Loading...
HomeMy WebLinkAboutContract 42525-CO1 (3) FOR WORTH City of Fort Worth CITYSEMITAW q�'Z,�—ep Change Order Request CONTRACT NO._�=.�.."""'�' Project Name I Sanitary Sewer Rehabilitation,Contract LXXI(71)-Part 3 City Sec No. 42525 Project No.(s) P254-708170041487/P258-708170041487 DOE No. 6582 City Proj.No. 00414 Project Description Sanitary Sewer Rehabilitation on Whistler Drive(Trail Lake Drive to Westrock Drive),Westrock Drive(360 feet North of Wrigley Way to Wrigley Way)and Two Alleys Contractorl Cleburne Utility Construction, Inc. Change Order# Date: 3/30/2012 City Project Mgr.1 Susan Schwin er City Inspector I Jerry Taliaferro Phone Number:1 817-392-6529 Phone Number: 817-223-2276 Dept. Water Sewer Totals Contract Time Original Contract Amount $276,354.50 $276,354.50 120 Extras to Date Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $276,354.50 $276,354.50 120 Amount of Proposed Change Order $5,393.40 $5,393.40 035 Revised Contract Amount $281,747.90 $281,747.90 155 Original Funds Available for Change Orders $13,800.00 $13,800.00 Remaining Funds Available for this CO $13,800.00 $13,800.00 Additional Funding(if necessary) CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 1.95% MAXALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $345,443.13 The change order will provide for steel platting, additional barricades for traffic control and temporary asphalt pavement trench repair on Mississippi Avenue due to delay in installing proposed sanitary sewer L-336 in an adjacent alley because of horizontal conflict with existing 4" and 6" gas lines that were encountered during construction. It is anticipated that L-336 will be constructed via another City Water De artment sanitary sewer rehabilitation project, after the existing gas� ���een relocated kw Yqs, ompany, Atmos Energy. �Ao®a0000a00CIO �a Staff concurs with the con r c i`irauest. 0itionai0ffin on4 OFFICIAL RE ORD I change 0,400 o y CITY SECRE ARC' ef N Z MMY J. Ka She �aa Q FT. WORTH, TX It is understood and agreed f hat the acceptance of this Change Order by the contractor constitut �W$3nd sVbction an represe payment in full(both time and money)for all costs arising out of,or incidental to,the above Change X►U��� l om omt9' I Cleburne Utility Construction, Inc. 4"I"w �- - (Z 04 M&C Number M&C Date Approved Fc�air WORTH City of Fort Worth • Change Order Additions Project Name Sanitary Sewer Rehabilitation,Contract LXXI 71 -Part 3 City Sec No. 42525 Project No.(s) P254-708170041487IP258-708170041487 DOE No. 6582 City Proj.No. 00414 Project Sanitary Sewer Rehabilitation on Whistler Drive(Trail Lake Drive to Westrock Drive),Westrock Drive(360 feet North Description of Wrigley Way to Wrigley Way)and Two Alleys Contractor Cleburne Utility Construction, Inc. Change Order# 01 Date: 3/30/2012 City Project Mgr. Susan Schwin er City Inspector I Jerry Taliaferro ADDITIONS IIEM DESCRIPTION DEPT Qty Unit Unit Cost Total 33 Steel Plates,Additional Barricades,Signs&Vertical Stands-Install Sewer 1.00 LS $5,115.00 $5,115.00 34 Pavement-2 inch min HMAC on 6 inch flex base-temporary-install(STR-030) Sewer 12.00 LF $23.20 $278.40 Water Sewer $5,393.40 Page 2 of 4 Additions Sub Total $5,393.401 Poilzx WORTH City of Fort Worth Change Order Deletions Project Name Sanitary Sewer Rehabilitation,Contract LXXI(71)-Part 3 City Sec No. 42525 Project No.(s) P254-708170041487/P258-708170041487 DOE No. 6582 City Proj. No. 00414 Project Description Sanitary Sewer Rehabilitation on Whistler Drive(Trail Lake Drive to Westrock Drive),Westrock Drive(360 feet North of Wrigley Way to Wrigley Way)and Two Alleys Contractor Cleburne Utility Construction, Inc. Change Order#=1 Date 3/30/2012 City Project Mgr. Susan Schwinger City Inspector FierryTaiiaferro DELETIONS ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total Water Sewer Page 3 of 4 D eletions Sub Total MWWBE Breakdown for this Change Order MWBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders CO# DATE AMOUNT Total $0.00 Page 4 of 4 M � � O O a L v v Cl) r- o 0 Ln u) rn lqt 0 0 P- oc oc v O N N co XO G9 61? 6n 613 6n 6n 64 J 0 ch coo cc C N J to m qT O O O > Q` Q M M M ti 00 GO O O (6 L M M o ti ti O v F— O V N N N N L W c LO in a) co W E m O Q cu L nr iii �c .. d . L U � Q 3 > 0 ,: 7 2 a) tnp0Oo O �, N a) L 0 O W cu OQ N N N N OpL N ,+�� H r N O0 r N O C Wca N � aocm UO L >, U E o 0 z o o U Q L L o Co � CL IL o In aa) O m co c ai ai L : co _co c a) O E Q > E ca 00 04) a � Q �, LJJ t U to (n 0 j C C U cv o fl. cN C Q - O Z 0 0 X N O owU En- o c>i � U- U U a) a) aa) U Q o U c' ca .� c E rn c w cn °- 2 W, cti c L � 'co co O O >, >, c co -0 rn c 0 > c E Ix I -- 0 O 0 L 0 E a) 0 a) -0 aamUUoa Uaa Uaa