HomeMy WebLinkAboutContract 38374:..:rr y SEC RETA r. · ')· l t
CONTRACT NO . ....._~0.....-;;;X
~ ,,. \ -;!?,... -t
SPECIFICATIONS
AND
CONTRACT DOCUMENTS
FOR
SIGNAL INSTALLATIONS
AT THE INTERSECTIONS OF:
BELKNAP STREET AND GROVE STREET;
GROVE STREET AND WEATHERFORD STREET
PROJECT No. TPW-TS-2008-00026
IN THE CITY OF FORT WORTH, TEXAS
MIKE MONCRIEF
MAYOR
SEPTEMBER, 2008
GREG SIMMONS, P. E.
DALE A. FISSELER, P.E.
CITY MANAGER
ACTING DIRECTOR OF TRANSPORTATION
AND PUBLIC WORKS DEPARTMENT
SCOTT R. ARNOLD, P.E.
KIMLEY-HORN AND ASSOCIATES, INC.
PROJECT MANAGER
TRANSPORTATION AND PUBLIC WORKS DEPARTMENT
03 -26-09 All:14 I N
0 L ECO D
CITY SECRE'li RY
FT. WORTH, TX
M&CReview Page 1 of 2
Official site of the City of Fort Worth, Texas
CITY COUNCIL AGENDA FORT\VORTH
~
DATE:
CODE:
2/10/2009
C
COUNCIL ACTION: Approved on 2/10/2009
REFERENCE
NO.:
TYPE:
C-23340
NON-
CONSENT
LOG NAME:
PUBLIC
HEARING:
20GROVESIGNALS
NO
SUBJECT: Authorize Contract with Durable Specialties, Inc., in the Amount of $124,300 .00 for the
Installation of Two New Traffic Signals at the Intersections of Belknap Street and Grove
Street and Weatherford Street and Grove Street
RECOMMENDATION:
It is recommended that the City Council authorize the City Manager to execute a contract with
Durable Specialties, Inc., in the amount of $124 ,300.00 for the installation of two new traffic signals at
the intersections of Belknap Street and Grove Street and Weatherford Street and Grove Street.
DISCUSSION:
The 2007 Critical Capital Program included funds for traffic signals. A traffic signal study concluded
that these intersections meet the warrant requirements for a traffic signal based on the Texas Manual
on Uniform Traffic Control Devices. The Transportation and Public Works Department proposes to
install pre-timed traffic signals .
Per City Secretary Contract No . 35160, Community Facilities Agreement with the Tarrant County
College Downtown Campus Addition, Tarrant County College District's participation for this signal
project is in the amount of $110,000.00 .
The expected installation cost for this project is $241,898.00 , which is described below.
ITEM DESCRIPTION
Contract Cost
Contingency
Supplies: Signals
Services
Design
TPW Staff Labor: Project Management, Inspection
TOTAL
COST
$124,300.00
$6 ,215.00
$47,450.00
$10,566.00
$39,000.00
$14,367.00
$ 241,898 .00
The expected annual maintenance cost for each signal is $1,704.00 or $3 ,408.00 for both pre-timed
signals.
The project was advertised for bid on September 18, 2008, and September 25 , 2008, and the following
bids were received :
BIDDER
Durable Specialties , Inc.
Battson Contracting Co., Inc.
Jackson Construction, Ltd.
AMOUNT
$124,300.00
$140,414.96
$173,196.00
http://apps.cfwnet.org/council_packet/mc _re view .asp?ID= 109 l 4&councildate=2/10 /2009 2/23 /2009
M&CRev iew Page 2 of2
Staff considers Durable Specialties, lnc.'s bid to be fair and reasonable and recommends approval.
Durable Specialties, Inc., is in compliance with the City 's M/WBE Ordinance by committing to 17
percent M/WBE participation .The City's goal on this project is 11 percent.
This project is located in COUNCIL DISTRICT 9.
FISCAL INFORMATION/CERTIFICATION:
The Financial Management Services Director certifies that funds are available in the current capital
budgets, as appropriated , of the 2007 Critical Capital Fund and the New Development Fund.
TO Fund/Account/Centers
Submitted for City Manager's Office by:
Originating DeRartment Head:
Additional Information Contact:
ATTACHMENTS
20GROVES1GNALS.pdf
FROM Fund/Account/Centers
C295 541200 208710047180 $14 ,300 .00
C202 541200 208710047180 $110 ,000 .00
Fernando Costa (6122)
William A. Verkest (7801)
Marisa Conlin (8779)
http ://apps.cfwnet.org/council _packet/me_ review.a sp?ID= 10914&councildate=2/10 /2 009 2/23/2009
TO:
FROM:
TELEFAX COVER SHEET
City of Fort Worth
Transportation/Public Works Department
Independent Utility Construction Inc.
Durable Specialties
Paradigm Traffic Systems
Jackson Construction
JP Sales
Battson Contracting Co. Inc.
DFW Minority Council
Homero Beltran
Phone: (817) 392-8061
Fax: (817) 392-2533
FAX: 817-330-0078
FAX: 972-780-7411
FAX: 972-444-9822
FAX: 817-478-0443
FAX: 817-447-3785
FAX: 972-227-6191
FAX: 214-637-2241
SUBJECT: ADDENDUM NO. 1
NEW SIGNAL INSTALLATIONS: Belknap Street & Grove Street; Grove
Street & Weatherford Street
Project No. TPW-TS-2008-00026
Bid Opening Date: October 9, 2008
Addendum Issued: October 7, 2008
Total Pages: 1
The following changes to the Contract Documents should be noted by all prospective
bidders:
1. Plan Set -ESTIMATE SUMMARY GROVE STREET SIGNALS
(Sheet 4)
Item No. 38 Item Description Should Read:
Signal-1 ?0E Controller/Cabinet Pole-Mnt -Install item provided by the City
Item No . 39 Item Description Should Read:
Signal-170E Controller/Conflict Monitor and Modem -Install item provided by
the City
CC: Marisa Conlin, P.E., Traffic Signal Operations Manager
Pamela Kenney , Administrative Assistant
Gloria Cook, Administrative Assistant
Part A
PartB
PartC
PartD
PartE
PartF
PartG
TABLE OF CONTENTS
Notice to Bidders
Special Instructions to Bidders
Proposal
Vendor Compliance to State Law
Conflict of Interest Disclosure Requirement
Minority and Women Business Enterprise Specifications
General Conditions
(See City of Fort Worth Standard Specifications For Street
And Storm Drain Construction, Part I. General Provisions)
Special Provisions
Traffic Signal Specifications
Certificate of Insurance and Bonds
Certificate of Insurance
Contractor Compliance With Worker's Compensation Law
Experience Record
Equipment Schedule
Maintenance Bond
Performance Bond
Payment Bond
Contract
PART A
NOTICE TO BIDDERS
AND
SPECIAL INSTRUCTIONS TO BIDDERS
NOTICE TO BIDDERS
Sealed proposals for the following:
FOR: SIGNAL INSTALLATIONS AT THE INTERSECTIONS OF:
BELKNAP ST. AND GROVE ST.;
GROVE ST. AND WEATHERFORD ST.
PROJECT NO. TPW-TS-2008-00026
The project consists of the complete installation of traffic signals with poles, mast arms , pole foundations ,
conduit, and detection system at the locations listed above.
Addressed to Mr. Dale A. Fisseler, P.E., City Manager of the City of Fort Worth, Texas , will be received at the
Purchasing Office until 1:30 PM, Thursday, October 9, 2008 and then publicly opened and read aloud at 2:00
PM in the Council Chambers. Plans, Specifications and Contract Documents for this project may be obtained
beginning Wednesday, September 24, 2008 from the Transportation and Public Works Department's James
Ave Service Center located at 5001 James Ave, Suite 301 , Fort Worth, Texas. Each set of documents will be
provided to prospective bidders for a cost of $30.00; such deposit will be nonrefundable . These documents
contain additional information for prospective bidders .
A non-mandatory Pre-Bid Conference will be held at 10:00 AM on Tuesday, September 30, 2008 5001 James
Ave , Suite 301. All bidders are encouraged to attend .
Bid security is required in accordance with the Special Instruction to Bidders.
The City reserves the right to reject any and/or all bids and waive any and/or all irregularities. No bid may be
withdrawn until the expiration of forty -nine (49) days from the date the M/WBE UTILIZATION FORM,
PRIME CONTRACTOR W AIYER FORM and/or the GOOD FAITH EFFORT FORM ("Documentation") as
appropriate is received by the City. The award of contract, if made, will be within forty-nine (49) days after
this documentation is received, but in no case will the award be made until the responsibility of the bidder to
whom it is proposed to award the contract has been verified .
Bidders are responsible for obtaining all Addenda to the contract documents and acknowledging receipt of the
Addenda by initialing the appropriate spaces on the PROPOSAL form . Bids that do not acknowledge receipt of
all Addenda may be rejected as being nonresponsive. Information regarding the status of Addenda may be
obtained by contacting the Transportation and Public Works Department at (817) 3 92-773 8.
In accord with City of Fort Worth Ordinance No.15530 , the City of Fort Worth has goals for the participation of
minority business enterprises and women business enterprises in City contracts. A copy of the Ordinance can
be obtained from the Office of the City Secretary. The bidder shall submit the S/S UTILIZATION FORM,
PRIME CONTRACTOR W AIYER FORM, the GOOD FAITH EFFORT FORM ("Documentation") and/or the
JOINT VENTURE FORM as appropriate. The documentation must be received no later than 5:00 PM, five (5)
City business days after the bid opening date. The bidder shall obtain a receipt from the appropriate employee
of the managing department to whom delivery was made. Such receipt shall be evidence that the
documentation was received by the City. Failure to comply shall render the bid nonresponsive . For additional
information, contact Romero Beltran, at (817) 392-8061.
Advertising Dates: September 18, 2008 and September 25, 2008
SPECIAL INSTRUCTIONS TO BIDDERS
1. BID SECURITY : Cashier's check or an acceptable bidder's bond payable to the City of
Fort Worth, in an amount of not less than 5 percent of the largest possible total of the bid
submitted must accompany the bid , and is subject to forfeit in the event the successful
bidder fails to execute the contract documents within ten days after the contract has been
awarded.
To be an acceptable surety on the bid bond, the surety must be authori z ed to do business
in the state of Texas. In addition, the surety must (1) hold a certificate of authority from
the Untied States secretary of the treasury to qualify as a surety on obligations permitted
or required under federal law ; or (2) have obtained reinsurance for any liability in excess
of $100,000 from a reinsurer that is authorized and admitted as a reinsurer in the state of
Texas and is the holder of a certificate of authority from the Untied States secretary of the
treasury to qualify as a surety on obligations permitted or required under federal law.
Satisfactory proof of any such reinsurance shall be provided to the City upon request.
The City, in its sole discretion, will determine the adequacy of the proof required herein.
2. PROPOSAL: After proposals have been opened and read aloud , the proposals will be
tabulated on the basis of the quoted prices , the quantities shown in the proposal, and the
application of such formulas or other methods of bringing items to a common basis as
may be established in the Contract Documents .
The total obtained by taking the sum of the products of unit prices quoted and the
estimated quantities plus any lump sum items and such other quoted amounts as may
enter into the cost of the completed project will be considered as the amount of the bid.
Until the award of the contract is made by the Owner, the right will be reserved to reject
any or all proposals and waive technicalities , to re-advertise for new proposals, or to
proceed with the work in any manner as maybe considered for the best interest of the
Owner.
The quantities of work and materials to be furnished as may be listed in the proposal
forms or other parts of the Contract Documents will be considered as approximate only
and will be used for the purpose of comparing bids on a uniform basis. Payment will be
made to the Contractor for only the actual quantities of work performed or materials
furnished in strict accordance with the Contract Documents and Plans. The quantities of
work to be performed and materials to be furnished may be increased or decreased as
hereinafter provided, without in any way invalidating the unit prices bid or any other
requirements of the Contract Documents .
3. ADDENDA: Bidders are responsible for obtaining all addenda to the Contract
Documents prior to the bid receipt. Information regarding the status of addenda may be
obtained by cont acting the Department of Transportation Public Works Traffic Services
Division at (817) 392-7738. Bids that do not acknowledge all applicable addenda will be
rejected as non-responsive.
SPECIAL IN STRUCTIONS TO BIDDERS
-I -
4. AW ARD OF CONTRACT: The contract, if awarded, will be awarded to the lowest
responsible bidder. The City reserves the right to reject any or all bids and waive any or
all irregularities . No bid may be withdrawn until the expiration of forty-nine ( 49) City
business days from the date that the M/WBE UTILIZATION FORM, PRIME
CONTRACTOR W AIYER FORM and/or the GOOD FAITH EFFORT FORM
("Documentation") is received by the City.
5. PAYMENT, PERFORMANCE AND MAINTENANCE BONDS: The successful bidder
entering into a contract for the work will be required to give the City surety in a sum
equal to the amount of the contract awarded. The successful bidder shall be required to
furnish bonding as applicable in a sum equal to the amount of the contract awarded. The
form of the bond shall be as herein provided and the surety shall be acceptable to the
City. All bonds furnished hereunder shall meet the requirements of Chapter 2253 of the
Texas Government Code, as amended.
A. If the total contract price is $25,000 or less, payment to the contractor shall be
made in one lump sum. Payment shall not be made for a period of 45 calendar
days from the date the work has been completed and accepted by the City.
B. If the contract amount is in excess of $25,000, a Payment Bond shall be
executed, in the amount of the contract, solely for the protection of all claimants
supplying labor and material in the prosecution of the work.
C. If the contract amount is in excess of $100,000, a Performance Bond shall be
executed, in the amount of the contract conditioned on the faithful performance of
the work in accordance with the plans, specifications, and contract documents.
Said bond shall solely be for the protection of the City of Fort Worth.
D. A Two-year Maintenance Bond is required for all projects to insure the prompt,
full and faithful performance of the general guarantee as set forth in Paragraph 7
of the Special Provisions .
To be an acceptable surety on the performance, payment and maintenance bonds,
the surety must be authorized to do business in the state of Texas and meet all
requirements of Texas Insurance Code, section 7 .19-1. In addition, the surety
must (1) hold a certificate of authority from the Untied States secretary of the
treasury to qualify as a surety on obligations permitted or required under federal
law; or (2) have obtained reinsurance for any liability in excess of $100,000 from
a reinsurer that is authorized and admitted as a reinsurer in the state of Texas and
is the holder of a certificate of authority from the Untied States secretary of the
treasury to qualify as a surety on obligations permitted or required under federal
law. Satisfactory proof of any such reinsurance shall be provided to the City upon
request. The City, in its sole discretion, will determine the adequacy of the proof
required herein.
No sureties will be accepted by the City that are at the time in default or
delinquent on any bonds or which are interested in any litigation against the City.
Should any surety on the contract be determined unsatisfactory at any time by the
City, notice will be given to the contractor to that effect and the contractor shall
immediately provide a new surety satisfactory to the City
SP ECIAL IN STRUCTIO NS T O BIDDERS
- 2 -
6.
7.
LIQUIDATED DAMAGES: The Contractor's attention is called to Part 1 -General
Provisions, Item 8, Paragraph 8.6, Standard Specifications for Street and Storm Drain
Construction of the City of Fort Worth, Texas, concerning liquidated damages for late
completion of projects.
EMPLOYMENT AND NON-DISCRIMINATION: The Contractor shall not
discriminate against any person(s) because of sex, race, religion, color or national origin
and shall comply with the provisions of sections 13A-21 through 13A-29 of the Code of
the City of Fort Worth (1986), as amended, prohibiting discrimination in employment
practices.
8 WAGE RA TES: All bidders will be required to comply with prov1S1on 5159a of
"Vemons Annotated Civil Statutes" of the State of Texas with respect to the payment of
prevailing wage rates as established by the City of Fort Worth, Texas, and set forth in
Contract Documents for this project.
9. FINANCIAL STATEMENT: A current certified financial statement may be required by
the Department of Transportation/Public Works Director for use by the CITY OF FORT
WORTH in determining the successful bidder. This statement, if required, is to be
prepared by an independent Public Accountant holding a valid permit issued by an
appropriate State Licensing Agency.
10 . INSURANCE: Within ten days of receipt of notice of award of contract, the Contractor
must provide, along with executed contract documents and appropriate bonds, proof of
insurance for Workers Compensation (statutory); Comprehensive General Liability
($1,000,000 per occurrence, $2,000,000 aggregate); and Automobile Insurance
($1,000,000 each accident on a combined single basis or $250 ,000 property
damage/$500,000 bodily injury per person per occurrence. A commercial business
policy shall provide coverage on "any auto", defined as autos owned, hired, and non-
owned). Additional lines of coverage may be requested. If such a request is made after
bid opening, Contractor shall be entitled to additional compensation equal to 110% of the
additional premium cost. For worker's compensation insurance requirements, see Special
Instructions to Bidders -Item 16.
ADDITIONAL INSURANCE REQUIREMENTS:
A. The City, its officers, employees and servants shall be endorsed as an additional
insured on Contractor's insurance policies excepting employer's liability insurance
coverage under Contractor's workers' compensation insurance policy.
B . Certificates of insurance shall be delivered to the City of Fort Worth, contract
administrator in the respective department as specified in the bid documents, 1000
Throckmorton Street, Fort Worth, TX 76102, prior to commencement of work on
the contracted project.
C. Any failure on part of the City to request required insurance documentation shall
not constitute a waiver of the insurance requirements specified herein.
D . Each insurance policy shall be endorsed to provide the City a minimum thirty
days notice of cancellation, non-renewal , and/or material change in policy terms
SPECIAL INSTRUCTIONS TO BIDDERS
-3 -
or coverage. A ten days notice shall be acceptable in the event of non-payment of
premmm.
E . Insurers must be authorized to do business in the State of Texas and have a
current A.M. Best rating of A: VII or equivalent measure of financial strength and
solvency.
F. Deductible limits, or self-funded retention limits, on each policy must not exceed
$10,000.00 per occurrence unless otherwise approved by the City.
G. Other than worker's compensation insurance, in lieu of traditional insurance, City
may consider alternative coverage or risk treatment measures through insurance
pools or risk retention groups. The City must approve in writing any alternative
coverage.
H. Workers' compensation insurance policy(s) covering employees employed on the
project shall be endorsed with a waiver of subrogation providing rights of
recovery in favor of the City.
I. City shall not be responsible for the direct payment of insurance premium costs
for contractor's insurance.
J. Contractor's insurance policies shall each be endorsed to provide that such
insurance is primary protection and any self-funded or commercial coverage
maintained by City shall not be called upon to contribute to loss recovery.
K. In the course of the project, Contractor shall report, in a timely manner, to City's
officially designated contract administrator any known loss occurrence which
could give rise to a liability claim or lawsuit or which could result in a property
loss.
L. Contractor's liability shall not be limited to the specified amounts of insurance
required herein.
M . Upon the request of City, Contractor shall provide complete copies of all
insurance policies required by these contract documents .
11. NON-RESIDENT BIDDERS: Pursuant to Texas Government Code, art. 2252.002, the
City of Fort Worth will not award this contract to a non-resident bidder unless the non-
resident's bid is lower than the lowest bid submitted by a responsible Texas resident
bidder by the same amount that a Texas resident bidder would be required to underbid a
non-resident bidder to obtain a comparable contract in the state in which the non-
resident's principal place of business is located.
"Non-resident bidder" means a bidder whose principal place of business is not in this
state, but excludes a contractor whose ultimate parent company of majority owner has its
principal place of business in this state .
SPECIAL INSTRUCTIONS TO BIDDERS
-4 -
"Texas resident bidder" means a bidder whose principal place of business is in this state,
and includes a contractor whose ultimate parent company or majority owner has its
principal place of business in this state.
This provision does not apply if the project is funded in whole or in part with federal
funds
The appropriate blanks of the Proposal must be filled out by all non-resident bidders in
order for its bid to meet specifications . The failure of a non-resident contractor to do so
will automatically di squalify that bidder.
12 . MINORITY/WOMEN BUSINESS ENTERPRISE: In accordance with City of Fort
Worth Ordinance No. 15530, the City of Fort Worth has goals for the participation of
minority business enterprises and women business enterprises in City contracts. You may
obtain a copy of the Ordinance from the Office of the City Secretary.
The M/WBE Utilization Form, Prime Contractor Waiver Form and the Good Faith Effort
Form, as applicable, must be submitted no later than 5:00 p. m. five (5) City business
days after the bid opening date, exclusive of the bid opening date. The bidder shall
submit the documentation at the reception area of the Department of
Transportation/Public Works ("Managing Department"), 2nd floor , City Hall, and shall
obtain a receipt. Failure to comply shall render your bid non-responsive.
Upon contract execution between the City of Fort Worth and the successful bidder, now
known as Contractor, a pre-construction meeting will be scheduled at which time the
Contractor is required to submit either Letters of Intent or ex ecuted agreements with the
M/WBE firm(s) to be utilized on this project. Such Letters of Intent or executed
agreements shall include the following information:
1. Name of Contract
2. Name of M/WBE firm utilized
3 . Scope of Work to be performed by the M/WBE firm
4. Monetary amount of work to be performed by the M /WBE firm
5. Signatures of all parties
A notice to proceed will not be issued until the signed letter(s) or executed
agreement(s) have been received.
Throughout the duration of this project, the Contractor comply with the M/WBE
Ordinance by complying with the following procedures:
• A M/WBE Participation Report Form must be submitted monthly until the contract is
completed. The first report will be due 30 days after commencement of work. The
monthly r eport MUST have an original signature to ensure accountability for audit
purposes .
• Reports are to be submitted monthly to the M /WBE O ffice , regardless of whether or
not the M/WB E firm has been u til iz ed. If there w as no acti v ity b y an M/WBE in a
particul ar month, place a "O" or "no participation" in the spaces prov ided, and provide
a brief explanation.
SP ECIAL INSTRUCTIONS TO BIDDER S
-5 -
• The Contractor shall provide the M/WBE Office proof of payment to the M/WBE
subcontractors and suppliers only. The M/WBE Office will accept the following as
proof of payment:
1. Copies of submitted invoices with front and back copies of canceled check(s), OR
2. A notarized letter explaining, in detail:
a Subcontractor/supplier Scope of Work
b. Date when services were received from subcontractor/supplier
c. Amounts paid to the subcontractor/supplier
d. Original signatures from both parties must be included on this letter.
• If the Contractor foresees a problem with submitting participation reports and/or
proof of payment on a monthly basis , the M/WBE Office should be notified.
If the Contractor wishes to change or delete an M/WBE subcontractor or supplier, adhere
to the following:
1. Immediately submit a Request for Approval of Change Form to the M/WBE
Office explaining the request for the change or deletion.
2. If the change affects the committed M/WBE participation goal , state clearly how
and why in documentation .
a. All requests for changes must be reviewed and pre-approved by the M/WBE
Office.
b. If the Contractor makes change(s) prior to approval , the change will not be
considered when performing a post compliance review on this project.
• Upon the Contractor's successful completion of this project, and within ten days after
receipt of final payment from the City of Fort Worth, The Contractor will provide the
M/WBE Office with a Final Participation Report Form to reflect the total
participation from ALL subcontractors/suppliers utilized on the project.
• All forms are available at the M/WBE Office, 3rd floor -City Hall. For additional
information regarding compliance to the M/WBE Ordinance , call (817) 392-6104.
Upon request , Contractor agrees to provide to Owner Complete and accurate information
regarding actual work performed by a Minority/Women Business Enterprise (M /WBE)
on the contract and payment therefore . Contractor further agrees to permit an audit and/or
examination of any books , records or files in its possession that will substantiate the
actual work performed by an M/WBE. The misrepresentation of facts ( other than a
negligent misrepresentation) and/or the commission of fraud by the Contractor will be
grounds for termination of the contract and /or initiating action under appropriate federal ,
state or local laws or ordinances relating to false statements ; further , any such
misrepresentation ( other than a negligent misrepresentation) and/or commission of fraud
will result on the Contractor being determined to be irresponsible and barred from
p articipating in City work for a period of time of not less than three years.
SP ECIAL INS TRUCTIONS TO BIDD ERS
-6 -
13. AMBIGUITY: In case of ambiguity or lack of clearness in stating process in the
proposal , the City reserves the right to adopt the most advantageous construction thereof
or to reject the proposal.
14 . PAYMENT, FINAL PAYMENT PROJECT ACCEPTANCE AND WARRANTY : The
contractor will receive full payment (less retainage) from the city for each pay period .
Payment of the retainage will be made with the final payment upon acceptance of the
project as being complete. The project shall be deemed complete and accepted by the
City as of the date the final punch list has been completed , as evidenced by a written
statement signed by the contractor and the City. The warranty period shall begin as of
the date that the final punch list has been completed. If the contract amount is less than
$400,000, retainage will be 10%; in excess of $400,000, retainage will be 5%.
15 . OZONE ALERT DAYS: The Contractor shall be required to observe the following
guidelines relating to working on City construction sites on days designated as "OZONE
ALERT DAYS". Typically, the Ozone Alert season within the Metroplex area runs from
May through September, with 6:00 a.m . -10:00 a.m. being critical ozone forming periods
each day.
The Texas Commission on Environmental Quality (TCEQ), in coordination with the
National Weather Service, will issue the Ozone Alert by 3:00 p.m. on the afternoon prior
to the alert day. On designated Ozone Alert Days, the Contractor shall bear the
responsibility of being aware that such days have been designated Ozone Alert Days and
as such shall not begin work until 10:00 a.m. whenever construction phasing requires
substantial use of motorized equipment. However, the Contractor may begin work earlier
if such work minimizes the use of motorized equipment prior to 10:00 a.m.
If the Contractor is unable to perform continuous work for a period of at least seven hours
between the hours of 7:00 a.m . - 6 :00 p.m., on a designated Ozone Alert Day, that day
will be considered as a weather day and added onto the allowable weather days of a given
month.
16. WORKERS COMPENSATION INSURANCE COVERAGE: Contractors compliance
with Workers Compensation shall be as follows:
A. Definitions:
Certificate of coverage ("certificate") - A copy of a certificate of insurance , a
certificate of authority to self-insure issued by the commission, or a coverage
agreement (TWCC-81 , TWCC-82 , TWCC-83 , or TWCC-84), showing statutory
workers' compensation insurance coverage for the person's or entity employees
providing services on a project, for the duration of the project.
Duration of the project -includes the time from the beginning of the work on the
project until the contractor's /person's work on the project has been completed and
accepted by the governmental entity.
Persons providing services on the project ("subcontractor" in. 406.096) -includes all
persons or entities performing all or part of the services the contractor has undertaken
SPECIAL INSTRUCTIONS TO BIDDER S
-7 -
to perform on the project, regardless of whether that person has employees. This
includes, without limitation, independent contractors, subcontractors, leasing
companies, motor carriers, owner-operators, employees of any such entity, or
employees of any entity which furnishes persons to provide services on the project.
"Services" include, without limitation, providing, hauling, or delivering equipment or
materials, or providing labor, transportation, or other service related to a project.
"Services" does not include activities unrelated to the project, such as food/beverage
vendors, office supply deliveries, and delivery of portable toilets.
B. The contractor shall provide coverage, based on proper reporting of classification
codes and payroll amounts and filing of any coverage agreements, which meets the
statutory requirements of Texas Labor Code, Section 401.011(44) for all employees
of the contractor providing services on the project, for the duration of the project.
C. The Contractor must provide a certificate of coverage to the governmental entity prior
to being awarded the contract.
D. If the coverage period shown on the contractor's current certificate of coverage ends
during the duration of the project, the contractor must, prior to the end of the
coverage period, file a new certificate of coverage with the governmental entity
showing that coverage has been extended.
E. The contractor shall obtain from each person providing services on a project, and
provide to the City:
(1) a certificate of coverage, prior to that person beginning work on the project, so
the City will have on file certificates of coverage showing coverage for all
persons providing services on the project; and
(2) no later than seven days after receipt by the contractor, a new certificate of
coverage showing extension of coverage, if the coverage period shown on the
current certificate of coverage ends during the duration of the project.
E. The contractor shall retain all required certificates of coverage for the duration of the
project and for one year thereafter.
G. The contractor shall notify the governmental entity in writing by certified mail or
personal delivery, within ten days after the contractor knew or should have known, of
any change that materially affects the provision of coverage of any person providing
services on the project.
H. The contractor shall post on each project site a notice, in the text, form and manner
prescribed by the Texas Workers' Compensation Commission, informing all persons
providing services on the project that they are required to be covered, and stating how
a person may verify coverage and report lack of coverage.
I. The contractor shall contractually require each person with whom it contracts to
provide services on a project, to:
SPEC IAL INSTRUC TIONS TO BIDDERS
-8 -
(1) provide coverage, based on proper reporting on classification codes and payroll
amounts and filing of any coverage agreements, which meets the statutory
requirements of Texas Labor Code, Section 401.011(44) for all of its employees
providing services on the project, for the duration of the project;
(2) provide to the contractor, prior to that person beginning work on the project, a
certificate of coverage showing that coverage is being provided for all employees
of the person providing services on the project, for the duration of the project;
(3) provide the contractor, prior to the end of the coverage period, a new certificate
of coverage showing extension of coverage, if the coverage period shown on the
current certificate of coverage ends during the duration of the project;
( 4) obtain from each other person or entity with whom it contracts, and provide to
the contractor:
(a) a certificate of coverage, prior to the other person or entity beginning work
on the project; and
(b) a new certificate of coverage showing extension of coverage, prior to the end
of the coverage period, if the coverage period shown on the current certificate
of coverage ends during the duration of the project;
(5) retain all required certificates of coverage on file for the duration of the project
and for one year thereafter.
(6) notify the governmental entity in writing by certified mail or personal delivery,
within ten days after the person knew or should have known, of any change that
materially affects the provision of coverage of any person providing services on
the project; and
(7) contractually require each person with whom it contracts, to perform as required
by paragraphs (1) -(7), with the certificates of coverage to be provided to the
person for whom they are providing services .
J . By signing this contract or providing or causing to be provided a certificate of
coverage, the contractor is representing to the governmental entity that all employees
of the contractor who will provide services on the project will be covered by workers'
compensation coverage for the duration of the project, that the coverage will be based
on proper reporting of classification codes and payroll amounts , and that all coverage
agreements will be filed with the appropriate insurance carrier or, in the case of a self-
insured , with the commission's Division of Self-Insurance Regulation. Providing
false of misleading information may subject the contractor to administrative penalties,
criminal penalties , civil penalties or other civil actions .
K. The contractor's failure to comply with any of these provisions is a breach of contract
by the contractor which entitles the City to declare the contract void if the contractor
does not remedy the breach within ten days after receipt of notice of breach from the
City.
SP ECIAL INSTRUCTIONS TO BIDDERS
-9 -
"The contractor shall post a notice on each project site informing all persons
providing services on the project that they are required to be covered , and stating how
a person may verify current coverage and report failure to provide coverage. This
notice does not satisfy other posting requirements imposed by the Texas Workers'
Compensation Act or other Texas Workers' Compensation commission rules. This
notice must be printed with a title in at least 30 point bold type and text in at least 19
point normal type , and shall be in both English and Spanish and any other language
common to the worker population. The text for the notices shall be the following
text, without any additional words or changes:
REQUIRED WORKERS' COMPENSATION COVERAGE
"The law requires that each person working on this site or providing services related
to this construction project must be covered by workers' compensation insurance.
This includes persons providing, hauling , or delivering equipment or materials , or
providing labor or transportation or other service related to the project, regardless of
the identity of their employer or status as an employee ."
"Call the Texas Workers' Compensation Commission at (512) 440-3789 to receive
information on the legal requirement for coverage, to verify whether your employer
has provided the required coverage, or to report an employer's failure to provide
coverage."
17. AGE DISCRIMINATION: In accordance with the policy ("Policy") of the Executive
Branch of the federal government, contractor covenants that neither it nor any officers,
members, agents or employees who engage in the performance of this contract shall , in
connection with such employment, advancement or discharge of employees or in
connection with the terms, conditions or privileges of their employment, discriminate
against any person because of their age except on the basis of a bona fide occupational
qualification, retirement plan or statutory requirement.
Contractor further covenants that neither it nor its officers, members, agents or employees
acting on their behalf, shall specify in solicitations or advertisements for employees to
work on those ' contract a maximum age limit for such employment unless the specified
maximum age limit is based upon a bona fide occupational qualification, retirement plan
or statutory requirement.
Contractor warrants that it will fully comply with the Policy and will defend, indemnify
and hold City harmless against any and all claims or allegations filed by third parties
against City arising out of Contractor's alleged failure to comply with the Policy in the
performance of this contract.
18 . DISCRIMINATION DUE TO DISABILITY: In accordance with the provisions of the
Americans with Disabilities Act of 1990 ("ADA "), Contractor warrants that it will not
unlawfully discriminate on the basis of disability in the provision of services to the
general public, nor in the availability, terms or conditions of employment for applicants
for employment with, or current employees of, Contractor. Contractor warrants that it
will fully comply with the ADA's provisions and any other applicable federal , state , or
local laws concernin g disability and will defend, indemnify and hold City harmless
SP ECI AL INSTR UCTIONS TO BIDDERS
-10 -
against any and all claims or allegations filed by third parties against City arising out of
Contractor's alleged failure to comply with the ADA in the performance of this contract.
19. COMPLIANCE WITH AND ENFORCEMENT OF PREVAILING WAGE LAWS
(a) Duty to pay Prevailing Wage Rates. The contractor shall comply with all requirements
of Chapter 2258, Texas Government Code (Chapter 2258), including the payment of not
less than the rates determined by the City Council of the City of Fort Worth to be the
prevailing wage rates in accordance with Chapter 2258. Such prevailing wage rates are
included in these contract documents.
(b) Penalty for Violation. A contractor or any subcontractor who does not pay the prevailing
wage shall, upon demand made by the City, pay to the City $60 for each worker
employed for each calendar day or part of the day that the worker is paid less than the
prevailing wage rates stipulated in these contract documents . This penalty shall be
retained by the City to offset its administrative costs, pursuant to Texas Government
Code 2258.023.
( c) Complaints of Violations and City Determination of Good Cause. On receipt of
information, including a complaint by a worker, concerning an alleged violation of
2258.023 , Texas Government Code, by a contractor or subcontractor, the City shall make
an initial determination, before the 31 st day after the date the City receives the
information, as to whether good cause exists to believe that the violation occurred. The
City shall notify in writing the contractor or subcontractor and any affected worker of its
initial determination. Upon the City's determination that there is good cause to believe
the contractor or subcontractor has violated Chapter 2258, the City shall retain the full
amounts claimed by the claimant or claimants as the difference between wages paid and
wages due under the prevailing wage rates, such amounts being subtracted from
successive progress payments pending a final determination of the violation.
( d) Arbitration Required if Violation Not Resolved. An issue relating to an alleged violation
of Section 2258 .023, Texas Government Code, including a penalty owed to the City or an
affected worker, shall be submitted to binding arbitration in accordance with the Texas
General Arbitration Act (Article 224 et seq ., Revised Statutes) if the contractor or
subcontractor and any affected worker do not resolve the issue by agreement before the
15th day after the date the City makes its initial determination pursuant to paragraph ( c)
above. If the persons required to arbitrate under this section do not agree on an arbitrator
before the 11th day after the date that arbitration is required, a district court shall appoint
an arbitrator on the petition of any of the persons. The City is not a party in the
arbitration. The decision and award of the arbitrator is final and binding on all parties
and may be enforced in any court of competent jurisdiction.
( e) Records to be Maintained. The contractor and each subcontractor shall, for a period of
three (3) years following the date of acceptance of the work, maintain records that show
(i) the name and occupation of each worker employed by the contractor in the
construction of the work provided for in this contract; and (ii) the actual per diem wages
paid to each worker. The records shall be open at all reasonable hours for inspection by
the City. The provisions of the Audit section of these contract documents shall pertain to
this inspection.
SP EC IAL INS TR UCTIONS T O BIDDER S
-11 -
(f) Pay Estimates . With each partial payment estimate or payroll period, whichever is less,
the contractor shall submit an affidavit stating that the contractor has complied with the
requirements of Chapter 2258 , Texas Government Code.
(g) Posting of Wage Rates . The contractor shall post the prevailing wage rates m a
conspicuous place at the site of the project at all times .
(h) Subcontractor Compliance. The contractor shall include in its subcontracts and/or shall
otherwise require all of its subcontractors to comply with paragraphs (a) through (g)
above.
SP ECIAL INSTRUCTIONS TO BID DER S
-12 -
CITY OF FORT WORTH
HIGHWAY CONSTRUCTION
PREVAILING WAGE RATES FOR 2008
CLASSIFICATION
AIR TOOL OPERA TOR
ASPHALT RAKER
ASPHALT SHOVELER
BATCHING PLANT WEIGHER
CARPENTER
CONCRETE FINISHER (PA YING)
CONCRETE FINISHER HELPER
(PAVING)
CONCRETE FINISHER
(STRUCTURES)
CONCRETE RUBBER
ELECTRICIAN
FLAGGER
FORM BUILDER (STRUCTURES)
FORM LINER (PA YING & CURB)
FORM SETIER (PA YING & CURB)
FORM SETIER (STRUCTURES)
LABORER, COMMON
LABORER, UTILITY
MECHANIC
OILER
SERVICER
PAINTER (STRUCTURES)
PIPELAYER
PIPELA YER HELPER
BLASTER
ASPHALT DISTRIBUTOR OPERA TOR
ASPHALT PA YING MACHINE
BROOM OR SWEEPER OPERA TOR
BULLDOZER
CONCRETE CURING MACHINE
CONCRETE FINISHING MACHINE
CONCRETE PA YING JOINT MACHINE
CONCRETE PAVING JOINT SEALER
CONCRETE PA YING SAW
CONCRETE PAVING SPREADER
SLIPFORM MACHINE OPERA TOR
CRANE, CLAMSHELL, BACKHOE,
DERRICK, DRAGLINE, SHOVEL
FOUNDATION DRILL OPERA TOR
(CRAWLER MOUNTED)
FOUNDATION DRILL OPERA TOR
(TRUCK MOUNTED)
RATE CLASSIFICATION
$10.06 FRONT END LOADER
MILLING MACHINE OPERATOR
$11.01 MIXER (OVER 16 CF)
$8 .80 MOTOR GRADER OPERA TOR (FINE
GRADE)
$14.15 MOTOR GRADE OPERA TOR
(ROUGH)
$12 .80 PAVEMENT MARKING MACHINE
$12.85 ROLLER, STEEL WHEEL
$9 .70 (PLANT-MIX PAVEMENTS)
$13.27 ROLLER, STEEL WHEEL (OTHER
(FLATWHEELOR TAMPING)
$10.61 ROLLER, PNEUMATIC SELF-
PROPELLED SCRAPER
$18 .12 SCRAPER
$8.43 TRACTOR-CRAWLER TYPE
$11.63 TRACTOR-PNEUMATIC
$10.23 TRAVELING MIXER
$11.83 WAGON-DRILL, BORING MACHINE
$9.73 REINFORCING STEEL SETTER
(PAVING)
$9.18 REINFORCING STEEL SETTER
(STRUCTURAL)
$10.65 STEEL WORKER-STRUCTURAL
$16.97 SPREADER BOX OPERA TOR
$14.98 WORK ZONE BARRICADE
$12.32 TRUCK DRIVER-SINGLE AXLE
(LIGHT)
$13 .17 TRUCK DRIVER-SINGLE AXLE
(HEAVY)
$11.04 TRUCK DRIVER-TANDEM AXLE
$6 .75 (SEMI-TRAILER)
$11.50 TRUCK DRIVER-LOWBOY/FLOAT
$13 .99 TRUCK DRIVER-TRANSIT MIX
$12.78 TRUCK DRIVER-WINCH
$9.88 VIBRATOR OPERA TOR (HAND
TYPE)
$13 .22 WELDER
$12 .00
$13.63
$12 .50
$9.00
$13 .56
$14.50
$12.33
$14.12
$13.67
$16.30
END OF SECTION
SPECIAL INSTRUCTIONS TO BIDDERS
-13 -
RATE
$12 .62
$11.83
$11.58
$15 .20
$14 .50
$10.04
$1 1.28
$10.92
$11.07
$11.42
$12 .60
$12 .91
$12.03
$14 .00
$14 .86
$16.29
$17.43
$10 .92
$10 .09
$10 .91
$11.47
$11.75
$14 .93
$12 .08
$9.80
$7.32
$13 .57
PARTB
PROPOSAL
VENDOR COMPLIANCE TO STATE LAW
CONFLICT OF INTEREST DISCLOSURE REQUIREMENT
M/WBEFORMS
PROPOSAL
TO: Dale A. Fisseler, P.E.
City Manager
Fort Worth, Texas
FOR: SIGNAL INSTALLATIONS AT THE INTERSECTIONS OF:
BELKNAP ST. AND GROVE ST.;
GROVE ST. AND WEATHERFORD ST.
PROJECT NO. TPW-TS-2008-00026
Pursuant to the foregoing "Notice to Bidders", the undersigned has thoroughly examined the
plans, specifications and the site, understands the amount of work to be done, and hereby
proposes to do all the work and furnish all labor, equipment, and materials necessary to complete
all the work as provided in the plans and specifications, and subject to the inspection and
approval of the Director of the Department of Transportation and Public Works of the City of
Fort Worth.
Upon acceptance of this proposal by the City Council, the bidder is bound to execute a contract
sums, to-wit: and furnish Performance and Payment Bond approved by the City of Port Worth for
performing and completing said work within the time stated and for the following signal
installations.
Proposal B - 1
SIGNAL INSTALLATIONS: BELKNAP ST. AND GROVE ST.; GROVE ST. AND WEATHERFORD ST.
PAY APPROX. DESCRIPTION OF ITEMS UNIT COST TOTAL COST ITEM QUANTITY
1 1 LS Signal -Mobilization -Service CS $ 39:X:),{)() $ 3S-W;oo
2 14 EA Furnish and Install Signal Head 3 Section
Type A, Type B $ 9{)(), 00 $ /:lt,«). 00
3 16 EA Furnish and Install International Pedestrian
Signal Type P $ s-ro .oo $ gwo.oo
4 5 EA Furnish and Install Ground Box with Lid and
Apron -Large $ 700,00 $ :SS"cX>,00
5 6 EA Furnish and Install Ground Box with Lid and
Apron -Small $ 0cw.oo $ t/li/0, 00
6 150 LF Furnish and Install Conduit -Schedule 40,
PVC 3" Open Cut $ i6,00 $ !5"<X>. 00
7 355 LF Furnish and Install Conduit -Schedule 40,
/0 ,DO PVC 2" Open Cut $ $ 3$'§'0.DO
8 560 LF Furnish and Install Conduit -Schedule 40,
PVC 3" Bore $ Zl ,(X) $ IZ32D,OO
9 660 LF Furnish and Install Conduit -Schedule 40,
PVC 2" Bore $ Jti,.co $ JC1 'iitl),OO
10 40 LF Furnish and Install Conduit -Schedule RM,
2" $ 10,00 $ ft,t{O, 00
11 795 LF Furnish and Install Cable -20 Conductor #14
Stranded Cable $ 3 .00 $ 2 3'6'5,00
12 605 LF Furnish and Install Cable -25 Conductor #19
Communications Cable $ 3 ,C() $ 1815 ,C()
13 420 LF Furnish and Install Cable -Num 8 XHHW
Black $ /.00 $ 42.0 .()()
14 420 LF Furnish and Install Cable -Num 8 XHHW
/.00 White $ $ L/W.ro
15 1,765 LF Furnish and Install Cable -Num 8 Bare $ /.00 $ J 71o5,00
16 1,080 LF Furnish and Install Cable -Num 6 XHHW
Black $ [,00 $ /(/J(),C()
17 685 LF Furnish and Install Cable -Num 6 XHHW /,OD II!JS",00 White $ $
18 2 EA Furnish and Install Concrete Foundation
Type 1 $ 92 / ,C() $ /8tfZ,a)
19 4 EA Furnish and Install Concrete Foundation
Type 3 $ ;. r;co . C() $ /01(X){), 00
20 2 EA Furnish and Install Concrete Foundation
Type4 $ J()(j),00 $ /cff1) ,00
21 2 EA Furnish and Install Base for 10 ' or 14 ' 9q),OO Pedestal Pole Assembly $ $ nC(),ro
22 1 EA Furnish and Install Cabinet Concrete
Foundation $ J.t;OD ,CO $ JSd),W
23 2 EA Furnish and Install Pedestal Service $ 413 ,00 $ 9~/o .00
24 2 EA Furnish and Install Mast Arm Stabilizer $ 100.00 $ 1r,(),O()
25 2 EA Traffic Signal Miscellaneous (Testing, etc.) $ ;;l.t;'C0 .{)0 $ 5'CCO.tX>
26 968 SF Furnish and Install ADA Wheelchair Ramp $ IZ .f'X) $ J I' (p/{p • t90
27 234 .5 SF Furnish and Install Walk $ 8,0D $ I '&lb ,()()
Proposal B -2
28 11 LF Furnish and Install Curb & Gutter $ ?f;.d) $ &s.oo
29 2 EA Install IO ' Pedestal Pole (City Furnished) $ Sfi:),(Y) $ /{Xx),CO
30 2 EA Install 24 ' Mast Arm (City Furnished) x)(),00 ;!Yi).m
31 2 EA Install 28 ' Mast Arm (City Furnished) 9X).OO /OCi).00
32 1 EA Install 44 ' Mast Arm ( City Furnished) '5'{:D,00 5ZX>,D0
33 1 EA Install 48' Mast Arm ( City Furnished) 5"[X),CX) e;"M ri7'i
34 2 EA Install Type 41 Signal Pole (City Furnished) '-Ht),CO 3&).00
35 2 EA Install Type 42 Signal Pole (City Furnished) cm.co ff)({). DO
36 2 EA Install Type 43 Signal Pole (City Furnished) 5('1'),00 jt)f)().()()
37 1 EA Install 170E Controller/Cabinet Ground-
Mount (City Furnished) l~()().O() /5'ti). C()
38 1 EA Install 170E Controller/Cabinet Pole-Mount
/'XJO,DO /~(X).CO (Citv Furnished)
39 2 EA Install 170E Controller/Cabinet, Conflict
Monitor and Modem (City Furnished) 2<;L(){) 5D.o0
40 2 LS Install Opticom Cable and Detectors ~a),O() /CU),oO
41 16 EA Remove Existing Sign Panels /IJ,CO //e/),00
42 75 SF Remove Existing Sidewalk 5',<X> /?7.<;".00
43 240 SF Remove Existing Curb Ramps §".CO /za:>,CK)
4:4 8 LF Remove Existing Curb and Gutter /t),O{) S?t), oO
45 1 EA Remove Existing Sign Posts l~.{)0 /D,00
T OTAL BID $ l2'/i3Cl),00
Proposal B -3
Proposal
CONTRACTOR WILL BE SELECTED ON BASIS OF TOTAL BID
This contract is issued by an organization which qualifies for exemption pursuant to the provision of Article
20.04 (F) of the Texas Limited Sales, Excise and Use Tax Act,
The Contractor shall comply with City Ordinance 7278 , as amended by City Ordinance 7400 (Fort Worth
City Code Sections 13-A-21 through l 3-A-29), prohibiting discrimination in employment practices .
The undersigned agrees to complete all work covered by these contract documents within Forty five ( 45)
Working Days from and after the date for commencing work as set forth in the written Work Order to be
issued by the Owner and to pay not less than the "Prevailing Wage Rates for Street, Drainage and Utility
Construction" as established by the City of Fort Worth, Texas.
Within ten (10) calendar days of receipt of notice of acceptance of this bid, the undersigned will execute the
formal contract and will deliver an approved Surety Bond and other bonds required by the Contract
Documents for the faithful performance of this Contract. The attached bid security in the amount of 5% in
the sum of ~%? ~ a,b f~ 1c.e Dollars ($ ~% ) is to be forfeited in the
event the contract and b od are not executed within the time set forth, as liquidated damages for delay and
additional work caused thereby.
The Bidder agrees to begin construction within 10 working days after issue of the work order, and to
complete the contract within Forty five (45) Working Days after beginning construction as set forth in the
written work order to be furnished by the Owner. *
(Vwe ), acknowledge receipt of the following addenda to the plans and specifications, all of the provisions
and requirements of which have been taken into consideration in preparation of the foregoing bid:
Addendum No. 1 (Initials) <ft~ Addendum No . 3 (Initials) ____ _
Addendum No . 2 (Initials) ______ Addendum No. 4 (Initials) ____ _
(SEAL)
By:~'..d.4!.4f.~L....l-,::.,_:_~....JL:.~-I----
Title: W 1beJ()'/
Contractor)w21 "5ce. s!EC14C.,Ti£.S . / lJC.
7
Address: /b )6r,K 3rf't7fr
)£4J cmi1,/4, ix-7s,3Y
Telephone: qzz -l./16-?~ Lt
Date /0 " <;/-O t
k '? L,_~}-<--A-t/D.u.J_
~ r:')-~ / -'-.::V -
L-f 5 e.i ~ J<JJ IL v"J 5. ~o"v
/f<_c,cuvvn11<..1t-I JJ I/ 't>Vl TL c.J TO
A~\re. (CJ!
--
B-4
VENDOR C OM PLIANCE T O STATE LAW
The 1985 Session of the Texas Legislature passed House Bill 620 relative to the award of contracts to nonresident
bidders . This law provides that, in order to be awarded a contract as low bidder, nonresident bidders ( out-of-State
contractors whose corporate offices or principal place of business are outside of the State of Texas) bid projects for
construction, improvements, supplies or services in Texas at an amount lower than the lowest Texas resident bidder
by the same amount that a Texas resident bidder would be required too underbid a nonresident bidder in order to
obtain a comparable contract in the State in which the nonresident 's principal place of business is located. The
appropriate blanks in Section A must be filled out by all out-of-State or nonresident bidders in order for your bid to
meet specifications . The failure of out-of-State or nonresident contractors to do so will automatically disqualify that
bidder. Resident bidders must check the box in Section B .
A. Nonresident vendors in (give State), our principal place of business, are required to
be percent lower than resident bidders by State law. A copy of the Statute is attached.
Nonresident vendors in __________ (give State), our principal place of business, are not required
to underbid resident bidders .
B . Our principal place of business or corporate offices are in the State of Texas .
BIDDER:
T2urahk 5µxia!fies,,)nc. By: Jet~"Q,t C. &ryaf\
(Please print)
J)vfJCaAv,//e , 1 i
/ I City State
1S"l38
Zip
Title: f re.s:de}\,t ------=-----'---------
(Please print)
TIDS FORM MUST BE RETURNED WITH YOUR QUO TATION
INTER-OFFICE CORRESPONDENCE
•••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••
Date:
To:
From :
Subject:
October 21 , 2008
Gail Scott, Contract Compliance Specialist
M/WBE Office
Gloria Cook, Administrative Assistant
TPW /Business Support
SIGNAL INSTALLATIONS AT THE INTERSECTIONS OF
BELKNAP ST AND GROVE; GROVE ST AND WEATHERFORD
•••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••
Bids for the above project were received on October 9, 2008. Attached, for your
review, is a copy ofM/WBE documentation submitted by the low bidder. Also included
is a copy of the bid tabulation.
Should you have any questions or need more information, please call me at X2852 .
~~
Gloria Cook
M/WBE PARTICIPATION
SIGNAL INSTALLATIONS AT THE INTERSECTIONS OF BELKNAP ST AND GROVE ; GROVE ST WEATHERFORD
BIDS RECEIVED :
OCTOBER 9 , 2008
NAME $ %
CONTRAC T OR BID D/M/WBE DWMBE DWMBE
LOW APPARENT BIDDER
Durable Specialties, Inc $ 124,300.00 JP Sales $ · 14,015.00 11%
APPROVED -PROJECT MANAGER: DATE:
APPROVED -DBE ADMINISTRATOR: DATE:
TOTAL %
DBE
11%
Project:
TPW Project Number:
DOE Project Number:
Bid Date:
Advertised :
WORKING CAYS
UNIT QTY
LS
14 EA
16 EA
5 EA
6 EA
150 LF
355 LF
560 LF
660 LF
40 LF
795 LF
605 LF
420 LF
420 LF
1,765 LF
1,080 LF
685 LF
2 EA
4 EA
2 EA
2 EA
1 EA
2 EA
2 EA
2 EA
968 SF
234 .5 SF
11 LF
2 EA
2 EA
2 EA
1 EA
1 EA
2 EA
2 EA
2 EA
EA
1 EA
2 EA
2 LS
16 EA
75 SF
240 SF
8 LF
1 EA
ADDENDUM'S :
SIGNAL INSTALLATIONS AT THE INTERSECTIONS OF
BELKNAP ST AND GROVE ; GROVE ST & WEATHERFORD
TPW-TS-2008--000 26
OCTOBER 9, 2008
SEPTEMBER 18 & SEPTEMBER 25, 2008
45
TRANSPORTATION AND PUBLIC WORKS
BID TABULATION
Tabulat ed By: Gloria Cook
Project Manager : Homere Be ltran
Eng i nee rs Estimate:
Addendum's:
PO Box 381788
Dun ca nville, TX 75138
972-296-6324
DESCRIPTION UNIT PRICE BID
Signal-Mobilization-Service CS $ 3,500 .00 $ 3,500 .00
Furnish and lnstaU Signal Head 3 Section Type A, Type B $ 900 .00 $ 12,600 .00
Furnish and Install International Pede strian Signal Type P $ 500 .00 $ 8,000 .00
Furnish and lnstaU Ground Box with Lid and Apror>-Large $ 700 .00 $ 3,500 .00
Furnish and Install Ground box with Lid and Apror>-Small s 690 .00 $ 4,140.00
Furnish and Install Conduit-Schedule 40 PVC 3" Open Cut $ 10.00 $ 1,500 .00
Furnish and Install Conduit-Schedule 40 PVC 2" Open Cut s 10.00 s 3,550 .00
Furnish and Install Condui t-Schedule 40 , PVC 3" Bore $ 22 .00 $ 12 ,320 .00
Furnish and Install Conduit-Schedule 40 , PVC 2" Bore $ 16 .00 $ 10 ,560 .00
Furnish and Install Conduit-Schedule RM , 2" $ 16 .00 $ 640 .00
Furnish and Install Cable-20 Conductor #14 Stranded Cable $ 3.00 $ 2,385 .00
Furnish and Install Cable -25 Conductor #19 Communications Cable $ 3.00 $ 1,815 .00
Furnish and Install Cable-Num 8 XHHW Black $ 1.00 $ 420 .00
Furnish and Insta ll Cable -Num 8 XHHW White $ 1.00 $ 420 .00
Furnish and Install Cable-Num 8 Bare $ 1.00 $ 1,765 .00
Furnish and Install Cable-Num 6 XHHW Black $ 1.00 $ 1,080 .00
Furnis h and Install Cable-Num 6 XHHW Whi te $ 1.00 $ 685 .00
Furnish and Install Concrete Foundation Type 1 $ 921.00 $ 1,842 .00
Furnish and Install Concrete Foundation Type 3 $ 2,500 .00 $ 10 ,000 .00
Furnish and Install Concrete Foundation Type 4 $ 3,000 .00 $ 6,000 .00
Furnis h and Install Base for 10' or 14' Pedestal Pole Assembly $ 950 .00 $ 1,900 .00
Furnish and lnstan Cabinet Concrete Foundation s 2,500 .00 $ 2,500 .00
Furnish and lnstal Pedestal Service $ 493 .00 $ 986 .00
Furnish and Install Mast Arm Stabilize r $ 100.00 s 200 .00
Traffic Signal Miscellaneous (Testing , etc .) $ 2,500 .00 $ 5,000 .00
Furnish and lnstal ADA Wheelchair Ramp $ 12.00 s 11 ,616 .00
Furnish and lnstan Walk $ 8.00 $ 1,876 .00
Furnish and Install Curb & Gutter $ 75 .00 $ 825 .00
Install 10' Pedestal Pole (City Furnished ) $ 500 .00 $ 1,000 .00
lnstan 24" Mast Arm (City Furnished ) $ 500 .00 $ 1,000 .00
Install 28' Mast Arm (City Furnished) $ 500 .00 $ 1,000 .00
lnstan 44" Mast Arm (City Furnished ) s 500 .00 $ 500 .00
lnstan 48" Mast Arm (City Furnished ) $ 500 .00 $ 500 .00
lnstaH Type 41 Signal Pole (City Furnished) $ 400 .00 $ 800 .00
Install Type 42 Si gnal Pole (City Furni shed) $ 500 .00 $ 1,000 .00
lnstan Type 43 Signa l Pole (City Furnished) $ 500 .00 $ 1,000 .00
Install 170E Controll er/Cabinet Ground-Mount (City Furnished) $ 1,500 .00 $ 1,500 .00
Install Signal -170 E Controller/Cabi net Pole-Mount (City Furnished) $ 1,500 .00 $ 1,500 .00
Install Signa~ 170E Controller/Cabinet, Conflict Monitor and Modem (City Furnished) $ 25 .00 $ 50.00
Insta ll Opticom Cable and Detectors ' s 500 .00 $ 1,000 .00
Remove Existing Sign Panels $ 10.00 $ 160 .00
Remove Existing Sidewalk $ 5.00 $ 375 .00
Remove Existing Curb Ramps $ 5.00 $ 1,200 .00
Remove Existing Curb and Gutter $ 10.00 $ 80 .00
Remove Existing Sign Posts $ 10.00 $ 10.00
TOTAL $ 124 ,300 .00
TRANSPOR TATION AND PUBLIC WORKS
BID TABULATION
Project: SIGNAL INSTALLATIONS AT THE INTERSECTIONS OF
BELKNAP ST AND GROVE; GROVE ST & W EATHERFORD
TPW Project Number: TPW-TS-2008--00026
DO E Project Number:
Bid Date: OCTOBER 9 , 2008
Advertised: SEPTEMBER 18 & SEPTEMBER 25 , 2008
WOR KI NG DA YS 45 2
64 0 E. Main 5 11 2 Sun Vall ey Or
Lancaste r, TX 751 4 8 Fort Worth , TX 78119
972-227-6888 817 -5 72-3 303
UN IT QTY DES CRIPTION UN IT PRICE BID UNIT PRI CE BID
LS Signal-Mobllization,..Service CS $ 5,541 .17 $ 5,541 .17 $ 16 ,000 .00 $ 16,000 .00
14 EA Furnish and Install Signal Head 3 Section Type A, Type B $ 774.48 $ 10 ,842.72 $ 650 .00 $ 9,100 .00
16 EA Furnish and Install International Pedestrian Signal Type P $ 601.49 $ 9,623 .84 $ 400 .00 $ 6,400 .00
5 EA Furnish and Install Ground Box with Lid and Apron-Large $ 770 .50 $ 3,852 .50 $ 1,100.00 $ 5,500 .00
6 EA Furnish and Install Ground box with Lid and Apron-Small $ 702 .92 $ 4,217 .52 $ 975 .00 $ 5,850 .00
150 LF Furnish and Install Conduit-Schedule 40 PVC 3" Open Cut $ 8.26 s 1,239 .00 $ 10.00 $ 1,500 .00
355 LF Furnish and Install Conduit-Schedule 40 PVC 2" Open Cut s 7.44 $ 2,641 .20 s 10.00 $ 3,550 .00
560 LF Furnish and Install Conduit-Schedule 40 , PVC 3" Bore s 17 .04 $ 9 ,542.40 $ 52 .00 $ 29 ,120.00
660 LF Furnish and Install Conduit-Schedule 40 , PVC 2" Bore $ 14 .87 $ 9,814 .20 $ 51 .00 $ 33 ,660 .00
40 LF Furnish and Install Condui t-Schedule RM , 2" $ 15 .14 $ 605 .60 $ 10.00 $ 400 .00
795 LF Furnish and Install Cable-20 Conductor #14 stranded Cable s 3.99 $ 3,172.05 $ 5.00 $ 3,975 .00
605 LF Fumsh and Install Cable-25 Conductor #19 Communications Cable $ 1.70 $ 1,028 .50 $ 6.00 $ 3,630 .00
420 LF Fumsh and Install Cable-Num 8 XHHW Black $ 1.55 $ 651 .00 $ 1.00 $ 420 .00
420 LF Furnish and Install Cable -Num 8 XHHW White $ 1.55 $ 651 .00 $ 1.00 $ 420 .00
1,765 LF Furnish and Install Cable-Num 8 Bare $ 1.39 $ 2,453 .35 $ 1.00 $ 1,765 .00
1,080 LF Furnish and Install Cable-Num 6 XHHW Black s 1.79 $ 1,933 .20 $ 1.00 $ 1,080 .00
685 LF Furnish and Install Cable-Num 6 XHHW White s 1.79 $ 1,226 .15 $ 1.00 $ 685 .00
2 EA Fumsh and Install Concrete Foundation Type 1 $ 703 .63 $ 1,407 .26 $ 550.00 $ 1,100.00
4 EA Furnish and Install Concrete Foundation Type 3 s 2,007 .34 $ 8,029 .36 $ 1,300 .00 $ 5,200 .00
2 EA Furnish and Install Concrete Foundation Type 4 s 2,677.68 $ 5,355 .36 $ 1,900 .00 $ 3,800 .00
2 EA Furnish and Install Base for 10' or 14' Pedestal Pote Assembly $ 379 .84 $ 759 .68 $ 400 .00 $ 800 .00
1 EA Furnish and Install Cabinet Concrete Foundation $ 1,959 .92 $ 1,959 .92 $ 1,700 .00 $ 1,700.00
2 EA Furnish and Install Pedestal Service $ 4,419 .56 $ 8,839 .12 $ 4,500.00 $ 9,000 .00
2 EA Furnish and Install Mast Arm Stabilizer $ 275 .75 $ 551 .50 s 650 .00 $ 1,300 .00
2 EA Traffic Signal Miscellaneous (Testing , etc .) $ 1,825 .24 $ 3,650.48 $ 1,100.00 $ 2,200 .00
968 SF Furnish and Install ADA Wheelchair Ramp $ 25 .34 $ 24 ,529 .12 $ 10.00 $ 9,680 .00
234 .5 SF Furnish and Install Walk $ 6.76 $ 1,585 .22 $ 8.00 $ 1,876 .00
11 LF Furnish and Install Curb & Gutter $ 24 .33 $ 267 .63 $ 50 .00 $ 550 .00
2 EA Install 10' Pedestal Pole (City Fumshed) $ 182 .52 $ 365 .04 $ 200.00 $ 400 .00
2 EA Install 24" Mast Arm (City Furnished) s 304 .21 $ 608.42 $ 200 .00 $ 400 .00
2 EA Install 28' Mast Arm (City Furnished) $ 304 .21 $ 608.42 $ 200 .00 s 400 .00
1 EA Install 44" Mast Arm (City Furnished) $ 304 .21 $ 304 .21 $ 550 .00 s 550 .00
1 EA Install 48" Mast Arm (City Furnished) $ 304.21 s 304 .21 $ 550 .00 s 550 .00
2 EA lnstan Type 41 Signal Pote (City Furnished) $ 456 .31 $ 912 .62 $ 200 .00 $ 400 .00
2 EA Install Type 42 Signal Pote (City Furnished) $ 456 .31 $ 912 .62 $ 200 .00 $ 400 .00
2 EA Install Type 43 Signal Pole (City Furnished) $ 456.31 $ 912 .62 $ 200.00 $ 400 .00
EA Install HOE Controller/Cabinet Ground-Mount (City Furnished) $ 365 .05 $ 365 .05 $ 900 .00 $ 900 .00
1 EA lnstan Signal -170E Controller/Cabine t Pole-Mount (City Furnished) s 365 .05 s 365 .05 $ 900 .00 $ 900 .00
2 EA Install Signa~ 170E Controller/Cabinet , Conflict Monitor and Modem (City Furnished ) $ 243 .36 $ 486 .72 $ 800 .00 $ 1,600 .00
2 LS Install Opticom Cable and Detectors $ 1,825 .24 $ 3,650.48 $ 1,300 .00 $ 2,600 .00
16 EA Remove Exsting Sign Panels $ 91 .26 $ 1,460 .16 $ 100 .00 $ 1,600 .00
75 SF Remove Exsting Sidewalk $ 6.76 s 507 .00 $ 5.00 $ 375 .00
240 SF Remove Exsting Curb Ramps s 10.14 $ 2,433 .60 $ 5.00 $ 1.200 .00
8 LF Remove Exsting Curb and Gutter $ 21.96 $ 175.68 $ 20 .00 $ 160.00
1 EA Remove Existing Sign Posts $ 73 .01 $ 73 .0 1 $ 100.00 $ 100.00
TOTAL $ 140.414 96 $ 173,19600
ADDENDUM'S :
M/WBE REQUIRED DOCUMENTATION RECEIPT
Transportation & Public Works
Official Date: .l~ _ _f lJL! 0 <fS Official Time:
Bid Date:
Project Name:
Project Manager:
Forms Submitted By
Name:
Company:
Received By:
j_Q_;_:t_;fil
S 1 §V'e,\ h s tctl.1G ~u--\_ Bel~ J6ro«-/~
t\o t'Y\U o &J -ha "-
'FO R T W ORTH
(.Hy of f on ~Vo rth
Mi~0 r!~Y ~!"'!d VVo~e ~ B u s ~P ess Ente qJr!se S p e cm c~t~ons
APP UC AT lO N OF PO U r. 'f
!f t he tcta! dc!!ar va!u2 cf the · contract !s $25,000 er mCre: t hs M!WBE goa! !s apPHcab ~e .
If the total doil ar va iu e of th e contract is iess tha n $2 5,000, t he MtVJBE goai is not ap p licab le.
POLICY STATEMENT
!t is th e pol icy of th e ~ity of Fo rt W orth to ensu re t he fu l! and eq uit a b le partici pat ion by Min onty a nd W omen Business
Enterprises (M/WBE ) in the procurement of all goods and services to t he Ci ty on a contractual basis . All requirements
and regulations stated in the City's current Minority and Women Business Enterprise Ordinance apply to this bid.
M/WBE PRO.JECT GOAL S
The City's M/WBE goal on this project is ----'-/ ..... / __ % of the total bid (Base bid applies t o Parks and Community Services).
COMPLIANCE TO BID SPECIF!CATlONS
On C ity contracts of $25 ,000 or mor~. bidders are required ·o comply w ith th e intent of the C ity 's M/VI/BE Ordinance by
either of the following:
~. Meet er 2::tc22d t~s :?!:C'Je st2teC ~!!.1'/'!SE f;C2!, er
2. Good Faith Effort documentation, or;
3. Waiver documentation, or;
4. Joint Venture.
1 . Subcontractor Uiiiizaiion Form, if goa i is
met or exceeded :
2. Good Faith Effort and Subcontractor
U :lizati on Form , if partic ipation is less an I stated goal:
3. Good Faith Effort and Subcontractor
Utilization Form, if no M/WBE participation :
4. Prime Contractor Waiver Form , if you will
perform all subcontracting/supplier work:
5. Joint Venture Form , if utilize a joint venture
to met or exceed qoal.
received by 5:00 p.m., five (5) Ciiy business days after U1e bid
opening date , exclusive of the bid opening date.
re ceived by 5 :00 p .m ., fi ve (5 ) City business days after the bid
, pening date , excl u s ive of the b id o pening date .
I received by 5:00 p.m., five (5) City business days after the bid
opening date , exclusive of the bid opening date.
received by 5:00 p .m., five (5) City business days after the bid
opening date , exclusive of the bid opening date.
received by 5:00 p.m., five (5) City business days after the bid
opening date, exclusive of the b id opening date .
FAILURE TO COMPLY WITH THE CITY'S M/WBE ORDINANCE, WILL RESULT I N THE BID BEING CONSIDERED .
NON-RESPONSIVE TO SPECIFICATIONS
Any questions, please contact the M/WBE Office at (817) 392-6104.
Re v. 11 /1/05
I
City of fort Worth
SubcontractorsJSu gpHers Utrnzatkm Form
ATIACHMENT 1A
P age 1 of 4
i PR!Ml:: CCMPA~J'f NAM::C:
I Dq~bl~ Spec;"Hie> Xrx,.
C!ieck ap~:;cab:~ tiicc~ !v jescribe µriiiie i
I
I PROJ ECT NAM E : , I M/vW DBE JJ,.--=-N~N-;1~~;-i
I ' r'ltil.kieJ :!i tr:>ec.-l,on~·.
BID DATE
I Cit'/ ~ .. 'lf"f-JBE Pr oject G oai: I Prime's Ml' 'iBE Projec, u.mzat :cn:
O/o %
lrliPntifv ::111 ~11hr.nntr::irtnr~/~11nnli1Pr~ uni 1 \A/ill 11~,::i. nn thi~ nrni,::i.rt ----·-··J ------··-·----·-·--.-.-··-·-J --..... ----·· -···-.-· -.1 ---
f ailt.ite · fo -com'~l~te this fo rm, in its entirety with requested documer,fatidn , · ana reee iveq "bf ttie Man~grng ·
pepatrm:ent ~-~prbefqte 5_:00 p. m : five (5) City business days afte(bi_d · ope.ning, e~clusive of bid ' openiritJdate.;-.
_will ,res-~ltin tftef bid being considered non-responsive to bid speeifiratipns ) ·~ ' '. ' . -' . ~--•'
The un d'ef sig~-ed Offerer agrees to ente r into a form al agreement with the iVl!WBE firm(s J listed ih; 'this -
_utiliza•ion sc..,_hedule , conditioned upon execution of a contract with the City of Fort Worth. The jnte_ntional
and/or kn owing misrepresentati on of facts is grounds for consideration of. disqualification and will result ifrthe
bid being considered non:-responsive to' bid specifications
M/WBEs li sted toward meeting the project goal must be lo ca ted in the nine (9) county marketplace or
currently doing bu s iness in th e marketpla ce at the time of bid . Marketplace is t he geographic area of Tarrant,
Parker, Johnson, Collin, Dallas , Denton, Ellis, Kaufman and Rockwall counties . ·
identify eac h Ti er leve l. Ti er is the leve l of subcontracting bel ow the prim e contract or, i.e ., a direct
payment from the prime con tractor to a subcontractor is considered 151 tier, a payment by a subcontractor to
its supplier is considered 2 nd tier
ALL Ml'N8Es MU ST BE CE RTIFI ED BEFORE CONTRACT AWARD.
Certification means th ose fi rms , lo ca ted or doing business at the tim e of bid opening within the Marketplace , th at have
been determined to be bonafide minority or wom en businesses by th e North Central Tex as Re g ional Certification
Agency (NCTRCA). or the Texas Department of Tra nsportat ion (TX DOT), highway division . Disadvantaged Business
En terp rise (DB E) is synonymous with Minority/Women Bus iress Enterprise (M /\J\/BE ).
If hauling services are utilized , the prime will be given credit as long as the M/WBE listed owns and
operates at least one fully licensed and operational truck to be used on the contract. The M/WBE may lease
trucks from another M/WBE firm, incl uding M/WBE owner-operators , and receive full M/WBE cred it The
M/WBE may lease trucks from non-M/WBEs , including owner-operators , but will only receive credit for the
I fee s and commissions ea rned by the M/WBE as ou tlin ed in the lease agreement. I
Rev. 5/30/03
ATTACHM ENT 1A
Paqe 2 of 4
Prinie:; a1e re lluire u lo iueniify AL L subcontraciorsisuppiiers, rega rdiess ci status; i.e ., iviino r ity, Women and non-iviiWBEs .
SU8C0NTRACTOR1SUPPLiER
Company Name
A-'-'----1"\UUl't:'~:>
TelephoneiFa:;i:
a.. ,e~
Po Box "1>4"1
8(.\t-elot10, '"
I I ?60'11 -aol./lf
I
I
l
I
I
I
I
Piease lisi iviiWBE firms first , us e add iiionai sheets ii necessary.
I I -!f" ,. -.
i ' Certiflca ,ion i 1 1
j ! /check one\ I O j
j ! i I I N I T ~I " i Detail j Detail j
I ~ I .. I ... I c I .X M ! SubcontractinQ Werk I Supplies Pu;chased l
i ;Ii ; I ~ i ~I g I: I -ii . . il.
E IE I ,I _ _ I
l I I I ·~ I I ! !:: ! ! !
Dollar Amount
I I I I Al I I I t \ j
I I I I I"' i;, s 1.'.I""' i $ J'f t> 15 !!!?..
ivf'i ij1thl"> ~ R-Jv,./t. · f
I I Sij~I }\~~;
I I I I I I l~wi.J t>c){~) I I I I I I I I
I I
I I I
I
I I
' ' I I I I
I I
I
I
I I
I I
I
I I I I
I I !
I I I I I
I
' I i i
I I I I I
Rev. 5/30/03
I I
I
I
I I
I
I
I
I
I
i
I
JP SALES
Date: Odober 08, 2008
QUOla Number: 1008-01 Revised
TO;
Durable Specialties. Inc.
Po Box 381788
Duncanville TX 75138
PH 9n-296-6324
fX 972-780-7411
Terma
Net30
lTEMNO. QTY
2 14
3 16
4 5
5 8
21 2
Quotation
CERIIFIED BY NCTRCA a TIJCP
..cTRCA DIIIIWBE CERTlFICATION HWFD8,....7Y0708
City of Fort Worth Project No _ TPW-TS-2008-00026
Signal Installations at the lntersectiOn of:
Baknap st and Grow st
Grove St. and Weatherford Sl
ShioDda
30-80 n-MO
ShlDVla
BastWav
DESCRJPTION UNIT UNITPRICE
3 Section Sianal Head 12" RYG -SSM_OO
lrype A T-B with LED lnwts
nlBmational Ped ~innal T-p 88 $295.00
with LEO insert
"'-.~ Boxwilh Lid ·La--$149.00
TweA 13 x 24 x 12
;....... H'inh v,.a-/Traffic Siana!
Box wilh Ud. Small ea $205.00
!rvue B 17 • 3Ch: 12
umum' Hiah V,._ I Traffic Sinn.al
~ -I Pole .. Basewilh ea $125.00
~Bolls
-Total
FOB
DestinaUon
lOTAL
$7 070_()()
~.720.00
S745.00
S17~-00
r.,50,00
$14015.00
GREAT AMERICAN INSURANCE COMPANY
OHIO
BID BOND
Approved by The American Institute of Architects, A.I.A. Document No . A3 l O February, 1970 Edit ion
Bond No. 16961
KNOW ALL MEN BY THESE PRESENTS : that we ___ D_u_r_a_b_l_e_S_p~e_c_i_a_l _t_i_e_s~, _l_n_c_. -----~-----------
as Principal, hereinafter called Principal, and GREAT AMERICAN INSURANCE COMPANY, a corporati o n duly o rganized under the laws of the S ta te of Ohio , with
Adm ini strative Offices at 580 Walnut Street, Cinc innati, Ohio 4 5202, as Surety. hereinafter call ed the S urety, are held fi rml y bound unto Cit Y Of Fort Worth
as Obli ge e, hereinafter cal led Ob li gee, in th e sum of 5 % o £ the greatest amount bid Dollars (S --------
Fo r the pay ment of which sum well and truly to be made, and t he said P rincipal and the sa id S urety, bind o urselves, our heirs, executors, administrators, successors and
assigns, join tly and severally, firm ly by these presents .
WHEREAS,thePrincipalhassubmittedabidfor Signal Installations at the Intersections of Belknap St.
and Grove St.; Grove St. and Weatherford St.
Project .No. TPW -TS -2008 -00026
NOW, THEREFORE, if the Obl igee shall accept the bid of the Principal a nd the Pr incipal sha ll e nt er into a Co ntra ct with the Obl igee in accordance wi th the terms of
such bid, and give s uch bo nd or bonds as may be spec ified in the bidding o r Contract Documents with good a nd sufficient surety fo r the faithful pe rformance of such
Contract and fo r the prompt payment of labor an d material furnished in the prosecution thereof, or in the event of the failure of the Principal to enter such Contract and
give such bond o r bonds, if the Principal shall pay to the O bligee the difference no t to exceed the penalty hereo f between the amount specified in .said b id and such
large r amount for whi ch the Ob ligee may in good faith contract with another Party to perfom1 the Wor k covered by sa id b id, then this obiigation shail be nuli anJ vo id,
otherwise to remain in fu ll force and effect.
Signed and sealed this 9th dayof October 2008
In the presence of:
Durq,b 1 e Specia lti es , Inc .
(Princip~ (Sea l)
/ ./:/
l..c ;.:.,__,,.,r"J ~ J (T itie j
?
,~ea!)
r_.....__,,_.-
Patricia A . (A~CITiCy-111 -f'ac~/
Bid Bonrl F9630a
GREAT AM ER ICAN IN SURA NC E COMPANY®
Administrative Office: 580WALNUT STREET 9 CINCINNATI, OHIO 45 202 • 5 13-369-5000 • FA X 5 13-723-2740
The number of persons amhorizecl by
thi s power o f attorney is no t more than THREE
No . 0 16961
POWER OF ATTORNEY
KNOW ALL MEN BY THESE PRESENTS : Th at the GREAT AMERICAN lNSURANCE COM PANY, a co rporation orga ni zed and exi sti ng under
aJ1l1 by virtue o l the laws o r the St.ate of Oh io , does here by nominate, constitute and appoint the person or persons named below its true and lawfu l attomey-in-
fact , fo r it a nd in its nam e. place and s tead to execut e in behalf of th e said Comp any. as s ur ety, an y and all bo nd s . undertaking s and co ntr acts of s uretys hip. o r
other wri tten obligati o ns in the nature thereof; provided that the liabilit y of the sai d Company o n any s uch bo nd . undertaking or co nt ract of suretys hip execu ted
under this auth o1it y shall not exceed the li mit stat ed below.
JACK M . CROWLE Y
WAYNE A . COBLE
PATRICIA A . SMITH
Na me Addre ss
ALL OF
ARLINGTON , TEXAS
Thi s Powt:r of Atto rn ey rev o ke s all p rev ious powe rs :ssu ccl in be half of the att orney (s)-in-fo c t name d a bo w.
Limit of Power
ALL
$75 ,000 ,000
I N WITNESS WHEREOF th e GREAT AMERICAN INSURANCE COMPANY ha s ca used these pre sents to he signed and :11te s1e ct hy i1 s appmpri atc
officers and its co rpo rate se al here unto affixed thi s 2ND da y of OCTOBER 2007
Attes t GREAT AMERICAN lNSU RANCE COMPANY
STATE OF OHIO, COUNTY OF HAMILTON _ ss: DAVID c. KITCH IN (513-41 2-4602)
On th is 2ND clay of OCTOBER 2007 , bel'o re me person all y a ppe ared DAVID C KIT CH I N, to me known ,
bei ng dul y swo rn, deposes a nd says that he res id es in Ci ncinn ati, Ohio, that he is the Divis ionai Senior Vi<.:e Frt:s iden l o r Lhe Bo nd D ivision uf G reat A merican
Insu rance Company, the Company de sc rib ed in and which executed th e ab ove inslrnm em ; that he know s the seal of the said Co mpan y; that the sea l aftixecl to the
said ins trument is su ch co rpo rate se al ; th at it was so a ffi xe d by a uth ority of hi s office under the. By-Laws o f sa id Company, a nd th at he signed his name the reto
by lik e authority.
Thi s Power of Att o rn ey is gra nted by a uth o1ity of the fo ll ow ing reso lutions adop ted by the Boa rd of D irecto rs of Grea t Ameri can Ins urance Company
by una nimo us writte n conse nt da ted Marc h I , 1993.
RESOLVED: Thar tir e Divis ional Presidenr. th e Divis ional Senior Vic e Pres idem. tire several Divisional Vic e Pres idenrs and Divisunal Assistant Vice
Preside Ill s, or any one of them. be and hereby is aurh orice d , fro m time ro rime. ro appoin r o ne o r m o re Attomevs-in-Fact to execu te on helwlf of tlw Cmnpnnv,
as sure/}\ any and a ll bonds, u.11derwkings and contracts of su.retyslt ip, o r other written ob!iga1 io11s in the nature 1l1ereof-to prescribe tl,eir re.,p ective duties and
the respeciive li;;1its uf th,:ir ,.,,uthudty: u iid iu ,e110/...e llllY .,uch llfl/JUi11 t 111e11 1 at any rin1t!.
RESOLVE[) FURTHER: That !h!: C(1!!?J1 (!!1 )' 5e fl! and th e sig.1!C!!!1:·e [,'f an y :,,f rh r: c:fi"J :-r.::;aid ojJic ::.··:; ;::;d c.:ry Stcr::l:,:ry c ;· /t :;:;/:;tLin: S e,.-;·c~:t.i ;-:,· ,·;f i'li c·
Co11.1J1any 1_11ay be affixed by ji:,cs imile to any power of a rtomey o r ce rtifica te of eith er given .fiH the execurion of any bond, undertaking, contract ur .mrery ship,
or mher wrinen obiigu tion in the nature there 1~f; such signa ture and seal when so used being hereby adopted by th e Co 111panv as the original .,·ignarure of.rn ch
,~tficer and rhe o rig in al seal qf rlre Co111pa11 y. to he valid and binding 1.rp011 the Co r11pa11y wirh th e smne fr1rc e and e ffect as !!tou g h mumwll\' a ffi xed.
CERTIFJ CATTON
r RON.A I )J (' H t.l. v r.". ,.\ ,,l,1:m1 ~,~c ,··~r~r)' nf G r~_:-:~t A!111~r ic n li 1'.':u r~u1 c~ 1:~~:!1;):~!'!)', :.!8 t~!·d ~j ' ~~:-~::·:., ~~:.:~ ~!1 c ~·c :·c;;c i::b f)cv::::-c : .'\.:t c 1:1c y :iiiC: ::~c.
Re solutions o f the Board of Di ree l or, ,l i' tvhm:ii i 9 9 , have no! hl·,·n rev oked and are now in foii fo rce and effec t.
Signed and sc aled thi s 9 t h October 2008
S1 029W (6/07)
PARTC
GENERAL CONDITIONS
See city of Port Worth Standard Specifications For Street and Storm Drain Construction.
PARTD
SPECIAL PROVISIONS
SPECIAL PROVISIONS FOR
STREET AND STORM DRAIN IMPROVEMENTS
Table of Contents
1. SCOPE OF WORK .................................................................................................... SP-4
2. AWARD OF CONTRACT .......................................................................................... SP-4
3. PRE CONSTRUCTION CONFERENCE ..................................................................... SP-4
4. EXAMINATION OF SITE .......................................................................................... SP-5
5. BID SUBMITTAL ....................................................................................................... SP-5
6. WATER FOR CONSTRUCTION ............................................................................... SP-5
7. SANITARY FACILITIES FOR WORKMERS .............................................................. SP-5
8. PAYMENT ................................................................................................................. SP-5
9. SUBSIDIARY WORK ................................................................................................. SP-5
10. LEGAL RELATIONS AND RESPONSIBILITIES
TO THE PUBLIC ........................................................................................................ SP-6
11. WAGE RATES .......................................................................................................... SP-6
12. EXISTING UTILITIES ................................................................................................. SP-7
13. PARKWAY CONSTRUCTION ................................................................................... SP-7
14. MATERIAL STORAGE .............................................................................................. SP-7
15. PROTECTION OF EXISTING UTILITIES
AND IMPROVEMENTS ............................................................................................. SP-7
16. INCREASE OR DECREASE IN QUANTITIES ........................................................... SP-8
17. CONTRACTORS RESPONSIBILITY FOR DAMAGE CLAIMS .................................. SP-8
18. EQUAL EMPLOYMENT PROVISIONS ...................................................................... SP-8
19. MINORITY AND WOMENS BUSINESS ENTERPRISE
(M/WBE) COMPLIANCE ........................................................................................... SP-9
20 . FINAL CLEAN UP ..................................................................................................... SP-10
21 . CONTRACTOR'S COMPLIANCE WITH WORKER'S
COMPENSATION LAW ........................................................................................... SP-10
22. SUBSTITUTIONS ..................................................................................................... SP-13
23. MECHANICS AND MATERIALSMEN'S LIEN ........................................................... SP-14
24. WORK ORDER DELAY ........................................................................................... SP-14
25. WORKING DAYS .................................................................................................... SP-14
26. RIGHT TO ABANDON ............................................................................................. SP-14
27. CONSTRUCTION SPECIFICATIONS ..................................................................... SP-14
28 . MAINTENANCE STATEMENT ................................................................................ SP-14
29. DELAYS ....................................................................................................... SP-14
30. DETOURS AND BARRICADES ............................................................................... SP -15
31 . DISPOSAL OF SPOIUFILL MATERIAL ............................................................ : ..... SP-15
32. QUALITY CONTROL TESTING .............................................................................. SP-15
33. PROPERTY ACCESS ............................................................................ : ................ SP-16
34. SAFETY RESTRICTIONS -WORK NEAR HIGH VOLTAGE LINES ...................... SP-16
35. WATER DEPARTMENT PRE-QUALIFICATIONS ................................................... SP-17
36. RIGHT TO AUDIT .................................................................................................... SP-17
37 . CONSTRUCTION STAKES ..................................................................................... SP-17
38 . LOCATION OF NEW WALKS AND DRIVEWAYS ................................................. SP-18
39. EARLY WARNING SYSTEM FOR CONSTRUCTION .............................................. SP-18
40. AIR POLLUTION WATCH DAYS ............................................................................. SP-18
06/20/08 SP -1
SPECIAL PROVISIONS FOR
STREET AND STORM DRAIN IMPROVEMENTS
Table of Contents
CONSTRUCTION ITEMS:
41.
42.
43.
44.
45.
46.
47.
48.
49.
50.
51.
52.
54.
55.
56.
57.
58.
59.
60.
61 .
62.
63.
64.
65 .
66.
67.
68.
69.
70.
71 .
72.
PAY ITEM-
PAY ITEM-
PAY ITEM-
PAY ITEM-
PAY ITEM-
PAY ITEM-
PAY ITEM-
PAY ITEM-
PAY ITEM-
PAY ITEM-
UNCLASSIFIED STREET EXCAVATION ....................................... SP-19
6" REINFORCED CONCRETE PAVEMENT ................................... SP-19
SILICONE JOINT SEALING ........................................................... SP-21
7" CONCRETE CURB .................................................................... SP-25
RETAINING WALL ......................................................................... SP-25
REPLACE EXIST. CURB AND GUTIER ....................................... SP-25
HMAC TRANSITION ...................................................................... SP-25
6" PIPE SUBDRAIN ........................................................................ SP-25
TRENCH SAFETY ............................. :: ........................................... SP-26
8" THICK LIME STABILIZED SUBGRADE AND CEMENT FOR
SUBGRADE STABILIZATION ....................................................... SP-26
PAY ITEM-6" HMAC PAVEMENT (THICKNESS TOLERANCES AND HMAC
TESTING PROCEDURES) ............................................................. SP-26
PAY ITEM -CONCRETE FLAT WORK (CURB, CURB & GUTIER,
SIDEWALKS, LEADWALKS, WHEELCHAIR RAMPS AND
DRIVEWAYS) ................................................................................. SP-27
53. PAY ITEM-REMOVE EXISTING CONCRETE SIDEWALK, DRIVEWAYS,
PAY ITEM-
PAY ITEM-
PAY ITEM-
PAY ITEM-
PAY ITEM-
PAY ITEM-
PAY ITEM-
PAY ITEM-
PAY ITEM-
PAY ITEM-
PAY ITEM-
PAY ITEM-
PAY ITEM-
PAY ITEM-
STEPS, LEADWALKS AND WHEELCHAIR RAMPS ..................... SP-2.8
REMOVE EXISTING CURB AND GUTIER ................................... SP-28
REMOVE EXISTING CURB INLET ................................................ SP-28
6" REINFORCED CONCRETE DRIVEWAY ................................... SP-28
REMOVE AND CONSTRUCT CONCRETE STEPS ....................... SP-28
4' STANDARD CONCRETE SIDEWALK, LEADWALK AND
WHEELCHAIR RAMP .................................................................... SP-29
REMOVE AND REPLACE FENCE ................................................. SP-29
STANDARD 7" CURB AND 18" GUTIER. ...................................... SP-30
REMOVE AND RECONSTRUCT MAILBOXES/MISCELLANEOUSSP-30
BORROW ....................................................................................... SP-30
CEMENT STABILIZATION ............................................................. SP-30
CEMENT ........................................................................................ SP-30
NEW 7" CONCRETE VALLEY GUTTER ........................................ SP-30
STORM DRAIN INLETS ................................................................. SP-31
TRENCH EXCAVATION AND BACKFILL
FOR STORM DRAIN ...................................................................... SP-31
PAY ITEM-STORM WATER POLLUTION PREVENTION (FOR DISTURBED
AREAS EQUAL TO OR GREATER THAN 1 ACRE) ...................... SP-31
PRE BID ITEM -PROJECT DESIGNATION SIGN ................................................... SP-33
PRE BID ITEM -UTILITY ADJUSTMENT ................................................................ SP-34
PRE BID ITEM -TOP SOIL ...................................................................................... SP-34
PRE BID ITEM -ADJUST WATER VALVE BOX ...................................................... SP-34
06/20/08 SP-2
73.
74.
75.
76.
77.
78.
79.
80.
81 .
82.
83.
84.
85.
86.
87.
88.
89.
90.
91 .
92.
SPECIAL PROVISIONS FOR
STREET AND STORM DRAIN IMPROVEMENTS
Table of Contents
PRE BID ITEM -
PRE BID ITEM -
NON-PAY ITEM -
NON-PAY ITEM -
NON-PAY ITEM-
NON-PAY ITEM -
NON-PAY ITEM-
NON-PAY ITEM -
NON-PAY ITEM -
NON-PAY ITEM -
NON-PAY ITEM -
NON-PAY ITEM-
NON-PAY ITEM -
NON-PAY ITEM-
NON-PAY ITEM -
NON-PAY ITEM -
NON-PAY ITEM -
NON-PAY ITEM -
MANHOLE ADJUSTMENT ....................................................... SP-34
ADJUST WATER METER BOX ................................................ SP-36
CLEARING AND GRUBBING ................................................... SP-36
SPRINKLING FOR DUST CONTROL. ...................................... SP-36
PROTECTION OF TREES, PLANTS AND SOILS .................... SP-36
CONCRETE COLORED SURFACE ........................................ SP-36
PROJECT CLEAN-UP .............................................................. SP-37
PROJECT SCHEDULE ............................................................. SP-37
NOTIFICATION OF RESIDENTS ............................................. SP-37
PUBLIC NOTIFICATION PRIOR TO
BEGINNING CONSTRUCTION ............................................... SP-37
PRE-CONSTRUCTION NEIGHBORHOOD MEETING ............ SP-38
WASHED ROCK ...................................................................... SP-38
SAWCUT OF EXISTING CONCRETE ...................................... SP-38
LOCATION AND EXPOSURE OF MANHOLES
AND WATER VALVES ............................................................. SP-38
TIE-IN INTO STORM DRAIN STRUCTURE ............................. SP-39
SPRINKLER HEAD ADJUSTMENT .......................................... SP-39
FEE FOR STREET USE PERMITS AND RE-INSPECTIONS ... SP-39
TEMPORARY EROSION, SEDIMENT AND WATER
POLLUTION CONTROL (FOR DISTURBED AREAS LESS
THAN 1 ACRE) ......................................................................... SP-40
NON-PAY ITEM -'GREEN' CEMENT POLICY ...................................................... SP-41
PAY ITEM -TRAFFIC CONTROL ............................................................... SP-41
06/20/08 SP-3
SPECIAL PROVISIONS
FOR
STREET AND STORM DRAIN IMPROVEMENTS
FOR: SIGNAL INSTALLATIONS AT CITY PROJECT NO .: TPW-TS-2008-00026
THE INTERSECTIONS OF:
BELKNAP ST. AND GROVE ST.
GROVE ST. AND WEATHERFORD ST.
1. SCOPE OF WORK: The work covered by these plans and specifications consist of the
following: Construction of Traffic Signals and all other miscellaneous items of
construction to be performed as outlined in the plans and specifications which are
necessary to sat isfactorily complete the work.
2. AWARD OF CONTRACT: Submission of Bids: Unit 1 and Unit II constitute a package . If
the Contractor submits a bid on both Unit 1 and Unit II and has the lowest responsive
proposal price, the Contractor will be the apparent successful bidder for this project. The
Contractor can bid either the HMAC alternate and/or the Concrete alternate. The
additive alternate must be included in any bid .
Bidders are hereby informed that the Director of the Engineering Department reserves
the right to evaluate and recommend to the City Council the best bid that is considered to
be in the best interest of the City .
3 . PRECONSTRUCTION CONFERENCE : The successful Contractor, Engineer, and City -
City shall meet at the call of the City for a preconstruction conference before any of its
work begins on this project. At this time , details of sequencing of the work, contact
06/20/08 SP-4
individuals for each party, request for survey , and pay requests will be covered. Pr ior to
the meeting, the Contractor shall prepare schedules showing the sequencing and
progress of their work and its effect on others. A final composite schedule will be
prepared during this conference to allow an orderly sequence of project construction . As
used he rein, the term "Engineer" shall mean the design engineer who prepared and
sealed the plans , specifications and contract documents for this project.
4. EXAMINATION OF SITE: It shall be the responsibility of the prospective bidder to visit
the project site and make such examinations and explorations as may be necessary to
determine all conditions that may affect construction of this project. Particular attention
should be given to methods of providing ingress and egress to adjacent private and
public properties , procedures for protecting existing improvements and disposition of all
materials to be removed. Proper consideration should be given to these details during
preparation of the Proposal and all unusual conditions that may give rise to later
contingencies should be brought to the attention of the City prior to the submission of the
Proposal.
During the construction of this project, it is required that all parkways be excavated and
shaped including bar ditches at the same time the roadway is excavated . Excess
excavation will be disposed of at locations approved by the Engineer. During construction
of this project , the Contractor shall comply with present zoning requirements of the City
of Fort Worth in the use of vacant property for storage purposes .
5 . BID SUBMITTAL : Bidders shall not separate, detach or remove any portion , segment or
sheets from the contract documents at any time . Failure to bid or fully execute contract
without retaining contract documents intact may be grounds for designating bids as "non-
responsive " and rejecting bids as appropriate and as determined by the Director of the
Engineering Department.
6. WATER FOR CONSTRUCTION : Water for construction will be furnished by the
Contractor at his own expense.
7. SANITARY FACILITIES FOR WORKERS : The Contractor shall provide all necessary
conveniences for the use of workers at the project site. Specific attent ion is directed to
this equipment.
8. PAYMENT : The Contractor shall receive full payment from the City for all the work
based on unit prices bid on the proposal and specified in the plans and specifications
and approved by the Engineer per actual field measurement.
9. SUBSIDIARY WORK : Any and all work specifically governed by documentary
requirement for the projects , such as conditions imposed by the Plans , the General
Contract Documents or these special Contract Documents , in which no specific item for
bid has been provided for in the Proposal , shall be considered as a subsid iary item or
work , the cost of which shall be included in the price bid in the Proposal for each bid
item, including but not limited to surface restoration cleanup and relocation of ma ilboxes .
All objectionable matter required to be removed from within the right-of-way and not
particularly described under these specifications shall be covered by Item No . 102
"Clearing and Grubbing " and shall be subsidiary to the other items of the contract.
06/20/08 SP-5
10. LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC : The Contractor's
particular attention is directed to the requirements of Item 7, "Legal Relations and
Responsibilities to the Public" of the "Standard Specifications for Street and Storm Drain
Construction".
11 . WAGE RATES :
Compliance with and Enforcement of Prevailing Wage Laws
Duty to pay Prevailing Wage Rates.
The contractor shall comply with all requirements of Chapter 2258, Texas Government
Code (Chapter 2258), including the payment of not less than the rates determined by the
City Council of the City of Fort Worth to be the prevailing wage rates in accordance with
Chapter 2258. Such prevailing wage rates are included in these contract documents .
Penalty for Violation.
A contractor or any subcontractor who does not pay the prevailing wage shall, upon
demand made by the City, pay to the City $60 for each worker employed for each
calendar day or part of the day that the worker is paid less than the prevailing wage rates
stipulated in these contract documents. This penalty shall be retained by the City to
offset its administrative costs , pursuant to Texas Government Code 2258 .023 .
Complaints of Violations and City Determination of Good Cause .
On receipt of information, including a complaint by a worker, concerning an alleged
violation of 2258 .023 , Texas Government Code, by a contractor or subcontractor, the
City shall make an initial determination, before the 31st day after the date the City
receives the information , as to whether good cause exists to believe that the violation
occurred. The City shall notify in writing the contractor or subcontractor and any affected
worker of its initial determination. Upon the City's determination that there is good cause
to believe the contractor or subcontractor has violated Chapter 2258, the City shall retain
the full amounts claimed by the claimant or claimants as the difference between wages
paid and wages due under the prevailing wage rates , such amounts being subtracted
from successive progress payments pending a final determination of the violation .
Arbitrat ion Required if Violation Not Resolved .
An issue relat ing to an alleged violation of Section 2258 .023 , Texas Government Code,
including a penalty owed to the City or an affected worker, shall be submitted to binding
arbitration in accordance with the Texas General Arb itrat ion Act (Article 224 et seq.,
Revised Statutes) if the contractor or subcontractor and any affected worker do not
resolve the issue by agreement before the 15th day after the date the City makes its
initial determination pursuant to paragraph (c) above . If the persons required to arbitrate
under this section do not agree on an arbitrator before the 11th day after the date that
arb itration is required, a district court shall appoint an arbitrator on the petition of any of
the persons . The City is not a party in the arbitration . The decision and award of the
arbitrator is final and binding on all parties and may be enforced in any court of
competent jurisdiction .
06 /20/08 SP -6
-
Records to be Maintained.
The contractor and each subcontractor shall , for a period of three (3) years following the
date of acceptance of the work, maintain records that show (i) the name and occupation
of each worker employed by the contractor in the construction of the work provided for in
this contract; and (ii) the actual per diem wages paid to each worker. The records shall
be open at all reasonable hours for inspection by the City . The provisions of the Audit
section of these contract documents shall pertain to this inspection .
Pay Estimates.
With each partial payment estimate or payroll period , whichever is less, the contractor
shall submit an affidavit stating that the contractor has complied with the requirements of
Chapter 2258 , Texas Government Code .
Posting of Wage Rates .
The contractor shall post the prevailing wage rates in a conspicuous place at the site of
the project at all times.
Subcontractor Compliance.
The contractor shall include in its subcontracts and/or shall otherwise require all of its
subcontractors to comply with paragraphs (a) through (g) above .
(Wage rates are attached at the end of this section .)
12 . EXISTING UTILITIES : The locations and dimensions shown on the plans relative to
existing utilities are based on the best information available . It shall be the Contractor's
responsibility to verify location of adjacent and/or conflicting utilities sufficiently in
advance of construction in order that he may negotiate such local adjustments as are
necessary in the construction process in order to provide adequate clearance . The
Contractor shall take all necessary precautions in order to protect all services
encountered .
Any damage to utilities and any losses to the utility City due to disruption of service
resulting from the Contractor's operations shall be at the Contractor's expense .
13. PARKWAY CONSTRUCTION : During the construction of th is project , it will be required
that all parkways be excavated and shaped at the same time the roadway is excavated .
Excess excavation will be disposed of at locations approved by the Director of the
Engineering Department.
14. MATERIAL STORAGE: Material shall not be stored on private property unless the
Contractor has obtained permission from the property City.
15. PROTECTION OF EXISTING UTILITIES AND IMPROVEMENTS : The Contractor shall
take adequate measures to protect all existing structures, improvements and utilities ,
which may be encountered .
The utility lines and conduits shown on the plans are for information only and are not
guaranteed by the City or the Engineer to be accurate as to extent , location and depth ,
they are shown on the plans as the best information available at the time of design , from
the Owners of the utilities involved and from evidences found on the ground .
06/20/08 SP-7
16. INCREASE OR DECREASE IN QUANTITIES : The quantities shown in the Proposal are
approximate. It is the Contractor's sole responsibility to verify all the minor pay item
quantities prior to submitting a bid . No additional compensation shall be paid to
Contractor for errors in the quantities. Final payment will be based upon field
measurements . The City reserves the right to alter the quantities of the work to be
performed or to extend or shorten the improvements at any time when and as found to
be necessary, and the Contractor shall perform the work as altered , increased or
decreased at the unit prices as established in the contract documents . No allowance will
be made for any changes in anticipated profits or shall such changes be considered as
waiving or invalidating any conditions or provisions of the Contract Documents .
Variations in quantities of storm drain pipes in depth categories shall be interpreted
herein as applying to the overall quantities of storm drain pipe in each pipe size but not to
the various depth categories .
17 . CONTRACTOR'S RESPONSIBILITY FOR DAMAGE CLAIMS: Contractor Covenants
and agrees to indemnify City's Engineer and Architect , and their personnel at the project
site for Contractor's sole negligence . In addition , Contractor covenants and agrees to
indemnify, hold harmless and defend, at its own expense , the City , its officers, servants
and employees, from and against any and all claims or suits for property loss, property
damage, personal injury, including death , arising out of, or alleged to arise out of, the
work and services to be performed hereunder by Contractor, its officers , agents,
employees, subcontractors , licensees or invitees , whether or not any such injury,
damage or death is caused, in whole or in part, by the negligence or alleged
negligence of City, its officers, servants, or employees. Contractor likewise
covenants and agrees to indemnify and hold harmless the City from and against any and
all injuries to City 's officers, servants and employees and any damage , loss or
destruction to property of the City arising from the performance of any of the terms and
conditions of this Contract, whether or not any such injury or damage is caused in
whole or in part by the negligence or alleged negligence of City, its officers,
servants or employees .
In the event City receives a written claim for damages against the Contractor or its
subcontractors prior to final payment , final payment shall not be made until Contractor
either (a) subm its to City satisfactory evidence that the claim has been settled and/or a
release from the claimant involved , or (b) provides Ci ty with a letter from Contractor's
liabil ity insurance carrier that the claim has been referred to the insurance carrier .
The Director may , if deemed appropriate, refuse to accept bids on other City of Fort
Worth public work from a Contractor against whom a claim for damages is outstanding
as a result of work performed under a City Contract.
18 . EQUAL EMPLOYMENT PROVISIONS : Contractor shall comply with City Ordinance
Number 7278 as amended by City Ordinance Number 7400 (Fort Worth City Code
Sections 13-A-21 through 12 -A-29) prohibiting d iscriminat ion in employments practices .
The Contractor shall post the required notice to that effect on the project site, and at his
request , will be provided by assistance by the City of Fort Worth 's Equal Employment
Officer who will refer any qualified applicant he may have on file in his office to the
Contractor. Appropriate notices may be acquired from the Equa l Employment Officer.
06/20/08 SP-8
19. MINORITY AND WOMEN BUSINESS ENTERPRISE (M/WBE) COMPLIANCE: In
accordance with City of Fort Worth Ordinance No. 15530, the City has goals for the
participation of minority business enterprises and women business enterprises in City
contracts. The Ordinance is incorporated in these specifications by reference. A copy of
the Ordinance may be obtained from the Office of the City Secretary. Failure to comply
with the ordinance shall be a material breach of contract.
M/WBE UTILIZATION FORM, M/WBE GOALS WAIVER FORM AND GOOD FAITH
EFFORT FORM, as applicable, must be submitted within fine (5) city business days after
bid opening . Failure to comply shall render the bid non-responsive.
Upon request, Contractor agrees to provide the City complete and accurate information
regarding actual work performed by a Minority or Women Business Enterprise (M/WBE)
on the contract and payment thereof. Contractor further agrees to permit an audit and/or
examination of any books, records or files in its possession that will substantiate the
actual work performed by an MBE and/or WBE. The misrepresentation of acts (other
than a negligent misrepresentation) and /or the commission fraud by the Contractor will
be grounds for termination of the contract and/or initiating action under appropriate
federal, state, or local laws or ordinances relating to false statement. Further, any such
misrepresentation (other than a negligent misrepresentation) and/or commission of fraud
will result in the Contractor being determined to be irresponsible and barred from
participating in City work for a period of time not less than three years.
The City will consider the Contractor's performance regarding its M/WBE program in the
evaluation of bids . Failure to comply with the City's M/WBE Ordinance, or to
demonstrate "good faith effort", shall result in a bid being rendered non -responsive to
specifications .
Contractor shall provide copies of subcontracts or co-signed letters of intent with
approved M/WBE subcontractors prior to issuance of the Notice to Proceed. Contractor
shall also provide monthly reports on utilization of the subcontractors to the City's
M/WBE office .
The Contractor may count first and second tier subcontractors and/or suppliers toward
meeting the goals. The Contractor may count toward its goal a portion of the total dollar
amount of the contract with a joint venture equal to the percentage of the M/WBE
participation in the joint venture for a clearly defined portion of the work to be performed .
All M/WBE Contractors used in meeting the goals must be certified prior to the award of
the Contract. The M/WBE Contractor(s) must be certified by either the North Central
Texas Regional Certification Agency (NCTRCA) or Texas Department of Transportation
(TxDOT), Highway Division and must be located in the nine (9) county marketplace or
currently doing business in the marketplace at time of bid. The Contractor shall contact
all such M/WBE subcontractors or suppliers prior to listing them on the M/WBE utilization
or good faith effort forms as applicable . Failure to contact the listed M/WBE
subcontractor or supplier prior to bid opening may result in the rejection of bid as non-
responsive .
Whenever a change order affects the work of an M/WBE subcontractor or supplier, the
M/WBE shall be given an opportunity to perform the work . Whenever a change order
exceeds 10% of the original contract, the M/WBE coordinator shall determine the goals
applicable to the work to be performed under the change order .
06/20/08 SP-9
During the term of the contract the contract shall :
1. Make no unjustified changes or deletions in its M/WBE participation
commitments submitted with or subsequent to the bid , and,
2. If substantial subcontracting and/or substantial supplier opportunities arise
during the term of the contract which the Contractor had represented he
would perform with his forces, the Contractor shall notify the City before
subcontracts or purchase orders are let, and shall be required to comply with
modifications to goals as determined by the City, and ,
3. Submit a REQUEST FOR APPROVAL OF CHANGE FORM, if the Contractor
desires to change or delete any of the M/WBE subcontractors or suppliers .
Justification for change may be granted for the following :
a. Failure of Subcontractor to provide evidence of coverage by Worker's
Compensation Insurance.
b. Failure of Subcontractor to provide required general liability of other
insurance.
c. Failure of Subcontractor to execute a standard subcontract form in the
amount of the proposal used by the Contractor in preparing his M/WBE
Participation plan.
d. Default by the M/WBE subcontractor or supplier in the performance of
the subcontractor.
Within ten (10) days after final payment from the City, the Contractor shall
provide the M/WBE Office with documentation to reflect final participation of
each subcontractor and supplier used on the project, inclusive of M/WBEs .
20. FINAL CLEAN-UP : Final cleanup work shall be done for this project as soon as the
paving and curb and gutter has been completed. No more than seven days shall elapse
after completion of construction before the roadway and ROW . is cleaned up to the
satisfaction of the Engineer. The Contractor shall make a final cleanup of all parts of the
work before acceptance by the City or its representative . This cleanup shall include
removal of all objectionable rocks, pieces of asphalt or concrete and other construction
materials, and in general preparing the site of the work in an orderly manner and
appearance.
21 . CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW:
A. Workers Compensation Insurance Coverage
a . DEFINITIONS :
b. Certification of coverage ("Certificate"). A copy of a certificate of insurance , a
cert ificate of authority to self-insure issued by the commission , or a coverage
agreement (TWCC-81 , TWCC -82, TWCC-83 , OR TWCC-84), showing statutory
workers' compensation insurance coverage for the person's or entity's employees
06/20/08 SP-10
providing services on a project, for the duration of the project. Duration of the project-
includes the time from the beginning of the work on the project until the
Contractor's/person's work on the project has been completed and accepted by the
governmental entity.
Persons providing services on the project ("subcontractor" in §406.096)-includes all
persons or entities performing all or part of the services the Contractor has undertaken
to perform on the project, regardless of whether that person contracted directly with the
Contractor and regardless of whether that person has employees . This includes,
without limitation, independent Contractors , subcontractors , leasing companies , motor
carriers , City-operators, employees of any such entity, or employees of any entity which
furnishes persons to provide services on the project. "Services" include , without
limitation, providing, hauling, or delivering equipment or materials, or providing labor,
transportation, or other services related to a project. "Services" does not include
activities unrelated to the project, such as food/beverage vendors , office supply
deliveries , and delivery of portable toilets .
The Contractor shall provide coverage, based on proper reporting of classification
codes and payroll amounts and filing of any coverage agreements , which meets the
statutory requirements of Texas Labor Code , Section 401 .011 (44) or all employees of
the Contractor providing services on the project, for the duration of the project.
c . The Contractor must provide a certificate of coverage to the governmental entity prior to
being awarded the contract.
d . If the coverage period shown on the Contractor's current certificate of coverage ends
during the duration of the project , the Contractor must , prior to the end of the coverage
period, file a new certificate of coverage with the governmental entity showing that
coverage has been extended .
e . The Contractor shall obtain from each person providing services on a project, and
provide to the governmental entity :
(1) a certificate of coverage , prior to that person beginning work on the
project , so the governmental entity will have on file certificates of
coverage showing coverage for all persons providing services on the
project ; and
(2) no later than seven days after receipt by the Contractor , a new
cert ificate of coverage showing extension of coverage , if the coverage
period shown on the current certificate of coverage ends during the
duration of the project.
f . The Contractor shall retain all required certificates of coverage for the duration of the
project and for one year thereafter .
g . The Contracto r shall not ify the governmental entity in writing by certi fi ed mail or
personal delivery , within ten ( 10) days after the Contractor knew or should have known ,
or any change that ma terially affects the provision of coverage of any person providing
services on the project.
06/20/08 SP -11
h. The Contractor shall post on each project site a notice, in the text, form and manner
prescribed by the Texas Worker's Compensation, informing all persons providing
services on the project that they are required to be covered, and stating how a person
may verify coverage and report lack of coverage.
i. The Contractor shall contractually require each person with whom it contracts to provide
services on a project, to:
06/20/08
(1) provide coverage, based on proper reporting on classification codes
and payroll amounts and filing of any coverage agreements, which
meets the statutory requirements . of Texas Labor Code, Section
401.011 (44) for all of its employees providing services on the project,
for the duration of the project;
(2) provide to the Contractor, prior to that person beginning work on the
project, a certificate of coverage showing that coverage is being
provided for all employees of the person providing services on the
project, for the duration of the project;
(3) provide the Contractor, prior to the end of the coverage period, a new
certificate of coverage showing extension of coverage, if the coverage
period shown on the current certificate of coverage ends during the
duration of the project;
(4) obtain form each other person with whom it contracts, and provide to
the Contractor:
(a)
(b)
(c)
{d)
(e)
a certificate of coverage, prior to the other person beginning
work on the project; and
a new certificate of coverage showing extension of coverage,
prior to the end of the coverage period, if the coverage period
shown on the current certificate of coverage ends during the
duration of the project;
retain all required certificates of coverage on file for the
duration of the project and for one year thereafter.
notify the governmental entity in writing by certified mail or
personal delivery, within ten (10) days after the person knew or
should have known, of any change that materially affects the
provision of coverage of any person providing services on the
project; and
contractually require each person with whom it contracts, to
perform as required by paragraphs (1 )-(7), with the certificates
of coverage to be provided to the person for whom they are
providing services .
SP-12
B.
j.
k.
By signing this contract or providing or causing to be provided a certificate of
coverage, the Contractor is representing to the governmental entity that all
employees of the Contractor who will provide services on the project will be
covered by worker's compensation coverage for the duration of the project,
that the coverage will be based on proper reporting of classification codes and
payroll amounts, and that all coverage · agreements will be filed with
appropriate insurance carrier or, in the case of a self-insured , with the
commission's Division of Self-Insurance Regulation. Providing false or
misleading information may subject the Contractor to administrative, criminal,
civil penalties or other civil actions .
The Contractor's failure to comply with any of these provisions is a breach of
contract by the Contractor which entitles the governmental entity to declare
the contract void if the Contractor does not remedy the breach within ten day
after receipt of notice of breach from the governmental entity.
The Contractor shall post a notice on each project site informing all persons
providing services on the project that they are required to be covered, and
stating how a person may verify current coverage and report failure to provide
coverage . This notice does not satisfy other posting requirements imposed
by the Texas Worker's Compensation Act or other Texas Worker's
Commission rules. This notice must be printed with a title in at least 30 point
bold type and text in at least 19 point normal type , and shall be in both English
and Spanish and any other language common to the Worker population. The
text for the notices shall be the following text , without any additional words or
changes:
"REQUIRED WORKER'S COMPENSATION COVERAGE "
The law requires that each person work ing on this site or providing services
related to this construction project must be covered by worker's compensation
insurance . This includes persons providing, hauling , or delivering equipment
or materials , or providing labor or transportation or other service related to the
project, regardless of the identify of their employer or status as an employee."
Call the Texas Worker's Compensation Commission at 512 -463-3642 to
receive information on the legal requirement for coverage, to verify whether
your employer has provided the required coverage , or to report an employer's
failure to provide coverage".
22 . SUBSTITUTIONS: The specifications for materials set out the minimum standard of
quality that the City believes necessary to procure a satisfactory project. No
substitutions will be permitted until the Contractor has received written perm ission of the
Engineer to make a substitution for the material that has been specified . Where the term
"or equal ", or "or approved equal " is used , it is understood that if a material, product , or
piece of equipment bearing the name so used is furnished, it will be approvable , as the
particular trade name was used for the purpose of establishing a standard of quality
acceptable to the City . If a product of any other name is proposed substitutes is
procured by the Contractor. Where the term "or equal ", or "approved equal " is not used
in the specifications , this does not necessarily exclude alternative items or material or
equ ipment which may accomplish the intended purpose . However, the Contractor shall
06/20/08 SP -13
have the full responsibility of providing that the proposed substitution is , in fact, equal ,
and the Engineer , as the representative of the City, shall be the sole judge of the
acceptability of substitutions . The provisions of the sub-section as related to
"substitutions" shall be applicable to all sections of these specifications .
23. MECHANICS AND MATERIALMEN 'S LIEN : The Contractor shall be required to execute
a release of mechanics and materialmen's liens upon receipt of payment.
24 . WORK ORDER DELAY: All utilities and right-of-way are expected to be clear and
easements and/or permits obtained on this project within sixty (60) days of advertisement
of this project. The work order for subject project will not be issued until all utilities, right-
of-ways, easements and/or permits are cleared or obtained . The Contractor shall not
hold the City of Fort Worth responsible for any delay in issuing the work order for this
Contract.
25. WORKING DAYS : The Contractor agrees to complete the Contract within the allotted
number of working days .
26. RIGHT TO ABANDON : The City reserves the right to abandon , without obligation to the
Contractor, any part of the project or the entire project at any time before the Contractor
begins any construction work authorized by the City .
27. CONSTRUCTION SPECIFICATIONS: This contract and project are governed by the two
following published specifications, except as modified by these Special Provisions :
STANDARD SPECIFICATIONS FOR STREET AND STORM DRAIN CONSTRUCTION
CITY OF FORT WORTH
STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION
NORTH CENTRAL TEXAS
A copy of either of these specifications may be purchased at the Office of the
Department of Engineering, 1000 Throckmorton Street, 2nd Floor, Municipal Building,
Fort Worth , Texas 76102. The specifications applicable to each pay item are indicated
in the call -out for the pay item by the Engineer. If not shown , then applicable published
specifications in either of these documents may be followed at the discretion of the
Contractor. General Provisions shall be those of the Fort Worth document rather than
Div ision 1 of the North Central Texas document.
28. MAINTENANCE STATEMENT: The Contractor shall be responsible for defects in this
project due to faulty materials and workmanship , or both, for a period of two (2) years
from date of final acceptance of this project and will be required to replace at his
expense any part or all of the project which becomes defective due to these causes .
29 . DELAYS : The Contractor shall receive no compensat ion for delays or hindrances to the
work, except when direct and unavoidable extra cost to the Contractor is caused by the
fa ilure of the City to provide information or mate rial , if any , which is to be furnished by the
City . When such extra compensation is claimed a written statement thereof shall be
presented by the Contractor to the Director of t he Engineering Department and if by him
06/20/0 8 SP -14
found correct shall be approved and referred by him to the Council for final approval or
disapproval; and the action thereon by the Council shall be final and binding. If delay is
caused by specific orders given by the Engineers to stop work or by the performance of
extra work or by the failure of the City to provide material or necessary instructions for
carrying on the work , then such delay will entitle the Contractor to an equivalent
extension of time, his application for which shall, however, be subject to the approval of
the City Council ; and no such extension of time shall release the Contractor or the surety
on his performance bond form all his obligations hereunder which shall remain in full
force until the discharge of the contract.
30 . DETOURS AND BARRICADES : The Contractor shall prosecute his work in such a
manner as to create a minimum of interruption to traffic and pedestrian facilities and to
the flow of vehicular and pedestrian traffic within the project area. Contractor shall
protect construction as required by Engineer by providing barricades.
Barricades, warning and detour signs shall conform to the Standard Specifications
"Barriers and Warning and/or Detour Signs ," Item 524 and/or as shown on the plans .
Construction signing and barricades shall conform with the latest version of the "Texas
Manual on Uniform Traffic Control Devices for Streets and Highways"
31. DISPOSAL OF SPOIUFILL MATERIAL: Prior to the disposing of any spoil/fill material,
the Contractor shall advise the Director of the Department of Engineering acting as the
City of Fort Worth's Flood Plain Administrator ("Administrator''), of the location of all sites
where the Contractor intends to dispose of such material. Contractor shall not dispose of
such material until the proposed sites have been determined by the Administrator to
meet the requirements of the Flood Plain Ordinance of the City of Fort Worth (Ordinance
No. 10056). All disposal sites must be approved by the Administrator to ensure the filling
is not occurring within a flood plain without a permit. A flood plain permit can be issued
upon approval of necessary engineering studies. No fill permit is required if disposal
sites are not in a flood plain. Approval of the Contractor's disposal sites shall be
evidenced by a letter signed by the Administrator stating that the site is not in a known
flood plain or by a Flood Plain fill Permit authorizing fill within the flood plain. Any
expenses associated with obtaining the fill permit, including any necessary engineering
studies, shall be at the Contractor's expense. In the event that the Contractor disposes
of spoil/fill materials at a site without a fill permit or a letter from the administrator
approving the disposal site, upon notification by the Director of Engineering, Contractor
shall remove the spoil/fill material at its expense and dispose of such materials in
accordance with the Ordinance of the City and this section .
32 . QUALITY CONTROL TESTING:
(a) The Contractor shall furnish , at its own expense, certifications by a private laboratory
for all materials proposed to be used on the project, including a mix design for any
asphaltic and/or Portland cement concrete to be used and gradation analysis for
sand and crushed stone to be used along with the name of the pit from which the
material was taken . The Contractor shall provide manufacturer's certifications for all
manufactured items to be used in the project and will bear any expense related
thereto.
(b) Tests of the design concrete mix shall be made by the Contractor's laboratory at
06/20/08 SP -15
least nine days prior to the placing of concrete using the same aggregate , cement
and mortar which are to be used later in the concrete . The Contractor shall provide a
certified copy of the test results to the City .
(c) Quality control testing of on site material on this project will be performed by the City
at its own expense . Any retesting required as a result of failure of the material to
meet project specifications will be at the expense of the Contractor and will be billed
at commercial rates as determined by the City. The failure of the City to make any
tests of materials shall in no way relieve the Contractor of its responsibility to furnish
materials and equipment conforming to the requirements of the contract.
(d) Not less than 24 hours notice shall be provided to the City by the Contractor for
operations requiring testing . The Contractor shall provide access and trench safety
system (if required) for the site to be tested and any work effort involved is deemed to
be included in the unit price for the item be ing tested .
(e) The Contractor shall provide a copy of the trip ticket for each load of fill material
delivered to the job site. The ticket shall spec ify the name of the pit supplying the fill
material.
33. PROPERTY ACCESS: Access to adjacent property shall be maintained at all times
unless otherwise directed by the Engineer.
34. SAFETY RESTRICTIONS-WORK NEAR HIGH VOLTAGE LINES :
The following procedures w ill be followed regarding the subject item on this contract:
(a) A warning sign not less than five inches by seven inches , painted yellow with black
letters that are leg ible at twelve feet shall be placed inside and outs ide vehicles such
as cranes , derricks , power shovels , drilling rigs, pile drivers, hoisting equipment or
similar apparatus . The warn ing sign shall read as follows :
"WARNING -UNLAWFUL TO OPERATE THIS EQUIPMENT WITHIN SIX FEET OF
HIGH VOLTAGE LINES ."
(b) Equipment that may be operated within ten feet of high voltage lines shall have an
insulating cage-type of guard about the boom or arm , except back hoes or d ippers
and insulator links on the lift hood connections .
(c) When necessary to work within six feet of high voltage electric lines , notification shall
be given the power company (TU Electric Service Company) which will erect
temporary mechanical barriers , de-energ ize the line or ra ise or lower the line. The
work done by the power company shall not be at the expense of the City of Fort
Worth . The notifying department shall maintain an accurate log of all such calls to
TU Electric Service Company and shall record action taken in each case .
(d) The Contractor is required to make arrangements with the TU Electric Service
Company for the temporary relocation or raising of high voltage lines at the
Contractor's sole cost and expense .
06/20/08 SP-16
(e) No person shall work within six feet of a high voltage line without protection having
been taken as outlined in Paragraph (c).
35 . WATER DEPARTMENT PRE-QUALIFICATIONS: Any Contractor performing any work
on Fort Worth water or sanitary sewer facilities must be pre -qualified with the Water
Department to perform such work in accordance with procedures described in the current
Fort Worth Water Department General Specifications which general specifications shall
govern performance of all such work .
36 . RIGHT TO AUDIT :
(a) Contractor agrees that the City shall, until the expiration of three (3) years after final
payment under this contract have access to and the right to examine and photocopy
any directly pertinent books, documents, papers and records of the Contractor
involving transactions relating to this contract. Contractor agrees that the City shall
have access during normal working hours to all necessary Contractor facilities and
shall be provided adequate and appropriate workspace in order to conduct audits in
compliance with the provisions of this section. The City shall give Contractor
reasonable advance notice of intended audits .
(b) Contractor further agrees to include in all its subcontracts hereunder a provision to
the effect that the subcontractor agrees that the City shall , under the expiration of
three (3) years after final payment under the subcontract, have access to and the
right to examine and photocopy any directly pertinent books , documents, papers and
records of such subcontractor involving transactions to the subcontract and further,
that City shall have access during normal working hours to all subcontractor facilities
and shall be provided adequate and appropriate work space in order to conduct
audits in compliance with the provisions of this article together with subsection (c )
hereof. City shall give subcontractor reasonable advance notice of intended audits .
(c) Contractor and subcontractor agree to photocopy such documents as may be
requested by the City. The City agrees to reimburse Contractor for the cost of copies
at the rate published in the Texas Administrat ive Code in effect as of the time
copying is performed .
37 . CONSTRUCTION STAKES;
The City, through its Surveyor or agent, will prov ide to the Contractor construction stakes
or other customary methods of markings as may be found consistent with professional
practice to establish line and grade for roadway and utility construction and centerlines
and benchmarks for bridgework. These stakes shall be set sufficiently in advance to
avoid delay whenever practical. One set of stakes shall be set for all utility construct ion
(water, sanitary sewer, drainage, etc .), one set of excavation/or stabilization stakes, and
one set of stakes for curb and gutter and/or paving . It shall be the sole responsibility of
the Contractor to preserve, maintain , transfer, etc., all stakes furnished until completion
of the construction phase of the project for which they were furnished .
If, in the op inion of the Engineer, a sufficient nu mber of stakes or markings provided by
the City have been lost, destroyed , or disturbed , that the proper prosecution and control
of the work contracted for in the Contract Documents cannot take place , then the
Contractor shall replace such stakes or marking s as required . An ind ividual registered
06/20/08 SP -17
by the Texas Board of Professional Land Surveying as a Registered Professional Land
Surveyor shall replace these stakes , at the Contactor's expense . No claims for delay due
to a lack of replacement of construction stakes will be accepted, and time will continue to
be charged in accordance with the Contract Documents .
38 . LOCATION OF NEW WALKS AND DRIVEWAYS;
The Contractor will make every effort to protect existing trees within the parkway, with
the approval of the engineer the Contractor may re-locate proposed new driveways and
walks around existing trees to minimize damage to trees .
39 . EARLY WARNING SYSTEM FOR CONSTRUCTION: Time is of the essence in the
completion of this contract. In order to insure that the Contractor is responsive when
notified of unsatisfactory performance and/or of failure to maintain the contract schedule,
the following process shall be applicable:
The work progress on all construction projects will be closely monitored . On a bi-monthly
basis the percentage of work completed will be compared to the percentage of time
charged to the contract. If the amount of work performed by the Contractor is less than
the percentage of time allowed by 20% or more (example : 10% of the work completed in
30% of the stated contract time as may be amended by change order}, the following
proactive measures will be taken:
1. A letter will be mailed to the Contractor by certified mail, return receipt
requested demanding that , within 10 days from the date that the letter is
received, it provide sufficient equipment, materials and labor to ensure
completion of the work within the contract time . In the event the Contractor
receives such a letter, the Contractor shall provide to the City an updated
schedule showing how the project will be completed within the contract time .
2 . The Project Manager and the Directors of the Department of Engineering,
Water Department, and Department of Transportation and Public Works will
be made aware of the situation . If necessary , the City Manager's Office and
the appropriate city council members may also be informed .
3 . Any notice that may , in the City 's sole discretion, be required to be provided to
interested individuals will distributed by the Engineering Department's Publ ic
Information Officer.
4. Upon receipt of the Contractor 's response , the appropriate City departments
and directors will be notified. The Engineering Department's Public
Information Officer will , if necessary, then forward updated notices to the
interested individuals .
5. If the Contractor fails to provide an acceptable schedule or fails to perform
satisfactorily a second time prior to the completion of the contract, the
bonding company will be notified appropriately .
40 . AIR POLLUTION WATCH DAYS : The Contractor shall be required to observe the
follow ing guidelines relating to working on City construction sites on days designated as
"AIR POLLUTION WATCH DAYS ". Typically , the OZONE SEASON , w ith in the
06/20/08 SP -18
Metroplex area, runs from May 1, through OCTOBER 31, with 6:00 a.m. -10:00 a.m.
being critical BECAUSE EMISSIONS FROM THIS TIME PERIOD HAVE ENOUGH TIME
TO BAKE IN THE HOT ATMOSPHERE THAT LEADS TO EARLY AFTERNOON
OZONE FORMATION.
The Texas Commission on Environmental Quality (TCEQ), in coordination with the
National Weather Service, will issue the Air Pollution Watch by 3:00 p.m. on the
afternoon prior to the WATCH day. On designated Air Pollution Watch Days, the
Contractor shall bear the responsibility of being aware that such days have been
designated Air Pollution Watch Days and as such shall not begin work until 10:00 a.m.
whenever construction phasing requires the use of motorized equipment for periods in
excess of 1 hour. However, the Contractor may begin work prior to 10 :00 a.m . if use of
motorized equipment is less than 1 hour, or if equipment is new and certified by EPA as
"Low Emitting ", or equipment burns Ultra Low Sulfur Diesel (ULSD), diesel emulsions , or
alternative fuels such as CNG .
If the Contractor is unable to perform continuous work for a period of at least seven
hours between the hours of 7:00 a.m . -6:00 p.m., on a designated Air Pollution Watch
Day, that day will be considered as a weather day and added onto the allowable weather
days of a given month.
CONSTRUCTION
41. PAY ITEM-UNCLASSIFIED STREET EXCAVATION:
See Standard Specifications Item No. 106, "Unclassified Street Excavation" for
specifications governing this item.
Removal of existing penetration or asphalt pavement shall be included in this item.
Operations necessary to windrow existing gravel base in order to lower or raise subgrade
shall be considered as subsidiary to this item and no additional compensation shall be
given as such.
During the construction of this project, it is required that all parkways be excavated and
shaped at the same time the roadway is excavated. Excess excavation will be disposed
of at locations approved by the engineer.
The intention of the City is to pay only the plan quantity without measurement. Should
either contracting party be able to show an error in the quantities exceeding 10 percent,
then actual quantities will be paid for at the unit prices bid. The party requesting the
payment of actual rather than plan quantities is responsible for bearing any survey and/or
measurement costs necessary to verify the actual quantities .
42 . PAY ITEM -6" REINFORCED CONCRETE PAVEMENT:
(a) All applicable provisions of standard Specifications Item 314 "Concrete Pavement,"
shall apply . The Contractor shall use a six (6) sack concrete mix for all hand
placement in the intersections . The unit price bid per square yard shall be full
payment for all labor, material , equipment and incidentals necessary to complete the
work .
06/20/08 SP -19
(b) Once an evaluation of the pavement is made to determine whether the crack is due
to distress or minor shrinkage, the following policy will apply :
(1) When the crack is minor and due to shrinkage (cosmetic}, then no further
treatment will be needed.
(2) If the crack is due to distress (structural}, the failed pavement must be
removed and replaced a minimum of 5 feet. In no case should the remaining
portion of the panel be less than 5 feet wide after repairing the failed panel.
(3) Any crack within 12 inches of any joint must be removed and replaced a
minimum of 5 feet to prevent future spalling of the pavement.
(c) All concrete pavement not placed by hand shall be placed us ing a fully automated
paving machine as approved by the Construction Engineer. Screeds will not be
allowed except if approved by the Construction Engineer.
06/20/08 SP -20
43. PAY ITEM -SILICONE JOINT SEALING FOR CONCRETE PAVEMENT:
CITY OF FORT WORTH , TEXAS
TRANSPORTATION AND PUBLIC WORKS DEPARTMENT
SPECIFICATION
for
SILICONE JOINT SEALING
(Revision 1, October 18 , 1989)
(Revision 2, May 12, 1994)
1. SCOPE
This specification for silicone joint sealing Portland Cement Concrete pavement and
curbs shall supersede Item 314 .2 . (11) "Joint Sealing Materials " of STANDARD
SPECIFICATIONS FOR STREET AND STORM DRAIN CONSTRUCTION-CITY OF
FORT WORTH , and Item 2 .210 "Joint Sealing" of STANDARD SPECIFICATIONS
FOR PUBLIC WORKS CONSTRUCTION -NORTH TEXAS COUNCIL OF
GOVERNMENTS.
2. MATERIALS
2 .1 The silicone joint sealant shall meet Federal Specification TT-S -001543A for
Class A sealant except as modified by the test requirements of this
specification . Before the installation of the joint sealant, the Contractor shall
furnish the Engineer certification by an independent testing laboratory that the
silicone joint sealant meet these requirements .
2 .2 The manufacturer of the silicone joint sealant shall have a minimum two-year
demonstrated, documented successful field performance with Portland
Cement Concrete pavement silicone joint sealant systems . Verifiable
documentation shall be submitted to the Engineer. Acetic acid cure sealants
shall not be accepted . The silicone sealant shall be cold applied .
2.3 Self-Leveling Silicone Joint Sealant
The joint sealant shall be Dow Corning 890-SL self-leveling silicone joint
sealant as manufactured by Dow Corning Corporation , Midland , Ml 48686-
0994 , or an approved equal.
Self-Leveling Silicone Jo int Sealant
Test Method Requirement
AS SUPPLIED
****
MIL-S-8802
ASTM D 1475
****
****
06/20/08
Non Volatile Content,% min .
Extrusion Rate , grams/minute
Specific Gravity
Skin -Over Time , minutes max.
Cure Time , day$"'
SP -21
96 to 99
275 to 550
1.206 to 1.340
60
14 to 21
**** Full Adhesion, days 14 to 21
AS CURED-
ASTM D 412, Die
ASTM D 3583
(Sect. 14 Mod .)
ASTM C 719
ASTM D 3583
(Sect. 14 Mod .)
ASTM D 3583
(Sect. 14 Mod.)
Mod . Elongation, % min .
Modulus @ 150% Elongation , psi max.
Movement, 10 cycles@ +100/-50%
Adhesion to Concrete,% Elongation min .
Adhesion to Asphalt,% Elongation min.
1400
9
No Failure
600
600
2.4 The joint filler sop shall be of a closed cell expanded polyethylene foam backer rod
and polyethylene bond breaker tape of sufficient size to provide a tight seal. The
back rod and breaker tape shall be installed in the saw-cut joint to prevent the joint
sealant from flowing to the bottom of the joint. The backer rod and breaker tape
shall be compatible with the silicone joint sealant and no bond or reaction shall
occur between them . Reference is made to the "Construction Detail " sheet for the
various joint details with their respective dimensions .
3. TIME OF APPLICATION
On newly constructed Portland Cement Concrete pavement, the joints shall be
initially saw cut to the required depth with the proper joint spacing as shown on
the "Construction Detail " sheet or as directed by the Engineer within 12 hours of
the pavement placement (Note that for the "dummy" joints, the initial 1/4 inch
width "green" saw-cut and the "reservoir" saw cut are identical and should be
part of the same saw cutting operation . Immediately after the saw cutting
pressure washing shall be applied to flush the concrete slurry from the freshly
saw cut joints .) The pavement shall be allowed to cure for a minimum of seven
(7) days. Then the saw cuts for the joint sealant reservoir shall be made, the
joint cleaned, and the joint sealant installed . During the application of the joint
sealant, the weather shall not be inclement and the temperature shall be 40F (4C)
and rising .
4. EQUIPMENT
0 6/20/08
4 .1 All necessary equipment shall be furnished by the Contractor. The Contractor
shall keep his equipment in a satisfactory working condition and shall be
inspected by the Engineer prior to the beginning of the work . The minimum
requirements for construction equipment shall be as follows :
4 .2 Concrete Saw : The sawing equipment shall be adequate in s ize and power to
complete the joint sawing to the required dimensions.
SP-22
4 .3 High Pressure Water Pump: The high pressure cold water pumping system
shall be capable of delivering a sufficient pressure and volume of water to
thoroughly flush the concrete slurry from the saw-cut joint.
4.4 Air Compressors: The delivered compressed air shall have a pressure in
excess of 90 psi and 120 cfm . There shall be suitable reaps for the removal
of all free water and oil from the compressed air. The blow -tube shall fir into
the saw-cut joint.
4 .5 Extrusion Pump: The output shall be capable of supplying a sufficient volume
of sealant to the joint.
4.6 Injection Tool : This mechanical device shall apply the sealant uniformly into
the joint.
4 . 7 Sandblaster: The design shall be for commercial use with air compressors as
specified in Paragraph 5.4.
4 .8 Backer Rod Roller and Tooling Instrument: These devices shall be clean and
free of contamination. They shall be compatible with the join depth and width
requirements .
5. CONSTRUCTION METHODS
06/20/08
5.1 General : The joint reservoir saw cutting, cleaning , bond breaker installation ,
and joint sealant placement shall be performed in a continuous sequence of
operations
5.2 Sawing Joints : The joints shall be saw-cut to the width and depth as shown on
the "Construction Detail " sheet. The faces of the joints shall be uniform in
width and depth along the full length of the joint.
5.3 Cleaning Joints : Immediately after sawing, the resulting concrete slurry shall
be completely removed from the joint and adjacent area by flushing with high
pressu re water. The water flushing shall be done in one-direction to prevent
joint contamination .
When the Contractor elects to saw the joint by the dry method , flushing the
joint with high pressure water may be deleted. The dust resulting from the
sawing shall be removed from the joint by using compressed air. (Paragraph
Rev . 1, October 18 , 1989)
After complete drying, the joints shall be sandblasted . The nozzle shall be
attached to a mechanical aiming device so that the sand blast will be directed
at an angle of 45 degrees and at a distance of one to two inches from the
face of the joint. Both joint faces shall be sandblasted in separate, one
directional passes . Upon the termination of the sandblasting , the joints shall
be blown -out using compressed air. The blow tube shall fit into the joints .
The blow n joint shall be checked for residual dust or other contam ination . If
SP-23
any dust or contamination is found, the sandblasting and blowing shall be
repeated until the joint is cleaned . Solvents will not be permitted to remove
stains and contamination.
Immediately upon cleaning, the bond breaker and sealant shall be placed in
the joint. Open, cleaned joints shall not be left unsealed overnight.
Bond Breaker Rod and Tape: The bond breaker rod and tae shall be installed
in the cleaned joint prior to the application of the joint sealant in a manner that
will produce the required dimensions.
5.4 Joint Sealant: Upon placement of the bond breaker rod and tape , the joint
sealant shall be applied using the mechanical injection tool. The joint sealant
application shall not be permitted when the air and pavement temperature is
less than 40F (4C). Joints shall not be sealed unless they are clean and dry.
Unsatisfactorily sealed joints shall be refilled. Excess sealant left on the
pavement surface shall be removed and discarded and shall not be used to
seal the joints.
The pavement surface shall present a clean final condition .
Traffic shall not be allowed on the fresh sealant until it becomes tack-free.
Approval of Joints : A representative of the sealant manufacturer shall be
present at the job site at the beginning of the final cleaning and sealing of the
joints. He shall demonstrate to the Contractor and the Engineer the
acceptable method for sealant installation . The manufacturer's representative
shall approve the clean , dry joints before the sealing operation commences .
6 . WARRANTY
The Contractor shall provide the Engineer a manufacturer's written guarantee on all
joint sealing materials. The manufacturer shall agree to provide any replacement
material free of charge to the City . Also, the Contractor shall provide the Engineer
a written warranty on all sealed joints . The Contractor shall agree to replace any
failed joints at no cost to the City . Both warranties shall be for two years after final
acceptance of the completed work by the Engineer.
7 . BASIS OF PAYMENT
06/20/08
Payment will be made at the Contract bid item unit price bid per linear foot (l.F.) as
provided in "MEASUREMENT" for "SILICONE JOINT SEALING ", which price of
shall be full compensation for furnishing all materials and for all preparation ,
delivery , and application of those sealing mate r ials and for all labor, equipment ,
tools and incidentals necessary to complete the silicone joint sealing in conform ity
with the plans and these specifications.
SP -24
44. PAY ITEM -7" CONCRETE CURB :
The Contractor may, at his option , construct either integral or superimposed curb. Standard
Specification Item 502 shall apply except as follows: Integral curb shall be constructed along
the edge of the pavement as an integral part of the slab and of the same concrete as the
slab . The concrete for the curb shall be deposited not more than thirty (30) minutes after the
concrete in the slab.
If the Contractor fails to backfill behind the curb within seven (7) calendar days of pouring the
curb and gutter, the amount paid for the curb shall be reduced by 25% until the backfill
operation is complete.
45 . PAY ITEM-RETAINING WALL:
This item will consist of placing retaining walls in locations and at heights determined by the
engineer in the field. All applicable section of City of Fort Worth Standard Specification item
518 shall apply except as follows:
Retaining wall shall be constructed per City of Fort Worth Construction Standard Drawing
No. S-M13 "Retaining Wall With Sidewalk" where applicable .
All existing brick and/or stone retaining walls not significantly impacted by proposed grade
changes will be protected. Replacement of retaining walls not impacted by proposed grade
changes will be at the expense of the Contractor.
46. PAY ITEM -REPLACE EXIST. CURB AND GUTTER:
This item is included for the purpose and removing and replacing existing curb and gutter in
transition areas as determined by the Engineer i n the field . The proposed curb and gutter
will be of the same dimensions as the existing curb and gutter to be removed. Quantities for
this pay item are approximate and are given only to establish a unit price for the work
The price bid per linear foot for "REPLACE EXIST. CURB AND GUTTER" as shown in the
Proposal will be full payment for materials including all labor, equipment, tools and
incidentals necessary to complete the work .
47. PAY ITEM-HMAC TRANSITION:
This item will consist of the furnishing and placing at varying thicknesses an HMAC surface
in transition areas where indicated on the plans , as specified in these specifications and at
other locations as may be directed by the Engineer.
This item shall be governed by all applicable provisions of Standard Specifications Item 312.
The price bid per ton HMAC Transition as shown in the Proposal will be full payment for
materials including all labor, equipment, tools and incidentals necessary to complete the
work.
48. PAY ITEM --6 " PIPE SUBDRAIN :
No specific location for this item is designated on the plans . Subdrain shall be installed only
if field conditions ind icate ground water at subgrade level after excavation and if deemed
necessary by the Engineer.
06/20/08 SP-25
-
-
liiil
49. PAY ITEM -TRENCH SAFETY:
Description: This item will consist of the basic requirements which the Contractor must
comply with in order to provide for the safety and health of workers in a trench. The
Contractor shall develop, design and implement the trench excavation safety protection
system. The Contractor shall bear the sole responsibility for the adequacy of the trench
safety system and providing "a safe place to work " for the workman .
The trench excavation safety protection system shall be used for all trench excavations
deeper than five (5) feet. The Excavating and Trenching Operation Manual of the
Occupational Safety and Health Administration , U.S. Department of Labor, shall be the
minimum governing requirement of this item and is hereby made a part of this specification.
The Contractor shall, in addition, comply with all other applicable Federal , State and local
rules, regulations and ordinances .
Measurement and Payment: All methods used for trench excavation safety protection shall
be measured by the linear foot of trench and paid at the unit price in the Proposal, which
shall be total compensation for furnishing design, materials , tools , labor, equipment and
incidentals necessary , including removal of the system .
Trench depth for payment purposes for Trench Safety Systems is the vertical depth as
measured from the top of the existing ground to the bottom of the pipe .
50. PAY ITEM - 8" THICK LIME STABILIZED SUBGRADE & CEMENT FOR SUBGRADE
STABILIZATION :
See Standard Specifications Item No . 210 , "Lime Treatment (Material Manipulation)" and
Specification Item No . 212 , "Hydrated Lime and Lime Slurry" for specifications governing this
item . Quantities for this pay item are approximate and are given only to establish a unit price
for the work.
The price bid per square yard for "8" THICK LIME STABILIZED SUBGRADE " as shown in
the Proposal will be full payment for all labor, equipment , tools and incidentals necessary to
complete the work . The price bid per ton for "LIME FOR SUBGRADE STABILIZATION" as
shown in the Proposal will be full payment for materials necessary to complete the work .
51. PAY ITEM -6" H.M.A.C. PAVEMENT (Thickness Tolerances and HMAC Testing
Procedures):
The base course shall be a 3" deep Type "B" course placed in one lift. The surface course
shall be a 3" deep Type "D" course placed in one li ft.
All provisions of Standard Specification No. 312 . 7 'Construction Tolerance' shall apply
except as modified herein :
1) After completion of each asphalt paving course, core tests will be made to determine
compliance with the contract specifications . The hot-mix asphaltic concrete pavement
will be core drilled by the City of Fort Worth . The thickness of the asphaltic surface will
be determined by measurement cores taken at locations determined by the Engineer.
The thickness of individual cores will be determined by averaging at least three (3)
measurements . If the core measurements ind icate a deficiency, the length of the area of
such deficient thickness shall be determ ined by add itional cores taken along the length of
06/20/08 SP-26
the pavement in each direction until cores are obtained which are at least of specified
thickness . The width of such area shall not be less than ~ of the roadway width .
2) When the thickness of the base course (as determined from core samples) is more than
15% deficient of the plan thickness , the Contractor shall remove and replace the
deficient area at his own expense. If the thickness is less than 15% deficient , the
Contractor shall make up the difference in the base thickness with surface course
material.
3) The surface course must be the plan thickness . This does not include surface course
material used to make up deficiencies in the base course as described in item 2).
4) The overall thickness of asphaltic concrete pavement must be a minimum of the plan
thickness . Deficient areas (as determined in item 1) found to be less than the plan
thickness will be removed and replaced at the Contractor's expense.
5) No additional payment over the contract price will be made for any hot-mix asphaltic
concrete course of a thickness exceeding that required by the plans and specifications .
6) H~AC Testing Procedure:
The Contractor is required to submit a Mix Design for both Type "B" and "D " asphalt that
will be used for each project. This should be submitted at the Pre-Construction
Conference . This design shall not be more than two (2) years old . Upon submittal of
the design mix a Marshal (Proctor) will be calculated , if one has not been previously
calculated, for the use during density testing. For type "B" asphalt a maximum of 20%
rap may be used . No Rap may be used in type "D"
Upon approval of an asphalt mix design and the calculat ion of the Marshal (proctor) the
Contractor is approved for p lacement of the asphalt. The Contractor shall contact the
City Laboratory, through the inspector, at least 24 hours in advance of the asphalt
placement to schedule a technician to assist in the monitoring of the number of passes
by a roller to establish a roll ing pattern that will provide the required densities . The
required Density for Type "B" and for Type "D" asphalt will be 91 % of the calculated
Marshal (proctor). A Troxler Thin Layer Gauge will be used for all asphalt testing.
After a rolling pattern is establ ished , densities should be taken at locations not more than
300 feet apart. The above requ irement applies to both Type "B" and "D" asphalt.
Densities on type "B" must be done before Type "D" asphalt is applied.
Cores to determine thickness of Type "B'' asphalt must be taken before Type "D" asphalt
is applied . Upon completion of the application of Type "D" asphalt additional cores must
be taken to determine the applied thickness .
52 . PAY ITEM -CONCRETE FLAT WORK (CURB, CURB & GUTTER, SIDEWALKS,
LEADWALKS, WHEELCHAIR RAMPS AND DRIVEWAYS):
Concrete flatwork is defined as curb , cu rb and gutter, sidewalks , leadwalks , wheelchair
ramps and driveways as shown in the plans . This provision governs the sequence of work
related to concrete flatwork and shall be considered a supplement to the specifications
governing each specific item .
06/20/08 SP -27
Required backfilling and finished grading adjacent to flatwork shall be completed in order for
the flatwork to be accepted and measured as comp leted .
No payment will be made for flatwork until the pay item has been completed , wh ich includes
backfilling and finished grading .
53. PAY ITEM -REMOVE EXISTING CONCRETE SIDEWALK, DRIVEWAYS, STEPS,
LEADWALKS AND WHEEL CHAIR RAMPS :
This item includes removal of existing concrete sidewalks, driveways , steps , leadwalks and
wheelchair ramps at location shown on the plans or as designed by the Engineer. See Item
No. 104 "Removing Old Concrete", for Specifications governing this item.
54. PAY ITEM-REMOVE EXISTING CURB AND GUTTER:
Where shown on the plans or where designated by the Engineer, existing curb and or gutter
and existing laid down curb shall be removed and disposed of in a manner satisfactory to the
Engineer. Measurement will be by the linear foot for curb and gutter, laydown curb removed,
and for all labor, tools, and incidentals necessary to complete the job.
55. PAY ITEM -REMOVE EXISTING CURB INLET:
This item shall include all labor, materials, and equipment necessary to remove and dispose
of the existing inlet and removal and connection of the existing RCCP lead pipe inlet as
shown on the Plans and as directed by the Engineer.
56 . PAY ITEM-6" THICK REINFORCED CONCRETE DRIVEWAY:
See Standard Specification Item No. 504 , "Concrete Sidewalks and Driveways " for
specifications governing this item as well as details S-S5 and S-S5A.
The price bid per square foot for "6'' THICK REINFORCED CONCRETE DRIVEWAY" as
shown in the Proposal will be full payment for materials including all labor, equipment , tools
and incidentals necessary to complete the work .
57 . PAY ITEM-REMOVE AND CONSTRUCT CONCRETE STEPS:
See Standard Specification Item No. 516, "Concrete Steps " for specifications governing this
item as well as details SM-3 .
The price bid per each for "REMOVE CONCRETE STEPS" and "CONSTRUCT CONCRETE
STEPS" as shown in the Proposal w i ll be full payment for materials including all labor,
equipment, tools and incidentals necessary to complete the removal and construction of
each set of concrete steps.
0 6/2 0/08 SP-28
58. PAY ITEM - 4 ' STANDARD CONCRETE SIDEWALK, LEADWALK AND WHEELCHAIR
RAMP :
All applicable provisions of standard Specifications Item 104 "Removing Old Concrete " and
Item 504 "Concrete Sidewalk Driveways " shall apply except as herein modified .
The Contractor shall construct standard concrete wheelchair ramps as shown on the
enclosed details, or as d irected by the Engineer.
The Contractor shall not remove any regulatory sign , instruction sign , street name and sign
or other sign which has been erected by the City . The Contractor shall contact Signs and
Marking Division, TPW (Phone 817 -392 -7738).
All concrete flared surfaces shall be colored with LITHOCHROME color hardener as
manufactured by L.M. Scofield Company or equal. The color hardener shall be brick red
color and dry-shake type , and shall be used in accordance with manufacturers instructions .
"Contractor shall provide a colored sample concrete panel of one foot by one foot by three
inches dimension, or other dimension approved by the Engineer, meeting the
aforementioned specification. The sample, upon approval by the Engineer, shall be the
acceptable standard to be applied for all construction covered in the scope of this pay item.
The method of application shall be by screen, sifter, sieve or other means in order to provide
for a uniform color distribution ."
59. PAY ITEM -REMOVE AND REPLACE FENCE :
This item shall include the removal and reconstruction of the existing fence at the locations
shown on the plans or where deemed necessary by the Engineer. The Contractor shall
exercise caution in remov ing and salvaging the materials to they may be used in
reconstructing the fence . Their constructed fence shall be equal in every way , or superior, to
the fence removed . The Contractor shall be responsible for keeping livestock within the
fenced areas during construction operation and while removing and relocating the fence, and
for any damage or injury sustained by persons, livestock or property on account of any act of
omission, neglect or misconduct of his agents, employees, or subcontractors . The unit price
per linear foot shown on the Proposal shall be full compensation for all materials , labor,
equ ipments, tools and incidentals necessary to complete the work.
60 . PAY ITEM-STANDARD 7" CURB AND 18 " GUTTER:
All provisions of Standard Specification No. 502 'Concrete Curb and Gutter' shall apply
except as modified herein :
Subsidiary to the unit price bid per linear foot shall be the following :
A minimum of 5" or greater as required depth of stabilized subgrade properly compacted
under the proposed curb and gutter as shown in the construction deta ils .
0 6/20/08 SP -29
If the Contractor fails to backfill either in from of the gutter or behind the curb within seven
(7) calendar days of pouring the curb and gutter, the amount paid for the curb and gutter
shall be reduced by 25% until the backfill operation is complete.
Standard Specifications Item No . 502, shall apply except as herein modified. Concrete shall
have minimum compressive strength of three thousand (3,000) pounds per square inch in
twenty-eight (28) days. The quantity of mixing water shall not exceed seven (7) gallons per
sack (94 lbs.) of Portland Cement. The slump of the concrete shall not exceed three (3)
inches. A minimum cement content of five (5) sacks of cement per cubic yard of concrete is
required.
61. PAY ITEM-REMOVE AND RECONSTRUCT MAILBOXES/ MISCELLANEOUS:
This item includes the removal and reconstruction of existing mailboxes, brick walls,
flowerbed trim and miscellaneous items within the right of way which may be damaged or
removed during construction. When possible, the Contractor shall salvage existing materials
for reuse in the replacement or repair of damaged or removed items . Items which are to be
repaired or reconstructed should look architecturally the same in material and appearance
and should be reconstructed or repaired in a better or new condition.
All applicable provisions of City of Fort Worth Construction Standards shall apply.
62. PAY ITEM -BORROW:
The non-expansive earth fill should consist of soil materials with a liquid limit of 35 or less, a
plasticity index between 8 and 20, a minimum of 35 percent passing the No. 200 sieve, a
minimum of 85 percent passing the No. 4 sieve, and which are free of organics or other
deleterious materials . When compacted to the recommended moisture and density, the
material should have a maximum free swell value of 0.5 percent and a maximum hydraulic
conductivity (permeability) of 1 E-05 cm/sec, as determined by laboratory testing of
remolded specimens of the actual materials proposed for the non-expansive earth fill.
63. PAY ITEM-CEMENT STABILZATION:
All applicable provisions of Item 214, 'Portland Cement Treatment' shall apply .
64. PAY ITEM -CEMENT :
All applicable provisions of Item 214, 'Portland Cement Treatment' shall apply.
65. PAY ITEM-NEW 7" CONCRETE VALLEY GUTTER:
This item shall include the construction of concrete valley gutters at various locations to be
determined in field .
Removal of existing, asphalt pavement, concrete base, curb and gutter, and necessary
excavation to install the concrete valley gutters all shall be subsidiary to this pay item.
Furnishing and placing of 2 :27 concrete base and crushed limestone to a depth as directed
by the Engineer and necessary asphalt transitions as shown in the concrete valley gutter
details shall be subsidiary to this Pay Item .
06/20/08 SP-30
-
-
See standard specification Item No. 314", Concrete Pavement", Item 312 "Hot-Mix Asphaltic
Concrete", Item No . 104, "Removing Old Concrete", Item No . 106 , "Unclassified Street
Excavation" Item No. 208 "Flexible Base." Measurement for final quantities of valley gutter
will be by the square yard of concrete pavement and the curb and gutter section will be
included .
Contractor may substitute 5" non-reinforced (2 :27) Concrete Base in lieu of Crushed Stone
at no additional cost. See Item 314" Concrete Pavement".
The concrete shall be designed to achieve a minimum compressive strength of 3000 pounds
per square inch . Contractor shall work on one-half of Valley gutter at a time, and the other
half shall be open to traffic. Work shall be completed on each half within seven (7) calendar
days .
66 . PAY ITEM-STORM DRAIN INLETS :
An alternative method of construction for these items will be "Pre-Cast" manholes and inlets .
If the Contractor desires to use this method , he must submit details for the construction to
the Transportation and Public Works Department fore review and approval if said details are
acceptable. The Pre-Cast construction must be equal or super ior to the strength
requirements for this item as set out in Item 444 , "Manholes and Inlets " and said construction
shall be in compliance with all other requirements of Item 444 where applicable .
67. PAY ITEM -TRENCH EXCAVATION AND BACKFILL FOR STORM DRAIN:
Work under this item includes all the proposed excavation and backfill in the project area
and the necessary fill area . Payment will be made for the quantity of earth
excavated/backfilled. The placing of fill shall be subsidiary to the trench excavation/backfill
price . Excess material which is obtained from excavating the trench shall be used for fill
placement subject to the provisions of Item 114 of the City of Fort Worth Standard
Specifications .
All excavated material which is unacceptable as fill material shall become the property of the
Contractor to be hauled off the site and disposed of properly . Unacceptable material shall
be, but not limited to : rocks , concrete, asphalt , debris , etc. The cost for removal and
disposal of unacceptable material shall be subsidiary to the unit prices.
68. PAY ITEM -STORM WATER POLLUTION PREVENTION (FOR DISTURBED
AREAS EQUAL TO OR GREATER THAN 1 ACRE):
PERMIT : As defined by Texas Commission on Environmental Quality (TCEQ) regulations, a
Texas Pollutant Discharge Elimination System (TPDES) General Construction Permit is
required for all construction activities that result in the disturbance of one to five acres (Small
Construction Activity) or five or more acres of total land (Large Construction Activity). The
Contractor is defined as an "operator" by state regulations and is required to obtain a perm it.
Information concern ing the permit can be obtained through the Internet at
http://www. tnrcc.state . tx . us/permitting/water perm/wwperm/construct. html. Soil stab ilization
and structural practices have been selected and designed in accordance with North Central
Texas Council of Governments Best Management Practices and Erosion Control Manual for
06/20/08 SP -3 1
Construction Activities (BMP Manual). This manual can be obtained through the Internet at
www.dfwstormwater.com/runoff.html. Not all of the structural controls discussed in the BMP
Manual will necessarily apply to this project. Best Management Practices are construction
management techniques that, if properly utilized, can minimize the need for physical controls
and possible reduce costs . The methods of control shall result in minimum sediment
retention of not less than 70%.
NOTICE OF INTENT (NOi): If the project will result in a total land disturbance equal to or
greater than 5 acres, the Contractor shall sign at the pre-construction meeting a TCEQ
Notice of Intent (NOi) form prepared by the engineer. It serves as a notification to the TCEQ
of construction activity as well as a commitment that the Contractor understands the
requirements of the permit for storm water discharges from construction activities and that
measures will be taken to implement and maintain storm water pollution prevention at the
site. The NOi shall be submitted to the TCEQ at least 48 hours prior to the Contractor
moving on site and shall include the required $100 application fee .
The NOi shall be mailed to:
Texas Commission on Environmental Quality
Storm Water & General Permits Team; MC-228
P.O. Box 13087
Austin, TX 78711-3087
A copy of the NOi shall be sent to :
City of Fort Worth
Department of Environmental Management
5000 MLK Freeway
Fort Worth, TX 76119
NOTICE OF TERMINATION (NOT): For all sites that qualify as Large Construction Activity,
the Contractor shall sign, prior to final payment, a TCEQ Notice of Termination (NOT) form
prepared by the engineer. It serves as a notice that the site is no longer subject to the
requirement of the permit.
The NOT should be mailed to:
Texas Commission on Environmental Quality
Storm Water & General Permits Team; MC-228
P.O. Box 13087
Austin , TX 78711-3087
STORM WATER POLLUTION PREVENTION PLAN (SWPPP): A document consisting of an
erosion control and toxic waste management plan and a narrative defining site parameters
and techniques to be employed to reduce the release of sediment and pollution from the
construction site. Five of the project SWPPP's are available for viewing at the plans desk of
the Department of Engineering. The selected Contractor shall be provided with three copies
of the SWPPP after award of contract, along with unbounded copies of all forms to be
submitted to the Texas Commission on Environmental Quality .
LARGE CONSTRUCTION ACTIVITY -DISTURBED AREA EQUAL TO OR GREATER
THAN 5 ACRES: A Notice of Intent (NOi) form shall be completed and submitted to the
TCEQ including payment of the TCEQ required fee. A SWPPP that meets all TCEQ
06/20/08 SP -32
requirements prepared by the Engineer shall be prepared and implemented at least 48 hours
before the commencement of construction activities . The SWPPP shall be incorporated into
in the contract documents . The Contractor shall submit a schedule for implementation of the
SWPPP. Deviations from the plan must be submitted to the engineer for approval. The
SWPPP is not warranted to meet all the conditions of the permit since the actual
construction activities may vary from those anticipated during the preparation of the SWPPP.
Modifications may be required to fully conform to the requirements of the Permit. The
Contractor must keep a copy of the most current SWPPP at the construction site. Any
alterations to the SWPPP proposed by the Contractor must be prepared and submitted by
the Contractor to the engineer for review and approval. A Notice of Termination (NOT) form
shall be submitted within 30 days after final stabilization has been achieved on all portions of
the site that is the responsibility of the permittee, or, when another permitted operator
assumes control over all areas of the site that have not been finally stabilized .
SMALL CONSTRUCTION ACTIVITY -DISTURBED AREA EQUAL TO OR GREATER
THAN ONE ACRE BUT LESS THAN FIVE ACRES: Submission of a NOi form is not
required. However, a TCEQ Site Notice form must be completed and posted at the site . A
copy of the completed Site Notice must be sent to the City of Fort Worth Department of
Environmental Management at the address listed above . A SWPPP, prepared as described
above, shall be implemented at least 48 hours before the commencement of construction
activities . The SWPPP must include descriptions of control measures necessary to prevent
and control so il erosion, sedimentation and water pollution and will be included in the
contract documents. The control measures shall be installed and maintained throughout the
construction to assure effective and continuous water pollution control. The controls may
include , but not be lim ited to, silt fences , straw bale dikes, rock berms , diversion dikes,
interceptor swales, sediment traps and basins, pipe slope drain, inlet protection, stabilized
construction entrances , seeding, sodding, mulching , soil retention blankets , or other
structural or non-structural storm water pollution controls . The method of control shall result
in a min imum sediment retention of 70% as defined by the NCTCOG "BMP Manual."
Deviations from the proposed control measures must be submitted to the eng ineer for
approval.
PAYMENT FOR SWPPP IMPLEMENTATION : Payment shall be made per lump sum as
shown on
the proposal as full compensation for all items contained in the project SWPPP.
FOR DISTURBED AREAS LESS THAN 1 ACRE , SPECIAL PROVISION 23 -40 SHALL BE
APPLICABLE .
69 . PRE BID ITEM -PROJECT DESIGNATION SIGN :
The Contractor shall construct and install two (2) Project Designation Signs and it will be the
responsibility of the Contractor to maintain the signs in a presentable condition at all times
on each project under construction . Maintenance will include painting and repairs as
directed by the Engineer.
It will be the respons ibility of the Contractor to have the individual proj ect signs lettered and
painted in accordance with the enclosed detail. The quality of the paint , painting and
lettering on the signs shall be approved by the Engineer. The height and arrangement of the
lettering shall be in accordance with the enclosed deta il. The sign shall be constructed of %"
fir plywood , grade A-C (exterior) or better . These signs shall be installed on barricades or as
0 6/20 /0 8 SP -33
directed by the Engineer and in place at the project site upon commencement of
construction.
The work, which includes the painting of the signs, installing and removing the signs,
furnishing the materials, supports and connections to the support and maintenance shall be
to the satisfaction of the Engineer.
The unit price bid per each will be full payment for materials including all labor, equipment,
tools and incidentals necessary to complete the work .
70. PRE BID ITEM -UTILITY ADJUSTMENT:
This item is included for the basic purpose of establishing a contract price which will be
comparable to the final cost of making necessary adjustments required due to street
improvements to water, sanitary sewer and natural gas service lines and appurtenances
where such service lines and appurtenances are the property owner's responsibility to
maintain. An arbitrary figure has been placed in the Proposal; however, this does not
guarantee any payment for utility adjustments, neither does it confine utility adjustments to
the amount shown in the Proposal. It shall be the "Contractor" responsibility to provide the
services of a licensed plumber to make the utility adjustments determined necessary by the
Engineer. No payment will be made for utility adjustments except those adjustments
determined necessary by the Engineer. Should the Contractor damage service lines due to
his negligence, where such lines would not have required adjustment or repair otherwise, the
lines shall be repaired and adjusted by the Contractor at the Contractor's expense . The
payment to the Contractor for utility adjustments shall be the actual cost of the adjustments
plus ten percent ( 10%) to cover the cost of bond and overhead incurred by the Contractor in
handling the utility adjustments.
71 . PRE BID ITEM -TOP SOIL:
The proposed quantities shown are calculated to provide topsoil 4 to 6 inches in depth
(compacted) over the parkway area and do not include deeper than design depth behind the
curb. The pay item is intended to pay for topsoil that must be imported where suitable
material is either not available on the job or cannot reasonably be stored on-site . Payment
will be made on the basis of loose truck volume (full truck with sideboards up) tickets and
material must meet City of Fort Worth standards for topsoil. Only the volume imported will be
paid for and may be substantially less than the proposal quantities listed .
72 . PRE BID ITEM -ADJUST WATER VALVE BOX:
Contractor will be responsible for adjusting water valve boxes to match new pavement
grade . The water valves themselves will be adjusted by City of Fort Worth Water
Department forces.
The unit price bid will be full payment for materials including all labor, equipment , too ls and
incidentals necessary to complete the work .
73. PRE BID ITEM -MANHOLE ADJUSTMENT:
Th is item shall include adjusting the tops of existing and/or proposed manholes to match
proposed grade as shown on the plans or as directed by the Engineer. Standard
Specification Item No. 450 shall apply except as follows :
06/20/08 SP-34
Included as part of this pay item shall be the application of a cold-applied preformed
flexible butyl rubber or plastic sealing compound for sealing interior and/or exterior joints
on concrete manhole sections as per current City Water Department Special Conditions.
74 . PRE BID ITEM-ADJUST WATER METER BOX :
This item shall include raising or lowering an existing meter box to the parkway grade
specified. No payment will be made for existing boxes , which are within 0.1' of specified
parkway grade.
The unit price bid will be full payment for materials including all labor, equipment , tools and
incidentals necessary to complete the work .
75. NON-PAY ITEM -CLEARING AND GRUBBING :
All objectionable items within the limits of this project and not otherwise provided for shall be
removed under this item in accordance with Standard Specification Item 102, "Clearing and
Grubbing ." However, no direct payment will be made for this item and it shall be considered
incidental to this contract.
76 . NON-PAY ITEM -SPRINKLING FOR DUST CONTROL:
All applicable provisions of Standard Specifications Item 200 , "Sprinkling for Dust Control"
shall apply . However, no direct payment will be made for this item and it shall be considered
incidental to this contract.
77. NON-PAY ITEM -PROTECTION OF TREES, PLANTS AND SOIL:
All property along and adjacent to the Contractor's operations including lawns , yards, shrubs,
trees , etc. shall be preserved or restored after completion of the work to a condition equal or
better than existed prior to start of work .
By ordinance , the Contractor must obtain a permit from the City Forester before any work
(trimming , removal or root pruning) can be done on trees or shrubs growing on public
property including street rights-of-way and designated alleys. This permit can be obtained
by calling the Forestry Office at 871-5738 . All tree work shall be in compliance with pruning
standards for Class II Pruning as described by the National Arborist Association . A copy of
these standards can be provided by calling the above number. Any damage to public trees
due to negligence by the Contractor shall be assessed using the current formula for Shade
Tree Evaluation as defined by the International Society of Arboriculture . Payment for
negligent damage to public trees shall be made to the City of Fort Worth and may be
withheld from funds due to the Contractor by the City .
To prevent the spread of the Oak Wilt fungus , all wounds on Live Oak and Red Oak trees
shall be immediately sealed using a commercial pruning paint. This is the only instance
when pruning paint is recommended .
78 . NON-PAY ITEM -CONCRETE COLORED SURFACE :
Concrete wheelchair ramp surfaces , excluding the side slopes and curb , shall be colored
with LITHOCHROME color hardener or equal. A brick red color , a dry-shake hardener
manufactured by L.M. Scofield Company or equal , shall be used in accordance with
manufacturers instructions . Contractor shall provide a sample concrete panel of one foot by
one foo t by three inches dimension , or other d imens ion approved by the Enginee r, mee ti ng
the aforementioned specifications. The sample , upon a pproval of the Engineer, shall be the
06/20/08 SP-35
liiiiill
acceptable standard to be applied for all construction covered in the scope of this Non-Pay
Item. No direct payment will be made for this item and it shall be considered incidental to
this contract.
The method of application shall be by screen, sifter, sieve, or other means in order to
provide for a uniform color distribution .
79. NON-PAY ITEM -PROJECT CLEAN-UP:
The Contractor shall be aware that keeping the project site in a neat and orderly condition is
considered an integral part of the contracted work and as such shall be considered
subsidiary to the appropriate bid items . Clean up work shall be done as directed by the
Engineer as the work progresses or as needed. If, in the opinion of the Engineer it is
necessary, clean up shall be done on a daily basis. Clean up work shall include, but not be
limited to:
• Sweeping the street clean of dirt or debris
• Storing excess material in appropriate and organized manner
• Keeping trash of any kind off of residents' property
If the Engineer does not feel that the jobsite has been kept in an orderly condition, on the
next estimate payment (and all subsequent payments until completed) of the appropriate bid
item(s) will be reduced by 25%.
Final cleanup work shall be done for this project as soon as the paving and curb and gutter
has been constructed. No more than seven days shall elapse after completion of
construction before the roadway and right-of-way is cleaned up to the satisfaction of the
Engineer.
80. NON-PAY ITEM -PROJECT SCHEDULE:
Contractor shall be responsible for producing a project schedule at the pre-construction
conference. This schedule shall detail all phases of construction , including project clean up,
and allow the Contractor to complete the work in the allotted time . Contractor will not move
on to the jobsite nor will work begin until said schedule has been received and approval
secured from the Construction Engineer. However, contract time will start even if the project
schedule has not been turned in . Project schedule will be updated and resubmitted at the
end of every estimating period. All costs involved with producing and maintaining the project
schedule shall be considered subsidiary to this contract.
81. NON-PAY ITEM -NOTIFICATION OF RESIDENTS:
In order to cut down on the number of complaints from residents due to the dust generated
when saw-cutting joints in concrete pavement, the Contractor shall notify residents, in
writing, at least 48 hours in advance of saw-cutting joints during the construction of paving
projects .
All costs involved with providing such written notice shall be considered subsidiary to this
contract.
82. NON-PAY ITEM -PUBLIC NOTIFICATION PRIOR TO BEGINNING CONSTRUCTION:
Prior to beginning construction on any block in the project, the Contractor shall, on a block
by block basis, prepare and deliver a notice or flyer of the pending construction to the front
06/20/08 SP-36
door of each residence or business that w ill be impacted by construction. The notice shall be
prepared as follows :
The notification notice or flyer shall be posted seven (7) days prior to beginning any
construction activity on each block in the project area . The flyer shall be prepared on the
Contractor's letterhead and shall include the following information: Name of Project, DOE
No., Scope of Project (i.e . type of construction activity), actual construction duration within
the block, the name of the Contractor's foreman and his phone number, the name of the
City's inspector and his phone number and the C ity 's after-hours phone number. A sample of
the 'pre-construction notification' flyer is attached .
The Contractor shall submit a schedule showing the construction start and finish time for
each block of the project to the inspector. In addition, a copy of the flyer shall be delivered to
the City Inspector for his review prior to being distributed . The Contractor will not be allowed
to begin construction on any block until the flyer is delivered to all residents of the block. An
electronic version of the sample flyer can be obtained from the construction office at 817-
392-8306.
All work involved with the pre-construction notification flyer shall be considered subsidiary to
the contract price and no additional compensation shall be made.
83. NON-PAY ITEM -PRE-CONSTRUCTION NEIGHBORHOOD MEETING :
After the pre-construction conference has been held but before construction is allowed to
begin on this project a public meeting will be held at a location to be determined by the
Engineer. The Contractor, inspector, and project manager shall meet with all affected
residents and present the projected schedule, including construction start date, and answer
any construction related questions. Every effort will be made to schedule the neighborhood
meeting within the two weeks following the pre-construction conference but in no case will
construction be allowed to begin until this meeting is held.
84 . NON -PAY ITEM -WASHED ROCK:
All washed rock used for embedment or backfill or as otherwise directed by the Engineer
shall washed, crushed stone and shall meet the following gradation and abrasion : (Actual
washing not required if gradation is met)
Sieve Size
1"
1/2"
3/8 "
#4
#8
% Retained
0-10
40-75
55-90
90-100
95-100
Los Angeles Abrasion Test: 50 % Maximum wear per A .S .T .M. Designation C-131.
85 . NON-PAY ITEM-SAWCUT OF EXISTING CONCRETE :
When existing concrete or H .M .A.C . is cut , such cuts shall be made with a concrete saw.
The Contractor may break out cu r b and gutter to the nearest joint if he chooses . All sawing
shall be subsid iary to the unit cost of the respective item .
06/20/08 SP -3 7
86 . NON PAY ITEM -LOCATION AND EXPOSURE OF MANHOLES AND WATER
VALVES :
The Contractor shall be responsible for locating and marking all previously exposed
manholes and water valves in each street of this contract before the recycling process
commences for a particular street.
The Contractor shall attempt to include the construction engineer (if he is available) in the
observation and marking activity. In any event a street shall be completely marked a
minimum to two (2) working days before recycling begins on any street. Marking the curbs
with paint is a recommended procedure.
It shall be the Contractor's responsibility to notify the utility companies that he has
commenced work on the project. As the recycling is completed (within the same day) the
Contractor shall locate the covered manholes and valves and expose them for later
adjustment. Upon completion of a street the Contractor shall notify the utilities of this
completion and indicate that start of the next one in order for the utilities to adjust facilities
accordingly. The following are utility contact persons :
Company
AT&T
TXU
ATMOS Energy
Dig TESS
Telephone Number
817 -338-627 5
1-800-233-2133
817-215-0366
880-344 -8377
Of course , under the terms of this contract, the Contractor shall complete adjustment of the
storm drain and Water Department facilities, one traffic lane at a time within five (5) working
days after completing the laying of proposed H .M.A.C. overlay adjacent to said facilities.
Any deviation from the above procedure and allotted working days may result in the shut
down of the recycling operation by the Construction Engineer.
The Contracto r shall be responsible for all materials, equipment and labor to perform a most
accurate job and all costs to the Contractor shall be figured subsidiary to this contract.
87 . NON PAY ITEM -TIE IN INTO STORM DRAIN STRUCTURE : The cost for making
lateral t ie-ins
to the storm dra in structure shall be subsidiary to the bid price for the respective lines.
88 . NON PAY ITEM -SPRINKLER HEAD ADJUSTMENT: The adjustment and/or relocation
of
sprinkler heads encountered shall be paid for under utility adjustment in the proposal
section. No other
compensation will be provided.
89 . NON PAY ITEM -FEE FOR STREET USE PERMITS AND RE -INSPECTIONS: A fee for
street
use permits is in effect. In addition , a separate fee for re-inspections for parkway
cons t ruction , such as
driveways , sidewalks , etc., w ill be requ ired . The fees are as follows :
06/20/08 SP-3 8
The street permit fee is $50 .00 per permit with payment due at the time of permit application .
A re-inspection fee of $25 .00 will be assessed when work for which an inspection called for
is incomplete . Payment is due prior to the City performing re-inspection.
Payment by the Contractor for all street use permits and re-inspections shall be considered
subsidiary to the contract cost and no additional compensation shall be made .
90 . NON PAY ITEM -TEMPORARY EROSION, SEDIMENT AND WATER POLLUTION
CONTROL (FOR DISTURBED AREAS LESS THAN 1 ACRE):
A. DESCRIPTION: This item shall consist of temporary soil erosion sediment and water
pollution control measures deemed necessary by the Engineer for the duration of the
contract. These control measures shall at no time be used as a substitute for the permanent
control measure unless otherwise directed by the engineer and they shall not include
measures taken by the CONTRACTOR to control conditions created by his construction
operations . The temporary measures shall include dikes, dames, berms , sediment basins,
fiber mats, jute netting, temporary seeding, straw mulch, asphalt mulch, plastic liners , rubble
liners, baled-hay retards , dikes, slope drains and other devices .
B. CONSTRUCTION REQUIRMENTS : The Engineer has the authority to define
erodible earth and the authority to limit the surface are of erodible-earth material exposed by
preparing right-of-way, clearing and grubbing, the surface area of erodible-earth material
exposed by excavation, borrow and to direct the CONTRACTOR to provide temporary
pollution-control measures to prevent contamination of adjacent streams , other water
course , lakes, ponds or other areas of water impoundment. Such work may involve the
construction of temporary berms, dikes, dams, sediment basins, slope drains and use of
temporary mulches , mats , seeding or other control devices or methods directed by the
Engineer as necessary to control soil erosion . Temporary pollution-control measures shall
be used to prevent or correct erosion that may develop during construction prior to
installation of permanent pollution control features , but are not associated with permanent
control features on the project. The Engineer will limit the area of preparing right -of-way,
clearing and grubbing , excavation and borrow to be proportional to the CONTRACTOR 'S
capab ility and progress in keeping the finish grading , mulching , seeding , and other such
permanent pollution -control measures current in accordance with the accepted schedule .
Should seasonal conditions make such limitations unrealistic, temporary soil-erosion -control
measures shall be performed as directed by the Engineer.
0 6/2 0/08
1. Waste or disposal areas and construction roads shall be located and
constructed in a manner that will minimize the amount of sediment
entering streams .
2 . Frequent fordings of live streams will not be permitted ; therefore ,
temporary bridges or other structures shall be used wherever an
appreciable number of stream crossing are necessary. Unless otherwise
approved in writing by the Engineer, mechanized equ i pment shall not be
operated in live streams.
3. When work areas or material sources are located in or adjacent to live
streams , such areas shall be separated from the stream by a di ke or other
SP-39
barrier to keep sediment from entering a flowing stream . Care shall be
taken during the construction and removal of such barriers to minimize the
muddying of a stream.
4. All waterways shall be cleared as soon as practicable of false work , piling,
debris or other obstructions placed during construction operations that are
not part of the finished work .
5. The Contractor shall take sufficient precautions to prevent pollution of
streams, lakes and reservoirs with fuels, oils , bitumens, calcium chloride
or other harmful materials. He shall conduct and schedule his operations
so as to avoid or minimize siltation of streams, lakes and reservoirs and to
avoid interference with movement of migratory fish .
E. SUBMITTAL: Prior to the start of the applicable construction, the Contractor shall
submit for approval his schedules for accomplishment of soil-erosion-control work and his
plan to keep the area of erodible-earth material to a minimum . He shall also submit for
acceptance his proposed method of soil-erosion control on construction and haul roads and
material sources and his plan for disposal of waste materials . No work shall be started until
the soil-erosion control schedules and methods of operations have been reviewed and
approved by the Engineer.
F. MEASUREMENT AND PAYMENT: All work, materials and equipment necessary to
provide temporary erosion control shall be considered subsidiary to the contract and no extra
pay will be given for this work.
91 . GREEN CEMENT POLICY: As per Fort Worth City Council Resolution 3536, the
City Manager is authorized to specify the purchase of dry kiln cement as the base bid in City
of Fort Worth bid projects, with an alternative bid for the purchase of cement from an
unspecified source and preferential purchasing for bids from a cement kiln with emissions
not exceeding 1.7 pounds of NOx per ton of clinker produced. In cases where cement
meeting the above requirements is not available, and where cement from a non-compliant
source must be utilized, the Contractor shall furnish good faith effort documentation in the
form of letters from two North Texas cement suppliers of green cement stating that no stock
of green cement is available for the contractor at that time. These letters shall be
considered valid for a maximum of one week after which new letters must be submitted to
the Project Inspector if green cement continues to remain unavailable. All related costs for
complying with the Green Cement Policy shall be considered subsidiary to the applicable
project pay items .
The contractor shall submit the Green Cement Policy Compliance Statement or the good
faith effort documentation at the time the of bid opening of the project. A copy of the
Compliance Statement is attached at the end of this section. Failure to comply with the
Green Cement Policy may result in rejection of the bid as non-responsive.
92 . TRAFFIC CONTROL : The contractor will be required to obtain a "Street Use Permit"
prior to starting work . As part of the "Street Use Permit " a traffic control plan is required .
The Contractor shall be responsible for providing traffic control during the construction of this
project consistent with the provisions set forth in the "Latest Edition Texas Manual on
Uniform Traffic Control Devices for Streets and Highways" issued under the authority of the
06/20/08 SP -40
"State of Texas Uniform Act Regulating Traffic on Highways," codified as Article 6701d
Vernon's Civil Statutes, pertinent sections being Section Nos . 27, 29, 30 and 31.
Unless otherwise included as part of the Construction documents, the Contractor shall
submit a traffic control plan (duly sealed, signed and dated by a Registered Professional
Engineer (P.E.) in the state of Texas), to the City Traffic Engineer [Tel (817)392-8770] at or
before the preconstruction conference. The P.E. preparing the traffic control plan may utilize
standard traffic reroute configurations posted as "Typicals" on the City's Buzzsaw website.
Although work will not begin until the traffic control plan has been reviewed and approved,
the Contractor's time will begin in accordance with the timeframe mutually established in the
'Notice to Proceed' issued the Contractor. ·
The Contractor will not remove any regulatory sign, instructional sign, street name sign or
other sign, which has been erected by the City. If it is determined that a sign must be
removed to permit required construction, the Contractor shall contact the Transportation and
Public Works Department, Signs and Markings Division, (Phone Number 871-7738) to
remove the sign. In the case of regulatory signs, the Contractor must replace the permanent
sign with a temporary sign meeting the requirements of the above-referenced manual and
such temporary sign must be installed prior to the removal of the permanent sign. If the
temporary sign is not installed correctly or if it does not meet the required specifications, the
permanent sign shall be left in place until the temporary sign requirements are met. When
construction work is completed to the extent that the permanent sign can be reinstalled, the
Contractor shall again contact the Signs and Markings Division to reinstall the permanent
sign and shall leave his temporary sign in place until such reinstallation is completed.
Work shall not be performed on certain locations/streets during "peak traffic periods" as
determination by the City Traffic Engineer and in accordance with the applicable provision of
the "City of Fort Worth Traffic Control Handbook for Construction and Maintenance Work
Areas ."
The lump sum pay item for traffic control shall cover design, and I or installation and
maintenance of the traffic control plans.
06/20/08 SP-41
(To be printed on Contractor's Letterhead)
Date : ____ _
DOE No:
PROJECT NAME: Water/Sanitary Sewer and Paving/Storm Drain Improvements for:
MAPSCO LOCATION: --
LIMITS OF CONST.: -------------Estimated Duration of Construction on your Street : _ days
THIS IS TO INFORM YOU THAT UNDER A CONTRACT WITH THE
CITY OF FORT WORTH, OUR COMPANY WILL < REPLACE WATER
AND/OR SEWER LINES -RECONSTRUCT THE STREET> ON OR
AROUND YOUR PROPERTY.
CONSTRUCTION WILL BEGIN APPROXIMATELY SEVEN DAYS
FROM THE DATE OF THIS NOTICE.
IF YOU HA VE QUESTIONS ABOUT ACCESS, SECURITY, SAFETY
OR ANY OTHER ISSUE, PLEASE CALL:
Mr. <CONTRACTOR'S SUPERINTENDENT> AT <TELEPHONE NO.>
OR
Mr. <C ITY INSPECTOR> AT <TELEPHONE NO.>
AFTER 4:30 PM OR ON WEEKENDS, PLEASE CALL 871-7970
PLEASE KEEP THIS FLYER HANDY WHEN YOU CALL.
06/20/08 SP -42
PAR TE
SPECIFICATIONS
The City of Fort Worth 's "Standard Specifications for Street and Storm Drain Construction " will govern this
project, except as modified by the Contract Documents and the plans . A copy of these Standard Specifications may
be purchased at the office of the Transportation and Public Works Director, 1000 Throckmorton Street, 2"d Floor,
Municipal Building, Fort Worth, TX 76102.
"Texa s Departm ent of Transportation Standard Specifications for Construction of High ways, Stree ts and Bridges ",
latest edition, are also referenced by the plans and Contract Documents for signal installations .
"Standard Sp ecifications for Public Works Construction ", latest edition, as published by the North Central Texas
Council of Governments (NCTCOG) shall cover any remaining items not included by the Fort Worth or TxDOT
Standard Specifications or modified specifically by the plans or Contract Documents .
SECTION
NUMBER
1.0
2.0
2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8
2.9
2.10
2.11
2.12
2.13
2.14
2.15
2.16
2.17
2.18
2.19
2.20
2.21
3.0
3.1
3.2
3.3
3.4
3.5
3.6
3.7
3.8
3.9
TRAFFIC SIGNAL SPECIFICATION
TABLE OF CONTENTS
DESCRIPTION
GENERAL SPECIFICATIONS FOR
CONSTRUCTION OF TRAFFIC SIGNALS
MATERIALS
General Notes
Traffic Signal Heads
LED Traffic Signal Lamp Units
Traffic Signal Head Louvers
Traffic Signal Head Mounting Hardware
Pedestrian Signal Head
LED Pedestrian Signal Lamp Unit
Pedestrian Signal Head Mounting Hardware
Pedestrian Pushbutton Assemblies
Luminaires
Conduits and Related Hardware
Microwave Vehicle Detectors
Video Vehicle Detection Units
Detector Cable
Multi-Conductor Cable
Power Lead-In Cable
Ground Boxes
Traffic Signal Structures
Foundations
Hardware Paint (Non Streetscape Structures)
Grounding Conductor and Grounding Rod
INSTALLATION OF TRAFFIC SIGNAL
COMPONENTS
Installation of Electrical Service
Installation of Conduit
Install ation of Cable
Grounding
Vehicle Detector Loop Installation
Concrete Foundations for Signal Structures
Installation of Traffic Signal Structures
Installation of Signal Heads , Pedestrian Heads and Push
Buttons
Controller Cabinet Preparation
Traffic Signal Specifications -Part E
City of Fort Worth
PAGE
NUMBER
3
5
5
6
7
8
8
10
10
11
12
12
13
13
16
19
19
19
19
20
21
21
22
22
22
22
25
28
28
29
30
32
33
July 2008
Page 1
SECTION
NUMBER
3.10
3.11
3.12
4.0
5.0
6.0
6.1
6.2
6.3
6.4
6.5
7.0
7.1
7.2
7.3
7.4
7.5
8.0
9.0
10 .0
11.0
12.0
TRAFFIC SIGNAL SPECIFICATION
TABLE OF CONTENTS
DESCRIPTION
Installation of Microwave Detector Units
Installation of Video Detection Units
Installation of Emergency Vehicle Detector Units
INST ALLA TI ON AND RELOCATION OF TRAFFIC
SIGNS AND DAMPERS
PRESERVATION OF LANDSCAPING, SPRINKLER
SYSTEMS, AND PRIVATE PROPERTY
REMOVAL OF MISCELLANEOUS ITEMS
Removal of Traffic Signal Equipment
Removal and Replacement of Curbs and Walks
Removal of Foundations
Removal of Ground Boxes
Removal of Signs
SAMPLING AND TESTING
General Notes
Concrete
Vehicle Detector Loops
Signal Cables
Controller Cabinets
WARRANTIES/GUARANTEES
TRAFFIC SIGNAL MAINTENANCE DURING
CONSTRUCTION
BARRICADES
PAYMENT FOR FURNISHING AND INST ALLING
CONTRACT ITEMS
EXPERIENCE AND QUALIFICATIONS
Traffic Signal Specifications -Part E
City of Fort Worth
PAGE
NUMBER
33
33
33
33
34
34
34
34
35
35
35
35
35
36
36
36
36
37
37
37
38
39
July 2008
P age 2
TRAFFIC SIGNAL SPECIFICATIONS
1.0 GENERAL SPECIFICATIONS FOR CONSTRUCTION OF TRAFFIC SIGNALS
1.1 This specification, the General Conditions and the Special Provisions for construction in the
City of Fort Worth (the City), where applicable , shall govern the materials and installation of
traffic control signals , including illumination, at the intersections . In the event of a conflict ,
the plan set and detail sheets shall control.
1.2 This project shall consist of installing materials and equipment necessary to complete the
traffic signal at locations as set out in the construction plan set. The Contractor shall furnish
all required materials and equipment not provided by the City, and shall install signal systems
in the sequence specified by the Traffic Services Manager or designee . The City will issue
the anticipated sequence of work locations at the time the Notice to Proceed is issued .
1.3 All installation work shall be in accordance with the applicable sections of the National
Electrical Code (NEC), local ordinances and regulations , these specifications, the standard
detail sheets accompanying the plans , and those applicable sections of the City 's Standard
Specifications for Street and Storm Drain Construction. In the event that these specifications
should be less restrictive than the NEC , the NEC shall prevail. Any deviation from these
specifications or standard detail sheets shall be considered unacceptable unless authorized in
writing by the Traffic Services Manager or designee.
All workmanship shall be of the highest quality. Finished work shall be neat and uncluttered
in appearance. The City will have the authority to bar from this project any Contractor's
employee whose work is judged substandard and unacceptable by the project City Inspector
with approval of the Traffic Services Manager or designee. The Contractor shall schedule his
work so as to cause the minimum interference with traffic and the operation of the existing
signal system. Existing signals may be turned off or placed on flash for modification and/or
equipment installation only with the approval of the Traffic Services Manager or designee
with a minimum of 48 hour notice.
The Contractor's responsibility in regard to Traffic Signal installation work shall consist of
the following items :
(A) Furnishing and installing signal equipment including : signal structures, conduits ,
ground box es , signal head assemblies , detector units, AC service , conductors , concrete,
reinforcing steel , forms for structure foundations , grouting materials , painting materials ,
detector loop saw cut and sealing materials , signs, miscellaneous nuts , bolts, and washers ,
and all other miscellaneous equipment as required to complete the project, including all
necessary barricades or devices required to maintain proper traffic control in accordance
with the lat est version of the Tex as Manual on Uniform Traffic Control Devices
(TMUTCD).
Traffic Signal Specific ations -Part E
City of Fort Worth
July 2008
Page3
-
(B) Installing and connecting equipment supplied by the City, including but not limited to
controller-cabinet assemblies , signal poles , mast arms , emergency pre-emption
devices and video detection systems.
(C) Maintaining existing traffic signal operations including providing all materials and
labor.
(D) Removing and salvaging existing traffic signal or street light equipment as designated
in the plans.
(E) It shall be the responsibility of the contractor to perform the following at no additional
compensation:
1. Prevent any property damage to property owner's poles, fences , landscaping,
mailboxes, etc., and repair any damages.
2 . Provide access to all driveways during construction.
3. Protect all underground and overhead utilities, including sprinkler systems ,
and repair any damages
1.4 The Contractor's responsibility for correcting any substandard workmanship and/or materials
shall extend for a period of twenty four (24) months from the date the signal is accepted by
the City. This workmanship and materials shall include, but not be limited to , signal pole
construction, signal head assembly, vehicle detector systems, ground box and conduit
installation, signal head and cable installation.
1.5 The Contractor shall coordinate with the Inspector to have a qualified technician on the
project site when the traffic signal is placed into operation.
1.6
During the thirty (30) day test period, the City shall be the first respond to any trouble calls. If
the City Troubleshooter determines that the repairs are the result of poor workmanship, the
Contractor shall complete the repairs. The Contractor shall provide a local telephone number
(not subject to frequent changes) where trouble calls are to be received on a 24-hour basis .
The Contractor's response time to reported calls shall be within a reasonable travel time, but
not more than two (2) hours max imum. Appropriate repairs shall be made within 24 hours.
If, after further diagnosing the problem, the qualified technician determines the problem is in
the equipment supplied by others, the Contractor shall notify the Inspector.
NO EXTRA COMPENSATION WILL BE ALLOWED FOR FULFILLlNG THE
REQUIREMENTS STATED ABOVE.
The City of Fort Worth, Traffic Services Division will furnish the traffic signal controller and
cabinet. The Contractor shall connect all field wiring to the controller-cabinet assembly. The
City will assist in determining how the detector loop lead-in cables are to be connected in the
cabinet. The City will program the controller, the conflict monitor, detector units , and other
equipment in the controller cabinet and turn on the traf fic signals. The contractor shall obtain
the signal cabinet from the City of Fort Worth, Traffic Services Division, 5001 James
A venue .
The Contractor shall notify the Inspector at least 3-working days prior to picking up the
controller-cabinet assembly.
Traffic Signal Specifications -Part E
City of Fort Worth
July 2008
Page4
....
1.7 The locations of traffic signal foundations, bases, conduit, detectors, etc., shown on the plans
are approximate. The Contractor shall give the Inspector 48 hours notice of his intention to
establish the final location of any foundations, bases, conduit, detectors, etc., and have the
locations approved on the ground by the Project Engineer or an authorized representative.
1.8 The location and depth of all utilities shown on the plans are approximate and there may be
other unknown utilities existing not shown on the plans that should be field verified and
protected by the contractor prior to the start of construction. The contractor shall contact DIG
TESS and all appropriate utility companies as needed 48 hours prior to doing any work in the
area including the following City of Port Worth offices:
a. City Utility Mains (Water, Sewer) 817-871-8275
b. City Traffic Signals, Street Lights and Storm Drains 817-392-8100
1.9 Whenever the work provided for and contemplated under the contract has been found by the
Inspector to be completed to his / her satisfaction on any individual signalized intersection, or
interconnected system of signalized intersections, as shown in the plans, final cleaning up of
said signalized intersection has been performed and the traffic signal equipment supplied by
the contractor has operated continuously for a minimum of thirty (30) days in a satisfactory
manner, the Contractor will be released from further maintenance on that particular
intersection. Such partial acceptance will be made in writing and shall in no way void or alter
any terms of the contract.
2.0 MATERIALS
2.1 General Notes
2.1 .1 It is the Contractor's responsibility to furnish all materials necessary to complete each traffic
signal installation, whether the item is specifically mentioned or not. All unspecified
materials (i.e., electrical tape, bolts, and nuts, etc .) shall meet the requirements of the National
Electrical Code. All materials supplied by the Contractor shall be new un-depreciated stock.
2 .1.2 Certain sections of these specifications list examples of acceptable brands and model
numbers of the items described. Items of equal durability, performance, and design may be
substituted upon City acceptance. Bidders may be required to submit to the Traffic Services
Division information on materials they desire to furnish and install. A two year warranty
shall be required on all other equipment furnished. A list of cities, towns, etc., where the
equipment being bid has been in field service for at least two (2) years may be required by the
City of Port Worth for reference. The list shall contain names and phone numbers of persons
who can be contacted for such reference. If the guidelines listed above are not met, the bid
and the equipment shall not be accepted.
2.1.3 If more than one unit of a given bid item is required, then the Contractor shall ensure that all
units are the product of one manufacturer, unless otherwise directed by the Traffic Services
Manager or designee.
2.1.4 All materials furnished by the Contractor shall become the property of the City of Port Worth,
effective upon successful completion of a 30 day test period . Except for materials supplied
Traffic Signal Specifications -Part E July 2008
City of Port Worth Page 5
-
by the City, the Contractor shall have full responsibility for materials until the date of
acceptance with respect to damage, theft, or loss.
2.1.5 Prior to final acceptance by the City, the Contractor is responsible for removal, replacement
and reinstallation of any damaged material at the Contractor's expense.
2.2 Traffic Signal Heads
Each traffic signal head supplied shall meet the following requirements:
2.2.1 The housing and doors of the signal head shall be made of die cast aluminum alloy in
accordance with A.S.T .M . Specification B85-57T. Sandcast aluminum alloy shall be used
for other parts of the signal head if in accordance with A.S .T .M. Specification B26 -57T.
The visors shall be fabricated from aluminum sheet conforming to the A.S.T.M.
Specification B-209-57T. All miscellaneous parts such as hinge pins, lens clips, locking
devices, etc . shall be made of a non-corrosive material.
2.2.2 The housing of the signal heads shall be constructed of interchangeable sections. All
exterior mating surfaces shall be flat to assure waterproof and dust-proof assembly of
sections. The top and bottom of the sections will have an opening approximately two (2)
inches in diameter to permit the entrance of one and a half (1-Yz) inch pipe nipples. Each
section shall have serrated openings or equivalent, for providing a positive and locked
positioning of signal sections when used with serrated mast arm or span wire mounting
brackets.
2.2.3 The door and lens housing shall be equipped with a watertight and dust-tight molded
neoprene gasket. The door of each signal section shall be attached to the housing in a
watertight and dust-proof manner. Non-corrosive hinge pins and two (2) wing screws will
be furnished on each door for opening and closing without the use of special tools. These
hinges and screws shall be of such design as to allow even gasket pressure .
2.2.4 Each signal head section shall be furnished with a detachable tunnel type visor unless
otherwise specified. Visors shall be a minimum of ten (10) inches in length ( depth) for
twelve (12) inch signals, or a minimum of seven (7) inches in length (depth) for eight (8)
inch signal heads where specifically called for in the construction plans. Visors shall be
attached to the door assemblies in a manner that facilitates field removal and installation.
Visors shall be fabricated from aluminum and shall not form a complete circle and shall
have the bottom open, unless louvers are required.
2.2.5 Traffic signal housing shall be furnished with LED inserts that comply with section 2.3 of
these specifications and shall be in the standard red, amber and green configuration as
specified by the most current version of the "Texas Manual on Uniform Traffic Control
Devices" (TMUTCD).
2.2.6 A screw down type terminal block shall be provided with each signal head for facilitating
field wiring. The pigtail leads from the lamp receptacles shall be connected to a common
terminal block within the head assembly. Each terminal block will be at least a six (6)
position, twelve (12) terminal strip securely fastened at both ends to the signal housing.
Traffic Signal Specifications -Part E
City of Fort Worth
July 2008
Page 6
2.2 .7. All traffic signal heads shall conform to the requirements of the most current version of the
Texas Manual On Uniform Control Devices in color and arrangement. The housing and
outside surface of the visors shall be "Federal Yellow" in color. The inside surface of
visors shall be a "Dull" or "Flat-black" color. The outside surface shall have a minimum
of two (2) coats of baked chrome yellow enamel (TT-C-595E 1310), Munsell notation
O.YP 47 /15 /3, per FAA Specification L-802-B and ASTM D 1535.
2.3 LED Traffic Signal Lamp Unit
2.3.1 This specification describes the minimum acceptable design and performance requirements
for a 12 in. (300mm) or 8 in (200 mm) LED (light emitting diode) traffic signal lamp unit.
The equipment furnished shall conform to these Specifications. Further, the equipment
shall conform to the applicable requirements of: the Underwriter's Laboratory Incorporate
(UL); the American Society for Testing and Materials (ASTM); the American Standards
Institute (ANSI); the National Electrical Manufacturer's Association (NEMA); and other
applicable standards and specifications.
(A) The LED traffic signal lamp unit shall comply at a minimum with the Institute of
Transportation Engineers (ITE) specification for Vehicle Traffic Control Signal Head
-Light Emitting Diode (LED) Circular Signal Supplement (YTCSH); adopted June
2005, for circular indications and Vehicle Traffic Control Signal Head Part 3: Light
Emitting Diode (LED) Arrow Traffic Signal Modules for arrow indications.
(B) The LED shall have an "incandescent" look, using the minimum number of LED's
that comply with the ITE specification.
(C) If proper orientation of the LED unit is required for optimum performance, a clear,
durable and unmistakable marking shall be provided on each lens as to its proper
orientation (top or bottom).
(D) The manufacturer's name, serial number and other necessary identification shall be
permanently marked on the backside of the LED traffic signal lamp unit. A label
shall be placed on the unit certifying compliance to ITE standards.
2.3 .3 Documentation Requirements
(A) Each LED traffic signal lamp unit shall be provided with the following
documentation:
(B)
(1) Complete and accurate installation guide.
(2) Contact name, address, and telephone number for the representative,
manufacturer, or distributor for warranty repair.
A copy of a test report certified by an independent laboratory that the LED traffic
signal lamp model submitted meets all the requirements of these specifications in
accordance with ITE VTSCH Part 2.
Traffic Signal Specifications -Part E
City of Fort Worth
July 2008
Page 7
2.4 Signal Head Louvers
2.4.1 Louvers shall be provided for those signal sections indicated in the plans. All louvers shall
be of such design as to provide visibility of the lens for the intended lane of traffic as
indicated by the plans and block visibility to all other lanes.
2.4.2 The internal arrangement of each louver shall consist of 5 vanes or 7 baffles with 7 degree
cut-off right of center, or unless specifically call for in the plan set. All louvers or baffles
shall have a flat black finish. Each louver or baffle shall be of suitable weight and size to fit
inside the full circle visor furnished for the intended signal section.
2.4.3 Louvers shall be secured by rivets to the visor. Baffles shall be secured by sponge 0-rings.
2.5 Traffic Signal Head Mounting Hardware
2.5.1 Mast Arm Mount Signal Bracket, I-Way Cable Mount
The product bid shall be equal to or better than the mast arm mount signal bracket, 1-way
cable mount, for 3 to 5 section head with 84" cable and 74" long gusseted tube manufactured
by Pelco, part no. AB-0125 . General Specifications are below.
2.5.2 Mast Arm Mount Signal Bracket, I-Way Cable Mount, Clamp Assembly
The product bid shall be equal to or better than the mast arm clamp assembly with 84" cable
manufactured by Pelco, part no. AB-3009. General Specifications are below.
2.5 .3 Mast Arm Mount Signal Bracket, 2-Way Cable Mount
The product bid shall be equal to or better than the mast arm mount signal bracket, cluster
cable mount, for 5 section signal head with 84" cable manufactured by Pelco, part no. AB-
0138. General Specifications are below.
2.5.4 General Specifications for Traffic Signal Head Mounting Hardware
(A) The bracket shall be completely adjustable such that it is capable of rotational
adjustment about the bracket axis, vertical adjustment, rotational adjustment about the
mast arm and rotational adjustment right & left from the vertical plane.
(B) The bracket shall be provided with aircraft type stranded cable for fastening the
bracket to the supporting arm or structure. The bracket shall be easily adjustable to fit
all sizes of round, octagonal, elliptical or other shaped structure without special tools
or equipment.
(C) The bracket shall attach to the signal in a clamping manner holding the signal both
top and bottom in order to assure maximum rigidity. For the one-way cable mount, a
standard bracket shall accommodate all major signal manufacturers' signals from a
three (3) section I-way 8" and 12 " signal through a five (5) section I-way 12 " signal
and any combination thereof including 3M and ICC configurations . For the two-way
cable mount, a standard bracket shall accommodate all major signal manufacturers'
Traffic Signal Specifications -Part E July 2008
City of Fort Worth Page 8
signals from a three (3) section 2-way 8" signal through a three (3) section 2-way 12"
signal and any combination thereof including 3M and ICC configurations.
(D) All electrical wiring shall be completely concealed within the bracket. The vertical
support shall be a gusseted "C" shaped extruded aluminum tube to accommodate the
signal cable regardless of vertical positioning of the tube.
(E) Upper & Lower Arms: Shall be cast from 319 aluminum or equivalent. The lower
bracket arm shall be internally threaded to accommodate the threaded vertical support
tube. The lower arm shall be furnished with ABS plastic covers, which will slide and
snap into position without the use of fasteners or tools. All upper and lower arms shall
have 72 tooth serrations cast into the arm to assure a positive lock with signal housing
and shall be secured about their rotational axis with setscrews. Both upper and lower
arms shall have a tri-bolt arrangement for attachment to the signal housing. Opening
in the lower arms shall accommodate a minimum of 3, 12 conductor 14 gauge cables .
(F)) Vertical Support Tube: Shall be a double gusseted tube extruded from 6063-T6
aluminum alloy or equivalent and have a cross section. Each tube shall be complete
with a vinyl closure strip and be threaded on one end to accommodate the lower arm
assembly.
(G) Mast Arm Clamp Assembly: Both male and female halves shall be cast from 713
aluminum alloy or equivalent. The male clamp half shall be secured within the
female half, utilizing a spring steel retainer ring. Such assembly shall provide an
unobstructed center of 2 3/8" minimum diameter, allowing for 360 degree rotation of
the clamp assembly. There shall be no internal cross bracing assembly obstructing
the center opening.
(H) Aircraft Type Stranded Cable: Shall be fabricated in one piece with a minimum
diameter of 3/16" either galvanized or stainless steel. The cable shall be complete
with 7 /16" stainless steel clamp screw permanently attached to each end. Each clamp
screw shall be fitted with a stainless steel hex nut, SAE flatwasher and an aluminum-
bearing washer. The clamp screw shall be flattened on two opposite sides for wrench
accommodation. The stranded cable shall be of sufficient length to fasten the clamp
assembly to a minimum pole diameter of 8.6".
(I) Hardware: Each bracket shall be complete with all necessary bolts, washers, gaskets,
etc . to allow assembly of the signal to the bracket and the bracket to the mast arm.
(J) Finish: All aluminum parts shall have an Alodine (or equivalent) finish . All steel
parts shall have a federal yellow zinc di-chromate finish.
Traffic Signal Specifications -Part E
City of Port Worth
July 2008
Page9
2.6 International Pedestrian Signal Housing
2.6.1 These specifications cover the minimum requirements for a single-section pedestrian signal
housing with international hand/walk symbol. The housing shall be fitted with an LED
module that has an incandescent look and complies with Section 2. 7 of these specifications.
2.6.2 The housing shall be a one-piece corrosion resistant aluminum alloy die-casting with
integrally cast top , bottom and sides that are weather proof and dust-tight. It shall be right &
left drilled for clamshell attachment and shall have top and bottom ports that are opened and
capped and will accommodate standard 1 Yz " pipe.
2.6 .3 The approximate size of housing (including body, door, and ears) shall be 18.5"H x 18.75"W
x 8"D .
2.6.4 The doorframe shall be a one-piece corrosion resistant aluminum die-casting.
2 .6.5 The unit shall be powder coated federal yellow.
2 .6.6 The unit shall have a black z-crate visor that fits inside the assembly door and is secured with
screws to minimize movement.
2.6 .7 It shall have a standard three-position terminal block, pre-wired to receptacles to permit easy
field installation of a power supply.
2.6.8 All necessary hardware shall be provided with housing. Rivets shall be aluminum and bolts,
lock washers, screws , eyebolt assembly and pins shall be stainless steel.
2.7 LED Pedestrian Signal Lamp Unit
LED pedestrian indications must meet the following requirements: The equipment furnished
shall conform to these Specifications. Further, equipment supplied shall conform to the
applicable requirements of: the Underwriter's Laboratory Incorporate (UL); the American
Society for Testing and Materials (ASTM); the American Standards Institute (ANSI); the
National Electrical Manufacturer's Association (NEMA); and other applicable standards
and specifications.
2 .7 .1 General
The single combination WALK (man) and DON'T WALK (hand) LED unit shall be
designed to retrofit existing pedestrian signal housings without the use of any special tools.
(A) Installation of a retrofit replacement LED traffic signal lamp unit into an existing
signal housing shall only require removal of the existing lens , reflectors, and
incandescent lamps, fitting of the new unit securely in the housing door, and
connecting to existing electrical wiring or terminal block by means of simple
connectors.
Traffic Signal Specifications -Part E
City of Fort Worth
July 2008
Page 10
(B) If proper orientation of the LED unit is required for optimum performance, a clear,
durable and unmistakable marking shall be provided on each lens as to its proper
orientation (top or bottom).
(C) The manufacturer's name, serial number and other necessary identification shall be
permanently marked on the backside of the LED traffic signal lamp unit. A label
shall be placed on the unit certifying compliance to ITE standards.
2. 7 .2. Physical and Mechanical Requirements
(A) The LED traffic signal lamp unit shall fully conform to Institute of Transportation
Engineers (ITE) Equipment and Materials Standards, Vehicle Traffic Control Signal
Heads (VTCSH) part 2: LED vehicle Signal Modules .
2.7.3 Documentation Requirements
(A) Each LED traffic signal lamp unit shall be provided with the following
documentation:
(1) Complete and accurate installation guide.
(2) Contact name, address, and telephone number for the representative
manufacturer, or distributor for warranty repair.
(B) A copy of a test report certified by an independent laboratory that the LED traffic
signal lamp model submitted meets all the requirements of these specifications in
accordance with ITE VTSCH Part 2.
2.8 Pedestrian Signal Head Mounting Hardware
Each pedestrian signal head mounting hardware must meet the following requirements:
2.8.1 The pedestrian signal head mounting hardware shall be the clamshell mount type
equivalent to or better than the clamshell #4805 manufactured by McCain.
2.8.2 The subject mounting hardware shall be a two piece, cast aluminum alloy assembly. The
two separate castings shall be joined in the final assembly by the use of stainless steel
spnngpms.
2.8.3 The pole half of the assembly shall be designed to adapt to a wide range of pole
configurations ( 4 inch minimum diameter).
2.8.4 Unit .construction shall allow band-it type mounting. Band-it type mounting shall be
permitted by two recessed slots near the top and bottom of the pole half of the assembly.
2.8.5 The pedestrian assembly shall be capable of being mounted on the pole by lining up the
mounting pins of the pole half with the mounting ears of the pedestrian assembly and
lowering it into position.
Traffic Signal Specifications -Part E
City of Fort Worth
July 2008
Page 11
2.8.6 Three sets of screw terminal pairs shall be located on a terminal block in the upper third of
the head half of the clamshell assembly.
2 .8.7 A closed cell neoprene sponge gasket shall be provided on the mating surfaces of the two
halves of the assembly to compete the rain-tight construction .
2.9 Pedestrian Push Button Assemblies
2.9 .1 The product bid shall be equivalent to or better than the Bulldog pushbutton BDLM2-Y with
Bulldog Pole Mount BDPM-X manufactured by Polara and shall meet the following
specifications .
2.9.2 Button must be highly vandal resistant and pressure activated with essentially no moving
parts. Button must be able to withstand an impact from a baseball bat or hammer.
2.9.3 Button housing must be cast aluminum powder coated federal yellow.
2.9 .4 Button cap must be made of 316 stainless steel.
2 .9.5 Switch must be solid state electronic Piezo switch rated for 100 million cycles with no
moving plunger or moving electrical contacts.
2.9.6 Button must have LED to give indication of button being pushed.
2.9.7 Button must give a two toned beep indication of button being pushed (one tone for push, one
tone for release).
2.9.8 Button must have built in surge protection.
2.9.9 Button must be able to hold the call for a minimum of 5 seconds.
2.9.10 Button must operate immediately after being completely immersed in water for 5 minutes.
2.9 .11 Button must not be able to allow ice to form such that it would impede function of button or
button cap.
2 .9.12 All switch electronics must be sealed within the cast aluminum housing.
2.9 .13 Button must have raised ridges to protect the button from side impacts.
2.9.14 The button shall come complete with a aluminum round housing to be mounted to the signal
pole. The housing shall be cast aluminum powder coated federal yellow.
2.9 .15 All necessary pole mounting hardware shall be supplied.
2.10 Luminaires
2 .10.1 When luminaires are to be installed on steel mast arm poles, a separate fusetron link shall be
provided in the signal pole access compartment. The conductors from the pole base to the
Traffic Signal Specifications -Part E July 2008
City of Fort Worth Page 12
luminaire shall be #8 XHHW wire. Luminaires shall have a multi-tap (120 / 240 volt) ballast.
2.10.2 The luminaire head shall be a 'cobra ' type with drop lens. Each unit shall come with a photo
cell switch mounted on the top. Each luminaire shall contain a 200 watt high pressure
sodium bulb.
2.11 Conduits and Related Hardware
2.11.1 Conduit: All polyvinyl chloride conduits, including elbows and couplings shall be schedule
40 PVC conduit, conforming to Federal Specification W-C-1094 and Underwriters'
Laboratories, Inc. Standard UL-651. All conduit sizes shall be as indicated on the plans.
2.11.2 Rigid metal: Rigid metal conduit shall be steel, hot-dipped galvanized inside and outside.
2.11.3 Weather heads shall be made of aluminum and may be the threaded or the clamp on type.
2.12 Microwave Overhead/ Side-mounted Vehicle Detector
2 .12.1 General
(A) This item shall govern for the mm1mum acceptable design and installation
requirements for an overhead or side-mounted microwave vehicle presence
detector. All equipment required to interface with a traffic signal controller will be
subsidiary to this pay item.
(B). The unit shall detect the continuous presence of every type of vehicle.
(C) The horizontal range for detection shall be from a minimum of 1 ft . (300 mm) to a
maximum of 80 ft. (24,400 mm) at a mounting height of 20 feet.
(D) The sensor shall be able to hold the detection until the zone 1s cleared.
Additionally, the sensor shall be able to tune-out stationary targets that remain
within the detection zone for a minimum programmable time with one (1) minute
resolution from one (1) to thirty (30) minutes.
(E) The sensor shall self-tune to its detection zone with no external adjustments other
than physical alignment after the initial set-up. There will be no tuning controls of
any kind which will require an operator once the unit has been properly installed
with the set-up software.
(F) The detector output must be directly compatible with the controller cabinet detector
input.
(G) The detector shall be capable of continuous operation over a temperature range of -
35 F to + 165 F (-31 C to 78 C).
Traffic Signal Specifications -Part E
City of Fort Worth
July 2008
Page 13
2.12.2 Functional Requirements
(A) The microwave unit must have Federal Communications Commission (F.C.C .)
certification. The FCC-ID number must be displayed on an external label. The
detector will operate at a frequency , as allowed under the F.C.C. Rules, Part 15.
(B) Cabinet power utilized by a detector power supply will range from 90 to 135 VAC.
The detector will be self-contained. The power supply shall be an integral part of
the unit. External power supplies shall not be allowed.
(C) The unit will have an electro-mechanical SPDT relay to send a signal to the
controller.
(D) No component shall be of such design, fabrication, nomenclature or other
identification as to preclude the purchase of said component from any wholesale
electronic distributor.
(E) The unit must employ a circuit for power failure to put the relay to a fail-safe
position (recall) during a power failure.
(F) The detector must have a monitoring circuit for the transceiver that will change the
output relay to the fail-safe position in the event of a component failure.
(G) The detector shall work either as a side of the pole mounted detector or as an
overhead mounted detector at a height range of 12 ft. to 24 ft. (3650 mm to 7300
mm).
(H) All set -up and diagnostic software shall be provided to run on a Windows XP or
Windows NT based operating system.
2.12.3 Mechanical Requirements
(A) Each sensor shall be enclosed in a finished fabricated plastic and aluminum chassis
with a minimum 4 in. (100 mm) wide by 5 in . (130 mm) high front plastic panel.
The front plastic panel shall be constructed of a high impact plastic that covers the
opening in front of the antenna.
(B) Each detector chassis will be water resistant without the use of silicone gels or any
other material that will deteriorate under prolonged exposure to ultraviolet rays.
(C) The printed circuit board shall be coated with a solder mask material that resists
moisture and fungus. The solder mask shall have a silk screen to provide a label for
each component on the printed circuit board.
(D) The sensor shall be furnished with a bracket designed to mount directly to a pole or
overhead mast-ann structure.
(E) The sensor shall interface with the set-up software via a RS-232 port with a baud
rate of 1200.
Traffic Signal Specifications -Part E
City of Fort Worth
July2008
Page 14
(F) The maximum size of the detector shall be:
Height: 8.00 in. (200 mm) w/ mounting bracket
Width : 4.25 in. (108 mm)
Depth : 10.50 in. (270 mm)
2.12.4 Functional Tests:
(A) The manufacturer will test all microwave units to insure compliance to all F.C.C.
and department specifications.
2.12 .5 Software
(A) The set-up software shall be menu driven and shall utilize a Windows XP or
Windows NT type format for operating the software.
(B) An on-line help shall be provided as an integral part of the system software.
(C) The operator shall be able to perform the following functions through the set-up
software:
1. View a detection output from the unit.
2. View a low microwave signal from the unit.
3. Program the average intersection cycle time in the
set-up software.
4 . Program the presence time-out in one (1) minute intervals from one (1) to
thirty (30) minutes.
5. Program a delay time from zero (0) to twenty-five (25) seconds m one (1)
second intervals . 0 = off.
6. Program a delay inhibit time from zero (0) to twenty-five (25) seconds in one
(1) second intervals . 0 = off.
7. Provide a quick re-tune feature for re-tuning in an expedited fashion under ideal
background conditions.
(D) The operator shall be able to perform the following advanced program functions
through the set-up software:
1. Select and program a new sensor I.D. for each sensor.
2. Program a response time for the sensor.
Traffic Signal Specifications -Part E
City of Fort Worth
July 2008
Page 15
3. Program a hysteresis value from a selection of:
Low, Medium, or High
4. Program a profile value for each sensor.
(E) The operator shall be able to view the signature of the microwave and the deviation
parameters of the microwave for each sensor through the set-up software.
2.12.6 Documents
The Manufacturer shall supply an hardware installation guide and a software set up and
user manual.
2.13 Video Detection System (Does not apply to this contract)
2.13 .1 This specification describes the minimum acceptable design and performance requirements
for a video detection system to be furnished and installed in the City of Fort Worth, Texas
for the Transportation and Public Works Department. The Contractor shall furnish all
labor, materials, equipment and incidentals necessary to provide a video detection system .
2.13 .2 The equipment furnished shall conform to these Specifications and conform to the
applicable requirements of: the Underwriter's Laboratory Incorporate (UL); the American
Society for Testing and Materials (ASTM); the American National Standards Institute
(ANSI); the National Electrical Manufacturer's Association (NEMA); The Institute of
Transportation Engineers (ITE), and other applicable standards and specifications.
2 .13 .3 The Contractor shall furnish and install a functional Video Detection System. The system
shall detect the presence of vehicles on all approaches of the intersection and be
operationally compatible with controllers and conflict monitors currently used by the City
of Port Worth.
2.13 .4 The Video Detection System shall be equal or equivalent to the items listed in item 2.13. 7
below. Any video detection system proposed by the Contractor must meet all functions
provided by the system components listed.
2.13.5 The video detection component of this system is generally composed of 4 camera/processor
combination units and associated hardware.
2.13.6 The Video Detection System must be Autoscope Solo Pro or equivalent and capable of
performing the following functions:
The Video Processor System (VPS) shall be capable of providing up to sixteen (16) detector outputs to a
Type 170 traffic controller from up to eight (8) camera/video processor units (CNPU). Each CNPU field of
view shall provide a minimum of thirty-two (32) virtual detection zones for vehicle detection. The specific
number ofCNPUs to be provided is shown on the plan sheets for each intersection.
The Video Processor Unit (VPU) shall reside in each camera housing . The video output from the CNPU
shall be in color with active detection zones overlayed on full motion video.
Connection from the controller cabinet to the camera/processor mu st be twisted wire pairs only. No coaxial
cable shall be used from the controller cabinet to the cameras .
The CNPU shall be able to simultaneously perform vehicle presence detection while computing and storing
Traffic Signal Specifications -Part E
City of Port Worth
July 2008
Page 16
traffic data parameters for user selected intervals of 10 , 20 , or 30 seconds or 1, 5, 10 , 15 , 30 , or 60 minutes.
These parameters must include vehicle counts , flow rate , classification, occupancy, and speeds. The CNPU
shall be capable of operating in an IP-addressable multi-drop communications network that allows the traffic
data parameters to be polled down to ten (10) second intervals . It shall be possible to verify and download
the stored data at any time without disturbing the data currently stored in memory . The CNPU shall be
provided with occlusion compensation software on a per detection zone per lane basis in order to minimize
overcounting due to large vehicles.
Phase Red and Green load switch outputs from up to sixteen (16) phases ofa Type 170 traffic controller shall
be provided as inputs to the CNPU for inhibiting detector Extend/Delay timing functions.
The CNPU software shall provide Boolean logic gates (AND , OR, NAND , and N of M) that allow the
detector outputs to be daisy chained/linked together for customized operation. In addition, the CNPU shall
be able to condition the detector outputs based on the state of the associated phase number and color. The
following detector types shall be available:
Detector Output Type Function Phase State
0 Send a call for every Not applicable
vehicle presence detected
1 Extend a call Green
Delay a call Not Green
2 Delay a call Green
Extend a call Not Green
3 Lock a call Not Green
4 Extend and/or lock a call Not Green
5 Extend and/or lock a call Not Green
(with an automatic reset
timer)
6 Lock a call Red
7 Reserved for future output
type (Defaults to Type 0
output)
8 Calculate dilemma zone Green
and automatically extend a
call Not Green
Send a call for every
vehicle presence detected
9 Delay and/or lock a call Red
Send a call for moving Not Red
vehicles only
The serial communication port on the VPS shall be a DB-9 RS-232 connector. The Contractor shall supply a
software package that will operate with Windows 3.1, 95 , 98 , and NT. In the direct connect mode , the
software resident in the VPS and in the personal computer shall be capable of transmitting and receiving all
information needed for detection zone set-up , monitoring vehicle detection by viewing flashing detection
zone overlays , and uploading/downloading and interrogating all stored data within the VPS. Future remote
communications with the VPS shall be possible with the addition of external communication devices (modem,
codec , etc .) using the RS-232 and video output ports on the VPS.
The VPS shall be provided with front panel switches and LED indicators that allow an operator to manually
select and verify the VPS operating mode , monitor camera Sync and Data operation, and monitor a minimum
of 16 outputs and 8 inputs of the VPS without the use of an external device such as a personal computer.
The CN PU shall be capable of detecting vehicles for a minimum of eight (8) lanes plus two (2) shoulders on
a per camera basis . The CNPU shall also be able to simultaneously detect both approaching and departing
vehicl es for each camera field of view .
The CNPU operational software shall be stored internally in Flash Memory and be capable of being updated
without the removal and replacement of memory devices.
The CNPU shall be provided with count, presence, directional presence , speed, stopped vehicles , and queue
Traffic Signal Specifications -Part E July 2008
CityofFort Worth Page 17
types of detection zones. An adjustable cycle timer shall be available for dealing with stopped vehicles . The
Windows software shall be able to display the traffic parameters on the screen of an SVGA monitor on a per
vehicle basis for each detection station by lane. It shall also be possible to view and sort the stored data for
selected time intervals.
A Clock/Calendar shall be resident in the CNPU software for turning on/off certain parameters used to
enhance detection performance, and shall include Daylight Savings compensation.
The Contractor shall provide a .125 inch thick aluminum Camera Interface Panel mounted to the wall of the
traffic controller cabinet for protecting the CNPU video, data, and power. The panel shall contain as a
minimum; one (1) Edco CX06 coax protector per camera (if video is output on coaxial cable), an Edco ACP-
340 for protecting the CNPU power, a 10 amp circuit breaker, and a terminal strip with a minimum of six (6)
8-32 binder head screws for input/output power.
The VPS shall be IS09002 registered prior to bid opening . The VPS shall also be a UL recognized
component that complies with the requirements ofEN6095D.
The VPS at each intersection shall be able to be networked using a 2-TWP interconnect back to the Master
Cabinet for future communication to the Traffic Management Center. This communication must be full-
duplex RS-485 and be capable of being daisy-chained at each VPS location.
A minimum two-year warranty shall be provided commencing with the payment for materials on hand.
2.13.7 Video Detection System Components
Item Description
1 Camera/Processor Combination
2 5 Yi Pair 18-Gauge Cable
3 Communications Interface Panel ( 4-Camera)
4 Mini-Hub Detector Card
5 Camera Mounting Bracket, Pelco Model AB-0166-5-84
6 Interface Cable Assemblies
7 Users Guide
8 Field Setup Monitor
9 Installation Assistance and/ or User Training (Days)
2.13. 8 Warranty and Documentation Requirements
The Video Detection System shall be warranted against failure due to workmanship or
material defects within the first 2 years of field operation.
2.13 .9 If any one component fails, it should be easily identifiable by visual inspection
And replaced or repaired per the warranty.
2.13 .1 OEach component shall be provided with the following documentation:
A. Complete and accurate installation, set-up and users guide.
B. Contact name, address , and telephone number for the representative, manufacturer,
and/or distributor for warranty repair.
2.13.11 Measurement and Payment
The Video Detection System Installation will be measured as a completed installation and payment
will be made at the lump sum price listed on Proposal. The lump sum price shall be full
compensation for furnishing, placing, and testing all materials and equipment and for all tools,
Traffic Signal Specifications -Part E
City of Port Worth
July 2008
Page 18
labor, equipment, and incidentals necessary to complete the work. Portions of the work that have
not been approved by the Inspector will not be considered complete, and payment shall be
withheld until the Contractor has corrected the work to the satisfaction of the Traffic Services
Manager or designee .
2.14 Detector Cable
2.14.1 Detector Loop Wire:
All detector loop wire shall be #14 AWG, or better if required on the traffic signal layout
sheet, stranded, type XHHW one (1) conductor cable.
2.14.2 Detector Lead-In Cable:
Loop detector lead-in cable shall be a single four (4) conductor No. 18 AWG, shielded
cable . One (1) cable shall service each loop where practical.
2.15 Multi-Conductor Cable
2.15.l All cable for intersection signalization shall be multi-conductor capable of operating at 600
volts maximum, and suitable for use at conductor temperatures not exceeding 75 degrees C
(167 degrees F).
2.15 .2 Multi-conductor cable shall be either stranded IMSA 20-1, #14 AWG, stranded copper wire,
IMSA 7-1, #16 AWG, stranded copper, or IMSA 5-1, #16 AWG, stranded copper. The
copper wire (before insulating) shall meet the requirements of the latest American Society for
Testing and Materials (ASTM) standards for uncoated wire.
2.16 Power Lead-In Cable
2.16.1 Power lead-in cable shall be stranded RHW copper wire and suitable for A/C electric service.
2 .16.2 The cable shall be capable of operating at 600 volts maximum and suitable for use at
conductor temperatures not exceeding 167 F (75 C). Material and construction shall be in
accordance with the applicable requirements ofIMSA and NEC standards.
2 .16 .3 Conductors shall be stranded, anneal coated copper. Copper wire before insulating or
stranding, shall meet the requirements of the latest edition of ASTM B-033 (for coated wire).
Stranding shall be class B, in accordance with the latest edition of ASTM B-8.
2.16.4 Insulation shall consist of cross-linked thermosetting polyethylene, meeting the requirements
ofIMSA and listed by UL as type USE RHW-75C.
2.17 Ground Boxes
2.17.1 General Requirements
All ground boxes specified for use at signalized intersections shall satisfy the following
general requirements :
Traffic Signal Specifications -Part E
City of Fort Worth
July 2008
Page 19
A.. The top surface of the ground box cover shall have a minimum co-efficient of friction
of0.5.
B. Boxes shall be stackable for extra height.
C. Boxes shall be manufactured from Reinforced Polymer Concrete (RPM) composed of
borosilicate glass fiber, a catalyzed polyester resin and an aggregate. Side walls may
be reinforced polymer.
D. Enclosures and covers shall be rated for a minimum of 5000 lbs. strength over a 10 in.
(250 mm) x 10 in. (250 mm) area. All components shall be designed and tested to
withstand temperatures as low as -20 F (-4 C).
The size and dimensions of the required ground boxes shall be shown on the Ground Box and
Detector Details sheet in the plan set
2.18 Traffic Signal Structures
2.18.1 Unless specifically required in the construction plan set, all traffic signal mast arm poles shall
be furnished by the City. If the plans call for traffic signal structures to be supplied by the
Contractor, then the strict compliance with the designs, dimension, strength, and material
quality specified in the standard detail sheets and the construction plan set shall be exercised
to assure structural consistency of all components.
2.18.2 All pole shafts and mast arms for this project shall be marked with the identification numbers
from the traffic signal layout sheets on the plans to facilitate assembly of these items in the
field. For projects with multiple intersections, the pole shafts and mast arms shall be
identified by intersection.
All steel mast arms ranging above 36 ft. (11.0 M) to 60 ft . (17.8 M) in length shall be
provided with aluminum vibration dampers.
All components of Traffic Signal Structures listed in this subsection shall be hot dipped
galvanized to resist corrosion, unless otherwise required in the construction plan set or bid
documents.
High Strength Galvanized Steel Bolts: The allowable working stresses for A325 bolts shall
be given in the AASHTO Streetscape Structure Specifications for Structural Joints using
ASTM A3250-N or A490-N bolts.
2.18.2 Mast Arm Pole Shaft
Each traffic signal mast arm pole shall be fabricated from a one piece high strength steel
sheet, and shall have no more than two longitudinal full length high frequency resistance
welded joints and no horizontal welded joints except at the base of the pole. All welds shall
have a smooth and consistent external surface appearance. All traffic signal poles shall have
a uniform taper. All poles shall have a minimum of 50,000 PSI yield strength. Cold working
the steel to attain the 50 ,000 PSI required yield strength is not acceptable. The certifications
Traffic Signal Specifications -Part E
City of Fort Worth
July 2008
Page 20
from the vendor on the steel must indicate a minimum of 50,000 PSI yield strength after
fabrication.
2 .18.3 Mast Arm
Each traffic signal mast ann shall be constructed from a one piece high strength, steel sheet
with a guaranteed minimum yield strength of 50,000 PSI. Arms over 40 ft. (12.2 M) may be
two piece but shall arrive at the job site and City yard as welded one piece. The certifications
from the vendor on the steel must indicate a minimum of 50,000 PSI yield strength after
fabrication. Cold working the steel to attain the 50,000 PSI required yield strength is not
acceptable . All mast arms shall have no more than two longitudinal full length high
frequency resistance welded joints. All welds shall have a smooth and consistent external
surface appearance. All mast arms shall have a uniform taper.
2.18.4 Luminaire Arm
All luminaire arms shall be fabricated in accordance with the pole detail sheets included on
the plan set.
2.18.5 Pedestal Structures
All pedestal structures for mounting pedestrian signals or median-mount traffic signals shall
be furnished with a transformer base, pole cap, and all necessary hardware for proper
installation. Height of pole shall be set in the construction plan set, but shall not exceed 15 ft .
(4 .6 M).
2.18.6 All other hardware necessary for complete installation of traffic signal structures , i.e., simplex
plates, pole caps, transformer bases, anchor bolts, etc. shall be hot dipped galvanized and
conform to the design, dimension, and strength requirements of said items as indicated on the
Traffic Signal Pole and Mast Arm Assembly detail sheet. All hardware shall be packed on a
per pole basis.
2.19 Foundations
2.19.1 All foundations shall be built in accordance with the requirements stated in the standard detail
sheets of the plan set.
2.20 Hardware Paint
2.20.1 The paint to be applied to existing non-galvanized traffic signal structures shall be a durable
iodized alkyd enamel with high gloss finish . The drying time shall be approximately three
hours with an average dry film thickness of 1.4 mil. The paint quality shall allow for
application on surfaces at temperatures as low as 20 F (7 C).
2.20.2 Hardware paint color shall as called for in the construction plans set or bid documents .
Traffic Signal Specifications -Part E
City of Fort Worth
July 2008
Page 21
2.21 Grounding Conductor and Ground Rod
2 .21.1 The grounding conductor shall be a #8 AWG solid copper wire. The conductor shall be
bonded to all ground rods .
2.21.2 Ground rod electrodes shall be copper-bonded steel being at least 5/8 m. (16 mm) m
diameter. All ground rods shall be a minimum of 8 ft. (2.4 M).
3.0 INSTALLATION OF TRAFFIC SIGNAL COMPONENTS
3.1 Installation of Electrical Service
3 .1.1 The Contractor shall install all electrical service connections including conduit, pole risers ,
meter base, breaker box, breakers etc., in accordance with NEC standards and specifications .
Installation of conduit and wire in to the Power Company vaults shall be per the Power
Company specifications.
3.1.2 Unless otherwise called for in the plans, the power connection shall be made to a 120-240
volt, two-phase, 60 cycle AC supply. The wire used for the power connection shall be #8
A WG or better (if specifically required on the traffic signal layout plan sheet) stranded and
shall be insulated for six hundred (600) volts. One circuit shall supply the controller cabinet
and the other shall supply any roadway lighting. The grounding wire shall be bare copper, the
common wire shall be white-coded and the power shall be black-coded.
3.2 Install ati on of Conduit
3.2.1 The Contractor shall provide and install underground cable facilities required to complete the
construction plan set. The Contractor will be required to coordinate with all local utility
companies, long distance communication companies, City utilities, railroad companies , and
Dig Tess if applicable, to ascertain exact locations of conflicting underground services .
3.2.2 The location of conduits and ground boxes are diagrammatic only and may be shifted by the
Inspector to accommodate field conditions.
3 .2.3 When Boring is used for under pavement conduit installations, the maximum allowable
overcut shall be 1 in. (25 mm) in diameter.
3.2.4 When conduits are bored, the vertical and horizontal tolerances shall not exceed 18 in. (457
mm) as measured from the intended target point.
3.2 .5 The use of a pneumatically driven device for punching holes beneath the pavement
( commonly known as a "missile") will not be permitted on this project.
3.2 .6 Conduit installed for future use shall hav e a non-metallic , nylon type pull string and shall be
capped using standard weather tight conduit caps , as approved by the Inspector. This work
shall not be paid for directly but shall be considered subsidiary to this item.
3.2 .7 The contractor shall place duct seal or foam at the ends of all conduit where conductors
and/or cables are present.
Traffic Signal Specifications -Part E
City of Fort Worth
July 2008
Page 22
3.2.8 New Conduit
(A) Unless otherwise shown on plans or standard detail sheets, all underground
conductors shall be 40 PVC conduit. All conduit or raceways above ground shall be
rigid metal. All conduit and fittings shall be of the sizes and types shown on the
plans . Each section of conduit shall bear evidence of approval by Underwriter's
Laboratories.
(B) Conduit terminating in posts or pedestal bases shall not extend vertically more than 3
inches above the concrete foundation. Field bends in conduit shall have a minimum
radius of 12 diameters of the nominal size of the conduit
(C) Exposed vertical conduit shall be galvanized rigid metal, and reamed and couplings
made tight. PVC conduit shall be joined by the solvent--weld method in accordance
with the conduit manufacturer's recommendations. No reducer couplings shall be
used unless specifically indicated on the plan sheet.
(D) All conduit and fittings shall have burrs and rough places smoothed and shall be clean
and free of obstructions before the cable is installed. Field cuts shall be made with a
hacksaw only, and shall be square and true so that the ends will butt or come together
for the full diameter thereof. In no case shall a cutting torch be used to cut or join
conduit. Slip joints or running threads will not be permitted for coupling conduit
unless approved by the Inspector. When a standard coupling cannot be used, an
approved union coupling shall be used and shall provide a water-tight coupling
between the conduit.
All couplings shall be properly installed to bring their ends of connected conduit
together to produce a good rigid connection throughout the entire length of the
conduit run. Where the coating on a rigid metal conduit run has been damaged in
handling or installation, such damaged parts shall be thoroughly painted with rust
preventive paint. Ends of conduits shall be capped or plugged until installation of the
wire is complete. Upon request by the Inspector, the Contractor shall draw a full-size
metal wire brush, attached by swivel joint to a pull tape, through the metal conduit to
insure that the conduit is clean and free from obstructions. Conduits shall be placed
in an open trench at a minimum 24 in. (612 mm) depth below the curb grade in the
sidewalk areas, or 18 in. ( 450 mm) below the finished street grade in the street area.
(E) Conduit placed for concrete encasement shall be secured and supported in such a
manner that the alignment will not be disturbed during placement of the concrete. No
concrete shall be placed until all of the conduit ends have been capped and all box
openings closed.
(F) PVC conduit, which is to be placed under ex1stmg pavement, sidewalks , and
driveways , shall be placed by first providing a void through which the PVC conduit
shall be inserted. The void may be made by either boring or jacking a mandrel.
Heavy jacks are to be used for jacking. Use of water or other fluids in connection
with the boring operation will be permitted only to lubricate cuttings . Water jetting
will not be permitted.
Traffic Signal Specifications -Part E
City of Fort Worth
July 2008
Page 23
(G) If it is determined by the Inspector that it is impractical to place the conduit by
boring as outlined above due to unforeseen obstructions, written permission may be
granted by the Traffic Services Manager or designee for the Contractor to cut the
existing pavement. Pits for jacking and boring shall not be closer than 2 ft. (612 mm)
to the back of the curb or the outside edge of the shoulder. The jacking and boring
method used shall not interfere with the operation of streets, highways, or other
facilities, and shall not weaken or damage any embankment structure, or pavement.
(H) Backfill -Compaction & Density Test for All Ditchlines
All ditchlines within paving areas of existing and proposed streets and within 2 ft.
(600 mm) back of curb are to be mechanically tamped. All tamping is to be density
controlled to 90% standard proctor density at optimum moisture content and no
greater than 5% optimum or less than 2% below optimum. All backfill material is to
be select native material, 6 in. (150 mm) diameter clods and smaller. It is permissible
to put backfill in 6 in. to 8 in. (150 mm to 400 mm) lifts with densities being taken for
each 1ft. (300 mm) of compacted material on offsetting stations of 50 ft . (15 .9 M).
(I) The Contractor shall provide adequately bent conduit and shall properly excavate so
as to prevent damage to the conduit or conductor by a bend radius which is too short.
(J) All conduit runs shall be continuous and of the same material (metal only or PVC
only). Where tying into existing conduit, the Contractor must continue with the same
material (metal to metal or PVC to PVC).
(K) Each length of galvanized rigid metal conduit, where used, shall be reamed and
threaded on each end and couplings shall be made up tight. White-lead paint or
equal shall be used on threads of all joints. Metal conduit and fittings shall have the
burrs and rough places smoothed. Where the coating on a metal conduit run has
been damaged in handling or installation, such damaged parts shall be thoroughly
painted with rust preventive paint.
3.2.9 Existing Conduit
(A) Prior to pulling cable in existing underground conduit, the conduit shall be cleaned
with a mandrel or cylindrical wire brush and blown out with compressed air. If
conduit appears to be blocked, the Contractor shall make an attempt to clear the
conduit by rodding (The Contractor will not receive extra compensation for rodding).
(B) If the existing conduit cannot be used, the Contractor may be required to repair and/or
replace this conduit as directed by the engineer. Repair of this conduit will be paid
for as "extra work" on a Change Order
(C) The Inspector shall be notified prior to disconnection or removal of any existing
cable .
Traffic Signal Specifications -Part E
City of Fort Worth
July 2008
Page 24
3.3 Installation of Cable
3 .3.1 General
(A) Cables shall be installed in conduit unless indicated as an "overhead" cable run.
Conduit must be continuous, reasonably dry, completely free of debris, and without
sharp projections, edges, or short bends. If required by the Inspector, the Contractor
shall demonstrate that the conduit is dry and free of debris by pulling a swab and/or
mandrel through the conduit. The conductors shall be installed in a manner so as to
insure against harmful stretching of the conductors or damage to the insulation.
Installation methods shall conform to the recommendations of the cable
manufacturer. The Contractor shall furnish, at the request of the Traffic Services
Manager or designee a copy of the manufacturer's recommendations, which shall
include methods of attaching pull cable, pulling tension per conductor size and per
radius of conduit bend, and the type of lubricant to be used.
(B) All cables in a given conduit run shall be pulled at the same time and the conductors
shall be assembled to form one loop in such a manner that the pulling tension is
equally distributed to all the cables. Long, hard pulls will necessitate the use of
pulling eyes . For short runs, the cables may be gripped directly by the conductors by
forming them into a loop to which the pull wire or rope can be attached. The
insulation on each conductor shall be removed before the loop is formed. The
method used will depend on the anticipated maximum pulling tension in each case.
(C) In existing conduit where new cables are to replace existing cables, the exit cables
may be used to pull in the new cables. At locations where new cables are to be added
to existing cable runs, the existing cables shall first be pulled out, the new cables are
to be added to the existing cables to form one cable pull. Installation and removal
shall be done in such a way as to prevent damage to the existing and/or new cables.
fu the event of damage, the Contractor shall bear the responsibility of providing the
material and labor for replacement of defective cables at no extra cost to the City.
(D) All conduit runs shall be measured accurately and precisely for determining cable
lengths to be installed. A conduit run measurements shall take place in the presence
of the fuspector. The Inspector shall record all cable measurements and include the
distances on an as-built drawing. In locations where new cables are to replace
existing cables, the Contractor may use the removed cables as a measuring device to
determine the lengths of the new cables to be installed. However, this does not
relieve the Contractor of his responsibility to record accurate measurements of all
cable lengths .
(E) The manufacturer's recommended maximum pulling tensions shall not be exceeded
under any circumstances. If so required by the fuspector, the Contractor shall insert a
dynamometer in the pull wire as the cables are being pulled into the conduit to
demonstrate that the maximum tensions are not being exceeded. The cable shall be
fed freely off the reel into the conduit without making a reverse curve. At the pulling
end, the pull wire and cables shall be drawn from the conduit in direct line with the
conduit. Sheaves or other suitable devices shall be used as required to reduce any
hazards to the cable during installation. The cables shall be adequately lubricated to
Traffic Signal Specifications -Part E July 2008
City of Fort Worth Page 25
reduce friction and further minimize possible damage. Such lubricants shall not be
the grease or oil type used on lead sheathed cables, but shall be one of several
commercially available wire pulling compounds that are suitable for PVC sheathed
cables. They shall consist of soap, talc , mica, or similar materials and shall be
designed to have no deleterious effect on the cables being used.
(F) Cables shall be neatly trained to their destinations. The Contractor shall adhere to the
cable manufacturer's recommended values for the minimum bending radii to which
cables may be bent for permanent training during installation. These limits do not
apply to conduit bends, sheaves, or other curved surfaces around which these cables
may be pulled under tension while being installed. Larger radius bends are required
for such conditions.
3.3.2 Wire and Cable
(A) All wire and cable shall conform to the requirements shown in the plans, except wire
and cable specifically covered by other items of this contract.
3.3 .3 Controller Cabinet Wiring
(A) Wiring for the controller cabinet shall consist of connecting (1) signal wires, (2) loop
detector wires, (3) power wires, (4) ground wires, and (5) pedestrian push button
wires to their respective terminals in the cabinet. In the controller cabinet, stranded
signal conductors from the field shall be stripped back and a solderless terminal
connector (spade lug) shall be attached by means of a crimping tool. These terminal
Connectors shall be inserted under the binder head screw and tightened securely.
Other wiring for the controller shall be completed as shown on the wiring diagrams
and in the instructions furnished with the controller by the manufacturer.
(B) All field wiring in cabinets shall be neatly installed. Incoming cables shall be trained
to their destination and neatly laced together. All spare wires shall be trimmed and
neatly coiled with the ends taped. Detector lead-in cables shall have their insulation
jackets removed from their terminal strip connection to the bottom of the cabinet.
(C) Pedestrian push buttons shall have a ground wire that is completely isolated and
independent from all other ground wires. This wire shall be connected to the
designated terminal in the controller cabinet. A pedestrian isolation board shall be in
place.
3.3.4 Signal Head Wiring
(A) Conductors shall run as follows :
1. An unbroken 20-conductor cable, one #10 AWG neutral cable and one bare #8 shall
run from the controller cabinet to each pole pier.
2. An unbroken seven (7) conductor, #16 AWG cable shall run from the signal pole
base to each 5-section, 4-section signal head , or the 3-section head located at the end
of mast arm ; and an unbroken five (5) conductor, #16 AWG cable to each other 3-
Traffic Signal Specifications -Part E July 2008
City of Fort Worth Page 26
section or pedestrian signal head. Two (2) signal conductors, #16 AWG shall run to
each pedestrian push button.
(B) Each cable shall be identified as referenced on the pole wiring detail sheet provided in
the construction plan set with permanent marking labels (panduit type PLM standard
single marker tie, Thomas and Betts type 548M or equivalent) at each ground box,
pole base and controller.
3.3.5 Luminaire Wiring
Two (2) #8 cables shall run from service disconnect in parallel around the intersection as on
the traffic signal layout sheet of the construction plan set. Luminaire wiring connection may
be made in the nearest ground box to the traffic signal pole; such connection shall be placed
in a water tight seal. If more than three wires are splice together in the traffic signal cabinet
then a Kearney connector shall be used as required in Section 3.3.7 (B) below.
3.3.6 Terminals
(A) The ends of all stranded wires from the controller cabinet and from the signal heads
shall be twisted at least three turns and wire nut applied in the base of the signal
structure.
3.3.7 Splices
(A) Splices are strictly prohibited inside conduit runs. Detector cables shall not be spliced
at any point except where transitioning from #14 XHHW loop detector cable to lead-
in cable (see Section 3.5.4). Signal cables are to be spliced only at locations that are
specified in the plans. Splicing signal cable in pull boxes shall not be permitted.
(B) Splicing methods shall be in accordance with good electrical practice and the cable
manufacturer's recommendations. All materials used shall be of high quality and
specifically intended for this purpose.
Cables shall be trained to their final position and cut to proper lengths. The cable's
jacket and insulation shall be removed as required. In doing this, use proper care to
insure against nicking the conductors. The connection shall be installed tightly and
all burrs, rough edges, etc . shall be removed. If wire nuts are used to secure the
connection, then only "Scotchlock" brand connectors shall be utilized. No more than
four ( 4) wires shall be spliced together using "Scotchlock" connectors and the wire
shall be twisted. If more than four (4) wires are connected, then a Kearney connector
or mechanical clamp shall be used. All splices involving grounding conductors shall
be made by twisting the cables together, applying solder then wrapping the
connection with green electrical tape.
Heating the connection with a direct flame will not be permitted for cable gauge less
than #14. Care shall be used to protect the insulation when soldering . The entire
surface shall be cleaned taking special care in cleaning the outside jacket in order to
remove the wax finish. Then approved thermo-setting materials shall be used to
provide a water tight seal.
Traffic Signal Specifications -Part E
City of Fort Worth
July 2008
Page 27
(C) The fuspector shall select at random at least five (5) splices to be thoroughly
inspected. The Contractor shall, in the presence of the fuspector, sectionalize each
selected splice to expose the various layers of materials and the connector. These
splices shall be thoroughly checked for compliance to these special provisions. Each
splice shall then be remade by the Contractor. This work shall not require extra
payment, but is considered subsidiary to other items in the Contract. All of the
splices selected for this inspection shall conform to the requirements of these special
provisions. If any splices fail to meet these requirements, then ten more splices shall
be selected at random by the fuspector for examination.
3.3 .8 Identification of Signal Wires and Cables
(A) IMSA color coded signal cable shall be used for all signal systems . Colors shall be
continuous from the point of origin to the point of termination.
(B) Each signal cable, detector lead-in cable and communication cable shall be designated
with permanent marking labels or (panduit type PLM, Thomas and Betta type 548M
standard single marker type or equivalent) and color coded tape at each pull box and
in the controller cabinet.
3.4 Grounding
3.4.1 There shall be a properly installed and connected ground rod for each controller cabinet,
power drop and signal pole pier to reduce any extraneous voltage to a safe level. The ground
rod shall be located so as to minimize the length of the grounding-conductor run. For pole
mounted cabinets a grounding rod and grounding conductor shall be installed at the nearest
foundation or ground box . All grounding circuits shall be substantial and permanent and
shall be electrically continuous with an ohms-to-ground resistance not to exceed 10 ohms
when tested by volt-ohm-meter.
3.4.2 Grounding Connectors and Electrodes
(A) When the location precludes driving a single ground rod to a depth of 2.4 m (8 feet),
or when a multiple ground rod matrix is used to obtain the required resistance to
ground, ground rods shall be spaced at least six feet apart and bonded by a minimum
No. 6 A WG copper wire.
(B) Connection of grounding circuits to grounding electrodes shall be by devices which
will ensure a positive, fail-safe grip between the conductor and the electrode (such as
lugs or pressure connectors). No splice joint will be permitted in the grounding
conductor.
(C) Each grounding rod shall be driven into the ground to a depth sufficient to provide the
required resistance (10 ohms) between electrodes and ground.
3.5 Vehicle Detector Loop Installation
3.5.1 Detector lead-in cables shall be identified as shown on the plans (phase
Traffic Signal Specifications -Part E
City of Fort Worth
1, etc.) with
July 2008
Page 28
permanent marking labels (panduit type PLM, Thomas and Betts type 548M standard single
marker tie or equivalent) at each ground box, pole base, and controller.
3.5.2 It is required that all work related to the installation of a particular detector loop , with the
exception of the layout task , shall be completed in the same work day. All loop installation
work shall be performed during off-peak traffic hours . Loop installation shall not be made
during any type of precipitation.
3.5 .3 fustallation of detector loops shall be in accordance with the plans. Lead-in saw cuts from the
street to the pull box shall maintain a maximum separation from other loops of 12 in.(500
mm) and a minimum separation of 6 in. (150 mm) from other lead-in saw cuts. The saw cut
depth, as specified in the standard detail sheets of the plan set shall be consistent, including
the entry point into the curb . The maximum number of wires placed in a single saw slot shall
be four (4) wires . Each lead-in shall enter the curb through a separate hole.
3.5.4 3M Loop sealant or approved equal shall be used to seal all loop wire within the roadway.
3.5.5 Detector lead-in cables shall be run continuously without splices from the curbside ground
box to the controller. If splices must be made, they shall be solder connected and the splice
connection shall be insulated and waterproofed with 3M DBR-6 Direct Bury Splice Kits or
approved equal. Splices at the curbside pull box es shall be made in the same manner (see
Section 3.3.6). Splices in detector cables must be pre-approved by the fuspector in writing.
3.5 .6 fu all cases where detector loop lead-ins pass from pavement through a curb to an existing
ground box for a splice point, conduit shall be installed from the curb entry point up into the
ground box. A minimum one inch diameter conduit shall be provided from the curb entry
point to the ground box for each loop.
3.5.7 All loop wire from the loop in the street to the ground box shall be tightly twisted a minimum
of 5 times per foot (16 times per meter) as it is placed in the lead-in saw cut.
3.6 Concrete Foundations for Signal Structures
3.6.1 All foundations shall be staked by the contractor and approved by the fuspector prior to
excavation. While staking the pole locations , the contractor, along with the fuspector, shall be
cogni zant of pedestrian needs by verifying the location of the push buttons and the pedestrian
heads.
3.6.2 Concrete foundations for signal structures shall be located so that the closest face is a
minimum of 3 ft. (900 mm) from the face of the nearest vertical curb. The Contractor shall
probe before ex cavating foundations to determine the location of utilities and structures.
Foundations shall be paid for onc e, regardless of extra work caused by obstructions . The
Contractor shall furnish all supplementary items n ecessary for proper foundation installation.
3.6.3 Excavation for all foundations shall be done in accordance with lines and depths indicated on
the standard detail sheets of the plan set. All loose material shall be removed from the
excavation before concrete is placed . Any water shall be remo v ed by pumping or bailing.
The use of explosives will not be permitted .
Traffic Signal Specifications -Part E
City of Port Worth
July 2008
Page 29
3.6.4 Foundations shall be constructed to the dimensions shown on the plans. The Contractor is
required to make certain that the top of the finished foundation is level and formed . Anchor
bolts and conduits shall be held rigidly in place by a template until the concrete is set.
A mechanical vibrator shall be used for compacting and working the concrete. After the
concrete has been placed and the top struck off, it shall be covered with wet cotton or burlap
mats or other appropriate form of curing, for not less than 96 hours . All bracing and
templates for anchor bolts shall remain in place for 96 hours after the concrete is poured.
During that time, the anchor bolts and conduit shall not be subjected to any applied strain.
Transformer bases shall not be installed on any foundations until approval has been given by
the Inspector.
3.6 .5 Backfill shall be tamped with mechanical tamps in 6 in. (150 mm) layers to the density of the
surrounding ground. Where excavation is made in the roadway shoulder, the shoulder shall
be replaced with material equal to the original composition.
3.6.6 All excavated material, not required for backfill, shall be promptly removed and disposed of
by the Contractor, outside the limits of the project. The work site shall be kept clean and neat
at all times.
3.6.7 No concrete shall be placed when the atmospheric temperature drops below 40 F (40 C)
(temperature reading taken in the shade away from artificial heat) unless permission to do so
is given by the Inspector.
3 .6.8 The City shall supply to the contractor the controller cabinet anchor bolts and specific cabinet
templates . The cabinet door shall generally open away from the intersection.
3.6.9 Pole anchor bolts shall be aligned to be parallel to the tangent of the street curb that the pole
is intended to serve.
3 .6.10 Tubing used to form pole foundations shall not be visible and all exposed concrete shall be
finished with vinyl concrete patch mix to provide a smooth quality finish with all voids
filled and no aggregate exposed. The cost of the work shall be included in the unit bid price
for this item.
3.7 Installation of Traffic Signal Structures
3. 7 .1 The Contractor shall install all traffic signal structures in accordance with the plans.
Deviation from the plans because of physical obstructions, such as overhead utilities or in
appropriate mast arm length to fit a relocated foundation , shall be worked out with the
Inspector and approved prior to installation.
Poles shall have nuts on top and bottom of the pole base plate. Anchor bolts for mast arm
signal poles shall be set so that two are in tension and two are in compression.
The traffic signal pole heights and mast arm lengths shown on the plans and in the material
summary are to be used for bidding purposes only. Prior to fabrication , the contractor, in
cooperation with the Inspector, shall make field measurements to determine the actual pole
height necessary to ensure a vertical clearance of 17 Ft. (5.2M) minimum, and 19 ft. (5.8M)
Traffic Signal Specifications -Part E July 2008
City of Fort Worth Page 30
maximum from the roadway surface to the bottom of the lowest point on the signal head
assembly or mast arm and to determine the mast arm lengths required to mount the traffic
signal heads over the traffic lanes . The masts arms shall be straight and level in the area
where the signal heads are attached. These field measurements and evaluations shall be
determined from the actual field location of the pole foundations, considering all above and
below ground utilities and the existing roadway elevations and lane widths.
3.7.2 Transformer bases for pedestal poles shall be leveled and tightly secured to the foundation
before the structure is placed on the base. If shims are required for leveling, total shim height
shall not exceed 1/2 in. (127 mm). Foundation anchor bolts shall extend a minimum of 1 in.
(25 .4 mm) through each nut in the base.
3.7.3 Except as modified herein, erection of traffic signal structures shall be in accordance with the
applicable specifications and standards of the AISC Manual of Steel Construction. Erecting
equipment shall be suitable for the work and shall be in proper working condition. Where
parts cannot be assembled or fitted properly as a result of errors in fabrication or deformation
due to handling or transportation shall be reported immediately to the Inspector.
Straightening of plates and angles or other shapes shall be done by approval of the
manufacturer. No corrections will be allowed that will void the manufacturer's warranty. A
letter from the manufacturer approving the corrections shall be required or the material may
be rejected by the Inspector.
3. 7.4 The steel structure frame shall be lifted as shown in the manufacturer's specifications and all
match marking shall be followed. Temporary bracing shall be used wherever necessary to
support all loads to which the structure may be subjected, including equipment, operation,
and material loading. Such bracing shall be left in place as long as may be required for
safety. The various members, after being assembled, shall be aligned and adjusted accurately
before being fastened. Fastening of splices on compression members shall be done after the
abutting surfaces have been brought completely into contact. No welding or bolting shall be
done until the structures have been properly aligned.
3.7.5 Bearing surfaces and surfaces which will be in permanent contact with each other shall be
cleaned before the members are assembled. Bearing plates shall be set in exact position and
shall have a full and even bearing upon the concrete. As erection progresses , the work shall
be bolted to take care of all dead load, wind and erection stresses. All erection bolts used in
welded construction may be tightened securely and left in place. If removed, the holes shall
be filled with plug welds .
3.7 .6 Field bolting shall be in accordance with the requirements specified for shop fabrication.
Untrue holes shall be corrected by reaming. Where the surface of a bolted part has a slope of
more than 1 :20, a beveled washer shall be used to compensate for the lack of parallelism.
Bolt heads and nuts shall be drawn tight against the work with a suitable wrench not less than
15 inches long. Bolt heads shall be tapped with a hammer while the nut is being tightened.
3.7.7 Field Painting of Structures:
Surfaces where the shop coat of paint has been damaged shall be retouched after installation
in compliance with Section 2.20 .1. The cleaning, pretreatment, and priming of welds and the
areas adjacent thereto shall be done promptly after the acceptance of the weld. Care shall be
Traffic Signal Specifications -Part E July 2008
City of Fort Worth Page 31
taken to properly mask signals heads, signs, pedestrian pushbuttons and their mounting
hardware to keep paint from splashing onto these components. Masking shall be removed
after completion of the painting process. A sufficient number of paint coatings shall be
applied to each structure to result in a uniform finish once completed. All structures shall be
air blasted using high pressure air to remove peeled paint and dust prior to application of new
paint.
3.7.8 Bolted parts shall fit solidly together when assembled and shall not be separated by gaskets or
any other interposed compressible material. When assembled, all joint surfaces, including
those adjacent to the bolt heads, nuts, or washers, shall be free of scale, except tight mill
scale, and shall also be free of burrs, dirt, and other foreign material that would prevent solid
seating of the parts. Each fastener shall be tightened to at least the minimum bolt tension as
recommended by the pole manufacturer using ASTM A325 or A490 bolts for the size of
fastener used. Threaded bolts shall be tightened with properly calibrated wrenches or by the
"turn-of-nut" method. Bolts may be installed without hardened washers when tightening
takes place by the "tum-of-bolt" method. Any bolt tightened by the calibrated wrench method
( or by torque control) shall have a hardened washer under the element (nut or bolt head)
turned in to a point not closer than 7/8ths of the bolt diameter from the center of the washer.
3.7.9 Grouting: The Contractor shall perform all work required to complete the grout work
associated with installing the signal structure and furnish all supplementary items necessary
for its proper installation .
3.7 .10 Where signal poles and/or mast arms exist on raised foundations that are to be removed and
installed on new foundations, the Contractor shall store these poles, mast arms, street lights,
and wiring until they can be installed on their new foundations.
3.8 Installation of Signal Heads, Pedestrian Heads and Pedestrian Push Buttons
3.8.1 The Contractor shall be required to assemble all signal head units as specified in the plans or
as directed by the Inspector. Signal and pedestrian heads shall be securely tightened
immediately after signal head assembly has been installed. If any signal head assembly is
found to be loose or asymmetrical in any manner, the Contractor shall be required to
remove and rebuild the signal head assembly to the satisfaction of the Inspector.
3.8.2 The Contractor shall mount signal heads level and plumb . The Contractor shall position and
secure the signal heads so they are visible as stipulated, in Table 4-1 of the TMUTCD.
3.8.3 All signal heads or parts of heads not in operation shall be covered with burlap or fabric
material until placed into operation. When the signal heads become operational, all existing
heads no longer required shall be removed immediately.
3.8.4 Pedestrian head assemblies installed such that the wiring to each head shall pass from the
mast arm through the signal head bracing or attachment hardware to the signal head . No
exposed cable or wiring will be permitted.
Traffic Signal Specifications -Part E
City of Fort Worth
July 2008
Page 32
3.9 Controller Cabinet Preparation
3.9.1 Each controller cabinet shall be modified for use at a specific intersection in accordance with
the instructions included in the plans. Each cabinet shall be prepared and tested for on-the-
street use by the Traffic Services Division of Transportation and Public Works Department
prior to field installation of the cabinet.
3.9.2 All wiring modifications made in conjunction with preparing the cabinet for use at a specific
intersection shall be documented on the cabinet prints for that intersection .
3.10 Installation of Microwave Detector Units (Does not apply to this contract.)
3.10.1 Microwave detector units shall be installed as shown the Signal Layout Sheet of the signal
construction plans.
3.10.2 The Contractor shall provide a technician to assist with adjusting and aiming the detector unit
at the time of traffic signal turn-on, in order to comply with Engineer's desired detection
areas as shown on the construction plans.
3.11 Installation of Video Detection Units
3 .11.1 The Contractor shall install the video cameras in accordance with the manufacturer's
recommendations in order to achieve the detection areas as shown on the construction plan
sheets . The camera mounts shall be neat and plumb . The detector unit outputs shall be
programmed by a manufacturer representative at the time of signal turn-on in accordance
with the detector table shown on the construction plan sheets .
3.11.2 Video detection camera cables shall be installed in the conduit system at the same time as the
other signal cables in accordance with Section 3.3 .1.
3.12 Installation of Emergency Vehicle Detection Units
3.12 .1 Any emergency vehicle detection (EVD) equipment required in the construction plan set will
be supplied by the City. Where practical, EVD receiver units shall be mounted to a rigid
metal arm supplied by the City and banded to the mast arm pole upright on the intersection
comer designated on the Traffic Signal Layout sheet of the plan set. The Inspector shall
determine if the roadway sight line permits this type ofEVD installation.
Otherwise the EVD receiver units shall be mounted on the mast arms for the intersection
approaches as designated on the Traffic Signal Layout sheet of the plan set.
4.0 INSTALLATION AND RELOCATION OF TRAFFIC SIGNS AND DAMPERS
4.1 The contractor shall furnish , install and relocate ex isting signs as shown in the plan s et.
Mast-arm signs shall be mounted with astro-sign brae or signfix aluminum channel or
equal as appro ved by the engineer.
4.2 Metro street name si gns shall be mounted l evel with the ground as show n on the standard
C onstruction d etail sheets .
Traffic Signal Specifications -Part E
City of Port Worth
July 2008
P ag e 33
4.3 Dampers shall be installed using Astro Sign Brae or Signfix Aluminum Channel or equal.
5.0 PRESERVATION OF LANDSCAPING, SPRINKLER SYSTEMS, AND PRIVATE
PROPERTY
5 .1 The Contractor shall assume full responsibility for the preservation of existing landscaping
(sod, shrubbery, trees , and etc.), sprinkler systems, and/or other private property at the site
during the installation of items in this contract document. Damaged landscaping, sprinkler
systems, and/or other private property shall be replaced within a reasonable time , by the
Contractor at his own expense, to the satisfaction of the Inspector.
5 .2 The contractor shall relocate the existing EVD equipment.
5.3 No trees or shrubbery shall be cut except upon the specific authority of the Inspector.
5.4 Removal of mail boxes in the way of construction requires 48 hours advance notice to the
post office.
6.0 REMOVAL OF MISCELLANEOUS ITEMS
6.1 Removal and Salvaging of Traffic Signal Equipment
All salvage materials will be delivered by the Contractor to the City at a locations designated
by the Inspector. The Inspector, assisted by authorized representatives, will serve as the
receiving agent for salvage material.
The Contractor will ship and handle all salvage material (heads, poles, cabinets, cable, signs,
amplifiers, etc.) in a manner so as to prevent damage to these items. Signal heads will be
removed from poles prior to shipping. All cables must be secured in controller cabinets to
prevent damage during shipment and handling. All screws will be tightened into their
respective slots to prevent loss during shipping. The controller and all supplemental control
equipment (conflict monitors, detector amplifiers, load switches, etc.) will be removed from
the cabinet prior to cabinet removal and given to the Inspector at the time of the signal tum-
on.
The Inspector will identify existing damage to salvageable material and mark damaged items
in the field before they are delivered to the City yard . If damage to material is the fault of the
Contractor, he or she will have three (3) working days to make repairs or supply like items, at
his/her expense, for damaged items. If the Contractor fails to repair or replace damaged items
in said time, the City may charge the Contractor for the assessed value as determined by the
Traffic Services Manager or designee .
6.2 Removal and Replacement of Curbs and Walks
(A) Contractor shall secure permission from the Inspector before cutting into or removing
any walks or curbs which might be required during construction.
Traffic Signal Specifications -Part E
City of Fort Worth
July 2008
Page 34
(B) Where possible, dig under sidewalks . If the Contractor chooses to remove or cut the
sidewalk, the concrete must be sawed and broken out and then restored to an equal or
better condition than the original.
6.3 Removal of Foundations
All foundations subject to removal (as indicated on the plans) shall be razed to a level at least
12 inches below the ground surface if the foundation subject to removal is located within a
sidewalk, the foundation shall be removed to a depth equal to or greater than the thickness of
the walkway. Once the foundation is removed, the ground surface shall be restored to
surrounding conditions.
6.4 Removal of Ground Boxes
If the construction plans call for the removal of abandoned ground boxes, then the hole
remaining from ground box removal shall be filled and the ground surface shall be restored to
surrounding conditions . Any conduit elbows found the ground box to be removed shall be
cut back to a minimum of 12 inches below the natural ground surface.
6.5 Removal of Signs
The existing stop sign panels, or any grounded mounted signs, as shown on the plans, will be
removed after the traffic signals are placed in flash and before the signal is turned to full
colors by City forces.
7.0 SAMPLING AND TESTING
7.1 General Notes
(A) Initial testing of all materials, construction items, or products incorporated in the work
will be performed at the direction of the City and at the expense of the Contractor,
including initial compaction and density tests deemed necessary in connection with
the construction of embankment, backfill of structures, or excavation.
(B) In the event that a material, construction item, product incorporated in the work,
embankment, backfill, excavation or any other item tested, fails to satisfy the
minimum requirements of the initial test described above, appropriate prove-out tests
shall be made as directed by the Inspector to determine the extent of the failure and to
verify that corrective measures have brought the item up to specification
requirements. The cost of all testing necessary to determine the extent of the failure
and the adequacy of the corrective measures shall be the responsibility of the
Contractor.
(C) The failure to require tests of materials by the Inspector shall in no way relieve the
Contractor of his responsibility of furnishing materials conforming to these
specifications .
(D) Tests, unless otherwise specified, shall be made in accordance with the latest methods
of the ASTM or other approved test methods . The Contractor shall provide such
Traffic Signal Specifications -Part E
City of Fort Worth
July 2008
Page 35
facilities, as the Inspector may require, for the collecting and forwarding of samples
and shall not use the materials represented by the samples until tests have been made.
The Contractor shall furnish adequate samples without charge.
7.2 Concrete
(A) All concrete materials, reinforcing steel, and preparation shall be in accordance with
the requirements of the City of Fort Worth Standard Specifications for Street and
Storm Drain Construction.
7 .3 Vehicle Detector Loops
(A) Prior to termination of the loop lead-in in the controller cabinet an installation test
shall be made by applying not less than 500 volts DC to the completed detector loop.
A minimum resistance of 1 megohm shall be obtained by use of a meger.
(B) After the above tests are completed and the lead-in cable has been terminated in the
cabinet, the Contractor shall assist the Inspector in determining the loop inductance of
each loop detector. A detector loop analyzer shall be used to determine the total
inductance of the loop in the pavement and its associated lead-in cable as well as to
determine the percentage shift in loop inductance for various size vehicles that actuate
the detector.
7 .4 Signal Cables
(A) The Traffic Services Manager or designee may require that all cables shall be checked
for insulation resistance upon installation and prior to termination. The tests shall be
made with a test set operating at a minimum of 500 volts DC applied to the
conductors.
(B) Each conductor in the multi-conductor signal cables shall be tested for insulation
resistance relative to each other and to the outer covering of the cable. The minimum
acceptance value for insulation resistance shall be one megohm.
7.5 Controller Cabinets
(A) If the controller cabinet is to be supplied by the Contractor for this project, the cabinet
shall be tested at a facility located within the Dallas/Fort Worth area.
(B) The Contractor shall notify the Inspector or his representative a minimum of three
working days prior to beginning the test period of his intent to test a cabinet or group
of cabinets. At this point, the City may schedule an inspection team and notify the
Contractor of the earliest date and time the team can visit.
(C) Each cabinet shall be tested with a controller unit for a minimum of 24 continuous
hours. The cabinet test will include conflict monitor functions, detector unit function
and load switch operation for conformance with cabinet hardware specifications, etc.
The cabinet must successfully pass all items. Otherwise the test is restarted for
another 24 hour period.
Traffic Signal Specifications -Part E
City of Port Worth
July 2008
Page 36
8.0 WARRANTIES/GUARANTEES
8.1 The Contractor guarantees all work performed and materials furnished under this project for a
period of twenty-four (24) months following the date of final acceptance . In addition, the
Contractor shall furnish any normal manufacturer warranties with effective beginning dates
the same as the date of the project acceptance.
8.2 All faulty equipment shall be repaired within 15 working days of the Contractor being
notified.
9.0 TRAFFIC SIGNAL MAINTENANCE DURING CONSTRUCTION
9 .1 While performing work under this contract, the Contractor bears the sole risk of loss for
damages to or destruction of any traffic signal equipment or appurtenances , on equipment
that was not to be replaced or installed under this Contract, but which was damaged or
destroyed through the fault or negligent acts of the Contractor. The Contractor shall replace
such damaged or destroyed equipment, etc., at no cost to the City, regardless of whether or
not the damaged or destroyed equipment, etc., was a part of this contract or any warranties
under this contract. The Contractor's responsibility shall cease under this paragraph upon
written acceptance of an intersection by the City.
9 .2 The Contractor's responsibility for full operation and maintenance of all traffic signal
equipment shall begin when he starts any type of work which effects active intersection
control at the first intersection and shall extend through the period of final project acceptance
of each intersection. This maintenance responsibility includes existing controllers/masters ,
existing interconnect and cabling systems, existing signal indications , existing vehicle
detectors , new controllers/masters, new signal hardware, new cabling systems, and other
hardware elements which are considered part of either the existing or the new traffic signal
system.
9.3 It is recognized that the City may continue to make a first response to any trouble call.
Action on such response will, however, be limited to placing the intersection on flash ,
replacing load switches or detector amplifiers, erecting temporary control devices, requesting
immediate traffic control by uniformed police officer, or other such action deemed necessary
to provide a safe operation. Such action will in no way relieve the Contractor of his operation
and maintenance responsibility.
9.4 The Contractor shall be required to notify the Inspector or Traffic Services Division at least
24 hours in advance of any planned controlled change-outs or any other operational
procedures .
10.0 BARRICADES
10.1 The Contractor shall be required to obtain a Street Use Permit from the Street Management
Section of the Traffic Engineering Division, 311 W 1 o th St. The traffic control plan (TCP)
for this project shall be as detailed on the Traffic Control Plan Detail sheets of the plan set. A
copy of this Traffic Control Plan shall be submitted with the Street Use Permit.
Traffic Signal Specifications -Part E
City of Fort Worth
July 2008
Page 37
10.2 If the Inspector discovers that the Contractor has failed to comply with applicable federal and
state laws (by failing to furnish the necessary flagmen, warning devices , barricades , lights ,
signs, or other precautionary measures for the protection of persons or property), the
Inspector may order such additional precautionary measures be taken to protect persons and
property.
10.3 In addition, the Contractor shall be held responsible for all damage to work items and other
public or private property due to the failure of warning devices , barricades , signs , lights , or
other precautionary measures in protecting said property. Whenever evidence is found of
such damage, the In spector may order the damaged portion immediately removed and
replaced by the Contractor at his expense.
10.4 Subject to the approval of the Inspector, portions of this project, which are not affected by or
in conflict with the proposed method of handling traffic or utility adjustments , can be
constructed during any phase.
10.5 Barricades and signs shall be placed in such a manner as to not interfere with the sight
distance of drivers entering the highway from driveways or side streets . To facilitate shifting,
barricades and signs used in lane closures or traffic staging may be erected and mounted on
portable supports . The design of these supports are subject to the approval of the engineer.
10 .6 The contractor shall provide and maintain flaggers at such points and for such periods of time
as may be required to provide for the safety and convenience of public travel and contractor's
personnel , and as shown on the plans or as directed by the engineer. These flaggers shall be
located at each end of the lane closure and shall be properly attired. The two flaggers shall be
in two way radio contact with each other at all times. Paddles will be required for this
project.
10.7 The contractor will not be permitted to commence work on the road before sunrise and shall
arrange his work so that no machinery or equipment shall be parked closer than 30 ft .
(9.14M) to the traveled roadway after sunset except as authorized by the engineer.
10.8 The contractor shall keep traveled surfaces used in his hauling operation clear and free of dirt
or other material.
10.9 The use of rubber-tired equipment will be required for moving dirt and other materials along or
across paved surfaces .
10.10 No lane closures will be allowed prior to 9 :00 a.m. or after 4:00 p .m ., Monday thru Friday
unless otherwise directed by the engineer.
10.11 If at any time the existing traffic signals become inoperable , the contractor shall provide
portable stop signs with two orange flags , as approved by the engineer, to be used for traffic
control.
11.0 PAYMENT FOR FURNISHING AND INSTALLING CONTRACT ITEMS
11 .1 The unit bid price shall be full compensation for placing and testing all materi als as well as
use of equipment, tools , labor and incidentals necessary to complete the work. Portions of
Traffic Signal Specifications -Part E July 2008
City of Fort Worth Page 38
-
the work that have not been approved by the Inspector will not be considered complete and
payment shall be withheld until the Contractor has completed the work to the satisfaction of
the Inspector.
12.0 EXPERIENCE AND QUALIFICATIONS
12.1 The Bidder may be required to supply a list of cities, towns, etc ., where previous Contract
work as been completed. The list shall contain names and phone numbers of persons who can
be contacted for such reference. If the guidelines listed above are not met, the bid may not be
accepted.
12.2 The Bidder shall also furnish information, as outlined above on each major subcontractor (i .e.
manufacturer or fabricator of traffic signal structures, etc .) that will participate in this project.
The City reserves the right to reject any and all subcontractors .
12.3 The City reserves the right to reject any and all bids and to waive formalities.
Traffic Signal Specifications -Part E
City of Fort Worth
July 2008
Page 39
-·
PARTF
CERTIFICATE OF INSURANCE
CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW
EXPERIENCE RECORD
EQUIPMENT SCHEDULE
MAINTENANCE BOND
PERFORMANCE BOND
PAYMENT BOND
F-1
CONTRACTOR COMPLIANCE WITH
WORKERS' COMPENSATION LAW
Pursuant to V.T.C .A. Labor Code §406 .96 (2000), as amended , Contractor certifies that
it provides workers' compensation insurance coverage for all of its employees employed
on City of Fort Worth Project Installation of Two New Traffic Signals at the
Intersections of Belknap Street and Grove Street and Weatherford Street and
Grove Street and City of Fort Worth Proj ect No . TPW-TS-2008-00026 .
STATE OF TEXAS
COUNTY OF TARRANT
§
§
§
CONTRACTOR:
Title : we J I d eJlt
Date: 5 .., ':)--D9 ---~-----'------
Before me , the undersigned authority, on this day personally appeared
ill:ffr~ C,. ()(~ 0..0
known to me to be the person whose name is subscribed to the foregoing instrument ,
and acknowledged to me that he executed the same as the act and deed of
f(esiden+, Qu vable 2[X?ciaJ :H ts , :Lnc.
for the purposes and consideration t herein expressed and in the capacity therein stated.
Given Under My Hand and Seal of Office this ~ day of (Y)a r eh '20123.
Notary Public in and for
Texas ,,,,,, ....... ,,,,
,,,,, ~p. HEOG~'',,,
.... ,0'?, ••••••••• ~..o~ ,~ f ~.•;._~Y Pc,J;•:~\ ~ uJ'* ~·· ~ : : : = =*= ·*= -. . -
:; ~ "'~ "": :: ~ •. -,,.~Of~i,: .• ~ , . . ~ -,, • •• tx"'u.~ ••• • ~ ,, 0 ...... .. , ..
,, 7·31 2""' , ..... ,,,, • V ,, ..... ,,,,.,, .... ,,,
8:1110 068
Certificate of Insurance -Liberty Mutual Group Inc.
This certificate is issued as a matter ofinfonnatio n only and confers no rights upon th e certificate holder. This certificate is not an insurance policy an d does not affirmative ly or negatively amend . extend, or
alter the covera e afforded b the licie s listed below .
This is to certify that (Namt and address of Insured)
DURABLE SPECIAL TIES , INC.
1211 S. Alexander St
Dun canv ille , TX 75138
Agency i\'ame
HUB International Rigg
IS , at the ISSUe date ofth1S cert ificate , insured under the pohcy(1 es ) hsted below . The insurance afforded by the listed pohcy(,cs) IS sub;ect to all their tcnns . exclusions and conditions and is not alt ered by
any rcauirernenL tern, or condition of any contract or other document with respect to which this certificate ma be issued. Al!l!'reaate limits shown may have been reduced bv oaid claims .
Exoiration Tvoe Eff./Exp. Date(s) Policy Number(s) Limits of Liabilitv
Continuous• 05/31/2008 / 05/31/2009 WCl-191-437877-018 Coverage afforded undtr WC law of Employers Liability -the following states: Extended Bodily Injury By Accident -
X Policy Term TX SS00 ,000 Each Accident
Bodily Injury By Disease
SS00 ,000 Policy Limit
Workers Compensation Bodily Injury By Disease
$500,000 Each Person
05/31/2008 / 05/31/2009 T B l-191-437877-038 General Aggregate-Other than Prod/Completed Operations
General Liability S2 ,000,000
Products/Completed Operations Aggregate
~ Claims Made S2 000 000
Occurrence Bodily Injury and Property Damage Liability Per
SI 000 000 Occurrence
I Retro Date I Personal and Advertising Injury Per Person/
SI 000 000 Or2anization
Other Liability I Other Liability
Fire Damage SI 00,000 Med Pav $5 ,000
05/3 1/2008 I 05/3 1/2009 AS7-l 91-437877-068 Each Accident -Single Limit -B. I. and P. D. Combined
Automobile Liability $1 ,000,000
Each Person
..!. Owned
..!. Non-Owned Each Accident or Occurrence
X Hired
Each Accident or Occurrence
C Re : OSI #852 . Project# TPW TS 2008--00026-lnstallation of Two Ne w Traffic Siganls at the Intersections of Belknap Street & Grove Street and Weath erford Street & Grove
0 Street. Per endorsement LG 3220 0805 General Lia bil ity and CG 2048 0299 Automobile Liability , The City of Forth Worth is an additional ins ured under the General Lia bility
M and Automobile Liability pol icies if required by a written contract with the Named Insured , but on ly for the coverages and limits provided by the policy and the additional
M insured endorsement. A Waiver of Subrogation in favor of The City of Fort Worth under the Workers' Compensation polic y per WC 42 03 04A .Coverage is primary and non-
E contributory as it pertains to OSI work and per the policy terms and conditions .
N
T
s
IMPORTANT Jf th e certificate holder is an ADDITIONAL INSURED, th e po !i cy(ies) must be endorsed. A state ment on this certificate does not confer rights to th e c~ificate holder in lieu of such cndorsement(s).
r,.;'o ti ce of car.cell ari on: Should any of :i':e above desc:':bed po '.i cirs be canceled before t.~e ex.pirati on c!at e ~i':creof, we wi ll endeavor to mll i JO days notice of such car.cel!ati on to t.~e below ii sted Certifi cate HolCe r. bet fai ::.ire :o do so
shall impos e no ob ligati o:: or liab i::ty on t.1-:e ir.su:-er, its ager.ts or rep :-es~:atives.
Phone X umber: 817-820-817 4
Certificate Holder:
:he Ci~y o: ?or:: War:::-:
:ooo Tn =oc~~o=ton Scree::
?art War:::-:, ~X 76:C2
~~a,,_)
STACY SALl:'iAS
Authorized Reoresentative
Date Issued: 03/16/2009 Prepared By: D~
DURABLE SPECIAL TIES, INC . WORK EXPERIENCE COMPLETE 2003
CONTRACT
AMT
SCOPE OF WORK YEAR LOCATED
s 473 ,19 1.50 T RAF FI C SIGNALS
s 342 ,402 .25 TRAFF IC SIGNALS
$ 91 ,000 .00 TRAFF IC SIGNALS
CONTRACT SCOPE OF WORK
AMT
S 705 ,600 .00 TRAFFIC S IGNALS
$ 2 ,382 ,000 .00 TRAFFIC SIGNALS
s
s
s
s
s
263 ,500 .00 TRAFFIC SIGNALS
192 ,370.00 TRAFFIC SIGNALS
413 ,000.00 LED SIGNAL HEAD
UPGRADE
CONTRACT
AMT
SCOPE OF WORK
628 ,600 .00 TRAFFIC SIGNALS
257 ,200 .00 TRA F FIC SI GNA LS
COMPLETED
2003/21 6 NAC OG DOCHES
2003/2 23 DALLAS
2003 DALLAS
MAJOR CONTRACTS IN 2004
YEAR/JOB# LOCATED
2004/339 DALLAS
2004/401 AMAR ILLO
2004/321 ALLEN
2004/336 KAUFMAN US 80
2004/449 DALLAS
MAJOR CONTRACTS 2005
YEAR/JOB# LOCATED
2005/519 POTTER VARIOUS
2005/537 FT W ORTH
NAME AND
ADDRESS
MOORE BR OS . CONST .
PO BO X 35
LUF KIN , TX . 75902-0035
CITY OF MESQUITE
PO BOX 850137
MESQUITE , TX 75185-0137
WESTERN BUILDERS
PO BOX 15368
AMARILLO , TX . 79105-5368
TXDOT DALLAS
NAME AND
ADDRESS
PO BOX 133067
DALLAS , TEXAS 75313
DAN TURK
214-320-6681
TXDOT AMARILLO
PO BOX 7368
AMARILLO, TEXAS 79114
CHR IS FREEMAN
806-356-3290
CITY OF ALLEN
ONE BUTLER CIRCLE
ALLEN , TX 75013
TXDOT DALLAS
PO BOX 133067
DALLAS , TX 75313
TXDOT DALLAS
PO BOX 133067
DALLAS , TEXAS 75313
DAN TURK
214-320-6681
NAME AND
ADDRESS
TXDOT AMARILLO
PO BOX 7368
AMARIL LO , TX 79114
C ITY OF FT W O RTH
1000 T HROCKM ORT ON
FT WORTH, TX 7610 2
DURABLE SPECIA L TIES , INC . WORK EXPERIENCE
MAJOR CONTRACTS 2005
CONTRACT SCOPE OF WORK YEAR/JOB# LOCATED NAME AND
AMT ADD RESS
s 592 ,000 .00 TRAFFIC SIGNALS 2005/5 13 CARR IER PKWY CITY OF GRAND PRAIRIE
PO BOX 534045
GRAND PRAIRIE , TX 75053
s 138 ,900 .00 TRAFF IC SIGNALS 2005/508 VARIOUS BECK GROUP
3178 N. GEORGE BUSH FRWY
GARLAND , TEXAS 75040
s 182 ,952.00 TRAFF IC SIGNALS 2005/527 VARIOUS TOWN OF FLOWER MOUND
2121 CROSS TIMBERS ROAD
FLOWER MOUND, TX. 75028
s 102 ,850.00 TRAFFIC SIGNALS 2005/528 FM 548 & MUSTANG JONES & BOYD, INC .
CROSSING 17090 DALLAS PARKWAY, #200
DALLAS , TEXAS 75248
s 187 ,316 .00 TRAFFIC SIGNALS 2005/533 FM 3537/FM 720 REBCON, INC.
AT CUSTER ROAD 1868 W. NORTHWEST HWY
DALLAS , TEXAS 75220
s 257 ,20 0 .00 TRAFFIC SIGNALS 2005/537 VARIOUS CITY OF FT. WORTH
1000 THROCKMORTON ST.
FT. WORTH, TEXAS 76102
$ 457 ,400.00 TRAFFIC S IGNALS 2005/557 MIDWAY RD REBCON , INC.
1868 W . NORTHWEST HWY
DALLAS , TEXAS 75220
$ 184 ,000 .00 TRAFFIC SIGNALS 2005/560 XIT PAVING & CONST., INC .
3934 S. HWY 287
WAXAHACHIE, TEXAS 75149
s 115,067.50 TRAFFIC SIGNALS 2005/562 MARSH & RUNNING RATCLIFF CONSTRUCTORS , LP
DUKE 14901 QUORUM DR., #715
DALLAS , TEXAS 75254
$ 119,075.00 RED LIGHT 2005/569 VARIOUS DYNAMIC VISION
MONITORING SYS. PO BOX 50748
DENTON , TEXAS 76208
s 259 ,000 .00 TRAFFIC SIGNALS 2005/ 573 CITY OF DESOTO PATCO UTILITIES
FOR TRAFF IC LANE FM 1382 1617 W . HWY 303
MODIFICATION GRAND PRAIRIE, TX . 75051
ARTHUR TUCKER
972-641-7901
DURABLE SPECIALTIES, INC . WORK EXPERIENCE
MAJOR CONTRACTS 2006
CONTRACT SCOPE OF WORK YEAR/JOB# LOCATED NAME AND
AMT ADDRESS
s 537,959 .00 TRAFF IC SIG NAL 2006 /601 FT. W O RTH CITY O F FT. WORTH
RECONSTRUCT IO N BERR Y ST. 1000 THROC KMORTON ST.
FT. WORTH , T EXAS 76102
s 340 ,000 .00 TRAFFIC SIGNAL 2006/602 CITY OF ROWLETI NORTH TEXAS CONTRACTING
MI LLER RD PO BO X 468
KELLER , TEXAS 76 244
s 216 ,989 .00 TRAFFIC SIGNAL 2006/604 DENTON TOWNE SPRING VALLEY CONSTRUCTION
TEMP & PERM CROSSING 10950 ALDER CIRCLE
DALLAS , TEXAS 75238-1353
s 561 ,675 .50 TRAFFIC SIGNAL 2006/607 RICHARDSON CITY OF RICHARDSON
MAINTENANCE VARIOUS LOCATIONS PO BOX 830309
RICHARDSON , TEXAS 75083-0309
s 1 ,272 ,794 .60 TRAFFIC SIGNAL 2006/609 DENTON MICA CORPORATION
PERM & TEMP LOOP 288 EAST PO BOX 161609
FT . WORTH, TEXAS 76161
s 153 ,000 .00 TRAFFIC S IGNAL 2006/610 DALLAS SCR CONTRUCTION COMPANY
IH 30 & JIM MILLER RD 5420 FM 2218
RICHMOND , TEXAS 77469
s 655 ,000 .00 TRAFFIC S IGNAL 2006/615 YOUNG COUNTY TXDOT -WICHITA FALLS
SH16 1601 S.W. PARKWAY
WICHITA FALLS , TX 76302
s 157 ,293 .70 TRAFFIC SIGNAL 2006/616 FRISCO CITY OF FRISCO
HILLCREST RD 6859 MAIN ST .
FRISCO , TEXAS 75034
$ 178 ,700 .00 STREET LIGHTING 2006/618 LITILE ELM TOWN OF LITILE ELM
ELDORADO PKWY 100 W . ELDORADO PKWY
LITILE ELM, TEXAS 75068
s 87 ,900 .00 TRAFF IC S IGNAL 2006/623 ALLEN CITY OF ALLEN
HEDGCOXE RD 305 CENTURY PKWY
ALLEN , TEXAS 750 13-8042
s 253 ,350 .00 TRAFF IC S IGNAL 2006/624 WACO CITY O F WACO
VARIOUS PO BOX 2570
WACO , TEXAS 76702 -2570
$ 201 ,725.00 TRAFF IC S IGNAL 2006 /62 6 CITY OF PLANO MCMAHON CONTRACTING
RELO CAT ION MCDERMOTIRD PO BOX 153086
IRVING , TE XA S 750 15-3086
s 194 ,472 .50 TRA FFIC S IGNAL 2006/627 NTIA M ICA COR PORATION
PROJECT #2038 -DN T-PO BOX 161609
01 -CN-E N FT . WORTH , TEXAS 76161
DURABLE SPECIAL TIES , INC. WORK EXPERIENCE
MAJOR CONTRACTS 2007
CONTRACT SCOPE OF WORK YEAR/JOB# LOCATED NAME AND
AM T ADDRESS
s 215,250 .00 TRAFFIC S IGNAL 200 7/70 2 AUSTIN MICA CORPORATION
183A -TURNPIKE PO BOX 161609
FT. WORTH , TEXAS 76161
s 219,500.00 TRAFFIC S IGNAL 2007/704 CITY OF DESOTO CITY OF DESOTO
SYSTEM UPGRADE VARIOUS LOCATIONS 211 E. PLEASANT RUN RD
DESOTO , TEXAS 75115
$ 102 ,750.00 TRAFFIC S IGNAL 2007/706 GRAND PRAIRIE SPRING VALLEY CONSTRUCTION
DORYN DR. & MAGNA 10950 ALDER Cl RCLE
CARTA DALLAS, TEXAS 75238-1353
$ 357 ,900 .00 ADAPTIVE CONTROL 2007/708 TYLER CITY OF TYLER
SIGNAL SYS us 69 PO BOX 2039
TYLER , TEXAS 75710
$ 120 ,921 .50 TRAFFIC SIGNAL 2007/710 SEAGOV ILLE DUKE CONSTRUCTION
DIVIDEND DR . & POINT 5495 BEL TUNE RD #360
WEST BLVD DALLAS, TEXAS 75254
s 122 ,750 .00 TRAFFIC SIGNAL 2007/711 DENTON ED BELL CONSTRUCTION
FM 407 PO BOX 540787
DALLAS , TEXAS 75354-0787
s 206 ,1 50 .00 TRAFFIC SIGNAL 20071712 DALLAS REBCON , INC.
N. GALLOWAY AVE 1868 W. NORTHWEST HWY
TO BEL TUNE RD DALLAS , TEXAS 75220
s 107 ,500 .00 TRAFFIC SIGNAL 2007n14 WISE TXDOT-TARRANT
FM 51 & PRESKITI RD PO BOX 6868
FT. WORTH , TEXAS 76 115
s 20 1,149 .20 TRAFFIC SIGNAL 207/720 TARRANT MICA CORPORATION
IH 30 & CENTER ST. PO BOX 161609
FT . WORTH , TEXAS 76161
$ 385 ,700.00 TRAFFIC SIGNAL 2007/721 TARRANT MICA CORPORATION
SH 199 PO BOX 161609
FT . WORTH , TEXAS 76161
$ 4 ,234,419 .95 TRAFFIC SIGNAL 2007/723 DALLAS ARCHER WESTERN
VARIOUS LOCATIONS 2121 AVENUE J, #103
DART-CMGC-3 LINE ARLINGTON , TEXAS 76006
NW-2, NW-3 , NW-4
$ 299 ,800 .00 TRAFFIC SIGNAL 2007/725 DALLAS TRI-CON SERVICES , INC.
NAAMAN SCHOOL RD 3010 W. MAIN ST.
ROWLETI, TEXAS 75088
s 397 ,350 .00 TRAFFIC SIGNA L 2007/729 WEATHERFORD EDA. WILSON
MAIN ST. -DOWNTOWN PO BOX 11423
FT . WORTH, TEXAS 76110-0423
s 103 ,600 .00 TRAFF IC SIGNAL 2007/732 PLANO -VARIOUS LOC JIM BOWMAN CONSTRUCTION
1111 SUMMIT AVE, #1
PLANO , TEXAS 75074
s 117 ,300 .00 TRAFF IC SIGNAL IMPR' 2007/735 HOLLAND RD & BROAD L H LACY CONSTRUCTION
STREET PO BOX 541297
DALLAS , TEXAS
DURABLE SPECIAL TIES, INC. WORK EXPERIENCE
MAJOR CONTRACTS 2007
CONTRACT SCOPE OF WORK YEAR/JOB# LOCATED NAME AND
A MT ADDRE SS
s 136,715 .00 TRAFFIC S IGNAL MODI 2007/737 LUNA RD & VALLEY VIEW JFG CONCRETE , INC .
(RACETRAC) PO BOX 550
PRINCETON , TEXAS 75407
s 164.000 .00 TRAFFIC SIGNAL 2007/739 SH 170 & PARK VISTA CITY OF FT. WORTH
5001 JAMES AVE , #301
FT. WORTH , TEXAS 76115
s 123,300 .00 TRAFF IC SIGNAL 2007/743 AMARILLO BLVD & BRAD DRAKE CONSTRUCTION
LOWES LANE 3737 LAMAR AVE , #700
PARIS , TEXAS 75462
s 666,720 .00 TRAFFIC S IGNAL 2007/744 MOCKINGBIRD LANE GIBSON & ASSOCIATES, INC .
PO BOX 800579
BALCH SPRINGS , TEXAS 75180
$ 101 ,000 .00 TRAFFIC SIGNAL 2007/745 BU 287P & FM 157 TXDOT-TARRANT
PO BOX6868
FT. WORTH , TEXAS 76115
s 117 ,453 .00 STREET LIGHTS/ 2007/746 TCCD SOUTH CAMPUS ROEBUCK CONCRETE CONTRACTORS
TRAFFIC S IGNALS CAMPUS & JOE B PO BOX 301
RUSHING FT. WORTH, TEXAS 76101
s 462 ,568.80 TRAFFIC !S IGNALS 2007/751 FM 2499 MICA CORPORATION
PO BOX 161609
FT. WORTH , TEXAS 76161
s 2 ,835 ,000 .00 TRAFF IC SIGNALS 2007/755 us 80 TXDOT -TYLER
15986 SH 155
TYLER, TEXAS 75703
s 254 ,500 .00 RECONSTRUCT 2007/757 VARIOUS LOCATIONS CITY OF WACO
TRAFFIC SIGNALS PO BOX 2570
WACO , TEXAS 76072
s 334 ,800 .00 TRAFFIC SIGNALS 2007/761 EXCHANGE PKWY LACY CONSTRUCTION
TWIN CREEKS & SH 121 PO BOX 541297
DALLAS , TEXAS 75354
s 369 ,165.00 TRAFFIC SIGNAL 2007/762 SHADY OAKS & BRINKER LACY CONSTRUCTION
IMPROVEMENTS PO BOX 541297
DALLAS , TEXAS 75354
s 923 ,807 .02 TRAFFIC SIGNAL 2007/763 IH 30 MICA CORPORATION
INSTALL PO BOX 161609
FT. WORTH , TEXAS 76161
DURABLE SPECIAL TIES , INC. WORK EXPERIENCE
MAJOR CONTRACTS 2008
CONTRACT SCOPE OF WORK YEAR/JOB# LOCATED NAME AND
A MT A DD RESS
s 64 4 ,378 .30 TRA FF IC SIGNAL 2008/801 PANTHER CR EEK PKWY MARIO SINACOLA & SONS
IMPROVE MENTS AND LEGACY DR. PO BOX 2329
FRISCO , TEXAS 75034
s 103 ,400 .00 TRAFFIC SIGNAL 2008/805 SH 198 TEXAS ST ER LING
2100 N . HWY 360, #106A
GRAND PRAIRIE , TEXAS 75050
s 130 ,3 75 .00 TRAFFIC SIGNAL 2008/806 RO UTH CREEK PKWY L. H. LACY
PO BOX 541297
DALLAS , TEXS 75354
$ 142 ,000 .00 TRAFFIC SIGNAL 2008/807 BRIARGROVE TO REBCON
RAILROAD NORTH TO 1868 W. NORTHWEST HWY
PGBT DALLAS , TEXAS 75220
$ 559 ,000 .00 TRAFF IC SIGNAL 2008/808 VARIOUS LOCATIONS CITY OF GRAND PRAIRIE
206 W . CHURCH ST.
GRAN PRA IRIE, TEXAS 75050
$ 454,250 .00 TRAFFIC SIGNAL 2008/809 PLEASANT RIDGE RO. L. H. LACY
PO BOX 541297
DALLAS, TEXS 75354
$ 111 ,000 .00 TRAFFIC SIGNAL 2008/811 W INSCOTI RD . & OLD CITY OF BENBROOK
BENBROOK RD/BECKMAN 911 WINSCOTI RD .
DRIVE BENBROOK, TEXAS 76126
s 413 ,022 .0 0 TRAFFIC SIGNAL 2008/812 BEL TLINE RD , ARAPAHO REBCON
RD , CAMPBELL RD & COIT 1868 W . NORTHWEST HWY
RD DALLAS , TEXAS 75220
s 379,290 .00 TRAFFIC SIGNAL 2008/819 SH 360@ SH 180(D1VISION MICA CORPORATION
STREET) PO BOX 161609
FT. WORTH , TEXAS 76161
s 420 ,483 .00 TRAFFIC S IGNAL 2008/821 FM 2934 (ELDORADO MICA CORPORATION
PKWY) PO BOX 161609
FT . WORTH , TEXAS 76161
$ 651 ,165.00 TRAFFIC S IGNAL 2008/825 IH 30 TEXAS STERLING
2100 N . HWY 360, #106A
GRAND PRAIRIE , TEXAS 75050
$ 124 ,500.00 TRAFFIC SIGNAL 2008/826 SH 183 APAC-TEXAS, INC .
PO BOX 1807
FT . WORTH , TEXAS 76101
$ 899 ,397 .00 TRAFFIC SIGNAL 2008/827 FM 117 1 GLENN THURMAN
PO BOX 850842
MESQUITE , TEXAS 75185-0842
s 472 ,400 .00 TRAFF IC SIGNAL 2008/828 STADIUM OR. -DIVISION JACKSON CONSTRUCT ION
STREET TO RANDOL MILL 5112 SUN VALLEY DR .
ROAD FT. WORTH , TEXAS 76119
s 365 ,037 .50 TRAFFIC SIGNAL 2008/829 MAYFIE LD DR. JACKSON CONSTRUCTION
51 12 SUN VALLEY DR.
FT . WORTH , TEXAS 76119
s 1,1 45 ,000 .00 NON -S ITE 2008/830 VARIOUS LOCAT IO NS TXDOT -DALLAS
PO BOX 133067
DALLAS, TEXAS 75313
DURABLE SPECIAL TIES , INC . WORK EXPERIENCE
MAJOR CONTRACTS 2008
CONTRACT SCOPE OF WORK YEAR/JO B# LOCATED NAME AND
AMT AD DRE SS
s 656 ,000 .00 TRAFFIC SIGNAL 2008/831 BARNETI RD & JOHNSON TXDOT -WICHITA
ROAD 1601 SOUTHWEST PKWY
WICHITA FAL LS , TEXAS 76302
s 328 ,000 .00 TRAFFIC SIGNAL 2008/832 VAR IOUS LOCATIONS TXDOT -DALLAS
PO BOX 133067
DALLAS , TEXAS 75313
$ 125 ,600 .00 TRAFFIC SIGNAL 2008/835 TEASLEY LN & HICKORY C D HENDERSON
CREEK 1985 FOREST LANE
GARLAND, TEXAS 75042
s 398 ,600.00 TRAFFIC SIGNAL 2008/837 MOUNTAIN CREEK PKWY TEXAS STERLING
2100 N. HWY 360 , #106A
GRAND PRAIRIE, TEXAS 75050
$ 168,500.00 VIDEO DETECTION 2008/838 VARIOUS LOCATIONS CITY OF HAL TOM CITY
4200 HOLLIS ST.
HALTOM CITY , TEXAS 76111
$ 471,009 .00 TRAFFIC SIGNAL 2008/845 GEORGE BUSH TURNPIKE MICA CORPORATION
PO BOX 161609
FT. WORTH , TEXAS 76161
$ 167,192.13 TRAFFIC SIGNAL 2008/845 US 75 UNDERPASS @ MICA CORPORATION
PARKER RD PO BOX 161609
FT. WORTH, TEXAS 76161
$ 98 ,800 .00 TRAFFIC SIGNAL 2008/849 DENTON TAP RD@ UNITED COMMERCIAL DEVELOPMENT
HIGHLAND DR. 7001 PRESTON RD., #500
DALLAS, TEXAS 75205
$ 148 ,700 .00 TRAFFIC SIGNAL 2008/850 IH 20 (FM 3325/FM 1187) MICA CORPORATION
PO BOX 161609
FT. WORTH, TEXAS 76161
$ 124,300.00 TRAFFIC SIGNAL 2008/852 BELKNAP ST & GROVE ST. CITY OF FT. WORTH
GROV E ST. & WEATHERFORD 5001 JAMES AVE, #301
ST. FT. WORTH, TEXAS 76115
$ 383 ,500 .00 TRAFFIC SIGNAL 2008/856 FM 544 -WOODBRIDGE L. H. LACY
CROSSING IMPRV MT PO BOX 541297
DALLAS, TEXS 75354
$ 1,117,000 .00 TRAFFIC SIGNAL 2008/857 IH 35E TXDOT -DALLAS
PO BOX 133067
DALLAS , TEXAS 75313
s 302 ,000 .00 T RAFFIC SIGNA L 2008/858 SH 121 -NTIA MICA CORPORATION
PO BOX 161609
FT. WORTH, T EXAS 76 16 1
DURABL E SP ECIAL TIES , INC . WORK EX PERIEN CE
MAJOR CONTRACTS 2009
CON T RACT SCOPE OF WORK Y EAR/JOB # LOCATED
AMT
NAME AND
ADDRESS
S 129 ,849 .00 S IGNAL MODIF ICATION 2009/901 W . 7TH & CURR IE ST. CONATSER CONSTRUCTION
5327 WICHITA ST .
s
$
260 ,077.00 TRAFFIC SIGNAL
302 ,700 .00 TRAFFIC SIGNAL
IMPRO VEMEN TS
FT . WORTH , TEXSA 76102
2009/902 IH 20 (GREAT SOUTHWEST MCMAHON CONTRACTING
PARKWAY) PO BOX 153086
IRVING , TEXAS 75015-3086
2009/904 VARIOUS LOCATIONS CITY OF NORTH RICHLAND HILSS
72 00 A DICK FISH ER DR. S
NORTH RICHLAND HILLS, TEXAS 76182-0609
DESCRIPTION OF EQUIPMENT
2005 F450 W/ALTEC BUCKET
2005 VERMEER R~650
2007 CATERPILLAR EXCAVA'ID.R 304C
2006-BJBCAT SKID STr,i:',t:<. LOADER
2006 VERi'IBER D24X40ll NAVIGATOR
2007 MACK crP713
2005 IH 4200CR 18 TON CRANE
2001 INTERNATIONAL CRANE :
2004 MACK Qf613 CAB TRUCK
?.000 VF.RMF.RRVS750 TRENCHER
2000 SPOIL VAC
EQUIPMENT SCHEDULE
List of Equipment owned by Bidder that is in serviceable condition and available for use:
Portions of work Bidder proposes to sublet in case of Award of Contracts including amount and
type :
F-5
THE STATE OF TEXAS
COUNTY OF TARRANT
§
§
§
Bond# 2892376
PAYMENT BOND
KNOW ALL BY THESE PRESENTS :
That we, (1) ____ D __ u_ra __ b __ l __ e_S__.p.__e __ c"'""i""'"al"-ti ..... e"""'s .... , __ ln"""'c""-----' as Principal herein ,
and (2) Great American Insurance Com p a n y of New York a corporation
organized and existing under the laws of the State of (3) NY , as surety ,
are held and firmly bound unto the City of Fort Worth , a municipal corporation located in
Tarrant and Denton Counties , Texas, Obligee herein , in the amount of One Hundred
Twenty Four Thousand, Three Hundred Dollars and No Cents Dollars ($124,300.00)
for the payment whereof, the said Principal and Surety bind themselves and their heirs ,
executors , administrators , successors and assigns , jointly and severally , firmly by these
presents :
WHEREAS , the Principal has entered into a certain written contract with the
Obligee dated the 10th day of February , 2009 , which contract is hereby referred
to and made a part hereof as if fully and to the same extent as if copied at length , for the
following project: Installation of Two New Traffic Signals at the Intersections of
Belknap Street and Grove Street and Weatherford Street and Grove Street
TPW Project No. TPW-TS-2008-00026.
NOW, THEREFORE , THE CONDITION OF THIS OBLIGATION IS SUCH , that if
the sa id Principal shall fa ithfully make payment to each and every cla imant (as defined
in Chapter 2253 , Texas Government Code , as amended) supplying labor or materials in
the prosecution of the work under the contract, then this obligation shall be void ;
otherwise , to remain in full force and effect.
PROVIDED , HOWEVER, that this bond is executed pursuant to Chapter 2253 of
the Texas Government Code, as amended , and all liabilities on this bond shall be
dete rmined in accordance with the provisions of said statute , to the same extent as if it
were copied at length herein.
IN WITNESS WHEREOF , the duly authorized representatives of the Principal
and the Surety have executed this instrument.
SIGNED and SEALED this 10th day of February , 2009 .
Durable Specialties, Inc.
ATTEST:
(,~J C11YVYv ·&]\hN
(Principal) Secretary
Title : 9 {e_5i Q Qf) "t -
(SE AL)
(SEAL)
NOTE: (1)
(2)
(3)
Address : P.O. Box 3817 88
Duncanville, TX 75138 ---------------F.---:--
Great American Insurance Company of New York
:~RETY~&
Name: Jack M. Crowley
Attorney in Fact
Address : 2201 N. Collins 11295
Arlington, TX 76011-2698
Telephone Number: 817-794-1600
Correct name of Principal (Contractor).
Correct name of Surety .
State of incorporation of Surety
Telephone number of surety must be stated. In addition , an original copy of
Power of Attorney shall be attached to Bond by the Attorney-in-Fact.
The date of bond shall not be prior to date of Contract.
G REAT A MER ICAN INSU RA NCE COMPA NY O F NEW YORK
GREAT AMERICAN INSURANCE COMPANY OF NEW YORK
NewYork
Administrative Office: 580WALNUT STREET • CINCINNATI, OHIO 45202 • 513-369-5000 • FAX 513-723-2740
The number of persons authorized by
this power of attorney is not more than THREE No . 0 16961
POWER OF ATTORNEY
KNOW ALL MEN BY THESE PRESENTS: That the GREAT AMERICAN INSURANCE COMPANY OF NEW YORK, a corporation
organized and existing under and by virtue of the laws of the State of New York , does hereby nominate, constitute and appoint the
person or persons named below its true and lawful attorney-in-fact , for it and in its name , place and stead to execute in behalf of the said
Company, as surety, any and all bonds, undertakings and contracts of suretyship, or other written obligations in the nature thereof;
provided that the liability of the said Company on any such bond, undertaking or contract of suretyship executed under this authority
shall not exceed the limit stated below.
Name Address Limit of Power
JACK M . CROWLEY
WAYNE A. COBLE
PATRICIA A. SMITH
ALL OF
ARLINGTON , TEXAS
ALL
$75 ,000,000
This Power of Attorney revokes all previous powers issued in behalf of the attorney(s)-in-fact named above .
IN WITNESS WHEREOF, the GREAT AMERICAN INSURANCE COMPANY OF NEW YORK has caused these presents to be signed
and attested by its appropriate officers and its corporate seal hereunto affixed this 10th day of July , 2006
Attest GREAT AMERICAN INSURANCE COMPANY OF NEW YORK
1 I I
"II,, f
DAV ID C . KITCHIN (5 13-412-4602)
STATE OF OHIO, COUNTY OF HAMILTON-ss:
On this 10th day of July , 2006 , before me personally appeared DAVID C. KITCHIN, to me known,
being duly sworn , deposes and says that he resides in Cincinnati , Ohio, that he is the Divisional Senior Vice President of the Bond
Division of Great American Insurance Company of New York , the Company described in and which executed the above instrument; that
he knows the seal; that it was so affixed by authority of his office under the By-Laws of said Company, and that he signed his name
thereto by like authority.
KAREN L BERRY
NOTARY PUBLIC STATE OF OHIO
My Commission Expires 02 16-09
f
This Power of Attorney is granted by authority of the following resolu t ions adopted by the Board of Directors of Great American
Insurance Company of New York by unanimous written consent dated July 27, 1995 .
RESOLVED: That the Division President, the several Division Vice Presidents and Assistant Vice Presidents, or any one of them,
be and hereby is authorized, from time to time, to appoint one or more Attorneys-In-Fact to execute on behalf of the Company, as surety,
any and all bonds, undertakings and contracts of suretyship, or other written obligations in the nature thereof; to prescribe their respective
duties and the respective limits of their authority; and to revoke any such appointment at any time .
RESOLVED FURTHER: That the Company seal and the signature of any of the aforesaid officers and any Secretary or Assistant
Secretary of the Company may be affixed by facsimile to any power of attorney or certificate of either given for the execution of any bond,
undertaking, contract or suretyship, or other written obligation in the nature thereof, such signature and seal when so used being hereby
adopted by the Company as the original signature of such officer and the original seal of the Company, to be valid and binding upon the
Company with the same force and effect as though manually affixed.
CERTIFICATION
I, RONALD C. HAYES, Assistant Secretary of Great American Insurance Company of New York , do hereby certify that the
foregoing Power of Attorney and the Resolutions of the Board of Directors of July 27 , 1995 have not been revoked and are now in full force
and effect.
Signed and sealed this lOth:lay of February ,2009 ~
/ I -' ~ ~-~:----_; __ ---~
I ,t ~. /I
Bond# 2892376
PERFORMANCE BOND
THE STATE OF TEXAS
COUNTY OF TARRANT
§
§
§
KNOW ALL BY THESE PRESENTS:
That we, ( 1 ) ____ D __ u=r __ a=b ....... le----"-S.._p ....... e ___ ci __ a;.;..;lt=ie;;...s ...... __ 1 n __ c _____ as Principal herein, and (2) _
Great American Insurance Company of New York a corporation
organized under the laws of the State of (3) _N_Y _________ , and who is
authorized to issue surety bonds in the State of Texas, Surety herein, are held and
firmly bound unto the City of Fort Worth , a municipal corporation located in Tarrant and
Denton Counties, Texas, Obligee herein, in the sum of One Hundred Twenty Four
Thousand, Three Hundred Dollars and No Cents Dollars ($124,300.00) for the
payment of which sum we bind ourselves, our heirs, executors, administrators,
successors and assigns, jointly and severally , firmly by these presents.
WHEREAS, Principal has entered into a certain written contract with the Obligee
dated the 10th day of February , 2009, a copy of which is attached hereto
and made a part hereof for all purposes, for the construction of Installation of Two
New Traffic Signals at the Intersections of Belknap Street and Grove Street and
Weatherford Street and Grove Street TPW Project No. TPW-TS-2008-00026.
NOW, THEREFORE, the condition of this obligation is such, if the said Principal
shall faithfully perform the work in accordance with the plans, specifications, and
contract documents and shall fully indemnify and hold harmless the Obligee from all
costs and damages which Obligee may suffer by reason of Principal's default, and
reimburse and repay Obligee for all outlay and expense that Obligee may incur in
making good such default, then this obligation shall be void; otherwise , to remain in full
force and effect.
PROVIDED, HOWEVER, that this bond is executed pursuant to Chapter 2253 of
the Texas Government Code, as amended, and all liabilities on this bond shall be
determined in accordance with the provisions of such statute, to the same extent as if it
were copied at length herein.
IN WITNESS WHEREOF, the duly authorized representatives of the Principal
and the Surety have executed this instrument.
SIGNED and SEALED this 10th day of February , 2009.
Durable Specialties, Inc.
ATTEST:
~k A~ J D/\vvv ~lb ,-v
(Principal) Secretary
(SE AL)
(SE AL)
Address: P.O. Box 381788
Duncanville, TX 75138
-----------,.,.-::--=-----c.:.: ,
.... -__ .-
Great American Insurance Company of New York
SURETY/: ~h
By: ~d ~
Name: Jack M. Crowley
Attorney in Fact
Address :2201 N. Collins #295
Arlington, TX 76011-2698
Witness as to Surety Telephone Number: 817 -794 -1600
NOTE: (1)
(2)
(3)
Correct name of Principal (Contractor).
Correct name of Surety.
State of incorporation of Surety
Telephone number of surety must be stated . In addition, an original copy of
Power of Attorney shall be attached to Bond by the Attorney-in-Fact.
The date of bond shall not be prior to date of Contract.
G REAT A MERIC AN INSUR A NCE COMPA NY OF NEW YORK
GREAT AMERICAN INSURANCE COMPANY OF NEW YORK
NewYork
Administrative Office: 580 WALNUT STREET • CINCINNATI, OHIO 45202 • 513-369-5000 • FAX 513-723-2740
The number of persons authorized by
this power of attorney is not more than THRE E No. 0 16961
POWER OF ATTORNEY
KNOW ALL MEN BY THESE PRESENTS: That the GREAT AMERICAN INSURANCE COMPANY OF NEW YORK , a corporation
organized and existing under and by virtue of the laws of the State of New York , does hereby nominate, constitute and appoint the
person or persons named below its true and lawful attorney-in-fact, for it and in its name , place and stead to execute in behalf of the said
Company, as surety, any and all bonds, undertakings and contracts of suretyship, or other written obligations in the nature thereof;
provided that the liability of the said Company on any such bond , undertaking or contract of suretyship executed under this authority
shall not exceed the limit stated below.
Name Address Limit of Power
JACK M. CROWLEY
WAYNE A. COBLE
PATRICIA A. SMITH
ALL OF
ARLINGTON , TEXAS
ALL
$75 ,000 ,000
This Power of Attorney revokes all previous powers issued in behalf of the attorney(s)-in-fact named above .
IN WITNESS WHEREOF, the GREAT AMERICAN INSURANCE COMPANY OF NEW YORK has caused these presents to be signed
and attested by its appropriate officers and its corporate seal hereunto affixed this 10th day of July , 2006
Attest GREAT AMERICAN INSURANCE COMPANY OF NEW YORK
___ -::::::,
DAV ID C. KITCHIN (513-412-4602)
STATE OF OHIO, COUNTY OF HAMILTON-ss:
On this 10th day of July , 2006 , before me personally appeared DAVID C. KITCHIN , to me known,
being duly sworn , deposes and says that he resides in C incinnati , Ohio, that he is the Divisional Senior Vice President of the Bond
Division of Great American Insurance Company of New York , the Company described in and which executed the above instrument ; that
he knows the seal ; that it was so affixed by authority of his office under the By-Laws of said Company, and that he signed his name
thereto by like authority.
KAREN L BERRY
NOTARY PUBLIC ~TATE OF OHIO
My Commission Fxpires 02-16-09
~1l, I
"*,.
This Power of Attorney is granted by authority of the following resolutions adopted by the Board of Directors of Great American
Insurance Company of New York by unanimous written consent dated July 27 , 1995.
RESOLVED: That the Division President, the several Division Vice Presidents and Assistant Vice Presidents, or any one of them ,
be and hereby is authorized, from time to time, to appoint one or more Attorneys-In-Fact to execute on behalf of the Company, as surety,
any and all bonds, undertakings and contracts of suretyship, or other written obligations in the nature thereof; to prescribe their respective
duties and the respective limits of their authority; and to revoke any such appointment at any time .
RESOLVED FURTHER: That the Company seal and the signature of any of the aforesaid officers and any Secretary or Assistant
Secretary of the Company may be affixed by facsimile to any power of attorney or certificate of either gi ven for the execution of any bond,
undertaking, contract or suretyship, or other written obligation in the nature thereof, such signature and seal when so used being hereby
adopted by the Company as the original signature of such officer and the original seal of the Company, to be valid and binding upon the
Company with the same force and effect as though manually affixed.
CERTIFICATION
I, RONALD C. HAYES , Assistant Secretary of Great American Insurance Company of New York , do hereby certify t hat the
foregoing Power of Attorney and the Resolutions of the Board of Directors of July 27 , 1995 have not been revoked and are now in full force
and effect.
lOthlay of February
' I \
THE STATE OF TEXAS
COUNTY OF TARRANT
KNOW ALL BY THESE PRESENTS :
§
§
§
Bond# 2 892376
MAINTENANCE BOND
That Durable Specialties, Inc ("Contractor''),as principal , and ,
Great American Insurance Company o f Ne w York a corporation organized under the laws of
the State of NY , ("Surety"), do hereby acknowledge themselves to be held and bound to
pay unto the City of Fort Worth , a Municipal Corporation chartered by virtue of Constitution and laws of the
State of Texas , ("City") in Tarrant County , Texas , the sum of One Hundred Twenty Four Thousand,
Three Hundred Dollars and No Cents Dollars ($124,300.00) lawful money of the United States , for
payment of which sum well and truly be made unto said City and its successors , said Contractor and Surety do
hereby bind themselves , their heirs , executors , administrators , assigns and successors , jointly and severally .
This obligation is conditioned , however, that:
WHEREAS, said Contractor has this day entered into a written Contract with the City of Fort Worth ,
dated the 10th of February , 20 09, a copy of which is hereto attached and made a part hereof, for
the performance of the following described public improvements : Installation of Two New Traffic Signals
at the Intersections of Belknap Street and Grove Street and Weatherford Street and Grove
Street the same being referred to herein and in said contract as the Work and being designated as project
number(s) TPW-TS-2008-00026 and said contract , including all of the specifications , conditions , addenda ,
change orders and written instruments referred to therein as Contract Documents being incorporated herein
and being made a part hereof; and ,
WHEREAS , in said Contract, Contractor binds itself to use such materials and to so construct the work
that it will remain in good repair and condition for and during a period of after the date of the final acceptance of
the work by the City ; and
WHEREAS , said Contractor binds itself to maintain said work in good repair and cond it ion for said term
of 2 (Two) Years ; and
WHEREAS , said Contractor binds itself to repair or reconstruct the Work in whole or in part at any time
within said period , if in the opinion of the Director of the City of Fort Worth Department of Transportation and
Public Works , it be necessary ; and,
WHEREAS , said Contractor binds itself, upon receiving notice of the need therefore to repair or
reconstruct said Work as herein provided.
NOW THEREFORE , if said Contractor shall keep and perform its said agreement to maintain , repair or
reconstruct said Work in accordance with all the terms and conditions of said Contract , these presents shall be
null and void, and have no force or effect. Otherwise , this Bond shall be and remain in full force and effect, and
Bond# 2892376
the City shall have and recover from Contractor and Surety damages in the premises as prescribed by said
Contract.
This obligation shall be a continuing one and successive recoveries may be had hereon for successive
breaches until the full amount hereof is exhausted .
IN WITNESS WHEREOF, this instrument is executed in _6_ counterparts, each of which shall be
deemed an original , this 10th day of February , AD. 2009.
Durable Specialties, Inc.
ATTEST :
cit\ 1\ o-1) a Mfh) :12vr.Rlw
(Principal) Secretary
(SE AL)
(SE AL)
Address : P.O. Box 381788
Duncanville, TX 75138
Great American Insurance Company of New York
SURETY /J _ / __..-; .,.----S2.._
By : v:% ,,r7' ~
Nam_e_:~;?t:-a~c~k~M~.-C_r_o~:-l_e_y ~~~~~~
Attorney in Fact
Address : 2201 N. Collins 11295
Arlington, TX 76011-2698
Witness as to Surety Telephone Number: 817-794-1600
NOTE : (1)
(2)
(3)
Correct name of Principal (Contractor).
Correct name of Surety .
State of incorporation of Surety
Telephone number of surety must be stated . In addition , an original copy of Power of
Attorney shall be attached to Bond by the Attorney-in-Fact.
The date of bond shall not be prior to date of Contract.
GREAT A M ER IC A N INSURA NCE COMPANY OF NEW YORK
GREAT AMERICAN INSURANCE COMPANY OF NEW YORK
NewYork
Administrative Office: 580 WALNUT STREET • CINCINNATI, OHIO 45202 • 513-369-5000 • FAX 513-723-2740
The number of persons authorized by
this power of attorney is not more than THREE No . 0 16961
POWER OF ATTORNEY
KNOW ALL MEN BY THESE PRESENTS: That the GREAT AMERICAN INSURANCE COMPANY OF NEW YORK , a corporation
organized and existing under and by virtue of the laws of the State of New York , does hereby nom inate, constitute and appoint the
person or persons named below its true and lawful attorney-in-fact, for it and in its name, place and stead to execute in behalf of the said
Company, as surety, any and all bonds, undertakings and contracts of suretyship, or other written obligations in the nature thereof;
provided that the liability of the said Company on any such bond , undertaking or contract of suretyship executed under this authority
shall not exceed the limit stated below.
Name Address Limit of Power
JACK M. CROWLEY ALL OF ALL
WAYNE A . COBLE
PATRICIA A. SMITH
ARLINGTON , TEXAS $75 ,000 ,000
This Power of Attorney revokes all previous powers issued in behalf of the attorney(s)-in-fact named above.
IN WITNESS WHEREOF, the GREAT AMER ICAN INSURANCE COMPANY OF NEW YORK has caused these presents to be signed
and attested by its appropriate officers and its corporate seal hereunto affixed this 10th day of July , 2006
Attest GREAT AMERICAN INSURANCE COMPANY OF NEW YORK
DAVID C. KITCHIN (513-412-4602)
STATE OF OHIO, COUNTY OF HAMILTON-ss:
On this 10th day of July , 2006 , before me personally appeared DAVID C. KITCHIN , to me known ,
being duly sworn , deposes and says that he resides in Cincinnati , Ohio, that he is the Divisional Senior Vice President of the Bond
Division of Great American Insurance Company of New York , the Company described in and which executed the above instrument ; that
he knows the seal; that it was so affixed by authority of his office under the By-Laws of said Company, and that he signed his name
thereto by like authority.
i<AHEN L BERRY
NOTARY PUBLIC STATE OF OHIO
Mv COITlfTIISSton £:xp1res 02-16-09
This Power of Attorney is granted by authority of the following resolutions adopted by the Board of Directors of Great American
Insurance Company of New York by unanimous written consent dated July 27 , 1995.
RESOLVED: That the Division President, the several Division Vice Presidents and Assistant Vice Presidents, or any one of them,
be and hereby is authorized, from time to time, to appoint one or more Attorneys-In-Fact to execute on behalf of the Company, as surety,
any and all bonds, undertakings and contracts of suretyship, or other written obliga tions in the nature thereof; to prescribe their respective
duties and the respective limits of their authority; and to revoke any such appointment at any time.
RESOLVED FURTHER: That the Company seal and the signature of any of the aforesaid officers and any Secretary or Assistant
Secretary of the Company may be affixed by facsimile to any power of attorney or certificate of either given for the execution of any bond,
undertaking, contract or suretyship, or other written obligation in the nature thereof, such signature and seal when so used being hereby
adopted by the Company as the original signature of such officer and the original seal of the Company, to be valid and binding upon the
Company with the same force and effect as though manually affixed.
CERTIFICATION
I, RONALD C. HAYES , Ass istant Secretary of Great American Insurance Company of New York , do hereby certify that the
foregoing Power of Attorney and the Resolutions of the Board of Directors of July 27 , 1995 have not been revoked and are now in full force
and effect.
Signed and sealed this lOthlay of February ,2009 ~
/ (~ ) \
\___ ~;.----~
\ I f \ • ,,,.
PARTG
CONTRACT
G-0
CITY OF FORT WORTH, TEXAS
CONTRACT
THE STATE OF TEXAS
KNOW ALL MEN BY THESE PRESENTS:
COUNTY OF TARRANT
This agreement made and entered into this the 10th day of February , 20...Q.L by
and between the CITY OF FORT WORTH , a municipal corporation of Tarrant County, Texas,
organized and existing under and by virtue of a special charter adopted by the qualified voters within
said City on the 11th day of December, A.O ., 1924, under the authority (vested in said voters by the
"Home Rule" provision) of the Constitution of Texas, and in accordance with a resolution duly passed at
a regular meeting of the City Council of said city, and the City of Fort Worth being hereinafter termed
Owner, and Durable Specialties, Inc HEREINAFTER CALLED Contractor.
WITNESSETH: That said parties have agreed as follows :
1.
That for and in consideration of the payments and agreements hereinafter mentioned to be
made and performed by the Owner, and under the conditions expressed in the bond bearing even date
herewith, the said Contractor hereby agrees with the said Owner to commence and complete the
construction of certain improvements described as follows :
INSTALLATION OF TWO NEW TRAFFIC SIGNALS AT THE INTERSECTIONS
OF BELKNAP STREET AND GROVE STREET AND
WEATHERFORD STREET AND GROVE STREET
Designated as project number: TPW-TS-2008-00026.
2.
That the work herein contemplated shall consist of furnishing as an independent contractor all
labor, tools , appliances and materials necessary for the construction and completion of said project in
accordance with the Plans and Specifications and Contract Documents prepared by the Transportation
and Public Works Department of the City of Fort Worth adopted by the City Council of the City of Fort
Worth , which Plans and Specifications and Contract Documents are hereto attached and made a part
of this contract the same as if written herein.
OFFICIAL RECOR
CITY SECRETARY
FT. WORTH, TX
3.
The Contractor hereby agrees and binds himself to commence the construction of said work
within ten (10) days after being notified in writing to do so by the Transportation and Public Works
Department of the City of Fort Worth .
4.
The Contractor hereby agrees to prosecute said work with reasonable diligence after the
commencement thereof and to fully complete and finish the same ready for the inspection and approval
of the Transportation and Public Works Department of the City of Fort Worth and the City Council of the
City of Fort Worth within a period of 45 (Forty Five) working days .
If the Contractor should fail to complete the work as set forth in the Plans and Specifications and
Contract Documents within the time so stipulated , plus any additional t ime allowed as provided in the
General Conditions , there shall be deducted from any monies due or which may thereafter become due
him , the sum of $ 210.00 per calendar day, not as a penalty but as liquidated damages , the
Contractor and his Surety shall be liable to the Owner for such deficiency.
5 .
Should the Contractor fail to begin the work herein provided for within the time herein fixed or to
carry on and complete the same according to the true meaning of the intent and terms of said Plans,
Specifications , and Contract Documents , then the Owner shall have the right to either demand the
surety to take over the work and complete the same in accordance with the Contract Documents or to
take charge of and complete the work in such a manner as it may deem proper, and if, in the
completion thereof, the cost to the said City shall exceed the contract price or prices set forth in the sa id
Plans and Specifications made a part hereof, the Contractor and/or its Surety shall pay said City on
demand in writing , setting forth and specifying an itemized statement of the total cost thereof, said
excess cost.
6.
Contractor covenants and agrees to indemnify City's engineer and architect , and their
personnel at the project site for Contractor's sole negligence. In addition , Contractor covenants and
agrees to indemnify , hold harmless and defend, at its own expense , the Owner, its officers , servants
and employees, from and against any and all claims or suits for property loss , property damage ,
personal injury, including death , arising out of, or alleged to arise out of, the work and services to be
performed hereunder by Contractor, its officers , agents , employees , subcontractors , licensees or
invitees , whether or not any such injury, damage or death is caused, in whole or in part, by the
negligence or alleged negligence of Owner, its officers. servants, or employees. Contractor
likewise covenants and agrees to indemnify and hold harmless the Owner from and against any and
all injuries to Owner's officers , servants and employees and an dama e , loss or destruction to
property of the Owner arising from the performance of any of the terms and conditions of this
Ot-llilAL RECOR
CITY SECRETARY
C -2 FT. ~ORTH, TX
Contract, whether or not any such injury or damage is caused in whole or in part by the
negligence or alleged negligence of Owner, its officers, servants or employees .
In the event Owner receives a written claim for damages against the Contractor or its subcontractors
prior to final payment, final payment shall not be made until Contractor either (a) submits to Owner
satisfactory evidence that the claim has been settled and/or a release from the claimant involved, or
(b) provides Owner with a letter from Contractor's liability insurance carrier that the claim has been
referred to the insurance carrier.
The Director may, if he deems it appropriate, refuse to accept bids on other City of Fort Worth public
work from a Contractor against whom a claim for damages is outstanding as a result of work
performed under a City Contract.
7.
The Contractor agrees, on the execution of this Contract, and before beginning work, to make,
execute and deliver to said City of Fort Worth good and sufficient surety bonds for the faithful
performance of the terms and stipulations of the Contract and for the payment to all claimants for labor
and/or materials furnished in the prosecution of the work, such bonds being as provided and required in
Texas Government Code Section 2253, as amended, in the form included in the Contract
Documents, and such bonds shall be 100 percent ( 100%) of the total contract price , and the said surety
shall be a surety company duly and legally authorized to do business in the State of Texas, and
acceptable to the City Council of the City of Fort Worth.
8 .
Said City agrees and binds itself to pay , and the said agrees to receive, for all of the aforesaid
work, and for all additions thereto or deductions therefrom, the price shown on the Proposal submitted
by the successful bidder hereto attached and made a part hereof. Payment will be made in by-weekly
installments upon actual work completed by contractor and accepted by the Owner and receipt of
invoice from the Contractor. The agreed upon total contract amount (including/excluding) alternates
N/A shall be
ONE HUNDRED TWENTY FOUR THOUSAND
THREE HUNDRED DOLLARS AND NO CENTS
$124,300.00
C-3
OF FI IAL RECO
CITY SECRETARY
FT.W TH ,TX
9.
It is further agreed that the performance of this Contract, either in whole or in part, shall not be
sublet or assigned to anyone else by said Contractor without the written consent of the Director of the
Transportation and Public Works Department.
10.
The Contractor agrees to pay at least the minimum wage per hour for all labor as the same is
classified, promulgated and set out by the City of Fort Worth , Texas, a copy of which is attached hereto
and made a part hereof the same as if it were copies verbatim herein.
11.
The Contractor shall procure and shall maintain during the life of this contract insurance as
specified in paragraph 8 of Special Instruction to Bidders of this contract documents.
12.
It is mutually agreed and understood that this agreement is made and entered into by the parties
hereto with references to the existing Charter and Ordinances of the City of Fort Worth and the laws of
the State of Texas with references to and governing all matters affecting this Contract, and the
Contractor agrees to fully comply with all the provisions of the same.
IN WITNESS WHEREOF, the City of Fort Worth has caused this instrument to be signed in Six (6)
counterparts in its name and on its behalf by the City Manager and attested by its Secretary, with the
corporate seal of the City of Fort Worth attached. The Contractor has executed this instrument through
its duly authorized officers in Six (6) counterparts with its corporate seal attached .
C-4
c.; LRECO
CITY SECRETAR
FT. WORTH, TX
Done in Fort Worth , Texas , this the 1 oth day of February , 20..a....;09 ___ _
APPROVED:
~ ..d, le ~C~L.c DIRECToR,TNSPO ATloN AND
PUBLIC WORKS DEPARTMENT
})u,<Lb)t S pecia,\--h es 1"1.fL . ATIEST:
(Contractor)
~c~
(SEAL)
C,-~~340
Contrac~ Authorizatiou
c9-.)10\oc,
(TITLE) Date
l7 .D .'t:)uJ-3B l1 Bo APPROVED AS TO FORM &
(Address) LEGALi :
1) llt'\(CLVI \/1 \ \ e \1'x,. 1 '5 138
(City/State/Z ip)
Revised Ju ne 2008
GREEN CEMENT POLICY COMPLIANCE STATEMENT
(To be furnished by the Contractor to the City at the time of bid opening)
(Submit separate forms for each supplier I product supplier)
Name of Project:
City Praj. Na.:
This is to certify that the cement to be utilized for the above project will meet the following
criteria:
The cement was manufactured in a kiln utilizing the dry process (list source below} or in a
kiln that meets the emission standard of 1. 71b or less of NOx l ton of clinker released into
the atmosphere.
Name o.f Manufacturer
Address of Manufacturer: -------------------
CONTRACTOR SUPPLIER
Name Name
Title Title
Company Company
Phone Number Phone Number
D-74 "GREEN" CEMENT POLICY
As per Fort Worth City Council Resolution 3536, the City Manager is authorized to
specify the purchase of dry kiln cement as the base bid in City of Fort Worth bid projects,
with an alternative bid for the purchase of cement from an unspecified source and
preferential purchasing for bids from a cement kiln with emissions not exceeding 1. 7
pounds of NOx per ton of clinker produced. In cases where cement meeting the above
requirements is not available , and where cement from a non-compliant source must be
utilized, the Contractor shall furnish good faith effort documentation in the form of letters
from two North Texas cement suppliers of green cement stating that no stock of green
cement is available for the contractor at that time. These letters shall be considered
valid for a maximum of one week after which new letters must be submitted to the
Project Inspector if green cement continues to remain unavailable . All related costs for
complying with the Green Cement Policy shall be considered subsidiary to the applicable
project pay items .
The contractor shall submit the Green Cement Policy Compliance Statement or the good
faith effort documentation at the time the of bid opening of the project. A copy of the
Compliance Statement is attached at the end of this section. Failure to comply with the
Green Cement Policy may result in rejection of the bid as non-responsive.