Loading...
HomeMy WebLinkAboutContract 42543-CO3 (2) MYSECRETARY FORT WORTH. City of Fort Worth CONTRACT N0. "14� Change Order Request ..� Project Namel Butler-McClure Drainage,Paving,Water,and Sewer Improvements City Sec# 1 42543 Client Project#(s)l 00475 Project Description Paving,Drainage,Water,and Sewer Contractorl Conatser Construction TX,LP Change Order# �3 Date 7l3/2013 City Project Mgr.1 Michael Owen City Inspector Michael Collier Dept. TPW Water Sewer Contract Time Totals (CD) Original Contract Amount $1,618,576.50 $0.00 $1,618,576.50 270 Extras to Date $21,990.00 $60,950.00 $82,940.00 20 Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $1,640,566.50 $60,950.00 $1,701,516.50 290 Amount of Proposed Change Order $39,440.00 $0.00 $0.00 $39,440.00 100 Revised Contract Amount $1,680,006.50 $60,950.00 $1,740,956.50 390 Original Funds Available for Change Orders $48,577.50 $48,577.50 Remaining Funds Available for this CO $26,587.50 $0.00 $26,587.50, Additional Funding('rf necessary) $12,852.50 $12,852.50 CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 7.56% MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) [727023,220.63 S MTM#WAWW§) CKANW ORDER Permanent erosion measures(P550 and S150 Erosion Blankets)were recommended by SW Field Operations to better protect the slopes of the newly constructed relief channel and to allow for ease of maintenance. Also fencing around structures were added to provide better protection for the public./r AU d OFFICIAL RECORD °oo° ICY CITY SECRETARY aiy J. s , Ct Secre 00000 4Icy FT.WORTH,TX S It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full(both time and money)for all costs arising out of,or incidental to,the above Change Order. Contractor's Company Name Contractor(Name) Contract signalm Date Conatser Construction TX,LP Inspector/inspection Supervisor Date Project Manager/Pragram Manager Date t Director(Dept) Date MPOW, tV Department(Dept) Date Fr tip' 3r 1 W • /it I t 4. Date Ass' Manager Date Councr�Aaron(3t reQ�ed) M&C Number M&C Date Approved RECEIVED JUL 2 3 2013 I 1 ■ FORT WORRT_H® City of Fort Worth Change Order Request Project Name I Butler-McClure Drainage,Paving,Water,and Sewer Improvements = City Sec# 1 42543 Client Project#(s)l 00475 Project Description Paving,Drainage,Water,and Sewer Contractorl Conatser Construction TX,LP Change Order# 0 Date 7/3/2013 City Project Mgr.I Michael Owen City Inspector Michael Collier Dept Ti?W Water Sewer Contract Time Totals (CD) Original Contract Amount $1,618,576.50 $0.00 $1,618,576.50 270 Extras to Date $21,990.00 $60,950.00 $82,940.00 20 Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $1,640,566.50 $60,950.00 $1,701,516.50 290 Amount of Proposed Change Order $39,440.00 $0.00 $0.00 $39,440.00 100 Revised Contract Amount $1,680,006.50 $60,950.00 $1,740,956.50 390 Original Funds Available for Change Orders $48,577.50 $48,577.50 Remaining Funds Available for this CO $26,587.50 $0.00 $26,587.50 Additional Funding(if necessary) $12,852.50 $12,852.50 CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 7.56% MAXALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $2,023,220.63 JUSTIFICATION(REASONS)FOR CHANGE ORDER Permanent erosion measures(P550 and S150 Erosion Blankets)were recommended by SW Field Operations to better protect the slopes of the newly constructed relief channel and to allow for ease of maintenance. Also fencing around structures were added to provide better protection for the public. 1 I It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full(both time and money)for all costs arising out of,or incidental to,the above Change Order. Contractor's Company Name Contractor(Name) Contract Signature Date Conatser Construction TX,LP r Inspector/Inspect io Supervisor, Date Project Manaagler/Progr nager Date Assistant Director(Dept) Datetrading Department(Dept) Date / J A rant C' Date Assistant 2 ity Manager Date Council Action(if required) M&C Number � M&C Date Approved ri FORT WORTH® City of Fort worth Change Order Request Project Namel Butler-McClure Drainage,Paving,Water,and Sewer Improvements City Sec# 1 42543 Client Project#(s)l 00475 Project Description Paving,Drainage,Water,and Sewer Contractorl Conatser Construction TX,LP Change Order# 0 Date 7/3/2013 City Project Mgr.I Michael Owen City Inspector Michael Collier Dept TPW Water Sewer Contract Time Totals (CD) Original Contract Amount $1,618,576.50 $0.00 $1,618,576.50 270 Extras to Date $21,990.00 $60,950.00 $82,940.00 20 Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $1,640,566.50 $60,950.00 $1,701,516.50 290 Amount of Proposed Change Order $39,440.00 $0.00 $0.00 $39,440.00 100 Revised Contract Amount $1,680,006.50 $60,950.00 $1,740,956.50 390 Original Funds Available for Change Orders $48,577.50 $48,577.50 Remaining Funds Available for this CO $26,587.50 $0.00 $26,587.50 Additional Funding(f necessary) $12,852.50 $12,852.50 CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 7.56% MAXALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $2,023,220.63 JUSTIFICATION(REASONS)FOR CHANGE ORDER Permanent erosion measures(P550 and S150 Erosion Blankets)were recommended by SW Field Operations to better protect the slopes of the newly constructed relief channel and to allow for ease of maintenance. Also fencing around structures were added to provide better protection for the public. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full(both time and money)for all costs arising out of,or incidental to,the above Change Order, Contractor's Company Name Contractor(Name) Contract Signature Date Conatser Construction TX,LP Inspector inspection Supervisor Date Project Manager/Program Manager Date t Assistant Director(Dept) Date Director,Contracting Department(Dept) Date t G' ttom Date Assistant City Manager Date Council Action(if required) M&C Number M&C Date Approved FORT WORTH, City of Fort worth Change Order Request Project Name I Butler-McClure Drainage,Paving,Water,and Sewer Improvements City Sec# 1 42543 Client Project#(s)l 00475 Project Description Paving,Drainage,Water,and Sewer Contractorl Conatser Construction TX,LP Change Order# 0 Date 7/3/2013 City Project Mgr.I Michael Owen City Inspector FMichael Collier Dept. TPW Water Sewer Contract Time Totals (CD) Original Contract Amount $1,618,576.50 $0.00 $1,618,576.50 270 Extras to Date $21,990.00 $60,950.00 $82,940.00 20 Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $1,640,566.50 $60,950.00 $1,701,516.50 290 Amount of Proposed Change Order $39,440.00 $0.00 $0.00 $39,440.00 100 Revised Contract Amount $1,680,006.50 $60,950.00 $1,74-0,956.50 390 Original Funds Available for Change Orders $48,577.50 $48,577.50 Remaining Funds Available for this CO $26,587.50 $0.00 $26,587.50 Additional Funding(if necessary) $12,852.50 1 1 $12,852.50 CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 1 7.56% MAXALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) 22,023,220.63 JUSTIFICATION(REASONS)FOR CHANGE ORDER Permanent erosion measures(P550 and S150 Erosion Blankets)were recommended by SW Field Operations to better protect the slopes of the newly constructed relief channel and to allow for ease of maintenance. Also fencing around structures were added to provide better protection for the public. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full(both time and money)for all costs arising out of,or incidental to,the above Change Order. Contractor's Company Name Contractor(Niarne) Contract Signature Date Conatser Construction TX,LP Inspector/Inspection Supervisor Date Project Manager/Program Manager Date Assistant Director(Dept) Date Director,Contracting Department(Dept) Date Assistant C Atto Date Assistant City Manager Date Council Action(if required) M&C Number M&C Date Approved m ' M 0 LD N LiO LD M to O 4t be, _ U 00 N C U) N U � 0 C � J _N O i o 0 t =0 C) U A LO �# cL N co N � N 01 U 4- c 0 t N ri U c v d! � t°0o � U a p � Z a a 0- o c VF- Q L. 'O CL ILL E Q v O0 3 0 CO tio U c r _ _ U U � 3 c C% m CD F U CCO Cp O Ca � C 2 CO N 0 =3 c p W 0 � 3 0 U 0 CL) c U) a� c Y N cu r ca �:-. C t f6 C6 a U C C U_ 0 m o c m cn o 0 0 F a> a* c o E ` o N U U 01 O W ca 0 O Y � � O CO � U w a to r 00 0 0 co CD 0 0 0 0 0 v V9 ors of M cn 69 N C O "0 O fn N ~ O H 7 N O N N 00 (0 d C O a=� Q N N 00 C m L U m 0 c+) N C'7 O N C= O U N C _T U o m 0 c m 0 H U am m L U T N a N O U 4-- c 0 L c U c Q) N r m = U a O t i:, to c 0 > W Q O _J U. 'a E ❑ 'O O 3 aD v Cl) bo cca V = m s _ U cu V m 3 a> c Cl) a a co a N J X m m c c_ coo m U N 2 N coO =C p C 3 U O _ p� n a� U ti C m L � C U m o � U g Z n m 3cn E.. (D U o a ac) a �+ o U 0 0 0 6 0 0 c 0 m 0 N O N N 00 c0 a c 0 v v 0 v O v to c cc t U MWWBE Breakdown for this Change Order MWBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders CO# DATE AMOUNT 1 3/18/2013 $7,910.00 2 5/21/2013 $75,030.00 Total $82,940.00