Loading...
HomeMy WebLinkAboutContract 55369-CO1CSC No. 55369-CO1 Fc)R�r' Wc�:#zTH City of Fort Worth .--- Change Order Request PfOject Name: Emergency - Pavement Repairs of Multiple Water Main Breaks Ciry Sec No.: 55369 Project No.(s): NIA DOE No. N/A City Proj. No.: NIA Project Description: Emergency - Pavement Repairs for Multiple Water Main Breaks for February 2021 Deep Freeze Contractor: Jackson Construction, Lttl. Change Ofdef #�1 Date: 5/1212021 City Project Mgr. Tony Sholola Ciry Inspector: David Johnson Phone Number: 817-392-6054 Phone Number: 817-392-8455 Dept. Original Contract Amount Extras to Date Credits to Date Pending Change Orders (in M&C I'rocess) Contract Cost to Date Revised Contract Amount Original Funds Available for Chanc�e Orders Remaining Funds Available for thi:> CO Additional Funding (if necessary) Water �750,000.00 $0.00 00 Totals I Contract Time $0.00 0 CHANGE ORDER.S to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 26.67% MAX ALL06VABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) $937,500.00 JUSTIFICATION (REASONS) FOR CHANGE ORDER Change Order No. 1, authorized by the attached April 29, 2021 memorandum, provides additional funding in the amount of $200,000.00 as supplement to the March 3, 2021 memorandum which authorized City Secretary Contract No. 55369 with Jackson Construction, Ltd. in the amount of $750,000.00 for pavement repairs for multiple water mains for the February 2021 deep freeze event. Based upon the pavement repairs conducted, funding in the amount of $200,000.00 is necessary to compensate Jackson Coristruction for additional work performed. It is understood and agreed that the acceptance of this Change Order by the conlractor constitutes an accord and satisfaction antl represents payment in full (both time and money) for all costs arising oul of, or incidental to, the above Change Order. Contractor's Company Name Contractor Name Contractor Si nature Date Jackson Construction, Ltd. Troy Jackson � �� /�, ���u � � 05/14/2021 Assistant M&C Number � N/A Date Pro'eck Manager ��(�� �c:r.� d�tc, �. � Date Co st�uction Supervisor V �ay 14, 2021 Date Assistant Ci Manager May n, 2o2i ��a ��gGc�loff - CounCil Action (If Required) M&C Date Approvetl Dat ;�;� � :r Dept) Date S - � ���I Date OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX FC)�z�T c� R`�` �� City of Fort Worth Change Order Additions Project Name Project No,(s): Project Description Contractor City Project Mgr Emergency - f�avement Repairs of Multiple Water Main Breaks City Sec No.: 55369 NIA DOE No. N/A City Proj. No.: NIA Emergency -('avement Repairs for Multiple Water Main Breaks for February 2021 Deep Freeze Jackson Construction Ltd. Change Order:C� Date: 511212021 Tony Sholola City Inspector David Johnson ADDITIONS F� � R T o RT i--� City of Fort Worth — —� Change Order Deletions Projeci Name Emergency - Pavemenl Repairs of MulUple Water Maln 8reaks City Sec No.: 55369 Projecl No.(s): N/A DOE No. N/A City Proj. No.: N/A Project Description Emergency - Pavement Repairs for Multiple Water Main Breaks for February 2021 Deep Freeze I Contractor Jackson Construction, ud. Change Order: � Date 5/1212021 City Project Mgr. Tony Sholola � City Inspector: David Johnson DELETIONS Page 1 of 1 Previous Change Orders Con�ract Compliance Mana�er By signing I acicnowledge that I arn the person responsible for the monitoring and administration of this contract, including ensuring all perfoimanc �_ , n � �D � reporting requirements. Tony Sholola Name of Employee Assistant Water Director Title ATTEST: � I��� Mary 1, Kayser City Secretary ,d4���� a� OR ���� ��,��� °°°°T�L a� o � o° d�° o o��� ��o °=d ��� � °o Qao ��d �° � °a00000 .o' n� �EXASa�'a �FFICIAL REC�RD CITY SECRETARY FT. WDRTH, TX INTEROFFICE MEMO Date: To: Froin: Via: Subj ect Apri129, 2021 Dana Burghdoff, Assistant City Manager Chris Harder, P.E., Water Duector Doug Black, Senior Assistant City Attotney Cynthia Garcia, Assistant Director, Purchasing Supplement to March 3, 2021 Memorandum Re: Februaiy 2021 Deep Freeze, City Secretary Contract No. 55369 for Einergency -Paveinent Repairs for Multiple Water Main Breaks. The deep fi�eeze event of February, 2021 necessitated the engagement of several contractors for emergency water main repairs. Due to the number of breaks, it was necessary to hire paving contractors to augment our on-call paving contractor in order to keep up with pavement repair subsequent to the water main repairs. To address this situation, Jackson Consh-uction Ltd. was engaged to conduct pavement repairs subsequent to water main repairs by others under CSC 55369 (initial contract authorization of $750,000.00). Based upon the pavement repairs conducted, additional funding in the amount of $200,000.00 is necessaiy to compensate Jackson Construction for work performed. This memo is submitted to request authorization for funding emergency pavement repair services as outlined above at a revised total cost of $950,000.00. A change order will be processed to the existing contract with Jackson Construction Ltd., respectively, and the actual cost will be reconciled at the end of the project. APPROVED FOR EMERGENCY PROCUREMENT: �' �irLodG�e� tfa�de� Recommended: � " � � `" Approved as to fo�m and Legality: Approve: Approve: Chris Harder, P.E., Director, Water Department el��5 Douglas W. Blacic, Sr. Assistant City Attorney �o�CG,�,7vGrh �a�'ihi �. «.,,�������d:.��,;��:,,... �...a ��,r: C,ynthia Garcia, Assistant Director, Purchasing ba.ria, 8ur^A� n,��.:,�; r;. zo.. �:��.,; �_or; Dana Burghdoff, Assistant City Manager