Project Name Highland Hills, Monticello and Jessamine St City Sec # 55050
Client Project #(s) 102540
Project
Description
The repair and reconstruction of failed sitlewalks, curbs & gutter, ramps antl driveways
Contractor Makou Inc Change Ortler # 1 Date 51512021
City Project Mgr. Salman Shahid City Inspector Rodney Beecham
Dept.
Original Contract Amount
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
Original Funds Available for Change Orders
Remaining Funds Available for this CO
Additional Funding (if necessary)
TPW
CHANGE ORDERS fo DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
MAX ALLOWABLE CONTRACTAMOUNT (ORIGINAL CONTRACT COST+ 25%)
Totals
Contract Time
230
4.93%
$1,236,368.75
JUSTIFICATION (REASONS) FOR CHANGE ORDER
is change order is to add an additional $48,800.00 to the construction contract 55050 with revisetl contract amount of $1,037,895.00. Project has available funds requiretl
this change order through the General Capital Project fund antl does not need adtlitional funding.
o match the existing curb antl gutter on the project site, the 18" gutter with 7" curb neetls to be revised to 24" a gutter with 7" curb. Also, some gutters and ramps neetl an
tlditional asphalt transition tlue to several cracking in the existing pavement.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in
full (both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below
acknowledges that he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and
reporting requirements.
Contractor's Company Name Contractor (Name) Contract Signature Date
Makou Inc Maqsood Khan ���SDOJ�ktfqN May 11, 2021
�f�(i:ri
Date Project P
May 12, 2021 , �
Director Dept Date Director, Contracti
��� May 12, 2021 ��-
Cit Attorne Date Assistant Cit Mar
M ay 13, 2021 � $�9��f
Council Action (if repuired)
M&C Number �
ATTEST: {'���C�-e��
U (I
Mary J. Kayser, City Secretary
o-o4na�
aa� FORT��a�
�� F000000000�L �
��o
� �� d�
pvo °=d
� ° o° a
��a a� �EXA?aQ',�
nn
s�v
M&C Date Approved
Date
May 12, 2021
Date
May 12, 2021
Date
May 13, 2021
10/28/2014
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
llt:M
New
New
City of Fort Worth Change Order Additions
Project Name
Client Project #
Highland Hills, Monticello and Jessamine St
102540
Contractor�! ______ M_a _ko_u _ln_c _____ �
Ut::)l,t"' IUN
I" 1,;oncrete 1,;uro & �4" l;utter
Asphalt Transition
City Sec# 55050
PM I Salman Shahid Inspector! Rodney Beecham I
Change Order Submittal # c:::r=J Date 5/5/2021
ADDITIONS
Ut:I I "''Y unn unn 1.,ost
1.-VV J,uuu.uuuuuuuu :;y �OU.CU
TPW 200.00000000 ton $187.00
TPW
Sub Total Additions
Change Order Additions Page 2 of 4
10!81
�•L,4UU.UU
�Jl,4UU.UU
$129,800.00
$129,800.00
LF
IIC:M
4
City of Fort Worth Change Order Deletions
Project Name Highland Hills, Monticello and Jessamine St City Sec# 55050
ClientProject# :=::::10::::254=0 ==========::;-------;:::========:;--------;::====-� Contractor! Makou Inc PMI Salman Shahid Inspector! Rodney Beecham I
Ut.�vn.1r'IIUN o< , o.u , u< , U>ncrete \.Uro & 1 a· uuner
Change Order Submittal# � Date 5/5/202 1
DELETIONS uc:�, I.IIY Unit UnltGost ,� .. J,uuu.uuuuuuuu ::,y �lf.UU
TPW
::,uo Iota ue1etions
Change Order Deletions Page 3 of 4
IOtal �01,uuu.UU
$8 1 ,000 .00
�01,uuu.UU
LF
MISBE for this Change Order
1
Soto, Vania Elizabeth
From:Black, Doug
Sent:Monday, May 24, 2021 3:20 PM
To:Shahid, Salman; Soto, Vania Elizabeth; Cox, Sara L
Cc:Munoz, Filogonio
Subject:RE: CPN:102540 CO1
Yes. That one. Pp 2‐3 showing the change. Do you also have an email from the contractor accepting these changes? I
know you said he agreed to them.
Thanks,
db
Douglas W Black
Senior Assistant City Attorney
200 Texas Street
Fort Worth, Texas 76102
817-392-7615 Direct
Doug.Black@fortworthtexas.gov
Due to the ongoing coronavirus pandemic, the Fort Worth City Attorney’s Office has implemented a
department‐wide telework and all staff, except the City Attorney, are working remotely. You may
communicate with me by using my customary email address and telephone extension number.
City of Fort Worth – Working together to build a strong community.
RECIPIENTS - PLEASE CONTACT ME PRIOR TO FORWARDING MESSAGES DESIGNATED AS
ATTORNEY-CLIENT COMMUNICATIONS.
This e-mail and any files transmitted with it are confidential and are intended solely for the use of the individual or entity
to which they are addressed. This communication may contain material protected by the attorney-client privilege. If you
are not the intended recipient or the person responsible for delivering the e-mail to the intended recipient, be advised that
you have received this e-mail in error and that any use, dissemination, forwarding, printing, or copying of this e-mail is
strictly prohibited. If you have received this e-mail in error, please immediately notify Doug Black at the City of Fort
Worth City Attorney's Office (817) 392-7615.
From: Shahid, Salman
Sent: Monday, May 24, 2021 10:35
To: Soto, Vania Elizabeth <Vania.Soto@fortworthtexas.gov>; Black, Doug <Douglas.Black@fortworthtexas.gov>; Cox,
Sara L <Sara.Cox@fortworthtexas.gov>
Cc: Munoz, Filogonio <Filogonio.Munoz@fortworthtexas.gov>
Subject: RE: CPN:102540 CO1
Vania
2
Please see attached PDF with Redlines
From: Soto, Vania Elizabeth
Sent: Monday, May 24, 2021 9:48 AM
To: Shahid, Salman <Salman.Shahid@fortworthtexas.gov>; Black, Doug <Douglas.Black@fortworthtexas.gov>; Cox, Sara
L <Sara.Cox@fortworthtexas.gov>
Cc: Munoz, Filogonio <Filogonio.Munoz@fortworthtexas.gov>
Subject: RE: CPN:102540 CO1
I’ll need the document that we are changing with the changes made so I can upload. Nothing was sent to me.
Vania E. Soto
Administrative Assistant
City Secretary’s Office
817-392-6090
Vania.Soto@fortworthtexas.gov
From: Shahid, Salman
Sent: Monday, May 24, 2021 9:04 AM
To: Black, Doug <Douglas.Black@fortworthtexas.gov>; Cox, Sara L <Sara.Cox@fortworthtexas.gov>
Cc: Munoz, Filogonio <Filogonio.Munoz@fortworthtexas.gov>; Soto, Vania Elizabeth <Vania.Soto@fortworthtexas.gov>
Subject: RE: CPN:102540 CO1
Thank you so much sir
Regards,
Salman Shahid, P.E. , PMP®, PMI‐RMP®, PMI‐SP®, MPM
Professional Engineer
Transportation and Public Works
5001 James Ave. Suite 201 Fort Worth TX, 76115
Office : 817-392-7968 Cell: 817-584-2964
salman.shahid@fortworthtexas.gov
City of Fort Worth — Working together to build a strong community
3
Follow Fort Worth
From: Black, Doug
Sent: Friday, May 21, 2021 2:39 PM
To: Shahid, Salman <Salman.Shahid@fortworthtexas.gov>; Cox, Sara L <Sara.Cox@fortworthtexas.gov>
Cc: Munoz, Filogonio <Filogonio.Munoz@fortworthtexas.gov>; Soto, Vania Elizabeth <Vania.Soto@fortworthtexas.gov>
Subject: RE: CPN:102540 CO1
Based on your description and seeing the correction docs, I have no problem with them being changed at the CSO. We
want an accurate representation of the contract in our records.
I’ve copied Vania Soto in CSO to assist with making the change.
Thanks,
Doug
Douglas W Black
Senior Assistant City Attorney
200 Texas Street
Fort Worth, Texas 76102
817-392-7615 Direct
Doug.Black@fortworthtexas.gov
Due to the ongoing coronavirus pandemic, the Fort Worth City Attorney’s Office has implemented a
department‐wide telework and all staff, except the City Attorney, are working remotely. You may
communicate with me by using my customary email address and telephone extension number.
City of Fort Worth – Working together to build a strong community.
RECIPIENTS - PLEASE CONTACT ME PRIOR TO FORWARDING MESSAGES DESIGNATED AS
ATTORNEY-CLIENT COMMUNICATIONS.
This e-mail and any files transmitted with it are confidential and are intended solely for the use of the individual or entity
to which they are addressed. This communication may contain material protected by the attorney-client privilege. If you
are not the intended recipient or the person responsible for delivering the e-mail to the intended recipient, be advised that
you have received this e-mail in error and that any use, dissemination, forwarding, printing, or copying of this e-mail is
strictly prohibited. If you have received this e-mail in error, please immediately notify Doug Black at the City of Fort
Worth City Attorney's Office (817) 392-7615.
From: Shahid, Salman
Sent: Wednesday, May 19, 2021 14:15
To: Black, Doug <Douglas.Black@fortworthtexas.gov>; Cox, Sara L <Sara.Cox@fortworthtexas.gov>
4
Cc: Munoz, Filogonio <Filogonio.Munoz@fortworthtexas.gov>
Subject: RE: CPN:102540 CO1
Yes Sir, Contractor agrees to this.
We had 7” Concrete Curb & 18” Gutter in our contract with Liner Feet Unit. In this change order we wanted to remove
some of the quantity for this item and add 7” Concrete Curb & 24” Gutter with Linear Feet unit but instead it is
mentioned Square Yard instead of Linear Feet. All the description and numbers remain the same. See attached
correction we are looking for.
5
Thank you
Regards
Salman Shahid
From: Black, Doug
Sent: Wednesday, May 19, 2021 2:01 PM
To: Cox, Sara L <Sara.Cox@fortworthtexas.gov>
Cc: Shahid, Salman <Salman.Shahid@fortworthtexas.gov>; Munoz, Filogonio <Filogonio.Munoz@fortworthtexas.gov>
Subject: RE: CPN:102540 CO1
Does the contractor agree with the change? If so, send me the email or other writing saying that. How does it change
the equations? If substantially, we can rescind the erroneous CO and reissue a new one. But if the numbers are right and
only the letters need to change, we can make the correction at CSO.
Thanks,
Doug
Douglas W Black
Senior Assistant City Attorney
200 Texas Street
Fort Worth, Texas 76102
817-392-7615 Direct
Doug.Black@fortworthtexas.gov
6
Due to the ongoing coronavirus pandemic, the Fort Worth City Attorney’s Office has implemented a
department‐wide telework and all staff, except the City Attorney, are working remotely. You may
communicate with me by using my customary email address and telephone extension number.
City of Fort Worth – Working together to build a strong community.
RECIPIENTS - PLEASE CONTACT ME PRIOR TO FORWARDING MESSAGES DESIGNATED AS
ATTORNEY-CLIENT COMMUNICATIONS.
This e-mail and any files transmitted with it are confidential and are intended solely for the use of the individual or entity
to which they are addressed. This communication may contain material protected by the attorney-client privilege. If you
are not the intended recipient or the person responsible for delivering the e-mail to the intended recipient, be advised that
you have received this e-mail in error and that any use, dissemination, forwarding, printing, or copying of this e-mail is
strictly prohibited. If you have received this e-mail in error, please immediately notify Doug Black at the City of Fort
Worth City Attorney's Office (817) 392-7615.
From: Cox, Sara L
Sent: Wednesday, May 19, 2021 13:55
To: Black, Doug <Douglas.Black@fortworthtexas.gov>
Cc: Shahid, Salman <Salman.Shahid@fortworthtexas.gov>; Munoz, Filogonio <Filogonio.Munoz@fortworthtexas.gov>
Subject: CPN:102540 CO1
Importance: High
Good afternoon Doug,
The attached change order for CPN: 102540 has the incorrect Units it should be LF for Curb and Gutter not SY. Since this
change order has been signed and approved, are we able to correct the units or what would you advise to get the units
changed?
Thank you,
Sara L. Cox
Sr. Administrative Assistant
Transportation and Public Works
Email: Sara.Cox@fortworthtexas.gov
City of Fort Worth — Working together to build a strong community.
1
Soto, Vania Elizabeth
From:Shahid, Salman
Sent:Monday, May 24, 2021 3:39 PM
To:Black, Doug; Soto, Vania Elizabeth; Cox, Sara L
Cc:Munoz, Filogonio
Subject:FW: FW: CPN:102540 CO1
Please see below, contractor’s response
From: Maqsood Khan <makouinc@gmail.com>
Sent: Monday, May 24, 2021 3:37 PM
To: Shahid, Salman <Salman.Shahid@fortworthtexas.gov>
Cc: Black, Doug <Douglas.Black@fortworthtexas.gov>
Subject: Re: FW: CPN:102540 CO1
CAUTION: This email originated from outside of the City of Fort Worth email system. Do not click any links or open attachments
unless you recognize the sender and know the content is safe.
Good Afternoon Salman
MAKOU INC have no concerns or problem with these corrections.
Let us know if you have any questions
Best Regards
Maqsood Khan
Principal
MAKOU INC.
On Mon, May 24, 2021 at 3:33 PM Shahid, Salman <Salman.Shahid@fortworthtexas.gov> wrote:
Good Afternoon Maqsood,
Reference to our telephonic conversation earlier regarding the Change Order 1 for project 102540 Highland Hills. As
discussed earlier the units for Concrete curb were mistakenly written as SY instead of LF. I have made these changes
see attached redlines in page 2 and 3. Please confirm with an email that you don’t have any concerns or problems with
these corrections.
2
3
Regards,
Salman Shahid, P.E. , PMP®, PMI‐RMP®, PMI‐SP®, MPM
Professional Engineer
Transportation and Public Works
5001 James Ave. Suite 201 Fort Worth TX, 76115
Office : 817-392-7968 Cell: 817-584-2964
salman.shahid@fortworthtexas.gov
City of Fort Worth — Working together to build a strong community
4
Follow Fort Worth
‐‐
Maqsood Khan
Principal
MAKOU INC
www.makouinc.com
7100 S. Cooper St. #15
Arlington, TX 76001
Cell: (817) 798‐5426
Fax: (817) 494‐0404