Loading...
HomeMy WebLinkAboutContract 42524-A3 s. r AMENDMENT NO. 3 to AGREEMENT for ARCHITECTURAL DESIGN SERVICES RICHARDSON BASS BUILDING EXHIBIT and CATERING at WILL ROGERS MEMORIAL CENTER STATE OF TEXAS § CITY SECRETARY CONTRACT NO. COUNTY OF TARRANT § WHEREAS, The City of Fort Worth and Hahnfeld Hoffer Stanford (Architect) made and entered into City Secretary Contract No. 42524 (The Contract) which was duly authorized administratively without the requirement of an Mayor & Council approval, the 4th day of November, 2011; and Amendment No. 1 in the amount of $1,330.00 was administratively approved on March 29, 2012; and Amendment No.2 in the amount of$104, 964.00 was approved by City Council on August 21, 2012 (M&C C-25795); and WHEREAS, further amendment is necessary for design services to include additional Texas Accessibility Standards design services for the existing restroom facilities modification; and NOW THEREFORE, City and Architect, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article 1.1, SECTION I—SERVICES OF THE ARCHITECT, a paragraph is added to read as follows: "Provide Additional Achitectural & Engineering Services to update the existing restrooms to comply & meet the current Texas Accessibility Standards (TAS) requirement. The cost of this Additional Service is $3,290.00. The Additional Services is described more fully in the Hahnfeld Hoffer Stanford's letter dated October 3, 2012 subject: Proposal for Additional Services, City of Fort Worth, Texas, WRMC (Will Rogers Memorial Center) Richardson Bass Exhibit Area, which is attached hereto as Attachment"A" and made a part of this Agreement." 2. Paragraph 1 of SECTION V-COMPENSATION TO ARCHITECT, is amended as follows: "The total compensation for all of the assignments to be performed by Architect as described in CHARACTER AND EXTENT of ARCHITECT'S SERVICES hereof shall be a fixed fee of $114,584.00 plus up to $10,000.00 in reimbursable expenses." 3. All other provisions of this Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED this theQday of jOlVI512012, in Fort Worth, Tarrant County, Texas. Hahnfeld Hoffer Stanford APPROVED- By: By: a o°o�o°�°o� �� Eric L. f AIA' Fernando Costa d 0� Principal Assistant City Manage r �o° a W. APPROV ECOMME/ND,EDkE : ` RECORDED: / fr��0. By: w• By: YY�� 'o°0 -C° � Douglas . Wiersig, Mary J. Kays �` 1ro,00000 ,� Directo ransportation & Public orks Dept. City Secretary aa�ftxa�a 'U.11u4O APPRO5 AS O AND LEGALITY: M&C (No M&C Required) Contract Authorization By: - Doug . Black ate: Assistant City Attorney OFFICIAL RECOR CITY SECRETARY FT. WORTH, TX Hahnfeld Hbffer 81 T 302'.0693-�, 0 Staryford hahm-'N(JLUIII--a architects/planners/interiors *T I 4i ow 141 October 3,2012 Mr.Alfonso Meza Registered Architect City of Fort Worth Transportation and Public Works Department Facilities Management Group/Architectural Services 401 West 13th Street Fort Worth,Texas 76102 RE: Proposal for Additional Services City of Fort Worth,Texas WRMC Richardson Bass Exhibit Area Dear Mr.Mesa: I am sending you this proposal for additional services to update the existing restrooms to make them meet the current TAS requirements. Our original proposal did not include any work in the existing restrooms; however, after review by our TAS consultant, the proximity of the existing restrooms to the proposed project will necessitate their being brought up to date. Our proposal to complete architectural and MEP engineering services for the upgrade of the existing restrooms is for an additional fee of $3,290.00, (Three Thousand Two Hundred Ninety Dollars and No Cents). The proposal includes a Fee Worksheet for Hahnfeld Hoffer Stanford, as Exhibit'A',and a fee proposal from Yaggi Engineering, Inc., as Exhibit 'B'. Please review and if possible, amend our contract to include these services.Thank you. Sincerely, HAHNFELD HOFFER STANFORD architects planners interiors 5t�-- - Eric L Hahnfeld,AIA, Principal Cc: David Stanford-Hahnfeld Hoffer Stanford Lee Hill-Hahnfeld Hoffer Stanford Attachments: Exhibit'A'-Hahnfeld Hoffer Stanford Fee Worksheet Exhibit'B'-Yaggi Engineering, Inc.(HUB) Fee Proposal F Fee Worksheet-WRMC Richardson Bass Exhibit Area Add Services Hahnfeld Hoffer Stanford 101312012 SCOPE OF SERVICES INCLUDE: 1. Revise the current CD documents to accomodate the revisions required to bring the existing restrooms up to current TAS standards 2. Meet and coordinate with the project team DESIGN PHASE ARCHITECTURAL 'Sr.Project ESTIMATED HOURS: PM Architect Architect CAD Clerical Totals Coondnation mtgs notes Construction Documents 0 0 0 4 0 4 QA/QC 1 0 0 1 0 2 Specifications 0 0 0 0 0 0 Project Management 0 0 0 0 0 0 Total Man Hours 2 0 0 5 DESIGN PHASE ESTIMATED FEES Totals PM 2 hours.@ $170.0 /hour = $340 Senior Project Architect 0 hours. @ $170.00 /hour = $0 Architect 0 hours. @ $125.00 /hour = $0 CAD 5 hours. @ $90.00 /hour = $450 Clerical 0 hours.@ $80.00 /hour = $0 subtotal 7 total ours $112.86 avg.Thr. _ MEP(Yaggi)total fee $2,500 Fee w/o Reimbursables $3,290 Reimbursables-Estimated Cost $0 Total Additional Services Fee $3,290 Hahnfeld Hoffer Stanford, 200 Bailey Ave,Fort Worth, TX, 76107(817)921-5928 (1&WO12, 9:24 AM)-Page 1 of 1 1 YAGG/ ENG/NEER/NG, INC. ELIZABETH A.YAGGI,P.E. R.TIM YAGGI,P.E. October 1,2012 Mr.David Stanford Hahnfeld Hoffer Stanford 200 Bailey Avenue, Suite 200 Fort Worth,Texas 76107 Re: Will Rogers Memorial Center Richardson Bass Renovation Additional Services—Restroom Upgrade Dear David: We appreciate the opportunity to provide the following additional services: • MEP engineering services for a new family restroom or renovation of the existing restrooms specifically necessary to comply with current TAS standards which will include work to the toilet exhaust system and replacement of plumbing fixtures. Our proposed additional fee is $2,500. We will begin immediately upon written notice to proceed. Please call if you have any questions or if you need additional information. Sincerely, YAGGI ENGINEERING,INC. ACCEPTED: Signature Elizabe A.Yaggi,P.E. Title EAY/sr Date 5840 W.1-20,Suite 270 Phone 817-483-2373 Arlington,TX 76017 www.yaggiengineering.com Fax 817-483-4233