testing.
It is untlerstood and agreetl that the acceptance of this Change Ortler by the contractor constitutes an accord and satisfaction and represents payment
in full (both time and money) for all costs arising out of, or incidental to, the above Change Order.
Contractor's Company Name Contractor Name Contractor Signature Date
Oscar Renda Contracting, Inc. Rudy V. Rentla Rudolph V. Renda Date[a202103.09 �408:59 pbppenda 3/08/2021
Assistant Director
is+ophev �frardev
Assistant
M&C Number N/A
Date Project Manager
3 -�- ��,� � rs�,,��,
Date C nstruction Supervisor (Water De{
Apr 29, 2021
Date Assistant City Manager
Apr 29, zo2i �� a �
Council Action (If Required)
M&C Date Approvetl �
Date
3__ �..
Date
'-�'�a'�
Date
May 6, 2021
OFFIGIAL RECORD
CITY SECRETARY
FT. WORTH, TX
FORT WORTH
City of Fort Worth
Change Order Additions
Project Name Northside II 48-inch Water Main Phase I, Part 2 City Sec No.: 46606
Project No.(s): 59601-0600430-0O2082-001483 DOE No. 7068 City Proj. No.: 02082
Project
Description
Northside II 48-inch Water Main, Phase I, Part 2 from Old Denton Road to Heritage Trace Parkway
Contractor Oscar Renda Contracting, Inc. Change Order:�6 Date: 3l8/2021
City Project Mgr. John Kasavich City Inspector David Johnson
ADDITIONS
Totai
rage 1 oi i
Sewer
Paving
Additions Sub Total
F�R�1' VVORTH City of Fort Worth
Change Order Deletions
Project Name Northside II 48-inch Water Main Phase I, Part 2 City Sec No.: 46606
Project No.(s): 59601-0600430-0O2082-001483 DOE No. 7068 City Proj. No.: 02082
Project Description
Northside II 48-inch Water Main, Phase I, Part 2 from Old Denton Road to Heritage Trace Parkway
Contractor Oscar Renda Contracting, Inc. Change Order: �6 Date 3/8/2021
City Project Mgr. John Kasavich City Inspector: David Johnson
DELETIONS
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total
Sewer
Paving
Pag� 1 c�f 1 Deletions Sub Total
Page 1 of 1
MIWBE Breakdown for this Change Order
Coniract Compliance Mana�er '
By signing I acicnowledge ihat I am the person responsible
for the monitoring and administration of ihis coniract, including
ensuring all performance and reporting requirements.
c��.. �.� �
Signature
�; -
r.l�J�y,., � . l�<�Ew� G�
Name of Lrrt�loyee
��iit ��'%rui i"' `�'`�-�` �
Title
ATTEST:
� :�.... ��...4
Mary J. Kayser
City Secretary
�4����
a ��
��► �o�OR������
o°
0
p�o
o �
��a oi�
0
0 00 �a
°o o �`�
��a� o
°O�00000� ,o�
�� �EX A`'�aa�O'a
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX