Loading...
HomeMy WebLinkAboutContract 55731Received Date: May 18, 2021 Received Time: 12:04 pm Developer and Project Information Cover Sheet: Developer Company Name Address, State, Zip Code: Phone & Email: Authorized Signatory, Title Project Name: Brief Description: Project Location: Plat Case Number: PP-20-043 Mapsco: Not Provided CFA Number: CFA21-0018 City of Fort Worth, Texas Standard Community Facilities Agreement Rev. 2/21 D.R Horton — Texas, LTD 6751 North Freeway Fort Worth, Texas 76131 (817) 230-0800 � BMClark@drhorton.com Benjamin M. Clark, Assistant Vice President Bailey Park Phase 1 Water, Sewer, Paving, Storm Drain, Street Lights South of West Bailey Boswell Road and Silo Drive Plat Name: Bailey Park Phase 1 Council District: 7 City Project Number: 103ll 8 � IPRC20-0154 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX City Contract Number: 55731 STANDARD COMMUNITY FACILITIES AGREEMENT This COMMUNITY FACILITIES AGREEMENT ("Agreement") is made and entered into by and between the City of Fort Worth ("City"), a home-rule municipal corporation of the State of Texas, acting by and through its duly authorized Assistant City Manager, and D.R. Horton — Texas, LTD ("Developer"), acting by and through its duly authorized representative. City and Developer are referred to herein individually as a"party" and collectively as the "parties." WHEREAS, Developer is constructing private improvements or subdividing land within the corporate limits of Fort Worth, Texas or its extraterritorial jurisdiction, for a project known as Bailey Park Phase 1 ("Project"); and WHEREAS, the City desires to ensure that all developments are adequately served by public infrastructure and that the public infrastructure is constructed according to City standards; and WHEREAS, as a condition of approval of the Project, Developer is required to bear a portion of the costs of municipal infrastructure by constructing the public infrastructure necessary for the Project as described in this Agreement ("Communiry Facilities" or "Improvements"); and WHEREAS, as a condition of approval of the Project, Developer is required to meet the additional obligations contained in this Agreement, and Developer may be required to make dedications of land, pay fees or construction costs, or meet other obligations that are not a part of this Agreement.; and WHEREAS, the City is not participating in the cost of the Improvements or Project; and WHEREAS, the Developer and the City desire to enter into this Agreement in connection with the collective Improvements for the Project; NOW, THEREFORE, for and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: 1. CFA Ordinance The Community Facilities Agreements Ordinance ("CFA Ordinance"), as amended, is incorporated into this Agreement by reference, as if it was fully set forth herein. Developer agrees to comply with all provisions of the CFA Ordinance in the performance of Developer's duties and obligations pursuant to this Agreement and to cause all contractors hired by Developer to comply with the CFA Ordinance in connection with the wark performed by the contractors. If a conflict exist between the terms and conditions of this Agreement and the CFA Ordinance, the CFA Ordinance shall control. City of Fort Worth, Texas Standard Community Facilities Agreement Rev. 2/21 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX 2. Incorporation of Engineering Plans The engineering plans for the Improvements that have been approved by the City ("Engineering Plans") are incorporated into this Agreement by reference as if fully set out herein. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the Improvements required by this Agreement. 3. Description of Improvements; Exhibits and Attachments The following exhibits describe the generallocation, nature and extent of the Improvements that are the subject of this Agreement and are attached hereto and incorporated herein by reference: � Exhibit A: Water � Exhibit A-1: Sewer � Exhibit B: Paving � Exhibit B-1: Storm Drain 0 Exhibit C: Street Lights & Signs The Location Map and Cost Estimates are also attached hereto and incorporated herein by reference. To the extent that Exhibits A, A-1, B, B-1, C, the Location Map, or the Cost Estimates conflict with the Engineering Plans, the Engineering Plans shall control. If applicable, Attachment 1— Changes to Standard Community Facilities Agreement, Attachment 2— Phased CFA Provisions, and Attachment 3— Concurrent CFA Provisions, are attached hereto and incorporated herein for all purposes. 4. Construction of Improvements Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and specifications, the Engineering Plans, the Cost Estimates provided for the Improvements, and this Agreement. Developer acknowledges that City will not accept the Improvements until the City receives affidavits and lien releases signed by Developer's contractors verifying that the contractors, and all subcontractors and material suppliers, have been paid in full for constructing the Improvements, and consent of the surety on payment and performance bonds provided for the Improvements. 5. Financial Guarantee Developer has provided the City with a financial guarantee in the form and amounts set forth in this Agreement which guarantees the construction of the Improvements and payment by Developer of all contractors, subcontractors, and material suppliers for the Improvements ("Financial Guarantee"). Developer shall keep the Financial Guarantee in full force and effect until released by the City and shall not reduce the amount of the Financial Guarantee unless authorized by the City in accordance with the CFA Ordinance. City of Fort Worth, Texas Page 3 of 15 Standard Community Facilities Agreement Rev. 2/21 6. Completion Deadline; Extension Periods This Agreement shall be effective on the date this Agreement is executed by the City's Assistant City Manager ("Effective Date"). Developer shall complete construction of the Improvements and obtain the City's acceptance of the Improvements within two (2) years of the Effective Date ("Term"). If construction of the Improvements has started during the Term, the Developer may request that this Agreement be extended for an additional period of time ("Extension Period"). All Extension Periods shall be agreed to in writing by the City and the Developer as set forth in a written amendment to this Agreement. In no event shall the Term of this Agreement plus any Extension Periods be for more than three years. 7. Failure to Construct the Improvements (a) The City may utilize the Developer's Financial Guarantee to cause the completion of the construction of the Improvements if at the end of the Term, and any Extension Periods, the Improvements have not been completed and accepted by the City. (b) The City may utilize the Developer's Financial Guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of the Improvements before the expiration of the Term, and any Extension Period, if the Developer breaches this Agreement, becomes insolvent, or fails to pay costs of construction. (c) If the Financial Guarantee is a Completion Agreement and the Developer's contractors or suppliers are not paid for construction costs or materials supplied for the Improvements the contractors and suppliers may place a lien upon any property which the City does not have an ownership interest that is the subject of the Completion Agreement. (d) Nothing contained herein is intended to limit the Developer's obligations under the CFA Ordinance, this Agreement, the Financial Guarantee, Developer's agreements with Developer's contractors, or other related agreements. 8. Termination If Developer desires to terminate this Agreement before Developer's contractors begin constructing the Improvements, Developer agrees to the following: (a) that Developer and City must execute a termination of this Agreement in writing; (b) that Developer will vacate any final plats that have been filed with the county where the Project is located; and (c) to pay to the City all costs incurred by the City in connection with this Agreement, including time spent by the City's inspectors at preconstruction meetings. 9. Award of Construction Contracts City of Fort Worth, Texas Page 4 of 15 Standard Community Facilities Agreement Rev. 2/21 (a) Developer will award all contracts for the construction of the Improvements and cause the Improvements to be constructed in accordance with the CFA Ordinance. (b) Developer will employ construction contractors who meet the requirements of the City to construct the Improvements including, but not limited, to being prequali�ed, insured, licensed and bonded to construct the Improvements in the City. (c) Developer will require Developer's contractors to provide the City with payment and performance bonds naming the City and the Developer as dual obligees, in the amount of one hundred percent (100%) of the cost of the Improvements as required by the CFA Ordinance. The payment and performance bonds shall guarantee construction of the Improvements and payment of all subcontractors and material suppliers. Developer agrees to require Developer's contractors to provide the City with a maintenance bond naming the City as an obligee, in the amount of one hundred percent (100%) of the cost of the Improvements, that guarantees correction of defects in materials and warkmanship for the Improvements by the contractor and surety for a period of two (2) years after completion and final acceptance of the Improvements by the City. All bonds must be provided to the City before construction begins and must meet the requirements of the City's Standard Conditions, Chapter 2253 of the Texas Government Code, and the Texas Insurance Code. (d) Developer will require Developer's contractors to provide the City with insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City must be named as an additional insured on all insurance policies. The Developer must provide the City with a Certificate of Insurance (ACORD or form approved by the State of Texas), supplied by each contractor's insurance provider, which shall be made a part of the Project Manual. (e) Developer will require the Developer's contractors to give forty-eight (48) hours' advance notice of their intent to commence construction of the Improvements to the City's Construction Services Division so that City inspection personnel will be available. Developer will require Developer's contractors to allow construction of the Improvements to be subject to inspection at any and all times by the City's inspectors. Developer will require Developer's contractors to not install or relocate any sanitary sewer, storm drain, or water pipe unless a City inspector is present and gives consent to proceed, and to allow such laboratory tests as may be required by the City. (fl Developer will not allow Developer's contractors to begin construction of the Improvements until a notice to proceed to construction is issued by the City. (g) Developer will not allow Developer's contractors to connect buildings to service lines of sewer and water mains constructed pursuant to this Agreement, if any, until said sewer, water mains and service lines have been completed to the satisfaction of the City. 10. Utilities Developer shall cause the installation or adjustment of utilities required to: (1) serve the Project; and (2) to construct the Improvements required herein. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the Improvements to be constructed pursuant to this Agreement. City of Fort Worth, Texas Page 5 of 15 Standard Community Facilities Agreement Rev. 2/21 11. Easements and Rights-of-Way Developer agrees to provide, at its expense, all necessary rights-of-way and easements required for the construction and dedication to the City of the Improvements provided for by this Agreement. 12. Liability and Indemnification (a) DEVELOPER HEREBY RELEASES AND AGREES TO INDEMNIFY, DEFEND AND HOLD THE CITY HARMLESS FOR ANY INADEQUACIES IN THE PRELIMINARY PLANS, SPECIFICATIONS, ENGINEERING PLANS, AND COST ESTIMATES SUPPLIED BY THE DEVELOPER FOR THIS AGREEMENT. (b) THE DEVELOPER COVENANTS AND AGREES TO, AND BY THESE PRESENTS DOES HEREBY FULLY INDEMNIFY, HOLD HARMLESS AND DEFEND THE CITY, ITS OFFICERS, AGENTS AND EMPLOYEES FROM ALL SUITS, ACTIONS OR CLAIMS OF ANY CHARACTER, WHETHER REAL OR ASSERTED, BROUGHT FOR OR ONACCOUNT OFANYINJURIES OR DAMAGES SUSTAINED BYANYPERSONS, INCL UDINGDEATH, OR TO ANY PROPERTY, RESULTING FROM OR IN CONNECTION WITH THE CONSTR UCTION, DESIGN, PERFORMANCE OR COMPLETION OF ANY WORK TO BE PERFORMED BY SAID DEVELOPER, ITS CONTRACTORS, SUBCONTRACTORS, OFFICERS, AGENTS OR EMPLOYEES, OR IN CONSEQUENCE OF ANY FAILURE TO PROPERLYSAFEGUARD THE WORK, OR ONACCOUNT OFANYACT, INTENTIONAL OR OTHERWISE, NEGLECT OR MISCONDUCT OF SAID DEVELOPER, ITS CONTRACTORS, SUB-CONTRACTORS, OFFICERS, AGENTS OR EMPLOYEES, WHETHER OR NOT SUCHINJURIES, DEATH OR DAMAGES ARE CAUSED, IN WHOLE OR IN PART, BY THE ALLEGED NEGLIGENCE OF THE CITY OF FORT WORTH, ITS OFFICERS, SERVANTS, OR EMPLOYEES. (c) DEVELOPER WILL REQUIRE ITS CONTRACTORS TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY, ITS OFFICERS, AGENTS AND EMPLOYEES FROM AND AGAINST ANY AND ALL CLAIMS, SUITS OR CAUSES OF ACTION OF ANY NATURE WHATSOEVER, WHETHER REAL OR ASSERTED, BROUGHT FOR OR ON ACCOUNT OF ANY INJURIES OR DAMAGES TO PERSONS OR PROPERTY, INCL UDING DEATH, RESULTING FROM, OR INANY WAY CONNECTED WITH, THE CONSTRUCTION OF THE IMPROVEMENTS CONTEMPLATED HEREIN, WHETHER OR NOT SUCH INJURIES, DEATH OR DAMAGES ARE CAUSED, IN WHOLE OR IN PART, BY THE ALLEGED NEGLIGENCE OF THE CITY OF FORT WORTH, ITS OFFICERS, SERVANTS, OR EMPLOYEES. FURTHER, DEVELOPER WILL REQUIRE ITS CONTRACTORS TO INDEMNIFY, DEFEND, AND HOLD HARMLESS THE CITY FOR ANY LOSSES, DAMAGES, COSTS OR EXPENSES SUFFERED BY THE CITY OR CAUSED AS A RESULT OF SAID CONTRACTORS' FAILURE TO COMPLETE THE WORK AND CONSTRUCT THE IMPROVEMENTS IN A GOOD AND WORKMANLIKE MANNER, FREE FROM DEFECTS, IN CONFORMANCE WITH THE CFA ORDINANCE, AND INACCORDANCE WITHALL PLANS AND SPECIFICATIONS. 13. Right to Enforce Contracts City of Fort Worth, Texas Page 6 of 15 Standard Community Facilities Agreement Rev. 2/21 Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by Developer with its contractors, along with an assignment of all warranties given by the contractors, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. 14. Estimated Fees Paid by Developer; Reconciliation Prior to execution of this Agreement, Developer has paid to the City the estimated cost of administrative material testing service fees, construction inspection service fees, and water testing lab fees in the amounts set forth in the Cost Summary section of this Agreement. Upon completion of the construction of the Improvements, the City will reconcile the actual cost of administrative material testing service fees, construction inspection service fees, and water testing lab fees with the estimated fees paid by Developer. If the actual costs of the fees are more than the estimated payments made by the Developer, ihe Developer must pay the difference to the City before the Improvements will be accepted by the City. If the actual costs of the fees are less than the estimated payments made by the Developer, the City will refund the difference to the Developer. If the difference between the actual costs and the estimated payments made by the Developer is less than �fty dollars ($50.00), the City will not issue a refund and the Developer will not be responsible for paying the difference. The financial guarantee will not be released by the City or returned to the Developer until reconciliation has been completed by the City and any fees owed to the City have been paid by the Developer. 15. Material Testing The City maintains a list of pre-approved material testing laboratories. The Developer must contract with material testing laboratories on the City's list. Material testing laboratories willprovide copies of all test results directly to the City and the Developer. If the Improvements being constructed fail a test, the Developer must correct or replace the Improvements until the Improvements pass all retests. The Developer must pay the material testing laboratories directly for all material testing and retesting. The City will obtainproof from the material testing laboratories that the material testing laboratories have been paid in full by the Developer before the City will accept the Improvements. 16. Notices All notices required or permitted under this Agreement may be given to a party by hand- delivery or by mail, addressed to such party at the address stated below. Any notice so given shall be deemed to have been received when deposited in the United States mail so addressed with postage prepaid: CITY: Development Coordination Office City of Fort Worth 200 Texas Street Fort Worth, Texas 76102 DEVELOPER: D.R. Horton — Texas, LTD 6751 North Frwy. Fort Worth, Texas 76131 City of Fort Worth, Texas Standard Community Facilities Agreement Rev. 2/21 Page 7 of 15 With copies to: City Attorney's Office City of Fort Worth 200 Texas Street Fort Worth, Texas 76102 and City Manager's Office City of Fort Worth 200 Texas Street Fort Worth, Texas 76102 Or to such other address one party may hereafter designate by notice in writing addressed and mailed or delivered to the other party hereto. 17. Right to Audit Developer agrees that, until the expiration of three (3) years after acceptance by the City of the Improvements constructed pursuant to this Agreement, that the City shall have access to and the right to examine any directly pertinent books, documents, papers and records of the Developer involving transactions relating to this Agreement. Developer agrees that the City shall have access during normal working hours to all necessary Developer facilities and shall be provided adequate and appropriate workspace in order to conduct audits in compliance with the provisions of this section. The City shall give Developer reasonable advance notice of intended audits. Developer further agrees to include in all contracts with Developer's contractors for the Improvements a provision to the effect that the contractor agrees that the City shall, until the expiration of three (3) years after �nal payment under the contract, have access to and the right to examine any directly pertinent books, documents, papers and records of such contractor, involving transactions to the contract, and further, that City shall have access during normal working hours to all of the contractor's facilities, and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this section. City shall give Developer's contractors reasonable advance notice of intended audits. 18. Independent Contractor It is expressly understood and agreed that Developer and its employees, representative, agents, servants, officers, contractors, subcontractors, and volunteers shall operate as independent contractors as to all rights and privileges and work performed under this Agreement, and not as agents, representatives or employees of the City. Subj ect to and in accordance with the conditions and provisions of this Agreement, Developer shall have the exclusive right to control the details of its operations and activities and be solely responsible for the acts and omissions of its employees, representatives, agents, servants, officers, contractors, subcontractors, and volunteers. Developer acknowledges that the doctrine of respondeat superior shall not apply as between the City and its officers, representatives, agents, servants and employees, and Developer and its employees, representatives, agents, servants, officers, contractors, City of Fort Worth, Texas Page 8 of 15 Standard Community Facilities Agreement Rev. 2/21 subcontractors, and volunteers. Developer further agrees that nothing herein shall be construed as the creation of a partnership or joint enterprise between City and Developer. It is further understood that the City shall in no way be considered a co-employer or a joint employer of Developer or any employees, representatives, agents, servants, officers, contractors, subcontractors, and volunteers of Developer. Neither Developer, nor any officers, agents, servants, employees or subcontractors of Developer shall be entitled to any employment benefits from the City. Developer shall be responsible and liable for any and all payment and reporting of taxes on behalf of itself, and any of employees, representatives, agents, servants, officers, contractors, subcontractors, and volunteers. The City, through its authorized representatives and employees, shall have the sole and exclusive right to exercise jurisdiction and control over City employees. 19. Applicable Law; Venue This Agreement shall be construed under and in accordance with Texas law. Venue shall be in the state courts located in Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort Worth Division. 20. Non-Waiver The failure of the City to insist upon the performance of any term or provision of this Agreement or to exercise any right herein conferred shall not be construed as a waiver or relinquishment to any extent of City's right to assert or rely on any such term or right on any future occasion. 21. Governmental Powers and Immunities. It is understood that by execution of this Agreement, the City does not waive or surrender any of its governmental powers or immunities. 22. Headings The paragraph headings contained herein are for the convenience in reference and are not intended to define or limit the scope of any provision of this Agreement. 23. Severability In the event that any clause or provision of this Agreement shall be held to be invalid by any court of competent jurisdiction, the invalidity of such clause or provision shall not affect any of the remaining provisions hereof. 24. Review of Counsel City and Developer, and if they so choose, their attorneys, have had the opportunity to review City of Fort Worth, Texas Page 9 of 15 Standard Community Facilities Agreement Rev. 2/21 and comment on this document; therefore any rule of contract construction or interpretation that would normally call for the document to be interpreted as against the drafting party shall not apply in interpretation of this Agreement, and each section, portion, and provision of this Agreement shall be construed solely on the basis of the language contained therein, regardless of who authored such language. 25. Prohibition on Boycotting Israel Developer acknowledges that in accordance with Chapter 2271 of the Texas Government Code, the City is prohibited from entering into a contract with a company with 10 or more full-time employees that has a value of $100,000 or more that is to be paid wholly or partly from public funds of the City for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel" and "company" has the meaning ascribed to those terms by Chapter 2271 of the Texas Government Code. To the extent that Chapter 2271 of the Government Code is applicable to this Agreement, by signing this Agreement, Developer certi�es that Developer's signature provides written veri�cation to the City that Developer: (1) does not boycott Israel; and (2) will not boycott Israel during the term of this Agreement. 26. Immigration and Nationality Act Developer shall verify the identity and employment eligibility of its employees who perform work under this Agreement, including completing the Employment Eligibility Verification Form (I-9). Upon request by City, Developer shall provide Ciry with copies of all I-9 forms and supporting eligibility documentation for each employee who performs work under this Agreement. Developer shall adhere to all Federal and State laws as well as establish appropriate procedures and controls so that no services will be perfortned by any Developer employee who is not legally eligible to perform such services. DEVELOPEIZ SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES, LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY DEVELOPER, DEVELOPER'S EMPLOYEES, StIBCONTRACTORS, AGENTS, OR LICENSEES. City, upon written notice to Developer, shall have the right to immediately terminate this Agreement for violations of this provision by Developer. 27. Amendment No amendment, modification, or alteration of the terms of this Agreement shall be binding unless the same is in writing, dated subsequent to the date hereof, and duly executed by the City and Developer. 28. Assignment and Successors Developer shall not assign or subcontract all or any part of its rights, privileges, or duties under this Agreement without the prior written consent of City. Any attempted assignment or subcontract without the City's prior written approval shall be void and constitute a breach of this Agreement. 29. No Third-Party Beneficiaries City of Fort Worth, Texas Page 10 of 15 Standard Community Facilities Agreement Rev. 2/21 The provisions and conditions of this Agreement are solely for the benefit of the City and Developer, and any lawful assign or successor of Developer, and are not intended to create any rights, contractual or otherwise, to any other person or entity. 30. Compliance with Laws, Ordinances, Rules and Regulations Developer, its officers, agents, servants, employees, and contractors, shall abide by and comply with all laws, federal, state and local, including all ordinances, rules and regulations of City. It is agreed and understood that, if City calls to the attention of Developer any such violation on the part of Developer or any of its officers, agents, servants, employees, or subcontractors, then Developer shall immediately desist from and correct such violation. 31. Signature Authority The person signing this Agreement on behalf of Developer warrants that he or she has the legal authority to execute this Agreement on behalf of the Developer, and that such binding authority has been granted by proper order, resolution, ordinance or other authorization of the entity. The Ciry is fully entitled to rely on this warranty and representation in entering into this Agreement. 32. Counterparts This Agreement may be executed in multiple counterparts, each of which will be deemed an original, but which together will constitute one instrument. 33. Entire Agreement This written instrument, together with any attachments, exhibits, and appendices, constitutes the entire understanding between the City and Developer concerning the work to be performed hereunder, and any prior or contemporaneous, oral or written agreement that purports to vary from the terms hereof shall be void. [REMAINDER OF PAGE INTENTIONALLY BLANK] City of Fort Worth, Texas Page 11 of 15 Standard Community Facilities Agreement Rev. 2/21 34. Cost Summary Sheet Project Name: Bailey Park Phase 1 CFA No.: CFA21-0018 City Project No.: 103118 IPRC No.: IPRC20-0154 Items A. Water and Sewer Construction 1. Water Construction 2. Sewer Construction Water and Sewer Construction Total B. TPW Construction 1. Street 2. Storm Drain 3. Street Lights Installed by Developer 4. Signals TPW Construction Cost Total Total Construction Cost (excluding the fees): Estimated Construction Fees: C. Construction Inspection Service Fee D. Administrative Material Testing Service Fee E. Water Testing Lab Fee Total Estimated Construction Fees: Financial Guarantee Options, choose one Bond = 100% Completion Aareement = 100% / Holds Plat Cash Escrow Paving/Storm Drain = 125% Letter of Credit = 125°/a City of Fort Worth, Texas Standard Community Facilities Agreement Rev. 2/21 Developer's Cost $ 696,976.00 $ 703,560.00 $ 1,400,536.00 $ 1,465,640.95 $ 1,282,372.00 $ 141,714.90 $ - $ 2,889,727.85 $ 4,290,263.85 $62,500.00 $28,175.00 $1, 740.00 $ 92,415.00 Choice Amount Mark on 4,290,263.85 X 4,290,263.85 1, 750, 670.00 3,612,159.81 5.362.829.81 Page 12 of 15 IN WITNESS WHEREOF, the City and Developer have each executed this Agreement by their duly authorized signatories to be effective on the date executed by the City's Assistant City Manager. CITY OF FORT WORTH 15� Bcc�AGcd��� Dana Burghdoff(N �y 18,2 l0�UL1 .23 CDTI Dana Burghdoff Assistant City Manager DEVELOPER D.R. Horton — Texas, Ltd. A Texas Limited Partnership By: D.R. Horton, Inc., a Delaware Corporation its Authorized Agent Date: May 18, 2021 Recommended by: ��e�+�,cr�.�. �Q.:.r�c.� !/ Evelyn Roberts/Jennifer Ezernack Project Assistant Planning and Development Approved as to Form & Legality: � Richard A. McCracken (May 14, 2021 08:16 CDT) Richard A. McCracken Sr. Assistant City Attorney M&C No. Date: May 14, 2021 �,d��vu��� Form 129s: �� �oFORp�a� o � G ~ ° oO�•l 0 o � ATTEST: �va oZ � $ o° T o o F � � o �� G�` � a °° o0 �� /� a� EXA`'�aA'� T p ��a�abo� Mary J. Kayser/ Ronald Gonzales City Secretary / Assistant City Secretary City of Fort Worth, Texas Standard Community Facilities Agreement Rev. 2/21 ��a 13enjamin M Gark (May 13, 202110:16 CDT) Benjamin M. Clark Assistant Vice President Date: May 13, 2021 Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. �7a�rie S��Cet� �Io�aGes Janie Scarlett Morales (May 13, 20211520 CDT) Janie Scarlett Morales Development Manager OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX The following attachments are incorporated into this Agreement. To the extent a conflict exists between the main body of this Agreement and the following attachments, the language in the main body of this Agreement shall be controlling. Included Attachment � Attachment 1- Changes to Standard Community Facilities Agreement ❑ Attachment 2— Phased CFA Provisions ❑ Attachment 3— Concurrent CFA Provisions 0 Location Map � Exhibit A: Water Improvements � Exhibit A-1: Sewer Improvements 0 Exhibit B: Paving Improvements � Exhibit B-1: Storm Drain Improvements � Exhibit C: Street Lights and Signs Improvements 0 Cost Estimates (Remainder of Page Intentionally Left Blank) City of Fort Worth, Texas Page 14 of 15 Standard Community Facilities Agreement Rev. 2/21 ATTACHMENT "1" Changes to Standard Community Facilities Agreement City Project No. 103118 None City of Fort Worth, Texas Page 15 of 15 Standard Community Facilities Agreement Rev. 2/21 � NORTH NOT TO SCALE LOCATION MAP BAILEY PARK PHASE 1 DATE: FEBRUARY, 2021 OWNER: D.R. HORTON 6751 NORTH FREEWAY FORT WORTH, TX 76131 PHONE #: 817.230.0805 I PRC20-0154 CPN 103118 ::::: PELOTON II LAND SOLUTIONS 9800 HILLWOOD PARKWAY SUITE 250 FORT WORTH, TX 76177 PHONE: 817-562-3350 TWIN MILLS � � TWIN MILLS CAB. A, SLD. 11289 CAB. A, SLD. 11289 EX 36�� W C.R.T.C.T. C.R.T.C.T. (W - Ek' -- —EXW- EXW ---EXW— ----�XW- EXW EX:h��--- WEST BA/LEY BOSWELL ROAD -�--'___` ° __....__ —....._ -- _.. _ —_--------�--- -`-'� -- --"- ---�------ --------- — — — - � � � - � I-�'=�i, — — , \ � � � ,� ,� „ , „ ,• ,° „ " „ " � \ , ` � �BLUE TOP DRIVE • ETA MAD WSORI � ----_ _ J v � � i v�� , �� r � N . n 9 \ � , � ,. � � „ � _ , w �v �' � � � �„ � , s ,o , � . , � \ ,. \ n . Y „ , .A , ���,\ � u r J • L \ / � � �. v \\ / REQ FE N LANE � ` „ � �� � � „ „ N ' � . _° 1 � �_ — � j I � ,. . � �r, _ � � � � � w n , " " � °� \ a � „ . , s „ \ � 0 U „ � � � F ,s v ' � DR HORTON—TEXAS LTD. � a ,� _ , �� `� � � �Q� �" � m U x .o = . " w " � ., _ ��, � , � 'A� ,. �� � � _• . � ��,. �. � � _� �F y �� � � � � „ P r 1 ' , Fy „ { , = s' a ��-�� BOLD EqGLE �l�E � ., , o,t,�„ �� � <"� . Y • � " , ' • ,. ` — — � �� 9 � ` ' \ 1 A� l ' �� � �. . � \ \ VQ,C�� � �, �� � \ � � � � � , ° � � � ' " p �� � � ���� � �� � � � � �� � � � � �i \ - DR HORTON—TEXAS LTD. L� j DR HORTON—TEXAS LTD. � \ �/� I i > � � �j �-� / � � �� � �� � „ � ,\� � I I � LEGEND PROPOSED WATER LINE EXW EXISTING WATER LINE PROPOSED GATE VALVE EXW �� EXISTING GATE VALVE PROPOSED FIRE HYDRANT NOTE: ALL PROPOSED WATER LINES EXW � EXISTING FIRE HYDRANT ARE 8" UNLESS OTHERWISE NOTED. I PRC20-0154 EXHIBIT A— WATER CPN 103118 � WATER OWNER: ::::: PELOTON o N°RTH 300' IMPROVEMENTS D.R. HORTON ,i LAND 5o��r�oNS 6751 NORTH FREEWAY 9800 HILLWOOD PARKWAY BAI LEY PARK PHASE 1 FORT WORTH, TX 76131 SUITE 250 PHONE #: 817.230.0805 FORT WORTH, TX 76177 GRAPHIC SCALE DATE: FEBRUARY, 2021 PHONE: 817-562-3350 1 CAB. AI SL�DL11289 � CABC.R TMC TS289 � II C.R.T.C.T. WESr BAILEY BOSWELL ROAD _• _-- --.._..__ ___.—_— � --- —�---- - — �---.�.— �- --- ----�--_.-- --`__,.------ — — — — -- � �—�•� — — I '° " ,� • ' � , �• " " „ � � ., � T � �� � � B UE � TOP DRIUE ° E7A M AD WS DRl � ---- u a \UV. \ � � � � n \ e \ \ � ,. � \ ' O /F� . � : � \ N / � u� a e �o a � �v � n \\ ,. . , �, . Y „ . .A , \ � / �. : J s / n � , m �� � � RED FE N LANE ` „ � ,. � � � , � � � �— � � � � M _. . ' ex ss — � �� o � „ , � „ A � � \ a � ,� o� . � �do � I � � � �m DR HORTON-TEXAS LTD. w ¢ � � ., s , ,o ,. ��� � � �mv F� ���, � m" � °° 2�, ,� ' ��, �P< " � � � � o � ��,a �� o , �F , ����k. � � I . , T� '° " 1e y „ _= s „ °, BOLD E GLE D l� � � ' F , o�4c` 5Po T ,s �� � � �q�., . . ° � N � �� � f ' � � F ����� � � � , �� �� • � � �P � `T� � � �u'<n I � � � � �� � � ♦ �\,��,�' \ ' ° % v 0�J \ \ � � \ � � , � „ �, � /, �, � DR HORTON-TEXAS LTD. � � �y�� .. � i JU. DR HORTON-TEXAS LTD. � � j� � � .� � /� , _� .. � m ,��� . �� / / �v� �� � .o �.A ��� � � � I �N �, , LEGEND PROPOSED SANITARY SEWER LINE EXSS �� EXISTING SANITARY SEWER LINE NOTES: 1. ALL PROPOSED SANITARY SEWER LINES ARE 8" UNLESS OTHERWISE NOTED. 2. ALL SANITARY SEWER MANHOLES ARE 4' DIA UNLESS OTHERWISE NOTED. EXHIBIT A1 — SEWER � SEWER o N°RTH 300' IMPROVEMENTS BAILEY PARK PHASE 1 GRAPHIC SCALE DATE: FEBRUARY, 2021 OWNER: D.R. HORTON 6751 NORTH FREEWAY FORT WORTH, TX 76131 PHONE #: 817.230.0805 I PRC20-0154 CPN 103118 '�": PELOTON II LAND SOLUTIONS 9800 HILLWOOD PARKWAY SUITE 250 FORT WORTH, TX 76177 PHONE: 817-562-3350 I � TWIN MILLS I TWIN MILLS � CAB.A,SLD.11289 CAB.A,SLD.11289 C.R.T.C.L ^�� C.R.T.C.T. WESr BA/LEY BOSWELL ROAD ' --- —'_— —� ' -�-- -. .s -- ---- ------- - ---�' _- - -.- _ ..._,...- - - ----- — . _ - r. . ---' `- '. - i ,� � � — —. — --���--� �;_� — _ � I �� �—T i � i� n � '" � I � „ ° ,• � „ ,� s � . � � � B UE TOP ORIVE �� � i • ETA �AD WS DRl � � — — — — _ , ,� � � y � — _ / I �� � � � �I �., �� �� j ° �� � / �° � � � i „ � j �' ' � „ . W ,, , � \ � � v , � ,. ° �� n ��v �� , „ . � ' fl \� � I � DFENLA „ n -�� , � ,. . p � _� _� � � I� � `� � — i � a = „ � � a ,s �� ' � , ,. � � � o c� ,. e,—.� . � ��� „ `,, �' � n � " / � \ DR HORTON-TEXAS LTD. w ¢ � � � �� A 5� „ , a , / ,o � � � �� � � m v r y� �� � � Q iV � � m • „ » �� m" \ F � '�� ��, .. , ' ��' � „ ' � ' �� � ,� � � � � u � �.� �� / . � . � �F � �� � � '` "y� „ � � ` il � a �'`,� �'. � ti r { P s „ � GLE D l� � „ ,s O,A�,. ��0 , s F� _ — � / ����-�9�,0'� , • , � � � �� � e � _ \� "�. F '° � \ � ' � � . ��� . „ ���� � \ �� � /� / � � � � � � � � •. ,i �� �'��� ` � ��' • � � � � n ss � , � �!� � s ��` �� � DR HORTON-TEXAS LTD. � � '�� �'� / DR HORTON-TEXAS LTD. w j,\�\, \ I � � � � � �� �� ,�� � � , �� �� �� � � � � � � � � i 1 � � G ' � � 4' I I � � I � LEGEND � 29' B—B / 50' ROW (TYP) � 37' B—B / 60' ROW (TYP) � SIDEWALK BY DEVELOPER ---- SIDEWALK BY HOMEBUILDER O H.C. RAMPS BY DEVELOPER EXHIBIT B — PAVING � PAVING o N°RTH 300' IMPROVEMENTS BAILEY PARK PHASE 1 GRAPHIC SCALE DATE: FEBRUARY, 2021 OWNER: D.R. HORTON 6751 NORTH FREEWAY FORT WORTH, TX 76131 PHONE #: 817.230.0805 I PRC20-0154 CPN 103118 '�": PELOTON II LAND SOLUTIONS 9800 HILLWOOD PARKWAY SUITE 250 FORT WORTH, TX 76177 PHONE: 817-562-3350 TWIN MILLS � TWIN MILLS CAB. A, SLD. 11289 24° RCP CAB. A, SLD. 11289 C.R.T.C.T. C.R.T.C.T. �,� 2-24" SLOPING WEST BAILEY BOSWELL R� H D W L�� � - - -- -- - � - - -_ =__ -_`_'- --- --- - ---�-----�----- c-.-..•,.— ----- -- — — — -- -- � i — — � 24" RCP 3'x2' RCB , � 18" RCP 2-24" SLOPING Era��AO WS ORI 3'x2' SLOPING � �-- -- —_ 2-18" SLOPING HDWLS HDWL� 4-8'x4' HDWLS � \ � a � o v � 2-6'x3' BOX • , 2-21" RCP \ CULVERT ,o , � 2-10' INL > � � �� , s � �s � AND HDWL . , " ' Y „ , 7J ' � 30" RCP �L• � %2-21" RCP � � 2-10' INL DR HORTON-TEXAS LTD. � �/—��� � , . �� 6x3 SLOPING :P � ��� HDWL / �CP �� 5'x5' JB �_ _ � � , INL T=�� =_ ---� -- ---- — � / �� 6'x3' RCB � �� I�J' I N L� � DR HORTON-TEXAS LTD. � � 42" RCP �� � �� i � 2-21" RCF 0 5'x5' JB�`�� �• PARALLEL 2_10' INI P� .,\ / �, � HDWL x s' \ \ \ - GLE �36" RCP„ F„ 27" RCP iP � x � ; 2-21" RCP q �• _ � 2-10' INL �� PARALLEL - - � ..�_h.r . HDWL � � 27"SLOPING HDWL �� � LEGEND r PROPOSED STORM DRAIN INLET -------1� --- EXISTING STORM DRAIN INLET � v \` � 27"SLOPING � HDWL , \ � \ � ,�;� DR HORTON-TEXAS LTD. � � � � � � � � � � / \ / � \ � �� � PROPOSED STORM DRAIN MANHOLE —� PROPOSED STORM DRAIN HEADWALL EXHIBIT B1 — STORM DRAIN � STORM DRAIN o N°RTH 300' IMPROVEMENTS BAILEY PARK PHASE 1 GRAPHIC SCALE DATE: FEBRUARY, 2021 OWNER: D.R. HORTON 6751 NORTH FREEWAY FORT WORTH, TX 76131 PHONE #: 817.230.0805 TOP ORI UE � �� o� Q�� � � U � � H � � oiU OU m = 24" RCP i � 4-8'x4' BOX CULVERT � � � I PRC20-0154 CPN 103118 '�": PELOTON II LAND SOLUTIONS 9800 HILLWOOD PARKWAY SUITE 250 FORT WORTH, TX 76177 PHONE: 817-562-3350 � II LL TWIN MILLS TWIN MILLS I CAB.A,SLD.11289 CAB.A,SLD.11289 C.RS.C.T. C.R.T.C.T. — WE T BA/LEY BOSWELL ROAD - - --�.. _ -- — - — __ — - - - — — --' ` --� - - --- --� — — �-- _ --__ - - _ — -._� J �- _ ------ i ,o ,o „ , „ � , ,s , „ ,. � „ �� �, �� �' � ' ' ' � � � � � � BLUE TOP DRIIiE n ° ETA MAD WSORI � ----_ _ � _. � � � o „ , �" � �\ u� : : �� a� � � �., �� � � � , „ � , . ,o , � „ . � ,; � ,. � , ., . Y „ , � , � � .. . J . < \ / � a v \\ / REQ FE N LAN � ° „ � �� � I " g . � �_ � � � � 9 � _ / I a� —� �� ¢ � ,. „ , � „ '� �� � �oc� . ��� " � DR HORTON-TEXAS LTD. � \ I W a U �. m n , , �e �_ � \ \\ `� / I � Q F�, , � 'v m � v � � ti� � ' \ �� ' � 1 � '�I �' , ` -�,s,�� � o � �`"`�' � ' A� � � � � I P � '° . 2 „ y , _• 3' °� BOLD E �LE D l� � . o� ��0 , �� , �,� , � ° ' L� � �ic9q ' � �� �F, „ n o��� \ \� \ \ ., „ ,o �P�� �� _° � � � � � � �� � �,`�� � s ' � " ��� � � � � �✓��1- � � DR HORTON-TEXAS LTD. �.� DR HORTON-TEXAS LTD. ^� \� i/ �I I � � � � � � / � � �� .. � : �� �� / � — o ���� - �� � LEGEND • PROPOSED STREET LIGHT O EXISTING STREET LIGHT - PROPOSED STREET NAME SIGNS 0 EXISTING STREET NAME SIGNS EXHIBIT C- STREET LIGHTS & STREET NAME SIGNS STREET LIGHT & OWNER: o NORTH 300� STREET NAME SIGNS D.R. HORTON BAILEY PARK PHASE 1 FORT WORTH TX 6 31 GRAPHIC SCALE DATE: FEBRUARY, 2021 PHONE #: 817.230.0805 I PRC20-0154 CPN 103118 '�": PELOTON II LAND SOLUTIONS 9800 HILLWOOD PARKWAY SUITE 250 FORT WORTH, TX 76177 PHONE: 817-562-3350 00 42 43 DAP - BID PROPOSAL Page 1 of2 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Unit of Bid No. Description Section No. Measure Quantity UnitPrice Bid Value UNIT IV: PAVING IMPROVEMENTS 1 3213.0101 6" Conc Pvmt 32 13 13 SY 19095 $34.95 $667,370.25 2 9999.0015 7.5" Conc Pvmt 32 13 13 SY 7782 $41.90 $326,065.80 3 3213.0301 4" Conc Sidewalk 32 13 20 SF 16998 $6.00 $101,988.00 4 9999.0016 4" Conc Sidewalk (10' Wide) 32 13 20 SF 19095 $6.00 $114,570.00 5 3211.0501 6" Lime Treatment 32 11 29 SY 20412 $3.60 $73,483.20 6 3211.0502 8" Lime Treatment 32 11 29 SY 8202 $3.85 $31,577.70 7 3211.0400 Hydrated Lime 32 11 29 TN 454 $160.00 $72,640.00 8 3213.0501 Barrier Free Ramp, Type R-1 32 13 20 EA 4 $2,000.00 $8,000.00 9 3213.0506 Barrier Free Ramp, Type P-1 32 13 20 EA 16 $1,800.00 $28,800.00 10 3213.0506 Barrier Free Ramp, Type P-1 32 13 20 EA 2 $2,800.00 $5,600.00 11 3213.0401 6" 3600 PSI Concrete Driveway on West 32 13 20 SF Bailey Boswell Rd. 1685 $8.00 $13,480.00 9999.0017 6" 3600 PSI Concrete Driveway on Bold 32 13 20 12 Eagle Dr. SF 402 $8.00 $3,216.00 13 3471.0001 Traffic Control 34 71 13 MO 3 $2,500.00 $7,500.00 14 9999.0018 Remove End-of-Road Barricade 00 00 00 EA 1 $300.00 $300.00 15 9999.0019 End-of-Road Barricade 00 00 00 EA 4 $1,100.00 $4,400.00 16 3441.4006 Stop Sign w/ Street Name Blades on 34 41 30 EA Galvanized Post 14 $475.00 $6,650.00 17 18 _ 19 20 � 21 22 — — 23 24 25 26 27 — — 28 — — 29 — — 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 TOTAL UNIT IV: PAVING IMPROVEMENTS $1,465,640.95 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Fonn Version May 22, 2019 00 42 43 Bailey Park Phase 1 Paving 00 42 43 DAP - BID PROPOSAL Page 2 of 2 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Unit of Bid No. Description Section No. Measure Quantity Unit Price Bid Value UNIT IV: PAVING Bid Sum Total ConstrucHon Bid This Bid is submitted by the entity named below: BIDDER: Glenn Thurman, Inc P.O. BOX 850842 Mesquite, Texas 75185-0842 Contractor agrees to complete WORK for FINAL ACCEPTANCE within CONTRACT commences to run as provided in the General Conditions. END OF SECT[ON $1,465,640.95 BY' / r �Ca=� ,�Lt 7-i7l.F.: Cp��RACI� ��fflP;ftGEft nATE: 2 /lr I � �. / � � 40 working days after the date when t6e CfI'Y OF FORT WORTH STANDARD CONSTRUCT[ON SPECIFICATION DOCUMENTS - DEVELOPERAWARDED PROJECTS Fomt Version May 22, 2019 00 42 43 Bailcy Park Phase I Paving 00 42 43 DAP - BID PROPOSAL Page 1 of2 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Unit of Bid No. Description Section No. Measure Quantity Unit Price Bid Value UNIT V: STREET LIGHTING IMPROVEMENTS 1 2605.3015 2" CONDT PVC SCH 80 (T) 26 05 33 LF 2275 $11.92 $27,118.00 2 3441.3050 Furnish/Install LED Lighting Fixture (70 watt 34 41 20 EA Cobra Head) 32 $305.00 $9,760.00 3 3441.3301 Rdwy Illum Foundation TY 1,2, and 4 34 41 20 EA 32 $1,158.00 $37,056.00 4 3441.3351 Furnish/Install Rdway Illum TY 11 Pole 34 41 20 EA 32 $1,421.00 $45,472.00 5 3441.1646 Furnish/Install Type 33B Arm 34 41 10 EA 32 $233.00 $7,456.00 6 3441.1410 NO 10 Insulated Elec Condr 34 41 10 LF 6825 $1.14 $7,780.50 7 3441.1403 NO 6 Triplex OH Insulated Elec Condr 34 41 10 LF 1405 $1.28 $1,798.40 $ 3441.3051 Furnish/Install LED Lighting Fixture (137 34 41 20 EA watt ATB2 Cobra Head) 6 $443.00 $2,658.00 9 3441.3323 Furnish/Install 8' Wood Light Pole Arm 34 41 20 EA 6 $436.00 $2,616.00 10 11 12 13 14 15 16 17 18 19 20 21 22 — — 23 24 25 26 27 — — 28 — — 29 — — 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 TOTAL UNIT V: STREET LIGHTING IMPROVEMENTS $141,714.90 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Fonn Version May 22, 2019 00 42 43 Bailey Park Phase 1 StreeUights 00 12 J3 DAP - BID PROPOSAL Page 2 of 2 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Unit of Bid Description Unit Price Bid Value No. Section No. Measure Quantity UNIT V: STREET LIGHTI Bid .r� Total Construction Bid 41,714.90 41.714.90 This Bid is submitted by the entity named below: BIDDER: Independent Utility Construction, Inc. 5109 Sun Valley Dr. Fort Worth, Texas 76119 Contractor agrees to complete WORK for FINAL ACCEPTANCE within CONTRACT commences to run as provided in the General Conditions. END OF SECTION CI'[Y OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Version May 22, 2019 sY: Ri rd Wolfe � TITLE: esident DATE: 03-25-2021 30 working days after the date when the 00 �12 d3 Bailey Park Phase 1 Streetlights 00 42 43 DAP - BID PROPOSAL Page 1 of4 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Unit of Bid No. Description Section No. Measure Quantity Unit Price Bid Value UNIT I: WATER IMPROVEMENTS 1 3311.0241 8" Water Pipe 33 11 12 LF 7162 $31.00 $222,022.00 2 3311.0441 12" Water Pipe 33 11 10 LF 547 $67.00 $36,649.00 3 3312.2003 1" Water Service 33 12 10 EA 185 $1,314.00 $243,090.00 4 3312.2103 1 1/2" Water Service 33 12 10 EA 3 $1,752.00 $5,256.00 5 3312.2203 2" Water Service 33 12 10 EA 1 $2,153.00 $2,153.00 6 3312.3003 8" Gate Valve 33 12 20 EA 19 $1,481.00 $28,139.00 7 3312.2103 12" Gate Valve 33 12 20 EA 1 $2,357.00 $2,357.00 8 3312.0001 Fire Hydrant w/6" Gate Valve 33 12 40 EA 9 $4,583.00 $41,247.00 9 3311.0001 Ductile Iron Water Fittings w/ Restraint 33 11 11 TON 8 $9,009.00 $72,072.00 10 3305.0109 Trench Safety 33 05 10 LF 7709 $1.00 $7,709.00 11 0241.1118 4"-12" Pressure Plug 02 41 14 EA 4 $754.00 $3,016.00 12 3312.0117 Connect to Existing 4"-12" Water Main 33 12 25 EA 1 $1,921.00 $1,921.00 13 3312.0110 Connect to Existing 36" Water Main 33 12 25 EA 1 $16,011.00 $16,011.00 14 3201.6014 Conc Pvmt Repair, Resiential 32 01 29 SY 34 $121.00 $4,114.00 15 3201.0127 10' Wide Asphalt Pvmt Repair, Arterial 32 01 17 LF 51 $220.00 $11,220.00 16 17 18 19 20 21 22 — — 23 24 25 26 27 — — 28 — — 29 — — 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 TOTAL UNIT I: WATER IMPROVEMENTS $696,976.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Fonn Version May 22, 2019 00 42 43 Bailey Park Phase I Utilities 00 42 43 DAP - BID PROPOSAL Page 2 of4 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Unit of Bid No. Description Section No. Measure Quantiry UnitPrice Bid Value UNIT II: SANITARY SEWER IMPROVEMENTS 1 3331.4115 8" Sewer Pipe 33 31 20 LF 6903 $40.00 $276,120.00 2 3339.1001 4' Manhole 33 39 20 EA 33 $2,608.00 $86,064.00 3 3339.1002 4' Drop Manhole 33 39 20 EA 3 $3,630.00 $10,890.00 4 9999.0001 4' Flat Top Manhole w/ Watertight Lid 00 00 00 EA 2 $2,918.00 $5,836.00 5 3339.1003 4' Extra Depth Manhole 33 39 20 VF 133 $178.00 $23,674.00 6 3339.0001 Epoxy Manhole Liner 33 39 60 VF 29 $384.00 $11,136.00 7 3331.3101 4" Sewer Service 33 31 50 EA 191 $1,179.00 $225,189.00 8 3331.3201 6" Sewer Service 33 31 50 EA 1 $1,461.00 $1,461.00 9 9999.0002 Connect to Existing Sanitary Sewer 00 00 00 EA 1 $1,083.00 $1,083.00 10 3305.0109 Trench Safety 33 05 10 LF 6903 $1.00 $6,903.00 11 3301.0002 Post-CCTV Inspection 33 01 31 LF 13806 $1.00 $13,806.00 12 3305.0110 Utility Markers 33 05 26 EA 2 $897.00 $1,794.00 13 3301.0101 Manhole Vacuum Testing 33 01 30 EA 38 $110.00 $4,180.00 14 9999.0003 CSS Encasement for Utility Pipes 33 05 10 LF 432 $82.00 $35,424.00 15 16 17 18 19 20 21 22 — — 23 24 25 26 27 — — 28 — — 29 — — 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 UNIT II: SANITARY SEWER IMPROVEMENTS $703,560.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Fonn Version May 22, 2019 00 42 43 Bailey Park Phase I Utilities 00 42 43 DAP - BID PROPOSAL Page 3 of4 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Unit of Bid No. Description Section No. Measure Quantiry Unit Price Bid Value UNIT III: DRAINAGE IMPROVEMENTS 1 3341.0402 42" RCP, Class III 33 41 10 LF 476 $156.00 $74,256.00 2 3341.0309 36" RCP, Class III 33 41 10 LF 139 $121.00 $16,819.00 3 3341.0302 30" RCP, Class III 33 41 10 LF 191 $93.00 $17,763.00 4 3341.0208 27" RCP, Class III 33 41 10 LF 1177 $81.00 $95,337.00 5 3341.0205 24" RCP, Class III 33 41 10 LF 467 $73.00 $34,091.00 6 3341.0201 21" RCP, Class III 33 41 10 LF 319 $65.00 $20,735.00 7 3341.0200 18" RCP, Class III 3341 10 LF 29 $63.00 $1,827.00 8 3341.1001 3'x2' Box Culvert 33 41 10 LF 49 $181.00 $8,869.00 9 3341.1202 5'x4' Box Culvert 33 41 10 LF 138 $313.00 $43,194.00 10 3341.1302 6'x3' Box Culvert 33 41 10 LF 255 $326.00 $83,130.00 11 3341.1501 8'x4' Box Culvert 33 41 10 LF 451 $502.00 $226,402.00 12 3349.5001 10' Std Curb Inlet 33 49 20 EA 14 $6,165.00 $86,310.00 13 3349.5002 15' Std' Curb Inlet 33 49 20 EA 2 $7,812.00 $15,624.00 14 3349.0001 4' Storm Junction Box 33 49 10 EA 1 $5,022.00 $5,022.00 15 3349.0002 5' Storm Junction Box � 33 49 10 EA 3 $5,543.00 $16,629.00 16 9999.0004 8'x4' & 6'x3' Headwall, 6 boxes 00 00 00 EA 1 $33,185.00 $33,185.00 17 9999.0005 8'x4' Headwall, 4 boxes 00 00 00 EA 2 $56,573.00 $113,146.00 18 9999.0006 42" Sloping Headwall 00 00 00 EA 2 $7,163.00 $14,326.00 19 9999.0007 27" Sloping Headwall 00 00 00 EA 2 $2,551.00 $5,102.00 20 9999.0008 24" Sloping Headwall 00 00 00 EA 5 $2,331.00 $11,655.00 21 9999.0009 18" Sloping Headwall 00 00 00 EA 2 $2,222.00 $4,444.00 22 9999.0010 6'x3' Sloping Headwall 00 00 00 EA 1 $5,790.00 $5,790.00 23 9999.0011 5'x4' Sloping Headwall 00 00 00 EA 2 $21,080.00 $42,160.00 24 9999.0012 Remove & Dispose Existing Headwall 00 00 00 LS 1 $7,055.00 $7,055.00 25 9999.0013 Turf Reinforcing Mat 34 41 20 SF 30530 $4.00 $122,120.00 26 3137.0102 Large Stone Riprap, dry 31 37 00 SY 1579 $110.00 $173,690.00 27 3305.0109 Trench Safety 33 05 10 LF 3691 $1.00 $3,691.00 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 TOTAL UNIT III: DRAINAGE IMPROVEMENTS $1,282,372.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Fonn Version May 22, 2019 00 42 43 Bailey Park Phase I Utilities 00 42 43 DAP - BID PROPOSAL Page 4 of 4 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item pescri tion Specification Unit of Bid No. p Secrion No. Measure Quantity Unit Price Bid Value Bid Summary UNIT I: WATER IMPROVEMENTS UNIT II: SANITARY SEWER IMPROVEMENTS TOTAL UNIT III: DRAINAGE IMPROVEMENTS This Bid is submitted by the entity named below: BIDDER: Wright Construction Co., Inc 601 W. Wall St. Grapevine, Texas 76051 Contractor agrees to complete WORK for FINAL ACCEPTANCE within CONTRACT commences to run as provided in the General Conditions. END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROIECTS Form Version May22,2019 Total Construction Bid $696,976.00 $703,560.00 BY: 1�4�?"�►'''`t ���` TITLE: ��/,��` � �•�i DATE: -�/ �g worlang days after the date when the 00 42 43 Bailey Park Phase 1 Utilities