HomeMy WebLinkAboutContract 55744Received Date: May 24, 2021
Received Time: 10:02 am
Developer and Project Information Cover Sheet:
Developer Company Name
Address, State, Zip Code:
Phone & Email:
Authorized Signatory, Title
Project Name:
Brief Description:
Project Location:
Plat Case Number:
FP-19-126
Mapsco: Not Provided
CFA Number: CFA21-0035
Forestar (USA) Real Estate Group, Inc.
2221 E. Lamar Blvd., Suite 790 Arlington, Texas 76006
(817) 769-1873 � Kevinlazares(a�forestar.com
Daniel C. Bartok, Chief Executive Officer
Watersbend South Phase 6
Water, Sewer, Paving, Storm Drain, Streetlights
Wagley-Robertson Rd & Bailey-Boswell Drive
Plat Name: Watersbend South
Council District: 7
City Project Number: 102477 � IPRC19-0238
OFFICIAL RECORD
CITY SECRETARY
FT. W�RTH, TX
City of Fort Worth, Texas
Standard Community Facilities Agreement
Rev. 2/21
Page 1 of 18
City Contract Number: 55744
STANDARD COMMUNITY FACILITIES AGREEMENT
This COMMUNITY FACILITIES AGREEMENT ("Agreement") is made and entered into by
and between the City of Fort Worth ("City"), a home-rule municipal corporation of the State of Texas,
acting by and through its duly authorized Assistant City Manager, and Forestar (USA) Real Estate Group,
Inc. ("Developer"), acting by and through its duly authorized representative. City and Developer are referred
to herein individually as a"party" and collectively as the "parties."
WHEREAS, Developer is constructing private improvements or subdividing land within the
corporate limits of Fort Worth, Texas or its extraterritorial jurisdiction, for a project known as Watersbend
South Phase 6 ("Project"); and
WHEREAS, the City desires to ensure that all developments are adequately served by public
infrastructure and that the public infrastructure is constructed according to City standards; and
WHEREAS, as a condition of approval of the Project, Developer is required to bear a portion of
the costs of municipal infrastructure by constructing the public infrastructure necessary for the Project as
described in this Agreement ("Community Facilities" or "Improvements"); and
WHEREAS, as a condition of approval of the Project, Developer is required to meet the additional
obligations contained in this Agreement, and Developer may be required to make dedications of land, pay
fees or construction costs, or meet other obligations that are not a part of this Agreement.; and
WHEREAS, the City is not participating in the cost of the Improvements or Project; and
WHEREAS, the Developer and the City desire to enter into this Agreement in connection with
the collective Improvements for the Project;
NOW, THEREFORE, for and in consideration of the covenants and conditions contained herein,
the City and the Developer do hereby agree as follows:
1.
CFA Ordinance
The Community Facilities Agreements Ordinance ("CFA Ordinance"), as amended, is incorporated
into this Agreement by reference, as if it was fully set forth herein. Developer agrees to comply with all
provisions of the CFA Ordinance in the performance of Developer's duties and obligations pursuant to this
Agreement and to cause all contractors hired by Developer to comply with the CFA Ordinance in
connection with the work performed by the contractors. If a conflict exist between the terms and conditions
of this Agreement and the CFA Ordinance, the CFA Ordinance shall control.
City of Fort Worth, Texas
Standard Community Facilities Agreement
Rev. 2/21
�FFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
2.
Incorporation of Engineering Plans
The engineering plans for the Improvements that have been approved by the City ("Engineering
Plans") are incorporated into this Agreement by reference as if fully set out herein. Developer shall provide
at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to
construct the Improvements required by this Agreement.
3.
Description of Improvements; Exhibits and Attachments
The following exhibits describe the generallocation, nature and extent of the Improvements that
are the subject of this Agreement and are attached hereto and incorporated herein by reference:
� Exhibit A: Water
� Exhibit A-1: Sewer
� Exhibit B: Paving
❑X Exhibit B-1: Storm Drain
❑X Exhibit C: Street Lights & Signs
The Location Map and Cost Estimates are also attached hereto and incorporated herein by
reference. To the extent that Exhibits A, A-1, B, B-1, C, the Location Map, or the Cost Estimates
conflict with the Engineering Plans, the Engineering Plans shall control. If applicable, Attachment 1—
Changes to Standard Community Facilities Agreement, Attachment 2— Phased CFA Provisions, and
Attachment 3— Concurrent CFA Provisions, are attached hereto and incorporated herein for all
purposes.
4.
Construction of Improvements
Developer agrees to cause the construction of the Improvements contemplated by this Agreement
and that said construction shall be completed in a good and workmanlike manner and in accordance with
all City standards and specifications, the Engineering Plans, the Cost Estimates provided for the
Improvements, and this Agreement. Developer acknowledges that City will not accept the Improvements
until the City receives affidavits and lien releases signed by Developer's contractors verifying that the
contractors, and all subcontractors and material suppliers, have been paid in full for constructing the
Improvements, and consent of the surety on payment and performance bonds provided for the
Improvements.
5.
Financial Guarantee
Developer has provided the City with a financial guarantee in the form and amounts set forth in
this Agreement which guarantees the construction of the Improvements and payment by Developer of
all contractors, subcontractors, and material suppliers far the Improvements ("Financial Guarantee").
Developer shall keep the Financial Guarantee in full force and effect until released by the City and shall
not reduce the amount of the Financial Guarantee unless authorized by the City in accordance with the
CFA Ordinance.
City of Fort Worth, Texas Page 3 of 18
Standard Community Facilities Agreement
Rev. 2/21
6.
Completion Deadline; Extension Periods
This Agreement shall be effective on the date this Agreement is executed by the City's Assistant
City Manager ("Effective Date"). Developer shall complete construction of the Improvements and
obtain the City's acceptance of the Improvements within two (2) years of the Effective Date ("Term").
If construction of the Improvements has started during the Term, the Developer may request that this
Agreement be extended for an additional period of time ("Extension Period"). All Extension Periods shall
be agreed to in writing by the City and the Developer as set forth in a written amendment to this Agreement.
In no event shall the Term of this Agreement plus any Extension Periods be for more than three years.
7.
Failure to Construct the Improvements
(a) The City may utilize the Developer's Financial Guarantee to cause the completion of the
construction of the Improvements if at the end of the Term, and any Extension Periods, the
Improvements have not been completed and accepted by the City.
(b) The City may utilize the Developer's Financial Guarantee to cause the completion of the
construction of the Improvements or to cause the payment of costs for construction of the
Improvements before the expiration of the Term, and any Extension Period, if the Developer
breaches this Ageement, becomes insolvent, or fails to pay costs of construction.
(c) If the Financial Guarantee is a Completion Agreement and the Developer's contractors ar suppliers
are not paid for construction costs or materials supplied for the Improvements the contractors and
suppliers may place a lien upon any properry which the City does not have an ownership interest
that is the subject of the Completion Agreement.
(d) Nothing contained herein is intended to limit the Developer's obligations under the CFA
Ordinance, this Agreement, the Financial Guarantee, Developer's agreements with Developer's
contractors, or other related agreements.
8.
Termination
If Developer desires to terminate this Agreement before Developer's contractors begin
constructing the Improvements, Developer agrees to the following:
(a) that Developer and City must execute a termination of this Agreement in writing;
(b) that Developer will vacate any final plats that have been filed with the county where the Project
is located; and
(c) to pay to the City all costs incurred by the City in connection with this Agreement, including
time spent by the City's inspectors at preconstruction meetings.
9.
Award of Construction Contracts
City of Fort Worth, Texas Page 4 of 18
Standard Community Facilities Agreement
Rev. 2/21
(a) Developer will award all contracts for the construction of the Improvements and cause the
Improvements to be constructed in accordance with the CFA Ordinance.
(b) Developer will employ construction contractors who meet the requirements of the City to construct
the Improvements including, but not limited, to being prequali�ed, insured, licensed and bonded to
construct the Improvements in the City.
(c) Developer will require Developer's contractors to provide the City with payment and performance
bonds naming the City and the Developer as dual obligees, in the amount of one hundred percent
(100%) of the cost of the Improvements as required by the CFA Ordinance. The payment and
performance bonds shall guarantee construction of the Improvements and payment of all
subcontractors and material suppliers. Developer agrees to require Developer's contractors to
provide the City with a maintenance bond naming the City as an obligee, in the amount of one
hundred percent (100%) of the cost of the Improvements, that guarantees correction of defects in
materials and warkmanship for the Improvements by the contractor and surety for a period of two
(2) years after completion and final acceptance of the Improvements by the City. All bonds must
be provided to the City before construction begins and must meet the requirements of the City's
Standard Conditions, Chapter 2253 of the Texas Government Code, and the Texas Insurance Code.
(d) Developer will require Developer's contractors to provide the City with insurance equal to or in
excess of the amounts required by the City's standard specifications and contract documents for
developer-awarded infrastructure construction contracts. The City must be named as an additional
insured on all insurance policies. The Developer must provide the City with a Certificate of
Insurance (ACORD or form approved by the State of Texas), supplied by each contractor's
insurance provider, which shall be made a part of the Project Manual.
(e) Developer will require the Developer's contractors to give forty-eight (48) hours' advance notice
of their intent to commence construction of the Improvements to the City's Construction Services
Division so that City inspection personnel will be available. Developer will require Developer's
contractors to allow construction of the Improvements to be subject to inspection at any and all
times by the City's inspectors. Developer will require Developer's contractors to not install or
relocate any sanitary sewer, storm drain, or water pipe unless a City inspector is present and gives
consent to proceed, and to allow such laboratory tests as may be required by the City.
(fl Developer will not allow Developer's contractors to begin construction of the Improvements until
a notice to proceed to construction is issued by the City.
(g) Developer will not allow Developer's contractors to connect buildings to service lines of sewer and
water mains constructed pursuant to this Agreement, if any, until said sewer, water mains and
service lines have been completed to the satisfaction of the City.
10.
Utilities
Developer shall cause the installation or adjustment of utilities required to: (1) serve the Project;
and (2) to construct the Improvements required herein. City shall not be responsible for payment of any
costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with
any of the Improvements to be constructed pursuant to this Agreement.
City of Fort Worth, Texas Page 5 of 18
Standard Community Facilities Agreement
Rev. 2/21
11.
Easements and Rights-of-Way
Developer agrees to provide, at its expense, all necessary rights-of-way and easements required for
the construction and dedication to the City of the Improvements provided for by this Agreement.
12.
Liability and Indemnification
(a) DEVELOPER HEREBY RELEASES AND AGREES TO INDEMNIFY, DEFEND AND
HOLD THE CITY HARMLESS FOR ANY INADEQUACIES IN THE PRELIMINARY
PLANS, SPECIFICATIONS, ENGINEERING PLANS, AND COST ESTIMATES
SUPPLIED BY THE DEVELOPER FOR THIS AGREEMENT.
(b) THE DEVELOPER COVENANTS AND AGREES TO, AND BY THESE PRESENTS DOES
HEREBY INDEMNIFY, HOLD HARMLESS AND DEFEND THE CITY, ITS OFFICERS,
AGENTS AND EMPLOYEES FROM ALL SUITS, ACTIONS OR CLAIMS OF ANY
CHARACTER, WHETHER REAL OR ASSERTED, BROUGHT FOR OR ONACCOUNT OF
ANYINJURIES OR DAMAGES SUSTAINED BYANYPERSONS, INCL UDING DEATH, OR
TO ANY PROPERTY, REStILTING FROM OR IN CONNECTION WITH THE
CONSTR UCTION, DESIGN, PERFORMANCE OR COMPLETION OF ANY WORK TO BE
PERFORMED BY SAID DEVELOPER, ITS CONTRACTORS, SIIBCONTRACTORS,
OFFICERS, AGENTS OR EMPLOYEES, OR IN CONSEQUENCE OF ANY FAIL URE TO
PROPERLYSAFEGUARD THE WORK, OR ONACCOUNT OFANYACT, INTENTIONAL
OR OTHERWISE, NEGLECT OR MISCONDUCT OF SAID DEVELOPER, ITS
CONTRACTORS, SUB-CONTRACTORS, OFFICERS, AGENTS OR EMPLOYEES. IF, DUE
TO THE JOINT, CONCURRING, COMPARATIVE OR CONTRIBUTORY FAULT,
NEGLIGENCE OR WILLFUL MISCONDUCT OF THE PARTIES WHICH GIVES RISE TO
DAMAGES FOR WHICH THE CITYIS ENTITLED TO INDEMNIFICATION UNDER THIS
SECTION, THEN SUCH DAMAGES SHALL BE ALLOCATED BETWEEN THE PARTIES
IN PROPORTION TO THEIR RESPECTIVE DEGREES OF FAULT, NEGLIGENCE OR
WILLFUL MISCONDUCT CONTRIBUTING TO SUCHDAMAGES.
(c) DEVELOPER WILL REQUIRE ITS CONTRACTORS TO INDEMNIFY, DEFEND AND
HOLD HARMLESS THE CITY, ITS OFFICERS, AGENTS AND EMPLOYEES FROM
AND AGAINST ANY AND ALL CLAIMS, SUITS OR CAUSES OF ACTION OF ANY
NATURE WHATSOEVER, WHETHER REAL OR ASSERTED, BROUGHT FOR OR ON
ACCOUNT OF ANY INJURIES OR DAMAGES TO PERSONS OR PROPERTY,
INCLUDING DEATH, RESULTING FROM, OR INANY WAY CONNECTED WITH, THE
CONSTRUCTION OF THE IMPROVEMENTS CONTEMPLATED HEREIN IF, DUE TO
THE JOINT, CONCURRING, COMPARATIVE OR CONTRIBUTORY FAULT,
NEGLIGENCE OR WILLFUL MISCONDUCT OF THE CONTRACTOR AND THE CITY
WHICH GIVES RISE TO DAMAGES FOR WHICH THE CITY IS ENTITLED TO
INDEMNIFICATION UNDER THIS SECTION, THEN SUCH DAMAGES SHALL BE
ALLOCATED BETWEEN THE CONTRACTOR AND CITY IN PROPORTION TO THEIR
RESPECTIVE DEGREES OF FAULT, NEGLIGENCE OR WILLFUL MISCONDUCT
CONTRIBUTING TO SUCHDAMAGES. FURTHER, DEVELOPER WILL REQUIRE ITS
CONTRACTORS TO INDEMNIFY, DEFEND, AND HOLD HARMLESS THE CITY FOR
ANYLOSSES, DAMAGES, COSTS OR EXPENSES SUFFERED BY THE CITY OR CAUSED
AS A RESULT OF SAID CONTRACTORS' FAILURE TO COMPLETE THE WORK AND
City of Fort Worth, Texas Page 6 of 18
Standard Community Facilities Agreement
Rev. 2/21
CONSTRUCT THE IMPROVEMENTS IN A GOOD AND WORKMANLIKE MANNER,
FREE FROM DEFECTS, IN CONFORMANCE WITH THE CFA ORDINANCE, AND IN
ACCORDANCE WITHALL PLANSAND SPECIFICATIONS.
13.
Right to Enforce Contracts
Upon completion of all work associated with the construction of the Improvements, Developer will
assign to the City a non-exclusive right to enforce the contracts entered into by Developer with its
contractors, along with an assignment of all warranties given by the contractors, whether express or implied.
Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City
the right to enforce such contracts as an express intended third party beneficiary of such contracts.
14.
Estimated Fees Paid by Developer; Reconciliation
Prior to execution of this Agreement, Developer has paid to the City the estimated cost of
administrative material testing service fees, construction inspection service fees, and water testing lab fees
in the amounts set forth in the Cost Summary section of this Agreement. Upon completion of the
construction of the Improvements, the City will reconcile the actual cost of administrative material testing
service fees, construction inspection service fees, and water testing lab fees with the estimated fees paid
by Developer. If the actual costs of the fees are more than the estimated payments made by the Developer,
the Developer must pay the difference to the City before the Improvements will be accepted by the City. If
the actual costs of the fees are less than the estimated payments made by the Developer, the Ciry will refund
the difference to the Developer. If the difference between the actual costs and the estimated payments made
by the Developer is less than fifty dollars ($50.00), the City will not issue a refund and the Developer will
not be responsible for paying the difference. The financial guarantee will not be released by the City or
returned to the Developer until reconciliation has been completed by the City and any fees owed to the City
have been paid by the Developer.
15.
Material Testing
The City maintains a list of pre-approved material testing laboratories. The Developer must
contract with material testing laboratories on the City's list. Material testing laboratories will provide copies
of all test results directly to the City and the Developer. If the Improvements being constructed fail a test,
the Developer must correct or replace the Improvements until the Improvements pass all retests. The
Developer must pay the material testing laboratories directly for all material testing and retesting. The City
will obtainproof from the material testing laboratories that the material testing laboratories have been
paid in full by the Developer before the City will accept the Improvements.
16.
Notices
All notices required or permitted under this Agreement may be given to a party by hand-
delivery ar by mail, addressed to such party at the address stated below. Any notice so given shall be
deemed to have been received when deposited in the United States mail so addressed with postage
prepaid:
CITY: DEVELOPER:
City of Fort Worth, Texas Page 7 of 18
Standard Community Facilities Agreement
Rev. 2/21
Development Coordination Office
City of Fort Worth
200 Texas Street
Fort Worth, Texas 76102
With copies to:
City Attorney's Office
City of Fort Worth
200 Texas Street
Fort Worth, Texas 76102
and
City Manager's Office
City of Fort Worth
200 Texas Street
Fort Worth, Texas 76102
Forestar (USA) Real Estate Group Inc.
2221 E. Lamar Blvd., Suite 790
Arlington, Texas 76006
Attn: Stephen Brim
Forestar (USA) Real Estate Group Inc.
Attn: Carrie R. Cappel
2221 E. Lamar Blvd., Suite 790
Arlington, Texas 76006
Or to such other address one party may hereafter designate by notice in writing addressed and
mailed or delivered to the other party hereto.
17.
Right to Audit
Developer agrees that, until the expiration of three (3) years after acceptance by the City of the
Improvements constructed pursuant to this Agreement, that the City shall have access to and the right to
examine any directly pertinent books, documents, papers and records of the Developer involving
transactions relating to this Agreement. Developer agrees that the City shall have access during normal
working hours to all necessary Developer facilities and shall be provided adequate and appropriate
workspace in order to conduct audits in compliance with the provisions of this section. The City shall give
Developer reasonable advance notice of intended audits.
Developer further agrees to include in all contracts with Developer's contractors for the
Improvements a provision to the effect that the contractor agrees that the City shall, until the expiration of
three (3) years after final payment under the contract, have access to and the right to examine any directly
pertinent books, documents, papers and records of such contractor, involving transactions to the contract,
and further, that City shall have access during normal working hours to all of the contractor's facilities, and
shall be provided adequate and appropriate work space in order to conduct audits in compliance with the
provisions of this section. City shall give Developer's contractors reasonable advance notice of intended
audits.
18.
Independent Contractor
It is expressly understood and agreed that Developer and its employees, representative, agents,
servants, officers, contractors, subcontractors, and volunteers shall operate as independent contractors as to
all rights and privileges and work performed under this Agreement, and not as agents, representatives or
City of Fort Worth, Texas Page 8 of 18
Standard Community Facilities Agreement
Rev. 2/21
employees of the City. Subj ect to and in accordance with the conditions and provisions of this Agreement,
Developer sha11 have the exclusive right to control the details of its operations and activities and be solely
responsible for the acts and omissions of its employees, representatives, agents, servants, officers,
contractors, subcontractors, and volunteers. Developer acknowledges that the doctrine of respondeat
superior shall not apply as between the City and its officers, representatives, agents, servants and
employees, and Developer and its employees, representatives, agents, servants, officers, contractors,
subcontractors, and volunteers. Developer further agrees that nothing herein shall be construed as the
creation of a partnership or joint enterprise between City and Developer. It is further understood that the
City shall in no way be considered a co-employer or a joint employer of Developer or any employees,
representatives, agents, servants, officers, contractors, subcontractors, and volunteers of Developer.
Neither Developer, nor any officers, agents, servants, employees or subcontractors of Developer shall be
entitled to any employment benefits from the City. Developer shall be responsible and liable for any and
all payment and reporting of taxes on behalf of itself, and any of employees, representatives, agents,
servants, officers, contractors, subcontractors, and volunteers.
The City, through its authorized representatives and employees, shall have the sole and exclusive
right to exercise jurisdiction and control over City employees.
19.
Applicable Law; Venue
This Agreement shall be construed under and in accordance with Texas law. Venue shall be in
the state courts located in Tarrant County, Texas or the United States District Court for the Northern
District of Texas, Fort Worth Division.
20.
Non-Waiver
The failure of the City to insist upon the performance of any term or provision of this Agreement
or to exercise any right herein conferred shall not be construed as a waiver or relinquishment to any extent
of City's right to assert or rely on any such term or right on any future occasion.
21.
Governmental Powers and Immunities.
It is understood that by execution of this Agreement, the City does not waive or surrender
any of its governmental powers or immunities.
22.
Headings
The paragraph headings contained herein are for the convenience in reference and are not intended
to define or limit the scope of any provision of this Agreement.
23.
Severability
In the event that any clause or provision of this Agreement shall be held to be invalid by any
court of competent jurisdiction, the invalidity of such clause or provision shall not affect any of the
City of Fort Worth, Texas Page 9 of 18
Standard Community Facilities Agreement
Rev. 2/21
remaining provisions hereof.
24.
Review of Counsel
City and Developer, and if they so choose, their attorneys, have had the opportunity to review
and comment on this document; therefore any rule of contract construction or interpretation that would
normally call for the document to be interpreted as against the drafting party shall not apply in
interpretation of this Agreement, and each section, portion, and provision of this Agreement shall be
construed solely on the basis of the language contained therein, regardless of who authored such
language.
25.
Prohibition on Boycotting Israel
Developer acknowledges that in accordance with Chapter 2271 of the Texas Government Code,
the City is prohibited from entering into a contract with a company with 10 or more full-time employees
that has a value of $100,000 or more that is to be paid wholly or partly from public funds of the City for
goods or services unless the contract contains a written verification from the company that it: (1) does not
boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel"
and "company" has the meaning ascribed to those terms by Chapter 2271 of the Texas Government Code.
To the extent that Chapter 2271 of the Government Code is applicable to this Agreement, by signing this
Agreement, Developer certifies that Developer's signature provides written verification to the City that
Developer: (1) does not boycott Israel; and (2) wi11 not boycott Israel during the term of this Agreement.
26.
Immigration and Nationality Act
Developer shall verify the identity and employment eligibility of its employees who perform work
under this Agreement, including completing the Employment Eligibility Verification Form (I-9). Upon
request by City, Developer shall provide City with copies of all I-9 forms and supporting eligibility
documentation for each employee who performs work under this Agreement. Developer shall adhere to all
Federal and State laws as well as establish appropriate procedures and controls so that no services will be
performed by any Developer employee who is not legally eligible to perform such services. DEVELOPER
SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES,
LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY DEVELOPER,
DEVELOPER'S EMPLOYEES, SUBCONTRACTORS, AGENTS, OR LICENSEES. City, upon written
notice to Developer, shall have the right to immediately terminate this Agreement for violations of this
provision by Developer.
27.
Amendment
No amendment, modification, or alteration of the terms of this Agreement shall be binding unless
the same is in writing, dated subsequent to the date hereof, and duly executed by the City and Developer.
28.
Assignment and Successors
City of Fort Worth, Texas Page 10 of 18
Standard Community Facilities Agreement
Rev. 2/21
Developer shall not assign or subcontract all or any part of its rights, privileges, or duties under this
Agreement without the prior written consent of City. Any attempted assignment or subcontract without the
City's prior written approval shall be void and constitute a breach of this Agreement.
29.
No Third-Party Beneficiaries
The provisions and conditions of this Agreement are solely for the benefit of the City and
Developer, and any lawful assign or successor of Developer, and are not intended to create any rights,
contractual or otherwise, to any other person or entity.
30.
Compliance with Laws, Ordinances, Rules and Regulations
Developer, its officers, agents, servants, employees, and contractors, shall abide by and comply
with all laws, federal, state and local, including all ordinances, rules and regulations of City. It is agreed
and understood that, if City calls to the attention of Developer any such violation on the part of Developer
or any of its officers, agents, servants, employees, or subcontractors, then Developer shall immediately
desist from and correct such violation.
31.
Signature Authority
The person signing this Agreement on behalf of Developer warrants that he or she has the legal
authority to execute this Agreement on behalf of the Developer, and that such binding authority has been
granted by proper order, resolution, ordinance or other authorization of the entity. The City is fully entitled
to rely on this warranty and representation in entering into this Agreement.
32.
Counterparts
This Agreement may be executed in multiple counterparts, each of which will be deemed an
original, but which together will constitute one instrument.
33.
Entire Agreement
This written instrument, together with any attachments, exhibits, and appendices, constitutes the
entire understanding between the City and Developer concerning the work to be performed hereunder, and
any priar or contemparaneous, oral or written agreement that purports to vary from the terms hereof shall
be void.
[REMAINDER OF PAGE INTENTIONALLY BLANK]
City of Fort Worth, Texas Page 11 of 18
Standard Community Facilities Agreement
Rev. 2/21
34.
Cost Summary Sheet
Project Name: Watersbend South Phase 6
CFA No.: CFA21-0035
Ite ms
A. Water and Sewer Construction
1. Water Construction
2. Sewer Construction
Water and Sewer Construction Total
B. TPW Construction
1. Street
2. Storm Drain
3. Street Lights Installed by Developer
4. Signals
TPW Construction Cost Total
City Project No.: 102477 IPRC No.: IPRC19-0238
Total Construction Cost (excluding the fees)
Estimated Construction Fees:
C. Construction Inspection Service Fee
D. Administrative Material Testing Service Fee
E. Water Testing Lab Fee
Total Estimated Construction Fees:
Developer's Cost
$ 161,601.00
$ 227,573.00
$ 389,174.00
$ 354,592.00
$ 118,979.00
$ 34,184.00
$ -
$ 507,755.00
$ 896,929.00
$37,500.00
$11, 074.00
$2,040.00
$ 50,614.00
Ch oice
Financial Guarantee O tions, choose one Amount Mark one
Bond = 100% $ 896,929.00 X
Com letion A reement = 100% / Holds Plat $ 896,929.00
Cash Escrow Water/Sanitar Sewer= 125% $ 486,467.50
Cash Escrow Pavin /Storm Drain = 125°/o $ 634,693.75
Letter of Credit = 125°/a $ 1,121,161.25
City of Fort Worth, Texas Page 12 of 18
Standard Community Facilities Agreement
Rev. 2/21
IN WITNESS WHEREOF, the City and Developer have each executed this Agreement by their
duly authorized signatories to be effective on the date executed by the City's Assistant City Manager.
CITY OF FORT WORTH
�� B��Gr�J�f
DanaBurghdoff(Nay20,2 P:46CDT)
Dana Burghdoff
Assistant City Manager
DEVELOPER
Forestar (USA�, Real Estate Group Inc.
�G��r.�(i ��r. ,td�
Danlel C Bartok (May2Q 20211324 CDT)
Daniel C. Bartok
Chief Executive Officer
Date: May 20, 2021
Recommended by:
��¢�+s�tr�e�. �a�E �tC�c.�
�/ <J
Evelyn Roberts/Jennifer Ezernack
Project Assistant
Planning and Development
AppYoved as to Form & Legality:
� ��
Richard A. McCracken (May2Q 202115:39 CDT)
Richard A. McCracken
Sr. Assistant City Attorney
M&C No.
Date: May 20, 2021
,o,,�,�".-FORr u��
Form 1295: � p�o�°°°°°�o�L�d
��' ° �oi►�
p�o 0
d�o o�
ATTEST: �v o o =
o �
��d� ��°°�0000�°°� *�
�-,�l� G,�` �� �EXASa�'.d
Mary J. Kayser/ Ronald Gonzales
City Secretary / Assistant City Secretary
Date: May 20, 2021
Contract Compliance Manager:
By signing, I acknowledge that I am the person
responsible for the monitoring and
administration of this contract, including
ensuring all performance and reporting
requirements.
� %Gl/'l%� cSGGlYG2�� /�/IDl�Gi�G�I
Janie Scarlett Morales (May 2Q 202ll5:01 CDT)
Janie Scarlett Morales
Development Manager
OFFICIAL RECORD
CITY SECRETARY
FT. W�RTH, TX
City of Fort Worth, Texas
Standard Community Facilities Agreement
Rev. 2/21
Page 13 of 18
The following attachments are incorporated into this Agreement. To the extent a
conflict exists between the main body of this Agreement and the following attachments, the
language in the main body of this Agreement shall be controlling.
Included Attachment
0 Attachment 1- Changes to Standard Community Facilities Agreement
0 Attachment 2— Phased CFA Provisions
❑ Attachment 3— Concurrent CFA Provisions
0 Location Map
� Exhibit A: Water Improvements
0 Exhibit A-1: Sewer Improvements
0 Exhibit B: Paving Improvements
� Exhibit B-1: Storm Drain Improvements
� Exhibit C: Street Lights and Signs Improvements
0 Cost Estimates
(Remainder of Page Intentionally Left Blank)
City of Fort Worth, Texas Page 14 of 18
Standard Community Facilities Agreement
Rev. 2/21
ATTACHMENT "1"
Changes to Standard Community Facilities Agreement
City Project No. 102477
None
City of Fort Worth, Texas Page 15 of 18
Standard Community Facilities Agreement
Rev. 2/21
ATTACHMENT "2"
Phased CFA Provision
City Proj ect No. 102477
The improvements being constructed by Developer pursuant to this Agreement will
connect to improvements Developer is constructing under a separate Community Facilities
Agreement that have not been completed and accepted by the City. Therefore, this Agreement
shall be considered a"Phased CFA" and the provisions contained in this section shall apply to this
Agreement.
The improvements being constructed by Developer under the separate Community
Facilities Agreement shall be defined as the "Parent Project." The improvements being
constructed by Developer under this Agreement shall be defined as the "Child Project."
Developer acknowledges and agrees that due to Developer's election to construct a Phased
CFA, the potential exists for technical, delivery, acceptance or performance problems (hereinafter
"Construction Problems"). Construction Problems may include, but are not limited to: failure of
the improvements to comply with the approved plans or City Specifications; failure of the
improvements in the Parent Project and the Child Project to properly connect to each other;
changes to the design ar construction of the improvements in the Parent Project that impact the
design and construction of the improvements in the Child Project; construction delays, delay
claims, ar claims far liquidated damages; increased costs for the Developer; failure of the
improvements to pass inspection or material testing; or rejection by the City of some or all of the
improvements and Developer having to remove and reconstruct the improvements at Developer's
expense. In addition, Developer understands and agrees that disputes may arise between
Developer's contractors or their subcontractors relating to responsibility for the Construction
Problems. Developer shall be solely responsible for resolving disputes between contractors or
disputes between contractors and subcontractors.
Developer further acknowledges and agrees that Developer has notified all of Developer's
contractars for the Project that Developer has elected to construct a Phased CFA, the provisions
of this section, the risks associated with a Phased CFA, and that the City shall not bear any
responsibility for Developer's decision to proceed with a Phased CFA.
Developer shall not make the final connection of the improvements in the Child Project to
the improvements in the Parent Project until the improvements in the Parent Project have been
constructed and accepted by the City and the City has consented to Developer making the
connection.
Developer agrees that if this Agreement is for improvements relating to the construction,
renovation or modification of one ar mare single family residential homes or structures, the City
will not record the plat related to the Project until the improvements are constructed and accepted
by the City. Developer agrees that if this Agreement is for improvements relating to the
City of Fort Worth, Texas Page 16 of 18
Standard Community Facilities Agreement
Rev. 2/21
construction, renovation or modification of one or more commercial buildings or structures, the
Developer shall not receive a Certificate of Occupancy from the City for the building(s) related to
the Project until the improvements in this Agreement are constructed and accepted by the City.
Developer further understands and agrees that completion of the improvements under this
Agreement does not entitle Developer to obtain a final plat of the property until all other
requirements of Federal law, State law, or the City Code relating to the filing and recording of a
final plat have been met by Developer.
BY CHOOSING TO CONSTRUCT A PHASED CFA, DEVELOPER ASSUMES
ALL RISKS AND DEVELOPER SHALL BE LIABLE AND RESPONSIBLE FOR ANY
AND ALL DAMAGES, INCLUDING BUT NOT LIMITED TO ANY AND ALL
ECONOMICDAMAGESPROPERTYLOSS, PROPERTYDAMAGESANDPERSONAL
INJURY, (INCL UDING DEATH), OFANYKIND OR CHARACTER, WHETHER REAL
ORASSERTED. DEVELOPER HEREBYEXPRESSLYRELEASESANDDISCHARGES
CITY FROM ANY AND ALL LIABILITY FOR DAMAGES, INCLUDING, BUT NOT
LIMITED TOANYANDALL ECONOMICDAMAGES, PROPERTYLOSS, PROPERTY
DAMAGE AND PERSONAL INJURY (INCLUDING DEATH) ARISING OUT OF OR IN
CONNECTION WITH, DIRECTL Y OR INDIRECTL Y, THE CONSTRUCTION OF THE
IMPROVEMENTS OR DEVELOPER'S DECISION TO CONSTRUCT A PHASED CFA.
DEVELOPER, AT ITS SOLE COST AND EXPENSE, AGREES TO AND DOES HEREBY
INDEMNIFY, DEFEND PROTECT, AND HOLD HARMLESS CITY, AND CITY'S
OFFICERS, REPRESENTATIVES, AGENTS, EMPLOYEES, AND SERVANTS FOR,
FROMAND A GAINST ANYAND ALL CLAIMS (WHETHER A T LA W OR INEQUITY),
LIABILITIES, DAMAGES (INCLUDING ANY AND ALL ECONOMIC DAMAGES,
PROPERTYLOSS, PROPERTYDAMAGESAND PERSONAL INJURIES INCLUDING
DEATH), LOSSES, LIENS, CAITSES OF ACTION, SUITS, JUDGMENTS AND
EXPENSES (INCLUDING, BUT NOT LIMITED TO, COURT COSTS, ATTORNEYS'
FEES AND COSTS OF INVESTIGATION), OF ANY NATURE, KIND OR
DESCRIPTION ARISING OR ALLEGED TO ARISE BY OR IN ANY WA Y RELATED
TO CONSTRUCTION OF THE IMPROVEMENTS OR DEVELOPER'S CHOICE TO
CONSTRUCT A PHASED CFA, OR (2) BY REASON OF ANY OTHER CLAIM
WHATSOEVER OF ANY PERSON OR PARTY OCCASIONED OR ALLEGED TO BE
OCCASIONED IN WHOLE OR IN PART BY THE CONSTRUCTIONS OF THE
IMPROVEMENTS OR DEVELOPER'S CHOICE TO CONSTRUCT A PHASED CFA
WHETHER OR NOT SUCH INJURIES, DEATH OR DAMAGES ARE CAUSED, IN
WHOLE OR IN PART, BY THE ALLEGED NEGLIGENCE OF THE CITY OF FORT
WORTH, ITS OFFICERS, SERVANTS, OR EMPLOYEES.
City of Fort Worth, Texas Page 17 of 18
Standard Community Facilities Agreement
Rev. 2/21
DEVELOPER:
Forestar (USA) Real Estate Group Inc.
T����' Sc�.�
Danicl C Bartok (May 2Q 20211324 CDT)
Name: Daniel C. Bartok
Title: Chief Executive Officer
Date: May 20, 2021
City of Fort Worth, Texas Page 18 of 18
Standard Community Facilities Agreement
Rev. 2/21
CPN 102477
MA.PSCO # 19Y
��� '�� �(:1�� �� �:; �:J�� ��1 �(�� � ( � �
I" I I \ � I� ��,
; �i�� •,. I I:���� i���_
�I' �,' " � ' • ' : .�
,_:,�:. •_;:�:.•.:�c� �_
�AQ roxr•.si:a��
�i e. �.aMaR e�w. su�rE �so
a�.rrc�roN. nc �soos
972-702-8699
\ I" �•, III . ''1� _' i
PR�AAR� 9Y
cC �De�i�
�t�sx,��. �
��-�-�
«. ,
Meeo (81»'J78-4s79
V
�
V
�
�
�
n
n
9
�
o.
Q
�
L
O
i
a
4
1.
.�
L
�
L
-�--
7
O
�
�
�
�
�
�
�
�
0
�
�
�
�
a
�
�
-�
�
�
�
N
L
�
�
O
�
i
�
�
a
/
W
V/C/NITY MAP
,•-�
`` ,�\ I I .I\.11�)I .\ I,� ��•�l ..I � II
I" f I �\ � I : �.�
, .,�
:� � � ��:, .
N'' // •
NOT D(ISTNIG
R�FRASTRUCTURE
CPNR 102139
D(STING
WFRASTRUCTURE
CPNN 002304
EXISTNG
R�F'RASTRUCTURE
CPNX 101507
��x� �:
tC �DBVIl�T3
II }�ffA�tSHAY.L Y
��-��-�
� .�.
� �,� s�a.$�
� :��: � .:� .�,:�.�:�
��� li,()I�I;ti'T�I�
�i E. uwnR e�w. surE �so
a�TON. Tx �soos
s�2-�o2-ssss
N
W�E
$
��C�1L.�1G� 1„ � �9�/id�9
lr�1J°�Y
LEQEND
��N PROPOSED WATER LINE
W EXISTING WATER LINE
NOTE�
ALL WATER LINES SHOWN
ARE S' IN DIAMETER UNLESS
OTHERWISE NOTED
N
O
N
�
�
�
�
O
N
i
a
Q
N
�
�
O
L
a
�i�i '� � �.����: �.� ��) ���)� � � �
���� �.���� , %1
' ` I:�I^
:�� ir.
CPN1024T7
PR�A4� SY:
c��I)WINB
}�IfA�tSHAI..�. Y
av� e+on�s - �uru�e - s�uEro�s
�. ,
� c�,� �.,�
nsv�,a�ro�rr�:
�� F()Ri;ti'I'1R
2221 E. LAMAR BLVD. SIAI'E 790
a�.r�roN. rx �soos
s72-�o2-asss
N
W�E
S
���][..lE: l" _ ?.�QD'
LE(3END
��6 PROPOSED SANITARY
SEWER LINE
S EXISTING SANITARY
SEWER LINE
NOTE �
ALL PROPOSED SANITARY SEWER
LINES SHOWN ARE 8' IN DIAMETER
N
O
N
�
N
�
�
�
�
a
a
_�
�
0
�
n
Q
�
U
�
I
N
�
O
s
�
�
L
7
O
�
I
�
c
N
.a
N
i
N
O
�
/
�
L
�
L
7
O
N
�
C
N
�
N
L
N
O
�
/
N
C
O
�
/
�
C
N
�
N
L..
N
O>
>
�
�
�
�
i
w
��` '� I I. I� ti I:� I.\ I�) �(�) I I I I
I"f I ���I �.�
�. ���•. :,�:�
:� � i r•.
w� • � r
\
PR�Ait� B7C:
c��DWIN�1
1�� (fAYt.S�IAI.g., il
av� e�or,�e - ruw+e�s - �
�ao (�� sa�-�s�
�
�m� F(1R1;�'I'\li
2221 E. UWM �VD. BUTE 780
ARL.1rOTON. 1X 76006
972-702-8699
N
W�E
$
��C�II.IE: 1" = 200'
L.E(IEND
_�-- � 1 1
i
�_ 1---�
5' SIDEWALK BY HOMEBUILDER
O ADA RAMPS PER THIS CONTRACT
� '-/ '�'� >:
,�
PROPOSED 29'B-B ROADWAY
w/ 50' R.O.W.
6' THICK REINFORCED
CONCRETE PAVEMENT
5' SIDEWALK PER THIS CONTRACT
EXISTING 5' SIDEWALK
EXISTING 29' B-B ROADWAY
w/ 50' R.O.W.
6' THICK REINFORCED
CONCRETE PAVEAiENT
N
O
N
O
�
�
O
N
�
a
a
�
�
�
��� �� ��� :����a��e���� �c��� .��< <
�" f f . -� � � . ��l
; ,� �,. � Y, �r . j�
:� A II:1+:, ; � i:,
� � �r
--
� � b
^� N Rl Q LL7 rD 1'�� m A 0 � � � �
— — �
��QQ��000008�
N I NQI � I � ( � ( � I � I `� I � I �i OI �
�'�'7`i i�� �
s� u �
�€■ ��
��
• : �
�
`
PR�i►R� Bx:
�II�D��
�/ffAIL�F$AL.L._ �I _ _ __
au�eao�s— �— �mv�v�
�
��eno �a�� sxws�s
D6V�,OF�1IdWP�t:
�i�P I+ORGS7'AR
2221 E. LAMM 9.VD. Sl�?E 790
ARI.IiGTON. 1'X T6006
972-702-8699
— — � �
N N
N
N
�
� �
�
�
.�
°�
� � �
\ �
/
�
�
<7
N
W�E
s
►±�l.�L'alLrlGe � N � /�/M�9
�Yi"li�
LEC;END
- PROPOSED STORM DRA/N LN1lE
EXISTING STORM ORAIN LINE
� PROPOSED STORM DRAlN IA�ET
� PROPOSED STORM DRA/N DROP IJ�ET
N
O
N
�
M
N
�
!Li
�
�
a
Q
i
Li
O
L
a
a
�
U
�
�
�
N
O
L
�
�
S
7
O
�
I
v
c
�
�
N
L
N
O
�
/
�
L
�
.�L-
7
O
�
�
�
�
�
N
N
O
�
N
C
O
�
/
�
C
N
.a
N
i
�
0
�
I
�
�
O
/
w
" . �1 I I!. I \ � I�) � . \ I,� � �•� ( . . I I �
I�� � � �\ , l �� ��l
i s'� i"�' ' iC��' ` II' �,� �
r:�1���i 11111L I ! � �
Ii" //
N
W�E
S
��C111WG.�a �11 � /yR�,9
6,rQWY
N
O
N
�
d-
N
�
�
�
i
d
Q
.�
LL
O
i
a
Q
LL
U
�
L
�
�
0
n
�
PR�AR� BY:
(��D@VII�i�
� 12. $�Ai T- �
cive. oao�s - x�r� - ��
.om. 1
r�eoo te+n a��a�s
nBV�OPID�p�lpl�t:
�j�� I'ORESTAR
2221 E. LAMAR �VD. SU1'E 780
a�roN. Tx isoo�
972-702-8699
LE�END
PROPOSED LIGHT POLE �$
PROPOSED STREET SIGN .
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
Wateisbend South, Phase 6, City Project #102477
UNIT PRICE BID
Project Item Informarion Bidde�s Proposal
BidGst SpeciScation Unit of Bid
Item Descriprion Section No. Measwe [tunntin Unit Price Bid Value
Water Facilities
1 3305.0109 Trench Safet
2 3311.0001 Ductile Iron Water I
3 3311.0241 8" PVC Water Pipe
4 3312.0001 Std. Fire H drantA
5 3312.0117 Connectto Existin
6 3312.2003 1" Domestic Water
w/ Restraint
33 12 40
33 12 25
33 1210
33 12 20
LF
EA
EA
EA
EA
0.5
2,123
3
2
64
4
Subtotal
9 33�5.�109 Trench Safe
10 3305.a1 13 Trench Water Stn s
11 3331.3� 0� SDR-26 4" Sewer Services
12 3331.4115 8" SDR-26 PVC Sewer Pipe
13 3331.4116 8" PVC Sanitary Sewer Pipe w/ CSS Backfill
14 3339.1001 4' Std. Dia. Manhole
15 3339.1003 4' Extra Depth Manhole
16 9999.0001 Connect to Existin 8" Sewer
Sanitary Sewer Subtotal
Storm Drain Facilities
3305.0112 Concrete Collar
3341.0201 21" RCP, Class III
3341.0205 24" RCP, Class III
3341.0208 27" RCP, Class III
3349.0001 4' Storm Junction Box
3349.4105 24" SET, 1 pipe
3349.4106 27" SET, 1 pipe
3349.5001 10' Curb Inlet
Storm Drain Subtotal
WaterlSanitary SewerlStorm Drein Facilkies Subtotal
CIfY OF FORT WOR1H
STANDARO CON57Ai7CTION Hm PROPOSALDEVGIAPEA AWAROID PROffiC1S
Fam Revisad Januery 29, 207A
33 05 15 EA 4 3500.1](1 �2.000.00
33 31 50 EA 63 5675.06 342.525.U�
33 11 10,
33 31 12, LF 2,546 $44.00 $112,024.00
33 31 20
331710, LF 131 $54.00 $7,074.00
3311 12
33 39 10, EA 10 $4,000.00 $40,000.00
33 39 20
33 39 10, VF 49 $185.00 $9,065.00
33 39 20
00 00 00 EA 1 51.500.00 $1.50D.00
330510
33 0517
33 41 10
33 41 10
35 41 10
33 49 10
33 49 40
33 49 40
SY
LF
EA
LF
LF
LF
EA
EA
EA
101
632
3
221
411
95
5
2
1
.00
$508,153.00
Watas6�d South Pheae 6
Ciry Proj 1 q102477
00 42 43_Bid Pmpasnl
SECTION 00 42 43
Developer Awarded Pmjects - PROPOSAL FORM
Watersbend South, Phase 6, Ciry Project #102477
UNIT PRICE BID
Project Item Informarion Bidder's Proposal
Bidlist Description Specification Unit of Bid Unit Price Bid Value
Item Section No. Measure Quantity
Paving Facilities
3211.0400 H drated Lime ¢ 321bs./S.Y. (Residential) 32 11 29 TON 129.2 $185.00 $23,902.00
3211.0501 6" Lime Treated Sub rade IResidential} 32 11 29 SY 8,070 $3.00 $24,210.OD
3213.0101 6" Concrete Pavement (Residential} 3213 13 SY 7,593 $38.00 $288,534.00
3213.0301 4" Conc Sidewalk 31 13 20 SF I 1.768 $3.25 �5.746.OD
00 00 00 EA 4
00 00 00 EA 12
Paving Subtotal
Bid
Facilities Subtotal
Grand Tqial
This bid is submitted by the entity listed below:
Company: Conatser Construction TX, L.P. 8y: Brock Huggins
Street Address: 5327 Wichita Street �
City, State, Zip Code: Ft. Worth, TX 76779
Phone: 817-534-1743 Slgna
Title: President
Date:
Contractor agrees to complete WORK for FINAL ACCEPTAIVCE within 90 working days after the date when the
CONTRACT commences to run as provided in the General Conditions.
END OF SECTION
S20,o00.D0
5882,745.00
C1IYOFFORTWORI7{ Wetnahmd SouW Phese6
STANDARDCON57RUC110NBmPROPOSA4DEVEIAPERAWARDEDPRO]EC75 CiryProjeq K102477
FormRevieed 7enuary 29, 2020 0� 42 43 Hid Pmposfll
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
Watersbend South, Phase 6, City Project #102477
UNIT PRICE BID
Project Item Informauon Bidder's Proposal
Bidlist Specification Unit of Bid
Item Description Unit Price Bid Value
Secrion No. Measure (�uantiry
Street Lighting Facilities
3441.1633 Type 33B Arm
3441.3201 LED Liqhting Fixture
3441.3301 Rdwy Illum Foundation TY 1,2, and
3441.3341 Rdwy Illum TY 11 Pole
2605.3011 2" CONDT PVC SCH 40 (T)
3441.1408 NO 6 Insulated Elec Condr
Street Lighting Subtotal
41 20
EA
EA
EA
LF
S
8
8
8
104
This bitl is submitted by the entity listed below:
Campany: Conatser Construction TX, L.P. By: 8rock Huggins �
Street Address: 5327 Wichita Street
City, State, Zip Code: Ft. Worth, TX 76119
Phone: 817-534-1743 Signat
Thle: President
Date:
Contractor agrees to complete WORK for FINAI, ACCEPTANCE within 30 worki¢g days after the date when tAe
CONTRACT wmmences to run as provided in Ne General Conditlons.
END OF SECTION
C77YOFFORTWOR7}I Wa[ersE�d South PLeae6
STANDABD CONSIRUC7ION Hm PROPOSAUDEVEIAPE2 AWARDm PRO7EC15 CiTy Anject q702477
Frnm Revisad ]avuazy 29, 201A 00 42 43_Bid Proposel