NOTICE OF PROJECT COMPLETION
$0.00 Ns 1
DOE. Ns: N/A
Regarding contract 51144 for Sycamore Creek Relief Interceptor Phase I as required by the Water Department as
approved by City Council on 6/26/18 through I�1&C G28754 the Director of the Water Department, upon the
recommendarion of the Sr. Capital Projects Officer, Capital Projects Delivery, ��Uater Department, has accepted the
project as complete.
Original Contract Prices:
Amount of Approved Change Orders:
Revised Contract Amount:
Total Cost Work Completed:
�2,883,880.00
$2,883,880.00
$2,654,164.00
Less Deductions:
Liquidated Damages:
Other Deductions(see comments):
Total Deduction Amount:
Total Cost Work Completed:
Less Previous Payments:
Final Payment Due
$0.00
$2,654,164.00
$2,627,622.36
$26,541.64
��,'��✓� �� ,� ,,
Recommended for Acceptance
Assistant Director, Water Department
C%U�`��G�e� f�de�
Christopher arder(May21,7_07_109:41CDTi
Accepted
Director, Water Department
Dcrvra Bur�il��laff
Dana Burghdoff ( 9ay 21, 20211228 CDT)
City Manager
CSC No. 51144-FP2
.�(��i � - C oaa c��
c s S 1111�f �x�v
Days @ $630.00/ Day
� �, � Ll
Date
May 21, 2021
Date
M ay 21, 2021
Date
�FFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Project Name: Sycamore Creek Relief Interceptor Phase I DOE. Ns: N/A
Comments:
I�c,�—�'i v V�ch�e �
City Project Numbers 02200
Contract Name SycamorcCmek Reli�f Interceptor Phase 1
Contract Limits Gateway Park south to Union Pacific Railroad ROW
Project Type Sewer
5� n►�-- c� a aoa
c� �- ► > �..� z.�
DOE Number 0901
Estimate Number 17
Payment Number 17
For Period Ending 4/30; 20? l
Project Funding
Project Manager Bierman
Inspectors Johnson / Die
Contractor Mountain Cascadc ��f Texas
11729EFM917
Alvarado, TX 76009
City Secretary Contract Number �1144
Contract Date 6/26/2015
Contract Time 990 CD
Days Charged to Date 792 CD
Contract is 000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
sl�o i l� -[� L.w o 2���s�, �80 0. uo �26 s41.64 sz6�sa�.6a
- — - - -- - — �lec,ll� �o��czao -- C.G2zrzC�-C-�'T�I�J - -
Total Cost of Work Completed
Less � % Retained
Net Earned
Earned This Period $26,541.64
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 / Day
LessPavement Deficiency
Less Penalty
Less Previous Payment
Plus Material on Hand Less IS%
Balance Due This Payment
$2,654,164.00
$0.00
$2,654,164.00
$0.00
�0.00
$0.00
$2,627,622.36
$0.00
$ 26,541.64
Friday, May 14, 2021 Page 6 of 6
FORT �ORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name SycamoreCreek Relief lnterceptor Phase I
Contract Limits Gateway Park south to Union Pacific Railroad ROW
Project Type Sewer
City Project Numbers 02200
DOE Number 0901
Estimate Number 17 Payment Number 17 For Period Ending
City Secretary Contract Number � I 144
Contract Date 6/26/201 S
Project Manager Bierman
Contractor Mountain Cascade of Texas
11729EFM917
Alvarado, T?C 76009
Inspectors Johnson / Die
4/30/2021
CD
Contract Time 99�D
Days Charged to Date 792
Contract is 92.000 Complete
Friday, May 14, 2021 Page 1 of 6
City Project Numbers 02200
Contract Name SycamoreCreek Relief [nterceptor Phase 1
Contract Limits Gateway Park south to Union Pacific Railroad ROW
Project Type Sewer
Project Funding
Unit I Sanitary Sewer
Item Description of Items
No.
26 Imported Embedment/Backfill, CLSM
27 3" Pavement Pulverization
23 3" Asphalt Pavement, Type D
29 CementModification,261bs/sy
30 TxDOT and City of Fort Worth Traffic
31 Construction Survey (Redline As-buil
32 Construction Stakin�
33 Exploratory Excavation of Existing U
34 SWPPP
35 Construction Allowance (Sewer)
I 66" FRP SN46 Sanitary Sewer Pipe
2 66" FRP SN72 Sanitary Sewer Pipe
3 33" Tunnel Liner Plate & 66" Carrier
4 34" Tunnel Liner Plate & 66" Carrier
5 Reinforced 144" Diameter Polymer Man
6 3" SDR-26 PVC Se�ver Pipe
7 6" SDR-26 PVC Sewer Pipe
3 Remove Sanitary Sewer Manhole
9 Utility Marker Pole
]0 Concrete Curb & Gutter Replacement
1 I Concrete Valley Gutter Replacement
12 Concrete Driveway Replacement
13 Seedin�, Hydromulch with Bindin� Age
14 Seedin�, Hydromu]ch with Bindin� A�e
I S Junction Structure at Sta. 5+33.36 (
16 Fontaine Series 95 Stop Lo�s - 70" O
17 Fontaine Series 95 Stop Lo�s - 101.5
IS Warren Epoxy Protective Coating for
19 Bypass Pumpin�
20 Manhole Vacuum Testing
21 Pre - CCTV Inspection
DOE Number 0901
Estimate Number 17
Payment Number 17
For Period Ending 4/30/2021
Estimated Unit Unit Cost Estimated Completed Completed
Quanity Total Quanity Total
200 CY $120.00 $24,000.00 200 $24,000.00
2300 SY $9.00 $25,200.00 2761 $24,349.00
2300 SY $19.00 $53,200.00 2761 $52,459.00
36 TN $I50.00 $5,400.00 35.5 $5,325.00
1 LS $15,000.00 $15,000.00 1 $15,000.00
1 LS $1,000.00 $1,000.00 1 $1,000.00
i LS $4,000.00 $4,000.00 1 $4,000.00
2 EA $1,300.00 $2,600.00 2 $2,600.00
I LS $12,000.00 $12,000.00 1 $12,000.00
] LS $150,000.00 $150,000.00
1144 LF $520.00 $594,880.00 1144 $594,330.00
36 LF $525.00 $13,900.00 36 $ l 5,900.00
221 LF $1,900.00 $419,900.00 221 $419,900.00
373 LF $1,700.00 $634,100.00 373 $634,100.00
! LS $115,000.00 $115,000.00 f $115,000.00
20 LF $74.00 $1,430.00 20 $1,430.00
20 LF $70.00 $1,400.00 20 $1,400.00
l EA $2,500.00 $2,500.00 1 $2,500.00
3 EA $I50.00 $450.00 3 $450.00
550 LF $10.00 $5,500.00 536 $S,S60.00
94 SY $70.00 $6,530.00 199 $13,930.00
270 SF $14.00 $3,730.00 ]009 $14,126.00
12500 SY $1.00 $12,500.00 12500 $12.500.00
7600 SY $I.00 $7,600.00 7600 $7,600.00
i LS $212,500.00 $212,300.00 1 $212,300.00
] 0 EA $3,000.00 $30,000.00 10 $30,000.00
10 EA $4,000.00 $40,000.00 ]0 $40,000.00
1700 SF $20.00 $34,000.00 1700 $34,000.00
I LS $157,100.00 $I57,100.00 1 $I57,100.00
7 EA $140.00 $950.00 7 $930.00
]00 LF $I.00 $100.00
Friday, May 14, 2021 Pa�e 2 of 6
City Project Numbers 02200
Contract Name SycamoreCreek Relief Interceptor Phase I
Contract Limits Gateway Park south to Union Pacific Railroad ROW
Project Type Sewer
Project Funding
22 Post - CCTV Inspection 1300 LF
23 Temporary Chain Link Fencing and Gat 7�00 LF
24 Preparation and Implementation of a 12S4 LF
2� Temporary Asphalt Paving Repair (2" 710 LF
Sub-Total of Previous Unit
Unit II Water
Item
No.
1
?
3
4
�
6
7
s
9
10
11
12
13
14
1�
16
17
Description of Items
Estimated ��nit
Quanity
333 LF
�0 LF
55 LF
1 TO
1 EA
2 EA
3 EA
3 EA
] EA
9�0 SF
] LS
1 LS
] LS
100 CY
2 EA
2 EA
1 LS
DOE Number 0901
Estimate Number 17
Payment Number 17
For Period Ending 4/30/2021
$1.00 $1,300.00 1730 $1,730.00
$2.00 $15,000.00 7500 $15,000.00
$1.00 $1,234.00 1234 $1,234.00
$�0.00 $3�,�00.00
$2,64�,�34.00 $2,476,303.00
Unit Cost Estimated Completed Completed
Total Quanity Total
$70.00 $23,660.00 363 $25,760.00
$340.00 $17,000.00 50 $17,000.00
$».00 $3,025.00 » $3,025.00
$2,000.00 $2,000.00 1 $2,000.00
$300.00 $300.00 1 $300.00
$1,600.00 $3,200.00 2 $3,200.00
$1,000.00 $3,000.00 3 $3,000.00
$3,200.00 $9,600.00 3 $9,600.00
$1,000.00 $1,000.00 I $1,000.00
$�.00 $4,7�0.00 2�3 $1,26�.00
$2,400.00 $2,400.00 1 $2,400.00
$250.00 $250.00 I $2�0.00
$1,000.00 $1,000.00 I $1,000.00
$120.00 $12,000.00 20 $2,400.00
$�00.00 $1,000.00 2 $1,000.00
$3,400.00 $6,300.00 2 $6,S00.00
$�0,000.00 $�0,000.00
$140,93�.00 $30,000.00
3" PVC Water Pipe
S" PVC Water Pipe (By Other Than Ope
6" PVC Water Pipe
Ductile Iron Water Fit[in�s w/ Restr
Removal of Water Valve
S" Gate Valve
6" Gate Valve
Connection to Existing 4-12" Water M
Cut & Cap Ea. Water Main to Abandon
Concrete Sidewalk, Adjacent to Curb
Temporary Water Services
Constniction Survey (Redline As-bui]
Construction Stakin�
Imported Embedment/Backfill, CLSM
Salva�e Fire Hydrant
Fire Hydrant Assembly
Construction Allowance (Water)
Sub-Total of Previous Unit
Altemative B
Item Description of Items Estimated �fnit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
B I Reinforced 60" Dia. Type A Polymer M 6 EA $11,300.00 $70,300.00 6 $70,300.00
B2 Additional VeRical Depth on Reinfor 34 VF $443.00 $1�,062.00 34 $1�,062.00
B3 Reinforced 4S" Dia. Polymer Manhole 1 EA $9,000.00 $9,000.00 1 $9,000.00
Friday, May 14, 2021 Page 3 of 6
City Project Numbers 02200
Contract Name SycamoreCreek Relief Interceptor Phase ]
Contract Limits Gateway Park south to Union Pacific Railroad ROW
Project Type Sewer
Project Funding
DOE Number 0901
Estimate Number 17
Payment Number 17
For Period Ending 4/30202 ]
64 Additional Veitical Depth on Reinfor 'J VF $3�7.00 $2,499.00 7 $? 499.00
Sub-Total Of PreviOus Unit $97,361.00 $97,361.00
Friday, May 14, 2021 Page 4 of 6
City Projcct Numbcrs 02200
Contrnct Nnme SycamoreCreek Relief lncercep�or Pliase 1
Confrlcl Limits G�le�v�y Pnrk south lo Union Pucific R�ilroad RO�l'
Project Type Sen�er
Project rw�ding
ll0� Numba• 0901
Cstimntc Numbcr l7
Pnyment Number l7
rar Period �nding d/30/2021
CQutract Information Su►nmary
Originnl ConQ•act Amounl
$2,SS3,8S0.00
Chau�e Orders
Ch�ngc Orilcr Numbcr
Chnngc Or�cr Numbcr 1
ClinngcOr�cr\umLer I
L'�✓�--� Date � I� %�
Crnilr tor —�
DnteS � /�f -�-/
L�spection Su�ervjso�
!.0 �i�l' I
�o- J L
: � j �i n� ��' ,y � •,� D�te 'S /� � L I
Project Mana�er
N��
Asst. Directorll'PW
Ciu�stv��ie� tl�u-r7es-
�n�rsropne� a�de�;�ayz_,zoz�o9:������
Director / Conlracting Depnrtmcnt
$0.00
$0.00
$0.00
Totnl Contr;tct Price 52,SS3,SS0.00
Totnl Cost of Worlc Completed
Less 0 % Ret�ined
Net Cnrned
�nrned Tl�is Period $26,541.64
Retninnge This Period $0.00
Less Liqui��te� Dnninges
D�ys « / Day
LessPnvement Deficiency
Less Pen�lty
Less Previous P�yment
Plus Nt�teri�l on Hnnd Less IS%
Bnl�nce Duc T6is Pnyment
$2,654,16d.00
$0.00
$2,654,164.00
$0.00
$o.00
$0.00
$2,627,62236
$0.00
$26,541.64
friday, �vfuy 14, 2021 Pa�c 5 oFG
FO RT WO RT H rcv 03/OS/07
;
:��:
,
x_:.
WATER ENGINEERING & FISCAL SERVICES
FINAL STATEMENT OF CONTR.ACT TIME
FINAL STATCM�NT NO.: 17
NAM� OF PROJECT: Sycamoi•e Creek Relief Interceptor - Phase 1
PROJ�CT NO.: 2200 CONTRACTOR: Mountain Cascade
CITY PROJ�CT
P�RIOD FROM:10/15/18 TO: 03/O1/20 FINAL INSP�CTION DAT�:
WORI{ ORD�R �FF�CTIV�: 10/15/2018 CONTRACT TIM�: 270 Q WD Q CD
DAY OF DAYS R�ASON FOR DAYS DAY OF DAYS R�ASON FOR DAYS
MONTH CHARG�D CR�DIT�D MONTH CHARG�D CR�DIT�D
DURING DURING
1. 16.
2. 17.
3. 18.
a. 19.
5. 20.
6. -- — 21.
7. 22. — —
8. 23.
9. 24.
10. 25.
I l. 2G.
I2. 27. — --- —
l3. — -- — 28.
14. 29.
15. 30.
31.
SAT, SUN, RAIN, TOO W�T, UTILITI�S OTHCRS * DAYS TOTAL
& HOLIDAYS & TOO COLD R�LOCAT[ONS CHARG�D DAYS
THIS
P�RIOD
PR�VIOUS
PGRIOD
TOTALS
TO DAT�
xR�MARI{S:
0 I
502
.. ,�� :, .
CONTRACTOR DATE IN�`PEC[T"OR DATE
Capital Pzojects Delivery, Water Department
The Citp of Fort North • 1000 Throckmorton Strcet • FoLt �Uorth, T176012-G311
(817) 392 - 4�77 • Fax: (817) 392 - 84G0
F����%�T�
Capital Projects Deliveiy, Water Department
PERFORMANCE EVALUATION OF CONTRACTOR
I) CONTRACTOR & PROJ�CT DATA
Nanie ojConiracla•
Mountain Cascade of Texas
INnter Engineering Lrspecla•
Judy Die
fl�aler Engineering Lrspecfor
❑� Water ❑� Waste Water ❑ Storm Drainage ❑✓ Pavement
Irrilia! Conn�nd Amarm!
$2,883,880.00
Finnl Cwrlracl Amornu
$2,883,880.00
II) PERFORMANC� �VALUATION
Projed Nmne
Sycamore Creek Relief Interceptoi• Phase 1
DDE Nmirber
N/A
Projec! dlmrager
Liam Conlon
ProjeN D�ctd1��
Q Simple QQ Routine
14/2021
REV: �2,2�,��
Q Camplex
0-]nadequate 1- Deficient 2- Standard 3- Good 4-�xcellenl
ELEb1ENT tiVEIGHT ( x) AppLICABLE (Y / N) RATNG (0 - 4) MAX SCOItE SCORE
1 Subrttission ofDocuments 2 Y 3 8 6
2 PublicNotifications 5 Y 3 20 1�
3 Plans on Site 5 Y 3 20 IS
4 Field Supervision l5 Y 4 60 GO
5 Work Performed 15 Y 2 60 30
6 Finished Product 15 Y 3 60 45
7 Job Site Safety 15 Y 4 60 60
8 Traffic Control Maintenance 15 Y 4 GO 60
9 Daily Clean Up 5 Y 3 20 1�
10 Citizen's Complaint Resolution 5 Y 3 20 15
11 Propecty Restoration 5 Y 3 20 15
12 After Hours Response � Y 4 20 20
13 Project Completion 5 Y 4 20 20
TOTAL ELEMENT SCORE (A)
BONUS POINTS (25 Maximum) (B)
TOTr1L SCORG ('CS)
IIn CONTRACTOR'S RATING
Ma�imum Score (A4S) = 443 or sum of applicaUle element score maximums which = 448
RAti�ig ([TS ( I1'ISJ `' 100%) 37G / 448 = 8�4%
Perform�nce Category E�cellent
<20% = Inadequate 20% to <d0% = Deficient /0% ro<60% = Srn,7dard 60% �o <80% = Good >_80% = Escelle�rt
Inspector's Commenfs (INCLUDING CITLANATION OT 130NUS POI�]TS A�VARD�D)
376
37C>
/'/� /J � Q /�! --�--r
Signahu•e Inspector �� / ���:- Si�nature Contractor �
Signature Inspector's Supervisor
CONTRACTOR'S COMMENTS
Capitnl Piojects De(ivei}�, \\/atei Deparmient
The City of Fo�t \��ordi • 1000 Tluockmorton Street • Foit �Uoidt,'TZ 7G012-6311
(817) 392 - 4477 • Fa�: (817) 392 - S4G0
FORTWORTH
; '
Capital Projects Deliveiy, Watei Departinent
CONTRACTOR'S EVALUATION OF CITY
I) PROJ�CT INFORMATION Date: r4-Mav-21
A�nme ojConlracla�
Mountain Cascade of Texas
JNalw• Errgi�teering Inspeclor
Judy Die
DOENun�ber• ProjeclD�calq�
N/A � Simple QQ Routine
Inilia( Cor�h•ac! �L�rorrnl
$2,883,880.00
II) PERFORIVIANC� �VALUATION
0- Inadequate 1- Deficient 2- Standard
ELEMENT
INSPECTION EVALUATION
1 Availability ofInspector
2 ICnowledge of Inspector
3 Acci.u•acy of Measured Quantities
4 Display Of Professionalism
5 Citizen Complaint Resolution
6 Performance - Settin� up Valve Crews, Labs
ADMINISTRATION
1 Chan;e Ordei• Processing Time
2 Timliness of Conh•actor Payments
3 Bid Opening to Pre-Con Meeting Tim •ame
IIn COMII�NTS & SIGNATUItES
COIVIIVIEN'I'S
Si�natui•e Conh•actor
Signature Inspector
Signariire lnspector's Supervisor
INSP�CTOR'S CONIM�NTS
PLANS & SP�CIFICATIONS
1 Accuracy of Plans to Existing Conditions
2 Clarity & Sufficiency of Details
3 Applicability of Specifications
4 Accuracy of Plan Quantities
PRO,T�CT MANAG�R �VALUATION
1 Knowledtre AncUOr Problem Resolution
Availability of Project Ma�a��
Comruunication
Resolution of Utilitv Conflicts
��
� /'/�- J �4 � Ili
Q Complex
RE�: �2,22,��
Projecl �Vnine
Sycamore Creek Relief lnterceptor Pllase I
Projecl d�lnnnger
Liam Conlon
T}pe ojConh•ac!
� Water 0 Waste Water ❑ Storm Drainage 0 Pavement
Fina! Conlracl �Imotuil
$2,883,880.00
3 - Good 4 - Excellent
RATING ELEMENT
(� -'�)
RATR�IG
(0 - �)
Capital Pcojects DeliveiZ�, �Vatei DepaLtment
The Ciq� of Fort �\/oLdi • 1000 Tlirockmoiton Stieet • Fort ��'otdi, TZ 76012-G311
(817) 392 - 4=477 • Fax: (S17) 392 - 8460
CSC No. 51144-CO1
FORT WORTH City of Fort Worfh
Change Order Request
Project Name: Sycamore Creek Relief Interceptor Phase I City Sec No.: 51144
Project No.(s): SSOtEo7ooaao-co��s3 DOE No. N/A City Praj. No.: 02200
Project Description:l This project will provide additional wastewater capacity to the Sycamore Creek Drainage Basin.
Contractor. Mountain Cascade of Texas, LLC Change Order# � Date: 5/712021
City Project Mgr. Liam Conlon City Inspector: David Johnson
Phone Number: 817-392-6824 Phone Number: 817-392-8455
Dept.
Original Contract Amount
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
Unit I Sewer � Unit II Water � Alternative B
Totais Contract Time
(Caiender days)
Revised Contract Amount
Original Funds Available for Change Orders
Remaining Funds Available for this CO
Additional Funding (if necessary)
1.00
S1
51
CHANGE ORDERS to DATE (INCLUD/NG 7H1S ONE) AS % OF ORIGINAL CONTRACT 0.00% Ij
MAXALLOWABLE CONTRACTAM�UNT (ORIGINAL CONTRACT C05T+ 25%) 53,604,850.00
- ".•,v,la.r.r.vv �v� � .v�a�v��u-�nu�.r.rnucn �
The change order will provide an additional 720 Calendar days on the project for the following:
• Negotiations with a property owner who demanded that all their parking spaces be repaved in areas
that were not impcted by construction. The City ended up not paving these areas.
• Negations with a gas company for access through their gas pad site to construct a porton of the project
sewer main on the property.
• Having to shut down construction numerous times to accomodate events at a church located at
LancasterAvenue /Windham Drive intersection
• The time period it took for TRWD to accept the restoration that was conducted on its propety after
sewer installation.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaclion and represents
payment in full (both time and money) for all costs arising out of, or incidentai to, the above Change Order.
FO RT ��VC� RT H City of Fort Worth
Change Order Additions
Project Name Sycamore Creek Relief Interceptor Phase I City Sec No.: 51144
Project No.(s): 56016-0700430-001783 DOE No. N/A City Proj. No.: 02200
Project
Description
Contractor
City Projecl Mgr.
This project will provide additional wastewater capacity to the Sycamore Creek Drainage Basin.
Mountain Cascade of Texas, LLC Change Order: � Date: 5/7/2021
Liam Conlon City Inspector David Johnson
ADDITIONS
FORT WCORri'I-� Cify of Fort Worfh
Change Order Deletions
Project Name Sycamore Creek Relief Interceptor Phase I City Sec No.: 51144
Project No.(s): 56016-0700430-001783 DOE No. N/A City Proj. No.: 02200
Project Description � This project will provide additional wastewater capacity to the Sycamore Creek Drainage Basin.
Contractor Mountain Cascade of Texas, LLC Change Order: �1 Date 5l7/2021
City Project Mgr. Liam Conlon City Inspector: David Johnson
DELETIONS
Previous Change Orders
co# DATE AMOUNT
Total $0.00
Page 4 of 4
MIWBE Breakdown for this Change Order
Contraci Compliance Mana�er
By signing I acicnowledge that I am the person responsible
for the monitoring and adm.inisiraiion of this con��act, including
ensuring all performance and reporting requiremenfs.
� Q/�'� �ki�'%1'��''`"1 `
Signaiure
�9 � ►� 1''� �� �. 00�
Name of Employee
� ��/
w`�D � .e C� � %�l��G�'c- ,"l�
Title
.
�• �i' /••���,
/' � /' /
MaryJ. Kayser
Ciiy Secretary
PROJECT NAME:
PROJECT NUMBER:
DOE NUMBER:
PIPE LAID
WATER
WATER
FIRE HYDRANTS: 2
PIPE ABANDONED
WATER
DENSITIES:
NEW SERVICES:
PIPE LAID
SEWER
SEWER
SEWER
PIPE ABANDONED
SEWER
DENSITIES:
NEW SERVICES:
FORTWORTH
� �;��
�:. ':.�%�!�_
, �,--
WATER ENGINEERING & FISCAL SERVICES
PIPE REPORT FOR:
Sycamor Creek Relief Interceptor Phase I
2200
N/A
WATER
SIZE TYPE OF PIPE LF
8-Inch P VC 3 8 8
6-Inch PVC 55
SIZE
6-Inch
VALVES (16" OR LARGER)
TYPE OF PIPE
CI
�
SIZE
66-Inch
8-Inch
6-Inch
SIZE
6-Inch
SEWER
TYPE OF PIPE
FRP
PVC
PVC
TYPE OF PIPE
CCP
�
LF
443
LF
1774
20
20
L,F
40
Wr�T'ER ENGINEEP�ING 8c FISCr�I. SERVICES
The City of Fort Worth • 1000 Throckmorton Stxeet • Fort Worth, TZ 76012-6311
(S17) 392 - 4477 • Fa�: (S17) 392 - 5460
Bond No. 070207299
CONSENT OF
SURETY GOMPANY
TO F{NAL PAYMENT
OWNER ❑
ARCHITECT �
CONTRACTOR �
SURETY �
OTHER ❑
PROJECT:
Svcamore Creek Relief Interceptor- Phase 1, Prolect No. 02200
TO: City of Fort Worth
1000 Throckmorton Street
Fort Worth, CA 76102
CONTRACTOR:
Mountain Cascade of Texas, LLC
ARCHITECT'S PROJECT NO.:
CONTRACT FOR:Sycamore Creek Relief
Interceptor- Phase 1, Project No. 02200
CONTRACT DATE
In accordance with the provisions of the Subcontract between McCarthy and the Subcontractor as indicated above, the
Liberty Mutual Insurance Company , SURE7Y COMPANY
175 Berkeley Street , Boston, MA 02116
on bond of
Mountain Cascade of Texas, LLC , SUBCONTRACTOR,
11729 East FM 917, Alvarado, TX 76009
hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall not relieve the Surety
Company of any of its obiigations to City of Fort Worth
1000 Throckmorton Street OWNER,
Fort Worth, CA 76102
as set forth in the said Surety Company'
IN WITNESS WHEREOF,
the Surety has hereunto set its hand this 24th day of April 2020
Attest:
{Seal):
Libertv Mutual Insurance Companv
Surety"� ; �` ` .�
, ,� ,-� � � •
BY. �, I � f��� ' i ,: -�_!._„� __— _
Signature of Authorize'd Representative � �r�—
Bradley N. Wright, At4orney-in-Fact
Title
NOTE: This forms is to be used as a companion document to AIA DOCUMENT G706, CONTRACTOR'S AFFIDAVIT OF PAYMENT OF DEBTS AND
CLAIMS, Current Edition.
surety.doc-12/1194
_
ACKNOWLEDGMENT
A notary public or other officer completing this
certificate verifies only the identity of the individual
who signed the document to which this certificate is
attached, and not the truthfulness, accuracy, or
validit of that document.
State of California
County of San Francisco
On APRIL 24, 2020 before me, S. Nicole Evans, Notary Public
(insert name and title of the officer)
personally appeared BRADLEY N. WRIGHT ---------------------------------------------------
who proved to me on the basis of satisfactory evidence to be the person(� whose name(�) is�
subscribed to the within instrument and acknowledged to me that hel�fi��executed the same in
his/k�f#I��authorized capacity�, and that by hisli�a��g� signature(�) on the instrument the
person(�), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing
paragraph is true and correct.
�•,s�x..s�c,� y^�-- ,, �.
.+ � � �CI � V �..
WITNESS my hand and official seal. � ,,� ,, ���� F����� a� �or���1
e. :.
a e� (�%� �. n F enc � � Cu��ly
��� �d''��.YlI ���!"1^115`,=1Cf! 4 J7'1�%!
/ �/1"'�( //rl/ti ,�'9 '`'�—y'�� M r Ccmir�. t<pires f c: 1�. 2020
_ ;��
Signature
(Seal)
_• I,il�er�`�T
1�'�t��al
SURETY.
This Power of Attorney limits the acts of those named herein, and they have no authority to
bind the Company except in the manner and to the extent herein stated.
Liberty Mutual Insurance Company
The Ohio Casuaity Insurance Company
West American Insurence Company
POWER OF ATTORNEY
Certificate No: 8196953 - 395022
KNOWN ALL PERSONS BY THESE PRESENTS: That The Ohio Casualty Insurance Company is a corporation duly organized under the laws of the State of New Hampshire, that
Liberry Mutual Insurance Company is a corpora6on duly organized under the laws of the State of Massachusetts, and West American Insurance Company is a corporation duly organ¢ed
under the laws of the State of Indiana (herein collectively called the "Companies"), pursuant to and by authority herein set forth, does hereby name, constitute and appoint, Carolync
Emery, S. Nicole Evans, Frances M. Murphy, Bradley N. Wright
all of the city of San Fnncisw state of California each individually if there be more than one named, its true and lawful attomey-in-fact to make,
execute, seal, acknowledge and deliver, for and on its behalf as surery and as its act and deed, any and all undertakings, bonds, recognizances and other surety obligaUons, in pursuance
of these presents and shall be as binding upon the Companies as if Ehey have been duly signed by the president and attested by the secretary of the Companies in their own proper
persons.
IN WITNESS WHEREOF, this Power of Attomey has been subscribed by an authorized officer or offidal of the Companies and the corporate seals of the Companies have 6een affixed
thereto this Sth day of Occober , 2018 .
Liberty Mutual Insurance Company
�, Ws�R �ZY �NSV ��NsuR The Ohio Casualty Insurance Company
�pP'GoµvoRyTqy� �JP�oaPor�r'Qyy \P`oµvogqr9y� WestAmencan Insurance Company
J 3 Fo m Q 3 "'o c� � r Fo t�
` 9912 0 0 1919 � t 1991 � ��
�' 3 Z a. O 6 O �/
Yd�9sSNCHU9�.La1' yO�h'/�AMPS� a� �C �NOIANP a /1�./'��-���
g�> � t-`' ,,Ht *��a s''M * 1��a BY= �
David M. Carey, Assistant Secretary
State of PENNSYLVANIA ss
County of MONTGOMERY
� On this Sch day of October 2013 before me personally appeared David M. Carey, who acknowledged himseli to be the Assistant Secretary of Liberty Mutual Insurance
� Company, The Ohio Casualty Company, and West American Insurance Company, and that he, as such, being authorized so to do, execute the foregoing instrument for the purposes
> therein contained by signing on behalf of 1he corporations by himseff as a duly authorized offcer.
IN WITNESS WHEREOF, I have hereunto subscribed my name and affixed my notarial seal at King of Prussia, Pennsylvania, on the day and yearfirst above written.
�O
O �
C �
��
C� �
COMMONWEALTH OF PENNSYLVANIA
Notarial Seal
- Teresa Pastelia, Notary Public
UpperMenonTwp..MontgameryCounry B�/:
I My Cort'�.mission Expires March 28.2021
� MemDer. Per.nsylvanla Associanon of Noianes
/!,� ���L.dJ
�'� This Power of Attorney is made and execu[ed pursuant to and by authority of the foliowing By-laws and Authorizations of The Ohio Casualty Insurance Company, Liberty Mutual Insurance
o.� Company, and West American Insurance Company which resolutions are now in full force and effect reading as follows:
� a? ARTICLE IV — OFFICERS: Section 12. Power of Attomey.
o� Any offcer or other official of the Corporation authorized for that purpose in writing by the Chairman or the President, and subject to such IimitaGon as the Chairman or the President
'a � may prescribe, shall appoint such attorneys-in-fact, as may be necessary to act in behalf of the Corporation to make, execute, seai, acknowledge and deliver as surety any and all
�� undeRakings, bonds, recognizances and other surety obligations. Such attomeys-in-fact, subject to the limitations set forth in their respective powers of attomey, shall have full
»
o� power to bind the Corporation by their signature and execution of any such instruments and to attach thereto the seal of the Corporetion. When so executed, such instruments shall
Z � be as binding as if signed by the President and attested to by the Secretary. Any power or authority granted to any representative or attomey-in-fact under the provisions of this
articie may be revoked at any time by the Board, the Chairman, the President or by the officer or officers granting such power or authority.
ARTICLE XIII — Execution of Contracts: Section 5. Surety 6onds and Undertakings.
Any offcer of the Company authorized for that purpose in writing by the chairman or the president, and subject to such limitations as the chairman or the president may prescribe,
shall appoint such attomeys-in-fact, as may be necessary to act in behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings,
bonds, recogniza�ces and other surety obligations. Such attomeys-in-fact subject to the limitations set forth in their respective powers of attomey, shall have full power to bind the
Company by their signature and execution of any such instruments and to attach thereto the seal of the Company. When so executed such insVuments shall be as binding as if
signed by the president and attested by the secretary.
Certificate of Designation — The President of the Company, acting pursuan[ to the Bylavrs of the Company, authorizes David M. Carey, Assistant Secretary to appoint such attomeys-in-
fact as may be necessary to act on behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety
obligations.
Authorization — By unanimous consent of the Company's Board of Directors, the Company consents that facsimile or mechanically reproduced signature of any assist�nt secretary of the
Company, wherever appearing upon a certified copy of any power of attomey issued by the Company in connecGon with surety bonds, shall be valid and binding upon the Company with
the same force and effect as though manually affixed.
I, Renee C. Llewellyn, ihe undersigned, Assistant Se�retary, The Ohio Casualty Insurance Company, Liberty Mutual Insurance Company, and West American Insurance Company do
hereby certify that the original power of attomey of which the foregoing is a full, true and correct copy of the Power of Attorney executed by said Companies, is in full force and effect and
has not been revoked.
IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed the seals of said Companies this 24 day of APRIL 2020 .
P� \NSU,� P�jY INgV � \NSUR
aJ c°RPOR'0r Lc+ yJ u°ap�eq>R92 `'Po°RPaR°T'9y�'
J 3 Fo i� Q 3 Fo c+ 4 r Fo m �
� 1912 � 0 1919 � � 1991 � �,G,.dGy�_.
Y 93, S� Z Zt�` P�v O a A By:
b.� SqCHU`+�.da ��HAMp`�" aa3 �s ��'DIAN�' ,da Renee C. Llewell n Assistant Secreta
g�> + �� '�y1 * h� �M * r� Y , ry
�
c
.�
�
s
�o
��
�m
�d
�
O �P
LM&12873 LMIC OGC WAIC Multi Co_062018
Arrlvnvli
STAT� OF T�XAS
COUNTY OF JOHNSON
Before me, the undersigned atithoi•ity; a notaiy public in the state
and county aforesaid, on this da}� personall}� appeared Andi•ew L.
NicCulloch, Vice President Of Mountain Cascade of Texas, LLC, la�own
to me to be a credible person, who being by me duly s��orn; upon his oath
deposed and said;
That all persons, firms; associations, corporations, or other
organizations fiu�nislzina !abor and/or materials have been paid in fiill;
That the wabe scale establishecl by the City Council in the City of
Foi•t Woi•th has been paid in fi�ll;
That there are no claims pendin� for personal injury and/or
property damages;
On Contract described as;
Sycamore Creek Relief Interce�tor - Phase 1 �,
BY
Andre L. McCulloch, Vice President
Subscribed and s�vorn before me on this date 24th of April, 2020.
Notary Public
Jol-uzson County, Te�as
,a�������,, VJANDA SUC JARRELL
:r ��'Y�pu°� ��';NotarY Public, State of Texas
ac
;;�,�:. �,��� Camm. �xpires 06-29-2020
�'�"f�'oF���,;.'� Nutary ID 11952407
'���,,,r�,,,�_,_.._ -
_��
�ORTWORTH
May 14, 2021
Mountain Cascade of Teias
11729 E FM 917
Alvarado, TZ 76009
Re: Acceptance Letter
Project Name: Sycamore Creek Relief Interceptor Phase I
Project Type: Se��er, Water and Paving
Project Ns: 02200
D.O.E. Ns: N/A
Contiact Ns: 51144
Dated: 6/26/2015
�endeman:
On February ZS, 2020 a final inspecrion was made on the subject project. There were no punch list items
identified at the time. The final inspection indicates that the ��ork meets the City of Fort Wortl.z specificauons and
is therefore accepted by the City. The warranty period �vi]1 start on February 28, 2020, which is the date of fmal
inspection and will eztend for (2) years in accordance �vith the Contract Documents.
If you have any questions concerning this letter of acceptance, please feel free to contact me at (�17) 392-60�4
Yours Truly,
_ ; �
�e: ;`. � ��` " �;> '�
Tony Sholola, P.E., Assistant Director Water Departrnent
MP /
cc: Chris Harder, P.E., Director, Water Department
Laura Wilson, P.E., Deputy Director, Water Department
Captain Michael Skains, Fire Department
Cesar Zavala, Field Operations Superintendent, Water Department
Bill Lund�Tall, Field Operations Superintendent, Waste Water Department
Liam Conlon, Project Manager
Greg Vauglin, P.F,., LAN, Consultant
Mountain Cascade of Tetias , Contractor
David Johnson, Inspection Supervisor, ��later Engineerin� and Fiscal Services
Judy Die, Inspector, Water En�ineering and Fiscal Services
File
WATER DEPARTMENT
ENGINEER[NG AND FISCAL SERVICES
THE CITY OF FORT WORTH * IOOO THROCKMORTOIV STREET * FORT WORTH, TF..Xt1S 76102
817-392-8240 * F.vc 817-392-8195
`y Printed on recycled paper