HomeMy WebLinkAboutContract 54953-AD1CSC No. 54953-ADl
CITY OF FORT WORTH, TEXAS
MASTER AGREEMENT FOR ENGINNERING RELATED PROFESSIONAL SERVICES
ADDENDUM NO. 1
This Addendum No. 01 - Scope of Work (SOW) is made as of M aY 14� 2�21
,
under the terms and conditions established in the MASTER PROFESSIONAL SERVICES
AGREEMENT between the City of Fort Worth ("City") and Jacobs Engineering Group Inc.
("Engineer"), the same being Fort Worth City Secretary Contract (CSC) No. 54953 (the
"Master Agreement" or"MSA").
This Scope of Work is made for the following purposes, consistent with the services
defined in the Master Agreement: The Design Review of Gulfstream MRO Facility
Taxilane at Fort Worth Alliance Airport. In particular, Engineer shall perform those
functions identified below in the Scope of Services, as such services are more fully
detailed in the MSA.
Section A. Scope of Services
This scope of work for this contract is for the review of the design for the taxilane connecting
Taxiway Hotel and Gulfstream's new Maintenance Repair and Operations facility at Fort Worth
Alliance Airport.
1 PROJECT MANAGEMENT
Management activities will consist of internal project set-up, stakeholder coordination and
communication and document control.
1.1 Project Execution Plan
A detailed Project Execution Plan will be submitted within fourteen (14) calendar days of the
Notice to Proceed. The work plan will identify the execution and management of the work
throughout the length of the contract. The work plan will include:
• Roles and responsibilities of key team members will be confirmed and lines of authority
and communication identified. This will be submitted as an organization chart or other type
of exhibit that clearly identifies roles, responsibilities and lines of communication.
• A detailed Project schedule will be prepared that identifies dates for key meetings, duration
of design activities, submittals, deliverables and other important milestones for the
completion of the work.
1.2 Document Control
The Engineer will manage electronic document retention of project deliverables, including but not
limited to; status reports, comment review forms, meeting minutes, invoices and other relevant
documentation as needed.
Addendum No. 1 to CSC No. 54953
Between the City of Fort Worth and
Jacobs Engineering Group Inc.
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
1.3 Monthly Status Report
The Engineer will maintain regular communications with the AFW and other stakeholders. A
monthly report will be prepared to demonstrate the progress and status of the work. Themonthly
report will be submitted along with the monthly invoice
1.4 Coordination Meetings
The Engineer will attend coordination meetings with stakeholders to coordinate and communicate
issues related to the Project. It is anticipated that key staff will attend four (4) project coordination
meetings.
2 DESIGN REVIEW
Jacobs will review the design of the taxilane (drawings and technical specifications) for
conformance with applicable FAA design criteria and advisory circulars. It is anticipated that there
will be two (2) design submittals, preliminary design and final design.
2.1 Preliminary Design Review
A set of drawings that represent approximately 65% complete taxilane design will be submitted
to Jacobs for review along with a comprehensive list of applicable technical construction
specifications. The geotechnical report and taxilane pavement design report will also be submitted
for review at this time.
Jacobs will review this information and provide a set of written comments identifying items that
are not in compliance with FAA Advisory Circulars and / or accepted airfield design practice. The
written comments will be provided to the design engineer for resolution. A comment resolution
meeting will be held to review and document the design engineer's responses to the comments.
Prior to the final design submittal, the design engineer will conduct a meeting with Jacobs to
demonstrate how the comments from the preliminary design have been addressed. The results
of this meeting will be documented by Jacobs and a recommendation provided to the City of Fort
Worth on proceeding with the final design submittal.
2.2 Final Design Review
A set of drawings and technical specifications that represent approximately a 100% complete
taxilane design will be submitted to Jacobs for review. Updated geotechnical report and taxilane
pavement design report will also be submitted for review, if required.
Jacobs will review this information and provide a set of written comments identifying items that
are not in compliance with FAA Advisory Circulars and / or accepted airfield design practice. The
written comments will be provided to the design engineer for resolution. A comment resolution
meeting will be held to review and document the design engineer's responses to the comments.
Prior to bidding, the design engineer will conduct a meeting with Jacobs to demonstrate how the
comments from the final design review have been addressed. The results of this meeting will be
documented by Jacobs and a recommendation provided to the City of Fort Worth on proceeding
with the bid phase of the project.
Addendum No. 1 to CSC No. 54953 Page 2 of 4
Between the City of Fort Worth and
Jacobs Engineering Group Inc.
3 EXCLUSIONS
The following services are excluded from this scope and will be performed as an additional
service, if required for the project:
• FAA Airspace Submittals
• Review of construction contract "front end" documents
• FAA modifications to standards
Section B. Schedule: To be determined by contractor schedule.
Section C. Compensation, Reimbursable Expenses, and Billinq Terms: Processing and
payment of Fees and Reimbursable Expenses, including the structure of payments and
invoicing therefor, shall be in accordance with the Master Professional Services
Agreement.
The total Fee that shall be paid to Engineer for The Design Review of Gulfstream MRO
Facility Taxilane at Fort Worth Alliance Airport shall be in accordance with Article 2(a) and
Article 3 of the Master Service Agreement. If the City requests additional documentation
of expenses, the Engineer shall provide such information if available.
A copy of the fee proposal is attached.
Engineer shall submit invoices for Fees and Reimbursable Expenses to
Tyler Dale in the City's Aviation Department.
On full and final completion of the Services for this Scope of Work, the Engineer shall
submit a final invoice.
Section D. Counteraarts: Electronicallv Transmitted Sianature:
This SOW may be executed in one or more counterparts, each of which when so executed
and delivered shall be considered an original, but such counterparts shall together
constitute one and the same instrument and agreement. Any signature delivered by a
party by facsimile or other electronic transmission (including email transmission of a
portable document file (pdf) or similar image shall be deemed to be an original signature
hereto.
Executed in multiple originals on M ay 14� 2021
[Signature Page Follows]
Addendum No. 1 to CSC No. 54953 Page 3 of 4
Between the City of Fort Worth and
Jacobs Engineering Group Inc.
CITY OF FORT WORTH, TEXAS:
}.� cL
By, Fernando Costa (May 14, 2021 09:56 CDT)
Fernando Costa
Assistant City Manager
�ate: M ay 14, 2021
APPROVAL RECOMMENDED:
By: �����
Roger Venables
Director, Aviation
ATTEST:
��Y^ t�uGi� P, Gi(/Y�i2�G�G�'b�
By�or Ronald P. Gonzales (May 14, 202110:55 CDT)
Mary Kayser
City Secretary
APPROVED AS TO FORM
AND LEGALITY:
By: � n��' �/� , r�
Thomas Royce Hansen
Assistant City Attorney
JACOBS ENGINEERING GROUP INC.
, �
; ,.
By: �!i�.��-" - -
i � Joh ny Jackson
Manager of Projects
Date: May 6, 2021
,o,a�" FORT u��
� OF00000000a� d
�� � o�� �
p�o 0
�(�o o.T.
o °
� * F
��� �� rExaS�apQ
Contract Compliance Manager:
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all perFormance and reporting requirements.
�,�1- �
Tyler Dale (May7, 20211528 CDT)
Tyler Dale
Airport Project Coordinator
Addendum No. 1 to CSC No. 54953
Between the City of Fort Worth and
Jacobs Engineering Group Inc.
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
��coBs�
Fort Worth Alliance Airport 12/7/2020
Gulfstream Taxilane Design Review Fee Proposal
Labor Hour Estimate
Task Activity Project Project Project Total Hours
Manager Engineer Coord.
1 Project Management
1.1 Project Management 4 4 8
1.2 Document Control 8 8
1.3 Monthly Status Report 4 4 8
1.4 Coordination Meetings (4 Total) 6 6 12
2 Design Review
2.1 Preliminary Design Review 2 24 4 30
Comment Resolution Meeting 2 2
Verification 3 3
2.2 Final Design Review 2 32 4 38
Comment Resolution Meeting 2 2
Verification 4 4
Total: 12 73 30 115
Project Manager
Project Engineer
Project Coordinator
Labor Cost: Salary Rate
$ 104.00
$ 104.00
$ 40.25
Salary Cost:
Overhead @ 99.41 %:
Subtotal:
Profit @ 10%
Total Labor Cost
Other Direct Expenses
Travel:
Mileage (2 trips at 35 miles x$0.575)
Tolls (2 trips at $8.00 R/T)
Meals (2 @ $16 per each)
Total Direct Expenses:
Hours Labor
12 $ 1, 248.00
73 $ 7,592.00
30 $ 1,207.50
$ 10,047.50
$ 9.988.22
$ 20,035.72
$ 2.003.57
$ 22,039.29
$ 40.25
$ 16.00
$ 32.00
$ 88.25
Total Cost: $ 22,127.54